ANNUAL REPORT, DEPARTMENT OF THE ARMY
        Fiscal Year Ended June 30, 1952



      ANNUAL REPORT OF THE

CHIEF OF ENGINEERS
                               U. S. ARMY


                                  1952
                           IN TWO PARTS

                                PART 1
                                    Vol. 1




                        DE:PT, CF TVE ARMlY .-....
     OFFTCE OF iTiE CHEF OF ENGINEERS
                                     LIRA Y
                                 UNITED STATES
                       GOVERNMENT PRINTING OFFICE
                                WASHINGTON : 1953




     For sale by the Superintendent of Documents, U. S. Government Printing Office
                    Washington 25, D. C. - Price $3.25 (Buckram)
U,3        n


       I                .

                                                  CONTENTS

                                                                                                             Page

                                                                                                 Voldme 1 'Volue~


      Introductory pages-----------------------------------                                              1           ---
      NEW ENGLAND DIVISION__-                       -----------------                    --             25
      NORTH ATLANTIC DIVISION:
               New York, N. Y., district_-         ----------------             -153    __
               Philadelphia, Pa., district ----------------------------             261-----
               Baltimore, Md., district -----------                 - -----   -     311
               Washington, D. C., district------------------                -----   379
               Norfolk, Va., district__--------               __-- --------         421      _
      SOUTH ATLANTIC DIVISION:
               Wilmington, N. C., district------------------ -------                                  467
               Charleston, S. C., district----------------------------                                505
               Savannah, Ga., district -----------------------------                                  521
               Jacksonville, Fla., district_----          --- ------------                            549
               Mobile, Ala., district_-         ---------                                             651
      LOWER MISSISSIPPI VALLEY DIVISION:
               New Orleans, La., district-         _------------------------                          713
               Vicksburg, Miss., district---              - --                                        815
               Memphis, Tenn., district-          --                                                  847
      SOUTHWESTERN DIVISION:
          Galveston, Tex., district_-            -                                                    859--8
          Fort Worth, Tex., district-----------927                                                                ....
          Albuquerque, N. Mex., district- __969--____             ___..._                            969
          Little Rock, Ark., district _-              -_________-________-                           991
          Tulsa, Okla., district-- -----------------------------                                    1055_
      UPPER MiSSISS1PI VALLEY DIVISION:
               St. Louis, Mo., district-_-----__-__-__             __ -___
                                                                         ......                                          1119
               Mississippi River between the Missouri River and Mi-
                 neapolis, Minn------------------------------------------                                                1163
               Rock Island, Ill., district -_________  _______           ___-_ ..                                        1179
               St. Paul, Minn., district-------------------------------------                                            1203
      MISSOURI RIVER DIVISION:
               Kansas City, Mo., district _-- ---..--------.-- ...              ------         -                         1241
               Omaha, Nebr., district-------..--------.....     ---------------                                          1301
               Garrison,, N. Dak., district ..               __  ____-       ___ _ ___-
                                                                                    ........     _                       1347
                                             ..-------------
               Fort Peck, Mont., district_----                                       .....--- ..                         1361
      OHIO RIVER DIVISION:
               Ohio River, ......
                              -----------------------------------------------                   1381
               Nashville, Tenn., district......------------------------------------1395
               Louisville, Ky., district -------------------------------------.....             1439
               Huntington, W. Va., district- --........--------  --                 ..... --    1513
               Pittsburgh, Pa., district _-----            - - --------......  --            -__1573
      GREAT LAKES DIVISION:
               Duluth, Minn., district__----.------..---               _____- -     ...                                  1641
               Milwaukee; Wis., district .........-                                                                      1669
               Chicago, Ill., district __-           --------------------                                                1745
                                           .........----------
               Detroit, Mich., district_------                                  _ _1795
               Buffalo, N. Y., district--------------------------------------                                            1841
               U. S. Lake Survey ----------------------------------                   -------                            1911
      SOUTH PACIFIC DIVISION:
                                             .......-.-
               Los Ange4qs, Calif., district----                                     -   --         -    -    -          1919
               San Francisco, Calif., district- -----------                                   -1979
               Sacramento, Calif., district_------                             ---            -- ---------- -            2039
                                                                                                               II

                              PROPLTY OF THE
                         UNITED STATES GOVERNMENT
                                   US-CE-C
IV                                          CONTENTS


                                                                                         Page

                                                                                Volume 1    Volume 2

NORTH PACIFIC DIVIsIoN:
     Portland, Oreg., district_......--------------.----_                            _ _           2105
     Seattle, Wash., district -------------------------------------                                2197
     Walla Walla, Wash., district_                           _____------------_
                                                                              ........         -2259
     Alaska district----------------------- -----------                         ------             2285
The Board of Engineers for Rivers and Harbors--------------------.                                 2307
The Beach Erosion Board_---------                    .. -------------                     --  -....2311
California Debris Commission_---   .       ---------
Mississippi River Commission _____.____________
                                                                 - --
                                                                      -.-
                                                                         ...
                                                                       .___-
                                                                             --------- ..          2315
                                                                                                   2331
Waterways Experiment Station                                 ___
                                                             ____                          __      2385
Permanent International Association of the Congresses of
  Navigation--.----      ----------------- ------------------------..                              2387
Interoceanic Canal surveys --           _-.. ------------------------------                        2389
Investigations and supervision of projects under the Federal
  Water Power Act -------------------------------------------                                      2391
Miscellaneous Civil Works         --------------------------------------     .....                 2393
                               REPORT

                                  OF

     THE CHIEF OF ENGINEERS
                     UNITED STATES ARMY



                                  DEPARTMENT OF THE ARMY
                                  OFFICE::OF THE CHIEF OF ENGINEERS
                                  October 156, 1959


Subject: Annual Report, Fiscal Year 1952
To:      The Secretary of the Army


     I present for your information the following report for the fiscal
year 1952 on the civil works activities of the Department of the Army
which are carried out by the Corps of Engineers. This report pre-
sents the engineering, statistical, and fiscal information regarding the
authorized Federal improvements for navigation, flood control, and
related water resource developments, similar to that contained in
previous annual reports of the Chief of Engineers.
                                          LEWIS A. PIcK
                             Lieutenant General, Chief of Engineers
                                                              1
2      REPORT OF CHIEF OF ENGINEERS, U.          S. ARMY,   1952

               APPROPRIATIONS AND EXPENDITURES

   For use in the fiscal year 1952 net funds made available to the Corps
of Engineers for river and harbor operations amounted to $192,826,278
and for flood-control operations $423,760,075, a total of $616,586,353.
The expenditures from the available funds, including the balances on
hand at the beginning of the fiscal year, amounted to $619,800,665.69,
of which $2'14,956,865.25 was for river and harbor work and allied
operations and $404,843,800.44 for flood control and related work.
New work was completed on 25 river and harbor and flood-control
projects, materially advanced on 87 other projects and maintenance
operations were in progress on 246 projects.
   The policy of the Corps of Engineers to have work performed by
contract, except when the best interests of the United States require
hired labor operations, has been followed during the year, 78 percent
of all work performed having been done by contract and 22 percent
by Government plant and hired labor.
   The continuation of an adequate check on the cost of work per-
formed on river and harbor and flood-control projects has been main-
tained. Summary of these efforts is reflected throughout this report.
   In keeping with the President's directive to all Government agen-
cies to curtail nondefense expenditures, the Corps of Engineers' con-
struction program for rivers and harbors and flood control was care-
fully screened to include only those projects which, as directed by the
President, directly contribute to national defense or to civilian re-
quirements essential in the changed international situation. There-
fore, many worthwhile authorized river and harbor and flood-control
projects that could not be considered as meeting the requirements of
the established criteria have been deferred for the duration of the
present emergency.
                       ACCIDENT PREVENTION

  During fiscal year 1952 the application of comprehensive accident
prevention to all new work operations and maintenance continued to
hold accidental injuries to a low level.

                       RIVERS AND HARBORS

   Program: The present program for Federal improvement of rivers
and harbors for navigation and allied purposes as authorized by Con-
gress includes projects located throughout the continental United
States, Puerto Rico, Alaska, and the Hawaiian Islands. The total esti-
mated cost to complete all authorized river and harbor projects pres-
ently deemed necessary in the interest of commerce and navigation is
about $4,298,400,200.
   Planning: New funds appropriated by the Civil Functions Appro-
priation Act, 1953, approved July 11, 1952, for advance planning for
river and harbor projects total $405,000. These funds, together with
unobligated balances will be used to carry on the planning program
during fiscal year 1953.
                        RIVERS AND    HARBORS                        3
   Navigation operations: Improvement operations were carried out on
46 river and harbor projects, of which 9 were completed. Maintenance
operations were performed on 246 projects, including the numerous
coastal ports, harbors, and connecting channels on the Great Lakes,
and the extensive Intracoastal Waterway and Mississippi River net-
works, together with the operation and care of the canalized Ohio
River system, Illinois Waterway, the Upper Mississippi River, and the
hydroelectric power plants on the Columbia River at Bonneville Dam,
Oreg. and Wash., and the Missouri River at Fort Peck Dam, Mont.
   In addition to the above-mentioned hydroelectric projects, many of
the navigation dams that have been completed or are under construc-
tion have been authorized as multiple purpose projects in river and
harbor legislation or, most recently, in omnibus bills covering both
flood-control and river and harbor projects. These multiple purpose
projects have been designed to serve in the interest of navigation,
flood control, and the production of hydroelectric power. In this con-
nection, it may be noted that the authorizing legislation with respect
to general project features, including local cooperation, reservoir
management, recreation, disposal of power referred to in detail here-
after under Flood Control-General, is synonymous in many respects
with river and harbor legislation for the authorization of multiple
purpose navigation dams.
   It will be noted from the above that the Corps of Engineers' civil
works construction program for the fiscal year 1952 was limited to
those projects which would contribute directly to national defense or
to essential civilian requirements as well as conserve the resources of
men, materials, and equipment. In keeping with this program, a
review was made by the Bureau of the Budget of all projects which
were eligible for appropriation under Public Law 203, Eighty-second
Congress, approved October 24, 1951. The Bureau of the Budget
approved the program as it complied in all aspects with the criteria
established in the Presidential directive.
   Under this curtailed construction program, work was continued
throughout the fiscal year 1952 on 49 river and harbor projects. The
principal navigation projects under construction during the fiscal
year, by-States, are as follows: Demopolis lock and dam, Alabama;
Arkansas River and tributaries, Arkansas and Oklahoma; Jackson-
ville to Miami Waterway, Florida; Jim Woodruff lock and dam,
Georgia and Florida; Chain of Rocks lateral canal, Illinois; Missouri
River from Kansas City, Missouri to Sioux City, Iowa; Gulf Intra-
coastal Waterway-Algiers Cutoff, Louisiana; St. Mary's River power-
house, Michigan; Mississippi River-St. Anthony Falls, Minnesota;
Missouri River, Kansas City to the mouth, Missouri; New York and
New Jersey Channels, New Jersey; Cleveland Harbor, Ohio; McNary
lock and dam, Oregon and Washington; The Dalles lock and dam,
Oregon and Washington; Monongahela River, Pennsylvania and West
Virginia, lock 2, Pennsylvania; Schuylkill River, culm removal, Penn-
sylvania; Cheatham lock and dam, Tennessee; Old Hickory lock and
dam, Tennessee; and Chief Joseph Dam, Washington.
4      REPORT OF CHIEF OF ENGINEERS,         U. S. ARMY,   1952

                 INACTIVE CANALIZED WATERWAYS
   The Corps of Engineers has discontinued the operation and main-
tenance at Federal expense of 65 locks and 29 dams and other struc-
tures on 8 obsolescent waterways, or sections thereof; namely, the
Upper Fox River, Wis.; Illinois and Mississippi Canal, Ill.; Osage
River, Mo.; Green River, Ky.; Big Sandy River, Ky.; Little Kanawha
River, W. Va.; Upper White River, Ark.; and Muskingum River,
Ohio. Commercial navigation on these waterways had receded to the
point where they afforded little or no benefit to general commercial
traffic to justify the continued operation and maintenance of the
structures at Federal expense.
   State and local governmental agencies and industrial concerns have
been given an opportunity to assume the responsibility for mainte-
nance of the discontinued facilities in consideration of the strictly
local benefits derived therefrom.
                              COMMERCE
   The water-borne commerce of the United States, Puerto Rico,
Alaska, and the Hawaiian Islands for the calendar year 1951 is con-
tained in part 2 of the annual report for the fiscal year 1952.
                    WORK FOR OTHER AGENCIES
   Major dredging operations and construction of other fleet facilities
were carried out during the year at various permanent reserve fleet
sites for the United States Maritime Commission with funds trans-
ferred from that agency. Miscellaneous dredging and related work
was also performed for the Navy and other Government agencies on a
reimbursement basis during the year.
                     GENERAL FLOOD CONTROL
  The authorized general flood-control program, exclusive of the pro-
grams for the alluvial valley of the lower Mississippi River and the
Sacramento River, Calif., is covered in this section. The authorized
programs for those two rivers are discussed in the two succeeding
sections.
  Congress in the flood control act approved June 22, 1936, established,
and in the amendatory and supplemental general flood control acts
approved August 28, 1937, June 28, 1938, August 11, 1939, August 18,
1941, December 22, 1944, July 24, 1946, June 30, 1948, and May 17,
1950, reaffirmed the general policy that flood control throughout the
United States is a proper activity of the Federal Government, in
cooperation with the States and local communities, and that the Fed-
eral Government should improve or participate in the improvement of
navigable waters or their tributaries for flood-control purposes, if
such projects are economically justified and if the lives and social
security of people are otherwise adversely affected. Those acts also
specified the local cooperation required for the projects authorized
therein.
   These requirements of local cooperation, in brief, are as follows:
  (a) Dam and reservoir projects authorized in any of the afore-
mentioned flood-control acts are constructed entirely at the expense
                          GENERAL    FLOOD CONTROL                           5
   of the United States and are maintained and operated by the Corps
   of Engineers. No local cooperation is required for dam and reservoir
   projects unless specifically prescribed by special provisions of law.
      (b) For local flood-protection projects, except channel improve-
   ment or channel rectification projects authorized by the acts of 1936,
   1937, and 1938, local iriterests must provide without cost to the United
   States all lands, easements, and rights of way necessary for the con-
   struction of the projects, hold and save the United States free from
   damages due to the construction works, and maintain and operate all
   the works after completion in accordance with regulations prescribed
   by the Secretary of the Army. Channel improvement and channel
   rectification projects authorized by the acts of 1936, 1937, and 1938 are
   built at Federal expense, and no local cooperation is required. Ex-
   ceptions to these general rules are provided by law in the case of certain
   specific projects.
      The Congress stated in the flood control act approved December 22,
   1944, and reaffirmed in the acts approved July 24, 1946, and June 30,
   1948, that in connection with the exercise of jurisdiction over the
   rivers of the Nation through the construction of works of improvement
   for navigation or flood control, it is the policy of the Congress to recog-
   nize the interests and rights of the States in determining the develop-
   ment of the watersheds within their borders, and likewise their in-
   terests and rights in water utilization and control. In conformity
   with this policy Congress provided that plans, proposals, or reports of
   the Chief of Engineers for any works of improvement for navigation
   or flood control not previously authorized, or authorized in the Flood
   Control Act of December 22, 1944, shall be submitted to the Congress
   only after these plans, proposals, or reports have been submitted to
   the governors of the States concerned, or such officials or agencies of
  the affected State, or States, as may be designated by the governors,
   and after coordination with the Secretary of the Interior, if the
" drainage basin under investigation is located in a State lying wholly
  or in part west of the ninety-seventh meridian.
     Authority for the development of recreation facilities in con-
  nection with reservoirs under the control of the Department of the
  Army is contained in the 1944 and 1946 Flood Control Acts which
  authorize the Chief of Engineers, under the supervision of the
  Secretary of the Army to construct, maintain, and operate public
  park and recreational facilities in such reservoir areas and to permit
  the construction, maintenance, and operation of such facilities. The
  acts also authorize the Secretary of the Army to grant leases of lands,
  including structures or facilities thereon, in reservoir areas for such
  periods and upon such terms as he may deem reasonable; and provide
  that the water areas of all such reservoirs shall be open to public use
  generally without charge for boating, swimming, bathing, fishing, and
  other recreational purposes, and ready access to and exit from such
  water areas along the shores-of such reservoirs shall be maintained
  for general public use when such use is determined by the Secretary
  of the Army not to be contrary to the public interest. These acts
  further provide that no use of any such area shall be permitted which
  is inconsistent with the laws for the protection of fish and game of the
  State in which the area is situated.
6      REPORT OF CHIEF OF ENGINEERS,          U. S. ARMY,    1952

   The policy for the development of reservoirs to provide for the
best possible utilization of the water resources of the Nation was
broadened by the 1944 flood control act, which states that whenever
the Secretary of the Army determines upon recommendation by the
Secretary of the Interior that any dam and reservoir project operated
under the direction of the Secretary of the Army may be utilized for
irrigation purposes, the Secretary of the Interior is authorized to
construct, operate, and maintain under the provisions of the Federal
reclamation laws such additional works in connection therewith as
he may deem necessary for irrigation purposes. Such irrigation
works may be undertaken only after a report and findings thereon
have been made by the Secretary of the Interior as provided under
reclamation laws and after subsequent specific authorization of the
Congress (by an authorization act).
   A procedure for the disposal of electric power and energy generated
at reservoir projects under the control of the Department of the Army,
and in the opinion of the Secretary of the Army not required in the
operation of such projects, was prescribed by the Congress in the Flood
Control Act approved December 22, 1944. In accordance with this
legislation such electric power and energy is to be delivered to the
Secretary of the Interior, who shall transmit and dispose of this
power and energy in such manner as to encourage the most widespread
use thereof at the lowest possible rates to consumers consistent with
sound business principles, the rate schedules to become effective upon
confirmation and approval by the Federal Power Commission. The
legislation states that preference in the sale of such power and energy
shall be given to public bodies and cooperatives.
   Authority is contained in section 2 of the Flood Control Act of
August 28, 1937, as amended, for the removal of accumulated snags
and other debris and clearing and straightening the channel in navi-
gable streams and tributaries when, in the opinion of the Chief of
Engineers, such work is advisable.
   The Flood Control Act of 1946 authorized allotment of $1,000,000
per year for the construction of emergency bank protection works
to prevent flood damage to highways, bridge approaches, and public
works when, in the opinion of the Chief of Engineers, such work is
advisable.
   The flood control act approved December 22, 1944, placed upon the
Secretary of War the responsibility of prescribing regulations for
the use of storage allocated for flood control or navigation at reservoirs
constructed wholly or in part with Federal funds.
   The flood control act approved June 30, 1948, was in a sense an
emergency bill, inasmuch as only projects presenting an emergency
or acute condition were considered by the Congressional Committees
on Public Works. That act contained several changes in existing
law, as follows: (a) It provided authorization for the construction
of small flood-control projects, subject to certain conditions of local
cooperation, and economic justification, provided the cost of each
project does not exceed $100,000, and placed a limitation of $2,000,000
per year on the total allotment for this type of remedial work for any
one fiscal year; (b) Increased the scope of emergency repair authority
contained in Section 12 of the Flood Control Act of July 24, 1946,
                       GENERAL   FLOOD CONTROL


by permitting the Corps of Engineers to perform certain necessary
work beyond that required to restore the damaged structure to its
original condition.
     The President, on May 17, 1950, signed into law the first major
omnibus river and harbor and flood-control act since 1946. This act,
in addition to providing authority for the construction of numerous
navigation projects throughout the Nation, authorized the initiation
and continuation of all types of flood-control projects ranging from
small local protection works to comprehensive multiple-purpose
developments for the control and conservation of the floodwaters of
the great river basins, such as the Mississippi, Ohio, and Missouri.
This act, known as Public Law 516, Eighty-first Congress, contains
several changes in existing law as follows: (a) Provides authority for
installation and maintenance of telephone service in dam tenders'
dwellings at flood-control dams; (b) Increases the emergency mone-
tary fund provided for the repair and restoration of existing flood-
control structures threatened or destroyed by floods from $2,000,000
to $15,000,000; (c) Increases the monetary fund provided for the
construction of small flood-control projects not specifically authorized
by Congress from $2,000,000 to $3,000,000 for any one fiscal year with
the provision that not more than $150,000 shall be allotted for this
purpose at any single locality from the appropriation for any one
fiscal year.
    Congress, since passage of the basic flood control law in 1936, has
provided a monetary authorization totaling $3,758,784,400 for the
construction of approximately 994 projects dispersed throughout the
Nation.
    The Civil Functions Department of the Army Appropriation Act,
1953, approved July 11, 1952, made available funds in the amount
of $255,742,800, for flood control, general, projects. This amount,
together with all previously appropriated funds provided for by
the Congress, totals $2,734,200,375, of which $2,600,181,975 was for
the prosecution of the authorized flood control, general, projects,
while the remaining $134,018,400 was for maintenance to completed
projects, surveys, and minor items.
    In addition to these authorizations Congress has approved general
comprehensive plans covering most of the important river basins of
the country and including many additional projects for flood control,
hydroelectric power, and allied water uses. All of these projects are
parts of comprehensive, coordinated plans for the river basins of the
Nation to provide desirable and economic flood protection and allied
benefits for a large number of centers of industry and population and
for many thousands of acres of rich, agricultural land. A number
of reservoirs in the authorized program also provide favorable pos-
sibilities for the economic development of large quantities of hydro-
electric power. Several of the projects now authorized include power-
generating machinery in the initial developments.
   During the year 16 flood control projects were either completed
and in operation or construction work was sufficiently advanced so
that they could be placed in partial operation. Thus, at the end of
the fiscal year, 370 flood-control projects were successfully functioning
in the interest of flood control and allied purposes.
8      REPORT OF CHIEF OF ENGINEERS,        U.   S. ARMY,   1952

   Construction work during the year was continued on 41 flood-con-
trol projects including reservoirs and projects which would provide
benefits of a local character, such as levees, flood walls, channel im-
provements, etc. During the year construction work was initiated
on 5 projects.
   Reservoirs placed in partial operation during the fiscal year in-
cluded the Mansfield Hollow Reservoir, Conn.; the Harlan County
Reservoir, Nebr. ;the Cagles Mill Reservoir, Ind.; the Whitney Reser-
voir, Tex.; the Tenkiller Ferry Reservoir, Okla.; the Mount Morris
Reservoir, N. Y.; the Pine Flat Reservoir, Calif.; and the Albeni
Falls Reservoir, Idaho. Local protection projects placed in partial
operation during the fiscal year included the projects at Portville,
N. Y.; Olean, N. Y.; Mount Clemens, Mich.; Hoosick Falls, N. Y.;
Adams and North Adams, Mass.; Amazon Creek, Oreg.; and Milton-
Freewater, Oreg.
   Floods occurred in many of the major river basins throughout the
Nation during the fiscal year 1952. The most devastating of all was
the flood of March-April 1952 in the Missouri River Basin. Flooding
on the main stem was caused mainly by excessive local runoff and
inflows from flooded tributaries, as a result of the sudden thawing
of a relatively heavy snow cover. Ice jams in the upper Missouri
River were important contributing factors in the areas most severely
flooded in North Dakota. As the flood moved down the Missouri it
surpassed all previous records, including the historic flood of 1881.
Due to its long crest and enormous volume, estimated at 10,000,000
acre-feet, flooding of the more vulnerable points downstream often
preceded the crests by nearly a week.     Major flooding occurred at
Sioux City, Iowa, and points below. All privately built farm levees
were overtopped in the reach between Sioux City and Kansas City.
Three out of the eighteen Federal agricultural levees between Omaha
and Kansas City were overtopped. In order to protect the cities of
Omaha and Council Bluffs, one of the greatest flood fights in history
was waged by the Corps of Engineers in cooperation with Federal,
State, and local agencies. In the fight that saved these cities from
inundation, the Corps of Engineers' employees and their contractors
and Army troops put in nearly 11/2 million man-hours of work. About
5 million sandbags were used, 800,000 feet of lumber and nearly
100,000 tons of stone. At the peak nearly 25,000 people took part
in all phases of the levee defenses at Omaha and Council Bluffs, in-
cluding 7,000 Fifth Army troops and numerous pieces of equipment.
Estimated damage caused by the flood was $179,000,000. Total
damage prevented by existing flood-control works amounted to
$238,580,000.
  The April 1952 flood on the Mississippi River above Keokuk, Iowa,
was the highest on record and came from snowmelt in central and
southern Minnesota. Outstanding floods occurred on the Mustinka,
Sand, Elk, Crow, Rum, and Minnesota Rivers. Record breaking dis-
charges occurred at 38 gaging stations in Minnesota. Flood damage
in Minnesota alone was estimated at $9 million. Estimated damage
caused by the flood was $30,000,000. Damage prevented amounted to
an estimated $24,500,000.
                 SACRAMENTO     RIVER FLOOD CONTROL                    9
   Heavy rainfall fell over the entire State of New Jersey on March
11-12, 1952, with heaviest concentrations along the watersheds of
the northern tributaries of the Passaic River, N. J. The heavy run-
off accompanying the storm inflicted total damages estimated at
$468,000. The Passaic River was in flood stage again on April 5-6,
1952, and a third flood occurred in the basin on June 1-2, 1952. Total
damage in the Passaic River basin from these two floods amounted
to $1,694,500.
   Floods also occurred in southern California during January 1952.
The major stream basins that were affected were Los Angeles River,
San Gabriel River, Rio Hondo, and Ballona Creek. The principal
types of property damaged by the flood were industrial, business,
residential, street, highway, and railroad property; temporary chan-
nel improvements; and debris basins. Estimated damage from flood
waters amounted to $4,510,000. The damage prevented by existing
improvements is estimated at $20,200,000.
                SACRAMENTO RIVER FLOOD CONTROL
    The authorized project for the control of floods and other pur-
poses on the Sacramento River, Calif., as adopted by the flood control
acts approved March 1, 1917, May 15, 1928, August 26, 1937, and
August 18, 1941, provides for the enlargement of river channels, the
excavation of cutoffs, the construction of levees, weirs, bank protec-
tion, and pumping facilities in the lower Sacramento River Valley
and for channel clearing, rectification and snagging on the Sacra-
mento River and tributaries in Tehama County, and from Red Bluff
southerly. The total estimated Federal cost of the project is $61,535,-
000. Up to the present time Federal funds in the amount of $43,811,-
500 have been apropriated by Congress for the prosecution of this
project, including $1,000,000 provided for in the Department of the
Army Civil Appropriations Act, 1953, approved July 11, 1952. Local
interests have expended funds in excess of $52,000,000 on this project
including a cash contribution of approximately $6,761,700 for con-
struction by the Corps of Engineers of protective works related to
the authorized project.
   In addition to this existing project, Congress in the flood control
act approved December 22, 1944, as a part of the general flood-control
program, authorized the modification of the existing project for the
Sacramento River to provide for certain changes and extensions in
levees and other structures, and for the construction of nine local
levee and channel improvements, the Black Butte Dam and Reservoir
and the low Table Mountain Dam and Reservoir with power facilities,
substantially in accordance with the recommendations of the Chief of
Engineers in House Document No. 649, Seventy-eighth Congress,
second session. The estimated Federal cost revised in 1953 is
$113,960,000.
   The projectworks of the Sacramento flood control project provide
protection to cities and towns, to thousands of acres of agricultural
lands, and to railway and highway networks of great importance to
the civilian economy of the western part of the United States.
   Work accomplished during the year included levee construction;
enlargement of uncompleted levees; removal of debris; bank protec-
10      REPORT   OF CHIEF OF ENGINEERS,       U.   S.   ARMY,   1952

tion; rectification of channels; channel clearing; and miscellaneous
work, including preliminary surveys, explorations, and preparation
of contract plans.

                 MISSISSIPPI RIVER FLOOD CONTROL

   Progress was made during the fiscal year 1952 on the flood-control
project for the alluvial valley of the Mississippi River, adopted by
the flood control act approved May 15, 1928, and amended by the acts
approved June 15, 1933, June 28, 1938, August 18, 1941, December 22,
1944, July 24, 1946, June 30, 1948, and May 17, 1950. The 1936 amend-
ment retained the purpose of the 1928 act and the features completed
under that authority, and authorized an additional $272,000,000 for
extension of flood-control work on the lower Mississippi River. The
1938 amendment removed legislative restrictions with respect to cer-
tain features of the amended plan and authorized $40,000,000 for work
in addition to that contemplated for the project as amended in 1936.
The 1941 amendment provided for the abandonment of the Boeuf and
Eudora floodways and extension and for raising main Mississippi
River levees to confine within those levee lines between the mouths
of the Arkansas and Red Rivers the project flood without a floodway
west of the Mississippi River. That amendment also authorized
certain minor modifications and backwater protection in the Yazoo
and Red River backwater areas at an estimated additional cost of
$25,982,000. The 1944 amendment modified the existing project to
provide for a navigation channel 12 feet deep and 300 feet wide at low
water between Cairo, Ill., and Baton Rouge, La., by the execution of a
channel improvement and stabilization program at an estimated cost
of $200,000,000 and also modified the project for flood protection in
the backwater area of the Yazoo River to include additional work at
an estimated cost of $1,952,000. The 1946 amendment increased the
project authorization by $161,675,500 to provide for several new items
of related work; for incorporating in the alluvial valley project items
of work that had been previously adopted under "Flood control,
general" legislation but that were physically located within the alluvial
valley and should be a part of the comprehensive project; and for
the increased cost of construction of the unfinished features of the
comprehensive project. The 1948 amendment modified the project
to provide for the improvement of the Mississippi River with respect
to the West Tennessee tributaries; the improvement of the L'Anguille
River, Ark.; and the Devils Swamp project at Baton Rouge, La.
   The Flood Control Act of 1950 increased the authorization for the
Red River backwater area from $14,000,000 to $29,000,000; authorized
flood control and major drainage improvement in the St. Francis
River Basin at a partial cost of $20,000,000; modified the 1946 Flood
Control Act with respect to local cooperation; authorized the plan
for flood protection in the Cache River Basin at a partial cost of
$10,000,000; amended the 1928 Flood Control Act to include flood-
control improvements in the Parish of Orleans, La.; authorized the
                                SURVEYS                                11
filling of Grant's Canal at Lake Providence, La., at a cost of $11,000;
authorized flood protection for Des Are, Ark., at a cost of $228,000;
authorized the project for Lake Pontchartrain, La., at a cost of
$3,150,000; authorized the project for emergency bank protection on
the Amite River at a cost of $50,000; authorized the project for Grand
Prairie Region and Bayou Meto Basin at a partial cost of $6,000,000
and, in addition to the above items, the Lower Mississippi River project
was increased by an additional $200,000,000. The total authorization
for the project as amended and supplemented is now $1,292,748,500, of
which $768,790,849 has been appropriated through fiscal year 1952.
   In accordance with the provision of the act approved August 18,
1941, "that funds hereafter expended for maintenance shall not be
considered as reducing present remaining balances of authorizations,"
it is estimated that $139,216,975 expended for maintenance since Aug-
ust 18, 1941, or scheduled for expenditure during fiscal year 1952, will
not be deducted from the total authorizations for the project.
   Noteworthy progress was made on principal features of the project
on the main river, on the tributaries and in the side basins. Main-
stem work on levees, revetments, Memphis Harbor and the Morganza
control structures was satisfactorily accomplished. Features in the
Atchafalaya Basin which were vigorously pushed toward completion
included the high-level crossings in the Morganza floodway, and flood
control below Morgan City. Work on the tributaries included acceler-
ation of the construction of the Enid and Grenada Reservoirs, Green-
wood protection works, and Red River backwater levees.
   Under section 6 of the 1928 act, flood-control work was undertaken
on the Mississippi River between Rock Island, Ill., and Cape Girar-
deau, Mo., and on outlets and tributaries affected by backwaters on
the Mississippi River, wherever the local contributions of one-third
of the costs were provided as required by law.
   The Department was able to assist localities in the emergency repair
of flood-control works on tributaries of the Mississippi River threat-
ened or destroyed by flood, under the provisions of section 9 of the
act approved June 15, 1936.
   Work accomplished on the adopted project for the alluvial valley
of the Mississippi River has demonstrated its effectiveness by afford-
ing protection from general overflow for a period of more than twenty
years to date. However, because of the elimination of the Eudora
floodway by the Flood Control Act of 1941, the levee system which
constitutes the major part of the project is not yet sufficiently complete
to afford protection against predicted floods. Even a partial overflow
of the valley may interrupt postal service, transcontinental and inter-
state commerce, and produce widespread destruction and disorder,
national in scope. As flood control of this vast alluvial valley and
navigation of the lower Mississippi River are important to the national
economy and to the security of a large number of people, this project
should be steadily prosecuted toward completion.
12     REPORT OF CHIEF OF ENGINEERS,          U.   S.   ARMY,   1952

                                SURVEYS

    During the year reports in response to 66 items of law enacted by
Congress and resolutions adopted by Congressional committees au-
thorizing investigations of the advisability of potential river and har-
bor and flood-control improvements were completed and transmitted
to Congress with the recommendations of the Chief of Engineers. Of
these investigations, 11 were preliminary examinations and 9 were
surveys made in response to authority contained in river and harbor
and flood-control acts, and 46 were re-examinations undertaken pur-
suant to committee resolutions. Seven of the above re-examinations
were limited to preliminary examination scope and were transmitted
to the Committee on Public Works of the House of Representatives
for authority to submit a report of survey scope. In addition, the
Chief of Engineers completed reports on four cooperative beach ero-
sion control studies and transmitted one interim survey report to
Congress.
   The Public Works Committees of Congress adopted 70 resolutions
requesting review of prior reports on proposed river and harbor and
flood-control improvements.
   "Pursuant to section 205 of the flood control act approved May 17,
1950, the President's directive to the Secretary, Department of the
Army dated October 9, 1950, and resolution adopted by the Federal
Inter-Agency River Basin Committee on October 27, 1950, the New
England-New York Inter-Agency Committee was formed to survey
the resources and related matters of the New England-New York
region. Membership consists of one representative each of the De-
partment of Agriculture, Department of the Army, Department of
Commerce, Department of the Interior, the Federal Power Commis-
sion, and the Federal Security Agency, with the Department of the
Army the Chairman agency. The survey is being conducted in coop-
eration with the governors of the seven States participating in the
survey. Scheduled completion date for the survey report is June 30,
1954. Information and data is being obtained through the field offices
of the Federal agencies and the departments of the seven States,
supplemented by public hearings held throughout the region. Joint
conferences are held monthly with the governors' representatives to
coordinate Federal and State activities. Public hearings have been
held in all of the seven States. The cost of the work during the fiscal
year amounted to $577,957 and expenditures were $593,265. Unex-
pended balance of $154,959, together with an allotment of $410,000
received in fiscal year 1953 and an anticipated allotment of $50,000, a
total of $614,959, less accounts payable of $48,515, will be applied as
needed during fiscal year 1953 to payment of expenses incurred under
this heading. For itemized reports see reports of the New England
Division and the New York and Buffalo Districts."
   "The Flood Control Act of 1950 (approved May 17, 1950) author-
ized and directed the Secretary of the Army to cause preliminary ex-
aminations and surveys for flood control and allied purposes to be
                                SURVEYS                               13
made under the direction of the Chief of Engineers, and authorized
and directed the Secretary of Agriculture to cause preliminary exami-
nations and surveys for runoff and waterflow retardation and soil
erosion prevention of the Arkansas-White-Red River Basins in
Arkansas, Louisiana, Oklahoma, Texas, New Mexico, Colorado, Kan-
sas and Missouri, with the view of developing comprehensive inte-
grated plans of improvement as may be provided for under Federal
policies and procedures, all to be coordinated with the Department
of Interior, Department of Agriculture, Federal Power Commission,
other appropriate Federal agencies, and with the States as required
by existing law." On May 19, 1950, the President of the United States
in identical letters to the secretaries of the interested Federal depart-
ments, requested that they "organize an inter-agency committee, for-
mulate procedure, and map out a joint plan of investigation, indicating
specifically the precise responsibilities of each and the prospective
allocation of agency resources to the joint effort." He further stated
that "because of the language contained in H. R. 5472, it seems de-
sirable that the Department of the Army be designated as the chair-
man agency.       * * *The final product of such a joint inter-agency
investigation should be a single comprehensive report embracing the
coordinated views of all agencies concerned." In compliance with
this request of the President, the Federal Inter-Agency River Basin
Committee in Washington met on June 12, 1950, and by resolution
directed the formation of the Arkansas-White-Red River Basins In-
ter-Agency Committee. This committee consists of one member each
from the Department of the Army, Department of the Interior, De-
partment of Agriculture, Department of Commerce, Federal Power
Commission, and Federal Security Agency. It further provides that
the governors of the eight States referred to "shall be invited by the
Federal Inter-Agency River Basin Committee to participate in the
regular meetings of the Arkansas-White-Red Basins Inter-Agency
Committee for the purpose of keeping the members advised of the
interests of the States in the plans or proposals under discussion."
Col. Louis W. Prentiss, Corps of Engineers, United States Army,
division engineer, Southwestern Division, Dallas, Tex, was chairman
of the Inter-Agency Committee to May 8, 1952; Lt. Col. James B.
Lampert was assigned as acting chairman from that date to June 23,
1952, and Col. Herbert T. Vogel, Corps of Engineers, United States
Army, was division engineer and chairman from June 23, 1952. The
Arkansas-White-Red Office, Southwestern Division, Tulsa, Okla., was
established on August 1, 1950. The officer in charge, AWR Office,
is a direct assistant to the division engineer and acts for him on AWR
matters both within the Corps of Engineers and with other Federal
agencies, and the States. During the fiscal year 1952, the Inter-
Agency Committee has held seven formal and five informal meetings.
Organization and procedures to permit existing Federal and State
agencies to develop a coordinated plan for Arkansas, White, and Red



     245554-53-vo1. 1-   2
14     REPORT OF CHIEF OF ENGINEERS,        U. S. ARMY,   1952

Basins have been the subject of continuing discussions. Other ac-
complishments in fiscal year 1952 have been the completion of study of
present and potential problems and the preparation of "Possible Solu-
tion" summaries for the 17 major subjects to be reported upon. The
report is scheduled to be completed by June 30, 1954.
   The total funds expended for Corps of Engineers' offices for the
AWR report amount to $1,382,978.12 as of June 30, 1952.
   The gathering of hydrological data in Nicaragua, under authority
contained in the river and harbor act approved on June 20, 1938, was
continued.
   The cooperative programs with the United States Weather Bureau
and the Geological Survey for the purpose of more adequately meeting
the requirements of the department in the planning and operation of
flood control and river and harbor improvements were continued.
Projects included in cooperation with the Weather Bureau were: (a)
operation of a nationwide network of recording rain gages; (b) hy-
drometeorological investigations and review of the studies of major
storms of record, the preparation of estimates of maximum possible
precipitation for selected drainage basins, revision of the New York
and New England portion of previously published generalized esti-
mates of maximum possible precipitation, preparation of text and
charts of the most critical winds possible over Lake Okeechobee, prep-
aration of preliminary charts showing seasonal variation of the stand-
ard project storm values for 200 and 1,000 square mile 24-hour values.
       SURVEYS FOR NAVIGATION, FLOOD CONTROL, POWER, AND
                           IRRIGATION

   Existing project.-The existing project provides for making in-
vestigations of those navigable streams and their tributaries whereon
power development appears feasible and practicable, with a view to
the formulation of general plans for the most effective improvement of
such streams for the purposes of navigation and the prosecution of
such improvement in combination with the most efficient development
of the potential water power, the control of floods and the needs of
irrigation.
   The River and Harbor Act of January 21, 1927, adopted the project
as laid down in House Document 308, Sixty-ninth Congress, first
session, and added the following streams to those listed in that docu-
ment: Red River, Yazoo River and tributaries, Pearl River, Altamaha
River and tributaries, tributaries of the Warrior, Coosa, and Tom-
bigbee Rivers. The flood control act approved May 15, 1928, extended
the scope of the investigation and surveys so as to include tributaries
of the Mississippi River system, subject to destructive floods, and laid
down certain additional investigations on these tributaries.
   Further study or review of reports is authorized by section 6 of
the River and Harbor Act of August 30, 1935, reading as follows:
  That the surveys authorized pursuant to section 1 of the River and Harbor
Act of January 21, 1927, and House Document No. 308, Sixty-ninth Congress, first
session, shall be supplemented by such additional study or investigation as the
Chief of Engineers finds necessary to take into account important changes in
economic factors as they occur, and additional streamflow records, or other
factual data.
   Operations and results.--Work on each of the surveys involved was
inaugurated in the spring of 1928. Valuable cooperation has been
received from other Federal agencies; from State, county, and munici-
pal engineers; from levee and drainage districts, hydroelectric com-
panies, railroads, universities, and other local sources of information.
Stream-gaging stations, where needed, have been established mainly
in cooperation with the United States Geological Survey. At the
close of the fiscal year 1949, surveys of 191 streams had been completed
and reports thereon transmitted to Congress, and reports on the re-
maining streams well advanced to completion. For list of reports
transmitted to Congress, see Annual Report for 1938, pages 1953-1957.
In addition, four reports have been transmitted to Congress as follows:

                      Name of stream                            Transmitted
                                                                to Congress
                                                                                    Printed in document No.


Mississippi River above mouth of the Ohio River ._.....Mar.             16,1940    H.   669,   76th   Cong.,   3d sess.
Susquehanna River and tributaries__--..                          Apr.
                                              .....----------------     11, 1942   H.   702,   77th   Cong.,   2d sess.
Muskingum River and its tributaries, Ohio------------........... July   13,1943    H.   251,   78th   Cong.,   1st sess.
St. Marys River, Ga. and Fla., and North River, Ga__             May    17,1948    H.   680,   80th   Cong.,   2d sess.


                                                                                                               15
16     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,           1952

                   MISCELLANEOUS CIVIL WORKS

   Miscellaneous civil works have, as heretofore, been administered by
the Corps of Engineers. These works are varied in character and
include the administration of the Federal laws enacted for the pro-
tection and preservation of the navigable waters of the United States,
which govern the following: Granting of permits for structures or
operations in navigable waters; approval of the location and plans of
bridges, dams, dikes, or causeways; alteration of obstructive bridges;
investigation and removal of sunken vessels or other obstructions
endangering navigation; establishment of regulations for the use,
administration, and navigation of navigable waters, including draw-
bridge regulations; establishment of anchorage grounds, special
anchorage areas, danger zones, dumping grounds, restricted areas,
fishing areas and harbor lines; investigations of the discharge or
deposit of refuse matter of any kind in navigable waters; prevention
of pollution of coastal navigable waters by oil; determination of the
heads of navigation and the extent to which the laws shall apply to
specific streams; supervision of the harbor of New York to prevent
obstructive or injurious deposits in the tidal waters thereof, including
the waters of Long Island Sound; establishment of reasonable rates
of toll for transit across bridges over navigable waters; granting of
permits for the occupation and use of Federal works under control of
the Corps of Engineers; studies for the preservation of Niagara Falls
and the supervision of power companies diverting water therefrom;
reports of international boards on operations affecting international
boundary waters; issuance of instruments authorizing the occupation
of Government-owned land under the jurisdiction of the department;
and legislation in connection with the foregoing.
                                                                            APPROPRIATIONS

     The funds with which the works for the maintenance and improvement of rivers and harbors and flood control
were prosecuted during the fiscal year were derived from unexpended balances of prior appropriations and from the
following appropriation acts, which include not only appropriations made during the fiscal year but also the initial
appropriation for fiscal year 1953.

                                       Appropriation title                                               Date of act                Rveborand              Flood control         I   Miscellaneous          Total by appro-
                                                                                                                                                                                                             priation acts
                                                                                                   a                       i                          i                                                 i




Maintenance and operation, certain Federal water mains outside the District of Columbia, 1950-.         Oct. 13,1949 ................-------------
                                                                                                                 -.       f
                                                                                                                                                      I................------
                                                                                                                                                      t-------
                                                                                                                                                                        -$251.08                        I
                                                                                                                                                                                                        I-----
                                                                                                                                                                                                                     -$251.08

General Appropriation Act, 1951: 1
   Maintenance and improvement of existing river and harbor works.............................           Sept. 6, 1950 -$15,789,000.00                                                                      -15, 789, 000.00
   Alteration of bridges over navigable waters .........            .........................  .       .....   do........ -900, 000.00                                                                          -900, 000.00
   Flood control, general..        --.........-----
                                      ........                .....     -                              .....
                                                                                                       -----..do   .......--..-...........- -$27,563,975.00
                                                                                                               do .......                                                                                   -27, 563, 975. 00
   Flood control, Mississippi River and tributaries___......_________                                  ------------------------------------
                                                                                                               do ....
                                                                                                                                             -5, 022, 000. 00
   Flood control, Sacramento River, Calif.------                   ----- ---------                     -----do-------                          -508, 000.00                                                      -508,000.00     b
   Flood control, Roseville, Ohio_..............                                                                                                                 -432, 000.00                                    -432, 000. 00
   Maintenance and operation, certain Federal water power mains outside the District of Co-
     lumbia, 1951.......    -----------------------------------------------------------            .1                     .---------------
                                                                                                                                  .-----------    -- .----                                -1, 000. 00              -1,000. 00
                                                                                                                                             I             I                                             I
                                                                                                                                                                                                        I----L----------
      Total....----------------------------------------------------------------                                              iCo
                                                                                                                                         WVUU.
                                                                                                                                   n n nnn L oo r9K n
                                                                                                                               -.-..... UO-
                                                                                                                                         8,      UU       -33,     52,      UU
                                                                                                                                                                         5tU.
                                                                                                                                                                                          -1,000
                                                                                                                                                                                          -1,UUU.   0       -50, 215, 975. 00
General Appropriation Act, 1952:
   Maintenance and improvement of existing river and harbor works......---------------------            Oct. 24,1951 - 1,788, -750. 00 ....-            .                            ..         .            -1, 788, 750.00
   Flood control, general ................................                                             .....do ...--------               -5, 534, 025. 0                                                     -5, 534,025. 00
                                                                                                                                                                                                                                 w1
     Total      ------------                -            -        -          -                                       -1.788, 750. 00                       -5, 534, 025. 0 --------------- -7,322,775.00
Flood Control, General, Emergencies-----------------------------------------------                     June 4,1952       .35,                                   000, 000. 00 ---------------- 35.000,00000
Flood Control, General, Emergencies..............-----------------------------------------------       June 5, 1952 ................                         5, 750, 000. 00 ------........---------....... 5, 750, 000.00
Civil Functions Appropriation Act, 1953:
    Maintenance and improvement of existing river and harbor works-...........---...--.---. .          July 11, 1952      236, 788, 800. 00 --.........................---------------------....   236, 788, 800. 00
    Flood control, general.........                                                                                                                                       ................
                                                                                                                                            .. 255, 742,800. 00--------------                      255, 742, 800. 00
    Flood control, general, emergencies       i,       emergencies_................_......._..                            ..............          8, 000, 000. 00 ..............----------------..   8, 000, 000. 00
    Flood control, Mississippi River and tributaries.........     ,,,,,,,,,                                             ...........             60,020,000.00 ---------------- 60, 020,000.00
    Flood control on tributaries of Mississippi River, emergencies.......-------           ----        ------
                                                                                                        ....  do-------
                                                                                                              d o.......                              250, 000. 00 ----------..----250,000. 00
    Flood control, Sacramento River, Calif.-------            -- ------------                                                    ----------       1,000, 000 ----------------                        1,000, 000.00
    Niagara redevelopment works investigation, Corps of Engineers._______________                                                      ------.-----
                                                                                                                                               ..------        -----              100,000.00            100,000.00
     Total---------------------------------------------------------                               ----------      236, 788, 800. 00 325, 012, 800. 00  100,000.00   561, 901, 600.00
   1Negative appropriations        reflect withdrawal of reserves recommended by the President in House Document 182, 82d Congress, and enacted into law in Chapter XII of Public
Law 253, 82d Congress, approved Nov. 1, 1951.

                                                                                                                                                                                                                                 F-.
                                                                                                 APPROPRIATIONS-Continued                                                                                                                                                                  I
                                                                                                                                                                                                                                                                                           00

                                                             Appropriation title                                                                   Date of act            River and
                                                                                                                                                                           harbor
                                                                                                                                                                             harbor
                                                                                                                                                                                                       Flood control                      I Miscellaneous            Total by appro-
                                                                                                                                                                                                                                                                      priation acts
                                                                                                                                              I                  *                               -I.                                      I                      I
                                                                                                                                                                                                                                                                                           0
Supplemental Appropriation Act, 1953:
   Maintenance and improvement of existing river and harbor works .....................                                                           July 15,1952                 $5, 000. 00                                                                                  $5,000.00         O
Special fund (credits to accounts from licenses under Federal Power Act, Aug. 26, 1935):
    Maintenance and operation of dams and other improvements to navigable waters .............                                                    Aug. 26,1935      152, 664. 80                                                                                           152, 664. 80
Payments to States, Flood Control Act June 28, 1938, as amended            ...........                                                            June 28,1938 --......-...-..-                                                                  $826, 372. 03             826, 372. 03    O
Department of State Appropriation Act, 1949:
    Salaries and expenses, Philippine Rehabilitation, Department of State (transfer to Army),                                                                                                                                                                                             0
      1947-50-----------................................................................................                                          June 3, 1948       -   .. .--        -   . .         -.      . . .           .. .             -216, 187. 72           -216,187. 72
    Salaries and expenses, Philippine Rehabilitation, Department of State (transfer to Army),
      1947-51.......--        --..........
                                      ........        .        .                                                                                                          . . .
                                                                                                                                                       do- ...--.--..--------------..                            .         .          .         -424, 578. 47
                                                                                                                                                                                                                                                       -.---            -424, 578. 47
        Total-............................................                                                                                                           ...............................                                            -640, 766. 19           -640, 766. 19
                                                                                                                                                                                                                                                                                          M
                                                                                                                                                                                                                                                                                          m




Hospital and domiciliary facilities, Veterans' Administration (transfer to Army):                                                                                                                                                                                                         0
   Cash ............... .. . . . . . . .. .. . .. . . . .. .. .                               .. .. .. . . .                          .. .         .-- . . -         -.............._._......._......_40, 000, 000. 00                                                 40, 000, 000. 00
   Contract authorization---..............--.................................................                                                                              . ..                   .... -40, 000,000. 00                                              -40, 000, 000. 00
Expenses, international development, Executive Office of the President (allotment to Army), 1951 ................ ................................                                                                                                -8, 360. 00             -8, 360. 00
American section, International Commission (transfer to Army), 1952 ............-----------------------      Oct. 22, 1951 .............................                                                                                          103, 700. 00            103, 700. 00    Itd
     Grand total appropriated funds ...........................................................-------------                 218, 468, 714. 80 $326, 702, 800. 00                                                                                 379, 694. 76       545, 551, 209. 56
Trust Funds (contributions and advances):
   Funds contributed for improvement of rivers and harbors___  ...                                                                                      (1)                   79, 900. 00-                                                                                 79, 900.00
   Funds contributed for flood control, rivers and harbors_...                                                                                          (1)                                                 2, 581, 547. 07 .----------------...........               2, 581, 547. 07
        Total contributed funds _                       .-      ...                                .--....      .    .   ..       .   ..-         ..     ..                   79, 900.00                    2, 581, 547.07------                           -_-.... 661, 447.0772,
Funds transferred,from other departments as working funds:
   Working fund, Army, Engineers, civil__..........................................                                                                     (1)                                                  193, 757. 39                                                 193, 757. 39    0
   Working fund, Army, Engineers, civil, 1950_. _................_._......_                                                                             (1)                                                  -1, 631.62                                                   -1, 631.62
   Working fund, Army, Engineers, civil, 1951_...............                   ... ......         .                                                    (1)                                                    3, 719. 20                                                   3, 719. 20
   Working fund, Army, Engineers, civil, 1951-52 ................                                                                     _, __             (1)           _.._. _.__... ___._______._._.____.    160, 000. 00                                                 160, 000. 00    Cn
   Working fund, Army, Engineers, civil, 1952 ...........               ,,-.....,.........                                                              (I)          ._......____.___ ___._._._______.    2, 488, 726. 00                                              2, 488, 726. 00
   Working fund, Army, miscellaneous civil, 1950....                  _                                                                                (1)        _-              -                    --              -        _               -30, 991.81              -30, 991.81
   Working fund, Army, miscellaneous civil, 1951-52 .................                      .........................                                   (1)        ______________._               _____._____.____                              4, 750, 000. 00         4, 750, 000. 00
   Working fund, Army, Engineers, civil (trust fund) ............................                                  ............                        (1)                                 __
                                                                                                                                                                                           _ _ __                               ..             4, 197, 280. 00         4, 197, 280. 00
   Working fund, Army, Engineers, civil, 1952 (trust fund)-..................................                                                          (1)                                                                                        300, 000. 00            300, 000. 00    0o
        Total working funds---------------------------------------------..........................................................                                                                                                            12, 060, 859. 16        12, 060, 859. 16
        Grand total all funds......................................................................................                                                  218, 548, 614. 80             329, 284, 347. 07                          12, 440, 553. 92       560, 273, 515. 79

     'Various.
                                                                               ADVANCED FUNDS

     The following amounts have been advanced by local interests for river and harbor improvements under the provi-
sions of section II, River and Harbor Act, March 3, 1925, and for flood-control works under the provisions of the Act
of October 15, 1940, and are returnable to the same interests when necessary Government funds are available.

                                                                                                                                            Balance due             Amount re-               Amount re-          Balance due
                                                                                                                                            from United               ceived                   turned            from United
                                                                                                                                            States, June            during fiscal            during fiscal       States, June
                                                                                                                                               30, 1951                 year                     year               30, 1952

Sacramento River, Calif__.   ------------------------------------------                                  .....
                                                                                       Sacramento, Calif___----                        _       $200,000. 00 --------------------------                              $200, 000.00
                                                                  --------
Gulf Intracoastal Waterway, Franklin Canal, St. Marys Parish, La__--                   New Orleans, La__....-                                    44, 000. 00 ..-------------------------------                        44, 000. 00
                               .....---.-.----....--...-.-...........-...
      Total, rivers and harbors--                                                       ..-                       .               .                             ................
                                                                                                                                                 .244, 000. 00 ------------------------------                        244, 000. 00
Buffalo Bayou, Tex-------------....................-....----.-.                        Fort Worth, Tex--------------                         2,900,000.00 .......................-----                            2,900,000.00
      Grand total..........................................       ........-------------------------------------------.................--------------------------------
                                                                                                                                          3,144, 000.00 ............-----------------------------.............    3,144,000.00      d
                                                                                                                                                                                                                                    I




                                                                                                                                                                                                                                    z
                                                                                                                                                                                                                                    d0
                                                                                                                 EXPENDITURES

     The total actually expended under the direction of the Chief of Engineers in connection with the maintenance
and improvement of rivers and harbors, flood control, and other miscellaneous works during the fiscal year ended June
30, 1952, is as follows:

                                                                                                                                                                                                                       Expenditures
                                                            Appropriation title                                                                           Appropria-
                                                                                                                                                            tion act
                                                                                                                                                                                     New work                          Maintenance                    Total              0

Rivers and harbors:
   Maintenance and improvement of existing river and harbor works..-.-.....-.....-...-...-...-....-          (1)                                                                2 $123, 099, 856. 51                     $90, 790, 386. 61
                                                                                                                                                                                                                        Sa                            $213, 890, 243. 12
   Power Plant, Bonneville Dam, Columbia River, Oreg., construction ..........................--             (1)                                                                                 123, 277. 53                                                123, 277. 53 C0
   Alteration of bridges over navigable waters of the United States._._................................  Various (4)                                                                             790, 680. 55                 152, 664....................05 790, 680. 55
   Maintenance and operation of dams and other improvements to navigable waters .......-...----         Aug. 26,1935                                                      ....................                                152, 664. 05                   152, 664. 05 t
        Total, rivers and harbors                          .................------------------------------------------------                                                          124, 013, 814. 59                   90, 943, 050. 66          214, 956, 865. 25    O
                                                                                                                                                                                                                                                                         04
Flood control (projects authorized in Act of 22 June 1936, as amended and supplemented):
    Flood control, general_..                                                                                                                                   (1)               5317., 203, 873. 55                      8, 576, 280. 40          325, 780, 153. 95
    Flood control, general, emergencies.--......--.---...-.........-                                                                                            (1)                              96, 753. 31              15, 475, 764.30            15, 572, 517. 61
                                                                                                                                                                                                                                                                         t
        Total, flood control, general.......................................................                                                                                         317, 300, 626.86                     24, 052, 044. 70          341, 352, 671.56
Flood control, Mississippi river: (Act May 15, 1928, as amended).
    Flood control, Mississippi River and tributaries...........
                                                           ..............        ..................-----                                                        (1)                 6 46,133, 460. 28                     15,175, 373. 59            61, 308, 833. 87
    Flood control on tributaries of Mississippi River, emergencies ..............-...-..--.---                                                                  (1)                                                          238, 382. 76                238, 382. 76
      Total flood control, Mississippi River___.........__________                                                                                                                    46,133, 460.28            15,413, 756.35                       61, 547, 216.63
Flood control, Sacramento River, Calif__        _ __               _ _             __                    _     __        _       __       _      _              (1)                    1, 915, 054. 79                 7, 361.89                      1, 922, 416.68
Flood control, Sutton Reservoir, W. Va_................................................._                                                                       (1)                         2, 000. 00------------------------
                                                                                                                                                                                           19, 495. 57 --------------------                                2,000. 00
Flood Control, Trinity River, Tex_, ,,,,,,                  ------          ,,,,,,,,                                         ,        ,------                   (1)                                                                                       19, 495. 57
             Total, all flood control-------------
                                   ......................--.....-------------------------------------.........................................                                      365, 370, 637. 50                     39, 473, 162. 94          404, 843,800.44
Miscellaneous Appropriations:
    Maintenance and operation, certain Federal water mains outside the District of Columbia 1951....                                                    Sept. 6, 1950 ....................                                          3,928.61                3,928.61
    Maintenance and operation, certain Federal water mains outside the District of Columbia, 1952....                                                   Oct. 24, 1951                                                               8, 514. 64              8, 514. 64
    Hospital and domiciliary facilities, Veterans Administration (transfer to Army) ..............-----                                                 Mar. 4,1931          50, 294, 702. 23                      .........--------------------      50, 294, 702. 23
    Niagara redevelopment remedial works investigation ...........................................                                                                               377, 624. 38                      ....................                   377, 624. 38
    Salaries and expenses, Philippine Rehabilitation, Department of State (transfer to Army), 1947-50_                                                  June 3,1948                   424. 33                      ..--        .-- --. ----..    -.            424. 33
    Salaries and expenses, Philippine Rehabilitation, Department of State (transfer to Army), 1947-51_                                                      do-------             12, 498. 68                      -----------------.             -..      12, 498. 68   CA
    Payments to States, flood control Act June 28, 1938, as amended.__........................                                                          June 28, 1938                                                            812, 869. 99             812, 869. 99
    American Section, International Commission (transfer to Army) 1951-..........-----------.                                                           June 2,1951               35, 000. 00                      ....................                    35, 000. 00
    Am erican Se ction , Interna tion al C o m missio n (transfe r to A rmy) 19 52_.... . .. . . . . . . . . . . . . . . . .. . . .. .                  Oct. 22, 1951             93, 179. 58                              --------------------            93, 179. 58
    Hydraulic mining in California, debris control.......................................                                                               June 19, 1934                                                              15, 025. 10             15, 025. 10
         otal      sceaneous aDDroriation.................................................--------------------------------...-----------..............---..............               50, 813, 429. 20                       840,338.34              51, 653, 767. 54
                                                                                                                                                                                                               I                             I
Contributed and Advanced Funds:
   Funds contributed for improvement of rivers and harbors ........................................
                                                                                                  (7)                                            1, 116, 539. 37           550, 595. 48     1, 667, 134. 85
   Funds advanced for improvement of rivers and harbors_.............................__..._...... (7)                                               111, 014.30 ---------------.....           111, 014. 30
   Funds contributed for flood control, rivers and harbors..__.. .............. .............     (7)"                                           4, 370, 629. 21           189, 522. 62     4, 560,151.83
        Total, contributed and advanced funds..........................................................                                          5, 598, 182. 88           740, 118. 10     6, 338, 300. 98
        Total Engineer Department and contributed funds_.       ................ ................                                              545, 796, 064. 17      131, 996, 670. 04   677, 792, 734. 21
Working Funds (transfers from other departments):
   Working fund, Army, engineers, civil, no year (various projects)-...................................                                    --.-...
                                                                                                                                          -.............
                                                                                                                                          ...................               597, 752. 20
   Working fund, Army, engineers, civil 1950 (various projects) ...................................-...
                                                                                                     -------- -- -- ................ _........................               -33,178. 09
   Working fund, Army, engineers, civil, 1951 (various projects)-......................................
                                                                                                      --- --- --- -- ........................................                94,325.  87
   Working fund, Army, engineers, civil, 1952 (various projects)------     .--.--..---.--.--... . -.      - - -     - - -    - -   -     - -                             1, 724, 634.18
   Working fund, Army, engineers, civil, 1948-52 .... ----_.....--_---_.....
                                                                           ......................         - - - -     - --   -     - -   ....................
                                                                                                                                         - -         -.........                  308. 97
   Working funds, Army, miscellaneous civil, 1950 (special operations)-.................. ..... --- --- -- - --                                                          6, 653, 078. 47
   Working funds, Army, miscellaneous civil, 1950-52 (special operations) ..........---..............  -- --- - -- --                                                   11, 702,101.04
   Working fund, Army, miscellaneous civil, 1951 (special operations)--.-                                                                                                   493, 938. 00
                                                                                                     --- - ---- ----
   Working fund, Army, engineers, civil (trustfund) no year (various projects)-....................... --..................                        -.................... 3, 407, 449. 99
        Total working funds--------------------------..................................................
                                                                                            -- .....................-..............                                                        24, 706, 766. 81
                                                                                                                                                                                                               bi
        Grand total expenditures by Engineer Department_.............................................        ----...............               545, 796, 064. 17      131, 996, 670. 04   702, 499, 501. 02

   1
       'Annual'or'supplemental.
   2 Includes $1,405,337.14 reimbursements.
   3 Includes $23,899,773.18 reimbursements.
   4 On page 34.
   TIncludes $5,211,873.19 reimbursements.
   6 Includes $1,519,172.85 reimbursements.
   ZTrust funds, various.




                                                                                                                                                                                                              I.
                                                         Consolidated cost and financial summary as of 80 June 1952

                                                                                                                                    Allotted            Unallotted                                       Additional amo
                                                                             Cost     of mainte-        Totalexpenditures           Allotted              allotted           Total to be ac-             Additional amount
                                                   Costnance                                                                      unexpended           unexpended               counted for               required for com-
                                                                                                                                                     unexpended
                                                                                                                                                       unexpended                                         pletion
                                                                                                                                                                                                                                   O
River and harbor as of June 30, 1952........       $2, 573, 558, 282. 45       $1,406,073, 701. 16       $4, 071, 838, 795. 42 $103, 450, 720. 33       $4, 844, 129. 70       $4, 180, 133, 645. 45       $4, 184, 602, 300. 00   0
Flood control as of June 30, 1952...-----------     3, 104, 781, 552. 80            428, 910, 001. 16     3, 521, 538, 883. 37 289, 280, 389. 26        37, 923, 783. 70        3, 848, 743, 056. 33        4, 769, 818, 900. 00
Passamaquoddy Tidal Power Project....---                 6, 384, 393. 74--.....----..            -._.          6, 384. 393. 74----    -_-_----_        -- .--.--.      --.   --..    6, 384, 393. 74 .       8
                                                                                                                                                                                                                                   O
      Total as of June 30, 1952 --..............    5, 684, 724, 228. 99       1, 834, 983, 702. 32       7, 599, 762, 072. 53   392, 731, 109. 59     42, 767, 913. 40        8, 028, 876, 701. 78         8, 954, 421, 200. 00

    NOTE. Difference between sum of costs of new work and maintenance and total expenditures includes value of plant, stocks and undistributed items; accounts receivable and
accounts payable.


                                                                                                                                                                                                                                   O
                                                                                                                                                                                                                                   LTJ


                                                                                                                                                                                                                                   M




                                                                                                                                                                                                                                   1




                                                                                                                                                                                                                                   cp



                                                                                                                                                                                                                                   Cn
                  AMOUNTS        NEEDED         TO BE APPROPRIATED                  23
                 AMOUNTS NEEDED TO BE APPROPRIATED

  The amounts that are needed to be appropriated during the fiscal
year ending June 30, 1954 are as follows:
Maintenance and improvement of existing river and harbor works:
   Major capital outlay_ ------------------        $270, 386, 200
   Current expense-------------------------          90, 716, 700

       Total, rivers and harbors-----------        ---------------- $361, 102, 900
Alteration of bridges, Public Law 647, 76th Cong -------------             11, 655, 200
Niagara power redevelopment and remedial works investigation_               1, 000, 000
St. Lawrence Seaway and Power Project ------           --------.         -1, 200, 000
Flood control:
     Mississippi River and tributaries_   ___--- -       $98, 390, 000
     Emergency fund on tributaries of Mississippi
       River------------------------------------                250, 000
     Sacramento River, Calif----------                       5, 000, 000
     Flood control, general, act of June 22, 1936,
       amended and supplemented----------------339, 863, 500
    Flood control, general (emergency fund)- .-           - 8, 000, 000

      Total, flood control_ ----------------------                  _     451, 503, 500

      Grand total--------            ----------------------------         826, 461, 600
       IMPROVEMENT OF' RIVERS AND HARBORS IN THE
                 NEW ENGLAND DIVISION
   The New England Division, an operating division with both dis-
trict and division functions, comprises all of New. England except
western Vermont and small portions of Massachusetts and Connecticut
along their western boundaries, and includes small :portions of south-
eastern New York, all embraced in the drainage basins tributary to
Long Island Sound and the Atlantic Ocean east of the New York-Con-
necticut State line. It also includes Fishers Island, N. Y.
   Division engineers of the New England Division, Boston, Mass.:
Col. Henry J. Woodbury, Corps of Engineers, division engineer,
July 1, 1951 to May 11, 1952; Col. H. T. Lentz, Corps of Engineers,
acting division engineer, May 12, 1952 to June 30, 1952.
                                     IMPROVEMENT'
                  Navigation                          Navigation--Continued
                                         Page                                         Page
1.    Corea Harbor, Maine                26 28. Great Salt Pond, Block
2.    Matinicus Harbor, Maine..          27        Island, R. I .            .        76
3.    Kennebec River, Maine..-           28, 29. Pawcatuck River, R. J. and
4.    Portla.d Harbor, Maine .. .        30.       Conn- .l------.-..                 77
5     Josias River, Maine _       _      32, 30. Mystic River, Conn._ _        .      79
6.    Lake Winnipesaukee, N. H _         34, 31. New London Harbor, Conn,.            81
7.    Isles of Shoals Harbor, Maine          32. Thames River, Conn_         .
          and N. H--------------_         35 33. Connecticut      River    below
8.    Gloucester Harbor and An-                    Hartford, Conn_                    84
          nisquam River, Mass- ..         36 34. Clinton Harbor, Conn_                 87
9.    Salem Harbor, Mass ......         38 35. New Haven Harbor Conn_                 88
10.    Mystic River, Mass .......        40 36. Housatonic River, Conn ....            91
11.    Boston Harbor, Mass_               42 37. Bridgeport Harbor, Conn..,            93
12:    Weymouth        Fore     River,        38. Norwalk Harbor; Conn. . .            96
          Mass----------------           47 39. Stamford Harbor, Conn_                9$



13.'   Town River, Mass_                  49 40. Mianus River, Conn__ _ _             100
14.    Plymouth Harbor, Mass . ..        51 41. Examinations, surveys and
15.    Cape Cod Canal, Mass__             53        contingencies       (general)
16.    Chatham (Stage) Harbor,                      river and harbor                  101
          Mass_----------------          57 42. Plant allotment ..                ... 102
17. Pollock Rip Shoals, Nan-                  43. Inactive navigational proj-
      tucket Sound, Mass _               58         ects_                             102
18. Harbor of Refuge, Nan-                    44. Miscellaneous activities, _.        105
      tucket, Mass_-             _       59
19. Cross Rip Shoals, Nantucket                             Flood Control
      Sound, Mass_                       61
20. Channel from Buzzards Bay                 45. Merrimack      River     Basin,
      to Buttermilk Bay -                62         N. IH. and Mass--..       .       110
21. New Bedford and 1Pairhaven                46. Franklin    Falls Reservoir,
      Harbor, Mass ....      _...        63         Merrimack River Basin,
22. Cuttyhunk Harbor, Mass_              65         N. H-------------------112
9. Fall River Harbor, Mass ..           66 47. Edward MacDowell Reser-
24. Providence River and Har-                       voir, Merrimack        River
      bor, R. I-------------             69         Basin, N. H-------------          113
25. Seekonk River, R. I ..       ..      70 48. Blackwater Reservoir, Mer-
26. Harbor of Refuge at Point                       rimack River Basin, N. H-         115
      Judith and Point Judith                 49. Blackstone    River      Basin,
      Pond, R. I---.       ---           71         Mass. and R. I------------        117
27. Harbor of Refuge at Block                 50. Thames River Basin, Conn.,
      Island, R. I_                      74         R. I., and Mass_     . .-.-- 119
                                                                              25

                               UND                      MN
 26        REPORT OF          CHIEF OF ENGINEERS,             U.   S.   ARMY,   1952

         Flood Control-Continued                           Flood Control-Continued
                                             Page                                         Page
51. Mansfield Hollow Reservoir,                     62. Holyoke, Connecticut River
       Thames           River      Basin,                  Basin, Mass____           __   137
       Conn-----------__-----                121     63. Springdale, Connecticut
52. Norwich Channel Improve-                              River Basin, Mass___...        139
       ment, Thames River Ba-                        64. Chicopee, Connecticut River
       sin, Conn-.--               __--_     122           Basin, Mass______              140
53. Connecticut         River Basin,                65. Riverdale, Connecticut River
       Vt., N. H., Mass., and                              Basin, Mass-------------       141
       Conn -          _---------------      123     66. West Springfield, Connecti-
54. Victory Reservoir, Connecti-                          cut River Basin, Mass _ __     142
       cut,River Basin, Vt_ ___              127    67. Hartford, Connecticut River
55. Union      Village       Reservoir,                   Basin, Conn___._._.__          143
       Connecticut River Basin,                     68. Winsted, Connecticut River
       Vt------------------                  128           Basin, Conn_._.--. --          145
56. Ball Mountain Reservoir,                       69. Thomaston Reservoir, Hous-
       Connecticut River Basin,                           atonic River Basin, Conn_       146
       Vt ------------        -----          129    70. Preliminary     examinations,
57. Surry Mountain Reservoir,                             surveys, and contingencies
       Connecticut River Basin,                           for flood control----------     147
       N. H - ---- --                        130    71. Inactive flood-control proj-
58. Birch Hill Reservoir, Con-                            ects- ...-- .------ ...- .      148
       necticut        River      Basin,            72. Miscellaneous activities... ..    149
       Mass -_                        . __   132    73. Flood Control Work under
59. Tully Reservoir, Connecticut                          authority of Section 205,
       River Basin, Mass_ .__.               133          Public Law 858, Eightieth
60. Barre Falls Reservoir, Con-                           Congress, second session,
      necticut         River      Basin,                  Norwalk, Norwalk River
       Mass_ _----------                     135          Basin, Conn__________           150
61. Knightville Reservoir, Con-
      necticut         River      Basin,
       Mass __                               136

                               1. COREA HARBOR, MAINE

   Location.-This harbor,- locally known as Indian Harbor, lies at
the southeasterly extremity of the town of Gouldsboro and just west-
erly of the entrance to Gouldsboro Bay, about 12 miles east of Bar
Harbor, Maine. (See U. S. Coast and Geodetic Survey Chart No.
305.)
   Existing project.-This provides for an anchorage basin 8 feet deep
at mean low water, 600 feet long in an east and west direction, and
400 feet wide in a north and south direction. The mean tidal range
is 10.5 feet and the extreme 12 feet.
   The cost of new work for the completed project was $31,707.06.
There is no approved estimate of cost for maintenance.
   The existing project was approved by the River and Harbor Act
of August 30, 1935. The latest published map is in the project docu-
ment (Rivers and Harbors Committee Document No. 27, 74th Cong.,
1st sess.).
  Local cooperation.-None required.
  Terminal facilities.-There are 21 wharves, 15 of which are small
and cannot be approached by vessels at low tide. The wharves are
privately owned. Facilities are considered adequate for present
commerce.
  Operations and results during fiscal year.-A condition survey to
determine extent of shoaling in the harbor, by hired labor, was carried
                  RIVERS            AND        HARBORS-NEW                        ENGLAND               DIVISION                     27
on during fiscal year at a cost of $1,030.68, for maintenance. The
expenditures were $1,051.44.
  Condition at end of fiscal year.-The existing project was com-
pleted in 1938. The controlling depths at mean low water were 5.2 *
feet in the middle area and approximately 2.0 feet along the limits
of the project in 1952. The costs under the existing project have
been $32,737.74 of which $31,707.06 was for new work and $1,030.68
was for maintenance. The expenditures were $32,758.50, of which
$31,707:06 was for new work and $1,051.44 for maintenance.
  Proposed operations.-No work is scheduled for fiscal year 1953.
  The sum of $45,000, maintenance funds, can be profitably expended
during fiscal year 1954 for maintenance dredging, by contract, to
project depth of 8 feet.
                                            Cost and financial summary

                                                           Fiscal year ending June 30                                    Total to June
                                                                                                                        30,1952, includ.
                                                                                                                        ing fiscal years
                                        1948             1949              1950               1951            1952       prior to 1948


New work:
   Appropriated---....--...---..------......-------.....------------------------.
   Cost-- -- -------------------              .-----------------------------------------
                                                                                                        ------------..
                                                                                                       --............
                                                                                                                              31, 707 06
                                                                                                                              31,707.06
   Expenditures----------......... --------------------------------------                                 ---------           31, 707. 06
Maintenance:
   Approprited.........---------------------- -------------...........--------                              $1,500.00           1, 030.68
    Cost---------......--------------------------------------------........................                  1,030.68           1, 030. 68
    Expenditures----....       --.... --------. -----.--------------------                           ----    1,051.44           1, 051. 44


                                      2. MATINICUS HARBOR, MAINE

   Location.--This harbor lies on the easterly side of Matinicus Island,
about 20 miles south of Rockland Harbor, Maine. (See U. S. Coast
and Geodetic Survey Charts Nos. 225 and 1203.)
   Existing project.-This provides for the construction of a rubble-
stone breakwater extending from Youngs Point on Matinicus Island
to Indian Ledge, a distance of about 450 feet. The mean range of tide
is 9 feet.
   The cost for new work for the completed project was $14,000. There
is no estimate of cost for annual maintenance.
   The existing project was authorized by the River and Harbor Act
of June 25, 1910. The latest published map is in the project document
 (H. Doc. No. 653, 60th Cong., 1st sess.).
   Local cooperation.-Nonerequired.
   Terminal facilities.-There are 12 privately owned wharves in the
harbor, variously constructed of wood piles, stone and crib work, and
all are in fairly good condition. There is no publicly owned wharf,
but one private wharf is available for landing of mail, freight and
passengers. The berths at these wharves are dry at low water. One
wharf has :facilities.
   Operations and results during fiscal year.--A condition survey, by
hired labor, of the riprap breakwater was carried on during the fiscal
year at a cost of $708.47. The expenditures were $729.90.
   Condition at end of fiscal year.-The existing project was completed
in 1911. The breakwater is in serviceable condition. The cost under
 28           REPORT OF CHIEF OF ENGINEERS, U.                                                     S. ARMY,            1952

  the existing project has been $14,000 for new work and $8,413.11 for
  maintenance, a total of $22,413.11. Expenditures have been $22,434.54.
    Proposedoperations.-No work is scheduled for the fiscal years 1953
* and 1954.
                                              Cost and financial summary

                                                             Fiscal year ending June 30                                    Total to June
                                                                                                                           30,1952, includ-
                                                                                                                           ing fiscal years
                                          1948             1949              1950             1951             1952          priorto 1948


New work:
    Appropriated----
                 ....................                          ...........------------------------
                                                ..----------.......--------------
                                     ......-------......                                                                        $14,000.00
    Cost---------              --
                         ---------------------- ----------- ------------ ------------                                            14,000.00
    Expenditures                          ----------------------------- -------------------
                                --------------.                                                                                   14,.000.00
Maintenance:
    Appropriated----                      ......................--------------.........-------------------
                     ............--------.......                                                             $1, 500.00           8, 413.11
    Cost .......---....-
             -------          --         ----------------........------............
                                                                   ----                                          708.47           8,413.11
    Expenditures--------- .------------ -----------------------------------                                      729. 90          8, 434. 54



                                          3. KENNEBEO RIVER, MAINE

    focation.-Kennebec River drains a large number of lakes and
minor streams, and flows from Moosehead Lake about 150 miles in a
southerly direction and discharges into the Atlantic Ocean about 25
miles east of Portland. (See U. S. Coast and Geodetic Survey Charts
Nos. 288, 289, and 314.)
    Previous projects.-The first project was adopted by the River and
Harbor Act of March 2, 1827. Modifications and additions were
authorized by River and Harbor Acts of August 30, 1852, June 23,
1866, July 11, 1870, March 3, 1871, March 3, 1873, March 3, 1881, and
August 11, 1888. For further details of previous projects see page
1735 of Annual Report for 1915, and page 52 of Annual Report for
1938.
    Existing project.-This provides for a channel 27 feet deep and not
less than 500 feet wide, extending from the mouth to a point about
0.6 mile above the bridge at Bath; thence to Gardiner a channel not
less than 150 feet wide, with a depth of 17 feet at Beef Rock Shoal,
at the foot of Swan Island, 18 feet deep through rock at Lovejoy
Narrows, near the head of Swan Island, decreasing to 16 feet deep at
Gardiner; a channel west of Swan Island 100 feet wide, 12 feet deep,
except at the upper shoal, where the depth was to be 15 feet; and a
channel 125 feet wide and 11 feet deep from Gardiner upstream to
Augusta, at the head of navigation. The section of river included in
the project is about 44 miles in length. The work includes dredging,
rock excavation, and two riprap training walls. The project depths
refer to mean low water. The mean tidal range is 8.3 feet at the mouth
of the river, 6.5 feet at Bath, 5.5 feet at the foot of Swan Island, 5 feet
at Gardiner, and 4.1 feet at Augusta. The spring tides are about 1
foot greater at the mouth and about 0.5 foot greater at Augusta.
    The estimate of cost for new work, approved in 1952, is $1,199,500,
exclusive of amounts expended under previous projects. The latest
  (1950) estimate for annual cost of maintenance is $8,000.
               RIVERS AND             HARBORS--NEW                   ENGLAND           DIVISION                 294u

  The existing project was authorized by the following river and
harbor acts:

    Acts                            Work authorized                                        Documents

June 13,1902   Channel between Augusta and Gardiner, Maine-......               H. Doc. 262, 56th Cong., 1st sess.'
Mar. 2,1907    Channel below Gardiner, Maine .....-----------------             H. Doe. 321, 59th Cong., 2d seas.'
Mar. 4,1913    Channel west of Swan Island .....---------------..............   H. Doc. 746, 2d Cong., 2d sesas.
Oct. 17,1940   27-foot channel from mouth to Bath ....---------------           S. Doc. 55, 77th Cong., 1st sess.'

  1 Contains the latest published maps.


    Recommended modification of project.-In House Document No.
2107, Sixty-fourth Congress, second session, it was recommended that
the improvement and maintenance of the channel west of Swan Island,
near the town of Richmond, be abandoned.
    Local cooperation.-Nonerequired.
    Terminal facilities.-Wharves suitable for landing or loading are
located at Bath, Woolwich, Richmond, Randolph, Gardiner, Hallowell,
and Augusta. Of the 24 wharves located at Bath, 5 are publicly owned
and 19 privately owned, about one-third of which are in poor repair
and are little used. Rail connections are available at 19 of the wharves
at Bath. Depths alongside range from 12 to 25 feet. At the other
points named above there are 16 wharves in usable condition. All but
one are equipped with mechanism for handling passengers and freight.
Those open to the public on equal terms are two at Hallowell and one
each at Randolph and Augusta. None is publicly owned. The facili-
ties are considered adequate for existing commerce.
    Operations and results during fiscal year.-Preliminary work, by
hired labor, in connection with condition survey was accomplished
during fiscal year at a cost of $72.00, all maintenance funlds. The
expenditures were $72.00.
    Condition at end of fiscal year.-The existing project was completed
December 1943, with the exception of project dredging from the Bath
Iron Works Corp., to its upper limit 0.6 mile above the Bath Bridge,
for which there appears to be no immediate need. The controlling
depths at mean low water in the Kennebec River from the mouth to
Bath are 25.0 feet (1950), with the exception of a shoal area along the
northerly limit of the channel northwest of North Sugarloaf Island,
having a controlling depth of 21.0 feet (January 1951); 13 feet from
Abagadasset Point to the Gardiner-Randolph Bridge (1942) ; thence
8 feet to Augusta for the project channel widths (1942).
    The cost and expenditures under the existing project have been
$1,303,765.81, of which $1,090,529.30 was for new work and $213,236.51
was for maintenance.
   Proposedoperations.-Thefunds unexpended June 30,1952 amount-
ing to $2,381.32 will be used for a condition survey, by hired labor, in
the fall of 1952.
   The sum of $60,000 can be profitably expended during fiscal year 1954
for maintenance dredging of approximately 250,000 cubic yards in the
27-foot channel by United States hopper dredge.


       245554-53-vol. 1-             3
30               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                  1952

                                                   Cost and financial summary

                                                               Fiscal year ending June 30                                          Total to June
                                                                             ...                                                  30,1952, includ-
                                                                                                                                  ing fiscal years
                                                1948         1949                  1950          1951             1952              priorto 1948


New work:
     Appropriated----                 ............
                         ........ -------..----------.......-----....-----   ----------..                    ...........
                                                                                                        ------------                $1, 599, 940. 33
                                                                                                            ....--.......--
     Cost--.............-------------....------------............------------.................-----------...........----             1, 599, 940. 33
     Expenditures------------- _-------------------------------
                                                   -----                                                                             1, 599, 940.33
Maintenance:
     Appropriated-.......                    $40,000. 00      $909. 16 -----------............ $30, 000. 00 .....------------..         215, 617. 83
     Cost---------------..................    38, 850. 03   2, 059. 13 -----------              27, 546. 68         $72. 00             213, 236. 51
     Expenditures--------.........            38, 850. 03   2,059. 13 .------------ 27,546.68                        72. 00             213, 236. 51


Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project-------------- $109, 000. 00

                                              4. PORTLAND HARBOR, MAINE

   Location.-This harbor is on the southwestern coast of Maine, about
100 miles northeast of Boston, Mass. (See U. S. Coast and Geodetic
Survey Chart No. 325.)
   Previous projects.-Adopted by joint resolution of June 5, 1868,
and River and Harbor Act of June 10, 1872. For further details see
page 1736 of Annual Report for 1915, and page 40 of Annual Report
for 1936.
   Existing project.-This provides for an anchorage area 35 feet
deep at mean low water, approximately 170 acres in area, northwest
of House Island; an anchorage area off the eastern end of the city,
with a minimum depth of 30 feet; dredging a 35-foot channel from
the westerly side of the Maine State pier in the lower part of the
main harbor through its channel of approach to the sea; dredging to
35 feet the present 30-foot channel from the Maine State pier to
Portland Bridge for its full width, thence to Vaughan Bridge for a
width of 400 feet, thence to the Boston & Maine Railroad Bridge
for a width of 300 feet; dredging a 35-foot turning basin easterly of
Vaughan Bridge; and construction of stone breakwater about 900
feet long from Spring Point to Spring Point Light; for a channel 30
feet deep and 300 feet wide from the anchorage to the Grand Trunk
Bridge at the mouth of Back Cove; for rock excavation to give a
depth of 14 feet between the Grand Trunk and Tukeys Bridges, and
a channel 12 feet deep and 300 feet wide thence to the head of Back
Cove; for the removal of two obstructing ledges in the main ship
channel to a depth of 40 feet; for a stone breakwater about 2,000 feet
long on the southerly side of the mouth of the inner harbor; and the
maintenance of Soldier Ledge Channel in Hussey Sound, Casco Bay,
at a depth of 40 feet.
   The project depths refer to mean low water. The mean tidal range
is 8.9 feet, extreme 10.2 feet, though variations as great as 16 feet
have been observed under storm conditions.
   The estimate of cost for new work, approved in 1952, is $4,751,800,
exclusive of amounts expended on previous projects. The latest
 (1950) estimate for annual cost of maintenance is $40,000.
   The existing project was authorized by the following river and
harbor acts:
                       RIVERS AND          HARBORS-NEW               ENGLAND          DIVISION                     31

       Acts                              Work authorized                                   Documents

July     4,1836        Breakwater on southerly side of mouth of inner har-     H. Doc. 491, 23d Cong., 1st sess.
                         bor.
June 23,1866 Extension of breakwater.
June 3, 1896 Dredging to 30 feet over greater part of inner harbor ___         S. Doc. 271, 54th Cong., 1st sess.
Mar. 3, 1905 Extension of 30-foot depth up Fore River to Boston
(Sundry civil) & Maine R. R. bridge and in channel of approach
                         to Back Cove.
July 25, 1912          30-foot anchorage; 14 feet at entrance to Back Cove;    H. Doc. 489, 62d Cong., 2d sess.
                         restoration of 12-foot depth in Back Cove and 30-
                         foot depth in the approach as well as in lower part
                         of harbor.
Aug.      8, 1917      35-foot depth in lower part of main harbor and the      H. Doc. 71, 65th Cong., 1st sess.
                         channel of approach, and removal of 2 obstructing
                         ledges in main channel.                                                                    1
Mar.      2, 1945      35-foot anchorage, approximately 170 acres in area      H. Doc. 560, 76th Cong., 3d sess.
                         northwest of House Island.
       Do-----......   Maintenance of Soldier Ledge Channel in Hussey          H. Doc. 730, 79th Cong., 2d sess.
                          Sound, at depth of 40 feet.
July 24,1946           Deepening 30-foot channel to 35 feet; 35-foot turning   H. Doe. 510, 79th Cong., 2d sess,'
                         basin easterly of Vaughan Bridge; breakwater at
                          Spring Point.


  I Contains latest published maps.


    Local cooperation.-Fully complied with.
    Terminal facilities.-There are 60 wharves in the harbor, of which
48 are active and 12 inactive and in poor condition. Six of the wharves
are publicly owned, three by the United States Government, one by
the State of Maine, one by the city of South Portland, and one by the
city of Portland. Mechanical handling facilities are available at 28
of the wharves. Railroad connections have been made to 35 of them.
The facilities are considered adequate for the needs of existing com-
merce. For a further description of terminal facilities see Port and
Terminal Facilities of Northern New England, 1941.
    Operations and results during fiscal year.-During the fiscal year
there was an adjustment of costs, new work funds in the amount of
 $30,823.76 in accordance with approved supplemental agreement for
breakwater at Spring Point.
    Maintenance dredging in the 35-foot channel and 30-foot anchorage
by United States Hopper Dredge Lyman was carried on from October
3, 1951, to December 1, 1951, and again from May 11, 1952, to June 16,
1952. During this period 480,633 cubic yards, bin measurement, of
mud and sand were removed at a cost of $160,929.67.
    The total costs were $191,753.43, of which $30,823.76 was for new
work, and $160,929.67 was for maintenance. The total expenditures
were $200,917.55.
    Condition at end of fiscal year.-The existing project was about 70
percent completed, the remaining portion consisting of the removal
to a depth of 40 feet at mean low water of a ledge located about 0.5 mile
southeast of Portland Head Light at the entrance to Portland Harbor,
dredging the 35-foot anchorage area northwest of House Island and
the dredging of the hard areas in the 35-foot channel. The controlling
depths at mean low water in the various improved channels of Port-
land Harbor at the dates they were last surveyed were: 33.1 feet in
the 35-foot channel from the sea to abreast the State pier (1952);
35.0 feet in the 35-foot channel; to 210 feet downstream of the Vaughan
Bridge, with the exception of the hard areas downstream of the Port-
land Bridge where the controlling depth is 30.0 feet (1950); thence
32             REPORT              OF CHIEF OF ENGINEERS,                                     U. S.     ARMY,          1952

30.0 feet (1946) through the north drawspan of Vaughan Bridge to
230 feet upstream of the bridge; thence 35.0 feet (1950) to the Boston &
Maine Railroad Bridge; 17.9 feet in the entrance channel to Back Cove
 (1945); 13.3 feet between the Grand Trunk and Tukey's Bridges
 (1945); 8.5 feet in Back Cove (1945) ; 28.5 feet in the 30-foot anchor-
age (1951) ; and from 16 to 45 feet in the 35-foot anchorge (1939).
   The total costs under the existing project have been $4,162,174.91 of
which $3,260,398.68 was for new work and $901,776.23 was for main-
tenance. The expenditures have been $4,164,798.83, all funds.
   Proposed operations.-The unexpended balance and accounts re-
ceivable June 30, 1952, of $28,525.46 will be applied as follows:
Accounts payable June 30, 1952_------------------------------ $500.67
New work:
    Unallocated- -    _
                      _--        -----                -       ------------- 21, 422. 79
Maintenance :
    After dredging survey, by hired labor, of the 35-foot outer channel
      and 30-foot anchorage ---------------------------------                2, 578.14
    Dredging by U. S. hopper dredge--------------------- _                   4, 023. 86
          Total maintenance-__-                                    ---------------------                                      6, 602. 00

          Total all work                     ------------                 -------------------------- 28, 525. 46
  The sum of $643,000 can be profitably expended during fiscal year
1954 as follows:
New work:
   Improvement dredging, by contract, of the 35-foot anchorage area
      northeast of House Island------------------------------ $600, 000
Maintenance:
    Condition survey, by hired labor, of the inner part of the main
      harbor from the State pier southwesterly ------------------   4, 300
          Total all work-------                                 --------------------------------                               604, 300
                                                 Cost and ftnaneia                 summary

                                                                 Fiscal year ending June 30                                Total to June
                                                                                                                          30,1952, includ-
                                                                                                                          ing fiscal years
                                            1948               1949            1950            1951          1952          prior to 1948


New work:
   Appropriated-------    ........--           $5,000.00 $1,243,111.18 $206,000.00         ---------....------------        $3, 974,256.72
   Cost-------.............---.........---..------------...... 364, 533. 46 871, 015.12 $166, 316.05       $30, 823. 76      3, 952,833. 93
   Expenditures-- ......---------------                        280, 160. 13 877, 103. 64 238, 060. 66       37, 363. 96      3, 952, 833. 93
Maintenance:
   Appropriated _........                   -6, 543.40 ............         175,000.00 -10, 513.18         175, 000. 00        915, 846. 56
   Cost----------..------------------------                                 117, 917. 94 46, 568. 88       160, 929.67         901, 776. 23
   Expenditures.................................                             75, 589. 32 88, 897. 50       163, 553.69         904, 400.15


Other new work data:
    Unobligated balance, June 30, 1952   __.--------------------                                                           $21, 422.79
    Estimated additional amount needed to be appropriated for
      completion of existing project _-----------------------                                                          1, 470, 000. 00

                                                 5. JOSIAS RIVER, MAINE

  Location.-This is a small river running through Flat Pond to
Perkins Cove, which is the harbor for Ogunquit, a village on the coast
of Maine 30 miles southwest of Portland. (See U. S. Coast and
Geodetic Survey Chart No. 1205.)
                   RIVERS AND HARBORS--NEW                                  ENGLAND           DIVISION                    33
    Existing project.-This provides for a channel 5 feet deep and 40
  feet wide in the Josias River from that depth in Perkins Cove to and
including an anchorage basin of the same depth and about 3.2 acres
in area in Flat Pond. The project depths refer to mean low water.
The mean range of tide is 8.7 feet and the spring range is 10 feet.
    The estimate of cost for new work, approved in 1952, is $36,000,
exclusive of $35,000 expended by local interests for work on the project.
The latest (1950) approved estimate of cost for annual maintenance
is $1,800.
    The existing project was authorized by the River and Harbor Act
of March 2, 1945 (H. Doc. 227, 76th Cong., 1st sess.). The latest
published map is in the project document.
    Local cooperation.-Fullycomplied with.
    Since the preparation of the project document, the residents of
Ogunquit have spent $35,000 toward the accomplishment of the project
and the River and Harbor Act of March 2, 1945, states "except that
the useful work done on the project by local interests shall be accepted
toward the fulfillment of the requirements of local cooperation."
    Terminal facilities.-Thereare no wharves on this waterway. How-
ever, the town has erected a wood bulkhead on the left bank of the
river. This bulkhead serves as a landing for local fishermen. This
structure provides adequate landing facilities for the needs of the
harbor.
    Operations and results during fiscal year.-A new contract to com-
plete the improvement dredging remaining to be done under contract
defaulted on May 3, 1951, was commenced on October 16, 1951, and
completed on November 25, 1951. During this period 9,626 cubic
yards of gravel, sand, mud, and clay and 120.81 cubic yards of boulders
were removed at a cost of $37,933.22, all for new work. The expen-
ditures were $37,927.22.
    Condition at end of fiscal year.-The existing project was completed
in 1951. The controlling depth at mean low water is 5.0 feet from
Perkins Cove to and including the basin area with the exception of
ledge areas along the south and west limits of the basin area.
    The costs under the existing project have been $52,668.07 for new
work. The expenditures have been $51,913.94.
    Proposed operations.--New work funds unexpended at the end of
fiscal year 1952, amounting to $2,397.64, minus accounts payable of
$754.13, leaving a balance of $1,643.51 are being held in reserve pending
settlement of claim.
    No work is scheduled for fiscal year 1954.
                                          Cost and financial summary

                                                     Fiscal year ending June 30                              Total to June
                                                                                                            30, 1952, includ-
                                                                                                            ing fiscal years
                                      1948          1949         1950            1951           1952          priorto1948

New work:
   Appropriated------.........       --------- ------------   $33,500.00- -     -- ,    .-   $18,315. 00          $54,311. 58
    Cost_--- -------             ------------------------       1,178. 64     $11, 059.63     37, 933. 22          52, 668. 07
    Expenditures..--..-----------------------                   1,191. 29      10, 298. 85    37, 927. 22          51,913. 94


Other new work data: Unobligated balance, June 30, 1952_--------                                              $1, 643.51
34          REPORT OF CHIEF OF ENGINEERS,                            U.    S.   ARMY,      1952

                             6. LAKE WINNEPESAUKEE, N. H.

  Location.-Lake Winnepesaukee and its tributaries lie wholly
within the State of New Hampshire, their waters forming the chief
source of the Merrimack River. The lake is about 20 miles long and
has an average width of about 5 miles. At its southwestern extremity
(at Weirs) it has an outlet into Long Bay (Paugus Bay), which is
navigable for a distance of 4 miles to its outlet at Lakeport. (See
U. S. Geological Sheets Winnepesaukee and Wolfeboro, N. H.)
  Existing project.-This provides for a channel approximately 3,000
feet long, 50 feet wide, and not less than 5 feet in depth in the lowest
known stage of the water, the object being to afford an outlet channel
for the lake into Long Bay. The cost of new work for the completed
project was $7,500. The latest estimate for annual cost of mainte-
nance, approved 1950, is $1,500.
  The existing project was adopted by the River and Harbor Act of
1879. The latest published map is in the Annual Report for 1880,
page 362.
  Local cooperation.-None required.
  Terminal facilities.-There are several small wharves located at
Alton Bay, Wolfeboro, Weirs, and at Lakeport. They are chiefly
used from the middle of May to the latter part of November in con-
nection with the transportation of pleasure travel.
  Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-The existing project was com-
pleted in 1882. Maintenance dredging during the fiscal year 1950
restored the channel between Lake Winnepesaukee and Long Bay to
full project dimensions. The costs of the existing project have been
$7,500 for new work and $29,650.91 for maintenance, a total of $37,-
150.91. The expenditures have been $7,500 for new work, and $29,-
550.91 for maintenance, a total of $37,050.91.
  Proposed operations.-Funds unexpended at the end of the fiscal
year 1952 amounting to $5,449.09, minus accounts payable of $100.00,
leaving a balance of $5,349.09 are being held in reserve pending
settlement of claim.
  No work is scheduled for fiscal year 1954.
                                   Cost and financial summary

                                              Fiscal year ending June 30                       Total to June
                                                                                               30, 1952, includ-
                                                                                               ing fiscal years
                                1948         1949         1950         1951         1952        priorto 1948

New work:
   Appropriated--....-- -------------         --------------------------------- ------------          $7,500.00
   Cost ...-----------    - ----------------------------------- -----------------------                7,500.00
   Expenditures---         ...------------------------------------------------ ------------            7.500. 00
Maintenance:
   Appropriated___-------         -------------------- $30,000.00 -----------------------             35,000.00
     Cost----------      ------------------------- 28, 716. 03 -$4,065.12                             29,650. 91
     Expenditures...-------...------------- -------- 14, 761.85   9, 789. 06    ------------          29,550. 91
          RIVERS   AND   HARBORS-NEW       ENGLAND    DIVISION        35
           7. ISLES OF SHOALS HARBOR, MAINE AND N. H.

    Location.--A group of islands in the open sea about 6 miles south-
east of Portsmouth Harbor, N. H. Three of them, Smuttynose, Cedar,
and Star Islands, are so situated that, with the shoals connecting them,
they afford a small harbor of fair depth, open only to the west and
northwest, known as Gosport Harbor. (See U. S. Coast and Geodetic
Survey Chart No. 330.)
    Previous projects.-The first work of improvement by the Govern-
ment was ordered by the Act of March 3, 1821. Subsequent modifica-
tions and additions were authorized by the Act of May 7, 1822, and
the River and Harbor Act of July 13, 1902. The cost for the com-
pleted project was $41,453.21. For scope of previous projects see page
1739 of annual report for 1915.
    Existing project.-This provides for the construction of three rough
stone breakwaters as follows: One from Smuttynose Island west-
wardly to Malaga Island on the north side of the harbor, having a
length of 240 feet; one extending southeastwardly from Smuttynose
Island to Cedar Island, protecting the harbor on the east, having a
length of 700 feet; and a third extending southwestwardly from Cedar
Island to Star Island, affording protection from the southeast and
south, having a length of 530 feet. The mean tidal range is 8.7 feet and
the extreme 9.9 feet.
    The cost for new work for the completed project was $39,238.32,
exclusive of amounts expended under previous projects. There is no
approved estimate of cost for maintenance.
    The existing project was adopted by the River and Harbor Act ap-
proved June 25, 1910 (H. Doc. No. 1122, 60th Cong., 2d sess.). The
latest published map is printed in the annual report for 1913, page
1530.
   Local cooperation.-None.
    Terminal facilities.--There is one wharf near the hotel on Star
Island which is used to accommodate a passenger steamer plying be-
tween Portsmouth, N. H., and the Island during 3 months of the
summer.
    Operationsand results during fiscal year.-None.
    Conditionat end of fiscal year.-The existing project was completed
in 1913 and repaired in 1929. The breakwaters between Smuttynose
Island and Malaga Island, and Smuttynose Island and Cedar Island
are in good condition. The breakwater between Cedar Island and
Star Island is in poor condition. The costs and expenditures under
the existing project have been $39,238.32 for new work and $34,261.68
for maintenance, a total of $73,500.
   Proposed operations.-An allotment of $40,000 maintenance funds,
to be made during fiscal year 1953, will be applied toward restoring
the breakwater dimensions at the point of anchorage to Star Island,
by contract.
   No work is scheduled for fiscal year 1954.
36          REPORT OF CHIEF OF -ENGINEERS, -U.                                          S. ARMY,              1952

                                            Cost and financial summary

                                                           Fiscal year ending June 30                                  Total to June
                                                                                                                  30, 1952, includ-
                                                                                                                  ing fiscal years
                                        1948             1949            1950     1951            1952                 prior to 1948


New work:
   Appropriated         _...------------------------ ------------------                       ------------
                                                                                             ..........----                $80,691.53
   Cost   -----------------          ---  ----------------- ------------------             ------------
                                                                                           -                                80, 691.53
   Expenditures.................-----------...-----------------------------------             ..........------------        80, 691.53
Maintenance:
               .....-------------------------------------------------------
   Appropriated-----                                                                                                        34, 261.68
   Cost     ------------------------------------------------------------------
   Expenditures--...........                              ----------- -----------
                         ----------------------------------
                                                                                                                            34,261. 68
                                                                                                                            34, 261.68



           8. GLOUCESTER HARBOR AND ANNISQUAM RIVER, MASS.

   Location.-GloucesterHarbor is situated at the southern extremity
of Cape Ann, about 23 miles northeast by water from Boston Harbor.
Annisquam River is a narrow tidal waterway extending across the base
of Cape Ann from Gloucester Harbor on the south side to Ipswich
Bay on the north side, a distance of approximately 4 miles. A reach
of this waterway, at the Gloucester Harbor end, for a length of about
1,800 feet, is known as the Blynman Canal. (See U. S. Coast and
Geodetic Survey Chart No. 243.)
   Previous projects.-Projects for Gloucester Harbor were adopted
by river and harbor acts of June 10, 1872, August 5, 1886, and June 3,
1896. There were no previous projects for Annisquam River. For
further details see page 1740 of annual report for 1915, and page 50
of annual report for 1937.
   Existing project.-This provides:
   Gloucester Harbor: (a) For a rubblestone breakwater 2,250 feet
long, surmounted by a superstructure of dry walls of heavy split stone
enclosing a core of rubblestone from Eastern Point over Dog Bar to
Cat Ledge.
   (b) For the removal of three ledges in the inner harbor, 1 to 12
feet and 2 to 15 feet depth at mean low water, and five ledges in the
outer harbor, 4 to 18 feet and 1 to 25 feet depth at mean low water,
aggregating a total of 2,206 cubic yards, place measurement.
   (c) For removal to depth of 15 feet below mean low water of ledges
and boulders obstructing the approach to the wharves between Harbor
Cove and Pews wharf, near the head of the inner harbor; dredging
to the same depth the channel leading past the wharves and dredging
Harbor Cove to the depth of 10 feet at mean low water.
   Annisquam River: For a channel 8 feet deep at mean low water
60 feet wide from Gloucester Harbor to the Boston & Maine Railroad
bridge, 100 feet wide from the railroad bridge to the mouth of the
river, and 200 feet wide across the bar in Ipswich Bay, including the
removal of a ledge near the Gloucester Harbor entrance; and for a
dredged anchorage area about 17 acres in extent and 8 feet deep at
the entrance of Lobster Cove. The project depths refer to mean low
water.
   The mean range of tide in Gloucester Harbor is 8.9 feet; the extreme
range is 12.6 feet. The mean range of tide in Annisquam River is 8.8
feet; the extreme range is about 10 feet.
                 RIVERS AND           HARBORS--NEW                 ENGLAND          DIVISION                37
  The estimate of cost for new work, revised in 1952, exclusive of
amounts expended on previous projects is $660,000. The latest esti-
mate for annual cost of maintenance is $10,000.
  The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                    Documents

Aug. 11,1888     Removal of ledges and boulders, and dredging, in           Annual report, 1887, p.503.
                  Gloucester Harbor.
Aug. 18,1894     Construction of breakwater at entrance to Glouces-         H. Ex. Doc. 56, 48th Cong., 2dsess.,
                  ter Harbor from Eastern Point to Round Rock                and annual report, 1885, p. 534.
                   Shoal.
June 13,1902     Termination at Cat Ledge of breakwater authorized          Annual report, 1902, p. 89.
                  by act of Aug. 18, 1894.
June 25,1910     Removal of 8 ledges in Gloucester Harbor....----------..   H. Doe. 1112, 40th Cong., 2d sess.l
Aug. 30,1935     Dredging in Annisquam River and removal of a ledge         Rivers and Herbors Committee,
                  in gloucester
                  quam River.
                                Harbor near the entrance to Annis-           Doe. 39, 72d Gong., 1st sess.l
Mar.    2,1945   Dredging 8-foot anchorage area in Lobster Cove,            H. Doc. 329, 77th Cong., 1st sess.'
                  Annisquam River.,

  i Contains latest published maps.

    Local cooperation.-The River and Harbor Act of March 2, 1945,
provides that local interests contribute one-third of the initial cost
of the improvement, but not to exceed $25,000, furnish free of cost
to the United States all lands, easements, rights of way, and spoil-
disposal areas necessary for the improvement and for subsequent
maintenance, when and as required, and hold and save the United
States free from claims for damages resulting from the improvement.
Assurances of local cooperation were furnished during fiscal year 1949.
    Terminal facilities.-There are in Gloucester Harbor 61 wharves
worthy of mention. The depth beside the wharves varies from 0 to
20 feet at mean low water. Except for 3 wharves, 2 owned by the
city and the fish pier which is leased by the city from the Common-
wealth of Massachusetts, all are private and are not available to the
public. There are two commercial wharves on Annisquam River, on
the east bank. These facilities are considered adequate for the existing
commerce of the port. For full description see Port and Terminal
Facilities at the Ports of Northern New England, 1941.
    Operations and results during fiscal year.--None.
    Condition at end of fiscal year.-The existing project was about
81 percent complete. The existing project was completed in 1936
except for dredging the anchorage area in Lobster Cove in the Annis-
quam River. The removal of all ledges and boulders in Gloucester
Harbor between Harbor Cove and Pews wharf, and other obstructing
rocks, was completed in 1896; the dredging of a channel in front
of the wharves and in Harbor Cove was completed in 1894; and the
removal of a pinnacle rock in the outer harbor in 1896. The break-
water which was completed in 1905 was repaired in 1940 and is in
good condition. The removal of all ledges to project depth was com-
pleted in 1916. The improvement of Annisquam River was completed
in 1936 at a cost of $33,975.89. The controlling depths over the ledges
in the outer harbor in 1916, were from 18 to 25 feet; over ledge
in the inner harbor in 1931, 14.6 feet; and over ledges A and B in
                                                                                                            0
the inner harbor in 1940, 13.6 and 15 feet respectively. The controlling
depth in Annisquam River in 1949 was about 8 feet. The costs for
38                REPORT                OF CHIEF                    OF ENGINEERS,                              U.       S. ARMY,                     1952

Gloucester Harbor under the existing project have been $501,178.84
for new work and $52,447.80 for maintenance, a total of $553,626.64.
The costs for Annisquam River have been $33,975.89 for new work
and $123,592.84 for maintenance, a total of $157,568.73. The total
costs and expenditures under the existing project have been $711,-
195.37, of which $535,154.73 was for new work and $176,040.64 was
for maintenance.
  Proposed operations.-No work is scheduled in fiscal year 1953.
  The sum of $2,200, maintenance funds, can be profitably expended
during fiscal year 1954 as follows:
Maintenance:
    Condition survey, by hired labor, to determine extent of shoaling
       and restriction of width of Annisquam River and of 15-foot chan-
       nel in Gloucester Harbor to determine extent of deterioration of
       the project-----------------------------         ------------- $2, 000
Miscellaneous inspections and reports--------------------- -----------   200
              Total all work----------------------------------------                                                                                           2, 200
                                                         Cost and financial summary

                                                                           Fiscal year ending June 30                                                 Total to June
                                                                                                                                                      30, 1952, includ-
                                                                                                                                                      ing fiscal years
                                                   1948                 1949                 1950                   1951               1952            priorto 1948

New work:
                             ............
   Appropriated----....... ------------------------                  ---------...........
                                                                  ............      -----
                                                                                , .........---.......-----------...          $556, 154. 73
                                                         ............ ............
   Cost .......-----------......------------.......------------------------------------                --------..........--- 556,1 4. 73
   Expenditures .......------------------............---..........--------------------------- --------.......................
                                                                                                                --            556,154. 73
Maintenance:
   Appropriated_                      ----------------------                       -----------------------------------                                      176, 040. 64
   Cost----------------------------..................----------------------------------..........                              ...........                  176,040.64
   Expenditures---............---------................--------------......................------------...-------------...............----------..          176, 040. 64


Other new work data : Estimated additional amount needed to be appro-
priated for completion of existing project---------------------- $125, 000

                                                       9. SALEM HARBOR, MASS.

  Location.--This harbor is located on the north shore of Massachu-
setts Bay, about 12 miles by water generally north of the entrance to
Boston Harbor. (See U. S. Coast and Geodetic Survey Charts
Nos. 240 and 1207.)
  Previous projects.-Adopted by the River and Harbor Act of
March 3, 1873, and extended by the River and Harbor Act of Septem-
ber 19, 1890. For further details see page 1741 of annual report for
1915.
  Existing project.-This provides for a channel 10 feet deep in South
River, 300 feet wide at the 10-foot depth in the harbor, gradually
narrowing to 200 feet at a point opposite the outer end of Derby
Wharf, thence 150 feet wide to the bend at the outer end of Derby
Wharf, thence 90 feet wide to the turn near the inner end of Derby
Wharf and thence 50 feet wide to the upstream end of Pickering
          RIVERS   AND HARBORS-N.EW       ENGLAND    DIVISION        39
Wharf, for a branch channel on the east side of Derby Wharf, 8 feet
deep, 100 feet wide, and about 700 feet long widening into a basin of
the same depth, 500 feet long and 200 feet wide; and for a channel 25
feet deep, 300 feet wide, and about 1,500 feet long, including the
removal to the same depth of a shoal near Abbot Rock Beacon. The
project depths refer to mean low water. The mean range of tide is 9
feet and the extreme range is 12.7 feet.
   The estimate of cost for new work revised in 1952 is $148,000 ex-
clusive of amounts expended on previous projects. The latest (1945).
approved estimate of cost for annual maintenance is $4,500.
   The existing project was authorized by the following river and
harbor acts: March 3, 1905 (H. Doc. 303, 58th Cong., 2d sess.) ; July 3,
1930 (H. Doc. 112, 70th Cong., 1st sess.) ; March 2, 1945 (H. Doc. 701,
76th Cong., 3d sess.). The latest published map is in the project
document.
   Local cooperation.-The River and Harbor Act of March 2, 1945,
provides that no dredging shall be done within 50 feet of any wharf
or structure, that local interests shall furnish assurances satisfactory
to the Secretary of War that suitable landing facilities open to all on
equal terms will be provided and maintained, and that they will hold
and save the United States free from claims for damages that may
result from the channel improvement.
   Terminal facilities.-The harbor has a developed waterfront of a
little more than 1 mile. There are 10 wharves in this area, 1 of which
is not in use. The facilities are considered adequate for the existing
commerce. For further details see Port and Terminal Facilities at
the Ports of Northern New England, 1941.
   Operations and results during fiscal year.-Preliminary work, by
hired labor, in connection with condition survey was accomplished
during fiscal year at a cost and expenditure of $18, all maintenance
funds.
   Condition at end of fiscal year.-The existing project is about 51
percent completed, the remaining portion consisting of the extension
of the 10-foot channel in South River from the outer end of Derby
Wharf, approximately 90 feet wide to the turn near Central Wharf,
thence 50 feet wide to the upstream end of Pickering Wharf, and a
branch channel on the east side of Derby Wharf 8 feet deep, 100 feet
wide, and aproximately 700 feet long, widening to a basin of the same
depth 500 feet long and 200 feet wide. The controlling depths were
0 to 1 foot in the 8-foot channel and turning basin (1939) ; 7 feet in
the 10-foot channel (1950) ; and, 25 feet in the 25-foot channel (1950)
 (1939). The costs under the existing project have been $55,605.91,
of which $48,087.91 was for new work and $7,518 was for maintenance.
   Proposed operations.-No work is proposed for the fiscal year 1953.
   The additional sum of $40,200 can be profitably expended during
the fiscal year 1954 for maintenance.
40             REPORT OF CHIEF OF ENGINEERS,                                                          U. S. ARMY,                   1952

                                                  Cost and financial summary

                                                                     Fiscal year ending June 30                                      Total to June
                                                                                                                                     30,1952, includ-
                                                                                                                                     ing fiscal years
                                             1948                  1949                   1950          1951            1952          prior to 1948


New work:
                              ............------------
   Appropriated---------.......------------.       ............                   ...........------------------
                                                                     -------............              ............              $100,456. 57
                                                   ............
   Cost............-------------------....----------------------............--   ------------............
                                                                                 --............         ------...........------  100, 456. 57
                                ............----------
   Expenditures-------------------.........                                                                                      100, 456. 57
                                                                ------------............---............----------------........................
Maintenance:
   Appropriated---...---------                  ..................-----------..........-----------   ---------.       $1, 866. 00           9, 366.00
     Cost-------------------------   ............--------------........                     -----------------.
                                                                                                        ...........        18. 00           7, 518. 00
     Expenditures .........------------......................................-----------------------------------           18.00            7, 518.00


Other new work data: Estimated additional amount needed to be ap-
  propriated for completion of existing project-----1------------                                                                       $100,   000

                                                 10. MYSTIC RIVER, MASS.

   Location.-The Mystic River rises in Mystic Lakes, Mass., flows in
a southeasterly direction, and empties into Boston Harbor near the
Boston Naval Shipyard. It is 7 miles in length. (See U. S. Coast and
Geodetic Survey Chart No. 248 and U. S. Geological Survey Chart,
"Boston".)
   Previous projects.-Original project for the lower Mystic was
adopted by the River and Harbor Act of March 3, 1899 and curtailed
by the River and Harbor Act of June 25, 1910. For further details see
page 1743 of annual report for 1915, and page 59 of annual report for
1938.
   There has been no previous project for the upper Mystic.
   Existing project.-This provides for a channel 35 feet deep, extend-
ing from the upper limit of the 35-foot channel at Boston Harbor at
the Mystic River bridge to approximately 300 feet downstream of the
Malden Bridge, having widths varying from about 940 feet at its
lower end, to about 1,060 feet at a point about 1,200 feet below the
Malden Bridge, thence decreasing to 150 feet at its upper limit; a
channel 20 feet deep from the head of the existing 35-foot channel to a
point 800 feet above the Malden Bridge, with widths decreasing from
150 feet at the lower end to 75 feet through the drawspan, thence in-
creasing to approximately 340 feet to form a turning basin above the
bridge; a channel 6 feet deep and 100 feet wide from the Boston &
Maine Railroad (western division) bridge to about 2,500 feet above
Wellington Bridge, about 1 mile, and thence 4 feet deep, gradually
narrowing from 100 feet to 50 feet at the upper end for about 2 miles
to the head of commercial navigation at Craddock Bridge in Medford.
The project depths refer to mean low water. The mean range of tide
is 9.6 feet. The extreme range is 13.7 feet.
   The estimate of cost for new work, approved in 1952, is $4,870,000,
exclusive of amounts expended on previous projects. The latest
 (1950) approved estimate of cost for annual maintenance is $14,000.
   The existing project was authorized by the following river and
harbor acts:
                RIVERS AND        HARBORS---NEW            ENGLAND           DIVISION                  41

    Acts                         Work authorized                                  Documents

July 13, 1892  Improvement of the upper Mystic----------------..Annual report, 1891, p. 672.
June 25,1910   Improvement of channel downstream from mouth H. Doc. 1086, 60th Cong., 2d sess.
                 of Island End River to the 35-foot channel of Boston
                 Harbor.
Aug. 30, 19351 Improvement of channel upstream from mouth of Rivers and Harbors Committee
                 Island End River to city playground at Charles-      Doc. 33, 74th Cong., 1st sess.
                 town.
June 20,1938    Improvement of channel upstream from city play-      H. Doe. 542, 75th Cong., 3d sess.
                 ground at Charlestown to a point 800 feet above
                 the Malden Bridge.
May 17, 1950    Improvement of the channel from the upper limit of   H.   Doc. 645, 80th Cong., 2d seas.'
                  the 35-foot Boston Harbor channel to the Malden
                  Bridge.

  I Also Emergency Relief Act of 1935.
s Contains latest published map; a map showing the entire river is published in H. Doc. 2108, 64th
Cong., 2d sess.

    Local cooperation.-None required.
    Terminal facilities.-In the section of the river benefited by the
35-foot-channel project there are on the south bank of the river four
wharves aggregating over 4,000 feet of berthing space used for the
receipt, storage, and shipment of coal, lumber, and gypsum. These
wharves consist of substantial stone or wooden bulkheads filled solid,
and in some cases fronted by pile platforms. There is also on the south
bank a lumber terminal, the largest of its kind on the Atlantic coast.
It is equipped with the most modern mechanical appliances, has rail-
road connection, and occupies 4,400 feet of water front. On the north
bank of the river within the scope of this improvement there is a large
wharf for receipt and shipment of oil on an extensive scale; immedi-
ately adjacent to this wharf is an extensive terminal constructed in
connection with an iron works; downstream of the Malden Bridge
there is a wharf for receipt of oil in connection with electric generating
plant; on the west bank of Island End River, which flows into Mystic
River on the north about midway of the 35-foot channel, are situated
two large terminal wharves, of 800 feet dockage, for receipt and ship-
ment of coal, coke, tar, and oil. These wharves are connected with
the 35-foot channel by a channel 30 feet deep at mean low water,
dredged by private interests. None of the above wharves is publicly
owned, and none is open to general public use.
    Beyond the scope of the authorized 35-foot-channel improvement,
and within the scope of the 20-foot channel and the improvement of
the upper Mystic, there are on the south bank in Charlestown and
Somerville about 1,850 feet, and on the north bank in Medford about
1,235 feet of available dockage, of which 450 feet on the south bank
and 435 feet on the north bank are customarily in use. A large auto-
mobile assembly plant is located on the south bank in Somerville.
   The existing wharves consist of stone and wooden bulkheads, solid
filled. None is publicly owned, but two are open to the public on pay-
ment of wharfage charges. The capacities of the lower Mystic are
being utilized to a gratifying extent. These facilities are considered
adequate for existing commerce. For further details see "The Port
of Boston, Mass.-Port Series No. 3.-Revised 1946."
   Operations and results during fiscal year.-Maintenance dredging,
by contract, to restore 30-foot channel depths was commenced on Feb-
ruary 7, 1952 and was in progress at the end of the fiscal year. During
42           REPORT          OF         CHIEF OF ENGINEERS,                                  U.      S. ARMY,        1952


the period 104,784 cubic yards of clay, mud, sand and silt, and 62.76
cubic yards of rock were removed at a cost of $118,646.90. The ex-
penditures were $100,878.21, for maintenance.
   Condition at end of fiscal year.-The existing project is about 16
percent complete. To complete the project there remains the dredg-
ing of the 35-foot channel, including the removal of ledge in the
channel. The controlling depths at mean low water in Mystic River
at the time the various sections were last surveyed were: Approxi-
mately 20 to 30 feet in the 35-foot channel (1950); 20 feet in the 20-
foot channel (1948); 3 feet in the 6-foot channel; and 3 feet in the
4-foot channel but narrowed in width (1946).
   The total costs under the existing project from regular funds have
been $472,147.23, of which $293,341.72 was for new work and $178,-
805.51 for maintenance. The expenditures were $293,341.72 for new
work and $161,036.82 for maintenance. The total costs and expendi-
tures under emergency relief appropriation funds have been $476,-
783.40, all for new work. The total costs under all funds have been
$948,930.63, of which $770,125.12 was for new work and $178,805.51
was for maintenance. The total expenditures under all funds have
been $931,161.94.
  Proposed operations.-The unexpended balance and accounts re-
ceivable June 30, 1952 of $54,477.23 will be applied as follows:
Accounts payable--------------------------------$18,                                                                             124. 13
Completion of maintenance dredging to restore 30-foot channel
  depths, approximately 26,216 cubic yards and 62.24 cubic yards
  hard material --------             --- ----------------------------                                                      36, 353. 10
                                                                                                                           54, 477. 23
  The sum of $1,000,000 can be profitably expended during fiscal year
1954 for new work dredging by contract.
Dredging to 35 feet of the 35-foot project from Boston Harbor to
  the Malden Bridge_ ---------------------           ----------- $1, 000,000

                                          Cost and financial summary

                                                          Fiscal year ending June 30                                     Total to June
                                                                                                                         30, 1952, includ-
                                                                                                                         ing fiscal years
                                        1948            1949                1950                  1951       1952         priorto 1948


New work:
   Appropriated------....-------.------------                       -----------------------------------......                 $895,848.32
                   ----------
    Cost--------....                           ------------------               ---------------      ---------- ------         895,848.32
    Expenditures- -------------------                       ----------- -    ----------------      ----------------            895, 848.32
Maintenance:
                          $10, 500.00
    Appropriated- ........--               -$755. 56                        $664.32    ----------      000.00
                                                                                                   $155,
                                                                                         ...........                           225,440.53
    Cost----------------     9, 744.44 ------------.                         664.32      ...------..118,646.90                 189, 087.43
                             9, 744. 44 ------------
    Expenditures ..-------....                                               664. 32     ------     100, 878. 21               171, 318. 74


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project------------  $4,100, 000. 00

                                        11. BOSTON HARBOR, MASS.

  Location.-This harbor includes all the expanse of tidewater lying
within a line from Point Allerton to Point Shirley and extending from
that line westward to the mainland. This comprises an area of about
          RIVERS   AND HARBORS--NEW        ENGLAND    DIVISION         43
47 square miles, exclusive of the islands. (See U. S. Coast and Geo-
detic Survey Charts Nos. 246 and 248.)
   Previous projects.-Adopted by the River and Harbor Acts of
March 2, 1867, June 14, 1880, September 19, 1890, June 3, 1896, and
July 25, 1912. For further details see page 1743 of annual report for
1915, page 81 of annual report for 1917, and page 63 of annual report
for 1938.
   Existing project.-This provides for the following:
   a. A channel 40 feet deep in general, but 45 feet deep through rock,
from the sea to President Roads through Broad Sound, 2 miles, 900
feet wide except at the outer end where it is widened to 1,100 feet.
   b. Deepening to 40 feet the main ship channel from President Roads
to about 200 feet northerly of the site of Mystic Pier No. 1, Charles-
town; having widths varying from 600 feet to 1,200 feet with suitable
widening at the bends. Length about 5.5 miles.
   c. An anchorage area 2,000 feet wide, 5,500 feet long, and 40 feet
deep, on the north side of President Roads.
   d. Extension of President Roads anchorage 700 feet to the north
and 500 feet to the west at a depth of 40 feet, and dredging an area
to 35 feet lying west of the anchorage.
   e. Deepening to 40 feet that part of the approach channel to the
United States Navy drydock No. 3 at South Boston between the main
ship channel and the United States harbor line.
   f. A channel 35 feet deep along the same line as the 40-foot main
ship channel in the following manner: Adjacent to the westerly side
of the 40-foot main ship channel through Broad Sound 600 feet wide,
a distance of about 2 miles; adjacent to the northerly side of the 40-foot
main ship channel from President Roads to abreast the fish pier 600
feet wide, a distance of about 3 miles; adjacent to the westerly side
of 40-foot main ship channel from abreast Fort Point Channel to the
Mystic River and Charlestown Bridges and the entrance to the Chelsea
River, having widths varying from 100 feet to 1,000 feet, a distance
of about 2 miles.
   g. A channel 2 miles long, 30 feet deep, and 1,200 feet wide from the
sea to President Roads through Broad Sound by a less direct route
than the 35- and 40-foot channels.
   h. A channel 27 feet deep and 1,000 feet wide from Nantasket Roads
to President Roads known as the "Narrows" Channel, 3 miles.
   i. A channel 15 feet deep, 300 feet wide, and 550 feet long through
the bar which extends from the north head of Long Island to Nixes
Mate Shoal, known as "Nixes Mate" or "Nubble" Channel.
   j. A channel in Chelsea River 30 feet deep and generally 200 feet
wide, from the mouth of the river, at the head of the 35-foot channel
in Boston Harbor, to a point about 1 mile upstream of the Chelsea
Street Bridge, a distance of about 2 miles, thence a channel 8.4 feet
deep to the Boston & Maine Railroad Bridge 150 feet wide a distance
of about one-half mile.
   k. Improvement of Reserved Channel east of L Street Bridge by a
channel 30 feet deep and 300 feet wide.
   1. The Fort Point Channel, 23 feet deep and 175 feet wide from its
entrance in Boston Harbor, about four-fifths of a mile to the Dorches-
ter Avenue (old Federal St.) Bridge.
 44           REPORT             OF      CHIEF         OF     ENGINEERS,    U.        S.   ARMYI,      1952


    m. Sea walls of coursed stone and riprap protecting the most
exposed headlands and islands.
    All depths are referred to mean low water. The mean range of tide
is 9 feet at Boston Light, and 9.6 feet in the upper harbor, in Chelsea
Creek, and in Fort Point Channel. The extreme range is about 4 feet
greater.
   The estimate of cost for new work, approved in 1952, exclusive of
amount expended on previous projects and of sea walls for which no
estimate was given is $19,131,000. The latest (1950) approved esti-
mate for annual cost of maintenance is $130,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                                  Work authorized                                    Documents
              -   -
                  I                                                              I




Mar.    2,1825        Pteservation of islands by sea walls.
Aug.    5,1886        Fort Point Channel_._...........______.............            H. Ex. Doc. 206, 48th Cong., 2d
                                                                                      seas. Annual Report, 1885, p. 543.
                Channel 15 feet deep from Long Island to Nixes Mate                  Annual Report 1887, p. 517.
                  Shoal (Nixes Mate or Nubble Channel).
July 13,1892 Channel 27 feet deep from Nantasket Roads to Presi-                     Annual Report, 1893, p. 766.
                  dent Roads.
Mar. 3,1899 For 30-foot channel from sea to the President Roads                      H. Doc. 133, 55th Cong., 2d sess.
                  through Broad Sound by less direct route than the                   Annual Report, 1898, p. 886.
                  35- and 40-foot channels.
June 13,1902 For 35-foot channel from the sea to Boston Naval                        H. Doc. 119, 56th Cong., 2d sess.
                  Shipyard, Chelsea and Charles River Bridges.                        Annual Report, 1901, p. 1096.
                Elimination from the project of the removal of Finns                 Authorized by Chief of Engineers
                  Ledge at the outer entrance.                                        Mar. 11, 1913.
Aug. 8,1917     Depth of 40 feet (45 feet in rocks) in Broad Sound                   H. Doc. 931, 63d Cong., 2d sess.1
                  Channel.
Aug. 30, 1935 2 Present project dimensions Of channel from Presi-                    H. Doc. 244, 72d Cong., 1st sess.l
                 dent Roads to Commonwealth pier No. 1, East
                  Boston and anchorage area north side of President
                  Roads.
    Do ..-...Present project dimensions of that part of approach                     Rivers and Harbors Committee   1
                 channel to U. S. Navy drydock No. 3, at South                        Doc. 29, 74th Cong., 1st sess.
                  Boston between Main Ship Channel and United
                 States harbor line.
Aug. 26, 1937 Chelsea River Channel, 30 feet deep....----         ..-----            Rivers and Harbors Committee
                                                                                      Doc. 24, 75th Cong., 1st sess.' 1
Oct. 17,1940          Reserved Channel 30 feet deep_ ......................  H. Doc. 225, 76th Cong., 1st sess.
Sept. 7,1940          Abandons seaplane channel authorized in River and Public Law 420, 78th Cong.
                       Harbor Act approved Oct. 17, 1940 (H. Doc. 362,
                       76th Cong., 1st sess.).
Mar. 2,1945           Extension of 40-foot channel_........................_ H. Doc. 733, 79th Cong., 2d sess.1
July 24,1946          Extension of President Roads Anchorage_.............   H, Doe. 244, 80th Cong., 1st sess.'

  1 Contains latest published maps. See also Annual Report, 1911, p. 1178 (sea walls and Nixes Mate Chan-
nel) and Annual Report, 1903, p. 770 (Fort Point Channel).
  2 Authorized in part by Public Works Administration, Sept. 6, 1933.


  Local cooperation.-The River and Harbor Act of March 2, 1945
provides that the dredging of the proposed channel extension shall not
be undertaken until the Secretary of War is afforded satisfactory
assurance that the Commonwealth of Massachusetts will construct the
pier and provide a depth of 40 feet at mean low water in the berths
at the new pier which will be served by the proposed channel extension.
The construction of the new pier authorized by the Massachusetts
Legislature was completed in May 1952. Fully complied with.
Assurances approved by Chief of Engineers February 16, 1950.
  Terminal facilities.-There are 186 wharves and piers in the harbor,
not including the Mystic River, Weymouth Fore River, and Town
River, which are reported elsewhere. In addition, there are 4 ferry
          RIVERS AND    HARBORS-NEW        ENGLAND    DIVISION        45
slips and 2 car floats. Of the terminals, 33 are publicly owned, 3 are
open to public use, 86 have mechanical handling facilities, and 68 have
railroad connections. The facilities are considered adequate for the
present requirements of commerce. (For the latest full description
of terminal facilities, see Port Series No. 3--the Port of Boston, Mass.,
revised 1946.)
   Operations and results during the fiscal year.--Improvement dredg-
ing, by contract, of the extension of the 40-foot main channel in prog-
ress at the beginning of the fiscal year was completed on October 31,
1951. During the period 641,556 cubic yards of clay, mud and sand
were removed at a cost of $511,139.83, all for new work. The expendi-
tures were $658,052.37 for new work.
   In conjunction with the above contract, maintenance dredging was
done in the main ship channel to 35 feet. During the period 153,020
cubic yards of clay, mud and sand were removed at a cost of $124,998.90
for maintenance.
   Maintenance dredging, by contract, in the vicinity of the former
Chelsea North Bridge and Meridian Street Bridge was commenced
on September 22, 1951 and was completed on November 6, 1951. Dur-
ing the period 25,615 cubic yards of clay, mud, and sand were removed
and a concrete encased pipe and two dolphins were removed and dis-
posed of at a cost of $71,929.77 for maintenance.
   Maintenance dredging, by contract, in Fort Point Channel to 21
feet was commenced on November 30, 1951 and was completed on
February 10, 1952. During the period, 12,450 cubic yards of mud
were removed at a cost of $17,767.37, exclusive of $17,767.37 from
contributed funds for maintenance.
   Maintenance dredging, by contract, in Reserved Channel to 30 feet
was commenced on May 20, 1952, and was in progress at the end of the
fiscal year. During the period, 2'5,900 cubic yards of mud, silt, and
debris were removed at a cost of $39,442.99.
   Snagging operations, by hired labor, were begun in February 1952
and carried on during the balance of the fiscal year at a cost of
$4,088.15, for maintenance.
   Condition survey, by hired labor, of the 27-foot Narrows Channel,
30-, 35- and 40-foot entrance channels from Broad Sound to President
Roads, the 40-foot anchorage, the 35- and 40-foot main ship channel
up to the Charlestown and Mystic River Bridge and the 30-foot
Chelsea River channel was in progress at end of fiscal year. The costs
were $2,273.68.
   The total costs were $789,408.06, of which $511,139.83 were for new
work, and $278,268.23 were for maintenance. Total expenditures
were $907,874.72.
   Condition at end of fiscal year.--The existing project is about 86
percent complete, the remaining portion consisting of dredging the
extension of President Roads anchorage 700 feet to the north and 500
feet to the west at a depth of 40 feet, and dredging an area to 35 feet
lying west of the anchorage. Sea walls of a total length of about
3.75 miles have been built and maintained on Great Brewster, Lovells,
Gallups, Long, Hainsford, Deer, and Georges Islands, and on Point
     245554-53-vol. 1--4
46           REPORT         OF     CHIEF OF ENGINEERS,                        U.       S. ARMY,             1952

Allerton. The "Nixes Mate" or Nubble Channel was completed in
1892; the 30-foot channel in 1905; the 27-foot channel in 1907; Fort
Point Channel in 1909; the 35-foot channel in 1915; the Broad Sound
40-foot channel in 1930; the 40-foot anchorage in 1937; the 30-foot
Chelsea River channel in 1940, except for the small area immediately
below the Chelsea Street Bridge which was completed in 1946; the
the 40-foot inner harbor channel in 1941; and the 30-foot Reserved
Channel in 1941.
   The controlling depths at mean low water in the various improved
channels of Boston Harbor at the dates they were last surveyed were:
Broad Sound 40-foot channel, 40 feet (1939); main ship channel to
Commonwealth pier No. 1, 36.5 feet (1945), from Commonwealth pier
No. 1 to 200 feet northerly of Mystic pier No. 1, 39.7 feet (1951);
President Roads Anchorage,39 feet (1937); extension to the President
Roads anchorage and 35-foot area 15 to 35 feet (1945); approach to
Navy drydock No. 3, 40 feet (1938) ; 35-foot channel, 35 feet (1934);
Broad Sound 30-foot channel, 30 feet (1939) ; Narrows Channel, gen-
erally 27 feet with the exception of an encroachment 150 feet into the
northerly limit of the channel in the vicinity of "Narrows Light", a
depth of +5.2 feet on this shoal (1949); Nubble Channel, 15 feet
 (1951) ; Reserved Channel, maintenance dredging being done (195S);
Chelsea River, 30 feet inthe 30-foot channel (1947) ;8.0 feet in the 8.4-
foot channel (1936) ; and Fort Point Channel, 20 feet in three-quarters
of the channel width and 16 feet in the easterly quarter (1952).
   The costs and expenditures under the existing project to June 30,
1952, have been as follows:

                                                                        Costs
                                                                                                             Expenditures
                                                  New work          Maintenance              Total

Regular funds _ _ _  _....--------------------... $14,414,831. 97    $1,778,862. 22     $16, 193, 694. 19     $16, 164, 838. 67
Public works funds- -----------------               1,030, 806. 26 --                     1,030, 806. 26        1,030, 806. 26
Emergency relief funds___.....--........ 935, 303. 03--                                      935, 303. 03          935, 303. 03
      Total_--------------                       16,380, 941. 26     1, 778, 862. 22     18, 519, 803. 48      18, 130, 947. 96



  Proposed operations.--The unexpended balance and accounts re-
ceivable as of June 30, 1952 amounting to $59,092.12, plus an allot-
ment of $9,000 to be made during fiscal year 1953, a total of $68,092.12,
will be applied as follows:
Amounts payable June 30, 1952 .....---------              --   ---      _ $12, 687. 00
Maintenance:
   Completion of maintenance dredging, by contract, in Reserved
      Channel to 30 feet, approximately 26,900 cubic yards---------. 37, 678. 80
   Completion of condition survey, by hired labor ____       .--------
                                                                     ..     7, 726. 32
   Snagging operations, by hired labor __-------------------               10, 000.00

         Total-------------                    --------------------------------                               55, 405. 12
         Total all work-------------------                               -------------------                   68, 092. 12
                      RIVERS              AND         HARBORS-NEW                              ENGLAND                  DIVISION                         47

  The sum of $1,712,000 can be profitably, expended during fiscal year
1954 for the following scheduled work:
New work :
    Improvement dredging, by contract, of President Roads 40-foot
       anchorage extension---     -----------------------------       $1, 500,000
Maintenance:
    Maintenance dredging, by contract, in shoal areas of 40-foot main
       channel, 27-foot Narrows Channel, and the 15-foot Nubble
       Channel (approximately 200,000 cubic yards) ---------------        200, 000
Miscellaneous inspections and reports----------------------------           2, 000
Snagging operations, by hired labor-------------------------------         10, 000

            Total, all work------------------------------------------                                                                        1, 712, 000

                                                    Cost and financial summary
                                                          UNITED STATES FUNDS


                                                                     Fiscal year ending June 30                                            Total to June
                                                                                                                                          30, 1952, includ-
                                                                                                                                          ing fiscal years
                                         1948                1949               1950               1951                   1952             priorto1948

New work:
   Appropriated ....          -$6,500.00     -$6, 405.31 $400. 000.00 $380, 000. 00                                    -$38, 537. 56 1 $17,846, 064. 22
   Cost --------------------------------                     5,100. 55 225, 222. 06                                      511,139. 83 117, 846, 064. 22
   Expenditures--.... ------------ ------------              5, 062.80  78, 347. 27                                      658, 052. 37 1 17, 846, 064. 22
Maintenance:
   Appropriated ....             44, 546. 72 -34, 907. 50   15, 500. 00 73, 000. 00                                      235, 000. 00       2   1,825, 379. 23
   Cost _---------- ------------                8, 486. 71   2, 430. 76 18, 769. 05                                      260, 500. 86       2 1, 778, 974. 11
   Expenditures_....               1,015. 34    7, 512. 811  2, 389. 32 18, 359. 41                                      249, 822. 35       2 1, 767, 885. 96



Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project------------- $2, 750, 000. 00
                                                           CONTRIBUTED FUNDS


                                                                     Fiscal year ending June 30                                            Total to June
                                                                                                                                          30,1952, includ.
                                                                                                                                          ing fiscal years
                                               1948               1949                1950               1951               1952            priorto 1948

Maintenance:
   Appropriated-----......... ........--....---------------............-----............              .......-------------- $17, 767.37           $17, 767.37
   Cost- ............-----------...... ...---------.........---------------............---------- ......------------         17, 767.37            17, 767.37
   Expenditures--.......---------.............-----..-----........-----------                    -........-----------..      17, 767.37            17, 767.37

   1Includes $935,303.03 expended from emergency     relief funds for new work.
   2   In addition $17,767.37 was expended for maintenance from contributed funds.


                                       12. WEYMOUTH FORE RIVER, MASS.

   Location.-Rises in Braintree, Mass., and flows in a northerly
direction 7.5 miles, emptying into Hingham Bay, Boston Harbor.
 (See U. S. Coast and Geodetic Survey Chart No. 246.)
   Previous projects.--Adopted by the River and Harbor Act of Sep-
tember 19, 1890, and extended by the River and Harbor Acts of March
3, 1905, February 27, 1911, and July 27, 191'6. For further details see
page 1745 of annual report for 1915, page 64 of annual report for
1932, and page 67 of annual report for 1938.
   Existing project.-This provides for (a) a channel 27 feet deep
with a general width of 300 feet from a point in Hingham Bay be-
tween Nut and Peddocks Islands to the Weymouth Fore River bridge
at Quincy Point, about 3.0 miles; (b) a channel in Nantasket Gut 27
48            REPORT OF           CHIEF OF ENGINEERS,            U.    S.   ARMY,       1952

feet deep and 400 feet wide,, extending from deep water in Nantasket
Roads to Hingham Bay, a distance of about 2,000 feet; thence through
Hingham Bay 27 feet deep and 300 feet wide for a distance of about
1.4 miles to deep water in Weymouth Fore River west of Sheep
Island; and (c) extension of the 27-foot channel so as to include the
present 27-foot State-improved channel through and above the
Weymouth Fore River bridge and to provide in this section a com-
bined channel and maneuvering basin of the same depth, with a
length of about 2,500 feet and widths varying from 470 to 900 feet.
   The plane of reference is mean low water. The mean range of tide
is 9.5 feet. The extreme range is 13.6 feet.
   The estimate of cost for new work, approved in 1952, is $972,000,
exclusive of amounts expended on previous projects. The latest
(1950) approved estimate for annual cost of maintenance is $1'4,500.
   The existing project was authorized by the following river and
harbor acts:

       Acts                          Work authorized                             Documents


Aug. 30,1935       27-foot channel from Hinghamn Bay (between Nut     H. Doc. 207, 72d Cong., 1st sess.
                     and Peddocks Islands) to Weymouth Fore River
                     bridge.
Oct. 17,1940       27-foot channel through Nantasket Gut and Hing-    H. Doc. 568, 76th Cong., 3d sess.t
                     ham Bay to deep water in Weymouth Fore River
                     west of Sheep Island.
Mar.    2,1945     27-foot channel through and above Weymouth Fore    H. Doc. 294 77th Cong., 1st sess.
                     River bridge, and maneuvering basin.

2 Contains      latest published maps.

   Local cooperation.-Fullycomplied with.
   Terminal facilities.-There are nine wharves in Weymouth Fore
River all grouped near the head of the Federal improvement. Con-
struction consists mainly of pile and timber piers extending from
timber or concrete bulkheads. There are 6,092 feet of berthing space
available. Six of the wharves have railroad connections and six have
mechanical handling facilities. Three of the wharves are used in con-
nection with a large shipyard, two with oil terminals, one with an
electric generating plant, one with a large soap manufacturing plant,
and two with yacht clubs. There are no publicly owned wharves. The
facilities are considered adequate for the present needs of commerce.
 (For further description of terminal facilities see Port Series No. 3,
Port of Boston, revised 1946.)
   Operations and results during fiscal year.-Maintenance dredging,
by contract, in progress at beginning of fiscal year was completed on
August 4, 1951. During the period, 21,929 cubic yards of mud, sand
and silt were removed at a cost of $39,489.48. The expenditures were
$44,602,52.
   Condition at end of fiscal year.-The existing project was about 37
percent completed, the remaining portion consisting of dredging the
27-foot channel through Nantasket Gut and Hingham Bay to deep
water in Weymouth Fore River west of Sheep Island, authorized by
the River and Harbor Act of October 17, 1940, and the extension of
the 27-foot channel so as to include the present 27-foot State-improved
channel through and above Weymouth Fore River Bridge, and to
provide in this section a combined channel and maneuvering basin of
                         RIVERS AND                     HARBORS--NEW                              ENGLAND                  DIVISION                     49
the same depth, authorized by the River and Harbor Act of March 2,
1945. The controlling depths were 17.6 feet from Nantasket Gut
through Hingham Bay to abreast Sheep Island (1939) ; 26.0 feet for
project width of 300 feet from abreast Grape Island to Weymouth
Fore River Bridge (1949); 21.5 feet in channel and maneuvering
basin upstream of Fore River Bridge (1948). The costs under the
existing project have been $487,931.53, of which $355,227.34 was for
new work and $132,704.19 was for maintenance. The expenditures
have been $487,931.53.
   Proposed operations.- The unexpended balance June 30, 1952
amounting to $2,252.20 will be expended for a condition survey, by
hired labor, of the 27-foot channel from Nut and Peddocks Island
to Weymouth Fore River Bridge.
   The sum of $297,000 can be profitably expended during fiscal year
1954 for new work dredging, by contract, of the 27-foot Nantasket
Gut Channel.
                                                      Cost         nd fnnancial summary

                                                                       Fiscal year ending June 30                                           Total to June
                                                                                                                                           30, 1952, includ-
                                                                                                                                           ing fiscal years
                                                1948                1949                   1950             1951                1952        prior to 1948

New work:
   Appropriated ....-------............---....------------.....-----------------....................-------...-----------...............        $991,127.34
      Cost_ -------------------------                              ------           ----     ----------------- ------------                    1991,127. 34
   Expenditures---                                                  .....-----------
               .........................-------------------------------------------                                                            1 991,127. 34
Maintenance:
     Appropriated ........                  $35, 069. 24         $1,000. 00 -----------                 50, 139.12 ---.-.--        _             140, 206. 39
     Cost---------------.............        37, 460. 39          1,000. 00 -----                        8, 397. 44 $39,489. 48                  137, 954. 19
     Expenditures           --------.        37, 460. 39          1,000. 00                              3, 284. 40      44, 602. 52             137, 954. 19


  1 Exclusive of $100,000 expended from contributed funds for new work on previous project.
Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project--- --------- $617, 000.00
                                                       13. TOWN RIVER, MASS.

   Location.-Town River is a tidal river 2 miles long lying entirely
within the limits of the city of Quincy, just south of Boston, Mass. It
flows in an easterly direction and empties into Weymouth Fore River
at Quincy Point. (See U. S. Coast and Geodetic Survey Chart No.
246.)
   Previous project.-Adopted by the River and Harbor Act of June
3, 1896. For further details see page 65 of annual report for 1907,
and page 69 of annual report for 1938.
   Existing project.--This provides for a channel 24 feet deep at mean
low water and generally 150 feet wide from deep water in Weymouth
Fore River to a point opposite the upstream end of the Quincy Oil Co.
terminal, a distance of 6,700 feet, with a turning basin 18 feet deep,
400 feet wide, and roughly 1,000 feet long at the inner end; and a
channel 15 feet deep and 100 feet wide, thence to a point just below
the plant of the Quincy Electric Light & Power Co., a further distance
of 1,370 feet. The mean range of tide is 9.5 feet. The extreme range
is 11 feet.
   The estimate of cost of new work, made in 1936, was $456,400, in-
cluding $136,920 contributed by local interests but exclusive of
amounts expended under the previous project. The latest (1936)
50            REPORT           OF CHIEF         OF ENGINEERS,                     U.         S. ARMY,    1952

approved estimate for annual cost of maintenance is $6,000. The
existing project was adopted by the River and Harbor Act of August
26, 1937 (H. Doc. 96, 75th Cong., 1st sess.). The latest published map
is in that document.
   Local cooperation.-The River and Harbor Act of August 26, 1937,
requires that local interests contribute 30 percent of the initial cost of
the entire improvement, furnish free of cost to the United States a
suitably located right of way 400 feet wide and spoil-disposal areas,
bulkheaded where necessary, for new work and for subsequent main-
tenance as required, and release the United States from all claims for
damages attributable to the work of improvement. With the excep-
tion of furnishing certain easements, all conditions of local cooperation
have been complied with.
   Terminal facilities.-On the south bank of Town River are located
eight wharves, three of which are used for boat building and repair
work, three used for receipt of petroleum products, one for receiving
and storing lumber, and one for receiving scrap materials. On the
north bank of the river is located a yacht building and repair yard.
The facilities are considered adequate for existing commerce.
   For full description see The Port of Boston, Mass.-Port Series 3-
Revised 1946.
   Operations and results during the fiscal year.-None.
   Conditionat end of fiscal year.-The existing project was completed
in 1940. The controlling depth in 1947 from deep water in Weymouth
Fore River to a point opposite the upstream end of the Quincy Oil
Co. was about 22 feet, from the Quincy Oil Co. to a point just below
the Quincy Electric Light & Power Co. plant it was 14.5 feet, and in
the turning basin it was 17.6 feet.
   The total costs under the existing project have been $443,182.34, of
which amount $372,392.52 was for new work, including $111,762.76
contributed funds, and $70,789.82 was for maintenance. The expendi-
tures have been $443,182.34, including $111,762.76 contributed funds.
   Proposed operations.-An allotment of $1,200 to be made during
fiscal year 1953 will be applied toward a condition survey, by hired
labor, of the 24-foot channel from deep water in Weymouth Fore
River to Quincy Oil Co., thence of the 15-foot channel to just below
Quincy Electric Light & Power Co. plant.
   The sum of $36,000, maintenance funds, can be profitably expended
during the fiscal year 1954 for maintenance dredging, by contract, in
the 24-foot channel (approximately 25,000 cubic yards).
                                        Cost and financial summary

                                                      Fiscal year ending June 30                              Total to June
                                                                                                         S30,1952, includ-
                                                                                                              ing fiscal years
                                    1948            1949            1950             1951         1952         priorto 1948

New work:
     Appropriated--------- ---------             -$150. 00--------------------------------                       1$285,629. 76
     Cost   _---------------- -$150. 00                                                                           1285, 629. 76
   Expenditures---------.........   -150. 00 -----------------------------------------                            1285, 629. 76
Maintenance:
     Appropriated---------.-----             --------------------                 ----------------------            83, 367. 23
     Cost--------------59, 980. 87 ........---------..-----------------------------------............              83, 367. 23
     Expenditures-........ 60, 327. 91 ---  ---... -- - - . --.-       ..               - --              -      - 83, 367. 23

   1 Excludes $111,762.76 expended of contributed funds.
                RIVERS       AND      HARBORS--NEW               ENGLAND           DIVISION                51
                              14. PLYMOUTH HARBOR, MASS.

   Location.-This harbor is 45 miles by water south of Boston. Its
outer anchorage, the "Cow Yard," is common to Plymouth, Duxbury,
and Kingston. (See U. S. Coast and Geodetic Survey Chart No. 245.)
  Previous projects.-Adopted by acts of May 26, 1824, March 3, 1875,
and 1877, 1884, and 1885. For further details see page 1746 of annual
report for 1915, and page 72 of annual report for 1938.
  Existing project.-This provides for (a) protecting by riprap the
sections of Long Beach damaged by the storm of November 1898, and
for restoring Eel River to its former course; (b) dredging a channel
18 feet deep at mean low water and 200 feet wide, increased at the
entrance and on curves, from the bay to the town wharves, formerly
in the areas south of the State pier, a distance of about 2.5 miles, with
a suitable turning basin at the inner end; (c) dredging a channel 150
feet wide, 15 feet deep at mean low water, extending in a northwesterly
direction about 0.3 mile from a point off the site of northerly Craigs
wharf (now State pier) with a turning basin 300 feet square, and of
the same depth, at its northwesterly end; (d) maintenance of the area
dredged to a depth of 18 feet below mean low water by the Common-
wealth of Massachusetts, connecting the 15-foot channel with the 18-
foot channel in the vicinity of the State pier; and (e) dredging an
anchorage basin 18 feet deep at mean low water, 850 feet wide and
2,125 feet in average length on the southeast side of the project channel
near Long Beach. The mean range of tide is 9.6 feet; the extreme
range is 13.7 feet.
   The estimated Federal cost of new work, approved in 1952 is
$538,500.
  The latest approved estimate for annual cost of maintenance is
$12,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                           Work authorized                                     Documents

Mar. 3,1899     Beach protection---         --------------------------      Annual report for 1899, p. 1089.
Mar. 4, 1913    Dredging 18-foot channel                -    -   -   _.--   H. Doc. 1194, 62d Cong., 3d sess.
Sept. 22,1922   Dredging 15-foot extension, including turning basin_ _      H. Doc. 996, 66th Cong., 3d sess.'
June 20,1938    Dredging 18-foot anchorage basin-----------------           H. Doc. 577, 75th Cong., 3d sess.1

  1 Contains latest published maps.


  Local cooperation.--The River and Harbor Act of June 20, 1938,
provided for an anchorage basin 18 feet deep at mean low water,
850 feet wide, and 2,125 feet in average length on the southeast side
of the project channel near Long Beach, provided local interests
furnish, free of cost to the United States, spoil-disposal areas for
initial work and for subsequent maintenance as may be required, and
contribute one-third the initial cost of the improvement. These con-
ditions have not yet been complied with.
  Terminal facilities.-There are three wharves and five boatyards.
Two of the wharves are publicly owned, one by the town of Plymouth
and one by the Commonwealth of Massachusetts. These wharves are
open to the public free of charge. The third wharf is used in con-
52          REPORT         OF     CHIEF OF ENGINEERS,                  U.      S. ARMY,          1952


nection with a yacht club. The wharves are of pile and timber
construction with timber docks. None of the wharves have railroad
connections. Of the boatyards, two are used for the construction
of new boats and the repair of old boats, and three are used for the
servicing and storage of boats. The facilities are considered ade-
quate for the present requirements of commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was about 35
percent completed. No work has been done on the 18-foot anchorage
basin authorized by the River and Harbor Act of June 20, 1938.
Work of protecting by riprap the sections of Long Beach damaged
by the storm of 1898 was completed in 1909. Eel River was restored
to its former course in 1904. The dredging of a channel 18 feet deep
at mean low water was completed in 1915. The 15-foot channel was
completed in 1927. Controlling depths were 6 feet from the entrance
in Cape Cod Bay to Beacon No. 4, thence 11 feet to the State Pier in
the 18-foot channel (1950); 11 feet in the 15-foot channel (1950);
8 feet in the 15-foot turning basin at the town wharf (1950) ; and +4
to 18 feet in the 18-foot anchorage (1950). The costs and expendi-
tures under the existing project have been $324,722.30, of which
$188,571.16 was for new work and $136,151.14 was for maintenance.
In addition, $108,400 has been expended from contributed funds, of
which $108,000 was for new work and $400 was for maintenance.
   Proposed operations.-An allotment of $195,000, maintenance
funds, to be made during fiscal year 1953 will be expended for main-
tenance dredging by contract for partial restoration of the 18-foot
channel by dredging to 15 feet and restoring the 15-foot channel to
project depth (approximately 225,000 cubic yards). No work is
scheduled for fiscal year 1954.
                                      Cost and financial summary

                                                  Fiscal year ending June 30                      Total to June
                                                                                                  30, 1952, includ-
                                                                                                  ing fiscal years
                                   1948          1949        1950        19051        1952          prior to 1948


New work:
   Appropriated .....--------------------------------------- -        ----------- ------------       ' $377, 217.75
    Cost__-----_-----------               ------------------------------------------------              377, 217.75
    Expenditures---------.......----------     ---------------------------------   -----------        1377, 217.75
Maintenance:
    Appropriated---.....--------------------------------------         $2, 500.00 ------------  1 138,164.35
   Cost
   Cost------------------- ------------ ------------                     2,50.0------------1 1138,164.35
                                                                        2,50000                    38643
    Expenditures------...------------         --------------------      2, 500.00 .------------ 1 138,164.35


SIn addition $108,000 was expended from contributed funds for new work and $400 for
maintenance.
Other new work data : Estimated additional amount needed to be ap-
propriated for completion of existing project----------------     $350, 000.00
           RIVERS   AND   HARBORS-NEW      ENGLAND    DIVISION        53
                      15. CAPE COD CANAL, MASS.

    Location.-This waterway is a sea-level canal, extending from the
  head of Buzzards Bay, Mass., to a point on Cape Cod Bay about 15
miles southeast of Plymouth Harbor, Mass. In general direction
the canal trends from Buzzards Bay easterly to Cape Cod Bay. (See
U. S. Coast and Geodetic Survey Charts Nos. 251 and 1208.)
    Existing project.-This provides for the purchase of the Cape Cod
Canal, including a 600-foot jetty and a 3,000-foot breakwater at the
east end of the Canal at a cost to the United States of $11,500,000;
for an open canal 32 feet deep at mean low water, with widths of 540
feet in the land cut, 500 feet in a straight channel in Buzzards Bay to
Wings Neck, and 700 feet beyond Wings Neck; mooring basins con-
sisting of a basin on the south side of Hog Island channel 4,000 feet
long, with widths varying from 0 to 400 feet, 32 feet deep at mean
low water, and a basin at Sandwich 3,260 feet long, with widths vary-
ing from 0 to 385 feet, and 25 feet deep at mean low water; the con-
struction of two fixed highway bridges having a horizontal clearance
of 500 feet, and a vertical clearance of 135 feet at mean high water;
the construction of a vertical lift railroad bridge with a 500-foot span
and 135-foot clearance above mean high water when the span is raised;
an improved lighting system; other accessory and minor features
which may be deemed necessary and to be in accordance with plans
approved by the Chief of Engineers, which include a dike extending
southwesterly 10,700 feet from Stony Point, a dike between Hog and
Mashnee Islands, a dike between Hog Island and Rocky Point, a
small East Boat Basin, 13 feet deep at mean low water on the south
bank of the canal, and a small West Boat Basin 18 feet deep at mean
low water on the north bank of the canal; a harbor of refuge for
small vessels by dredging a channel 150 feet wide and 15 feet deep
at mean low water into Onset Bay and to the town wharf in the village
of Onset; for enlargement of the 15-foot turning basin at the town
wharf and for an anchorage basin of about 16 acres, having a depth
of 8 feet below mean low water, located contiguous to the proposed
15-foot channel and turning basin.
   The land cut is 7.7 miles long, and with approach channels, the
total length of the canal is 171/2 miles.
   The mean range of tide in Cape Cod Bay is 9.4 feet and in-Buzzards
Bay 4 feet. The mean range of spring tides is about 13 feet in Cape
Cod Bay, and 6.5 feet in Buzzards Bay.
   The estimate of cost for new work, approved in 1952, is $31,552,500,
including $11,500,000, purchase price of the canal and properties which
were taken over by the United States on March 31, 1928. The latest
approved (1950) estimate for annual cost of maintenance is $600,000
including $270,000 for operation and care.
54            REPORT           OF CHIEF OF ENGINEERS,                      U.   S. ARMY,           1952


  The existing project was authorized by the following river and
harbor acts:

                  Acts                              Work authorized                             Documents

Jan. 21, 1927 (sec. 2)--....--....       Purchase of canal from the Boston,        H.     Doc. 139, 67th Cong., 2d
                                           Cape Cod & New York Canal Co.,               sess.
                                           in accordance with contract dated
                                          July 29, 1921, executed by that com-
                                          pany.
Included in Public Works Ad-             Construction of 3 bridges and widen-      H.     Doc. 795,   71st Cong., 3d
  ministration program, Sept.             ing canal to 205 feet.                        sess.
  6, 1933.
June 26, 1934 (Permanent Ap-             Operation and care of works of im-
  propriations Repeal Act).               provement provided for with funds
                                          from War Department appropria-
                                           tions for rivers and harbors.
Included in Public Works Ad-              Construction of a mooring basin______    H. Doc. 795,       71st Cong., 3d
  ministration program, Apr.                                                         sess.
  29, 1935.
Included      in emergency      relief   Dredging and bank protection .-------
  program, May 28, 1935.
Aug. 30, 1935----------------            Existing   project   for   main   canal   Rivers and Harbors Commit-
                                          adopted                                       tee Doc.
                                                                                            1
                                                                                                 15, 74th Cong., 1st
                                                                                        sess.
Mar. 2, 1945....---__.....--    ---      15-foot channel and turning basin in      H.     Doc. 431, 77th Cong., 1st
                                           Onset Bay.                                   sess.'

   1Contains latest published map.

   Local cooperation.-The River and Harbor Act of March 2, 1945,
provides that local interests contribute one-half of the first cost, but
not to exceed $48,000, for the channel and turning basin in Onset Bay
and hold and save the United States free from all claims for damages
attributable to the work. It is expected that these requirements will
be met.
   Terminal facilities.-There are four terminals on the canal. Three
are privately owned, one being used for the receipt and freezing of
fish and two for the receipt and storage of oil. The fourth terminal
is the State pier, owned by the Commonwealth of Massachusetts, and
located on the north bank of the canal at Bourne Neck. The terminals
are considered adequate for the purposes for which they are used.
   Operationsand results during the fiscal year.-Maintenance:Dredg-
ing by United States hopper dredge was carried on from October 1-2,
1951; December 2 to 28, 1951; was commenced on June 16, 1952, and
was in progress at end of fiscal year. During the fiscal year 190,512
cubic yards, bin measurement, of mud, sand, and silt were removed at
a cost of $78,343.15.
   Cleaning and painting of Buzzards Bay railroad bridge, by contract,
in progress at the beginning of the fiscal year, was completed on Octo-
ber 15, 1951. The costs during the fiscal year were $6,275. Final
settlement of claim is pending.
   Cleaning and painting of the Bourne and Sagamore Highway
Bridges was commenced on July 24, 1951, and was in progress at the
end of the fiscal year. Costs during the fiscal year were $59,970.50.
   Costs in connection with real estate activities amounted to $2,134.97
during the fiscal year.
   Channel work consisting of maintenance surveys of dikes and con-
dition surveys of the channel, mooring basins and miscellaneous areas
was carried on by hired labor, during the fiscal year at a cost of
$27,330.68.
          RIVERS   AND   HARBORS---NEW      ENGLAND    DIVISION         55
   Maintenance of bridges, lights, power and signal systems, dolphins,
service roads, dikes, and drilling and blasting boulders was performed
by hired labor at a cost of $112,423.27.
   Operation and care of canal: The canal was open to navigation
and the railroad bridge operated throughout the year except for inter-
mittent periods. During the month of May 1952, when salvage opera-
tions were in progress in raising the sunken motorship Arizona Sword
from the canal, it was necessary to close the canal for short periods
when actual pumping was being done. During the periods June 4-6
and June 9-10, 1952, when auxiliary counterweight cables were re-
newed on the Buzzards Bay railroad bridge, it was also necessary to
close the canal to shipping when actual interchange of cables was being
done. The costs during the fiscal year for operating and care were
$247,505.27.
   The total costs during the fiscal year were $533,982.84 for mainte-
nance, including $247,505.27 for operation and care. The total
expenditures were $529,960.25.
   Condition at end of fiscal year.-The existing project is substan-
tially complete except for dredging the 15-foot channel from deep
water in the vicinity of Wickets Island to the town wharf at Onset
and enlargement of the 15-foot turning basin at the town wharf, and
an 8-foot anchorage basin contiguous thereto, authorized by the River
and Harbor Act of March 2, 1945. The canal is crossed by two high-
level highway bridges and a vertical lift railroad bridge. The canal
in the land cut from the easterly entrance to station 430 has a least
bottom width of 480 feet, except opposite the State pier where the
width is 450 feet. From station 430 to Wings Neck (Hog Island Chan-
nel) the width is 500 feet and beyond Wings Neck (Cleveland Ledge
Channel) 700 feet. The controlling depths at mean low water for
this project were: Canal in land cut, 31 feet (1952); mooring basin,
north side, easterly end, 19 feet (1952) ; Hog Island Channel, 30 feet
 (1952) ; Cleveland Ledge Channel, 29 feet (1951) ; 21 feet in mooring
basin, south side, westerly end (1952) ; 12 feet in boat basin, south side,
east entrance (1952) ; 16.2 feet in Onset Bay Channel from the Cape
Cod Canal to Wickets Island (1943) ; 15.5 feet in channel to the town
wharf and the turning basin at the town wharf (1940) ; with consider-
able shoaling along the limits; 2 to 6 feet in the 8-foot anchorage.
   The total costs from regular funds have been $31,772,287.21, of
which $20,437,653.42 (including the purchase price of $11,500,000)
was for new work and $11,334,633.79 was for maintenance, including
$5,753,456.51 for operation and care of the canal. The total expendi-
tures have been $31,753,535.21.
   The total costs and expenditures from Public Works funds have
been $6,138,157.30 for new work.
   The total costs and expenditures from emergency relief appropria-
tion funds have been $4,849,739.57 for new work.
   The total costs, all funds, have been $42,760,184.08 of which $31,-
425,550.29 (including the purchase price of $11,500,000) was for new
work and $11,334,633.79 was for maintenance. The total expenditures
have been $42,741,432.08. This includes the sum of $1,658,354.71
expended between March 31, 1928, and June 30, 1935, on the operation
56        REPORT         OF CHIEF OF ENGINEERS, 17.                          S. ARMY,   1952

and care of the works of improvement under the provision of the
permanent indefinite appropriation for such purpose.
  Proposed operations.-Fundsunexpended at the end of the fiscal
year, amounting to $81,897.24, plus accounts receivable of $3,185.75
plus an allotment for fiscal year 1953 of $538,070, a total of $623,-
152.99, will be applied as follows:
Accounts payable June 30, 1952_---                       _       _-------------           $21, 937.75

Maintenance:
   Complete painting contract on the Bourne and Sagamore High-
      way Bridges, July, August and September 1952 --------                43, 231. 19
   Reserve for claim in settling contract for painting Buzzards Bay
      railroad bridge___-----   ----                               __- -2,     859. 05
   Dredging by U. S. seagoing hopper dredge Lyman (July 1-Aug. 6,
      1952, and June 7-30, 1953) -------------------------------         115, 500. 00
   Maintenance of structures, July 1, 1952-June 30, 1953-----            130, 675. 00
   Real estate and miscellaneous activities (July 1, 1952-June
      30, 1953) -------------        -----------------------------          5, 000. 00
   Condition surveys, by hired labor (July 1, 1952-June 30, 1953) ___ 28, 950. 00

       Total maintenance----                    --------------------------                326,215.24

Operation and care of canal:
   Operation of canal, bridges, etc-------------- ------------ 226, 095. 00
   Ordinary repairs --------------------------------------      13, 905. 00
   Renewal of auxiliary generating set, Buzzards Bay railroad
       hrid
       UL LAsq
                 -   -
                         a---------------------------------------
                                                                                           Rp A---- fl
                                                                                          e--u--   vw.   V   w




          Total operation and care               ...-----------------------              275, 000. 00
          Grand total--------               ----------------------------                  623,152. 99
  The sum of $645.300 can be profitably expended for the following
schedule of work during fiscal year 1954.
Maintenance:
   Dredging by United States seagoing hopper dredge Lyman (July
      1-31, 1953, and June 1-30, 1954) ----------------------         $115, 000. 00
   Maintenance of bridges, light, power and signal systems, service
      roads, dikes, dolphins, banks, and revetment, by hired labor
      (July 1, 1953-June 30, 1954) -------         ------------------- 238, 500. 00
   Condition surveys, by hired labor (July 1, 1952-June 30, 1954)__ 36, 000.00
   Real estate and miscellaneous activities, by hired labor (July 1,
      1953-June 30, 1954) ---------------------------------------        3, 500. 00
   Drilling and blasting boulders, borrow pit and subaqueous opera-
      tions, by hired labor (July 1, 1953-June 30, 1954)-----------      5, 000. 00

         Total maintenance_ -----------------                                ------      398, 000.00

Operation and care of canal:
   Operation of canal, bridges, etc--------------------------                            227, 300. 00
   Ordinary repairs------------------------------------20,                                    000.00
       Total operation and care----------                       ------------------- 247, 300.00

       Grand total-------------------------------------645,                                        8300. 00
                     RIVERS             AND         HARBORS-NEW                              ENGLAND                  DIVISION                         57
                                                  Cost and financial summary

                                                                  Fiscal year ending June 30                                              Total to June
                                                                                                                                          30, 1952, includ-
                                                                                                                                          ing fiscal years
                                             1948               1949                1950                1951               1952             prior to 1948

New work:
   Appropriated___------ ........------------..........................................----------.....---......--------.....-----------    $31, 425, 550. 29
   Cost-----.........--------------.........---------...................................---------------------......-----------....          31, 425, 550. 29
   Expenditures................---------.... -------.----                         ----------------------------- -------                     31, 425, 550. 29
Maintenance:
   Appropriated--_.........$387, 700.00 $512,000.00 $478, 000.00 $535, 000. 00 $445, 000.00                                                 11, 397, 779. 03
   Cost.---------------          395,487. 14 501, 656.95 436, 163.33    465, 776. 74 533, 982. 84                                           11, 334, 633. 79
   Expenditures--------......... 401, 977. 73 506, 819. 41 433, 282. 84 462, 949. 78 529, 960. 25                                           11, 315, 881.79


Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project-----------  $127, 000. 00

                                 16. CHATHAM (STAGE) HARBOR, MASS.
   Location.-At the northeastern corner of Nantucket Sound, about
16 miles east of Hyannis Harbor, Mass., and 66 miles south of
Provincetown Harbor at the northern extremity of Cape Cod. (See
U. S. Coast and Geodetic Survey Chart No. 1209.)
  Previous project.-Adopted by the River and Harbor Act of Sep-
tember 19, 1890. For further details see page 73, annual report for
1942.
   Existing project.--This provides for an entrance channel 10 feet
deep at mean low water and 150 feet wide from Chatham Roads into
the upper harbor. The mean and spring tidal ranges are 3.8 and 4.6
feet, respectively. The estimate of cost, approved in 1952, is $140,000
for new work exclusive of $43,500 to be contributed by local interests
and exclusive of amounts expended under the previous projects; and
$6,000 annually for maintenance, approved in 1950.
   The existing project was authorized by the River and Harbor Act
approved March 2, 1945. The latest published map is in the project
document (H. Doc. 456, 77th Cong., 1st sess.).
   Local cooperation.-The River and Harbor Act approved March 2,
1945, authorized the existing project subject to the conditions that
local interests contribute one-half the estimated first cost, but not to
exceed $43,500, and furnish assurances satisfactory to the Secretary of
War that they will provide free of cost to the United States suitable
areas for spoil disposal for the initial work and subsequent mainte-
nance when and as required and hold the United States free from
claims for damages resulting from the improvement. It is expected
that these requirements will be met.
   Terminal facilities.-There are two commercial wharves on the
north side of the inner harbor open to public use subject to the owners'
convenience. Facilities are adequate for existing commerce.
  Operationsand results during fiscal year.-None.
  Condition at end of fiscal year.-Work on the existing project has
not begun. The controlling depths are 6 feet in the existing channel,
100 feet wide around Harding Beach to Stage Harbor (1944 and
1950); and 2 feet in the existing project channel. The costs and
expenditures under the previous project have been $51,227.94, of which
$7,888.95 was for new work, and $43,338.99 was for maintenance.
58          REPORT         OF CHIEF            OF ENGINEERS,               U.      S. ARMY,             1952

  Proposed ,operations.-An allotment of $1,000 will be applied to-
ward a condition survey, by hired labor, of the old 6-foot project from
that depth in Chatham Roads to the upper harbor.
  No work is contemplated during the fiscal year 1954.
                                      Cost and financial summary

                                                   Fiscal year ending June 30                            Total to June
                                                                                                         30,1952, includ-
                                                                                                         ing fiscal years
                                   1948          1949        1950             1951              1952       prior to 1948

New work:
   Appropriated------            --- -------------------------------------------------------- ----              $7, 888.95
    Cost---------        -----------------------------------------------------------                             7,888.95
    Expenditures---------------------       ------------------------------------          -----------            7,888.95
Maintenance:
    Appropriated...------........------------------------.   $967. 83 -----------------------                   43, 338. 99
    Cost ..----------------..--...----- ------------               ---------------------- I
                                                              967.83                                            43,338.99
    Expenditures------..-....----------------------           967.83------------------------.......             43, 338. 99


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project---------------- $140, 000. 00

               17. POLLOCK RIP SHOALS, NANTUCKET SOUND, MASS.

   Location.-Pollock Rip Channel is the northerly passage through
the shoals off the eastern entrance to Nantucket Sound connecting the
deep water of the sound with that of the ocean. It is about 33 miles
east from the harbor of Vineyard Haven, on the island of Marthas
Vineyard, Mass., and 60 miles south from Provincetown Harbor at
the northern extremity of Cape Cod. (See U. S. Coast and Geodetic
Survey Chart No. 250.)
   Existing project.-This provides for dredging through the shoals
at the eastern entrance to Nantucket Sound with a Government
dredge, which is to assist the natural agencies in obtaining such depth
and width as may be found practicable, but not exceeding a depth of
30 feet at mean low water and a width of 1 mile. The mean tidal
ranges are about 3.7 feet at Monomoy Point, the nearest land, and 6.7
feet at Chatham Light, about 9 miles to the north of this point. The
ranges of spring tides at these two points are 4.4 and 7.9 feet. The
ranges are largely affected by direction and force of storms. The
original expenditure authorized for experimental work was $250,000,
and later the operation of a dredge was authorized at an estimated
annual cost of $200,000.
   The cost of the completed project was $1,083,504.41 for new work.
The latest approved (1950) estimate for annual cost of maintenance
is $60,000.
   The existing project was authorized by the following river and
habor acts:

    Acts                             Work authorized                                            Documents

July 25,1912    Experimental dredging through the shoals to deter-              H. Doc. 536, 62d Cong., 2d sess.
                 mine if a channel could be secured and maintained
                 not over 30 feet deep and not over 1 mile wide.
July 27,1916    Continuation of work with a Government-owned                    Rivers and Harbors Committee
                 hopper dredge.                                                   Doc. 3, 64th Cong., 1st sess.
                    RIVERS              AND HARBORS-NEW                              ENGLAND        DIVISION


   The latest published map is in the annual report for 1915, page:
2056.
  Local cooperation.-None required.
   Terminal facilities.-None.
   Operations and results during the fiscal year.-None.
   Conditionat end of fiscal year.-The existing project was completed
in 1925. The depths previously secured over the northern tongue of
the Stone Horse Shoals have been maintained. A cut 2,000 feet wide
has been dredged through Bearse and Pollock Rip Shoals. The con-
trolling depth at mean low water was 30 feet for a width of about
1,750 feet, and about 12 feet along the north edge of the 2,000-foot
channel (July 1946). The channel depths are adequate for existing
commerce. The costs and expenditures under the existing project
have been $1,083,504.41 for new work, and $732,405.15 for mainte-
nance, a total of $1,815,909.56.
   Proposedoperations.-An allotment of $1,600 will be expended for
a condition survey, by hired labor, to determine the extent of shoaling
in the 30-foot project.
   The sum of $60,000.00 can be profitably expended during fiscal
year 1954 for maintenance dredging to project depth of 30 feet by
United States hopper dredge.
                                                     Cost and financial summary

                                                                Fiscal year ending June 30                       Total to June
                                                                                                                 30, 1952, includ--
                                                                                                                 ing fiscal years
                                               1948           1949            1950           1951       1952      priorto 1948

New work:
   Appropriated..-------------------- -------------.--------......---......                         ------------ $1,083, 504. 41
   Cost-------                   --         ------------             -------------------------------------          1, 083, 504. 41
   Expenditures-. _-----_,_-----------------------------------------------------
Maintenance:
                                                                                                                    i1,083, 504. 41
   Appropriated-------_--------------                                  ------------
                                                             $1, 666. 69            _-------  ---------------          732, 405. 15
   Cost- ..............-----------------------............    1, 666. 69 ----------------------------------            732, 405. 15
   Expenditures-.......----....------------.........         1, 666. 69 -------------------------                      732, 405. 15


                          18. HARBOR OF REFUGE, NANTUCKET, MASS.

  Location.-Nantucket Harbor (Harbor of Refuge at Nantucket)
is on the north shore of Nantucket Island about 26 miles southeast
from Hyannis Harbor, Mass. (See U. S. Coast and Geodetic Survey
Chart No. 343.)
   Previous projects.-Adopted by the River and Harbor Act of
March 2, 1829. For further details see page 1747, annual report for
1915.
  Existing project.-This provides for a channel 15 feet deep at mean
low water, without prescribed width, through the bar at the entrance,
and for converging jetties, of riprap, 6,987 feet and 5,755 feet long,
on the east and west sides, respectively, of the entrance; an anchorage
area of about 50 acres on the east side of the harbor opposite the
wharves, about 2,800 feet long, 300 to 1,100 feet wide, and 15 feet deep
at mean low water; and a fairway of the same depth extending south-
ward through the harbor along the west side of the anchorage to a
point about 2,700 feet south of Brant Point. The mean and spring
tidal ranges at the entrance are 3.1 and 3.7 feet respectively. The
60            REPORT          OF CHIEF            OF ENGINEERS,                  U.    S. ARMY,         1952

estimate of cost revised in 1952, is $661,500 for new work, exclusive
of $31,500 to be contributed by local interests, and exclusive of
amounts expended under previous project, and $11,500 annually for
maintenance, revised in 1945.
  The existing project was authorized by the following river and
harbor acts:

       Acts                             Work authorized                                           Documents

June 14,1880       West jetty----------------------------------------.........        H. Doc. 18, 46th Cong., 2d sess.,
                                                                                        and Annual Report for 1880,
                                                                                        p. 423.
Aug.     5, 1886   East jetty and dredging when necessary ......--.....               Annual Report for 1885, p. 579.
Mar.     2, 1945   Anchorage and fairway inside harbor---------------                 H. Doec. 115, 77th Cong., 1st sess.'

  I Contains latest published      map.

    Local cooperation.-TheRiver and Harbor Act approved March 2,
  1945, authorized the anchorage and fairway subject to the conditions
  that local interests furnish free of cost to the United States suitable
  spoil-disposal areas for new work and subsequent maintenance when
and as required, contribute the sum of $31,500 in cash or dredging, and
hold and save the United States free from all claims for damages which
might result from the improvement. About $12,000 was expended by
the town and State on dredging completed in 1944, and this sum may
be acceptable as part of the required cooperation. It is expected that
the remaining requirements will be met. The Commonwealth of
Massachusetts and local interests have expended for dredging and
boulder removal inside the harbor about $130,000.
    Terminal facilities.-These consist of five piers affording about 3,2001
feet of berthing space. Facilities are considered adequate for present
commerce.
    Operations and results during the fiscal year.-A condition survey
to determine extent of shoaling in the harbor, by hired labor, was
carried on during fiscal year at a cost of $1,946.48 for maintenance.
The expenditures were $1,981.80.
    Condition at end of fiscal year.--The existing project was about 69
percent complete. The east jetty was completed in 1907 and the chan-
nel in 1930. The jetties have been built to varying heights and cross
sections with a view to controlling and regulating scour between them.
The west jetty is in need of repairs; the east jetty is in good condition.
The controlling depth at mean low water in the channel was 12 feet
for widths generally in excess of 200 feet with minor shoals to 8.4 feet
along the eastern edge and 12 feet along the western edge as determined
in 1952, and in the 15-foot anchorage and fairway 10 to 15 feet (1940).
To complete the project would require extention of the west jetty by
about 800 feet and enlargement of 400 feet of the existing construction
near its outer end to full section and dredging of the anchorage and
fairway inside the harbor. The costs under the existing project have
been $456,482.25 for new work and $277,199.87 for maintenance, a
total of $733,682.12. Expenditures have been $733,717.44.
   Proposed operations.-No work is contemplated for the fiscal years
1953 and 1954.
               RIVERS AND HARBORS--NEW                               ENGLAND           DIVISION                    61
                                     Cost and financial summary

                                                  Fiscal year ending June 30                          Total to June
                                                                                                      30, 1952, includ-
                                                                                                      ing fiscal years
                                  1948          1949          1950          1951           1952        prior to 1948


New work:
   Appropriated--........  ------------------------------............--............ -- ------------                $502, 317. 00
                                                                                                    -------............---............---
   Cost-..-------------..-----..              ----...   -------- ----------- ----------------------                 502,317.00
   Expenditures---...............---        -       ------------------------------------------------                502,317.00
Maintenance:
   Appropriated ---------
                  _     _--------- ------.--      ------------ ------------              $2, 782.00         277,299.87
                                       --------------------------------
   Cost......---------------...................-------                                    1,946.48          277,199.87
   Expenditures.---------.-------.-- --------- ------------- ------------                 1,981.80          277, 235.19


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project--------------$205, 000. 00

              19. CROSS RIP SHOALS, NANTUCKET SOUND, MASS.

   Location.-Nantucket Sound lies south of Cape Cod and north of
Nantucket and the eastern part of Marthas Vineyard Islands. Cross
Rip Shoals are a little southerly and easterly of the geographical
center of the sound. They are about 17 miles east from Vineyard
Haven on the island'of Marthas Vineyard and about 15 miles north-
west from Nantucket Harbor. (See U. S. Coast and Geodetic Survey
Chart No. 1209.)
   Existing project.-This provides for a channel 4,000 feet wide and
30 feet deep at mean low water between Half Moon Shoal and Cross
Rip Shoal, about 1.7 miles. The mean tidal range is about 2 feet and
the maximum range, due to the combined effect of wind and other
causes, is 3 feet or more.
   The cost for new work of the completed project was $24,200.13.
The latest (1950) approved estimate for annual cost of maintenance
is $8,000. The existing project was authorized by the River and
Harbor Act of July 3, 1930 (H. Doc. 182, 70th Cong., 1st sess.). The
latest published map is in the project document.
   Terminal facilities.-None.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was completed
in 1931. In April 1941, the controlling depth was 29 feet at mean low
water, except for minor shoals, with a minimum depth of 26 feet along
the edge opposite Cross Rip Shoal; 30 feet except for minor shoals,
opposite Half Moon Shoal; and 30 feet and over through the sailing
course. The costs and expenditures under the existing project have
been $24,200.13 for new work, and $41,354.56 for maintenance, a total
of $65,554.69.
   Proposedoperations.-An allotment of $800 to be made during fiscal
year 1953 will be expended for a condition survey, by hired labor, to
determine the extent of the shoaling in the 30-foot channel.
   The sum of $30,000.00 can be profitably expended during fiscal year
1954 for maintenance dredging to project depth of 30 feet, mean low
water, by United States hopper dredge.


       245554-53-vol. 1-                 5
62           REPORT OF CHIEF OF ENGINEERS,                                       U. S. ARMY,              1952

                                         Cost and financial summary

                                                      Fiscal year ending June 30                                Total to June
                                                                                                                30, 1952, includ-
                                                                                                                ing fiscal years
                                      1948          1949            1950           1951           1952            priorto 1948

New work:
   Appropriated- .--- -----.--.              . - -------------------------
                                                  .-                       -------- -- --------                       $24, 200.13
     Cost.......----..----....-----------.........------------ --------------- -------------------                     24, 200. 13
     Expenditures-----......--...    --            ------------------------
                                                      .-                    ------------   ------------                24, 200.13
Maintenance:
     Appropriated--------......... -----------------               ------------------------    --     -------          41, 354. 56
     Cost..-------................----------------------------- ------ -----------------------                         41,354.56
     Expenditures.....-------....---.....--------    -------------------         -----------------------               41, 354. 56



  20. CHANNEL FROM BUZZARDS BAY TO BUTTERMILK BAY, MASS.

    Location.-BuzzardsBay, Mass., is at the southern end of Cape Cod
Canal. It is connected with Buttermilk Bay to the north by a natural
channel branching from Cape Cod Canal and extending northerly past
Butler Cove for a distance of 2 miles into Buttermilk Bay. (See U. S.
Coast and Geodetic Survey Chart No. 251.)
    Existing project.-This provides for a channel 100 feet wide and 7
feet deep at mean low water through the sand bar across the channel.
The mean range of tide is 4 feet and the spring range is 5.1 feet.
    The estimate of cost for new work made in 1952 is $27,000. The esti-
mate of cost of annual maintenance is $500.
    The existing project was authorized by the River and Harbor Act
of June 30, 1948. The latest published map is contained in the project
document (H. Doc. 552, 80th Cong., 2d sess.).
    Local cooperation.-Localinterests are required to give assurances
satisfactory to the Secretary of the Army that they will hold and save
the United States free from damage due to the construction works. It
is expected that this requirement will be met.
    Terminal facilities.-Thereare no wharves bordering on the channel.
The only facilities in Buttermilk Bay are small private piers for
shallow-draft boats.
    Operationsand results duringfiscal year.-None.
    Condition at end of fiscal year.-No costs have been incurred under
the existing project. The work remaining to be done is the dredging
of the channel 100 feet wide and 7 feet deep at mean low water through
the bar. Conditions are as shown on the map published in the project
document.
   Proposedoperations.-An allotment of $25,800, new work funds, to
be made during fiscal year 1953 will be applied for the construction of
the 7-foot channel.
   No work is scheduled for fiscal year 1954.
                                         Cost and financial summary

Other new work data :
    Appropriated for fiscal year ending June 30, 1953-------------$25,                                                800. 00
    Unobligated balance available for fiscal year 1953-------------25,                                                800.00
                  RIVERS AND HARBORS--NEW                        ENGLAND          DIVISION                   63
                 21. NEW BEDFORD AND FAIRHAVEN HARBOR, MASS.

    Location.-New Bedford Harbor is a tidal estuary on the western
side of Buzzards Bay, about 27 miles northwesterly from the harbor
at Vineyard Haven, Mass., and about 37 miles to the eastward of Point
Judith Harbor, R. I. (See U. S. Coast and Geddetic Survey Chart
No. 252.)
   Previous projects.-Adopted by River and Harbor Acts of July 4,
1836, March 3, 1875, and August 11, 1888. For further details see page
1748, Annual Report for 1915, and page 101, annual report for 1938.
   Existing project.-This provides for a channel 30 feet deep and 350
feet wide from deep water in Buzzards Bay to a point just above the
New Bedford-Fairhaven Bridge, nearly 5 miles, with increased widths
for anchorage and maneuvering purposes in the area northwest of
Palmer Island and above the bridge; a channel 25 feet deep between
harbor lines along the New Bedford wharf front near the bridge,
about 0.2 mile; a channel 100 feet wide and 18 feet deep from the 30-
foot area north of Fish Island to Belleville, a distance of about 2 miles,
with a turning basin at the upper end 300 feet wide; dredging the area
west of a line 50 feet channelward of the Fairhaven Harbor line to a
depth of 15 feet over widths of 150 to 400 feet from Pierce & Kilburn
wharf to the Old South wharf, and thence 10 feet deep and 150 feet
wide to a point 1,000 feet south of the old causeway pier, about 0.7
mile; and for the maintenance of the 25-foot anchorage area east of
the channel and north of Palmer Island. The plane of reference is
mean low water, the mean range of the tide being 3.7 feet and the
maximum range, due to the combined effect of wind and other causes,
7 feet or more.
   The estimated cost for new work approved in 1952, is $1,792,000,
including $20,385 contributed by local interests but exclusive of
amounts expended on previous projects. The latest (1950) approved
estimate for annual cost of maintenance is $35,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                  Documents

Mar.    2,1907   The 25-foot anchorage area north of Palmer Island....   H. Doec.271, 59th Cong., 2d sess.
Mar. 3,1909      Extension of the 25-foot channel along the New Bed-     Specified in act.
                  ford wharf front near the bridge.
July 25,1912     The 18-foot channel in Acushnet River to Belleville. _ H. Doc. 442, 62d Cong., 2d sess. 1
July 3,1930      The 30-foot channel, anchorage, and maneuvering H. Doec.348, 71st Cong., 2d sess.
                   area (channel limited to width of 350 feet).
Aug. 30,1935     Present project dimensions of the anchorage area        Rivers and Harbors Committee   1
                  northwest of Palmer Island and maintenance of                16, 74th Cong., 1st sess.
                                                                           Doec.
                   the 25-foot anchorage.
                 Elimination from the project of the prior authoriza-
                  tion for enlarging and deepening the maneuvering
                  area 30 feet deep east of the harbor channel.
Aug. 26,1937     The 15-foot and 10-foot channel along the Fairhaven     Rivers and Harbors Commitee    1
                  wharf front.                                            Doe. 25, 75th Cong., 1st sess.

1 Contain latest published maps.
5 Also Emergency    Relief Act, May 28, 1935.


  Local cooperation.-The River and Harbor Act of July 25, 1912,
imposed the condition that local interests construct a new bridge at
Coggeshall Street with a draw opening of at least 100 feet and build
64     REPORT OF CHIEF OF ENGINEERS,         U. S. ARMY,   1952

a subtantial wharf upon the city property at Belleville, the name
given to the northern part of the city. These conditions have not
been met, and there is no present prospect of their being complied
with. The condition imposed by the River and Harbor Act of August
26, 1937, was fully complied with.
   The Commonwealth of Massachusetts expended approximately
$120,000 in dredging a channel 25 feet deep and 100 feet wide from
Fish Island nearly to Coggeshall Street Bridge.
   Terminal facilities.-There are 31 wharves in the harbor with a
total berthing space of about 19,000 feet. Twenty-four of these
wharves are active, seven are inactive and in poor condition. Their
construction consists mainly of open pile and timber piers extending
from solid-filled stone or timber bulkheads. Seven are publicly owned,
one by the United States Government at Fort Rodman, two by the
Commonwealth of Massachusetts, three by the city of New Bedford,
and one by the town of Fairhaven. Five of the wharves have railroad
connections and seven have mechanical handling facilities. These
facilities are considered adequate for the present needs of commerce.
For a further description of terminal facilities see Port and Terminal
Facilities of Southern New England, 1941.
   Operations and results during fiscal year.-Preliminary work, by
hired labor, in connection with maintenance dredging in the entrance
channel and maneuvering area was completed at a cost of $3,649.43.
The expenditures were $3,613.81.
   Condition at end of fiscal year.-The existing project was about 94
percent complete. To complete the project requires the dredging of
the 18-foot Acushnet River channel to Belleville and a turning basin.
The controlling depths at mean low water were as follows: 28 feet in
the entrance channel to the New Bedford-Fairhaven Bridge (1952) ;
28.7 feet in the turning basin above the bridge, except a shoal 25 feet
in the southwest corner (1952); 28 feet in the 30-foot maneuvering
area (1952); 25 feet in the 25-foot anchorage (July 1944); in the
Fairhaven waterfront channel 15 feet in the 15-foot portion and 10
feet in the 10-foot portion except for a small 9-foot shoal at the head
of the channel (March 1944) ; 20 feet in 25-foot New Bedford water-
front channel (1944) ; in the Acushnet River, about 23 feet to a point
about 1,200 feet below Coggeshall Street Bridge (May 1928); and
thence 7 feet to 4.800 feet upstread of the Coggeshall Street Bridge
 (1905). The head of navigation is about 7 miles north of the entrance,
opposite Sconticut Point.
   The costs from regular funds under the existing project have been
$1,459,653.66 for new work and $505,522.70 for maintenance, a total
of $1,965,176.36. The expenditures from regular funds under the
existing project have been $1,459,653.66 for new work and $505,487.08
for maintenance, a total of $1,965,140.74. The costs and expenditures
from emergency relief funds have been $227,264.49 for new work.
The total costs United States funds were $1,686,918.15 for new work
and $505,522.70 for maintenance, a total of $2,192,440.85. The total
expenditures United States funds, were $1,686,918.15 for new work
and $505,487.08 for maintenance, a total of $2,192,405.23. In addition,
the sum of $20,400 was expended for new work from contributed funds.
                      RIVERS AND                       HARBORS-NEW                            ENGLAND           DIVISION                    65
Proposed operations.-The unexpended balance June 30, 1952,
amounting to $81,386.19, will be expended as follows:
Accounts payable     -------------------------------------------     $35. 62
Maintenance dredging, by contract, in the entrance channel and
  maneuvering area during July-September 1952----------------    81, 350. 57

           Total-------------------                                        ----------------         --------                      81, 386. 19
    No work is scheduled for fiscal year 1954.
                                                   Cost and financial summary

                                                                  Fiscal year ending June 30                                    Total to June
                                                                                                                               30, 1952, includ-
                                                                                                                               ing fiscal years
                                                1948            1949                1950            1951           1952          prior to 1948


New work:
   Appropriated--------..              ------------ ------------ ----------                     ------------------------        1$1,857, 618.15
     Cost -----------------               ---              -------------------                  ----------- ------------          1,857, 618.15
   Expenditures..................--...-----------...........----------------------------------------1                              1,857, 618.15
Maintenance:
     Appropriated------.......------------..........-----------...........       $37, 200. 00     $2, 070. 00   $85,000.00           586, 873. 27
              ........------------------------------------
     Cost--------                                                                                 39, 270. 00     3, 649. 43         505, 522. 70
                                      ..............................---------....------------
     Expenditures-------------------......                                                        39, 270. 00     3, 613. 81         505, 487. 08



Other new work data: Estimated additional amount needed, to be
appropriated for completion of existing project---------------- $105, 000. 00
   1 In addition $20,400 of contributed funds was expended for new work.

                                          22. CUTTYHUNK HARBOR, MASS.

   Location.-At the eastern end of Cuttyhunk Island, at the western
entrance to Buzzards Bay, about 14 miles south of New Bedford
Harbor, Mass. (See U. S. Coast and Geodetic Survey Chart No. 297.)
   Existing project.-This provides for a channel generally 75 feet
wide and 10 feet deep from the outer harbor to the westerly terminal
in Cuttyhunk Pond, about 3,500 feet; and anchorage in the inner
harbor 10 feet deep, 900 feet long, and 800 feet wide; and for main-
tenance of the existing jetties. All depths refer to mean low water.
The mean and spring tidal ranges are 3.4 and 4.2 feet, respectively.
The cost of the completed project was $27,167.86, for new work ex-
clusive of $11,643.37 contributed by local interests. The latest
approved (1952) estimate for cost of annual maintenance is $8,000.
   The existing project was authorized by the River and Harbor Act
approved August 26, 1937. The latest published map is in the project
document (H. Doec. 81, 75th Cong., 1st sess.).
  Local cooperation.-Fullycomplied with. Spoil disposal areas for
maintenance will be furnished when required.
   Terminal facilities.-Two town wharves of timber and pile con-
struction, having total berthing space of 400 feet are open to public
use. No mechanical handling facilities are available. Facilities are
considered adequate for existing commerce.
   Operationsand results during fiscal year.-Constructionof approx-
imately 500 feet of additional protective barrier and repairs to the
north jetty at the entrance to the harbor in progress at the beginning
of the fiscal year was completed on August 4, 1951. During the
period one car float was placed, 19,580 cubic yards of dike fill were
66              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                           1952

placed; and 1,827 tons of stone were delivered and placed at a cost
of $1,427.61, for maintenance. In addition there were costs amount-
ing to $50,000 from contributed funds.
   Maintenance dredging, by contract, was commenced on May 15,
1952, and was completed on May 29, 1952. During the period 17,000
cubic yards of gravel, mud and sand were removed at a cost of
 $20,800.17 for maintenance.
   The total costs were $22,227.78 for maintenance. The expenditures
were $61,575.52. In addition there. were costs and expenditures of
 $50,000 from contributed funds.
    Condition at end of fiscal year.-The existing project was com-
pleted in 1939. The controlling depths at mean low water were 9.8
feet in the entrance channel (1952); 10 feet through the harbor
 (1939); and 10 feet except for minor shoals to 9 feet in the 10-foot
anchorage (1947). The north jetty is in poor condition. The costs
from regular funds have been $27,167.86 for new work and $325,413.20
for maintenance, a total of $352,581.06. The expenditures have been
 $352,606.69. The costs and expenditures from contributed funds
were $61,643.37 of which $11,643.37 were for new work and $50,000
for maintenance. The total costs, all funds, were $38,811.23 for new
work and $375,413.20 for maintenance, a total of $414,224.43. The
total expenditures, all funds, were $414,250.06.
   Proposed operations.-The unexpended balance June 30, 1952, of
$11,840.16 plus accounts receivable of $28,712.97, of which $28,579.34,
has not been collected on a defaulted contract, making available
$11,973.79, will be applied as follows:
Accounts payable------------------------------------------108.           00
Maintenance: Held in reserve pending approval of supplemental
agreement and for final costs under completed contract ------- 11, 865. 79
           Total all work---------------------------------- -------                                                    11,973.79
   No work is scheduled for fiscal year 1954.
                                                  Cost and financial summary

                                                              Fiscal year ending June 30                             Total to June
                                                                                                                    30,1952, includ-
                                                                                                                     ing fiscal years
                                              1948           1949          1950          1951           1952          priorto 1948


New work:
                                                                                                  1$27, 167. 86
   Appropriated---.............------------........ ...........------------------------------------------------
   Cost__------               --------------------------------------------------------             127,167.86
   Expenditures......--- ----------------------------------------------- ------------ 127,167.86
Maintenance:
   Appropriated-.........                  $18, 026. 47   $62, 166. 90 $177, 800.00   $69, 418. 75   $20, 000. 00        2 365, 858. 33
   Cost---------------..................    18, 026. 47     1, 277.35 221, 949. 78     43, 485. 61    22, 227. 78        2 325, 413. 20
   Expenditures---------                    18, 026. 47     1, 291.'58 221, 935. 55     4, 163.50     61, 575.52         2 325, 438. 83

1 Does not include $11,643.37 contributed funds.
s Does not include $50,000 contributed funds.

                                           23. FALL RIVER HARBOR, MASS.
  Location.-Situated at the mouth of Taunton River, on the east
side and at the head of Mount Hope Bay, which empties into the
ocean through Narragansett Bay and Sakonnet River. It is about
18 miles northerly from Newport Harbor. (See U. S. Coast and
Geodetic Survey Chart No. 353.)
                 RIVERS      AND      HARBORS-NEW              ENGLAND          DIVISION                    67
  Previous projects.-Adopted by River and Harbor Acts of June 23,
1874, March 3, 1899, June 13, 1902, and June 25, 1910. For further
details see page 1749 of annual report for 1915, and page 106 of
annual report for 1938.
  Existing project.-This provides for a channel 35 feet deep and
400 feet wide adjacent to the waterfront from deep water west of
Common Fence Point through Mount Hope Bay and the harbor to
the wharves above the bridges, with increased width at the bend
on the approach below Slades Ferry Bridge, for a turning basin of
the same depth about 1,100 feet wide and 850 feet long above the
bridges between the Shell and Montaup wharves for a channel 30
feet deep and generally 300 feet wide extending about 1 mile below
Slades Ferry Bridge, for removal of the lower end of Hog Island
Shoal to a depth of 30 feet and for the maintenance of the 25-foot
anchorage, about 42 acres in area, west of the harbor channel. The
length from Hog Island Shoal to the head of the project is about 10.5
miles.
  The mean tidal range is 4.4 feet and the maximum range due to
the combined effect of wind and other causes, is 8 feet or more.
  The estimate of cost of new work, approved in 1952, is $3,017,800,
exclusive of amounts expended on previous projects. The latest
(1950) estimate for annual cost of maintenance is $30,000.
  The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                Documents

July    3,1930   30-foot channel including Hog Island Shoal and the     H. Doc. 158, 71st Cong., 2d sess.
                   maintenance of the 25-foot anchorage.                                                    1
July 24,1946     35-foot channel and turning basin-----------------H.      Doc. 628, 79th Cong., 2d sess.


  1Contains latest published map.

   Local cooperation.-Fullycomplied with, to the extent of the work
accomplished. Assurances furnished by city of Fall River and town
of Tiverton were approved November 2, 1948 by the Assistant Secre-
tary of the Army.
   Terminal facilities.--There are 25 wharves and piers in Fall River
Harbor, of which 17 are active and in good condition, 7 are inactive
and in poor condition, and 1 is undergoing reconstruction. Two of
the wharves are publicly owned. One, owned by the city of Fall
River, is used as a landing for excursion boats, and the other, a former
steamship terminus, was reconstructed by the Commonwealth of
Massachusetts. It is a large, modern, deepwater terminal for the
receipt and shipment of general cargo. The wharves are generally
open pile and timber piers extending from solid filled stone bulkheads.
Three have railroad connections and 11 have mechanical handling
facilities. The facilities are considered adequate for the existing needs
of general commerce. For a further description of terminal facilities
see Port and Terminal Facilities of Southern New England, 1941.
   Operations and results during fiscal year.-During the fiscal year
there were final costs of $65,393.94 on new work already accomplished
under a continuing contract for improvement dredging of the 35-foot
entrance channel from Tiverton oil wharves to Massachusetts State
68          REPORT         OF     CHIEF OF ENGINEERS,                      U.   S. ARMY,         1952


line, and in dredging portions of the 35-foot channel and turning
basin above Globe Wharf to Shell and Montaup Wharves. The ex-
penditures were $71,517.61 for new work.
   Condition at end of fiscal year.---The existing project is about 81
percent complete. The controlling depths at mean low water were
as follows: about 29 feet in the present 30-foot channel, 400 feet wide
through Mount Hope Bay to Globe Wharf (1951); 35 feet in the
35-foot turning basin (1950); 35 feet in the 35-foot channel to the
Gulf Oil Co.Wharf with the excepion of boulder areas in the vicinity
of Common Fence Point and the Bay Oil Co. wharf where the con-
trolling depths are 32.6 and 30.5 feet respectively (1950) ; 35 feet in
the 35-foot channel from Globe Wharf to Shell Oil Co. Wharf, with
the exception of three ledge areas on west limit of the channel, down-
stream of the Slades Ferry Bridge, between Slades Ferry Bridge and
Brightman Street Bridge, and upstream of Brightman Street Bridge,
where controlling depth is about 30 feet (1951) ; 21 feet in the channel
from the Gulf Oil Wharf to Globe Wharf (1944); 19 feet in the 25-
foot anchorage (1942) ; and 20 feet on Hog Island Shoal at west edge
of channel (1940). To complete the project requires removal of ledge
rock at Hog Island Shoal, and completion of the dredging of the 35-
foot channel. The costs under the existing project have been $2,496,-
831.26 for new work, and $313,106.56 for maintenance, total of $2,-
809,937.82, including $2,859.87 for maintenance dredging at the
Firestone Wharf under section 3 of the River and Harbor Act of
October 17, 1940. The expenditures have been $2,809,937.82.
   Proposed operations.-No work is scheduled for fiscal year 1953.
   The sum of $200,000, new work funds, can be profitably expended
during fiscal year 1954 for the following schedule of work:
New work :
   Complete payment for dredging, by continuing contract, of the
     35-foot channel at the upper end of the project---------------     $45, 000
    Completion of 35-foot channel above the bridges, by removal of rock
     shoals projecting 5 feet above the channel bottom and 50 to 100
     feet into the channel from the west limit both north and south
     of the bridges------------------------------------                 155, 000
          Total all work            -------------------------------------------                           200, 000

                                      Cost and financial summary

                                                  Fiscal year ending June 30                          Total to June
                                                                                                     30,1952, includ-
                                                                                                     ing fiscal years
                                   1948          1949          1950         1951         1952         priorto 1948

New work:
     Appropriated---                  $750,
                  ....--....------------    000.00 $800, 000.00 $454, 000.00          $40, 954. 07     $2,827,950.37
     Cost....-----------------------    15, 523.92 1,409,518.22 553, 603.04            65, 393.94       2, 827, 035.42
     Expenditures--------------------   14, 989. 71 1,250,183.07 707, 348. 73          71, 517. 61      2, 827, 035.42
Maintenance:
     Appropriated----......... --------      __       .----- 39, 000. 00    7, 430. 00 ......-.....        394, 516. 87
     Cost-------------------------- ----------                    71.39    46,358.61 ............          394,516.  87
     Expenditures_-----.........    .-  _---    -- --         - 63.50      46,366.50 ............          394, 516.87


Other new work data:
   Unobligated balance, June 30, 1952--------------------------$914.                                               95
   Estimated additional amount needed to be appropriated for
          completion of existing project-------------------                             -----         565,000. 00
         RIVERS AND    HARBORS-NEW      ENGLAND   DIVISION        69
             24. PROVIDENCE RIVER AND HARBOR, R. I.
   Location.-Providence River is formed at the city of Providence by
the junction of the Seekonk River and two small streams which rise
in northern Rhode Island. It is tidal and flows southerly in a deep
channel between broad flats about 8 miles, emptying into Narragansett
Bay. (See U. S. Coast and Geodetic Survey Chart No. 278.)
   Previous projects.-Adopted by river and harbor acts of August 30,
1852; March 2, 1867; March 3, 1873; June 18, 1878; August 2, 1882;
August 5, 1886; June 3, 1896; June 13, 1902; March 3, 1905; March 2,
1907; June 25, 1910; and March 4, 1913. For further details see page
1750, annual report for 1915, page 96, annual report for 1936, and
page 111, annual report for 1938.
   Existing project.-This provides for an approach channel 35 feet
deep at mean low water and generally 600 feet wide through the river
from the deep water of Narragansett Bay opposite North Point on
Popasquash Neck to the turn below Fields Point, 8.1 miles, and thence
with the same depth, and of width ranging up to 1,700 feet to Fox
Point, excluding a marginal strip 75 feet wide channelward of the
established harbor lines, about 2.6 miles. The mean tidal range is
about 4.6 feet and the maximum range, due to the combined effect of
wind and other causes is 8 feet or more.
   The cost of the completed project for new work was $23322,233.67
exclusive of amounts expended on previous projects.
   The latest (1950) approved estimate for annual cost of maintenance
is $65,000.
   The existing project was authorized by the River and Harbor Act
of August 26, 1937 (H. Doc. 173, 75th Cong., 1st sess.). The latest
published map is in the project document.
   Local cooperation.-Fullycomplied with. In addition to extensive
dredging prior to 1900 in the channel from Fox Point to the head of
navigation, the city of Providence has since spent about $216,000 in
maintaining a 20-foot depth in this channel.
   Terminal facilities.-There are 35 wharves (in use or usable con-
dition), including 1 owned by the State and 5 by the city adjacent to
the harbor area, Providence River below Crawford Street, and See-
konk River below Red Bridge. The total available berthing space
is 19,170 feet. The municipal wharf at Field Point and the State
pier are open to general public use for commercial purposes. One
wharf is open to the public upon agreement with the owner. Thirteen
of the wharves have rail connections. The facilities are considered
adequate for existing commerce. (For further details see Port and
Terminal Facilities of Southern New England, 1941.)
   Operations and results during fiscal year.-Maintenance dredging,
by contract, of the 35-foot channel from Field Point to Sabin Point
in progress at the beginning of the fiscal year was completed on
August 16, 1951. During the period, 47,477 cubic yards of mud, sand
and silt were removed at a cost of $64,205.67, all for maintenance.
   Maintenance dredging, by U. S. Hopper Dredge Harding from
Pomham Light to Ohio Ledge was commenced on July 1, 1951, and
completed on August 29, 1951. During the period 446,680 cubic yards,
bin measurement, of clay and mud, were removed at a cost of $120,-
100.30.
70           REPORT OF CHIEF OF ENGINEERS, U.                                              S. ARMY,               1952

   The total costs were $184,305.97 for maintenance. The expenditures
were $207,591.37 for maintenance.
   Condition at end of fiscal year.--The existing project was completed
in 1949. Under the existing project, a channel 600 feet wide from
the deep water of Narragansett Bay to the turn below Field Point,
thence to Fox Point, with a width ranging up to 1,700 feet, has been
dredged to a general depth of 35 feet. The head of commercial navi-
gation is at Crawford Street Bridge, about 0.8 mile above Fox Point.
The controlling depths at mean low water were as follows: 33 feet in
the channel from abreast North Point to Field Point (1942-48);
thence generally 35 feet to Fox Point (1949). The costs under the
existing project have been $3,482,242.94, of which $2,322,233.67 was
for new work and $1,160,009.27 was for maintenance. The expend-
itures have been $3,482,242.94, all funds.
   Proposed operations.-No work is scheduled for fiscal year 1953.
   The sum of $9,000, maintenance funds, can be profitably expended
during fiscal year 1954 for a condition survey, by hired labor, of the
35-foot main channel to determine extent of the shoaling.

                                            Cost and financial summary

                                                          Fiscal year ending June 30                               Total to June
                                                                                                                   30, 1952, includ-
                                                                                                                   ing fiscal years
                                       1948             1949             1950          1951           1952           prior to 1948

New work:
   Appropriated.---.-__            ------------       ----------- $210,000.00 -         -           .------          $6,083, 645.23
   Cost-................----------------------.............----------- 210, 000.00 -----------------------            6, 083, 645. 23
   Expenditures---.................------------.......------------     210, 000.00 -----------------------            6, 083, 645.23
Maintenance:
    Appropriated---....                 $200, 000.00 $531, 894. 08   -30, 543. 70 $100, 000.00    $120, 000.00        1, 810, 145. 54
    Cost-.......---------------........    4, 881.80   78, 503. 24    604, 513. 18  49, 097. 21    184, 305. 97       1, 810, 145. 54
    Expenditures ..-----.....--- 6, 137. 61            67, 456. 21    615, 582. 73  25, 811. 81    207, 591.37        1, 810, 145. 54



                                          25. SEEKONK RIVER, R. I.

   Location.-This river rises in the vicinity of Worcester, Mass., and
flows in a general southeasterly direction for about 52 miles, emptying
into Providence Harbor at Providence. (See U. S. Coast and Geodetic
Survey Chart No. 278.)
   Previous projects.-Adopted by river and harbor acts of March 2,
1867, July 5, 1884, and March 3, 1899. For further details see page
1749 of annual report for 1915, and page 113 of annual report for 1938.
   Existing project.-This provides for a channel 16 feet deep at mean
low water and 150 to 230 feet wide from Red Bridge up to the ledge
rock between the wharves at Pawtucket, 3.2 miles; thence with same
depth 100 to 60 feet wide through the ledge to Division Street Bridge,
0.2 mile. The mean tidal range is about 4.6 feet at the mouth of the
river and about 5 feet at Pawtucket, and the maximum range due to
the combined effect of wind and other causes is 8 feet or more.
   The cost for new work for the completed project was $337,788.85,
exclusive of amounts expended on previous projects. The latest
 (1928) estimate for annual cost of maintenance is $10,000.
   The existing project was authorized by the following river and
harbor acts:
                   RIVERS           AND        HARBORS--NEW                        ENGLAND              DIVISION                         71


       Acts                                 Work authorized                                                   Documents

Mar.    3,1905     The 16-foot channel from Red Bridge in Providence,                          H. Doc. 113, 56th Cong., 1st sess.
                     to Division St. Bridge in Pawtucket.
Mar.    3,1909     Provisional authorization to deepen the channel to                          Specified in act.
                    18 feet at mean low water and increasing the width
                    at such places as would best serve the interests of
                    navigation.                                                                                                               1
Mar.    2,1919     Widening the channel, except through the ledge at                           H. Doc. 1283, 64th Cong., 1st sess.
                      Pawtucket, to 150 feet.
Sept. 22,1922      Present project width of channel through the ledge                          H. Doc. 654, 66th Cong., 2d sess.
                      at Pawtucket.

  I Contains latest published map.

   Local cooperation.-Fully complied with.
   Terminal facilities.-Including the five terminals at and near
Phillipsdale, the facilities cover about 5,260 feet of docking space,
of which 700 feet is owned by the State of Rhode Island and 4,560
feet owned and used by private owners. At the State terminal 100
feet of docking space is available for public use. The facilities are
considered adequate for the existing commerce.
   Operations and results during fiscal year.-None.
   Conditionat end of fiscal year.-The existing project was completed
in 1927. The controlling depths at mean low water in 1948 were as
follows: 17 feet to a point about 2,400 feet below State pier, Pawtucket,
except for minor edge shoals; thence 15 feet in the middle half of
channel to State pier; thence about 12 feet to the head of the project.
The head of navigation is at Pawtucket Falls, about 5.2 miles above
the mouth of the river. The costs under the existing project have
been $337,788.85 for new work, and $564,637.09 for maintenance, a
total of $902,425.94. The expenditures have been $902,471.37. In
addition, the sum of $67,792 has been expended for new work from
contributed funds.
   Proposed operations.-An allotment of $1,200 to be made during
fiscal year 1953 will be applied toward a condition survey, by hired
labor, of the channel from Red Bridge to the upper limit of the 16-foot
Federal project.
   No work is scheduled for fiscal year 1954.
                                             Cost and financial summary

                                                           Fiscal year ending June 30                                     Total to June
                                                                                                                         30, 1952, includ-
                                                                                                                         ing fiscal years
                                        1948              1949             1950            1951              1952         prior to 1948

New work:
                                                                                                                                 $672, 214.17
    Appropriated.....................--------.........----... .------------..........-----.....--------....----....------------...............
    Cost--..----------...................------------------------------------------....-------.................                 1672, 214.17
    Expenditures....--------- ....-------- --------------------------------------........                                       1672, 214.17
Maintenance:
    Appropriated-__---.._           $150, 000.00 -$22, 000. 00 -$6, 195.81- ------------------               ----               564, 637. 09
    Cost---------....-.                                         ............----
                                      - 2,867. 74 118, 936.45------------                    - ------------                     564, 637.09
    Expenditures------........          2, 743. 19 119, 106. 43            .......................------------..
                                                                    -45.43-----------                                           564, 637. 09

  1 In addition $67,792 has been expended from contributed funds for new work.

                   26. HARBOR OF REFUGE AT POINT JUDITH AND
                             POINT JUDITH POND, R. I.

  Location.-PointJudith marks the southwestern entrance to Nar-
ragansett Bay. The harbor lies in the shallow bight west of the point,
72             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

about 14 miles southwest of Newport Harbor, R. I., and 33 miles east
of New London Harbor, Conn. Point Judith Pond is a shallow salt
pond, with a length north and south of about 4 miles, lying in the rear
of the sandy beach of the Rhode Island shore, just west of Point Judith,
and is connected with Point Judith Harbor by a narrow opening
through the sand dunes. (See U. S. Coast and Geodetic Survey
Charts No. 276 and 1210.)
   Previous project.--dopted by the River and Harbor Act of March
3, 1905. For further details see page 95 of the annual report for 1948.
   Existing project.-This provides for main breakwater 6,970 feet
long, built in part on Squid Ledge approximately in the form of the
letter V, with its apex facing outward in about a south by west direc-
tion, and lying from 1/2 to 11/4 miles from shore; for an east shore-arm
breakwater 2,240 feet long, east of the main breakwater, leaving an
entrance to the harbor 1,200 feet in width; for a west shore-arm break-
water 3,640 feet long, extending toward the west arm of the main
breakwater, leaving an entrance to the harbor 1,500 feet in width; and
for the removal of two shoals, one in the anchorage area and the other
near the easterly entrance, to a depth of 18 feet at mean low water.
All breakwaters are of the rubble-mound type, with the crests 8 and 10
feet above mean low water.
   The project further provides for a channel into Point Judith Pond
15 feet deep and 150 feet wide between the jetties and extending
thence on the west side of the pond to a point 100 feet north of the
State pier at Jerusalem with a branch channel 15 feet deep and 200
feet wide on the east side of the pond extending to a point 100 feet
north of the State pier at Galilee; and anchorage basin just inside the
entrance 10 feet deep with an area of about 5 acres; sand-arresting
structures of sheet piling or other works at the entrance; a channel 6
feet deep and 100 feet wide from the 15-foot west branch to the vicinity
of Wakefield with an anchorage basin 6 feet deep and about 5 acres
in area at the upper end.
   The mean and spring tidal ranges are 3.1 and 3.9 feet, respectively,
in the Harbor of Refuge. The mean tidal range in the pond is about
2.8 feet. The cost of the completed project is $2,488,430.75 for new
work, exclusive of $17,587.00 contributed by local interests, and
$32,000 annually for maintenance, approved in 1950.
   The existing project was authorized by the following river and
harbor acts:

     Acts                             Work authorized                                       Documents

Sept.   19,1890    The main breakwater__-------      _----------- -------      H.   Doc. 66, 51st Cong., 1st sess.
Mar.     2,1907    Present dimensions of eastern shore arm-----------.......   H.   Doec. 60, 58th Cong., 2d sess.
June    25, 1910   The western shore arm_----------        -----------         H.   Doc. 911, 60th Cong., 1st sess.
Mar.     2, 1919   Removing 2 shoals from the harbor area------------          H.   Doc. 2001, 64th Cong., 2d sess.
June    30,1948    Abandons project for entrance to Point Judith Pond 2        S.   Doc. 15, 80th Cong., 1st sess.'
                     and authorizes channels and anchorages in lower
                     pond and upper pond.


  1 Contains latest published map.
  3 For complete description of project for entrance to Point Judith Pond, R. I., see p. 142 of annual re-
port for 1917.
          RIVERS AND HARBORS---NEW        ENGLAND    DIVISION        73
    Local cooperation.---Fully complied with.
    The State of Rhode Island and the town of South Kingstown have
expended about $290,000, exclusive of a Federal Public Works Admin-
istration grant of $77,000, in dredging an anchorage basin and
channels, extending the stone east jetty, constructing sheetpile bulk-
head, constructing a pier on each side of the basin, and repairing the
east jetty and bulkhead following the hurricane of 1938.
    Terminal facilities.-There are no terminal facilities on the Harbor
of Refuge. Inside the entrance to the pond, the State of Rhode Island
owns and operates two public piers, each with about 450 feet of berth-
ing space, one on the east shore at Galilee and the other at Jerusalem,
on the west shore. Fish are landed at both piers. The one at Galilee
is the mainland terminus of the mail, passenger and freight boat
service to Block Island. A number of small private piers, which are
used by fishing and pleasure craft, are located on both sides of the
basin. The United States Coast Guard has a boathouse and pier at
Galilee. None of the piers has mechanical facilities for handling
freight. At Wakefield, there is a boat yard amply equipped for
servicing and storing small craft up to 5 feet in draft. The Point
 ,Judith Yacht Club has some pier facilities at this boat yard. There
are no rail connections to any of the piers.
    Operationsand results during fiscal year.-None.
    Condition at end of fiscal year.-The existing project was completed
in 1950. The breakwaters were completed in 1914 and dredging of
shoals in the protected area was done in 1921. The controlling depths
were as follows: West entrance about 19 feet (1939) ; east entrance
about 22 feet (1939) ; 15 feet in the 15-foot channel into Point Judith
Pond extending along the west side of the pond to a point 100 feet
north of the State pier at Jerusalem (1950); 15 feet in the 15-foot
channel extending 100 feet north of the State pier at Galilee (1950);
10 feet in the 10-foot anchorage (1950),; 6 feet in the 6-foot channel
from the west branch channel to the vicinity of Wakefield, and 6 feet
in the anchorage at Wakefield (1950). The breakwaters are in need
of repairs. The total costs under the existing project from United
States funds have been $3,365,876.17, of which $2,488,430.25 was for
new work, and $877,445.92 was for maintenance. The expenditures
have been $3,365,876.17. In addition, costs and expenditures from
contributed funds have been $17,587.
   Conditions in the entrance channel and the channels and anchorages
in the pond are as shown in the latest project document (S. Doc. No. 15,
80th Cong., 1st Sess.).
   Proposed operations.-An allotment of $1,400, maintenance funds,
to be made during fiscal year 1953 will be expended for a condition
survey, by hired labor, of the 15-foot channel, 6-foot channel, 10-foot
anchorage basin, and 6-foot anchorage basin.
   No work is scheduled for fiscal year 1954.
74              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                               1952

                                                  Cost and financial summary

                                                                   Fiscal year ending June 30                                  Total to June
                                                                                                                               30, 1952, includ-
                                                                                                                               ing fiscal years
                                             1948               1949           1950            1951             1952             prior to 1948

New work:
    Appropriated_................................
                                  _                                        $126,000.00 ---       ------ $9, 037. 30 1 $2,500,430.25
    Cost-----------......-----------------------............                 23, 776.71 $93, 185.99 ----------- 1 2, 500, 430. 25
    Expenditures--          -.....................                ------     22,170. 90    94, 791.80 -----------      2, 500, 430. 25
Maintenance:
    Appropriated_---........-..............                             . 175, 000. 00 -37,188. 01 ------------                      877, 445. 92
    Cost--------      --------------..............................---       2, 588. 75  135, 223. 24 ............                    877, 445. 92
    Expenditures.....................                          ---          2,601.28    135, 210. 71 .........-----------...         877, 445. 92

  1In addition $17,587 was expended of contributed funds for new work.


                      27. HARBOR OF REFUGE AT BLOCK ISLAND, R. I.

   Location.-Located on the east side of Block Island, near the south
end of the inner curve of the shore line. It is 13 miles south-south-
west from Point Judith Harbor and about 25 miles southeasterly from
Stonington Harbor, Conn. (See U. S. Coast and Geodetic Survey
Chart No. 276.)
  Existing project.-This provides for a rubble-mound breakwater
extending northerly about 1,950 feet from the shore; a similar break-
water about 1,100 feet long, extending northerly and easterly, enclos-
ing, with the main breakwater, an area about 800 feet square desig-
nated as the inner harbor; masonry walls in the southeastern corner
of the inner harbor enclosing an area nearly 300 feet square designated
as the basin; and for dredging to a depth of 15 feet at mean low water
the outer protected area and about 67 percent of the inner harbor and
of the basin; a jetty about 140 feet long southeast of main breakwater
having a T-head 100 feet across. The mean tidal range is 2.9 feet, and
the maximum range, due to the combined effects of wind and other
causes, is 7 feet or more.
   The estimate of cost for new work, approved in 1952, is $622,000.
The latest approved (1952) estimate for annual cost of maintenance
is $13,400.
   The existing project was authorized by the following river and
harbor acts:

       Acts                                      Work authorized                                                 Documents

July 11, 1870        The main breakwater....-----...............-------------------------         Annual Report 1868, p. 785, and S.
                                                                                                      Misc. Dec. 81, 40th Cong.,              2d
                                                                                                      sess.
Aug.     2,1882      Repairs to basin walls and cliff protection east of                          S. Ex. Doc. 26, 47th Cong., 1st sess.
                      harbor.
Aug.     5,1886      Breakwater enclosing the inner harbor-----------................             S. Doc. 27, 48th Cong., 2d sess.,
                                                                                                      and Annual Report, 1885, p. 610.
June 3,1896           Raising the crest of the main breakwater and mak-                           H. Doc. 83, 54th Cong., 1st sess.
                         ing it sandtight.                                                                                                     1
July 25,1912          Rebuilding the basin walls and present project di-                          H. Doc. 828, 60th Cong., 1st sess.,
                       mensions of the dredged areas.

1Contains latest published map.
  Recommended modifications of project.-On June 24, 1926, the
Chief of Engineers recommended that this project be modified by
                  RIVERS         AND HARBORS--NEW                          ENGLAND           DIVISION                     75

eliminating the dredging of the outer harbor west of the entrance
channel (H. Doc.467, 69th Cong., 1st sess.).
   Local cooperation.-None required.
    Terminal facilities.-The only wharf in the harbor is the steel
sheet-pile bulkhead which comprises the southern and eastern limits
of the basin. Total docking space amounts to 500 feet. No mechani-
cal handling facilities are available. The wharf is owned by the
Town and open to the public. It is considered inadequate for the
present general needs of boating in the harbor. There is ample room
for the expansion of terminal facilities.
    Operations and results during fiscal year.-A condition survey, by
hired labor, of the entrance channel was carried on during fiscal year
at a cost of $599.64.
   Maintenance dredging, by contract, in the 15-foot entrance channel
was commenced on January 16, 1952, and completed on March 18,
1952. During the period, 42,562 cubic yards of clay, sand and silt
were removed at a cost of $45,364.08, for maintenance.
   The total costs and expenditures were $45,963.72 for maintenance.
   Condition at end of fiscal year.-The existing project was about 93
percent complete. The breakwater and harbor walls were completed
in 1916. The inner harbor and basin have been dredged to project
dimensions, and a channel 60 to 130 feet wide and 15 feet deep has
been dredged from deep water outside the harbor up to the town
wharf. To complete the project requires the dredging to a depth of
15 feet of the outer protected area adjacent to the dredged channel.
The controlling depths at mean low water are as follows: 16 feet in
maintained channel to entrance to basin (1952); 16 feet in basin,
except along edges (1952) ; inner harbor, 15 feet except for shoal ex-
tending 100 to 200 feet from the west end and other minor shoals
 (August 1945); and outer protected area 6 to 14 feet (1931). The
harbor walls and the breakwaters are in good condition.
   The costs have been $576,856.47 for new work and $445,201.64 for
maintenance, a total of $1,022,058.11. The expenditures have been
$1,022,058.11, all funds.
   Proposed operations.-No work is scheduled for fiscal years 1953
and 1954.
                                        Cost and financial summary

                                                     Fiscal year ending June 30                              Total to June
                                                                                                            30, 1952, includ-
                                                                                                            ing fiscal years
                                    1948            1949           1950          1951           1952         priorto 1948

New work:
   Appropriated---......             ---------------------------------- -----------------------
                                                                                      ............              $576,856.47
   Cost------..------------------------------------------------------------576,856.47
   Expenditures......--------------------------------------------------------..........                           576,856.47
Mainenance:
   Appropriated-_......... -$5, 442. 85 ----------             $120,000. 00    $9, 056. 51   $49, 000.00          445, 201.64
   Cost............---------------.....       ------------
                                        25, 269. 74              81, 214. 56   45, 841.95     45, 963.72          445, 201.64
   Expenditures--------.....            25, 245. 75 ----------- 27, 459. 20    99, 597. 31    45, 963. 72         445, 201.64


Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project................. $45,000.00
76          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                     28. GREAT SALT POND, BLOCK ISLAND, R. I.

   Location.--On the west shore of Block Island, about 11 miles south-
west by south from Point Judith Harbor, R. I., and 18 miles south-
easterly from Stonington Harbor, Conn. (See U. S. Coast and Geo-
detic Chart No. 276.)
   Existing project.-This provides for a channel from the ocean to
the pond 600 feet wide with a central depth of 25 feet for a width of
150 feet; sloping gradually up to a depth of 12 feet in a width of 504
feet; thence up to low-water level with a 1 on 4 bottom slope; for
two riprap jetties at the entrance, the northerly one 1,200 feet long,
and the southerly one extending 350 feet beyond the 18-foot contour
(actual length, 1,691 feet, including 837 feet built by the State) ; stone
revetment and sand fences to protect the banks through the original
beach; an entrance channel 100 feet wide and 12 feet deep from Great
Salt Pond into the inner harbor and a basin of about 1.4 acres in that
harbor to the same depth. All depths refer to mean low water. Mean
tidal range is 2.6 feet, and the maximum range, due to the combined
effect of wind and other causes, is 7 feet or more.
   The estimates of cost, approved in 1952 are $609,000 for new work,
exclusive of $8,000 to be contributed by local interests, and $3,000
annually for maintenance, approved in 1950.
   The existing project was authorized by the following river and
harbor acts.

     Acts                        Work authorized                                      Documents

June 3, 1896   Channel and jetties__-------.-.---          -               H. Doec. No. 57, 54th Cong., 1st sess.
June 13,1902   Extending south jetty and dredging...                       Specified in act. Annual report for
                                                                  ..---------------
                                                                           1900, p. 1276.
Mar. 2,1945    Channel and basin in inner harbor_.- _-......---          H. Doec. No. 330, 77th Cong., 1st
                                                                           seSs.


  For latest published map see H. Doc. No. 60, 58th Cong., 2d sess., and H. Doc. No. 330, 77th Cong.,
1st sess.

  Recoinime~ded modifications of project.-On June 24, 1926, the
Chief of Engineers recommended curtailment of the existing project
by omitting construction of the proposed north jetty (H. Doec. 467,
69th Cong., 1st sess.).
  Local cooperation.-The River and Harbor Act approved March 2,
1945, authorized improvement of inner harbor subject to the condi-
tion that local interests contribute 50 percent of the estimated first
cost, but not to exceed $8,000, furnish free of cost to the United States
suitably bulkheaded areas for spoil disposal for the initial work and
subsequent maintenance, when and as required, and hold and save the
United States free from claims for damages resulting from the im-
provement. These conditions have not been met. The State of Rhode
Island and the town of New Shoreham expended $124,975.90 in dredg-
ing and protecting the channel into Great Salt Pond.
  Terminal facilities.-These consist of a wharf with about 600 feet
of publicly available berthage and several privately owned and oper-
ated small wharves and piers. These facilities are considered adequate
for existing commerce.
               RIVERS       AND       HARBORS--NEW                    ENGLAND DIVISION                            77
   Operations and results during fiscal year.-A condition survey, by
hired labor, of the entrance channel was carried on during fiscal year
1952, at a cost of $637.57.
   Maintenance dredging, by contract, in a section of the entrance
channel in the vicinity of the U. S. Coast Guard was commenced on
December 27, 1951, and completed on January 14, 1952.
   During the period, 5,050 cubic yards of gravel and sand were
removed at a cost of $7,118.21.
   The total costs and expenditures were $7,755.78 for maintenance.
   Condition at end of fiscal year.-The existing project was about 31
percent completed. The channel, 300 feet wide and 18 feet deep, with
a central depth of 25 feet over a width of 150 feet, has been dredged
into the pond. The south jetty was completed to its present length
of 1,691 feet in 1905. The controlling depths are 16 feet in the vicinity
of the Outer End Light and 13.0 feet in the vicinity of the Coast Guard
station in the 25-foot entrance channel (1952) ; 11 to 25 feet in 75-foot
width east of central 150-foot channel; 0 to 25 feet in 75-foot width
west of central 150-foot channel; 10 feet in entrance channel to inner
harbor; and 11 to 14 feet in basin except for minor edge shoals. The
soundings were taken in 1943 and 1944. The jetty is in fair condi-
tion. To complete the project would require the further widening
and deepening of the channel, the construction of the north jetty, and
dredging of the inner harbor channel and basin. The costs and ex-
penditures have been $189,036.65 for new work and $96,046.76 for
maintenance, a total of $285,083.41.
   Proposed operations.-No work is scheduled for fiscal years 1953
and 1954.
                                  Cost and financial summary

                                                Fiscal year ending June 30                            Total to June
                                                                                                     30, 1952, includ-
                                                                                                     ing fiscal years
                               1948            1949           1950         1951          1952          priorto 1948

New work:
   Appropriated---- ---------------       ---------   -------------   ------------ ------------           $189,036. 65
   Cost- -------- -------             ------------ - -----------------          ----------- -              189,036.65
    Expenditures------------------------        -----------------------------------------                  189, 036.65
Maintenance:
   Appropriated---------       $500. 00       $201.81 ------------         $794. 48   $11,000.00            96, 046. 76
   Cost-----------------.       500. 00        201.81 ------------          794. 48     7, 755. 78          96, 046. 76
                .......
   Expenditures---------        500. 00        201.81 -794.                      48     7, 755. 78          96, 046. 76


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project-------------- $420, 000. 00

                       29. PAWOATUCK RIVER, R. I. AND CONN.
  Location.-Formedby the function of the Wood and Charles Rivers
in southwestern Rhode Island, the river flows westerly and southerly
18 miles and enters Little Narragansett Bay about 13 miles east of
New London Harbor. (See U. S. Coast and Geodetic Survey Charts
Nos. 358 and 1211.)
  Previous projects.-Adopted by the River and Harbor Acts of
March 3, 1871, August 14, 1876, and August 5, 1886. For further
details see page 1752 of the annual report for 1915 and page 69 of
the annual report for 1933.
       245554-53-vol. 1               6
78            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                   1952

  Existing project.-This provides for a channel in Little Narra-
gansett Bay and in the river 10 feet deep at mean low water and
200 feet wide from Stonington to Avondale, about 4 miles; 100 feet
wide from Avondale to the lower wharves at Westerly, about 3 miles;
and 40 feet wide between the lower and upper wharves of Westerly,
about one-half mile; for the removal of obstruction at Watch Hill, at
the southeastern part of Little Narragansett Bay; for a channel 10 feet
deep and 100 feet wide from the mouth of the river into Watch Hill
Cove; for an anchorage basin in the cove 10 feet deep and about 16
acres in area; and for a riprap jetty 200 feet in length near the south-
west corner of the basin. The mean tidal range is about 2.5 feet, and
the maximum range, due to the combined effect of wind and other
causes, is 7 feet or more.
  The estimate of cost, approved in 1952 is $259,000 for new work,
exclusive of $20,000 to be contributed by local interests, and exclusive
of amounts expended on previous projects, and $5,000 annually for
maintenance, approved in 1950.
  The existing project was authorized by the following river and
harbor acts:

       Acts                              Work authorized                                            Documents

                                                                                                                              1
June    3,1896   Present channel dimensions- .................-------------------.....   H. Doc. 62, 54th Cong., 1st sess.
Mar. 3,1905      Removal of obstructions near Watch Hill---....---......---- Specified in act.
Mar.    2,1945   Channel, anchorage and jetty at Watch Hill Cove .---                    H. Doc. 839, 76th Cong., 3d Sess.l


  1Contains latest published maps.

   Local cooperation.-Fullycomplied with.
   Terminal facilities.--There are five private wharves in use near the
head of navigation. At Watch Hill there are three public wharves
and the yacht club wharf with a total of about 500 feet of berthage.
Facilities are adequate for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was about 70
percent complete. The bay and river channels have been dredged to
project dimensions; except that the channel in the bay has a general
width of 100 feet, the channel in the river at Pawcatuck Rocks a width
of 80 feet, and there is a slight deficiency in depth at the channel edge
in the vicinity of Rhodes Folly beacon, due to ledge rock or large
boulders deeply embedded in the bottom. The most obstructive
boulders in the vicinity of Watch Hill have been removed, the work
being completed in 1913. The extension to the anchorage has been
constructed. The controlling depths at mean low water were as fol-
lows: 9 feet in maintained channel from abreast Rhodes Folly Light
through Little Narragansett Bay, and in the Pawcatuck River to
abreast Graves Neck, thence 8 feet to a point abreast Union Street,
Westerly, R. I. (1948) ; 10 feet in channel through Little Narragansett
Bay to Watch Hill Cove anchorage basin (1949) ; and 10 feet in major
portion of Watch Hill Cove anchorage (1949).
  To complete the project requires widening of the channel to 200
feet to Avondale, the removal of rock at Pawcatuck Rocks and in
the vicinity of Rhodes Folly Beach. The costs under the existing
                 RIVERS AND HARBORS-NEW                                   ENGLAND                    DIVISION                     79
project have been $181,777.34 for new work, and $205,846.41 for
maintenance, a total of $387,623.75. In addition, $20,000.00 was con-
tributed for new work by local interests. The expenditures have been
$387,623.75. In addition $20,000.00 was expended from contributed
funds.
   Proposed operations.--An allotment of $1,500 to be made during
fiscal year 1953 will be applied toward a condition survey, by hired
labor, of the 10-foot entrance channel from Rhodes Folly beacon to
the upper wharves at Westerly, R. I.
   No work is contemplated for the fiscal year 1954.
                                        Cost and financial summary

                                                   Fiscal year ending June 30                                       Total to June
                                                                                                                   30, 1952, includ-
                                                                                                                   ing fiscal years
                                     1948         1949           1950                  1951                 1952     priorto 1948

New work:
   Appropriated-----.------------              $30, 000.00    $68,500.00 -$2, 057. 76 ------------                     1$315, 134.31
   Cost---------------------------                  90. 02     96, 352. 22 .-----------------------                    1 315, 134. 31
   Expenditures---------......-----------          130. 00     96, 312. 24 -----------------------                     1 315, 134. 31
Maintenance:
   Appropriated-.........         $40,000.00     1, 592. 48       700. 00--        ...----.....-... .205,                      846. 41
   Cost-.....--.. ...            - 4, 309.19    78,423.18         700.00-         ..      ...        ..      ..    -       205,846.41
   Expenditures-------........       191.00     81, 541.37        700. 00 ------------------------                         205, 846. 41


Other new work data: Estimated additional amount needed to be appro-
priated for completion of existing project------------------------- $77, 000
  a In addition $20,000 of contributed funds was expended for new work.

                                        30. MYSTIC RIVER, CONN.

   Location.-This river has its source in southeastern Connecticut.
It flows in a southerly direction 8 miles and empties into Fishers
Island Sound at Noank, 11 miles east of New London, Conn. (See
U. S. Coast and Geodetic Survey Charts Nos. 358 and 1211.)
   Previous project.-Adopted by the River and Harbor Act of Sep-
tember 19, 1890. For further details see page 1753 of annual report
for 1915.
   Existing project.-This provides for a channel 15 feet deep and 125
feet wide from Fishers Island Sound to the bend opposite Murphy
Point, thence 15 feet and 100 feet wide to the highway bridge at
Mystic, thence 12 feet deep generally 100 feet wide to a point about
700 feet above the wharf of the Marine Historical Association, a total
length of about 3.7 miles from the mouth; an anchorage basin of 8.5
acres 9 feet deep north of Mason Island; and a turning basin 9 feet
deep about 500 feet below the highway bridge by widening the channel
to 200 feet for a distance of 400 feet. All depths refer to mean low
water. The mean and spring tidal ranges at Noank are 2.6 and 3.1
feet respectively.
   The estimate of cost, revised in 1952, is $85,000 for new work, ex-
clusive of $14,000 to be contributed by local interests and exclusive of
amounts expended under the previous project, and $2,500 annually
for maintenance.
80          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

  The existing project was authorized by the following river and
harbor acts:

     Acts                          Work authorized                                  Documents

Sept. 19, 1890   Channel from Fishers Island Sound to highway            Annual Report for 1889, p. 746.
                  bridge.
July 25,1912     Restoration and maintenance of original project......   H. Doc. 858, 61st Cong., 2d sess.
Mar. 4,1913      Channel above highway bridge__------------------        H. Doc. 637, 62d Cong., 2d sess.
Mar. 2,1945      Channel widening to Murphy Point, anchorage and         H. Doc. 349, 77th Cong., 1st sess.
                  turning basin.


  I Contains latest published map.


   Local cooperation.-The River and Harbor Act approved March 2,
1945, authorized the channel widening, anchorage, and turning basin
subject to the conditions that local interests contribute 50 percent
of the estimated first cost of dredging the anchorage area, but not to
exceed $14,000, furnish free of cost to the United States suitable areas
for spoil disposal for the initial work and subsequent maintenance
when and as required, and furnish assurances satisfactory to the
Secretary of War that they will establish and maintain a suitable
public small-boat terminal adjacent to the turning basin, and hold
and save the United States free from claims for damages resulting
from the improvements. It is expected that these requirements will
be met.
   Terminal facilities.-In addition to the small town wharf at Noank,
there are numerous small private wharves, some open to the public
subject to the owners' convenience. A public small-boat terminal
near the shopping center of Mystic is needed.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was 24 percent
complete. Channels of project depths but deficient in width have been
secured. To complete the project requires widening the channel by
25 feet up to Murphy Point and part of the channel above the high-
way bridge by 10 to 20 feet, dredging the anchorage basin north of
Mason Island and the turning basin below the highway bridge. The
controlling depths at mean low water were 15 feet to the highway
bridge at Mystic (except in the widening), thence about 12 feet (not
full width.) to the head of the project (1941); 3 feet in the 9-foot
anchorage (1940) ; and 0 to 15 feet in the 9-foot turning basin (1940).
The head of navigation is about one-half mile above the head of the
project. The costs and expenditures under the existing project have
been $11,525.50 for new work and $44,264.67 for maintenance, a total
of $55,790.17.
   Proposed operations.-An allotment of $1,100 to be made during
fiscal year 1953 will be applied toward a condition survey, by hired
labor, of the 15-foot and 12-foot sections of the channel to the head of
navigation.
   The sum of $80,000, maintenance funds, can be profitably expended
during fiscal year 1954 for maintenance dredging, by contract, of
approximately 80,000 cubic yards in the 15-foot and 12-foot sections
of the channel to restore project depth to the head of navigation.
                     RIVERS            AND IHARBORS--NEW                                 ENGLAND DIVISION                                       81

                                                 Cost and financial summary

                                                                Fiscal year ending June 30                                          Total to June
                                                                                                                                   30, 1952, includ-
                                                                                                                                   ing fiscal years
                                            1948              1949              1950               1951             1952             prior to 1948

New work:
   Appropriated---------------.........----............-------------............----------............-------------------                $48,125. 50
   Cost---------------..................................................................--------------------------------------------      48,125. 50
   Expenditures--..............------------.......-----------------...........             -----------------------------                  48,125. 50
Maintenance:
     Appropriated- ........                                                                     ---.                ----                  44, 264. 67
     Cost_------------------         ------------------------------------                                        ------------             44, 264. 67
     Expenditures--........----------------------------------------------------                                               --          44, 264. 67


Other new work data: Estimated additional amount needed to be appro-
  priated for completion of existing project----- -----------------  $73, 500

                                      31. NEW LONDON HARBOR, CONN.

  Locality.-On the north shore of Long Island Sound, at its eastern
end and about 14 miles east of the mouth of the Connecticut River.
(See U. S. Coast and Geodetic Survey Chart No. 293.)
  Previous projects.--Adopted by River and Harbor Acts of June
14, 1880, March 3, 1881, and July 13, 1892. For further details see
annual reports for 1915 and 1938, pages 1753 and 116, respectively.
  Existing project.-This provides for an entrance channel generally
600 feet wide, widened at the approach to the State pier, 33 feet deep
and about 3.8 miles long from deep water in Long Island Sound to
the State pier, a channel 400 feet or more in width, 23 feet deep, and
about 6,000 feet long skirting the water front of the city; branch
channels 23 feet deep in Winthrop Cove and east of Central Vermont
Railroad pier generally 250 feet wide, 1,500 feet long and 100 feet
wide, 1,000 feet long respectively; a maneuvering area 0 to 450 feet
wide, 23 feet deep, west of the main channel and south of the State
pier; and for dredging Shaw Cove to a depth of 15 feet. The plane
of reference is mean low water, the mean tidal range being 2.6 feet.
The maximum tidal range, due to the combined effects of wind and
other causes is 7 feet or more. The cost of new work, for the com-
pleted project was $567,974.19, exclusive of amounts expended on
previous projects. The latest approved (1950) estimate for annual
cost of maintenance is $10,000.
  The existing project was authorized by the following river and
harbor acts:

      Acts                                      Work authorized                                                      Documents

June 13,1902          Water-front channel and branch channels in Win-                                  H. Doc. 392, 56th Cong., 1st sess.
                         throp Cove and east of Central Vermont Railroad
                         pier.
June 25,1910          Dredging in Shaws Cove------------- ------------- H. Doc. 329, 60th Cong., 1st sess.
July 27,1916          Entrance channel_---------------------------- H. Doc. 613, 63d Cong., 2d sess.'
Aug. 26,1937          Maneuvering area and present project extent of en-                               Rivers and Harbors Committee
                         trance channel.                                                                  Doc. 82, 74th Cong., 2d sess.'


  a Contains latest published maps.
82                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

  Local cooperation.-Fullycomplied with.
  Terminal facilities.-These comprise 44 wharves and piers in a
developed frontage of about 3 miles. Five piers are owned and used
by the Federal Government, one owned by the city, and one by the
State. Seven of the wharves are entirely or in part open to general
public use and two by agreement with the owners. Three wharves
have direct rail connections. The total available berthage space is
about 27,000 feet. Facilities are considered adequate for existing com-
merce. (For further details see Port and Terminal Facilities at the
Ports of Southern New England.)
  Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-The existing project was completed
in 1938. The controlling depths at mean low water were: Entrance
channel to State pier, about 32 feet (1942 and 1943) ; waterfront chan-
nel, 23 feet except for minor shoal to 19 feet in south reach (1943);
Winthrop Cove, 22 feet (1941) ; maneuvering area, 23 feet (1941) ;
and Shaw Cove, 15 feet, except minor shoals, (1941). The costs and
expenditures under the existing project have been $567,974.19 for new
work and $219,037.37 for maintenance, a total of $787,011.56.
  Proposed operations. No work is scheduled for fiscal year 1953.
The sum of $3,800 can be profitably expended during fiscal year 1954
as follows:
Maintenance: Condition survey, by hired labor, of the entire project__ $3, 500. 00
Miscellaneous inspections and reports----------------------       ----- 300. 00
            Total all work---------------------------                                                                 -- ----------                 3. 800. 00

                                                      Cost and financial summary

                                                                        Fiscal year ending June 30                                              Total to June
                                                                                                                                                30, 1952, includ-
                                                                                                                                                ing fiscal years
                                                 1948                 1949                1950                 1951                 1952         priorto 1948

New work:
     Appropriated....-------------------............---...........------------......----------............--.........------------............       $608, 774. 19
     Cost--------------------------                                      -----       -----------------------------------                             608,774.19
     Expenditures-----------------
                               ..................---------......                       ----------------............-----------------                 608, 774. 19
Maintenance:
     Appropriated--.....-------------------............                  $8.00 ......-               .219, ..-.-.-..-
                                                                                                     ..-                                                   037. 37
     Cost-.----------------------                                         8. 00 -..--                      ..- ....--- ............                   219, 037. 37
     Expenditures-.....--..------.........-----------.....                8. 00 -.----------..---.-.--......                                          219, 037.37



                                                     32. THAMES RIVER, CONN.
  Location.-This is a tidal estuary varying in width from about 400
feet to three-fourths of a mile, and extending from the junction of
the Yantic and Shetucket Rivers at Norwich, Conn., 15 miles south-
erly to Long Island Sound at New London. (See United States
Coast and Geodetic Survey Chart No. 359.)
  Previous projects.-Adopted by the River and Harbor Acts of
July 4, 1836, and March 3, 1879. For further details see page 1754 of
annual report for 1915, and page 118 of annual report for 1938.
  Existing project.--This provides for a channel 25 feet deep and 250
feet wide to the upper end of Bartlett Crossover and thence to Nor-
wich generally 200 feet wide, with increased width in the bends,
                RIVERS AND               HARBORS-NEW                  ENGLAND    DIVISION                   83
through Long Reach, and at the head of navigation, a total distance
of about 8.6 miles; for widening the channel opposite the submarine
base by an average of about 350 feet with a depth of 20 feet, the con-
struction of 5 training walls of pile and stone or riprap, having their
tops at mean high water and with an aggregate length of about 13,800
feet, located, respectively, at Mohegan, Trading Cove, Long Rock,
Rolling Mill and Norwich, and the removal of obstructions in the
Shetucket River at Norwich. The plane of reference is mean low
water, the mean tidal range being 2.6 feet at New London, and 3.1
feet at Norwich. The maximum range, due to the combined effect of
wind and other causes, is 7 feet or more.
   The estimate of cost, approved in 1952, is $1,351,600 for new work
exclusive of amounts expended on previous projects, and $31,000
annually for maintenance, approved in 1950.
   The existing project was authorized by the following river and
harbor acts:

    Acts                               Work authorized                               Documents

Aug.   2,1882   Training walls-------------------------------Annual               Report, 1882, p. 606.
June 25,1910    Removal of obstructions in the Shetucket River.---.. H. Doc. 397, 61st Cong., 2d sess.
Jan. 21,1927    Channel 18 feet deep above Allyns Point-........-   .l H. Doc. 107, 69th Cong., Ist sess.
July 3,1930     Present project dimensions of channel up to Allyns Rivers and Harbors Committee      1
                  Point.                                                   Doc. 14, 71st Cong., 2d sess.
Aug. 30,1935    Present project dimensions of channel above Allyns        Rivers and Harbors Committee
                                                                                                 1
                  Point.                                                   Doc. 18, 74th Cong., 1st sess.
Mar. 2,1945     Increased width opposite submarine base, 20 feet deep_ H. Doc. 367, 76th Cong., 1st sess.'

I Contains latest published maps.


   Local cooperation.--Fully complied with.
   Terminal facilities.-Wharves along the river and at Norwich are
mainly of the bulkhead type, both with and without pile aprons.
The facilities are considered adequate for the existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project is 99 percent
completed. The training walls were completed in 1906, except the
upper end of the Rolling Mill dike, which is replaced by adjacent
shore improvements. The training walls are in fair condition. The
widening opposite the submarine base was completed in 1940 by the
Navy Department. To complete the project requires slight widening
of the channel at the upper end of Long Beach. The head of navi-
gation is at Norwich, about 15 miles above the mouth. The con-
trolling depth at mean low water (not full width) was 25 feet to
Bartlett Crossover (1946); thence 23 feet to Norwich, except for
minor shoals (1949); about 25 feet in the basin at Norwich (1949);
and 12 feet in the Shetucket River up to the town wharf (1947). The
costs under the existing project have been $1,323.571.87 for new work,
and $768,986.69 for maintenance, a total of $2,092,558.56. The ex-
penditures were $2,092,558.56.
   Proposed operations.-An allotment of $2,600 to be made during
fiscal year 1953 will be applied toward a condition survey, by hired
labor, of the 25-foot channel beginning at deep water north of New
London highway bridge to the head of navigation.
84             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

  The sum of $280,300, maintenance funds can be profitably expended
for the following scheduled work during fiscal year 1954:
Maintenance dredging, by contract, in the 25-foot channel (approxi-
mately 250,000 cubic yards) -------------------------------        $280,000.00
Miscellaneous inspections and reports------------------ ----             300. 00

           Total all work--------                            -----         ------------------                           280, 300. 00

                                            Cost and financial summary

                                                           Fiscal year ending June 30                                  Total to June
                                                                                                                       30, 1952, includ-
                                                                                                                       ing fiscal years
                                        1948             1949            1950             1951            1952           priorto 1948

New work:
   Appropriated            ..-------------------.----------------------       --.------------------------                $1, 471, 919.46
   Cost--....----------------------------..........----------.....---............................----------------...      1,471,919.46
   Expenditures-------- --------                    -----          ----- ------- ------------------------                 1, 471, 919.46
Maintenance:
     Appropriated--------- ...... ----- --   $124, 992. 00 $153, 811. 23 .------------------------                           805, 582. 56
     Cost ......-------------------------       4, 204. 22 274, 599.01 ------------------------                              805, 582. 56
     Expenditures.........
                    --------      ----------    4, 301.38 274, 501.85 -----------------------                                805, 582. 56


Other new work data : Estimated additional amount needed to be ap-
propriated for completion of existing project_--- -----------     $28, 000. 00

                 33. CONNECTICUT RIVER BELOW HARTFORD, CONN.

   Location.-This river has its source in Connecticut Lake in northern
New Hampshire, flows southerly 380 miles, and empties into Long
Island Sound at Saybrook, Conn., 14 miles west of New London.
Hartford, now the head of commercial navigation, is 52 statute miles,
by channel, from the mouth. (See U. S. Coast and Geodetic Survey
Charts Nos. 215, 254, 255, and 256.)
   Previous project.-Adopted by the River and Harbor Acts of July
14, 1836, and July 11, 1870. For further details see page 1754, annual
report for 1915, and page 120, annual report for 1938.
   Project for Eightmile River, Conn.-Elimination as separate
project.-This provides for a channel 8 feet deep and 75 feet wide
from deep water in the Connecticut River to Hamburg and for a
turning basin of the same depth, 150 feet wide approximately 300
feet long at Hamburg. The project was adopted by the River and
Harbor Act of June 25, 1910. The costs and expenditures have been
$9,000, all for new work. In accordance with the River and Harbor
Act of May 17, 1950, the project for Connecticut River below Hart-
ford was modified to include the project for Eightmile River, which
was eliminated as a separate project. The aforementioned act also
provided for an anchorage basin 6 feet deep and about 6.3 acres in
area in the upper cove at Hamburg.
  Existing project.-This provides for a channel 15 feet deep at mean
low water, 300 feet wide from the mouth to the Lyme railroad bridge,
about 3.4 miles, and thence 150 feet wide to Hartford, a total distance
of 52 miles, the channel to be obtained by dredging and the construc-
tion of dikes, training walls, revetments, and the accessory works;
for two riprap jetties at the mouth of the river, the tops to be 5 feet
above high water and 6 feet wide, the easterly one about 2,300 feet
and the westerly about 2,750 feet in length; for a training dike about
                  RIVERS        AND HARBORS--NEW                          ENGLAND DIVISION                         85
3,700 feet long at Hartford, and for an anchorage 11 feet deep, about
12 acres, and one, 6 feet deep, about 17 acres, in North Cove, Old Say-
brook, with an entrance channel 11 feet deep and 100 feet wide; for
a channel 18 feet deep, 75 feet wide about 1.5 miles in length from
the Connecticut River to Hamburg; a turning basin of the same depth
150 feet wide and 300 feet long at Hamburg; and an anchorage area
at Hamburg 6 feet deep, about 6.5 acres in area. The mean tidal
range is 3.5 feet at the mouth, and at summer stage is about 1 foot
at Hartford. The maximum tidal range at the mouth due to wind
or other causes, is 8 feet or more. At Hartford the usual rise due to
spring freshets is between 16 and 24 feet above mean low water. The
maximum recorded freshet at Hartford (March 1936) was 35.5 feet
above mean low water. Below Middletown the height of the crest
of the' freshet decreases rapidly.
   The estimate of cost, approved in 1952, is $1,256,800 for new work,
exclusive of $85,500 to be contributed by local interests, and $90,000
annually for maintenance approved in 1950.
   The existing project was authorized by the following River and
Harbor acts:

       Acts                                 Work authorized                                    Documents

June 10,1872      Jetties at the mouth------------------------------                Present project dimensions approv-
                                                                                      ed by the Chief of Engineers,
                                                                                     Dec. 22, 1887.
Mar.     3,1881   The Hartford dike-...----------------------------                 Present project dimensions author-
                                                                                      ized by the Chief of Engineers in
                                                                                      1889.
June 25,1910      Channel and turning basin in Eightmile River- .-....              H. Doc. 327, 60th Cong., 1st sess.
Feb. 27,1911      Present project dimensions of the channel over Say-               H. Doc. 1294, 61st Cong., 3d sess.
                    brook Bar.                                                                                        1
Mar. 2, 1919      Dikes, training walls, and revetments ------- -     .- H. Doc. 132, 65th Cong., 1st sess.
                                                                                                       1
Aug. 30,1935      Present project dimensions of channel and additional H. Doc. 49, 73d Cong., 1st sess.
                    dikes, training walls, revetments, and accessory
                    works.
May 24,1937       Park River declared nonnavigable .............----------------.   Ltr. Sec. War, Apr. 21, 1937.    1
Mar. 2,1945       Channel and anchorages, North Cove, Old Saybrook                  H. Doc. 358, 7th Cong., 1st sess. 1
May 17,1950       Channel, anchorage, and turning basin, Eightmile                  H. Doc. 666, 80th Cong., 2d sess.
                    River ..


  I   Contains latest published maps.

  Local cooperation.-The River and Harbor Act of August 30, 1935,
authorized the 15-foot channel up to Hartford and additional dikes,
training walls, and revetments, subject to the provision that local
interests shall furnish, free of cost to the United States, suitable
areas for the disposal of dredged material during initial construction
and for future maintenance as and when needed. Areas have been
furnished where required and it is understood that future require-
ments will be met. The River and Harbor Act approved March 2,
1945, authorized the channel and anchorages in North Cove subject
to the provisions that local interests contribute in cash $67,500, but
not to exceed 50 percent of the initial construction cost and give
assurances satisfactory to the Secretary of War that they will provide
a suitable public landing in the cove. The River and Harbor Act
of May 17, 1950, authorized the channel, anchorage, and turning basin
in Eightmile River provided that local interests contribute in cash
50 percent of the initial cost of dredging, but not to exceed $18,000;
construct public landing facilities of a design satisfactory to the
86     REPORT OF CHIEF OF ENGINEERS,        U.   S. ARMY,   1952

Chief of Engineers; provide suitable spoil-disposal areas, as and
when required, for new work and subsequent maintenance; and hold
and save the United States free from claims for damages resulting
from the improvement. It is expected that these conditions will be
met.
   Terminal facilities.-Onboth the Connecticut and Eightmile Rivers
there are two or three wharves at each of the river towns, one or more
in each town being open to public use. At Hartford and at Middle-
town there is approximately one-half of wharf frontage along the
west bank of the river. The facilities are considered adequate for
existing commerce.
   Operations and results during fiscal year.-Maintenance dredging,
by contract, of various river bars below Hartford was commenced
on October 11, 1951, and was completed on April 16, 1952. During
the period 155,684 cubic yards of gravel, sand and silt were removed
at a cost of $125,144.78 for maintenance.
   Preliminary work, by hired labor, in connection with condition
survey was accomplished during fiscal year at a cost of $264.36 for
maintenance.
   The total costs were $125,409.14 for maintenance. The expenditures
were $125,693.98 for maintenance.
   Condition at end of fiscal year.-The existing project was about
68 percent complete. The 15-foot channel from the mouth to Hart-
ford was completed in 1937. The Saybrook jetties and training walls
at Hartford, Clay Banks, and Sears Shoal were completed in 1915.
The stone dikes and timber spurs at Pistol Point, Glastonbury, Press
Barn, Naubuc, Cys Hollow, and Clay Banks were completed in 1927
and those at Wethersfield in 1947. Timber pile dikes at Press Barn
were completed in 1940 and at Glastonbury Bend in 1943. The Clay
Banks, Cys Hollow, Naubuc, Press Barn, Glastonbury (including Two
Piers), and Gildersleeve Island and Reaches have ben revetted. The
jetties at Saybrook need repairs. The training walls, dikes, and
revetments are generally in good condition. To complete the project
requires the construction of additional permanent works, dredging
the channel and anchorage in North Cove, Old Saybrook, Connecticut,
and the dredging of the 6-foot channel, turning basin, and anchorage
in Eightmile River. The head of commercial navigation is at Hart-
ford, 52 miles by channel from the mouth. A dam at Holyoke, Mass.,
34 miles above Hartford, completely interrupts navigation.
   The controlling depths at mean low water were 15 feet (not full
width) to Hartford (1952) ; 1-foot in entrance channel to North Cove
 (1938); 0 feet in anchorages at North Cove (1938) ; 7 feet in channel
and basin in Eightmile River (1946); 1 to 6 feet in anchorage at
Hamburg (1946). The costs under the existing project have been
$858,555.98 for new work, which includes $9,000 of completed new
work project (existing project) transferred from Eightmile River
project, and $1,996,014.69 for maintenance, a total of $2,854,570.67.
Expenditures have been $2,854,604.60.
   Proposed operations.-The unexpended balance and accounts re-
ceivable June 30, 1952, amounting to $10,539.74 will be expended as
follows:
                  RIVERS AND HARBORS---NEW                                  ENGLAND         DIVISION                     87
Accounts payable--------- ------------------------                                                                 $4. 26
Completion of condition survey, by hired labor, in fall of 1952                               -------         10, 535. 48
          Total all work .__......,_                            . --..                                        10, 539. 74
  The sum of $180,500, maintenance funds, can be profitably expended
during fiscal year 1954, as follows:
Maintenance dredging, by contract, of the river bars to project depth
of 15 feet, mean low water (approximately 200,000 cubic yards)__ $180, 000. 00
Miscellaneous inspections and reports--.---------------------_          500. 00
          Total all work-- -----                      _-       ---------------                  --          180, 500. 00

                                          Cost and financial summary

                                                     Fiscal year ending June 30                             Total to June
                                                                                                           30, 1952, includ-
                                                                                                           ing fiscal years
                                      1948          1949             1950        1951          1952          prior to 1948


New work:
   Appropriated--.......------..    $6, 500.00 ----------------------------------------                     1 $1,145, 930. 27
   Cost------------------           76, 562. 47-----------------------------------------1                      1, 145, 930. 27
   Expenditures.....-------....     75, 648. 41 ----------------------------------------                     1 1,145, 930. 27
Maintenance:
   Appropriated-.........          102, 300.00 $150, 000.00      $58,000.00 $160,000. 00    $10,000.00         2, 372, 898. 64
   Cost------------------           34, 583. 60  55, 103. 17     250, 692. 43 10, 094. 41   125, 409. 14       2, 362, 363. 16
   Expenditures-......-------..     38, 197. 68  18, 193.65      287, 804. 31  9, 843.50    125, 693.98        2, 362, 397. 09


Other new work data: Estimated additional amount needed to be appro-
  priated for completion of existing project ---------------------   $398, 300
  1 Includes $9,000 expended for new work on project: "Eight Mile River, Connecticut."


                                      34. CLINTON HARBOR, CONN.

   Location.--On the north shore of Long Island Sound about 10 miles
west of the mouth of the Connecticut River and about 20 miles east
of New Haven Harbor, Conn. (See U. S. Coast and Geodetic Survey
Charts Nos. 216 and 1212.)
   Previous project.--Adopted by River and Harbor Act of August 2,
1882. For further details see page 640, annual report for 1894 and
page 112, annual report for 1943.
   Existing project.-This provides for a channel 8 feet deep at mean
low water and 100 feet wide from Long Island Sound to the upper
end of the wharves at Clinton, an anchorage area of the same depth
opposite and above the wharves, 50 feet wide south of the channel
and extending 600 feet above the end of the channel with widths of
150 to 250 feet, and for maintenance of a stone dike closing a breach
in the sandy peninsula which separates the river from the outer
harbor. The mean and spring tidal ranges are 4.7 and 5.5 feet respec-
tively. The estimate of cost, approved in 1952, for new work, is
$76,800 exclusive of $6,600 to be contributed by local interests and
exclusive of amounts expended under the previous project; and $1,000
annually for maintenance, approved in 1950.
88            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

  The existing project was authorized by the following river and
harbor acts:

       Acts                                Work authorized                                                   Documents

Aug.     2,1882   Dike...------------------------------............................--------     S. Ex. Doc. 84, 47th Cong., 1st sess.1
Mar.     2,1945   Channel and anchorage.........-----------.....-------------                   H. Doc. 240, 76th Cong., 1st sess.

1   Contains latest published map.

  Local cooperation.-Fully complied with.
  Terminal facilities.-There are several small private wharves, some
of which are open to public use.
  Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-The existing project was completed
in 1950. The controlling depths at mean low water were 8.0 feet in
the channel, and 8 feet in the 8-foot anchorage (1950).
  Costs and expenditures under the existing project have been $68,-
359.87, all for new work, excluding $6,600 from contributed funds.
  Proposed operations.-Funds unexpended at the end of the fiscal
year 1952 amounting to $8,440.13 plus accounts receivable of $2,284.29,
a total of $10,724.42 will be held in reserve pending settlement of
claim on original contract for new work.
  No work is scheduled for the fiscal year 1954.
                                            Cost and financial summary

                                                           Fiscal year ending June 30                                 Total to June
                                                                                                 -30,1952,                       includ-
                                                                                                                     ing fiscal years
                                       1948              1949             1950                1951           1952     prior to 1948

New work:
     Appropriated_---  .....-. _. - -_ _ $76, 800. 00 ...---------------------------------                                1   $83,130. 02
     Cost-............                     1,534. 89 $27, 132. 11 $39, 692.87 -$2, 284. 29                                    1 72, 405. 60
     Expenditures-----.... -------------- 1, 426. 41    15, 111.08  51, 822. 38 -2, 284. 29                                   1 72, 405. 60
Maintenance:
     Appropriated-.......    ------------ ------------ ------------ ------------------------                                    1, 917. 25
     Cost-------             ------------------------------------------------------------                                       1, 917. 25
     Expenditures------------------....-----------------------------------............       --------                           1,917. 25


Other new work data: Unobligated balance, June 30, 1952_-
                                                       ......                                                            $7, 527. 37
     1In   addition $6,600 of contributed funds was expended for new work.

                                     35. NEW HAVEN HARBOR, CONN.

  Location.--On the north shore of Long Island Sound, about 67 miles
to the east of New York City. (See U. S. Coast and Geodetic Survey
Chart No. 218.)
  Previous projects.-Adopted by River and Harbor Acts of August
30, 1852, March 3, 1871, June 10, 1872, and for West River, March 3,
1905. For further details, see page 1755 of annual report for 1915
and page 127 of annual report for 1938.
  Existing project.-This provides for a main channel 35 feet deep,
400 to 800 feet wide, from Long Island Sound to Tomlinson bridge;
2 anchorage basins below Tomlinson bridge of 16- and 15-foot depths;
a pile and riprap dike, total length about 4,200 feet, to contract tidal
                  RIVERS AND         HARBORS---NEW            ENGLAND              DIVISION             89


flow at Fort Hale bar; a channel 12 feet deep and 100 to 150 feet wide,
from the southwest corner of the 16-foot anchorage basin via City
Point and the West Haven wharf front to Kimberly Avenue bridge;
thence 12 feet deep and prevailing width of 75 feet up West River
approximately to the railroad 'bridge, and an anchorage basin 6 feet
deep in West River opposite Mars wharf; a channel 100 feet wide and
12 feet deep from the 15-foot anchorage basin toward Brewery Street,
about 1,500 feet; a channel in Quinnipiac River 22 feet deep and 250
to 400 feet wide to a point about 1,000 feet above Ferry Street, thence
16 feet deep and 200 feet wide to Grand Avenue, with turning basin
22 feet deep, 200 to 800 feet wide and 700 feet long at the mouth of
Mill River; a channel up Mill River 12 feet deep, 200 feet wide, to
the junction of the two branches above Chapel Street, thence to Grand
Avenue, 100 feet wide in the East Branch and generally 125 feet
wide in the West Branch; and the removal of certain obstructive
rocks in Morris Cove. The mean range of tide is 6.2 feet.
   The estimate of cost approved in 1952 is $4,459,000 for new work
exclusive of amounts expended on previous projects, and $75,000
annually for maintenance, approved in 1950.
   The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                  Documents

Aug.     2,1882   Sandy Point dike-.....-----------   ----------------- Plans approved by a Board of
                                                                          Engineers, Oct. 2, 1882.
Mar. 3,1899       The 16-foot anchorage basin ..--------------------- H. Doc. 82, 55th Cong., 1st sess.
June 25, 1910     Brewery St. channel, removal of rocks in Morris H. Doc. 1159, 60th Cong., 2d sess.
                   Cove and present project dimensions of the 15-foot
                    basin.
July 25,1912   Present project dimensions of the channels in Mill        H. Doc. 26, 62d Cong., 1st sess.
                 River.
    Do-....... Present project dimensions of the West River channel      H. Doc. 535, 62d Cong., 2d sess.
                 and anchorage.
July 3,1930 18-foot and 16-foot channels in Quinnipiac River----......   H. Doc. 686, 69th Cong., 2d sess.
Aug. 30,1935 1 The 25-foot channel                                           Doc. 479, 72d Cong., 2d sess.
                                                                         H--------------------------.
Mar. 2,1945 The 30-foot channel and anchorage and present loca-          H. Doc. 307, 76th Cong., 1st sess.
                 tion of 16-foot anchorage.
July 24,1946 35-foot main channel, elimination of 30-foot anchor-        H. Doc. 517, 79th Cong., 2d sess.
                 age, present location and extent of 16-foot anchor-
                 age, and 22-foot channel and turning basin in
                 Quinnipiac River.
Aug 16,1949    Brewery Street Channel declared non-navigable-......      H. R. 3511, 81st Cong., 1st sess.
                                                                           Public Law 234, 81st Cong., 1st
                                                                           sess.

  1 Also Public Works Administration, September 6, 1933.
  2 Contains latest published map.




  Local cooperation.-The 35-foot main channel and the 22-foot
channel and turning basin in Quinnipiac River were authorized
subject to the conditions that local interests furnish free of cost
to the United States all lands, easements, and rights-of-way and
suitable spoil disposal areas for the initial work and for subsequent
maintenance when and as required, and hold and save the United
States free from damages resulting from the improvement. These
requirements, as applied to the 35-foot channel, have been met, and
assurances have been furnished that the requirements for the 22-foot
channel and turning basin in the Quinnipiac River will be met. These
assurances were approved by the Chief of Engineers on June 2, 1947.
90       REPORT OF CHIEF OF ENGINEERS, U.            S. ARMY,       1952

   Terminal facilities.-The wharves and piers served by this im-
provement are grouped near the head of the main harbor; on both
sides of Mill River between Chapel Street and Grand Avenue; on
both sides of Quinnipiac River throughout the greater part of its
improved portion; at City Point; and along the westerly side of
West River. The total length of berthing space available at 50
wharves or piers is about 16,920 feet. One of the wharves is open
to public use, 6 are open to public use upon agreement with the
owners, and 9 have direct rail connections.
   Facilities are adequate for existing commerce. For further details
see Port and Terminal Facilities of Southern New England.
   Operations and results during fiscal year.--During the fiscal year
costs in the amount of $348.97 were incurred in connection with claim
pending on contract for new work dredging already completed. The
expenditures were $348.97 for new work.
   Condition at end of fiscal year.--The existing project was about 86
percent complete. The Sandy Point dike, completed in 1889, is in
poor condition. The controlling depths at mean low water are as
follows: Main channel to within 1,000 feet of Tomlinson Bridge, 35
feet (1949), thence to within 300 feet of Tomlinson Bridge, 18 feet
(1943); 16-foot anchorage, 0 to 25 feet (1950); 15-foot anchorage,
16 feet except at edges (1940); 12 feet in Brewery Street Channel
(1940); West Haven 6-foot anchorage, 0 to 10 feet (1952); West
River, 9.8 feet to Kimberly Avenue Bridge (1952), thence 9 feet to
head of navigation (1952); Mill River, 12 feet (1949) ; Quinnipiac
River, 17 feet to Ferry Street Bridge (1943); thence 11 feet except
at edges to Grand Avenue Bridge (1952).
   To complete the project requires the dredging of the 22-foot Quin-
nipiac River channel and turning basin. The total costs, all funds,
under the existing project have been $5,453,298.27 of which $3,506,-
490.81 were regular funds, $290,877.00 were National Industrial Re-
covery funds, and $59,206.75 Public Works funds, a total of $3,856,-
574.56 for new work and $1,596,723.71 for maintenance. The total
expenditures have been $5,453,198.27.
   Proposed operations.--The unexpended balance June 30, 1952, of
$192,528.58, plus an allotment of $7,000 to be made in fiscal year 1953,
a total of $199,528.58 will be applied as follows:
Accounts payable------------------------------------------                 $100. 00
New work: New work funds held in reserve pending final settlement
  of claim--------------------------------------------192,                  428. 58
Maintenance: Condition survey, by hired labor, to determine manner
  in which banks are holding, and effect of any deterioration on
  general area of channel--- -----------------             -------     7, 000. 00

      Total all work___---------------------------              -    199, 528. 58
  The sum of $157,000, maintenance funds, can be profitably expended
during fiscal year 1954 for the following schedule of work.
                       RIVERS AND HARBORS-NEW                                      ENGLAND DIVISION                                     91
Maintenance :
    Partial maintenance dredging, by contract, to 16 feet in the
       Quinnipiac River immediately above Ferry Street Bridge, for a
       distance of approximately 1,000 feet and a width of 200 feet
       (approximately 40,000 cubic yards)                                                                                       $45, 000
    Dredging, by contract, in the channel below Kimberly Avenue
       Bridge to project depth of 12 feet at mean low water (approxi-
       mately 100,000 cubic yards) -_ -- _.__.                                                                                  110, 000
Miscellaneous inspections and reports __ _ _ __                                                                                   2, 000

             Total all work--------------------------------------------                                                         157, 000

                                                 Cost and financial summary

                                                              Fiscal year ending June 30                                   Total to June
                                                                                                                           30,1952, includ-
                                                                                                                           ing fiscal years
                                            1948            1949            1950            1951            1952            priorto 1948

New work:
   Appropriated--_......                $1,140,000.00 $1,236,555.31 $163, 000. 00 ...--------- -------..........-----       1$4, 380, 628. 80
   Cost---------------...............     561, 049. 211, 838, 599.53 432, 817.82        $182.38           $348. 97           1 4, 188, 200. 22
   Expenditures-------.....               448. 606. 14 1, 791, 067. 05 592, 115.59       136.49             348. 97          1 4, 188, 100. 22
Maintenance:
      Appropriated---------.....   56, 000.00 -88,916.96                                                    ............
                                                                         165, 000. 00 -13, 947. 74------------                1, 629, 213. 71
      Cost-----------------3,145.22                   -----------                    .......................-----------
                                                                         151, 052. 26----------                               1, 629, 213. 71
      Expenditures-.........     -25,466.69 -----------                  151,052.26------.....-............                   1, 629, 298. 71


Other new work data:
   Unobligated balance, June 30, 1952--------------------------- $3, 227. 58
   Estimated additional amount needed to be appropriated for com-
      pletion of existing project----------------------------     410, 000.000
  1 Includes $290,877 National Industrial Recovery funds and $59,206.75 Public Works
funds.

                                          36. HOUSATONIC RIVER, CONN.

   Location.--Rises in northwestern Massachusetts, flows southerly
130 miles through Massachusetts and Connecticut, and empties into
Long Island Sound at Stratford, 5 miles east of Bridgeport Harbor.
(See U. S. Coast and Geodetic Survey Chart No. 219.)
  Existing project.-This provides for a channel 18 feet deep at mean
low water and 200 feet wide from the mouth to the lower end of Cul-
vers bar, about 5 miles, and thence 7 feet deep and 100 feet wide to
Derby and Shelton, about 8 miles; a riprap breakwater at the mouth,
consisting of an inner arm, 3,250 feet long, 3 feet high above mean low
water, top width 6 feet, side slopes 1 on 1, and an outer arm 2,571 feet
long, 6 feet high above mean high water, top width 12 feet, outer
slope 1 on 2, inner slope 1 on 1; riprap dike in the river below Strat-
ford not to exceed 1,500 feet in length; and a riprap jetty 163 feet
long at Sow and Pigs Rocks. The mean tidal range, exclusive of the
winter season and freshets, is 6.7 feet at the mouth, 5.5 feet at Strat-
ford, and 5 feet at Shelton; the extreme range due to combined effect
of wind and other causes is about 11 feet at the mouth, diminishing
toward the head. The spring freshets occasionally rise to a height
of 18 feet or more above summer low water, but only average about 12
feet above that datum.
92            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                 1952

   The estimate of cost for new work, approved in 1952, is $1,354,000
exclusive of $150,000 plus $50,000 in lieu of suitable bulkhead areas
to be contributed by local interests. The latest approved (1950) esti-
mate for annual cost of maintenance is $30,000.
  The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                 Documents

Mar.    3,1871   A jetty at Sow and Pigs Reef and the present project   H. Doc. 95, 41st Cong., 3d sess.,
                  width of the channel across the outer bar.              and Annual Report, 1871, p. 781.
Aug. 11,1888     Breakwater at the mouth and the prese nt project       S. Doc. 103, 50th Cong., 1st sess.,
                   dimensions of the river channel above the lower      and Annual Report, 1888, p. 554.
                   end of Culvers bar.
                 The Stratford dike-.......--.-- ----..__-.------  - _ Authorized by Department; proj-
                                                                        ect submitted by the district
                                                                        engineer July 15, 1892.
July    3,1930   Present project dimensions of channel up to Culvers H. Doc. 449, 70th Cong., 2d sess.t
                  bar.

  I Contains latest published map.

   Local cooperation.--The River and Harbor Act of July 3, 1930,
authorized the 18-foot channel up to Culvers Bar subject to the
provision that no work shall be started until local interests have
contributed $150,000 toward the cost of the work, and provided further
that local interests shall furnish, free of cost to the United States,
suitable bulkhead areas for the deposit of dredged material, or in
lieu thereof an additional $50,000 in cash. These conditions of
local cooperation will be met in the time construction funds are
appropriated.
   Terminal facilities.-There are six wharves for commercial use at
Stratford, one at Devon, and eight at Shelton and Derby. The facili-
ties are considered adequate for the existing commerce.
   Operationsand results during fiscal year.--None.
   Condition at end of fiscal year.-The existing project was about
17 percent completed. The up-river channels were completed in
1893. The breakwater at the mouth was completed in 1914, except
that the outer arm has a top width of 8 feet and outer slope of 1 on
11/2 instead of project dimensions; the Stratford dike was completed
to its present length of 1,255 feet in 1916, and the jetty at Sow and
Pigs Rocks was completed in 1871. The breakwater is in good con-
dition and the dike and jetty in fair condition.
   To complete the project requires the enlargement of the outer arm
of the breakwater to provide a top width of 12 feet and an outer slope
of 1 on 2, which is not required at this time, the extension of the
Stratford dike not more than 245 feet, and deepening and widening
of the channel from the mouth up to the lower end of Culvers Bar.
The head of navigation is at Derby and Shelton, about 14 miles by
channel above the mouth. The controlling depth at mean low water
in the channel was about 7 feet to Shelton (1944). The costs and
expenditures have been $234,364.92 for new work and $261,432.89 for
maintenance, a total of $495,797.81.
   Proposedoperations.-An allotment of $80,000, maintenance funds,
to be made during fiscal year 1953 will be expended for maintenance
dredging, by contract, of a channel 100 feet wide, 7 feet deep at mean
                  RIVERS AND HARBORS--NEW                                      ENGLAND DIVISION                                           93
low water, from the mouth of the river to Culvers Bar, approximately
5 miles (approximately 70,000 cubic yards).
  No work is contemplated for the fiscal year 1954.
                                      Cost and financial summary

                                                Fiscal year ending June 30                                                   Total to June
                                                                                                                             30, 1952, includ-
                                                                                                                             ing fiscal years
                                   1948        1949                 1950         *        1951                  1952          prior to 1948

New work:
   Appropriated--------
                 ...       -----------------------............ ---------------------------                                        $234,364.92
   Cost--.....--     ------------------------------------------------------------                                                  234,364.92
   Expenditures .......---------------------- ------------------------------------                                                 234,364.92
Maintenance:
   Appropriated-------------------$299.77 ----------------------------------                                                       261,432.89
   Cost--------------------------    299. 77 ----.-------------------------------                                                  261,432.89
    Expenditures--------.....   ------------    299. 77 ...........----------.........------------------------............         261, 432. 89


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project----- -------- $1, 120, 000

                                37. BRIDGEPORT HARBOR, CONN.
   Location.-On the north shore of Long Island Sound, about 51
miles east of New York City. (See U. S. Coast and Geodetic Sur-
vey Chart No. 220.)
   Previous projects.-Adopted by the River and Harbor Acts of
July 4, 1836, March 3, 1871, and (for Black Rock Harbor) July 5,
1884. For further details see page 1756 of annual report for 1915,
and page 133 of annual report for 1938.
  Eawisting project.-This provides for-
   (1) Two riprap breakwaters, one 3,823 feet long on the easterly
side, and one 2,110 feet long on the westerly side of the entrance
to the main harbor.
   (2) The construction and maintenance of shore protection on
Fayerweather Island, including a sea wall connecting the northerly
and southerly portions of the island.
   (3) Main channel 30 feet deep and generally 400 feet wide from
Long Island Sound to a point abreast Bridgeport Breakwater Light
widening to approximately 600 feet opposite the Cilco terminal, and
decreasing in width to 250 feet at a point about 720 feet below the
Stratford Avenue Bridge across the Poquonock River.
   (4) A turning basin 30 feet deep at the entrance of Johnsons River
channel.
   (5) Two anchorage basins: One 25 feet deep and 23 acres in area,
opposite Tongue Point; one 18 feet deep and 29 acres in area, ad-
joining the main channel on the west above Tongue Point.
   (6) Poquonock River channel, 18 feet deep and from 125 to 200 feet
wide from the lower bridge to a point about 500 feet below the dam at
Berkshire Avenue, about 1.1 miles.
   (7) Yellow Mill channel, 18 feet deep and 150 to 200 feet wide from
the 30-foot channel to a point about 370 feet from Crescent Avenue,
about 1 mile.
   (8) Johnsons River channel, 15 feet deep and generally 200 feet
wide from the 25-foot anchorage to a point 1,700 feet below Hollisters
         245554---53-vol. 1-7
94            REPORT OF CHIEF OF ENGINEERS,                             U.    S. ARMY, 1952


Dam, thence 9 feet deep and 100 feet wide to a point about 600 feet
below Hollisters Dam about 1 mile.
   (9) Black Rock and Cedar Creek channel, 18 feet deep and 100 to
200 feet wide from the 18-foot curve in Black Rock Harbor to the
heads of both branches of Cedar Creek, about 2.4 miles.
   (10) Burr Creek channel, 7 feet deep and 100 feet wide from its
junction with Cedar Creek channel to the south side of Yacht Street
extended, about one-quarter mile.
  All depths refer to mean low water, the mean tidal range being 6.8
feet. The extreme tidal range, due to wind and other causes, is 11
feet or more.
  The estimates of cost, approved in 1952, are $2,302,000 for new work,
exclusive of amounts expended under previous projects, and $37,000
annually for maintenance, approved in 1950.
  The existing project was authorized by the following river and
harbor acts:

       Acts                          Work authorized                                    Documents

                  Fayerweather Island sea wall..---   -      --------
July    4,18399   Shore protection of Fayerweather Island--.--------         Annual Report, 1899, p. 1173.
Mar.    3,1899    West breakwater and present project dimensions of          H. Does. 275 and 521, 59th Cong.
Mar.    21907       east breakwater.                                          2d sess.
Mar.    21919     Present project depths of the 18- and 12-foot anchorage    H. Doc. 898, 63d Cong., 2d sess.
        S191        basins and of Burr Creek channel.
                  25-foot entrance channel, the 25-foot anchorage and        H. Doc. 281, 71st Cong., 2d sess.
July    3,1930      an 18-foot channel through Johnsons River; present
                    project dimensions of the channels through Poquo-
                    nock River, Yellow Mill Pond, Black Rock Har-
                    bor, and Cedar Creek.
Aug. 12,19371     The present extent of Burr Creek channel .......--------... Specified in act.
Aug. 12, 1937     The 25-foot channel through the main harbor, and H. Doc. 232, 75th Cong., 1st sess.
Aug. 26, 1937      present project location and extent of the 18- and
                    12-foot anchorage basins.
Mar.    21945     The 30-foot channel; elimination of 12-foot anchorage_     H. Doe. 819, 78th Cong., 3d sess.
                       turning basin and 15-foot and 9-foot channels         H. Doc. 680, 79th Cong., 2d sess.2
          y 24 30-foct
July 25, 1945    in Johnsons River.

  1 Publi - Law 273, 75th Cong.
  2 Contains latest published map.

   Local cooperation.-The River and Harbor Act approved March 2,
1945, authorized the 30-foot channel subject to the provision that
local interests hold and save the United States free from claims for
damages resulting from the improvement.
  The River and Harbor Act approved July 24, 1946, authorized the
30-foot turning basin and present authorized channels in Johnsons
River subject to the conditions that local interests make necessary
changes to the Pleasure Beach Bridge; give assurances satisfactory
to the Secretary of War that they will provide suitable berthing and
unloading facilities for large tankers on the main harbor turning
basin and adequate terminals on Johnsons River; furnish free of cost
to the United States all lands, easements, and rights of way and
suitable bulkheaded spoil disposal areas for the initial work and for
subsequent maintenance when and as required; and hold aid save the
United tSates free from damages resulting from the improvement.
Assurances required by both of the above acts were approved by the
Secretary of War on April 4, 1947. All of these requirements have
been met except those pertaining to making changes in the Pleasure
Beach Bridge and providing terminals on Johnsons River.
  Terminal facilities.--There are 45 wharves and piers in use or in
            RIVERS AND HARBORS-NEW             ENGLAND DIVISION               95
usable condition, including 1 modern deep-water public terminal on
the main harbor and 4 owned by the city, that are served by the
improvement. The total available length for berthing is about 13,000
feet. Four of the wharves are open to general public use and 3 may
be used by the public upon agreement with the owners or operators
Direct rail connections are available at 3 wharves. The existing facili-
ties are considered adequate for existing commerce. (For further
details see Port and Terminal Facilities of Southern New England,
1941.)
    Operations and results during fiscal year.-Maintenance dredging,
by contract, in Yellow Mill Channel was commenced on June 1, 1952,
and was in progress at the end of the fiscal year. During the period
23,589 cubic yards of mud, sand, and silt were removed at a cost of
 $21,413.42, for maintenance.
    Condition survey, by hired labor, was accomplished during the fiscal
year. The costs were $2,120.52 for maintenance.
    The total costs were $23,533.94 for maintenance. The expenditures
were $12,938.91 for maintenance.
    Condition at end of fiscal year.-The existing project was about 96
percent complete. The breakwaters were completed in 1908. The
east breakwater is in good condition; the west breakwater and the shore
protection works on Fayerweather Island are in need of repairs. The
removal of rock in Yellow Mill Pond is needed to complete the project.
This work is not presently required. The controlling depths at mean
low water were as follows: 30 feet in the 30-foot main channel (1948),
and 30 feet in the 30-foot turning basin (1948) ; in Johnsons River 15
feet in the 15-foot channel (1948), and 9 feet in the 9-foot channel
 (1948) ; Poquonock River, 18 feet to head of project, except for minor
shoals (1945) ; Yellow Mill Pond Channel, 18 feet to about 1,300 feet
below head of project (1944), thence 15 feet nearly to head of project
 (1943); Black Rock Harbor and Cedar Creek, 18 feet except for minor
edge shoals (1943) ; Burr Creek, about 3 feet (1939) ; 25-foot anchor-
age basin, 25 feet (1943); 18-foot anchorage basin, 18 feet (1942).
The costs under the existing project have been $2,921,667.40, of which
$2,206,897.75 was for new work and $714,769.65 for maintenance. Ex-
penditures have been $2,911,072.37.
   Proposedoperations.-Theunexpended balance and accounts receiv-
able June 30, 1952, of $41,270.09, plus an allotment of $4,400 to be
made during fiscal year 1953, a total of $45,670.09 will be applied as
follows :
Accounts payable     ----------------------------------------        $10, 952. 03
Maintenance :
   Completion of dredging in Yellow Mill Channel, by contract,
      approximately 31,411 cubic yards------------------------ 28, 577. 08
   Completion of condition survey, by hired labor, in Black Rock
      Harbor and Cedar Creek Channel--------------------------           140. 98
   Condition survey, by hired labor, of 30-foot main channel, 30-foot
      turning basin, 25-foot and 18-foot anchorages, 18-foot channel
      in Poquonock River, and 15-foot channel in Johnsons River,
      in the fall of 1952-----------------------------------          6, 000. 00
        Total maintenance---------------------------------            34, 718. 06
        Total------------------------------------------               45, 670. 09
96          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                               1952

  The sum of $180,000, maintenance funds, can be profitably expended
during fiscal year 1954 for maintenance dredging, by contract, in
Black Rock Harbor and Cedar Creek channel to project depths of 18
feet, mean low water, approximately 200,000 cubic yards.
                                      Cost and financial summary

                                                  Fiscal year ending June 30                              Total to June
                                                                                                         30, 1952, includ-
                                                                                                         ing fiscal years
                                  1948           1949         1950           1951           1952          prior to 1948

New work:
   Appropriated.........       $915,000. 00 -$25, 111. 18----------- ......-----..   ------------            2, 585, 347. 28
   Cost--.. __........____      959, 555. 78     -43. 99 ------------      --------------------              2, 585, 347. 28
                ------
   Expenditures.........        964, 188.67      -33.01 ------------     -----------    ----------           2, 585, 347. 28
Maintenance:
   Appropriated________.... .----      - ---------------    $35, 000.00   -$9, 796.20     $53, 852. 00         757, 036. 68
   Cost ...------      -- _ ----------------------            1, 050.70     24, 153. 10    23, 533.94          726, 718. 62
   Expenditures.....--    ........ ----------------------     1, 074.63     24, 129. 17    12, 938. 91         716, 123.59


Other new work data: Estimated additional amount needed to be ap-
  propriated for completion of existing project-------------------- $95, 000

                                 38. NORWALK HARBOR, CONN.

  Location.--On the north shore of Long Island Sound, about 40
miles east of New York City. (See U. S. Coast and Geodetic Survey
Charts Nos. 221 and 1213.)
  Previous projects.-Adopted by River and Harbor Acts of June
10, 1872, June 3, 1896, and March 2, 1907. For further details see
page 1757 of annual report for 1915, and page 137 of annual report
for 1938.
   Existing project.-This provides for a channel 12 feet deep from
the outer harbor to the highway bridge at South Norwalk, about 3.1
miles, 200 feet wide to Gregory (Dorlon) Point, thence 150 feet wide
to South Norwalk, and 250 feet wide .along the South Norwalk
wharves, thence a channel 10 feet deep and generally 100 feet wide
to the head of navigation about 1.5 miles, an anchorage basin 10 feet
deep and about 17 acres in area opposite Fitch Point; a channel 6 feet
deep from the 10-foot anchorage to East Norwalk, 125 feet wide to
the bend beyond Third Street, thence 150 feet wide to the head, a total
distance of 2,900 feet; and for an irregular-shaped anchorage basin
of about 7 acres, 6 feet deep adjacent to the upper portion of the East
Norwalk channel. All depths refer to mean low water. The mean
and spring tidal ranges at South Norwalk are 7.1 and 8.4 feet respec-
tively. The cost of the completed project was $368,612.89 for new
work, exclusive of $34,500 contributed by local interests and exclusive
of amounts expended under previous projects; and $10,000 annually
for maintenance approved in 1950.
   The existing project was authorized by the following river and
harbor acts:
                  RIVERS        AND     HARBORS--NEW                ENGLAND              DIVISION                97
       Acts                           Work authorized                                        Documents

Mar.     2,1919   South Norwalk and Norwalk             channels;   10-foot     H. Doc. No. 1143, 63d Cong., 2d
                   anchorage.                                                    sess.
Mar.     2,1945   East Norwalk channel widening and anchorage--....            H. Doc. No. 220, 76th Cong., 1st
                                                                                 sess.


  1 Contains latest published maps.

   Local cooperation.-Fully complied with.
    Terminal facilities.-There are two city wharves, neither of which
is in usable condition. There are 19 private wharves in use or in
usable condition having a total berthing space of about 3,100 feet.
One has rail connections. None of the private wharves are open to
general public use. The public wharves are inadequate for existing
commerce. (For further details see Port and Terminal Facilities
of Southern New England, 1941.)
   Operations and results during fiscal year.-Duringthe fiscal year,
expenditures of $33,965.15 were made for improvement dredging al-
ready accomplished under the completed contract. There were no
costs incurred.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1950. The controlling depths at mean low water were as
follows: To Gregory (Dorlon) Point, 12 feet (1942) ; thence to Wash-
ington Street Bridge, South Norwalk, 12 feet (1937); thence 11 feet
to the head of navigation at Norwalk (1940) ; 6 feet on the west side
of the 6-foot channel to East Norwalk for widths of 50 to 75 feet
 (1950) ; 3 feet on the east side of the 6-foot channel to East Norwalk
for a width of 75 feet (1950); in the 10-foot anchorage, 10 to 12 feet
 (1937); and in the 6-foot anchorage, East Norwalk, 6 feet (1950);
and 6 to 12 feet in the basin at Norwalk (1940). The costs and ex-
penditures have been $368,612.89 for new work and $209,368.08 for
maintenance, a total of $577,980.97. In addition there have been costs
and expenditures of $34,500 from contributed funds.
   Proposed operations.-No work is scheduled for fiscal year 1953.
   The sum of $1,000, maintenance funds, can be profitably expended
during the fiscal year 1954 for a condition survey, by hired labor, of
the 12- and 10-foot channels from the outer harbor to the head of
navigation, the 10-foot anchorage, and the 6-foot channel along the
east side of the harbor to the head of the harbor at East Norwalk.
                                      Cost and financial summary

                                                Fiscal year ending June 30                          Total to June
                                                                                                   30, 1952. includ-
                                                                                                    ing fiscal years
                                 1948         1949           1950             1951          1952     priorto 1948

New work:
                                         $22,000.00 -----------------------
     Appropriated----------------$110,000.00                                      1$551,206. 53
     Cost--.------------------------     113, 343.59 -$2,171.47 -
                                        751.05                          ----   -1531,129.70
                            ------........-----....
     Expenditures-------.........--     753. 58
                                          44, 432. 55  32, 771.89 $33, 965. 15     1531, 129. 70
Maintenance:
                                                                       200. 00
     Appropriated..------.........------------................-------......              ............    275, 488. 52
     Cost--------------------------------- ------------        200.0 ------------                        275, 488. 52
     Expenditures--------------------------- ----------- ----- 200.00------------                        275,488.52
1
     In addition $34,500 was expended from contributed funds for new work.
98            REPORT OF CHIEF OF ENGINEERS,                        U.    S. ARMY,        1952

                               39. STAMFORD HARBOR, CONN.

   Location,.--On the north shore of Long Island Sound, 32 miles east
of New York City. (See U. S. Coast and Geodetic Survey Chart
No. 221.)
   Previous projects.-Adopted by the acts of August 5, 1886, and
July 13, 1892. For further details see page 1758 of annual report for
1915, and page 139 of annual report for 1948.
   Existing project.-This provides for two detached breakwaters;
one 1,200 feet long on the easterly side, and one 2,900 feet long on the
westerly side of the channel at the entrance to the harbor; an entrance
channel 18 feet deep, 200 feet wide to the upper end of the 18-foot
anchorage, about 0.55 mile, and thence 15 feet deep to the junction of
the branches, about 0.5 mile; a channel in the west branch 15 feet deep,
125 feet wide, and about three-fourths mile long, and a basin of the
same depth at the head of the branch of such widths as to exclude
extensive rock excavation along the northeast side; a channel in the
east branch 12 feet deep and 100 feet wide, with increased width at
the turns, to a point 1,100 feet from the head of navigation, thence of
the same depth and from 85 to 125 feet wide to the head of navigation,
a total distance of about 1.5 miles; and anchorage basin 18 feet deep
on the west side of the 18-foot entrance channel, 600 feet wide, and
1,000 to 1,900 feet long, and an.-anchorage basin 8 feet deep adjacent
to the East Branch Channel, about 4.2 acres. The plane of reference
is mean low water, the mean tidal range being about 7.2 feet. The
extreme tidal range, due to the combined effects of wind and other
causes, is 12 feet or more.
   The estimate of cost for new work, approved in 1952, is $839,300
exclusive of $169,635.85 contributed by local interests, and exclusive
of amounts expended on previous projects. The latest (1950) ap-
proved estimate for annual cost of maintenance is $30,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                       Work authorized                                  Documents

Mar.    2,1919   The East Branch channel and the present project        H. Doc. 1130, 63d Cong., 2d sess.
                   width of the entrance channel.
Aug. 30, 1935    The 8-foot anchorage area, the present project depth   Rivers and Harbors Committee
                   of the upper portion of the entrance channel, and     Doc. 8, 74th Cong., 1st sess.
                   the present project dimensions of the West Branch
                  channel and basin.
Aug. 26,1937     The breakwaters, the 18-foot anchorage basin, and      Rivers and Harbors Committee    1
                   present project depth of the outer section of the     Doc. 29, 75th Cong., 1st sess.
                   entrance channel.
July 24,1946     Substituted 8-foot anchorage basin adjacent to East    H. Doc. 676, 79th Cong., 2d sess.'
                   Branch channel for that in outer harbor.

 ' Contains latest published maps.


  Local cooperation.-Theconditions of local cooperation imposed by
the River and Harbor Acts of March 2, 1919, and August 26, 1937, have
been fully complied with. The River and Harbor Act approved July
24, 1946, authorized the 8-foot anchorage basin adjacent to the East
           RIVERS AND HARBORS-NEW          ENGLAND DIVISION            99
Branch Channel subject to the conditionthat responsible local agencies
furnish assurances satisfactory to the Secretary of War that they will
provide fr~e of cost to the United States all necessary lands, easements,
rights-of-way, and spoil-disposal areas for new work and subsequent
maintenance when and as required; construct concurrently the neces-
sary bulkheads, piers, landing platforms, and service facilities which
shall be open to all on equal terms; and hold and save the United States
free from damages resulting from the improvement. Local interests
were informed under dates of September 22, 1948, April 5, 1949, May
13, 1949, and December 14, 1949, of the above-mentioned requirements
of local cooperation. No statement has been received as to when and
if these requirements will be met.
    Terminal facilities.-There are 1 city wharf and 21 privately owned
wharves and piers in use and in usable condition adjacent to the chan-
nels in the East and West Branches. The total available berthage is
about 4,500 feet. None of the wharves is open to general public use,
except the city wharf. Two have direct rail connections. The facili-
ties are considered adequate for existing commerce; but additional
pleasure-craft facilities are needed. (For further details see Port
and Terminal Facilities of Southern New England, 1941.)
   Operationsand results during fiscal year.-None.
    Condition at end of fiscal year.-The existing project was about 94
percent completed. The East Branch Channel has been completed
except for a slight deficiency in width opposite Ludlow Street. The
West Branch Channel and entrance channel north of the 18-foot an-
chorage have been dredged to 15 feet and all of the basin similarly
deepened. The 18-foot entrance channel and 18-foot anchorage basin
have been substantially completed. The controlling depths at mean
low water are as follows: Entrance channel to north and 18-foot
anchorage, 18 feet except for minor shoals, mostly near north end of
anchorage basin (1944); 15-foot entrance channel to junction of
branches and West Branch Channel and basin, 15 feet for minor shoals
 (June 1946) ; East Branch Channel, 12 feet (not full width) (1941);
8-foot East Branch Basin 0 to +6 (1949). To complete the project
requires a slight widening (not essential to navigation) in the East
Branch Channel opposite Ludlow Street and the dredging of the 8-foot
basin adjacent to the East Branch Channel. Costs under the existing
project have been $757,681.74 for new work and $168,661.78 for main-
tenance, a total of $926,343.52. Expenditures have been $926,343.52.
In addition, costs and expenditures have been $169,635.85 from con-
tributed funds for new work.
   Proposed operations.-No work is scheduled for fiscal year 1953.
   The sum of $2,500, maintenance funds, can be profitably expended
during fiscal year 1954 for a condition survey, by hired labor, to
determine the amount of shoaling that has occurred in the areas.
100            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                           1952

                                        Cost and financial summary

                                                     Fiscal year ending June 30                       Total to June
                                                                                                     30, 1952, includ-
                                                                                                     ing fiscal years
                                     1948          1949         1950          1951         1952           to1948
                                                                                                      prior

New work:
   Appropriated-------------------               $55,000.00-----------$53,619.01-----                   1$892,824.59
     Cost-------------------------                1,242. 94     $138.05    -----------------------      1     892,824. 59
   Expenditures---------.........   ----------    1, 261. 79     119. 20                      --          1   892, 824. 59
Maintenance:
                                              -------------------
     Appropriated---------.........-------..........                   ----------------------                 228, 081.77
     Cost-------     -----------------------------------------------------------............                  228, 081. 77
     Expenditures.........
                       ---------------------------------------------------------                              228,081.77

  1 In addition $169,635.85 has been expended from contributed funds for new work.

Other new work data: Estimated additional amount needed to be ap-
propriated for completion of existing project ...-------------   $81, 600

                                        40. MIANUS RIVER, CONN.

  Location.--This river has its source in southeastern New York.
It flows in a southerly direction about 20 miles, crossing the south-
western corner of Connecticut, and empties into Captain Harbor,
an arm of Long Island Sound, about 3 miles west of Stamford Har-
bor, Conn. (See U. S. Coast and Geodetic Survey Charts Nos. 222
and 1213.)
   Previous project.-Adopted by the River and Harbor Acts of July
13, 1892, and June 3, 1896. Abandoned by River and Harbor Act
of March 3, 1905. For further details see page 106, annual report
for 1904.
   Existing project.-This provides for a channel 6 feet deep at mean
low water and 100 feet wide from Cos Cob Harbor to the head of
navigation at Boston Post Road, a distance of about 1 mile. The
lower end of the project is about 1 mile above the entrance to Cos Cob
Harbor. The mean and spring tidal ranges are 7.2 and 8.5 feet,
respectively. The cost was $113,500 for new work, exclusive of
$46,500 contributed by local interests and exclusive of amounts ex-
pended under the previous project and $2,500 annually for main-
tenance, approved in 1950.
   The .existing project was authorized by the River and Harbor Act
approved March 2, 1945. The latest published map is in the project
document (H. Doc. 549 78th Cong., 2d sess.).
   Local cooperation.--Fully complied with.
   Terminal facilities.-There are three town wharves with about 750
feet of berthing space, a coal wharf at the railroad power plant, a
commercial wharf, several piers at small shipyards and one at the
yacht club. Most of these are open to the public subject to the owners'
convenience. Facilities are adequate for existing commerce.
   Operationsand results during fiscal year.-Improvement dredging,
by contract, of the 6-foot channel to head of navigation at the high-
way bridge in Cos Cob in progress at the beginning of the fiscal year
was completed on September 10, 1951. During the period 44,079 cubic
yards of mud were removed at a cost of $33,987.66 for new work.
The expenditures were $51,142.98 for new work.
                   RIVERS AND HARBORS--NEW                                   ENGLAND DIVISION                              101

   Condition at end of fiscal year.-The existing project was completed
in 1951. The controlling depth at mean low water was 6 feet in the
channel from Cos Cob Harbor to Mianus (1951). Costs and ex-
penditures under the existing project have been $113,500, all for new
work. In addition there have been costs and expenditures of $46,500
from contributed funds for new work.
   Proposed operations.-No work is scheduled for fiscal years 1953
and 1954.
                                          Cost and financial summary

                                                       Fiscal year ending June 30                               Total to June
                                                                                                                30,1952, includ-
                                                                                                                ing fiscal years
                                      1948            1949           1950            1951           1952         prior to 1948


New work:
  Appropriated-_--------------------------$113, 500. 00--------------                                              1$132,435.19
  Cost        -------------------------                  .----------- 2,480. 83 $77,031. 51 $33,987. 66             1 132, 435. 19
                                      ............
  Expenditures-----------------..........          ------------........... 2, 474. 39 59, 882. 63 51, 142. 98       1 132, 435. 19
Maintenance:
                                          ----------- -----------
Appropriated---...----.... -----------......                              --------- ------------                          64. 81
Cost---------------------------              ----------------------------            ----------                           64. 81
Expenditures----...--      ------------------------------------ --- ---------------------                                 64.81

  1 In addition, $46,500 has been expended from contributed funds for new work.

   41. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                            (GENERAL)
                       RIVER AND HARBOR

   The cost of work during the fiscal year amounted to $148,556.32
for examinations and surveys (including $7,000.41 for beach erosion
studies) and $52,516.34 for contingencies, a total of $201,072.66 for
maintenance. Expenditures were $201,232.92 for maintenance.
  Funds unexpended at the end of the fiscal year amounting to $47,-
164.39, including $20,505.40 contributed funds, plus accounts receiva-
ble amounting to $1,592.03, plus an allotment for fiscal year 1953 of
$71,200, of which $25,700 is for examinations and surveys and $45,500
for contingencies, and an allotment of $210,000 for New England-
New York Inter-Agency Committee Survey, making a total of
$329,956.42, will be applied as follows during the fiscal year 1953:
Accounts payable------------------------------------------                   $87. 75
Examinations and Surveys---------------------------------                71, 585. 65
New England-New York Inter-Agency Committee Survey--------- 210,000.00
              .....--------.....------------.....---------------- ------ 48, 283. 02
Contingencies--
         Total------------                       ------------------------------                                 329, 956. 42

   The additional sum of $88,413.15 can be profitably expended during
fiscal year 1954 for the following schedule of work:
Examinations and surveys----------                  ----------------------                                          $45, 000
Contingencies -----    -         ------------------------             -----.                                         47, 500
New England-New York Inter-Agency Committee Survey------------                                                      370, 000
        Total--------------------------------------------------------                                               462, 500
102           REPORT OF CHIEF OF ENGINEERS, U. Si- ARMY, 1952

                                         Cost and financial summary
                                                 UNITED STATES FUNDS


                                                      Fiscal year ending June 30                                 Total to June
                                                                                                                 30, 1952, includ-
                                                                                                                 ing fiscal years
                                     1948           1949           1950           1951              1952          prior to 1948


Maintenance:
   Appropriated- ..... --119, 150.00 $124, 500.00 $158, 450. 00               1$269,500.00  $56, 500.00             $2, 667, 678.36
        .......
   Cost--------------          123, 637. 00 158, 944. 58 134, 778.95           164, 733.27 1190, 660.85              2, 639, 515.09
   Expenditures-...---...--...  67, 010.02 160, 490. 14 133, 331.08            164,323.39 1190,821.11                2,641,019.37

  I Includes $100,000 for New England-New York Inter-Agency Committee Survey.
                                                 CONTRIBUTED FUNDS


                                                       Fiscal year ending June 30                                 Total to June
                                                                                                                 30,1952, includ-
                                                                                                                 ing fiscal years
                                     1948            1949          1950            1951             1952          prior to 1948

Maintenance:
   Appropriated-........          $19, 800.00     $30, 750.00 - ---- -_-      $24, 450.00        $4, 900.00              $98, 900.00
   Cost ----------------            5, 420. 42     32, 967.02 $16,015.77 ------------            10, 411.81               78, 394.60
   Expenditures__ ----              5, 420. 42     32, 967.02     16, 015. 77                    10, 411.81               78, 394. 60



              42.     PLANT ALLOTMENT, NEW ENGLAND DIVISION

                                         Cost and financial summary

                                                       Fiscal year ending June 30                                 Total to June
                                                                                                                 30, 1952, includ-
                                                                                                                 ing fiscal years
                                     1948            1949          1950            1951             1952          prior to 1948

Maintenance:
   Appropriated--------_ -$217,905.63 -$50, 000.00---------- -$57, 058. 76------------                                $573, 626. 16
   Cost.                                                             .
   Expenditures.         -370,742.00 -36,511.03 $142, 830. 29 -15, 628.62 -$223,547.11                                   217, 486. 83

  Total undistributed costs to 30 June 1952, $263,597.48.

                          43.     INACTIVE NAVIGATION PROJECTS

                                                                For last    Costs and expenditures to
                                                                full re-          June 30, 1952                    Estimated
                      Name of project                           port see                                             amount
                                                                annual                                             required to
                                                                report       New work             Mainte-           complete
                                                                  for                             nance

1.   St. Croix River, Maine ....                                1950        1$180, 549.    81   $10, 450. 19     Completed.
2.   Passamaquoddy tidal 3power project, Maine.....             1935        6, 384, 393.   74                    (2).
3.   Cobscook Bay, Maine 4__________________                    1866             4,173.    51                    Completed.
4.   Lubec Channel, Maine__________________                     1950           303, 365.   53     7, 067. 45          Do.
5.   Machias River, Maine a_______________                      1877            32, 000.   00                         Do.
6.   Moosabec Bar, Maine 3_________________                     1930           114, 000.   00    12, 600. 00          Do.
7.   Beals Harbor, Maine. -               __                    1949                                             $122,000.
8.   Pleasant River, Maine s 5     _____________.__             1892             3, 500. 00                      Completed.
9.   Narraguagus River, Maine 3 ______________... ..            1907            71, 643. 81                           Do.
10.   Sullivan Falls Harbor, Maine 3 4________________           1914            54, 870. 64                           Do.
11.   Bar Harbor, Maine-.-                                       1932           406, 591. 12                      $67,000.
                                                                           ----------------
12.   Northeast Harbor, Maine-... . ---------                    1949                                             $160,000.
13.   Bass Harbor Bar, Maine
                           4   __..   _______        ___         1920             4, 076.13        3, 418. 20     Completed.
14.   Union River, Maine 6 _ _                _     ...     .    1912           176, 854. 85                           Do.
15.   Deer Island Thoroughfare, Maine-.           .       .      1916            40, 000. 00                           Do.
16.   Isle au Haut Thoroughfare, Maine .------------             1949                                             $60,000.
17.   Bagaduce River, Maine 84 ___-_--. ------                   1912            28,000.00        16,-589.-41-    $21,000.
18.   Bucksport Harbor, Maine.____                               1907            18, 420. 99         279. 01      Completed.
19.   Penobscott River, Maine__________________                  1951           501, 020. 53      94, 223. 57          Do.
20.   Stockton Harbor, Maine 54 __   ..       _............      1915            33, 000. 00                           Do.
      See footnotes at end of table.
                        RIVERS            AND        HARBORS-NEW                           ENGLAND                  DIVISION                             103

                                                                             For last     Costs and expenditures to
                                                                             full re-           June 30, 1952                                Estimated
                           Name of project                                   port see                                                          amount
                                                                             annual                                                          required to
                                                                             report         New work                   Mainte-                complete
                                                                               for                                     nance

21.    Belfast Harbor, Maine __........................                                 1897       $61, 561. 45                        Completed.
22.    Carvers Harbor, Maine 8 .-.-.._.._......__.....                                  1915        59, 199. 70                           Do.
23.    Criehaven Harbor, Maine_-.------------..-
                                       6                                                1939        40, 775. 99        $7, 956. 28        Do.
24.    Camden Harbor, Maine ___________________                                         1945       102, 400. 00       31,075.      56     Do.
25.    Rockport Harbor, Maine 4__________.__. ___ 1915                                              47, 000. 00                           Do.
26.    Rockland Harbor, Maine___                                    ___                 1950       915, 862. 73       78, 452. 93         Do.
27.    Owls Head Harbor, Maine 4 6__.______                             _               1855        17, 897.16    ............            Do.
28.    Tenants Harbor, Maine_ __.                                      __               1920        18, 750. 00                           Do.
29.    Georges River, Maine 6.........................                                  1935        25, 787. 91       39, 566. 38         Do.
30.    Medomak River, Maine_.__  - - - - - - -- - - - - - - - - --- -                   1949        17, 000. 00       91,593.31           Do.
31.    New Harbor, Main _                                                               1937        10, 500. 00        12, 566. 27        Do.
32.    Damariscotta River, Maine 6______._..____                                        1906         5, 000. 00   .........         _-    Do.
33.    South Bristol Harbor, Maine__--                                                  1914         3,500. 00    ...........             Do.
34.    East Boothbay Harbor, Maine .............                                __      1950         6, 500. 00        16, 447. 57        Do.
35.    Boothbay Harbor, Maine 3 ______                              __                  1947        18,000. 00                858. 07     Do.
36.    Hendricks Harbor, Maine________..___......._                                     1949                      ..            080...9..   $13,000.
37.    Richmond Harbor, Maine 3 5                             -.              .--     .-1883        20, 000. 00   ...........               Completed.
38.    Sasanoa River, Maine 3 4                                                         1915        92, 487. 69   ...........               Completed.
39.    Cathance River, Maine 3 4_____________________                                   1884        21,000. 00    ..........                   Do.
40.    Harraseeket River, Maine 5____________________                                   1896        30,963.62                                  Do.
41.    Royal River, Maine 3 4 6_____                        ------                      1884        21,919.03            8, 080. 97            Do.
42.    Richmonds Island Harbor, Maine a.---------- 1882                                            119, 844. 22   ...........                  Do.
43.    Scarboro River, Maine, between Prouts Neck                                       1950 -- - - -- - - -                                $175,000.7
         and Pine Point.
44.    Saco River, Maine ....--------...------------....                                1947     8 531,715. 89       132, 019. 45           $27,000.
45.    Wood Island Harbor, Maine, and the Pool at                                       1950                                                $93.000.'
         Biddeford.
46.    Cape Porpoise Harbor, Maine_--- _ ------                                         1951     8 175, 036.55                              Completed.
47.                                          ..
       Kennebunk River, Maine ______..___...-__--                                       1951        83, 584. 01     135, 281.77             Completed.
48.    Wells Harbor, Maine 3 6 -- -----------------                                     1874                          5, 000. 00               Do.
49.    York Harbor, Maine -- ___________________                                        1951        57, 400. 00      20, 301. 06               Do.
50.    Portsmouth Harbor, N. H.__                                __                     1892       130,392.61     ............                 Do.
51.    Pepperells Cove, Maine 3-_____-- ----------                                      1920       158, 262. 28             137. 72            Do.
52.    Cocheco River, N. H.3 6____-                          ____________               1913       289, 149. 93          9, 642. 54            Do.
53.    Bellamy River, N. H.3 4______________________                                    1897        34, 642. 98   ............                 Do.
54.    Lamprey     River,     N.  H.3     ___________________                           1913        19, 980. 58          8,267.53              Do.
55.    Exeter River, N. H. a__________________--_-_-__                                  1913        62, 454. 42   ............                 Do.
56.    Little Harbor, N. H. 10_________________________
                                                47        . . . . . . . . . . .         1909       133, 227. 33      3, 121. 74                Do.
57.    Newburyport Harbor, Mass.      6       - - --       - - - --- -- -- -            1947       463, 843. 62    291, 704. 24             $166,000.
58.    Merrimack River, Mass. ________                                      __          1940       369, 891. 49    147,860.42                  Do.
59.    Ipswich River, Mass________----                    ----------                    1950         5, 617. 91      2,151.40                  Do.
60.    Essex River, Mass_________-----------      3                                     1948        21,759.21     1160,049. 84
61.    Sandy Bay, Cape Ann, Mass. 12__                                                  1922    1, 925, 552. 30     15, 925. 70        $9,000.
62.    Rockport Harbor, Mass.e___                                                       1905        91, 229. 25   ...........          Completed.
63.    Manchester Harbor, Mass_____________ ________                                    1949        23, 985. 57                        $380,000.'3
64.    Beverly    Harbor,     Mass__________-____----                                   1951    14 246, 047. 76          1, 718. 33 Completed.
65.    Marblehead Harbor, Mass__.___________-                                           1945                                   584. 00 $190,000.15
66.    Lynn Harbor, Mass...___________ __--___-----                                     1951       755, 042. 91     102, 501.29 $575,000
67.    Winthrop Beach, Mass., 3Beach Erosion Control..                                  1950                      .........            $227,000.1
68.    Winthrop Harbor, Mass. 4'                                                        1895         8, 992. 59                        Completed.
69.    Malden River, Mass.17 ...................-.....                                  1922    18s104, 853. 08        45,096.92           Do.
70.    Dorchester Bay and Neponset River, Mass.o__                                      1945        94,584.55          33,591.89 $620,000.
71.    Weymouth Back River, Mass.@..                 6           -_-)-       -__        1944     so 69, 219. 35          6, 521.32 Completed.
72.    Hingham Harbor, Mass_______         .........         _.__._..                   1949        28,316.  58        51, 309. 64          Do.
73.    Cohasset Harbor, Mass ........... _.._________                                   1949        10, 000. 00                        $150,000.21
74.    Scituate   Harbor,     Mass...                _       _                   ...
                                                                                   _    1941       274, 886. 96        38,930.      98 Completed.
75.    Duxbury Harbor, Mass ..                                      ___                 1949        37, 000. 00   ...........          $175, 000.2
76.    Kingston Harbor, Mass. (North Plymouth Har-                                      1895         8, 940. 09   ............
                                                                                                                                       Completed.
         bor) .5
77.    W ellfleet H arbor, M ass .... ......--                    . ........---         1949        11, 350. 37                             $158,000.23
78.    Provincetown Harbor, Mass------                                  ------          1949       347, 453. 72        42,128. 73           $929,000.24
79.    Hyannis Harbor, Mass..._                                         _        ...    1951       197,382.58          56, 265. 82          $212, 500.
80.    Falmouth Harbor, Mass ......-       2 .          . . . . . . . . . . . . . .     1948                       ...........              $45,000.35
81.    Edgartown Harbor, Mass. _______                 26                               1943     27 45, 614. 42   ............              Completed.
82.    Vineyard Haven Harbor, Mass. _                .                          _       1943        82, 573. 47   ............                   Do.
83.    Menemsha Creek, Marthas3 Vineyard, Mass--....-                                   1951     28 56,925.77     ............                   Do.
84.    Canapitsit Channel, Mass. ____                                                   1899         9,112.  54   ............                   Do.
85.    Little Harbor, Woods Hole, Mass.3 26                               ..........    1906        18, 000. 00                                  Do.
86.    Woods Hole Channel, Mass___..                                 -               . 1940        338, 599. 92        11, 660. 57               Do.
87.    Wareham Harbor, Mass.___.. ........                                      ...... 1896         95,997.30     ............              $43,000.
88.    Mattapoisett Harbor, 3Mass.*...............__.__                                 1950                      ............              $42,000.2'
89.    Westport River, Mass.            19.                                             1942         3,000.00                      $67,500.3"
90.    Sakonnet Harbor, R. 1.3 36                                                       1940        62, 202. 50        10, 295. 97 Completed.
91     Sakonnet River, R. 1.26 a1lt___                            _       ___.          1909        38, 426. 95   ............          Do.
92.    Taunton River, Mass_                           --.-.--- 1948                                442, 894. 58        32,916.79 $712,000.3
93.    Harbor at Coasters Harbor Island, R. I.3a26 .                                    1911         5, 500. 00        13, 052. 49 Completed.
94 .   N e wp or t H arb o r , R . I ___. _.. . . . . .                                 1951       733, 523. 91        37, 499.96      Do.

       See footnotes at end of table.
 104            REPORT OF CHIEF OF ENGINEERS,                                       U.    S. ARMY, 1952


                                                                   For last Costs and expenditures to
                                                                   full re-       June 30, 1952                     Estimated
                       Name of project                             port see                                           amount to
                                                                                                                    required
                                                                   annual
                                                                   report       New work            Mainte-          .complete
                                                                     for                            nance

95.                       6-1890
       Warren River, R. I...........................                                                                  Completed.
                                                                                      $5,000.00 .......---..-------.....
96.   Greenwich Bay, R. I. 26-------------------                         1893         2, 000.00 ...------------           Do.
97.   Potowomut River R. sa .................... 1882                                 5, 000.00 .....------......         Do.
98.   Wickford Harbor, Rhode Island............... 1950                          * 134, 033. 24 ...-----------            Do.
99.   Stonington Harbor, Conn               --.....................      1950      337, 453. 83 $45, 007.85 $51,000.84
100.   Hay (West) Harbor, N. Y.26 ...--                        -..        1931         8,401.15 .........--------.. Completed.
101.   Connecticut River above Hartford, Conn.8@....                      1932       116, 324. 81         14, 373. 54 $11,500.88
102.   Duck Island Harbor, Conn----                     ----
                                        ...................               1950       482,165. 81 351, 653. 26 Completed.
103.   Guilford Harbor, Conn----....----                         ..-------1949 ......--                ..........
                                                                                       ----........--------           $80,000.
104.   Branford Harbor, Conn-__- _----------------                        1946         9, 537. 45 119, 345. 96 Completed.
105.   Breakwaters at New Haven, Conn ...-----------                      1950    1,242. 246. 09         40, 253.91        Do.
106.   Milford Harbor, Conn- .           .-------------------             1951     48 88, 716. 92       101,810. 33 $44,000.
107.   Southport Harbor, Conn----   ........... -                   .. 1949        4o96, 926. 72 41, 601. 34 Completed.
108.   Jennings Beach, Conn__-------------------- 1950 ........................                                       $16,000.s
     Burial Hill Beach,
110. Southport
11109.           Beach, Conn......................
                        Conn------------------                      1950 ...----------------          ........    $12,000.
                                                                                                                  $6,600.41
                                                                                                         ...------------
112.   Sherwood Island State Park, Co ............                  1950 ---------------------... $125,000.
113.   Compo Beach, Westport, Conn ..........--------------         1950------------------------$40,000.
114.   Westport Harbor and Saugatuck River, Conn_                   1948         32,104. 55   16, 621.16 $13,000.
115.   Harbor at Wilson Point, Conn~ -          -                   1895                       ______---- Completed.
                                                                                 54,176.90 .....
116.   Fivemile River Harbor, Conn.6 26 4............               1938         35, 490. 44  31, 311. 43 $13,000.
117.   Westcott Cove, Conn .....---------------------               1948 ----------------...---------- $37,000.45
118.   Greenwick Harbor, Conn--....----------------..........       1951     46 198, 758. 57  75, 669. 90 Completed.

     1 Exclusive of $19,891.65 expended from contributed funds.
     2 Work discontinued 1937. Facilities transferred to the War Assets Administration.
  34 No    commerce reported.
       Abandonment recommended in H. Doc. 467, 69th Cong., 1st sess.
   $ Reported by the District engineer as unworthy of further improvement.
     * Improvements adequate for commerce.
     TExclusive of $10,000 to be contributed by local interests.
     * Exclusive of $20,000 expended from contributed funds.
     * Exclusive of $12,000 to be contributed by local interests.
     10Elimination of maintenance dredging recommended in H. Doec. 467, 69th Cong., 1st sess.
     11Excludes $5,000 expended of contributed funds.
   12Abandonment recommended in H. Doc. 411, 64th Cong., 1st sess., and in Rivers and Harbors Com-
mittee Doc. 3, 65th Cong., 1st sess.
     13Exclusive of $100,000 to be contributed by local interests.
     14Excludes $100,000 expended from contributed funds.
     15Exclusive of $60,000 to be contributed by local interests.
     18Costs to local interests $454,000, exclusive of Federal participation.
   17 Under State maintenance.
   18Exclusive of $62,000 expended from contributed funds.
   219Awaiting local cooperation.
     o Exclusive of $20,000 expended from contributed funds.
    21Exclusive of $30,000 to be contributed by local interests.
    a Exclusive of $35,000 to be contributed by local interests.
     3' Exclusive of $32,000 to be contributed by local interests.
    24Exclusive of $760,000 to be contributed by local interests.
    25Exclusive of $35,000 to be contributed by local interests.
     6 Maintenance unnecessary or not urgent.
    27In addition $10,000 was expended from contributed funds.
     s8Excludes $12,500 expended from contributed funds.
    29 Exclusive of $33,000 to be contributed by local interests.
    3oExclusive of $67,500 to be contributed by local interests.
     1 Commerce included under Tiverton Harbor, R. I.
    asExclusive of $52,000 to be contributed by local interests.
    '3 Exclusive of $25,000 contributed by local interests.
    MExclusive of $5,500 to be contributed by local interests.
    3' Awaiting local cooperation. Under date of January 14,1939, the Chief of Engineers recommended modi-
fication of the existing project to provide for construction of a lock, dam, and power plant at Enfleld Rapids.
(H. Doc. 165, 76th Cong., 1st sess.)
     6 Estimated cost of project $11,500,000, expenditures limited by law to $1,000,000.
  37    Exclusive of $25,500 to be contributed by local interests.
    38 Costs to local interests $32,000, exclusive of Federal participation.
    3a Costs to local interests $32,000, exclusive of Federal participation.
    40Costs to local interests $24,000, exclusive of Federal participation.
    41Costs to local interests $13,200, exclusive of Federal participation.
    42Costs to local interests $250,000, exclusive of Federal participation.
    a Costs to local interests $80,000, exclusive of Federal participation.
    4 Curtailment recommended Dec. 15, 1914, in H. Doc. 1419, 63d Cong., 3d sess.
    a Exclusive of $21,000 to be contributed by local interests.
    " Excludes $100,000 expended from contributed funds.
    '7 Exclusive of $34,000 to be contributed by local interests.
    4 In addition $11,379.58 was expended from contributed funds.
     o Includes $37,713.39 Emergency Relief Funds and excluding $18,285 contributed funds of which $1,785
was for work outside the limits of the approved project.
                   RIVERS AND              HARBORS-NEW                  ENGLAND DIVISION                                                    105
                                44.      MISCELLANEOUS ACTIVITIES

Status of all investigations for navigation called for by river and harbor acts and
                                committee resolutions
                                                                           Date trais-                   Document                    Recommen-
               Locality                       Authorization act            mitted to                       No.                         dation
                                                                            Congress

Acushnet River and New Bed-
ford and Fairhaven Harbors,
                                         River and Harbor Act
                                          Mar. 2, 1945.
                                                                       I..-.....          .....
Mass., particularly to pro-
vide greater depth in the
eastern portion of the anchor-
age basin and for the improve-
ment of navigation, flood con-
trol and related purporses.
Annisquam River, Mass---.....            House Public Works Com-
                                          mittee resolution, Apr.
                                          22, 1947.                          -,-
                                                                             -, ---------------
Annisquam River, Inland
Waterway to Plum Island
                                         River and Harbor Act Mar.
                                          2, 1945.
                                                                       -r----------- ---------
Sound, Essex County, Mass.,
and continuous waterway be-
tween Portland, Maine, and
Boston, Mass.
Apponaug Cove, R. I-------..........     House Public Works Com-        ......--.......
                                          mittee resolution, Aug.
                                           16, 1950.
Bar Harbor, Maine---------............   Rivers and Harbors Com-
                                          mittee resolution, May
                                          10, 1945.
Bass Harbor, Maine--------............   River and Harbor Act May
                                          17, 1950.
Bentleys Creek with a view to            House Public Works Com-
  providing a suitable naviga-            mittee resolution, June
  tion channel, New London                 17, 1948.
  Harbor, Conn.
Block Island, R. I., harbor of     Senate Public Works Com-              Apr. 26,1952                --------------                  Unfavorable.
  refuge.                           mittee resolution, Mar. 4,
                                    1947.
Block Island, R. I., Great Salt Senate Public Works Com-                 Apr. 25, 1952               --------------                  Unfavorable.
  Pond.                             mittee resolution, Mar. 4,
                                    1947.
Blue Hill Harbor, Maine....... River and Harbor Act Mar.                 Apr. 30, 1952               --------------                  Unfavorable.
                                    2, 1945.
Boothbay Harbor, Maine, par- River and Harbor Act Mar.                   .....            .. -- --   -------"------

  ticularly the Mill Cove area.. -  2, 1945.
Boston Harbor (Chelsea Riv-              Rivers and Harbors Com-                                     - - - - - - - - - - - - - -


er), Mass., to provide greater           mittee resolution, Feb. 1,     ..............-
depth and bridge clearances.             1946.
Boston Harbor (Mystic South              House Public Works Com-                                     - - - -   - - - - - - - - - -


Channel), Mass.                          mittee resolution, Mar.        ..............-
                                          15, 1949.
Boston Harbor (Reserved Chan-            House Public Works Com-                                     --------------

nel), Mass.                              mittee resolution, June        ..............-
                                          27, 1950
Boston, Mass., to Portland,              River and Harbor Act            ... ..........---------------
Maine, for a continuous water-           Mar. 2, 1945.
way, inland where possible
and a waterway from Plum
Island Sound to Annisquam
  River.
Boston to Long Island Sound,             Senate Public Works Com-
Intracoastal Waterway, ref-              mittee resolution Apr. 13,
erence section through Rhode              1950.
Island.
Branford Harbor, Conn........ Commerce Committee res-
                               olution, Oct. 10, 1945.
Branford, Harbor at Pine Or- River and Harbor Act,
chard, Conn.                  July 24, 1946.
Bridgeport Harbor, Conn...... Senate Public Works reso-
                               lution, Apr. 20, 1948.
                              House Public Works Com-
    Do........................------------------
                               mittee resolution, Mar.
                                15, 1949.
106           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

Status of all investigations for -navigation called for by river and harbor acts and
                          committee resolutions-Continued

                                                                              Date trans-        Document         Recommen-
              Locality                        Authorization act                mitted to         Document         Recommen
                                                                               Congress

Bullock Cove, R. I.............   River and Harbor Act,                     --- --- --- --
                                     July 24, 1946.
Cape, Cod Canal, Mass., with House Public Works Com-                        ---------------.
  view to deepening to 40 feet.      mittee resolution Feb.
                                     17, 1949.
    Do.............----..     ... Senate Public Works Com-
                                     mittee resolution Mar.
                                     12, 1949.
Cape Cod Canal, Mass., East Senate Public Works Com-
  Boat Basin.                        mittee resolution Mar.
                                     12, 1949.
                                  House Public Works Com-
    Do ........................------------------
                                     mittee resolution July 6,
                                     1949.
Carvers Harbor, Vinalbaven, Senate Public Works Com-
  Maine.                            mittee            resolution Jan. 18,
                                     1949.
Chelsea River (Boston       Har-  Rivers          and       Harbors Com-
  bor), M ss., to provide greater   mittee resolution Feb. 1,
  depth and bridge clearance.        1946.
Connecticut Beach erosion Public Law 520, 71st Con-
  control study.                     gress (River and Harbor
                                    act July 3, 1930) section
                                     2 as amended and supple-
                                     mented.
    Area 3, New Haven Har- .. 1947.
      bor to Housatonic River.
    Area 4, Connecticut River .............................                  June   12,   1952   HD   514/82/2.   Unfavorable.
      to Hammonasset River.
    Area 5, Pawcatuck River                                                 ............... ..............
      to Thanies River.
    Area 6, Niantic River to                                                 .............. ... . ...      ---
       Connecticut River.
    Area 7, Housatonic River .-- . ........................
      to Ash Creek.
    Area 8, Saugatuck River to
       Byram River.                                                         ... . . . ----
    Area 9, East River to New
       Haven Harbor.
    Area 10, Thames River .............................
      to Nihntic River.                                                     .. - -- - -- -
    Area 11, Saugatuck River
      to Byram River.                                                       . . - -- - -- -
    Final Composite Report
       Connecticut Shore.
Connecticut River, Conn---.....
Connecticut River, below Hart-
ford, Conn., in vicinity of
  Saybrook-Lyme Bridge.
Connecticut River between
  Hartford, Conn., and Spring- River                        and Act,
                                                          Harbor
field and Holyoke, Mass.                   July 24, 1946.
Corea Harbor, Maine .........             Senate    Public Works Com-
                                            mittee resolution, NovFeb.
                                            2,1952.
                                                 1949.
Cotuit Harbor and West Bay, HouRivers               and Harbors Com-
Mass.                                      mittee resolution Jan. a3,
                                            27,1947.
Cranberry Island Harbor,                                                  Apr. 30,1952 ..............             Unfavorable.
  Maine.                                  Housenate Public Works Com-
                                            mittee resolution Julyne 11,
Criehaven Harbor, Maine, ex-                194952.
  tension of breakwater.                  House Public Works Com-mittee
                                            mitteeresolution, 25, 1951.
                                                                  JanApril
Cuttyhunk Harbor, Mass_...... 28, 1947.
                                          Senate Public Works Com-
Damariscotta River, Maine....               mittee resolution, NovDec.6,
                                            8,19048.
    Do.-----------------.................                                ---------------

Dutch Island Harbor, R. I_.....                                             ---------------

Eastport Harbor, Maine--........                                            ---------------
               RIVERS        AND HARBORS-NEW                                ENGLAND DIVISION                                                   107
Status of all investigations for navigation called for by river and harbor acts and
                          committee resolutions-Continued

                                                                                Date trans-                            Document         Recommen-
            Locality                    Authorization act                       mitted to                                No.            Retion
                                                                                 Congress

East Greenwich (Greenwich)         House Public Works Com-
  Harbor Bay and Cove, R. I.        mittee resolution Aug.
  (limited to p. e. scope).         16, 1950.
Fairhaven and New Bedford          River and Harbor Act,
  Harbors and the Achusnet          Mar. 2, 1945.
  River, Mass., to provide
greater depth in eastern por-
  tion of anchorage, flood con-
  trol and related purposes.
Fairhaven--New Bedford Har-        House Public Works Com-
bor, Mass.                          mittee resolution, Sept.
                                     27, 1951.
Fall River Harbor, Mass--.......   House Public Works Com-
                                     mittee resolution, July 6,
                                     1949.
Great Salt Pond, Block Island,     Senate Public Works Com-                  Apr. 25,1952                                               Unfavorable,
R. I.                               mittee resolution, Mar.
                                     4, 1947.
Greenwich Cove, Conn.......        River and Harbor Act,
                                     July 24, 1946.
Greenwich Bay & Cove, R. I.        House Public Works Com-
 (E. Greenwich) (Limited to          mittee Resolution, Aug.
p. e. scope).                       16, 1950.
Gurnet Point to Pemberton          Public Law 520, 71st Con-
Point, Mass., beach erosion         gress (River and Harbor
control study.                      Act, July 3, 1930) section
                                     2 as amended and supple-
                                     mented.
Hampton Beach, N. H., beach        --...do   _------------------                     ---.......                      ----------
erosion contrpl study.
Hampton River and Harbor,          House Public Works Com-                      .........               ..
N. H.                               mittee resolution, June 2,           ...        .      .   .   .        .   .
                                     1949.
Harbor at Pine Orchard, Bran-      River and Harbor Act,                                                             --------------

ford, Conn.                         July 24, 1946.
Harbor of Refuge, Block            Senate Public Works Com-                  Apr. 26,1952                            --------------     Unfavorable.
Island, R. I.                       mittee resolution, March
                                     4, 1947.
Harbor of Refuge, Point Judith     Senate Public Works Com-               ----           - - - - -                   --------------
and Point Judith Pond, R. I.        mittee resolution, July
                                     1, 1949.
Hartford, Conn. (below) Con-       Senate Public Works Com-                     .- - - - - - -                       -----------
  necticut River, vicinity of        mittee resolution, Feb.
   Saybrook-Lyme Bridge.             25, 1949.
Hartford, Conn. to Springfield     Rivers and Harbors Com-                -- - - - - - -                             --------------
  and Holyoke, Mass., Con-           mittee resolution, Jan.
  necticut River.                    3, 1947.
Holyoke and Springfield, Mass.     Rivers and Harbors Com-                 .- - - - - - -                            ------------
  to Hartford, Conn., Connect-       mittee resolution, Jan.
  icut River.                        3, 1947.
Indian Ledge, Matinicus,           House Public Works Com-                                                                ---- ------
  Maine.                             mittee resolution, Apr.              -- - - - - - -
                                     13, 1948.
Inland waterway, Plum Island       River and Harbor Act,                   . . - -- - -- -                           --------------
  Sound to Annisquam River,         Mar. 2, 1945.
  Mass., and continuous water
  way between Portland,
  Maine, and Boston, Mass.
Intracoastal Waterway from         Senate Public Works Com-
  Boston to Long Island             mittee resolution Apr.
  Sound, with reference to sec-      13, 1950.
  tion through R. I.
Little Harbor, N. H_.....--__      House Public Works              Com-
                                     mittee resolution,            June         .-------------
                                    2, 1949.
Long Island Sqund to Boston,       House Public Works              Com-
Intracoastal Waterway, with         mittee resolution,            Apr.
reference to section through        13, 1950.
R. I.
Marblehead Harbor, Mass......      House Public Works Com-
                                    mittee Resolution, June
                                    2, 1949.
 108         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

Status of all investigations for navigation called for by river and harbor acts and
                            committee resolutions-Continued

                                                                 Date trans-      Document       Recommen
            Locality                   Authorization act         mitted to          No.           e tion
                                                                  Congress

Matinicus, Maine, Indian Ledge. House Public Works Com- ---------------
                                    mittee resolution, Apr.
                                    13, 1948.
Merrimack River, Mass., and River and Harbor Act, ---------------
   N. H., with view to improve-     June 20, 1938.
   ment for navigation, flood
   control and water power.
Merrimack River, Mass., and House Public Works Com-
   N. H., vicinity of Salisbury,    mittee resolution, Sept.
   Mass. (see Newburyport           29, 1949.
   Harbor for second authoriza-
   tion of same thing).
Mill Cove Area, Boothbay River and Harbor Act,
   Harbor, Maine.                   Mar. 2, 1945.
Mystic South Channel, Boston House Public Works Com-
 * Harbor, Mass. -                 mittee resolution, Mar.
                                    15, 1949.
Nantucket Harbor, Mass....... House Public Works Com-
                                   mittee resolution, June 2,
                                    1949.
Narragansett Bay at mouth of Senate Public Works Com- Oct. 18,1951                               Unfavorable.
   Narrow River, R. I.             mittee resolution, June
                                   10, 1947.
Narragansett Pier, R. I -.......... do.............-........    Nov. 21, 1951                       Do.
Narrow River at mouth of .....        do-------........-----    Oct. 18,1951                        Do.
   Narragansett Bay, R. I.
New Bedford and Fairhaven River and Harbor Act, -- - - - - - -
   Harbors and the Acushnet        Mar. 2, 1945.
   River, Mass., to provide
  greater depth in the eastern
  portion of the anchorage
  basin and for the improve-
  ment of navigation, flood
   control and related purposes.
New Bedford-Fairhaven Har- House Public Works Com- -------------               --------------

   bor, Mass.                      mittee resolution, Sept.
                                   27, 1951.
Newburyport Harbor, Mass., Senate Public Works Com-
  with particular reference to     mittee resolution, Aug.
  Salisbury, Mass.
New Haven Harbor, Conn ....
                                   11, 1949.
                                 House Public Works Com-                       ---------------
                                                                               --------------

                                   mittee resolution, Dec.
                                   14, 1950.
New London Harbor, Conn., House Public Works Com-
  with a view to providing a       mittee resolution, June
                                                                               --------------
  channel into Bentleys Creek.     17, 1948.
Newport Harbor, R. I-......... River and Harbor Act,
                                   July 24, 1946.
                                                                               --------------
Ogunquit-Perkins Cove, Maine. House Public Works Com-                          --------------

                                   mittee resolution, Feb.
                                   17, 1949.
Patchogue River, Conn........ River and Harbor Act,
                                   July 24, 1946.              -------------- '
                                                                               --------------
Pawtuxet Cove, R. I........... House Public Works Com-                         --------------

                                   mittee resolution, Apr. 5,
                                   1949.
Pemberton Point to Gurnet Public Law 520, 71st Con-
  Point, Mass., beach erosion      gress (River and Harbor
                                                                               ---------------
  control study.                   Act July 3, 1930) section 2 ------------ '~
                                   as amended and supple-
                                   mented.
Perkins Cove, Ogunquit, Maine House Public Works Com- ---- -- -- - ---
                                   mittee resolution Feb. 17,
                                   1949.
Pine Orchard, Harborat, Bran- River and Harbor Act,
  ford, Conn.                      July 24, 1946.
Piscataqua River, Maine and House Public Works Com-
  New Hampshire and Ports-         mittee Resolution Feb.
  mouth Harbor, N. H.              17, 1949.
                RIVERS AND                 HARBORS-NEW                ENGLAND                            DIVISION               109

Status of all investigations for navigation called for by river and harbor acts and
                          committee resolutions-Continued

                                                                         Date
                                                                         Date trans-
                                                                              trans-                       Document      Recommen-
            Locality                        Authorization act             mitted to                          No.           dation
                                                                          Congress

Plum Island, Mass., beach ero-        Public Law 520, 71st Con-
  sion control study.                  gress (River and Harbor
                                       Act July 3, 1930) sec-
                                       tion 2 as amended and
                                       supplemented.
Plum Island Sound to the An-          River and Harbor Act
  nisquam River, Essex                 Mar. 2, 1945.
  County, Mass., inland water-
  way. and continuous water-
  way    between     Portland,
  Maine, and Boston, Mass.
Plymouth Harbor, Mass-------          Senate Public Works Com-
                                        mittee resolution, Apr.
                                        20, 1948.
Portland, Maine, to Boston,
  Mass., for a continuous water-
                                      River and Harbor Act,
                                      Mar. 2, 1945.
                                                                                         --- -------
                                                                                       -----
  way, inland where possible,
  and a waterway from Plum Is-
  land Sound to Annisquam
  River, Essex County, Mass.
Portsmouth Harbor, N. H.,             House Public Works Com-        ..............-
  and Piscataqua River, Maine           mittee resolution Feb. 17,
  and New Hampshire.                    1949.
Providence River and Harbor,          Senate Public Works Com-          . .-    - -     -    - -   -

  R. I.                                 mittee resolution, Jan. 6,
                                        6, 1950.
Reserved Channel,        Boston       House Public Works Com-        . . - -- - -- -
Harbor, Mass.                          mittee resolution June                                         ..............
                                        27, 1950.
Rockland Harbor, Maine-------         House Public Works Com-
                                        mittee resolution, Apr.
                                        25, 1951.
Round Pond Harbor, Maine_....          River and Harbor Act,
                                        May 17, 1950.
Rye Harbor, N. H____.___          _   House Public Works Com-
                                        mittee resolution, Feb.
                                        20, 1951.
Sakomnet Harbor, R. I.........        House Public Works Com-         Apr.             14,   1952
                                                                                                       ......-------
                                                                                                                         Favorable.
                                        mittee resolution, Apr.
                                        13, 1948.
Salem Harbor, Mass_..........         House Public Works Com-        ...............                   ........------
                                        mittee resolution June
                                        17, 1948.
Salisbury, Mass., particular          Senate Public Works Com-       ...............                   .......--.....-
  reference to Newburyport              mittee resolution, Aug.
  Harbor.                               11, 1949.
Salisbury, Mass., vicinity of         House Public Works Com-
  Merrimack River, Mass. and            mittee resolution, Sept.     ...............
  New Hampshire.                        29, 1949.
Saugus River, Mass..........--        Senate Public Works Com-
                                        mittee resolution, Aug.      ...............
                                        16, 1949.
Scituate Harbor, Mass ..........      Rivers and Harbors Com-
                                        mittee resolution, July      ...............
                                        20, 1946.
Seekonk River, R. I...........        Senate Public Works Com-
                                        mittee resolution, Jan. 6,   . . - -- - -- -
                                        1950.
Sesuit Harbor, Mass- ........         River and Harbor Act,
                                        May 17, 1950.                .. - -- - -- -
South Bristol Harbor, Maine     --    Senate Public Works Com-       . . - -- - -- -
                                        mittee resolution, May
                                        18, 1950.

        245554-53-vol. 2              -8
110         REPORT OF CHIEF OF ENGINEERS,                         U.   S.   ARMY,     1952

Status of all investigationsfor navigation called for by river and harbor acts and
                        committee resolutions-Continued

                                                              Date trans-     Document      Recommen-
           Locality                  Authorization act         mitted to         No.          dation
                                                               Congress

South Harpswell, Maine __-.... Senate Public Works Comrn- ..
                                       mittee resolution, Jan.
                                       18, 1949.
Springfield and Holyoke, Mass. Rivers and Harbors Com- .
  to Hartford, Conn., Con-             mittee resolution, Jan. 3,
  necticut River.                      1947.
Stonington Harbor, Maine -.....
                              -      House Public Works Com- .
                                       mittee resolution, July
                                       13, 1949.
Town River, Mass----------- Rivers and Harbors Com- .
                                       mittee resolution, Dec. 2,
                                       1946.
Vinalhaven, Carvers Harbor, Senate Public Works Comrn- ...........................
Maine.                                mittee resolution, Jan.
                                       18, 1949.
West Bay and Cotuit Harbor, House Public Works Com-
Mass.                                 mittee resolution, Jan.
                                       28, 1947.
Weymouth Fore River, Mass___ House Public Works Com-
                                      mittee resolution, Apr.
                                       22, 1947.
Winter Harbor, Maine-------........- Senate Public Works Com-
                                      mittee resolution, Mar.
                                       17, 1952.
York Harbor, Maine---------........ House Public Works Com- .............................
                                      mittee resolution, June
                                       2, 1949.


               45. MERRIMACK RIVER BASIN, N. H. AND MASS.

  The works covered by the comprehensive plan are located on the
Merrimack River and its tributaries in New Hampshire and Massa-
chusetts.
  The Flood Control Act approved June 22, 1936, authorized the
construction of a system of flood-control reservoirs in the Merri-
mack River Basin for the reduction of flood heights in the Merrimack
Valley. The Flood Control Act approved June 28, 1938, approved
the general comprehensive plan for flood control and other purposes
as approved by the Chief of Engineers pursuant to preliminary ex-
aminations and surveys authorized by the Act of June 22, 1936, and
modified the project to provide, in addition to the construction of a
system of flood-control reservoirs, related flood-control works which
may be found justified by the Chief of Engineers.
  The following reservoirs and related flood-control works were
proposed for construction under the comprehensive plan:
                                                                                                                      Reservoirs

                                                                                                                       Distance                                                                               Estimated cost
                                                                                                                        above                                                  Reservoir
                            Name                                                         Nearest city                  mouth of     Height                Type                 capacity
                                                                                                                      Merrimack                                                capacity        Construe-        Land and        Total
                                                                                                                         River                                                                    tion          damages 1

                                                                                                                         Miles        Feet                                        Acre-feet                                                   0
Franklin Falls s.......-------...........                           . Franklin, N. H-----------------------                118. 2       140 Earth fill-------------..............   170, 000   $6, 167, 600     $1, 765, 600   $7, 933, 200
Mountain Brook            ....................---------------------   Jaffrey, N. H ------------------------               167.8         50 -    do.............-----------------     5, 300                                                  0
                                                                                                                                                                                                   695, 000          79, 000       774, 000
Edward MacDowell                ----..................--              Peterborough, N. H-------------------                161.3         67 _-_do............-----          ..       12, 800    1, 738, 000         331,000     2, 069, 000   0
Bennington .........
               ------------------------                               Bennington, N. H--------------------                 147.0         64 .... do----------------                  90, 000    7, 008, 000      4, 298, 000   11, 306, 000   0td
                                                                                                                                                                                                                                              O
Beards Brook ........----------------------- Hillsboro, N. H.....---------..------------......                             136. 4       115 ....-do................. 35, 000                    6, 229, 000         372, 000    6, 601,000
Blackwater 2--------............................                      Webster, N. H-----------------------                 118.8         75 ....-do................                  46, 000       806, 000         518, 000    1, 324, 000
                                                                                                                                                                                                                                              O
      1 Includes highway, railroad, and utility relocations.
      s For details, see individual report.
                                                                                                             Local protection projects

                                                                                                Distance                                                                                            Estimated cost
                                                                                                 above
                                        Location                                                mouth of                         Type of structure
                                                                                                Merrimack                                                                       Construction           Land and                Total
                                                                                                     River                                                                                             damages     1


                                                                                                     Miles
Nashua, N. H.'-----------------------------------------55                                                                        -----------------------------------
                                                                                                              Wall and levee........................................   $270,000                                 $3, 000          $273, 000
North Andover and Lawrence, Mass--..----------------------                                              27. 3 -....                                             ...-- 1,465, 000
                                                                                                                 do........................-------.....--..........-----                                        43, 000         1, 508, 000
Lowell, Mass.----------................---------......----------------------......................        39 .....
                                                                                                                 do.............................................        490,600                                 90, 000            580, 600


      1To be borne    by local interests.
                                                                                                                                                                                                                                              t-
      2 For details, see individual report.
      a Completed. For last full report, see annual report for 1945.
112     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

  All operations pertaining to flood control in the Merrimack River
Basin are now carried on under and are reported under the projects
for the individual units of the comprehensive plan referred to above
and in the report on preliminary examinations and surveys for flood
control.
   No further expenditures are contemplated under the general project
for flood control in the Merrimack River Basin. For final cost and
financial summary see annual report for 1946.
  46. FRANKLIN FALLS RESERVOIR, MERRIMACK RIVER BASIN, N. H.
   Location.-The dam is located on the Pemigewasset River, the main
tributary of the Merrimack River, about 21/2 miles above Franklin,
N. H., and 92 miles north of Boston, Mass.
   Existing project.-The dam is of rolled earthfill with dumped rock
shell and toe, 1,740 feet long, with a maximum height of 140 feet.
The spillway consists of a channel in an earth and rock cut in the
right abutment with a gravity-type concrete ogee section 550 feet
long. Twin gate-controlled outlet conduits are located in the right
abutment. The reservoir has a capacity of 154,000 acre feet at spill-
way crest and controls a drainage area of 1,000 square miles. Safe
channel capacity can be maintained, utilizing surcharge storage, up
to an effective storage capacity of 170,000 acre feet. The estimated
cost, revised in 1952, is $6,167,600 for construction and $1,765,600 for
lands and damages including highway relocation, a total of $7,933,200
for new work. The latest approved (1952) estimate for annual cost
of operation and maintenance is $27,000. The project is a unit of the
comprehensive plan for flood control and other purposes in the Merri-
mack River Basin which was authorized by the Flood Control Act
approved June 22, 1936, and modified by the Flood Control Act ap-
proved June 28, 1938.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-New work: None.
   Maintenance: Work consisted of periodic checking of gates and
operating equipment, and general maintenance of roads, buildings
and grounds. Costs from regular funds for maintenance were
$22,798.22.
   Reservoir operation.-Therewere two periods of regulation during
the year. In April an inflow of 19,500 c. f. s. was restricted to an out-
flow of 15,500 c. f. s. The maximum storage utilized was 16,000 acre-
feet equal to 0.3 inch of run-off or 10 percent of the total available
capacity. There was no gate operation required at this time.
   The reservoir was regulated following the storm of June 1, 1952.
The computed peak inflow was 29,000 c. f. s. and the regulated flow
through the reservoir was 18,500 c. f. s. The storage utilized was
25,000 acre-feet, equal to 0.5 inch of run-off or 16 percent of the total
available capacity.
   Total costs during the fiscal year from regular funds were $22,699.60.
Expenditures were $22,968.15.
   Condition at end of fiscal year.-Construction of the dam and ap-
purtenant works was initiated in November 1939 and completed in
October 1943. Work remaining to be done consists of disposition of
                               FLOOD CONTROL---NEW                      ENGLAND            DIVISION                       113
condemnation cases in connection with land acquisition. Total costs
for the project have been $8,088,947.96, of which $7,914,506.39 was
for new work and $174,441.57 for maintenance. Expenditures have
been $8,087,569.02.
   Proposed operations.-The unexpended balance at the end of the
fiscal year amounting to $21,129.62, plus an allotment of $27,700 for
maintenance for fiscal year 1953, a total of $48,829.62, will be applied
as follows:
Accounts payable to June 30, 1952_-_--_ ----------.-           $1, 618. 54
New work: Land acquisition-------------------------------- 18, 742. 25
Maintenance: Operation, maintenance and repairs---------------28, 468. 83
            Total for all work__--                      __--------------- -----                                  48, 829. 62
   The additional sum of $24,000 can be profitably expended during
fiscal year 1954 for operation and maintenance.
                                             Cost and financial summary

                                                         Fiscal year ending June 30                            Total to June
                                                                                                              30, 1952, includ-
                                                                                                              ing fiscal years
                                         1948          1949           1950          1951          1952         prior to 1948

New work:
   Appropriated---------....         --------      $90,800.00      $60,000.00 -$30,000.00       .------------$7,933, 248. 64
     Cost--                            12, 506. 45
                                      $------------ 15, 395. 94     90, 897. 11    3, 755. 57     -$98. 62        7, 914, 506. 39
     Expenditures--------.........     23, 668. 12  15, 108. 08     91, 156. 31    3, 745. 02       -7. 40        7, 914, 506. 39
Maintenance:
                  ........
     Aoropriated-------                18, 500. 00   25, 000.00     27, 000. 00   12, 000. 00   23, 950. 00         175, 450. 00
     Cost---------------               21, 072. 54   24, 660. 43    22, 053. 72   20, 278.77    22, 798.22          174, 441.57
     Expenditures---.........          20, 974. 01   24, 154. 19    22, 113. 70   20, 288. 74   22, 975. 55         173, 062. 63


Other new work data:
    Unobligated balance, June 30, 1952- --              _-------------.                                             $148.25
    Unobligated balance available for fiscal year 1953.__---------                                                   148. 25

                          47. EDWARD MacDOWELL RESERVOIR
                     (FORMERLY WEST PETERBOROUGH RESERVOIR)
                             MERRIMACK RIVER BASIN, N. H.

   Location. The dam is located one-half mile upstream from the
village of West Peterborough, N. H., and 1,000 feet upstream from
the existing Verney Mills Dam on Nubanusit Brook, a tributary of the
Contoocook River; approximately 35 miles southwest of Concord,
N. H., and 60 miles northwest of Boston, Mass. The reservoir lies
within Hillsboro and Cheshire Counties, N. H.
   Existing project.-The dam is of the rolled-earth embankment type,
with a rock blanket on the upstream slope and the downstream drain-
age toe, 1,030 feet long at the top, with a maximum height of 67 feet
and a top width of 25 feet. The outlet works located in the west abut-
ment of the dam consist of an intake structure, a conduit controlled
by three mechanically operated gates and a stilling basin which dis-
charges into the pool created by the Verney Mills Dam. The spillway
is a concrete, gravity weir section 100 feet in length, with an approach
channel 1,900 feet long; a discharge channel 3,080 feet long and a pro-
tective dike approximately 2,540 feet in length to guide the spillway
discharge. The spillway is located in a natural saddle at the north
side of the reservoir approximately 3 miles from the dam site, and will
114        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                         1952

discharge into Ferguson Brook, which, in turn, discharges into the
proposed Bennington Reservoir. The reservoir will provide a storage
capacity of approximately 12,800 acre-feet, and control a drainage
area of 44 square miles. The estimated cost, revised in 1952, is
$1,738,000 for construction and $331,000 for lands and damages, a
total of $2,069,000 for new work. The latest approved (1952) estimate
for annual cost of operation and maintenance is $19,800. The project
is a unit of the comprehensive plan for flood control and other pur-
poses in the Merrimack River Basin which was authorized by the
Flood Control Act approved June 22, 1936, and modified by the Flood
Control Act approved June 28, 1938. The name "Edward MacDowell
Dam" was adopted by Section 206 of the Flood Control Act approved
May 17, 1950.
   Local cooperation. Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operation and results during fiscal year.-New work : Operations
consisted of installation of underground electric and telephone serv-
ice at utility building and consummation of agreement for relocation
of telephone lines. Costs from regular funds for new work were
$6,589.01.
   Maintenance: Work consisted of periodic checking of gates and
operating equipment and general maintenance of roads, buildings and
grounds. Costs from regular funds for maintenance were $16,126.90.
   Reservoir operation: There were three periods of regulation during
the fiscal year. Flows and the results of regulation are shown in the
following tabulation:

                              Maximum           Regulated outflow
                              computed        (cubic feet per second)                Storage utilized
    Date, 1951-52, month           inflow
                              (cubic feet                                                               Percent
                             per second) Maximum             Minimum    Acre-feet        Inches          total

November --------------------          600             540          0       1,800              0. 8               14
January                                 70            450
                                       5----------------------    150       1,500               .6                12
April..-------------------------       950             500          0       4, 000             1. 7               31


   Total costs during the fiscal year from regular funds were $22,-
715.91, of which $6,589.01 was for new work and $16,126.90 for main-
tenance. The total expenditures were $23,135.32.
   Condition at end of fiscal year.-Construction of the dam and ap-
purtenant works was initiated in March 1948 and completed in March
1950. Work remaining to be done consists of disposition of condem-
nation cases in connection with land acquisition, and clearing reser-
voir of dead and down timber. Total costs for the project have been
$1,994,976.64, of which $1,951,801.52 was for new work and $43,175.12
was for maintenance. Expenditures have been $1,994,220.72.
   Proposed operations.-The unexpended balance at the end of the
fiscal year amounting to $118,325.78, plus an allotment for fiscal year
                           FLOOD            CONTROI---NEW                        ENGLAND             DIVISION                       115
1953 of $17,000 for maintenance, a total of $135,325.78, will be applied
as follows:
Acctounts payable to June 30, 1952----------------------------              $755. 92
New work: Reserved for payment of final costs outstanding on
  construction contracts--                       -----------------------  2, 347. 59
                                                                         6--------
Land acquisition-------      ---------------------------------           54, 847. 39
Maintenance: Operation, maintenance and repairs---------------17, 374. 88

          Total for all work---------------------------------                                                             135, 325. 38
   The additional sum of $17,200 can be profitably expended during
fiscal year 1954 for operation and maintenance.
                                                Cost and financial summary

                                                                Fiscal year ending June 30                               Total to June
                                                                                                                         30, 1952, includ-
                                                                                                                         ing fiscal years
                                           1948               1949              1950          1951          1952          prior to 1948

New work:
   Appropriated---......$1,000,000.00 $600, 000. 00 $371, 800. 00 .....---------....------------..                         $2, 069, 000. 00
   Cost---------------          178, 712. 56 874, 522. 60 785, 357. 80 $12,152. 07      $6, 589. 01                         1, 951, 801. 52
   Expenditures.......--------. 141, 992. 47 652, 101.00 1, 038, 443. 13 17, 896. 23     6, 701. 21                         1, 951, 601. 52
Maintenance:
   Appropriated----......... ...........------------------------               15, 000. 00   12, 300. 00   16, 250. 00          43, 550. CO
   Cost---------------.....................--------.....------------            7, 582. 37   19, 465. 85   16, 126. 90          43, 175. 12
   Expenditures----------.........----....-.......- ............------------    6, 101. 14   20, 083. 95   16, 434. 11          42, 619. 20


Other new work data:
   Unobligated balance, June 30, 1952-----------------------        $2, 414. 83
   Unobligated balance available for fiscal year 1953-------------- 2, 414. 83

  48. BLACKWATER                           RESERVOIR, MERRIMACK RIVER BASIN, N. H.

   Location.-The dam is located on the Blackwater River in New
Hampshire, 8.2 miles above the confluence with the Contoocook River
and 118.8 miles above the mouth of the Merrimack. The reservoir
lies within the towns of Webster and Salisbury in the county of Merri-
mack, the dam being situated just above the village of Swetts Mills
in Webster, 12.5 miles by highway northwest of Concord, N. H.
   Existing project.-The dam is of the rolled-earth type, with a
dumped-rock toe and a dumped-rock blanket on the upstream face.
The total length, including spillway, is 1,150 feet, with a maximum
height of approximately 75 feet and a top width of about 39 feet. A
gravity-type spillway, 240 feet long, and a 16-foot diameter penstock
intake, have been constructed. Three gate-controlled outlet conduits
with an area of 55 square feet are located in the spillway. The reser-
voir will provide a storage capacity of 46,000 acre-feet and control a
drainage area of 128 square miles. The estimated cost, revised in
1952 is $806,000 for construction and $518,000 for lands and damages,
a total of $1,324,000 for new work. The latest approved (1952) esti-
mate for annual cost of operation and maintenance is $7,000. The
project is a unit of the comprehensive plan for flood control and other
purposes in the Merrimack River Basin which was authorized by the
Flood Control Act approved June 22, 1936, and modified by the Flood
Control Act approved June 28,1938.
116      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-New work: Operations
consisted of installation of oil heating system in operator's quarters.
Costs from regular funds for new work were $911.47.
   Maintenance: Work consisted of periodic checking of gates and
operating equipment and general maintenance of roads, buildings, and
grounds. Costs from regular funds for maintenance were $5,500.49.
   Reservoir operation: There were two periods of regulation during
the year. Precipitation combined with snowmelt necessitated the
complete closure of the gates in April. The maximum computed in-
flow was 2,700 c. f. s. The maximum storage utilized was 12,800
acre-feet equal to 1.9 inches of runoff or 28 percent of the total
available capacity.
   The gates were again closed following the storm of June 1, 1952.
The maximum computed inflow was 2,500 c. f. s. The maximum
storage utilized was 5,200 acre-feet equal to 0.8 inch runoff, or 11
percent of the total available capacity. Total costs during the fiscal
year from regular funds were $6,411.96. Expenditures were
$6,966.94.
   Condition at end of fiscal year.--Construction of the dam and ap-
purtenant works was initiated in May 1940 and completed in November
1944. Work remaining to be done consists of disposition of condem-
nation cases in connection with land acquisition and consummation
of agreement for utility relocation. Total costs for the project have
been $1,359,907.86 of which $1,316,864.20 was for new work and $43,-
043.66 for maintenance. Expenditures have been $1,359,644.56.
   Proposed operations.-The unexpended balance at the end of the
fiscal year amounting to $7,706.44, plus an allotment of $6,000 for
maintenance for fiscal year 1953, a total of $13,706.44, will be applied
as follows:
Accounts payable to June 30, 1952------------------------      ----     $263. 30
New work: Payments in connection with land acquisition and utility
  relocation-------------------------------------------------          7, 186. 80
Maintenance: Operation, maintenance and repairs----------------        6, 256. 34

      Total for all work-       ---------------------------           13, 706.44

  The additional sum of $5,900 can be profitably expended during fiscal
year 1954 for operation and maintenance.
                            FLOOD CONTROL--NEW ENGLAND DIVISION                                                                    117
                                               Cost and financial summary

                                                             Fiscal year ending June 30                                  Total to June
                                                                                                                         30,1952, includ-
                                                                                                                         ing fiscal years
                                            1948           1949           1950           1951           1952              prior to 1948

New work:
   Appropriated--.-.....                  $30,000. 00    $1,000.00     $96,200. 00 -$33,000.00 ......------------......$1,324, 051.00
   Cost--....--------------..............   2, 301. 65   78, 396. 57    11, 909. 79   1, 420. 18      $911. 47          1,316, 864. 20
   Expenditures-------......                2, 251. 59   78,183. 52     12,196. 11    1, 222. 34    1,168. 64           1, 316, 864.20
Maintenance:
   Appropriated---------.........           4, 500. 00   5, 000. 00      6, 000. 00     5, 000. 00     5, 800. 00              43, 300. 00
   Cost..  ---------------- 3, 205. 47                   6, 486. 02      5, 472. 20     5, 400. 19     5, 500. 49              43, 043.66
   Expenditures.........                    2, 813. 09   5, 875. 04      6, 517. 76     4, 843. 69     5, 798. 30              42, 780. 36


Other new work data:
    Unobligated balance, June 30, 1952--------....-----------------                                                           $486. 80
    Unobligated balance available for fiscal year 1953--------------                                                           486. 80

                     49. BLACKSTONE                      RIVER BASIN, MASS., AND R.                                 I.

  Location.-The works covered by this project consist of a dam and
reservoir on the West River and local protection works at three cities
on the Blackstone River.
  Existing project.-The Flood Control Act approved December
22, 1944, authorized the plan for a reservoir on the West River and
local protection works at Worcester, Mass., and Woonsocket and Paw-
tucket, R. I., substantially in accordance with House Document No.
624, Seventy-eighth Congress, second session.
  The following individual projects comprise the authorized plan:
                                                                                                                          Reservoirs

                                                                                                                            Distance                                                                       Estimated cost
                                                                                                                             above                                              Reservoir
                           Name                                                       Nearest city                         mouth of Height                   Type               capacity
                                                                                                                           Blackstone
                                                                                                                             River
                                                                                                                                                                                capacity     Construc-
                                                                                                                                                                                               tion
                                                                                                                                                                                                             Ldand
                                                                                                                                                                                                             damages 1
                                                                                                                                                                                                                             Total            ~TJ
                                                                                                                                                                                                                                              0
                                                                                                                                                                                                                                              w



                                                                                                                              Miles        Feet                               Acre-feet                                                       b


West Hill...---..............----------------------
                                      ...........                  Uxbridge, Mass-----------------------                          25. 8       43    Earth fill.--------------11,900          $1, 794,000       $622, 000    $2, 416,000
                                                                                                                                                                                                                                              0

     1 Includes highway, railroad, and utility relocations.                                                                                                                                                                                   H
                                                                                                                                                                                                                                              C)
                                                                                                                 Local protection projects                                                                                                    ~r
                                                                                                                                                                                                                                              Li
                                                                                              Distance                                                                                           Estimated cost
                                                                                               above                                                                                                                                          0
                                       Location                                               mouth of                               Type of structure
                                                                                             Blackstone                                                                         Construction        Land and                Total
                                                                                                    River                                                                                           damages 1

                                                                                                    Miles                                                                                                                                     U2
                                                                                                                                                                                                                                              M




                                                                                                                                                                                                                                              LT]
Worcester, Mass ........---.........................---------------------------------...                    48   Diversion tunnel and channel-----------------------$3,                        814, 000       $505, 000   $4, 319,000
Woonsocket, R. I........................................----------------------------------------.           15   Channel improvement----- ------------------------                          1, 715, 000        148, 000    1,863, 000
                   ------------------------------------------
Pawtucket, R. I....................                                                                          2                                                                                 184, 000 -----------------
                                                                                                                 Flood wall ................. .................----------------------------------------                       184, 000

     1To be borne by local interests.




                                                                                                                                                                                                                                          V




                                                                                                                                                                                                                                          CR
                                                                                                                                                                                                                                          ci
             FLOOD CONTROL--NEW      ENGLAND   DIVISION         119


         50. THAMES RIVER BASIN, CONN., R. I., AND MASS.

  Location.-The works covered by this project are a series of dams
and reservoirs on tributaries of the Thames River in Massachusetts
and Connecticut, within a radius of 45 miles from Norwich, Conn.,
and a channel enlargement on the Shetucket River where it discharges
into the Thames River at Norwich.
  Existing project.-The Flood Control Act approved August 18,
1941, approved the plan for a system of reservoirs and channel im-
provements in the Thames River Basin in accordance with House
Document No. 885, Seventy-sixth Congress, third session, and au-
thorized $6,000,000 for initiation and partial accomplishment of the
project. The Flood Control Act approved December 22, 1944, au-
thorized the completion of the approved plan.
  The following individual projects comprise the approved plan:
                                                                                                                               Reservoirs

                                                                                                                                  Distance                                                                               Estimated cost
                                                                                                                                     above                                                 Reservoir
                              Name                                                       Nearest city                             mouth of         Height              Type                 capacity
                                                                                                                                  Thames                                                                  Construc-        Land and         Total
                                                                                                                                   River                                                                    tion           damages 1
                                                                                                                                                                                                                                                         0
                                                                                                                                        Miles       Feet                                  Acre-feet
Hodges Village............................                                Oxford, Mass.......................-------------------------     74. 5      55 Earth fill--------------.............. 13, 000   $1, 298, 000     $1, 400,000    $2, 698,000    O
Buffumville .......-----------------                                      Buffumville, Mass--------------------                            74.7             -- do---------------
                                                                                                                                                      66 --....                                 12, 700    1, 890, 000         506, 000    2, 396, 000
                ....--.-.-..-.-..
East Brimfield.---                                                        East Brimfield, Mass---       .....--------------............    83.0       48 Concrete gravity and                   20, 800    1, 591.000       3, 058, 000    4, 649, 000
                                                                                                                                                             earth fill.
Westville--__- -------- -------------                                     Westville, Mass-----------------------                         77. 2        36 Concrete-gravity.....                  12, 000   2, 313, 000       2, 612, 000    4, 925, 000   0
Mansfield Hollow --.----                 -----------.                __   Mansfield Hollow, Conn ............------------                40.0         70 Earth fill-------------
                                                                                                                                                                       .............            51,000    5,324, 000        2, 226, 000    7, 550, 000
Andover---------------------------..................................      Andover, Conn-----------------------                           47. 0        80 .... do----- --------                  16, 800   3, 441, 000       1,132, 000     4, 573, 000
South Coventry_----..----..--------.-.                                    South Coventry, Conn ............. _                           41.6         94 ..... do----................          36, 900    4, 018, 000       5, 474, 000    9, 492, 000
                                                                                                                                                                                                                                                         O
      1Includes highway, railroad, and utility relocations.
      2For details, see individual report.
                                                                                                                                                                                                                                                         Lrj
                                                                                                                  Local protection projects 1

                                                                                                   Distance                                                                                                   Estimated cost
                                                                                                    above
                                          Location                                                 mouth of                                  Type of structure
                                                                                                   Thames                                                                                                                                 Total          U
                                                                                                    River

                                                                                                     Miles
Norwich, Conn----------------------                                       --------------------               15    Channel improvement ............................---                                                                    $1, 255, 000   C

      1 For details, see individual report.
      s To be borne by local interests.
             FLOOD CONTROIr--NEW ENGLAND         DIVISION          121
  All operations previously reported are now contained in individual
reports, and previous costs and expenditures have also been transferred
to those reports.
51. MANSFIELD HOLLOW RESERVOIR, THAMES RIVER BASIN, CONN.

   Location.-The site of Mansfield Hollow Dam, for flood control, is at
Mansfield Hollow, Conn., on the Natchaug River about 5.3 miles above
its confluence with the Willimantic River. It is located about 4 miles
northeast of the city of Willimantic, Conn. The reservoir will extend
upstream 3.2 miles on the Natchaug River, 2.7 miles on the Mount
Hope River, and 3.7 miles on the Fenton River.
   Existing project.-This project provides for the construction of
a rolled earthfill dam, about 70 feet maximum height, on both sides
of a concrete gravity spillway, which is located across the main
channel of the Natchaug River. The total length of the dam will be
12,400 feet. In addition, a dike, 830 feet long with a maximum height
of 55 feet, across Chaplin Brook, and four dikes, averaging 6 feet in
height and respectively 210, 275, 265, and 790 feet long, across saddles
north of the main dam, and one dike 100 feet long with an average of
6 feet in height across the saddle at the south end of the dam, will be
required. The crest length of the concrete spillway will be 690 feet.
The dam will provide a total storage capacity of 51,000 acre-feet. The
reservoir outlets will consist of five conduits through the spillway
section. Each conduit will be provided with a 5-foot 6-inch by 7-foot
slide gate, hydraulically operated from a control house at the right
end of the spillway. The drainage area controlled is approximately
159 square miles. The reservoir will be operated as a unit of the
coordinated system for the control of floods in the Thames River Basin.
   The estimated cost, revised in 1952, is $5,324,000 for construc-
tion and $2,226,000 for lands and damages, including highway and
utility relocation, a total of $7,550,000 for new work. The latest ap-
proved (1952) estimate for annual cost of operation and maintenance
is $25,000.
   The existing project was authorized by the Flood Control Act
approved August 18, 1941 (H. Doc. 885, 76th Cong., 3d sess.).
   Local cooperation.-Section 2 of the Flood Control Act of June
28, 1938, applies.
   Operation and results during fiscal year.-New work: Operations
consisted of completion of construction of the dam, acquisition of
lands, consummation of agreements with towns of Mansfield and
Chaplin for relocation of roads, initiation of construction of cemetery
protection, award of contract for reservoir clearing to El. 210, com-
pletion of operations manual and installation of telemark and rain
gage. Costs from regular funds were $1,132,651.53. Expenditures
were $1,412,068.32.
   Reservoir operation: The reservoir was ready for flood regulation
early in 1952. It was regulated for the first time following the storm
                                                              i
of June 1,1952. The computed peak inflow was 4,000 c. f. s.; maximum
regulated outflow 2,800 c. f. s.; and minimum outflow 1,700 c. f. s.
The maximum storage utilized was 2,000 acre-feet, equal to 0.2 inch
of runoff, or 4 percent of the total reservoir capacity.
122         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   Condition at end of fiscal year.-Constructionof the dam, initiated
in July 1949, was completed in May 1952. Work to be done consists
of relocation of State roads and utilities; extension of runway at
Windham Airport; reservoir clearing; and miscellaneous clean up
work. Total costs have been $5,120,843.52. Expenditures have been
$5,095,528.23.
  Proposed operations.-Funds unexpended at the end of the fiscal
year amounting to $1,664,471.77, plus allotments of $540,000 for new
work and $22,000 for maintenance, and accounts receivable amounting
to $250,000, a total of $2,476,471.77, will be applied as follows:
Accounts payable to June 30, 1952_____           ---      --
                                                 _______-__-           _                                  $25, 315. 29
New work:
    Highway relocations__--------------------- $598, 843.15
    Land acquisition___---------------------               258, 911. 71
    Storage facilities-__-------- --------------             60, 800. 00
    Telephone relocations----------------------              61, 499. 44
    Reservoir clearing--__---------------                  324, 105. 88
    Airport runway extension__________________             162, 434. 91
    Utility relocations-----------------                     34, 587. 95
    Cemetery protection________ -_________-_                  1, 555.22
    Seepage investigations---------------------193,              848. 50
    Miscellaneous minor features- .------            __-_    32, 381. 34
    Contingency allowance and unallocated balance
      pending settlement outstanding claims------- 700, 188. 38
         Total for all work___-
                             ---      --------------------                                              2, 454, 471. 77
Maintenance: Operation and ordinary maintenance and repairs__                                               22, 000.00

            Total for all work____                  _____-----------------                          2, 476, 471. 77
   The additional sum of $21,600 can be profitably expended during
fiscal year 1954 for operation and maintenance.

                                     Cost and financial summary
                                                  Fiscal year ending June 30                             Total to June
                                                                                                        30, 1952, includ-
                                                                                                         ing fiscal years
                                  1948          1949           1950          1951          1952           priorto 1948


New work:
                                           --------------..
   Appropriated--------- ---............---------.....-----                             $3,000,000.00
                                                                  ............----------------             $7, 010, 000. 00
               ------      $10, 209. 28 $98, 012.80 $1,365,908.75 $2,252,138.84 1, 132, 651. 53
   Cost---..................                                                                                5, 120,843. 52
   Expenditures-----.........-    8, 592.53    86,689.89    955, 077. 812, 369, 560.611, 412, 068.32        5,095, 528. 23


Other new work data:
    Unobligated balance, June 30, 1952-__    -----------------                                          $717, 648. 25
    Appropriated for fiscal year ending June 30, 1953------------                                        540, 000. 00

        Unobligated balance availabe for fiscal year 1953---------1, 257, 648. 25

52. NORWICH CHANNEL IMPROVEMENT, THAMES RIVER BASIN, CONN.

  Location.-The site of the proposed work is in the channel of the
Shetucket River immediately upstream from its confluence with the
Yantic River to form the Thames River at Norwich, Conn.
  Existing project.-This project provides for deepening and widen-
ing of a 700-foot reach of the Shetucket River at Norwich, Conn.,
centering about Laurel Hill Bridge. The improved channel will be
108 feet wide at Laurel Hill Bridge, and will extend in depth 32 feet
below mean sea level, representing an increase in channel area of 40
                  FLOOD      CONTROL---NEW            ENGLAND          DIVISION                      123
percent. At the upper and lower limits, the width will be 140 and
132 feet and the depths will be 20 and 25 feet, respectively, below mean
sea level. A transition section at each end will grade the proposed
widening and deepening into the dimensions of the existing channel.
   The estimated cost, revised in 1952, is $1,183,000 for construction.
The estimated cost of local cooperation is $72,000 for relocation of
the Laurel Hill Bridge and for lands and damages. The existing
project. was authorized by the Flood Control Act approved August
18, 1941 (H. Doc. 885, 76th Cong., 3d sess.).
   Local cooperation.-See pages 4-5 for requirements. In addition
local interests are required to bear the cost of necessary bridge modi-
fications and reconstruction. Requirements of cooperation have been
fully complied with for the completed portion of the work. Con-
struction of the remaining portion of the project cannot be initiated
until relocation of a bridge has been accomplished by local interests.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-Constructionof the initial portion
of the project, initiated in June 1947, was completed in March 1949.
Project is 70 percent complete. Work remaining to be done is being
deferred pending relocation of a bridge by local interests. Total costs
and expenditures from regular funds for new work have been
$643,144.08.
   Proposed operations.-Fundsunexpended at the end of the fiscal
year amounting to. $855.92 plus accounts receivable amounting to
$370,000, a total of $370,855.92, will be retained for completion of
the project after relocation of a bridge by local interests.
   No additional funds are recommended for expenditure in fiscal
year 1954.
                                Cost and financial summary

                                          Fiscal year ending June 30                        Total to June
                                                                                           30,1952, includ-
                                                                                           ing fiscal years
                             1948        1949        1950         1951        1952          priorto 1948

New work:
   Appropriated...
               -------------------                    0.000.
                                         ------- $1290,   000 -            .                 $1,014,000. 00
   Cost....
      --------------    $528, 077. 03 $90, 150. 56   127. 60      $44. 09 ------------          643, 144.08
   Expenditures-....... 479, 975.30 140, 810. 27     157. 60       44. 09 --------------        643, 144. 08


Other new work data:
    Unobligated balance, June 30, 1952_                             855. 92
                                                                   $-------------------------
    Unobligated balance available for fiscal year 1953--------
    Estimated additional amount needed to be appropriated for com-
                                                                    855. 92       ___
      pletion of existing project--------------------------- 169,000. 00

    53. CONNECTICUT RIVER BASIN, VT., N. H., MASS., AND CONN.

  Location.-The works covered by this project are a series of dams
and reservoirs on tributaries of the Connecticut River in Vermont,
New Hampshire and Massachusetts, within a radius of 230 miles
from Hartford, Conn., and local protection works at several cities in
the basin.
  Existing project.-The Flood Control Act, approved June 22, 1936,
as amended by the act approved May 25, 1937 (Public Law 111, 75th
Cong.), authorized the construction of 10 reservoirs on tributaries of
124     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

the Connecticut River in accordance with plans in House Document
No. 412, Seventy-fourth Congress, second session, as the same may be
revised upon further investigation of the 1936 flood.
   The Flood Control Act, approved June 28, 1938, approved a general
comprehensive plan for the control of floods and other purposes in
the Connecticut River Valley, as set forth in House Document No.
455, Seventy-fifth Congress, second session, and authorized the sum
of $11,524,000 for construction of local flood-protection projects in
the plan. The act of October 15, 1940, modified the act of June 28,
1938, to provide additional protection at East Hartford, Conn., as
set forth in House Document No. 653, Seventy-sixth Congress, third
session. The act of August 18, 1941, modified the comprehensive plan
approved in 1938 to include the improvements recommended in House
Document No. 653, Seventy-sixth Congress, third session, and House
Document No. 724, Seventy-sixth Congress, third session, with such
further modifications as may be found justifiable in the discretion of
the Secretary of the Army and the Chief of Engineers. The latter
act also authorized to be appropriated the additional sums of $6,000,000
for local protection works and $10,000,000 for reservoirs. The act of
October 26, 1942 (Public Law 759, 77th Cong., 2d sess.), further
modified the plan by including the construction of Gully Brook conduit
at Hartford, Conn.
   The Flood Control Act approved December 22, 1944, authorized
the expenditure of $30,000,000 in addition to the previous authoriza-
tion for the comprehensive plan approved in 1938 and modified the
plan by (1) directing specific consideration of an alternative plan
of the Vermont State Water Conservation Board instead of the
Williamsville Reservoir in the West River Basin, Vt., (2) directing
consultation with the affected States during the course of investiga-
tions and transmission of the proposal and plans to each affected
State for written views and recommendation for reservoir projects
heretofore authorized for construction at Cambridgeport, Ludlow,
South Tunbridge and Gaysville and resubmission of the projects or
modifications thereof to the Congress, and (3) rescinded the authoriza-
tion for construction at the Sugar Hill site.
   The Flood Control Act of 1950 (Public No. 576, 81st Cong., 2d
sess.), modifies the project for flood control at Hartford, Conn., au-
thorized by the Flood Control Act approved June 28, 1938, as amended,
to include Folly Brook dike and conduit.
   Following are lists of the reservoirs and local protection works
which were proposed for construction in the modified comprehensive
plan.
                                                                                                Dams and reservoirs

                                                                                                           Distance                                                                            Estimated cost
                                                                                                            above                                                Reservoir
CA
                           Name                                          Nearest city                      mouth of
                                                                                                           Connecti-
                                                                                                                         Height               Type               capacity       Construc-        Land and
                                                                                                           cut River                                                                tion         damages 1

     Vermont:                                                                                                    Miles    Feet                                       Acre-feet
        Victory s.2--------...        -................ North Concord, Vt-----.--------------                      306. 0    76 Earthfill.------------                 104, 600 $3, 370, 000       $795, 000    $4, 165, 000   0o
o       Union Village 2--........................ Union Village, Vt.--------------------                           228. 4   170 _do..........                     .     38, 000  3, 089, 000         895, 000    3, 984, 000
        Gaysvaysville  ------------------------                       aysville, Vt-...-------------    -------     246. 8   178 Concrete--.....------------            124, 150 10, 452, 000      4, 545, 000   14, 997, 000
C'      South Tunbridge                     ....                    South Royalton, Vt------------------
                                                            ..------------------                                   234. 5   105 Earthfill.......--------------          32, 600  2, 860, 000      2, 086, 000    4, 946, 000   0
        North Hartland_...-------------------                       North Hartland, Vt----...-------------211. 7            176 ..... do----...............--..          71, 100 7, 790, 000      1,042, 000     8, 832, 000
        Ludlow__ -------------------------
C       Brockway_-        .................-.--.-..
                                                                    Ludlow, Vt------------------------
        North Springfield--.----------------- North Springfield, Vt----------------
                                                                    Brockway Mills, Vt-------------------
                                                                                                                   211.8
                                                                                                                   191.3
                                                                                                                   182. 0
                                                                                                                            118 .--- do--..---.----
                                                                                                                            106 -. do----------------.50,600
                                                                                                                            132 ..... do---...     ----. -.-.
                                                                                                                                                                    - 23,900
                                                                                                                                                                        37, 700
                                                                                                                                                                                 2,302,000
                                                                                                                                                                                 7,176,000
                                                                                                                                                                                 4, 351,000
                                                                                                                                                                                                  2,376,000
                                                                                                                                                                                                  1,261,000
                                                                                                                                                                                                  5, 250. 000
                                                                                                                                                                                                                 4,678. 000
                                                                                                                                                                                                                 8,437,000
                                                                                                                                                                                                                 9, 601,000
                                                                                                                                                                                                                               0
        Cambridgeport........................ Cambridgeport, Vt----.....                         ---------         180. 3   101 ..... do.................               21,600   3, 713, 000         924, 000    4, 637, 000
        The Island_ -.----..........-------..      .        .       Londonderry, Vt----....---------------         189. 6   100 ..... do....----------------            19, 400  2, 197, 000         744, 000    2, 935, 000
        Ball Mountain 2-...........--------. Jamaica, Vt...------------------------.........                       178. 2   240 Concrete arch-------......              54, 600 13, 617, 000         323, 000   13, 940, 000
        Townshend.......---------------------                       Townshend, Vt-........--.....----....----------......
                                                                                                                   168. 3   130 Earthfill.....---------.........        33, 000  8,173, 000       1,108, 000     9, 281,000
     New Hampshire:
        Sugar Hill ___________________________ Lisbon, N. H------------------------                                    .9   163 ..... do.................               91, 600  3, 500, 000      3, 385, 000    6, 885, 000   dr
        West Canaan_--------------------. West Canaan, N. H-------------------                                     233.8     80 -.. do---------                     - 54, 000    3,160,000        5,133,000      8,293, 000
        Claremont_------------------------ Claremont, N. H_-------------                                           202.4    128 .--- do-....-------                 - 78, 300    7,346, 000       4, 448,000    11,794, 000
        Surry Mountain -                        -         -        Keene, N. H------------------------             174.4     86 .-- do-.----------                      32,  500 1,407,700           326,300     1,734,000
        Honey Hill_-------------.-----.do--                                      -----------------------           168.9     65 ....-do-------------                    26, 200  2, 420,000       1,328,000      3, 748,000
     Massachusetts:
        Birch Hill      ...          . .              .             South Royalston, Mass---------                 153. 3
                                                                                                           --................56 ..... do--.....-.-----.                 49, 900  1, 225, 200      2, 997, 750    4, 222,950
        Tully 2-      -             -            -                 Fryville, Mass-----------------------148. 7               62 -     do.---------------                22,000   1,201,500          361,500      1,563,000
        Barre Falls '      --------------                          Barre, Mass.-------------------             -   130.2     62 Rock earthfill.-------                - 24, 300  2,246,000            23,000     2, 269,000
        West Brookfield ..                    ...-------------------
                                                                   West Brookfield, Mass_....-       .---.---      100. 5    30 Earthfill----------..............       33,000   3,120, 000       4, 990, 000    8,110, 000
        Knightville 2.......................-                   . Knightville, Mass...  ---------------------      102. 8  160-_ do.......                        .     49,000   2, 387, 700         819, 300    3,207, 000

         1Includes highway, railroad, and utility relocations.
         3
         2 For detals, see individual reports.
           Alternate site to be selected. Cost has not been revised on current price basis.                                                                                                                                    0




                                                                                                                                                                                                                               C1t
                                                                                                   Local protection projects

                                                                                    Distance                                                                                                         Estimated cost
                                                                                      above
                                  Location    I                                     mouth of                                Type of structure
                                                                                    Connecti-                                                                                   Construction           Land and        Total
                                                                                    cut River                                                                                                          damages                         Li

                                                                                                                                                                                                                                      b

                                                                                      Miles                                                                                                                                            O

Northampton, Mass.........----------......-----............                                  94 Wall and levee--------......................................--------------------------  $960, 000          $150, 000   $1, 110,000
Holyoke, Mass_--------------85                                                                    ... do..............................................                                 3, 420, 000          150, 000    3, 570, 000
Springdale, Mass--...--------------------------------------                                  84 .... do            ------------------------------------------                             700, 000           57, 000       757, 000   y


Chicopee, Mass....------------------------------------------                                 80 .... do.....-----------------------------------------                                  1, 711,000           500, 000    2, 211,000     O


Riverdale, Mass-----------------------------------------                                     80 .... do-----...........................-------------------......................       1, 139, 000           50, 000    1,189, 000     0
West Springfield, Mass----------------------------------
                          ...................................                                76 .... do---.....----------------------------------------1,678, 000                                            30, 000    1,708, 000     H
Springfield, Mass................................--------------------------------..........76    --    do-.....--.....-----.........-----------------------------------                   932, 000          272, 000    1,204, 000
Hartford, Conn . -----------------------------------------                                   52 .... do----.........................-------------------                                6, 754, 000          900, 000    7,654,000
East Hartford, Conn-------------------------------------                                     52 --.... do---------
                                                                                                           .....................................-----------------------------          2,138, 500           270, 000    2, 408, 500
Winstd, Conn.....-----------------------------------------                                  115 Channel improvement..----------------------------                                         171,500            30, 000       201, 500    0ITJ
     1 Details of these projects are given in individual reports.
    2 To be borne by local interests.                                                                                                                                                                                                 O
        All operations, costs, and expenditures are contained in the individual reports.                                                                                                                                              zO~

                                                                                                                                                                                                                                       TJ




                                                                                                                                                                                                                                      Co'
                            FLOOD CONTROLr--NEW ENGLAND DIVISION                                                                             127
       54. VICTORY RESERVOIR, CONNECTICUT                                                               RIVER BASIN,                   VT.

   Location.-The site of the proposed Victory Dam is on the Moose
River, 17.4 miles above its junction with the Passumpsic River and 12
miles northeast of St. Johnsbury, Vt. The reservoir will extend
upstream approximately 5 miles.
   Existing project.-This project provides for the construction of an
earthfill-type dam having a crest length of 1,000 feet rising 76 feet
above the stream bed and providing a total storage capacity of 104,600
acre-feet for flood control and conservation storage. The spillway will
be an overflow type in the right abutment having a crest length of 50
feet and a discharge capacity of 11,600 cubic feet per second. The
outlet works will consist of a 9-foot diameter conduit controlled by a
gate structure provided with gates mechanically operated from a
control house. The drainage area controlled is approximately 75
square miles. The reservoir will be operated as a unit of a coordinated
system of reservoirs for the control of floods on the Connecticut River.
The conservation storage will be operated for the benefit of down-
stream power plants.
   The estimated cost, revised in 1952, is $3,370,000 for construction
and $795,000 for lands and damages including highway and utility
relocations, a total of $4,165,000 for new work.
    The existing project was authorized by the Flood Control Acts
approved June 22, 1936, and June 28, 1938 (H. Doc. 455, 75th Cong.,
2d sess.) .
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Preparationof detailed
plans was continued. Costs and expenditures from regular funds for
new work were $23,221.41.
   Condition at end of fiscal year.-No construction work has been
done on the project. Detailed plans were 10 percent complete. Total
costs and expenditures have been $23,241.41.
   Proposed operations.--The sum of $75,000 appropriated for fiscal
year 1953 will be applied to completion of detailed plans and initiation
of preparation of contract plans and specifications. The sum of
$100,000 can be profitably expended during fiscal year 1954 for con-
tinuation of preparation of contract plans and specifications.
                                                  Cost and financial summary

                                                                   Fiscal year ending June 30                                     Tota I to June
                                                                                                                                 30, 1952, includ-
                                                                                                                                 ing fiscal years
                                             1948                1949               1950            1951            1952          priorto 1948

New work:
   Appropriated ........-------------------............ --------------............                  $146, 000.00 -$122,758.59
                                                                                           ---............                             $23, 241.41
   Cost----------                 ------------        ............
                                                   ------------------------ ............                   20. 00   23, 221.41          23, 241.41
   Expenditures-------------------------------
                         ............                ............                     -------............
                                                                                                   20. 00           23, 221.41          23, 241.41


Other new work dataa:
    Appropriated for fiscal year ending June 30, 1953_ ...--     .    $75, 000. 00
    Estimated additional amount needed to be appropriated for
      completion of existing project___----------- -----     - -   4, 066, 758. 59
128      REPORT OF CHIEF OF ENGINEERS, U. S. ARIMY, 1952

55. UNION VILLAGE RESERVOIR, CONNECTICUT RIVER BASIN,               VT.

    Location.--The site of the Union Village Dam is on the Ompom-
panoosuc River, about 4 miles above its junction with the Connecticut
River and one-quarter mile north of Union Village, Vt. The reser-
voir will extend upstream approximately 31/2 miles.
   Existing project.-This project provides for the construction of a
rolled-fill earth dam, 1,167 feet long at the crest line, rising 170 feet
above the stream bed and providing a total storage capacity of 38,000
acre-feet. The spillway has an ogee weir, 388 feet long, built on rock,
with a discharge capacity of 84,900 cubic feet per second. The outlet
consists of a 13-foot diameter tunnel 1,169 feet long. Control is ac-
complished by gates mechanically operated from a house over a shaft
near the middle of the tunnel. The drainage area controlled is ap-
proximately 126 square miles. The reservoir is operated as a unit of
a coordinated reservoir system for the control of floods in the Con-
necticut River Basin.
   The estimated cost, revised in 1952 is $3,089,000 for construction
and $895,000 for lands and damages, including highway relocation, a
total of $3,984,000 for new work. The latest approved (1952) esti-
mate of annual cost of operation and maintenance is $19,000.
   The existing project was authorized by the Flood Control Acts ap-
proved June 22, 1936, and June 28, 1938 (H. Doc. 455, 75th Cong.,
2d sess.).
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-New work: Operations
consisted of preparation of as-built drawings, installation of lighting
circuit at gate house, initiation of construction of outlet channel slope
protection, fire fighting facilities and reservoir clearing. Costs from
regular funds were $17,095.79.
   Maintenance: Work consisted of periodic checking of gates and
operating equipment, and general maintenance of roads, buildings,
and grounds. Costs from regular funds were $12,399.61.
   Reservoir operation: One period of regulation was required during
the year. There was complete closure of the gates following the
storm of June 1, 1952. The maximum computed inflow for this
period was 6,900 c. f. s. The storage utilized was 5,700 acre-feet equal
to 0.8 inch runoff or 15 percent of the total available capacity.
   Total costs during the fiscal year from regular funds were $29,495.40.
Expenditures were $29,149.35.
   Condition at end of fiscal year.-Construction of the dam was ini-
tiated in March 1947 and completed in June 1950. Work remaining
to be done consists of disposition of condemnation cases in connection
with land acquisition, relocation of telephone line, and completion of
reservoir clearing, outlet channel protection, and fire fighting facil-
ities. Total costs from regular funds have been $3,934,171.10, of
which $3,895,410.90 was for new work and $38,760.11 for maintenance.
Expenditures have been $3,920,855.09.
   Proposed operations.-The unexpended balance at the end of the
fiscal year amounting to $102,744.91, plus an allotment for fiscal year
                         FLOOD CONTROL---NEW ENGLAND                                           DIVISION                        129

1953 of $12,500 for maintenance, a total of $115,244.91, will be ap-
plied as follows:
Accounts payable to June 30, 1952..---------------                     ------------ $13, 316.01
New work:
    Land acquisition--------------                      -------------- $44,120. 17
                         __
    Reservoir clearing ------        ----------------------               30, 645. 55
    Outlet channel protection.............----------------..-----...--     2, 058. 63
    Fire-fighting facilities --------------------------                    9, 987. 16
    Telephone line relocation------.....-----------------1, 777. 50

      Total for new work----     ----------------------------- 88, 589. 01
Maintenance: Operation and ordinary maintenance and repairs----..... 13, 339. 89

         Total for all work----------.-------------------- ----                                                      115, 244. 91
   The additional sum of $16,200 can be profitably expended during
fiscal year 1954 for operation and maintenance.
                                           Cost and financial summary

                                                          Fiscal year ending June 30                                Total to June
                                                                                                                    30, 1952, includ-
                                                                                                                    ing fiscal years
                                       1948             1949             1950           1951           1952           prior to 1948

New work:
   Appropriated.........           $270, 000.00 $1,530,000.00 -$50, 000. 00 -$15, 000. 00            $50,000.00        $3,984,000.00
   Cost_--                          083, 378. 14 1, 594, 223. 83
                                   1------------.1,                   366, 619. 49     67, 684. 71    17, 095. 79      3, 895, 410. 99
   Expenditures--------.........    856, 251.26 1, 649, 351. 54       577, 175. 35     68, 645. 08    16, 090. 10      3, 882, 387. 72
Maintenance:
                                                             ---         19, 000. 00
   Appropriated--------- ---------.........--------............---............          8, 200. 00    12, 400. 00          39, 600.00
   Cost------------------------------------                                7,118.94    19, 241. 56    12, 399. 61          38, 760.11
   Expenditures------- -----------------------                             5,887.41    19, 520.71     13, 059.25           38, 467.37


Other new work data:
    Unobligated balance, June 30, 1952----------------------        $31, 165. 29
    Unobligated balance available for fiscal year 1953------------- 31,165. 29

  56. BALL MOUNTAIN RESERVOIR, CONNECTICUT RIVER BASIN, VT.

   Location.-The site of the proposed Ball Mountain Dam is on
the West River, 29.0 miles above its junction with the Connecticut
River at Brattleboro, Vt., and approximately 3 miles north of Ja-
maica, Vt. The reservoir will extend upstream approximately 6 miles.
   Existing project.-This project provides for the construction of
a concrete arch dam, 1,100 feet long at the crest line, rising 240 feet
above the stream bed and providing a total storage capacity of 54,600
acre-feet. An overflow spillway in the center of the dam will have
a discharge capacity of 148,000 cubic feet per second. The outlet
will consist of four 5-foot by 7-foot 6-inch conduits through the dam,
60 feet long. Control will be accomplished by hydraulically operated
gates. The drainage area controlled is approximately 172 square
miles gross, 132 square miles of which are below The Island dam
site. The reservoir will be operated as a unit of a coordinated reser-
voir system for control of floods in the Connecticut River Basin.
   The estimated cost, revised in 1952, is $13,617,000 for construction
and $323,000 for lands and damages including relocations, a total
of $13,940,000 for new work.
   The existing project was authorized by the Flood Control Act ap-
proved December 22, 1944 (Public Law 534, 78th Cong., 2d sess.).
130         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

  Local cooperation.-Section2 of the Flood Control Act of June 28,
1938, applies.
   Operations and results during fiscal year.-Subsurface explorations
by borings were initiated in connection with preparation of plans
and specifications. Costs from regular funds were $14,120.91. Ex-
penditures were $13,507.27.
   Condition at the end of fiscal year.-Detailed plans are complete.
No construction work has been initiated. Total costs from regular
funds have been $444,822.95. Expenditures have been $443,940.20.
   Proposed operations.-Fundsunexpended at the end of the fiscal
year amounting to $28,138.47, plus accounts receivable of $71.85, a
total of $28,210.32, will be applied as follows:
New work:
   Accounts payable to June 30, 1952 -----------------------                                              $882. 75
   Completion of exploratory borings_____---____--27,                                                      327.57
        Total all work                -------------------------------------- 28, 210. 32
   The additional sum of $900,000 can be profitably expended in fiscal
year 1954 for completion of preparation of plans and specifications,
acquisition of lands required for initial construction contracts, con-
struction of access road required for transportation of construction
equipment, and stripping abutments.
                                  Cost and financial summary

                                              Fiscal year ending June 30-                             Total to June
                                                                                                     30, 1952, includ-
                                                                                                     ing fiscal years
                               1948          1949          1950          1951            1952         priorto 1948


New work:
   Appropriated-.........   $15, 000. 00 $120, 150.52   $90, 000. 00 $105, 000.00    -$48,000.00          $472, 150. 52
                    ----
   Cost- ....----------      41, 905. 20 119, 655. 52   163, 867. 10   34, 355. 00     14, 120. 91         444, 822. 95
   Expenditures--------..    39, 301. 30 118, 861. 28   162, 947. 42   38, 403. 71     13, 507. 27         443, 940. 20


Other new work data:
    Unobligated balance, June 30, 1952_--_---_---__------------     $13, 736. 71
    Unobligated balance available for fiscal year 1953___ ___         13, 736. 71
    Estimated additional amount needed to be appropriated for
      completion of existing project-                                      800. 00
                                                                1-------------------3,467,

57. SURRY MOUNTAIN RESERVOIR, CONNECTICUT RIVER BASIN, N. H.

   Location.-The site of the Surry Mountain Dam is on the Ashuelot
River, about 34.6 miles about its junction with the Connecticut River,
and 5 miles north of Keene, N. H. The reservoir will extend upstream
about 3 miles.
  Existing project.-This project provides for the construction of
a rolled earthfill dam 1,670 feet long at its crest, rising 86 feet above
the stream bed, and providing a total storage capacity of 32,500 acre-
feet. The spillway consists of an open side channel with a low con-
crete weir 337.5 feet long, with a discharge capacity of 40,900 cubic
feet per second. The outlet consists of a 10-foot-diameter tunnel 383
feet long. Control is accomplished by gates mechanically operated,
through a shaft, from a house above. The drainage area controlled
                   FLOOD CONTROLr--NEW ENGLAND                             DIVISION                            131
is approximately 100 square miles. The reservoir is operated as a
unit of a coordinated reservoir system for the control of floods in the
Connecticut River Basin.
   The estimated cost, revised in 1952, is $1,407,700 for construction
and $326,300 for lands and damages, including highway relocations,
a total of $1,734,000 for new work. The latest approved (1952) esti-
mate for annual cost of operation and maintenance is $24,000.
   The existing project was authorized by the Flood Control Acts
approved June 22, 1936, as amended, and June 28, 1938 (H. Doc. 455,
75th Cong., 2d sess.).
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Preparationof opera-
tions manual was completed. Costs from regular funds were $46.32.
   Maintenance: Work consisted of periodic checking of gates and
operating equipment and general maintenance of roads, buildings and
grounds. Costs from regular funds for maintenance were $16,858.42.
   Reservoir operation: There were four floods requiring regulation
during the year. Flows and the results of regulation are shown in the
following tabulation:

                              Maximum          Regulated outfow                      Storage utilized
                              comuted        (cubic feet per second)
    Date, 1951-52, month         inflow
                             (cubic feet                                                                   Percent
                            per second) Maximum           Minimum      Actual feet       Inches             total

November-------------------         2, 300          900            0       10, 400               1.9                 32
January- ---         -1,               000          700            0        4, 000                .7                 12
April ------------------------      2, 500          900            0       15, 200               2. 8                47
June ------------------------       3, 000          600            0        3, 500                .6                 11



   Total costs during the fiscal year from regular funds were $16,904.74.
Expenditures were $17,944.41.
   Condition at end of fiscal year.-The project is complete. Con-
struction of the dam and appurtenant work was initiated in August
1939 and completed in June 1942. Total costs for the project have
been $1,898,130.59 of which $1,731,318.90 was for new work and
$166,811.69 was for maintenance. Expenditures have been $1,897,-
496.93.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, amounting to $5,103.07, plus accounts receivable of $202.39
and an allotment of $19,200 for maintenance during fiscal year 1953,
a total of $24,505.46, will be applied as follows:
Accounts payable to June 30, 1952_---------_-______________                                               $836. 05
New work : Available for final costs outstanding on completed items__                                    2, 681. 10
Maintenance: Operation and ordinary maintenance and repairs....                                         20, 988. 31
       Total for all work---------------------------------                                   .     $24, 505. 46
   The additional sum of $19,300 can be profitably expended during
fiscal year 1954 for operation and maintenance.
132             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                                           Cost and       financial summary
                                                       Fiscal year ending June 30                          Total to June
                                                                                                           30, 1952, includ-
                                                                                                           ing fiscal years
                                       1948          1949          1950          1951          1952             to1948
                                                                                                            prior

New work:
     Appropriated-------.------------.------------                     -- $6,000.00 ------------             $1,734,000.00
     Cost---------------           $7,093.53 $15,468.03 $14, 628.30       24, 776.22     $46.32               1,731,318. 90
     Expenditures--------.........  6, 278. 64 16, 229. 43 14, 521. 36    24, 727. 22    297. 87              1, 731, 318. 90
Maintenance:
   Appropriated--------.........     29,100. 00    19, 000. 00   22, 000. 00   13, 000. 00   17, 800.00          168, 600.00
     Cost.....---------------        19, 459.14    24. 865. 11   23, 713. 89   17, 499. 49   16, 858. 42         166, 811. E9
     Expenditures--------.........   19, 549. 45   24, 021.10    24, 333. 96   16, 984. 43   17, 646.54          166,178. 03


Other new work data:
       Unobligated balance, June 30, 1952__.-------   ---------------- $2, 81. 10
       Unobligated balance available for fiscal year 1953-----....-------. 2,681.10
    58. BIRCH HILL RESERVOIR, CONNECTICUT RIVER BASIN, MASS.
   Location.-The site of the Birch Hill Dam is on the Millers River,
about 27.3 miles above its junction with the Connecticut River, and 1.3
miles northeast of South Royalston, Mass. The reservoir extends up
the Millers River about 61/2 miles and up the Otter River about
3 miles.
   Existing project.--This project provides for an earth dam of
rolled-fill construction, extending across the Millers River and over-
flow spillway sections closing natural saddles in the right bank. The
dam is 1,400 feet long and rises 56 feet above the river bed. The
spillway weir consists of two concrete overflow sections, separated
by a natural knoll and a short weir closing an abandoned railroad
cut. The main spillway is approximately 810 feet long, the adjacent
spillway 350 feet, and the small one 30 feet. The total discharge
capacity is approximately 57,000 cubic feet per second at a surcharge
of 6 feet. The outlet works consist of an intake channel 1,500 feet
long, with a bottom width of 70 feet; a gate structure with operating
gatehouse directly above; and an outlet channel 1,150 feet long, with a
bottom width of 70 feet. The intake and gate-operating tower contain
gates mechanically controlled from the operating house above. The
gross drainage area controlled is approximately 175 square miles.
The reservoir provides a storage capacity of 49,900 acre-feet at spill-
way crest. The reservoir is operated as a unit of a coordinated reser-
voir system for the control of floods in the Connecticut River Basin.
   The estimated cost, revised in 1952, is $1,225,200 for construction
and $2,997,750 for lands and damages, including highway and railroad
relocations, a total of $4,222,950 for new work. The latest approved
 (1952) estimate for annual cost of operation and maintenance is
$17,800.
   The existing project was authorized by the Flood Control Acts
approved June 22, 1936, as amended, and June 28, 1938 (H. Doc. 455,
75th Cong., 2d sess.).
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operationsand results during fiscal year.-New work: Operations
consisted of preparation of agreements for utility relocations. Costs
from regular funds were $445.72.
                         FLOOD CONTROLr--NEW ENGLAND DIVISION                                                                133
   Maintenance: Work consisted of periodic checking of gates and
operating equipment and general maintenance of roads, buildings, and
grounds. The costs from regular funds were $13,612.06.
   Reservoir operation: There was no significant regulation for flood
control required during the year.
   Total costs during the fiscal year from regular funds were $14,057.78.
Expenditures were $14,289.26.
   Condition at end of fiscal year.-Constructionof the dam and ap-
purtenant works was initiated in June 1940 and completed in February
1942. Work remaining consists of disposition of condemnation cases
in connection with land acquisition and abandonment of a section of
road and consummation of agreements for relocation of utilities.
   Total costs for the project have been $4,311,567.16, of which
$4,141,213.71 was for new work and $170,353.45 was for maintenance.
Expenditures have been $4,310,682.24.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, amounting to $82,917.76, plus an allotment of $14,800 for
maintenance during fiscal year 1953, a total of $97,717.76, will be
applied as follows:
Accounts payable to June 30, 1.952-----------------------------$884. 92
New work: Completion of land acquisition and relocations----------. 81, 736.29
Maintenance: Operation and ordinary maintenance and repairs-... 15,096. 55

         Total for all work-----------                                ----------------------- 97, 717. 76
   The additional sum of $15,000 can be profitably expended during
fiscal year 1954 for operation and maintenance.
                                          Cost and financial summary

                                                        Fiscal year ending June 30                               Total to June
                                                                                                                 30, 1952, includ-
                                                                                                                 ing fiscal years
                                      1948            1949           1950            1951            1952         priorto 1948


New work:
   Appropriated----.........----------............ $100,000. 00   $40, 000. 00   -$18,000.00 ............           $4, 222, 950. 00
   Cost_--------------            $15, 769. 99 152, 321. 29        50, 977. 55      7, 932. 15       $445. 72        4, 141, 213. 71
                     --------
   Expenditures.........            30, 284. 10 151, 365. 34       38, 699. 65     20, 105.78          369. 50       4, 140, 974. 35
Maintenance:
   Appropriated--------.........   28, 700. 00     18, 000. 00     22, 000. 00      9, 000. 00    13, 900. 00          170, 650. 00
   Cost---------------             15, 819. 42     25, 894. 16     22, 811.86      18, 204. 45    13, 612. 06          170, 353. 45
                    -------
   Expenditures.........           15, 919. 16     25, 068. 02     23, 419. 98     18, 238. 20    13, 919. 76          169, 707. 89


Other new work data:
    Unobligated balance, June 30, 1952----------    --------------- $21.89
    Unobligated balance available for fiscal year 1953------------ 21.89

       59. TULLY RESERVOIR, CONNECTICUT RIVER BASIN, MASS.
   Location.-The site of the Tully Dam is on the Tully River, about
3.9 miles above its junction with the Millers River, and 1 mile north of
Fryville, Mass. The reservoir will extend up the Tully River about
61/2 miles.
   Existing project.-This project provides for the construction of a
rolled-earthfill dam, 1,570 feet long at its crest and rising 62 feet above
the stream bed, providing a total storage capacity of 22,000 acre-feet.
A spillway constructed on rock is located in a saddle located about
800 feet south of the left abutment of the dam. The outlet consists
134     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

of a 6-foot diameter tunnel approximately 243 feet long. Control
is accomplished by gates mechanically operated from a tower located
at the upper end of the tunnel. The drainage area controlled is ap-
proximately 50 square miles. The design includes provisions for
future raising and adaptation to the development of hydroelectric
power. The reservoir is operated as a unit of a coordinated reservoir
system for the control of floods in the Connecticut River Basin.
   The estimated cost, revised in 1952, is $1,201,500 for construction,
and $361,500 for lands and damages, including highway and utilities
relocation, a total of $1,563,000 for new work. The latest approved
 (1952) estimate for annual cost of operation and maintenance is
$16,800.
   The existing project was authorized by the Flood Control Acts
approved June 22, 1936, as amended, and June 28, 1938 (H. Doc. 455,
75th Cong., 2d sess.).
   Local cooperation.--Section2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-New work: Operations
consisted of land acquisition and construction of miscellaneous safety
features. Costs from regular funds were $2,624.69.
   Maintenance: Work consisted of periodic checking of gates and
operating equipment and general maintenance of roads, buildings,
and grounds. The costs from regular funds for maintenance were
$12,507.89.
   Reservoir operation: There was no significant regulation for flood
control required during the year. Total costs for the fiscal year from
regular funds were $15,132.58. Expenditures were $15,550.47.
    Condition at end of fiscal year.-Construction of the dam was
initiated in March 1947 and completed in September 1949. Work
remaining to be done consists of completion of land acquisition. Total
costs have been $1,575,697.23, of which $1,537,671.44 was for new
work and $38,025.79 was for maintenance. Expenditures have been
$1,575,215.54.
   Proposed operations.-Fundsunexpended at the end of the fiscal
year, amounting to $26,384.46, plus an allotment of $13,800 for main-
tenance during fiscal year 1953, a total of $40,184.46, will be applied
as follows:
Accounts payable to June 30, 1952_ -____----         -      -__--$481.69
New work : Land acquisition______------------------               25, 328. 56
Maintenance: Operation and ordinary maintenance and repairs       14, 374. 21

      Total all work -----------------------------------           40, 184. 46
   The additional sum of $14,000 can be profitably expended during
fiscal year 1954 for operation and maintenance.
                        FLOOD CONTROI--NEW                                   ENGLAND            DIVISION                      135
                                          Cost and financial summary

                                                             Fiscal year ending June 30                            Total to June
                                                                                                                   30, 1952, includ-
                                                                                                                   ing fiscal years
                                      1948                1949             1950          1951          1952          prior to 1948


New work:
   Appropriated-......... $726, 000. 00 $100, 000. 00 ............------ -$22,000.00 ..---...-----.......            $1, 563, 000. 00
   Cost.--------------      443, 386.00 769, 734. 17 $82, 508.94            5, 931.09   $2, 624. 69                   1, 537, 671. 44
   Expenditures     -. ...- 371, 913. 23 851, 433. 27
                   .-                                     84, 592. 79       6, 644. 91    2, 683.63                   1, 537, 667. 10
Maintenance:
    Appropriated----          -----.    ....-------............          16, 000. 00   10, 000. 00   12, 600. 00          38, 600.00
                 .
    Cost ________--------              .....            --............   12, 933. 31   12, 584. 59   12, 507. 89          38, 025. 79
    Expenditures_..-....        ..-             ............             12, 335. 33   12, 346. 27   12, 866. 84          37, 548. 44


Other new work data:
    Unobligated balance, June 30, 1952_ ___________-                                                       __-          $430.50
    Unobligated balance available for fiscal year 1953-__-                                            ---_-_-            430. 50

   60. BARRE FALLS RESERVOIR, CONNECTICUT RIVER BASIN, MASS.
   Location.-The site of the proposed Barre Falls Dam is on the Ware
River about 31.9 miles upstream from its confluence with the Swift
River and about 4 miles east of Barre, Mass. The reservoir will extend
approximately 4 miles up the East Branch of the Ware River, about
2 miles up the West Branch of the Ware River, about 2.5 miles up
Steven Brook, and about 1.5 miles up Longmeadow Brook.
   Existing project.-This project provides for the construction of an
earth-and-rockfill dam approximately 885 feet long at its crest and
rising 62 feet above the stream bed providing a flood control storage
capacity of 24,300 acre-feet. Three dikes totaling 3,215 feet at the
southern end of the Steven Brook arm of the reservoir, will be located
at low points in the reservoir rim. The spillway, consisting of a con-
crete weir and chute, will be located in the right abutment. A rein-
forced concrete conduit under the dam and on rock will be constructed
as an outlet works and will be controlled by mechanically operated
gates from a gate tower at the intake end. The drainage area con-
trolled is 57 square miles. The reservoir will be operated as a unit of a
coordinated reservoir system for the control of floods in the Connecticut
River Basin.              No provisions are made for the development of hydro-
electric power.
   The estimated cost revised in 1952 is $2,246,000 for construction and
$23,000 for lands and damages including highway relocation; a total
of $2,269,000 for new work.
   The existing project was authorized by the Flood Control Act
approved August 18, 1941.
   Local cooperation.-Section2 of the Flood Control Act approved
June 28, 1938, applies.
   Operationsand results during fiscal year.-None.
   Condition at the end of fiscal year.-Contractplans and specifica-
tions were substantially complete. No construction work has been
done. Total costs and expenditures from regular funds for new work
have been $216,971.68.
   Proposedoperations.-No funds are available for operations during
fiscal year 1953. The sum of $1,000,000 can be profitably expended
during fiscal year 1954 for initiation of construction of the dam, high-
way relocation, and land acquisition.
136            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                                                Cost and flnancial summary

                                                             Fiscal year ending June 30                      Total to June
                                                                                                             30, 1952, includ-
                                                                                                             ing fiscal years
                                             1948          1949           1950         1951        1952       priorto 1948


New work:
   Appropriated-..-..._                   $42, 398.85   $77, 143. 97   $10, 000.00 ----------      -$17,571.14    $216,971. 68
   Cost ...........---------------         40, 821.85    40, 255. 74    26, 850. 60   $4, 096. 09 ------------     216, 971. 68
   Expenditures- --..                -.    37,273.52     43,804.07      26, 850.60     4,096. 09 --------------    216, 971.68


Other new work data : Estimated additional amount needed to be
appropriated for completion of existing project --
                                                 ____------    $2, 052, 028. 32

61. KNIGHTVILLE RESERVOIR,                                        CONNECTICUT RIVER BASIN,                          MASS.

   Location.-The site of the Knightville Dam is on the Westfield
River, about 27.5 miles above its junction with the Connecticut River
and 4 miles north of the town of Huntington, Mass. The reservoir
extends up the Westfield River about 6 miles and up the Little River
about 1 mile.
   Existing project.-This project provides for the construction of
a hydraulic earthfill dam, 1,600 feet long at the crest line, including
400 feet of spillway, rising 160 feet above the stream bed and provid-
ing a total storage capacity of 49,000 acre-feet. The outlet consists
of a 16-foot diameter tunnel approximately 605 feet long. Control
is accomplished by gates mechanically operated from a tower located
at the intake end of the tunnel. The drainage area controlled is ap-
proximately 162 square miles. Provision has been made for future
installation of penstocks for the development of hydroelectric power.
The reservoir is operated as a unit of a coordinated reservoir system
for the control of floods in the Connecticut River Basin.
   The estimated cost, revised in 1951, is $2,387,700 for construction
and $819,300 for lands and damages, including highway relocations,
a total of $3,207,000 for new work. The latest approved (1952) esti-
mate for annual cost of operation and maintenance is $22,000.
   The existing project was authorized by the Flood Control Act ap-
proved June 22, 1936, as amended and June 28, 1938 (H. Doec. 455,
75th Cong., 2d sess.).
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during the fiscal year.-New work: Opera-
tions consisted of installation of flood-warning system. Costs from
regular funds were $1,365.35.
   Maintenance: Work consisted of periodic checking of gates and
operating equipment and general maintenance of roads, buildings and
grounds. Costs from regular funds were $16,900.87.
   Reservoir operation: There were five periods of regulation during
the year. Flows and the results of regulation are shown in the fol-
lowing tabulation:
                           FLOOD CONTROL---NEW ENGLAND                                                 DIVISION                               137

                                         MaximumRegulated         outflow                                        Storage utilized
                                         computed (cubic feet per second)
      Date, 1951-52, month                  inflow
                                         (cubic feet                                                                                     Percent
                                        per second) Maximum                  Minimum Actual feet                      Inches              total

November--------------------                     5,000            3,300                   0             6,500                  0.8                 13
January ---------------------                    2,200            1,900                 400             2,000                   .24
April-------------------------                   8,300            2,900                   0            15,300                  1.8                 31
May._------------2,500                                            2,000                 500             2, 000                  .2                   4
June.-----------------------                    12.000            3, 300                  0            17, 000                 2.0                 35


  Total costs during the fiscal year from regular funds were $18,266.22.
Expenditures were $18,687.02.
  Condition at end of fiscal year.--Construction of the dam was
initiated in August 1939 and completed in December 1941. Work
remaining to be done consists of completion of land acquisition.
  Total costs for the project have been $3,342,018.92, of which $3,182,-
752.89 was for new work and $159,266.03 was for maintenance. Ex-
penditures have been $3,341,422.94.
  Proposed operations.--Funds unexpended at the end of the fiscal
year amounting to $25,627.06, plus an allotment of $17,000 for mainte-
nance during fiscal year 1953, a total of $42,627.06, will be applied
as follows:
Accounts payable to June 30, 1952-------------------------------          $595. 98
New work : Land acquisition__                      _..-------------______
                                                                        24, 247. 11
Maintenance: Operation and ordinary maintenance and repairs ... -       17, 783. 97
         - Total all work----                        ---------------------------------                                           $42, 627. 06
   The additional sum of $19,500 can be profitably expended during
fiscal year 1954 for operation and maintenance.
                                             Cost and financial summary

                                                             Fiscal year ending June 30                                          Total to June
                                                                                                                                30,1952, includ-
                                                                                                                                ing fiscal years
                                         1948              1949             1950                1951               1952              prior to 1948


New work:
     Appropriated---.------------------------                          $25, 000. 00       $12, 000.00 -----......--                   $3, 207, 000. 00
     Cost--------------            $12, 778. 14 $25, 354. 01            20, 168. 04        24, 112. 38    $1, 365. 35                  3, 182, 752. 89
     Expenditures--------.........  11, 590. 44  26, 138. 62            20, 343. 33        24, 299. 22     1, 456. 55                  3,182, 752. 89
Maintenance:
     Appropriated--------.........     26, 500. 00       24,000. 00       22, 000. 00          2, 500. 00        16. 300. 00              160, 050. 00
     Cost.--------------               19, 728. 35       22, 229. 58      18, 564. 10         16, 916. 42        16, 900. 87              159, 266.03
     Expenditures---------..........   19, 578. 71       21, 873. 44      18, 839. 82         16, 956. 00        17, 230. 47              158, 670.05


Other new work data:
   Unobligated balance, June 30, 1952 ........    _ _________     $17, 790. 11
   Unobligated balance available for fiscal year 1953--.--------. 17, 790. 11

                     62. HOLYOKE, CONNECTICUT RIVER BASIN, MASS.

   Location.-Holyoke, Mass., is located in Hampden County on the
west bank of the Connecticut River, 85 miles above the mouth.
   Existing project.-The plan of improvement provides for the con-
struction of a system of levees and concrete flood walls, consisting of
138     REPORT OF CHIEF OF ENGINEERS,       U.   S. ARMY,   1952

the following features: Approximately 400 feet of earth levee and
approximately 5,600 feet of concrete flood wall along the Connecticut
River, extending from the Holyoke Water Power Co. dam southerly
to high ground near Mosher Street; about 10,000 feet of concrete flood
wall along the Connecticut River, from high ground near Appleton
Street southerly to the existing Springdale levee, including a concrete
flood wall along both banks of a power canal, the level of which is
below flood grade; 6 pumping plants for the disposal of interior
drainage; 18 stop-log structures; 20 gate structures for inlet and
outlet works of existing power developments; and appurtenant drain-
age structures. The levees and walls are designed to protect against
a flood, greater than any of record, reduced by the approved plan of
reservoirs. The levee and wall grades are at all points above the maxi-
mum stage of the greatest flood of record, that of March 1936. The
existing project was authorized by the Flood Control Act approved
June 28, 1938, and modified by the Flood Control Act of August 18,
1941.
   The estimated cost of new work, revised in 1951, is $3,420,000 for
construction and $150,000 for lands and damages. In addition to
the authorized existing project, supplementary work with relief labor
has been undertaken at a cost of $344,236.87 pursuant to the provi-
sions of the Emergency Relief Act approved June 21, 1938.
   Local cooperation.-Fully complied with. In addition $3,355.70
was contributed by the city of Holyoke to cover cost of relocation of
poles of the Holyoke Water Power Co. and connecting certain inter-
secting city sewers with the project drainage system. An additional
$24,446.45 has been contributed by the city of Holyoke to cover the
cost of miscellaneous work desired by the city, to be built in conjunc-
tion with work now under construction.
   Operations and results during fiscal year.-Operationsconsisted of
continuation of preparation of as-built drawings and miscellaneous
studies. Costs from regular funds were $4,869.38. Expenditures were
$7,662.18.
   Condition at end of fiscal year.-Construction of the first portion
of the authorized project which provides flood protection for the area
north of Mosher Street was initiated in December 1938 and completed
in 1940. Construction of the remaining portion was initiated in April
1947 and'completed in February 1950. Work remaining to be done
consists of completion of record drawings. Total costs and expendi-
tures have been $610,000 from Public Works Administration funds,
$2,807,092.82 from regular funds and $24,446.45 from contributed
funds, a total of $3,441,539.27.
   Proposed operations.-Fundsunexpended at the end of the fiscal
year amounting to $2,907.18 will be applied to completion of as-built
drawings.
   No work is scheduled for 1954.
                     FLOOD CONTROL--NEW ENGLAND DIVISION                                                        139
                                    Cost and financial summary

                                                Fiscal year ending June 30                           Total to June
                                                                                                     30, 1952, includ-
                                                                                                     ing fiscal years
                                 1948         1949           1950           1951        1952           prior to 1948

New work:
   Appropriated ........ -$25,000.00      $940, 000. 00   $80, 000. 00 ............ -$50,000.00       1$3,425, 550. 00
       -------------- 1,116,248.93 910, 750. 88
    Cost_                                                  90, 044. 59   -$344. 46     4, 869. 38      1 3, 417, 092. 82
    Expenditures-......... 946, 290. 26 1,053,390.91      109, 871. 55      284. 04    7, 662. 18      1 3, 417, 092. 82


  1 Includes $610,000 Public Works funds. In addition $24,446.45 was expended from contributed funds.

Other new work data :
    Unobligated balance, June 30, 1952    _----_-----------------                                      $8, 457. 18
    Revocation for fiscal year ending June 30, 1953--------------                                     -5, 550. 00
    Unobligated balance available for fiscal year 1953-------------                                      2, 907.18
            63. SPRINGDALE,              CONNECTICUT RIVER BASIN, MASS.
   Location.-Springdale is in the southern portion of the city of
Holyoke, Mass., in Hampden County, on the west bank of the Con-
necticut River, 84 miles from the mouth and forms an integral part
of the protection for the South End section of Holyoke.
   Existing project.-The plan of improvement involves the recon-
struction of approximately 4,200 feet of earth dike crossing an exist-
ing outfall pressure conduit and the construction of a pumping sta-
tion. Approximately 550 feet of the dike has been replaced by a
concrete flood wall. The dike provides protection against a flood
greater than any of record, reduced by the approved plan of reser-
voirs. The grades are at all points above the maximum stage of the
greatest flood of record, that of March 1936. The existing project
was authorized by the Flood Control Act approved August 18, 1941
 (H. Doc. 724, 76th Cong., 3d sess.). The estimated cost of the work
revised in 1951 is $700,000 for construction, and $57,000 for-lands
and damages.
   Local cooperation.-Fullycomplied with.
   Operations and results during fiscal year.-Operations during the
year consisted of engineering studies, inspections and reports. Costs
from regular funds for new work were $4,118.62. Expenditures were
$5,486.62.
   Condition at end of fiscal year.-Construction of the project was
initiated in April 1947 and completed in February 1950. Total costs
and expenditures for new work from regular funds have been $700,000.
   Proposed operations.-None. The project is complete.
                                   Cost and financial summary

                                               Fiscal year ending June 30                            Total to June
                                                                                                    30, 1952, includ-
                                                                                                    ing fiscal years
                                1948          1949           1950          1951         1952         prior to 1948


New work:
   Appropriated-.........$170, 000. 00 1155,
                                          $    300. 00-    .                                             $720, 700. 00
   Cost...                   441, 523. 89 147, 298. 30 $31, 468.31
                   ...--------------                                     $8, 800.00   $4, 118.62           700, 000. 00
   Expenditures---.---.      383, 595.95 199,908.84     39, 953.96        9, 791.38    5,486.62            700, 000.00

Other new work data :
   Unobligated balance, June 30, 1952- ------ ------                                                 $20, 700. 00
   Revocation for fiscal year ending June 30, 1953 ___________                                      -- 20, 700. 00
140     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

          64. CHICOPEE, CONNECTICUT RIVER BASIN, MASS.

   Location.-Chicopee, Mass., is located in Hampden County on the
east bank of the Connecticut River, 80 miles above the mouth.
   Existing project.-The plan of improvement provides for the con-
struction of a system of levees and flood walls, approximately 25,700
feet in length, and pumping stations for the disposal of interior
drainage. The protection system consists of two short sections of
dike in the Willimansett section in the extreme northern portion of
the city; 20,200 feet of levee extending from high ground about 2
miles below the Willimansett bridge downstream along the Connecti-
cut River and up the north bank of the Chicopee River to high ground
above the Boston & Main Railroad bridge; 3,200 feet of flood walls
and 1,500 feet of levee along the south bank of the Chicopee River and
Connecticut River from high ground above the highway bridge over
the Chicopee River to high ground north of the highway bridge over
the Connecticut River; three stop-log structures; six pumping sta-
tions, and appurtenant drainage structures. The levees and walls
are designed to protect against a flood greater than any of record,
reduced by the approved plan of reservoirs. The levee and wall
grades are at all points above the maximum stage of the greatest
flood of record, that of March 1936. The existing project was au-
thorized by the Flood Control Act approved June 28, 1938. The
estimated cost of the new work, revised in 1952, is $1,711,000 for
construction and $500,000 for lands and damages. In addition to the
authorized existing project, supplementary work with relief labor
has been undertaken at a cost of $168,677.26 pursuant to the provisions
of the Emergency Relief Act approved June 21, 1938.
   Local cooperation.-See pages 4-5 for requirements. Fully com-
plied with for completed portion of the work.
   Operations and results during fiscal year.-None. Costs of $2.50
from regular funds for new work were incurred for reproduction of
plans. Expenditures were $64.50.
   Condition at end of fiscal year.-Construction of the authorized
project was initiated in March 1939 and completed in 1941 with the
exception of a section of dike in Willimansett and the Charbonneau
Terrace pumping station. Work remaining to be done consists of the
completion of design and construction of the dike in the Willimansett
section and the Charbonneau Terrace pumping station and tie-in
dike construction. Total costs and expenditures for new work have
been $295,000 from Public Works Administration funds and $1,-
133,270.29 from regular funds, a total of $1,428,270.29. In addition
costs and expenditures of $385 apply to contributed funds.
   Proposed operations.-Funds unexpended at the end of the fiscal
year, amounting to $6,229.71 will be applied as follows:
Tie-in dike construction   -----------------------------------   $4, 000. 00
Continuation of design of Willimansett Dike upon compliance by
  the city with requirement of local cooperation----------------  2, 229. 71
      Total new work--------------------------         ---------- $6,229. 71
  No additional funds are recommended for expenditure in fiscal year
1954.
                        FLOOD CONTROIL---NEW                     ENGLAND            DIVISION                       141
                                        Cost and financial summary

                                                    Fiscal year ending June 30                        Total to June
                                                                                                      30, 1952, includ-
                                                                                                      ing fiscal years
                                     1948         1949          1950          1951        1952         priorto 1948

New work:
   Appropriated-------
                 .........-------......
                            --  256, 000. 00                  -$88, 500                          1$1,434, 500. 00
                                                                            -$155, 000 ...........------------
   Cost ---------------
          _                       $1, 393.35     9, 663. 62    4,450.06        189. 65       $2. 50     1   1, 428, 270. 29
   Expenditures-------.........     1, 393. 35   9, 644. 63    4, 165. 57      431. 13       64. 50     11, 428, 270. 29

  1Includes $295,000 Public Works funds; in addition the sum of $385 has been expended from contributed
funds for new work.

Other new work data:
      Unobligated balance, June 30, 1952__---                                  --------
                                                                                     _    ..-.-          $6, 229. 71
     Unob i4ated balance available for fiscal year 1953-    __---------   6,229. 71
     Estimated additional amount needed to be appropriated for com-
       pletion of existing project----------------------------          276, 500. 00

               65. RIVERDALE, CONNECTICUT RIVER BASIN, MASS.

   Location.--Riverdale is in the northern portion of the town of West
Springfield, Mass., in Hampden County, on the west bank of the
Connecticut River. It is located 80 miles from the mouth.
   Existing project.---The plan of improvement involves the construc-
tion of approximately 12,700 feet of earth levee, two pumping stations
and three stop-log storage structures. The levee provides protection
against a flood greater than any of record, reduced by the approved
plan of reservoirs. The grades are at all points above the maximum
stage of the greatest flood of record, that of March 1936. The existing
project was authorized by the Flood Control Act approved August 18,
1941 (H. Doc. 724, 76th Cong., 3d sess.). The estimated cost of the
work, revised in 1951 is $1,139,000 for construction, and $50,000 for
lands and damages.
   Local cooperation.-Fully complied with. The town of West
Springfield has contributed $25,000 to defray the cost of local drainage
works.
   Operations and results during fiscal year.-Operations during the
fiscal year consisted of engineering studies, inspections and reports.
Costs from regular funds for new work were $1,491.89. Expenditures
were $1,502.49.
   Condition at end of fiscal year.-Construction of the project,
initiated in April 1949, was completed in December 1950. Work re-
maining consists of preparation of record drawings. Total costs and
expenditures from regular funds for new work have been $1,137,421.91
and $25,000 from contributed funds, a total of $1,162,421.91.
   Proposed operations.-Funds unexpended at the end of the fiscal
year, amounting to $1,578.09, will be applied to preparation of record
drawings.
   No additional funds are recommended for expenditure.




         245554-53-vol. 1-                  10
142       REPORT         OF CHIEF          OF ENGINEERS,                U.     S. ARMY,             1952

                                    Cost and financial summary

                                                Fiscal year ending June 30                           Total to June
                                                                                                     30, 1952, includ-
                                                                                                     ing fiscal years
                                1948          1949          1950             1951            1952     priorto 1948


New work:
                                          ...........
   Appropriated ...............-------- -----------      612, 000. 00 -$10,000.00 -----------          $1,144, 000. 00
   Cost-----------------        $695. 83 $338, 280. 13   6 39, 329. 67   7, 121. 76    $1, 491. 89      1, 137, 421.91
   Expenditures---------         695. 83  124, 489. 46   860, 173. 52   30, 057.98      1,502.49       11, 137, 421.91


1 In addition $25,000 has been expended from contributed funds for new work.

Other new work data:
    Unobligated balance, June 30, 1952 ..                   _____-----                ----             $6, 578. 09
    Revocation for fiscal year ending June 30, 1953-----------------5, 000. 00
    Unobligated balance available for fiscal year 1953--------------- 1, 578. 09

      66. WEST SPRINGFIELD, CONNECTICUT RIVER BASIN, MASS.

    Location.-West Springfield, Mass., is located in Hampden County
on the west bank of the Connecticut River, 76 miles above the mouth.
   Existing project.-The plan of improvement provides for the con-
struction of a system of levees and flood walls, approximately 24,500
feet in length, extending along the Connecticut and Westfield Rivers
for the protection of the section of town located on the point of land
above the junction of and between the two rivers, Three pumping
stations are provided for the disposal of the interior drainage. The
protection system extends from high ground in the vicinity of Harri-
son Place downstream along the Connecticut River and thence up-
stream along the Westfield River to high ground at the Boston &
Albany Railroad and involves the construction of approximately 2,300
feet of concrete flood wall, enlargement of 13,700 feet of existing levee,
2,400 feet of bank improvement, 6,100 feet of foundation treatment
and three pumping stations. The levees and walls are designed to
protect against a flood greater than any of record reduced by the
approved plan of reservoirs. The levee and wall grades are at all
points above the maximum stage of the greatest flood of record, that
of March 1936. The existing project was authorized by the Flood
Control Act approved June 28, 1938 (H. Doc. 455, 75th Cong., 2d sess.),
and modified by the Flood Control Act of August 18, 1941 (H. Doc.
653, 76th Cong., 3d sess.). The estimated cost of new work, revised
in 1951 is $1,678,000 for construction and $30,000 for lands and
damages. In addition to the authorized existing project, supple-
mentary work with relief labor has been undertaken at a cost of $223,-
947.21 pursuant to the provisions of the Emergency Relief Act
approved June 21,1938.
   Local cooperation.-Fullycomplied with.
   Operations and results during fiscal year.-Operationsconsisted of
preparation of plans and specifications and issuance of invitations to
bid on construction of relief well and drainage system. Costs from
regular funds were $8,277.73. Expenditures were $8,003.43.
   Conditionat end of fiscal year.-Constructionof the authorized proj-
                    FLOOD CONTROL---NEW. ENGLAND                                 DIVISION                      143
ect was initiated in March 1939 and completed in July 1942 with the
exception of the foundation treatment along the Westfield River, south
of the Agawam Bridge, which was initiated in May 1947 and completed
in November 1947. Work remaining to be done consists of construc-
tion of relief well and drainage system. Total costs have been $245,000
from Public Works Administration funds and $1,027,766 from regular
funds, a total of $1,272,766. Expenditures have been $1,272,310.34.
   Proposed operations.-Funds unexpended at the end of the fiscal
year amounting to $405,689.66 will be applied as follows:
Accounts payable to June 30, 1952 __---------.--- --          -                                        $455. 66
                                                          ..
New work: Construction of relief well and drainage system--------                                   405, 234. 00

       Total all work-------                -----------------------------                            405, 689.66
   The expenditures proposed above will complete the project.
                                   Cost and financial summary

                                              Fiscal year ending June 30                            Total to June
                                                                                                    30, 1952, includ-
                                                                                                    ing fiscal years
                               1948          1949          1950           1951          1952         priorto 1948

New work:
   Appropriated......... -$10,000.00 -------            1,--.- --     -$72,000.00 1$400, 000. 00     1 $1,678, 000. 00
      --------------
   Cost_                    243, 192. 58   $2, 044.65   $17,062. 57     11, 216. 79    8, 277. 73     11, 272, 766. 00
   Expenditures _...... -   245, 382.20     1,807. 17    16, 352.46     11, 983.02     8,003.43       1 1, 272,310.34

1 Includes $245,000 Public Works funds.

Other new work data:
    Unobligated balance, June 30, 1952_-______-__-__----- $404,961. 66
   Unobligated balance available for fiscal year 1953-__------ 404, 961. 66

            67.    HARTFORD, CONNECTICUT RIVER BASIN, CONN.

   Location.-Hartford, Conn., is located in Hartford County on the
west bank of the Connecticut River, 52 miles above the mouth.
   Existing project.--The plan of improvement provides for the con-
struction of a system of levees and flood walls approximately 38,000
feet long, along the Connecticut River from high ground immediately
north of town to high ground immediately south of town, with the
Park River, which discharges into the Connecticut River at about
the center of town, confined between concrete walls discharging
through a short conduit section through the Connecticut River dike,
including pumping stations for the disposal of interior drainage. The
improvements as planned involved the construction of approximately
4,000 linear feet of concrete flood wall, 22,000 feet of earth dike,
and an enlargement of 12,000 feet of existing dike along the Con-
necticut River, the construction of 5,600 linear feet of concrete con-
duit on the Park River, construction of 2,400 feet of conduit on Gully
Brook, construction of 1,900 feet of conduit on Folly Brook, con-
struction of five stop-log structures, three pumping stations, and
other appurtenant drainage structures and facilities. The project
grade for levees and walls was designed to protect against a flood
 144      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

greater than any of record, as modified by an approved plan of res-
ervoirs for flood control in the Connecticut River Basin. The grades
at all points were above the maximum stage of the record flood, that
of March 1936. At the request of the city of Hartford, the wall and
dike grades were increased 5 to 6 feet, the crown width for levees
increased from 10 to 15 feet, a conduit provided for the Park River
in lieu of the open channel improvement; special equipment provided
for the Keney Lane and Bushnell Park pumping stations, and a super-
structure of special architectural treatment provided for the Bushnell
Park pumping station. Additional expense of approximately $2,725,-
000 involved in these changes is being borne by the city of Hartford.
The existing project was authorized by the Flood Control Act ap-
proved June 28, 1938 (H. Doc. 455, 75th Cong., 2d sess.), and mod-
ified by the Flood Control Act of August 18, 1941 (H. Doc. 653, 76th
Cong., 3d sess.), the act of October 26, 1942 (Public Law 759, 77th
Cong., 2d sess.), and the act of 1950 (Public Law 516, 81st Cong.,
2d sess.). The estimated cost of new work for the authorized proj-
ect, revised in 1952, is $6,754,000 for construction and $900,000 for
lands and damages, exclusive of the cost of the additional work de-
sired by the city. In addition to the authorized existing project,
supplementary work with relief labor has been undertaken at a cost
of $388,221.82 pursuant to the provisions of the Emergency Relief
Act approved June 21, 1938.
    Local cooperation.-Fully complied with. In addition, $2,771,630
has been contributed by the city to cover the increased cost of con-
structing the dikes to a higher grade, constructing a conduit instead
of walls for the Park River, and including special features in the
Keney Lane and Bushnell Park pumping stations.
    Operations and results during fiscal year.-None.
    Condition at the end of fiscal year.-Constructionof the authorized
project was initiated in December 1938 and is substantially completed.
Work remaining to be done consists of the construction of Folly Brook
conduit and construction to final grade of a stop-log structure and
a short section of earth dike. The costs and expenditures for the
existing project have been $835,000 from Public Works Administra-
tion funds, $5,637,089.90 from regular funds, and $2,527,613.69 from
contributed funds, a total of $8,999,703.59 for new work.
   Proposed operations.-Fundsunexpended at the end of the fiscal
year, amounting to $250,926.41 will be applied as follows:
Unallocated contributed funds available for city's share of cost of
  completion of project_----------------------------------- $244, 016. 31
Held pending receipt of additional funds for design and construction
  of Folly Brook conduit-- ------------------       ---------------  6, 910. 10

       Total new work--..---------------------------------250, 926. 41
   The additional sum of $25,000 can be profitably expended in fiscal
year 1954 for preparation of detailed and contract plans and specifica-
tions for Folly Brook dike.
                         FLOOD CONTROL---NEW ENGLAND                                        DIVISION                      145
                                         Cost and financial summary

                                                          Fiscal year ending June 30                          Total to June
                                                                                                              30, 1952, includ-
                                                                                                              ing fiscal years
                                     1948               1949           1950          1951         1952         prior to 1948

New work:
   Appropriated---------.----------              -   $60,000.00     $10,000.00    ----------                   1$-----------
                                                                                                                6,479,000.00
   Cost--.------------$.312, 054.55                  323,933.88      29, 452.88    $8,093.56------------        16, 472,089.90
   Expenditures.---- 230, 497. 11                    339, 269.69     99,470. 02     8,689. 00 ------------       6,472, 089.90

1 Includes $835,000 Public Works Administration funds.
Other new work data:
    Unobligated balance, June 30, 1952------------------           $6, 910.10
    Unobligated balance available for fiscal year 1953------------ 6, 910.10
    Estimated additional amount needed to be appropriated for
      completion of existing project  .-----------     ------- __ 275,000. 00

                                                      Contributedfunds

                                                          Fiscal year ending June 30                          Total to June
                                                                                                              30, 1952, includ-
                                                                                                              ing fiscal years
                                     1948               1949           1950          1951         1952         prior to 1948

New work:
   Appropriated----------------.........----...........-----------------------------------------...........      $2, 771, 630. 00
   Cost --------------....... $81, 391.73 $192, 971. 71                $11, 000 -----------------                 2, 527, 613. 69
   Expenditures--------.........   81, 391. 73       192, 971. 71       11, 000 -----------------------           2, 527, 613. 69


Other new work data:
    Unobligated balance, June 30, 1952------------------------$244, 016.31
    Unobligated balance available for fiscal year 1953-------   244, 016. 31

                 68. WINSTED, CONNECTICUT RIVER BASIN, CONN.

   Location.-Winsted is located in Litchfield County, on the Mad
River, a tributary of the Farmington River, which in turn is a tribu-
tary of the Connecticut River, 115 miles from the mouth.
   Existing project.-The plan of improvement involves improvement
of the channel of Mad River to reduce flood heights. The work con-
sists of the removal of one dam and the excavation of a trapezoidal
channel from Lake Street, to a point approximately 1,600 feet below
the Case Avenue Bridge with an average bottom width of 7 feet and
1-on-21/2 side slopes. The existing project was authorized by the
Flood Control Act approved August 18, 1941 (H. Doc. 724, 76th
Cong., 3d sess.). The estimated cost of the work, revised in 1950, is
$171,500 for construction. The sum of $30,000 for land and damages
is to be paid by local interests.
   Local cooperation.-See pages 4-5 for requirements. Assurances of
cooperation were accepted by the Chief of Engineers on March 16,
1949.
   Operations and results during fiscal year.--Operations consisted of
construction and preparation of as-built drawings. Costs from regu-
lar funds were $152,019.14. Expenditures were $170,050.32.
   Condition at end of fiscal year.--Construction of the project initi-
ated in May 1950 was completed October 1951. Work remaining to
be done consists of preparation of operation and maintennace manual.
146         REPORT OF CHIEF OF ENGINEERS,                                 U. S. ARMY, 1952

Total costs from regular funds have been $246,301.46. Expenditures
have been $245,258.96. A portion of the expenditures indicated for
this project, which are in excess of the estimated cost, are reimbursible
from the bonding company due to default of contractor.
  Proposed operations.9-Fundsunexpended at the end of the fiscal
year, amounting to $39,741.04, will be applied as follows:
Accounts payable to June 30, 1952  -------------------------                                           $1, 042. 50
New work: Retained pending adjustment of costs in connection with
  defaulted contract-----------         ----------------------                                         38, 460. 48
Preparation operation and maintenance manual- ---------------                                              238. 06

       Total-------                  --------------------------------                                  39, 741. 04
   No work is scheduled for fiscal year 1954.
                                      Cost and flnancial summary

                                                 Fiscal year ending June 30                          Total to June
                                                                                                     30,1952, includ-
                                                                                                     ing fiscal years
                                1948            1949          1950          1951          1952        prior to 1948

New work:
   Appropriated----   -----------------------              $88, 500.00    $75,000.00 ------------        $285, 000. 00,
   Cost --------------------------               516. 61    20, 591. 03   64, 662. 52 $152,019. 14        246, 331. 46
   Expenditures-        --....                   514.99     19,087.07     47, 094.42 170, 050. 32         245, 258. 96


Other new work data:
    Unobligated balance, June 30, 1952--      -----------------                                       $38, 698.54
    Unobligated balance available for fiscal year 1953----------                                       38, 698.54

  69. THOMASTON RESERVOIR,                             HOUSATNIC RIVER BASIN, CONN.

   Location.-The site of the proposed Thomaston Reservoir is on the
Naugatuck River about 30 miles above its junction with the Housa-
tonic River and about 1 mile north of Thomaston, Conn. The reser-
voir will extend upstream approximately 6.4 miles.
   Existing project.-This project provides for the construction of a
rolled earthfill and rock dam 1,800 feet long at the crest line, ris-
ing 136 feet above the stream bed and providing a storage capacity
of 41,500 acre-feet. The spillway will consist of an open side chan-
nel constructed in rock on the right abutment and a low concrete
weir with discharge capacity of 63,800 cubic feet per second. The
outlet will consist of a 15-foot diameter tunnel 765 feet long. Con-
trol will be accomplished by gates mechanically operated through a
shaft from a house above. The drainage area controlled is 97 square
miles. The reservoir will be operated for the flood protection of
Waterbury and the other communities downstream on the Naugatuck
River.
   The estimated cost, revised in 1952 is $4,457,000 for construction
and $9,160,000 for lands and damages, including highway, railroad
and utility relocations; a total of $13,617,000 for new work.
   The existing project was authorized by the Flood Control Act ap-
proved December 22, 1944 (H. Doc. 338, 77th Cong., 1st sess.).
  Local cooperation.-Section3 of the Flood Control Act approved
December 22, 1944, applies.
   Operations and results during fiscal year.-Studies were made in
                           FLOOD CONTROL--NEW                                  ENGLAND               DIVISION                            147

connection with preparation of detailed plans. Costs and expendi-
tures from regular funds for new work were $119.
  Condition at the end of fiscal year.-Detailedplans were 5 percent
complete. No construction work has been done. Total costs and
expenditures from regular funds for new work have been $25,042.31.
  Proposed operations.-None. No funds are available.
  No work is scheduled for fiscal year 1954.
                                              Cost and financial summary

                                                              Fiscal year ending June 30                                      Total to June
                                                                                                                             30, 1952, includ-
                                                                                                                             ing fiscal years
                                          1948              1949             1950             1951              1952          priorto 1948


New work:
     Appropriated----.........                             ............
                                  ----.........--------..-----             ...---.....-----       -$25, 000 -$44,957.69            $25,042. 31
     Cost ..---------------...........       $2, 026. 98 $14, 794. 57             $286. 43------------
                                                                                              ............          119.00          25, 042. 31
     Expenditures------..             -..... 2,014. 88         14, 598. 60          494.   50 .......---------..... 119.00          25, 042. 31


Other new work data: Estimated additional amount needed to
be appropriated for completion of existing project-------- $13, 591,957. 69

   70. PRELIMINARY EXAMINATIONS, SURVEYS AND CONTINGENCIES
                      FOR FLOOD CONTROL

  The cost of work during the year amounted to $335,475.43 of which
$327,654.67 was for work in connection with the New England-New
York Inter-Agency Committee. Expenditures were $363,006.77 of
which $353,979.97 was for work in connection with the New England-
New York Inter-Agency Committee. Total costs have been $1,816,-
051.26. The balance unexpended at the end of the fiscal year amount-
ing to $113,668.20 plus an allotment of $105,000 for fiscal year 1953
and accounts receivable amounting to $449.98, a total of $219,118.18
will be applied during the fiscal year to payment of accounts payable
amounting to $29,479.89 and to expenses incurred under this heading.
  The sum of $642,100 for preliminary examinations and surveys can
be profitably expended during fiscal year 1954.
                                              Cost and financial summary

                                                             Fiscal year ending June 30                                      Total to June
                                                                                                                             30, 1952, includ-
                                                                                                                             ing fiscal years
                                          1948             1949             1950              1951             1952            priorto1948

Maintenance:
   Appropriated.........              $60, 000.00 $108, 900.00 $175, 000.00 $485, 500.00 $281, 700.00                         1 $1, 900, 689. 55
   Cost   ---------------.... 43, 534. 35          107, 342. 10 180, 247. 15 362, 681. 35 335, 475. 43                         2 1, 816, 051. 26
   Expenditures --------..             39, 815. 25 108, 618. 51 173, 327. 71 314, 770. 76 363,006. 77                         3  1, 786, 660. 92

1Includes  $739,500 for New England-New York Inter-Agency Committee Survey.

I
s Includes $657,126.95 for New England-New York Inter-Agency Committee Survey.
   Includes $627,895.23 for New England-New York Inter-Agency Committee Survey.
148             REPORT OF CHIEF OF ENGINEERS,                                          U.          S. ARMY,                  1952

                         71. INACTIVE FLOOD CONTROL PROJECTS

                                                                          For last   Cost and expenditures                            Estimated
                                                                         full report    to June 30, 1952                                amount
                        Name of project                                  see annual                                                   required to
                                                                           report                                                      complete
                                                                            for-     New work Marntenance

1. Hopkinton-Everett                   Reservoir,     Merrimack
      River Basin, N. H_...-.---.-......--.......                          1941      $67,131.49 ............                                 (1)
2. Mountain Brook Reservoir, Merrimack River
      Basin, N. H__               --         ---------------               1949        56, 890. 52 ----------............                    (2)
3. Bennington Reservoir, Merrimack River
      Basin, N. H--                            -----          ----         1949      204, 692. 27 ----------                     4 $11,101,307. 73
4. Beards Brook Reservoir, Merrimack River
     Basin, N. H...------                                        ....-     1949       77. 811. 55 ............                        4   6, 523, 188. 45
5. Nashua, Merrimack River Basin, N. H-.........                          1950      270, 000. 00 ..---------..........                      (5)
6. North Andover and Lawrence, Merrimack
      River Basin, Mass .__-                    -.     _-          _       1949       19, 488. 54 ............---------- 4 1, 504, 511. 46
7. Lowell, Merrimack River Basin, Mass ........                           1945      490,600.00 ...--------.........           (5)
8. Woonsocket, Blackstone River Basin, R. I-....                          1951     ........................                          41,715,000.00
9. Pawtucket, Blackstone River Basin, R. I-......                         1949                                             4 184,000.00
10. Clyde, Pawtuxet River Basin, R. I---...____........                    1948         8, 830. 09 ............---------- 3 6 601, 169. 91
11. Pontiac Diversion, Pawtuxet River Basin, R. I-                         1948        24, 216. 64 ............----------6 5, 245, 783. 36
                                                                                                                                  3


12. Westville Reservoir, Thames River Basin, Mass_                         1949        78, 567. 85 ............-- 44, 846, 432. 15
13. South Coventry Reservoir, Thames River
      Basin, Conn .............                                            1951        96, 000.00. ------------                       4   9, 396, 000. 00
14. North Springfield Reservoir, Connecticut
      River Basin, Vt-....---                 -------                      1949          9, 004. 96            ----------             4   8, 427, 995. 04
15. Brockway Reservoir, Connecticut River Basin,
     Vt................................                                    1946                                                       49, 601, 000.00
16. Williamsville Reservoir, Connecticut River
      Basin, Vt .. ---- --------                      ----                 1949      146, 501. 62 --..........                               (7)
17. West Canaan Reservoir, Connecticut River
      Basin, N. H ....................----                         -       1948        91,900.31 ----------                           4 8, 201, 099. 69
18. Claremont Reservoir, Connecticut River
      Basin, N. H                    --          ---------                 1949      206,794.68 ............----------4 11, 587, 205. 32
19. Honey Hill Reservoir, Connecticut River
      Basin, N. H ...                --           --      ---              1949        92, 215. 07- ............                      4   3, 655, 784. 93
20. West Brookfield Reservoir, Connecticut River
      Basin, Mass .................                         --             1948       67,154.11                ............---------- 4 8, 042, 845. 89
21. Northampton, Connecticut River Basin, Mass_                            1950      960, 000.000              ........----------....       (5)
22. Springfield, Connecticut River Basin, Mass .--                         1950      932, 000. 00              ...----------                (5)
23. East Hartford, Connecticut River Basin, Conn_                          1951     2,135,447.02               ............-                (5)
24. West Hill Reservoir, Blackstone River Basin,
      Mass .................................                                1951       82, 723. 728-             -73 ..--.                2, 333, 276. 28
25. Worcester Diversion, Blackstone River Basin,
     Mass .                                                                 1951       69, 736. 88----......-                             3, 744, 263.12
26. Buffumville Reservoir, Thames River Basin,
     Mass_--                                                         -      1951     114, 637. 68 --...------                             2, 281, 362. 32
27. East Brimfield Reservoir, Thames River
      Basin, Mass__                                                         1951       69, 942. 28 ......- ..----                         4, 579, 057. 72
28. North Hartland Reservoir, Connecticut River
      Basin, Vt..._----- - -                                                1951       28, 960. 87 ............                           8, 803, 039.13
29. Townshend Reservoir, Connecticut River
      Basin, Vt ...-------------------------                                1951       70, 505. 48 ............                           9, 210, 494. 52

  1 Bennington and Beards Brook Reservoirs have been substituted.
  2 A dam has been constructed by private interests at the site.
  3 Cost revised in 1949.
  4 Cost revised in 1952.
  ' Completed.
  6 Authorization expired due to failure of local interests to furnish assurances within the 5-year period
allowed by law.
  7 The Island, Townshend and Ball Mountain Reservoirs have been substituted.
                   FLOOD CONTROIr--NEW ENGLAND                     DIVISION                  149
                           72.   MISCELLANEOUS ACTIVITIES
Status of all investigations for flood control called for by flood-control               acts and
                                committee resolutions

                                                                   Date trans-   Docu-    Recom-
                Locality                    Authorization act       mitted to    ment     menda-
                                                                    Congress      No.      tion

Acushnet River and New Bedford and River and Harbor Act,
   Fairhaven Harbors, Mass., particularly      Mar. 2, 1945.
  to provide greater depth in the eastern
  portion of the anchorage basin and for
   the improvement of navigation, flood
   control and related purposes.
Ammonoosuc River, N. H., tributary of Flood control Committee
   the Connecticut River.                      resolution, May 28, 1941.
Aroostook River and tributaries,Maine..-- Flood Control Act, June
                                               30,1948.
Connecticut and Chicopee Rivers-......... Flood Control Act, Aug.
                                               28, 1937.
Connecticut and Merrimack Rivers and Flood Control Act, May
   their tributaries, and such other streams   17, 1950.
  in the States of Maine, New Hampshire,
   Vermont, Massachusetts, Connecticut,
  and Rhode Island, where power de-
   velopments appears feasible and prac-
  ticable, to determine the hydroelectric
  potentialities, in combination with other
  water and resource development.
Connecticut River and tributaries includ- Flood Control Committee
  ing Westfield River.                        resolution, June 16, 1938.
Connecticut River and tributaries for Senate Public Works Com-
  flood control on Passumpsic River and        mittee resolution, June
  tributaries, particularly in vicinity of     9, 1948.
   St. Johnsbury, Vt.
Connecticut River and tributaries, for Flood Control Committee
  substitute flood-control project in place   resolution, May 28,1941.
  of Sugar Hill Dam and Reservoir on
   Ammonoosuc River, N. H.
Connecticut River, Mass., between Hat- Flood Control Act, Aug.
  field and Mount Tom.                         11, 1939.
Fairhaven and New Bedford Harbors River and Harbor Act,
  and the Acushnet River, Mass., greater      Mar. 2, 1945.
  depth in the eastern portion of anchorage
  basin and for navigation, flood control
  and related purposes.
Green River, Mass..--------------------      Flood Control Act, Aug.
                                               11, 1939.
Housatonic River, Conn., Mass., and N. Y. Senate Public Works Com-
                                               mittee resolution, Feb.
                                               4, 1949.
Israel River, at and in the vicinity of Flood Control Act, May
   Lancaster, New Hampshire, in the in-        17, 1950.
  terest of flood control and related pur-
  poses.
Kennebec River, Maine------------------      Commerce Committee res-
                                              olution, March 28, 1936.
Kennebec River and tributaries, Maine.... Flood Control Act, June
                                               22, 1936.
Kennebec River, Maine................... Flood Control Act, June
                                               22,1936.
Merrimack and Connecticut Rivers and Flood Control Act, May
  their tributariesand such other streams      17, 1950.
  in the States of Maine, New Hampshire,
   Vermont, Massachusetts, Connecticut,
  and Rhode Island, where power develop-
  ments appears feasible and practicable.
Merrimack River, Mass., and N. H. with River and Harbor Act,
  a view to improvement for navigation,       June 20, 1938.
  flood control and water power.
Mystic River and its tributaries, Massa- Flood Control Act, May
  chusetts (between the Wellington Bridge      17, 1950.
  and the Craddock Bridge).
Narragaugus River and tributaries, Maine_ Flood Control Act, July July 27,1951            Unfavor-
                                               24, 1946.                                   able.
New Bedford and Fairhaven Harbors River and Harbor Act,
  and the Acushnet River, Mass., to           Mar. 2, 1945.
  provide greater depth in the eastern
  portion of the anchorage basin and for
  the improvement of navigation, flood
  control, and related purposes.
150          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

Status of all investigations for flood control called for by flood-control acts and
                         committee resolutions-Continued

                                                                          Date trans-           Docu-     Recom-
                 Locality                       Authorization act         mitted to             ment      menda-
                                                                           Congress              No.       tion

Passumpsic River and tributaries, par-      Senate Public Works Com- ...-------------------
  ticularly in the vicinity of St. Johns-     mittee resolution, June
bury, Vt.                                    9, 1948.
St. Johnsbury, Vt., Passumpsic River .....----
                                            do--.............----------------- ...............---------------.....
  and tributaries in vicinity of.
Sugar Hill Dam and Reservoir, substi- Flood Control Committee ---------------------
tute flood control project on Ammo-          resolution, May 28, 1941.
noosuc River, Connecticut River Basin.
Thames River and its tributaries, Con-      House Public Works Com-       -........---------   --------
necticut.                                   mittee resolution June
                                              17, 1948.
Westfield River, tributary of the Con-      Flood Control Committee-------------------........
necticut River.                              resolution, June 16,1938.



73. FLOOD-CONTROL WORK UNDER AUTHORITY OF SECTION 205,
   PUBLIC LAW 858, EIGHTIETH CONGRESS, SECOND SESSION,
  NORWALK, NORWALK RIVER BASIN, CONN.

   Section 205 of Public Law 858, Eightieth Congress, second session,
approved June 30, 1948, authorized the Secretary of the Army "to
allot from any appropriations heretofore or hereafter made for flood
control, not to exceed $2,000,000 for any one fiscal year, for the con-
struction of small flood control projects not specifically authorized
by Congress, * * * Provided, That not more than $100,000 shall be
allotted for this purpose at any single locality from the appropria-
tions for any one fiscal year: * * *" Under authority of this act,
the sum of $48,000 was allotted for construction of the Norwalk River
Channel Improvement.
   Location.-The project is located on the Norwalk River in the Perry
Avenue section of the city of Norwalk, Fairfield County, Conn.
   Existing project.-The plan of improvement involves enlargement
and limited realinement of the channel of the Norwalk River to reduce
flood heights. The work consists of the removal of 1 dam, excavation
of a trapezoidal channel approximately 1,700 feet long with an average
bottom width of 75 feet and 1- on 2-side slopes, and construction of
a dike approximately 1,100 feet long with a top width of 12 feet
and 1- on 2-side slopes. The estimated cost of the work is $52,200
for construction and $2,800 for lands and damages.
   Local cooperation.-See pages 4-5 for requirements.       Fully com-
plied with.
    Operationsand results during fiscal year.---Work on the project was
completed. Costs were $48,085.94. Expenditures were $48,086.36.
   Condition at end of fiscal year.--Construction of the project was
initiated in October 1951 and completed in December 1951. No work
remains to be done. Total costs from regular funds for new work
have been $52,150.50. Expenditures have been $52,145.64.
                           FLOOD CONTROI---NEW                   ENGLAND          DIVISION                   151


   Proposed operations.-None. Funds unexpended at the end of the
fiscal year, amounting to $26.24 will be applied as follows:
Accounts payable to June 30, 1952 .__-----------      ------ ___                                           $4. 86
                                         ___21.------------
Payment of unaudited obligations------------                                                                   38
       I'1otaI---------------------------
        m.,-n-l

                                                                                                          $26. 24
  No additional funds are required.

                                              Cost and financial summary

                                                     Fiscal year ending June 30                     Total to June
                                                                                                   30. 1952, includ-
                                                                                                   ing fiscal years
                                            1948    1949       1950         1951       1952          prior  to1948

New work:
   Appropriated---------            ------ ------------ $48,000.00. ------------     $9, 000.00         $57,000.00
   Cost---------------         ---------------------      3, 514. 62     $549.96     48, 085.94          52, 150. 50
   Expenditures ...-------.....---------------------      3, 421.82       637. 46    48, 086. 36         52, 145. 64


Other new work data:
    Unobligated balance, June 30, 1952   -----------------------                                     $4, 828.12
    Revocation for fiscal year ending June 30, 1953---------------                                  -4, 828.12
IMPROVEMENT OF RIVERS AND HARBORS IN THE NEW
            YORK, N. Y., DISTRICT
   This district comprises western Vermont, small portions of western
Massachusetts and Connecticut, eastern New York, including Long
Island, and northeastern New Jersey, embraced in the drainage basins
tributary to Lake Champlain and the St. Lawrence River system east
thereof and to the Atlantic Ocean from New York-Connecticut State
line to, but not including, Manasquan Inlet, N. J.
   It exercises jurisdiction, however, over all matters pertaining to
the improvement of the Great Lakes to Hudson River waterway; and,
for the purposes of study, investigation, and survey for the St. Law-
rence River seaway and power project, over the International Rapids
section of the St. Lawrence River, extending from Chimney Point to
the foot of Cornwall Island.
   District engineer: Col. E. P. Ketchum, Corps of Engineers, to July
31, 1951; and Col. A. H. Davidson, Jr., Corps of Engineers, district
engineer since that date.
   Division engineer of the North Atlantic Division, New York, N. Y.,
comprising the New York, N. Y., Philadelphia, Pa., Baltimore, Md.,
Washington, D. C., and Norfolk, Va., districts: Col. F. F. Frech, Corps
of Engineers to March 14, 1952; and Col. B. B. Talley, Corps of Engi-
neers, division engineer since that date.
                                    IMPROVEMENTS

                 Navigation                              Navigation-Continued
                                          Page                                         Page
1.   Port Chester Harbor, N. Y.... 154          27. Hudson River Channel, New
2.
3.
4.
      Mamaroneck Harbor, N. Y.... 156
      East Chester Creek, N. Y-
      Westchester Creek, N. Y-....
                                     -.   157
                                          159
                                                       York Harbor_ -----
                                                 28. New York Harbor-Collection
                                                                                __.
                                                                                 -
                                                       of drift----------- ------ 205
                                                                                        201

5.   Bronx River, N. Y----------- 160           29. Rondout Harbor, N. Y___ _-206
6.   Harbor at Flushing Bay, N. Y. 162          30. Hudson River, N. Y ___ --          208
7.   Hempstead Harbor, N. Y _ _ _        164    31. Great Lakes to Hudson River
8.   Huntington Harbor, N. Y--- 165                   waterway, enlargement of
9.   Port Jefferson Harbor, N. Y.        168          New York State Barge Canal_ 213
10.   Mattituck Harbor, N. Y _.. -        169    32. Narrows of Lake Champlain,
11.   Peconic River, N. Y _------         171          N. Y. and Vermont   --------     216
12.   Lake Montauk Harbor, N. Y_ 172             33. Newark Bay, Hackensack and
13.   Long Island Intracoastal                         Passaic Rivers, N. J --------    218
        Waterway, N. Y_-------            174    34. New York and New Jersey
14.   Great South Bay, N. Y -          -  175          Channels _                       222
15.   Fire Island Inlet, N. Y --------    176    35. Raritan River to Arthur Kill
16.   Jones Inlet, N. Y_- ---        ___  178          cut-off channel, N. J..-------.. 227
17.   East Rockaway (Debs) Inlet,                36. Woodbridge Creek, N. J.......      228
        N. Y-------------------           179    37. Raritan River, N. J ------         229
18.   Jamaica Bay, N. Y---------- 181            38. Washington Canal and South
19.   New York Harbor: Entrance                        River, N. J_--_----              233
        channels       and      anchorage        39. Shoal Harbor and Compton
        areas-_ -       -__---___-.--184               Creek, N. J----------            234
20.   Coney Island Creek, N. Y _ -_ 188          40. Sandy Hook Bay, N. J_-----         236
21.   Bay Ridge and Red Hook                     41. Shrewsbury River, N. J_ ....       237
        Channels, N. Y-----------189             42. Shark River, N. J _ --             240
22.   Gowanus Creek Channel, N. Y. 191           43. Examinations, surveys and
23.   Buttermilk Channel, N. Y-....       192          contingencies (General) -        241
24.   East River, N. Y------------194            44. Plant allotment------------- 242
25.   Newtown Creek, N. Y--------....... 197     45. Inactive navigation projects -     242
26.   Harlem River, N. Y--------- 200            46. Miscellaneous activities...------- 243
                                                                                  153
154        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                     1952

               Flood Control                         Flood Control-Continued
                                         Page                                       Page
47.   Rutland, Otter Creek, Vt_           246 55. Miscellaneous activities------- 257
48.   Hoosick Falls, Hoosic River             56. Emergen cy bank protection
        Basin, Vt---------------- 247               work under authority of the
49.   North Adams, Hoosic River                     Flood Control Act approved
        Basin, Mass__ __248                         December 22, 1944, as
50.   Adams, Hoosic River Basin,                    amended___-____--         ___ 257
        Mass_---
               _       -------    __-     251 57. Emergency flood control work
51.   Preliminary examinations, sur-                under authority of the Flood
        veys and contingencies for                  Control Act approved August
        flood control_-------------254              18, 1941, as amended, and
52.   Inspection of completed works_ 255            the Flood Control Act, ap-
53.   Inactive flood control projects _ 255         proved June 30, 1948      --_   258
54.   Snagging and clearing under             58. Flood protection work under
        authority of Section 2 of the               authority of Section 205 of the
        Flood Control Act approved                  Flood Control Act approved
        August      28,     1937,     as            June 30, 1948, as amended _ 260
        amended---------------- 255

                       1. PORT CHESTER HARBOR, N. Y.

   Location.-This harbor, located at the boundary between the States
of New York and Connecticut, comprises the tidal mouth, about 1.7
miles in length, of the Byram River whose source is in Byram Lake
about 12 miles north of Port Chester. The river empties into Long
Island Sound about 32 miles by water east of the Battery, New York
City. (See U. S. Coast and Geodetic Survey Chart No. 222.)
   Prevous projects.-Adopted by River and Harbor Act of June
10, 1872, modified in 1884 and 1888, and by the River and Harbor
Acts of March 3, 1899, and March 2, 1907. For further details see
annual report for 1915, page 1758, and annual report for 1938,
page 157.
   Existing project.-This provides for an anchorage basin near the
breakwater constructed at Byram Point under a previous project,
12 feet deep, for fenders on the east bank opposite the southern end
of Fox Island, and for a channel 12 feet deep at mean low water and
150 feet wide from Long Island Sound to the mouth of the river at
the southerly point of Fox Island; thence 10 feet deep and 100 feet
wide to 900 feet below the fixed bridge at Mill Street in Port Chester,
including a turning basin opposite the steamboat landing; and thence
3 feet deep and 175 to 100 feet wide to 100 feet below the fixed bridge.
The length of the section included in the project is about 1.7 miles.
Mean tidal range, 7.1 feet; mean range of spring tides, 8.5 feet; irregu-
lar fluctuations due to wind and barometric pressure vary from 4 feet
below mean low water up to 4.5 feet above mean high water.
   The estimate of cost for new work, revised in 1952, is $439,500,
exclusive of amounts expended on previous projects, and $5,500 to
be contributed by local interests. The latest (1927) approved esti-
mate for annual cost of maintenance after completion is $3,000.
              RIVERS AND           HARBORS---NEW               YORK,       N.   Y.,   DISTRICT           155

  The existing project was authorized by the following river and
harbor acts:

       Acts                       Work authorized                                     Documents

June 25, 1910     Entrance channel 12 feet deep, thence 10 feet deep    H. Doc. 1165, 60th Cong., 2d sess.
                   to and including turning basin, thence 3 feet deep
                   to head of improvement.
July     3,1930   Widening turning basin, dredging anchorage basin,     Rivers and Harbors Committee Doc.
                    and constructing fenders on east bank.                23, 70th Cong., 2d sess.

  1 Contains latest published map.

   Local cooperation.-The River and Harbor Act of July 3, 1930,
provides that local interests shall contribute $5,500 in cash toward
widening the channel at the turning basin. This condition has not
been fulfilled and there is no indication as to when compliance may
be expected.
   Terminalfacilities.-There are 34 terminals in Port Chester Harbor
between Fox Island and the Mill Street Bridge, with a total berthage
of about 5,300 feet, of which 3,210 feet are available for dockage. The
village of Port Chester owns several bulkheads which are used as pub-
lic landings for small pleasure craft. Several boatyards with storage
space for 75 boats and equipped with a total of 3 marine railways are
available for pleasure craft. The facilities appear to be adequate for
existing commerce. (For latest full description of terminal facilities,
see Port and Terminal Facilities of the Port of New York, 1942, Corps
of Engineers.)
   Operations and results during fiscal year.-The cost and expendi-
tures of a survey to determine the condition of the channel were
$582.30 for maintenance.
   Condition at end of fiscal year.-The existing project was about 94
percent completed. When examined in June 1952 the controlling
mean low water depth was 11 feet for a width varying from 130 to 50
feet from Long Island Sound to Fox Island, 8 feet in the anchorage,
thence 10 feet for a width varying from 50 to 100 feet to the turning
basin, 10 feet in turning basin, thence depths vary from 4 feet to 1
foot for full width to upper limit of 3-foot project. The work re-
maining to be done under the existing project consists of widening
the turning basin and constructing fenders on the bank opposite the
southern end of Fox Island.
   The total cost and expenditures of the existing project to June 30,
1952, were $482,835.55 of which $358,475.33 was for new work and
$124,360.22 for maintenance.
   Proposed operations.-No work is scheduled for fiscal years 1953
and 1954.
156            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                             1952

                                                     Cost and financial summary

                                                                         Fiscal year ending June 30                                       Total to June
                                                                                                                                        30, 1952, includ-
                                                                                                                                        ing fiscal years
                                               1948                   1949                   1950                 1951        1952        prior to 1948

New work:
    Appropriated--......... ............-- -----............---           ........................---.......--                               $433, 470. 43
    Cost......---------------------------------------............                   ...-------............    --------     ------------       433, 470. 43
    Expenditures------.........------------------..........--............   .......................                                           433, 470. 43
Maintenance:
                                                              ............
   Appropriated......... -$9, 538. 31 --------------------------------                                                       $582.30          140, 729. 34
    Cost......---------------               28, 503. 25--------.........-------------------------............                 582. 30         140, 729. 34
               -------
    Expenditures.........                   33, 283. 96 ............------.......----....---..........-----------..           582. 30         140, 729. 34


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project_---------------$81,000.                                                                             00

                                          2. MAMARONECK HARBOR, N. Y.

   Location.--This harbor is situated on the north shore of Long
Island Sound, 5 miles west of the Connecticut State line, and 27 miles
by water east of the Battery, New York City. (See U. S. Coast
and Geodetic Survey Chart No. 222.)
  Previous projects.-Adopted by River and Harbor Act of Au-
gust 2, 1882, modified in 1899, and by River and Harbor Act of
July 25, 1912. For further details see Annual Reports for 1915,
1924, and 1938, pages 1759, 141, and 160, respectively.
   Existing project.--This provides for a channel 10 feet deep at
mean low water and 100 feet wide from deep water in Long Island
Sound to Orienta Point, and thence 80 feet wide to a point about
150 feet below the Boston Post Road, including an extension to the
northeast 300 feet long and 80 feet wide, all with widening at bends;
for an anchorage in the East Basin of same depth; and for an
anchorage in the West Basin 6 feet deep at mean low water with a
channel of like depth and 80 feet wide connecting this anchorage
with the main channel. Length of section included in project, 13/4
miles. Mean tidal range, 6.9 feet; mean range of spring tides, 8.3
feet; irregular fluctuations due to wind and barometric pressure vary
from 3.9 feet below mean low water up to 8.5 feet above mean high
water.
  The cost for new work, for the completed project, was $126,679,
exclusive of $18,728 contributed funds and amounts expended on
previous projects. The latest (1950) approved estimate for annual
cost of maintenance is $5,000.
  The existing project was authorized by the following river and
harbor acts:

    Acts                                       Work authorized                                                              Documents

Sept. 22,1922         Dredging 10-foot channel and anchorage--..-------                                           . Doc. 651, 66th Cong., 2d sess.
Aug. 20, 1935         Dredging 6-foot anchorage in West Basin and its                                           Rivers and Harbors Committee Doe. 4,
                       approach channel.                                                                          74th Cong., 1st sess.'

  1 Contains latest published maps.
             RIVERS AND HARBORS-NEW                             YORK, N. Y.,                  DISTRICT              157
  Local cooperation.-Fully complied with except that local interests
are required to provide adequate and suitable spoil-disposal areas
suitably diked or bulkheaded as needed.
   Terminal facilities.-There are 11 wharves with a total available
berthage of 2,865 feet along the shores of the harbor; 7 are located
in East Basin and 4 are located in West Basin. Ten of the wharves
are equipped with freight- and boat-handling facilities; none has
railroad connections. One wharf with a berthage of 235 feet is
publicly owned. Seven boatyards with storage space for 1,050 boats
and equipped with marine railways are available for pleasure craft.
Smallboat landings, consisting of floats, having a total berthage of
400 feet, are available to the public. The facilities are adequate for
existing commerce. (For latest full description of terminal facilities,
see Port and Terminal Facilities at the Port of New York, 1942,
Corps of Engineers.)
   Operations and results during fiscal year.-The cost and expendi-
tures of a survey to determine the condition of the channel were
$400.00 for maintenance.
   Condition at end of fiscal year.-Work under the existing project
was commenced October 1924 and completed July 1939. When ex-
amined in March 1952, the controlling mean low water depth in
the main channel was 9 feet for a width varying from 100 to 65 feet
from Long Island Sound to the East Basin anchorage area, where
the depth was 7 feet. The controlling depth in the West Basin and
connecting channel was 6 feet below mean low water when examined
in April 1949.
   The total cost and expenditures of the existing project to June 30,
1952, were $187,468.19, of which $145,407.89 was for new work, $126,-
679.83 of which was United States funds, and $18,728.06 contributed
funds, and $42,060.30 for maintenance.
   Proposed operations.-No work is scheduled for fiscal years 1953
and 1954.
                                     Cost and financial summary

                                                 Fiscal year ending June 30                              Total to June
                                                                                                        30, 1952, includ-
                                                                                                        ing fiscal years
                                  1948         1949          1950            1951             1952       priorto 1948

New work:
   Appropriated---------                     -----------------------------------------------               1$207,404.26
   Cost------------------------------------                          ----- ------------ -----------          1207, 404. 26
   Expenditures.--                  ------------------------------------------........----------              207, 404. 26
Maintenance:
    Appropriated-----                     $1, 600
                   ....--..------------............             $250 ............               $------------400 55, 475. 16
    Cost ...---------------- ------------  1, 600                250 ------------..........      400             55,475.16
    Expenditures ...................       1, 600                250 ............                400             55, 475. 16

   SExclusive of      $18,728.06 contributed funds expended for new work.

                               3. EAST CHESTER CREEK, N. Y.

   Location.-This creek, also known as Hutchinson River, is a small
tidal stream emptying into East Chester Bay, an indentation in the
north shore of Long Island Sound immediately north of Throgs Neck,
12 miles southwest of the Connecticut State line and 21 miles by water
         245554---53---vol. 1--11
158     REPORT OF CHIEF OF ENGINEERS,         U. S. ARMY,   1952

northeast of the Battery, New York City. (See U. S. Coast and
Geodetic Survey Chart No. 223.)
    Previousprojects.-Adopted by the River and Harbor Acts of March
3, 1873, June 25, 1910, and July 3, 1930. For further details see annual
report for 1915, page 1761, annual report for 1929, page 167, annual
report for 1938, page 163, and annual report for 1949, page 208.
    Existing project.-This provides for a channel 10 feet deep at mean
low water and generally 150 feet wide from Long Island Sound
through East Chester Bay to a point 700 feet below the Boston Post
Road Bridge, and thence 70 feet wide extending to a point where the
creek divides into a Y, thence approximately 1,000 feet into the east
branch of the Y and approximately 500 feet into the west branch of
the Y; a passing basin south of the Boston Post Road Bridge; widening
of the channel at the Boston Post Road Bridge; and for construction
of a check dam at the head of navigation. Length of section included
in project, 5 miles. Mean tidal range, 7.3 feet in the estuary; mean
range of spring tides, 8.6 feet; irregular fluctuations due to wind and
barometric pressure vary from 3.9 feet below mean low water up to
8.1 feet above mean high water.
    The estimate of cost for new work, made in 1952, is $664,000, exclu-
sive of amounts expended on previous projects. The estimate of
annual cost of maintenance, revised in 1950, is $29,800.
    The existing project was adopted by the River and Harbor Act of
May 17, 1950 (H. Doc. 749, 80th Cong., 2d sess.). The latest published
map is in the project document.
    Local cooperation.-The River and Harbor Act of May 17, 1950,
provides that local interests shall:
    (a) Furnish free of cost to the United States all lands, easements,
rights-of-way, and suitable areas for disposal of dredged material
during construction of the project and for subsequent maintenance,
as and when required.
    (b) Hold and save the United States free from damages due to the
construction works and subsequent maintenance.
    These conditions have not been fulfilled.
    Terminal facilities.-There are 30 wharves with a total berthage
space of 9,528 feet available for use along the upper end of the water-
way. Eight of the wharves are equipped with mechanical handling
devices. The existing terminal facilities are adequate to meet the
present requirements of commerce. (For latest full description of
terminal facilities, see Port and Terminal Facilities at the Port of New
York, 1942, Corps of Engineers.)
   Operations and results during fiscal year.-Under contract for
maintenance dredging to restore previous project depth of 8 feet,
work was commenced April 15, 1952 and was in progress at the end
of the fiscal year. During the fiscal year 110,828 cubic yards, place
measurement of material were removed at a cost of $121,891.50 for
maintenance under the previous project.
   The cost of surveys and engineering preliminary to dredging was
$3,389.75 for maintenance under the previous project.
   The total cost of work was $125,281.25 for maintenance under the
previous project. The total expenditure was $66,765.90.
   Condition at end of fiscal year.-No work has been done under the
            RIVERS         AND     HARBORS-NEW                    YORK,       N.    Y.,    DISTRICT             159
existing project and there have been no costs or expenditures. When
examined between April 1949 and June 1952 the controlling depth at
mean low water was 8 feet for a width of 150 feet from Long Island
Sound to 300 feet below Fulton Avenue Bridge, thence the depths
decrease from 8 feet to 1 foot in the Y-shaped portion of the waterway.
The minimum width through bridge draws is 59.6 feet. The head of
navigation is about 1,550 feet above the Fulton Avenue Bridge.
   Proposed operations.-The balance unexpended at the end of the
fiscal year amounting to $139,116.75 will be applied as follows:
     Accounts payable June 30, 1952 _____  -      ______ _____--- $60, 177. 08
     Maintenance: Completed by July 17, 1952, under contract in
      force, dredging to restore the channel to previous project
       dept of 8 feet---------------------------    ------------    8, 939. 67
            Total --------------------                   ----          ----------------                139, 116. 75
   No work is scheduled for fiscal year 1954.
                                     Cost and financial summary

                                               Fiscal year ending June 30                              Total to June
                                                                                                      30,1952, includ-
                                                                                                      ing fiscal years
                                 1948         1949              1950        1951           1952         priorto 1948

New work:
   Appropriated------------------------------ ----------------------...........--..................--
                                                                       .......                     1 $592, 056. 65
   Cost------------- ---------------------------------------------------- 1 592, 056. 65
   Expenditures ... _ _-----------.----------------------------------------------- 1 592, 056. 65
Maintenance:
   Appropriated- _--.....      $1, 908. 50     $2, 400            $150    $2, 591. 00 $203, 291. 65        390, 318. 97
   Cost ..---------------      11, 725. 88      2, 400             150      1, 661. 73 125, 281. 25        311, 379. 30
   Expenditures....--------_   11, 835. 47      2,400              150 .....---.......  66, 765. 90        251, 202. 22


1 Exclusive of $14,402.80 contributed funds expended for new work.
Other new work dataa: Estimated additional amount needed to be
appropriated for completion of existing project ___-----      $664, 000. 00

                               4. WESTCHESTER CREEK, N. Y.

   Location.-This creek is a tidal stream flowing into the East River
from the north at a point 14 iniles by water northeast of the Battery,
New York City. (See U. S. Coast and Geodetic Survey Chart
No. 226.)
   Previous projects.-Adopted by the River and Harbor Act of June
25, 1910. For further details see page 238 of annual report for 1921,
and page 164 of annual report for 1938.
   Existing project.-This provides for a channel 12 feet deep at mean
low water, 100 feet wide for a length of 2,000 feet through the estuary;
thence 80 feet wide for 3,000 feet; and thence 60 feet wide to the head
of navigation at East Tremont Avenue (Fort Schuyler Road), a
distance of 8,800 feet, with widening at bends, and with two turning
basins, one near the upper end of the channel and another near the
Eastern Boulevard (Unionport) Bridge, a total length of about 2.6
miles. Mean tidal range, 7 feet; mean range of spring tides, 8.4
feet; irregular fluctuations due to wind and barometric pressure vary
from 3.9 feet below mean low water up to 8.4 feet above mean high
water.
160        REPORT         OF CHIEF OF ENGINEERS,                             U. S. ARMY,               1952


  The cost for new work, for the completed project, was $98,667,
exclusive of amounts expended on previous projects.
  The existing project was adopted by the River and Harbor Act
approved September 22, 1922 (Rivers and Harbors Committee Doc. 8,
67th Cong., 2d sess.). The latest published map is printed in House
Document 370, Sixty-fourth Congress, first session.
  Local cooperation.-Fullycomplied with.
  Terminal facilities.-There are 13 wharves with a total usable berth-
age of 2,660 feet located along the waterway. Eight of the terminals
are equipped with mechanical handling devices. One wharf with a
berthage of 50 feet is open to the public. Two boatyards with storage
space for 70 boats and equipped with marine railways are available
for pleasure craft. The facilities are considered adequate for existing
commerce. (For latest full description of terminal facilities, see Port
tnd Terminal Facilities at the Port of New York, 1942, Corps of
Engineers.)
  Operations and results during fiscal year.--The cost and expendi-
tures of a survey to determine the condition of the channel were
$713.18 for maintenance.
  Condition at end of fiscal year.-Work under the existing project
was commenced March 1932 and completed May 1933. The upper 0.5
mile of the channel was relocated by the city of New York in 1941.
When examined in June 1952 the controlling mean low-water depth
was 12 feet for a width varying from 100 to 20 feet from the East River
to 1,500 feet south of Unionport Bridge, thence 10 feet for a width
varying from 60 to 30 feet to 1,100 feet north of Unionport Bridge,
thence 8 feet for a width of 60 feet to the head of project. The head
of navigation is at East Tremont Avenue, Bronx, about 2.6 miles
above the mouth.
  The total cost and expenditures of the existing project to June 30,
1952, were $290,149.88, of which $98,666.88 was for new work and
$191,483 for maintenance.
  Proposed operations.-No work is scheduled for fiscal years 1953
and 1954.
                                      Cost and financial summary

                                                    Fiscal year ending June 30                             Total to June
                                                                                                           30, 1952, includ-
                                                                                                           ing fiscal years
                                   1948           1949           1950           1951            1952         priorto 1948


New work:
   Appropriated ........-------------------------------------------------------------...                        $175, 848. 52
    Cost---------------------------------------------------------------------------                              175, 848. 52
    Expenditures----................-- ---------------------------------------------- ------------               175, 848. 52
Maintenance:
    Appropriated-------..   ..   $2,235. 54 $129, 000. 00 -$1, 042. 68 ...------------.         $713. 18         258, 083. 14
    Cost ..---------------.       6, 596. 38 122, 743. 02      853. 46 ------------..........    713. 18         258, 083. 14
    Expenditures-..- ----.        1, 607. 88 127, 681. 62      903. 36    . ......               713. 18         258, 083. 14



                                        5. BRONX RIVER, N. Y.

  Location.-This stream empties into a shallow bay in the north
shore of East River, 11 miles by water northeast of the Battery, New
York City. (See U. S. Coast and Geodetic Survey Chart No. 226.)
  Previous project.-Adopted by the River and Harbor Act of June
         RIVERS AND    HARBORS--NEW      YORK,   N.   Y.,   DISTRICT   161
3, 1896. For further details see annual report for 1915, page 1762,
and annual report for 1938, page 166.
    Emisting project.-This provides for a channel 10 feet deep at mean
low water and 100 feet wide, to extend from deep water in East River
to the head of navigation at the dam at East 177th Street, involving
the first dredging from East River at Randall Avenue to a width
of 200 feet; thence to Spofford Avenue, 150 feet; thence to Watson
Avenue, 125 feet; thence to the railroad bridge near Westchester
Avenue, 100 feet, except in the southern approach to the bridge, where
it is to be 140 feet; and above the bridge 100 feet, with increase at
bends where permissible, including a turning basin at the head of
the improvement. The length of the section included in the project
is about 3.3 miles. Mean tidal range, 6.9 feet in the estuary; mean
range of spring tides, 8.2 feet; irregdlar fluctuations due to wind
and barometric pressure vary from 4 feet below mean low water up
to 3.5 feet above mean high water.
    The estimate of cost for new work, revised in 1952, is $1,333,000,
exclusive of amounts expended under previous projects and exclusive
of $10,000 contributed by local interests. The latest (1950) approved
estimate for annual cost of maintenance is $16,500.
    The existing project was adopted by the River and Harbor Act
of March 4, 1913 (H. Doc. No. 897, 62d Cong., 2d sess.). For latest
published map see annual report for 1912, page 1470.
    Local cooperation.-The River and Harbor Act of March 4, 1913,
provides that any right-of-way that may be necessary for the execu-
tion of the project shall be furnished free of cost to the United States.
Right-of-way within the bulkhead lines below the Westchester Ave-
nue Bridge was accepted by the Chief of Engineers under date of
June 9, 1920, and above the Westchester Avenue Bridge under date
of October 4, 1928. Under date of September 10, 1940, the Chief
of Engineers approved releases from damages furnished by adjoin-
ing property owners in the reach of the river between Westchester
Avenue and East 174th Street. Under date of November 12, 1940,
the Chief of Engineers approved an agreement under which the city
of New York would reimburse the United States for the cost of a
retaining wall to protect adjoining property in the reach of the river
between Westchester Avenue and New York, New Haven & Hartford
Railroad bridge in lieu of furnishing additional right-of-way. On
October 28, 1940, the Secretary of War authorized the acceptance
of $10,000 from the city of New York to defray the cost of the re-
taining wall. The $10,000 was deposited to the credit of the United
States on December 7, 1940. Additional right-of-way required in
the section above East 174th Street has not been furnished. The
city of New York has indicated that it does not feel justified in ac-
quiring any additional land along the river.
    Terminal facilities.-There are 3,430 feet of bulkheads and wharves
available for dockage, located along the east and west banks from
Randall Avenue to East 173d Street. One of the terminals is pub-
licly owned. Eight of the terminals are equipped with mechanical
handling devices. Additional terminals with modern facilities will
be needed when the existing project is developed. (For latest full
162          REPORT OF CHIEF OF ENGINEERS,                                   U. S.      ARMY,        1952

description of terminal facilities, see Port and Terminal Facilities
at the Port of New York, 1942, Corps of Engineers.)
    Operations and results during fiscal year.-The cost and expendi-
tures of a survey to determine the condition of the channel were
$667.86 for maintenance.
   Condition at end of fiscal year.-The existing project was about
82 percent completed. A channel to project dimensions was com-
pleted from deep water in East River up to the Westchester Avenue
Bridge in 1926. A channel 10 feet deep and 65 to 123 feet wide from
Westchester Avenue Bridge to East 174th Street was completed in
1941. When examined in June 1952, the controlling mean low-water
depth was 10 feet for a width varying from 50 to 100 feet from East
River to 800 feet south of Bruckner Boulevard bridge, thence 8 feet
for a width varying from 50 to 60 feet to 800 feet south of Westchester
Avenue Bridge, thence 7 feet for a width varying from 40 to 80 feet
to the New York, New Haven & Hartford Railroad bridge. The
work remaining to be done under the existing project consists of
widening to project width the reach between Westchester Avenue
Bridge and East 172d Street. The channel between East 172d Street
and the upper limit of the authorized project is in process of being
filled in by the city of New York under a Department of the Army
permit, and is no longer a waterway.
   The total cost and expenditures of the existing project to June 30,
1952, exclusive of $10,000 contributed funds for new work were
$1,420,200.96 of which $1,080,910.37 was for new work and $339,290.59
for maintenance.
   Proposed operations.-No work is scheduled for fiscal years 1953
and 1954.
                                       Cost and financial summary

                                                    Fiscal year ending June 30                             Total to June
                                                                                                           30, 1952, includ-
                                                                                                           ing fiscal years
                                    1948          1949           1950          1951           1952           prior to 1948


New work:
   Appropriated---.............---------               .....------
                                                           ---------------------------------------------    1$1,149,946. 09
   Cost .--------------                      ------------ ----------------------------------                 11,149, 946. 09
   Expenditures.........--------...........----------.....---------- -----------------------------------      1, 149, 946. 09
Maintenance:
    Appropriated--.......----  ------..      ----------------- ------------------ -           $667. 86           366, 211. 92
    Cost          ------------------------------------------------                             667. 86           366, 211. 92
    Expenditures------------...........----- ----------------------------------                667. 86           366, 211.92


  1 Exclusive of $10,000 expended from contributed funds for new work.
Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project_____--__-------- $252, 000. 00

                            6. HARBOR AT FLUSHING BAY, N. Y.

  Location.-The harbor is located on the north shore of Long Island,
12 miles by water northeast of the Battery, New York City, and
consists of Flushing Bay, 2 miles long, and Flushing Creek, 1 mile
long. (See U. S. Coast and Geodetic Survey Chart No. 226.)
  Previous projects.-Adopted by River and Harbor Acts of March 3,
1879, and March 4, 1913. For further details see annual reports for
1915, 1932, and 1938, pages 1772, 169, and 168, respectively.
           RIVERS AND           HARBORS-NEW                YORK, N.        Y.,   DISTRICT           163

  Existing project.-This provides for a channel 12 feet deep at mean
low water from that depth in East River through Flushing Bay and
in Flushing Creek to the Main Street Bidge with widths of 200 feet
through the bay and in the creek to the Northern Boulevard Bridge,
thence decreasing uniformly to 160 feet at the Main Street Bridge;
a branch channel 12 feet deep and 200 feet wide from the main channel
to a maneuvering area of the same depth outside the municipal boat
basin at the south end of the bay, with an anchorage basin of 8-foot
depth and approximately 700-foot width west of the branch channel;
and for the repair and reconstruction of 3,739 linear feet of dike.
   The length of the section included in the project is about 3.7 miles.
Mean tidal range, 6.8 feet; mean range of spring tides, 8.1 feet; ir-
regular fluctuations due to wind and barometric pressure vary from
4 feet below mean low water up to 7.6 feet above mean high water.
  The estimate of cost for new work, revised in 1952, is $1,038,000,
exclusive of amounts expended on previous projects. The latest (1950)
approved estimate for annual cost of maintenance is $20,000.
  The existing project was authorized by the following river and
harbor acts:

    Acts                         Work authorized                                  Documents

Mar. 4, 1913   Construction of new dike: repair of old dike--------- H. Doc. 1333, 61st Cong., 3d seas.
Mar. 3,1925    Dredging 12-foot channel_                                H. Doc. 124, 68th Cong., 1st sess.
                                                      .-----------------------
Aug. 26,1937   Branch channel, maneuvering area, and anchorage          Rivers and Harbors Committee
                 basin. Modified conditions of local cooperation.         Doe. 35, 75th Cong., 1st sess.1
June 20,1938   Providing 6-foot channel along west  2    side of harbor Senate   committee print, 75th
                 during period of the world's fair.                       Cong., 3d sess.1

1 Contains latest published maps.
2 No work was done.


   Local cooperation.-TheRiver and Harbor Act of August 26, 1937,
provides that the branch channel and anchorage shall not be con-
structed until local interests give assurances satisfactory to the Secre-
tary of War that they will construct a suitable landing for excursion
boats and a boat basin of appropriate capacity; provide and main-
tain a public landing of permanent construction for small boats, with
necessary service and supply facilities; provide adequate parking
spaces for automobiles in the immediate vicinity suitably connected
to the public-highway system and open to the public on equal terms,
and that no dredging shall be done in the Flushing Creek Channel
closer than 100 feet to the established harbor line at any wharf struc-
ture without previous consent of the owner and release of the United
States from any resultant claims for damages. Assurances providing
compliance with the local cooperation required for all improvements
authorized under this act, except for dredging in the creek channel,
were accepted by the Secretary of War on October 18, 1937. There
is no indication as to when compliance with the remaining conditions
affecting the 12-foot channel may be expected.
   Terminal facilities.-Thereare 5,995 feet of bulkheads available for
dockage. Two of the terminals and an excursion-boat landing and
boat basin at the south end of the bay are owned by the city of New
York, the latter being open to the public. Twelve of the terminals
are equipped with mechanical handling devices. The facilities are
considered adequate for existing commerce. (For latest full descrip-
164         REPORT OF CHIEF OF                     ENGINEERS,           U.      S.      ARMY,         1952

tion of terminal facilities see Port and Terminal Facilities at the
Port of New York, 1942, Corps of Engineers.)
   Operations and results during fiscal year.-The cost and expendi-
tures of a survey to determine the condition of the channel were
$753.60 for maintenance.
   Condition at end of fiscal year.-Work under the existing project
was commenced March 1938 and is about 59 percent complete. The
12-foot channel in the bay, branch channel, a maneuvering area and
the 8-foot anchorage area were completed in November 1938. When
examined in May 1949 and June 1952 the controlling mean low-water
depth was 12 feet for a width varying from 70 to 200 feet in the main
channel through the bay to Willets Point Boulevard Bridge, thence
10 feet for a width varying from 70 to 200 feet to the Broadway
Bridge, thence 1 foot for a width varying from 30 to 90 feet to the
Main Street Bridge. The depth in the branch channel and maneu-
vering area was 7 feet and in the anchorage area the depth was 5 feet.
The head of navigation is about 500 feet above Main Street Bridge.
The work remaining to be done under the existing project consists
of the construction of the channel in the creek to a depth of 12 feet
and the repair and reconstruction of dike.
   The total cost and expenditures of the existing project to June
30, 1952, were $393,095.60, of which $389,629.46 was for new work and
$3,466.20 for maintenance.
  Proposed operations.-No work is scheduled for fiscal years 1953
and 1954.
                                       Cost and financial summary

                                                 Fiscal year ending June 30                                Total to June
                                                                                                          30,1952, includ-
                                                                                                          ing fiscal years
                                    1948        1949        1950            1951               1952        priorto 1948


New work:
   Appropriated- .....--.------.--------        -------------------- -----------------------                  $628, 502. 37
   Cost-----------------------             -----------------------------------      ------------               628, 502. 37
   Expenditures--              ..--------....---....-------------------------- ---------------                 628, 502.37
Maintenance:
    Appropriated___.............-----------      $2, 000       $150    ........------------    $753. 60         209, 877. 67
    Cost ----------------- ------------           2, 000        150   .753.60                                   209, 877. 67
    Expenditures............-----------......     2, 000        150    .........------------    753, 60         209, 877. 67


Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project---------$----- $48, 000. 00

                                   7. HEMPSTEAD HARBOR, N. Y.

  Location.-Thisis an indentation of the north shore of Long Island,
25 miles by water northeast of the Battery, New York City, and 13
miles southwest of Stamford Harbor, Conn. (See U. S. Coast and
Geodetic Survey Chart No. 223.)
  Existing project.-This provides for a channel 6 feet deep at mean
low water and 100 feet wide from the entrance to a point opposite
Ward's wharf, a distance of about 5,600 feet; thence 80 feet wide to
the Roslyn town wharf, a distance of about 3,200 feet; and thence 50
to 70 feet wide to the head of navigation, a distance of about 1,700 feet.
Total length of channel included in the project is 2 miles. Mean tidal
range, 7.1 feet; mean range of spring tides, 8.4 feet; irregular fluctua-
               RIVERS AND                     HARBORS--NEW                           YORK,            N.      Y.,       DISTRICT                    165
tions due to wind and barometric pressure vary from 3.6 feet below
mean low water up to 8.7 feet above mean high water.
   The cost for new work, for the completed project was $39,468. The
latest (1950) approved estimate for annual cost of maintenance is
$6,000.
   The existing project was adopted by the River and Harbor Act of
June 25, 1910 (Rivers and Harbors Committee Doc. No. 1, 61st Cong.,
2d sess.). There is no published map.
   Local cooperation.-Fullycomplied with.
   Terminal facilities.-Water terminals, nine in number with avail-
able dockage of 2,700 feet, are located-eight along the east shore of
the harbor from Glen Cove to Roslyn and one on the west shore; none
has a railroad connection. The facilities are considered adequate for
existing commerce, which is local, and there is ample water front,
both public and private, for additional terminals as needs arise.
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-Work under the existing project
was commenced March 1912 and completed October 1912. When
examined in May 1950, the controlling mean low water depth was 6
feet for a width varying from 75 to 100 feet from the entrance at
Bar Beach to opposite former site of Ward's wharf, thence 6 feet for
a width varying from 80 to 30 feet to Old Town wharf, thence the
depths vary from 1 to 6 feet to the head of the project. The head of
navigation is the dam at Roslyn, about 2 miles by channel from the
mouth.
   The total cost and expenditures of the existing project to June 30,
1952, were $107,567.04, of which $39,468.11 was for new work; and
$68,098.93 for maintenance.
   Proposed operations.-An allotment of $800 made for maintenance
during fiscal year 1953 will be applied to a condition survey of the
channel.
   No work is scheduled for fiscal year 1954.
                                                Cost and financial summary

                                                                Fiscal year ending June 30                                             Total to June
                                                                                                                                      30, 1952, includ-
                                                                                                                                      ing fiscal years
                                           1948               1949              1950                1951                1952               prior to 1948


New work:
   Appropriated ...-------------------------....--------- .......------------------------..........                                            $39, 468.11
   Cost-.........-------------------.....--------------------------------...................................--...-----------                    39, 468.11
   Expenditures--..................--------------------------.........-------------.....................------------------..... ---             39,468.11
Maintenance:
                    ........------------......
   Appropriated---------                                          $800               $900 ...........-----------------------..........          68, 098. 93
   Cost-----------------.......-----------....                     800                900 .........-----------.........-----------...           68, 098. 93
   Expenditures---------.................------------              800                900 .........------------...........-----------...        68, 098. 93



                                        8. HUNTINGTON HARBOR, N. Y.

  Location.-This is an indentation of the north shore of Long Island,
40 miles northeast of the Battery, New York City, and 8 miles south-
east of Stamford Harbor, Conn. (See U. S. Coast and Geodetic
Survey Chart No. 224.)
166        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

  Previous projects.-Adopted by the act of June 1872. For fur-
ther details see page 1772 of annual report for 1915, and page 174
of annual report for 1938.
  Existing project.-This provides for a channel 8 feet deep at mean
low water and 100 feet wide from the 8-foot contour in Huntington
Bay to a turning basin of same depth and 200 feet wide, located op-
posite the Old Town dock, thence 6 feet deep and 100 feet wide to a
point 450 feet north of the causeway, an anchorage of the same depth
and 14 acres in extent on the west side of the 6-foot channel and a
cross-channel, 8 feet deep and 100 feet wide from the main 8-foot
channel to and along the wharves on the west side of the harbor,
extending to within 150 feet of the causeway. The length of the
section included in the project is about 2.5 miles. Mean tidal range,
7.4 feet; mean range of spring tides, 8.7 feet; irregular fluctuations
due to wind and barometric pressure vary from 3.6 feet below mean
low water up to 6.4 feet above mean high water.
   The estimate of cost for new work, revised in 1952, is $96,000
exclusive of amounts expended on previous projects and an esti-
mated local contribution of $51,000. The latest (1950) approved
estimate for annual cost of maintenance is $8,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                          Work authorized                                    Documents

Sept. 19,1890   8-foot channel to and including turning basin at Old      H. Ex. Doc. 200, 48th Cong., 2d
                  Town dock.                                               sess.                            1
June 20,1938    6-foot channel, 6-foot anchorage area, and 8-foot cross   H. Doc. 638, 75th Cong., 3d sess.
                  channel.

  1Contains latest published map.

   Local cooperation.-The River and Harbor Act of June 20, 1938,
provides for the 6-foot channel and anchorage area, and the 8-foot
cross channel subject to the conditions that local interests shall:
   (a) Furnish free of cost to the United States suitable spoil-disposal
areas for new work and subsequent maintenance as may be required.
   (b) Agree to provide and maintain adequate landing facilities open
to the public on equal terms to all.
   (c) Contribute prior to commencement of work on either the 6-foot
or 8-foot improvement one-half of the initial cost thereof, but not
in excess of $51,000.
   Assurances of compliance with the conditions affecting the 6-foot
improvement were accepted by the Chief of Engineers on May 2,
1940. The sum of $34,500, representing one-half of the estimated
cost of the 6-foot channel and anchorage, was deposited to the credit
of the United States by local interests on January 10, 1940. Fulfill-
ment of conditions of local cooperation affecting the 8-foot improve-
ment is expected within the next 2 years.
   Terminal facilities.-Nine terminals, consisting of timber and con-
crete bulkheads, with available dockage of 3,023 feet of which town-
owned wharfage amounting to 760 feet is open to the public, are lo-
cated at the southern end of the harbor. Upon completion of the
public dock to be constructed in accordance with the requirements
                 RIVERS            AND        HARBORS--NEW                         YORK,             N.      Y.,       DISTRICT                     167
of local cooperation, the terminals will be sufficient for existing and
reasonably prospective commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-Work under the existing project
was commenced September 1891 and is about 52 percent complete.
The main 8-foot channel and the turning basin were completed in
1904. The 6-foot channel and anchorage on the east side of the
harbor were completed in 1941. The controlling mean low water
depth when examined in September 1949 was 8 feet for full project
width from Huntington Bay to the vicinity of Old Town dock, ex-
cept at Sandy Point where width is 30 feet and the vicinity of Old
Town dock where width is 20 feet, thence 6 feet for a width varying
from 100 to 60 feet for a distance of 600 feet, thence the depths de-
crease to zero feet at the head of the project. The controlling mean
low-water depth was 8 feet in the turning basin and 6 feet in the an-
chorage area. In the cross channel the depth varied from 4 feet
below mean low water at the entrance to 1 foot above mean low-water
at the head of the channel (May 1941). The work remaining to be
done to complete the project consists of dredging the 8-foot cross
channel.
   The total cost and expenditures of the existing project to June 30,
1952, were $119,337.03, of which $49,034.92 was from United States
funds and $19,545.86 from contributed funds, a total of $68,580.78 for
new work; and $50,756.25 from United States funds for maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $800, will be applied to a condition survey
of the channel.
   No work is scheduled for fiscal year 1954.
                                                Cost and financial summary

                                                               Fiscal year ending June 30                                             Total to June
                                                                                                                                     30, 1952, includ-
                                                                                                                                     ing fiscal years
                                            1948             1949              1950               1951                 1952                prior to 1948

New work:
   Appropriated-....................------.........----------... ............--...----------......----------- -----------............ I $71, 534. 92
   Cost-....-------------------------                  ------    ----------------------- ------------                                   1 71,534. 92
   Expenditures---.........----------------------                            ------------------               ----------............      71, 534. 92
Maintenance:
   Appropriated _              _......         $650 ...........------------ $2,250           ...........                   $800                 51, 556. 25
     Cost -------------                          650                                      .......................
                                                                                  2, 250 ------------                ----                       50, 756. 25
     Expenditures.......                              ............
                                                 650 ------------                 2, 250 ............-----------------------............        50, 756. 25


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project--------------                                                                        $47, 000. 00
  1iExclusive of $19,545.86 expended from contributed funds.for new work.
  2 Exclusive of $31,455 to be contributed by local interests.
168          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                            9. PORT JEFFERSON HARBOR, N. Y.
   Location.-This is an indentation of the north shore of Long Island,
about 56 miles by water east of the Battery, New York City, and 13.5
miles southeast of Bridgeport Harbor, Conn. It is about 1.75 miles
long and averages 0.75 mile wide. The entrance is protected by
jetties, one on either side of the channel, which latter is about 0.5
mile long and 200 feet wide. (See U. S. Coast and Geodetic Survey
Chart No. 361.)
   Previous projects.-Adopted by River and Harbor Act of March 3,
1871, and modified in 1875 and 1877. For further details see annual
reports for 1875, 1877, and 1915, pages 265, 221, and 1771, respectively.
   Existing project.-This provides for dredging a channel through
the entrance 300 feet wide and 16 feet deep at mean low water, for
repairing and enlarging two riprap jetties built under the previous
project, and for extending the east jetty a distance of 450 feet. The
length of channel included in the project is about 2,600 feet, the length
of the west jetty is 940 feet, and the projected length of the east jetty
about 2,350 feet. Mean tidal range, 6.2 feet inside of entrance chan-
nel; mean range of spring tides, 7.4 feet; irregular fluctuations due to
wind and barometric pressure vary from 4 feet below mean low water
up to 4 feet above mean high water.
   The estimate of cost for new work, revised in 1952, is $1,143,000,
exclusive of amounts expended under previous projects, of which
$57,000 is to be contributed by local interests. The latest (1928)
approved estimate for annual cost of maintenance is $2,500.
   The existing project was authorized by the following river and
harbor acts:

    Acts                            Work authorized                                 Documents


Sept.   9,1890   Enlarging jetties and dredging channel 10 feet deep     Annual Report, 1889, p. 751.
                   and 200 feet wide.
Aug. 18,1894     Dredging channel 12 feet deep---       _ -__- ._______ Annual Report, 1895, p. 831.
July 3,1930      Channel 16 feet deep and 300 feet wide and extension   H. Doc. 305, 70th Cong., 1st sess.t
                  of east jetty.


  1 Contains latest published map.

   Local cooperation.-The river and harbor act of July 3, 1930, pro-
vides that local interests shall dredge the channel to full project
dimensions under plans to be approved by the Chief of Engineers and
the Secretary of War, or shall contribute $57,000 to the cost of the
work.
   Terminalfacilities.-There are eight terminals with a total available
berthage of 2,430 feet located at the head of the harbor, one of which
is a shipyard with storage space for 50 vessels and equipped with 3
marine railways. One privately owned pier is open to the public.
The facilities are adequate for existing and reasonably prospective
commerce.
   Operationsandresults during fiscal year.-None.
   Condition at end of fiscal year.-Work under the existing project
was commenced in May 1891 and is about 30 percent complete. The
channel was completed to a 12-foot depth by the United States in 1903
and was partially dredged to a 16-foot depth by private interests under
             RIVERS AND           HARBORS---NEW                  YORK,   N.     Y.,   DISTRICT             169

the modified project in 1930 and 1931. The east jetty has been built
to a length of 1,500 feet and the west jetty to a length of 940 feet, but
of incomplete width and height. These jetties have aided materially
in maintaining the width and depth of the dredged channel lying be-
tween them. No work of maintenance or improvement has been done
by the United States since 1909. When examined in June 1947, the
controlling depth at mean low water through the channel was 16 feet
for a width varying from 100 to 300 feet. The work remaining to be
done under the existing project consists in completing the jetties to
project dimensions and removing a few shoals left after the dredging
of the 16-foot channel by private interests.
   The total cost and expenditures of the existing project to June 30
1952, were $101,852.15, of which $91,226.71 was for new work and
$10,625.44 for maintenance.
  Proposed operations.--An allotment of $700 made for maintenance
during fiscal year 1953 will be applied to a condition survey of the
channel.
   No work is scheduled for fiscal year 1954.
                                    Cost and financial summary

                                                Fiscal year ending June 30                      Total to June
                                                                                                30, 1952, includ-
                                                                                                ing fiscal years
                                1948          1949         1950          1951         1952       priorto 1948

New work:
   Appropriated      .------------------- -----------------------------         ---------            $171,426. 71
   Cost--                    .-----------   ------------        ---------------                       171,426. 71
   Expenditures...-----------------------------------------------------                   -----       171,426. 71
Maintenance:
    Appropriated.........           $500 -----------..........---------------------------------   10, 625.44
    Cost   -------------             500 ------------            ------------        ............ 10, 625.44
    Expenditures.........                                                                         10, 626. 44
                                     500 ........-------------------..................................-------


Other new work data: Estimated additional amount needed to
be appropriated for completion of existing project-----------                               $1, 051, 800. 00
  1 Exclusive of $57,000 to be contributed by local interests.

                               10. MATTITUCK HARBOR, N. Y.

   Location.-This is a tidal inlet on the north shore of Long Island,
85 miles east of the Battery, New York City, and 24 miles southeast
of New Haven Harbor, Conn., extending southward about 21/4 miles
to the village of Mattituck. (See U. S. Coast and Geodetic Survey
Chart No. 299.)
   Existing project.-This provides for a channel 7 feet deep at mean
low water from Long Island Sound to the bridge at Waterville, pro-
tected at the entrance by two parallel jetties 400 feet apart, thence 7
feet deep at mean high water to the village of Mattituck, the widths
being 100 feet at the entrance and 80 feet elsewhere. Total length of
the channel is about 2.2 miles. Mean tidal range at entrance, 4.9 feet;
at Old Mill Bridge, Waterville, 5.1 feet; mean range of spring tides at
entrance, 5.8 feet; at Old Mill Bridge, 6 feet; irregular fluctuations
due to wind and barometric pressure vary from 2.2 feet below mean low
water up to 6.6 feet above mean high water.
170         REPORT       OF CHIEF          OF ENGINEERS,             U.      S. ARMY,              1952

  The cost for new work, for the completed project, including the cost
of maintenance up to June 30, 1909, was $133,344. The latest (1950)
approved estimated cost of annual maintenance is $12,000.
  The existing project was authorized by the following river and
harbor acts:

     Acts                          Work authorized                                         Documents

June 3,1896     The 7-foot channel, and 2 riprap jetties----__ ---- ---Annual Report, 1891, p. 843.
Aug. 30,1935    250-foot extension to west jetty_ _-------------------H. Doc. 8, 71st Cong., 1st sess. 1


  1Contains latest published map.

   Local cooperation.-Fullycomplied with.
   Terminal facilities.-A bulkhead and pier approximately 200 feet
in length are situated at the entrance to the harbor. There is a timber
bulkhead at Waterville, with available wharfage of 710 feet. At the
head of the project there is a crib pier, in poor condition, with 50
feet of available wharfage. These facilities are considered adequate
for existing commerce.
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.--Work under the existing project
was commenced September 1900 and substantially completed August
1938. The dredging was completed in 1914. The east jetty was
completed in 1906 for a length of 775 feet. The west jetty was com-
pleted in 1938. When examined in May and November 1950, the
controlling mean low water depth was 7 feet for a width of 100 feet
from Long Island Sound to 600 feet upstream from south end of west
jetty, thence 7 feet for a width varying from 80 to 40 feet to Old Mill
drawbridge, thence 4 feet for a width varying from 80 to 30 feet to
Long Creek, thence the depths decrease to zero at the village of
Mattituck.
   The total cost and expenditures of the existing project to June 30,
1952, were $346,740.30, of which $133,344.15 was for new work and
$213,396.15 for maintenance.
   Proposed operations.-An allotment of $300 made for maintenance
during fiscal year 1953 will be applied to a condition survey of the
channel.
   No work is scheduled for fiscal year 1954.
                                    Cost and financial summary

                                               Fiscal year ending June 30                              Total to June
                                                                                                  ___30,1952, includ-
                                                                                                       ing fiscal years
                                1948         1949          1950           1951            1952          prior to 1948


New work:
   Appropriated---,---...-------------        ---------------------------------- -----------               $133, 344.15
   Cost..........--------- ----------------- ----------------------------------  ------------               133, 344.15
   Expenditures.--------------------- ------------------------------------ ----------                       133, 344.15
Maintenance:
    Appropriated----....            $700      $1, 650         $900   $14, 884. 55-     ..-------..          213, 396. 15
    Cost------------------           700       1, 650          900    14, 884. 55 ..-.            ..        213, 396. 15
    Expenditures..... ...            700       1, 650          900    14, 884. 55   ... ..--. .             213, 396. 15
              RIVERS      AND     HARBORS-NEW               YORK,         N.   Y.,   DISTRICT            171

                                   11. PECONIC RIVER, N. Y.
   Location.-This is a narrow tidal stream at the intersection of the
north and south forks of Long Island, 74 miles by water east of the
Battery, New York City. The head of navigation is at a culvert at
Peconic Avenue, in the village of Riverhead, 4.7 miles west of the
junction with Great Peconic Bay. (See U. S. Coast and Geodetic
Survey Chart No. 299.)
  Existing project.-This provides for a channel 6 feet deep at mean
low water and 100 feet wide, extending from deep water in Great
Peconic Bay westerly for a distance of 1,100 feet, thence of the same
depth and a width of 75 feet to the former location of the Terry and
Wells dock about 1,100 feet below Peconic Avenue. Length of sec-
tion included in project, 4.6 miles. Mean tidal range, 2.9 feet; mean
range of spring tides, 3.4 feet; irregular fluctuations due to wind and
barometric pressure vary from 1.6 feet below mean low water to 4.5
feet above mean high water.
   The cost for new work, for the completed project was $25,000. The
estimate of annual cost of maintenance, made in 1950, is $6,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                    Documents

Mar.     3,1871   Channel 6 feet deep and 75 feet wide to Flanders Bay_    H. Ex. Doc. 60, 41st Cong., 3d sess.
Mar.     2,1945   Extension of channel to Great Peconic Bay, 6 feet        H. Doc. 237, 76th Cong., 1st sess.1
                   deep and 100 feet wide.

1   Contains latest published map.

  Local cooperation.-Fully complied with except that local interests
are required to furnish suitable spoil disposal areas for maintenance.
   Terminal facilities.-There are 16 terminals with a total available
dockage of 1,850 feet located along the upper end of the waterway.
Two of the terminals, with a total dockage of 140 feet, are open to
the public. Four boatyards with storage space for 111 craft and
equipped with 5 marine railways are available for fishing and pleas-
ure craft. The facilities are adequate for existing and reasonably
prospective commerce.
   Operations and results during fiscal year.-The cost and expendi-
tures of a survey to determine the condition of the channel were
$823.70 for maintenance.
   Condition at end of fiscal year.-Work under the existing project
was commenced August 1871 and was substantially completed June
1942. When examined in July 1948 and May 1952 the controlling
mean low-water depth was 6 feet for a width varying from 100 to
75 feet from Great Peconic Bay to head of project, except for a shoal
1,320 feet below head of project with least depth of 3.7 feet. The head
of navigation is at Riverhead, about 2.5 miles above the mouth of
Peconic River.
   The total cost and expenditures of the existing project to June 30,
1952, were $133,387.95, of which $25,000.00 was for new work and
$108,387.95 for maintenance.
   Proposed operations.--No work is scheduled for fiscal years 1953
and 1954.
172           REPORT OF CHIEF OF ENGINEERS,                                                  U.      S. ARMY,        1952

                                       Cost and financial summary

                                                       Fiscal year ending June 30                                         Total to June
                                                                                                                          30, 1952, includ-
                                                                                                                          ing fiscal years
                                    1948            1949                  1950                  1951         1952          priorto 1948


New work:
   Appropriated .....------------------..........-------
                                                  ........................----------.....
                                                                               -------..                     .......---------   $25, 000. 00
                                                                             ------- ---------------
    Cost-------..............-----....---------.............---------------------......                                          25, 000. 00
   Expenditures-         -__
                         ------------ -------------              ------------ ----------- ------------                           25, 000. 00
Maintenance:
    Appropriated ....-          $46, 700.00      $7, 020. 00 ------------------------                        $823. 70           108, 387. 95
    Cost..................       46, 269. 61      7, 450. 39      -----------------                 ------    823. 70           108, 387. 95
    Expenditures....--------     19, 922.62      33, 797. 38 ......------------..........-----------......    823. 70           108, 387. 95



                               12. LAKE MONTAUK HARBOR, N. Y.

   Location.-This harbor is located on the east end of Long Island,
about 3 miles by land west of Montauk Point and 125 miles by water
east of New York City. It is landlocked on the east, south and west
sides and is connected on the north with Block Island Sound by an
artificial inlet. (See U. S. Coast and Geodetic Survey Chart No. 1211.)
   Existing project.-This provides for a channel 12 feet deep at mean
low water and 150 feet wide extending from the 12-foot contour in
Block Island Sound to the same depth in the existing yacht basin east
of Star Island; for a boat basin 10 feet deep, 400 feet wide, and 900
feet-long, located northwest of Star Island; and for the repair and
extension shoreward of the east and west jetties. The length of section
included in the project is 0.7 mile. Mean tidal range, 1.9 feet; mean
range of spring tides, 2.2 feet; irregular fluctuations due to wind and
barometric pressure vary from 2 feet below mean low water up to 7
feet above mean high water.
   The estimate of cost for new work, revised in 1952, is $414,000,
exclusive of $82,737.73 from Navy Department funds. The estimate
of annual cost of maintenance, made in 1950, is $7,500.
   The existing project was adopted by the River and Harbor Act of
March 2, 1945 (H. Doc. 369, 76th Cong., 1st sess.). For latest pub-
lished map see project document.
   Local cooperation.-The River and Harbor Act of March 2, 1945,
provides that local interests shall:
   (a) Furnish, free of cost to the United States, spoil-disposal areas
for initial work and for subsequent maintenance when and as required.
   (b) Hold and save the United States free from claims for damages
that may occur from the construction and maintenance of the improve-
ments.
   (c) Convey to the United States, free of cost, all necessary rights-
of-way and structures, including such absolute and indefeasible ease-
ment in the body of water known as Lake Montauk Harbor and in the
shores and bed thereof as may be necessary to insure its permanent
dedication to the use and purposes of a public navigable waterway.
   (d) Give assurances satisfactory to the Secretary of War that they
will construct and maintain for free public use suitable roadways to
permit access to the boat basin and inner harbor.
        RIVERS   AND HARBORS--NEW       YORK,   N.   Y.,   DISTRICT   173
    (e) Give assurances satisfactory to the Secretary of War that they
will construct and maintain a suitable public landing open to all on
equal and reasonable terms. And provided further that no work be
done by the United States until the rights-of-way, structures, and
easement specified in (c) above have been conveyed to the United
States; and title to rights-of-way required for roadways and landing
facilities specified in (d) and (e) above, has been vested in the county
of Suffolk or the town of East Hampton, in the State of New York.
Under date of December 8, 1942, the Chief of Engineers approved the
instruments complying with condition (c) above, and partially com-
plying with items (a) and (b). Work undertaken in Lake Montauk
Harbor in 1942 was not then a part of an authorized river and harbor
project but was performed for the Navy Department. The conditions
of local cooperation required under the project were not considered
wholly applicable.
   The supervispr, town of East Hampton, was notified of the condi-
tions of local cooperation in letter dated January 24, 1946. Local
interests have indicated that the remaining conditions will be met
within the near future.
   Terminal facilities.-Water terminals, seven in number, with a total
available berthage of 1,390 feet are located on the east side of Star
Island, the lake area south of the island, and at the inner end of
entrance channel. None of the terminals has rail connections or is
equipped with freight-handling devices. All the terminals are
privately owned. Upon completion of a public landing to be con-
structed in accordance with the requirements of local cooperation, the
terminals will be adequate for existing commerce.
   Operations and results during fisoal year.-The cost and expendi-
tures of a survey to determine the condition of the channel were
$327.69 for maintenance.
   Condition at end of fiscal year.-Work under the existing project
was 31 percent completed. Dredging of the entrance channel and
shoreward extension of the west jetty were performed from August
1942 to January 1943 at the request of the Navy Department with
Navy funds. When examined in June 1952 the controlling depth at
mean low-water was 11 feet for a width varying from 90 to 150 feet
from a point in Block Island Sound about 300 feet north of the west
jetty to the upstream limit in Yacht Basin east of Star Island. The
work remaining to be done to complete the project consists of dredging
a boat basin northwest of Star Island; repair of existing east and west
jetties and shoreward extension of the east jetty.
   The total costs and expenditures to June 30, 1952, were $139,-
946.88, of which $82,737.73 was Navy funds for new work and $57,-
209.15 regular funds for maintenance.
   Proposed operations.-No work is scheduled for fiscal years 1953
and 1954.




     245554-53-vol. 1-   12
174        REPORT OF CHIEF OF ENGINEERS,                                 U.   S. ARMY,           1952

                                    Cost and financial summary

                                               Fiscal year ending June 30                             Total to June
                                                                                                     30, 1952, includ-
                                                                                                     ing fiscal years
                               1948           1949           1950         1951            1952        priorto 1948


New work:
   Appropriated .
   Cost_
                         - -------------- ----
                       ...-----                          ------------ -----------    ------------           (1)
                                                                                                            (-1------------(1)
   Expenditures....----.--..   ---...--   ----------------------------------          ------------          (1)
Maintenance:
   Appropriated--------...------------         $1, 480    $54, 988. 02    $413. 44       $327. 69          $57, 209. 15
   Cost .------ ----- ------
                        -      ----             1, 480     54, 988. 02     413. 44        327. 89           57, 209. 15
   Expenditures-------- ------------            1, 480     54, 988. 02     413. 44        327. 69           57, 209.15


  1The sum of $82,737. 73 was spent from Navy funds for new work.
Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project_____ -__--- $414, 000. 00

               13. LONG ISLAND INTRACOASTAL WATERWAY; N. Y.

   Location.-This waterway extends from East Rockaway Inlet, on
the south side of Long Island, to Great Peconic Bay at the eastern end
of Long Island. The section included under this project extends
from Great South Bay opposite Patchogue to the south end of
Shinnecock Canal. (See U. S. Coast and Geodetic Survey Chart No.
578.)
   Existing project.-This provides for a channel 100 feet wide and
6 feet deep at mean low water from the federally improved channel
in Great South Bay, opposite Patchogue to the south end of Shinne-
cock Canal. The length of the section included in the project is 34
miles. The mean tidal range varies from 1.0 foot in Shinnecock Bay
to 0.7 foot in Patchogue Bay; mean range of spring tides varies from
1.2 feet to 0.8 foot; irregular fluctuations due to wind and barometric
pressure vary from 1.8 feet below mean low water to 11.5 feet above
mean high water.
   The cost for new work, for the completed project, was $235,964.
The latest (1950) approved estimated cost of annual maintenance
is $15,000.
   The existing project was adopted by the River and Harbor Act
of August 26, 1937 (H. Doc. 181, 75th Cong., 1st sess.). The latest
published map is in the project document.
   Local cooperation.-Fullycomplied with except that local interests
are required to furnish suitable spoil-disposal areas for subsequent
maintenance as required.
   Terminal facilities.-There are 17 boat repair and storage yards
within the area immediately adjacent to the Federal improvement.
There is ample room for expansion and development of terminals
when future commerce warrants.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.--Work under the existing project
was commenced October 1939 and completed September 1940. When
examined from April 1946 to August 1949, the controlling mean low-
water depth in the channel was 5 feet for a width varying from 50
to 100 feet.
              RIVERS AND HARBORS--NEW                                  YORK,            N.        Y.,         DISTRICT              175

  The total cost and expenditures of the existing project to' June 30,
1952, were $327,137.02, of which $235,964.25 was for new work and
$91,172.77 for maintenance.
  Proposed operations.-An allotment of $1,000 made for mainte-
nance during fiscal year 1953 will be applied to a condition survey of
the channel.
  No work is scheduled for fiscal year 1954.
                                         Cost and financial summary

                                                     Fiscal year ending June 30-                                         Total to June
                                                                                                                         30, 1952, includ-
                                                                                                                         ing fiscal years
                                      1948           1949           1950              1951                        1952     prior to 1948

New work:
   Appropriated     ----------------------------------------------------------.........                                       $235, 964.25
   Cost-----------------                 -----       ------      ----------- -------------------------                         235, 964. 25
   Expenditures ... -----------------------------------------------------------                                                235, 964. 25
Maintenance:
    Appropriated ......                $1, 000   $30, 500. 00    $6, 004. 80     ..-...            -...........     _           91, 172. 77
     Cost....-----------------          1,000      4, 276. 12    32, 228. 68                  -
                                                                               .............-..........                         91, 172. 77
    Expenditures--------.........       1, 000     4, 122. 85    32, 381. 95   ........................                         91, 172. 77



                                     14. GREAT SOUTH BAY, N. Y.

    Location.-This is a lagoon inside the south shore of Long Island,
N. Y., about 26 miles long and 2 to 6 miles wide. The principal
entrance, through Fire Island Inlet, is about 50 miles by water south
and east of the Battery, New York City. (See U. S. Coast and Geo-
,detic Survey Chart No. 578.)
    Previous projects.-Adopted by the River and Harbor Act of Sep-
tember 19, 1890. For further details see page 1773, annual report
for 1915, and page 182, annual report for 1938.
    Existing project.-This provides for a channel 200 feet wide and
10 feet deep at mean low water from Fire Island Inlet to the central
basin in Great South Bay, and a channel 8 feet deep and 100 feet

-Patchogue
wide from the central basin in the bay to the head of navigation in
               River. The length of section included in the project is
.about 19.1 miles. Mean tidal range in the bay, 0.7 foot; mean range
of spring tides, 0.8 foot; irregular fluctuations due to wind and
barometric pressure vary from 1.7 feet below mean low water up to
4.6 feet above mean high water.
    The estimate of cost for new work, revised in 1952, is $200,000,
exclusive of amount expended under previous project. The latest
  (1950) approved estimate for annual cost of maintenance is $4,500.
    The existing project was adopted by the River and Harbor Act
of June 13, 1902 (H. Doc. No. 103, 56th Cong., 2d sess.). For latest
published map see annual report for 1916, page 2018.
    Terminal facilities.-Water terminals, 13 in number, with avail-
able wharfage of 5,000 feet, are located along the shores of Patchogue
River. These facilities consist of a lumberyard with wharf age of 2,000
feet, having rail connection; 7 boat-building yards; 2 fuel-oil termi-
nals; a coal yard; and 2 village wharves open to the public. These
 :facilities are considered adequate for the existing commerce.
    Operationsand results during fiscal year.-None.
  176              REPORT OF CHIEF OF ENGINEERS,                                                      U.      S.    ARMY,            1952

     Condition at end of fiscal year.-Work under the existing project
  was commenced November 1902 and is about 60 percent complete.
The channel in Patchogue River was completed in 1904. Of the
dredging through three bars, necessary to provide the projected chan-
  nel, only the easterly one, bar C, was dredged. The west jetty, 1,700
  feet long, completed under the previous project in 1897 and repaired
  in 1914, and the east jetty, formed of a sand spit, 1,000 feet long, with
a riprap extension 330 feet long, completed in 1917, are in good condi-
tion. When examined in March, October 1946, October-November
1949 and July 1950, the controlling mean low water depth was 10 feet
for a width of 200 feet from Fire Island Inlet to a point 8 miles east,
thence 7 feet for the same width to the channel opposite Patchogue,
thence 8 feet for a width varying from 80 to 100 feet to the head of
the project in Patchogue River. The head of navigation is Division
Street, Patchogue, about 19.1 miles by channel from the entrance at
Fire Island Inlet. The work remaining to be done to complete the
project consists of dredging through two bars necessary to provide
the projected channel to Patchogue River.
    The total cost and expenditures of the existing project to June 30,
1952 were $253,283.98 of which $59,820.82 was for new work and
 $193,463.16 for maintenance.
    Proposed operations.-An allotment of $800 made for maintenance
during fiscal year 1953 will be applied to a condition survey of the
channel.
    No work is scheduled for fiscal year 1954.
                                                   Cost and financial summary

                                                                  Fiscal year ending June 30-                                            Total to June
                                                                                                                                        30, 1952, includ-
                                                                                                                                         ing fiscal years
                                               1948               1949              1950               1951               1952               prior to 1948


New work:
   Appropriated ..............-------...... ...........----------------------------------------------------                                      $99, 820.82
   Cost............-- ...------------                   ------------ ------------------------------------                                         99,820.82
   Expenditures-----.......................----------------------------------.....................------------..    ..........------------        99, 820.82
Maintenance:
   Appropriated.......--------........--------.....      $59, 500. 00 -$17,157.90                      $565. 08 ....------------...              193, 463. 16
   Cost--------                ------------ 3, 761.49 37, 528. 72                                     1, 616. 97 ............                    193, 463. 16
                    .........-..........-------.
   Expenditures-------                                      3, 656.43       36, 818. 31              2, 432. 44 ------------............         193, 463. 16


Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project-------------- $140,000.00

                                            15. FIRE ISLAND INLET, N. Y.

   Location.-FireIsland Inlet is situated on the south shore of Long
Island, about 50 miles by water south and east of the Battery, New
York City. It is the main entrance into Great South Bay from the
Atlantic Ocean. (See U. S. Coast and Geodetic Survey Chart No.
578.)
  Existing project.--This provides for the construction of a jetty
extending generally southwest and south for a length of 5,000 feet
from high ground on Democrat Point at the west end of Fire Island,
and a channel 10 feet deep and 250 feet wide from deep water in the
ocean to deep water within the inlet. Mean tidal range at ocean and
            RIVERS       AND      HARBORS---NEW                YORK,       N.    Y.,    DISTRICT           177

inlet ends of Democrat Point are 4.1 and 2.6 feet, respectively. Ir-
regular fluctuations due to wind and barometric pressure vary from
2.5 feet below mean low water up to 2.6 feet above mean high water.
   The estimate of cost for new work, revised in 1952, was $834,000,
exclusive of $90,190.39 contributed by local interests. The estimate
of annual cost of maintenance, revised in 1950, is $110,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts               Work authorized                                       Documents

Aug. 26, 1937                            -------
                Construction of jetty--..........   Rivers and Harbors Committee Doc. 33, 75th Cong., 1st
                                                     sess.
May 17,1950     Channel 10 feet deep       _-.......... H. Doc. 762, 80th Cong., 2d sess.   (Contains latest pub-
                                                     lished map.)


   Local cooperation.-The River and Harbor Act of May 17, 1950,
provides that local interests shall:
   a. Furnish free of cost to the United States all lands, easements,
rights-of-way, and spoil-disposal areas necessary for the new work
and subsequent maintenance, when and as required.
   b. Hold and save the United States free from any damages result-
ing from the improvement.
   These conditions have not been fulfilled. The requirements under
the act of August 26, 1937 have been fully complied with.
   Terminal facilities.-No terminals are within the area immediately
adjacent to the Federal improvement. There are forty-two com-
mercial and pleasure-boating terminals with a total berthage of 15,935
feet located at Patchogue, Sayville, West Sayville, Islip, and Bay
Shore. In addition, 49 boat-repair and storage yards are located along
the shores of Great South Bay and adjacent creeks. The facilities
are ample for present and probable future needs. There is room for
expansion should future commerce warrant.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-Work under the existing project
was commenced June 1939 and is about 72 percent complete. When
examined in September and November 1946, the controlling mean
low water depth through Fire Island Inlet was 8 feet along a cir-
cuitous course. The jetty, which is approaching its capacity as a sand
entrapping agent, was in fair condition, when examined in April 1949.
The work remaining to be done under the existing project consists
of dredging the channel through the inlet.
  The total costs and expenditures of the existing project to June
30, 1952 were $686,773.85, of which $594,354.69 was United States
funds and $90,190.39 contributed funds--a total of $684,545.08 for
new work and $2,228.77 for maintenance.
  Proposed operations.-An allotment of $2,000 made for mainte-
nance during fiscal year 1953 will be applied to a condition survey
of the channel.
  The sum of $240,000 can be profitably extended for the following
scheduled work during the fiscal year 1954:
New work: Complete by June 30, 1954, under contract, dredging to
provide a channel 10 feet deep and 250 feet wide--   -----      $240, 000
178           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                                             Cost and financial summary

                                                              Fiscal year ending June 30--                              Total to June
                                                                                                                       30,1952, includ-
                                                                                                                       ing fiscal years
                                          1948               1949           1950         1951             1952           prior to 1948

New work:
   Appropriated------------.....---..            ..........
                                                      -----------------      -------------------............
                                                                                                          ------           $594, 354.69
    Cost-_ ------------------------------------------------------------------                                              1594,354.69
    Expenditures --------------------------------------------------------                                                  1 594, 354. 69
Maintenance:
    Appropriated- -----_         _-$2,      051.39         -$587.81 ------------         $151. 45      .-.-----.   .           2, 228. 77
    Cost.                                1----------------
                                          ,46. 58---------------------...........         151. 45   ------------               2, 228. 77
    Expenditures_-------                 1, 463. 58 -------..        --------.            151. 45   ------------               2, 228. 77

  1 Exclusive of $90,190.39 expended from contributed funds for new work.
Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project--------------. $240, 000. 00

                                                 16. JONES INLET, N. Y.

   Location.-This is a small inlet on the south shore of Long Island
connecting Hempstead Bay with the Atlantic Ocean. It is 37 miles
by water southeast of the Battery, New York City. (See U. S. Coast
and Geodetic Survey Chart No. 579.)
   Existing project.--This provides for an entrance jetty and a chan-
nel 12 feet deep and 250 feet wide, from that depth in the ocean
through the inlet to the Loop Causeway Bridge over Long Creek.
The length of section included in the project is about 2.1 miles. Mean
tidal range, 4.3 feet; mean range of spring tides, 5.2 feet; irregular
fluctuations due to wind and barometric pressure vary from 4.1 feet
below to 6.2 feet above mean high water.
   The estimate of cost for new work, revised in 1952, is $2,000,000,
exclusive of $2,000,000 (one-half of total cost) to be contributed by
local interests. The estimate of annual cost of maintenance, revised
in 1949, is $65,000.
   The existing project was adopted by the River and Harbor Act
of March 2, 1945 (H. Doc. 409, 77th Cong., 1st sess.). For latest pub-
lished map see project document.
   Local cooperation.-The River and Harbor Act of March 2, 1945,
provides that local interest shall:
   (a) Contribute 50 percent of the first cost of the improvement.
   (b) Furnish assurances satisfactory to the Secretary of War that
they will provide free of cost to the United States all lands, easements,
rights-of-way, and spoil-disposal areas needed for the initial work
and subsequent maintenance, when and as required.
   (c) Hold and save the United States free from claims for damages
resulting from the improvements.
   (d) Provide and maintain a channel 12 feet deep and generally
200 feet wide from the Loop Causeway Bridge over Long Creek to
the head of navigation in Freeport Creek at Mill Road.
   Local interests have indicated that they are willing and able to
meet these requirements and that the initial dredging for the 12-foot
channel under item (d) above had been completed. It is expected
that the conditions of local cooperation will be fully complied with
during the fiscal year 1953.
             RIVERS AND              HARBORS---NEW                 YORK,      N.    Y.,   DISTRICT          179

   Terminal facilities.-Within the area tributary to Jones Inlet there
are a number of privately owned small wharves and 40 boat repair
and storage yards. The latter are equipped for the repair of pleasure
craft and fishing vessels. In addition, there are nine public wharves
open to the public free of charge, with a total dockage of 2,180 feet.
Additional terminals would have to be constructed for the receipt
of commercial freight in any sizable quantity.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-No new work has been done on
this project. The controlling mean low water depth through the
inlet was 6.5 feet along a circuitous course when examined in April
and May 1948.
   The total cost and expenditures of the existing project to June 30,
1952 were $2,560, all for maintenance.
   Proposed operations.-An allotment of. $5,000 for new work made
during fiscal year 1953 will be applied to preparation of a brief def-
inite project report by hired labor to serve as a basis for construction
plans and specifications.
   No work is scheduled for fiscal year 1954 with Federal funds.
                                       Cost and financial summary

                                                    Fiscal year ending June 30-                   Total to June
                                                                                                 30, 1952, includ-
                                                                                                 ing fiscal years
                                    1948            1949        1950         1951         1952     prior to 1948

Maintenance:
                      ...............------------
   Appropriated--------                             $2, 560 -----------------------------------         $2, 560. 00
   Cost--    -----------------------............     2, 560 -----------------------------------          2, 560.00
   Expenditures--------......      ------------      2,560 ----------- ------------ ------------         2, 560. 00


Other new work data:
   Appropriated for fiscal year ending June 30, 1953_..-.       __-                                     $5, 000
    Unobligated balance available for fiscal year 1953---------- ---                                     5, 000
     Estimated additional amount needed to be appropriated for com-
        pletion of existing project----- ---------------------------- 11, 995, 000
1Exclusive of $2,000,000 to be      contributed by local interests.

                      17. EAST ROCKAWAY                       (DEBS) INLET, N. Y.

   Location.-The inlet is situated on the south shore of Long Island
between the main body of the island and the western end of Long
Beach. It is 10 miles east of Rockaway Inlet and about 27 miles by
water south and east from the Battery, New York City. (See U. S.
Coast and Geodetic Survey Charts Nos. 579 and 1215.)
  Existing project.-This provides for a channel 12 feet deep at mean
low water and 250 feet wide from the 12-foot contour in the Atlantic
Ocean to the 12-foot contour in Long Beach Channel, a distance of
about 0.6 mile, protected by jetties. Mean tidal range, 4.1 feet; mean
range of spring tides, 4.9; irregular fluctuations due to wind and
barometric pressure vary from 4.1 feet below mean low water up to
5.2 feet above mean high water.
   The estimate of cost for new work made in 1952 is $1,259,000 (ex-
cluding $100,000, local contribution). The latest (1950) approved
estimate for annual cost of maintenance is $20,000.
180     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,           1952

    The existing project was adopted by the River and Harbor Act of
July 3, 1930 (H. Doc. 19, 71st Cong., 1st sess.). The latest published
map is in the project document.
    Local cooperation.--The River and Harbor Act of July 3, 1930,
provides that local interests shall contribute $100,000 to the cost of
the work; give assurances satisfactory to the Secretary of War and
the Chief of Engineers that they will provide and maintain at their
own expense interior channels suitable for navigation, not less than
12 feet deep, from East Rockaway Inlet to the Hempstead-Oyster Bay
line, a distance of about 15 miles, to Hewlett Harbor and to Freeport
Harbor; furnish, without expense to the United States, necessary land,
easements, and rights-of-way for construction and maintenance of
the jetties, and agree to hold and save the United States free of claims
for damages to public and private property resulting from the im-
provement.
    Assurances of compliance with the conditions of local cooperation
precedent to construction of entrance channel and east jetty were
approved by the Chief of Engineers and Secretary of War on July
14 and 15, 1932, respectively. Local contribution of $100,000 was
deposited to the credit of the United States on August 23, 1932. Since
the construction of the west jetty is not considered necessary at this
time, easements, rights-of-way and release of claims for damages
necessary for construction are not being secured.
    Terminal facilities.-No terminals are within the area immediately
adjacent to the Federal improvement. The water front on the north
side of Long Beach has been bulkheaded. There are five water
terminals at Oceanside with an available wharfage of 2,000 feet.
Three are oil terminals, of which one has a spur railroad connection;
the other two are unused at present. There are two terminals at Island
Park having a wharfage of 400 feet. There are public wharves at East
Rockaway and Woodmere. The facilities are considered adequate
for existing commerce.
    Operationsand results during fiscal year.-The United States sea-
going hopper dredge Lyman was employed from April 2, 1952 to
May 11, 1952 in restoring the channel to project depth of 12 feet. Dur-
ing the fiscal year 166,700 cubic yards place measurement of material
were removed at a cost of $83,075.58 for maintenance.
    The cost of condition surveys, studies and surveys, and engineering
preliminary to dredging was $2,801.96 for maintenance.
    The total cost was $85,877.54 for maintenance. The total expendi-
ture was $85,680.71.
    Condition at end of fiscal year.-Work under the existing project
was commenced February 1933, and is about 85 percent complete.
The east jetty, 4,250 feet long, was completed in July 1934. The
project channel was completed in May 1935. When examined in May
1952 the controlling mean low-water depth through the best available
channel from deep water in Atlantic Ocean to deep water in East
Rockaway Inlet was 12 feet for a width of 210 feet. The east jetty
was in good condition. The work remaining to be done under the
existing project consists of building a west jetty, if necessary, to
protect the channel.
    The total cost and expenditures of the existing project to June
                    RIVERS                AND HARBORS--NEW                                          YORK,              N.      Y.,        DISTRICT                        181

30, 1952, were $864,852.48, of which $421,368.68 was from regular
funds and $82,600 from Public Works funds, a total of $503,968.68
for new work and $260,883.80 from regular funds for maintenance.
In addition, the costs and expenditures from contributed funds were
$100,000 for new work.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $10,824.29, plus an allotment of $41,272.54
made for maintenance during fiscal year 1953, a total of $52,096.83,
will be applied as follows:
Accounts payable June 30, 1952 ________-----------                    $196.83
Maintenance: Dredging in the inlet channel with a United States sea-
  going hopper dredge for about one dredge month during May 1953_ 50, 000. 00
Periodic channel surveys and miscellaneous inspections and reports_ 1, 900. 00

              Total                            ---------------------------------------------                                                                 52, 096. 83
      No work is scheduled for the fiscal year 1954.
                                                          Cost and financial summary

                                                                           Fiscal year ending June 30-                                                     Total to June
                                                                                                                                                         30, 1952, includ-
                                                                                                                                                          ing fiscal years
                                                     1948                 1949                 1950                  1951                 1952             prior to 1948

New work:
   Appropriated--........              ------------- ------------                                                                                                    1 $503, 968. 68
                                                                              ---............---............-----------............-----------...........--............
   Cost ..------------------------------............------------............---...........------------............---...........---..                                   503, 968. 68
                                               ............ ............---...........------------............
   Expenditures--------.........------------------------............ ---------                                                                                     503, 968. 68
Maintenance:
      Appropriated ........ $106, 500. 00 -$24,800.00      ............                                             $454.22          $96, 505. 00                  271, 511.26
      Cost-........ ...-...         80, 319. 30 1, 380. 70 ..........------------                                    454. 22          85, 877. 54                  260, 883. 80
      Expenditures--------......... 80, 264. 75 1,435.25 ............                                                454. 22          85, 680. 71                  260, 686. 97


   1Exclusive          of $100,000 contributed funds expended for new work.
Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project_------------------ $755, 000                                                                  _
                                                            18. JAMAICA BAY, N. Y.

  Location.-This is a bay inside the south shore of Long Island,
the entrance being about 17 miles by water south and east of the
Battery, New York City. (See U. S. Coast and Geodetic Survey
Chart No. 542.)
  Previous projects.--Adopted by the acts of June 14, 1880, and July
13, 1892. For further details see page 1770 of annual report for 1915,
and page 185 of annual report for 1938.
  Existing project.-This provides for an interior channel extending
from the vicinity of the Marine Parkway Bridge along the west and
north shores of the bay, 18 feet deep at mean low water and 300 feet
wide to Mill Basin, with a swinging basin 1,000 feet wide and 1,000
feet long at that point; thence 12 feet deep and 200 feet wide to Fresh
Creek Basin; an interior channel extending from the same locality
along the south shore to Head of Bay, 15 feet deep and 200 feet wide;
a channel in Mott Basin, 15 feet deep and 200 feet wide extending
from the channel along the south shore, 3,000 feet to the junction of
the two branches, thence 2,200 feet in the north branch (Inwood
Creek) and 3,200 feet in the south branch; and an entrance channel
connecting the two interior channels with deep water in the Atlantic
182         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

Ocean, of suitable hydraulic dimensions to maintain the present
tidal prism in the bay, but not less than 18 feet deep and 500 feet
wide from opposite Barren Island to Rockaway Point, thence enlarg-
ing to not less than 20 feet deep and 1,000 feet wide to sea, protected
by one riprap jetty. Length of section included in project is 19.7
miles. Mean tidal range, 4.9 feet at Barren Island, and 5.1 feet at
Head of Bay; mean range of spring tides, 5.9 and 6.1 feet, respectively;
irregular fluctuations due to wind and barometric pressure vary from
4 feet below mean low water to 4 feet above mean high water.
   The estimate of cost for new work, revised in 1952, excluding
amounts expended on previous projects but including $4,228,439 ex-
pended for'new work under River and Harbor Act of June 25, 1910,
is $5,065,000. The estimate of annual cost of maintenance, revised
in 1950, is $103,500.
   The existing project was authorized by the following river and
harbor acts:

    Acts                         Work authorized                                  Documents

June 25, 1910   Construction of 1 jetty-------------------------       H. Doc. 1488, 60th Cong., 2d sess.
Mar. 2,1945     Interior channel along west shore of bay, 18 and 12    H. Doc. 700, 76th Cong., 3d sess.
                  feet deep; interior channel along south shore, 15
                  feet deep; entrance channel, 20 and 18 feet deep;
                  and 1 riprap jetty, all in lieu of work heretofore
                  authorized. Modified conditions of local coopera-
                  tion.
May 17,1950     Channel 15 feet deep in Mott Basin, including its 2    H. Doc. 665, 80th Cong., 2d sess.
                  branches.                                             (Contains latest published map.)



   Local cooperation.-The River and Harbor Act of March 2, 1945,
provides that in lieu of conditions heretofore prescribed, local interests
shall furnish free of cost to the United States, suitable areas for the
disposal of dredged materials for new work and subsequent main-
tenance, when and as required, and shall hold and save the United
States free from claims for damages resulting from the improvement.
The city of New York was notified of the conditions of local coopera-
tion in letter dated January 25, 1946. In letter dated February 7,
1946, the mayor of the city of New York advised that disposal areas
are available and that the necessary document "holding the United
States free from claims for damages" would be executed.
   The River and Harbor Act of May 17, 1950, provides that local
interests shall:
   (a) Furnish free of cost to the United States all lands, easements,
rights-of-way, and suitable areas for disposal of dredged material
during construction of the project and for subsequent maintenance,
as and when required.
   (b) Hold and save the United States free from damages due to the
construction works and subsequent maintenance.
   (c) Perform all necessary alterations to the existing terminals
and bulkheads, and dredge adequate approaches thereto.
   These conditions have not been fulfilled.
   Terminal facilities.-There are 60 terminals with a total berthage
of 21,372 feet located along the shores of Jamaica Bay, most of which
              RIVERS AND             HARBORS--NEW                   YORK,                 N.     Y.,      DISTRICT           183

are concentrated at 2 general localities; Mill Basin on the west shore,
and from Seaside to and including Head of Bay on the south shore.
Six of the terminals are available for public wharfage; none has direct
rail connections. Nineteen yacht clubs and 18 boatyards, equipped
with marine railways, are located within the bay. In addition, there
are a number of small landings for pleasure craft. The existing fa-
cilities are considered adequate for existing commerce. (For latest
full description of terminal facilities, see Port and Terminal Facilities
of the Port of New York, 1942, Corps of Engineers.)
   Operations and results during fiscal year.--The cost and expendi-
tures of a survey to determine the condition of the channel were
$914.30 for maintenance.
   Condition at end of fiscal year.-Work under the existing project
was commenced August 1912 and is about 87 percent complete. The
westerly interior channel from Barren Island to Fresh Creek Basin
and the swinging basin at Mill Basin have been dredged to project
dimensions. No new-work dredging of the entrance channel was
done, since depths were greater than those required under the project.
The east jetty, was completed August 4, 1933, for a total length of
about 8,400 feet, was in fair condition when examined in April 1949.
   The controlling mean low-water depths of the channels included
in this project are as follows:

                                 Section                                        Depth            Width               Date
                                                                                 (feet)          (feet)

Entrance channel:
    From Atlantic Ocean to Rockaway Point _--------.....                           20            1,000     June 1952.
    Rockaway Point to Barren Island__...       -----                               18
                                                                      __......................     500        Do.
Interior channel (north and west shores):
    Barren Island to Mill Basin .--...------------------------                      18              300        Do.
    Swinging Basin ......------------------------------------                       18           1, 000        Do.
    Mill Basin to Fresh Creek Basin---------------__-       _            -.-        12              200        Do.
Interior channel (south shore):
    Barren Island to Cross Bay Boulevard Bridge ....------------                   15        200           June 1950.
      Cross Bay Boulevard Bridge to Long Island RR. bridge ...                      11       200               Do.
      Long Island RR. Bridge to Sommerville Basin..........------------              6.5 125-200           July 1950.
      Sommerville Basin to Mott Basin__....- ______-----                             0   100-200               Do.
      Mott Basin to Head of Bay_-___------...              --.-.-----.-- _          15   150-200           July to Sept. 1939.
      Mott Basin      --------------------------------------                        (2)           (2)      August 1946.

  1 Except for a shoal of 7 feet across the channel at Neponsit about 1.2 miles above junction.
2 The controlling depth of existing channels is 5 feet for widths varying from 50 to 150 feet.



  The work remaining to be done under the existing project consists
of dredging the southerly interior channel, and the channel in Mott
Basin.
   The total cost and expenditures of the existing project to June 30,
1952 were $4,319,338.48, of which $4,228,439.36 was for new work
and $90,899.12 for maintenance.
  Proposed operations.-An allotment of $34,714.30 made for main-
tenance during fiscal year 1953 plus accounts receivable of $485.70,
a total of $35,200 will be applied to repair of deteriorated sections
of jetty by contract (May 1953) and miscellaneous inspection and
reports.
  No work is scheduled for fiscal year 1954.
184          REPORT OF CHIEF OF ENGINEERS,                                        U. S. ARMY,               1952

                                        Cost and         financial summary
                                                     Fiscal year ending June 30-                                 Total to June
                                                                                                                30, 1952, includ-
                                                                                                                 ing fiscal years
                                     1948            1949            1950            1951            1952         prior to 1948


New work:
                                                                                                                    $4,307, 771.72
   Appropriated---...--..--...--------..........--..------------ ----------...............................---...------------
   Cost..------ ---------       -----------------------------------------------                                      4, 307, 771. 72
                     .....     ...
   Expenditures_------------------      --      ---- _ ----------- ------------ _--        --------                  4, 307, 771.72
Maintenance:
   Appropriated ........-            $600. 00     -$317. 89       $1, 900. 00     -$290.17        $1,400.00             94, 346. 27
   Cost-----------------                      ............
                                      282.11------------           1,179. 73         430. 09         914. 30            93, 860. 57
   Expenditures----------.........    282.11 ...------------          486. 65      1, 123. 18        914.30             93, 860. 57


Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project--------------                                                 $837, 000. 00

19. NEW YORK HARBOR:                              ENTRANCE CHANNELS AND ANCHORAGE
                                                     AREAS
   Location.-The works included under the above title are in the
upper and lower bays, New York Harbor. The harbor is 330 miles
southwest by water of Boston Harbor, Mass., and 165 miles northeast
of the entrance to Delaware Bay, N. J. and Del.
   The upper bay extends southerly from the junction of Hudson and
East Rivers opposite the Battery, New York City, a distance of about
51/2 miles to the Narrows. The lower bay extends from the Narrows
to the sea, a distance of about 9 miles. (See U. S. Coast and Geodetic
Survey Charts Nos. 369 and 541.)
   Existing project.-This provides for the Ambrose Channel 45 feet
deep and 2,000 feet wide, extending from the sea to deep water in the
lower bay, length about 10.2 miles; for the Anchorage Channel, an
extension of Ambrose Channel, with the same depth and width, in
the upper bay, opposite the anchorage grounds, length about 5.7 miles;
for Bayside-Gedney Channel 35 feet deep and 800 feet wide, extend-
ing from the sea to the junction with Main Ship Channel, length
about 6.2 miles; for the Main Ship Channel 30 feet deep and 1,000
feet wide, extending from Bayside-Gedney Channel to deep water in
the lower bay, length about 5.3 miles; for the removal of Craven Shoal
to a depth of 30 feet; for a channel 16 feet deep, 200 feet wide, and
about 2.3 miles long, extending from bell buoy 23 to Hoffman and
Swinburne Islands, for an irregularly triangular-shaped anchorage
area in the southerly half of Red Hook Flats (approximately 442
acres in extent), 40 and 30 feet deep; an anchorage in the vicinity of
Liberty (Bedloe) Island (about 160 acres in extent) 20 feet deep,
and for a channel along the New Jersey pierhead line connecting
Kill Van Kull with deep water in Anchorage Channel, south of the
Liberty Island anchorage, 20 feet deep for a width of 500 feet with
widening at bends to 800 feet and a length of about 3 miles. The
project depths refer to mean low water. Mean tidal range, 4.7 feet;
mean range of spring tides, 5.6 feet; irregular fluctuations due to
wind and barometric pressure vary from 3.9 feet below mean low water
up to 4.3 feet above mean high water.
   The estimate of cost for new work, revised in 1952, is $17,630,000.
The latest (1950) approved estimate for annual cost of maintenance
is $315,000.
              RIVERS     AND     HARBORS--NEW               YORK,      N.    Y.,   DISTRICT           185

  The existing project was authorized by the following river and
harbor acts:

       Acts                       Work authorized                                   Documents


July    5,1884 Main Ship-Bayside-Gedney to 30 feet for width of Annual Reports, 1887, p. 62; and
                1,000 feet (dimensions fixed by Secretary of War,           1888, p. 63.
                 Dec. 27, 1886, by authority of the act of Aug. 5, 1886).
Mar. 3, 1899 Ambrose Channel (East Channel) to 40 feet-..........         H. Doc. 159, 55th Cong., 3d sess.
                                                                            (Annual Report, 1899, p. 1279.)
June 25,1910 Maintenance of entrance channel under 1 head ......
Aug. 8,1917 Anchorage Channel, the extension of Ambrose Chan- H. Doc. 518, 63d Cong., 2d sess.
                nel into Upper Bay.
    Do-.......Removal of Craven Shoal             -__- -----------     -- H. Doc. 557, 64th Cong., 1st sess.
    Do-.......Channel between Staten Island and Hoffman and H. Doc. 625, 64th Cong., 1st seas.
                Swinburne Islands.
July 3,1930    Relocation of southerly section of Anchorage Channel. Rivers and Harbors Committee
                                                                            Doc. 18, 71st Cong., 2d sess. 1
Aug. 30,1935 Dredging south end of Red Hook Flats, Liberty H. Doe. 183, 73d Cong., 2d sess.
                Island Anchorage, and channel along New Jersey
                pierhead line.
    Do ___-.__ Deepening Bayside-Gedney Channel to 35 feet for a H. Doc. 133, 74th Cong., 1st sess.
                width of 800 feet.
Aug. 26,1937 Deepening Ambrose and Anchorage Channels to 45 Senate                  committee print, 75th
                feet for a width of 2,000 feet.                             Cong., 1st sess.


  1 Contains latest published maps.


  Terminal facilities.-The harbor consists of Upper Bay and Lower
Bay. In the Upper Bay there are 45 piers with a total berthage of
70,723 feet and 11,171 feet of bulkheads and wharves available for
dockage. In addition there are five car-float (railroad) bridges and
three ferry terminals. These terminals are located along the westerly
shore of the bay, from St. George, Staten Island, to the Narrows and
from Constable Hook, Bayonne, to Ellis Island. The terminals along
the Brooklyn waterfront are reported under Bay Ridge and Red
Hook Channels. The Lower Bay is largely undeveloped, the termi-
nals being confined to Gravesend Bay. There are 7 piers with a total
berthage of 9,808 feet and one bulkhead providing dockage of 1,675
feet. Of the terminals in the harbor, 27 are publicly owned, 4 are
open to public use, 27 are equipped with mechanical-handling devices,
and 24 have railroad connections. The facilities are considered ade-
quate for present commerce. (For latest full description of terminal
facilities see Port and Terminal Facilities at the Port of New York,
1942, Corps of Engineers.)
  Operations and results during fiscal year.-The United States sea-
going hopper dredge L'ssayons was employed intermittently from July
13, 1951 to September 9, 1951, in deepening Ambrose Channel to 45
feet and widening from 1,700 to 2,000 feet. During the fiscal year
589,800 cubic yards, place measurement, of material were removed
at a cost of $178,255.76 for new work.
  The United States seagoing hopper dredge Essayons was employed
intermittently from August 14, 1951 to September 12, 1951 in deepen-
ing a portion of the easterly 600-foot strip of Anchorage Channel to
45 feet. During the fiscal year 441,500 cubic yards, place measurement,
of material were removed at a cost of $140,920.65-$130,395.74 for new
work and $10,524.91 for maintenance.
  The United States derrickboat Babcock was employed 11, 13 and 28
December 1951 in removing shoals in Bayside and Gedney Channels.
During the fiscal year 39 cubic yards place measurement of broken
186           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

stone and sand were removed at a cost of $4,280.76 for maintenance.
   The cost of condition surveys, studies, engineering and surveys
preliminary to dredging was $674.96, for new work and $3,371.65 for
maintenance.
   The total cost of work was $327,503.78 of which $309,326.46 was
for new work and $18,177.32 for maintenance. The total expenditure
was $328,057.59.
   Condition at end of fiscal year.-Work under the existing project
was commenced in 1885 and is about 92 percent complete.
   Main Ship-Bayside-Gedney Channels were completed to a depth
of 30 feet in February 1891. The deepening of Bayside-Gedney
Chanel to 35 feet for a width of 800 feet was completed in June 1939.
   Ambrose Channel was completed to a depth of 40 feet for a width
of 2,000 feet in April 1914 and was substantially completed to a depth
of 45 feet for a width of 2,000 feet in 1951.
   Relocation of Anchorage Channel was completed to a depth of 40
feet in October 1932. The center 800 feet was dredged to 45 feet in
June 1947 and the westerly 600-foot strip in April 1948.
   The channel between Staten Island and Hoffman and Swinburne
Islands was completed in December 1920 up to "within 300 feet of
the southerly limits of the project. The dredged channel meets all
the needs of navigation and no further work of improvement is con-
templated for the present.
   The channel along the New Jersey pierhead line from Kill Van
Kull to Anchorage Channel was completed in March 1939. Widening
at bends near the southerly and northerly ends authorized in 1948
has not yet been done.
   The Red Hook Flats anchorage was completed to 40 and 30 feet
and the Liberty (Bedloe) Island anchorage was completed to 20
feet in October 1944.
   The controlling mean low water depths of the channels included
this project are as follows:

                        Section                             Depth
                                                            (feet)          WidthDate
                                                                            (feet)                     Date

Ambrose Channel .---------------------------                       45      1, 900-2, 000   August 1950 to August 1951.
Main Ship Channel_--                                               29           850-550    June 1952.
Bayside-Gedney Channel---------------------                        35           500-800    April 1951 to February 1952.
Anchorage Channel .,--------------------------                     45      2, 000-1,350        Do.
Craven Shoal -                         -                           30-----------------     July 1931.
Channel between Staten Island and Hoffman
  and Swinburne Islands:
    Buoy 23 to Hoffman Island ---.-.- ---                          13           100-200    November 1943.
    Hoffman Island to Swinburne Island....-..                      10           120-200       Do.
Red Hook Flats Anchorage:
    40-foot area....................----------------------------2 40 --------------        March 1950.
    30-foot area ....____ ___.           -- ---__ ....           3 30 ------ ------ -          Do.
Liberty (Bedloe) Island Anchorage-..-                 -            20
                                                                 420      --               January 1950.
Along New Jersey pierhead line --.----------                       19           500-200    February to March 1948.

    Except for a shoal 100 by 600 feet with least depth of 27 feet located along westerly channel line.
  2 Except for scattered shoals having a minimum depth of 38 feet.
  3 Except for scattered shoals having a minimum depth of 28 feet.
  ' Except for scattered shoals along the westerly side having a minimum depth of 12 feet.


  The work remaining to be done under the existing project consists of
completing the deepening of the easterly 600-foot strip of Anchorage
Channel to 45 feet for a width of 2,000 feet and widening the existing
                RIVERS AND HARBORS-NEW                             YORK, N. Y., DISTRICT                           187
500-foot channel along the New Jersey pierhead line to 800 feet at
the southerly and northerly bends.
    The total cost of the existing project to June 30, 1952, was $19,901,-
311.95-$16,175,963.44 for new work, including $116,530 applied to
removing wrecks authorized by acts prior to the adoption of the exist-
ing project, and $3,725,348.51 for maintenance. The total expendi-
ture was $19,900,502.05.
    Proposed operations.-The balance unexpended at the end of the
fiscal year amounting to $116,309.90 plus an allotment of $521,000
made during fiscal year 1953, a total of $637,309.90 will be applied as
follows:
Accounts payable June 30, 1952-__-             ------
                                       ________----_--        ___     $809. 90
New work: Dredge by use of one United States seagoing hopper
  dredge for about 3.3 dredge months during January-April 1953
  to complete deepening the remaining 600-foot wide easterly sec-
  tion of Anchorage Channel from 40 to 45 feet_-----------------  521, 000. 00
Maintenance: Dredge by use of one United States seagoing hopper
  dredge during August 1952 to restore Bayside-Gedney Channel to
  project dimensions_______------------------
                                      __________ --               100, 000. 00
Channel surveys and miscellaneous inspections and reports-------- 15, 500. 00

         Total for all work-----------------------------__________                                       637, 309. 90
  The sum of $832,700 can be profitably expended for the following
scheduled work during the fiscal year 1954:
New work : Widening the existing 500-foot channel along the New
  Jersey pierhead line to 800 feet at the southerly and northerly bends
  under a continuing contract (March 1953 to June 1953). Amount
  to be expended during the fiscal year     _____________-_________-                                        $500, 000
Maintenance: Dredge by use of one United States seagoing
  horper dredge for about two dredge months during the
  fiscal year to restore the entrance channels to project
  dimensions-- -----------------------------------             $310, 000
Miscellaneous inspections and reports_______________             22, 700
                                                                                                              332, 700
        Total for all work                  -------------------------------------                             832, 700

                                    Cost and financial summary

                                                Fiscal year ending June 30-                              Total to June
                                                                                                        30, 1952, includ-
                                                                                                        ing fiscal years
                                1948            1949          1950           1951           1952         prior to 1948

New work:
   Appropriated--......                    ---
                            $400, 000. 00 .........- _ $412, 000.00 $350,000.00 $400,000.00              $16, 175, 963. 44
    Cost-----    ----   -    390, 304. 92      $110. 21 382, 828. 92 470, 733. 00 309, 326. 46            16, 175, 963. 44
   Expenditures- ...---      401, 885. 32        185. 08   382, 627. 71   470, 474. 74   309, 746. 14     16, 175, 963. 44
Maintenance:
                   .....
   Appropriated------        300, 600. 00   240, 000. 00   117, 300. 00     5, 000. 00   134, 393. 50      3, 840, 848. 51
   Cost-----------      -    320, 828. 97   210, 400. 07   125, 803. 96     5, 902. 69    18, 177. 32      3, 725, 348. 51
    Expenditures.-.....      295, 897. 57   241, 602. 64   129, 200. 22     5, 199. 24    18, 311. 45      3, 724, 538. 61


Other new work data:
    Appropriated for fiscal year ending June 30, 1953--------------$521,000
    Unobligated balance available for fiscal year 1953-------------   521,000
    Estimated additional amount needed to be appropriated for com-
      pletion of existing project-------------------------------      933,000
188     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                    20. CONEY ISLAND CREEK, N.Y.
    Location.-This creek is a narrow tidal inlet which empties into
Gravesend Bay about 10 miles south of the Battery, New York City.
  (See U. S. Coast and Geodetic Survey Chart No. 369.)
    Existing project.-This provides for a channel 12 feet deep at mean
low water and widths varying between 70 and 150 feet, extending
from Gravesend Bay to Shell Road, a distance of about 2 miles. Mean
tidal range, 4.7 feet; means range of spring tides, 5.6 feet; irregular
fluctuations due to wind and barometric pressure vary from 4 feet
below mean low water up to 4 feet above mean high water.
    Estimated cost for new work, revised in 1952, is $265,000, the latest
  (1950) approved estimated cost of annual maintenance is $6,000.
    The existing project was adopted by the River and Harbor Act of
August 30, 1935. (Rivers and Harbors Committee Doc. 12, 73d Cong.,
1st sess.) The latest published map is printed in the project document.
    Local cooperation.-The River and Harbor Act of August 30, 1935,
provided that no work shall be done above any bridge which affords
inadequate clearances for navigation, that all dredging necessary to
afford a suitable passage 12 feet deep through the bridge has been
done without cost to the United States, and that available areas for
the deposit of dredged material shall be furnished by local interests.
    The clearances through the first three bridges were accepted by the
Chief of Engineers under date of February 24, 1936, as being ade-
quate for the existing needs of navigation. The assurances for dredg-
ing through the aforementioned bridges and a spoil-disposal area were
accepted as satisfactory by the Chief of Engineers on April 15, 1937.
    Terminal facilities.-There is an aggregate total of 7,060 feet of
usable marginal wharves or bulkheads extending along Coney Island
Creek to within 1,000 feet of the head of navigation at Shell Road.
The existing facilities appear to be adequate for present commerce.
 (For latest full description of terminal facilities, see Port and Ter-
minal Facilities at the Port of New York, 1942, Corps of Engineers.)
    Operations and results during fiscal year.-The cost and expendi-
tures of a survey to determine the condition of the channel were
$702.39 for maintenance.
    Condition at end of fiscal year.-Work under the existing project
was commenced October 1937 and is about 43 percent complete. When
examined in April 1947 and June 1952 the controlling mean low water
depth was 12 feet for a width of 150 feet from Gravesend Bay to West
23d Street, thence 11 feet for a width varying from 150 to 40 feet to a
point 600 feet below Cropsey Avenue Bridge, thence 7 feet for a width
varying from 75 to 40 feet to a point 400 feet above Cropsey Avenue
Bridge, thence 6 feet for a width varying from 50 to 35 feet to a point
350 feet below abandoned B. M. T. bridge, thence depths decrease
from 2 feet to zero to the head of the project at Shell Road.
    The work remaining to be done under the existing project consists
of completing the deepening of the project channel to 12 feet. No
further work of improvement is contemplated pending reconstruction
of dilapidated bulkheads bordering project channel.
    The total cost and expenditures of the existing project to June 30,
1952, were $71,111.14, of which $69,488.84 was for new work and
$1,622.30 for maintenance.
                    RIVERS AND                     HARBORS-NEW                                   YORK,              N.           Y.,   DISTRICT               189
  Proposedoperation.-No work is scheduled for fiscal years 1953 and
1954.
                                                     Cost and financial summary

                                                                      Fiscal year ending June 30--                                                 Total to June
                                                                                                                                                  30,1952, includ-
                                                                                                                                                   ing fiscal years
                                                 1948                 1949                  1950                   1951                1952            priorto 1948

New work:
                     ........------------------------------...........----............................--------------------............
       Appropriated----                                                                                                                                   $69,488.84
       Cost---------- ---            ----- -           ----------------------- ----------------------                                             --       69,488.84
   Expenditures-........                   .
                                          ----------- ----------- ---------------------                                            -------------           69, 488.84
Maintenance:
       Appropriated .......-                         $560 ....------..-...........---.........--------.......------------.             $702. 39             1, 622. 30
       Cost------- --------                           560 .........------------....................---------......------------          702. 39             1, 622. 30
       Expenditures.......--                          560 ..........---------............------------------------...........            702. 39             1, 622. 30


Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project -------------- $196, 000

                       21. BAY RIDGE AND RED HOOK CHANNELS, N. Y.
   Location.-These channels lie along the east shore of the Upper
Bay, New York Harbor, and with Buttermilk Channel, form an east-
erly channel along the Brooklyn water front from the Narrows to East
River. (See U. S. Coast and Geodetic Survey Charts Nos. 369 and
541.)
   Previous projects.-Adopted by River and Harbor Acts of March
3, 1881, August 11, 1888, September 19, 1890, August 18, 1894, and
June 3, 1896. For further details see page 1768 of annual report for
1915, and page 195 of the annual report for 1938.
   Existing project. This provides for a channel 1,200 feet wide and
40 feet deep at mean low water from the Narrows to Bay Ridge
Avenue, Brooklyn, thence 1,750 feet wide to the junction of Bay Ridge
and Red Hook Channels, thence 1,200 feet wide through Red Hook
Channel to the junction with Buttermilk Channel, and a channel of
the same depth extending into Gowanus Bay from the junction of
Bay Ridge Channel with Red Hook Channel, narrowing uniformly
in width to about 500 feet at 28th Street, Brooklyn. Length of sec-
tion included in the project, 4 miles. Mean tidal range, 4.7 feet; mean
range of spring tides, 5.6 feet; irregular fluctuations due to wind and
barometric pressure vary from 3.9 feet below mean low water up to
4.3 feet above mean high water.
   The cost for new work, for the completed project, was $4,277,196,
exclusive of amounts expended on previous projects. The latest (1950)
approved estimate for annual cost of maintenance is $230,000.
   The existing project was authorized by the following river and
harbor acts:
       Acts                                         Work authorized                                                                    Documents

Mar.      3,1899        Channel 40 feet deep and 1,200 feet wide- ...-                                      .          . Doc. 337, 54th Cong., 2d sess.
                                                                                                                      H...
                                                                                                                         Aemal Report, 1897, p. 1177.
Mar.      2,1907       Dredging to obtain, first, a depth of 35 feet, subse-
                         quently increasing depth to 40 feet for full width.
July      3, 1930      Widening of Bay Ridge Channel to 1,750 feet-....... Rivers and Harbors Committee
                                                                              Doec. 44, 71st Cong., 2d sess.
                                                                                                                         (Contains latest published map.)

            245554-53-vol. 1-                         13
190        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                 1952

   Terminal facilities.-There are 52 piers with a total berthage of
84,366 feet and 8,096 feet of bulkheads and wharves available for
dockage. Twenty-two of the terminals have mechanical handling
devices and 19 have railroad connections. In addition, there are 6
railroad float bridges and 2 ferry slips. Of the terminals, 4 are
Government owned, 15 are owned by the city of New York, and 7 are
open to public use. The terminal facilities are considered adequate
for existing commerce. (For latest full description of terminal facili-
ties, see Port and Terminal Facilities at the Port of New York, 1942,
Corps of Engineers.)
   Operations and results during fiscal year.-The United States sea-
going hopper dredge Essayons was employed intermittently from
April 1, 1952 to May 13, 1952 to restore sections of Bay Ridge and
Red Hook Channels to partial project depth of 35 feet. During the
fiscal year 438,500 cubic yards, place measurement, of material were
removed at a cost of $179,400.01 for maintenance.
   The cost of condition surveys, engineering and surveys preliminary
to dredging were $4,654.99 for maintenance.
   The total cost of work was $184,055 for maintenance. The total
expenditure was $174,437.01.
   Condition at end of fiscal year.-Work under the existing project
was commenced March 1901 and completed June 1940.
   The controlling mean low water depths of the channels included in
in the project are as follows:

                   Section                       Depth    WidthDate                    survey
                                                 (feet)   (feet)                  Date survey

In Bay Ridge Channel from Narrows to Bay             37    1,200-700    March-April 1952.
  Ridge Ave., Brooklyn.
From Bay Ridge Ave. to 41st St. (Pier 7) _....       35     1,750-780       Do.
From 41st St. to junction with Red Hook Chan-        32   1,400-1,200       Do.
  nel.
Branch in Gowanu Bay----------------------           30      650-370    April 1951 and April 1952.
Red Hook Channel -------------------------          37      500-110    March-April 1952.



  The total cost and expenditures of the existing project to June 30,
1952 were $8,435,897.06, of which $4,212,636.95 was regular funds
and $64,559.68 Public Works funds, a total of $4,277,196.63 for new
work and $4,158,700.43 for maintenance.
  Proposed operations.-No work is scheduled for fiscal year 1953.
  The sum of $157,700 can be profitably expended during fiscal year
1954 for maintenance dredging by use of one United States seagoing
hopper dredge for about one month in the removal of shoals, where
necessary, to partial project depth of 35 feet and for miscellaneous
inspections and reports.
               RIVERS            AND HARBORS-NEW                                   YORK,           N.      Y., DISTRICT                     191
                                                Cost and financial summary

                                                              Fiscal year ending June 30                                          Total to June
                                                                                                                                 30, 1952, includ-
                                                                                                                                 ing fiscal years
                                          1948              1949               1950              1951              1952           priorto 1948


New work:
   Appropriated--------------------
                           ............--------....... ....................                        -------------....----------     $5, 523, 296. 63
   Cost-------------------              -------------------------------------------                                                 5, 523, 296. 63
   Expenditures.. ............          ..                                   ....----------------------..-------.......---
                                                                                       ---....----...........----------------       5, 523, 296. 63
Maintenance:
   Appropriated---.........-   -$146. 90   $6, 650. 70                      $8, 000. 00 -$2, 038. 99 $184, 055.00                    4, 158, 700. 43
   Cost ...---------.....    ............ 6, 650. 70                         5, 961.01    ----------- 184, 055. 00                   4, 158, 700. 43
   Expenditures ------             -_...... 6, 650. 70
                                __.....                                      5, 823. 80      137. 21 174, 437. 01                    4, 149, 082. 44



                                22. GOWANUS CREEK CHANNEL, N. Y.

   Location.-Gowanus Creek is a small tidal inlet extending north-
easterly about 11/2 miles from the north end of Bay Ridge Channel.
The channel is shown on United States Coast and Geodetic Survey
Chart No. 369, but is not named; entrance is shown on chart No. 541.
   Previous projects.-Adopted by River and Harbor Acts of March
3, 1881 (under the title of "Gowanus Bay"), August 11, 1888, and
September 19, 1890. For further details see annual report for 1915,
page 1769, and annual report for 1938, page 198.
   Existing project.-This provides for a channel 26 feet deep at mean
low water from Bay Ridge Channel at 28th Street to the foot of
Percival Street, with width decreasing from 300 feet at 28th Street
to 200 feet at Percival Street, and thence 18 feet deep at mean low
water to Hamilton Avenue Bridge, gradually reducing in width to
100 feet at the bridge, all as limited by harbor lines. Length of
section included in the project, three-fourths mile. Mean tidal range,
4.7 feet; mean range of spring tides, 5.6 feet; irregular fluctuations
due to wind and barometric pressure vary from 3.9 feet below mean
low water up to 4.3 feet above mean high water.
   The cost for new work for the completed project was $70,000, ex-
clusive of amounts expended under previous projects. The latest
(1950) approved estimate for annual cost of maintenance is $6,000.
   The existing project was authorized by the following river and
bharbor acts:
       Acts                            Work authorized                                                        Documents

Mar.     3, 1881   Dredging 18-foot channel...________________
June     3,1896    Dredging 26-foot channel...--------------------                       Annual Report, 1896, p. 155; for latest pub-
                                                                                          lished map, see Annual Report for 1903,
                                                                                          p. 919.



  Recommended modification of project.--Under date of September
19, 1950, the Chief of Engineers recommended modification of the
existing project so as to provide for deepening the existing 26-foot
channel to 30 feet, including extension of the deepening and widening
of the channel at the junction with the existing 40-foot project of
Bay Ridge and Red Hook Channels, and for a branch channel 30
feet deep at mean low water and 150 feet wide in the lower 1,000
192          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

feet of Henry Street Basin, at an estimated cost of $287,000 with
$1,500 annually for maintenance, in addition to that now required,
subject to certain conditions of local cooperation.
  Terminal facilities.-There are 108 piers and bulkheads along this
waterway and Gowanus Canal, 5 of which, including a large grain
elevator, are owned and operated by the Port of New York Authority
as a grain terminal; 7 are owned by the city of New York, 24 are
owned and operated by 3 shipyards; and the remainder are privately
owned and operated. The total available berthage is about 53,160
feet. The terminals occupy practically the whole of the water front.
None has rail connections. (For latest full description of terminal
facilities, see Port and Terminal Facilities at the Port of New York,
1942, Corps of Engineers.)
  Operations and results during fiscal year.-The cost and expendi-
tures of a survey to determine the condition of the channel were
$454.60 for maintenance.
  Condition at end of fiscal year.-Work under the existing project
was commenced July 1881 and completed April 1904. When examined
in June 1952, the controlling mean low-water depth was 26 feet for
widths varying from 300 to 150 feet from the entrance up to Percival
Street, thence 18 feet for widths varying from 200 to 50 feet to the
head of the improvement at Hamilton Avenue Bridge.
  The total cost and expenditures of the existing project to June
30, 1952, were $143,631.42, of which $70,000 was for new work and
$73,631.42 for maintenance.
  Proposed operations.-No work is scheduled for fiscal years 1953
and 1954.
                                      Cost and financial summary

                                                Fiscal year ending June 30                         Total to June
                                                                                                   30, 1952, includ-
                                                                                                   ing fiscal years
                                   1948       1949          1950          1951          1952        prior to 1948

New work:
   Appropriated_ --     ---------------------    --------   ------------------------............        $145,000.00
   Cost----      ---------------------------------------------------------                               145, 000. 00
   Expenditures----- -------------- ---------------------------------- --------.--.                      145,000.00
Maintenance:
   Appropriated--------........    $600.00    $700.00     $1, 762. 76   $1, 292. 18     $454. 60          73, 631.42
   Cost----     -- ---              600. 00    700. 00     1, 762. 76    1, 292.18       454. 60          73, 631.42
   Expenditures-------.........     600. 00    700. 00     1, 762. 76    1, 292. 18      454. 60          73, 631.42


                                  23. BUTTERMILK CHANNEL, N. Y.

  Location.-This channel connects deep water in the Upper Bay,
New York Harbor, southwest of Governors Island, with deep water
in East River northeast of Governors Island, and with Bay Ridge
and Red Hook Channels forms an easterly channel along the Brook-
lyn water front from the Narrows to East River. It lies between
Governors Island and Brooklyn Borough, New York City. (See U. S.
Coast and Geodetic Survey Charts Nos. 541 and 745.)
  Previous projects.-Adopted by River and Harbor Acts of June
14, 1880, July 13, 1892, and June 3, 1896. For further details see
page 205, Annual Report for 1932.
  Existing project.-This provides for a channel 1,000 feet wide, 40
feet deep at mean low water for the width of the existing 500-foot
              RIVERS AND               I'ARBORS-NEW YORK, N. Y.,                             DISTRICT             193
channel and 35 feet deep for the remaining 500-foot width west of
the existing channel, with suitable widening at the junctions with
East River and Red Hook and Anchorage Channels. Length of sec-
tion included in the project, 21/4 miles. Mean tidal range 4.4 feet;
mean range of spring tides, 5.3 feet; irregular fluctuations due to
wind and barometric pressure vary from 3.8 feet below mean low
water up to 4.2 feet above mean high water.
    The estimated cost for new work, revised in 1952 is $2,664,000,
exclusive of amounts expended on previous projects. The latest
  (1950) approved estimated cost of annual maintenance is $45,000.
    The existing project was authorized by the following river and
harbor acts:

     Acts                        Work authorized                                         Documents

June 13,1902      Channel 1,200 feet wide and not less than 30           H. Doc. 122, 56th Cong., 2d sess.   (Annual
                   feet deep.                                              Report, 1901, p. 1299.)
Aug. 30,1935      Channel 1,000 feet wide to depths of 40 and 35         Rivers and Harbors Committee Doc. 55,
                   feet.                                                  74th Cong., 1st sess. (Contains latest
                                                                          published map.)


   Terminal facilities.-There are 20 piers with a total berthage of
27,324 feet, and 3,722 feet of bulkheads and wharves available for
dockage. Of the terminals, 13 are equipped with mechanical-han-
dling devices and 14 have railroad connections. Two of the termi-
nals are owned by the city of New York of which one is open to
public use. In addition, there are 2 float bridges and 2 ferry slips.
Practically all of the available water front is occupied and facilities
are considered adequate for existing commerce. (For latest full
description of terminal facilities see Port and Terminal Facilities
at the Port of New York, 1942, Corps of Engineers.)
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-Work under the existing project
was commenced October 1903 and is about 68 percent complete. The
easterly 500-foot width of channel from Anchorage Channel to East
River was completed to a 40-foot depth in May 1935. The westerly
500-foot channel including the widening at the junction with the East
River, was completed to a 35-foot depth for the northerly three-
quarters of a mile of its length in December 1939, and for the southerly
2,000 feet in October 1944. The widenings at the junctions with Red
Hook and Anchorage Channels were completed in December 1943.
The work remaining to be done under the existing project consists
of completing the deepening to 35 feet of the westerly 500-foot channel.
   The controlling mean low water depths of the sections included in
this project are as follows:

                                Section                                     D(feet)   Width (feet)        Date

East half of channel:
   Anchorage Channel to junction with Red Hook Channel....                       33         500-250   May 1951.
   Junction with Red Hook Channel to the East River __-...                       40         100-500   March 1950.
West half of channel:
   Anchorage Channel to 4,000 feet north        -.....................           23         500-250   May 1951.
   4,100 feet north of Anchorage Channel to 9,000 feet north                     27         250-500   March 1950.
   9,000 feet north of Anchorage Channel to the East River...                    33         250-500   March 1950.
194         REPORT OF CHIEF OF ENGINEERS,                                   U. S. ARMY,               1952


   When examined in March 1950 and May 1951, the controlling depths
in the widenings at the junctions with Anchorage, Red Hook and East
River Channels were 28, 34 and 35 feet, respectively.
   The total cost and expenditures of the existing project to June
30, 1952 were $2,002,195.94, of which $122,051.24 were Public Works
funds and $1,323,616.66 regular funds, a total of $1,445,667.90 for new
work and $556,528.04 for maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year amounting to $155,000 plus an allotment of $1,500 made
during fiscal year 1953, a total of $156,500 will be applied to main-
tenance dredging by use of one United States seagoing hopper dredge
for about 1.4 dredge months during August-September 1952 to restore
the southerly 0.6 mile reach of the 35- and 40-foot channels to a depth
of 35 feet and miscellaneous inspection and reports.
   No work is scheduled for fiscal year 1954.
                                       Cost and financial summary

                                                   Fiscal year ending June 30                                 Total to June
                                                                                                          30,1952, includ.
                                                                                                          ing fiscal years
                                     1948        1949          1950            1951            1952         priorto 1948

New work:
   Appropriated ........--------                           ------- ----------- $1, 941, 917. 90
                        -------------------.......................----------..............
   Cost--.         --------- ------------ ---------------------------------                                     1,941,917.90
   Expenditures...---------   ----           ----------------------- ---------- ------------                    1,941,917.90
Maintenance:
   Appropriated-....... $80, 000. 00          $11, 000. 00   $2, 782. 04 ---------                $155, 000       711, 528. 04
   Cost---                    90, 194. 38
                   ..------------                  805. 62    2, 782. 04 ------------ ----------                  556, 528. 04
   Expenditures--------       80,000. 00       11, 000. 00    2, 782. 04 ------------------------                 556, 528. 04


Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project------------- $1,218, 000

                                            24. EAST RIVER, N. Y.

  Location.-This is a tidal strait about 16 miles long and 600 to 4,000
feet wide, connecting Hudson River and the Upper Bay at the Battery,
New York City, with Long Island Sound at Throgs Neck, New York
City, and separating Long Island from Manahattan Island and the
mainland. (See U. S. Coast and Geodetic Survey Charts Nos. 223,
226, and 745.)
   Previous projects.-Adopted by River and Harbor Acts of August
30, 1852, July 25, 1868, March 3, 1899, and June 25, 1910. For further
details see page 210, annual report for 1932.
   Existing project.-This provides for channels of the following
dimensions (depths refer to mean low water): From deep water in
the Upper New York Bay to Wallabout Channel, 40 feet deep and
1,000 feet wide; from Wallabout Channel to Throgs Neck, 35 feet deep,
with widths varying from about 550 to 1,000 feet, according to locality;
east of Welfare (Blackwells) Island up to English Place (43d Drive),
Long Island City, 30 feet deep and varying in width from 500 to 900
feet, with widening in the approach from the main channel; between
South Brother and Berrian Islands, 20 feet deep and 300 feet wide,
with widening in the approach from the main channel; for the removal
of Coenties Reef to a depth of 40 feet, also the removal of the follow-
            RIVERS AND HARBORS-NEW                         YORK,      N.     Y.,        DISTRICT             195
ing rocks and reefs lying outside of the limiting lines of the main
channel to give access to wharves :Along the Brooklyn shore, Brooklyn
Bridge to Manhattan Bridge (Fulton Ferry Reef), to a depth of 25
feet; Jay Street Reef, 25 feet; Corlears Reef, 35 feet; Shell Reef, 25
feet; Horns Hook, 40 feet; Rhinelander Reef, 26 feet; and reef off
Oak Point, 30 feet; and for the construction of a dike in Pot Cove in
Hell Gate. The length of the section included in the improvement is
about 16.5 miles. The mean range of tide varies according to locality
from 4 feet at North Third Street, Brooklyn and 4.4 feet at the Battery
to 4.9 feet at Hallets Point, 6.5 feet at Port Morris, and 7.1 feet at the
eastern entrance at Throgs Neck; mean range of spring tides 4.8, 5.3,
5.9, 7.6, and 8.5 feet, respectively; irregular fluctuations due to wind
and barometric pressure vary according to locality from 3.8 feet below
mean low water at the Battery, 2.4 feet at North Third Street, Brook-
lyn and 3.8 feet at Throgs Neck up to about 4.2 feet above mean high
water at the Battery and 8.4 feet above mean high water at Throgs
Neck; extreme fluctuations do not seriously affect navigation.
   The cost for new work, for the completed project, exclusive of
amounts expended on previous projects, was $23,849,719. The latest
 (1950) approved estimate for annual cost of maintenance is $25,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                               Work authorized                                          Documents


Mar. 3,19151    Removal of Coenties Reef to 35 feet, conditioned upon local        H.     Doc. 188, 63d Cong.,
                 interests increasing depth to 40 feet.                                 1st sess.
July 27,1916    Channel across Diamond Reef 35 feet deep and 1,000 feet wide_             Do.
Aug. 8,1917     Channel east of Blackwells Island to 20 feet; channel between             Do.
                 South Brother and Berrian Islands, to 20 feet; channel
                 between North and South Brother Islands to 26 feet.
    Do_.        Chamnnel 4Qfeet deep through East River and Hell Gate-...-         H. Doc. 140, 65th Cong.,
                                                                                     1st sess.
July 18, 1918   Secure a depth of 40 feet in channel through East River and        Specified in act.
                  Hell Gate as soon as practicable.
Sept. 22,1922   Depth limited to 35 feet in the through channel between            Rivers and Harbors Com-
                 Wallabout Channel and Throgs Neck. Channel east of                 mittee  Doec. 3, 67th
                 Blackwells Island, 30 feet to English Place and eliminated         Cong., 2d sess. (Con-
                 20-foot channel north of English Place.   Eliminated chan-             tains    latest   published
                 nel between North and South Brother Islands except as              map.)
                 authorized prior to existing project. Removal of certain
                 rocks and reefs and construction of dike in Pot Cove, Hell
                  Gate.



1 Pub. Res. 67, 63d Cong., 3d sess.


  Local cooperation.-Fullycomplied with.
  Terminal faeilities.-There are 120 piers with a total berthage of
85,844 feet and 56,518 feet of bulkheads and wharves available for
dockage along both shores of the East River from the Battery to
Clason Point. In addition, there are 10 ferry slips and 20 car-float
bridges. Of the terminals, 141 are publicly owned, 5 are open to
public use, 93 are equipped with mechanical-handling devices, and
41 have railroad connections. The facilities are considered adequate
for present needs. (For latest full description of terminal facilities
see Port and Terminal Facilities at the Port of New York, 1942,
Corps of Engineers.)
  Operations and results during fiscal year.-The cost and expendi-
tures of a survey to determine the condition of the 35- and 40-foot
channel were $8,580.31 for maintenance.
196           REPORT OF CHIEF OF ENGINEERS,                                          U.    S.     ARMY,          1952


   Condition at end of fiscal year.--Work under the existing project
was commenced June 1916 and was substantially completed Septem-
ber 1935.
  The controlling mean low water depths of the various channels
as determined by intermittent surveys made during the period 1910
to 1952, are as follows:

                                              SectionDepth                                                                    Width
                                                         section                                              (feet)          (feet)

From Upper Bay to Wallabout Channel--...--...........-----------................-------------------                    40    950-1, 000
Corlears Reef ---------------------------------------------------------                                                29...
From Wallabout Channel through west channel at Welfare (Blackwells) Island
  and Hell Gate to Throgs Neck at Long Island Sound-------------........----------.......                              35     550-1, 000
East Channel at Welfare (Blackwells) Island:
    From Newtown Creek to English Place (43d Drive) Long Island City--------.......                                    30----------...
    From English Place to deep water off north end of Welfare Island------------                                       24 ...
Between South Brother and Berrian Islands.................-------------------------------                              20              300
Coenties Reef------------------------------------...........-------------------............................            40----------
Fulton Ferry Reef-----------------------------------------------------                                                 25----------
Jay Street Reef--------------   ----------------------------------------                                               20
Shell Reef-.----------------------------------------------------------                                                 25----------
Horns Hook Reef--------       -----------------------------------------                                                40
Rhinelander Reef------------       .--------------------------------------------                                       26----------
Reef Off Oak Point----------------------------------------------------------                                           30----------

  1 Except for scattered shoals in the vicinity of Belmont Island with least depth of 25.5 feet.

   The removal of a small shoal area along the east side of the 35-foot
channel between Grand Street and North Third Street, Brooklyn,
the construction of the dike at Pot Cove in Hell Gate, a part of the
widening near the pierhead line in Jay Street Reef, and North Third
Street, Brooklyn, were omitted as unnecessary, the work completed
being considered sufficient for the needs of navigation.
   The total cost and expenditures of the existing project to June
30,1952, were $24,686,366.10, of which $1,743,265.42 were Public Works
funds and $22,106,453.80 regular funds, a total of $23,849,719.22 for
new work and $836,646.88 for maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year amounting to $5,419.69 plus an allotment of $60,180.31 made
during fiscal year 1953, a total of $65,600 will be applied to mainte-
nance dredging by contract (March 1953) to restore project depth
of 40 feet in the vicinity of Corlears Reef and miscellaneous inspec-
tions and reports.
   No work is scheduled for fiscal year 1954.
                                           Cost and financial summary

                                                         Fiscal year ending June 30                                     Total to June
                                                                                                                       30,1952, includ-
                                                                                                                       ing fiscal years
                                       1948            1949            1950            1951             1952            priorto 1948

New work:
    Appropriated   - -------------------                                        $30,037,412. 72
                                             -----------------------............----------........
    Cost .---------------------------------------------------------------- 30,037, 412. 72
    Expenditures    -------------  -------------------- ----------- ----------- 30,037, 412.72
Maintenance:
    Appropriated---....---- --------  $1, 000                           $5, 900     $1, 229. 42    $14, 000. 00              879, 730. 52
                                       1, 000
    Cost....----------------------------                                 5, 900      1, 229. 42      8, 580. 31              874, 310. 83
                                       1, 000
    Expenditures.....---------------------                               5, 900      1, 229. 42      8, 580. 31              874, 310. 83
              RIVERS AND HARBORS--NEW                         YORK,       N. Y.,    DISTRICT           197

                                  25. NEWTOWN CREEK, N. Y.

   Location.-This creek is a tidal waterway entering the East River,
N. Y., and 41/2 miles by water northeast of the Battery, New York
City, and forms a part of the boundary between the boroughs of
Brooklyn and Queens, New York City. (See U. S. Coast and Geo-
detic Survey Chart No. 745.)
   Previous projects.-Adopted by River and Harbor Acts of June 14,
1880, July 5, 1884, and June 3, 1896. For further details see page
1769 of Annual Report for 1915, and page 207 of Annual Report
for 1938.
   Existing project.-This provides for a channel 23 feet deep and 130
feet wide from East River to a point about 150 feet north of Maspeth
Avenue; for a turning basin at the former location of Mussel Island
and a triangular area lying on the north side of the entrance to the
creek of the same depth; for a channel 20 feet deep at mean low water
elsewhere in Newtown Creek, including Dutch Kills, Maspeth Creek,
and English Kills, of the following widths: 150 feet wide from
Maspeth Avenue to Grand Street Bridge, thence 125 feet wide to
Metropolitan Avenue on the East Branch; 100 feet wide for a distance
of 2,000 feet up Maspeth Creek; 75 to 100 feet wide for a distance of
2,800 feet up Dutch Kills with a turning basin at the head; and 150
feet wide in English Kills; or West Branch, to the Metropolitan
Avenue Bridge, including the easing of bends, and for a channel 12
feet deep and 100 feet wide in English Kills from the Metropolitan
Avenue Bridge to within 80 feet of the Montrose Avenue Bridge, suit-
ably widened at bends and materially widened by excavating upland
at the second bend above the Metropolitan Avenue Bridge. The
total length of channel included in the project is about 5.2 miles.
Mean tidal range, 4.2 feet; mean range of spring tides, 5 feet; irregu-
lar fluctuations due to wind and barometric pressure vary from 3.8
feet below mean low water up to 4.2 feet above mean high water.
   The estimate of cost for new work, revised in 1952, is $1,310,000,
exclusive of amounts expended on previous projects. The latest
(1950) approved estimate for annual cost of maintenance is $36,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                  Documents
                                                                                                           1
Mar.     2,1919   20-foot channel_.....--.----------------..-.__          H. Doe. 936, 64th Cong., 1st sess.
July     3,1930   23-foot channel--....---------------------------        Rivers and Harbors Committee
                                                                           Doc. 42, 71st Cong., 2d sess.'
Aug. 26, 1937     12-foot channel in English Kills--.....---------------- Rivers and Harbors Committee
                                                                                                 1
                                                                           Doc. 4, 75th Cong., 1st sess.
                  Minor modification of project in the vicinity of Mus-
                   sel Island, without change in cost, approved by the
                   Secretary of War, Mar. 22, 1920.

I Contains latest published maps.


  Local cooperation.-The River and Harbor Act of March 2, 1919,
requires that all land needed for rights-of-way be furnished without
cost to the United States, and provides that no work shall be done in
Maspeth Creek, in the removal of Mussel Island, or in English Kills
until this has been done in each case and corresponding changes made
198     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,           1952

in existing harbor lines; also that no work shall be undertaken under
the existing project in Dutch Kills until the obstructive bridges near
its mouth have been suitably modified.
   The River and Harbor Act of August 26, 1937, requires that local
interests furnish, free of cost to the United States, necessary easements
of rights-of-way for the enlargement of the channel in English Kills
above Metropolitan Avenue and give assurances satisfactory to the
Secretary of War that they will remove obstructive deposits resulting
from the discharge of sewage into the waterway. That act also re-
quires that before widening the second bend south of Metropolitan
Avenue local interests shall furnish necessary lands or rights-of-way
and construct a new bulkhead on the widened channel.
   The lands needed in Maspeth Creek, Mussel Island, and the East
Branch have been ceded to the United States by the city of New York
by deed. The work of modifying the bridges near the mouth of
Dutch Kills was completed in 1923. No action has been taken by the
city authorities to comply with the requirements for dredging in
English Kills (West Branch).
   Terminal facilities.-The length of waterfront measured along
both sides of the improvement is 11.6 miles, of which 9.6 miles are
bulkheaded and about 2 miles of frontage, distributed over the entire
length of this waterway, is yet undeveloped. There are 5 piers with
a total berthage of 3,062 feet and 44,137 feet of bulkheads and wharves
available for dockage. Of the terminals, 8 are owned by the city of
New York, of which 5 are open to public use; 55 are equipped with
mechanical handling devices, and 23 have railroad connections. The
terminal facilities are considered adequate for present needs. (For
latest full description of terminal facilities see Port and Terminal
Facilities at the Port of New York, 1942, Corps of Engineers.)
    Opierations and results during fiscal year.--Under a contract for
dredging to a depth of 16 feet in English Kills from the entrance to
Metropolitan Avenue, work was commenced January 17, 1952 and
completed February 16, 1952. During the period 63,387 cubic yards,
place measurement, of material were removed at a cost of $80,636.28 for
maintenance under the previous project.
   The cost of surveys and engineering preliminary to contract dredg-
ing in English Kills was $2,482.93 for maintenance under the previous
project. The cost of a survey to determine the condition of the chan-
nel in East Branch was $197.22 for maintenance.
   The total cost of work was $83,316.43, of which $197.22 was under
the existing project and $83,119.21 under the previous project, all for
maintenance. The total expenditure was $83,007.06, of which $197.22
was under the existing project and $82,809.84 under the previous
project.
    Condition at end of fiscal year.-Work under the existing project
was commenced May 1921 and is about 64 percent complete. The
work of enlarging the main channel to 23-foot depth and 130-foot
width from the entrance to 150 feet north of Maspeth Avenue, includ-
ing the triangular area at the entrance, and a turning basin at the
former location of Mussel Island, is about 90 percent completed.
Dutch Kills has been dredged to project depth, 20 feet, for a width of
75 to 100 feet except at a few places near the head of improvement
              RIVERS       AND HARBORS--NEW                        YORK,       N.     Y.,    DISTRICT                199
where unstable bulkheads restricted dredging operations. Maspeth
Creek has been dredged to project dimensions throughout. Newtown
Creek is navigable on the West Branch (English Kills) to Johnson
Avenue, 3.92 miles from East River and on the East Branch to
Metropolitan Avenue, 3.29 miles from the East River.
   The controlling mean low water depths of the channels included in
this project are as follows:

                                    Section                                         Depth
                                                                                    (feet) Width
                                                                                           (feet)             Date

Main channel:
    From East River to south end of turning basin at Mussel Island....                  23   280-100      July 1950.
    From south end of turning basin at Mussel Island to 150 feet below                  18   130-160      August 1949.
     Maspeth Ave.
Turning Basin at Mussel Island_-------..........                  ---.--.........       19   ........         Do.
Dutch Kills:
    From Newtown Creek to 100 feet below Borden Avenue Bridge ...                       15    30-100      February 1949.
    From 100 feet below Borden Avenue Bridge to turning basin at the                    12    25-100         Do.
     head.
   Maspeth Creek...........................--------------------------------------------  8    50-100      August 1949.
East Branch:
    From 150feet below Maspeth Ave. to Grand Street Bridge----------........            16    60-130      June 1952.
    From Grand St. Bridge to Metropolitan Ave------......----------------13                   125-85         Do.
English Kills (West Branch):
    From junction with East Branch to Metropolitan Avenue----.........                  16       150    Do.
    From Metropolitan Avenue to within 80 feet of Montrose Avenue....                    8    80-100 March 1949.

  1   Excludes a length of 300 feet below easterly limit of project where the depth ranges from 8 feet to 0.

   The work remaining to be done consists of completing to project
dimensions: The 23-foot main channel between Greenpoint and
Meeker Avenues, and between 800 and 150 feet north of Maspeth
Avenue; the 20-foot channel in the East Branch; and the 20- and
12-foot channels in English Kills.
   The total cost and expenditures of the existing project to June 30,
1952 were $1,262,649.82, of which $767,093.96 for new work and $495,-
555.86 for maintenance.
   Proposed operations.-The balance unexpended at the end of the
fiscal year amounting to $1,362.94 minus accounts payable of $309.37,
a total of $1,053.57 will be applied to costs outstanding in connection
with contract for maintenance dredging in English Kills completed
during fiscal year 1952.
   No work is scheduled for fiscal year 1954.
                                       Cost and financial sunrmary

                                                    Fiscal
                                                         year ending June 30                              Total toJune
                                                                                                          30,1952, includ-
                                                                                                          ing fiscal years
                                   1948           1949          1950           1951           1952          prior to1948

New work:
   Appropriated--...............---------......--------------------------------------------....             $1,168,354.47
   Cost-....----------                 ------------------------ --------.----------- -----------             1,168,354. 47
   Expenditures-................---------       --------     ---------------- ------------------------.      1,168, 354.47
Maintenance:
   Appropriated- ........             -$1,282. 92        $1, 490 $342, 500. 00 -$8, 698. 95 $84,370. 00        918, 426. 81
   Cost..........---- .......--------.  33, 311. 37       1,490 216, 417. 59 117,383. 46 83, 316. 43           917, 373. 24
   Expenditures--------.........         34, 410.04       1,490     92, 853. 99 240,947. 06 83, 007. 06        917, 063. 87


Other new work data: Estimated additional amount needed to be
      appropriated for completion of existing project ---------------- $543, 000
200           REPORT         OF CHIEF OF ENGINEERS, U. S. ARMY,                                            1952

                                          26. HARLEM RIVER, N. Y.

   Location.--Harlem River and Spuyten Duyvil Creek, both included
in the project for the improvement of Harlem River, are two con-
necting tidal waterways, of a joint length of about 8 miles, lying
wholly within the limits of Greater New York and separating Man-
hattan Island from the mainland. (See U. S. Coast and Geodetic
Survey Chart No. 274.)
   Previous projects.-Adopted by the River and Harbor Act of June
23, 1874. For further details see annual report for 1915, page 1762,
and annual report for 1938, page 210.
   Ewisting project.-This provides for a continuous channel 15 feet
deep at mean low water and 400 feet wide from East River to Hudson
River, except in the vicinity of Washington Bridge, where the adopted
width is 354 feet, and at the rock cut through Dyckmans Meadow,
where it is 350 feet and the depth is 18 feet. It also provides for
straightening the channel at Johnson Iron Works by making a cut
15 feet deep and 400 feet wide. The length of channel included in
the project is about 8 miles. The main tidal range varies, according
to locality, from 4.9 feet at Willis Avenue Bridge to 3.8 feet at
Spuyten Duyvil Bridge; range of spring tides, 5.9 and 4.5 feet, re-
spectively. Irregular fluctuations due to wind and barometric pres-
sure vary from 3.8 feet below mean low water up to 4.7 feet above
mean high water at Willis Avenue Bridge and from 3.7 feet below
mean low water up to 4 feet above mean high water at Spuyten Duyvil
Bridge.
  The cost for new work, for the completed project, was $3,595,119,
exclusive of amounts expended on previous projects. The latest
(1950) approved estimate for annual cost of maintenance is $25,000.
  The existing project was authorized by the following river and
harbor acts:

       Acts                             Work authorized                                               Documents

June 18,1878      Channel 15 feet deep and 350 feet wide ...---....--------.......--....H.     Ex. Doc. No. 75, Pt. 9, 43d
                                                                                             Cong., 2d sess. (Annual Report,
                                                                                             1875, pt. 2, p. 224.)
                  Chief of Engineers authorized widening to 400 feet                   Annual Report, 1886, p. 674.
                    throughout except at Dyckmans Cut, where width
                    was kept at 350 feet and depth increased to 18 feet.
                  Chief of Engineers in 1893 reduced width of channel                  Annual Report, 1912, p. 198.
                    in vicinity of Washington Bridge to 354 feet.
Mar.    4, 1913   Straightening channel at Johnson Iron Works_ _.-..                   H. Doc. No. 557, 62d Cong., 2d sess.
                                                                                             (Contains latest published maps.)


   Local cooperation.-Fully complied with.
   Terminal facilities.-The length of the water front along both
shores of the Harlem River is about 16 miles, of which 4 miles are
unavailable for commercial use. About 5 miles of the waterfront
are occupied by 6 piers with a total berthage of 2,692 feet and 23,699
feet of bulkheads and wharves available for dockage. Twenty-six
of the terminals are owned by the city of New York. One of the latter
is used as a barge canal terminal. Of the terminals owned by the city,
six are open to the public on equal terms. Forty-three of the termi-
nals are equipped with mechanical-handling devices and 12 have rail-
road connections. In addition, there are four railroad float bridges.
              RIVERS AND               HARBORS--NEW                    YORK,       N.    Y.,    DISTRICT                201

The terminal facilities are considered adequate for present needs.
 (For latest field description of terminal facilities, see Port and Termi-
nal Facilities at the Port of New York, 1942, Corps of Engineers.)
   Operations and results during fiscal year.-The cost of a survey to
determine the condition of the channel was $387.07 for maintenance.
The expenditure was $1,194.11.
   Condition at end of fiscal year.-Work under the existing project
was commenced January 1888 and was substantially completed May
1938. Remaining widening to be done in the section above High
Bridge is prohibited by the proximity of bulkheads to the channel
line. The present width is considered adequate for navigation. No
further improvement is contemplated under the project. A channel
15 feet deep at mean low water and 400 feet wide has been excavated
from East River to High Bridge, thence 15 feet deep and 350 to 400
feet wide to the Hudson River. The rock cut through Dyckmans
Meadow was completed to 18-foot depth and 350-foot width in 1816.
The straightening of the channel at Johnson Iron Works was com-
pleted to 15-foot depth- and 400-foot width in 1938. The controlling
depth from East River to Hudson River, as shown by examination
made in December 1949 to June 1951 was 15 feet at mean low water
through a navigable channel varying from 50 to 400 feet in width,
except for a shoal in the vicinity of Little Hell Gate having a mini-
mum depth of 14 feet and scattered shoals between Sherman Creek
and Broadway Bridge having a minimum depth of 10 feet.
   The total costs and expenditures of the existing project to June 30,
1952, were $3,866,698.60, of which $3,595,119.48 was for new work
and $271,579.12 for maintenance.
   Proposed operations.-No work is scheduled for fiscal years 1953
and 1954.
                                        Cost and financial summary

                                                     Fiscal year ending June 30                              Total to June
                                                                                                             30, 1952, includ-
                                                                                                             ing fiscal years
                                    1948           1949              1950        1951           1952          priorto 1948

New work:
   Appropriated---        ------ ---------------------------------------------............                     $3,616,119.48
   Cost------------         --------------------------------------............-----------............
                             ............                                                                       3, 616, 119. 48
   Expenditures    - ----------- ------------              -----------------------------------............      3, 616, 119. 48
Maintenance:
    Appropriated---....                         ------------   $4,
                                                                800. 00 $2, 316. 00
                                                             $------------                ------------             271, 579. 12
    Cost-----------         ------------------------         4, 800. 00     987. 02             $387.07            271, 579. 12
    Expenditures........--- ------------ ------------ 4, 800. 00            179. 98            1,194.11            271, 579. 12



                27. HUDSON RIVER CHANNEL, NEW YORK HARBOR

  Location.-Hudson River empties into the Upper Bay of New York
Harbor at the Battery, New York City. The section included under
this title extends from deep water in upper New York Bay to just
north of Harlem River (Spuyten Duyvil Creek), a distance of about
14.5 miles. (See U. S. Coast and Geodetic Survey Charts Nos. 274,
745, and 746.)
  Previous projects.-Adopted by River and Harbor Acts of March 3,
1875, June 6, 1900, and March 3, 1905. For further details, see annual
report for 1915, page 1765, and annual report for 1938, page 213.
202           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   Existing project.-This provides for a channel 48 feet deep and
2,000 feet wide, suitably widened at the bends, from West 59th Street,
Manhattan, to West 40th Street, thence 45 feet deep of the same width
to deep water in Upper Bay; for a channel 40 feet deep for the full
width of the river extending from the north line of 59th Street to
the south side of Little Basin, and thence a channel of the same depth
to deep water in the Upper New York Bay off Ellis Island, substan-
tially as shown on maps in House Document 309, Seventy-second Con-
gress, first session, subject to the provision that no dredging shall be
done under the project within 50 feet of the pierhead lines; a channel
750 feet wide and 30 feet deep along the Weehawken-Edgewater water-
front; the removal of a shoal on the New York side 'between West
59th and West 61st Streets to a depth of 40 feet; and the removal of
an obstruction north of the mouth of Spuyten Duyvil Creek to the
depth of the surrounding river bottom. The length of channel in-
cluded in the project is about 11 miles. The plane of reference is
mean low water. Mean tidal range at the Battery, 4.4 feet, and at
West 129th Street, 4.1; mean range of spring tides, 5.3 feet and 4.9
feet, respectively; irregular fluctuations due to wind and barometric
pressure vary from 3.8 feet below mean low water at the Battery up
to 4.2 feet above mean high water and at West 129th Street from 3.6
feet below mean low water up to 4.2 feet above mean high water.
   The estimated cost for new work, revised in 1952, is $6,778,000, ex-
clusive of the amounts expended on previous projects. The latest
 (1950) approved estimate for annual cost of maintenance is $390,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                             Work authorized                                Documents

Mar.     4,1913   Channel 30 feet deep from Ellis Island to Newark St.,     H. Doc. 719, 62d Cong., 2d sess.
                    40 feet deep through the shoal from Newark St. to
                    Castle Point and channel 26 feet deep and 550 feet
                    wide along Weehawken-Edgewater water front.
                    Removal of shoal east side of river between West
                    19th and West 32d St.; removal of rock near the
                    Battery to 40 feet, and removal of obstruction near
                   Sputyen Duyvil Creek.
Mar.     4,1915   Additional dredging through shoal from Newark St.         Annual Report, 1914, pp. 234-235.
                    to Castle Point.
Aug.     8,1917   Removal of shoal between West 32d and West 61st           H. Doc. 1697, 64th Cong., 2d sess.
                   Sts. to 40 feet and widening the 40-foot channel be-
                   tween the Battery and Canal St. to 2,000 feet.
Mar.     3,1925   Channel 30 feet deep and 750 feet wide along Weehaw-      H. Doc. 313, 68th Cong., 1st sess.
                   ken-Edgewater water front.
Jan. 21,1927      Modification of conditions of local cooperation affect-
                   ing channel along Weehawken-Edgewater water
                   front.                                                                                       1
July     3,1930   Channel 40 feet deep between pierhead lines from 20th     H. Doc. 450, 70th Cong., 2d sess.
                    St., Manhattan, to a point 1,300 feet below Newark
                    St., Hoboken, thence 2,800 feet wide to deep water
                    off Ellis Island. Channel 30 feet deep between 40-
                    foot channel and channel along Jersey City water
                    front.
Aug. 30,1935'     Widening the 40-foot channel to full width of river       H. Doc. 309, 72d Cong., 1st sess.1
                   from north line of 59th St. to south side of Little
                    Basin, thence a channel of same depth to deep water
                    off Ellis Island.
   Do--....... Waiver of all conditions of local cooperation affecting Rivers and Harbors Committee
                the channel along the Weehawken-Edgewater water          Doc. 49, 72d Cong., 2d sess.
                front.
Aug. 26,1937 Channel 45 and 48 feet deep and 2,000 feet wide-....... Senate Committee Print, 75th,
                                                                         Cong., 1st sess.'

  SContain latest published maps.
  2Also Public Works Administration Sept. 6, 1933, and Apr. 27, 1935.
        RIVERS AND   HARBORS-NEW       YORK,   N.   Y.,   DISTRICT   203
   Terminal facilities.-The length of waterfront included in the proj-
ect for improvement, measured along both shores of the river, is 32
miles; of this length 7 miles of the Manhattan waterfront and 10 miles
of the New Jersey waterfront have been developed for commercial
use. Along the Manhattan waterfront, there are 96 piers with a
total berthage of 134,947 feet, 4,465 feet of bulkheads and wharves
available for dockage, 12 ferry slips, and 6 car-float bridges. Along
the Jersey waterfront, there are 135 piers having a total berthage of
167,760 feet, 23,948 feet of bulkheads and wharves available for
dockage, and 7 ferry slips, 11 car-float bridges, 6 small boat repair
yards, and 1 large shipyard. Of the terminals, 134 are publicly owned,
27 are open for public use, 159 are equipped with mechanical-handling
devices, and 135 have railroad connections. The facilities are adequate
for present requirements. (For latest full description of terminal
facilities see Port and Terminal Facilities at the Port of New York,
1942, Corps of Engineers.)
   Operations and results during fiscal year.-The United States
seagoing hopper dredge Essayons was employed intermittently from
November 10, 1951 to March 31, 1952, in dredging sections of the
channel between the Battery and West 40th Street to a depth of 45
feet. During the fiscal year 540,400 cubic yards place measurement
of material was removed at a cost of $162,833.09 for new work.
    The United States derrick boat Babcock was engaged in removing
shoals in the channel, vicinity of Ellis Island from June 2 to 10,
1952. During the fiscal year 294 cubic yards of material were re-
moved at a cost of $7,812.83 for new work.
   The United States seagoing hopper dredge Essayons was employed
from September 12 to 17, 1951; the United States seagoing hopper
dredge Goethals was employed from November 28, 1951 to December
9, 1951 in dredging to restore the channel along the Weehawken-
Edgewater waterfront to a depth of 30 feet. During the fiscal year
249,600 cubic yards place measurement of material were removed
at a cost of $81,221.73 for maintenance.
   The cost of studies and investigation of shoaling in Weehawken-
Edgewater Channel, surveys and engineering preliminary to dredg-
ing were $4,012.63, of which $870 was for new work and $3,142.63
for maintenance.
    The total cost of work was $255,880.28, of which $171,515.92 was
for new work and $84,364.36 for maintenance. The total expenditures
were $255,740.09.
    Condition at end of fiscal year.-Work under the existing project
was commenced April 1913 and was substantially completed in June
1952. The work of widening and deepening Weehawken-Edgewater
Channel to project dimensions was completed in August 1937. The
work of widening the 40-foot channel for the full width of the river
from Ellis Island to West 59th Street, Manhattan, was completed
in March 1939. The work of widening the 48-foot project to full
project width of 2,000 feet from West 40th Street to West 59th Street
was completed in November 1950. Deepening of the 45-foot channel
for a width of 2,000 feet from Upper Bay to West 40th Street was
204           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

substantially completed to project dimensions in June 1952, with the
exception of minor isolated shoals which will be removed in August
1952.
  The controlling mean low water depths of the sections included in
the project are as follows:

                            Section                                  Depth
                                                                     (feet)        Width
                                                                                   (feet)                     Date


40-foot channel:
     From Ellis Island to West 59th St....----------------...............   40   3,200-2,200      October 1949-May 1951.
45-foot channel:
     From Ellis Island to West 40th St--......--.....-----........          45   2,000-1, 500           Do.
48-foot channel:
     From West 40th St. to West 59th St----------------.................    48   2, 000-1, 500    April 1951.
Weehawken-Edgewater Channel:
     From West 59th St. to opposite Valvoline Oil dock._                    30        350-750     May 1950-June 1951.
     From opposite Valvoline Oil dock to West 156th St.,                    26        320-750     May 1950.
        Manhattan.



   The total cost of the existing project to June 30, 1952, was $10,599,-
108.89, of which $668,820.36 was Public Works funds and $6,029,323.15
regular funds--a total of $6,698,143.51 for new work and $3,900,965.38
for maintenance. The total expenditures were $10,598,387.49.
   Proposed operations.--The balance unexpended at the end of the
fiscal year amounting to $215,810.46 plus an allotment of $95,990.74,
a total of $311,801.20 will be applied as follows:
Accounts payable June 30, 1952_ __------ ------ __------- --                                                     $721.40
New work: Removal of isolated shoals in the 45-foot channel by use
  of U. S. Government plant during August 1952 to complete the
  project--    ---    ----------------------------------------                                                  4479.80
Maintenance:
    Dredge by use of one United States seagoing hopper
      dredge intermittently for about 2.7 dredge months
      during the fiscal year to restore the channel along
      the Weehawken-Edgewater waterfront to 30 feet .-- 300, 000
    Channel surveys and miscellaneous inspections and
      reports--------------------------------------            6, 600
                                                                                                 ----         306, 600. 00

                 Total for all work _____                __          ______-___-       ________ 311, 801.20
  The sum of $317,200 can be profitably expended during fiscal year
1954 for the following scheduled work:
Maintenance :
    Dredge by use of one United States seagoing hopper dredge for
      about 2 dredge months during the fiscal year to restore the
      channel along the Weehawken-Edgewater waterfront to 30 feet_ $310, 000
Miscellaneous inspections and reports__---___ -______-_____-__        7, 200
         Total for all work                  ------------------------------------                                317,200
                  RIVERS AND             HARBORS--NEW                    YORK,        N.    Y., DISTRICT                  205
                                           Cost and financial summary

                                                         Fiscal year ending June 30                             Total to June
                                                                                                               30, 1952, includ-
                                                                                                               ing fiscal years
                                       1948            1949           1950          1951           1952          priorto 1948


New work:
   Appropriated---------.....................----------------....... $400,000.00 $300,000.00 $175,000.00         $6, 772, 252. 43-
       Cost .------------------------------                       336, 452. 79   362, 551.49    171, 515. 92      6, 767, 772. 63
       Expenditures----.........-...........                      330, 642.83    368, 361.45    170, 928. 34      6, 767, 185. 05
Maintenance:
       Appropriated--------......... $470,000.00 $243, 692. 38    340, 000. 00   158, 677. 19   290, 000. 00      4, 111, 574. 64
       Cost-...-------------.....     463, 205. 90 277, 412. 16   320, 598. 96   174, 286. 11    84, 364. 36      3, 900,965. 38
       Expenditures-----......... 482, 631.04 277, 404. 64        294, 617. 83   199, 693.55     84, 811.75       3, 900, 831.56


Other new work data:
    Unobligated balance, June 30, 1952------------------------                                                   $4, 479. 80
    Unobligated balance available for fiscal year 1953 ---------                                                  4, 479. 80

   28. NEW YORK HARBOR--COLLECTION AND REMOVAL OF DRIFT
  Location.-This project applies to the Lower and Upper Bays, New
York Harbor: East River, Harlem River, Hudson River Channel,
N. Y., New York and New Jersey Channels, Newark Bay, N. J., and
their tributaries.
  Existing project.-This provides for the collection and removal of
drift from New York Harbor and its tributary waters, and authorizes
the Secretary of War to allot such amounts as may be necessary for
the work from appropriations for maintenance and improvement of
existing river and harbor works or other available appropriations,
and that this work shall be carried as a separate and distinct project.
It is wholly a work of maintenance. The purpose of the work is to
afford relief from variable conditions of obstruction, and no advance
estimate of the amount of work required and its proper cost can be
made.
   The existing project was authorized by the following river and
harbor acts:

       Acts                              Work authorized                                           Documents

                   (Allotment from appropriations made for New York
Mar.     4,1915      Harbor and its immediate tributaries may be used
Aug.     8,1917       for collection and removal of drift in these water-
                      ways.
July 3,1930         Carrying on this work as a separate and distinct
                      project.



  Terminal facilities.-Describedin the separate reports covered.
  Operationsand results during fiscal year.-The U. S. Drift Collector
Driftnmaster, steam lighter Gorhanm, motor tenders Daly and Stanwix
and auxiliary plant were assigned to the work of removing and dis-
posing of drift when not employed on other work. There were re-
moved and disposed of during the fiscal year 369,621.76 cubic feet
(2,887.67 cords) of driftwood ranging in size from small blocks to,
timbers of large dimensions, including piles and pieces of wreckage.
The cost of this work was $301,688.24 for maintenance. The total ex-
penditure was $303,087.18.
           245554--53-vol. 1-14
206           REPORT OF CHIEF OF ENGINEERS,                                       U.   S. ARMY, 1952

   Condition at end of fiscal year.-The existing project is one of con-
tinuous maintenance for which no percentage of completion exists.
Navigation has been made safer by the continual patrol of the harbor
and the removal of large quantities of drift material. The total cost
of operations to June 30, 1952, has been $4,226,687.67. The total ex-
penditures amounted to $4,224,970.79.
   Proposed operations.-The balance unexpended at the end of the
fiscal year amounting to $6,992.01 plus an allotment of $212,224.87
made during fiscal year 1953, a total of $219,216.88 will be applied as
follows :
Account payable June 30, 1952_------------------------------       $1, 716. 88
Maintenance: Continue the work of drift removal by use of United
  States drift collector Driftmaster, lighters, motor tenders, and
  launches (July 1952-June 1953)-------------------------- 217, 500.00
          Total---------                    -----------------------------------                               219, 216. 88
  The sum of $275,000 can be profitably expended during fiscal year
1954 to carry on this work by the operation of United States drift
collector, lighters, motor tenders, and launches.
                                          Cost and financial summary

                                                       Fiscal year ending June 30                             Total to June
                                                                                                              30, 1952, includ.
                                                                                                              ing fiscal years
                                      1948           1949           1950           1951           1952          prior to1948

Maintenance:
                           --
   Appropriated------.........    287, 037. 05 $290, 000. 00 $258, 000. 00 $295, 300. 00 $304, 500. 00          $4, 231,962. 80
         ........
     Cost---------- ------......... 286, 289.08   287, 408. 40   258, 330. 49   295, 850. 85   301, 688. 24      4, 226, 687. 67
     Expenditures------....293, 223. 49           287, 451. 55   261,847.81     291, 312. 15   303, 087. 18      4, 224, 970. 79



                                      29. RONDOUT HARBOR, N. Y.

  Location.-This harbor comprises the tidal mouth, about 1.8 miles
in length, of Rondout Creek, whose source is about 18 miles west of
Rondout. The creek empties into the Hudson River from the west,
about 89 miles north of the Battery, New York City, and 55 miles
south of Albany. (See U. S. Coast and Geodetic Survey Chart No.
283.)
  Existing project.-This provides for a channel 100 feet wide, widen-
ing at the bends, and 14 feet deep from deep water in Hudson River
to the highway bridge, 1.3 miles above the mouth, thence 12 feet
deep to the west end of Island dock, 1.8 miles above the mouth, two
parallel dikes 350 feet apart, to maintain the channel, and for a branch
dike to extend upstream from the outer end of the north dike to protect
that dike from running ice in Hudson River.
  Mean tidal range, 3.7 feet; mean range of spring tides, 4.2 feet;
extreme range, 8.2 feet; irregular fluctuations due to freshets vary
from 2 feet below mean low water up to 2.5 feet above mean high
water.
           RIVERS      AND      HARBORS-NEW              YORK,        N.    Y.,    DISTRICT            207
  The cost for new work, for the completed project, was $123,108.
The latest (1950) approved estimate for annual cost of maintenance is
$11,500.
  The existing project was authorized by the following river and
harbor acts:

    Acts                        Work authorized                                     Documents

June 10,1872   Parallel dikes, branch dike, and entrance channel       S. Ex. Doc. 35, 42d Cong., 2d sess.;
                14 feet deep.                                              Annual Report, 1872, p. 810.
Aug. 30,1935   Extension of the 14-foot channel and for the 12-foot    Rivers and Harbors Committee
                channel.                                                   Doec. 17, 73d Cong., 2d sess. (Con-
                                                                           tains latest published map.)


   Local cooperation.-Fully complied with.
   Terminal facilities.-There are 17 timber wharves with a total
available dockage of 12,132 feet located along the waterway. Four
of the terminals are equipped with transfer facilities; all are privately
owned. The existing terminals appear to be adequate for present
needs of commerce. (For latest full description of terminal facili-
ties, see Port and Terminal Facilities at the Ports on the Upper
Hudson River, 1941, Corps of Engineers.)
    Operations and results during fiscal year.-The cost and expendi-
tures of a survey to determine the condition of the channel were
$520.39 for maintenance.
    Condition at end of fiscal year.-Work under the existing project
was commenced April 1873 and substantially completed November
1938. Part of the diking originally proposed was not built because
deemed of doubtful usefulness. Two parallel dikes of an aggregate
length of about 5,000 feet, generally 350 feet apart, with a now obso-
lete spur from the old lighthouse south of the south dike, have been
built across the bar at the mouth of the creek. A branch dike about
1,000 feet long, extending northerly from the outer end of the north
dike was also constructed. The project channel was completed in
1938. When examined in June 1952, the controlling depth at mean
low water, from the Hudson River to the highway bridge, was 12
feet for a width varying from 50 to 100 feet, thence 10 feet for a
width varying from 50 to 100 feet to the head of the project.
    The total cost and expenditures of the existing project to June 30,
1952 were $329,820.24 of which $123,108.63 was for new work and
$206,711.61 for maintenance.
    Proposed operations.-An allotment of $61,120.39 made during fis-
cal year 1953 plus accounts receivable of $279.61 on June 30, 1952, a
total of $61,400 will be applied to maintenance dredging by contract,
  (October-December 1952) to restore the 14- and 12-foot sections of
the channel to project dimensions and miscellaneous inspections and
reports.
    No work is scheduled for fiscal year 1954.
208               REPORT OF CHIEF OF ENGINEERS,                                                                   U.       S. ARMY,                     1952

                                                         Cost and financial summary

                                                                            Fiscal year ending June 30                                                    Total to June
                                                                                                                                                         30,1952, includ-
                                                                                                                                                         ing fiscal years
                                                    1948                  1949                 1950                  1951                  1952           prior to 1948

New work:
   Appropriated                    ------------ ------------                          ---------------------------
                                                                        ............ ............      $123, 108. 63
     Cost..............-------------..------------------------............---............--------........................----------------............
                                                                                                        123,108.63
   Expenditures--------.........-------------------............--............ -- ----------------------                                          ----          123,108. 63
Maintenance:
   Appropriated-----.........             $2, 000.00 .$800.00                                                                                                  206, 991.22-
     Cost..................                       1. 247. 18             $752.82 -----------............--------..........---..              520. 39           206, 711.61
     Expenditures--------.........                1, 247. 18              752. 82 ------------------------                                   520. 39           206, 711. 61


                                                        30. HUDSON RIVER, N. Y.

    Location.-This river has its source in the Adirondack Mountains,
about 250 miles in a direct line and 315 miles along its course from the
Battery, New York City, and flows in a generally southerly direction
into New York Bay. The section under improvement extends from
New York City to Waterford, a distance of about 156 miles. (See U. S.
Coast and Geodetic Survey Charts Nos. 281 to 284, inclusive.)
    Previous projects.-The original project for improvement by the
United States was adopted by River and Harbor Act of June 30, 1834,
and modified in 1852 and 1866.
   A second project was adopted by River and Harbor Act of July 13,
1892, and modified in 1899. For further details see page 1764, annual
report for 1915, and page 226, annual report for 1938.
   Existing project.-This provides for a channel 27 feet deep at
mean low water and 300 feet wide up to Hudson; thence of same depth
and 400 feet wide through rock cuts and 300 feet wide elsewhere, from
Hudson to the site of the former Albany-Greenbush Bridge at Albany;
thence 14 feet deep at lowest low water and generally 400 feet wide to.
the Federal lock at Troy; and thence of same depth and 200 feet wide-
to the southern limit of the State barge canal at Waterford; with
widening at bends and in front of the cities of Troy and Albany to
form harbors 12 feet deep at lowest low water; and removal of State
dam at Troy and the construction of a. lock and dam about 21/2 miles
below Waterford.
   The channel is to be formed by dredging and rock excavation, and
to be maintained by dredging and by constructing new, and raising
and repairing old, longitudinal dikes, built partly under previous
projects and partly by the State of New York. The mean range of
pool elevation above the Federal dam at Troy, in seasons of moderate
rains is about 2.2 feet, as determined in 1934. The mean tidal range
is about 4.7 feet at the Federal dam at Troy and about 4.6 feet at
Albany, extreme range due to freshets is 33.4 and 25.7 feet,, respec-
tively.
   The normal pool level above the Federal dam from Troy to Water-
ford is 14.33 feet above mean sea level at Sandy Hook, N. J. In the
tidal section of the river below the dam the assumed lowest low water
plane from Troy to Albany is 3 feet below mean sea level at Sandy
Hook, N. J.
   The following table contains information concerning the various
features of the lock and dam included in the existing project:
                  RIVERS AND HARBORS-NEW                         YORK, N. Y., DISTRICT                      209

Location:
    Below Waterford-------------------------------miles                                                      2.2
    Above Battery, New York City-------- _---------------do                                               153.8
Lock :
    Clear width         -------------------------------------- feet__                                      44.44
    Greatest length available for full width----------------do----                                        492.5
    Lift at lowest stages-------------         ---------------- do-                                        17.3
    Depth on miter sills:
         Upper (at normal pool level) ------------------    __do--.                                        16.3
         Lower (at lowest low water) ---------------------      do--                                       13.0
Character of foundation: Rock.
Kind of dam: Fixed.
Type of construction: Concrete.
Completed: 1917.
Cost : $1,463,014.07.
   The estimated cost for new work, revised in 1952, is $17,528,000,
exclusive of amounts expended on previous projects. The latest
 (1950) approved estimate for annual cost of maintenance is $381,300,
including $65,300 for operation and care of the lock and dam.
       Acts                             Work authorized                                 Documents 1

June 25,1910          Channel 12 feet deep from Hudson to Waterford, re-     H. Doe. 719, 61st Cong., 2d sess.
                       moval of State lock and dam at Troy and construc-
                       tion of a new lock and dam.
Mar.         3,1925   Channel 27 feet deep from Hudson to Albany .___..... H. Doc. 350, 68th Cong., 1st seas.
July     3, 1930      Channel 27 feet deep below Hudson---------------       H. Doc. 210, 70th Cong., 1st sess.
        ()            Operation and care of lock and dam at Troy were in-
                       cluded in project July 1, 1935.
Aug. 30, 1935 3 Relocation of the 12-foot channel between Troy and           S. Doc. 155, 72d Cong., 2d sess.
                 Waterford.
June 20,1938          Deepening channel between Albany and Waterford         H. Doc. 572, 75th Cong., 3d sess.
                       to 14 feet, with no change in depths for harbors in
                       front of Albany and Troy.

  1 These documents contain latest published maps.
  Z   Permanent Appropriations Repeal Act approved June 26, 1934.
  3 PWA, Sept. 6, 1933.

   Local cooperation.-Fullycomplied with.
   Terminal facilities.-The piers and other terminal or transfer fa-
cilities served by the improvement are as follows:
   Between Waterford and the Federal dam at Troy there are 14
wharves aggregating approximately 5,000 feet in length. The State
of New York has constructed a barge-canal terminal at Cohoes. There
is a dock 325 feet long on the west side of the river just north of the
Federal dam.
   At Troy there are 9 terminals with available dockage of 2,383 feet,
including the State barge-canal terminal with 960 feet. In addition,
11/4 miles of concrete bulkhead were constructed along the waterfront
by the city of Troy. At Watervliet there is a stone bulkhead 755 feet
long. Between this point and Albany there are 5 timber wharves
aggregating 4,275 feet in length.
   At Albany, and Rensselaer on the east side of the river, there are
30 terminals aggregating 18,661 feet of available berthage, including
a city-owned recreation pier of 900 feet and the State barge-canal ter-
minal with 1,586 feet located on the west side of the river. These
terminals are adequately served with railroad trackage. There are
5 transit sheds, 1 warehouse, a 13,500,000-bushel grain elevator, and a
molasses-storage plant, all provided by the Albany Port District
Commission.
210    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

  Between Albany and Hudson there are about 100 timber wharves
aggregating 36,700 feet in length; at Hudson there are 12 timber
wharves aggregating 5,000 feet in length; at Athens there are 9 tim-
ber wharves aggregating 4,000 feet in length.
   Between Hudson and the upper limits of New York City the entire
waterfronts of Poughkeepsie, Newburgh, and Yonkers are equipped
with transfer facilities. At Poughkeepsie there are 14 terminals with
available dockage of 7,823 feet, including a city-owned pier of 270
feet. At Newburgh there are 17 terminals with a total dockage of
8,431 feet, of which 1 with 90 feet of dockage is open to the public.
At Yonkers there are 26 terminals with dockage of 8,479 feet, of which
596 feet are for public use.
   The existing wharves are ample for Hudson River traffic. (For
latest full description of terminal facilities see Port and Terminal
Facilities at the Ports on the Upper Hudson River, 1941 and Port
and Terminal Facilities at the Port of New York, 1942, Corps of
Engineers.)
   Operations and results during fiscal year.-Under a contract for
maintenance dredging to restore channel between Coeymans and
Hudson to project depth of 27 feet, work was commenced August 23,
1951, and completed December 16, 1951. During the fiscal year,
315,707 cubic yards place measurement were removed at a cost of
$255,887.21 for maintenance.
   United States derrick boat H. R. No. 1 with attendant plant was
employed in removing shoal at mouth of Poesten Kill Creek from
October 16 to November 15, 1951, and from June 9, 1952, through end
of fiscal year. During fiscal year 5,540 cubic yards place measure-
ment at a cost of $23,544.54 for maintenance.
   By use of Government plant and hired labor, snags and stumps
which formed a potential menace to navigation and other obstructions
were removed from the shores and channel of the river during the
fiscal year at a cost of $15,750.49 for maintenance.
   The cost of surveys, tidal observations, engineering and surveys pre-
liminary to dredging and contingencies were $34,336.54 for main-
tenance.
   The lock and dam in the Hudson River at Troy, N. Y. was operated
and maintained during the fiscal year. Operation of the lock for
the 1951 navigation season was suspended December 9, 1951, and
resumed April 3, 1952, for the 1952 season. Under contract for
electrification of the lock machinery, work commenced October 2,
1950, and completed October 15, 1951. Under contract for enlarging
and finishing wall recesses for emergency dam at Troy, work com-
menced January 7, 1952, and completed February 27, 1952. Under
contract for removal and replacement of upper miter gates at Troy
lock and dam, work was commenced January 31, 1952, and completed
March 27, 1952. Under contract for emergency repairs to fender
pier, work commenced February 23, 1952, and completed March 21,
1952. Under contract for furnishing removable bulkhead beams and
pick-up beam assembly, work commenced April 8, 1952, and completed
May 8, 1952. United States derrick boat H. R. No. 1 was employed
December 7 to 13, 1951, in removing fender booms and installing
emergency dam and April 2 and 3, 1952, in removing emergency dam
and replacing fender booms at north entrance to lock. The cost of
              RIVERS AND             HARBORS-NEW                     YORK,       N.    Y.,    DISTRICT            211
work during the fiscal year was as follows: Operations $47,158.82;
ordinary maintenance and repairs $43,985.04; emergency repairs
$21,454.73; improvements and betterments $70,363.18; a total of
$182,961.77.
   The total cost of work was $512,480.55 of which $329,518.78 was
for maintenance and $182,961.77 for operation and care of lock and
dam at Troy, N. Y. The total expenditure was $497,762.17.
   Condition at end of flscal year.-Work under the existing project
was commenced July 1910 and is about 96 percent complete. The con-
struction of new lock and dam at Troy, removal of old dam at Troy,
and construction of 15,545 linear feet of new dikes have been completed.
In the reconstruction of old dikes, 39,672 linear feet have been raised to
the adopted crest height. The channel from Albany to Waterford
has been completed to a depth of 14 feet, with the exception of a small
part of the widening to form a harbor at Troy, which work is not
deemed necessary for the present. The work of deepening the chan-
nel south of Albany to 27 feet mean low water has been completed
with the exception of about 1,500 linear feet at the northern end.
   The controlling mean low water depth from New York City to
Hudson, N. Y., is 27 feet for a width varying from 150 to 400 feet,
thence 27 feet for a width varying from 150 to 450 feet to about 4,700
feet below the Dunn Memorial Bridge, thence 14 feet for a width vary-
ing from 150 to 300 feet to the Dunn Memorial Bridge.
   The controlling lowest low water depth from Albany to the lock
and dam at Troy is 14.0 feet for a width varying from 400 feet at
Albany to 145 feet near the south entrance to the lock at Troy. At
the lock entrance it is 14 feet deep for a width of 45 feet. Controlling
depth over the lock sills is 13.0 feet at the lower sill. The controlling
pool-level depth above the lock at Troy to Waterford, the head of the
improvement, is 14 feet for a width of about 200 feet.
   The work remaining to be done under the existing project consists
of completing the widening to form a harbor 12 feet deep in front of
Troy, the construction and reconstruction of dikes, and deepening the
northerly 1,500 feet of the 27-foot channel from New York City to the
site of the former Albany-Greenbush Bridge.
   The total costs under the existing project to June 30, 1952, were
as follows:

                                                 New work           Maintenance       Operating
                                                                                          care
                                                                                                and         Total

Regular funds- .-   .             ...--.----- $15, 577, 937. 61
                                  ---                                 $5,107,263.10   $1, 694,085. 94    $22,379, 286. 65
Public Works funds ...-------------------          238, 350. 00    ...............                           238, 350. 00
Emergency Relief funds ...----------------         311, 461.08     ...............                           311, 461. 08
                      ..
      Total------.-----..-___--.                16, 127, 748. 69    $5, 107,  10
                                                                           263.         1,694, 085. 94    22,929,097. 73


  The total expenditures under the existing project to June 30, 1952
were $22,417,822.76--$21,868,011.68 regular funds, $238,350.00 Public
Works funds, and $311,461.08 Emergency Relief funds.
  In addition, the sum of $454,272.93 was expended between August
18, 1915, and June 30, 1935, on the operation and care of the work of
improvement under the provisions of the permanent indefinite appro-
priation for such purposes.
212       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   Proposed operations.-The balance unexpended at the end of the
fiscal year amounting to $78,153.40 plus allotments of $430,188.89
made during fiscal year 1953, a total of $508,342.29 will be applied as
follows:
Accounts payable June 30, 1952_ ___----------------------------              $57, 002.04
Maintenance:
    Complete by June 30, 1953, under contract, removal of
      shoals from the 27-foot channel between Albany
      and Hudson ---------------------------------- $250, 000
    Operate United States derrick boat H. R. No. 1 with
      attendant plant intermittently for about 3 months
      in removal of isolated shoals between Albany and
      Hudson and removing from the shores stumps and
      snags which are likely to be carried into the
      channel (July 1952-June 1953) -----------------           20, 000
    Operate Government-owned plant, consisting of
      derrick boat, launches, etc., during the fiscal year
      in maintaining dikes where found to be most
     urgently needed-------------------------                   12,000
   Channel surveys, sweepings, and current observations
      pertaining to maintenance operations and miscel-
      laneous inspections and reports (July 1952-June
      1953) --------------------------------------              45, 400
                                                                             327, 400. 00
Maintenance (operating and care) :
   Operations, services of permanent and temporary
      forces at Troy Lock and Dam (July 1952-June
      1953) --------------   --------------------  33, 000. 00
   Ordinary maintenance and repairs at Troy Lock
      and Dam (July 1952-June 1953) ------------- 22,000. 00
   Emergency repairs to Troy Lock and Dam---------68, 940. 25
                                                                             123, 940. 25
       Total for all work----------------------------------                  508, 342. 29
  The sum of $926,200 can be profitably expended for the following
scheduled work during fiscal year 1954:
Maintenance :
   Complete by June 30, 1954, under a contract to be entered
      into, the removal of shoals in the channels between
      Waterford and Hudson and at Barrytown, German-
      town and East Kingston----________-------------------  $293,000
   Operate U. S. derrick boat H. R. No. 1 with attendant
      plant for about 6 months during the fiscal year in
      removing isolated shoals and shoals over rock areas
      between Waterford and Hudson and removing from
      the shores stumps and snags which are likely to be
      carried into the channel__---__            -__-____---   12, 000
   Channel surveys, sweepings and current observations
      pertaining to maintenance operations during fiscal
      year and miscellaneous inspections and repairs------     51, 200
        Total for maintenance.......------------        ---------------      $356, 200
Maintenance (operation and care) :
   Operations-services of permanent and temporary forces
      at Troy Lock and Dam (July 1953-June 1954)        ---...       34, 000
   Ordinary maintenance and repairs at Troy Lock and Dam
      (July 1953-June 1954) ---------------------------              36, 000
   Improvement and reconstruction of Troy Lock ...---..             500, 000
         Total for operation and care ---------          --------------         570, 000
        Total for all work .------------       _,---   _--           -----      926,200
                RIVERS AND HARBORS-NEW                                       YORK, N. Y.,                           DISTRICT                 213

                                                 Cost and financial summary
                                                         CONSOLIDATED

                                                           Fiscal year ending June 30                                             Total to June
                                                                                                                                  30, 1952, includ-
                                                                                                                                  ing fiscal years
                                          1948           1949            1950                 1951                   1952          prior to 1948


New work:
   Appropriated-.......----------------............   $329, 300. 00   $19, 300.00-------............         -$18, 366. 46         $21,240, 342.19
     Cost- ....-----......--------.... -----------     329, 300. 00        933. 54 ............---------...........------------      21,240, 342.19
   Expenditures---------.----- ----                    329, 300. 00        933. 54---------....---............------------           21, 240, 342.19
Maintenance:
     Appropriated-.........          $285, 200.00      155, 900. 00 1, 073, 500. 00 -$210,292.18                 449, 368. 00       1 7,169, 297. 48
     Cost. ------------------         339, 403.89      164, 692. 45 448, 427. 93 346, 651.66                     512, 480. 55       17, 148, 146.12
     Expenditures...-----......       329,113.69       177, 299.95 447, 699.33 310, 816. 23                      497, 762.17        1 7, 091,144, 08



Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project------------  $1, 400,000.00
  i Includes O. & C.

31. GREAT LAKES TO HUDSON RIVER WATERWAY-ENLARGEMENT
              OF NEW YORK STATE BARGE CANAL
   Location.-This waterway consists of that portion of the New York
State Barge Canal system extending from the Hudson River at
Waterford to Oswego Harbor on Lake Ontario. (See U. S. Lake
Survey Charts Nos. 182, 183, 184, and 185.)
   Existing project.-This provides for the allotment of Federal funds
to the State of New York for expenditure under suitable Federal
control and supervision in the improvement of the canal connecting
Lake Ontario with the Hudson River. The improvement provides
for a depth of 13 feet below normal pool level through all locks
between Waterford and Oswego, deepening between locks to 14 feet
below normal pool levels, widening at bends and elsewhere, and in-
creasing the overhead clearance to 20 feet at maximum navigable
stage at bridges and other overhead structures. The widths of channel
to be provided under the project are 104 feet in earth cuts, 120 feet
in rock cuts, 200 feet in river sections, with widening at bends and
elsewhere as may be necessary.
   The length of the waterway included in this project is about 184
miles, of which 160 miles are in the Erie Canal from Waterford to
Three Rivers Point and 24 miles are in the Oswego Canal from Three
Rivers Point to Oswego.
   The estimated cost for new work, made in 1952, is $31,765,000 of
which not more than $27,000,000 shall be expended on deepening
between locks and raising of bridges and other overhead clearances as
contained in River and Harbor Committee Doec. 20, 73d Cong., 2d
sess. No estimate of maintenance with Federal funds is included, as
maintenance of the canal is not a part of the Federal project.

       Acts                                  Work authorized                                                          Documents

May 28,19351         Deepening between the locks to 14 feet, increasing                           Rivers and Harbors Committee,
Aug. 30,1935           overhead clearances to 20 feet and widening at                                Doc. 20, 73d Cong., 2d sess.2
                     bends and elsewhere.
Mar.     2,1945     Depth of 13 feet below normal pool level through all                         S. Doc. 252, 79th Cong., 2d sess.s
                     locks between Waterford and Oswego.

  1 Emergency Relief Act of 1935.
  I Contains latest published map.
214    REPORT OF CHIEF OF ENGINEERS, U.         S. ARMY,   1952

  Local cooperation.-The River and Harbor Act of March 2, 1945,
authorized the deepening of the locks subject to the condition that
an agreement be entered into between the United States and the State
of New York embodying certain limitations and provisions to safe-
guard the interests of general commerce and navigation, insure Fed-
eral control of the disposition of Federal funds, and provide for Fed-
eral supervision of the work performed. A supplemental agreement
dated June 5, 1947, containing all provisions necessary for efficient
prosecution of the improvement was entered into by the Chief of
Engineers and the Department of Public Works, State of New York.
The requirements under the prior acts have been fully complied with.
   Terminal facilities.-The State of New York has provided terminal
and transfer facilities at all important points along the Erie and
Oswego Canals, and at Buffalo, Troy, Albany, and New York Har-
bor. The freight-handling equipment, as well as the storage and dock
facilities, is governed by the requirements of the particular locality.
The State-owned terminal at Oswego is equipped with a grain eleva-
tor of 1,000,000 bushels capacity. The Albany Port District Com-
mission has erected a grain elevator of 13,500,000 bushels capacity
at Albany. The Port of New York Authority grain terminal in
New York Harbor on Gowanus Bay has a capacity of approximately
1,800,000 bushels.
   Terminals at Buffalo, Rochester, Syracuse, Schenectady, Troy,
Albany, and Oswego are provided with direct railroad connections.
All State-owned terminals are open to the public on equal terms.
Lakeport terminals are extensive in character. The available ter-
minals appear ample to meet all requirements.
   Operations and results during fiscal year.-The cost of engineering
studies for raising bridges and guard gates, lowering of sills, and
placing bank protection at various locations between Waterford and
Oswego, N. Y., was $1,837.64, for new work.
   Final costs of $17,383.25 were reported for reimbursement to State
of New York during fiscal year for work performed in an emergency
contract entered into and performed during fiscal year 1950 for re-
placement of lower miter gates, and lowering of lower sills at locks
3, 4,5,and 6.
   Final costs of $1,446.08 were reported during the fiscal year in
connection with contract for removal and replacement of guard gate
No. 5, constructing a spillway and other incidental work at Herkimer,
N. Y., completed June 1, 1951.
   The total cost of work was $20,666.97, all for new work. The total
expenditure was $87,829.89.
   Condition at end of fiscal year.-Work under the existing project
was commenced in September 1935 and is about 79 percent complete.
The status of the channel deepening and widening is as follows:
              RIVERS AND                HARBORS--NEW                     YORK,          N.   Y.,      DISTRICT           215

                                                                                                   Distance (miles)

                                                                                                  Work remaining to be
                 From-                                        To-                       Completed         done
                                                                                        toproject
                                                                                         depth    Work in      Future
                                                                                                  progress work

                     Guard gate 2 at Waterford ..._
Hudson River...__....__-..........                                                             2. 6 ..-----
                                                                                                         .....            0. 2
Guard gate 2 at Waterford ._--      -----     Lock 10 at Cranesville __--  ...                32. 2-------------------
Lock 10 at Cranesville  ........-----------   Lock 16 at Mindenville ...     _---             36.1 ..
Lock 16 at Mindenville ....---._---           Guard gates at Herkimer .                       15.5.       --
                                                                                                           .5
                                                                                                           ___.            .7
Guard gate 5 at Herkimer__ ....-              Oswego Harbor...........---------------         96. 7

                                                                                 ---
       Total (184 miles)--.........................------------------------------..          183.1      -------.           .9


   Thirty-five Barge Canal bridges have been raised and one lengthened
with Federal funds under this improvement. Project vertical clear-
ance has been provided at two additional bridges with Federal funds
by construction of additional spillway capacity at Herkimer, N. Y.
Three additional bridges were raised, four were removed and two
were removed and replaced by new structures at project clearance; all
by other agencies.
   The present depth is 14 feet at normal pool levels for the following
width; 75 feet in earth cuts, 94 feet in rock cuts, and 200 feet in
canalized rivers and lakes. The 29 locks, 22 in Erie Canal east of
Three Rivers Point, and 7 in Oswego Canal, north of Three Rivers
Point, have a clear width of 43.5 feet, usable length of 300 feet, and
depth over miter sills of 12 feet. Numerous fixed bridges, transmis-
sion lines, and other structures span the waterways. There are 66
bridges between Waterford and Three Rivers Point and 13 between
Three Rivers Point and Oswego. The minimum clearance under
existing bridges and other overhead structures is 14.66 feet above
maximum navigable stage.
   The work remaining to be done to complete the project consists of
widening and deepening the chanel by excavation, including the
removal of ledge rock and work incidental thereto, for a total distance
of 0.9 mile, as described in the above table, the raising of 21 barge
canal bridges, the raising of 4 guard gates, the revetment of banks
with quarry stones where necessary and the deepening to 13 feet
through 27 locks.
   The total cost of the existing project to June 30, 1952, was $22,-
774,702.35 for new work of which $17,961,302.19 was from regular
funds and $4,813,400.16 from Emergency Relief funds.
   The total expenditures were $22,773,958.66 of which $17,960,558.50
were regular funds and $4,813,400.16 Emergency Relief funds.
   Proposed operations.-The balance unexpended at the end of the
fiscal year amounting to 2,537.53 minus accounts payable of $743.69,
a total of $1,793.84 will be applied to engineering studies involved in
future work for lowering lock sills between Waterford and Oswego.
   The sum of $750,000 can be profitably expended for new work during
the fiscal year 1954 to reimburse the State of New York for work of
lowering lock sills at 15 locks in the canal between Waterford and
Little Falls.
216           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                       1952

                                        Cost and flnancial summary

                                                      Fiscal year ending June 30                                    Total to June
                                                                                                                   30, 1952, includ-
                                                                                                                   ing fiscal years
                                     1948           1949             1950             1951            1952          prior to 1948

New work:
   Appropriated .          ...-   .... _.......       __.........._ __...........- -$156,466.00   -$52, 337. 97     $22, 776, 496. 19
   Cost---------------..          $12, 889. 09    $91,889. 06 $1,022,889.07        644, 470. 17      20, 666. 97     22, 774, 702. 35
   Expenditures--....             -1,079.69   1   103,048.32      808,287.64       791,887.79        87, 829.89      22, 773,958. 66


Other new work data :
                                        _----
     Unobligated balance, June 30, 1952_--_-----------                                                               $2, 537. 53
     Unobligated balance available for fiscal year 1953 -----------                                                    2, 537.53
     Estimated additional amount needed to be appropriated for
         completion of existing project_----_----___-----------                                                8, 988, 000. 00

               32. NARROWS OF LAKE CHAMPLAIN, N. Y. AND VT.

   Location.-This waterway, 37 miles long, comprises the southern
end of Lake Champlain and extends from Whitehall to Crown Point,
N. Y. The portion included in the project extends from Whitehall,
N. Y., at the southern extremity of the lake, northerly to Benson
Landing, Vt., a distance of 13.5 miles. (See U. S. Lake Survey Chart
No. 174.)
   Previous projects.-Adopted by River and Harbor Acts of July 4,.
1836, March 3, 1837, July 7, 1838, August 5, 1886, July 13, 1892, and
March 3, 1899. For further details, see page 256, annual report
for 1932.
   Existing project.-This provides for a channel extending from
Whitehall, N. Y., at the head of Lake Champlain, to Benson Landing,
to be 12 feet deep at low lake level and generally 200 feet wide, and
the installation of fender booms at Putts Rock, Putts Leap, Narrows
near Dresden, Pulpit Point, and Cedar Mountain. The reference
plane of low lake level is 92.5 feet above mean sea level at Sandy
Hook, N. J. The length of the section included in the project for
improvement is about 13.5 miles. The usual annual variation of the
lake level is 5.8 feet, and the extreme variation varies from 0.6 foot
below up to 8.8 feet above the low lake level.
   The estimate of cost for new work, revised in 1952, is $1,975,000
exclusive of amounts expended on previous projects. The latest
 (1950) approved estimate for annual cost of maintenance is $9,000.
   The existing project was adopted by the River and Harbor Act of
August 8, 1917 (H. Doc. 1387, 62d Cong., 3d sess.). The latest pub-
lished map is in the project document.
   Terminal facilities.-Terminal facilities are located in Whitehall
Harbor and consist of 3 timber wharves, aggregating 4,200 feet in
length. The State of New York has constructed a barge canal terminal
at Whitehall, just south of the terminus of the canal, which has been
equipped with a 15-ton hand-operated derrick and a storehouse. The
facilities are considered adequate for present commerce.
   Operationsand results during fiscal year.-Repairs to fender booms
were made during the fiscal year by Government plant and hired labor,
at a cost of $740.40 for maintenance. The expenditures were $728.37.
                     RIVERS AND HARBORS--NEW                                                            YORK,              N.     Y.,        DISTRICT                    217
  Condition at end of fiscal year.--Work under the existing project
was commenced June 1919 and is about 47 percent complete. A chan-
nel 12 feet deep at low lake level and least width of 150 feet has been
excavated throughout the length of the improvement, except at the
Elbow, where the width is 110 feet. Fender booms have been placed
at the Elbow (Putts Leap and Putts Rock) and opposite the Dela-
ware & Hudson railroad trestle. No fender booms appear to be
needed at the Narrows near Dresden, Pulpit Point, and Cedar Moun-
tain. The controlling depths at low lake level, as disclosed by sur-
veys made in July 1949, through the reach included in the project,
were as follows:

                                                                Locality                                                                         Depth               Width

                                                                                                                                                    Feet              Feet
Whitehall to the Elbow----...........------...--..                                ----------------------------------                                          12             300
At the Elbow---...........--............--............................-------------------------------------------------------..                               12             110
From the Elbow to Maple Bend....---------------.....................-----------------------------                                                             12        100-150
From Maple Bend to Red Rock Bay         .....----------------------------------------                                                                         12            150
From Red Rock Bay to Benson Landing-------------------------------------                                                                                      12        100-150



   The work remaining to be done to complete the project consists in
widening the channel throughout its length to the project width of
200 feet.
   The total cost of the existing project to June 30, 1952, was $848,-
453.84--$566,811.14 for new work and $281,642.70 for maintenance.
The total expenditures were $847,845.74.
   Proposed operations.-The balance unexpended at the end of the
fiscal year amounting to $6,721.63 plus an allotment of $386.47 made
during fiscal year 1953, a total of $7,108.10 will be applied as follows:
Accounts payable June 30, 1952------------------------------------      $608. 10
Maintenance:
    Operate Government-owned plant during the fiscal year in repairing
      fender booms at the Elbow and opposite the Delaware and
      Hudson R. R. trestle---------------------------------            2, 500. 00
    Condition survey of the project channel--------------------- 4, 000. 00
              Total ----------------------------------------------                                                                                                 7,108.10
     No work is scheduled for the fiscal year 1954.
                                                           Cost and financial summary

                                                                               Fiscal year ending June 30                                                     Total to June
                                                                                                                                                              30,1952, includ-
                                                                                                                                                              ing fiscal years
                                                      1948                   1949                  1950                  1951                1952              prior to 1948

New work:
      Appropriated---------------------        ---------------------                                                                      -----............        $681, 811.14
      Cost------------              -------------------------------------------------------                                                                         681, 811. 14
      Expenditures------- ------------                                    ---..--------                                                 ..                          681, 811. 14
Maintenance:
      Appropriated.........  $3, 900.00                                  $1, 000. 00 $102, 000. 00                     -$40. 96         $3, 200. 00                 306, 896. 58
      Cost------------------      16. 16                                  5, 009 26    55, 809. 05                    42, 649. 21           740. 40                 300, 783. 05
      Expenditures.........       16. 16                                  3, 848. 68    7, 967. 57                    91, 055. 20           728. 37                 300, 174. 95


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project---------------.. . $1, 408, 000
218     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

      33. NEWARK BAY, HACKENSACK AND PASSAIC RIVERS, N. J.

    Location.-Newark Bay is an estuary about 11/4 miles wide and
6 miles long, extending southerly from the confluence of the Hack-
ensack and Passaic Rivers to New York and New Jersey Channels.
    The Hackensack River rises near Haverstraw, Rockland County,
N. Y., and flows into Newark Bay. It is about 45 miles long.
    The Passaic River rises in the highlands of northeastern New Jer-
sey and flows into Newark Bay. It is about 80 miles long. (See U. S.
Coast and Geodetic Survey Charts Nos. 287 and 369 and U. S. Geo-
logical Survey chart of New York City and vicinity.)
    Previous projects.-Adopted by River and Harbor Acts of August
30, 1852, June 10, 1872, June 14, 1880, June 13, 1902, March 2, 1907,
July 25, 1912, March 2, 1919, and September 22, 1922. For further
details see pages 265 and 266 of Annual Report for 1926; page 301,
annual report for 1929; and page 244, annual report for 1938.
   Existing project.-This provides for the following:
    (a) Newark Bay: A main channel 37 feet deep in rock and 35 feet
deep in other material, 550 feet wide at the entrance and narrowing
to 400 feet at 4,000 feet above the Central Railroad of New Jersey
bridge; thence continuing to that width and same depths to the branch
channel to Port Newark Terminal; thence 30 feet deep and 400 feet
wide to the junction of the Passaic and Hackensack River channels;
removal of the east and west cut-offs at the junction with Kill Van
Kull and widening of bend above the Central Railroad of New Jersey
bridge to the same depths, a distance of about 4.7 miles.
    (b) A branch channel in Newark Bay 37 feet deep in rock and
35 feet deep in other material, 600 feet wide to the inshore channel
at Port Newark Terminal, widened at the turn; thence an inshore
channel of the same depths and 400 feet wide, a total distance of
about 1.6 miles.
    (c) Hackensack River: A channel 30 feet deep and 400 feet wide
from the upper end of the Newark Bay channel to the Central Rail-
road of New Jersey bridge, about 1.1 miles; thence 30 feet deep and
300 feet wide to a point about 2,000 feet north of the Delaware,
Lackawanna & Western Railroad bridge, 2.8 miles; thence 12 feet
deep and 200 feet wide to Little Ferry, 10.1 miles and then 12 feet
deep and 150 feet wide to the New York, Susquehanna & Western
Railroad bridge, 2.5 miles, a total distance for the Hackensack River
of about 16.5 miles.
    (d) Passaic River: A channel 30 feet deep and 300 feet wide, from
Newark Bay to a point 3,000 feet above the Lincoln Highway Bridge,
2.6 miles; thence 20 feet deep and 300 feet wide to the Nairn Linoleum
Works, about 4.4 miles; thence 16 feet deep and 200 feet wide to the
Montclair & Greenwood Lake Railroad bridge, about 1.1 miles; thence
10 feet deep and 150 feet wide to the Eighth Street Bridge at Passaic,
7.3 miles, a total distance for the Passaic River of 15.4 miles.
   All depths refer to the plane of mean low water. The mean tidal
range in Newark Bay is 4.9 feet; in Hackensack River at Court Street
Bridge, 5.3 feet; in Passaic River at Pennsylvania Railroad freight
bridge, 5.1 feet; and in Passaic River at the Gregory Avenue Bridge,
5.1 feet; mean range of spring tides, 5.8, 6.4, 6.1, and 6.1 feet, re-
spectively; irregular fluctuations due to wind and barometric pres-
               RIVERS AND HARBORS--NEW                         YORK,       N.    Y.,   DISTRICT              219

sure vary from 3.7 feet below mean low water up to 6.2 feet above
mean high water.
  The estimate of cost for new work, revised in 1952, is $10,057,000
exclusive of amounts expended on previous projects. The latest
(1950) approved estimate for annual cost of maintenance is $250,000.
  The existing project was authorized by the following river and
harbor acts:

       Acts                          Work authorized                                     Documents

Mar. 2,1907        16-foot channel in Passaic River     ---------------      H. Doc. 441,   59th Cong., 2d sess.
Feb. 27, 1911      Widening 16-foot channel in Passaic River..------------      Do.
July 25,1912       20-foot channel in Passaic River ------------------       H. Doc. 707,   62d Cong., 2d sess.
     Do _.-.       12-foot channel in Hackensack River ..........-....
                                                                   -         H. Doc. 643,   61st Cong., 2d sess.
Sept. 22,1922      30-foot channel in Hackensack River below Central         H. Doc. 206,   67th Cong., 2d sess.l
                R. R. of New Jersey bridge, 30-foot channel in
                Newark Bay, and 30-foot Port Newark connecting
                channel.
Jan. 21,1927 10-foot channel in Passaic River -- -- ----------               H. Doc. 284, 69th Cong., 1st sess.
    Do-.....- 30-foot channel in Hackensack River above Central              H. Doc. 429, 69th Cong., 1st sess.'
                     R. R. of New Jersey bridge.
July     3, 1930   30-foot channel in Passaic River_ _------------ ------ H. Doc. 156, 71st Cong., 2d sess.'
Mar.     2, 1945   35 and 37 feet in main channel of Newark Bay and S. Doe. 250, 79th Cong., 2d sess.
                    branch channel to and inshore channel at Port
                    Newark Terminal and removal of portion of rock
                    area at Bergen Point to same depths.
    Do- .....      Modification of local cooperation for 10-foot channel     H. Doe. 430, 76th Cong., 1st sess.
                    in Passaic River.

  1 Contains latest published    map.

  Local cooperation.-Fully complied with as required by the River
and Harbor Act approved January 21, 1927, except that local interests
are required to provide suitable spoil-disposal areas for maintenance
dredging in the 30-foot channel in the Hackensack River above Cen-
tral Railroad of New Jersey bridge; in the 10-foot channel in the
Passaic River; and whenever required by the Secretary of War, for
dredging in the 30-foot channel in Newark Bay and the Hackensack
River below the Central Railroad of New Jersey bridge, as required by
the River and Harbor Act approved September 22, 1922.
   The River and Harbor Act of March 2, 1945, provides that local
interests shall:
   (a) Agree to furnish free of cost to the United States, all lands,
easements, rights-of-way and spoil disposal areas needed for new
work and subsequent maintenance, when and as required;
   (b) Hold and save the United States free from claims for damages
resulting from the improvements;
   (c) Provide and maintain suitable berthing areas at Port Newark
terminal.
   Assurances providing compliance with the local cooperation re-
quirements under this act, were accepted by the Chief of Engineers
on March 22, 1950. In addition the sum of $285,599.62 was contributed
by the Port of New York Authority to cover the cost of dredging the
berthing areas at Port Newark Terminal, which work was completed
by the United States in conjunction with the excavation of the project
channel during 1951.
   It further provided, for the 10-foot channel in Passaic River from
Montclair & Greenwood Lake Railroad bridge to the Eighth Street
Bridge in Passaic, that when spoil-disposal areas are not available, or
220     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,           1952

the placing of dredge spoil ashore is uneconomical as compared with
other methods of disposal, local interests shall not be required to fur-
nish disposal areas for maintenance dredging.
    Terminal facilities.-There are 16 piers with a berthage of 8,525
feet, 55,300 feet of bulkheads available for dockage and a large ship-
yard along the waterways included in the project. Thirteen of the
terminals are publicly owned, the largest of which, Port Newark,
owned and operated by the New York Port Authority, provides about
11,000 feet of wharfage. Nine of the terminals are open for public use,
56 are equipped with mechanical handling devices and 66 have rail-
road connections. The facilities are considered adequate for existing
commerce. (For latest full description of terminal facilities see Port
and Terminal Facilities at the Port of New York, 1942, Corps of
Engineers.)
    Operations and results during the fiscal year.-Final cost adjust-
ments of minus $5,005.22 regular funds and plus $5,005.22 contributed
funds were made in costs previously reported for new work.
   Under a contract for new work dredging to a depth of 35 feet in
Newark Bay from 1,200 feet south of Central Railroad of New Jersey
bridge to entrance to Port Newark terminal work was commenced
March 1, 1951, and completed July 28, 1951. During the fiscal year
256,380 cubic yards, place measurement, of material were removed at
a cost of $177,805.55 for new work.
   Under contract for new work dredging and rock removal to a depth
of 37 feet including the removal of Bergen Point Lighthouse and
foundation from Newark Bay, vicinity of Bergen Point, N. J., work
was commenced April 24, 1951, and completed April 24, 1952. Dur-
ing the fiscal year 91,265 cubic yards, place measurement, of rock and
22,433 cubic yards, place measurement, of material other than rock
were removed at a cost of $1,222,653.31 for new work. In addition the
removal of Bergen Point Lighthouse and foundation was commenced
June 8, 1951, and completed June 15, 1951 at a cost of $15,000 for
new work.
   The United States derrickboat Babcock was engaged in the re-
moval of shoals in the east and west draws of the Central Railroad of
New Jersey bridge from September 24, 1951, to October 19, 1951, and
February 26 to 29, 1952. During the fiscal year 424 cubic yards, place
measurement, of material and 189 cubic yards of debris were removed
at a cost of $26,522.53 for new work.
   The United States motor tug Daly was engaged in the removal of
an obstruction from the Passaic River at Harrison, N. J., on November
6, 1951, at a cost of $516.32 for maintenance.
   The cost of condition surveys and surveys and engineering prelim-
inary to dredging was $3,224.43 for new work and $2,899.81 for main-
tenance.
   The total cost of work, exclusive of $5,005.22 contributed funds for
dredging and rock removal of berthing areas, was $1,443,616.73 of
which $1,440,200.60 was for new work and $3,416.13 for maintenance.
The total expenditures, exclusive of $6,792.37 contributed funds, were
$1,550,309.60.
   Condition at end of fiscal year.-Work under the existing project
was commenced in 1907 and is about 89 per cent complete. The chan-
           RIVERS      AND HARBORS--NEW                 YORK,       N.   Y.,    DISTRICT            221
nels included in the project have been completed to full project dimen-
sions except for deepening the 20-foot main channel in Passaic River
from Jackson Street to Nairn Linoleum Works. Deepening of the
35-foot main channel in Newark Bay, including the triangular cut-
offs at the entrance was completed during April 1952.
   The controlling mean low-water depths of the various channels, as
shown by surveys made intermittently from September 1939 to June
1952, are as follows:

                                   Section                                        Depth         Width
                                                                                  (feet)         (feet)

In Newark Bay from mouth to junction with branch channel to Port Newark                    35     400-535
  Terminal.
From junction with branch channel to Port Newark Terminal to junction of                   29     220-400
  Hackensack and Passaic Rivers.
In Hackensack River from Newark Bay to about 2,000 feet above the Delaware,                29     180-400
  Lackawanna & Western R. R. bridge.
From 2,000 feet above Delaware, Lackawanna & Western R. R. bridge to head                  12     150-200
  of project at the New York, Susquehanna & Western R. R. bridge.
                                                             -- -------------
In Passaic River to 3,000 feet above the Lincoln Highway bridge                            22     200-300
From 3,000 feet above Lincoln Highway bridge to Jackson Street bridge .........            17     300-180
From Jackson Street bridge to Nairn Linoleum Works. ------------------------               15     150-300
From Nairn Linoleum Works to Montclair & Greenwood Lake R. R. bridge.....                  12     150-100
From Montclair & Greenwood Lake R. R. bridge to 8th Street bridge-----------               10      80-150
Port Newark entrance channel --.   .
                               _-..-----------------------------------                     35         400

Minimum widths through bridge draws:
    Hackensack River:                                                         Feet
        30-foot project----------..-----------------------------------93
        12-foot project     ------------------------------------------          56
    Passaic River:
        30-foot project----------       -----------------------------         100
        20- and 16-foot projects ----------------------                         75
        10-foot project---------------              -------------------------- 45
   Hackensack River is navigable 201/2 miles above mouth to New
Milford. Passaic River is navigable 16 miles above mouth to Dundee
Rapids. The work remaining to be done under the existing project-
consists of the completion of the 20-foot channel in Passaic River from
Jackson Street to the Nairn Linoleum Works. Work in the Passaic
River includes the removal of a small quantity of rock on the west side
of the channel above Center Street Bridge. Adjacent property owners
are opposed to this work.
   The total cost of the existing project to June 30, 1952, exclusive of
$285,599.62 contributed funds, was $12,233,677.98, of which $9,016,-
372.45 was for new work and $3,217,305.53 for maintenance. The total
expenditures were $12,116,439.23, all from regular funds.
   Proposed operations.-The balance unexpended at the end of the
fiscal year amounting to $11,527.23 plus allotments of $767,211.52
made during fiscal year 1953, a total of $778,738.75, will be applied as
follows:
Accounts payable June 30, 1952_._------------------.--.--------                        $505, 238. 75
Maintenance:
   Dredging by contract (April-June 1953) to restore
      the 30-foot section of Newark Bay, Hackensack
      and Passaic Rivers to project dimensions------ $265, 000
   Channel surveys and miscellaneous inspections and
     reports ----------------------------------            8, 500
                                                                                           273, 500. 00

         Total for all work-------- ------                     --        ----              778, 738.75
      245554-53--vo. 1---13
222             REPORT OF               CHIEF OF ENGINEERS,                            U.       S.   ARMY,         1952


  The additional sum of $440,400 can be profitably expended during
the fiscal year 1954 for the following scheduled work:
Maintenance:
   Dredging by contract to restore the 16-foot section of Passaic River
                           _---------
      to project dimensions--                      _--_
                                                  ----------            $430, 000
   Channel surveys and miscellaneous inspections and reports------        10, 400

               Total for all work--                  ------               --------
                                                                             _----                                            440,400

                                             Cost and financial summary
                                                              U. S. FUNDS


                                                           Fiscal year ending June 30                                    Total to June
                                                                                                                        30,1952, includ-
                                                                                                                        ing fiscal years
                                         1948             1949            1950              1951           1952           priorto 1948


New work:
      Appropriated-.........     ----     -
                                         ..........     $800, 000.00 $1,100,000.00 $732, 000.00                          $10,277,382.20
      Cost ------------------.------------
                             .                       --   72, 902. 08 1,613, 209. 03 1, 440, 200. 60                      10, 771, 693. 91
      Expenditures---         ---------   ----------
                               ...........--              20, 999. 69 1, 441, 179. 801, 549, 793. 28                      10,657,354. 97
Maintenance:
      Appropriated-...-                 -$
                                        -$4, 559. 62 $517,000.00        469, 714. 86 268, 262. 43          3,986. 90        4, 356, 273. 97
      Cost-------
               ..            ...----------- 28, 169. 58 375, 552. 64    603, 096. 71 275, 792. 70          3, 416. 13       4, 355, 673. 78
      Expenditures--------...               40, 028. 62 268, 881. 23    709, 539. 18 280, 101. 61             516. 32       4, 352, 773. 97


Other new work data:
   Unobligated balance, June 30, 1952___----------              - -$494, 311. 71
   Appropriated for fiscal year ending June 30, 1953__----------     494, 311. 71
   Estimated additional amount needed to be appropriated for
      completion of existing project_ _-----------------           1,041, 000. 00
                                                    CONTRIBUTED FUNDS


                                                      Fiscal year ending June 30                                         Total to June
                                                                                                                        30, 1952, includ-
                                                                                                                        ing fiscal years
                                    1948            1949               1950          1951                1952            priorto 1948

New work:
   Contributed-...... .----..                ---- ........ $265,000. 00
                                            ...-                                 $31, 000. 00        1-$10, 400. 38          $285, 599. 62
             -    .--
   Cost_.........--      .....-..              .--              32, 495. 76      248,098. 64             5,005. 22            285, 599. 62
   Expenditures_--- .-.                          ..
                                            ----..   . ------------              278, 807. 25            6, 792. 37           285, 599.62

  I   Return of surplus contributed funds.


                          34. NEW YORK AND NEW JERSEY CHANNELS

  Location.-These channels extend from deep water northwest of
Sandy Hook, through lower New York Bay and Raritan Bay, to Perth
Amboy, and thence through Arthur Kill, lower Newark Bay, and Kill
Van Kull to deep water in upper New York Bay. This route is lo-
cated approximately along the boundary line between the States of
New York and New Jersey. (See U. S. Coast and Geodetic Survey
Charts Nos. 285, 286, and 369.)
  Previous projects.-(a) RaritanBay.-Adopted by River and Har-
bor Acts of March 3, 1881, September 19, 1890, and June 3, 1896.
   (b) Staten Island Sound.-Adopted by River and Harbor Acts
of June 23, 1874, March 3, 1875, June 14, 1880, August 11, 1888, May
15, 1889, and October 20, 1890, June 3, 1896, June 13, 1902, June 25,
1910, and March 4, 1913.
   (c) New York and New Jersey channels.-Adopted by River and
              RIVERS AND HARBORS-NEW                     YORK,       N.   Y.,   DISTRICT            223
Harbor Act of September 22, 1922. For further details, see page
284 of the annual report for 1923, and page 194 of the annual report
for 1934.
   Existing project.-This provides for a channel through lower New
York Bay, Raritan Bay, Arthur Kill, lower Newark Bay, and Kill
Van Kull to upper New York Bay, the depth to be 37 feet in rock
and 35 feet in soft material throughout, the width to be 600 feet across
lower New York Bay and Raritan Bay and in the Arthur Kill to a
point 1,000 feet north of Smith Creek, widened to 800 feet in the
vicinities of Seguine Point and Wards Point, respectively, thence 500
feet wide to a point 1,000 feet south of the former location of Buck-
wheat Island, thence 500 to 600 feet wide and passing north of Shoot-
ers Island and protected by a dike on its northern side to the junc-
tion of the channel into Newark Bay; and thence 800 feet wide through
Kill Van Kull to upper New York Bay; with two anchorages 38
feet deep to accommodate five vessels each, one in the vicinity of
Sandy Hook and one south of Perth Amboy, all with suitable easing:
at the bends and junctions. Length of section included in project,
30.8 miles. In addition, the construction of a dike north of Shooters
Island and two secondary channels 30 feet deep and 400 feet wide,
one south of Shooters Island and the other in Raritan Bay connecting
with Raritan River, have been completed under previous projects and
are maintained under the existing project. All depths refer to the
plane of mean low water. The mean range of tides varies between
4.7 and 5.1 feet; the mean range of spring tides, 5.6 to 6.1 feet; ir-
regular fluctuations due to wind and barometric pressure vary from
3.9 feet below mean low water up to 4.8 feet above mean high water..
   The estimate of cost for new work, revised in 1952, is $57,143,000
exclusive of amounts expended on previous projects and exclusive of
$7,711.82 contributed by local interests. The estimate of annual cost
of maintenance, revised in 1950, is $195,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                         Work authorized                                 Documents

Sept.         Anchorage
        6,19331                                                      Rivers and Harbors.
ug. 3     1  Anchoroff Perth Amboy to 33 feet                       Comm. Doc. 17, 71st Cong. 2d, sess.8
              Channel 35 feet deep from lower bay to upper bay       H. Doc. 133, 74th Cong., 1st sess.
May 28,19352   except between vicinity of Smith Creek and vicinity
Aug. 30,1935   of Piles Creek to 30 feet with anchorages 38 feet
               deep at Sandy Hook and Perth Amboy.
May  17, 1950 Channel 35 feet deep from vicinity of Smith Creek to   H. Doc. 233, 81st Cong., 1st sess.
               vicinity of Piles Creek.

  1 Public Works Administration.
  =Emergency Relief Act of 1935.
  * Contain latest published maps.

  Local cooperation.-Work under the acts of May 28, 1935 and
August 30, 1935 is subject to the following conditions of local
cooperation:
   (a) That where the project channel encroaches upon upland prop-
erty and extends shoreward of harbor lines, the completion of the
encroaching portions of the project shall be deferred until the neces-
sary rights-of-way for channel purposes shall have been granted free
of cost to the United States; and
224     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,            1952

     (b) That local interests provide areas of land adjacent to the water-
way, free of cost to the United States, for the disposal of dredged
materials, except where, in the judgment of the Chief of Engineers,
no suitable disposal areas exist.
    Under condition (a), a portion of Buckwheat Island necessary for
channel purposes has been ceded to the United States. An easement
dated August 4, 1942, approved by the Chief of Engineers on Sep-
tember 5, 1942, conveyed to the United States free of cost, rights-of-
way for channel purposes at Howland Hook, Staten Island, N. Y.
Condition (b) is being complied with. Authority was granted by
the Chief of Engineers on November 11, 1935, to require local interests
to provide areas for the disposal of dredged material only in the
section of the waterway extending from the vicinity of Outerbridge
Crossing at Perth Amboy to the vicinity of the channel north of
Shooters Island.
    The River and Harbor Act of May 17, 1950, provides that local
interests shall:
    (a) Provide without cost to the United States all lands, easements,
rights-of-way, and spoil-disposal areas necessary for the construction
and subsequent maintenance of the project, when and as required.
    (b) Hold and save the United States free from damages due to the
construction and subsequent maintenance of the project.
    (c) Deepen the approaches and berths at the terminals which
would use the recommended improvement in order to secure the full
advantages of the deeper channel.
    The conditions under the act of May 17, 1950 have not been complied
with.
    Terminal facilities.-There are 138 piers with a total berthage of
84,105 feet, 35,507 feet of bulkheads and wharves available for dockage,
7 ferry landings, and 2 car-float (railroad) bridges. Of the terminals,
20 are publicly owned, 10 are open to the public, 94 are equipped with
mechanical-handling devices, and 76 have railroad connections. In-
cluded in the terminals are five large shipyards. The facilities are
considered adequate for existing commerce. (For latest full descrip-
tion of terminal facilities, see Port and Terminal Facilities at the
Port of New York, 1942, Corps of Engineers.)
    Operations and results during fiscal year.-Under a contract for
new work dredging in Perth Amboy anchorage to depth of 25, 35,
and 37 feet, work was commenced July 24, 1951, and in progress at the
end of the fiscal year. During the fiscal year 3,497,056 cubic yards
of material were removed at a cost of $1,571,125.28 for new work.
   The United States seagoing hopper dredge Goethals was employed
intermittently from November 14, 1951, to June 30, 1952, in dredging
a portion of the channel in lower New York Bay between Wards Point
and about 18,000 feet east of Seguine Point, to a depth of 35 feet and
widening from 400 to 600 feet. During the fiscal year 355,500 cubic
yards, place measurement, of material were removed at a cost of
$153,301.06 for new work.
   The United States derrickboat Babcock was engaged from July 1,
1951, to September 19, 1951, in the removal of two riprap light bases
from vicinity of Seguine Point at a cost of $68,075.38 for new work.
         RIVERS AND    HARBORS--NEW      YORK, N. Y.,   DISTRICT     225
     Final costs of $2,400 for new work were reported during the fiscal
  year in connection with contract dredging in Arthur Kill vicinity of
  Sewaren, N. J., completed April 11, 1951.
     Under a contract for dredging to a depth of 35 feet in channel north
  of Shooters Island, work was commenced June 18, 1951, and com-
  pleted October 13, 1951. During the fiscal year 378,565 cubic yards,
  place measurement, of material were removed at a cost of $464,748.46
  for maintenance.
     Under modification No. 1 to contract for dredging and rock removal
  in Newark Bay vicinity of Bergen Point, maintenance dredging to
  a depth of 35 feet in the channel adjacent to the east cutoff in Newark
  Bay was performed March 5 and 6, 1952 During the fiscal year 1,138
  cubic yards, place measurement, of material were removed at a cost of
  $3,242.07 for maintenance.
     Under a contract for dredging in a portion of the Perth Amboy
  anchorage area to the previous project depth of 33 feet, work was
  commenced December 13, 1951, and completed April 18, 1952. During
  the fiscal year 391,000 cubic yards, place measurement, of material
  were removed at a cost of $217,395.06 for maintenance.
     The United States seagoing hopper dredge Essayons was employed
July 1 and 2, 1951, in dredging the lower entrance channel from 5
miles west of Mainship Channel to Perth Amboy to a depth of 35
  feet. During the fiscal year 101,000 cubic yards of material were
  removed at a cost of $8,868.77 for maintenance. An adjustment of
  56,100 cubic yards of material was credited during the fiscal year due
to survey.
    The cost of condition surveys and surveys and engineering prelimi-
nary to dredging was $18,998.34 of which $5,222.38 was for new work
and $13,775.96 for maintenance.
    The total cost of work was $2,508,154.42 of which $1,800,124.10
was for new work and $708,030.32 for maintenance. The total ex-
penditure was $2,235,677.52.
    Condition at end of fiscal year.-Work under the existing project
was commenced October 1933 and is about 67 percent complete. Work
completed thus far has consisted of providing project depth of 35 feet
in soft material and 37 feet in rock in a 4.4-mile reach in lower New
York Bay for a width of 600 feet, extending westward from Bayside-
Gedney Channels, thence for a width of 400 feet in lower New York
and Raritan Bays to vicinity of Wards Point where the width is 800
feet, thence for a width of 600 feet to opposite Woodbridge Creek,
and thence 400 feet wide to 1,000 feet north of Smith Creek; the
channel for full width from 1,000 feet south of Buckwheat Island
through Kill Van Kull to upper New York Bay; and of providing
33-foot depth in the northeasterly portion of Perth Amboy anchorage.
    In addition to the above-mentioned work, the construction of a dike
north of Shooters Island, two secondary channels 30 feet deep and
400 feet wide, one south of Shooters Island, the other in Raritan Bay
connecting with Raritan River and a channel 30 feet deep and 400
feet wide in Arthur Kill from a point 1,000 feet north of Smith Creek
to 1,000 feet south of Buckwheat Island have been completed under
previous projects.
226            REPORT            OF CHIEF         OF ENGINEERS,                  U.     S.    ARMY,         1952


  The controlling mean low-water depths of the channel included
in the project are as follows:

                                    Section                              Depth        Width                      Date
                                                                         (feet)       (feet)


From main ship channel to Sewaren .......-------..............              35        150-800     April 1949-June 1952.
From Sewaren to Piles Creek             -.--------------------------        30        250-400     June 1945 to October 1949.
From Piles Creek to Elizabethport- .----------------------                  37        500-600     November 1939 to August
                                                                                                    1949.
From Elizabethport to Bergen Point Light ---------------                         35 600-800       September 1951.
From Bergen Point Light to Upper New York Bay----              .......           35     800       March 1944 to January 1949.
Channel south of Shooters Island....--............---------------------........25   140-400       May 1951.
Anchorage in the vicinity of Sandy Hook....-----------------21. 5--                               April 1951.
Anchorage south of Perth Amboy(----------------                     -           (1)    (1)
Channel in Raritan Bay connecting with Raritan River-....                        28 200-400       April 1951.

  1 Dredging operations are in progress to provide an anchorage area 1,800 feet wide and 4,500 feet long to
depths of 37 and 25 feet and will be completed about June 1953.

   The work remaining to be done under the existing project con-
sists of completing the deepening and widening of the entire channel
to dimensions authorized by the River and Harbor Acts of August
30, 1935, and May 17, 1950, the completion of the deepening of the
anchorage south of Perth Amboy, and dredging the anchorage in the
vicinity of Sandy Hook.
   The total costs and expenditures under the existing project to
June 30, 1952, were as follows:
                                                                          Costs
                                                                                                                   Expenditures
                                                    New work         Maintenance                  Total

Regular funds..--..------------------ $31, 174, 117. 34    $2, 214, 697. 84                  $33, 388, 815. 18      $33, 078, 583. 64
Public works funds   -----------------     807, 000. 00                                           807, 000. 00           807, 000. 00
Emergency Relief funds--------------    2, 023, 308. 41 --------------                         2, 023, 308. 41        2,.023, 308. 41
     Total United States funds-.......         34, 004, 425. 75  2, 214, 697. 84              36, 219, 123. 59      35,   08, 892. 05
Contributed funds............---------------------7,711.82 .........---------------....             7, 711. 82               .7711.82
       Total, all funds..................
                            --------------         34, 012,137. 57     2, 214, 697. 84       36, 226, 835. 41       35, 916,.603. 87


   Proposed operations.-The balance unexpended at the end of the
fiscal year amounting to $1,248,429.59 plus allotments of $1,271,686.39
made during fiscal year 1953, a total of $2,520,115.98 will be applied
as follows:
Accounts payable June 30, 1952____                                                                                $310, 231. 54
New work:
    Complete by May 15, 1953, under continuing
      contract in force, dredging of Perth Amboy
      anchorage to 37 and 25 feet---________          $1, 645, 874. 72
    Dredge by use of two United States seagoing
      hopper dredges for about 1.5 dredge months
      to continue deepening lower entrance chan-
     nel in the vicinity of Seguine Point to 35 feet_     146, 809. 72
                                                                                                                 1, 792, 684. 44
Maintenance:
    Dredging by contract (December 1952-March
      1953) to restore the channel south of
      Shooters Island to project dimensions-----   400, 000. 00
    Channel surveys and miscellaneous inspec-
      tions and reports-------- --       -___ ---- 17, 200. 00
                                                                                                                   417, 200. 00
              Total for all work__---_-__                       ..    ___---- _              ___                 2, 520,115. 98
               RIVERS AND HARBORS-NEW                                    YORK,        N. Y., DISTRICT                      227
   The additional sum of $2,427,800 can be profitably expended during
fiscal year 1954 for the following scheduled work:
New work:
   Complete by December 15, 1953, dredging of over-
     burden in the channel in Arthur Kill from Piles
     Creek to Tremley Point-----------$--------------880, 000
   Dredging and rock removal to 37 feet in Arthur Kill
     from Piles Creek to Pralls Island under a continuing
     contract (January-June 1954). Amount to be ex-
     pended during fiscal year_------------------------ 955, 000
   Dredge by use of one United States seagoing hopper
     dredge for about 1 month during the fiscal year to
     complete deepening the lower entrance channel to
     35 feet----------------------------------------- 165, 000
                                                                                                                $2, 000, 000
Maintenance :
   Repair by contract, dike north of Shooters Island;
      dredging by use of one United States seagoing
      hopper dredge for two dredge months during the
      fiscal year in the removal of shoals where necessary
      and miscellaneous inspections and reports--------                                         427, 800
              Total for all work-------------------------------------                                             2, 427, 800
                                          Cost and financial summa'ry

                                                       Fiscal year ending June 30                               Total to June
                                                                                                               30, 1952. includ-
                                                                                                               ing fiscal years
                                      1948           1949            1950           1951            1952        priorto 1948


New work:
   Appropriated . __               _.         1 $2,200,000.00 $1,260,000.00 $2,665,000.00 $1,414,000.00 1 2 $47,713,081.91
   Cost-----------.....--...      1$2,023,134.77 1, 944, 914. 13 849, 742. 25 1, 295, 693. 58 1, 800, 124. 10 1 5 46, 814, 400. 47
   Expenditures------......... 2, 038, 913. 211, 823, 900. 17 1, 053, 853. 88 1, 318. 674. 91 1, 511, 755. 03 12 46, 526, 438. 35
Maintenance:
   Appropriated----...---             383, 000. 00  110, 000. 00 118, 000. 00 860, 540. 27 290, 200.00             3, 346, 045. 65
   Cost- ......----..----------.... 391, 559. 39    127, 214. 20 123, 340. 17 415, 394. 25 708, 030. 32            3, 306, 532. 04
   Expenditures.--------              388, 317. 14   92, 994. 53 160, 684. 171 377, 350. 58 723, 922. 49           3, 284, 262. 62


Other new work data :
                                    ---------------------------- $246, 117. 50
  Unobligated balance, June 30, 1952___
Appropriated for fiscal year ending June 30, 1953-------------      894, 000.00
Unobligated balance available for fiscal year 1953--------------1, 140, 117. 50
Estimated additional amount needed to be appropriated for com-
    pletion of existing project-------------------------------   21, 346, 000. 00
  1 Exclusive of $7,711.82 expended from contributed funds for new work.
  s Includes $6,621 for new work and $1,621 for maintenance of Lemon Creek, Staten Island, N. Y

     35. RARITAN RIVER TO ARTHUR KILL CUT-OFF CHANNEL, N. J.

  Location.-This channel is in the western portion of Raritan Bay,
off Perth Amboy, and about 23 miles by water southwest of the Battery,
New York City. (See U. S. Coast and Geodetic Survey Chart No.
286.)
  Existing project.--This provides for a channel 1 mile long, 20 feet
deep at mean low water and 800 feet wide, connecting the Raritan
River Channel with the southern end of the Arthur Kill Channel,
New York and New Jersey Channels project. Mean tidal range, 5.1
feet; mean range of spring tides, 6.1 feet; irregular fluctuations due
to wind and barometric pressure vary from 3.6 feet below mean low
water up to 4.8 feet above mean high water.
228         REPORT OF CHIEF OF ENGINEERS,                                 U. S. ARMY, 1952

   The cost for new work for the completed project was $810,500.
The latest (1950) approved estimate of annual cost of maintenance
is $79,000.
   The existing project was authorized by the Public Works Adminis-
tration under date of September 6, 1933, and by River and Harbor
Act approved August 30, 1935 (H. Doc. 50, 73d Cong., 1st sess.),
which document contains latest published maps.
   Terminal facilities.-No terminal facilities are served by the im-
provement, which is a connecting channel.
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1935. When examined in March 1951 the controlling
mean low water depth through the channel was 20 feet for a width
of 800 feet.
   The total cost and expenditures of the existing project to June 30,
1952, were $1,780,695.03, of which $810,500 Public Works funds was
for new work and $970,195.03 regular funds for maintenance.
   Proposedoperations.-An allotment of $1,000 made for maintenance
during fiscal year 1953 will be applied to a condition survey of the
project channel.
   No work is scheduled for fiscal year 1954.
                                    Cost and financial summary

                                                Fiscal year ending June 30                               Total to June
                                                                                                        30,1952, includ-
                                                                                                        ing fiscal years
                                 1948          1949          1950           1951          1952            priorto 1948

New work:
   Appropriated---------------- ----------------------------------- ------------                            $810,500.00
   Cost------     ------------            -----------   -------------------------------        ----          810,500.00'
                                                             ------------ 810, 500.00
   Expenditures......... ................-----------........----------------------..........
Maintenance:
   Appropriated-----------------............     $910 ...........---------- 344, 197. 97 ------------        970, 195.03
   Cost----------------- ------------             910 ------------ 344,197. 97 ------------                  970,195.03
   Expenditures--------- -----------              910   -----------         344,197. 97 ------------         970,195.03



                                 36. WOODBRIDGE CREEK, N. J.

   Location.-This is a small creek rising near Rahway, N. J., and
flowing through marshes into the west side of Arthur Kill, about 20
miles, by water, southwest of the Battery, New York City. (See U. S.
Coast and Geodetic Survey Charts Nos. 286 and 369.)
   Previous project.-Adopted by River and Harbor Act of March 3,
1879. For further details see page 1777, annual report for 1915, and
page 256, Annual Report for 1938.
   Existing project.-This provides for a channel 8 feet deep at mean
low water and 50 feet wide, extending from Arthur Kill to the Sala-
mander dock, a distance of about 1.9 miles. Mean tidal range, 5.1 feet;
mean range of spring tides, 6.1 feet; iregular fluctuations due to wind
and barometric pressure vary from 3.6 feet below mean low water up
to 4.8 feet above mean high water.
   The cost for new work, for the completed project was $30,823,
exclusive of amounts expended on previous projects. The latest
(1950) approved estimate for annual cost of maintenance is $11,000.
              RIVERS            AND HARBORS-NEW                           YORK,          N.     Y.,     DISTRICT                  229

   The existing project was adopted by the River and Harbor Act
of June 13, 1902 (H. Doc. 282, 56th Cong., 1st sess., and annual report
for 1900, p. 1552). The latest published map is in the project docu-
ment.
   Terminal facilities.-There are two terminals with a total dockage
of 118 feet. One of the terminals with a dockage of 50 feet is publicly
owned. The terminals are adequate for present commerce.
   Operations and results during fiscal year.-The cost of a survey
to determine the condition of the channel was $553.50 for maintenance.
The expenditure was $501.03.
   Condition at end of fiscal year.--Work under the existing project
was commenced December 1902 and completed January 1908.
   The controlling mean low water depth from Arthur Kill to the
vicinity of Shell Oil Co. dock was 5 feet when examined in May 1952;
thence 3 feet for a width varying from 20 to 50 feet to 1,500 feet south
of Berry Street, thence decreasing to zero depth at the head of the
project when examined in March 1949.
   The total cost of the existing project to June 30, 1952, was
$208,495.36 of which $30,822.70 was for new work and $177,672.66 for
maintenance.
   The total expenditures were $208,444.57.
   Proposed operations.-The balance unexpended at the end of the
fiscal year amounting to $50.79 will be applied to accounts payable
June 30, 1952. No work is scheduled for fiscal years 1953 and 1954.
                                             Cost and financial summary

                                                      Fiscal year ending June 30                                    Total to June
                                                                                                                   30, 1952. includ-
                                                                                                                   ing   fiscal   years

                                         1948        1949            1950               1951            1952         prior to 1948

New work:
   Appropriated--------- ----------- ------------                                 ------------ ----------............--............--
                                                                                                                          $49,822. 70
   Cost------------------------------------49,822.                                                                                    7
              ..
   Expenditures-------                ------------------------------------------------                                      49, 822. 7
Maintenance:
   Appropriated--------.........             $700      $915   ........------------      $606. 00        $321. 16           177, 672. 66
   Cost------------------                     700       915   .........------------      373.66          553.50            177.672.66
   Expenditures-----........                  700       915   ------------
                                                               ............              375.34          501.03            177, 672.66



                                            37. RARITAN RIVER, N. J.

   Location.-Rises in the north-central part of New Jersey and
flows in a general southeasterly direction into Raritan Bay, be-
tween Perth Amboy and South Amboy, about 24 miles, by water,
south of the Battery, New York City. (See U. S. Coast and Geodetic
Survey Chart No. 375.)
   Previous projects.-A survey of Raritan River for the improve-
ment of New Brunswick Harbor was made in 1836. Subsequent
projects were adopted by acts of June 18, 1878, and March 3, 1881.
   For further details see page 1777 of annual report for 1915, page
359 of annual report for 1918, and page 259 of annual report for 1938,
   Existing project.-This provides for a channel 25 feet deep and
300 feet wide extending from the turn in New York and New Jer-
sey Channels near Great Beds Light to the Government wharf on
the main channel, a distance of 5.8 miles widened to 600 feet for
230           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                            1952

a length of 1,000 feet opposite the wharf to form a turning basin
of same depth; thence a channel 15 feet deep and 200 feet wide,
to the Washington Canal, a distance of 3.0 miles; thence 10 feet
deep in soft material, 11 feet deep in rock, and generally 100 feet
wide with widening at bends to the Delaware Raritan Canal en-
trance at New Brunswick, a distance of 5 miles; and for a south
channel, 25 feet deep and 300 feet wide from the junction with
the main channel at Keasby to the upper limit of the Titanium
Pigment Co. property, a distance of 0.8 mile; thence 10 feet deep
and 150 feet wide to the upper junction with the main channel
at Crab Island, a distance of 2.4 miles. The plane of reference is
mean low water. The mean range of tides is 5.1 feet at the mouth
of the river and 5.4 feet at New Brunswick; mean range of spring
tides, 6.1 and 6.5 feet, respectively. Irregular fluctuations due to
winds and barometric pressure vary from 3.6 feet below mean low
water up to 4.8 feet above mean high water.
   The estimate of cost for new work, revised in 1952, is $1,257,000,
exclusive of amounts expended on previous projects and exclusive
of $66,000 contributed by local interests. The latest (1940) approved
estimate for annual cost of maintenance is $60,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                           Work authorized                                        Documents

Mar.     2,1919   Channel 15 feet deep and 200 feet wide to Washington            H. Doc. 1341, 62d Cong., 3d sess.
                   Canal, thence 10 feet deep and 150 feet wide to ca-
                   nal locks and 10 feet deep through south channel.
July     3,1930   Channel 25 feet deep and 300 feet wide up to New                H. Doc. 127, 70th Cong., 1st sess.
                   York & Long Branch R. R. bridge.
   Do-.......     Channel 10 feet deep in earth and 11 feet in rock to            H. Doc. 454, 70th Cong., 2d sess.'
                   New Brunswick. Width reduced to 100 feet.
   Do.......      Relocation of lower reach of south channel..----------.......   Rivers and Harbors Committee,
                                                                                                          z
                                                                                    Doc. 31, 71st Cong., 2d sess.
Aug. 26,1937      Channel 25 feet deep and 300 feet wide to junction              River and Harbors       Committee,
                   of main and south channels, thence of same depth                 Doc. 74, 74th Cong., 2d sess.'
                   in south channel to Titanium Pigment Co.
Oct.    17,1940   Channel 25 feet deep and 300 feet wide from junction            Report on file in the Office, Chief
                   of main and south channels to the Government                     of Engineers (report not printed).
                   wharf, including a turning basin.

  1Contain latest published maps.

   Local cooperation.-Fully complied with except that local inter-
ests are required to furnish spoil-disposal areas for the maintenance
of the 25-foot channel from New York & Long Branch Railroad bridge
to junction of main and south channels, and in the south channel to
the Titanium Pigment Co. property.
   Terminal facilities.-There are 26 piers and bulkheads with a total
berthage of 16,469 feet along the shores of Raritan River. The Gov-
ernment has established a large ammunition and storage depot and
arsenal known as Raritan Arsenal on the river. One of the terminals
is municipally owned and is leased to private interests. Eleven of
the terminals are equipped with mechanical handling devices and 10
have railroad connections. In addition, there is a boatyard with
storage space for 100 craft and a boat basin with mooring for about 40
pleasure boats. The terminals are considered adequate for existing
           RIVERS AND HARBORS--NEW                      YORK, N. Y., DISTRICT                       231
commerce. (For latest full description of terminal facilities, see
Port and Terminal Facilities at the Port of New York, 1942, Corps of
Engineers.)
   Operations and results during fiscal year.-Under a contract for
dredging to a depth of 25 feet in the south channel from the junction
with the main channel to the upper limit of the Titanium Pigment
Co. wharf, work was commenced October 31, 1951, and completed
January 14, 1952. During the fiscal year 208,125 cubic yards, place
measurement, of material were removed at a cost of $106,450.53 for
maintenance.
   The United States lighter Gorham and United States motor tug
Daly were engaged in the examination and removal of an obstruction
from the Raritan River channel vicinity of South Amboy, N. J., on
January 4, 1952, at a cost of $660.69 for maintenance.
   A model study of the Raritan River was in progress at the Water-
ways Experiment Station, Vicksburg, Miss., and field surveys in con-
nection therewith were conducted during the fiscal year at a cost of
$3,522.11 for maintenance.
   The cost of studies and investigation of shoaling, condition surveys
and surveys and engineering preliminary to dredging was $6,169.09
for maintenance.
   The total cost of work was $116,802.42 for maintenance. The total
expenditure was $117,797.14.
   Condition at end of fiscal year.-Work under the existing project
was commenced September 1919 and is about 96 percent complete.
The main channel has been dredged 25 feet deep and 300 feet wide
from the junction with New York and New Jersey Channels to and
including a turning basin of the same depth opposite the Govern-
ment wharf, except for a shoal along the northerly channel line in
the vicinity of the Victory Bridge, thence 15 feet deep and 200 feet
wide to the mouth of the Washington Canal, thence 10 and 11 feet deep
and 100 feet wide to the Delaware & Raritan Canal outlet locks at
New Brunswick. The south channel has been dredged 25 feet deep
and 300 feet wide for a distance of 3,200 feet, thence 10 feet deep and
150 feet wide for a distance of 12,400 feet to within 1,300 feet of the
junction with the main channel at Crab Island.
   The controlling depths at mean low water are as follows:

                           Section                              Depth     Width             Date
                                                                (feet)    (feet)

In main channel from New York and New Jersey channels to         25      300-200   May and December
  junction with the south channel.                                                  1951.
From south channel junction to lower end of Government wharf     19      300-170   May 1951.
From lower end of Government wharf to upper end of Govern-       16      300-150      Do.
  ment wharf.
Turning Basin, opposite Government wharf---- --------------       9      100-300      Do.
From upper end of Government wharf to the Washington Canal_      15      100-200   July 1946-July 1947.
From Washington Canal to the Delaware & Raritan Canal lock       10       40-100   July 1946.
at New Brunswick.
In south channel to upper limit of Titanium Pigment dock-....    25          300   January 1952.
From upper limit of Titanium Pigment Co. dock to Crossman's       9. 5   150- 50   December 1950.
dock.
From Crossman's dock to Junction with main channel opposite       1      100-150   July 1947.
Crab Island.
232          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   The work remaining to be done under the existing project is the
dredging of the south channel to a depth of 10 feet and 150 feet wide
for a length of 1,300 feet to the upper junction with the main channel
at Crab Island, and the removal of a shoal along the northerly channel
line in the vicinity of the Victory Bridge.
   The total cost of the existing project to June 30, 1952, was $3,208,-
909.64, of which $878,314.59 was from regular funds, $292,685.07 from
Ordnance funds, and $66,000 from contributed funds, a total of $1,236,-
999.66 for new work, and $1,971,909.98 from United States funds for
maintenance. The expenditures were $3,208,861.47-$2,850,176.40 from
regular funds, $292,685.07 from Ordnance funds and $66,000 from con-
tributed funds.
   Proposed operations,--The balance unexpended at the end of the
fiscal year amounting to $6;385.54 plus an allotment of $121,862.63
made during fiscal year 1953, a total of $128,248.17 will be applied as
follows:
Accounts payable June 30, 1952--------------------------      ------      $48.17
Maintenance:
    Dredging by contract (October-December 1952) to restore the
      South Channel from Keasby to the Titanium Pigment Co. prop-
      erty to project depth of 25 feet and the main channel opposite
      Raritan Arsenal wharf to partial project depth of 18 feet...--- 125,000.00
    Channel surveys and miscellaneous inspections and reports------ 3,200.00

             Total for all work...---.---------------                                          ----         128,248.17
  The sum of $212,900 can be profitably expended during the fiscal
year 1954 for the following scheduled work:
Maintenance:
    Dredging by contract (October-December 1953) to restore the
      South Channel from Keasby to the Titanium Pigment Co. prop-
      erty to project depth of 25 feet-------------------------       $110, 000
   Dredge by use of one ljnited States seagoing hopper dredge for
      about one month to restore the existing 25-foot main channel
      below the New York and Long Branch railroad bridge to project
      dimensions --------------        ----------------------------- 100, 000
   Miscellaneous inspections and reports----.....--------------------    2,900
             Total for all work                  -----------------------------------                           212, 900

                                     Cost and financial summary

                                                  Fiscal year ending June 30                              Total to June
                                                                                                         30, 1952, includ-
                                                                                                         ingfiscal years
                                 1948            1949           1950          1951           1952         prior to1948

New work:
                                                                                 1t
   Appropriated .......------------------------------------------------...........-----...
                                                                                 2$1, 551,469.91
                                                                      ............
   Cost..--------          -------------
                                       -------------------------- --------------  21,551,469. 91
   Expenditures........----.---------- ---------------------------------------   121, 551, 469. 91
Maintenance:
     Appropriated-.........   198, 391. 30 $245, 000. 00 $219,137. 24      $99, 472. 00 $119,953. 10        2, 089, 666. 78
     Cost ,- ---   --         169, 929. 97   280, 914. 93   210, 635. 53   104, 787. 02   116, 802. 42      2, 083, 329. 41
     Expenditures-.........   169, 777.63    281, 180. 45   208, 826. 03   105, 567. 93   117, 797. 14      2, 083, 281.24

I Exclusive of $292,685.07 ordnance funds expended for new work.
1   Exclusive of $66,000.00 contributed funds expended for new work.
Other new work data: Estimated additional amount needed to be appro-
     priate.d for completion of existing project..-----..-- ---                                 -----          $86, 000
        RIVERS :AND HARBORS--NEW       YORK,   N.   Y   DISTRICT   233

          38. WASHINGTON CANAL AND SOUTH RIVER, N. J.

  Location.-South River rises in central New Jersey and empties
into the Raritan River from the south, about 8 miles above South
Amboy, N. J. (See U. S. Coast and Geodetic Survey Chart No. 375.)
  Previous projects.-Adopted by River and Harbor Acts of March
3, 1871, June 14, 1880, and July 25, 1912. For further details see
page 1778 of annual report for 1915, page 323, annual report for
1929, and page 262, annual report for 1938.
  Existing project.--This provides for a channel, to be obtained
by diking and dredging, 12 feet deep and 100 feet wide in Wash-
ington Canal, 0.8 mile, and 12 feet deep and generally 150 feet
wide in South River following cut-off No. 1 up to Old Bridge, 4.4
miles. The tidal variation at the canal is 5.1 feet, and at Old Bridge,
5.3 feet; mean range of spring tides, 6.1 and 6.4 feet, respectively.
Irregular tidal fluctuations due to wind and barometric pressure
vary from 3.6 feet below mean low water up to 4 feet above mean
high water.
   The cost for new work for the completed project was $48,891 ex-
clusive of amounts expended on previous projects. The latest (1929)
approved estimate for annual cost of maintenance is $8,000.
   The existing project was adopted by the River and Harbor Act
of July 3, 1930 (H. Doc. 109, 71st Cong., 1st sess.). The latest
published map is in the project document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There is one publicly owned wharf at South
River and eight private wharves, some of which are open to public
use. These facilities are considered adequate for existing commerce.
 (For further details see Port Series No. 20, Corps of Engineers.)
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-Work on the section of the ex-
isting.project to be done by the United States, extending from the
mouth of Washington Canal to the highway bridge at South River,
was commenced July 1931 and completed November 1931. The sec-
tion from the highway bridge at South River to Old Bridge was
completed by the State of New Jersey. The controlling depth at
mean low water when examined in August 1948 was 12 feet for a
width of 100 to 30 feet through Washington Canal and South River
to 1,600 feet south of Raritan Railroad bridge, thence 10 feet for a
width of 60 to 150 feet to within 2,000 feet of the head of the project
at Old Bridge, thence decreasing to 2 feet at the head of the project.
The minimum width through bridge draws is 48 feet. The head of
navigation is at Old Bridge, about 5.2 miles above the entrance.
   The total cost and expenditures of the existing project to June
30, 1952, were $172,397.90 of which $48,891.82 was for new work
and $123,506.08 for maintenance. In addition, the cost and ex-
penditures from contributed funds were $364.73 for new work.
  Proposed operations.-An allotment of $500 made for maintenance
during fiscal year 1953 will be applied to a condition survey of the
project channel.
   No work is scheduled for fiscal year 1954.
234             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                    1952

                                                Cost and financial summary

                                                                Fiscal year ending June 30                                           Total to June
                                                                                                                                 30, 1952, includ-
                                                                                                                                 ing fiscal years
                                            1948              1949              1950              1951              1952             prior to 1948


New work:
   Appropriated            ..---.----      ----- ------------------------                        .-----------------------  I $206,116.23
   Cost--.......----------................----....------------ ........------------                  ------------.........
                                                                                    ..........------------                    206,116. 23
   Expenditures          -----------------------            ------        -----------------------------                     1206,116.23
Maintenance:
     Appropriated--------------------                                   ---------------------------------                                  8, 440.54
     Cost--------------------------                      900 ----------------------------------                                          208, 440.54
     Expenditures--------- ---.........-----..........----..
                                                         900 ............----------...........------------------------............       208, 440. 54

   1 Exclusive of $364.73 contributed funds expended for new work.

                      39. SHOAL HARBOR AND COMPTON CREEK, N. J.

   Location.-Shoal Harbor is an indentation on the south shore of
Sandy Hook Bay about 4 miles west of Sandy Hook. Compton
Creek is a small stream rising on the west side of the Navesink High-
lands and flowing north through the meadows into Shoal Harbor.
 (See U. S. Coast and Geodetic Survey Chart No. 369.)
   Previous projects.-Adopted by River and Harbor Act of Sep-
tember 19, 1890. For further details see annual report for 1934, page
211, and annual report for 1938, page 265.
   Existing project.-This provides for dredging a channel 8 feet deep
at mean low water, extending from deep water in Sandy Hook Bay
to a point 1,000 feet upstream from the Main Street Bridge across
Compton Creek with a width of 150 feet in the bay and 75 feet inside
the mouth of the creek, with widening at bends. The length of
section included in the project is about 1.5 miles. Mean tidal range,
4.8 feet; mean range of spring tides, 5.8 feet; irregular fluctuations
due to wind and barometric pressure vary from 3.8 feet below mean
low water up to 5.9 feet above mean high water.
   The estimate of cost of new work, revised in 1952, is $70,000, ex-
clusive of amounts expended on previous projects. The latest (1950)
estimate of annual cost of maintenance is $20,000.
   The existing project was authorized by the following river and
harbor acts:

      Acts                                      Work authorized                                                       Documents

Aug. 30, 1935         8-foot channel in bay and creek to Main St. Bridge __
                                                                          ...                          H. Doc. 58, 73d Cons., 1st sess.
Mar. 2,1945           Extens on of 8-foot channel to 1,000 feet upstream                               H. Doc. 673, 76th Cong., 3d sess.
                         from Main St. Bridge.                                                              (Contains latest published map.)


  Recommended modification of project.-Under date of December
12, 1950, the Chief of Engineers recommended modification of the
existing project to provide for deepening the existing 8-foot channel
to a depth of 12 feet at mean low water to the first bend in the creek,
including extension of the channel to the 12-foot depth in Sandy Hook
Bay, with widening at the bends, at an estimated cost of $105,000 with
$12,000 annually for maintenance, in addition to that now required,
subject to certain conditions of local cooperation (H. Doc. 89, 82d
Cong. 1st sess.).
         RIVERS   AND   HARBORS-NEW       YORK,   N.   Y.,   DISTRICT   235
    Local cooperation.-The River and Harbor Act of March 2, 1945,
provides that no work shall be undertaken until harbor lines have been
established by the Secretary of War along that portion of Compton
Creek extending 1,000 feet upstream from Main Street Bridge and
until local interests have:
    (a) Conveyed to the United States, free of cost, a perpetual ease-
ment to excavate all lands above ordinary high water included
between said harbor lines and have removed all structures or parts
thereof extending channelward of said harbor lines.
    (b) Furnished, free of cost to the United States, suitable areas
for the disposal of dredged material for new work and subsequent
maintenance as needed.
    (c) Given releases to hold and save the United States free from
all claims for damages resulting from the improvement.
    (d) Constructed the public wharf, assurances for which were
furnished under the project of August 30, 1935, at a location and
in accordance with plans to be approved by the Chief of Engineers
and Secretary of War and given assurances satisfactory to the
Secretary of War that they will maintain this wharf open to all on
equal and reasonable terms.
   The clerk of Middletown Township was notified of the conditions
of local cooperation in letter dated January 18, 1946. A letter dated
July 2, 1946, advised that the township committee has given assur-
ances that it will comply with all of the above conditions. The re-
quirements under prior acts have been fully complied with.
   Terminal facilities.-There are two terminals with a total available
dockage of 1,400 feet located near the mouth of Compton Creek. The
terminals are equipped with loading and unloading devices. None
has railroad connections. Within the navigable sections of the creek,
there are about 35 small landings and 2 boat yards equipped with 5
marine ways suitable for small fishing boats. Upon completion of a
public wharf to be constructed under local cooperation, the terminals
will be adequate for existing commerce.
   Operations and results during fiscal year.-The cost and expendi-
tures of a survey to determine the condition of the channel were
$632.06 for maintenance.
   Condition at end of fiscal year.-Work under the existing project
was commenced August 1936 and is about 66 percent complete. The
controlling mean low water depth in the channel, when examined in
June 1952, was 8 feet for a width of 150 feet from Sandy Hook Bay
to the stone jetty, thence 7 feet for a width of 60 feet in the creek to the
vicinity of the Main Street Bridge. From Main Street Bridge to the
head of the project there was a controlling depth of 2 feet below]
mean low water for a width of 55 feet when examined in November
1939. The head of navigation is at the Central Railroad of New Jer-
sey bridge about 1 mile above the mouth. The work remaining to be
done under the project consists of extending the channel 1,000 feet
upstream from the Main Street Bridge.
   The total cost and expenditures of the existing project to June 30,
1952, was $183,724.41 of which $30,281.99 was for new work and
$153,442.42 for maintenance.
236         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                              1952

   Proposed operations.-No work is scheduled for fiscal years 1953
and 1954.
                                       Cost ana financial summary

                                                   Fiscal year ending June 30                           Total to June
                                                                                                       30, 1952, includ-
                                                                                                       ing fiscal years
                                   1948          1949            1950           1951        1952        prior to 1948

New work:
   Appropriated.         ----------- ------------------------               ------------ ------------        $47, 281,99
   Cost------- ---------------------------------- ------------ ------------------------                       47, 281.99
   Expenditures------------------------           ------------ ------------ ------------                      47, 281.99
Maintenance:
   Appropriated-_........ -$4, 996. 03         $4, 600. 00   $65, 000.00      $1, 838.00    $632.06          323, 151.25
   Cost----------------           3, 783. 54    4, 360. 67    19, 950. 35     47, 126. 98    632. 06         323, 151.25
   Expenditures---------......... 7, 029. 25    4, 310. 17    14, 009. 69     53, 118. 14    632. 06         323, 151.25


Other new work data: Estimated additional amount needed to be appro-
priated for completion of existing project----------------------- $40, 000

                                    40. SANDY HOOK BAY, N. J.

   Location.--This bay is the southern portion of lower New York
Bay, west of and adjoining the projecting arm of Sandy Hook, N. J.
 (See U. S. Coast and Geodetic Survey Charts Nos. 369 and 543.)
   Existing project.-This provides for the construction of a continu-
ous rubble-mound breakwater about 4,000 feet in length extending
eastward from the New Jersey Central Railroad steamboat dock at
Atlantic Highlands, N. J., and dredging of the area in its lee and sea-
ward of the new pierhead line to a depth of 8 feet at mean low water.
Mean range of tides, 4.6 feet; mean range of spring tides, 5.6 feet;
irregular fluctuations due to wind conditions vary from 1 to 2 feet
above or below the mean range.
   The cost for new work for the completed project was $508,936,
exclusive of $53,790 contributed by local interests. The latest (1937)
approved estimate for annual cost of maintenance is $6,000.
   The existing project was adopted by the River and Harbor Act of
August 26, 1937 (H. Doc. No. 292, 75th Cong., 1st sess.). For latest
published map, see the project document.
   Local cooperation.-Fullycomplied with, except that local interests
must furnish easements and rights-of-way necessary for subsequent
maintenance as and when required.
   Terminal facilities.-There are 3 piers, with a total berthage of
1,330 feet, located along the water front at Atlantic Highlands west-
erly of and adjacent to the anchorage area. One of these terminals
has railroad connections. Under the conditions of local cooperation,
5 boat basins with mooring stalls and servicing facilities for pleasure
boats were constructed. The existing terminals will be sufficient for
present needs. There is ample space for additional wharves and boat
basins should future needs warrant their construction. (For latest
full description of terminal facilities, see Port and Terminal Facili-
ties at the Port of New York, 1942, Corps of Engineers.)
   Operations and results during fiscal year.-The cost of a survey to
determine the condition of the anchorage area was $162.88 for mainte-
nance. The expenditures were $348.76.
  Conditionat end of fiscal year.-The existing project was completed
                  RIVERS AND                    HARBORS--NEW                          YORK,           N.         Y.,    DISTRICT                 237
in 1941. The breakwater was completed in 1940 and the anchorage
area was completed in 1941. When examined in June 1951 project
depth existed throughout the anchorage area, except for a shoal in
the westerly area with a least depth of 4.5 feet.
   The total cost of the existing project to June 30, 1952, was $563,996.55
of which $562,726.43 was for new work, $508,936.40 of which were
United States funds and $53,790.03 contributed funds and $1,270.12
for maintenance. The total expenditures were $563,974.43.
   Proposed operations.-The balance unexpended at the end of the
fiscal year amounting to $22.12 will be applied to accounts payable
June 30, 1952.
   No work is scheduled for fiscal years 1953 and 1954.
                                                  Cost and financial summary

                                                                  Fiscal year ending June 30                                         Total to June
                                                                                               ...                           ...    30,1952, includ-
                                                                                                                                    ing fiscal years
                                             1948               1949              1950               1951               1952          priorto 1948

New work:
   Appropriated.--------- ---..            ---        - --- ,--             ------------     ----------- ------------                     1$508, 936.40
   Cost ...............------......-----------.........................---------------------------------- ......-----------............    1508, 936. 40
   Expenditures ----------------                        ------------------------------------------...........                               508, 936. 40
Maintenance:
     Appropriated ....-.--            ---
                                        . -----------------
                                                .                            -------------- $1, 289. 24                -$19. 12               1, 270. 12
     Cost-_ ---         -------------------------------------------                                 1, 107. 24           162. 88              1, 270. 12
     Expenditures---------........................------.......------------------------............    899. 24           348. 76              1, 248.00

  i Exclusive of $53.790.03 expended from contributed funds for new work.

                                          41. SHREWSBURY RIVER, N. J.

   Location.-This river is mainly a large tidal basin in the eastern
part of New Jersey, the outlet being at the southeast end of Sandy
Hook Bay, about 4 miles south from the point of Sandy Hook. (See
U. S. Coast and Geodetic Survey Chart No. 543.)
   Previous projects.-Adopted by River and Harbor Acts of August
30, 1852; March 3, 1871; March 3, 1879, modified in 1883 and 1887;
and by the River and Harbor Act of March 2, 1919. For further
details, see page 1778 of annual report of 1915, page 373 of annual
report of 1918, and page 267 of annual report for 1938.
   Existing project.-This provides for a channel 12 feet deep and
300 feet wide, following the westerly shore, from deep water in
Sandy Hook Bay to a point 600 feet south of the railroad bridge at
Highlands, a distance of 2.2 miles; then 9 feet deep and generally 150
feet wide, suitably widened at bends and turns, in the south branch
of the river to the Branchport Avenue Bridge in the city of Long
Branch, a distance of 6.8 miles; and for a channel in the north branch
6 feet deep and 150 feet wide from the junction to Red Bank, a
distance of 6.1 miles; a turning basin and anchorage in the vicinity of
Red Bank, 6 feet deep and about 19 acres in area; a channel in
Claypit Creek, 6 feet deep and 100 feet wide from the 6-foot curve
in the north branch of the head of the creek, a distance of about 1.0
mile; a channel in Oceanport Creek, 6 feet deep, 100 feet wide and
2 miles long from the channel in south branch to the New York and
Long Branch Railroad Bridge; and for a channel in Little Silver
           245554-53-vol. 1-16
238         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                         1952

Creek, 6 feet deep, 100 feet wide and 1.6 miles long from the channel
in south branch to the Seven Bridge Road Bridge. All depths refer
to the plane of local mean low water. The mean range of tides at
Highlands, 3.8 feet; at Seabright, 1.7 feet; at Branchport, 1.7 feet;
and at Red Bank, 3 feet. Mean range of spring tides is 4.7, 2.1, 2.2,
and 3.6 feet, respectively. Irregular fluctuations due to wind and
barometric pressure vary from 1.7 feet below mean low water up to
6.5 feet above mean high water.
   The estimate of cost for new work, revised in 1952, was $937,000,
exclusive of amounts expended on previous projects and exclusive of
$36,311.03 funds already contributed and $86,000 to be contributed by
local interests. The estimate of annual cost of maintenance, revised
in 1950, is $68,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                             Work authorized                                    Documents

Mar. 2,1919                                                ..............--
                Channel 6 feet deep in North Branch------------               H. Doc. 1296, 62d Cong., 3d sess.
Aug. 30, 1935                          ...-----------------
                Channel 12 feet deep________                                  H. Doc. 157, 71st Cong., 2d sess.
   Do___....    Channel 9 feet deep.....______---------------------------     Rivers and Harbors Committee,
                                                                                Doc. 31, 74th Cong., 1st sess.
May 17,1950     Turning basin and anchorage 6 feet deep at Red                H. Doc. 285, 81st Cong., 1st sess.
                 Bank, and channels 6 feet deep in Claypit, Ocean-              (Contains latest published map.)
                  port and Little Silver Creeks.



   Local cooperation.-The River and Harbor Act of May 17, 1950,
provides that local interests shall
    (a) Provide without cost to the United States all lands, easements,
rights-of-way, and spoil-disposal areas necessary for the construction
and subsequent maintenance of the project, when and as required.
    (b) Hold and save the United States free from damages due to the
construction and subsequent maintenance of the improvement.
    (c) Provide and maintain a suitable public wharf on each of the
creeks to be improved, which shall be open to all on equal terms.
    (d) Remove at their own expense the Locust Avenue Bridge over
Claypit Creek.
    (e) Make cash contributions of $25,000, $33,000 and $27,500 toward
the cost of improvement of Claypit, Oceanport, and Little Silver
Creeks, respectively.
    Provided further that construction of any unit of the proposed im-
provement may be undertaken independently of the other units when
the required local cooperation has been provided.
   These conditions have not been fulfilled. The requirements under
prior acts have been fully complied with.
    Terminal facilities.-There are 33 terminals with a total berthage
of 7,986 feet located on the waterway. Eight of the terminals with a
total berthage of 1,000 feet are open to the public. In addition many
private pleasure-boat landings have been constructed by owners of
riverfront estates. Fifteen boat yards with storage space for 670 craft
and equipped with 21 marine railways are available. None of the
terminals has direct rail connections. The facilities are considered
adequate for existing commerce.
           RIVERS AND               HARBORS           NEW       YORK,           N.     Y.,      DISTRICT               239
  Operationsandresults duringfiscal year.-None.
  Condition at end of fiscal year.-Work under the existing project
was commenced October 1919 and is about 57 percent complete.
  The controlling mean low water depths of the channels included in
the project are as follows:

                                                                 Depth            Width
                          Section                                D(feet           (fet)             Date of survey

From Sandy Hook Bay to 600 feet south of railroad                    12              250-300     September 1950.
bridge at Highlands, N. J.
From 600 feet south of railroad bridge at Highlands,                   9                  150          Do.
  N. J., to junction of north and south branches.
From junction of north and south branches to Branch-                   8.0             80-150    May-June 1950.
  port Ave. bridge at Long Branch, N. J.
                 NORTH BRANCH

Junction with main channel to City Dock at Red Bank,                   6.0             75-150          Do.
  N. J.
From City Dock to head of project opposite Maple Ave.,                 4.5                150          Do.
  Red Bank, N. J.
Anchorage and turning basin at Red Bank, N. J .....                    3.0                400    September 1947.
Claypit Creek from mouth to Locust Avenue Bridge__.                    1.4                100        Do.
Oceanport Creek, from junction with south branch to                    1.6                100        Do.
  New York and Long Branch Railroad Bridge.
Little Silver Creek, from junction with south branch                       .8             100          Do.
  to Seven Bridge Road.


   The river is navigable on the north branch to Red Bank; on the
south branch to Branchport; on Claypit Creek to Locust Avenue; on
Oceanport Creek to Oceanport Avenue; and on Little Silver Creek to
Seven Bridge Road.
   The work remaining to be done under the existing project consists
of dredging the turning basin and anchorage in the vicinity of Red
Bank, and the channels in Claypit, Oceanport, and Little Silver
Creeks as authorized by the River and Harbor Act of May 17, 1950.
   The total cost and expenditures of the existing project to June 30,
1952 were $835,822.50 of which $466,562.59 was for new work and
$332,948.88 for maintenance. In addition, the costs and expenditures
from contributed funds were $36,311.03 for new work.
   Proposed operations.-No work is scheduled for fiscal year 1953.
   The sum of $2,500 can be profitably expended for maintenance during
fiscal year 1954 for a condition survey of the project channel.
                                    Cost and financial summary

                                                 Fiscal year ending June 30                                  Total to June
                                                                                                             30, 1952, includ-
                                                                                                             ing fiscal years
                                 1948          1949          1950               1951            1952           priorto 1948

New work:
                                                                                    ------------ $687, 456. 54
   Appropriated--------.........-----------------------..............................................
   Cost............---------------------------            ..------------------------------------ 1687, 456. 54
   Expenditures--------......... -- -----------------------------------------------               687, 456. 54
Maintenance:
   Appnropriated                            $1,990. 00 $98, 000.00 -$16,009.74 ............
                                ---........-----............                                              619, 554. 93
                                $1,300. 82
   Cost-............--------------......     2, 174. 43     5,216. 16         76, 774. 10 ...------------.........
                                                                                                          619, 554. 93
   Expenditures-......------...  3, 209. 44  2,242.97 ...........------------ 81, 990. 26 ..------------  619, 554. 93

1Exclusive of $36,311.03 contributed funds expended for new work.
 240     REPORT OF CHIEF OF ENGINEERS, U.         S.   ARMY,   1952

                         42. SHARK RIVER, N. J.

     Location.-This is a small stream entering the Atlantic Ocean 20
  miles south of Sandy Hook on the New Jersey coast. It is 40 miles
  by water south of the Battery, New York City. (See U. S. Coast and
  Geodetic Survey Charts, Nos. 795 and 1215 .)
     Existing project.-This provides for a channel 18 feet deep at
  mean low water and 150 feet wide across the bar at the entrance to
  the inlet; thence 12 feet deep and generally 100 feet wide through
  main channel and south channel to the Route 35 bridge; thence 8 feet
  deep and 100 feet wide to the upper limit of the Belmar municipal
  boat basin, with additional depths and widths where necessary and
  practicable to produce satisfactory current velocities at bridges; and
  an anchorage 12 feet deep over about 7.3 acres east of Route 4-N
bridge. The length of section included in the project is about 1.7
miles. Mean tidal range at the mouth is 4 feet; mean range of spring
tides 4.8 feet; irregular fluctuations due to wind and barometric pres-
sure vary from 2.6 feet below mean low water up to 8.4 feet above
mean high water.
     The cost for new work for the completed project was $150,000.
The estimate of cost for annual maintenance, made in 1938, is $30,000.
    The existing project was adopted by the River and Harbor Act of
March 2, 1945 (H. Doc. 102, 76th Cong., 1st sess.). For latest
published map see project document.
    Local cooperation.-Fullycomplied with except that local interests
are required to furnish suitable spoil-disposal areas for maintenance.
    Terminal facilities.-Two yacht basins are located on the south
shore of the lower portion of Shark River. One is publicly owned
and has a berthage of 2,600 feet. Several boat yards, boathouses, and
landings for commercial and recreational craft are located in the
lower portion of Shark River. Additional terminals adequate .for
prospective commerce are expected to be provided upon improvement
of the waterway.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-Work under the existing project
was commenced June 1947 and completed October 1947.
    The controlling mean low water depth, when examined in April
1950, was 6 feet for a width varying from 30 to 100 feet across the bar
at the entrance to the inlet; thence 8.5 feet for a width varying from
50 to 100 feet through Main Channel and South Channel to Route 35y
bridge; thence 8 feet for a width of 100 feet to the head of the project.
The controlling depth in the anchorage area was 10 feet below mean
low water. The head of navigation is at the head of the lagoon, a
distance of about 3 miles toward the south end and 21/2 miles to the
north, both distances being measured from the mouth.
    The total cost and expenditures of the existing project to June 30,
1952, were $292,639.49 of which $150,000 was for new work and $142,-
639.49 for maintenance.
   Proposed operations.-An allotment of $900 made for maintenance
during fiscal year 1953 will be applied to a condition survey of the
project channel.
   No work is scheduled for the fiscal year 1954.
                                                                                                                 -
                RIVERS AND HARBORS-NEW                                  YORIK, N.           Y.,   DISTRICT                241

                                           Cost and financial summary

                                                        Fiscal year ending June 30                          Total to June
                                                                                                           30, 1952, includ-
                                                                                                           ing fiscal years
                                       1948           1949           1950            1951         1952      priorto 1948


New work:
   Appropriated            .......... -........------------ $150,000. 00 .-----------------------
                           ----------                                                                                $150,000. 00
      Cost---------..................------------------------ 1150, 000. 00 ---------... ------------                 150, 000. 00
                           ............------------ 1150,000.00 .---------- ------------
   Expenditures----.......----------                                                                                  150,000.00
Maintenance:
                   .......---------------
      Appropriated--                               $20,000. 00    85, 281.47 ...------------------------              142, 639. 49
                       28, 869.53 26, 843. 97
      Cost.......--------------...........    86, 567. 97                     ------------------------                142, 639. 49
      Expenditures.....-------....   28, 715. 82     6,195. 93   107, 369. 72 ...-                                    142, 639. 49


  2   Reimbursement of advanced funds originally expended in prior fiscal years.

      43. EXAMINATIONS,                    SURVEYS, AND CONTINGENCIES                                (GENERAL)
   During the fiscal year hired labor work was performed in making
preliminary examinations, surveys, and reviews authorized by Con-
gress at a cost of $14,777.33. In addition, permits to execute work or
erect structures in navigable waters were issued and the work done
thereunder was inspected; commercial statistics were collected and
compiled; investigations were made in connection with application
for modifications to anchorage and bridge and navigation regulations;
and miscellaneous inspections, surveys, and estimates were made:
all by hired labor at a cost of $99,925.73.
   Under the supervision of the North Atlantic Division commercial
statistics were compiled by the regional office at a cost of $146,198.69.
The total cost was $260,901.75. The expenditures were $260,775.91,
all from regular funds.
   The unexpended balance at the end of the fiscal year amounting to
$16,248.36 together with an allotment for fiscal year 1953 of $8,400
for examinations and surveys and $214,200 for contingencies, includ-
ing the Regional Statistical Office, a total of $238,848.36 will be
applied as follows:
Eilxaminations and surveys:
     Accounts payable June 30, 1952------------------------------ $739. 21
     River and harbor examinations and surveys------------------ 9, 004. 17
Contingencies            (general) :
       Accounts payable June 30, 1952_---------------------------                                               3, 116. 84
      Contingencies          ----------------------                     47,164. 94
Commercial statistics, regional statistical office:
   Accounts payable June 30, 1952_........__.        --------------      7, 743. 32
   Compilation of statistics by regional office __-----------      -__ 171, 079.88
         Total for all work --------------------------------------                                         238, 848. 36
  The additional sum of $236,000 can be profitably expended during
the fiscal year 1954 as follows:
      Examinations and surveys_----------____-
      Contingencies          ----------------------------
                                                                                                                $15,
                                                                                                                $_____
                                                                                                                     500
                                                                                                                  51, 000
      Commercial statistics, regional statistical office--....                                     __      _-    169, 500
         Total-----------------------------------------------------                                              236, 000
242             REPORT OF              CHIEF OF ENGINEERS,                               U.           S.       ARMY,                       1952


                                            Cost and financial summary
                                                        CONSOLIDATED


                                                           Fiscal year ending June 30                                                           Total to June
                                                                                                                                               10, 1952, includ-
                                         1948            1949             1950                1951                          1952
                                                                                                                                               ing    fiscal years
                                                                                                                                                priorto 1948

Maintenance:
   Appropriated....
                - - - - - - -..- $232, 750.00 $244, 500.00 $306, 310.00 $256, 200.00 $247, 500.00                                                   $4, 330, 836.95
   Cost ------------              214, 616. 67 243, 526. 84 296,134. 58 266, 767.52 260,901.75                                                       4, 326,187.96
   Expenditures            - - 222, 630. 27 252, 271.33 295, 572.52 263, 204.28 260, 775. 91                                                         4, 314, 588. 59



           44.      PLANT ALLOTMENT, NEW YORK, N. Y., DISTRICT

                                             Cost and financial summary

                                                    Fiscal year ending June 30                                                                  Total to June
                                                                                                                                              30,1952, includ-
                                                                                                                                               ing fiscal years
                         1948            1949               1950                   1951                                    1952                 prior to 1948

Maintenance:
  Appropri-
   ated------$171,689.02 $225, 000.00                   -$20,000.00           $11,034,441.00 -$2,606,601.69                                     $13, 408,543. 82
  Cost---      .........
  E xpendi-
    tures..--- --      381,796.18     247, 799.49         -86, 048.40         10, 659, 498.45                -2, 357, 683. 22                       12, 706, 770. 23



                            45.      INACTIVE NAVIGATION PROJECTS

                                                                                                Cost and expenditures
                                                                              For last             to June 30, 1952                                   Estimated
                                                                          full report,                                                                  amount
                                                                          see Annual                                                                  required to
                                                                          Report for-          New work                         Mainte-                complete
                                                                                                                                nance


1.   Larchmont Harbor, N. Y...._                                               1916            $76, 064. 85                      $211. 42                 (1)
2.   Echo Bay Harbor, N. Y-...........                                         1950             64, 583. 89                     7,171.45                  (1)
3.   New Rochelle Harbor, N. Y.2_._                                            1949             73, 213. 67                    22, 030. 38                (1)
4.   Manhasset Bay, N. Y.a_________________ ___________                        1948          .....          ......                 460. 00               $153, 000
5.   Glen Cove Harbor, N. Y.2. ..........                                      1911              72, 000. 00                                              962, 000
6.   Northport Harbor, N. Y.5...a__             . .___ ._________              1949                                                                       6 49,000
7.   Greenport Harbor, N. Y.2 ...........                                      1949              74, 680. 83                   18, 464. 41                (1)
8.   Browns Creek, N. Y ..............................                         1951              33, 976. 03                   92, 507. 11                411, 000
9.   Orowoc Creek, N. Y....______________________________                      1949                                        ............                   7 45, 000
10.   Sumpawanus (Babylon Creek) Inlet, N. Y.s.4                  .....         1895               7, 000. 00               ............                   (1)
                                                                                                                                                           (0)
11.   Sheepshead Bay, N. Y_............................                         1948              33, 827. 50                    3, 762. 81
12.   Wallabout Channel, N. Y.2 ...                                             1948              18, 173. 69                   35, 295. 24                (1)
13.   Irvington Harbor, N. Y.a ____ ______...________                           1948          ............                          360.09                   58,000
14.   Tarrytown Harbor, N. Y.2_...__                  ___       __        .     1951              69, 836. 48                   57, 944. 03                (1)
15.   Peekskill Harbor, N. Y.2 ..                ._____________________         1951              19, 400. 00                   59, 808. 07                (1)
16.   Wappinger Creek, N. Y __.__..........                     ........        1950              13, 000. 00                   43, 025. 96                (1)
17.   Saugerties Harbor, N. Y._____                                             1949              81, 904. 91                   86, 294. 28                (1)
18.   Otter Creek, Vt.2. 4                                                      1950              60, 253. 50                    7, 619. 46                113, 000
19.   Gordons Landing, Lake Champlain, Vt-...........                           1892              34, 750. 00                                              (1)
20.   Channel Between North and South Hero Islands,
        Lake Champlain, Vt.= . 4.                                               1909              31, 000. 00                                              (1)
21.   St. Albans Harbor, Lake Champlain, Vt). 4________                         1917               3, 125. 45                             384. 55          (1)
22.   Swanton Harbor, Vt.2. 4                                                   1888              70, 500.00                ...........                  1, 796, 000,
23.   Rouses Point, Lake Champlain, N. Y.=-...........                          1895              98, 467. 55                                              (1)
24.   Great Chazy River, N. Y.. 4_______________________                        1895              18, 000.00                                               (1)
25.   Port Henry Harbor, N. Y.__........................                        1931          8 69, 406. 46                       1, 252. 75               (1)
26.   Ticonderoga River, N. Y. 4___________________                             1895            16, 500. 00                                                343, 000
27.   Elizabeth River, N. J.3....                                               1948            60, 481.15                    59, 391. 21                  175, 000
28.   Rahway River, N. J.' _                                                    1949            37, 000. 00                       306. 87                  176, 000
29.   Lemon Creek, Staten Island, N. Y.'_.                             __       1937              S6, 621. 00                 91,621.00                    185, 000
30.   Great Kills, Staten Island, N. Y_                 _.._                    1950          10137,301.              69      38, 410. 44                  (1)
31.   Cheesequake Creek, N. J.'. 4                                              1949            40, 000.              00      26, 151. 73                  290, 000
32.   Keyport Harbor, N. J.'. ___________________                               1949            40, 475.              00     174, 755. 33                  (1)
33.   Matawan Creek, N. J.*'. 4 _...............             .......            1934            21, 000.              00      73, 964. 09                    21,000
      See footnotes at end of table.
              RIVERS AND         HARBORS--NEW              YORK,          N.    Y.,      DISTRICT              243

                                                                          Cost and expenditures
                                                          For last           to June 30, 1952            Estimated
                                                         full report,                                     amount
                                                        see Annual                                      required to
                                                        Reportfor-- New work              Mainte-        complete
                                                                                          nance

34.   Waycake Creek, N. J.3------------------------------   1949                                             109,000
35.   Sandy Hook Bay at Leonardo, N. J.--------------
                                               ............ 1950                                              69, 000
36.   Glen Cove Creek, N. Y....------------------------     1949         1129, 760. 06    29,107. 62        12 58,000
37.   Sag Harbor, N. Y__...__________...............        1949          121,805. 39      1,266. 14    .----------
38.   Coney Island Channel, N. Y--.       --..              1949          111,371. 21    218, 741. 64   .........
39.   Burlington Harbor, Vt-------------------------1951                  706, 414.11    277, 651. 62    ..
40.   Plattsburg Harbor, N. Y---------------------- 1951                  198,415.13     102,452. 00    .........

   1 Completed.
  s Improvement adequate for commerce.
   ' Awaiting local cooperation.
  ' No commerce reported.
  i No funds available.
  * In addition $15,000 to be contributed by local interests.
   TIn addition $15,200 to be contributed by local interests.
  S Exclusive of $10,000 expended from contributed funds.
    'These amounts also included in report for New York and New Jersey Channels.               No work has been
done on the existing project for Lemon Creek.
  10oExclusive of $104,804.63 expended from contributed funds.
  11Exclusive of $29,774.11 expended from contributed funds.
  12 Exclusive of $58,000 to be contributed.


                           46. MISCELLANEOUS ACTIVITIES

Status of all investigations for navigation called for by River and Harbor acts and-
                                committee resolutions

                                                                        Date trans-      Document        Recom-
                Locality                   Authorization act             mitted to       Doc. et        meaon
                                                                         Congress          No.          mendation

Arthur Kill, N. Y. and N. J., New      House Public Works Com-
York and New Jersey Channels,          mittee resolution, June
with particular reference to provi-    11, 1952.
sion of a turning basin in Arthur
Kill, N, Y. and N, !,
Bronx River, N. Y.................    River and Harbor act,
                                        Mar. 2, 1945.
Champlain Canal, N. Y., with view .....do-----..........---.......-----
                                                                Mar. 21,1952                             Unfavor-
to improvement without taking                                                                             able.
title to said canal and its appurte-
nances.
Delaware Bay above Cape May to        House Public Works Com-
  Shrewsbury River-for extension        mittee resolution, Apr.
of New Jersey Intracoastal Water-      22, 1947.
way from Manasquan Inlet to
  Shrewsbury River and an alter-
nate connection to Delaware Bay.
Delaware River-New York Bay            Rivers and Harbors Com-
Section of Intracoastal Waterway,      mittee resolution, June
water supplly.                         25, 1943.
Dosoris Creek, N. Y. (Long Island). River and Harbor Act,
                                        June 30, 1948.
East Basin of Mamaroneck Harbor,       River and Harbor Act,
N. Y.                                  July 24, 1946.
East River and Flushing Bay and        Rivers and Harbors Com-
  Creek, N. Y., seaplane channels       mittee resolution, Jan.
and anchorage basins in vicinity of    19, 1940.
North Beach Airport.
East River and Hell Gate, N. Y.,       Rivers and Harbors Com-
between      South Brother and         mittee resolution, Apr.
  Berrian Islands.                      17, 1940.
Endikill Creek, N. Y., at mouth        River and Harbor Act,
of, construction of small-boat         Mar. 2, 1945.
anchorage basin, Hudson River.
Flushing Bay and Creek and East        Rivers and Harbors Com-
  River, N. Y., seaplane channels       mittee resolution, Jan.
and anchorage basins in vicinity       19, 1940.
of North Beach Airport.
Gowanus Canal, Brooklyn, N. Y..        River and Harbor Act,
                                        May 17, 1950.
Great Lakes-Atlantic Tidewaters        Rivers and Harbors Com-
  Deep Waterway.                        mittee resolution, Mar.
                                        7, 1928.
'244       REPORT OF CHIEF OF ENGINEERS,                          U.     S. ARMY, 1952

Status of all investigations for navigation called for by River and Harbor acts and
                         committee resolutions-Continued

                                                                  Date trans-        Document                  Recom-
              Locality                    Authorization act        mitted to           No.                    mendation
                                                                   Congress

Hackensack River, N. J _..--------     River and Harbor Act,      Oct.   2,   1951       H. 252, 82d          Favorable.
                                        Mar. 2, 1945.                                      Cong.,
                                                                                          1st sess.
Hashamomuck Creek, L. I., N. Y._-     Rivers and Harbors Com-                        ............
                                        mittee resolution, Dec.
                                        2, 1946.
Hell Gate, N. Y., on East River,      Rivers and Harbors Com-
  between South Brother and             mittee resolution, Apr.
  Berrian Islands.                      17, 1940.
Hudson River, N. Y., from Albany      River and Harbor Act,
  to New York City.                     Mar. 2, 1945.
Hudson River, at or near North             do .----------------
                                      ---....
  Germantown, Columbia County,
  N. Y.
Hudson River, N. Y., deep-water        Rivers and Harbors Com-
  channel between Hudson and            mittee resolution, Mar.
  Troy.                                 21,1945.
Hudson River at mouth of Endikill      River and Harbor Act,
  Creek, N. Y., construction of         Mar. 2, 1945.             - --------
  small-boat anchorage basin.
Hudson and Mohawk Rivers, N. Y.,       River and Harbor Act,
  with view to elimination of water     July 24, 1946.
  chestnut.
Lake Champlain in vicinity of          Senate Public Works Co m-
  Milton and South Hero, Vt.             mittee resolution, Sept.
                                         12,1951.
Long Island, Dosoris Creek, N. Y_._    River and Harbor Act,
                                         June 30, 1948.
Long Island, Hashamomuck Creek,        Rivers and Harbors Com- ---------------
N. Y.                                   mittee resolution, Dec.
                                         2, 1946.
Long Island, Manhasset Bay, N. Y_      Rivers and Harbors Com-
                                         mittee resolution, Dec.
                                         30,1938.
Long Island, Manhasset'Bay, N. Y..     Rivers and Harbors Com- ---------------
                                         mittee resolution, Mar.
                                         25, 1938.                 ---------------
Long Island, Moriches Inlet, N. Y      River and Harbor Act, .-        ------
                                         Mar, 2, 1945,
Long Island, St. James Harbor,             do----
                                      --.....  ...................
  N.Y.                                                             ---------------
Long Island, Shinnecock Inlet,                                     .. .. -- -- --
                                      .....do---.....................
  N.Y.
Long Island, southern coast from .....  do .-------..................
                                                              ---------------
  New York City line to Montauk
  Point, N. Y., for protection and
improvement of the beaches along
  coast.
Mamaroneck Harbor, N. Y., East River and Harbor Act, ---------------                 ---------          "'-

  Basin of.                           July 24, 1946.
Manasquan Inlet to Shrewsbury        Rivers and Harbors Com-                  ------------
  River section of the New Jersey     mittee resolution, Mar.
  Intracoastal Waterway.              23, 1943.               ---------------
Manasquan Inlet to Shrewsbury House Public Works                                     ----------"-

  River section of the New Jersey     Committee resolution,
  Intracoastal Waterway.              Apr. 22, 1947.
Manhasset Bay, N. Y. (Long Island)_ Rivers and Harbors Com- --------   rrr-----
                                      mittee resolution, Dec.
                                      30, 1938.
Manhasset Bay, N. Y. (Long Island)_ Rivers and Harbors Com-                          -----------



                                      mittee resolution, Mar.
                                      25, 1938.
Matawan Creek, N. J............... Rivers and Harbors Com-
                                      mittee resolution, Jan.
                                      24, 1936.
Matawan Creek, N. J............... Rivers and Harbors Com- ------------   r
                                      mittee resolution, Jan.
                                      26, 1940.
Mohawk River, N. Y............... River and Harbor Act, ---------       rr-----      -----------




                                      Mar. 2, 1945.
Mohawk and Hudson Rivers, N. Y., River and Harbor Act,
  with view to elimination of water   July 24, 1946.
chestnut.
Moriches Inlet, N. Y. (Long Island). River and Harbor Act,                           -"----------




                                      Mar. 2, 1945.
New'Creek, Staten Island, N. Y_.... River and Harbor Act,                            -    -    ------




                                      May 17, 1950.
               RIVERS AND HARBORS--NEW YORK, N. Y., DISTRICT                                                      245
Status of all investigations for navigation called for by River and Harbor acts and
                           committee resolutions-Continued

                                                                                 Date trans-       Document  Recom-
                 Locality                         Authorization act              mitted to           No.    mendaion
                                                                                  Congress

New Jersey Coast, from Sandy                 Riv 'er and Harbor Act,
Hook to Cape May, improvement                Mfar. 2, 1945.
and protection of the beaches along
said coast.
New Jersey Intracoastal Waterway             Riv vers and Harbors Com-         ---------------
in the vicinity of Shrewsbury                m Zittee resolution, Nov.
  River, N. J.                                11, 1943.
New Jersey Intracoastal Water-               Riv ers and Harbors Co-           ---------------
way, Manasquan Inlet to Shrews-              m ittee resolution, Mar.
bury River, N. J.                            23 , 1943.
New Jersey Intracoastal Waterway             Hot use Public Works              ---------------
from Shrewsbury River to Dela-               C(ommittee resolution,
ware Bay above Cape May for                 Apr .22, 1947.
extension of Waterway from Man-
asquan Inlet to Shrewsbury River
and an alternate connection to
Delaware Bay.
New York and New Jersey Chan-                Houise Public Works Com-
nels, with particular reference to           m ittee resolution, June
provision of a turning basin in              11,1952.
Arthur Kill, New York and New
Jersey.
New York Bay- Delaware River                      Riv ers and Harbors Com-     --------------- --- --- ---
section of Intracoastal Waterway,                  m ittee resolution, June
water supply.                                     25 ,1943.
New York Harbor, Entrance Chan-                   Sen ate Public Works         -----------   --

nels and anchorage area, with par-                 Ccommittee resolution,                        ------------
ticular reference to South Channel.                Jume 9, 1948.
North Beach Airport, East River,                  Riv ers and Harbors Com-     ---------------
and Flushing Bay and Creek,                       m ittee resolution, Jan.
N. Y.                                              19,1940.
Port Chester Harbor, N. Y-------........          Riv ers and Harbors Com-
                                                   m ittee resolution, Nov.
                                                                                                  ------------
                                                   30 ,1945.
Raritan River, N. J-------------................ Riv ers and Harbors Com-
                                                   m ittee resolution, Nov.
                                                                               ---------------    --,----------
                                                    13,,1945.                                     ------------



Shark River Inlet, N. J-----------............. Hot ise Public Works           ---------------
                                                    Ccommittee resolution,                        ------------
                                                   Ju ne 27, 1950.
St. James Harbor, N. Y. (Long Riv er and Harbor Act,                           ---------------
   Island).                                        Mtar. 2, 1945.                                 -,,,--------
Shinnecock Inlet, Long Island, N. Y- ..... do---                               ---------------
Shrewsbury River, N. J., entrance Hot use Public Works
                                                                                                  ------------
   channel across Sandy Hook                       Ccommittee resolution,                         -,,,,--------
   Peninsula.                                      Ju me 2, 1949.
Shrewsbury River, N. J., north Hou ise Public Works Com-                       ---------------
   branch above Red Bank.                          miittee resolution, Apr.                       -,,,------,-
                                                   21, ,1950.
Shrewsbury River to Manasquan Rivt ers and Harbors Com-                        ---------------
   Inlet section of the New Jersey                 miittee resolution, Mar.
   Intracoastal Waterway.                          23,,1943.
Shrewbury River, N. J., in the Rivt ers and Harbors Com-                       ---------------
   vicinity of, New Jersey Intra-                  miittee resolution, Nov.                       --,,---------
   coastal Waterway.                               11, 1943.
Shrewsbury River to Delaware Bay Hot use Public Works
   above Cape May-for extension of                 C(ommittee resolution,      ---------------
   New Jersey Intracoastal Water-                  Alpr. 22, 1947.
   way from Manasquan Inlet to
   Shrewsbury River and an alter-
  nate connection to Delaware Bay.
Southern coast of Long Island from Riveer and Harbor Act,
   New York City line to Montauk                   Mtar. 2, 1945.
   Point, N. Y., for protection and
  improvement of beaches along
   coast.
Staten Island, New Creek, N. Y-.... Hot use Public Works
                                                   Ccommittee resolution,
                                                   Mtay 17, 1950.
246    REPORT OF CHIEF OF ENGINEERS,        U.   S. ARMY,   1952

                 47. RUTLAND, OTTER CREEK, VT.

   Location.-Otter Creek rises in the Green Mountains at Dorset,
Vt., flows generally north about 107 miles and enters Lake Cham-
plain 19 miles south of Burlington, Vt. It has a drainage area of
936 square miles. The city of Rutland is located about 72 miles
above the river's mouth at the junction of East Creek and the main
stream. (See U. S. Geological Survey map covering Rutland, Vt.,
quadrangle.)
   Existing project.-This project provides for channel improvement
and construction of earth levees and concrete flood walls along East
Creek in the vicinity of Rutland. The channel improvement extends
for a distance of 5,640 feet. The aggregate length of the levees and
walls is 8,455 feet, of which 7,020 feet are earth embankment and
1,435 feet are concrete flood walls. Other work appurtenant to the
project involves construction of two pumping stations, reconstruc-
tion of four bridges, demolition of several structures, relocation of
roads and utilities, and construction of an interceptor sewer with
appurtenances.
   The estimated Federal cost for new work, revised in 1952, is
$4,020,000, exclusive of lands, relocations, bridge reconstruction,
sewer construction, and other work to be provided by local interests
at an estimated cost of $685,000.
   The existing project was authorized by the Flood Control Act
approved June 22, 1936, and modified by the Flood Control Act
approved August 18, 1941. (See S. Doc. 171, 76th Cong., 3d sess.,
which contains the latest published map.)
   Local cooperation.-See pages 4-5 for requirements. The Mayor,
city of Rutland, was requested to furnish formal assurances of local
cooperation on February 28, 1950, and executed an agreement assur-
ing full participation in the project on May 27, 1950. The assurances
were approved on June 29, 1950. Although funds for local coopera-
tion are dependent upon approval of a bond issue, it is expected that
these funds will be forthcoming.
   Operations and results during fiscal year.-The total cost and
expenditures for preparation of contract plans and specifications
were $179.01 for new work.
   Condition at end of fiscal year.-Preliminaryplans have been com-
pleted. Preparation of contract plans and specifications was 5 per-
cent completed. Completion of plans and specifications and con-
struction of the project works remain to be done. The total cost and
expenditures of the existing project to June 30, 1952, were $82,388.22
for new work.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $18.97, will be applied to minor engineering
operations.
   No work is scheduled for the fiscal year 1954.
                    FLOOD       CONTROL---NEW               YORK,          N.    Y.,    DISTRICT                247
                                    Cost and financial summary

                                                 Fiscal year ending June 30                           Total to June
                                                                                                      30,1952, includ-
                                                                                                      ing fiscal years
                                 1948          1949           1950              1951        1952       priorto 1948


New work:
   Appropriated-......... -$27, 000. 00      $15, 000. 00   $75, 000. 00-_--      _ -$71, 092. 81          $82, 407. 19
   Cost---------------.        4, 706. 97     27, 617. 45        200. 24   $3, 508. 97    179. 01           82, 388. 22
   Expenditures-----.........    6, 723.43    25, 124. 83     3, 568. 15        3, 695.32    179.01         82, 388. 22


Other new work data:
    Unobligated balance, June 30, 1952___ _-_-__-_---_------           $18. 97
    Unobligated balance available for fiscal year 1953 -------          18. 97
    Estimated additional amount needed to be appropriated for
      completion of existing project --------------------      3, 937, 600. 00

                     48. HOOSICK FALLS, HOOSIC RIVER BASIN, N. Y.

   Location.-The Hoosic River rises in northwestern Massachusetts,
flows generally north and northwest, crossing the southwest corner
of Vermont to the vicinity of Eagle Bridge, N. Y., where it turns
west and joins the Hudson River about 16 miles above Troy, N. Y.
It is 66 miles long and has a drainage area of 713 square miles.
Hoosick Falls, N. Y., is situated on the Hoosic River about 26 miles
:above the mouth. (See U. S. Geological Survey map covering Hoosick,
N. Y.-Vt. quadrangle.)
   Existing project.-This provides for channel widening for 3,300
feet, for removal of White Dam and channel excavation for 700
feet, and for construction of earth levees and concrete walls on both
banks of the river. The principal structures involved are reinforced-
concrete flood walls approximately 900 feet in length on the right
bank and 700 feet in length on the left bank, an earth levee approx-
imately 2,400 feet in length along the right bank, an emergency
outlet section in the right bank flood wall, relocation of Woods Brook
in a concrete flume and interior drainage structures.
   The current estimated Federal cost for new work, approved in
1952, is $1,100,000, exclusive of land and other work to be provided
by local interests at an estimated cost of $128,400.
   The existing project was authorized by the Flood Control Act
approved June 22, 1936, and modified by the Flood Control Act
approved August 18, 1941. (See H. Doc. 182, 76th Cong., 1st sess.,
which contains the latest published map.)
   Local cooperation.-See pages 4-5 for requirements. In addition
to the usual requirements for local cooperation as provided by law,
local interests are required to give assurances satisfactory to the Secre-
tary of the Army that they will insure against future encroachments
upon the flood channels to be provided by the improvements, and
.assume the cost of relocation of a sanitary sewer. The Superintendent
of Public Works, State of New York, who is duly authorized to
carry out the State's participation in the project, was requested to
furnish assurances on March 6, 1945, and executed an agreement
assuring State cooperation on March 12, 1945. The assurances were
approved on April 23, 1945.
248             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   Operations and results during fiscal year.-Under a continuing
construction contract awarded in fiscal year 1950 for the entire project,
construction work continued. During the fiscal year, 5,600 cubic yards
of rock and 40,000 cubic yards of earth were excavated and 3,600
cubic yards of concrete and 2,000 cubic yards of levee embankment
were placed. Channel excavation, concrete walls and earth levees
were completed. The cost was $2,857.73 for preliminary engineering
and $427,269.77 for construction, a total of $430,127.50 for new work.
The total expenditures were $506,020.56.
   Condition at end of fiscal year.-Constructionwork under the exist-
ing project was commenced on May 28, 1950, and completed on June
6, 1952. Final engineering reports remain to be done. The total
cost of the existing project to June 30, 1952, was $1,023,074. 74 for new
work. The total expenditures were $983,837.60.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $116,162.40, will be applied as follows:
Accounts payable June 30, 1952_------------------------                   $39, 237. 14
New work: Cost outstanding in connection with contract completed
  in prior fiscal year ; and final engineering reports and contingencies_ 76, 925. 26

                            .--....-----------------------
          Total for all work--                        _                                                       116, 162. 40
    No work is scheduled for fiscal year 1954.
                                              Cost and financial summary

                                                      Fiscal year ending June 30                              Total to June
                                                                                                             30,1952, includ.
                                                                                                             ing fiscal years
                                           1948      1949          1950           1951           1952          prior to 1948

New work:
   Appropriated--------......   --------           $8,000.00 $350,000.00 $500,000.00 $206,000.00               $1,100, 000.00
   Cost ----------.------------                     2, 065. 01   39, 942. 67   514, 939. 56   430, 127. 50      1, 023, 074. 74
    Expenditures..------------------....            1, 703. 19   36, 718.17    403, 395. 68   506,020.56           983, 837. 60


Other new work data:
    Unobligated balance, June 30, 1952___-----------.---                                                      $68, 877.12
    Unobligated balance available for fiscal year 1953 ------------                                            68, 877. 12

                     49. NORTH ADAMS, HOOSIC RIVER BASIN, MASS.

   Location.-The Hoosic River rises in northwestern Massachusetts,
flows generally north and northwest, crossing the southwest corner
of Vermont to the vicinity of Eagle Bridge, N. Y., where it turns
west and joins the Hudson River about 16 miles above Troy, N. Y.
It is 66 miles long and has a drainage area of 713 square miles. North
Adams, Mass., is situated on the Hoosic River about 14 miles below
the source of the river. (See U. S. Geological Survey map covering
Greylock, Mass.-Vt., quadrangle.)
   Existing project.-The project provides for local channel improve-
ment which would extend through the entire city for a distance of
9,100 feet along the north branch, 8,100 feet along the south branch,
and 12,100 feet along the main stream downstream from the junction
and including Braytonville. On the north branch the improvements
would consist of a debris basin above the Eclipse Dam; closure walls
at the proposed new Hoosac Cotton Mill Dam and a rectangular paved
            FLOOD CONTRO---NEW        YORK,   N.   Y.,   DISTRICT      249
  concrete chute. On the south branch, the improvements would consist
  of a closure levee with a check dam and stilling basin; raising of the
  Boston & Albany Railroad track; a new trapezoidal earth channel
  with levee; an improved trapezoidal and rectangular earth channel
  with levee and walls; and a rectangular paved concrete chute. At
the junction, the improvements would consist of a rectangular con-
crete chute to a drop structure and stilling basin below Brown Street;
closure levees; and rock-paved and improved earth channels. At
  Braytonville the improvements would consist of a rock-paved trape-
zoidal channel; a levee; an improved trapezoidal channel with levee;
  and a new dam and stilling basin with closure levee. Other work
appurtenant to the project would involve bridge reconstruction and
approaches; street and utility relocations; interior drainage; and mis-
cellaneous alteration, construction, and demolition works.
    The estimated Federal cost for new work, revised in 1952, is
 $14,276,000 exclusive of land and other work to be provided by local
interests at an estimated cost of $1,906,000.
    The existing project was authorized by the Flood Control Act ap-
proved June 22, 1936, and modified by the Flood Control Act approved
August 18, 1941. (See H. Doc. 182, 76th Cong., 1st sess., which con-
tains the latest published map.)
    Local cooperation.-See pages 4-5 for requirements. In addition
to the usual requirements for local cooperation as provided by law,
local interests are required to give assurances satisfactory to the Secre-
tary of the Army that they will insure against future encroachments
upon the flood channels to be provided by the improvements. General
assurances of local cooperation in the entire project were executed
by the Mayor of North Adams on December 15, 1949. The assurances
were approved on March 3, 1950. In accordance with a law enacted
by the Commonwealth of Massachusetts in 1950, the State Department
of Public Works on November 21, 1950, furnished general assurances
of local cooperation on the part of the State in the project, with the
exception of operation and maintenance of the project within the city
of North Adams which remains a responsibility of the city under
assurances previously furnished by the city of North Adams. Lands,
easements, and rights-of-way for the first and second units of con-
struction were acquired by local interests on March 9, 1950, and March
27, 1952, respectively. The sum of $54,000 was contributed by local
interests on June 9, 1950, for local utility relocation accomplished un-
der the initial Federal contract.
    Operations and results during fiscal year.-Under the existing con-
tract for new work, the first unit of construction in the Junction Reach
involving placing of channel riprap and concreting of the left half of
the concrete chute and left bank walls above the drop structure was
completed. Relocation of water lines and utilities for local intrests
for the initial unit of construction were completed. During the fiscal
year, 5,000 cubic yards of material were excavated, and 9,000 cubic
yards of concrete and 17,000 cubic yards of fill were placed.
   Contract plans and specifications for the second unit of construc-
tion in the Junction Reach were completed, and a contract was
awarded for channel excavation, and construction of concrete chute,
concrete walls and bridge abutments from Brown Street Bridge up-
250      REPORT OF CHIEF OF ENGINEERS,                U.   S. ARMY, 1952

stream to the junction of the North and South Branches. Work on
the second unit of the project was initiated on June 17, 1952.
   The cost, exclusive of $11,978.31 contributed funds, was $13,853.29
for preliminary engineering, and $445,700.90 for construction, a total
of $459,554.19 for new work. The total expenditures, exclusive of
$11,639.69 contributed funds, were $498,167.37.
   Condition at end of fiscal year.-Contract plans and specifications,
and model studies for the first and second units of construction have
been completed. Construction work under the existing project was
commenced on July 31, 1950, and is about 8 percent complete. Con-
struction of the first unit in the Junction Reach for channel excavation,
channel paving, construction of a drop structure and stilling basin,
was completed on May 29, 1952. A contract for the second unit of
the project, the remaining portion of the Junction Reach, was awarded
and construction initiated on June 17, 1952. Preparation of plans
and specifications, model studies, and the construction of protective
works for the remainder of the project remain to be done. The total
cost of the existing project to June 30, 1952, exclusive of $48,685.83
contributed funds, was $802,768.95 for new work. The total expendi-
tures, exclusive of $48,685.83 contributed funds, were $772,960.53.
   Proposed operations.--The balance unexpended at the end of the
fiscal year amounting to $410,039.47 plus unexpended contributed
funds of $5,314.17, together with an additional contribution of $55,000
made by local interests for fiscal year 1953, a total of $470,353.64 will
be applied as follows:
Accounts payable June 30, 1952--------           --------------------    $29, 808.42

New work :
   Complete during fiscal year 1953 the first unit of project under
     existing contract----      --------------------------------            6, 086. 05
   Complete during fiscal year 1953 the second unit of project under
     existing contract--------------------------                 -------- 325, 245. 00
   Complete during fiscal year 1953 relocation of utilities for
     local interests under existing contracts--------------------          60, 314.17
   Initiate preparation of plans and specifications and model studies
     for third unit of construction-------------------- ----- 48, 900. 00

         Total for new work_-----------------------------                 440, 545.22

         Total for all work-----------------..----------------470, 353. 64
  The additional sum of $900,000 can be profitably expended for the
following scheduled work during fiscal year 1954:
New work:
   Complete the preparation of plans and specifications, and model
     studies for third unit of construction------.       ..--------------- $120, 000
   Initiation, under a continuing contract, of the third unit of con-
     struction for channel excavation and concrete chute upstream
     of second unit of construction for 600 feet on the South Branch;
     and for 5,575 feet on the North Branch. Amount to be expended
     during fiscal year------------------------------------                 780, 000
         Total for all work----------------------------------------          900, 000
                  FLOOD CONTROL---NEW                       YORK,         N.    Y.,      DISTRICT                  251
                                        Cost and financial summary
                                                  U. S. FUNDS


                                                  Fiscal year ending June 30                             Total to June
                                                                                                         30,1952, includ-
                                                                                                         ing fiscal years
                                  1948          1949          1950             1951          1952         priorto 1948

New work:
   Appropriated       --......-      $3,000.00 $350,000.00 $350,000. 00 $400,000.00
                          _-............                                                                   $1,183, 000. 00
    Cost------------------          -          1, 585. 44   74, 415. 25   187, 214. 07    459, 554. 19         802, 768. 95
    Expenditures.-.-                          1, 495. 97
                                   --...........-           66, 353. 45   126, 943. 74    498, 167. 37         772, 960. 53


Other new work data:
   Unobligated balance, June 30, 1952- ------- __---------             $66, 904. 36
   Unobligated balance available for fiscal year 1953 ----------        66, 904. 36
   Estimated additional amount needed to be appropriated for
      completion of existing project---------___---        -     - 13, 093, 000. 00
                                           CONTRIBUTED FUNDS


                                                  Fiscal year ending June 30                              Total to June
                                                                                                         30, 1952, includ-
                                                                                                         ing fiscal years
                                  1948          1949          1950             1951          1952         priorto 1948

New work:
   Contributed....      ..--
                        --------..........---- ------------ ---------     $54, 000.00 ------------             $54, 000. 00
   Cost--- _-_------36,                                                        707.52 $11,978.31                48,685.83
   Expenditures---........------------------------
                            ............                    ----------     37,046. 14   11, 639. 69             48, 685. 83


Other new work data:
   Unobligated balance, June 30, 1952------------------------                                              $2, 572. 42
   Contributed for fiscal year ending June 30, 1953-------------                                           55,000. 00

         Unobligated balance available for fiscal year 1953-----------                                      57, 572. 42

                        50. ADAMS, HOOSIC RIVER BASIN, MASS.

   Location.-The Hoosic River rises in northwestern Massachusetts,
flows generally north and northwest, crossing the southwest corner
of Vermont to the vicinity of Eagle Bridge, N. Y., where it turns
west and joins the Hudson River about 16 miles above Troy, N. Y.
It is 66 miles long and has a drainage area of 713 square miles.
Adams, Mass., is situated on the Hoosic River about 6 miles below
the source of the river. (See U. S. Geological Survey map covering
Greylock, Mass.-Vt., quadrangle.)
   Existing project.-This provides for channel improvements, for a
distance of approximately 2.2 miles, with flood walls on both banks
of the stream from high ground below Plunkett Dam to a proposed
weir above Commercial Street; a concrete paved chute or flume from
this weir to a proposed stilling basin above the mouth of the Tophet
Brook and below Hoosac Street; an improved earth channel with
flood walls, earth levees, a closure levee and structure and two check
dams from the mouth of Tophet Brook to Lime Street; and a con-
crete chute drop structure and stilling basin on Tophet Brook from
Hoosac Street to junction with Hoosic River. Other work appurte-
nant to the project involves alteration of existing raceways, bridge re-
construction, street and utility relocations, and channel improvement
of tributary brooks.
252     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

    The estimated Federal cost for new work, revised in 1952, is $5,054,-
000, exclusive of land and other work to be provided by local interests
at an estimated cost of $590,000.
    The existing project was authorized by the Flood Control Act ap-
proved August 18, 1941. (See H. Doc. 182, 76th Cong., 1st sess.,
which contains the latest published map.)
    Local cooperation.-See pages 4-5 for requirements. In addition
to the usual requirements for local cooperation as provided by law,
local interests are required to give assurances satisfactory to the
Secretary of the Army that they will insure against future encroach-
ments upon the flood channels to be provided by the improvements.
General assurances of local cooperation in the entire project were
executed by the Board of Selectmen, town of Adams, on November
22, 1949. The assurances were approved on January 31, 1950. In ac-
cordance with a law enacted by the Commonwealth of Massachusetts
in 1950, the State Department of Public Works on November 21, 1950
furnished general assurances of local cooperation on the part of the
State in the project, with the exception of operation and maintenance
of the project in the town of Adams which remains a responsibility
of the town under assurances previously furnished by the town of
Adams. Lands, easements, and rights-of-way for the first and sec-
ond units of construction were acquired by local interests on March
29, 1950, and March 27, 1952, respectively. The sum of $11,200 was
contributed by local interests on June 1, 1950, for local utility relo-
cation and bridge abutments accomplished under the initial Federal
contract.
   Operations and results during fiscal year.-Model studies for the first
and second units of construction were completed. Under an existing
contract for new work, construction of the first unit in the middle
portion of the project was completed. The drop structure and stilling
basin on the main stream, the chute above the drop structure, and the
Tophet Brook stilling basin were completed. Utility relocations and
bridge abutments for local interests for the initial unit of construction
were completed. During the fiscal year 12,000 cubic yards of ma-
terial were excavated, and 2,000 cubic yards of concrete and 5,000
cubic yards of fill were placed.
   Contract plans and specifications for the second unit of construction
were completed, and a contract was awarded for channel excavation,
channel paving and construction of concrete walls on Tophet Brook
from Mill Street to Hoosac Street. Clearing and excavating under
this contract have been initiated. The cost, exclusive of $10,366.38
contributed funds, was $14,446.51 for preliminary engineering and
model studies, and $199,000.82 for construction, a total of $213,447.33
for new work. The total expenditures, exclusive of $10,662.42 con-
tributed funds were $264,357.00.
   Condition at end of fiscal year.-Preliminaryplanning is complete.
Model studies for the first and second units of construction are com-
plete. Construction work under the existing project was commenced
on June 23, 1950, and is about 17 percent complete. Construction of
              FLOOD     CONTROL-NEW YORK, N. Y., DISTRICT                                      253

the first unit in the middle portion of the project was completed on
April 3, 1952. Construction under the existing contract for the second
unit of construction was initiated on June 3, 1952, and is 5 percent com-
plete. Preparation of plans and specifications, model studies, and the
construction of protective works for the remainder of the project re-
main to be done. The total cost of the existing project to June 30, 1952,
exclusive of $10,725.10 contributed funds, was $648,163.65 for new
work. The total expenditures, exclusive of $11,019.41 contributed
funds, were $636,219.81.
   Proposed operations.-The balance unexpended at the end of the
fiscal year amounting to $207,780.19 plus contributed funds of $180.59
plus accounts receivable of $702.71, a total of $208,663.49, will be
applied as follows:
Accounts payable June 30, 1952 ------------------                         -----------   $12, 352. 24

New work:
   Continuation of plans and specifications -_.......-.-.-.-           6, 928. 33
   Completion of the second unit of project under existing contract_ 188, 908. 02
   Completion of local utility relocation and bridge abutments ac-
     complished under the initial Federal contract with contributed
     funds -----------------------------------------------                474. 90
         Total for new work-.--.            -------------------
                                                            __-                         196, 311. 25
         Total for all work--------------...              --.----------            -    208, 663. 49
  The additional sum of $400,000 can be profitably expended for the
following scheduled work during fiscal year 1954:
New work:
   Preparation of plans and specifications for the third unit of con-
     struction and completion of model studies for entire project....   $64, 000
   Initiation and completion under a new contract of the third unit
     of construction for channel excavation and paving, concrete walls,
     levee, and check dam for a distance of 1,000 feet from Murray
     Street to the vicinity of Cook Street Bridge----------      --     336, 000
        Total for all work         -----------------------------------                     400, 000

                             Cost and financial summary
                                       U. S. FUNDS




Other new work data:
    Unobligated balance, June 30, 1952__------ ----------            -   $48, 068. 11
    Unobligated balance available for fiscal year 1953 _____----     -    48, 068. 11
    Estimated additional amount needed to be appropriated for
      completion of existing project_-__----_---__             __---- 4, 210, 000. 00



      245554-53-vol. 1-       17
254             REPORT           OF      CHIEF          OF ENGINEERS,                  U.     S.      ARMY,          1952


                                      Cost and financial summary-Continued
                                                      CONTRIBUTED FUNDS


                                                            Fiscal year ending June 30                                    Total to June
                                                                                                                        30,1952, includ-
                                                                                                                         ing fiscal years
                                          1948            1949             1950             1951           1952           priorto 1948


New work:
     Contributed--                                                                         200.00 ------------
                                                                                     $-----------------------------------11,    $11, 200. 00
     Cost       ----------------       ------------------ ------------                      358.72     $10, 366.38                10,725.10
     Expenditures---------.........    ------        ------------ ------------              356. 99     10, 662. 42               11,019. 41


Other new work data:
    Unobligated balance, June 30, 1952----------------------------            $74. 34
    Unobligated balance available for fiscal year 1953  ___------------------ 74. 34

    51. PRELIMINARY EXAMINATIONS, SURVEYS, AND CONTINGENCIES
                       FOR FLOOD CONTROL

  The cost of work during the fiscal year amounted to $64,725.21
for maintenance, including $61,807.34 for the New England-New York
Inter-Agency Committee Resources Survey. The expenditures were
$57,508.07, including $52,253.11 for the New England-New York Re-
sources Survey. See page 12 for NENYIAC report. The balance
unexpended at the end of the fiscal year amounting to $26,032.08,
including $26,031.18 for the New England-New York Resources Sur-
vey, less accounts payable of $11,579.96, and together with an allot-
ment for fiscal year 1953 of $110,000 for the New England-New York
Resources Survey, a total of $124,452.12, will be applied as needed
during fiscal year 1953 to payment of expenses incurred under this
heading. The additional sum of $256,000, including $238,000 for the
New England-New York Resources Survey can he profitably expended
during the fiscal year 1954.
                                             Cost and financial summary
                                                        NENYIAC FUNDS


                                                            Fiscal year ending June 30                                   Total to June
                                                                                                                        30, 1952, includ-
                                                                                                                        ing fiscal years
                                          1948            1949            1950           1951              1952           priorto 1948

Maintenance:
   Appropriated-----....---...-------..                     ---------------------    $40, 000.00      $57, 000. 00              $97, 000. 00
   Cost    --------
   Expenditures.........
                                  ------------------------------------
                         ------------------------------------
                                                                                      20, 740. 54      61, 807.34                82, 547. 88
                                                                                      18, 715. 71      52, 253. 11               70, 968. 82


Preliminaryexaminations, surveys, and contingencies for flood control, excluding
                       NENYIAC Resources Survey

                                                           Fiscal year ending June 30                                   Total to June
                                                                                                                       30, 1952, includ-
                                                                                                                        ing fiscal years
                                         1948             1949            1950           1951             1952           prior to 1948

Maintenance:
   Appropriated.........              $80, 000. 00    $65, 000. 00    $42, 000. 00   $22, 000. 0 ---------.....                $523, 800. 00
   Cost --- ------
   Expenditures
                                       539. 37
                      -------- 1 86,3,937.74           53, 508. 38
                                                       55, 388. 37
                                                                       39, 402. 50
                                                                     / 40, 680. 39
                                                                                      33, 640. 55     $2, 917. 87
                                                                                      33, 679. 81 /----'5, 254. 96
                                                                                                                                523, 800. 00
                                                                                                                                523, 799. 10
                      FLOOD        CONTROL---NEW                     YORK,              N.        Y.,     DISTRICT                            255
                            52. INSPECTION OF COMPLETED WORKS

   The amount of $400 was allotted to the New York district during
fiscal year 1951 to defray the costs of inspections of local protection
projects. The total costs incurred during fiscal year 1952 were
$385.95 for maintenance. The total expenditures were $229.35.
   The total costs to the end of the fiscal year were $385.95 for mainte-
nance. The total expenditures were $229.35.
   The balance unexpended at the end of the fiscal year amounting to.
$170.65, plus the allotment of $400 made for fiscal year 1953, less ac-
counts payable in the amount of $156.60, a total of $414.05, will be
applied as needed during fiscal year 1953 to payment of expenses
incurred under this heading. The additional sum of $400 can be
profitably expended during fiscal year 1954.
                                         Cost and financial sunmmary

                                                        Fiscal year ending June 30                                                   Total to June
                                                                                                                                    30,1952, includ-
                                                                                                                                    ing fiscal years
                                     1948             1949              1950                   1951               1952                prior to 1948

Maintenance:
         Appropriated----------------------------                   ------------                   $400      -----                           $400.00
         Cost ..................----------------------------                                        ..------------.385. 95                    385. 95
                    ------------
         Expenditures........                  ------------------------------------                                229. 35                    229.35



                           53. INACTIVE FLOOD-CONTROL PROJECTS


                                                                    For last            Cost and expenditures
                                                                  full report              to June 30, 1952                           Estimated
                       Name of project                            see Annual                                                          reamount
                                                                      Report
                                                                                                                                      required to
                                                                                                             Mainte-                   complete
                                                                       for-             New work                nance


1. Lamoille River, Vt. 1 _.............---        ----....              1939          s$49, 837. 43        ..........------------         4 $137, 000
2.                                                                   1937
     Proctor, Otter Creek Basin, Vt ....-----....------------............                                                                   107, 000
                                                                                                                                          '---------------------
3.   Bennington, Hoosic River Basin, Vt---   ......---..            1941 -----------.                 ----                              ' 1, 298, 000
4.   Waterford, Hudson and Mohawk Rivers, N. Y.5._                   1939 ------------------------                                        1, 536, 000
5.   Winooski River, Vt.--        ....------------------------.....
                                                           .         1940      4,897,427.37------------                                   (5)
6. Waterbury Reservoir, Winooski River Basin, Vt__                      1951                  9, 253.37 ..........                           702, 800
7. Waterbury, Winooski River Basin, Vt.....-----------.                 1951       --------          ---------                I           3, 002, 000
8. Wrightsville Reservoir, Winooski River Basin,
    Vt ............------------------------------------                 1951             44, 640.00        ..........                     2, 262, 400
9. East Barre Reservoir, Winooski River Basin, Vt .                     1951             82, 900. 51            -       -                 3, 275,100


     1 Unit of project completed.
     9 Includes $23,507.43 emergency relief funds.
     a Completion not desired by local interests.
     4 Revised in 1952.
     5Awaiting local cooperation.
     6 Completed.

54. SNAGGING AND CLEARING UNDER AUTHORITY OF SECTION 2 OF
  THE FLOOD CONTROL ACT APPROVED AUGUST 28, 1937, AS
  AMENDED
  The Flood Control Act approved August 28, 1937, as amended by
the Flood Control Acts approved August 11, 1939, August 18, 1941,
and July 24, 1946, authorized the allotment of not to exceed $1,000,000
from the flood-control appropriations for any one fiscal year for the
256           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                   1952

removal of accumulated snags and other debris from, and the clearing
and straightening of channels in navigable streams and tributaries
thereof when such work in advisable in the interests of flood control;
provided that not more than $50,000 shall be allotted for this purpose
for any single tributary from the appropriations for any one fiscal year.
  During the fiscal year ending June 30, 1952, the following work was
performed: The contract awarded in fiscal year 1950 for snagging
and clearing of Roaring Branch, Bennington, Vt., was completed at
a cost of $42,212.74; and a contract for snagging and clearing of
Esopus Creek in the vicinity of Mt. Pleasant, N. Y., was awarded, and
construction work was completed at a cost of $38,372.18.
  The total costs incurred during the fiscal year amounted to $80,-
584.92, all for new work; the expenditures were $75,787.82.
  The total costs to the end of the fiscal-year were $195,044.03. The
total expenditures were $190,157.75.
  The balance unexpended at the end of the fiscal year amounting to
$19,332.16 plus accounts receivable in the amount of $82.59, a total of
$19,414.75 will be applied as follows:
Accounts payable June 30, 1952-----------------------------                                                      $4, 968. 87
New work: Clearing and snagging operations by contract:
   Roaring Branch, Bennington, Vt--2,------------------------2,818. 06
   Esopus Creek, Mt. Pleasant, N. Y------------------------- 11,627.82
         Total for clearing and snagging operations..---------------                                             14,445. 88

         Total for all work----------------------------------                                                    19, 414. 75

                                          Cost and financial summary

                                                        Fiscal year ending June 30                             Total to June
                                                                                                              30, 1952, includ-
                                                                                                              ing fiscal years
                                      1948            1949           1950           1951          1952          prior to 1948


New work:
   Appropriated-             .....------------.    $59,800.00     $89, 000.00 -$5, 676. 52     $41, 366. 43        $209, 489.91
   Cost-- --------------                $35. 55      2, 083. 61    69, 270. 66  39,821.37       80,584. 92          195, 044. 03
   Expenditures .....------... --         35. 55     1, 891.38     64, 867. 81   44, 327. 27    75, 787. 82         190, 157. 75


Other new work data:
    Unobligated balance, June 30, 1952        ---------------------- $11,905. 71
    Unobligated balance available for fiscal year 1953------------- 11, 905. 71
                  FLOOD        CONTROL--NEW YORK, N. Y., DISTRICT                                                        257
                            55.     MISCELLANEOUS ACTIVITIES

Status of all investigations for flood control called for by flood-control acts and com-
                                    mittee resolutions

                                                                                  Date trans-         Document        Recom-
               Locality                         Authorization act                  mitted to
                                                                                   Congress              No          mendation

Big Chazy River, Champlain, N. Y_ House Public Works Com- ..........................
                                   mittee resolution, July 6,
                                            1949.
Champlain, N. Y., Big Chazy ..... do------                         --.....
                                                     ---- ...........................
  River, N. Y.
Esopus Creek and tributaries, New Senate Public Works Com- .............-----------------------
  York.                             mittee resolution, Feb.
                                            15,1951.
Hackensack River and tributaries, Flood Control Act, July ..............--............
  New Jersey and New York.                  24, 1946.
Hudson River tributaries in Rens-         Senate Public Works Com- ...-...--.--.                    .............
selaer County, N. Y.                       mittee resolution, July
                                            29, 1949.
Hudson River tributaries in Rens-         House Public Works Comrn-............-----------------...--...........--
selaer County, N. Y.                      mittee resolution, Sept.
                                            29, 1949.
Mohawk River, N. Y_.--..-.....            Flood Control Act, Aug. -----------...------........
                                            11, 1939.
Passaic River, N. J..----------.-         Flood Control Act, June ...........-------------....------
                                            22, 1936.
Passaic River, N. J_....--.--...          Flood Control Act, May ---------------------.....
                                            6, 1936.
Rahway River and tributaries, N. J. Flood Control Act, June -----                            ---
                                                                                         ............
                                      30, 1948.
Rensselaer County tributaries, Hud- Senate Public Works Comrn-
                                                             ---................----------------------
son River, N. Y.                     mittee resolution July
                                             29, 1949.
Rensselaer County tributaries, Hud-       House Public Works Comrn-.------..........................
son River, N. Y.                          mittee resolution, Sept.
                                            29, 1949.
Winooski River and tributaries,           Flood Control Committee                                     ............
Vermont.                                  resolution, June 20, 1940.


56. EMERGENCY BANK PROTECTION WORK UNDER AUTHORITY OF THE
   FLOOD CONTROL ACT APPROVED DECEMBER 22, 1944, AS AMENDED

   The Flood Control Act approved December 22, 1944, as amended
by the Flood Control Act approved July 24, 1946, authorizes the
allotment from flood-control appropriations of not to exceed $1,000,000
per year for construction of emergency bank-protection works to
prevent flood damage to highways, bridge approaches and public
works, when in the opinion of the Chief of Engineers such work is
advisable: Provided, That not more than $50,000 shall be allotted for
this purpose at any single locality from appropriations for any one
fiscal year.
   Pursuant to this act, the amount of $50,000 was allotted to the New
York District for emergency bank protection work on the Ramapo
River at Suffern, N. Y. Contract plans and specifications were com-
pleted and a contract was awarded on May 16, 1950. Work was
commenced on July 13, 1950, and was completed on October 30, 1950.
The total costs during the fiscal year were $280.27 for new work. The
total expenditures were $293.01.
   The total costs and expenditures of the Suffern project to June 30,
1952 were $25,642.65 for new work.
   The total costs and expenditures for all emergency bank protection
work to June 30, 1952, were $38,336.73 for new work.
258         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

  The balance unexpended at the end of the fiscal year, amounting to
$24,357.35, will be applied as follows:
New work: Complete emergency bank protection work on Ramapo
River at Suffern, N. Y. under contract----------------------- $24, 357. 35
        Total for all work-- --------------------------                                                     $24, 357. 35
                                       Cost and financial summary

                                                     Fiscal year ending June 30                             Total to June
                                                                                                           30, 1952, includ-
                                                                                                           ing fiscal years
                                    1948           1949           1950           1951          1952         priorto 1948


New work:
   Appropriated.         _ .. __..------------_ $18, 000. 00   $50, 000. 00 -$5, 305. 92 ...------------         $62, 694.08
   Cost------ -----..    ----.-.        -----     1, 558. 83    13, 821. 50   22, 676. 13      $280. 27           38, 336. 73
                   -
   Expenditures.........     ..........
                                  -1,087.                 05    14, 250. 51   22, 706. 16       293. 01           38, 336. 73


Other new work data:
    Unobligated balance, June 30, 1952--------------- -------- $24,357. 35
    Unobligated balance available for fiscal year 1953------------ 24, 357. 35

57. EMERGENCY FLOOD CONTROL WORK UNDER AUTHORITY OF THE
  FLOOD CONTROL ACT APPROVED AUGUST 18, 1941, AS AMENDED, AND
  THE FLOOD CONTROL ACT APPROVED JUNE 30, 1948.

   Section 5 of the Flood Control Act approved August 18, 1941,
as amended by section 12 of the Flood Control Act of 1946, by
section 206 of the Flood Control Act of 1948 and by section 210 of
the Flood Control Act of 1950, authorizes an emergency fund in
the amount of $15,000,000 to be expended in rescue work or in the
repair, restoration or maintenance of any flood control work threat-
ened or destroyed by flood, including the strengthening, raising,
extending or other modification thereof as may be necessary in the
discretion of the Chief of Engineers for the adequate functioning of
the work for flood control.
   Section 208 of the Flood Control Act approved June 30, 1948, au-
thorizes the sum of $25,000,000 as an emergency fund to be expended
under the direction of the Secretary of the Army and the supervision
of the Chief of Engineers for the repair, restoration, and strengthen-
ing of levees and other flood-control works which have been threatened
or destroyed by recent floods, or which may be threatened or destroyed
by later floods, including the raising, extending, or other modifica-
tion of such works as may be necessary in the discretion of the Chief of
Engineers for the adequate functioning of the works for flood control.
   Pursuant to the Flood Control Act of 1941, as amended, the amount
of $77,100 was allotted to the New York District for emergency repairs
of a concrete flood wall on Roaring Branch, Bennington, Vt. An
additional amount of $165,000 was allotted for this work pursuant
to section 208 of the Flood Control Act of 1948. The project is
divided in two parts. The first part provides for reconstruction of
a 125-foot section of flood wall on the left bank upstream of Brook-
lyn Bridge and the second part provides for repair and reconstruc-
tion of a 600-foot section of the flood wall downstream of Brooklyn
Bridge. Construction of the first and second parts were completed
on December 31, 1949, and April 24, 1952, respectively. The total
                      FLOOD CONTROL--NEW                             YORK,        N. Y.,        DISTRICT                  259
costs incurred during the fiscal year were $131,044.56 for maintenance.
The total expenditures were $130,341.47.
   The total costs to the end of the fiscal year were $192,992.40 for
maintenance. The total expenditures were $192,168.85.
   Pursuant to section 208 of the Flood Control Act of 1948, the amount
of $55,400 was allotted to the New York District for emergency
repair of 650 feet of concrete flood wall and dike on the left bank of
Hoosic River at North Adams, Mass., between Brown Street and the
junction of the North and South Branches. A contract was nego-
tiated as a modification of the existing contract for the flood-control
project at North Adams, Mass. Construction work on the emergency
repair was commenced on February 6,1951, and completed on April 25,
1951. The total costs incurred during the fiscal year were $40,762.07
for maintenance. The total expenditures were $40,793.84.
   The total costs and expenditures to the end of the fiscal year were
$41,561.54 for maintenance.
   Pursuant to section 208 of the Flood Control Act of 1948, the amount
of $4,600 was allotted to the New York District for emergency repair
work involving construction of a riprapped spoil-bank on Esopus
Creek in the vicinity of Mount Pleasant, N. Y. A contract was
negotiated as a modification of the existing contract for the snagging
and clearing project at Mount Pleasant. Work was completed on
June 10, 1952. The total costs incurred during the fiscal year were
$209.87 for maintenance. There were no expenditures.
   The total costs to the end of the fiscal year were $209.87 for main-
tenance. There were no expenditures.
   The total costs to the end of the fiscal year for all emergency flood-
control work were $234,763.81 for maintenance. The total expendi-
tures were $233,730.39.
   The balance unexpended at the end of the fiscal year, amounting to
$68,369.61, will be applied as follows:
Accounts payable :
    Roaring Branch, Bennington, Vt-------------                                                   $823. 55
    Esopus Creek, Mount Pleasant, N. Y                                                             209. 87
     Total accounts payable__-----------------                                                                   $1,033. 42
Completion of emergency work:
   Roaring Branch, Bennington, Vt----------------                                           $49, 107. 60
   North Adams, Mass                                                                          13,838. 46
   Esopus Creek, Mount Pleasant, N. Y --------------                                           4, 390. 13
          Total emergency work_                       .____-------._.----_                                       67, 336. 19
          Total for all work---------------------- --------                                                      68, 369. 61

                                         Cost and financial summary

                                                         Fiscal year ending June 30                            Total to June
                                                                                                               30,1952, includ-
                                                                                                               ing fiscal years
                                      1948             1949            1950         1951           1952         prior to 1948

Maintenance:
   Appropriated---------.........   --------        $77,100. 00-    _-,    , . $225, 000. 00 ------------          $302, 100. 00
   Cost--------------.......---------          --    3, 180. 82    $33, 201. 53   26, 364.96 $172,016. 50           234, 763. 81
                ------------------
    Expenditures........                             3, 006. 68     32, 963. 25   26, 625. 15   171, 135. 31        233, 730. 39
 260              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

58. FLOOD PROTECTION WORK UNDER AUTHORITY OF SECTION 205
  OF THE FLOOD CONTROL ACT APPROVED JUNE 30,1948, AS AMENDED

   Section 205 of the Flood Control Act approved June 30, 1948, as
amended by section 212 of the Flood Control Act approved May 17,
1950, authorizes the allotment from flood-control appropriations of
not to exceed $3,000,000 for any one fiscal year for the construction
of small flood-control projects not specifically authorized by Congress,
and not within areas intended to be protected by projects so author-
ized, which come within the provisions of section 1 of the Flood Con-
trol Act of June 22, 1936, when in the opinion of the Chief of
Engineers such work is advisable: Provided, That not more than
$150,000 shall be allotted for this purpose at any single locality from
the appropriations for any one fiscal year: Providedfurther, That the
provisions of local cooperation specified in section 3 of the Flood
Control Act of June 22, 1936, as amended, shall apply: And provided
further, That the work shall be complete in itself and not commit
the United States to any additional improvement to insure its success-
ful operation, except as may result from the normal procedure apply-
ing to projects authorized after submission of preliminary examination
and survey reports.
   Pursuant to this act, the amount of $95,000 was allotted in fiscal
year 1950 to the New York District for construction of a small flood-
control project on Wappinger Creek in the vicinity of the village of
Pleasant Valley, N. Y. Detailed plans providing for reconstruction
of an existing rubble flood wall by a reinforced concrete wall 225 feet
in length and closure levee on the right bank of the creek at the upper
end of the village were completed on March 21, 1950. Modification
of the project, to provide for lowering of an existing mill dam down-
stream of the proposed wall reconstruction was discussed with the
New York State Flood Control Commission and local officials. The
New York State Flood Control Commission on October 29, 1951,
advised that local residents oppose lowering the dam and requested
that the project be deactivated. Accordingly, the unobligated bal-
ance in the amount of $91,924.95 was revoked on February 15, 1952.
   There were no costs and expenditures incurred during the fiscal year.
   The total costs and expenditures to June 30, 1952, were $3,075.05
for new work.
                                                    Cost and financial summary

                                                                    Fiscal year ending June 30                           Total to June
                                                                                                                     30, 1952, includ-
                                                                                                                     ing fiscal years
                                              1948                  1949       1950            1951         1952       prior to1948

New work:
   Appropriated------......-----------------------............
     Cost--------------------------------------------............
                                                                              $95, 000 -..             --                     $91,924.95
                                                                                                                              $3, 075.05
                                                                                             $3,075.05------------
                                                                                                           ...........         3,075. 05
     Expenditures-------------------------------.........                       -------       3, 075. 05 ------------          3, 075. 05
   IMPROVEMENTS OF RIVERS AND HARBORS IN THE
           PHILADELPHIA, PA., DISTRICT
  This district comprises a portion of southeastern New York., eastern
Pennsylvania, western and southern New Jersey, northern and south-
eastern Delaware, and a small part of northeastern Maryland em-
braced in the drainage basin of the Delaware Bay and River system
and those basins tributary to the Atlantic Ocean from Manasquan
River, N. J., inclusive, to the south boundary of Delaware. It also
includes the Chesapeake and Delaware Canal and the approach chan-
nel thereto in Chesapeake Bay and Elk River, Md.
  District engineer: Col. R. E. Cruse, Corps of Engineers, to March
18, 1952; Col. Walter Krueger, Jr., Corps of Engineers, since that
date.
  Division engineer of the North Atlantic Division, New York, N. Y.,
comprising the New York, N. Y., Philadelphia, Pa., Baltimore, Md.,
Washington, D. C., and Norfolk, Va., districts: Col. F. F. Frech,
Corps of Engineers, to March 15, 1952; Col. B. B. Talley, Corps of
Engineers, since that date.
                                       IMPROVEMENTS

                Navigation                             Navigation-Continued
                                        Page                                       Page
  1. Delaware River between                  19.   Plant allotment-                   300
      Philadelphia, Pa., and                 20.   Hopper dredge replacement_         300
       Trenton, N. J____                 262 21.   Inactive navigation projects_      301
2. Delaware River, Pa., N. J.,              22.   Miscellaneous activities_...       302
       and Del., Philadelphia,
       Pa., to the sea_-                 265                Flood control
3. Delaware River at Camden,
       N. J-                             269 23. Dyberry Reservoir, Dyberry
4. Schuylkill River above Fair-                    Creek, Pa________----             302
      mount Dam, Pa_                     271 24. Prompton Reservoir, Lacka-
5. Schuylkill River, Pa_      .....     272        waxen River, Pa-------            304
6. Wilmington Harbor, Del
7. Inland Waterway from Del-
                               ---       275 25. Bear Creek Reservoir, Le-
                                                   high River, Pa      -----          305
      aware River to Chesapeake              26. Allentown, Lehigh River,
      Bay, Del. and Md ......            278       Pa -___ -                          306
8. Murderkill River, Del .....          282 27. Preliminary examinations,
9. Inland Waterway between                        surveys, and contingencies
      Rehoboth Bay and Dela-                       for flood control-------           307
      ware Bay, Del________              283 28. Inspection of completed Fed-
10. Harbor of Refuge, Delaware
      Bay, Del-                                    eral projects.            ._____   307
                                         285
11. Indian River Inlet and Bay,              29. Inactive flood-control proj-
      Del----_- _ -                      286       ects-----------------              308
12. Cohansey River, N. J .....           288 30. Miscellaneous activities ....        308
13. Cold Spring Inlet, N. J ....         289 31. Snagging and clearing Sec-
14. Absecon Inlet, N. J_.....            291       tion 2 of the Flood Control
15. Tuckerton Creek, N. J ....           293       Act approved August 28,
16. Manasquan River, N. J       --       294        1937, as amended __-----          308
17. New Jersey Intracoastal                  32. Small flood control projects,
      Waterway_                          296       Section 205, Flood Control
18. Examinations, surveys, and                     Act approved June 30,
      contingencies (general)  -__       299        1948, as amended _------          309
                                                                             261
262     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,          1952

      1. DELAWARE RIVER BETWEEN PHILADELPHIA, PA., AND
                        TRENTON, N. J.

   Location.-This river has its source in southeastern New York,
flows in a general southerly direction 367 miles, forming the bound-
ary line between the States of New York and New Jersey on the
east and Pennsylvania and Delaware on the west, and empties into
Delaware Bay. (See U. S. Coast and Geodetic Survey Charts Nos.
1218, 280, 294, 295, and 296.)
   Previous projects.-Adopted by River and Harbor Acts of June
10, 1872; March 3, 1875; June 14, 1880; July 5, 1884; August 18,
1894; March 2, 1907; June 25, 1910; July 25, 1912; June 5, 1920;
and March 3, 1925. For further details see page 1778 of the annual
report for 1915; page 311 of the annual report for 1924; page 220
of the annual report for 1934; and page 296, annual report for 1938.
   Existing project.-This provides for a channel 28 feet deep and
300 feet wide from Allegheny Avenue, Philadelphia, to the Penn-
sylvania Railroad bridge at Delair; thence 25 feet deep and 300
feet wide to the upper end of the municipal marine terminal at
Trenton, including a turning basin 500 feet wide and 1,700 feet
long at the terminal, widening the 25-foot channel at bends above
Delair, and the maintenance of a channel 12 feet deep and 200 feet
wide from the upper end of the 25-foot channel to the Pennsyl-
vania Railroad bridge at Trenton, dredged under a previous project.
The project also provides for an auxiliary channel 20 feet deep and
200 feet wide east of Burlington Island extending easterly from the
main channel to the upper end of the United States Pipe & Foundry
Co.'s property at East Burlington, with a turning basin 450 feet
wide at the upper end, an anchorage 22 feet deep, 100 feet wide,
and 400 feet long along its west or landward side and 800 feet long
along the west side of the ship channel, opposite the mouth of Biles
Creek, Pa., and for the initial excavation only, of a cross channel
8 feet deep and 200 feet wide through the artificial island opposite
Delanco, N. J. The total length of the section included in the project
is about 301/ miles, excluding the auxiliary channel east of Burlington
Island which is 1.4 miles long, and the cross channel opposite
Delanco. The lower end is about 55 miles above the mouth of the
river at Liston Point and about 105 miles above the harbor of refuge
at the mouth of Delaware Bay. All depths refer to the plane of
mean low water. The mean tidal range at Trenton is 6.7 feet, an
increase of 1.3 feet since the completion of the 25-foot channel.
Freshets, which occur usually during February and March, attain
a height of 9 to 20 feet above mean low water in the vicinity of
Trenton. Navigation is occasionally suspended during a portion
of the winter months on account of ice.
   The estimate of cost for new work, revised in 1952, is $5,244,000,
exclusive of amounts expended on previous projects and $15,000
contributed funds. The latest (1950) approved estimate for annual
cost of maintenance is $232,000.
             RIVERS       AND HARBORS--PHILADELPHIA,                          PA.,     DISTRICT               263

  The existing project was authorized by the following river and
harbor acts:

     Acts                           Work authorized                                     Documents

July 3, 1930      A channel 28 feet deep, 300 feet wide between Alle-       Rivers and Harbors Committee
                    gheny Ave., Philadelphia, Pa., and Delair bridge.         Doc. 3, 71st Cong., 1st sess.
Aug. 30, 1935 3   Deepening the channel to 25 feet from Delair bridge       Rivers and Harbors Committee
                   to Trenton, N. J. and for maintenance of the 12-           Doc. 11, 73d Cong., 1st sess.
                   foot channel from the upper end of the 25-foot proj-
                ect to Pennsylvania R. R. bridge at Ferry St.,
                 Trenton.
    Do----.... Auxiliary channel, 20 feet deep, east of Burlington          Rivers and Harbors Committee
                   Island.                                                    Doec. 66, 74th Cong., 1st sess.'
Aug. 26,1937      A cross channel 8 feet deep, opposite Delanco, N. J___    Rivers and Harbors Committee
                                                                              Doc. 90, 74th Cong., 2d sess.
July 24,1946      Anchorage at mouth of Biles Creek- --            -...--   H. Doc. 679, 79th Cong., 2d sess.


  I Contains latest published maps.
  s Also Public Works Administration, Sept. 6, 1933, and Emergency Relief Administration, May 28, 1935.


   Local cooperation.--Fully complied with except that local interests
are required to furnish suitable areas for disposal of dredged material
during maintenance as and when needed.
   Terminal facilities.-There are 21 piers, wharves, and docks within
the improvement, exclusive of those within limits of city of Phila-
delphia. The facilities are considered adequate for existing com-
merce. (For further details see Port Series No. 9-Revised 1947-
Corps of Engineers.)
   Operations and results during fiscal year.-Maintenance, hired
labor: Dredging the east side of Frankford Range below Tacony-
Palmyra Bridge to project depth of 25 feet by United States hopper
dredge New Orleans was in progress from December 26 to 28, 1951.
There were removed 23,619 cubic yards, place measurement, of material
at a cost of $6,674.52. Other costs were: Surveys and channel ex-
aminations, $454.30; installation and operation of tide gage stations,
$4,673.67; and preparation of plans and specifications for dredging
from Allegheny Avenue to Newbold Island to project dimensions,
$821.54; a total of $5,949.51. The unamortized portion of the cost of
disposal areas was transferred to the project account during the
fiscal year. Deferred charges "undistributed" amounting to $141,-
218.54 were incurred.
   The cost for all work was $12,624.03 for -maintenance. The ex-
penditures were $153,740.73.
   Condition at end of fiscal year.-The existing project was about 99
percent complete. The channel between Philadelphia and Trenton,
including the channel east of Burlington Island, was completed in
1937 and the cross channel opposite Delanco in 1939. The work re-
maining to be done is the dredging of the anchorage at the mouth of
Biles Creek.
264                REPORT OF CHIEF OF ENGINEERS,                                                U.        S. ARMY, 1952

   The latest examinations show minimum depths, at mean low water
as follows:

                                                                                                                    Minimum depth

                                                                                    Project                             Mid-
          Date                                       Section                        depth                Left out-    channel                  Right
                                                                                     (feet)             side quar-    for half                outside
                                                                                                        ter (feet)    project                 quarter
                                                                                                            ter(feet) width                    (feet)
                                                                                                                       (feet)

February 1951...   Allegheny Ave. to Delair Bridge....                                         28               27. 8             26. 0              24. 7
April 1951-....... Delair Bridge to Trenton marine                                             25               10. 1             16. 0              13. 8
                     terminal.
April 1951-....... Trenton marine terminal to Pennsyl-                                         12                8.0               9. 7               3. 2
                     vania Railroad bridge.
April 1951....... Channel east of Burlington Island_..                                         20                8. 0             16. 7               6. 5


     The total costs and expenditures under the existing project were
as follows:
                                                                Public works        Emergency               Regular funds                   Total
                                                                   funds            relief funds

Costs:
   New work--------------...................... $2, 189, 955. 51 $2, 636, 456. 26                                $363,405. 46             $5, 189, 817. 23
              ---------------------------------.----------------
   Maintenance....                                                                                              1, 053, 710. 61            1, 053, 710. 61
         Total.-------              -----------------            2, 189, 955. 51     2, 636, 456. 26            1, 417, 116. 07            6, 243, 527. 84
Expenditures----------------------...........................    2,189, 955. 51      2, 636, 456. 26            1, 557, 994. 61            6, 384, 406. 38


  In addition $15,000 contributed funds were expended for new work.
  Deferred charges, undistributed, for the amortization of the costs
of disposal areas, amount to $141,218.54.
  Proposed operations.-Itis proposed to apply the funds unexpended
on June 30, 1952, amounting to $471.09 together with an allotment
of $717,000 made in fiscal year 1953, as follows:
Accounts payable, June 30, 1952- -------                                                  -         -     __-       -- _____-$340. 00

Maintenance contract: Dredging to project depth in the channel
from Allegheny Avenue to Newbold Island, August to November
1952 -------------------------------------------------------            707, 500. 00
Maintenance, hired labor:
   Condition surveys_-------------_------                       -------
                                                                     ___   6, 041.09
   Miscellaneous inspections and reports-----------............            3, 590. 00

             Total maintenance.....................--                                                           ......             - 717, 131.09

             Total for all work_----------                                    -------------_                    ___-_-_              717, 471. 09
     The additional sum of $10,600 can be profitably expended during the
fiscal year 1954 in making condition surveys and miscellaneous inspec-
tions and reports.
   The completion of the project is not required by existing commerce.
                RIVERS AND HARBORS--PHILADELPHIA,                                                       PA.,     DISTRICT              265
                                                     Cost and financial summary

                                                                   Fiscal year ending June 30                               Total to June
                                                                                                                            30, 1952, includ-
                                                                                                                            ing fiscal years.
                                              1948               1949            1950            1951            1952         priorto 1948


New work:
   Appropriated...............---------.....------------............ ------------
                                                                      ...........------------
                                                                                    ............------------............      $7, 678, 990.68
     Cost..................------------- -----------------------------                       ---------      -----------       1 7, 678, 990. 68
   Expenditures---- .................--------..........-----------           --------- ------------ ------------               7, 678, 990. 68
Maintenance:
     Appropriated.......-----.....---.....--------....        $5, 000. 00 $145,000. 00       -$25,000.00 $149, 318. 54         1, 747, 780. 70
     Cost-----------------................  $495. 46           4, 223. 98   36, 317. 44        80, 226. 22 12, 624. 03         1, 606, 431. 07
     Expenditures....-------....                461.60.         2, 715. 90     19, 242. 59    98, 572. 49    153, 740. 73      1, 747, 309. 61

   1 In addition, $15,000.00 contributed funds were expended for new work.
Other new work data: Estimated additional amount needed to be appro-
  priated for completion of existing project_-- -----_  -            $55, 00
                                                             -_-_-____

        2. DELAWARE RIVER, PA., N. J. AND DEL., PHILADELPHIA, PA.,
                             TO THE SEA

    Location.-See page 270, also United States Coast and Geodetic Sur-
vey Charts Nos. 1218, 294, 295, and 280.
    Previous projects.--Adopted by River and Harbor Acts of July 4,
1836; March 3, 1873; March 3, 1875; June 18, 1878; March 3, 1879;
July 5, 1884; August 11, 1888; and March 3, 1899. For further details,
see page 1779 of annual report for 1915 and page 299, Annual Report
for 1938.
    Existing project.-This provides for a channel 37 feet deep from
Allegheny Avenue, Philadelphia, Pa., to the Philadelphia Navy Yard,
thence 40 feet to deep water in Delaware Bay, 800 feet wide in the
straight reaches from Allegheny Avenue to a point in Delaware Bay
near Ship John Light, thence 1,000 feet wide to deep water in Delaware
Bay, with 1,200 feet width at Bulkhead bar and 1,000 feet width at
other bends and in Philadelphia Harbor; for an anchorage at Port
Richmond 37 feet deep and about 6,400 feet long; for an anchorage
at Gloucester 30 feet deep and about 3,500 feet long; for an anchorage
in the vicinity of Mantua Creek 37 feet deep, 1,400 feet wide and
having a mean length of 11,600 feet; and for an anchorage at Marcus
Hook 37 feet deep, 1,400 feet wide and having a mean length of 10,500
feet. It also provides for the construction of dikes and training works
for the regulation and control of the tidal flow; for straightening the
channel and extending the 1,000-foot width from Philadelphia Harbor
to Horseshoe Bend; and for the maintenance of an area on the north
side of the channel opposite the Philadelphia Navy Yard between
Shipway 3 and Schuylkill River to a depth of 40 feet and a width of
150 feet on Mifflin Range and 200 feet on West Horseshoe Range, and
of any areas dredged by local interests to a depth of 35 feet between
the channel and a line 100 feet channelward of the pierhead line
between Point House wharf and the Philadelphia Navy Yard, when in
the opinion of the Chief of Engineers such areas are so located as to
be of benefit to general navigation. The total length of the section
included in the project is about 96.5 miles. All depths refer to the
plane of mean low water.
    The mean tidal range at various points on the river and bay is as.
 266             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                     1952

follows: Philadelphia, Pa., 6.0 feet; Chester, Pa., 5.7 feet; New Castle,
Del., 5.5 feet; Liston Point, Del., 5.8 feet; and Lewes, Del., 4.1 feet.
Under the influence of heavy and long-continued winds the extreme
tidal range is about 14 feet. The normal maximum velocity of tidal
current in the dredged channel varies between 2 and 31/2 miles per hour.
Storm tides may increase the maximum to as much as 4 miles per
hour.
   The estimate of cost for new work, revised in 1952, is $33,771,000,
exclusive of amounts expended on previous projects. The latest (1950)
approved estimate for annual cost of maintenance is $6,165,000.
  The existing project was authorized by the following river and har-
bor acts:

       Acts                         Work authorized                                    Documents

June 25, 1910     Channel 35 feet deep from Allegheny Ave., Phila-         H. Doec. 733, 61st Cong., 2d sess.
                   delphia, Pa., to Delaware Bay.                                                               1
July    3, 1930   Anchorages 35 feet deep at Port Richmond and Man-        H. Doc. 304, 71st Cong., 2d sess.
                    tua Creek, a 30-foot anchorage at Gloucester, N. J.,
                   and extending the 1,000-foot channel width in Phil-
                   adelphia Harbor to Horseshoe Bend.
Aug. 30, 19352    An anchorage 35 feet deep at Marcus Hook, Pa....         Rivers and Harbors Committee
                                                                             Doc. 5, 73d Cong., 1st sess.
June 20,1938      A channel 37 feet deep from Philadelphia-Camden          S. Doc. 159, 75th Cong., 3d sess.'
                   Bridge to the navy yard, thence 40 feet deep to deep
                    water in Delaware Bay.
Mar.    2,1945    A 37-foot depth in channel from Allegheny Ave.,          H. Doc. 580, 76th Cong., 3d sess.'
                    Philadelphia, Pa. to Philadelphia-Camden Bridge
                    and in the anchorage at Port Richmond.
    Do-.......    A 37-foot depth in and enlargement of anchorages near    H. Doc. 340, 77th Cong., 1st sess.
                    Mantua Creek and Marcus Hook.
    Do-......     Maintenance of enlarged channel opposite Philadel-       Specified in act.
                    phia Navy Yard.


  1Contains latest published    maps.
  2 Also Public Works Administration, Sept. 6, 1933.



   Local cooperation.-The River and Harbor Act of June 20, 1938,
imposes the condition that the cities of Philadelphia and Camden
shall agree to dredge not less than 110,000 cubic yards annually in
maintaining the channel and anchorages in Philadelphia Harbor
between Allegheny Avenue and the mouth of Schuylkill River. This
condition will become effective after completion of initial dredging
of the 40- and 37-foot channels below the Philadelphia-Camden
Bridge.
   Terminal facilities.-There are 243 wharves on the river between
Allegheny Avenue, Philadelphia, and the sea, 188 located on the water-
front of Philadelphia, Camden, and Gloucester and 55 below Phila-
delphia. Eight are owned by the United States, 5 by the States of
Pennsylvania and New Jersey, 28 by municipalities, 77 by railroad
companies, and 125 by private interests. The public and railroad
piers are open to public use, some free and others on payment of
charges. Most of the piers which are equipped to handle general
cargo have direct rail connections with three railroad systems oper-
ating in the area. The facilities are considered adequate for existing
commerce. (For further details see Port Series Nos. 7 and 9-Re-
vised 1947-Corps of Engineers.)
   Operations and results during fiscal year.-Maintenance, contract:
A refund of $2,360.04 was received for the return of United States
              RIVERS AND HARBORS-PHILADELPHIA,                                 PA.,      DISTRICT            267

Coast Guard buoys that were used on the removal of rock on Chester
Range contract completed the previous fiscal year. A contract for
the dredging of Marcus Hook anchorage awarded the previous fiscal
year was in progress from July 6 to December 7, 1951. There were
removed 2,395,044 cubic yards, place measurement, of material. The
costs were $959,074.54. Maintenance, hired labor: Dredging in the
40-foot channel was in progress throughout the year. A total of
8,689,518 cubic yards, place measurement, of material was removed
by the United States hopper dredges Chester Harding, New Orleans
and Rossell, of which 6,825,003 cubic yards were rehandled by the
United States pipeline dredges Gillespie and Gulfport, and 1,864,515
cubic yards were deposited outside the channel limits. The costs were
$2,315,612.44.
   Other costs were: Surveys and channel examinations, $124,425.37,
charging off remaining cost of abandoned disposal areas, $504,672.72;
model studies of shoaling in Delaware River by United States Water-
ways Experiment Station, Vicksburg, Miss., $52,010.03; operation of
Sedimentation Station at Morrisville, Pa., in cooperation with United
States Geological Survey, $1,881.00; and preparation of plans for
repairs to Pea Patch Island dike, $331.81, a total of $683,320.93.
   The amount of $14,008.62 was received during the fiscal year in
settlement of the Government's claim against the Red Star Towing
& Transportation Co., for damages, caused by the barge Hygrade No.
4 in tow of the tug Newport, to Pea Patch dike on January 19, 1951.
   The unamortized portion of the cost of disposal areas and mainte-
nance costs were transferred to the project account. Deferred charges,
undistributed, amounting to $864,746.30 for cost of the disposal areas
and $87,886.57 for maintenance, a total of $952,632.87, were incurred.
   With costs of $3,958,007.91 for maintenance and credits of $16,368.66
the cost of all work was $3,941,639.25 for maintenance. The expendi-
tures were $4,976,679.87.
   Condition at end of fiscal year.-The existing project was about 82
percent complete. The 40-foot channel from Philadelphia Navy
Yard to the sea was completed in 1942. The enlarging and deepen-
ing of Marcus Hook anchorage was completed in 1947. The work
remaining to be done is the completion of the deepening and enlarg-
ing of Mantua Creek anchorage and the deepening of the channel
from Allegheny Avenue to the Philadelphia Navy Yard, including
Port Richmond anchorage, from 35 feet to 37 feet.
   The latest examinations show minimum depths, at mean low water,
available to navigation as follows:

                                                                             Minimum depth
                                             Project
   Date                Section               depth           Left out-      Left in-     Right in-     Right out-
                                                            side quar-    side quar-     side quar-    side quar-
                                                            ter (feet)     ter (feet)     ter (feet)    ter (feet)

April 1952_ Allegheny Ave., to Philadel-               37         27. 7          26. 3         28. 0          27. 1
              phia-Camden Bridge.
May 1952_   Philadelphia-Camden Bridge                 37         18. 0          35. 2         34. 0          24. 0
              to navy yard.
April 1952- Navy yard to the sea .........             40         29. 2          35. 5         35. 9          32. 0
268           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

  The costs and expenditures under the existing project were as
follows:

                                                                Public
                                                                   fundworkss         Regular funds             Total


Costs:
    New work__--------         ---------------------------            $813, 045. 79   $27, 647, 562. 64     $28, 460, 608. 43
    Maintenance----        ---------------------------------------                     64, 248, 975. 74      64, 248, 975. 74
         Total--------------------------------------813, 045. 79                       91, 896, 538. 38      92, 709.584.17
Expenditures       -----------------------------------                 813, 045. 79    92, 839, 842. 30      93, 652, 888.09



  Deferred charges, undistributed, for the amortization of the costs
of disposal areas amount to $952,632.87.
  Proposed operations.--Itis proposed to apply the funds unexpended
on June 30, 1952, amounting to $14,906.38 together with an allotment
of $1,660,000 made in fiscal year 1953, as follows:
Accounts payable, June 30, 1952_                           _____                              _              $9, 328. 95
Maintenance, hired labor :
   Dredging to maintain project depth in the channel between
      navy yard and Delaware Bay and 35 feet between navy yard
      and Allegheny Avenue with United States hopper dredges
      and rehandling with United States pipeline dredges during
      the year . .......                                        1, 427, 907. 43
   Condition surveys-                                              108, 940. 00
   Maintenance of disposal areas ...............                    85, 000. 00
   Continue model studies of shoaling in Delaware River by
      United States Experiment Station, Vicksburg, Miss .....       25, 000. 00
   Operation of sedimentation station at Morrisville, Pa., in
      cooperation with United States Geological Survey .......       2, 300. 00
   Miscellaneous inspections and reports ....................       16, 430. 00
          Total maintenance              --------------------------------                                 1, 665, 577.43
          Total for all work              -------------------------------                                 1,674,906.38
  The additional sum of $2,172,100 can be profitably expended for
the following schedule of work during the fiscal year 1954:
Maintenance, contract: Repairs to Pea Patch dike.      ....-----------...   $15, 000
Maintenance, hired labor :
   Dredging to maintain project depth in the channel between navy
      yard and Delaware Bay and 35 feet between navy yard and
      Allegheny Avenue with United States hopper dredges and
      United States pipeline dredges, as required---------------          2,000,000
    Condition surveys --------------------------------------                135, 000
   Miscellaneous inspections and reports------------------------             22,100
          Total       ---------------------------------------------                                          2, 172, 100
            RIVERS AND HARBORS--PHILADELPHIA,                                       PA.,      DISTRICT           269
                                    Cost and financial summary

                                                Fiscal year ending June 30                             Total to June
                                                                                                      30,1952, includ-
                                                                                                      ing fiscal years
                                 1948          1949           1950           1951             1952      priorto 1948


New work:
   Appropriated.........     $600, 000. 00 $298, 258. 17-------       -------.------------              $41,436, 666. 04
   Cost_. -------------        82, 545. 65 885, 332. 41-------        ------------ ------------...........
                                                                                                        41, 436, 666. 04
   Expenditures--........      14, 624. 59 953, 253. 47------------                  ....
                                                                                 --------------          41, 436, 666.04
Maintenance:
   Appropriated......... 2, 035, 500. 00 2, 559, 421.33 $3,705,410.66 $4,133,849.24 $3,905,448.67        66, 232, 595. 06
   Cost_...... ..--    . 1,888, 711,81 2, 732,366. 66 3,679,898.45 3,178,963.69 3,941,639.25             65, 274, 384. 76
   Expenditures......... 1, 862, 904. 95 2, 683, 053. 06 3,688,409.811 3,132,453.94 4,976,679.87         66, 217, 688. 68


Other new work data : Estimated additional amount needed to be ap-
   propriated for completion of existing project__------------------                                   $5, 310, 000

                       3. DELAWARE RIVER AT CAMDEN, N. J.

   Location.-Camden, N. J., is located on the east bank of the Dela-
ware River, directly opposite the city of Philadelphia, Pa. It is about
51 miles above the mouth of the river and about 101 miles above the
harbor of refuge at the mouth of Delaware Bay. (See U. S. Coast
and Geodetic Survey Charts Nos. 295 and 280.)
   Previous projects.-Adopted by River and Harbor Act of June 25,
1910. No work was done on this project. For further details, see
page 321, annual report for 1932.
   Existing project.-This provides for dredging in front of Camden
to a depth of 18 feet from that depth north of Cooper Point to
Berkley Street and 30 feet from the latter point to Newton Creek,
with the depth increased to 37 feet in front of the Camden marine
terminals, these depths extending from the ship channel in Dela-
ware River to a line parallel with and 50 feet distant from the estab-
lished pierhead line, and the 37-foot depth in front of the Camden
marine terminals extending about 2,900 feet along the inshore side
and about 5,100 feet along the ship channel. All depths refer to
the plane of mean low water.
  The distance from Cooper Point to Berkley Street is about 1.5 miles,
and from Berkley Street to Newton Creek is about 2.5 miles. The
lower end of the project is about 49 miles above the mouth of the river
at Liston Point and about 99 miles above the harbor of refuge at the
mouth of Delaware Bay.
  The mean tidal range is 6.0 feet and the extreme tidal range under
the influence of prolonged heavy winds is about 14 feet.
  The estimate of cost for new work, revised in 1952, is $1,099,000,
exclusive of $15,000 contributed funds. The latest (1950) estimate
for annual cost of maintenance is $60,000.




       245554-53-vol. 1               18
270           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                 1952

  The existing project was authorized by the following river and
harbor acts:

       Acts                          Work authorized                              Documents1

Mar.     2,1919    A depth of 30 feet from Newton Creek to Kaighn      H. Doc. 1120, 63d Cong., 2d sess.
                    Point, thence 18 feet to Cooper Point.
July     3,1930    Extending the 30-foot depth upstream to Berkley     H. Doc. 111, 70th Cong., 1st sess.
                     St. terminal.
Mar.     2,1945    A depth of 37 feet in front of the Camden marine H. Doc. 353, 77th Cong., 1st sess.
                     terminals.

  1 Contain latest published maps.


    Local cooperation.-Fully complied with.
    Terrminal facilities.-There are 60 piers, wharves, and docks along
the Delaware River waterfront at Camden, including 3 oil terminals
on Pettys Island. Two are modern terminals designed for overseas
and domestic general cargo, and are open to all carriers on equal
terms. They are the Beckett Street terminal, owned by the South
Jersey port district, and the Spruce Street municipal pier, owned by
the city of Camden. The piers have direct railroad connections.
The facilities are considered adequate for existing commerce. (For
further details see Port Series No. 7-Revised 1947-Corps of
Engineers.)
   Operations and results during fiscal year.-Surveys and channel
examinations were made at a cost of $738.60 for maintenance. The
expenditures were $738.43.
   Condition at end of fiscal year.-The existing project was about
55 percent complete. The work remaining to be done is the deepening
of the area in front of the Camden marine terminal from 30 feet to
37 feet. The latest examination (May 1952) indicates that project
depths are well maintained in the completed portion of the project
except near Cooper Point at the northerly end, and that the minimum
depth in the 37-foot project depth area in front of the terminal is
26 feet.
   The costs under the existing project, excluding $15,000 contributed
funds expended for new work, were $462,905.66 for new work and
$188,458.21 for maintenance, a total of $651,363.87. The expenditures
were $651,350.77.
  Proposedoperations.-It is proposed to apply the funds unexpended
on June 30, 1952, amounting to $70.66 together with an allotment
of $30,000 made in fiscal year 1953, as follows:
Accounts payable, June 30, 1952                   ___________                  _-$13.                  10
Maintenance, contract :
    Dredging 18-foot project to 12 feet, April 1953______---- ____-_ 28, 500. 00
    Condition surveys_____ ________________--            _     --        857. 56
    Miscellaneous inspections and reports_________________________       700. 00
         Total maintenance_____________________ -_                                          30, 057. 56

                  Total for all work---------------------------------_                       30, 070. 66
  No work is scheduled for fiscal year 1954.
            RIVERS AND               HARBORS-PHILADELPHIA,                                       PA.,      DISTRICT                 271
                                        Cost and financial summary

                                                        Fiscal year ending June 30                                        Total to Junie
                                                                                                                          30, 1952, includ-
                                                                                                                          ing fiscal years
                                    1948              1949              1950             1951              1952             priorto 1948

New work:
    Appropriated-------......... ------------ ------..........----
                                                             ---------------------------                                       $462, 905.66
    Cost...                  ......----------------------------------------------------------....................------         462,
                                                                                                                               905.      66
    Expenditures--........                                    ------------------------  462, 905. 66
                               ...............------..-......---....--------------........------...
Maintenance:
    Appropriated .......        $17, 000. 00      $72, 000. 00     $22, 000. 00     -$20,000.00         -$700. 00               188, 515. 77
    Cost-----....-------- -      16, 981.55        73,108.34            362. 53           922.83           738.60               188, 458.21
    Expenditures.........        18, 997. 19       72, 801. 72          315. 24        1, 265. 89          738. 43              188, 445. 11

  1In addition, $15,000 contributed funds were expended for new work.
Other New York data: Estimated additional amount needed to be ap-
propriated for completion of existing project------------------- $636, 000

               4. SCHUYLKILL RIVER ABOVE FAIRMOUNT DAM, PA.

    Location.-Schuylkill River has its source in Schuylkill County,
Pa., and flows southeasterly 150 miles to the Delaware River at Phila-
delphia, Pa. (See U. S. Geological Survey quadrangle sheets of
Pennsylvania.)
    Existing project.-Thisprovides for the improvement of the Schuyl-
kill River above Fairmount Dam in the interest of navigation and
other purposes by the removal of culm deposits from the pools formed
by Plymouth Dam, Flat Rock Dam, and Fairmount Dam.
    The estimate of cost for this work, revised in 1952, is $12,574,000.
    The existing project was authorized by the River and Harbor Act
of July 24, 1946 (H. Doc. 529, 79th Cong., 2d Sess.). The latest pub-
lished maps are contained in the project document.
    Local cooperation.-The accomplishment of the authorized work is
subject to the requirements that local interests: (a) Stop the discharge
of mine and industrial wastes into the streams of the Schuylkill water-
shed; (b) construct works to intercept accumulated wastes which enter
the headwaters by erosion, or are now present therein, and keep them
from going downstream; (c) remove 50 percent of the culm deposits
in the river between Auburn and Norristown Dam; (d) furnish with-
out cost to the United States all lands, easements, and rights-of-way
necessary for the construction of the project; (e) hold and save the
United States free from damages due to the construction works; and
 (f) maintain and operate all works after completion in accordance
with regulations prescribed by the Secretary of War. The required
conditions have been complied with except that all lands, easements
and rights-of-way for the construction of the project have not been
fully furnished.
    Operations and results during fiscal year.-New work, contract: A
refund of liquidated damages was made on the contract for the con-
struction of retaining embankments and sluice for the dredge-spoil
disposal area, near Spring Mill, Pa., on which the work was completed
the previous fiscal year. The cost was $1,005.34.
   A contract for dredging the culm from Plymouth and Flat Rock
Pools was awarded June 4, 1952. At the end of the fiscal year only
preliminary work had been done. The cost was $397.93.
272              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   New work, hired labor: Preliminary work for preparing disposal
areas and dredging for culm to be removed from Plymouth, Flat Rock
and Fairmount Pools was in progress. The cost was $12,930.38.
  The cost of all work was $14,333.65 for new work. The expenditures
were $13,889.07.
   Condition at end of fiscal year.-The existing project was about &
percent complete. Construction of disposal areas, for culm that is to
be removed from Plymouth and Flat Rock Pools, has been completed.
  The costs under the project were $391,641.55 for new work. The
expenditures were $390,335.74.
  Proposedoperations.-Itis proposed to apply the funds unexpended
on June 30, 1952, amounting to $1,774,664.26 together with an allot-
ment of $994,000 made in fiscal year 1953 and $135,000 in accounts
receivable as follows:
Accounts payable, June 30, 1952-----------------------------                                                               $1,305. 81
New work, contract:
   Dredging Plymouth and Flat Rock Pools under continuing
     contract in force to be completed March 1954_------------                                                      1,
                                                                                                                     516, 000. 00
   Construction of Darby Creek disposal area, March 1953 to
     March 1954-      -------------------------------------                                                              537, 000. 00
   Initiation of dredging of Fairmount Pool by continuing con-
     tract June 1953 to June 1957----------------- --------                                                              849, 358. 45

           Total new work -------                                     ------------------------- 2, 902, 358. 45
           Total for all work----------                                     ------------- ---------- 2, 903, 664.26.
  The additional sum of $1,300,000 can be profitably expended during
the fiscal year 1954 to continue the removal of culm from Fairmount
Pool.
                                                   Cost and financial summary

                                                               Fiscal year ending June 30                                Total to June
                                                                                                                        30,1952. includ-
                                                                                                                        ing fiscal years
                                                 1948         1949            1950           1951          1952          priorto 1948

New work:
   Appropriated--------------.........             ----    $35, 000. 00
                                                   ----............        $365, 000. 00----------... $1,900,000.00       $2, 300, 000. 00,
   Cost-------------------------                             24, 046. 65     42, 475. 67 $310, 785. 58    14, 333. 65         391, 641. 55
   Expenditures ...----              ---------               22, 047. 12     31, 807. 24 322, 592.31      13,889.07           390,335.74


Other new work data:
    Unobligated balance, June 30, 1952---------------------- $471, 488. 33
    Appropriated for fiscal year ending June 30, 1953---------- - 994, 000. 00
    Unobligated balance available for fiscal year 1953--------- 1,465,488. 33
    Estimated additional amount needed to be appropriated for
      completion of existing project.----------------------- 9, 280, 000. 00

                                                 5. SCHUYLKILL RIVER, PA.

  Location.-This river has its source in Schuylkill County, Pa., flows
in a general southeasterly direction 150 miles, and empties into the
Delaware River at Philadelphia, Pa. (See U. S. Coast and Geodetic
Survey Charts Nos. 295 and 280.)
  Previous projects.-Adopted by River and Harbor Act of July 11,
1870, and modified April 26, 1892. For further details see page 325,
annual report for 1932.
              RIVERS       AND     HARBORS-PHILADELPHIA,                        PA.,    DISTRICT               273

   Existing project.-This provides for a channel 33 feet deep and
400 feet wide in Delaware River to the mouth and within the river
to Twenty-ninth Street, three-fourths mile above the mouth; thence
the same depth and 300 feet wide to Passyunk Avenue Bridge, 31/2
miles above the mouth; thence 26 feet deep and 200 feet wide to
Gibsons Point, 41/ miles above the mouth; and thence 22 feet deep
and 200 feet wide to University Avenue Bridge, 6 miles above the
mouth, including widening at bends. The total length of the section
included in the project is about 61/ miles. All depths refer to the
plane of mean low water. The mean tidal range at the mouth is 5.9
feet and at Grays Ferry Bridge about one-half mile below University
Avenue Bridge, 6.4 feet. The extreme tidal range, due to freshets
and prolonged heavy winds, is about 14 feet.
   The estimated cost for new work, revised in 1952, is $2,805,000,
exclusive of amounts expended on previous projects. The latest
 (1949) approved estimate for annual cost of maintenance is $966,000,
in addition to $1,300,000 required to restore project depth below
Passyunk Avenue Bridge as provided by the River and Harbor Act
of July 3, 1930, and $1,036,000 for the restoration of project depths
above Passyunk Avenue Bridge as provided by the River and Harbor
Act of July 24, 1946.
   The existing project was authorized by the following river and
harbor acts:

       Acts                          Work authorized                                    Documents

Aug. 8,1917       Depths of 35 feet from mouth to Girard Point, thence
                   30 feet, 26 feet, and 22 feet to University Ave.
                                                                             H. Doc. 1270, 64th Cong.,   lost seas.
                    Bridge. Philadelphia.
July    3, 1930   A depth of 30 feet instead of 35 feet between the          Rivers and Harbors Committee
                                                                                                   1
                    mouth and     Girard Point,    and the conditional         Doc. 40, 71st Cong., 2d sess.
                    restoration and maintenance of the channel below
                    Passyunk Ave., by the United States.                                                          1
July 24, 1946     A deoth of 33 feet from the channel in Delaware River      H. Doc. 699, 79th Cong., 2d seas.
                    to Passyunk Ave., restoration of the project channel
                    dimensions between Passyunk Ave., and Univer-
                    sity Ave., and full maintenance of the entire project.

1 Contains latest published maps.

  Local cooperation.-The River and Harbor Act of July 24, 1946,
imposed the condition that the city of Philadelphia agree to remove
60,000 cubic yards (place measurement) of material annually from
that portion or those portions of the project which the district engi-
neer may designate until such time as adequate municipal sewage-
treatment works are constructed and placed in effective operation.
This condition is being satisfactorily complied with. All other re-
quirements have been fully complied with.
   Terminal facilities.-There are 43 wharves located within the limits
of the improvement. These terminals are considered adequate for
existing commerce. (For further details see Port Series No. 7-
Revised 1947-Corps of Engineers.)
   Operations and results during fiscal year.-Dredging in the 33-foot
channel between Delaware River and Passyunk Avenue Bridge by the
United States hopper dredges Harding, New Orleans, and Riossell,
was in progress at intervals during the year. There were removed
696,166 cubic yards, place measurement, of material. The costs, in-
274          REPORT OF CHIEF OF ENGINEERS,                                   U.    S. ARMY, 1952

cluding rehandling with a United States pipeline dredge, were
$347,348.09.
  Other costs were: Charging off remaining costs of abandoned dis-
posal areas, $57,443.41; and surveys and channel examinations, $16,-
454.01.
  The cost of all work was $421,245.51 for maintenance. The ex-
penditures were $425,859.18.
  In compliance with local cooperation requirements, the city of
Philadelphia dredged a total of 58,850 cubic yards of material from
the channel above Passyunk Avenue Bridge.
   Condition at end of fiscal year.-The existing project was about 98
percent complete. The 33-foot depth channel from Delaware River
to Passyunk Avenue Bridge was completed in 1949. The work re-
maining to be done is the removal of a few rock shoals above Passyunk
Avenue Bridge.
  The latest examinations show minimum depths, at mean low water,
available to navigation as follows:

                                                                                              Minimum depth

                                                              Project                           Mid-chan-
    Date                           Section                    depth               Left out-          nel for       Right out-
                                                               (feet)               side       hal    Project         side
                                                                                  quarter            width          quarter
                                                                                   (feet)                            (feet)


March   1952 -..  Delaware River to 29th Street- ____--                 33             22. 3             31.0            25. 2
March   1952 __ 29th St. to Passyunk Ave __        _                    33              8.0              18. 2           19.6
March   1952 _--  Passyunk Ave. to Gibson Point ......                  26             13. 3             11.8             6. 0
March   1952.. .. Gibson Point to University Ave       -...             22              4. 5              6. 3            3. 2



  The costs under the existing project were $2,753,037.88 for new work
and $8,865,731.79 for maintenance, a total of $11,618,769.67. The
expenditures were $11,617,171.56.
  Proposedoperations.-It is proposed to apply the funds unexpended
on June 30, 1952 amounting to $1,701.80 together with an allotment
of $392,500 made in fiscal year 1953, as follows:
Accounts payable, June 30, 1952------------------_ -_---                                                         $1, 598. 11

Maintenance, contract: Dredging in the 26-foot and 22-foot channel
between Passyunk Avenue Bridge and University Avenue Bridge,
to 20 feet and 15 feet, respectively, October to December 1952
Maintenance, hired labor:
                                                                   120, 000. 00                 -----
    Dredging project depth between Delaware River and Passyunk
      Avenue Bridge with United States hopper dredges, including
      rehandling with pipeline dredges, as required_
    Condition surveys       ----------------------------------
                                                                   258, 953.69
                                                                     8, 400. 00
                                                                                     ______--_
    Miscellaneous inspections and reports--------------------        5,250. 00
         Total maintenance--...-------------                   ------------------- 392, 603.69
                                ---------------------------------- 394, 201. 80
         Total for all work .......
               RIVERS AND                HARBORS-PHILADELPHIA,                            PA.,     DISTRICT              275
  The additional sum of $350,00 can be profitably expended for the
following schedule of work during the fiscal year 1954:
Maintenance, contract:
Dredging 26-foot and 22-foot project channel between Passyunk Avenue
  Bridge and University Avenue Bridge to 20 feet and 15 feet, respec-
tively-----              -------------------------------------- $126, 000
Maintenance, hired labor :
    Dredging to project depth in the channel between Delaware River
      and Passyunk Avenue Bridge with United States hopper dredges,
      including rehandling with United States pipeline dredges, as
      required _         _-----------------------------------_                        200,000
    Condition surveys    ---------------------------------------                       18, 000
    Miscellaneous inspections and reports                      ------------------------ 6, 000

           Total -----------------------------------------------                                                   350, 000

                                          Cost and financial summary

                                                        Fiscal year ending June 30                            Total to June
                                                                                                              30, 1952, includ-
                                                                                                              ing fiscal years
                                       1948           1949           1950          1951           1952          prior to 1948

New work:
   Appropriated---------.........   -------      $1,395,000.00 -$97, 963. 13 ...........      ......    ..      $3, 278, 037. 88
   Cost .------                      $70, 095. 77 1,156,453.87    70, 487. 23 ----------------------             3, 278, 037. 88
   Expenditures---..- ----            --------. 1,226,728.05      70, 308. 82 ....----------------------         3, 278, 037. 88
Maintenance:
    Appropriated--------.........    500, 000. 00   804, 000. 00   125, 078. 40 $926, 000. 00 $404, 643. 41      8, 865, 835. 48
    Cost---------..  ------..        532, 800. 80   649, 575. 61   261, 248. 55 914, 823. 75 421, 245. 51        8, 865, 731. 79
    Expenditures--------.........    506, 770. 93   664, 121. 50   261, 761. 18 910, 635. 74 425, 859. 18        8, 864, 133. 68


Other new work data: Estimated additional amount needed to be appro-
priated for completion of existing project----------------------- $52, 000

                                     6. WILMINGTON HARBOR, DEL.

   Location.-This harbor is formed by Christina River, which rises
in New Castle County, Del., flows northeasterly 16 miles, passing
through the city of Wilmington, Del., and empties into Delaware
River about 29 miles below Philadelphia, Pa. (See U. S. Coast and
Geodetic Survey Chart No. 294.)
  Previous projects.-Work was done on Christina River from 1836
to 1838. The original project was adopted by River and Harbor Act
of July 11, 1870, and modified by River and Harbor Acts of March 3,
1881, and July 5, 1884. For further details see page 1785 of annual
report for 1915 and page 308 of annual report for 1938.
  Existing project.-This provides for a channel 30 feet deep and 400
feet wide in Delaware River to the mouth of Christina River and
within the river to Lobdell Canal, three-fourths mile above the
mouth; thence 21 feet deep and 250 feet wide to the mouth of Brandy-
wine River, 11/2 miles above the mouth; thence the same depth and
200 feet wide to the pulp works, 33/4 miles above the mouth; thence
decreasing to a depth of 10 feet in 750 feet to the Pennsylvania Rail-
road bridge No. 4; and thence 7 feet deep and 100 feet wide to New-
port, 9 miles above the mouth, including an inner basin 30 feet deep
formed by widening the channel to an average width of 600 feet and
extending upstream from the mouth to Lobdell Catnal. It also pro-
vides for the removal of about 1,200 feet of the outer end of a stone-
276           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                      1952

filled, pile-and-timber-crib jetty constructed 2,150 feet long on the
north side of the entrance; for a steel-sheet pile jetty 2,300 feet long,
with 120-foot inshore wing, on the south side of the entrance, and
for a V-shaped stone-filled pile and timber jetty at the mouth of
Brandywine River, 430 feet long on the Brandywine side and 260
feet long on the Christina side. The total length of the section in-
cluded in the project is about 91/2 miles. All depths refer to the
  )lane of mean low water. The mean tidal range at the mouth is 5.6
feet, and at Newport 3.9 feet. The extreme tidal range due to pro-
longed heavy winds is about 13 feet.
    The estimate of cost for new work, revised in 1952, is $1,281,000,
exclusive of amounts expended on previous projects. The latest
 (1950) approved estimate for annual cost of maintenance is $400,000.
    The existing project was authorized by the following river and
harbor acts :

       Acts                          Work authorized                                    Documents


June 31896                                                                    H. Doc. 66, 54th Cong., 1st sess.;
Mar. 3,1899      Depths of 21, 10, and 7 feet, and jetties ..   ....-------------Annual Report, 1896, p. 973; An-
                                                                                 nual Report, 1897, p. 1250.1
July 25,1912     Purchase or construction of a dredge and auxiliaries,       H. Doc. 359, 62d Cong., 2d sess.
                  including a wharf and depot, and maintenance of
                  the project.
Sept. 22,1922    Entrance channel and basin with 25-foot depth and H. Doc., 114, 67th Cong., 1st sess.,
Mar. 3,1925       construction by local interests of the new south               and Senate committee print, 68th
                  jetty.                                                         Cong., 1st sess.'
July    3,1930   A 30-foot depth between Delaware River and the             Rivers and Harbors Committee
                   Lobdell Canal and modification or removal of a             Doc. 20, 71st Cong., 2d sess.'
                  portion of the north jetty.
Aug. 30,19352    Completion of the new south jetty by the United            Rivers and Harbors Committee
                   States; subject to the provision that the city of          Doc. 32, 73d Cong., 2d sess.
                   Wilmington shall reimburse the United States for
                   the cost, without interest, of any part of the struc-
                   ture that may subsequently be occupied and uti-
                   lized for city activities.
Oct.   17,1940   Permit temporary occupancy by the city of Wil-            H. Doc. 658, 76th Cong., 3d sess.
                   mington of any part of the south jetty for city ac-
                  tivities under revocable license, provided the occu-
                  pied portion of the jetty is properly maintained
                  without expense to the United States.

  I Contains latest published maps.
2Also    May 28, 1935, under Emergency Relief Administration.


  Local cooperation.-Fully complied with.
  Terminal facilities.-A modern marine terminal is located just
inside the entrance to the harbor. This terminal is operated for the
city of Wilmington by a board of harbor commissioners, and is open
to all on equal terms. Railroad connection on the terminal wharf
provides for direct interchange of freight between car and ship.
There are 29 other wharves and landings within the Christina River
which forms the harbor. The facilities are considered adequate for
existing commerce. (For further details see Port Series No. 8-
Revised 1947-Corps of Engineers.)
   Operations and results during fiscal year.--Maintenance dredging
in the channel between Delaware River and Lobdell Canal was in
                RIVERS AND               HARBORS--PHILADELPHIA,                                    PA.,          DISTRICT               277
progress at intervals during the year. There were removed 1,065,992
cubic yards, place measurement, of material by the United States pipe-
line dredges Gillespie and Gulfport at a cost of $266,640.45. Other
maintenance costs for surveys, channel examinations and miscel-
laneous engineering were $140.89.
   The cost of all work was $266,781.34 for maintenance. The expendi-
tures were $266,795.56.
   Condition at end of fiscal year.-The existing project was about 99
percent complete. The channel above .Lobdell Canal and the
V-shaped stone-filled pile and timber jetty at the mouth of the Brandy-
wine River, 430 feet long on the Brandywine side and 260 feet long
on the Christina side, were completed in 1901. Removal of about
1,200 feet of the outer end of a stone-filled pile and timber jetty con-
structed 2,150 feet long on the north side of the entrance was com-
pleted in 1931. The steel-sheet pile jetty 2,300 feet long, with a
120-foot inshore wing, on the south side of the entrance was completed
in 1936. The harbor channel with the exception of the deepening of
the inner basin from 25 feet to 30 feet was completed in 1931. The
work remaining to be done is deepening of the inner basin from 25
feet to 30 feet.
   The latest examinations show minimum depths at mean low water
as follows:

                                                                                                          Minimum depth

                                                                           Project                              Mid-chan-
       Date                             Section                            depth            Left out-                fan
                                                                                                                 neMidch         Right out-
                                                                            (feet)              side            half Project         side
                                                                                             quarter              width            quarter
                                                                                              (feet)              (feet)            (feet)

April 1952 ....       Delaware River to Lobdell Canal.....                           30               26. 0   25. 9                         21.8
July 1949_ -.-        Lobdell Canal to Brandywine River.                             21-------------        1 14. 2
July 1949-......      Brandywine River to Market St......                            21 .......----------   115. 0
July 1949-.....       Market St. to pulp works .________.....                        21       .------------ 1 16. 0
July 1949- ...        Pulp works to Pennsylvania Railroad                            10 .....------------      6. 0
                        bridge No. 4.
July 1949- ....       Pennsylvania Railroad bridge No. 4                              7 ...........----------           6. 1
                        to Newport.

  1 In 80 percent project width.

  The costs and expenditures under the existing project, excluding
$60,000 contributed funds expended for maintenance, were as follows:
                                                                           Emergency              Regular funds                  Total
                                                                           relief funds                 rfns                     Tt

Costs:
     New work      -----------------------------------                       $206, 176. 75            $924,356. 12             $1, 130, 532. 87
     Maintenance..     ---------------------------------------------                                 7, 241, 445. 42            7, 241, 445. 42
       Total_.................        --.........   .....- ...-.-   -. .      206, 176. 75           8, 165, 801. 54            8, 371, 978. 29
Expenditures ...........---     ......-- ........--..-                        206, 176. 75           8, 165, 798. 47            8, 371, 975. 22
278               REPORT OF CHIEF OF ENGINEERS,                               U.          S. ARMY, 1952

  Proposed operations.-Itis proposed to apply the funds unexpended
on June 30, 1952, amounting to $35.13 together with an allotment of
$236,000 made in fiscal year 1953, as follows:
Accounts payable, June 30, 1952-------.-------------------------                                                     $3.07
                                                                                                                     --         .

Maintenance :
    Dredging between Delaware River and Lobdell Canal with
      United States pipeline dredges at intervals during the year___ 230, 382. 06
   Condition surveys            _______-----------------4,                250. 00
   Miscellaneous inspections and reports                               11,400. 00

           Total maintenance             ---------------------------------- 236, 032.06
           Total for all work _____--__.                        ___               _-_____               -     236, 035. 13
    The additional sum of $380,000 can be profitably expended during
the fiscal year 1954 for maintenance dredging of the channel from
Delaware River to Lobdell Canal with United States pipeline dredges
as required and for condition surveys and miscellaneous inspections
and reports.
                                     Cost and financial summary

                                                 Fiscal year ending June 30                                   Total to June
                                                                                                             30,1952. includ-
                                                                                                             ing fiscal years
                                  1948         1949             1950               1951               1952     priorto 1948

New work:
   Appropriated ......---------     ------------------------           ------------           ------------     $1, 532, 654. 08
    Cost ------                               ----------
                                                    ..--.....           ...............   -   -----             1, 532, 654.08
    Expenditures                           ..   ..
                          ----------------------------------
                                                      ..               ------------           -----------       1, 532, 654.08
Maintenance:
    Appropriated-......   . $250, 000.00 $413, 216.43 $340, 000. 00 $475, 000. 00 $264, 200. 00                 7, 241, 477. 48
    Cost---     --      -    241, 640. 87 427, 208. 25 322, 869. 45 489, 984. 63 266, 781.34                   17, 241, 445. 42
    Expenditures-....... 228, 781.47 434, 298. 55 332, 600. 24 482, 580. 98 266, 795. 56                        7, 241,442. 35

  1 In   addition $60,000 contributed funds were expended for maintenance.
Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project_________-------- $150, 000

7. INLAND WATERWAY FROM DELAWARE RIVER TO CHESAPEAKE
                   BAY, DEL., AND MD.

   Location.-This waterway begins at Reedy Point on Delaware
River, about 41 miles below Philadelphia, Pa., and passes through
the sea level Chesapeake & Delaware Canal, a distance of 14 miles,
to Back Creek, at Chesapeake City, Md. It then passes for 5 miles
down Back Creek, thence 9 miles down Elk River to Chesapeake
Bay and thence 18 miles down Chesapeake Bay to a point near
Pooles Island. A branch channel connects Delaware River at
Delaware City, Del., with the main channel at a point about 1/2
miles west of Reedy Point. (See U. S. Coast and Geodetic Survey
Charts Nos. 294, 1226, 570, and 572.)
  Previous projects.-The River and Harbor Act of August 8,
1917, made appropriation for preliminary studies with a view to
taking over the Chesapeake & Delaware Canal. The River and
Harbor Act of March 2, 1919, provided for the purchase of the
Chesapeake & Delaware Canal. The River and Harbor Acts of
January 21, 1927, and July 3, 1930, provided for dredging in Back
Creek, Md., and the construction of bridges and roadways. For
        RIVERS   AND HARBORS--PHILADELPHIA,        PA.,   DISTRICT   279

further details, see annual report for 1934, page 242, and annual report
for 1938, page 312.
    Existing projects.-This provides for a sea-level channel to ac-
commodate vessels drawing 25 feet and having a depth of 27 feet
and a width of 250 feet from Delaware River to Elk River and
thence 400 feet wide down Elk River and Chesapeake Bay to deep
water at or near Pooles Island; alteration of existing bridges over
the canal; extension of the entrance jetties at Reedy Point; the
enlargement of the anchorage and mooring basin in Back Creek
to afford an area about 400 feet wide, 1,000 feet long, and 12 rfeet
deep, including provision of sluice gates at the fixed highway
bridge; dredging the Delaware City Branch Channel to a depth of
8 feet and a width of 50 feet; deepening the existing basin to the
same depth; revetment of both banks east of Fifth Street Bridge;
and construction of bulkheads.
   The project also provides for the construction of a four-lane
high-level fixed highway bridge across the canal at or near St.
Georges, Del., of such type, design, and clearances for navigation
as are approved by the Chief of Engineers.
   The total length of the section included in the project, excluding
the Delaware City Branch Channel, which is about 2 miles long,
is about 46 miles. All depths refer to the plane of mean low water
in Delaware River. The mean tidal range at the Delaware River
entrance is 5.4 feet and in Elk River at the mouth of Back Creek,
2.2 feet. The extreme tidal range is from 6.3 feet above mean high
water to 3.0 feet below mean low water.
   The estimate of cost for new work, revised in 1952, is $14,668,500.
The latest (1949) approved estimate of cost for annual maintenance
is $825,000, including $225,000 for operation and care of the waterway.
   The existing project was adopted by the River and Harbor Act
of August 30, 1935 (H. Doc. 201, 72d Cong., 1st sess., and Rivers
and Harbors Committee Docs. 18 and 24, 73d Cong., 2d sess.).
   The act approved August 7, 1939 (Public Law 310, 76th Cong.,
1st sess.), authorized the construction of a four-lane high-level
fixed highway bridge at or near St. Georges, Del.
   The latest published map of the canal is found in Rivers and
Harbors Committee Document No. 24, Seventy-third Congress,
second session. Operation and care of the canal and appurtenant
works were included in the project July 1, 1935, under the provisions
of the Permanent Appropriations Repeal Act approved June 26, 1934.
   Local cooperation.-Fullycomplied with.
   Terminal facilities.-Ample mooring facilities at the eastern and
western ends of the canal and bulkheads at Delaware City and St.
Georges have been constructed by the United States. A harbor for
small boats has been provided and a wharf has been constructed at
Chesapeake City. The facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year.-Maintenance, contract:
In closing the contract for dredging Reedy Point entrance, work under
which was completed the previous year, additional costs were in-
curred amounting to $375.92. Maintenance, hired labor: Removal of
shoals east of Summit Bridge by United States derrick boat No. 37
280             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                 1952

was in progress during September and October 1951. There were
removed 19,050 cubic yards, place measurement, of material. The
costs were $14,998.06.
   Other hired labor costs included: Surveys and channel examina-
tions, $4,362.68. General maintenance and repairs to banks,
$31,458.86; drainage of banks, $35,826.52; maintenance and repair of
auxiliary works, $76,159.49; removing miscellaneous obstructions and
debris, $28,695.31; preparation of plans and specifications for dredg-
ing and bank stabilization east of Summit Bridge, $2,440.61; and ac-
quisition of necessary land for dredging and bank stabilization east
of Summit Bridge, $2,664.00; a total of $181,607.47.
   The unamortized portion of the cost of disposal areas was trans-
ferred to the project account during the fiscal year. Deferred charges,
undistributed, amounting to $412,582.26 were incurred.
   Operating and care, contract: Painting Reedy Point Bridge in
progress at the end of the previous fiscal year was completed Sep-
tember 20, 1951. The costs were $4,850.70.
   Hired labor: The waterway and highway bridges across it were op-
erated throughout the year. The costs were $299,333.19.
   The cost of all work was $196,981.45 for maintenance and $304,183.89
for operating and care, a total of $501,165.34. The expenditures
were $987,391.88.
   Condition at end of fiscal year.-The existing project was practi-
cally complete. The 27-foot channel was completed in 1938 and the
four-lane high-level fixed highway bridge at St. Georges in 1942. The
work remaining to be done is deepening the Delaware City branch
channel from 6 feet to 8 feet, from a point 400 feet east of Fifth Street
Bridge to its junction with the canal.
   The latest examinations show minimum depths, at mean low water,
as follows:
                                                                                                  Minimum depth

                                                                      Project                       Mid-chan-
       Date                            Section                         depth          Left out-     Mid-chan- Right out-
                                                                       (feet)            side         nel for     side
                                                                                      quarter      half Projectquarter
                                                                                        (feet)         (feet)    (feet)

May 1951......         Delaware River to Elk River.........                   27           12. 0              23. 2               5. 3
May 1949......         Elk River to Chesapeake Bay...                         27           19. 6              22.2               17. 3
Dec. 1946-----......   Delaware City Branch Channel.......                      8------------             11. 1

  180 percent project width.

   The total costs and expenditures under the existing project were
as follows :

                                                                       reliefrgency       Regular funds                 Total

Costs:
     New work--------------------------........................$-------4, 756, 247. 79     $9, 788, 338. 66       $14,544,58. 45
     Maintenance----            -------------------------------------                      12, 572, 300. 96        12, 572, 300.96
     Operating and care--....---     ----------------------------                           6, 059, 157. 13            6, 059, 157. 13
         Total-----.......------------------------------               4, 756, 247. 79     28, 419, 791. 75           33, 176, 044.54
Expenditures--- -               .
                           ---..-.-.   ---.----------.-. .      .      4, 756, 247. 79     28, 825, 013. 81           33, 581, 261.60
           RIVERS AND HARBORS--PHILADELPHIA,                                        PA., DISTRICT               281

  Deferred charges, undistributed, for the amortization of the costs
of disposal areas amount to $412,582.26.
  Proposed operations.-Itis proposed to apply the funds unexpended
on June 30, 1952, amounting to $182,972.35, together with an allotment
of $876,500.00 made in fiscal year 1953, as follows:
Accounts payable, June 30, 1952 --_------------------                                           -       $7, 365. 20
Maintenance, contract:
    Dredging Reedy Point entrance November
      1952 to January 1953 ----------------              $105, 000.00
    Bank stabilization east of Summit Bridge, July
      to November 1952_-__-_            __--____--         56,000. 00
    Dredging of shoal east of Summit Bridge caused
      by slide, October to December 1952 _..---           123, 000. 00
Maintenance, hired labor :
    Dredging with United States pipeline and hop-
      per dredge, as required----------- ----             209, 534. 65
    Condition surveys-------------------------              9, 300. 00
    Maintenance of auxiliary works-----               --   32, 000. 00
    Maintenance and drainage of banks---------- 43, 000. 00
    Removing obstructions and debris-------                10, 000. 00
    Miscellaneous inspections and reports--------           2, 300. 00

      Total maintenance___---- --              --------------                                         590,134. 65
Maintenance (operating and care), contract:
   Making emergency repairs to Summit Bridge,
     July and August 1952      ------------------     $200, 000. 00
Maintenance, hired labor :
   Operating canal and bridges --------            -   230, 000. 00
   Ordinary maintenance and repairs to bridges__        31, 972. 50

           Total maintenance (operating and care) ---------                            ------         461, 972. 50

           Total for all work__-------                      --__    -----_           -_----         1, 059, 472. 35
  The additional sum of $725,000 can be profitably expended for the
following schedule of work during fiscal year 1954:
Maintenance: Dredging with United States hopper dredges and pipe-
    line dredges in order to maintain project depths; making condition
   surveys; maintaining canal banks and auxiliary works; removing
   obstructions and debris; draining banks; and miscellaneous inspec-
   tions and reports ___-___--_____--__---                             $425, 000
Maintenance (operating and care) : Operating canal and bridges, and
         for ordinary maintenance and repairs to bridges ------ __-     300, 000
        Total --------------------------------------------------                                           725, 000

                                    Cost and financial summary

                                                 Fiscal year ending June 30                           Total to June
                                                                                                     30, 1952, includ-
                                                                                                     ing fiscal years
                                 1948          1949          1950            1951        1952          prior to 1948

New work:
   Appropriated........ -$45, 000.00-------         -$2,649.64---------------------                    $25,254,341.46
   Cost .----------------. 73, 695. 30 ------------   16, 443. 85--.------ _-       -                   25, 254, 341.46
   Expenditures_---
               ........        82, 986. 70      $517. 43    16, 443. 85 ---...                          25, 254, 341.46
Maintenance:
   Appropriated-......... 1, 348, 700. 00 2, 677, 608. 46 923, 000. 00 -$130,000.00 $1,051,129.89       26, 123, 395. 36
   Cost------ --------    1, 474, 585. 91 2. 790, 250. 29 1, 127, 153. 16 -25, 590.97 501, 165. 34      25, 535, 205. 95
   Expenditures.-......   1, 427, 566. 21 2, 451, 358. 24+1,570, 961. 06 -91, 787. 73 987,391.88        25, 940, 423. 01


Other new work data: estimated additional amount needed to be appro-
  priated for completion of existing project..----------------       $124, 000
282            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                                            8. MURDERKILL RIVER, DEL.
   Location.-This river rises in Kent County, Del., flows northeast-
erly 19 miles through the county, and empties into Delaware Bay
about 25 miles above Cape Henlopen. (See U. S. Coast and Geodetic
Survey Chart No. 1218.)
   Existing project.-This provides for a channel 7 feet deep at mean
low water, 150 feet wide in Delaware Bay to the mouth, and thence 80
feet wide to Frederica, 71/2 miles above the mouth. The total length
of the section included in the project is about 81/2 miles. The mean
tidal range at the mouth is 4.9 feet and at Frederica 2.5 feet. The
extreme tidal range is from about 1 foot below mean low water to
about 2 feet above mean high water.
   The estimate of cost for new work, revised in 1952, is $116,600.
The latest (1950) approved estimate for annual cost of maintenance
is $7,800.
   This project was adopted by the River and Harbor Act of July
13, 1892 (H. Ex. Doc. 21, 52d Cong., 1st sess., and Annual Report
for 1892, p. 981). The latest published map is in House Document
No. 1058, Sixty-second Congress, third session.
   Local cooperation.-None required.
   Terminal facilities.-There are a number of light timber wharves
on both sides of the river inside the mouth and two wharves at Fred-
erica, all of which are privately owned. The facilities are consid-
ered adequate for existing commerce.
   Operations and results during fiscal year.-None. There were no
costs or expenditures.
   Condition at end of fiscal year.-The existing project was about 63
percent complete. A channel 7 feet deep and 60 feet wide from Dela-
ware Bay to Frederica was completed in 1911. The work remaining
to be done is the widening of the channel to project width. The latest
examinations show controlling depths at mean low water, as follows:
In August 1949, in Delaware Bay to the mouth, 7.5 feet; and thence
in June 1945, to Frederica, 5 feet. The costs and expenditures under
the existing project were $37,630.07 for new work and $203,520.95 for
maintenance, a total of $241,151.02.
   Proposed operations.-No funds are available on June 30, 1952.
   An allotment of $1,700 made in fiscal year 1953 will be applied to
making a condition survey under maintenance.
   No work scheduled for fiscal year 1954.
                                                Cost and financial summary
                                                               Fiscal year ending June 30                                 Total to June
                                                                  _-_                                                    30, 1952, includ-
                                                                                                                         ing fiscal years
                                            1948             1949               1950               1951       1952         priorto 1948


New work:
   Appropriated             ----....-----          --------------------------------------------.                               $37, 630.07
   Cost--..........---.......--------.......---------------------...        ---------------------------------                   37,630.07
   Expenditures .........-------- ------                 ---------------------------------                ------------          37, 630.07
Maintenance:
   Appropriated-.........-$1,    166. 30                 $35,000.00 -$13,000.00 -$2, 290. 57 ....-----.......---               203, 520. 95
   Cost------------------     1,166. 30                    7, 545. 24 12, 164. 19 ------------------------                     203, 520. 95
   Expenditures---     -----. 1, 166.30                    3,891. 57  15, 717.86                  00 ------------
                                                                                            100.00.                            203, 520. 95


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project------      - $79, 000
            RIVERS AND           HARBORS-PHILADELPHIA,                     PA.,    DISTRICT           283

9. INLAND WATERWAY BETWEEN REHOBOTH BAY AND DELAWARE
                       BAY, DEL.
   Location.-This waterway, a tidal canal, is situated in the south-
easterly part of Sussex County, Del. It extends 12 miles northward
from Rehoboth Bay through the highland west of the town of
Rehoboth to Gordon Lake; thence through the marshes back of Cape
Henlopen to Lewes River; thence down Lewes River to its junction
with Broadkill River near its mouth. An entrance to the waterway
from Delaware Bay is located about 4 miles above Cape Henlopen.
 (See U. S. Coast and Geodetic Survey Charts Nos. 379, 1218, and
1219.)
   Previous projects.-A canal along a slightly different route formed
a part of the projected waterway from Chincoteague Bay, Va., to
Delaware Bay, begun in 1886 and abandoned in 1905.
   Existing project.-Thisprovides for an entrance channel near Lewes
10 feet deep and 200 feet wide protected by two parallel jetties 500
feet apart; thence a channel 10 feet deep and 100 feet wide to South
Street Bridge at Lewes, with a basin of the same depth 1,200 feet
long and up to 375 feet in width at the latter point; thence a channel
6 feet deep and 50 feet wide (40 feet wide through Deep Cut near
Rehoboth) to Rehoboth Bay; a channel 6 feet deep and 100 feet wide
from the entrance to Broadkill River; two parallel rubble mound
jetties 725 feet long at the Rehoboth Bay entrance, and the construc-
tion of one highway bridge and one railroad bridge at Rehoboth. The
total length of the section included in the project is about 12 miles.
   All depths refer to the plane of mean low water. The mean tidal
range in the waterway opposite the Delaware Bay entrance is 4 feet,
at Lewes 3.7 feet, and at Rehoboth 0.6 foot. The extreme tidal range
is from about 1 foot below mean low water to about 3 feet above mean
high water.
   The estimate of cost for new work, revised in 1952, is $1,186,000,
exclusive of amounts expended on previous projects, and $60,000 con-
tributed funds. The latest (1950) approved estimate for annual
cost of maintenance is $33,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                          Work authorized                                  Documents 1

July 25,1912     For a 6-foot-depth canal to connect Rehoboth Bay       H. Doc. 823, 60th Cong., 1st sess.,
                  and Delaware Bay.                                       and Rivers and Harbors Com-
                                                                          mittee Doc. 51, 61st Cong., 3d
                                                                          sess.
Aug. 30,1935     For a 6-foot-depth entrance near Lewes, for jetties,   Rivers and Harbors Committee
                  for widening the canal from Broadkill River to          Dec. 53, 74th Cong., 1st sess.
                   Lewes, and basin.
Mar.   2, 1945   For a 10-foot-depth from Delaware Bay to Lewes         H. Doe. 344, 77th Cong., 1st sess.
                  and in basin, and for extending jetties.

1Contain latest published maps.

  Local cooperation.-The work authorized by the River and Harbor
Act of March 2, 1945, is subject to the conditions that local interests
furnish free of cost to the United States all lands, easements, rights
of way and spoil-disposal areas necessary for the improvements and
 284              REPORT OF CHIEF OF ENGINEERS,                                             U.     S. ARMY,             1952

  their subsequent maintenance, when and as required, hold and save
  the United States free from claims for damages resulting from the
  improvements, and give assurances satisfactory to the Secretary of
  War that they will provide and maintain suitable terminal facilities
   at Lewes. Assurance that the conditions will be met was accepted
   and approved by the Secretary of the Army on November 8, 1950.
  All prior requirements have been met.
     Operations and results during the fiscal year.-None. There were
  no costs or expenditures.
     Condition at end of fiscal year.-The existing project was about 59
  percent complete. The jetties at the Rehoboth Bay entrance were
  completed in 1903 under a previous project; the highway bridge at
  Rehoboth Beach in 1915, which the Delaware State Highway Depart-
  ment replaced with a new structure in 1926; the railroad bridge at
  Rehoboth Beach in 1916, removed by the Pennsylvania Railroad Co.,
  in 1941; a channel 6 feet deep and 50 feet wide from Broadkill River
  to Rehoboth Bay, in 1927; the channel widened to 100 feet between
  Broadkill River and Lewes with basin at Lewes and a new entrance
  from Delaware Bay 6 feet deep and 200 feet wide, in 1937; and
  jetties at the Delaware Bay entrance extending to the 6-foot depth
  curve in the bay, in 1938. The work remaining to be done is the
  deepening of the channel from Delaware Bay to Lewes and the basin
  at Lewes from 6 feet to 10 feet and extending the existing jetties
  at the Delaware Bay entrance.
     The controlling depths, at local mean low water, in October 1950,
  were as follows: Entrance channel, 5 feet; thence to highway bridge
  at Lewes, 5 feet; and thence (August 1950) to Rehoboth Bay, 3.1 feet.
     The costs and expenditures under the existing project, excluding
  $60,000 contributed funds, expended for new work, were $435,383.07
  for new work and $80,261.44 for maintenance, a total of $515,644.51.
     Proposed operations.-Itis proposed to apply an allotment amount-
,ing to $3,100 made in fiscal year 1953 in making a condition survey
  under maintenance.
     No work is scheduled during fiscal year 1954.
                                               Cost and financial summary

                                                                Fiscal year ending June 30                                  Total to June
                                                                                                                           31,1972, includ-
                                                                                                                           ing fi cal years
                                           1948             1949             1950             1951             1952          prior t, 1948

New work:
    Appropriated ....---------------------...............................------------------------------
                                                                                 $435,383.07
      Cost------------------------                       ----          --
                                                                       ---------------------- ------------                               07
                                                                                                                                1435, 383.
    Expenditures       -----------------------------------------------------------                                               435,383.07
Maintenance:
    Appropriated------------------                  $2, 400. 00 ------------ 1,515.69--------                                     80, 2-1;44
    Cost1------702.                                    , 702............         34
                                                                          $69-----------7.                                        80,21.44
    Expenditures...--------- ----------               1,675.00             725. 00        1, 515. 69 ..........-------------.     80, 261.44

   1 In addition $60,000,00 contributed funds were expended for new work.
Other new work data: Estimated additional amount needed to be ap-
  propriated for completion of existing project----------------------- $751, 000
              RIVERS AND                HARBORS-PHILADELPHIA,                   PA.,    DISTRICT            285

                     10. HARBOR OF REFUGE, DELAWARE BAY, DEL.

   Location.-This harbor is at the lower end of Delaware Bay, a
few miles from the Atlantic Ocean on the Delaware side of the bay.
It is about 120 miles south of New York Harbor, about 114 miles
north of the entrance to Chesapeake Bay and about 101 miles from
Philadelphia, Pa. (See U. S. Coast and Geodetic Survey Charts Nos.
1218, 1219, and 379.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of May 7, 1822, and modified by the River and Harbor
Acts of July 4, 1836, January 23, 1880, and August 2, 1882.
   The total cost and expenditures of all projects, prior to the adop-
tion of the existing project which was begun in 1897, were $2,749,-
451.79, all for new work. For further details see annual reports for
1874, part II, page 146; 1932, page 330; and 1938, page 330.
   Existing project.-This provides for the construction of a break-
water about 8,000 feet long, beginning at a point about 6,000 feet
from Cape Henlopen and extending in a northerly direction for
a distance of 2,695 feet; thence in a northwesterly direction for 5,330
feet; for the construction of 5 ice piers located in prolongation of this
line and 10 more in a line perpendicular thereto extending toward
the Delaware shore; and for a channel 15 feet deep and 300 feet wide
from deep water in Delaware Bay to the pier of the Atlantic Fisheries
Co. at Lewes, Del., with a turning basin 600 feet square at the inner
end. The mean tidal range at this locality is about 4.1 feet. The
extreme tidal range due to wind and equinoctial tides is about 9
feet greater.
   The cost for new work for the completed project was $2,412,778,
exclusive of amounts expended on previous projects. The latest
 (1950) approved estimate for annual cost of maintenance is $40,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                               Work authorized                                    Documents


                   Breakwater construction                       ____
                                                   -..............            _. H. Doc. 112, 52d Cong., 1st sess.
June     3,1896    Construction of 10 ice piers --------------       --------    (Subproject, approved by War De-
                                                                                   partment Apr. 23, 1900).
                   Construction of 5 additional ice piers - ----------__         (Subproject, approved by War De-
                                                                                   partment, June 30, 1902).
July     3, 1930   Channel 18 feet deep to the Queen Anne pier at Lewes,         Rivers and Harbors Committee
                    Del. (No work has been done on this channel).                  Doc. 15, 70th Cong., 1st sess.t
Aug. 30, 1935      Channel 15 feet deep to the pier of the Atlantic Fish- Rivers and Harbors Committee
                    eries Co., about 0.7 mile east of the Queen Anne               Doc. 56, 74th Cong., 1st sess.'
                    pier.

  1Contains latest published maps.

  Local cooperation.-Fully complied with.
  Terminal facilities.-The only terminal facilities are the wharves
on the Delaware Bay shore, about a mile east of the town of Lewes,
Del. These consist of four private piers owned by fertilizer com-
panies, and the Government-owned pier at Fort Miles. The four
private piers have rail connection.
  Operations and results during fiscal year.--A refund of liquidated
damages was made on a contract, completed the previous fiscal year,
          245554-53-vol. 1---19
286          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

for dredging the 15-foot depth channel to the Fish Products Co.
 (formerly Atlantic Fisheries) pier and turning basin at the inner
end, to project dimensions. The costs were $3,082.56 for new work.
The expenditures were $41,023.45.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1951. The breakwater was completed in 1901; the ice piers
in 1903; and the 15-foot channel to the Fish Products Co. (formerly
Atlantic. Fisheries Co.) pier, and a turning basin 600 feet square at
the inner end in 1951. The controlling depth at mean low water in
the channel in May 1951 was 15 feet.
   The costs and expenditures under the existing project were $2,412,-
777.86 for new work and $120,455.55 for maintenance, a total of
$2,533,233.41.
   Proposed operations.-No work is scheduled for the fiscal years
1953 and 1954.
                                       Cost and financial swnmary

                                                  Fiscal year ending June 30                          Total to June
                                                                                                      30, 1952, includ-
                                                                                                      ing fiscal years
                                   1948          1949         1950          1951          1952         priorto 1948


New work:
                       ------------ ----------- $206, 612.77 ------------......... -$19,907.38
   Appropriated-----.....                                                                                $5,174,362.52
   Cost------------     -----------------------          7, 797.10 $163, 692.86       3, 082. 56          5, 162, 229. 65
   Expenditures- .......---                 ------------
                       ............------------          6, 032.90 127, 516. 17      41, 023. 45          5, 162, 229. 65
Maintenance:
    Appropriated-------.........-----------   -----------------------------------------------               120, 455. 55
    Cost-...------------------------- ---------------------------------- ------------.                      120, 455. 55
    Expenditures---........-------------...........- ---------------------------------------------.         120, 455. 55


Other new work data:
    Unobligated balance, June 30, 1952      -------------------- $12, 132. 87
    Revocation for fiscal year ending June 30, 1953------------   12,132. 87

                        11. INDIAN RIVER INLET AND BAY, DEL.

   Location.-IndianRiver rises in Sussex County, Del., flows easterly
13 miles into Indian River Bay which is a shallow lagoon 6 miles
long and 2 miles wide on the Delaware Coast about midway between
Cape Henlopen and the Maryland State line. The inlet is an opening
through the barrier beach separating Indian River Bay and the At-
lantic Ocean. (See U. S. Coast and Geodetic Survey Chart No. 1219.)
  Previous projects.-Adopted by River and Harbor Act of August 2,
1882. For further details see page 744, annual report for 1888.
  Existing project.-This provides for the fixation of the inlet by
the construction of two parallel jetties of steel sheet pile and stone
design extending to approximately the 14-foot depth curve in the
ocean, and for dredging an entrance channel 15 feet deep and 200
feet wide, for a distance of 7,000 feet inshore from the jetties; thence
a channel 9 feet deep, 100 feet wide in the bay and 80 feet wide in
the river, to and including a turning basin 9 feet deep, 175 feet wide
and 300 feet long at Old Landing; thence a channel 4 feet deep and
60 feet wide to the highway bridge at Millsboro. The project also
provides that the interior channel dimensions may, in the discretion
of the Chief of Engineers, be modified as may be found desirable
to increase the hydraulic efficiency of the channel, without increas-
           RIVERS AND HARBORS--PHILADELPHIA,                                 PA., DISTRICT              287

ing the cost. The total length of the section included in the project
is about 13 3/4 miles. All depths refer to the plane of mean low water.
The mean tidal range in the ocean at the inlet is 3.8 feet, and at the
highway bridge inside the inlet, 2.4 feet. The extreme tidal range
at the highway bridge is about 6 feet.
   The cost for new work for the completed project was $511,210 ex-
clusive of amounts expended on previous projects and exclusive of
$210,000 contributed funds. The latest (1950) approved estimate
for annual cost of maintenance is $36,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                          Work authorized                                    Documents

Aug. 26,1937   A 15-foot inlet channel, steel and stone jetties, 6-foot   Rivers and Harbors Committee
                                                                                                 1
                 channel from end of inlet channel to deep water in         Doc. 41, 75th Cong., 1st sess.
                 the bay and authority to modify interior inlet
                 channel.
Mar. 2,1945    A 9-foot channel from inlet to Old Landing, including      H. Doc. 330, 76th Cong., 1st sess.'
                 basin, and 4-foot Channel to highway bridge at
                 Millsboro.

  1Contains latest published maps.

   Local cooperation.-Fullycomplied with except that local interests
are required to furnish suitable areas for disposal of dredged material
during maintenance as and when needed.
   Terminal facilities.-There is a privately owned basin with berth-
ing facilities for small boats located about three-fourths mile west
of the highway bridge near the inlet and one-quarter mile north of the
inlet channel connected therewith by a channel 6 feet deep and 40 feet
wide; a United States Coast Guard wharf on the north side of the inlet
channel in the same locality; and two wharves at Oak Orchard in
Indian River Bay. The facilities are considered adequate for exist-
ing commerce.
   Operations and results during fiscal year.-New work: Work on a
contract for dredging the channel from Indian River Inlet to the
highway bridge at Millsboro, including a turning basin at Old Land-
ing, to project dimensions, in progress at the end of the previous fiscal
year was completed July 30, 1951. There were removed 40,044 cubic
yards of material. The costs were $11,288.23 for new work. Mainte-
nance: Removal of shoals by dredging in the channel west of the
highway bridge near the inlet was accomplished coincidentally with
the new work dredging. There were removed 17,750 cubic yards of
material. The cost was $4,863.25 for maintenance.
   The cost for all work was $11,288.23 for new work and $4,863.25
for maintenance, a total of $164151.48. The expenditures were
$54,993.57.
   Condition at end of fiscal year.-The existing project was completed
in 1951. A channel 15 feet deep and 200 feet wide from the ocean to a
point 7,000 feet inshore from the ocean shoreline was completed in
1938. The construction of two parallel jetties spaced 500 feet apart,
each 1,566 feet long with inshore end sections of steel-sheet pile con-
struction reinforced with stone, the north jetty 904 feet long and the
south jetty 890 feet long, and the outshore end sections of all stone
288         REPORT OF CHIEF OF ENGINEERS,                                       U. S. ARMY,             1952

construction was completed in 1939. The channel 9 feet deep, 100 feet
wide in the bay and 80 feet wide in the river, to and including a turn-
ing basin 9 feet deep, 175 feet wide and 300 feet long at Old Landing,
thence a channel 4 feet deep and 60 feet wide to the highway bridge at
Millsboro was completed in 1951.
  The controlling depths at mean low water were as follows: In
March 1950 through the inlet to the entrance to the small boat harbor
10.6 feet; thence in June 1951 to Old Landing 9.9 feet; and thence in
February 1951 to Millsboro 6.1 feet.
  The costs and expenditures under the existing project, excluding
$210,000 contributed funds expended for new work, were $511,209.81
for new work and $261,044.06 for maintenance, a total of $772,253.87.
  Proposedoperations.-Nowork is scheduled for the fiscal years 1953
and 1954.
                                        Cost and financial summary

                                                     Fiscal year ending June 30                              Total to June
                                                                                                            30, 1952, includ-
                                                                                                            ing fiscal years
                                    1948            1949          1950            1951          1952          prior to 1948


New work:
   Appropriated-------.........--........       ----------      $320,000.00 -$75,200.00    -$3, 709. 38          $521, 209.81
   Cost_ __---- ---       ...----- ---------- --------- 24, 116. 83 1205, 685. 56            11, 288. 23        2 521, 209. 81
   Expenditures ----..       ---.... --........... ............   23, 658. 55 178, 115. 34   39, 316. 73          521, 209. 81
Maintenance:
   Appropriated--------- --........----.......---.....
                                                 $3, 500. 00    20, 000. 00 ............       4, 863. 25         261, 044. 06
   Cost-.................. $4, 922. 20             7, 154. 74       671.94     20, 000. 00     4, 863. 25         261,044. 06
   Expenditures-.........   5, 352. 74             8, 453. 55      904. 91       9, 186. 41   15, 676. 84         261, 044. 06

1 In addition $50,00 contributed funds were expended for new work.
2 In addition $210,000 contributed funds were expended for new work.

                                    12. COHANSEY                RIVER, N. J.

   Location.-This river rises in Salem County, N. J., flows southerly
and southwesterly 27 miles through Cumberland County, and empties
into Delaware Bay about 62 miles below Philadelphia, Pa. (See U. S.
Coast and Geodetic Survey Chart No. 1218.)
   Previous projects.-Adopted by River and Harbor Act of March 3,
1873, and modified in 1879. For further details, see page 1785,
annual report for 1915, and page 348, annual report for 1938.
   Existing project.-This provides for a channel 12 feet deep, 100
feet wide from that depth in Delaware Bay through a neck of land
at the mouth and within the river to the south side of Glass Street
in Bridgeton, 19 miles above the mouth; thence a channel 8 feet deep,
100 feet wide to Broad Street; and thence 75 feet wide to Commerce
Street Bridge, 191/4 miles above the mouth; and for a turning basin
12 feet deep and 800 feet long formed by widening the channel on
the south side to a maximum width of 250 feet just below Glass Street.
The total length of the section included in the project is about 191/2
miles. All depths refer to the plane of mean low water. The mean
tidal range at the mouth is 5.9 feet, and at Bridgeton 6.2 feet. The
extreme tidal range is from about 2 feet below mean low water to
about 3 feet above mean high water.
   The cost for new work for the completed project was $110,756, ex-
elusive of amounts expended on previous projects. The latest (1949)
approved estimate for annual maintenance is $9,000.
                   RIVERS AND                       HARBORS--PHILADELPHIA,                                                   PA.,          DISTRICT               289

   The existing project was authorized by the following river and
harbor acts:

        Acts                                           Work authorized                                                                      Documents

Mar. 2,1907             A channel of 7-foot depth over entire project--------......                                    H. Doc. 645, 59th Cong., 1st sess.'
Aug. 26,1937            A channel of 12-foot depth to Glass St., thence 8-foot                                         Senate Committee print, 75th
                          depth to Commerce St., with turning basin.                                                      Cong., 1st sess.'

    1Contains latest published maps.

  Local cooperation.-Fullycomplied with except that local interests
are required to furnish suitable spoil-disposal areas for subsequent
maintenance as required.
   Terminal facilities.-There are 18 wharves on this river, of which
15 are at Bridgeton and 3 at Greenwich Piers. Three wharves at
Bridgeton have direct rail connections. A marine railway is located
at the latter place. The facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year.-None. There were no
costs or expenditures.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1939. The controlling depths, at mean low water, were as
follows: In June 1945, from deep water in Delaware Bay to the mouth,
11.1 feet; thence in September 1948, to Glass Street, 12.6 feet; thence
in May 1947, to Broad Street, 4.5 feet; and thence in June 1945, to
Commerce Street Bridge, 2.6 feet.
  The costs and expenditures under the existing project were $110,-
755.75 for new work and $190,804.59 for maintenance, a total of
$301,560.34.
  Proposed operations.-No funds were available on June 30, 1952.
  An allotment of $3,900 made in fiscal year 1953 will be applied to
making a condition survey under maintenance.
  No work is scheduled during fiscal year 1954.
                                                       Cost and flnancial summary

                                                                         Fiscal year ending June 30                                                    Total to June
                                                                                                                                                       30,1952, includ-
                                                                                                                                                       ing fiscal years
                                                  1948                1949                   1950                  1951                   1952          prior to 1948


New work:
      Appropriated-.........---------...........------ --.........------------------------...........-----.....----........-----.....----.......           $146, 755. 75
      Cost..    .........------------- ------------ ------------------------------------------------                                                        146,755.75
   Expenditures------..........-----.............--......-------------------...-------................-------....-----------............                    146,755.75
Maintenance:
      Appropriated-.........                 $78,000. 00           $8, 027. 93 ............---------------------------............------............         190, 804. 59
      Cost.. -.....------------.....           8, 386. 79          77, 641. 14 ....................................                                          190, 804. 59
      Expenditures-------....                   5, 528. 06                               ----------------------------------
                                                                   80, 499. 87 ....................................                                          190, 804. 59


                                                 13. COLD SPRING INLET, N. J.

  Location.-This inlet is located in Cape May County, southern
New Jersey, about 3 miles east of Cape May City and about 16 miles
northeast of Delaware Breakwater. The inlet connects Cold Spring
Harbor and New Jersey Intracoastal Waterway with the Atlantic
290        REPORT OF CHIEF OF ENGINEERS, U.                              S. ARMY,         1952

Ocean and is about 1 mile in length. (See U. S. Coast and Geodetic
Survey Charts Nos. 234, 827, and 1219.)
  Existing project.-This provides for an entrance channel 25 feet
deep and 400 feet wide, protected by two parallel jetties, and extend-
ing from the 25-foot depth curve in the Atlantic Ocean to a line 500
feet harborward of a line joining the inner ends of the jetties; thence
20 feet deep and 300 feet wide to deep water in Cape May Harbor.
The total length of the section included in the project is about 21/4
miles. The mean tidal range at the inner ends of the jetties is 4.3
feet. The extreme tidal range, due to ocean storms, is about 11 feet.
  The cost for new work for the completed project was $879,275,
exclusive of $100,000 contributed by local interests and $50,000 Navy
Department funds. The latest (1950) approved estimate for annual
cost of maintenance is $48,000.
  The existing project was authorized by the following river and
harbor acts:

    Acts                         Work authorized                                     Documents

Mar. 2,1907   An inlet channel 25 feet deep and jetties- _..-------...   H. Doc. 388, 59th Cong., 2d sess.
Mar. 2,1945   A 20-foot channel to deep water in harbor-----.... -...    H. Doec. 262, 77th Cong., 1st sess.

1This document and annual report for 1911, p. 1382, contain the latest published maps.

   Local cooperation.-All cooperation required under the act of 1907
has been completed, except the work of deepening and enlarging
the inner harbor, which is 80 percent complete.
   Terminal facilities.-Wharves with docking facilities for com-
mercial fishing vessels and fishing-party boats are located on the
inner end of the harbor at Cape May. There is also a well-equipped
marine railway adjoining the fish dock, a number of small wharves
for private craft and party boats, and a yacht basin with accommoda-
tions for about 50 boats. North of the inlet entrance channel at
Wildwood Crest is another large well-equipped wharf for commercial
fishing boats. Both fish docks have direct railroad connections. The
facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-None. There were no
costs or expenditures.
   Condition at end of fiscal year.-The project was completed in 1942.
The jetties were completed in 1911, the 25-foot channel between the
jetties in 1917. The 20-foot channel in the harbor was completed in
1942 with Navy Department funds. The jetties are spaced 850 feet
apart. The east jetty is 4,548 feet long and the west jetty 4,410 feet
long, with inshore end wings 750 feet and 297 feet long, respectively.
The wings of both jetties and the 2,000-foot inshore end section of
the west jetty are of stone-filled pile and timber construction, and
the entire east jetty and the outshore end section of the west jetty are
of rubble mound construction. The controlling depth, at mean low
water, in July 1950, from the Atlantic Ocean to the inner ends of the
jetties was 20.4 feet; and thence in September 1949 to the inner end
of the project in Cape May Harbor,.16.7 feet.
             RIVERS AND                 HARBORS-PHILADELPHIA,                                    PA.,     DISTRICT                 291
   The costs and expenditures under the existing project, excluding
$100,000 contributed by local interests and $50,000 Navy Department
funds expended for new work, were $879,274.62 for new work and
$719,056.16 for maintenance, a total of $1,598,330.78.
  Proposedoperations.-Itis proposed to apply an allotment amount-
ing to $65,000 made in fiscal year 1953, on maintenance dredging
throughout the project with a United States hopper dredge during
April 1953.
  No work is scheduled for the fiscal year 1954.
                                           Cost and financial summary

                                                          Fiscal year ending June 30                                   Total to June
                                                                                                                      30, 1952, includ-
                                                                                                                      ing fiscal years
                                       1948             1949             1950            1951             1952          prior to 1948


New work:
   Appropriated-.-------------------- -----             ---------        --------------------------                           $879,274.62
   Cost-.------------        ---------------------.-                 .-----------------------------------1 879, 274. 62
                                                                                                        .........------------
   Expenditures--.......................---------.......... ..-----------..........----------...........------------.          879, 274. 62
Maintenance:
   Appropriated--------........     $6, 500.00    -$5, 000.00       $55, 000.00      ----..---.......- -$1, 492. 98          719, 056. 16
   Cost_----------------             2, 415. 90      2, 708. 10      52, 739. 75         $796. 91 ............               719, 056. 16
   Expenditures--------.........     3, 402. 69      2, 966. 81      52, 739. 75           796. 91 ............              719, 056. 16


  1In addition $100,000 contributed by local interests and $50,000 Navy Department funds expended for
new work.

                                          14. ABSECON INLET, N. J.

   Location.--This inlet is located on the coast of New Jersey about
65 miles north of Delaware Breakwater, between Brigantine Beach
on the north and Absecon Beach on the south. It forms the entrance
to the harbor at Atlantic City, N. J. (See U. S. Coast and Geodetic
Survey Charts Nos. 826 and 1217.)
   Previous project.-Adopted by River and Harbor Act of July 25,
1912. The project was completed in 1916. For further details see
annual report for 1936, page 319.
   Existing project.-This provides for an inlet entrance channel 20
feet deep at mean low water and 400 feet wide, for an entrance channel
15 feet deep and 200 feet wide from the inlet channel into Clam Creek,
and for a turning basin 15 feet deep within Clam Creek. The act
authorizing the inlet entrance channel also provides that should the
channel at any time have a deleterious effect on the Atlantic City
Beach, work upon the improvement may cease, it being understood
that the project is adopted on the basis that the interests of the beach
in front of the city are superior to those of the inlet. The total length
of the section included in the project is about 11/2 miles. The mean
tidal range in the ocean is 4 feet and at the inlet gorge 3.6 feet. The
extreme tidal range, due to ocean storms, is about 11 feet.
   The estimate of cost for new work, revised in 1952, is $250,000.
The latest (1949) estimate for annual cost of maintenance is $200,000.
292         REPORT OF CHIEF OF ENGINEERS,                       U.   S. ARMY, 1952

  The existing project was authorized by the following river and
harbor acts:
    Acts                            Work authorized                            Documents

Sept. 22,1922   An inlet entrance channel 20 feet deep....._ _  . __ H. Doc. 375, 67th Cong., 2d sess.
July 24,1946    A channel 15 feet deep into Clam Creek and a turn- H. Doc. 504, 79th Cong., 2d sess.
                 ing basin.                                           (Contains the latest published
                                                                      map.)


   Local cooperation.-Fullycomplied with except that local interests
are required to furnish suitable spoil-disposal areas for the new work
and subsequent maintenance when and as required for the dredging
of the entrance channel into Clam Creek and the turning basin within
Clam Creek.
   Terminalfacilities.-Thereare nine wharves served by this improve-
ment; one is Government-owned, six are privately owned and open
to the general public use upon payment of moderate wharfage, and
two are publicly owned. Three of the wharves have direct railroad
connection. There is also a continuous line of piers or landing places
for pleasure craft on both sides of the large basins which indent the
south shore of the inner channel. There are three shipyards and
three marine railways at this locality. The facilities are considered
adequate for the existing commerce.
   Operations and results during fiscal year.--Maintenance dredging
in the entrance channel by United States hopper dredge Lyman was
commenced August 23, and completed September 29, 1951. There
were removed 221,725 cubic yards, place measurement, of material at
a cost of $80,829.33.
   Surveys and channel examinations were made at a cost of $4,666.82
for maintenance. The cost of all work was $85,496.15 for mainte-
nance. The expenditures were $83,304.34.
   Condition at end of fiscal year.--The project was about 92 percent
complete. The inlet entrance channel was completed in 1938. The
work remaining to be done is the dredging of an entrance channel
from the inlet channel into Clam Creek and a turning basin in Clam
Creek. The controlling depth at mean low water, in June, 1952, in
the channel through the outer bar was 5.1 feet.
   The costs under the existing project were $208,647.66 for new work
and $1,748,730.95 for maintenance, a total of $1,957,378.61. The ex-
penditures were $1,955,186.80.
   Proposedoperations.-Itis proposed to apply the funds unexpended
on June 30, 1952, amounting to $2,325.49 together with an allotment
of $100,000 made in fiscal year 1953, as follows :
Accounts payable June 30, 1952__----------------------------                             $2, 191.81

Maintenance:
    Dredging in the inlet channel with a United States hopper
          dredge, October and November 1952----------------                              97, 903. 68
    Condition surveys--------------------------------------                               2, 230. 00

        Total maintenance-----
                          ....-----------------------------                             100, 133. 68
        Total for all work---------------------------------                             102,325. 49
   No work is scheduled for fiscal year 1954.
             RIVERS AND HARBORS--PHILADELPHIA,                                                     PA.,       DISTRICT                 293
                                                Cost and financial summary

                                                           Fiscal year ending June 30                                      Total to June
                                                                                                                          30,1952, includ-
                                                                                                                          ing fiscal years
                                         1948            1949             1950              1951             1952           prior to 1948


New work:
    Appropriated                      .
                                    ------------       ------------         ..----------------------------------............     $435,144. 55
    Cost--._-----------      -    ----------       ----------------------------------                                .------------ 435, 144. 55
    Expenditures----
                 .........       ......------      --------         ------------------------ ------------....                      435, 144.55
Maintenance:
     Appropriated-........ $130, 000. 00 $193, 500. 00 $159, 000. 00                   $62, 000. 00      $18, 000. 00         1, 984, 650. 24
     Cost---------------.......
                          .... 159, 484. 31 184, 139. 96 150, 813. 32                    6, 696. 75       85, 496. 15         1, 984, 516. 56
                   ........
     Expenditures------         23,920. 21 319, 468. 41  147, 295. 23                   10, 750. 09       83, 304. 34         1, 982, 324. 75



Other new work data: Estimated additional amount needed to be ap-
  propriated for completion of existing project------------------- $41, 000

                                       15. TUCKERTON CREEK, N. J.

   Location.-This creek rises in Ocean County, N. J., flows southerly
7 miles, and empties into Little Egg Harbor about 8 miles north of
Little Egg Inlet. (See U. S. Coast and Geodetic Survey Charts
Nos. 825 and 1216.)
   Emisting project.-This provides for a channel 6 feet deep, 80 feet
wide from the head of Marchelder Channel in Little Tuckerton Bay
to the mouth, thence 75 feet wide to Parkers Landing, 1 mile above
the mouth, thence 60 feet wide to West Tuckerton Landing, 13/4
miles above the mouth, thence a channel 5 feet deep and 60 feet wide
to just above Scow Landing, 2 miles above the mouth; and thence a
channel 3 feet deep and 40 feet wide to the mill dam at Tuckerton,
21/4 miles above the mouth. The total length of the section included
in the project is about 31/2 miles. All depths refer to the plane of
mean low water. The mean tidal range is 2.5 feet. The -extreme
tidal range is from about 1 foot below mean low water to about 1
foot above mean high water.
   The cost for new work for the completed project was $60,242. The
latest (1949) approved estimate for annual cost of maintenance is
$6,700.
   The existing project was adopted by the following river and harbor
acts:

     Acts                                  Work authorized                                                   Documents

June 13,1902     For depths of 6, 5, and 3 feet__--------------------                         H. Doc. 274, 56th Cong., 1st sess.
Mar. 3,1905      Substitution of channels across Little Tuckerton Bay_                        Specified in act.
                                                                                                (H. Doec. 1040, 64th Cong., 1st
                                                                                                sess., contains latest published
                                                                                                map.)


   Terminal faeilities.-There are a number of wharves and piers of
pile-and-timber construction along the creek. There are also four
boat yards with marine railways and repair and storage facilities
located at Tuckerton. One wharf at Tuckerton is publicly owned.
The facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-None. There were no
costs or expenditures.
294              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   Condition at end of fiscal year.--The existing project was com-
pleted in 1925. The controlling depths at mean low water, in April
1950, were as follows: In the entrance channel and within the Creek
to the Tuckerton Yacht Club 3.5 feet; thence to Parkers Landing,
3.6 feet; thence to Scow Landing 3.5 feet; and thence to the mill dam
at Tuckerton, 1.9 feet.
   The costs and expenditures under the existing project were $60,-
242.16 for new work and $172,863.16 for maintenance, a total of
$233,105.32.
   Proposed operations.--No funds are available on June 30, 1952.
   An allotment of $3,500 made in fiscal year 1953 will be applied to
making a condition survey under maintenance.
   No work is scheduled for fiscal year 1954.
                                                     Cost and financial summary

                                                                       Fiscal year ending June 30                                              Total to June
                                                                                                                                             30, 1952, includ-
                                                                                                                                             ing fiscal years
                                                 1948                1949                1950                1951                 1952         prior to 1948


New work:
                         ........---------............---............----------------------............----............-------............
     Appropriated---------------------                                                                                                             $60,242.16
     Cost-------------...--------------------------............-------------............---............--............--------.......                60,242.16
   Expenditures-------.........                            ----............---------
                                          ------------ ........................---....--------.....--------------...........                        60, 242.16
Maintenance:
                       --
     Appropriated.........     $8, 627. 26                          $273. 23          $3, 500.00          -$156. 77 ------------............       172, 863.16
     Cost ---------------    ------------                            273.23            3,071. 87      ------------------------                     172, 863.16
     Expenditures-...------..--     --   .                           273.23            2,727.72                615.51     ------------             172, 863.16



                                                 16. MANASQUAN RIVER, N. J.

   Location.-This is a small stream located in the eastern part of
New Jersey, rising near Freehold and flowing easterly to the At-
lantic Ocean, which it enters, about 26 miles south of Sandy Hook.
 (See U. S. Coast and Geodetic Survey Chart No. 795.)
   Previous projects.-Adopted by River and Harbor Act of March 3,
1879. For further details see annual report for 1909, page 186, and
annual report for 1938, page 269.
   Existing project.-This provides for a channel 14 feet deep and
250 feet wide, protected by jetties and other works, extending -from
the Atlantic Ocean to the inner end of the north jetty, thence 12
feet deep and 300 feet wide to within 700 feet of the New York &
Long Branch Railroad bridge, thence of same depth and narrowing
to a width of 100 feet to within 300 feet of the bridge; for a widening
on the northerly side of the channel of 200 feet for a distance of 3,150
feet to a depth of 8 feet; for an anchorage of 19 acres in area to a depth
of 10 feet on the south side of the channel and for an anchorage of
27.5 acres in area to a depth of 12 feet about 0.5 mile west of route
35 highway bridge. Length of section included in project is about
1.5 miles. Mean tidal range is 3.7 feet at the inner end of the inlet and
4 feet at ocean end; mean range of spring tides, 4.4 and 4.8 feet
respectively; irregular fluctuations due to wind and barometric pres-
sure vary from 2.7 feet below to 7.5 feet above mean low water at
the inner end of the inlet.
    The estimate of cost for new work, revised in 1952, is $893,000,
              RIVERS      AND HARBORS--PHILADELPHIA,                        PA.,    DISTRICT          295

exclusive of amount expended on previous projects and $300,000
contributed by local interests. The estimate for annual cost of main-
tenance, revised in 1950, is $32,500.
  The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                   Documents

July     3,1930   Channel 8 feet deep and provision of works designed    H. Doe. 482, 70th Cong., 2d sess.
                   to secure the channel.
Aug. 30, 1935     Widening of channel on northerly side_..-..----..      Senate committee document, 74th
                                                                           Cong., 1st sess.
Mar. 2,1945       Deepening channel to 12 and 14 feet; 10- and 12-foot   H. Doec. 356, 77th Cong., 1st sess.
                   anchorages.                                            (Contains latest published map.)


   Local cooperation.-The River and Harbor Act of March 2, 1945,
provides that local interests furnish, free of cost to the United States,
suitable areas properly diked for disposal of dredged material, for
new work and maintenance, when and as needed; convey to the United
States, free of cost, a perpetual easement to excavate all lands above
ordinary high water required for the improvement; and release the
United States from all claims for damage resulting from the im-
provement. Assurances of local cooperation furnished by local in-
terests in connection with the deepening of the channel only, were
approved by the Chief of Engineers on February 15, 1951.
   The requirements under prior acts have been fully complied with.
   Terminal facilities.-Five landings with a total wharfage of 700
feet, used by commercial fishermen, and seven landings and boat
basins for pleasure craft are located along the river and its branches.
The pleasure boat landings and basins are equipped with marine rail-
ways, boat building and repair facilities, and boat storage facilities.
Two yacht clubs with a mooring capacity of 45 boats and numerous
pleasure boat landings are also located along the waterway. The
existing facilities are considered adequate for present requirements.
   Operations and results during fiscal year.-Maintenance repairs,
by contract, were made to the bulkhead along the north side of the
inlet in November 1951. The costs and expenditures were $650.08.
   Condition at end of fiscal year.-The existing project was about 82
percent complete. Rubble-mound jetties, 1,230 feet long north of the
entrance and 1,030 feet long south of the entrance, were completed in
1931. Two steel bulkheads, each 950 feet long, at the inshore ends
of the jetties were completed in 1937. A steel bulkhead 698 feet long
and two steel groins of an aggregate length of 570 feet, constructed on
the northerly beach, were completed in 1938. A channel 10 feet deep
and 250 feet wide from the 10 foot depth curve in the ocean to a point
near the inshore ends of the jetties, and thence 8 feet deep and 300
feet wide to a point 700 feet below the New York, Long Branch rail-
road bridge was completed in 1933, and the widening on the northerly
side of the channel was completed in 1938. The work remaining to be
done is the deepening of the channel between the jetties from 10 feet
to 14 feet, thence the channel to a point 700 feet below the railroad
bridge from 8 feet to 12 feet and extending the 12 foot channel to
within 300 feet of the railroad bridge, also the dredging of the 19 acre
296             REPORT OF CHIEF OF 'NGINEERS,                                             U.       . ARMY, 1952

anchorage south of the channel and the 27.5 acre anchorage west of
the highway bridge.
  The controlling depth at mean low water, in June 1950, from the
ocean to the railroad bridge was 7 feet.
  The costs and expenditures under the existing project, excluding
$300,000 contributed funds expended for new work, were $335,342.16
for new work and $570,917.26 for maintenance, a total of $906,259.42.
  Proposed operations.--An allotment of $1,700 made in fiscal year
1953 will be applied to making a condition survey under maintenance.
  The additional sum of $175,000 can be profitably expended for the
following schedule of work during the fiscal year 1954:
Maintenance, contract:
   Repairs to bulkhead-------------------                                                        -------------                  $75, 000
   Repairs to jetties ------------------                                                       --------------                   100, 000

           Total     ----------------------------------------------- 175,000
                                             Cost and financial summary

                                                            Fiscal year ending June 30                                    Total to June
                                                                                                                         30, 1952, includ-
                                                                                                                          ing fiscal years
                                          1948             1949            1950             1951             1952          priorto 1948

New work:
   Appropriated--........------------                                          -------............---
                                                                                 ........-----------............
                                           ------------............-----------.........                                         $374, 342. 16
   Cost............-------..----------- ----------------------------------- ----------........................1374, 342.16
                                                                    ----------- ------............------........-------............374, 342. 16
   Expenditures------......... ------------ ---............-------........
Maintenance:
     Aporopriated ....................        _       $77, 500. 00     $41, 000. 00 -$6, 347. 26             $650. 08            572, 971. 37
     Cost ....---------------          $1,472. 41       4, 490. 02     110, 346. 05 -2, 683. 33               650. 08            572, 971.37
     Expenditures_-....----...          1, 422. 27      4, 195. 88     104, 930. 73     3, 026. 13            650. 08            572, 971. 37


Other new work data : Estimated additional amount needed to be appro-
  priated for completion of existing project                           $558, 000
                                                                __----_------------
  1In   addition $300,000.00 contributed funds were expended for new work.

                        17.     NEW JERSEY INTRACOASTAL WATERWAY

  Location.-This waterway, a sea-level inland water route approxi-
mately parallel with the New Jersey coast, extends from the Atlantic
Ocean at Manasquan Inlet, about 26 miles south of Sandy Hook, N. J.,
to Delaware Bay about 3 miles above Cape May Point. The water-
way extends through the inlet and up Manasquan River a distance of
about 2 miles; thence by the Manasquan-Bayhead Canal through high
ground for a distance of 2 miles to the head of Barnegat Bay. It
then passes through a series of bays, lagoons, and thoroughfares along
the New Jersey coast of Cape May Harbor; thence across Cape May
County to Delaware Bay through a land cut by way of the New Eng-
land Creek basin. (See U. S. Coast and Geodetic Survey Charts Nos.
234, 795, 825, 826, 827, 1216, 1217, 1218, and 1219.)
  Existing project.-This provides for a channel 12 feet deep at mean
low water and generally 100 feet wide, extending from the Atlantic
Ocean at Manasquan Inlet, N. J., to Delaware Bay above Cape May,
N. J., by the further improvement of Manasquan River and Inlet,
N. J., and the present New Jersey Intracoastal Waterway, and by the
construction of a canal of similar dimensions from Cape May Harbor
to Delaware Bay via the New England Creek basin, with adequate
        RIVERS AND HARBORS--PHILADELPHIA,          PA., DISTRICT     297
jetties at the Delaware Bay entrance. The total length of the project
is about 117 miles. Normal tidal range in sections of the waterway
remote from inlets is 0.5 feet. Near the inlets the mean tidal range
generally is 3 feet; in the ocean, 4 feet; at the head of Cape May
Harbor, 4.6 feet; and in Delaware Bay, near the entrance, 4.7 feet.
    The estimate of cost for new work, revised in 1952, is $6,234,000
exclusive of $1,824,940 Navy Department funds, and $99,000 con-
tributed by local interests. The latest (1950) approved estimate for
annual cost of maintenance is $400,000.
    The existing project was adopted by the River and Harbor Act
approved March 2, 1945 (H. Doc. 133, 76th Cong., 1st sess.). The
latest published map is in the project document.
    The River and Harbor Act approved July 24, 1946 (Public, 525,
79th Cong., 2d sess.), as extended by Public Law No. 240,-82d Con-
gress, dated October 30, 1951, authorized the use, for a period not to
exceed 6 years, of funds from appropriations heretofore or hereafter
made for maintenance and improvement of rivers and harbors, for
the maintenance of the canal from Cape May Harbor to Delaware
Bay constructed as an emergency wartime project with Navy De-
partment funds, including the cost of maintaining the temporary
railroad and seashore highway bridges over the canal.
    Local cooperation.-The project is subject to the conditions that
the State of New Jersey cede to the United States all right, title,
and interest that it has acquired to lands, easements, rights-of-way,
and structures other than bridges for the Manasquan-Bayhead Canal;
that the State of New Jersey furnish, free of cost to the United States,
all lands, easements, rights-of-way, and disposal areas required for
construction of the Cape May Canal and for improvement of the
proposed waterway and for their subsequent maintenance; that local
interests provide, maintain, and operate suitable bridges over the
waterway; that the State of New Jersey donate to the United States
the navigation aids in use on the present New Jersey Intracoastal
Waterway, and that the State of New Jersey hold and save the United
States and its agents free from any claims for damages resulting from
the work of improvement. The only measures taken by local interests
to comply with the specified requirements are that the State of New
Jersey has contributed $99,000 toward the acquisition of land for the
rights-of-way and disposal areas for the Cape May Canal, assumed the
maintenance and operation of one temporary highway bridge con-
structed by the Federal Government across the canal, and taken the
necessary legislative action to permit the Department of Conserva-
tion and Economic Development to meet the specified requirements.
   Assurances have been accepted by Chief of Engineers on January
18, 1952. It is expected that the conditions of local cooperation
imposed on the project will be fully met during the fiscal year 1953.
   Terminal facilities.-There are numerous piers, wharves, and docks
at resorts located at or adjacent to the waterway, most of which are
open to general public use, and fuel, water, and other supplies are
readily available. Public and privately owned boat basins are located
in a number of streams entering the bays and thoroughfares through
which the waterway passes. Boat repair and storage yards with
marine railways for small craft are also scattered along the waterway.
298      REPORT OF CHIEF OF ENGINEERS,                    U. S. ARMY,   1952

Transfer facilities, including facilities, for icing, storing, and ship-
ping food fish, are available at most of the larger communities along
the waterway, including Atlantic City, Wildwood, and Cape May.
The plants at the two latter places have direct railroad connections.
The facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-Maintenance: A rail-
road bridge and a highway bridge across the Cape May Canal were
operated and maintained from July 1 to July 23, 1951. The cost
was $8,199.91 for maintenance.
   Operating and care: A railroad bridge and a highway bridge were
operated and maintained from November 16, 1951 to June 30, 1952.
The cost was $26,178.92 for operating and care.
   The cost of all work was $8,199.91 for maintenance and $26,178.92
for operating and care, a total of $34,378.83. The expenditures were
$33,245.51.
   During the period from July 24 to November 15, 1951, inclusive,
the railroad bridge and highway bridge were operated and maintained
by the State of New Jersey.
   Condition at end of fiscal year.-The existing project was about 25
percent complete. A canal 12 feet deep and 100 feet wide from Cape
May Harbor to Delaware Bay was completed in 1942; two parallel
stone jetties at the Delaware Bay entrance and one temporary high-
way drawbridge in 1943; and one temporary highway drawbridge
and one railroad bridge in 1944, all with Navy Department funds.
The work remaining to be done is the dredging of a channel 12 feet
deep and 100 feet wide from the Atlantic Ocean at Manasquan
Inlet to Cape May Harbor. The latest examination (September
1949) showed that the controlling depth at mean low water in the
canal connecting Cape May Harbor with Delaware Bay was 8.3 feet.
   The costs under the existing project, excluding $1,824,940 expended
for new work and $286,954.70 for maintenance from Navy Department
funds and $99,000 contributed funds expended for new work were
$53,694.60 for new work, $265,800 for maintenance, and $26,178.92
for operating and care, a total of $345,673.52. The expenditures
were $344,378.60.
  Proposed operations.--It is proposed to apply the funds unex-
pended on June 30, 1952, amounting to $2,616.00 and accounts receiv-
able, amounting to $69.38, a total of $2,685.83, together with an
allotment of $5,100 made in fiscal year 1953, as follows:
Accounts payable, June 30, 1952--.--.------------------          --------    $1, 364. 30

Maintenance, hired labor: Condition surveys ------------------       2,100. 00
Maintenance (operating and care) : Maintaining and operating bridges
                                                  .....
crossing the canal July 1 to July 23, 1952_---------        ----
                                                             -       4, 321.08

       Total maintenance_------------------------._--                    _    6, 421.08

       Total for all work--...-----------------------------------             7, 785. 38
              RIVERS AND HARBORS--PHILADELPHIA,                                                       PA.,       DISTRICT                  299

    The additional sum of $197,800 can be profitably expended for the
following schedule of work during fiscal year 1954:
Maintenance, contract:
   Dredging the existing 6-foot channel of the waterway as
      required------------------------------------------------- $150, 000. 00
   Dredging 12-foot channel of Cape May Canal----------------     36, 800. 00
Maintenance, hired labor :
   Condition surveys---------------------------------              1, 000. 00
   Maintenance of banks, drainage ditches, and tide-gates-----    10, 000. 00

           Total -__--------------------------------------------------                                                           197,800. 00

                                          Cost and financial summary

                                                             Fiscal year ending June 30                                          Total to June
                                                                                                                             30,1952, includ-
                                                                                                                             ing fiscal years
                                      1948          -      1949             1950              1951              1952           priorto 1948

New work:
   Appropriated-........ -$1, 305.             40 ...------------..--...........                                                      $53, 694. 60
   Cost .-----       --------------               ----------- ------------ -----------------------                                     53, 694. 60
   Expenditures---------.........     -32.     35 .....-----..................------------------------............------------         53, 694. 60
Maintenance:
   Appropriated---  ........- 48, 000.         00       $83, 000. 00   $57, 000. 00      $31, 000. 00       $32, 800. 00              293, 300. 00
   Cost _--_------------- 43, 581.             76        89, 609. 31    44, 271. 87       40, 012. 83        34, 378. 83            2 291, 978. 92
   Expenditures---.........         40, 488.   01        92, 656. 86    44, 560. 82       41, 382. 14        33, 245. 51              290, 684. 00


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project--_------------ -- $6, 180, 000
1 In addition $1,824,940 Navy Department funds and $99,000 contributed funds were expended for new
work.
2 In addition $286,954.70 Navy Department funds were expended for maintenance.

   18. EXAMINATIONS,                     SURVEYS, AND CONTINGENCIES                                                    (GENERAL)

   The cost of the work during the year was $37,151.63 for examina-
tions and surveys, and $44,609.62 for contingencies, a total of $81,-
761.25. The expenditures were $82,916.34.
   It is proposed to apply the funds unexpended on June 30, 1952,
amounting to $7,506.48, together with allotment for fiscal year 1953
of $8,200 for examinations and surveys and $18,800 for contingencies,
to the payment of accounts payable amounting to $4,327.76 and to
expenses to be incurred under this heading.
   The additional sums of $8,100 for examinations and surveys and
$22,500 for contingencies can be profitably expended during fiscal year
1954 for work under this heading.
                                         Cost and financial summary

                                                            Fiscal year ending June 30                                       Total to June
                                                                                                                            30, 1952, includ-
                                                                                                                             ing fiscal years
                                     1948                 1949             1950              1951              1952              priorto 1948


Maintenance:
    Appropriated- ...... $64,400.00     800.00 $112,000.00 $142,874.96 $74,200.00
                                     $80,                                                                                        $1,794,921.69
    Cost ..                69,150.18 80,773.66 70,176.
                ........---------------                 81 178,697.90   81,761.25                                                 1,791,742.97
                      -------
    Expenditures.........  70,547.80 74,455.84   83,434.60 176,566.80 82,916.34                                                   1,787,415.21
300         REPORT          OF    CHIEF        OF      ENGINEERS,           U.      S.   ARMY,      1952


             19. PLANT ALLOTMENT, PHILADELPHIA,                                          PA., DISTRICT

Appropriation. Maintenance and Improvement of existing River and
    Harbor works.
Allotment. Plant (Plant, Shops and Yards, Stock, and Overhead).
  This item covers all plant, stocks of materials and supplies, and
overhead in the Philadelphia, Pa., district.
                                         Cost and financial summary

                                                     Fiscal year ending June 30                           Total to June
                                                                                                         30, 1952, includ-
                                                                                                         ing fiscal years
                                      1948          1949            1950         1951        1952          prior to 1948


Maintenance:
   Appropriated-------........ $501,429.03 $400,000.00 $120,710. 80----------........... $333, 400. 73      $3,010,762.09
   Cost ...-------------- 1,201,507.85      235, 946.44 -249,778.48 -$56, 612.59 379, 897.01                 2, 135, 097. 63
    Expenditures-------......... 1, 491, 333. 24 -99, 636.34 -108, 718. 90 -45, 678. 43   415, 462. 68       1, 979, 510.11


                            20. HOPPER DREDGE REPLACEMENT

   No work was in progress during the year.
   Costs incurred during the year in connection with continuing
financial accounting on prior years contract amounted to $0.91. The
expenditures were $42,186.57. No additional work is contemplated
for the fiscal years 1953 or 1954.
                                        Cost and financial summary

                                                     Fiscal year ending June 30                           Total to June
                                                                                                         30, 1952, includ-
                                                                                                         ing fiscal years
                               1948          1949           19.50           1951            1952           prior to 1948

Maintenance:
   Appropriated----.....$1,440.00.00, $800, 000.00 $150, 000.00 $-29, 732, 578. 47 -$7, 421. 53 ...-----------
   Cost-----------... ---...5, 065, 975. 64 6, 053, 519. 60 2, 302, 656. 00 -29, 756, 698. 51 32, 141.80
   Expenditures_..... 4, 671, 730. 23 16, 224, 295.03 3, 250, 371. 86 -29, 451, 752. 23       42, 186. 57
             RIVERS         AND      HARBORS-PHILADELPHIA,                                 PA.,         DISTRICT                   301

                          21. INACTIVE NAVIGATION PROJECTS

                                                For last           Cost and expenditures to                              Estimated
                                              full report,               June 30, 1952                                     amount
                Name of project               see Annual                                                                 required to
                                                 Report                                                                   complete
                                                 for-            New work                    Maintenance


1. Delaware River, N. Y., N. J. and Pa.
      at or near mouth of Neversink River,
      N. J.1'a ._________________---------__      1917       .........---.....----------------..........---------....       $58, 500. 00
2. Chester River, Pa.' 4 ....- ________ ...      1931                   $6, 000. 00                       $650. 26          26, 000. 00
3. Ice Harbor at Marcus Hook, Pa. .......        1928                 208, 963.64                      14, 336.36           (6)
4. Ice Harbor at New Castle, Del.5 ....-      _- 1898                 224, 703. 84 ........... ___..                        (6)
5. Appoquinimink River, Del.' 4......-           1931                   36, 973. 35                   41, 098. 56           14, 000. 00
                           .--
6. Smyrna River, Del.'------------               1949                 198, 843. 94                   195, 609. 18            9, 700. 00
7. Leipsic River, Del.4 -----------------        1931                   36, 956. 06                    32, 242. 94          (6)
8. Little River, Del. -------------------        1946                   12, 015. 86                   47, 808. 03           (6)
9. St. Jones River, Del.     -----------------   1950                 207, 102. 37                    65, 318. 02        1,263, 000. 00
10. Mispillion River, Del___________________      1951                 365, 189. 13                  384, 567. 35            (6)
11. Broadkill River, Del.4..-------------         1941                   68, 227. 97                  101, 853. 67           (6)
12. Waterway from Indian River Inlet to
       Rehoboth Bay, Del ----------------         1950       -------------------------------                                 89, 000. 00
13. Inland Waterway from Chincoteague
      Bay to Delaware Bay, Del.2 8........        1939               168, 411.88                      42, 794.40             (6)
14. Rancocas River, N. J.4'-----         -1942                        44, 500. 21                      13, 090.44           124, 500. 00
15. Cooper River, N. J _________________          1951                33, 101. 64                    233, 345. 22            (6)
16. Big Timber Creek, N. J.4--------------        1949              a 58, 664. 77                      11,396. 51            (6)
17. Woodbury Creek, N. J. '            -----      1940                27, 093.01                       55, 405. 91           (6)
18. Mantua Creek, N. J------------------          1951               169, 687. 08                    183,342. 97             (6)
19. Raccoon Creek, N. J.'----------------         1949                83, 664. 96                    218, 935. 89            (6)
20. Oldmans Creek, N. J. _______________          1941                31, 188. 43                     31, 736. 20           238, 000. 00
21. Salem River, N. J.4-------------------1947                    to 107, 634.43                     173, 153. 68          1127, 000. 00
22. Alloway Creek, N. J.4__________________       1931                21,397. 73                       33, 002. 27           (6)
23. Maurice River, N. J .12        ------         1948               143, 984. 49                    122, 380. 54           124, 000. 00
24. Dennis Creek, N. J.--.       -------------- 1897                   4, 701.05           ........------------              (6)
25. Goshen Creek, N. J.2 4_________________       1905                15, 358. 77                           870. 00          (6)
26. Absecon Creek, N. J_____________              1950                11,934.96                        68, 229. 84           (6)
27. Little Egg Harbor, N. J.1 2-                  (13)                 15,048.00-                 _-- --            --     - (6)
28. Barnegat Inlet, N. J    ------------------    1951            14448, 849. 09               1,177, 829. 88                (6)
29. Double Creek, N. J.4--                        1912                7,800. 00                    (15)                      (6)
30. Toms River, N. J ...--------------            1950               10, 050. 00                  19, 984. 62               325, 000. 00

   1Abondonment recommended in H. Doc. 467, 69th Cong., 1st sess.
  2  No commerce reported.
  3 Exclusive of amount to be contributed by local interests. The authorization of this project provided
for local interests to deposit with the United States, $54,780 for the accomplishment of certain work. The
present estimate for this work is $146,500.
  4 Channel adequate for commerce.
   5Harbor not now required for commerce.
  6 Completed.
  7 Exclusive of $20,000 required to be contributed by local interests.
   8 Cost of maintaining bridges assumed by State of Delaware.
  ' Exclusive of $50,000 contributed by local interests.
   to Exclusive of $51,825.10 contributed by local interests.
   11In addition, local interests are required to contribute an equal amount.
   2 Awaiting local cooperation.
   13Last appropriation for the project was in 1852. No information is at hand relative to work done.
   14Exclusive of $300,000 contributed by local interests.
   15Maintenance assumed by local interests as required by law.




          245554-53-vol. 1-              20
302         REPORT OF CHIEF OF ENGINEERS,                          U. S. ARMY,        1952

                             22. MISCELLANEOUS ACTIVITIES
Status of all investigations for navigation called for by river and harbor acts
                            and oomnnitteo resolutions

                                                                   Date trans-    Document        Recom-
               Locality                    Authorization act        mitted to       No.          mendation
                                                                    Congress

Cape May Harbor, Cold Spring            River and Harbor Act,
Inlet, N. J., with a view to shore      July 24, 1946.
protection.
Chesapeake Bay to Delaware River,       Commerce Committee res-
Md. and Del., Inland Waterway           olution, Mar. 28, 1939.
  (with particular reference to
bridges).
Cold Spring Inlet (Cape May Har-        River and Harbor Act, I....
bor), N. J., with a view to shore        July 24, 1946.
protection.
Delaware Bay to Rehoboth Bay,           Senate Public Works        Apr. 24,1952                  Unfavor-
                                                                                                 U............j
Del., waterway.                         Committee resolution,                               I     able.
                                         Mar. 4, 1950.
Delaware River, Pa., N. J., and         House Public Works
  Del., Philadelphia to the sea, with    Committee resolution,
  a view to determining whether          May 21, 1951.
  any modification of the existing
project is advisable at this time.
Delaware River to Chesapeake            Commerce Committee ...............
  Bay, Del., and Md., Inland Water-      resolution, Mar. 28, 1939.
way, (with particular reference to
  bridges).
Delaware River, Pa., N. J., and         River and Harbor Act,
  Del., Philadelphia to the sea.         July 24, 1946.
Delaware River, Pa., N. J., and         Senate Public Works
Del., Philadelphia to the sea, and       Committee resolution,
Philadelphia to Trenton, with a         February 4, 1949.
view to providing relief from oil
pollution in the Philadelphia port
area.
Delaware River, Pa., N. J. and          House Public Works Com-
Del., Philadelphia to the sea            Committee resolution,
  (anchorages) .'                         Sept. 27, 1951.
Delaware River at Camden, N. J.1.       House Public Works Com-
                                          mittee resolution June
                                          11, 1952.
Delaware River, Pa. and N. J.,          River and Harbor Act,
  between Philadelphia and Tren-         July 24, 1946.
  ton.
Delaware River between New House Public Works Com-
  Castle, Delaware and Delaware     mittee resolution, Apr.
  City, Del.                        25, 1951.
Delaware River, Pa., and N. J., Senate Public Works
  between Philadelphia and Tren-     Committee resolution,
  ton.                              Apr. 13, 1950.
Great Egg Harbor River, N. J...... House Public Works Com-
                                    mittee resolution, June
                                    27, 1950.
Manasquan Inlet to Shrewsbury House Public Works Com-
  River section of Intracoastal     mittee resolution, Apr.
Waterway, and alternate connec-    22, 1947.
tion to Delaware Bay.
New Jersey Coast Beach Erosion River and Harbor Act,
Survey.                            Mar. 2, 1945.
New Jersey Intracoastal Waterway House Public Works Com-
from Shrewsbury River to Dela-     mittee resolution, Apr.
ware Bay above Cape May for        22, 1947.
extension of waterway from Mana-
squan Inlet to Shrewsbury River
and an alternate connection to
Delaware Bay.
Rehoboth Bay to Delaware Bay, Senate Public Works Apr. 24,1952 ............                      Unfavor
Del., waterway.                    Committee resolution,                                         able.
                                    Mar. 4, 1950.
Wilmington Harbor (Christina Senate Public Works Sept. 8,1951 ...........                        Unfavor
River), Del.                       Committee resolution,                                         able.
                                    Mar. 28, 1949.

1 Limited to preliminary examination scope.
               23. DYBERRY RESERVOIR, DYBERRY CREEK, PA.

  Location.-The site of Dyberry Reservoir is in the Dyberry Creek
valley in the central part of Wayne County, Pa. between the borough
              FLOOD CONTROL--PHILADELPHIA,                               PA.,       DISTRICT                303
of Honesdale and the village of Tanners Falls. The dam site is ap-
proximately 3 miles above the confluence of Dyberry Creek and Lacka-
waxen River in Honesdale and 29 miles above the confluence of the
Lackawaxen and Delaware Rivers. (See U. S. Geological Survey
quadrangle sheet, "Honesdale, Pa.")
  Ewisting project.-The plan of improvement provides for a single-
purpose flood control reservoir having a capacity of 24,500 acre-feet
formed by an earth embankment, approximately 1,280 feet long at
the crest and rising 112 feet above the creek bed. It also provides
for a tunnel, with intake structure and stilling basin, in the left
abutment, a chute-type spillway and stilling basin also in the left
abutment. The reservoir will control the runoff from a drainage area
of 65 square miles which is 91 percent of the watershed of Dyberry
Creek and 39 percent of the Lackawaxen River watershed above
Honesdale, Pa. Construction of the project was authorized by the
Flood Control Act approved June 30, 1948.
   The estimated Federal cost of new work, revised in 1952, is $5,384,000
for construction and $1,208,000 for lands, damages and relocations,
a total of $6,592,000.
   Local cooperation.-The project is subject to the conditions that
responsible local agencies furnish assurances satisfactory to the Sec-
retary of the Army that they will (a) remove the three existing low
dams in the Lackawaxen River at Honesdale, Pa., and (b) establish
satisfactory measures to preserve the flood-carrying capacities of the
stream channels below the proposed reservoir. These assurances have
not been furnished by local interests; however, the three low dams
at Honesdale have been removed.
   Operations and results during fiscal year.-None. There were no
costs or expenditures.
   Condition at end of fiscal year.-No construction work has been
done on the project. Preliminary engineering planning has been
completed. Preparation of contract plans and specifications has not
been initiated. The cost and expenditures were $128,319.54 for new
work.
   Proposedoperations.-Itis proposed to apply the funds unexpended
on June 30, 1952, amounting to $50 for miscellaneous investigations.
   No work is scheduled for fiscal year 1954.
                                  Cost and financial summary

                                                Fiscal year ending June 30                         Total to June
                                                                                                   30,1952, includ-
                                                                                                   ing fiscal years
                               1948           1949         1950          1951           1952        priorto 1948

New work:
   Appropriated--- ---   _$128,000.00     ------------   $1,200.00   ------------     -$830.46         $128, 369.54
   Cost   ---       -       123, 031.90     $3,716.52    1,571.12 ------------------------              128, 319.54
   Expenditures -----       112, 386.10     14,197.47      529.22   $1, 206.75      ------------        128, 319. 54


Other new work data:
     Unobligated balance, June 30, 1952--.....-------------       - $50. 00
     Estimated additional amount needed to be appropriated for
       completion of existing project-----------------------   6,463, 630.00
304       REPORT OF CHIEF OF ENGINEERS,                      U.   S. ARMY,   1952

         24. PROMPTON RESERVOIR, LACKAWAXEN RIVER, PA.

    Location.-The site of Prompton Reservoir is in the Lackawaxen
River valley in the central part of Wayne County, Pa., between the
borough of Prompton and the village of Aldenville. The dam site
is within the corporate limits of Prompton, 4 miles upstream from
Honesdale, Pa., and approximately 30 miles above the confluence
of the Lackawaxen and Delaware Rivers. (See U. S. Geological
Survey quadrangle sheet, "Honesdale, Pa.")
    Existing project.-The plan of improvement provides for a single-
purpose flood-control reservoir having a capacity of 48,300 acre-feet
formed by an earth embankment approximately 1,230 feet long at
the crest and rising 140 feet above the river bed. It also provides
for an uncontrolled outlet conduit of reinforced concrete, with intake
structure and stilling basin, and an emergency spillway located high
on the right abutment. The reservoir will control the runoff from
60 square miles which is 64 percent of the area drained by the river
above its confluence with Dyberry Creek and 36 percent of the Lacka-
waxen River watershed above Honesdale, Pa. Construction of the
project was authorized by the Flood Control Act approved
June 30, 1948.
   The estimated Federal cost of new work, revised in 1952, is $3,960,000
for construction and $1,046,000 for lands, damages, and relocations,
a total of $5,006,000.
   Local cooperation.-The project as recommended is subject to the
conditions that responsible local agencies furnish assurances satis-
factory to the Secretary of the Army that they will (a) remove the
three existing low dams in the river at Honesdale, Pa., and (b),
establish satisfactory measures to preserve the flood-carrying capaci-
ties of the stream channels below the proposed reservoir. These
assurances have not been furnished by local interests; however, the
three low dams at Honesdale have been removed.
   Operations and results during fiscal year.-Miscellaneous investi-
gations and minor studies were made. The costs were $454.61 for
inew work. The expenditures were $454.61.
   Condition at end of fiscal year.-No construction work has been
done on the project. Preparation of plans and specifications was
about 24 percent complete. The costs were $167,262.69 for new work.
The expenditures were $163,762.69.
   Proposedoperations.--Itis proposed to apply the funds unexpended
on June 30, 1952, amounting to $4,012.39, as follows:
Accounts payable, June 30, 1952----------------------------                    $3, 500. 00

New work:
   Miscellaneous investigations-------------------------------                       50.00
   Minor studies and reports on preparation for suspension of plan-
     ning program..      ..----------------------------------------                 462.39

      Total new work --------             -------------------------------           512. 39

      Total for all work----------------------------------                      4, 012.39
  No work is scheduled for the fiscal year 1954.
               FLOOD CONTROL-PHILADELPHIA,                                PA.,      DISTRICT                  305

                                 Cost and financial summary

                                              Fiscal year ending June 30                            Total to June
                                                                                                   30, 1952, includ-
                                                                                                   ing fiscal years
                              1948           1949          1950          1951           1952        priorto 1948


New work:
   Appropriated ...----    $97, 000.00   $65,000.00     $63, 800.00 -$55 0C0.00     -$3, 024.92         $167, 775.08
   Cost ----------------    86, 680.08    25, 946. 67    40, 635. 54  13, 545. 79        454. 61         167, 262. 69
   Expenditures---------    79,115.54     29, 678.39     40, 855.48   13, 658. 67        454.61          163, 762.69


Other new work data :
    Unobligated balance, June 30, 1952--------------------------    $462. 39
    Unobligated balance available for fiscal year 1953 ---------      462. 39               --
    Estimated additional amount needed to be appropriated for
      completion of existing project------------------------- 4, 838, 225. 00

              25. BEAR CREEK RESERVOIR, LEHIGH RIVER, PA.

   Location.-The site of Bear Creek Reservoir is in northwestern
Pennsylvania on the Lehigh River between White Haven and Stod-
dartsville. The dam site is a short distance below the mouth of Bear
Creek, approximately 60 miles above the city of Allentown, and 77
miles above the confluence of the Lehigh River with the Delaware
River at Easton, Pa. (See U. S. Geological Survey quadrangle
sheet "Stoddartsville, Pa.")
   Existing project.-The plan of improvement provides for a single-
purpose flood-control reservoir having a capacity of 110,000 acre-feet,
formed by an earth dam 3,000 feet long at the crest, rising 234 feet
above the river bed, with gate-controlled outlet works discharging
through a tunnel in the west abutment, and a spillway located in a
saddle about 11/4 miles from the dam. The reservoir will control the
runoff from a drainage area of 288 square miles. The project was
authorized by the Flood Control Act approved July 24, 1946.
   The current estimate of Federal cost of new work, revised to 1952,
is $16,660,000 for construction and $331,000 for lands and damages,
a total of $16,991,000.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Miscellaneous investiga-
tions and minor studies were made. The costs and expenditures were
$434.25 for new work.
   Condition at end of fiscal year.-No construction work has been done
on the project. Preparation of plans and specifications was about
34 percent complete. The costs and expenditures were $491,489.98
for new work.
   Proposedoperations.--It is proposed to apply the funds unexpended
on June 30, 1952, amounting to $482.75 as follows:
New work :
   Miscellaneous investigations    -------------------------------         $50.00
   Minor studies and reports on preparation for suspension of planning
     program                  ---------------------------------------------432. 75

         Total       ----------------------------------------------                                       482. 75
  No work is scheduled for fiscal year 1954.
306         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                                Cost and financial summary

                                           Fiscal year ending June 30                        Total tolJune
                                                                                            30, 1952, includ-
                                                                                            ing fiscal years
                             1948         1949         1950          1951         1952        prior to 1948

New work:
   Appropriated-.........150, 000.00 $200, 000.00   $90, 000.00   $90, 000.00 -$68,027.27        $491, 972.73
   Cost------------------ 150,799.38 166,666.58     117,482.65     31,071.62       434.25         491,489.98
   Expenditures.-         145, 011.27 168,039.57    121, 912.53    37, 501.11      434.25         491, 489.98


Other new work data :
    Unobligated balance, June 30, 1952 --------------------       --- $482. 75
    Unobligated balance available for fiscal year 1953-----------       482. 75
    Estimated additional amount needed to be appropriated for
      completion of existing project-------------------------- 16, 499, 027. 00

                       26. ALLENTOWN, LEHIGH RIVER, PA.

   Location.--Allentown is located in Lehigh County on the Lehigh
River, 17 miles above its mouth. (See U. S. Geological Survey quad-
range sheets "Allentown and Allentown West, Pa.")
   Existing project.--The plan of improvement provides for widening
and deepening the channel of Lehigh River and easing the abrupt
turn and approaches thereto at the mouth of Little Lehigh Creek; it
also provides for a training dike and levees, and the necessary ap-
purtenant structures. The project was authorized by the Flood Con-
trol Act approved July 24, 1946. The estimated Federal cost of new
work, revised in 1952, is $1,823,000 for construction. The estimated
local cost for lands, damages, and utility alterations, revised in 1946,
is $25,000.
   Local cooperation.-See pages 4-5 for requirements. Assurances of
cooperation have not been furnished by local interests.
   Operations and results during fiscal year.--A model study by the
United States Waterways Experiment Station, Vicksburg, Miss., in
progress the previous fiscal year was continued. The costs were
43,866.65 for new work. The expenditures were $42,537.15.
   Conditionat end of fiscal year.-No construction work has been done
on the project. Preliminary engineering planning is about 20 per-
cent complete. The costs under the project were $44,808.61 for new
work. The expenditures were $43,167.05.
   Proposed operations.-Itis proposed to apply the funds unexpended
on June 30, 1952, amounting to $16,832.95 together with an allotment
of $25,000 made in fiscal year 1953, as follows:
Accounts payable, June 30, 1952-----------------------------                                  $1, 641. 56

New work:
   Completion of model Study by United States Waterways Experi-
     ment Station, Vicksburg, Miss--------------------------     5, 191. 40
   Engineering studies and design---------    ----------------- 35,000.00

       Total new work----
                      ...---------                      ----------------------- 40,191.40

       Total for all work---------                   ------------------------ 41, 832. 96
                    FLOOD CONTROL-PHILADELPHIA,                                         PA.,       DISTRICT                  307
   The additional sum of $55,000 can be profitably expended during
the fiscal year 1954 for the continuation of preliminary engineering.
                                           Cost and financial summary

                                                         Fiscal year ending June 30                                Total to June
                                                                                                                  30, 1952, includ-
                                                                                                                  ing fiscal years
                                       1948            1949             1950            1951           1952            to1948
                                                                                                                   prior

New work:
    Appropriated----......--......------...... ----------------------               $40, 000. 00   $20,000.00           $60,000.00
    Cost --------------               ------------------------------                     941.96     43,866.65            44,808.61
    Expenditures---------...............---... ------------          ------------        629.90     42, 537. 15          43, 167. 05


Other new work data :
    Unobligated balance, June 30, 1952--------------------- --                                                     $15, 191.39
    Appropriated for fiscal year ending June 30, 1953 .........------------                                         25, 000. 00
   Unobligated balance available for fiscal year 1953 -----------                                                   40, 191. 39
   Estimated additional amount needed to be appropriated for
      completion of existing project1------------------------,                                                     738, 000. 00

27. PRELIMINARY                     EXAMINATIONS, SURVEYS AND                                         CONTINGENCIES
                                       FOR FLOOD CONTROL

   The cost of work during the year was $379.57 for surveys and
$621.56 for contingencies, a total of $1,001.13. The expenditures were
$1,242.24.
   It is proposed to apply the funds unexpended on June 30, 1952,
amounting to $656.36, together with an allotment for fiscal year 1953
of $11,900, to the payment of accounts payable amounting to $138.21
and to expenses to be incurred under this heading.
  The additional sum of $9,500 can be profitably expended during fis-
cal year 1954 for work under this heading.
                                          Cost and flnancial summary

                                                        Fiscal year ending June 30                                Total to June
                                                                                                                  30, 1952, includ .
                                                                                                                  ing fiscal years
                                      1948             1949            1950            1951           1952         prior to 1948

Maintenance:
   Appropriated-.........         $22,000.00       $15,000.00       $5, 000.00      $23,000.00      -$700.00          $314, 900.00
   Cost------------- ----          17, 038.58       12,499. 56      11,965.10        23,051.19       1,001.13          314, 381.85
   Expenditures-....---- -         16, 981.85       12,180.53        9,980.50        25, 305.49      1, 242. 24        314,243.64



            28. INSPECTION OF COMPLETED                                        FEDERAL PROJECTS

   Inspections were made at a cost of $57.59. There were no expend-
itures.
   It is proposed to apply the funds unexpended on June 30, 1952,
amounting to $60.00, plus an allotment of $100 for fiscal year 1953,
to accounts payable amounting to $57.59 and to expenses incurred
under this heading.
308           REPORT       OF    CHIEF OF ENGINEERS,                  U.      S.   ARMY,       1952


                                    Cost and financial summary

                                               Fiscal year ending June 30                          Total to June
                                                                                                   ing fiscal years
                                 1948         1949         1950            1951         1952         priorto 1948

Maintenance:
   Appropriated...----------------------------- -----------                 $60.00 ........----              $60.00
    Cost------------------------------------------------------                          $57.59                57.59
    Expenditures----



                       29. INACTIVE FLOOD-CONTROL PROJECTS

                                                                            Cost and expenditures
                                                             For last          to June 30, 1952        Estimated
                       Name of project                     full report,                                  amount
                                                           see annual                                  required to
                                                           report for-- New work         Mainte-        complete
                                                                                          nance

1. Bethlehem, Lehigh River, Pa__---------------------         1950                                $6,629,000.00
                                                                           ------------ .....---------....
2. Mount Holly, Rancocas Creek, N. J----------------          1946         $283, 655.05    ()          (2)


  1 Maintenance assumed by local authorities as required by act authorizing tie project.
  2 Completed.

                             30. MISCELLANEOUS ACTIVITIES
Status of all investigations for flood control called for by flood control acts and
                               committee resolutions

                                                                          Date trans-   Document        Recom-
                Locality                    Authorization Act              mitted to      No.          mendation
                                                                           Congress


Delaware River, N. Y., Pa., N. J.,       Senate Public Works Com----------------..---              ------------
and Del. (beneficial water users).        mittee resolution Apr.
                                           13, 1950.
Delaware River, control of tidal         Senate Public Works Com-........................
flooding on west bank at and in           mittee resolution, Mar.
vicinity of New Castle and Dela-          10, 1951.
ware City, Del.
Delaware River, flood control at and     Senate Public Works Com--------------------               ------------
in the vicinity of Smithville, N. J.      mittee resolution, Sept.
and other areas along Rancocas            14, 1951.
Creek.



31. SNAGGING AND CLEARING, SECTION 2 OF THE FLOOD CONTROL ACT
             APPROVED AUGUST 28, 1937, AS AMENDED

   The Flood Control Act approved August 28, 1937, as amended by
the Flood Control Acts approved August 11, 1939, August 18, 1941,
and July 24, 1946, authorized the allotment of not to exceed $1,000,000
from the flood control appropriations for any one fiscal year for the
removal of accumulated snags and other debris from, and the clear-
ing and straightening of channels in, navigable streams and tribu-
taries thereof when such work is advisable in the interest of flood
control; provided that not more than $50,000 shall be allotted for this
purpose for any single tributary from the appropriations for any one
fiscal year.
   Engineering studies and preparation of plans and specifications for
clearing the Pequest River channel in the vicinity of Great Meadows,
                  FLOOD CONTROL---PHILADELPHIA,                                   PA.,     DISTRICT                    309
Warren County, N. J., in progress at the end of the previous fiscal year
were completed. No construction work has been done on the project.
The costs during the fiscal year were $1,172.81 for new work. The
expenditures were $1,401.67.
  The total costs to the end of the fiscal year were $8,794.10 for new
work. The expenditures were $8,793.97.
  The unexpended balance on June 30, 1952, amounting to $31,206.03,
together with an allotment of $10,000 in fiscal year 1953, will be ap-
plied to accounts payable of $0.13 and to complete emergency work
on Pequest River in the vicinity of Great Meadows, N. J.
                                        Cost and fllnancial summary

                                                     Fiscal year ending June 30                              Total to June
                                                                                                            30, 1952, includ-
                                                                                                            ing fiscal years
                                    1948           1949           1950           1951           1952         prior to 1948


New work:
   Appropriated .....-----------------------                                 $40, 000. 00 --------
                                                               .......------------                               $40,000.00
       ----------------
   Cost..                               ---------------- ------------           7, 621.29      $1, 172.81          8, 794. 10
   Expenditures .........-------- ---..     ------ ------------------..         7, 392.30       1, 401.67          8, 793. 97


Other new work data:
   Unobligated balance, June 30, 1952_ _ --------------       $31,205.90
   Unobligated balance available for fiscal year 1953-----     31, 205. 90
   Estimated additional amount needed to be appropriated for
      completion of existing project_-------------------_____  10, 000. 00

32. SMALL FLOOD CONTROL PROJECTS, SECTION 205, FLOOD CONTROL
           ACT APPROVED JUNE 30, 1948, AS AMENDED

   Section 205 of the Flood Control Act approved June 30, 1948, as
amended by section 212 of the Flood Control Act approved May 17,
1950, authorizes the allotment from flood-control appropriations, not
to exceed $3,000,000 for any one fiscal year, for the construction of
small flood-control projects not specifically authorized by Congress,
and not within areas intended to be protected by projects so author-
ized, which come within the provisions of Section I of the Flood
Control Act of June 22, 1936, when in the opinion of the Chief of
Engineers such work is advisable: Provided, That not more than
$150,000 shall be allotted for this purpose at any single locality from
the appropriations for any one fiscal year: Provided further, That
the provisions of local cooperation specified in Section 3 of the Flood
Control Act of June 22, 1936, as amended, shall apply: And provided
further,That the work shall be complete in itself and not commit the
United States to any additional improvement to insure its successful
operation, except as may result from the normal procedure applying
to projects authorized after submission of preliminary examination
and survey reports.
   Engineering studies in connection with flood-control protection on
the Chester River above Ninth Street in Chester, Delaware County,
Pa., in progress at the end of the previous fiscal year were completed.
The costs were $1,255.96 for new work. Preparation of plans and
specifications for flood-control protection on the Chester River above
Ninth Street was in progress at the end of the fiscal year. The costs
310          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

were $1,254.49 for new work. The expenditures were $1,505.05. En-
gineering studies in connection with flood-control protection in the
Livingston Manor and the Roscoe-Rockland area, Sullivan County,
N. Y., were in progress at the end of the fiscal year. The costs were
$4,992.39 for new work. The expenditures were $4,588.19.
   The total costs were $7,502.84 for new work. The total expenditures
were $6,093.24.
   Condition at end of fiscal year.-For flood-control protection on
the Chester River above Ninth Street in Chester, Delaware County,
Pa., engineering studies were completed and preparation of plans and
specifications were 33 percent complete. The work remaining to be
done is the completion of plans and specifications and initiation and
completion of construction. The costs were $3,254.49 for new work.
The expenditures were $2,033.27. Engineering studies in connection
with flood-control protection in the Livingston Manor and the Roscoe-
Rockland area, Sullivan County, N. Y., were 70 percent complete.
The work remaining to be done is the completion of the engineering
studies. The costs were $4,992.39. The expenditures were $4,588.19.
   The total costs, all for new work, were $8,246.88. The total
expenditures were $6,621.46.
   Proposedoperations.--Itis proposed to apply the funds unexpended
on June 30, 1952, amounting to $105,678.54, together with an allotment
of $2,000 made in fiscal year 1953 as follows:
                                                 -$1,
Accounts payable June 30, 1952___________________-----                                                                            625. 42

New work :
   Completion of plans and specifications for construction of levees
     and wall along Chester River above Ninth Street, Chester, Pa._    2, 800. 00
   Initiation and completion of construction of levees and wall
     along Chester River above Ninth Street, Chester, Pa._____       101, 253. 12
   Completion of engineering studies in connection with flood-
     control protection in the Livingston Manor and the Roscoe-
     Rockland area, N. Y-----       ----------------------------- 2, 000. 00

                Total new work ----                                                   -__-____-____
                                                                                                  -         _______         106, 053.12
                Total for all work .___.                                           ____________              ___-__-- _ 107, 678. 54
  No work is scheduled for fiscal year 1954.
                                               Cost and financial summary

                                                                    Fiscal year ending June 30                             Total to June
                                                                                                                           30,1952. includ-
                                                                                                                           ing fiscal years
                                            1948                 1949                   1950     1951           1952        prior to 1948

New work:
   Appropriated                      ............-............
                                     ------------                                  -.-.-..-    $2, 000. 00 $110, 300. 00       $112, 300. 00
   Cost .---------------------------------------------                                            744. 04     7, 502. 84          8, 246. 88
   Expenditures........---   ------------               ------------------------                  528. 22     6, 093. 24          6, 621.46


Other new work data:
    Unobligated balance, June 30, 1952_-  ------------      - -- $104, 053. 12
   Appropriated for fiscal year ending June 30, 1953----------      2, 000. 00
        Unobligated balance available for fiscal year 1953----------                                                       106, 053. 12
IMPROVEMENT OF RIVERS AND HARBORS, AND FLOOD
    CONTROL IN THE BALTIMORE, MD., DISTRICT

  This district comprises the watershed of the Susquehanna River
and its tributaries from headwaters in south central New York
State through central Pennsylvania to its mouth in the Chesapeake
Bay; eastern Maryland, southwestern Delaware, and eastern Vir-
ginia, embracing Chesapeake Bay and its tributaries north of Cove
Point, Md., on the western shore of the bay, and Onancock River, Va.,
on the eastern shore, and the watersheds tributary to the Atlantic
Ocean between the southern boundary of Delaware and a point north
of White Creek and Gargathy Inlet on the Atlantic coast.
  District engineer: Col. A. C. Welling, Corps of Engineers, to July
18, 1951, and Col. R. Whitaker, Corps of Engineers, thereafter.
  Division engineer of the North Atlantic Division, New York, N. Y.,
comprising the New York, N. Y., Philadelphia, Pa., Baltimore, Md.,
Washington, D. C., and Norfolk, Va., districts: Col. F. F. Frech, Corps
of Engineers to March 14, 1952, and Col. B. B. Talley, Corps of Engi-
neers, thereafter.
                                     IMPROVEMENTS

                Navigation                           Flood Control-Continued
                                      Page                                         Page
1.   Baltimore Harbor and Chan-              20. Wilkes-Barre-Hanover
        nels, Md_                      312           Township,      Susquehanna
2.   Baltimore Harbor, Md., col-                   River, Pa____                   359
        lection and removal of                21. Kingston-Edwardsville, Sus-
        drift _ __ _ __ __ _           318          quehanna River, Pa_____         360
3.   Chester River, Md_ ......        318-   22. Plymouth, Susquehanna
4.   Choptank River, Md ......        320          River, Pa____                   362
5.   Honga River and Tar Bay                 23. Sunbury, Susquehanna River,
        (Barren Island Gaps), Md_      321          Pa_ -_        -                 363
6.   Nanticoke River (including              24. Williamsport, Susquehanna
        Northwest Fork), Del. and                   River, Pa___________            365
        Md_                            323    25. Tyrone, Pa_                       368
7.   Upper Thoroughfare, Deal                26. York, Codorus Creek, Pa___        369
        Island, Md_                    325    27. Snagging and clearing under
8.   Pocomoke River, Md ......        327          authority of Section 2 of
9.   Twitch Cove and Big Thor-                     the Flood Control Act ap-
        oughfare River, Md .....       328          proved August 28, 1937, as
10.   Ocean City Harbor and Inlet                   amended_____________            371
        and Sinepuxent Bay, Md__       330    28. Preliminary      examinations,
11.   Examinations, surveys, and                    surveys, and contingencies
        contingencies (general)_--     333          for flood control ........      372
12. Plant allotment _ __               333    29. Inspection of completed proj-
13. Inactive navigation projects.      334          ects-_-                         373
14. Miscellaneous activities ....      335    30. Inactive flood-control proj-
                                                    ects--- - - - - - - -           374
                Flood Control                 31. Miscellaneous activities ....     374
15.   South Plymouth Reservoir,               32. Emergency flood control work
        Canasawacta Creek, N. Y_       336          under authority of the
16.   Genegantslet Reservoir, Gen-                  Flood Control Act ap-
17.
        egantslet Creek, N. Y .-
      Southern New York flood
                                -      337          proved August 18, 1941__
                                              33. Small flood control projects
                                                                                    375
        control project__              338          under Section 205 of the
18.   Stillwater Reservoir, Lacka-                  Flood Control Act ap-
        wanna River, Pa__....          356          proved June 30, 1948, as
19.   Swoyersville and Forty Fort,                  amended-_______-----            376
        Pa-_---      _-_ -    - -      357
                                                                                    311
312     REPORT OF CHIEF OF ENGINEERS,        U.   S.   ARMY,   1952

           1. BALTIMORE HARBOR       AND CHANNELS,        MD.

    Location.-Baltimore Harbor is situated at the head of the navi-
gable portion of the Patapsco River about 12 miles from Chesapeake
Bay. The river rises near the town of Westminster in Carroll
County, Md., and flows in a general southeasterly direction for about
65 miles to enter the Chesapeake Bay. (See U. S. Coast and Geodetic
Survey Chart No. 549.)
   Previous projects.-PatapscoRiver: The original project was dated
July 4, 1836. Modifications were contained in the River and Harbor
Acts of August 30, 1852; June 10, 1872; March 3, 1881; June 3, 1896;
March 3, 1905; March 3, 1909; February 27, 1911; and March 4, 1913.
    Middle Branch: The original project was dated June 3, 1896.
    Curtis Bay: The original project was dated July 13, 1892. It was
modified by the River and Harbor Act of June 13, 1902.
    York Spit: The original project was dated March 3, 1905.
    For further details see pages 1787 and 1788 of the annual report
for 1915, and page 389 of the annual report for 1932.
   Existing proect.-This provides: (a) A uniform main channel
depth of 39 feet between Cape Charles, Va., and Fort McHenry, Bal-
timore, Md., with dimensions as follows: 39 feet deep and 1,000 feet
wide between the curves of 39-foot depth in Chesapeake Bay opposite
York Spit, a distance of about 6.77 miles (under jurisdiction of the
Norfolk, Va., district); 39 feet deep and a general width of 600 feet
from the  39-foot   depth curve in Chesapeake Bay to Fort McHenry
on the Patapsco River, a distance of about 20 miles; (b) for branch
channels with dimensions as follows: 35 feet deep and 400 feet wide
from the main channel to head of Curtis Bay, a distance of about 21/s
miles; 35 feet deep and 400 feet wide from the main channel at Fort
McHenry to Ferry Bar, and thence 27 feet deep and 250 feet wide to
the Western Maryland Railway bridge, a total distance of about 31/8
miles; (c) for widening the angle between the Fort McHenry and
Ferry Bar sections; (d) for widening at the approaches and bends;
 (e) for the following anchorages-Fort McHenry anchorage, 3,500
feet long, 400 feet wide, and 35 feet deep; Riverview anchorage No. 1,
4,500 feet long, 1,500 feet wide, and 35 feet deep; Riverview anchor-
age No. 2, 2,400 feet long, 1,200 feet wide, and 30 feet deep; Quaran-
tine anchorage, 3,500 feet long, 600 feet wide, and 35 feet deep; (f)
it is further provided that as rapidly as the city of Baltimore, at its
own expense, provides the 35-foot depth into the Northwest Branch
 (inner harbor) the United States shall take over the maintenance
of that depth (the United States maintains a channel 35 feet deep
and generally 650 feet wide from Fort McHenry to and along the
southwest side of the inner harbor and a channel generally 750 feet
wide along the easterly side of the inner harbor); (g) for a con-
necting channel with a depth of 27 feet and width of 400 feet from
Cutoff-Brewerton angle in the main channel to the inland waterway
from Delaware River to Chesapeake Bay; (h) for a channel in Curtis
Creek with a depth of 35 feet and width of 200 feet from the head of
the existing 35-foot project channel in Curtis Bay to a point in the
creek about 750 feet below the Pennington Avenue Bridge; (i) for a
channel 22 feet deep and generally 200 feet wide from the 22-foot
                   RIVERS     AND HARBORS---BALTIMORE,                       MD.,    DISTRICT              313
depth curve in Curtis Creek immediately below the Pennington Ave-
nue Bridge, 18 feet over an irregular area of about 3 acres at the head
and adjacent to the 22-foot channel; a depth of 15 feet for a general
width of 450 feet from the head of the 22-foot channel to the upper
end of the marginal wharf of the United States ordnance depot; (j)
and for a channel 22 feet deep and 200 feet wide from the 22-foot
depth curve south of the Baltimore & Ohio Railroad bridge to the
vicinity of Arundel Cove, a distance of about 2,800 feet, thence 100
feet wide in Arundel Cove for a distance of about 2,100 feet; with
an anchorage basin approximately 700 feet square adjacent to the
channel southwesterly of the Coast Guard wharf.
   The estimate of cost for new work, revised in 1952, is $10,550,000
exclusive of amounts expended on previous projects. The latest
 (1950) approved estimate for annual cost of maintenance is $400,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                           Work authorized                                   Documents


Mar.      3,1905    Main channel 35 feet deep and 600 feet wide through-     H. Doc. 186, 57th Cong., 2d sess.
                     out.
Mar.      3,1909    Anchorage basin near intersection of Fort McHenry
                     and Curtis Bay Channels (within original limit of
                     cost authorized by act of Mar. 2, 1907).
Feb. 27,1911        Width increased at entrances and bends (increase
                     to be made within the limit of original estimate).
Aug.      8,1917    Branch channel 35 feet deep to head of Curtis Bay,       H. Doe. 799, 64th Cong., 1st sess.
                      and one 35 feet deep and 400 feet wide into the
                      Southwest Branch of the Patapsco River to a point
                      near Ferry Bar, and 27 feet deep and 250 feet wide
                      to Western Maryland Ry. bridge, widened at ap-
                      proaches and bends, and with anchorage and turn-
                      ing basins. Inclusion of Patapsco River and tribu-
                      taries into 1 project for Baltimore Harbor.
Jan.    21,1927     Change in location of the anchorage near upper end
                      of the Fort McHenry Channel.
July     3,1930     Increased anchorage facilities---.............    ....   Rivers and Harbors Committee1
                                                                              Doc. 11, 70th Cong., 1st sess. 1
       Do .......For 37-foot depth in that portion of channel to Balti-      H. Doc. 29, 71st Cong., 1st sess.
               more lying between the 37-foot depth curve near
               Baltimore Light to the Sparrows Point entrance
               channel; widening the angle between Fort Mc-
               Henry and Ferry Bar sections; and for width of
               400 feet in the Curtis Bay section.
Oct. 17, 1940 For the 22-, 18,- and 15-foot channels in Curtis Creek         Adopted as a national-defense
               from the 22-foot depth below Pennington Ave.                   project (no printed report).
               Bridge to the upper end of the marginal wharf of
               the United States ordnance depot.
Mar. 2,1945   Uniform main channel 39 feet deep from the ocean               H. Doe. 741, 79th Cong., 2d sess.
               through York Spit section and Craighill entrance
               to Fort McHenry, additional anchorage area 2,400
               feet long, 1,200 feet wide, and 30 feet deep; a con-
               necting channel 400 feet wide and 27 feet deep from
               Cutoff-Brewerton angle in the main channel to the
               inland waterway from Delaware River to Chesa-
               peake Bay; a channel in Curtis Creek 200 feet wide
               and 35 feet deep from the head of the existing 35-
               foot project channel in Curtis Bay to a point in the
               creek about 750 feet below the Pennington Ave.
               Bridge.
   Do....... A channel 22 feet deep and 200 feet wide from the 22-           In accordance with plans on file in
               foot depth curve south of the Baltimore and Ohio                The Office, Chief of Engineers.
               R. R. bridge to the vicinity of Arundel Cove, a dis-
               tance of about 2,800 feet, thence 100 feet wide in
               Arundel Cove for a distance of about 2,100 feet;
               with an anchorage basin approximately 700 feet
               square adjacent to the channel southwesterly of
               the Coast Guard wharf.

  1 Contains latest published maps.
314    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   Local cooperation.-The River and Harbor Act of August 8, 1917,
required that on all new work under the project approved by that
act, except the channel into Curtis Bay, improvement by the United
States is made conditional upon local interests providing, whenever
required by the Chief of Engineers, free of cost to the United States,
suitable areas behind bulkheads or other revetment, satisfactory to
the district engineer, in which the dredged material may be deposited.
This condition has been met as far as the channel has been completed.
   The River and Harbor Act of July 3, 1930, provided for increased
anchorage facilities subject to the provisions that no work shall be
started on the area therein recommended until local interests have
provided suitable disposal areas satisfactory to the district engineer
alongside of bulkheads behind which said interests will agree to pump
the material without delay to the Government work; or, in lieu of
the above requirement, agree to contribute the sum of 5 cents per cubic
yard, scow measure, to cover the additional cost to the United States
for disposal of the material on its own dumping area. This condi-
tion has been met.
   The River and Harbor Act of March 2, 1945, required that respon-
sible local interests agree to hold and save the United States free
from claims for damage resulting from the work. This condition has
been met in a resolution adopted by the city council of Baltimore and
approved by the mayor on March 1, 1949.
   Terminal facilities.-The total length of developed waterfront in
Baltimore Harbor, measured along the established bulkhead line, is
about 27 miles. Extensive areas remain which are available for fur-
ther development. The existing terminal facilities include wharves,
piers, grain elevators, coal and ore piers, storage and bunkering facil-
ities for fuel oil, terminal warehouses, marine railways, drydocks,
and shipyards.
   The State legislature has authorized the city of Baltimore to incur
an indebtedness of $50,000,000 for the development of the port. The
Port Development Commission, which was charged with administra-
tion under this authorization had completed an $8,500,000 terminal
pier at Port Covington, a $110,000 terminal pier on the Northwest
Branch and a $1,500,000 terminal pier in the Canton area of the port.
For further details, see page 391, annual report for 1932. The Port
Development Commission has now been replaced by the Port of Balti-
more Commission, with more liberal financing powers.
   Operations and results during fiscal year.-New work dredging,
by contract, to provide project dimensions in the remainder of the
Brewerton section and project depth and a maximum width of 800
feet in a portion of the Brewerton-Fort McHenry Angle was con-
         RIVERS AND    HARBORS-BALTIMORE,       MD.,   DISTRICT     315
tinued and completed 28 August 1951. A total of 289,421 cubic yards
 (place measure) of material was removed and deposited on the au-
thorized dumping area in Chesapeake Bay at Kent Island, Md.
   New work dredging, by contract, to provide project depths and 800
feet width in the remainder of the Brewerton-Fort McHenry angle
and project dimensions in a portion of the Fort McHenry section
commenced January 22, 1952, and was in progress at the end of the
fiscal year. A total of 603,358 cubic yards (place measure) of mate-
rial was removed and deposited on the authorized dumping area in
Chesapeake Bay at Kent Island, Md.
   Maintenance dredging in connection with the above new work con-
tracts to restore previous project dimensions in the Brewerton-Fort
McHenry angle and a portion of the Fort McHenry section was con-
tinued and in progress at the end of the fiscal year. Totals of 70,317
and 6,642 cubic yards (place measure) of materials, respectively, were
removed and deposited on the authorized dumping area in Chesapeake
Bay at Kent Island, Md.
   Maintenance dredging was accomplished by the United States hop-
per dredge Goethals to restore project dimensions in the Craighill-
cutoff angle, cutoff section, cutoff-Brewerton angle, Riverview anchor-
age No. 1, Curtis Bay and Ferry Bar sections, and the connecting
channel to the C. & D. Canal between the periods July 2, 1951, to
September 29, 1951, and February 28, 1952, to June 2, 1952. A total
of 2,053,234 cubic yards of material (place measure) was removed and
deposited on authorized dumping areas.
   A condition survey, and an estimate of yardage of shoal material,
was made during the fiscal year, by hired labor, in the Craighill-cutoff
angle, cutoff-Brewerton angle, Riverview anchorage Nos. 1, and 2, and
the connecting channel to the C. & D. Canal.
   The total costs were $1,317,734.40, of which $619,379.65 was for new
work and $698,354.75 was for maintenance. The total expenditures
were $1,151,288.37.
   Condition at end of fiscal year.-The existing project, excluding
the York Spit Channel, which is under jurisdiction of the Norfolk
district, is about 68 percent complete.
   The work remaining to be done, excluding York Spit Channel, is
the deepening of the remaining portion of the Fort McHenry section
from previous project depth of 35 feet to 39 feet; completion of that
portion of the Brewerton-Fort McHenry angle outside the previously
dredged 800-foot width; completion of the Ferry Bar section from
Port Covington entrance channel to Ferry Bar; and completion of
the Spring Garden section, including a turning basin, from Ferry Bar
to the Western Maryland Railway bridge.
316                 REPORT OF                     CHIEF OF ENGINEERS,                                        U.      S.    ARMY,        1952


      The controlling dimensions are as follows :

                                           Section                                                       Depth
                                                                                                         (feet)            Width
                                                                                                                           (feet)       Date ascertained


Craighill entrance...........................................                                                38. 0               600   February 1949.
Craighill---.......-- ....................--....................---------------------------------------..    38. 2               600   May 1951.
Craighill-cutoff angle.......................................                                                39. 0        600-1, 729   June 1952.
Cutoff-. ------------ _-----------------------                                                               38. 3               500   January 1952.
Cutoff-Brewerton angle__-----------....---. ---------.                                                 ---   39. 0        600-1, 540   June 1952.
Brewerton section -------------------------------------                                                      39. 0               600   May 1951.
Brewerton, Fort McHenry angle_._._..--                                     ---
                                                                            ......--..    --        -        41. 0               600   September 1951.
Fort McHenry .....----------------------------------------.....................................              36. 0               500   January 1952.
Northwest Branch (inner harbor):
    East side------------
                  .                                     -------------------------                            35.0                950   December 1947.
    West side channel___-----__ -- __----__                                            ----------            35. 0               550   June 1950.
    Turning basin_ --------------------------..                                             ----. -          30. 0        950-1, 200   December 1947.
Curtis Bay...__...                             ________.................... .....      ____...               35. 0               200   October 1951.
Ferry Bar (to a point opposite Western Maryland Ry. piers)_                                                  35.0                200   October 1951.
Ferry Bar (Western Maryland Ry. piers to Ferry Bar)                                          --....          19. 0               170   January 1950.
Spring Garden Channel (Ferry Bar to Hanover St. Bridge)                                                      19. 0               180   January 1950.
Spring Garden Channel (to old southwest Baltimore                                                             9. 5               250   August 1938.
  Channel).
Connecting channel to the Inland Waterway from Delaware                                                      27. 0              400    June 1952.
  River to Chesapeake Bay.
Quarantine anchorage .----------------------------------....................................                 35. 0               450   May 1951.
FortMcHenry anchorage -------------                                     -------------------                  34. 0               400   July 1946.
Riverview anchorage No. 1-............____                              ..............            .          36. 0            1, 500   July 1946.
Riverview anchorage No. 2..._.............................                                                   22. 0            1, 200   October 1950.
Curtis Creek:
    Main channel ---_-....                 ----- ___-----------------.                                       35. 0              200    June 1948.
    Approach channel to ordnance depot--_.------------                                                       22. 0              200    July 1941.
    Southerly anchorage area_---                               -----------               ___           ---   15. 5              450    July 1941.
    Easterly anchorage a'ea _                                      _--------------------.                    18. 2              320    July 1941.
    Channel to Arundel Cove ----------------------------                                                     19. 4              200    April 1946.
    Channel in Arundel Cove ________-_-_-_-__-------                                         ...             21. 1              100    April 1946.
    Anchorage basin in front of Coast Guard yard..........                                                   20. 5              700    April 1946.



   The total costs under the existing project (including York Spit
Channel prior to fiscal year 1942) were $13,706,834.20 of which
$7,186,500.54 was for new work and $6,520,333.66 was for maintenance.
The total expenditures were $13,510,882.68.
   Proposed operations.-The balance unexpended on June 30, 1952,
$700,523.79, plus accounts receivable, $9,028.55, plus allotments during
fiscal year 1953 of $497,000 for new work operations and $425,000 for
maintenance operations, a total of $1,631,552.34 will be applied as
follows:
Accounts payable June 30, 1952_                                                         -------------                                     $204, 980. 07

New work:
   Dredging, by contract, to widen the Brewerton-Fort McHenry
     angle from the 800-foot dredged width to project dimensions
     and to provide project dimensions in a portion of the Fort
     McHenry section, Sept. 15, 1952, to Apr. 15, 1953-----------  497, 000. 00
   Continue dredging, by contract, to provide project dimensions
     in a portion of the Fort McHenry section July 1, 1952, to
     Sept. 30, 1952--------------        ----------- ------------- 415, 094. 76
                           Total new work                                  ------------------------------                                  912,094. 76
               RIVERS AND HARBORS--BALTIMORE,                                      MD.,     DISTRICT                 317
Maintenance:
    Continue dredging, by contract, for the removal of all material
      to the previous project depth of 35 feet in a portion of the
      Fort McHenry section, July 1, 1952, to Sept. 30, 1952-------- $29, 477.51
   Dredging, by contract, for the removal of all material to the
      previous project depth of 35 feet in the remaining portion of
      the Brewerton-Fort McHenry angle and a portion of the Fort
      McHenry section, Sept. 15, 1952, to Apr. 15, 1953                 70, 000. 00------------
   Dredging, by Government plant and hired labor, to restore
      project dimensions in the Craighill-cutoff angle, cutoff section
      and the cutoff-Brewerton angle, Mar. 15, 1953, to June
      30, 1953------------------------------------------8              370, 000.00
   Condition surveys and maps of the Craighill-cutoff angle, cutoff
      section, cutoff-Brewerton angle, and the Fort McHenry sec-
      tion by hired labor, July 1, 1952, to June 30, 1953---------....  22, 500. 00
   Miscellaneous inspection and reports by hired labor, July 1,
      1952, to June 30, 1953-- ------------               _-----------  22,500. 00

                  Total maintenance--...-----                    ----.---.---...                           514, 477. 51
                  Total for all work------------                            --------------- 1,631,552.34
  The additional sum of $875,000 can be profitably expended dur-
ing fiscal year 1954 for the following schedule of work:
New work: Continue deepening of the main channel to Baltimore
    Harbor (Fort McHenry section) to provide project dimensions, by
    contract, Sept. 15, 1953, to Apr. 15, 1954--.----. -------------          $500, 000
Maintenance:
   Dredging, by Government plant and hired labor, in sections of the
      main channel to Baltimore Harbor between Craighill entrance
      and Fort McHenry April 1, 1954, to June 30, 1954------------- 300, 000
   Dredging, by contract, for the removal of all material to the pre-
      vious project depth of 35 feet in a portion of the Fort McHenry
      section, Sept. 15, 1953, to Apr. 15, 1954-          .-------------------- 15, 000
    Condition Surveys and maps of sections of the main channel to
      Baltimore Harbor, by hired labor, July 1, 1953, to June 30,
      1954 ----------------------------------------------                       30, 000
    Miscellaneous inspection and reports, by hired labor, July 1, 1953,
      to June 30, 1954--------------------------------------------30, 000

            Total------- ---------                    --------------                               ---         875, 000

                                     Cost and financial summary

                                                  Fiscal year ending June 30                              Total to June
                                                                                                          30, 1952, includ-
                                                                                                          ing fiscal years
                                  1948          1949           1950           1951           1952           prior to1948

New work:
   Appropriated- ........ $384,000.00 $862, 400.00 $650,000.00 $650, 000. 00 $800,000. 00                  $16,365,598.70
   Cost ..-----------.... 1, 005, 447. 44 1, 055, 484.02 82, 363. 91 1, 029, 700. 49 619, 379.65            15, 950, 503. 94
   Expenditures--------. 986, 443. 86j1, 043, 076. 15    71, 554. 28 1, 040, 487. 81 620, 568. 62           15, 921, 371. 49
Maintenance:
   Appropriated---------........  50, 000. 00 313, 978. 67   461, 435. 54   431, 491.39    369, 500. 00      7, 009. 612. 94
   Cost---------------           107, 568. 54 323, 904. 76   445, 013. 55    42, 072. 74   698, 354. 75      6, 920, 135. 43
   Expenditures .---------109, 781. 45i 317, 679.54          381,403.02     106, 397. 26   530, 719. 75      6,753,316.36


Other new work data:
   Unobligated balance, June 30, 1952 .___..........                 $54,881. 08
   Appropriated for fiscal year ending June 30, 1953 ..........     497, 000. 00
   Unobligated balance available for fiscal year 1953_-         _    551, 881.08
    Estimated additional amount needed to be appropriated for
      completion of existing project-----_       _          _     2, 451, 400. 00
     245554-53-vol. 1----21
318            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

2. BALTIMORE HARBOR, MD., COLLECTION AND REMOVAL OF DRIFT

   Location.-The project applies to Baltimore Harbor, Md., and its
tributaries.
   Existing project.-This provides for the collection and removal of
drift from Baltimore Harbor and its tributary waters, and author-
izes the Secretary of the Army to allot such amounts as may be
necessary for the work from appropriations for maintenance and
improvement of existing river and harbor works or other available
appropriations, and that this work shall be carried as a separate and
distinct project. It is wholly a work of maintenance. The purpose
of the work is to afford relief from variable conditions of obstruction.
   The existing project was authorized by the River and Harbor Act
of June 30, 1948.
   Terminal facilities.-Describedin the report for Baltimore Harbor
and channels, Md.
   Operations and results during fiscal year.-Operations, by hired
labor, consisted of the collection and disposal of 28,242 cubic feet
 (221 cords) of driftwood, ranging from small blocks up to timbers
of large dimensions. The total costs, all for maintenance, were
$33,759.40. The total expenditures were $34,603.93.
   Condition at end of fiscal year.-The existing project is one of con-
tinuous maintenance for which no percentage of completion exists.
Navigation has been made safer by continual patrol of the harbor and
removal of drift material. The total costs, all for maintenance, were
$146,822.06. The total expenditures were $146,513.06.
   Proposed operations.-The balance unexpended on June 30, 1952,
$1,405.58, minus accounts payable $309.00, plus $30,000 allotted for
fiscal year 1953, a total of $31,096.58 maintenance funds, will be
applied to the continuance of the collection and removal of driftwood,
by hired labor, July 1, 1952 to June 30, 1953.
   Additional maintenance funds in the amount of $60,000 can be
profitably expended during the fiscal year 1954 for collection and
removal of drift, by hired labor, in Baltimore Harbor and its
tributary waters.
                                                  Cost and financial summary

                                                                Fiscal year ending June 30                           Total to June
                                                                                                                     30, 1952, includ-
                                                                                                                     ing fiscal years
                                            1948             1949          1950           1951            1952        prior to 1948

Maintenance:
   Appropriated--         ........ ............      ............       $60,000.00     $57,918. 64    $30, 000.00         $147,918. 64
   Cost..................          ............      ............        57, 918. 64    55, 144. 02    33, 759. 40         146, 822. 06
   Expenditures......... ............                ............        59, 112. 67    52, 796. 46    34, 603. 93         146, 513. 06



                                                  3. CHESTER RIVER, MD.

   Location.-ChesterRiver rises in Kent County, Del., flows in a gen-
erally southwesterly direction, and empties into Chesapeake Bay. Its
total length is about 50 miles. Kent Island Narrows is a passage con-
necting Chester River and Eastern Bay. Wells Cove is an indentation
on the easterly side of Kent Island Narrows about 0.4 mile south of
         RIVERS AND HARBORS-BALTIMORE,           MD.,   DISTRICT    319
the highway bridge crossing the Narrows. (See U. S. Coast and
Geodetic Survey Charts Nos. 548 and 1226.)
    Previous projects.-The original project for the main river was
adopted by the River and Harbor Act of March 3, 1881. For further
details, see page 333 of annual report for 1935.
    Existing project.--This provides for a channel 6 feet deep at mean
low water and 60 feet wide from Crumpton to Jones Landing, the
length of the section included in the project being about 5.5 miles, the
lower end of the section being about 37 miles above the mouth of the
river; for a channel 7 feet deep at mean low water and 100 feet wide
from Chester River to Eastern Bay through Kent Island Narrows;
and a channel 7 feet deep at mean low water and 75 feet wide, extend-
ing from the 7-foot depth curve in Kent Island Narrows 800 feet into
Wells Cove with a basin of the same depth and 300 feet square at the
head of the channel. The mean range of tide is 2.4 feet.
    The estimate of cost for new work, revised in 1952, is $48,000, ex-
clusive of the amount expended on previous projects. The latest
 (1950) approved estimate for annual cost of maintenance is $2,200.
The existing project was adopted by the River and Harbor Acts of
March 3, 1873, and September 19, 1890 (H. Ex. Doc. 65, 51st Cong.,
1st sess.), and June 30, 1948 (H. Doc. 380, 80th Cong., 1st sess.). Maps
of the locality are printed in House Documents 797 and 1587, Sixty-
third Congress, second and third sessions, respectively, and in House
Document 380, Eightieth Congress, first session.
    Local cooperation.--Fully complied with except that local interests
are required to furnish spoil disposal areas for future maintenance of
the Wells Cove section of the project. Assurances of local coopera-
tion were accepted by the Secretary of the Army on February 16, 1950.
    Terminal facilities.-Thereare two bulkhead wharves on the Chester
River section, in poor condition, with dockage room of 100 and 120
feet, and available depths of 2 and 6 feet, respectively. In Kent
Island Narrows there are 8 timber pile wharves adjacent to crab
and oyster houses, in fair condition, aggregating approximately 700
lineal feet of dockage, with available depths of from 3 to 13 feet. In
Wells Cove there is a small wharf, a small marine railway and a pub-
lic landing. All of the facilities are privately owned except the public
.landing on Wells Cove. The facilities are considered adequate for
existing commerce.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-The existing project is about 72
percent complete. The work remaining to be done to complete the
project is to widen the channel from the 75-foot dredged width to the
100-foot project width in the Kent Island Narrows section. The
controlling depths, at mean low water were 2.4 feet from Crumpton
to Jones Landing, ascertained in October 1946; 7.2 feet in the Kent
Island Narrows section from Eastern Bay to the bridge and 7.0 feet
from the bridge to Chester River, ascertained in May 1950; 7.3 feet
in the Eastern Bay section, ascertained in August 1948; and 7.0 feet
in the channel and anchorage basin in Wells Cove, ascertained in May
1950. The total costs and expenditures of the existing project were
$138,804.83, of which $32,453.05 was for new work, and $106,351.78
was for maintenance.
320              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   Proposed operations.-Nofunds are available and no work is sched-
uled for fiscal year 1953.
   The additional sum of $32,000 can be profitably expended during
fiscal year 1954 for the following schedule of work:
Maintenance:
   Condition survey of the Kent Island Narrows section, by hired
      labor, July 1, 1953, to July 30, 1953------------------------- $2, 000
   Dredging, by contract, to restore the Kent Island Narrows section
     to authorized dimensions, Sept. 1, 1953, to Apr. 30, 1954--- ------ 30, 000
                 Total ------------------------                                         ---------------------- 32, 000

                                                   Cost and financial summary

                                                                 Fiscal year ending June 30                                    Total to June
                                                                                                   _                  _        30,1952, includ-
                                                                                                                               ing fiscal years
                                               1948            1949         1950           1951               1952               prior to 1948

New work:
   Appropriated---------------------------                               $16,400.00 -$2, 007.79 ------------                        $70, 494.51
    Cost__-----------                     ------------ -----------       14, 316. 51          75. 70 ------------                    70, 494.51
   Expenditures.....----------------------------                          13, 292. 35     1,099. 86 ............------------         70, 494. 51
Maintenance:
   Appropriated---------......... $181.67 $3, 000.00                      14, 900. 00     -643. 86 ............------------         106, 351. 78
    Cost .............-----------------         185. 91   2, 895. 97      14,140. 60         219.57 ------------............        106, 351. 78
    Expenditures--------.........             1,043.24 ------------       16,044. 10      1, 212. 04 ------------                   106, 351. 78


Other new work data: Estimated additional amount needed to be ap-
   propriated for completion of existing project-$1------------------                                                               $5,    547

                                                  4. CHOPTANK RIVER, MD.

   Location.-Choptank River rises in Delaware, below Dover, and
flows in a generally southwesterly direction to Cambridge, Md., where
it turns to the northwest and empties into Chesapeake Bay south of
Tilghman Island, Md. The head of navigation is at Greensboro, Md.,
about 60 miles above the mouth of the river. The total length of the
river is about 70 miles. (See U. S. Coast and Geodetic Survey Chart
No. 1225.)
   Existing project.-This provides for a channel 75 feet wide and 8
feet deep at mean low water from Denton to Greensboro, the length
of the section included in the project being about 8 miles, the lower.
end of the section being about 46 miles above the mouth of the river,
and for a channel through Pealiquor Shoal (about 2 miles below
Denton) 8 feet deep and 100 feet wide. The mean range of tide is
about 2 feet, and the extreme tidal range is 4.6 feet.
   The cost of new work for the completed project was $84,296. The
latest (1950) approved estimate for annual cost of maintenance is
$3,300. The existing project was adopted by the River and Harbor
Act of June 14, 1880 (S. Ex. Doc. 66, 46th Cong., 2d sess.; and annual
report for 1880, p. 634); and modified by the River and Harbor Act
of July 3, 1930 (H. Doc. 188, 70th Cong., 1st sess.), the last-mentioned
act providing for the channel through Pealiquor Shoal. The latest
published map is in the last-mentioned document.
  Local cooperation.-None.
   Terminal facilities.--The terminal facilities at Denton consist of
                  RIVERS AND HARBORS-BALTIMORE,                                            MD,, DISTRICT                              321
about 500 feet of bulkhead wharf and three open-pile piers, some
of which are equipped with warehouses, but have no mechanical
freight-handling devices. These wharves are privately owned and
open to the public at reasonable rates. They are considered adequate
for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
pleted in 1931. The controlling depths, at mean low water, were 5.6
feet in the Pealiquor Shoal section, ascertained in April 1950 and 3.5
feet in the remainder of the project, ascertained in May 1946. The
total costs and expenditures were $113,251.23 of which $84,296.34 was
for new work, and $28,954.89 was for maintenance.
   Proposed operations.-An allotment during fiscal year 1953 of
$21,000 will be applied to maintenance dredging, by contract, to re-
store the Pealiquor Shoal section to project dimensions, October 1,
1952 to 31 May 1953.
   No work is scheduled for fiscal year 1954.

                                           Cost and financial summary

                                                          Fiscal year ending June 30                                    Total to June
                                                                                                                       30,1952, includ-
                                                                                                                        ing fiscal years
                                        1948            1949            1950           1951               1952           prior to 1948


New work:
   Appropriated.......------------ --- --------- ------------ ------------ ------------                                        $84, 296.34
   Cost----------------------------       - ---------------------------------------.                                            84,296.34
   Expenditures--------...................-------...---------.......---------------   ---------................--------............84, 296. 34
Maintenance:
     Appropriated...-------.......----------------------                $708.31 ------------------------                        28, 954.89
    Cost_ ---------------------------         ------                     708.31 ......       ..-----                            28,954.89
    Expenditures_----- ---------------- --------                         708. 31 ----------------------                         28, 954. 89



       5. HONGA RIVER AND TAR BAY (BARREN ISLAND GAPS), MD.

   Location.-Honga River is a tidal estuary of Chesapeake Bay and
penetrates Dorchester County on the Eastern Shore of Maryland
between Hoopers Island and the Mainland; Tar Bay is a water area
between Barren Island and the mainland peninsula and Hoopers
Island. Fishing Creek connects Tar Bay and Honga River. Back
Creek is a branch of Honga River extending into upper Hooper
Island, the mouth is about 2 miles south of Fishing Creek (See U. S.
Coast and Geodetic Survey Chart No. 1224.)
   Existing project.--This provides for a channel 60 feet wide and 7
feet deep at mean low water from the 7-foot contour in Chesapeake
Bay, through Tar Bay and Fishing Creek to the 7-foot contour in
Honga River, a length of 25,300 feet; and for a channel in Back
Creek 7 feet deep and 60 feet wide from the 7-foot depth curve in
Honga River to a point near the head of Back Creek, with a turning
basin of the same depth, 150 feet long and 200 feet wide at the head
of the channel, a length of about 5,500 feet. The mean range of tide
is about 1.4 feet.
   The estimate of cost of new work, revised in 1952, is $73,000. The
latest (1950) approved estimate of cost of annual maintenance is
322     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

$7,000. The existing project was adopted under the provisions of
the Emergency Relief Appropriation Act of 1935 and by the River
and Harbor Act of August 30, 1935 (Rivers and Harbors Committee
Doc. 35, 74th Cong., 1st sess.), and modified by the River and Harbor
Act of June 30, 1948. (H. Doc. 580, 80th Cong., 2d sess.). Maps
are published in the project documents.
   Local cooperation.-The project was modified subject to the condi-
tions that local interests provide, without cost to the United States,
all necessary lands, easements, rights-of-way, and disposal areas for
execution of the project and for subsequent maintenance, as and when
required; hold and save the United States free from damages due to
construction and maintenance of the project; and provide and main-
tain, without cost to the United States, a suitable public landing and
approach channel. Local interests have constructed the public land-
ing, have made available sufficient spoil-disposal areas and are pre-
pared to dredge the approach channel to the landing at the time the
project is dredged.
   Terminal facilities.-Numerous small private wharves are scattered
along Fishing Creek and Back Creek. A public wharf, four oyster
houses and a marine railway are located on Back Creek. The facili-
ties are adequate for existing and reasonably prospective commerce.
   Operations and results during fiscal year.--A condition survey and
an estimate of yardage of shoal material was made of the completed
portion of the project during June 1952. The total costs, all for
maintenance, were $2,989.10. The total expenditures were $1,490.55.
   Condition at end of fiscal year.-The existing project is about 39
percent complete. The channel from Chesapeake Bay, through Tar
Bay and Fishing Creek to Honga River was completed in 1935. The
work remaining to be done is the Back Creek section of the project,
which was authorized by the River and Harbor Act of June 30, 1948.
The controlling depth in the Honga River and Tar Bay section of
the project was 4.5 feet, at mean low water, ascertained in June 1952.
The condition of the Back Creek section is as described in the project
document. The total costs were $83,055.92, of which $27,667.94 (Emer-
gency Relief Funds) and $950.71 (regular funds) were for new work
and $54,437.27 was for maintenance. The total expenditures were
$81,557.37.
   Proposed operations.-The balance unexpended on June 30, 1952,
$1,009.45 maintenance funds, will be applied to completion of a con-
dition survey by hired labor.
   The additional sum of $44,400 can be profitably expended during
fiscal year 1954 for the following schedule of work:
New work: Dredging, by contract, to provide a channel 60 feet wide
and 7 feet deep, from that depth in Honga River to a point near the
head of Back Creek with turning basin of the same depth, 150 feet
long and 200 feet wide at the head of the channel, as authorized by
the River and Harbor Act of June 30, 1948. July 1, 1953, to Aug. 31,
1953 ---------------------------------------------------             $44, 400
               RIVERS      AND HARBORS-BALTIMORE,                                            MD.,     DISTRICT                323
                                     Cost and financial summary

                                                      Fiscal year ending June 30                                    Total to June
                                                                                                                    30,1952, includ-
                                                                                                                    ing fiscal years
                                 1948               1949              1950                1951          1952          prior to 1948

New work:
   Appropriated___---      ---------- -----------                $42,000.00 -$41,049.29 ------------                     $28, 618. 6
   Cost-----_ ---------------
                   ________                                          868.42       82.29 ............                     1 28, 618.65
   Expenditures.-___--_ _______-_            _-----------            857.08        93. 63 ..........------------..       1 28, 618.65
Maintenance:
   Appropriated _---__      $34, 290. 13 -------------------------------                              $2, 500. 00          53, 948.17
   Cost--- ------------.     34, 290.13 -                                                              2, 989.10           54,437.27
   Expenditures.-------                             .....-----------....-
                             37, 221.69 ......------------             ..... ..........------------    1,490.55            52, 938. 72


Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project__              400
                                                              $---------------
1 Includes $27, 667.94 Emergency Relief Funds.

6. NANTICOKE RIVER (INCLUDING NORTHWEST FORK), DEL. AND MD.

   Location.-The headwaters of Nanticoke River consist of numerous
branches rising mainly in the northern portion of Sussex County, Del.
The river is about 50 miles long and flows in a southwesterly direction
from its source to Tangier Sound.
   The Northwest Fork is a branch of the Nanticoke which rises in
Kent County, Del., and flows past Federalsburg, Md., in a generally
southerly direction through Dorchester County, Md., to its junction
with the main river opposite Riverton, Md. It is about 30 miles in
length. (See U. S. Coast and Geodetic Survey Chart No. 77.)
   Previous projects.-The original project for the Nanticoke River
was adopted August 18, 1894. For further details see page 1790 of
annual report for 1915, and page 378 of annual report for 1938. There
has been no previous project for Northwest Fork.
   Existing project.-Nanticoke: This provides for a channel 12 feet
deep and 100 feet wide from the 12-foot contour in Tangier Sound
to the highway bridge at Seaford, Del. The length of the sections
included in the project is about 11 miles, extending over 32 miles
of the river; the lower end of the first section of the project is about 8
miles above the mouth of the river. The mean range of tide is 3.4 feet
and the extreme tidal range is 4.3 feet.
   Northwest Fork: This provides for dredging a channel 6 feet deep
and 60 feet wide at mean low water from upper Browns wharf to
within one-half mile of the southern boundary of the town of Federals-
burg, with a turning basin at the upper end. The length of the section
included in the project is about 51/4 miles, and its lower end is 113/4
miles above the mouth of the river. The mean range of tide is 2.6 feet,
and the extreme tidal range is 3.3 feet.
   The estimate of cost for new work, revised in 1952, is $139,000,
'exclusive of amounts expended under previous projects. The latest
 (1950) approved estimate for annual cost of maintenance is $3,200.
324         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                     1952

  The existing project was authorized by the following river and
harbor acts:
    Acts                             Work authorized                                Documents

June 3,1896     A 9-foot channel, 100 feet wide up to Seaford, Del.,     H. Doe. 323, 53d Cong., 3d sess.,
                  with a turning basin.                                    and Annual Report 1895, p. 1165.
June 25,1910    Slight widening between the bridges in the harbor H. Doc. 674, 61st Cong., 2d sess.
                  at Seaford, Del.
           A channel 6 feet deep, 60 feet wide in Northwest
   Do-.......                                                            H. Doc. 869, 60th Cong., 1st sess.
                  Fork, together with turning basin.
Mar.   2,1945   A channel 12 feet deep, 100 feet wide from the 12-foot   S. Doc. 69, 77th Cong., 1st sess.
                  contour in Tangier Sound to the highway bridge           (Contains published map.)
                  at Seaford.


    Local cooperation.-Localinterests are required to furnish free of
cost to the United States all lands, easements, rights-of-way, and
spoil-disposal areas necessary for the improvement and for subsequent
maintenance, when and as required, and hold and save the United
States free from claims for damages resulting from the improvement.
It is believed that these conditions will be met.
    Terminal facilities.-The waterfront at Seaford consists largely of
unconnected pile and timber bulkhead wharves with earth fills. One
public wharf is used principally for unloading fuel oil for the local
utility plant. The remaining wharves are privately owned. A rail
siding extends along a considerable portion of the waterfront and
offers facilities for interchange of rail and water traffic. Existing -
terminals are reasonably adequate for present and prospective
commerce.
    The terminal facilities on the Northwest Fork are all privately
owned and open to general public use. They consist of one solid
bulkhead wharf of 80-foot frontage and three landings each with
60-foot frontage. The depths of water are from 2 to 8 feet. The
landings are log revetments backed by earth fill and are in poor
condition.
   Operations and results during fiscal year.-A condition survey and
an estimate of yardage of shoal material to be removed to restore the
channel in Nanticoke River to Seaford, Del., to authorized dimensions
was made during May 1952. The total costs, all for maintenance,
were $2,759.96. The total expenditures were $4,186.86.
   Condition at end of fiscal year.-The existing project is 48 percent
complete. The 9-foot channel to Seaford, Del., was completed in 1911
and the channel in the Northwest Fork was completed in 1912. The
work remaining to be done is the deepening to 12 feet of the channel
from Tangier Sound to the highway bridge at Seaford. The con-
trolling depth is 9 feet at mean low water in Nanticoke River, ascer-
tained in May 1952, and 5 feet at mean low water in the Northwest
Fork, ascertained in September 1921. The total costs of the existing
project were $81,508.81, of which $43,815.31 was for new work,
and $37,693.50 was for maintenance. The total expenditures were
$82,935.71.
   Proposed operations.-The balance unexpended on June 30, 1952,
$813.14 plus accounts receivable, $1,426.90, a total of $2,240.04 main-
tenance funds, will be applied to completion of a condition survey of
the Nanticoke River, during July 1952 by hired labor.
   The additional sum of $95,200 can be profitably expended during
                  RIVERS AND HARBORS---BALTIMORE,                                                       MD., DISTRICT                           325
fiscal year 1954 for new work dredging, by contract, to complete the
project, July 1, 1953, to October 31, 1953.
                                                 Cost and financial summary

                                                                 Fiscal year ending June 30                                           Total to June
                                                                           ..   .....                                         .      30, 1952. includ-
                                                                                                                                     ing fiscal years
                                            1948               1949                 1950            1951               1952           prior to 1948


New work:
    Appropriated---........ ..........-----------...........--------------------------------                         $48,815. 31
                                                                                               -.................--------..........
    Cost       -------------------------------------------                               ------------                 48,815.31
   Expenditures----.....             ------------ ------------ ---------.-----------------------                                            48, 815. 31
Maintenance:
    Appropriated--------.........--------............-----                                              ------------
                                                                     ....---------------...........--------............ $5, 000.00         39, 933.54
    Cost----..........------           -------------------------------....                                 -----------.. 2,759.96          37,693.50
    Expenditures--------------                             ---------            -----------------------                  4,186. 86         39,120. 40


Other new work data : Estimated additional amount needed to be appro-
  priated for completion of existing project__   -------------------  $95, 200

                       7. UPPER THOROUGHFARE, DEAL ISLAND, MD.
  Location.-This is a natural waterway lying between Deal Island
and the mainland of Somerset County, Md., on the eastern shore of
Chesapeake Bay. (See U. S. Coast and Geodetic Survey Chart No.
1224.)
   Previous projects.-An appropriation was made in 1882, the work
done being limited to surveys. For further details, see page 382,
annual report for 1938.
   Existing project.-This provides for an entrance channel from
Tangier Sound 9 feet deep and 100 feet wide, thence of irregular width
to and along the south shore of the thoroughfare, protected by two
stone breakwaters at the entrance, the north breakwater being about
410 feet long and the south breakwater being about 310 feet long, with
a turning basin at the inner end 9 feet deep on the south side of the
channel to within 50 feet of the bulkhead along the south shore, an
anchorage area 6 feet deep and 150 feet wide extending across the
waterway parallel to the highway bridge to within 50 feet of the bulk-
head on the south shore, and an anchorage area of 650 feet long, 300 feet
wide, and 9 feet deep on the north side of the channel between the
breakwater and the 6-foot anchorage. The mean range of tide is
about 2 feet.
   The cost of new work for the completed project was $62,116. The
latest (1950) approved estimate of cost for annual maintenance is
$3,000.
   The existing project was authorized by the following river and
harbor acts:
    Acts                                       Work authorized                                                         Documents

Aug. 30,19351       A 9-foot channel 75 feet wide protected by break-                                  Rivers and Harbors Committee
                     water at the entrance, with turning basin at the                                    Doc. 37, 72d Cong., 1st sess.
                       inner end and anchorage area 6 feet deep and 150
                       feet wide.
Aug. 26,1937        Widening the entrance channel to 100 feet, extending                               H. Doc. 76, 75th Cong., 1st sess.
                     the 9-foot turning basin and 6-foot anchorage, and                                  (Contains latest published map.)
                       dredging an additional anchorage area on the north
                       side of the channel.

1 Included in Public Works Administration program, Sept. 16, 1933.
326       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   Local cooperation.--Local interests are required by the River and
Harbor Act of August 30, 1935, to provide a suitable dock at the turn-
ing basin, which shall be open to the public on just and equal terms;
to build a dike for retaining dredged material along the south shore
of the thoroughfare west of the bridge; to provide necessary lands
behind the dike for the deposit of dredged material; and to construct
a suitable road for free public use along the waterfront connecting
with the local road system. Fully complied with. Approved by the
Chief of Engineers June 13, 1939.
   Under the River and Harbor Act of August 26, 1937, local interests
are required to furnish free of cost to the United States necessary
rights-of-way and suitable spoil-disposal areas for new work and
subsequent maintenance as required. It is provided further that the
work of improvement shall not be undertaken until local interests have
constructed or entered into firm contract for the construction of a suit-
able public wharf at the turning basin in accordance with plans ap-
proved by the Chief of Engineers, together with a suitable road along
the waterfront connecting with the local road system. All conditions
of local cooperation have been met and approved by the Chief of
Engineers June 13, 1939.
   Terminal facilities.--There is a small packing-house wharf on the
shore of Tangier Sound south of the project channel; two small pack-
ing houses along the approach channel at which the sea food is landed;
and a public wharf at the turning basin with a suitable road connecting
it with the road system.
   Operations and results during fiscal year.--A condition survey and
an estimate of yardage of shoal material to be removed to restore the
project to authorized dimensions was commenced during June 1952.
The total costs, all for maintenance, were $359.30. There were no
expenditures.
   Condition at end of fiscal year.--The existing project was com-
pleted in 1939. The controlling depths, at mean low water, were 3.6
feet in the channel and 5.7 feet in the turning basin; 3.8 feet in an-
chorage basin parallel to the highway bridge and 3.4 feet in anchorage
basin on the north side of channel, ascertained in June 1952. The
total costs were $68,580.24, of which $24,772.94 (regular funds) and
$37,342.70 (Public Works funds) was for new work and $6,464.60
 (regular funds) was for maintenance. The total expenditures were
$68,220.94.
   Proposed operations.--The balance unexpended on June 30, 1952,
$3,500, plus an allotment of $43,000 during fiscal year 1953, a total
of $46,500, maintenance funds will be applied as follows:
Accounts payable June 30, 1952--------------___-----------------        $359. 30

Maintenance:
   Complete condition survey of the project, by hired labor, during
       July    1952-----------         ------            --   ---      3,140. 70
      Dredging, by contract, to restore the project to authorized dimen-
       sions, Oct. 1, 1952, to May 31, 1953__-------------------- :43, 000. 00

       Total maintenance------- --------------------
                                                  __..                46,140.70
       Total ------------------            --   ---                            00
                                                                      46, 500.00.
  No work is scheduled for fiscal year 1954.
                  RIVERS AND HARBORS---BALTIMORE,                                   MD.,       DISTRICT                327
                                               Cost and financial summary

                                                           Fiscal year ending June 30                        Total to June
                                                                                                            30, 1952, includ-
                                                                                                            ing fiscal years
                                          1948            1949        1950        1951           1952         prior to 1948


New work:
                                ............-----------........................-----------
   Appropriated------......... ------------    ------------                ............------..........           $62,445.73
   Cost-_---------------------
   Expenditures,--
                                              ---------------------------------------------
                                    -----------------------       -----------------------------------
                                                                                                                  162,445.73
                                                                                                                   62,445. 73
Maintenance:
   Appropriated--------- ----------                              ------------
                                                          $636. 01                $391.37      $3,500. 00           9, 605. 30
        .......................-----------..
   Cost----------------                                    636. 01 ------------    391.37         359. 30           6, 464. 60
   Expenditures..-------.......------------............    636. 01 ............    391. 37   ------------           6, 105. 30

1 Includes $37,342.70 Public Works funds.

                                              8. POCOMOKE RIVER, MD.

   Location.-This river is a tributary of Pocomoke Sound, an estuary
of and on the easterly side of Chesapeake Bay about 40 miles north of
Cape Charles, Va.
   Previous project.-The original project for Pocomoke River was
adopted June 18, 1878, and modified by the River and Harbor Act of
August 5, 1886. For further details see page 1789, annual report for
1915, and page 385, annual report for 1938.
   Existing project.-This provides for a channel 7 feet deep and 100
feet wide from that depth in Pocomoke Sound through "The Muds"
to deep water in the river; and a channel 9 feet deep at mean low water
and 100 to 130 feet wide from Shad Landing to above the bridge at
Snow Hill, widened to 150 feet to form a turning basin at the upper
end, the length of the section included in the project being about 4.5
miles, the lower end of the section being about 25.7 miles above the
mouth of the river. The mean range of tide is 2.5 feet and the extreme
tidal range is 3.7 feet.
   The estimated Federal cost of new work, revised in 1952, is $183,000
exclusive of amounts expended under previous projects. The latest
 (1950) approved estimate of cost for annual maintenance is $21,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                                   Work authorized                                    Documents

June 3,1896        A 9-foot channel from Shad Landing to Snow Hill ...              Annual report for 1895, p. 1167. 1
Aug. 30,1935       For a channel 7 feet deep and 100 feet wide from                 H. Doc. 227, 74th Cong., 1st sess.
                     Pocomoke Sound to Pocomoke River.
Mar.     2,1945    Extension of channel above bridge at Snow Hill,                  H. Doc. 429, 76th Cong., 1st sess.i
                     100 feet wide, 9 feet deep, widened to 150 feet to
                    form a turning basin at the upper end.

1 Contains latest published map.

   Local cooperation.-Fullycomplied with except that local interests
are required to furnish releases from damage to oyster beds and spoil-
disposal areas as required for future maintenance. Local interests are
also required under the River and Harbor Act of March 2, 1945, to
contribute one-half the initial cost of extending the channel above the
bridge at Snow Hill, but not to exceed $4,250; furnish free of cost to
the United States, all lands, easements, rights-of-way and spoil dis-
328             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

posal areas. Local interests are continuing their efforts to comply
with these requirements.
   Terminal facilities.-The present waterfronts at Pocomoke City
and at Snow Hill consist of pile and timber bulkheads with earth fills.
Some have warehouses and factories with mechanical handling facili-
ties and rail sidings. Practically all are privately owned; most of
them are in bad repair. Any appreciable increase in commerce at
Pocomoke City would necessitate the construction of a new terminal
and the repair of existing terminals. Considerable land areas are
available for the development of additional terminals if and when
needed.
   Operations and results during fiscal year.-Maintenanceoperations
consisted of a condition survey and an estimate of yardage of shoal
material in "The Muds" section of the project, by hired labor, during
February 1952. The total costs, all for maintenance, were $2,197.87.
The total expenditures were $2,264.05.
   Condition at end of fisoal year.-The existing project is 90 percent
complete. The work remaining to be done is the extension of the
channel to above the bridge at Snow Hill. The controlling depth was
6.5 feet, at mean low water, through "The Muds" to deep water in the
river on east side of Williams Point, in midchannel for half-project
width, ascertained in February 1952, and 9 feet in the section in
Pocomoke River from Shad Landing to Snow Hill, ascertained March
1948. The condition of the section above the bridge at Snow Hill is
as contained in the project document. The total costs were $343,828.44,
of which $161,926.43 was for new work and $181,902.01 was for main-
tenance. The total expenditures were $343,894.62.
  Proposed operations.-The balance unexpended on June 30, 1952,
$87,735.95, plus accounts receivable, $66.18, a total of $87,802.13, will
be applied to maintenance dredging, by contract, to restore "The
Muds" section of the project, September 1, 1952, to December 15, 1952.
   No work is scheduled for fiscal year 1954.
                                             Cost and financial summary

                                                         Fiscal year ending June 30                                          Total to June
                                                                                                                             30, 1952, includ-
                                                                                                                             ing fiscal years
                                         1948          1949            1950                1951                 1952          prior to 1948

New work:
   Appropriated---------....        ----------       $6,000. 00 -----------            $5, 531.40 ------------                   $182,426.43
     Cost.....-------------...........------------       428. 43        $40. 17 ..............-------------------.........         182, 426. 43
   Expenditures.........------..                         422. 51         47. 32              -1.23 ---.----.                       182, 426. 43
Maintenance
    Appropriated-------........    $4,300. 00        91,222. 00    -2, 403. 36 ........-----------... $90, 000.00                  269, 704.14
    Cost....----------------4,         222. 43       75, 181. 82    13, 714. 39 ............------------ 2, 197. 87                181,902. 01
    Expenditures---.....------....  ---------        73, 058. 83                ............--
                                                                    20, 059. 81----------                2,264. 05                 181, 968.19


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project_ ------- --                                                                      $21, 100

             9. TWITCH COVE AND BIG THOROUGHFARE RIVER, MD.
Location.-This is a tidal waterway about 4 miles long traversing
Smith Island, Md., in a southeasterly direction from Chesapeake Bay
on the west to Tangier Sound on the east.                                                      (See U. S. Coast and
Geodetic Survey Chart No. 1224.)
                   RIVERS AND HARBORS--BALTIMORE,                          MD.,     DISTRICT              329
   Existing project.-This provides for a channel 7 feet deep at mean
low water and 60 feet wide from Twitch Cove on Tangier Sound
through Big Thoroughfare River, thence through the canal at Ewell,
Md., thence through Levering Creek and Big Thoroughfare River
to the vicinity of Swan Point, thence of the same depth and 100 feet
wide through the offshore bar to deep water in Chesapeake Bay, with
twin stone jetties at the entrance, the north jetty being about 2,080
feet long, and the south jetty being about 1,800 feet long; an anchor-
age basin 7 feet deep, 100 feet wide and 700 feet long connecting with
the west side of the existing project channel at Ewell; extension of
the existing project channel in Levering Creek, 6 feet deep, and 60
feet wide and 1,000 feet long; and for a channel 4 feet deep and 25
feet wide around the point between Big Thoroughfare River and
Tylers River. The mean range of tide is 1.7 feet, and the extreme
tidal range is 3 feet under ordinary conditions.
   The estimate of cost for new work, revised in 1952, is $190,700.
The latest (1950) approved estimate for annual cost of maintenance
is $5,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                          Work authorized                                   Documents

July 25,1912       A channel 4 feet deep and 25 feet wide from Tangier     H. Doc. 285, 62d Cong., 2d sess.
                     Sound into Big Thoroughfare River, and one of
                     the same dimensions around the point beween
                     said river and Tylers River.
July     3, 1930   A channel 5 feet deep at mean low water and 25 feet     H. Doc. 313, 71st Cong., 2d sess.
                     wide from Twitch Cove on Tangier Sound through
                     Big Thoroughfare River to a point on Levering
                     Creek about 800 feet north of the canal at Ewell,
                    Md.
Aug. 30, 1935      A channel 7 feet deep and 60 feet wide from Twitch      Rivers and Harbors Committee,
                    Cove through Big Thoroughfare River to a point          Doc. 67, 74th Cong., 1st sess.
                     on Levering Creek about 800 feet north of the canal
                     at Ewell, Md.
June 20,1938       Present project dimensions of the main channel with     Rivers and Harbors Committee,
                     twin jetties at the entrance.                          Doc. 49, 75th Cong., 2d sess.
                                                                             (Contains    latest   published
                                                                            maps.)
May     17,1950    Anchorage basin 7 feet deep, 100 feet wide and 700      H. Doc. 340, 81st Cong., 1st sesas.
                    feet long on west side of project channel at Ewell,
                    Md., and an extension of the existing project chan-
                    nel in Levering Creek, 6 feet deep, 60 feet wide,
                    and 1,000 feet long.

   Local cooperation.--Local interests are required to (a) furnish
without cost to the United States, all lands, rights-of-way, and spoil
disposal areas for construction and maintenance of the improvement,
when and as required; (b) hold and save the United States free from
all damages due to the construction and maintenance of the improve-
ment; (c) acquire and reserve for public use an adequate land area
adjacent to the anchorage basin with suitable access thereto; and (d)
remove all structures within the limits of the proposed improvement.
It is believed that these conditions will be met.
   Terminal facilities.-There are numerous privately owned pile
and timber wharves and bulkheads at Ewell which are open to the
public for business transactions with the owners. A county wharf
is also located at the west end of the town. Five crab houses are
situated on Levering Creek, and one oyster house is located on the
project waterway west of the town of Ewell.
330            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   Operations and results during fiscal year.-Maintenance operations
consisted of a condition survey and an estimate of yardage of shoal
material in that portion of the project channel between the twin
jetties at Swan Point and the Chesapeake Bay, by hired labor, dur-
ing September 1951. The total costs, all for maintenance, were
$4,006.60, the total expenditures were $4,051.90.
   Condition at end of fiscal year.-The existing project was completed
in November 1940, except for the work authorized by the River and
Harbor Act of May 17, 1950. The project as a whole is 87 percent
complete. The controlling depths, at mean low water, are as follows:
6.5 feet from Tangier Sound to Ewell; thence 5.9 feet to deep water
in Chesapeake Bay, and 5.0 feet in the channel in Tylers River, as-
certained in September 1951. The condition of the portion of the
project authorized by the River and Harbor Act of May 17, 1950, is
as described in the project document. The north and south jetties
have settled in several places. The total costs were $234,865.10, of
which $164,174.53 was for new work and $70,690.57 was for mainte-
nance. The total expenditures were $234,910.40.
  Proposed operations.-The balance unexpended on June 30, 1952,
$40,948.10, plus accounts receivable, $45.30, a total of $40,993.40, will
be applied as follows:
Maintenance:
   Partial repair of north jetty, by contract, September 1, 1952 to
      December 15, 1952--2---------        --------------------- $20,000. 00
    Dredging, by contract, to restore project channels to authorized
      dimensions, March 15, 1953 to June 30, 1953--
              Total --------------------------------------
                                                                     20, 993. 40                       ------------                 40, 993. 40
   No work is scheduled for the fiscal year 1954.
                                                Cost and financial summary

                                                                Fiscal year ending June 30                                         Total to June
                                                                                                                                  30, 1952, includ-
                                                                                                                                  ing fiscal years
                                           1948               1949               1950               1951               1952         priorto 1948


New work:
                   ........-----.............................--------..--------------------............-------............
   Appropriated------------                                                                                                                       53
                                                                                                                                       $-----164,174.
   Cost--_--          ----
          _------------------------------------_-----------------_                                                                      164,174.53
   Expenditures ......------------.....-----------------------------------------...............................................         164,174. 53
Maintenance:
   Appropriated------- ----------                          $6,893.00        $25, 000.00       -$11,467.76         $45,000.00            111, 683. 97
   Cost ..--------------------------                        2, 762. 90       14, 708. 70         2, 953. 64         4, 006. 60           70, 690. 57
   Expenditures---_ -------------  ---                      5, 154. 49        2, 377. 96        12, 892. 79         4, 051.90            70, 735. 87



Other new work data: Estimated additional amount needed to be ap-
propriated for completion of existing project-------------------- $26, 500

    10. OCEAN CITY HARBOR AND INLET AND SINEPUXENT BAY, MD.

  Location.-Ocean City is on a barrier island between Sine-
puxent Bay and the Atlantic Ocean about 35 miles south of the
entrance to Delaware Bay. (See U. S. Coast and Geodetic Survey
Chart No. 1220.)
   Existing project.-This provides for the construction of an in-
let between the Atlantic Ocean and Sinepuxent Bay, with a depth
                 RIVERS AND HARBORS---BALTIMORE,                         MD., DISTRICT                331
of 10 feet and width of 200 feet, protected on the south side by a
stone jetty 2,380 feet long and on the north side by a stone jetty
projecting 1,531 feet into the Atlantic Ocean and connected on the
shore to a timber and stone bulkhead 255 feet long, continuing with
a rip rap dike 213 feet long and a steel sheet pile bulkhead 460 feet
long, along the shore of the inlet; a channel 6 feet deep and 150 feet
wide from they inlet to Green Point, and thence 100 feet wide into
Chincoteague Bay; a channel 10 feet deep at mean low water, 100
feet wide, and 3,000 feet long from the inlet channel into the marsh
area south of the railroad on the west side of Sinepuxent Bay, with
two turning basins of the same depth; and for a channel 6 feet deep
and 125 feet wide from the inlet channel to a point opposite North
Eighth Street in Ocean City, thence 75 feet wide into Isle of Wight
Bay.
   The cost of new work for the completed project was $350,193 ex-
clusive of $500,000 contributed by local interests. The latest (1'950)
approved estimate for annual cost of maintenance is $32,000. The
mean range of ocean tide is 3.4 feet.
   The existing project was authorized by the following river and
harbor acts:

     Acts                          Work authorized                                 Documents   1
Aug. 30, 19352    Construction of an inlet between the Atlantic Ocean    Rivers and Harbors Committee
                   and Sinepuxent Bay, 10 feet deep and 200 feet wide,    Doc. 38, 72d Cong., 1st sess.
                   protected by jetties, a channel 8 feet deep and 100
                   feet wide from the inlet to Ocean City, 6 feet deep
                   and 150 feet wide to Green Point, and 100 feet wide
                   into Chincoteague Bay.
    Do.....       Modification providing a 10- by 100-foot channel       Rivers and Harbors Committee
                   from the inlet to the west side of the bay with 2      Doc. 60, 74th Cong., 1st sess.
                   turning basins, a channel 6 feet deep 125 feet wide
                   from the inlet channel to opposite North 8th St.,
                   Ocean City, and 75 feet wide into Isle of Wight
                   Bay.


  1 Contains latest published maps.
  2 Included in Public Works Administration program Sept. 16, 1933. The site chosen for the inlet under
this authorization was that opened just south of Ocean City by natural forces during a severe storm in
August, 1933. This eliminated the necessity for an 8-foot channel from the inlet to Ocean City.
  3 Included in Emergency Relief program, 1935.


  Local cooperation.-Fullycomplied with.
   Terminal facilities.-There are two storage basins for pleasure and
small commercial craft and numerous privately owned pile and timber
piers and bulkhead wharves on the Sinepuxent Bay side of Ocean
City. The commercial fish harbor has a public bulkhead landing
about 1,000 feet long, several private bulkhead wharves open to the
public for transaction of business with the owners, and a boat repair
yard with a marine railway capable of handling boats up to about
150 tons. The Baltimore, Chesapeake and Atlantic Railway has a spur
line parallel to and 200 feet from the commercial fish harbor. Ade-
quate space is available for expansion of facilities if required.
   Operations and results durin fiscal year.-Emergency repairs and
a condition survey of the steel sheet pile bulkhead, located along the
north side of the inlet west of Baltimore Avenue were made by hired
labor during April 1952. The total costs, all for maintenance, were
$1,602.46. The total expenditures were $1,950.41.
332               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                     1952

  Condition at end of fiscal year.-The existing project was com-
pleted in 1936. The controlling dimensions are as follows:

                                        Section                                                  Depth
                                                                                                 (feet)          Width
                                                                                                                 (feet)         Date ascertained


Inlet Channel _.................-------------------------......---------------................       12.0             200    November 1947.
Commercial Fish Harbor---------------------- --------                                                11.7             100    July 1948.
Channel to Isle of Wight Bay:
    Inlet to North 9th St..................-----------------------------................              8.0             125    October 1944.
    North 9th St. into Bay......------...--------------------.....                                    6.0              75    October 1944.
Channel in Sinepuxent Bay.................................                                            5.0             150    July 1947.
Channel in Chincoteague Bay -----------------------------.                                            5.0             100    July 1947.


   Depths refer to mean low water (Atlantic Ocean) at Ocean City,
Md., which datum is lower than that in the bays.
   The total costs of the existing project were $861,770.78, of which
$283,007.93 (Public Works funds) and $67,185.09 (Emergency Relief
funds) was for new work and $511,577.76 (regular funds) was for
maintenance. The total expenditures were $862,118.73. In addition,
$500,000 of contributed funds was expended for new work.
   Proposed operations.-The balance unexpended on June 30, 1952,
$49.59, plus accounts receivable, $347.95, plus allotment during fiscal
year 1953 of $55,000, a total of $55,397.54 maintenance funds, will be
applied to restoration of the steel sheet pile bulkhead on the north
side of the inlet west of Baltimore Avenue, by contract, September 15,
1952, to December 15, 195g.
   The additional sum of $150,000 can be profitably expended during
fiscal year 1954 for partial restoration of the north stone jetty, by
contract, September 15, 1953, to June 30, 1954.
                                                   Cost and financial summary

                                                                     Fiscal year ending June 30                                    Total to June
                                                                                                                                  30. 1952, includ-
                                                                                                                                  ing fiscal years
                                               1948               1949               1950             1951            1952         prior to 1948

New work:
   Appropriated----- -------------------------------------------------------                                                           $350,193.02
   Cost    ---------------------- ----------------------                                                                               1 350,193.02
   Expenditures------- ----------------- ---------------------------------                                        -----------         1350,193. 02
Maintenance:
     Appropriated---...---..              $70,000.00 -$18,381.37 .........-----------              $3, 313. 62     $2, 000.00           511, 975.30
     Cost-----------------                112.877. 93   3, 218. 90       $337.00                       112. 89      1, 602.46           511, 577. 76
     Expenditures-.........               110, 958. 54 15, 990. 67     -390.85                         112. 89      1, 950.41           511, 925.71

  1 Includes $283,007.93 Public Works funds and $67,185.09 Emergency Relief funds; in addition $500,000
contributed funds were expended for new work.
              RIVERS AND HARBORS--BALTIMORE,                               MD.,      DISTRICT                333
     11. EXAMINATIONS, SURVEYS AND CONTINGENCIES (GENERAL)
   The cost of this work for the fiscal year amounted to $62,861.81, of
which $3,201.43 was for examinations and surveys, and $59,660.38
was for contingencies. The total expenditures were $61,115.78.
   The balance unexpended on June 30, 1952, $182.43, plus allotments
for fiscal year 1953 of $13,000 for examinations and surveys and $31,-
700 for contingencies, a total of $44,882.43 will be applied as follows:
Accounts payable, June 30, 1952----------------------------- $1, 944. 93
Preliminary examination, survey and review reports by hired labor,
     July 1, 1952 to June 30, 1953--------------------------------    12, 905. 87
Contingencies, by hired labor, July 1, 1952 to June 30, 1953--------- 30, 031. 63
         Total --------------------------------------------                                          44, 882. 43
  The additional sum of $52,200.00 is needed to be appropriated for
the following scheduled work during fiscal year 1954:
Preliminary examinations, surveys, and review reports, by hired
     labor, July 1, 1953 to June 30, 1954------------------------$20, 500. 00
Contingencies, by hired labor, July 1, 1953 to June 30, 1954- -------- 31, 700. 00
         Total ---------------------------------------                         ---------             52, 200. 00

                                     Cost and financial summary

                                              Fiscal year ending June 30                           Total to June
                                                                                                  30,1952, includ-
                                                                                                  ing fiscal years
                                1948        1949          1950          1951           1952         prior to 1948

Maintenance:
   Appropriated-$........ $100, 000.00   $81, 650.00 $108, 724.07    $82, 421.06   $33, 250.00       $1,070. 452. 85
   Cost--------------      118, 996.13    81, 633.25   95, 030.71     72, 303.92    62, 861.81        1,072,215.35
   Expenditures-......... 110, 943.62     82, 681. 16  97, 826. 71    73, 659.55    61,115. 78        1, 070, 270.42



             12. PLANT ALLOTMENT, BALTIMORE, MD., DISTRICT
                                     Cost and financial summary

                                             Fiscal year ending June 30                            Total to June
                                                                                                  30, 1952, includ-
                                                                                                  ing fiscal years
                              1948         1949           1950          1951          1952         prior to 1948

Maintenance:
   Appropriated....----  - -$50,000.00 -$100,000.00 ------------ ------------      $80, 100. 00       $465, 097. 97
   Cost.....------------I---------       -----             ---   $147, 441.13       91,247.00          368, 882.27
   Expenditures .- ..      -218, 756.80    87,911 72 -$11,402.45 162,424.12         50, 521.50         440,450.12




        246554-53-vol. 1--22
 334           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                              13. INACTIVE NAVIGATION PROJECTS

                                                                                    Cost and expenditures
                                                                      For last full    to June 30, 1952                  Estimated
                         Name of project                               report see                                        amount re-
                                                                        annual                                            quired to
                                                                       report for New work       Mainte-                  complete
                                                                                                   nance


  1. Middle River and Dark Head Creek, Md----------                    ...                   1947 1 $38,715.25      $2, 955. 45 ()
  2. Susquehanna River above and below Havre de
        Grace, Md.................................--------------------------------           1950 a 293, 569. 78    89, 492. 37 $30, 700
  3. N ortheast R iver M d -....--         -------           .. .. .. .. .. ..               1948    28, 488. 71    11, 802. 40 (2)
  4. Elk and Little Elk Rivers, Md.           8.....                                         1932  7 90,121. 28     44, 342. 35   10, 100
  5. Rock Hall Harbor, Md.------------------------...........................                1949   139, 757. 13    10,300.65     58,000
  6. Corsica River, Md .- ............................
                                              - - - - - - - - - - - - - -- - - - - - - - -   1948    39, 070. 85    55, 907. 69 (s)
  7. Queenstown Harbor, Md.__                                                                1947    44, 858. 27    27, 642. 19 ()
  8. Channel connecting Plain Dealing Creek and Oak
       Creek, Md...-----..........................---------------------------------..        1940        111.57------------
                                                                                                                  ............   148, 400
  9. Claiborne Harbor, Md............................                                        1933    42, 973. 65    48, 584. 27 (s)
10. Knapps Narrows, Md...-------........-------------------..................               1951  8 46,121.20      45, 403.14  (s)
11. Black Walnut Harbor, Md__....-.--------------                                           1950    32, 631.08--........--------...
                                                                                                                                (1)
12. Tilghman Island Harbor, Md.s a o10- ------    -                                         1922                                 11, 000
                                                                                                          29. 73--.......--------....
13. Tred Avon River, Md. 0...........................                                       1950    12, 692. 87     4,071. 75    58, 600
14. Town Creek, Md--------.........--.--.-. --.-.-...                                       1950    43, 219. 65 ..------------ ()
15. Island Creek, Md_-------.----------------------                                         1948     6, 229. 93     1,068. 80  ()
16. La Trappe River, Md.o--.-.--..--------------------                                      1948     8, 063. 87    16, 000. 24 (3)
17. Tuckahoe River, Md.............................                                         1923     9, 727. 36     1, 092. 64 (2)
18. Warwick River, Md--       ..................-----------------..........
                                        4                                                    1948    22, 040. 82    73, 271. 90 (s)
19. Cambridge Harbor, Md. .....-.-------                      _____---                    - 1949    81, 973. 94     7, 671. 37 149, 300
20. Waterway from Little  6           Choptank             River     to     Chop-
       tank River, Md. .................................                                     1939        305. 45 ............    105, 000
21. Slaughter Creek, Md_..-------.....-..-...                                 ---.....      1948     4, 140. 00     1, 119. 40 (s)
22. Duck Point Cove, Md......-------------------------                                      1951    25, 289. 01 ............------------
                                                                                                                                (2)
23. Fishing Bay, Md.........-----------------------..-                                      1949    33, 874. 19    46, 529. 41 (2)
24. Nanticoke River, Md-                  .----------------------                           1950    73, 243. 18     2, 732. 48 ()
25. Broad Creek River, Del---.....                 ,.--............ .                       1950    64, 520. 00    45, 623. 87 (s)
26. Tyaskin Creek, Md. _________________________                                        _   1923    16, 296. 63    18, 266. 39 (s)
.28.
27. Wicomico River, Md .....--------------------
     Lower Thoroughfare, at or near Wenona, Deals
       Island, Md.....---------------------------------
                                                                                             1950
                                                                                             1951
                                                                                                  11457,847.03
                                                                                                     44, 658. 45
                                                                                                                   319, 316. 49
                                                                                                                     1, 625. 20
                                                                                                                                (2)
                                                                                                                                (2)
29. Manokin River, Md. 9 ______________________                                         _   1919 12 34,788.  05    31,874.  44 (2)
30. Crisfield Harbor, Md---                     -----------------------                     1948   264, 195. 18     5, 723. 71 (2)
31. Broad Creek, Md----.----- ----- --------------             __                           1951    28, 227. 19    58, 742. 35 (s)
32. Starlings Creek, Va ...----------------------------                                     1950    16, 537. 47    34, 482. 65 (2)
33. Tangier Channel, Va                     -.....             __......                     1951 13 72, 969.'00    61, 315. 22 (s)
34. Waterway on the coast of Virginia 4---------------- 1950                                       107, 298. 16    28, 188. 16 651, 700
35. Chincoteague Bay, Va--- ----------------------                                          1949    25, 125. 92    23, 458. 65 (2)
36. Governors Run, Calvert County, Md.4             ------------                            1950 .....................           81,000
37. Fishing Creek, Md____-----___--                           ----------                    1951   111, 242. 07    75, 857. 38 (s)
38. Herring Bay and Rockhold Creek, Md.....-------_                                         1948    50, 591.47      9,844. 02  (2)
39. Broadwater Creek, Md, ----                                            1949      ........................                     000
                                                                                                                                88,
40. Parish Creek, Md.....--------------------------.....................  1951      14 19,170.
                                                                                              27         6,826.15              ()
41. Cadle Creek,Md.'------...........-----            -1949                                                                      14, 000
                                                                                     ........... ..........-------------------------
42. Lake Ogleton, Md.'----------------------------1950                              ........... ........ .                    110, 000
43. Back Creek, Anne Arundel County, Md-....----------                    1946        23, 061. 22            89. 03           (s)
44. Annapolis Harbor, Md.___-                 ___-___-. _______           1946        34, 249. 61       1, 672.08             (s)
45. Mill Creek, Md.'....                  _------------------------------ 1949      ---------------------------                  14, 000
46. Cypress Creek, Md....                                                 1947         3, 057. 27 ------------                (s)

    1 In addition, $165,681.43 of U. S. Navy Department contributed funds were expended.
    3 Completed.
   3  Includes $22,905.38 Works Progress Administration funds.
    4 Funds have not been appropriated for accomplishment of the new work.
    a Channels adequate for commerce.
    6 Awaiting local cooperation for completion of project.
    t In addition, $8,414.09 was expended from contributed funds.
    8Includes $46,121.20 Public Works funds.
    9 Abandonment recommended in 1926 (H. Doc. No. 457, 69th Cong., 1st sess.)
    10oInsufficient potential commerce to justify the improvement.
    11In addition, $14,000 was expended from contributed funds.
    12 Includes $2,000 expended outside the project limits.
    13Includes $42,000Public Works funds.
    14Includes $19,170.27 Works Progress Administration funds.
             RIVERS AND           IHARBORS--BALTIMORE,                 MD.,      DISTRICT            335
                            14. MISCELLANEOUS              AOTIVITIES
Status of all investigations for navigation, called for by River anid Harbor
                                Acts and committee resolutions

                                                                   Date trans-    Document        Reco-
              Locality                     Authorization act        mitted to       No.          mendation
                                                                    Congress

Apes Hole Creek, Somerset County, River and Harbor Act,
  Md.                                 May 17, 1950.
Assateague Channel, Va., and House Public Works Com-
  Smallers Drain, Assateague Is-      mittee resolution, June
  land, Va., with a view to deter-    17, 1948.
  mining if recommendations should
  be modified at this time.
Back River, Md .. .... _........_.._ River and Harbor Act,
                                       May 17, 1950.
"Ballast" to Powells Bay Accomack River and Harbor Act,
  County, Va., at Wisharts Point,     June 30, 1948,
  channel connecting.
Baltimore Harbor and Channels for House Public Works Com-
  improvements for navigation.         mittee resolution, Aug.
                                         17, 1949.
Betterton, Md., Harbor at.......... River and Harbor Act,
                                       July 24, 1948.
Chincoteague Bay, Va., with a view River and Harbor Act,
to establishing a harbor of refuge    May 17, 1950.
at Chincoteague, Accomack
County, Va.
Guilford Creek, Va................ --- _-do-..........--
Goose Creek, Manokin River, Som- House Public Works Com-
erset County, Md.                     mittee resolution July 8,
                                         1947.
Havre de Grace, Md................  River and Harbor Act,
                                     May 17, 1950.
Havre de Grace main channel lead- ----.....................
                                       do---
  ing from Turkey Point, Harford
  County Md.
Holdens Creek, Va...............  ' Rivers and Harbor Act,
                                     June 30, 1948.
Jenkins Creek, Md-............--   House Public Works Com-,
                                     mittee resolution, July
                                         8, 1947.
Little Magothy River, Md.........- River and Harbor Act,
                                       June 30, 1948.
Magothy River (Little), Md......... ..... do...................
                                       June 30, 1948.
Manokin River, Goose Creek, Som- House Public Works Com-
erset County, Va.                     mittee resolutions, July
                                         8, 1947.
Manokin River, St. Peters Creek,        House Public Works Com-    Apr. 24,1952 ............     Favorable
Md., with a view to determining         mittee resolution, Apr.                                 for survey
if existing project should be modi-     5, 1949.                                                  only.
fied by 1 improving St. Peters
Creek.
Miles River, opposite Oak Creek         River and Harbor Act,      Apr. 30,1952 ............- Unfavor-
Bridge to give outlet to Miles          July 26, 1946.                                        able.
  River Talbot County, Md.
Ocean C(ity Harbor and Inlet, and       River and Harbor Act,      Apr. 17,1953    H. Doe.       Favorable.
  Sinepuxent Bay, Md.                    Mar. 2, 1945.                               444. 82d
                                                                                     Cong.,
                                                                                     2d Sess.
Powells Bay, Accomack County,           River and Harbor Act,                     -.--...-...-
  Va., at Wisharts Point, and chan-      June 30, 1948.
  nel connecting said bay with the
  "Ballast."
IRinggold Cove, with particular ref-    River and Harbor Act,
  erence thereto Severn River,           May 17, 1950.
  Anne Arundel County, Md.
St. Michaels, Talbot County, Md.        River and Harbor Act,
                                         July 24, 1946.
St. Peters Creek, Manokin River,        House Public Works Com-    Apr. 24,1952----------        Favorable
  Md., with a view to determining        mittee resolution Apr.                                   for sur-
  if existing project should be modi-    5, 1949,                                                  vey only.
  fied by improving St. Peters
  Creek.l
St. Peters Creek, Md. (survey scope).   House Public Works Com-
                                         mittee resolution June
                                         11, 1952.
Severn River, with particular ref-      River and Harbor Act,
  erence to Ringgold Cove, Anne          May 17, 1950.
  Arundel County, Md.
  See footnote at end of table.
336           REPORT OF' CHIEF OF ENGINEERS, U.                               S. ARMY, 1952

Status    of all investigations for navigation, called for by River ar~d ,tarbor
                     A cts and committee resolutions---Continued

                                                                        Date trans-      Document  Recom-
               Locality                    Authorization act             mitted to         No.    mendation
                                                                         Congress

Sinepuxent Bay, Ocean City Har-        River and Harbor Act,           Apr. 17,1952       H.     Doc.     Favorable.
  bor and Inlet, Md.                    Mar. 2, 1945.                                          444, 82d
                                                                                              Cong.,
                                                                                              2d Sess.
Smallers Drain, Assateague Island      House Public Works Com- ..                         ---..--
                                                                              ------... --........
  Va., with a view to determining if     mittee resolution, June
   recommendation should be modi-        17, 1948.
  fled at this time.
Still Pond Harbor and Creek, Md.,      House Public Works Com-         Apr.     1, 1952 -----...... Unfavor-
with a view to determining if any      mittee resolution, June                                            able.
change in the recommendations          2, 1949.
should be made at this time.
Tolchester Beach area, Maryland-....   River and Harbor Act, ---------....----.........---------.
                                                                                    ...........
                                        July 30, 1948.
Turkey Point to Havre de Grace,        River and Harbor Act, ...............-.........
main channel Harford County,           May 17, 1950.
Md.
Wicomico River, Md., particularly      Senate Public Works Com- ...........--     --     --------
the section from Tonytank Creek        mittee resolution, Sept.
to Salisbury, Md.                      23, 1949.
Wisharts Point, Powells Bay, Ac-       River and Harbor Act, .....................---
comack County, Va., and channel        June 30, 1948.
connecting    said bay   with   the
 "Ballast."


  1 Limited to preliminary examination scope.


    15. SOUTH PLYMOUTH RESERVOIR, OANASAWACTA CREEK, N. Y.

   Location.-The South Plymouth dam site is in Chenango County,
N. Y., on Canasawacta Creek, 5 miles above its junction with the
Chenango River near Norwich, N. Y. (See U. S. Geological Survey
quadrangle sheet, "Norwich, New York.")
  Eisting project.-The plan of improvement consists of a dam of
the earth-filled type, 1,000 feet long at the top of the embankment
and rising 125 feet above the streambed, with a gate-controlled
outlet in the right abutment and the spillway in the saddle of the
left abutment. The reservoir will have a storage capacity of 18,500
acre-feet at spillway crest. The reservoir will control 94 percent
of the watershed of Canasawacta Creek or 4 percent of the Chenango
River watershed above Binghamton, N. Y. The reservoir area will
be 495 acres and the pool will extend 2.5 miles upstream. The exist-
ing project was authorized by the Flood Control Act approved Decem-
ber 22, 1944, as a modification of the plan for flood control in southern
New York and eastern Pennsylvania authorized by the act of June
22, 1936, as amended by the act of August 18, 1941. (H. Doc. 702,
77th Cong., 2d sess.) The estimated Federal cost for new work,
revised in 1952, is $7,100,000, of which $5,720,000 is for construction
and $1,380,000 is for lands and damages.
  Local cooperation.-None required. See pages 4-5.
   Operations and results during fiscal year.--Engineering studies
and preliminary design in connection with the development of the
project plan were continued during the fiscal year by hired labor.
The total costs, all for new work, were $378.70. The total expendi-
tures were $397.44.
  Condition at end of fiscal year.-Foundation investigations and
reservoir surveys are complete. Engineering studies and preliminary
                     .FLOOI)        CONTROL-BALTIMORE,                         MD.,      DISTRICT                    337
design are approximately 79 percent complete. Completion of de-
tailed design and preparation of contract plans and specifications, by
hired labor, and construction of the project, by contract, remain to be
done. The total costs, and expenditures, all for new work, were
$99,644.38.
  Proposed operations.-The balance unexpended on June 30, 1952,
$855.62 new work funds, will be applied to continuing preparation of
design and plans, by hired labor, July 1, 1952 to June 30, 1953.
  No work is scheduled for fiscal year 1954.
                                          Cost and financial summary

                                                       Fiscal year ending June 30                         Total to June
                                                                                                          30, 1952, includ-
                                                                                                          ing fiscal years
                                      1948            1949         1950         1951           1952        priorto 1948

New work:
   Appropriated_....-----------        --..      - $20,000.00    $1,500.00 -$67,000.00     -- $27000.00       $100,500.00
    Cost....--------------......   $12,175.69      20,127. 64    34, 427.58    9, 933.15         378.70          99,644.38
    Expenditures...---------        11, 484.50     19, 773. 14   36, 099. 28   9, 288.40         397.44          99, 644.38


Other new work data:
    Unobligated balance, June 30, 1952__---_----_--_---_-----_            $850. 62
   Unobligated balance available for fiscal year 1953 _____-____-           850. 62
    Estimated additional amount needed to be appropriated for
      completion of existing project_ ------------------          - 6, 999, 500. 00

     16. GENEGANTSLET RESERVOIR, GENEGANTSLET CREEK, N. Y.
  Location.-The Genegantslet Dam site is on the Genegantslet Creek,
3 miles above its junction with the Chenango River and about 2 miles
west of Greene in Chenango County, N. Y. (See U. S. Geological
Survey quadrangle sheet, "Greene, N. Y.")
  Existing project.--The plan of improvement consists of a dam of
the earth-filled type, 1,660 feet long at the top of the embankment and
rising 104 feet above the stream bed with a gate-controlled outlet and
a chute spillway in the left abutment. Outlet and spillway will be
placed on rock. The reservoir will have a storage capacity of 30,195
acre-feet at spillway crest. The reservoir area will be 923 acres, and
the pool will extend 4.8 miles upstream. The reservoir will control
90 percent of the watershed of Genegantslet Creek or 6 percent of
the Chenango River watershed above Binghamton, N. Y. The exist-
ing project was authorized by the Flood Control Act approved De-
cember 22, 1944, as a modification of the plan for flood control in
southern New York and eastern Pennsylvania authorized by the act
of June 22, 1936, as amended by the act of August 18, 1941 (H. Doe,
702, 77th Cong., 2d sess.). The estimated Federal cost for new work,
revised in 1952, is $6,875,000, of which $6,190,000 is for construction
and $685,000 is for lands and damages.
  Local cooperation.-Nonerequired. See - pages 4-5.
   Operationsand results during fiscal year.-Engineeringstudies and
preliminary design in connection with revision of the project plan
were continued during the fiscal year by hired labor. A report of the
completed model study was continued by the U. S. Waterways Experi-
ment Station, Vicksburg, Miss. The total costs, all for new work,
were $3,140.10. The total expenditures were $2,788.92.
338           REPORT OF CHIEF OF ENGINEERS, U. -S ARMY, 1952

   Condition at end of fiscal year.-Foundation investigations are
complete except for construction of an exploration tunnel, and pre-
liminary design plans are complete except for the spillway. The work
remaining to be done is completion of report of the model study,
foundation investigations, preparation of detailed design and contract
plans, and construction of the project. The total costs, all for new
work, were $208,607.46. The total expenditures were $208,237.54.
   PROPOSED OPERATIONs.-The balance unexpended on June 30, 1952,
$7,762.46, will be applied as follows:
Accounts payable, June 30, 1952---....-------...------..------------------                                      $369.92
New work July 1, 1952, to June 30, 1953:
    Continue preliminary design and plans by hired labor --------                                              7,392.54

          Total....----------------------------------------------                                              7, 762. 46
    No work is scheduled for the fiscal year 1954.
                                       Cost and financial summary

                                                    Fiscal year ending June 30                             Total to June
                                                                                                           30,1952, includ-
                                                                                                           ing fiscal years
                                   1948           1949           1950           1951            1952         priorto 1948

New work:
   Appropriated-          -..... $35,000.00           ..              ..-------$22, 000. 00 -$34,000.00        $216,000.00
   Cost.---------------          79, 865. 28   $29, 348. 01   $25, 365. 41      10, 908. 97     3,140.10        208, 607. 46
   Expenditures       --------   83, 193. 31    29, 442. 17    26, 218. 97      10, 343.87      2,788.92        208, 237. 54


Other new work data:
   Unobligated balance, June 30, 1952----------------------          $5, 975. 14
   Unobligated balance available for fiscal year 1953-----------      5, 975. 14
   Estimated additional amount needed to be appropriated for
      completion of existing project-----     ------------------ 6, 659, 000. 00

                17. SOUTHERN NEW YORK FLOOD CONTROL PROJECT

  Location.-The work covered by this project is in the upper water-
shed of the Susquehanna River to and including the Chemung River.
This includes about 6,050 square miles in south central New York, and
about 1,480 square miles in northern Pennsylvania. (See U. S.
Geological Survey index maps of New York and Pennsylvania.)
  Eaisting project.--The Flood Control Act approved June 22, 1936,
authorized the construction of detention reservoirs and related flood
control works for protection of Binghamton, Hornell, Corning, and
other towns in New York and Pennsylvania, in accordance with plans
approved by the Chief of Engineers on recommendation of Board of
Engineers for Rivers and Harbors. The Flood Control Act approved
May 17, 1950, modified the local flood protection plan as originally
authorized for Corning, N. Y., to provide for flood protection on
Monkey Run.
  The individual units which constitute the approved plan of improve-
ment are described in the following paragraphs:
  Davenport Center Reservoir: This reservoir will be located on
Charlotte Creek near Davenport Center, N. Y. The dam will be of
the earth-filled type, 3,900 feet long at the top of the embankment
and rising 100 feet above the stream bed, with a concrete spillway
            FLOOD CONTROIr-BALTIMORE,        MD., DISTRICT          339
in the right abutment and the outlet conduit in the valley floor. The
reservoir will provide a storage capacity of 52,500 acre-feet. The
estimated Federal cost of new work, revised in 1952, is $10,285,000,
of which $7,095,000 is for construction and $3,190,000 is for lands and
damages.
   West Oneonta Reservoir: This reservoir will be located on Otego
Creek near West Oneonta, N. Y. The dam will be of the earth-filled
type, 1,200 feet long at the top of the main embankment and rising 86
feet above the stream bed, with a concrete spillway and outlet conduit
in the right abutment. The main embankment will be joined at the
left abutment by a low dike, 6,700 feet in length. The reservoir will
provide a storage capacity of 34,500 acre-feet. The estimated cost
of new work, revised in 1952, is $10,725,000, of which $8,145,000 is for
construction and $2,580,000 is for lands and damages.
   East Sidney Reservoir: This reservoir is located on Ouleout Creek
near East Sidney, N. Y. The dam is of the concrete gravity and earth-
filled type, 2,010 feet long at the top of the embankment and rising
128 feet above the stream bed, and 146 feet above firm rock, with five
gate-controlled outlets in the spillway section of the dam; 750 feet
of the dam, including the spillway, Is concrete gravity section and
1,250 feet is rolled earth embankment. The reservoir will provide a
storage capacity of 33,494 acre-feet. The estimated Federal cost of
new work, revised in 1952, is $5,920,000, of which $5,300,000 is for con-
struction and $620,000 is for lands and damages.
   Copes Corner Reservoir: This reservoir will be located on Butternut
Creek near Copes Corner, N. Y. The dam will be of the earth-filled
type, 1,150 feet long at the top of the embankment and rising 75 feet
above the stream bed, with a concrete spillway and outlet conduit in
the right abutment. The reservoir will provide a storage capacity of
37,900 acre-feet. The estimated Federal cost of new work, revised
in 1952 is $12,680,000, of which $10,245,000 is for construction and
 $2,435,000 is for lands and damages.
    Whitney Point Reservoir: The reservoir is located on the Otselic
River near Whitney Point, N. Y. The dam is of the earth-filled type,
4,900 feet long at the top of the embankment and rising 95 feet above
the stream bed, with a concrete spillway and outlet conduit in the left
abutment. The reservoir has a storage capacity of 86,440 acre-feet.
The estimated Federal cost of new work, revised in 1952, is $5,080,000,
of which $3,981,000 is for construction and $1,099,000 is for lands
and damages.
    Arkport Reservoir: The reservoir is located on the Canisteo River
near Hornell, N. Y. The dam is of the earth-filled type, 1,200 feet
long at the top of the embankment and rising 113 feet above the stream
bed, with a concrete spillway and outlet conduit in the right abutment.
The reservoir has a storage capacity of 7,900 acre-feet. The estimated
Federal cost of new work, revised in 1952, is $1,910,000, of which
 $1,777,732 is for construction and $132,268 is for lands and damages.
    Almond Reservoir: This reservoir is located on Canacadea Creek
near Hornell, N. Y. The dam is of the earth-filled type, 1,260 feet
long at the top of the embankment and rising 90 feet above the bed
of the stream, with a concrete spillway and outlet conduit in the left
340     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,           1952

abutment. The reservoir will provide a storage capacity of 14,800
acre-feet. The estimated Federal cost of new work, revised in 1952, is
 $5,616,000, of which $4,722,000 is for construction and $894,000 is for
lands and damages.
    Oxford, N. Y.: The plan of improvement provides for the construc-
tion of earth levees and the clearing of the Chenango River channel,
consisting of the following features: About 2,100 feet of earth levee
on the left bank of the Chenango River, extending from high ground
near Cemetery Drive and running mostly along the railroad to high
ground near Main Street; removal of the dam and island below Main
Street; raising of the Delaware, Lackawanna & Western Railroad
over the levee; and appurtenant closure and drainage structures. The
improvement provides protection for the village of Oxford on the left
bank against a flood discharge substantially larger than the maximum
flood of record, which occurred in July 1935. The Federal cost of
new work for the completed project was $131,000 of which $96,944 was
for construction and $34,056 was for lands. The estimated local cost
of lands and damages, revised in 1951, is $13,000.
    Lisle, N. Y.: The plan of improvement provides for channel re-
alinement and the construction of earth levees and concrete flood
walls, consisting of the following features: Relocation of about 3,000
feet of the-Dudley Creek channel, extending from 1,200 feet west of
the intersection of Cortland and Main Streets to the confluence with
the Tioughnioga River; realinement of some 5,700 feet of the Tiough-
nioga River channel east of the village; about 4,150 feet of earth levee
and 970 feet of concrete wall on the right bank of Dudley Creek and
the Tioughnioga River, extending from Main Street just above
Collier Street to the railroad crossing on River Street; raising of
about 1,860 feet of the Delaware, Lackawanna & Western single-track
railroad over the levee; relocation of about 1,600 feet of Cortland
Street; a new bridge over the relocated Dudley Creek; and appur-
tenant drainage structures. The improvement provides protection
for the village of Lisle against flood discharges 20 percent greater on
the Tioughnioga River and about 100 percent greater on Dudley Creek
than the corresponding discharges of the maximum flood of record,
which occurred in July 1935. The estimated Federal cost of new
work, revised in 1952 is $665,000, of which $605,000 is for construction
and $60,000 is for lands and damages. The estimated local cost of
lands and damages, revised in 1951, is $95,000.
   Whitney Point, N. Y.: The plan of improvement provides for
channel realinement and construction of earth levees, consisting of
the following features: Realinement of about 1,800 feet of the Tiough-
nioga River channel, above the confluence with the Otselic River;
about 7,100 feet of earth levee along the right bank of the Tioughnioga
River, extending from high ground on Main Street above the village
to Collins Street just below the village; and appurtenant drainage
structures. The improvement, supplemented by the Whitney Point
Reservoir above the area, will provide protection for the village of
Whitney Point against a flood discharge approximately 20 percent
greater than the maximum flood of record, which occurred in July
1935. The Federal cost of new work for the completed project was
            FLOOD CONTROIr-BALTIMORE, MD.,         DISTRICT        f




 $424,096, of which $411,653 was for construction and $12,443 was for
lands and damages. The estimated local cost of lands and damages,
revised in 1952, is $100,000.
   Binghamton, N. Y.: The plan of improvement provides for the
construction of earth leyees, concrete flood walls and appurtenant
drainage structures, consisting of the following features: About 850
feet of channel excavation and about 1,375 feet of earth levee along
Phelps Creek, town of Port Dickinson; new concrete wall on the
right bank of the Chenango River extending downstream from high
ground near the city limits to the existing flood wall below DeForest
Street, a distance of about 520 feet; about 150 feet of concrete wall
just below Cutler Dam; about 180 feet of concrete wall at the pump
house near McDonald Avenue; raising the existing earth levee on the
right bank of the Chenango River, extending from Cutler Dam down-
stream for a distance of about 1,220 feet; about 2,915 feet of earth
levee on the left bank of the Chenango River north of the city limits in
the village of Port Dickinson, extending from Church Street to high
ground just north of the city line; about 3,900 feet of earth levee on
the left bank of the Chenango River extending from DeForest Street
to Cutler Dam; new concrete flood walls and river bank revetment for
a distance of about 5,570 feet extending on the left bank of the
Chenango River from Cutler Dam to the junction with the Susque-
hanna River; about 540 feet of new concrete flood wall and raising
about 1,085 feet of concrete flood wall on the right bank of the Susque-
hanna River, extending from the Delaware, Lackawanna & Western
Railroad downstream to the Tompkins Street Bridge; about 1,940
feet of earth levee, about 1,940 feet of concrete flood wall; and cap-
ping about 125 feet of concrete flood wall, on the right bank of the
Susquehanna River from Stuyvesant Street to the mouth of the
Chenango River; about 8,380 feet of earth levee, about 2,180 feet of
new concrete flood wall and raising about 125 feet of existing flood
wall on the left bank of the Susquehanna River extending from Pierce
Creek to high ground at State Highway No. 17; a debris dam and
flume between Corbett and Hotchkiss Streets and a concrete pressure
conduit, 1,060 feet long, to carry the flow of Park Creek from Vestal
Avenue to the Susquehanna River; about 665 feet of levee extending
from the Erie Railroad to high ground along the right bank of
Chamberlain Creek near the mouth; closure structures at the Erie
Railroad and at Court Street; a weir, a drop structure and about
1,800 feet of earth levee, about 2,235 feet of channel excavation; about
645 feet of channel paving, and raising about 470 feet of existing
concrete flood wall and about 200 feet of new concrete flood wall for
the improvement of Pierce Creek from its mouth to about 1,000 feet
above Conklin Avenue; and appurtenant drainage structures. The
improvement, supplemented by authorized flood-control dams above
the area, will provide protection for the city of Binghamton against
a flood discharge approximately 20 percent greater than the maxi-
mum flood of record, which occurred in July 1935 on the Chenango
River and in March 1936 on the Susquehanna River. The estimated
Federal cost of new work, revised in 1952 is $2,954,000, of which
$2,845,000 is for construction and $109,000 is for lands and damages.
342     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

The estimated local cost of lands and damages, revised in 1951, is
$720,000. Local interests have contributed an additional amount of
$163,095.63 for the construction of improvements not included in the
authorized project.

-struction
   Elmira, N. Y.: The plan of improvement provides for the con-
           of earth levees, concrete flood walls, a concrete conduit and
a pumping station, and consists of the following features: About
:17,700 feet of earth levee, and about 4,100 feet of concrete flood wall
on the right bank of Chemung River, extending from South Hoffman
Street to a point below the city near the upper end of Big Island;
about 12,100 feet of earth levee and about 6,300 feet of concrete wall
on the left bank of the Chemung River extending from Durland
Avenue to the Delaware, Lackawanna & Western Railroad at the
mouth of Newtown Creek; about 10,000 feet of earth levee on the
right bank of Newtown Creek, extending from about the intersection
of the Delaware, Lackawanna & Western Railroad and East Church
Street to high ground near the intersection of Sullivan and Warren
Streets; about 4,300 feet of earth levee on the right bank of Diven
Creek; about 2,000 feet of concrete conduit enclosing Hoffman Brook
from West Second Street to the Chemung River; clearing island and
river banks of trees and brush for a distance of about 31/2 miles in
the Chemung River; about 14,300 feet of earth levee on the left bank
of Seely Creek, extending from the Erie Railroad to high ground
approximately 1,000 feet northwest of the intersection of South
Broadway and Pennsylvania Avenue, a pumping plant for the dis-
posal of interior drainage; an interceptor sewer about 6,000 feet
long, varying in size from 48 to 96 inches in diameter; and appurte-
nant structures. The improvement will provide protection for the
city of Elmira against a Chemung River discharge approximately
equal to that of the maximum flood of record, which occurred in May
1946. The estimated Federal cost of new work, revised in 1952, is
$6,815,000, of which $6,627,000 is for construction and $188,000 is
for lands and damages. The estimated local cost of lands and dam-
:ages, revised in 1951, is $981,000.
    Corning, N. Y.: The plan of improvement as originally authorized
by the Flood Control Act of 1936 provides for the construction of a
:pumping station, earth levees, and concrete flood walls, consisting of
the following features: About 4,300 feet of earth levee, enlargement
of about 8,610 feet of existing earth levee, and about 3,100 feet of
,concrete flood wall on the right bank of Chemung River, extending

-the
from the Erie Railroad bridge to high ground at Park Avenue below
     city; about 200 feet of concrete flood walls; about 2,500 feet of
earth levees, and enlargement of about 11,500 feet of existing earth
levee on the left bank of the Chemung and Cohocton Rivers, extend-
-ing from the Erie Railroad bridge over the -Cohocton River to the
mouth of Post Creek; about 2,500 feet of earth levee and enlargement
Hof about 4,700 feet of existing earth levee on the right bank of Post
Creek from its mouth to Watkins Street; realinement of about 3,000
feet of channel, about 8,800 feet of earth levee, about 3,000 feet of
channel excavation, a pressure conduit about 400 feet long, a drop
structure and a weir for the improvement of Cutler Creek, extending
            FLOOD CONTRQL-BALTIMORE,        IVD., DISTRICT        343
from its mouth to high ground at Deckertown Road and Hornby
Road; and appurtenant drainage structures. The plan for flood pro-
tection on Monkey Run authorized by the Flood Control Act of 1950
provides for the construction of 1,870 feet of open flume, 2,280 feet
of pressure conduit, a pumping station with a capacity of 4,500 gal-
lons per minute, storm sewers and appurtenant facilities between the
existing improved channel above Sixth Street and the Chemung
River at a point immediately east of Pine Street. The modified im-
provement will provide protection for the city of Corning against
a flood discharge in the Chemung River approximately equal to the
maximum flood of record, which occurred in May 1946, and on trib-
utary streams against floods of greater magnitude than known to
date. The estimated cost of new work revised in 1952, is $5,237,000,
of which $5,076,000 is for construction and $161,000 is for lands and
damages. The estimated local cost, revised in 1952 is $980,000, of
which $730,000 is for land and damages, and $250,000 is to be con-
tributed for construction of the protection on Monkey Run.
   Painted Post, N. Y.: The plan of improvement provides for chan-
nel realinement and the construction of earth levees and concrete
flood walls, consisting of the following features: Realinement of
about 6,000 feet of the Cohocton River Channel, extending from about
one-half mile above State Highway Route No. 17 to the Chemung
River; construction of about 2,500 feet of earth levee and raising of
about 1,200 feet of existing flood wall along the left bank of the Co-
hocton River, extending from the mouth of Hodgman Creek to the
Chemung River; about 2,900 feet of earth levee, and about 2,100 feet
of concrete flood wall, extending on the left bank of Hodgman Creek,
from its mouth to high ground above State Highway No. 2; and
appurtenant drainage structures. The improvement provides pro-
tection for the village of Painted Post against a flood discharge.
approximately equal to the maximum flood of record, which occurred
in May 1946. The Federal cost of new work, for the completed proj-
ect was $414,182, of which $402,948 was for construction and $11,234
was for lands and damages. The estimated local cost of lands and
damages, revised in 1951, is $55,000.
   Addison, N. Y.: The plan of improvement provides for the con-
struction of earth levees and concrete flood walls, consisting of the
following features: Construction of about 3,100 feet of earth levee
and about 700 feet of concrete flood wall on the right bank of the
Canisteo River, extending from high ground on Steuben Street near
the Baltimore & Ohio Railroad to the mouth of Tuscarora Creek;
removal of existing dam, mill, and raceway from the channel; con-
struction of about 2,200 feet of earth levee on the left bank of Tusca-
rora Creek, extending from Tuscarora Street to the Canisteo River;
construction of about 4,600 feet of earth levee on the right bank of
Tuscarora Creek, extending from high ground at the southwest edge
of the village to high ground at the southeast edge of the village; and
appurtenant drainage structures. The improvement, supplemented
by the Arkport and Almond Reservoirs above the area, will provide
protection for the village of Addison against a flood discharge on the
Canisteo River approximately 28 percent greater than the maximum
344     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

flood of record, which occurred in July 1935: Protection is provided
on Tuscarora Creek against a flood discharge approximately equal
to the maximum flood of record, which occurred in May 1946. The
Federal cost of new work for the completed project was $827,050 of
which $814,236 was for construction and $12,814 was for lands and
damages. The estimated local cost of lands and damages, revised in
1951, is $125,500.
    Bath, N. Y.: The plan of improvement provides for the construc-
tion of earth levees and concrete flood walls along the Cohocton River,
consisting of the following features: Construction of about 10,400
feet of earth levee and about 1,250 feet of concrete flood wall, extend-
ing from above Cameron Street to below the turn-out of the Bath &
Hammondsport Railroad; including about 600 feet of cutoff levee
between the' Delaware, Lackawanna & Western Railroad and U. S.
Highway No. 15; three stop-log structures across railroad tracks;
a sandbag opening at Cameron Street; and a sill across the Delaware,
Lackawanna & Western Railroad tracks below Cameron Street; and
appurtenant drainage structures. The improvement will provide
protection for the village of Bath against a flood discharge approxi-
mately equal to the maximum flood of record, which occurred in July
1935. The Federal cost of new work for the completed project was
$638,331 for construction. The estimated local cost of lands and
damages, revised in 1951 is $56,700.
    Avoca, N. Y.: The plan of improvement provides for the construc-
tion of earth levees, channel improvement, and channel alinement,
consisting of the following features: Improvement and realinement
of about 8,300 feet of the Cohocton River Channel, extending from
above the Erie Railroad to below the junction of Main Street and U. S.
Highway No. 15; construction of about 8,500 feet of earth levee on
-the left bank of the Cohocton River, extending from high ground
above Alexander Avenue to about 1,300 feet below the junction of
Main Street and U. S. Highway No. 15; about 4,500 feet of earth levee
on the right bank of Salmon Creek, extending from high ground above,
Alexander Avenue to the Erie Railroad; a new highway bridge for
U. S. Highway No. 15 over the Cohocton River; raising of the Erie
Railroad bridge 4 feet; and appurtenant drainage structures. The
improvement provides protection for the village of Avoca against a
flood discharge approximately double the maximum flood of record,
which occurred in July 1935. The Federal cost of new work for the
completed project was $436,374, of which $406,589 was for construc-
tion anal $29,785 was for lands and damages. The estimated local
cost of lands and damages, revised in 1951, is $68,300.
    Canisteo, N. Y.: The plan of improvement provides for the con-
struction of earth levees, consisting of the following features: About
8,000 feet of earth levees on the right bank of the Canisteo River,
extending from high ground 1,570 feet west of State Highway Route
No. 21 above the village to a point at the intersection of Ordway Lane
and East Main Street; about 7,400 feet of earth levee on the left bank
of Purdy and Bennett Creeks, extending from Main Street Bridge to
high ground above Greenwood Street, and 1,000 feet of earth levee
             FLOOD CONTROIr--BALTIMORE,         MD., DISTRICT           345:
on the right bank of Bennett Creek, extending upstream from Main
Street Bridge; a concrete check dam with wing levees above Green-
wood Street; a new highway bridge at Greenwood Street; alterations
to existing timber check dams in Bennett Creek; channel excavation
in Bennett and Purdy Creeks; and appurtenant drainage structures.
The improvement, supplemented by the Arkport and Almond Reser-
voirs above the village, will provide protection for the village of
Canisteo against a flood discharge approximately 30 percent greater
on the Canisteo River than the maximum flood of record, and on
Bennett and Purdy Creeks the channel capacity will be approximately
equal to the discharge of the maximum flood of record, which occurred
in July 1935. The estimated Federal cost of new work, revised in
1952, is $976,000, of which $917,000 is for construction and $59,000
is for lands and damages. The estimated local cost of lands and
damages, revised in 1952, is $72,000.
   Hornell, N. Y.: The plan of improvement provides for channel
realinement and the construction of earth levees, concrete flood walls,
and check dams consisting of the following features: Realinement of
about 4,600 feet of Canisteo River Channel, and about 5,800 feet of
earth levee on its right bank, extending from Seneca Street upstream
to the junction of the Pittsburg, Shawmut & Northern Railroad and
the Erie Railroad; construction of about 4,500 feet of earth levee,
extending on both sides of Seneca Street from the Canisteo River to
Wrightman Avenue and the junction of Cleveland Avenue and
Bethesda Drive; construction of about 7,200 feet of earth levee, about
2,500 feet of concrete flood wall, and raising of about 1,500 feet of exist-
ing concrete flood wall, on the right bank of the Canisteo River, and
about 12,000 feet of channel improvement, extending from Seneca
Street to the Erie Railroad; construction of about 2,500 feet of earth
levee, about 2,100 feet of concrete flood wall on the left bank of Canisteo
River, extending from a point opposite Walnut Street to the Erie
Railroad; a ring-earth levee about 2,800 feet long around the sewage-
disposal plant on the left bank of the Canisteo River; about 4,500 feet
of realinement and improvement of the Canisto River Channel, with
about 4,500 feet of earth levee on its right bank, extending from Cedar
Street downstream to about 1,400 feet above East Avenue; about
2,400 feet of channel paving, 1,400 feet of earth levee, raising of about
1,900 feet of concrete flood wall, and construction of one check dam
on Canacadea Creek; about 1,600 feet of channel paving and construc-
tion of 3 check dams on Chauncey Run with about 300 feet of new
wall and about 300 feet of capping; a weir, a check dam, 3,030 feet
of channel paving, 4,800 feet of flood walls and levees, and related
work on existing walls, all on Crosby Creek; removal of 6 bridges,
erection of 4 bridges, miscellaneous bridge structures, and 3 drop
structures; and appurtenant drainage structures and small stream
control works.
    The improvement, supplemented by the Arkport and Almond
Reservoirs above the area, will provide protection for the city of
Hornell against a flood discharge approximately double the maximum
flood of record, which occurred in July 1935. The estimated Federal
346    REPORT OF CHIEF OF ENGINEERS, U.       S. ARMY, 1952


cost of new work, revised in 1952, is $4,260,000, of which $3,665,000
is for construction and $595,000 is for lands and damages. Local
interests have contributed $15,000 for construction of improvements
not included in the authorized project.
  Almond, N. Y.: The plan of improvement provides for channel
realinement and the construction of earth levees, consisting of the
following features: About 4,750 feet of earth levee on the left bank
of Canacadea Creek and McHenry Valley Creek, extending from high
ground above the village to high ground below the village; realine-
ment of about 3,200 feet of channel on Canacadea Creek, extending
downstream from Angelica Street; and appurtenant drainage struc-
tures. The improvement will provide protection for the village of
Almond against a flood discharge approximately equal to the maxi-
mum flood of record, which occurred in July 1935. The estimated
Federal cost of new work, revised in 1952, is $360,000, of which
$354,000 is for construction and $6,000 is for lands and damages.
The estimated local cost of lands and damages, revised in 1949, is
$24,000.
                                                                                      Dams and reservoirs 1


                                                                                                                           Distance                                          Estimated Federal cost
                                                                                                                            above         Height in     Reservoir
                  Name                            Nearest city                                 River                                        eet         cpcity in
                                                                                                                             miles                       acre-feet    Construc-      Lands and       Total
                                                                                                                                                                        tion         damages 3

Davenport Center______-.                ___ Oneonta. ------------------       Charlotte Creek----......---....------------            5           100       52, 500   $7,095,000 $3, 190, 000      $10, 285,000    r
West Oneonta__----   ____do        _.                 -------------------     Otego Creek .----------------------                     2            86       34,500     8,145, 000    2, 580, 000    10, 725, 000   O
                                                                                                                                                                                                                   0
East Sidney 2                 ..            Sidney-
                                            Sidney       ------------------   Ouleout Creek-.         ..--   ..-.----.                4           146       33,494     5,300,000        620, 000     5, 920, 000
Copes Corner----            --------------.     do ...-------------------     Butternut Creek................------------------       3            75       37, 900   10, 245, 000 , 2, 435, 000    12, 680, 000
Whitney Point 2--------------- Binghamton---- ------                          Otselic River..       .........---------------------- 1              95       86, 440    3, 981,000    1,099, 000      5, 080, 000   H
Arkport 2-----------            --       _  Hornell----- ------------         Canisteo River ----        ----------------            50           113        7, 900    1, 777, 732      132, 268     1,910, 000    0b-
Almond 2----------------------..-.... do_-------_         _ -------------     Canacadea Creek..             .......-----------------  3            90       14,800     4,722,000        894, 000     5, 616,000
      Total.......---------      ----------------           ..---------- ---------          -------------------------------------------------                         41, 265, 732   10, 950,          000
                                                                                                                                                                                            268 $52,216,

    1All dams are located in New York State; all are of earth-fill type except East Sidney.
    2Reservoir in operation.                                                                                                                                                                                       0
                                                                                                                                                                                                                   O


    3 Include relocations,
                                                                                                                                                                                                                   z

                                                                                                                                                                                                                   H
                                                                                                                                                                                                                   0
                                                                                                                                                                                                                   H
                                                                                                                                                                                                                   00
                                                                                          Local flood protection works


                                                                                                   Distance                                                                  Estimated Federal cost
                     Location, New York                                       River                 above                          Type of structure
                                                                                                   mouth,                                                              Construc-    Lands and
                                                                                                                                                                         tion        damages

Oxford -     .                                 _-----------------------------------_
                                                                       Chenango---------------         40    Levee and channel improvement-....--.........------------      $95, 944    $34, 056     $131, 000
Lisle 1--- -    .-   ....-.-..........---------            - ..  -- Tioughnioga-.---------             12    Wall, levee, and channel realinement.-----------               605, 000     60, 000      665, 000
Whitney Point '-.....        -          ....----.        -__.-----do--------------------               10    Levee and channel realinement......-------------.......--      411,653      12, 443      424, 096   00
Binghamton 1                 __.....___.-                              Susquehanna-......      ---- - 328    Wall, levee and conduit---. ----------                       2, 845, 000   109, 000   2, 954, 000
Elmira 1---         -------------------------------                    Chemung          --------       27    -- __do--..------       -------------------------            6, 627, 000   188, 000   6, 815, 000
Corming      -............................. ...do ...                                    -     -44           Wall, levee, flume and conduit--..--         ..........     55,076, 000    161, 000   5,237, 000
Painted Post s............-.               ----.. --..__ -..- _ Cohocton ---------------                0    Wall, levee and channel realinement--.........----------...     402, 948    11,234       414,182
Addison '  -         ----------------------------------Canisteo----------------                         8    .----do.---------.      --------------------------             814,236      12,814       827, 050
Bath' "W::::_:::::::                                             ::--: Cohocton::
                                                             :------------------------ :21                   Wall and levee-...-......--------------------
                                                                                                                               n638,                                              331-,               638,331
Avoca '-.--.............              .           -                         do--------............30
                                                                    -.......--..-...                         Levee and channel improvement and realine-                      406,589     29, 785      436,374
                                                                                                               ment.                                                                                             O
Canisteo .                            .
                             .------------                      Canisteo-------------..............---    36 Levee and wall............---------------..........    --...... 917,000     59,000       976,000    0
Hornell '------...        -
                       _ _-                  -.....             . -_do---
                                                            -_-_.....               --.......         .   42 Wall, levee and channel realinement--.............           3, 665, 000   595, 000   4, 260, 000
Almond 7. ...- .                   __                 _         Canacadea Creek----....                    6 Levee and channel realinement.-----..........                - 354, 000      6, 000      360, 000
       Total ......-------                       -        -------   ------------      -    -    ----------     -----------------        ------------------------ $22,
                                                                                                                                                                 $22 859, 701
                                                                                                                                                                           0        $1, 278, 332 $24, 138,033
                                                                                                                                                                                    $3----------------,          M
  1Project inoperation.                                                                                        ' Does not include $250,000 to be contributed for construction on Monkey Run.
   sPart of project complete.                                                                                  6 Does not include contributed funds of $15,000 by the City of Hornell.
   ' Project completed.                                                                                        7 Local cooperation has been withdrawn. In accordance with provisions of the 1941
   4Does not include contributed funds of $160,095.63 by the City of Binghamton and                           Flood Control Act, the 5-year limitation clause of local cooperation has been invoked.
$3,000 by the village of Port Dickinson.                                                                      Project authorization will expire May 26, 1953.
                                                                                                                                                                                                                 ,m



                                                                                                                                                                                                                 00i
             FLOOD CONTROr-BALTIMORE,       MD.,   DISTRICT        349

   Local cooperation.-Seepages 4-5 for general requirements. Fully
complied with, except as described in the following paragraphs:
   Local cooperation for Almond; N. Y., has been withdrawn. Sec-
tion 2 of the Flood Control Act approved August 18, 1941, is ef-
fective, and authorization for the AlTnod, N. Y., project will expire
May 26, 1953, unless acceptable assurances are given before that date
that requirements of local cooperation will be met.
   The Flood Control Act of 1950, which modifies the plan of im-
provement for Corning, N. Y., to include flood protection on Monkey
Run, specifies, in addition to the general requirements, that local
interests shall (a) restore city streets and pavements over the flume
and conduit, including bridge slabs and superstructures where high-
ways cross the flume; (b) contribute $250,000 in cash or an equivalent
amount of construction or reconstruction work; (c) provide, operate
and maintain without cost to the United States adequate pumping
capacity for disposal of storm waters draining through the property
of the Corning Glass Works and not intercepted by the Monkey Run
improvement; and (d) protect Monkey Run from any future en-
croachment or obstruction including waste disposal that would reduce
its flood-carrying capacity. Formal assurances of cooperation by
local interests have been requested; required assurances will be exe-
cuted prior to initiation of construction.
   Operations and results during the fiscal year.-Davenport Center
Reservoir: Engineering studies, design and preparation of detailed
plans for the dam and outlet works were continued. The total costs,
all for new work, were $856.38.
   West Oneonta Reservoir: Engineering studies and design were con-
tinued. The total costs, all for new work, were $30.27.
   East Sidney Reservoir: Relocation of telephone and power lines,
under separate contracts, was continued and completed. Reimburse-
ment to the State of New York for the costs of lands was continued.
The reservoir gates were closed from March 11 throiugh March 13,
1952 and were most effective in reducing downstream stages. The
total costs were $150,121.37, of which $133,773.64 was for new wor,
and $16,347.73 was for maintenance.
   Copes Corner Reservoir: Preliminary engineering studies and de-
sign in connection with revision of the proect plan were continued.
The total b6sts, all for new work,were $61.57.
   Whitney Point Reservoir: Alterations on the roof of the operating
house, by contract, were commenced and completed. Reimbursement
for the costs of lands and for utility relocations, accomplished by the
State of New York, was continued. The reservoir gates were closed
from March 11 through March 12, 1952, and from April 5 through
April 6, i952, and were most effective in reducing downstream stages.
The total costs were $25,180.14, of which $6,015.58 was for new work,
and $19,164.56 was for maintenance:
   Arkport Reservoir: Construction of a shelter and installation of
gaging .equipment by USGS .was. continued and completed. Final
drawings and reports were completed. The reservoir with its 'uncon-
trolled outlets operated satisfactorily and was effective in reducing

     245554-53-vol. 1   23
350      REPORT -OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

  downstream stages. The total costs were $11,079.67, of which
  $1,273.02 was for new work, and $9,806.65 was for maintenance.
     Almond Reservoir: Acquisition of reservoir lands was continued
by the State of New York and reimbursement to the State was in
progress. Installation of radio receiver, transmitter and auxiliary
power plant was continued. The reservoir gates were closed on April
5, 1952, and were most effective in reducing downstream stages. The
total costs were $42,126.42, of which $26,846.01 was for new work, and
 $15,280.41 was for maintenance.
     Oxford, New York: Preparation of final drawings and reports was
continued and completed. The total costs were $3,145.12, of which
 $3,015.20 was for new work, and $129.92 was for maintenance.
    Lisle, New York: Preparation of final drawings and reports was
continued. Reimbursement to the State of New York for the costs of
  lands acquired for the project was continued. The total costs were
 $2,436.72, of which $1,793.88 was for new work, and $642.84 was for
maintenance.
    Whitney Point (Village), New York: The total costs, all for main-
tenance, were $4,718.54.
    Binghamton, New York: Engineering studies and design were
continued. Contracts for rehabilitation of channel walls on Chenango
River and construction of debris dam on Park Creek were completed.
The major items of work accomplished under the above contracts in-
cluded removal of concrete and masonry structures, excavation of
10,286 cubic yards of material, placement of 5,383 cubic yards of levee
embankment and structural backfill, 8,710 square feet of steel sheet
piling, 2,545 cubic yards of riprap and 1,791 cubic yards of concrete.
Reimbursement to the State of New York for the costs of lands ac-
quired for the channel improvement portion of the project was con-
tinued by hired labor. The total costs were $207,695.29, of which
 $204,150.66 was for new work, and $3,544.63 was for maintenance.
    Elmira, New York: Construction of seepage relief system, section
2, was completed by contract. The major items of work accomplished
under the contract included excavation of 82,532 cubic yards of mate-
rial, placement of 60,263 cubic yards of backfill, 21 cubic yards of con-
crete and drilling of 13 relief wells. Reimbursement to the State of
New York for relocation of utility lines and for the costs of lands
acquired for the project was continued by hired labor. Federal main-
tenance responsibilities were carried out by hired labor. The total
costs were $105,222.16, of which $104,925.18 was for new work, and
$296.98 was for maintenance.
    Corning, New York: Preliminary studies and design in connection
with the Monkey Run Creek portion of the project were initiated by
hired labor. Reimbursement to the State of New York for costs of
lands acquired for the project was continued by hired labor. Federal
maintenance responsibilities were carried out by hired labor. The
total costs were $24,335.31, of which $21,692.31 was for new work, and
$2,713 was for maintenance.
    Painted Post, New York: Federal maintenance responsibilities were
carried out by hired labor. The total costs, all for maintenance, were
$30.60.
             FLOOD CONTROI--BALTIMORE,       MD.,   DISTRICT        351
   Addison, New York: Federal maintenance responsibilities were car-
ried out by hired labor. The total costs, all for maintenance, were
$58.78.
    Avoca, New York: Federal maintenance responsibilities were car-
ried out by hired labor. The total costs, all for maintenance, were
 $119.
    Canisteo, New York: Final drawings and reports were continued
by hired labor. Reimbursement to the State of New York for the costs
of lands acquired for the channel improvement was continued by hired.
labor. Federal maintenance responsibilities were carried out by hired
labor. The total costs were $2,423.16, of which $629.77 was for new
work, and $1,793.39 was for maintenance.
 - Hornell, New York: Construction of Crosby Creek flood walls,
levees, channel paving and check dam was continued by contract. Con-
struction of channel restoration on Canisteo River and Canacadea
Creek was completed by contract. Construction of Chauncey Run
channel improvement was completed by contract. The major items
of work accomplished under the above contracts included removal of
structures, excavation of 188,780 cubic yards of material placement
of 11,365 yards of levee embankment and structural backfill, 60 cubic
yards of riprap, 98 cubic yards of derrick stone, 378 square feet of
steel sheet piling, and 8,791 cubic yards of concrete. Preparation of
final drawings and reports was continued by hired labor. Reimburse-
ment to the State of New York for the cost of lands acquired for the
channel improvement was continued by hired labor. Federal main-
tenance responsibilities of completed improvements on upper, middle,
and lower sections, Chauncey Run and Canacadea Creek were con-
tinued, as required, by hired labor. The total costs were $633,869.93,
of which $628,918.90 was for new work, and $4,951.03 was for main-
tenance.
    Almond (Village), New York: Operations consisted of routine
office reports and correspondence. The costs, all for new work, were
$241.88.
   Summary of operationsand results during the fiscal year.-Effective
November 28, 1951, the plans of operation for 2 dams were altered in
order to assure a substantial reduction of peak flows even if human
or mechanical failure should prevent the gates being operated during
a flood. Beginning on that date, 2 of the 3 gates at Almond, and 3
of the 5 gates at East Sidney were kept closed except when water was
being released after a flood. During a small flood on March 11-13,
1952, all gates at East Sidney and Whitney Point were closed. Under
similar conditions on April 5, all gates were closed at Almond and
Whitney Point. On both occasions, the dams were effective in reduc-
ing downstream flood peaks.
   Federal maintenance responsibilities were carried out, as required.
Local interests, where required, carried out maintenance responsibili-
ties, in accordance with instructions contained in the respective Opera-
tion and Maintenance Manuals.
   The total costs for the fiscal year were $1,213,752.31 of which
$1,134,154.25 was for new work and $79,598.06 was for maintenance.
The total expenditures for the fiscal year were $1,300,901.25.
                                                                   E N
352            REPOR             i OF    °CHIEF             OF1'         GINEERS,          T.    S.   ARMY,           1952


           d of~f1c
- Cod$Yidtid                                                year. The soithernNew York projct is
approxim~tely 51 percent:complete, exclusive- of the Stiliwater, Gene-
gantslet and South Plymouth Reservoirs. The latter 2 reservoirs, in
the State of New York, and the Stillwater Reservoir, in the
State of Pennsylvania, were authorized by the 1944 Flood Con-
trol Act to supplement the comprehensive flood-control program for
Southern New York and are reported separately. The cost of new
work to June 30, 1952, and the percentage of construction work com-
pleted for each project unit are as follows:

                                                                                            Cost to June 30,1952               Perdentage
                                          Unit                                                                                     of con-
                                                                                                                Mainte-          struction
                                                                                           New work              ace            completed


Resetroirs:
   Davenport Center 1---------------_____-----------------..                                          $275, 687.75 ..---------------....
   West Oneonta ------------------------                                        -------------.. 188, 900.00                    ------
   East Sidney---------------------------------------------                                          5, 777, 089.51 $45, 393.33            6 97
   Copes Corner
             Whte                    -__---
                  on-------------------------------                                               -     160, 400.00          -
   Whitney Point ..------ -----------------------                          --- -----                   104.0-----------------
                                                                                                     5,068, 673.91 167, 202.06             100
   Arkport ....-----------------------------------------                                             1,908, 315.37     59, 061. 87         100
   Almond ...--- ---------------- ----------------------                                             5, 561,243.48     38, 008.78          100
Local flood protection:
   Oxford ......---------............-------------------................----------------------...     7131, 000. 00      1, 809. 93        100
   Lisle---------.--------------------------------                                                      660,449. 81      3, 669. 80        100
   Whitney Point (Village) ------------                                      ------                   7424,; 095. 79     5, 254.43         100
   Binghamton_ ....                 ..--------........--------..........         ..-------...        2, 944, 269. 65   30,859.76           100
   Elmira ..------- ----------------------------------                                               6, 710, 436.59         432.85         * 98
   Corning -----------------------------------------                                                 2,171, 789. 35    27, 558.64            41
   Painted Post., ..--.-                             ___-----..----                         ------    7414,181.43        4, 613.58         100
   Addison            ----------------------------------------                                          827, 050.13      3, 415.58         100
   Bath-----. -.-----.-              -          .--.----------   -------------                ------  7638, 331.46 ----------......        100
   Avoca ...                                                                                          ?------------.-------------__----7
                                                                                                        436, 374.34      9, 279. 25        100
   Canisteo....-----------                   --------------------------------                           966, 836. 84   17,782.80           100
   Hornell 4...------------- --------.---------------------                                          4,137, 945. 60    85, 004.32          6 97
   Alind       -------------------                             ----------------------                    24, 418. 32 ------------
          otal-------------------------------------------                                 39, 427, 489. 33     499, 346. 98 -..

  1 Cost for preliminary work only.
  2 Does not include $163,095.63 contributed funds.
  a Includes Monkey Run.
  4 Includes Canacadea Creek, Chauncey Run and Crosby Creek.
  6 Local cooperation withdrawn.
  1 Operationally complete.
  I Financially complete.

      The remaining work necessary to complete the existing project con-
sists of reimbursement to the State of New_ York for costs of lands
acquired and payment of outstanding liabilities of units on which
construction has been completed; completion of the East Sidney,
Whitney Point, Arkport and Almond Reservoirs, and the Bingham-
ton, Elmira, Corning, and Hornell local improvement units on which
major features have been beneficially completed; and completion of
engineering studies, design, and preparation of plans, and initiation
of construction of the remaining:project units comprising Davenport
Center, West Oneonta, and Copes Corner reservoirs and flood pro.
tection on the Monkey Run modification of the Corning Unit.
  The total costs were $39,926,836.31, of which$38,692,217.69 (regular
funds) and $73,27t.64: (Emergency Relief funds), were for new work
and $499,346.98. wasfor maintenance. The total expenditures were
                     FLOOD CQNTRO -Tr-J-BAI
                                         jTIMRE
                                         4    ]J)                        .. DITRICT.

$39,738,705.69. In addition, $163,095.63 was expended from oontrib-
uted funds for new work.
   Proposed operations.-The balance unexpended on June 30, 1952,
$761,281.10, plus accounts receivable $12.59, plus allotments during
fiscal year 1953 of $746,000 for new work and $78,355 for maintenance,
a total of $1.585.648.69. will be applied as follows:
                  -r 7 - - -   - - - -   - 7   . --   -             -   , -

Accounts payable-.--             --                              --.      ...             $193, 903. 02
New work July 1, 1952 to June 30, 1953
     Davenport Center Reservoir:
          Continue design studies and preparation of con-
             tract plans and specifications for the construc-
             tion of the dam and appurtenant works ...                ,_.                    4$3712. 00
     West Oneonta Reservoir:
          Continue design studies for the construction of
             the dam and appurtenant works_.--.--.-----                          $500
     East Sidney Reservoir:
          Complete reimbursement to the State of New York
             for the cost of lands and rights-of-way acquired
             for the dam and reservoir area---....-.-.-.---- 102, 400
          Complete installation of radio transmitter, rer
             ceiver, and auxiliary power plant...        -----......           2, 100
          Complete plans and specificatisas for raising of
             covered bridge road and- rock protection at:
            bridge abutments, and adjacent channel bank,
            and initiate construction, by contract00--                        26, 000
          Install gate heaters, by contract, including related
             Government costs-.------.-.    ..........--                       2,2Q..
          Complete minor modifications, general clean-up
             and record drawings_                         _---_------
                                                            ------            10, 210
                                                                                            142, 910. 00
     Oopes Corner Reservoir:
          Continue design studies for the construction of
            the dam and appurtenant works.--,--.-------                                          600.00
     Whitney Point Reservoir:
          Complete reimbursement to the State of New York
             for the costs of lands acquired for the dam and
            reservoir area, ........---         - ---                  -           0.........00
          Complete minor modifications, general cleainp and
             record drawings_  -------     .-------------                     10, 730
                                                                                             11,330.00
Arkport Reservoir:
     Complete final reports-.........    .--- -                                               1, 700.00
Almond Reservoir:
     Complete reimbursement to the State of New. York
       for the costs of lands acquired for dam, reservoir,
       and utility relocations accomplished by the State___ 39, 900
     Complete installation of radio transmitter, receiver
       and auxiliary power plant___...'.                             ..        1, 400
     Complete minor- modifications, general cleanup and
       record drawings----------------------------                            11, 500
     Install gate heaters, by contract, including related
       Government costs------------------ -----------                          2,000
                                                                                            .54, 800. 00
Lisle, N. Y.:
     Complete reimbursement to the State of New_ York
       for the costs of lands acquired for the channel
       portion of the project by hired labor --              __--.------       4, 400
     Complete record drawings and final reports by hired
        lahnr--- ____.-________________________________r____
        iG41VV1
                                                                                               110
                                                                               ---   --   --    --



                                                                                                     4, 510. 00
354      REPORT OF CHIEF OF ENGINEERS                           U. S. ARVY, 1952

Binghamton, N. Y.:
    Complete reimbursement to the State of New York
      for the costs of lands acquired for the channel portion
      of the project by hired labor-----------------------               $200
    Complete minor modifications, general cleanup and
      record drawings by hired labor-------------------                 9, 500
                                                                                    $9, 700. 00
Elmira, N. Y.:
   Complete reimbursement to the State of New York
      for the cost of lands acquired for the Hoffman Brook
      portion of the project by hired labor-___     _ _-_- 82, 820
   Complete minor improvements, general cleanup, con-
      struction engineering and record drawings by hired
      labor--------------------------------------          12,150
   Complete relocation of electric and telephone lines,
      by separate contracts, including related Government
      costs----------------------------------------         9, 600
                                                                                   104, 570. 00
Corning, N. Y.:
    Complete reimbursement to the State of New York
      for the costs of lands acquired for the Cutler Creek
      portion of the project by hired labor-----------       5, 700
    Continue and complete preliminary designs and plans,
      and prepare contract plans and specifications for
      the Monkey Run portion of the project------__---      98, 510
    Initiate construction of Monkey Run, including rein-
      forced concrete conduit, pumping station, and mis-
      cellaneous drainage structures, by continuing
      contract----------------------------------           680, 000
                                                                                   784, 210. 00
Canisteo, N. Y.:
    Complete reimbursement to the State of New York
      for the costs of land acquired for the channel section
      of the project by hired labor_---     ----------                  7, 340
    Complete final reports by hired labor__-----------                  1, 830
                                                                                     9, 170. 00
Hornell, N. Y.:
    Complete reimbursement for the cost of lands acquired
      for the Upper, Lower and Middle Hornell sections,
      and Canacadea Creek, Crosby Creek and Chauncey
      Run sections, and for utility relocations accomplished
      by the State of New York, by hired labor--------                 74, 900
    Complete Crosby Creek channel improvement, by con-
      tract, including related Government costs --------               38, 800
    Complete relocation of utilities, by contract, including
      related Government costs.---        -----------------             5, 500
    Complete minor improvements and general cleanup
      by hired labor----------------------            --- ----          3,00
    Complete construction engineering, record drawings
      and final reports by hired labor ----      ------------          14, 850
                                                                                   137, 050. 00
Almond (Village), N. Y.7,                                                               050. 00
   Complete reimbursement to the State of New York for the cost
     incurred incidental to acquisition of project rights-of-way
     by hired labor --------------------------------------                             203.46
        Total new work      ---------------------------------                    1, 309, 965.46
                FLOOD CONTROIr-BALTIMORE,1MD., DISTRICT                                        355

  The following reservoirs and local flood protection units under the
Southern New York Flood Control Project will be maintained by
hired labor:
Maintenance from July 1, 1952, to June 30, 1953:
   East Sidney Reservoir------------------------ $13, 383. 92
   Whitney Point Reservoir__--                        ---     -------- 13,640. 00
   Arkport Reservoir----.------------------                         --  9, 950. 00
   Almond Reservoir--.-------------------                              16, 530. 00
   Oxford          ----             --           --                        270.00
   Lisle --------------------------------------                         4, 560. 00
   Whitney Point (Village) ---                      ---------           2,150. 00
   Binghamton------------------------------                             2, 951. 29
   Elmira               --------------------------------                1, 630. 00
   Corning------------------- ------------                              2, 490. 00
   Painted Post--------------------------------                            495.00
   Addison ------------------------------------                            990. 00
   Avoca---------------                      ------                     1,480. 00
   Canisteo--          ---------------------------------                3,410. 00
   Hornell-----------------------------------7,                            850.00

       Total maintenance---------------.----                                           $81, 780. 21
       Total----           -----------------------------------                       1, 585, 648. 69
  The additional sum of $2,159,105 can be profitably expended for
the following schedule of work during fiscal year 1954:
New work from July 1, 1953, to June 30, 1954:
Davenport Center Reservoir :
   Complete detailed design and preparation of con-
     tract plans and specifications------------------        $50, 000
   Initiate acquisition of lands and rights-of-way for dam
     site and work areas-----           -------------- ----- 350,000
   Initiate relocation of railroad in the reservoir area, by
     continuing contract, including related Govern-
     ment costs----- -------     ---------       ----------  600,000
                                                                                             000
                                                                                       $1,000ooo,
  Corning (Monkey Run) :
   Complete detailed design and preparation of contract
      plans and specifications by hired labor -------    5---0,000
   Continue construction of reinforced concrete conduit,
      pumping station, and miscellaneous drainage struc-
      tures, by continuing contract, including related
      Government costs_-.--------------------------- 650, 000
   Initiate construction of flume and miscellaneous
      appurtenant works, by continuing contract, includ-
      ing related Government costs---..---------------- 300, 000
                                                                                        1,000, 000
          Total new work-------------                 ----------------------            2, 000, 000
356          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

  The following reservoirs and local flood protection units under the
Souththern New York Flood Control Project will be maintained by
hired labor:
Maintenance from July 1, 1953, to June 30, 1954:
   East Sidney Reservoir----------                                                                       $2 ,000
   Whitney Point Reservoir----------                                                                      22, goo
   Arkport Reservoir_          -       --                                                                  9 500
   Almond Reservoir.                                                                                      15,"000
   Oxford         ..- -.                                                                                   1, 000
   Lisle                                                                                                  -4,500
   Whitney Point (Village)-                                                                                1,900
                                                                                                               5   A0
      Binghamton__         -            ------------          -------------
      Elmira ------------                          -----------------------                                .1, 000
      Corning .......                              -----------------------                            .. 8,-200-
                                                                                                      ..
      Painted Post_:...-                                                 ----
                                                   -----------------------                                     5,600
      Addison -                                                -                                               1, 400
                                                                                                               ----
      Avoca __.                                                                                 --....         9,-000
                     -~~--~l-----       ---------------------
      Canisteo                                                                                                 6, 300
      HTrnell
      rLkLA ULA-     -   ---------             -    ----------        ----------                --.       10,000

         Total maintenance                             ---------------------------                                          $121, 600
         Total new work and maintenance_.....---.-----------                                                               2,121, 600

                                                   Cost and financiaZ summary
                                                       UNITED STATES FUNDS

                                                               Fiscal year ending Jane 30                               Total to June
                                                                                                                        30,1952, Inlud-
                                                                                                                        ing fiscal years
                                             1948             1949          1950         1051              1952          prior     to   1948


New work:
   Appropriated-... .....     4,44.100.00 $5,930,900.00 $2,095,000.00 $556,000. 00 $17,03.15 1 $39, 976, 454.79
   Cost--------------7,794, 502. 77 7,268,792.15 1, 957, 645.16 871,114.68 1,134,154.25 139, 427,489.33
   Expenditures--------......  625, 02.70 7, 294, 701.23 2, 703, 643.38 1, 010,899041, 211, 646. 99 39, 239,:446. 78
Maintenance:
   Appropriated.......-                    67, 200.00       56, 500.00     67, 500.00   66 900.00         85, 432.00             508, 532.00
   Cost   ----------------                 39, 947.98       60, 303.33     78,186. 30   77, 879. 63       79, 598.06             499, 346. 98
   Expendittres-------              -      41, 989.05       62, 464.41     79, 661.15   69, 003.59        89, 254.26             499, 258.91


Other new work data:
    Unobligated balance, June 30, 1952------....   -........---                                           -.            $312, 877. 49
    Appropriated for fiscal year ending June 30, 1953..L__                                                               746, 000. 00
        Unobligated balance available for fiscal year 1953--,..-..  1, 058, 877. 49
      Estimated additional amount needed to be appropriated for
        completion of existing, project--------------------        35,631,600.00
  1Includes $735,271.64 Emergency Relief funds.                       ..
                                                        CONTRIBUTED            FUNDS


                                                                Fiscal year ending June 30                               Total to June
                                                                                                                        30, 1952, includ-
                                                                                                                        ing fiscal years
                                             1948             1949          1950         1951              1952          prior to 1948

New work:
    Contributed.......... -----------...........
                ----............                                     .....-----------------.......
                                                                              ------               ............
                                                                                           $15, 000------------     $178,095. 63
    Cost.   ..-------- ------------------------.------------.-----------------------                                 163,095.63
    Expenditures-------------------------------------.-----------. -                                       --------- 163, 095. 63


           18. STILLWATER RESERVOIR, LACKAWANNA RIVER, PA.
  Location.-The Stillwater Dam site is on the Lackawanna River, 37
miles from the mouth of the stream and about 2 miles upstream from
                     FLOOD     -CoNTROL--BALTIMORE,                       MD., bDISTIICT                357
Forest City, Susquehanna County, Pa. (See U. S. Geological Survey
quadrangle sheet "Honesdale, Pa.")
   Existig project.--The plan of improvement consists of a dam of
the earthfill type, rising 60 feet above the stream bed with an outlet
and chute spillway in the left abutment. The reservoir capacity will
be 12,100 acre-feet, of which 11,600 acre-feet will be flood-control
storage and the remainder will be utilized to maintain the existing
water-supply reservoir for Forest City, Pa., at this site. The reservoir
area will be 425 acres, and the pool will extend about 2 miles upstream.
The reservoir will control 55 percent of the watershed above Carbon-
dale, 28 percent above Olyphant, and 17 percent above Scranton.
The existing project was authorized by the Flood Control Act ap-
proved August 18, 1941, as a modification of the southern New York
and eastern Pennsylvania project authorized by the Flood Control
Act approved June 22, 1936. The estimated Federal cost for new
work revised in 1952, is $8,000,000 of which $5,935,000 is for con-
struction and $2,065,000 is for lands and damages.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.--Minor engineering
studies were continued. The total costs and expenditures, all for new
work, were $49.65.
   Condition at end of fscal year.--Preparationof detailed design
and plans and specifications has been suspended pending disposition
of the review report on North Branch Susquehanna River. Con-
struction has not been initiated. The total costs and expenditures,
all for new work, were $80,000.
   Proposed operation'.-No funds are available and no work is
scheduled for fiscal year 1953 and 1954.
                                     Cost and flnancia summary

                                                     Fiscal year ending June 30                Total to June
                                                                                              30 1942, includ-
                                                                                              ing fiscal years
                                   1948        1949             1950        1951    1952       prfor to 1948


Iew work:
   Appropriated-----...         ......
                            ------------       ...-.------------------------------------               $80,000
   Cost-------------          --
                             __.
   Expenditures.--.....- _80,----
                                     _-._
                                      -        ---
                                              :- -_:_    $2, 613.73......._.
                                            _---------1,585.45             $1,028.28
                                                                                     ... 6              80,00
                                                                                      49.65             80,000


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project---------------- $7, 920,000

                          19. SWOYERSVILLE AND FORTY FORT, PA.

   Location.-Swoyersville and Forty Fort, Pa., are situated on the
Susquehanna River in Luzerne County, Pa. (See U. S. Geological
Survey quadrangle sheet, "Pittston, Pa.")
   Existing project.--The plan of improvement provides for the con-
struction of levees and related works along the north bank of the
Susquehanna River, along Abrahams Creek, and at Carpenters Creek.
The improvement will provide protection for the communities of
Swoyersville, Forty Fort, Wyoming, West Wyoming, Exeter and part
358      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                      1952

of West Pittston, against a flood discharge equal to the maximum
flood of record, which occurred in March 1936. The existing project
was authorized by the Flood Control Act approved June 22, 1936.
 (See H. Doc. 702, 77th Cong., 2d sess.) The estimated Federal cost
for new work, revised in 1952, is $3,650,000 for construction. The
local cost of lands and damages, revised in 1952, is $166,800.
   Local cooperation.-See pages 4-5 for requirements. The Common-
wealth of Pennsylvania has established drainage district No. 23 to
cover the drainage area of the North Branch of the Susquehanna
River in the Boroughs of Forty Fort, Swoyersville, Wyoming, West
Wyoming, Exeter and West Pittston, County of Luzerne. Formal
assurances of cooperation by local interests have been requested; re-
quired assurances will be executed prior to initiation of construction.
   Operations and results during fiscal year.-Foundation investiga-
tion and design for stabilization of river bank slopes in the first unit
of construction was continued by hired labor. Preparation of contract
plans and specifications for construction of the main levee and drain-
age structures along the Susquehanna River was continued by hired
labor. The total costs, all for new work, were $11,829.44. The total
expenditures were $12,413.88.
   Condition at end of fiscal year.--Preliminary plans are complete.
The work remaining to be done is preparation of contract plans and
specifications and construction of the project. The total costs, all
for new work, were $94,944.39. The total expenditures were
$94,877.00.
   Proposed operations.-The balance unexpended on June 30, 1952,
$4,123.00, plus an allotment during fiscal year 1953 of $896,000.00, a
total of $900,123.00, will be applied as follows:
Accounts payable June 30, 1952----------------------- ---------                 $67. 39
New work July 1, 1952, to June 30, 1953:
    Prepare contract plans and specifications for the
      initial units of construction, by hired labor--- 100, 055. 61
    Initiate construction of the main levee and drainage
      structures along the Susquehanna River, by con-
      tinuing contract, including related Government
      costs                    ---------------------         800, 000. 00
         Total of new work--------------           ------------------       900, 055. 61
         Total                                                  $900, 123.00
                        ------------------------------------------
  The additional sum of $1,000,000 can be profitably expended for the
following scheduled work during the fiscal year 1954:
New work July 1, 1953, to June 30, 1954:
   Continue and complete preparation of contract plans
     and specifications for the remaining units of con-
     struction by hired labor---             ------------------- $55, 000
   Complete construction of the main levee and drainage
     structures along the Susquehanna River, by con-
     tinuing contract, including related Government costs_ 526, 000
   Initiate construction of Abrahams Creek diversion
     channel and levees, drainage structures and two flood
     barriers across railroad tracks near Swetland Lane,
     by continuing contract, including related Govern-
     ment costs-----------------------------                ---- 419, 000

         Total----                                                          $,0-------00,00---
                                                                            $1, 000, 000
                  FLOOD CONTROL---BALTIMORE,                           MD.,      DISTRICT                     359
                                    Cost and financial summary

                                               Fiscal year ending June 30                           Total to June
                                                                                                   30, 1952, includ-
                                                                                                   ing fiscal years
                                1948         1949           1950          1951          1952        prior to 1948

New work:
   Appropriated__--------_--- -- ---------              $48, 500.00    $50, 000.00 -$29,500.00           $99, 000.00
   Cost-----------------         $70.45    $5, 382.73    45, 933. 22     7, 181. 73  11, 829. 44          94, 944. 39
   Expenditures---------          70.45     4, 986.08    47, 655.92      5, 203.86   12,413.88            94,877.00


Other new work data:
    Unobligated balance, June 30, 1952------------------         $4,055. 61
    Appropriated for fiscal year ending June 30, 1953----------896, 000. 00

       Unobligated balance available for fiscal year 1953------- 900, 055.61
     Estimated additional amount needed to be appropriated for
       completion of existing project----------------------- 2, 655, 000. 00

20. WILKES-BARRE-HANOVER TOWNSHIP, SUSQUEHANNA RIVER, PA.
    Location.-The city of Wilkes-Barre, with Hanover Township ad-
joining, is located in the central part of Luzerne County, Pa., on the
left bank of the North Branch of the Susquehanna River approxi-
mately 62 miles above its mouth. (See U. S. Geological Survey quad-
rangle sheets "Pittston and Wilkes-Barre, Pa.")
    EEisting project.-The plan of improvement provides for the con-
struction of a system of levees and concrete flood walls, consisting of
the following features: About 24,660 feet of earth levee and 160 feet
of concrete flood wall along the left bank of the North Branch of the
Susquehanna River, extending from high ground at the Lackawanna
 & Wyoming Valley Railroad near Union Street in Wilkes-Barre
downstream along the left bank of the river to high ground near the
mouth of Solomon Creek in Hanover Township; one impounding
reservoir including 3,200 feet of earth levees; one relief culvert and
eight pumping stations for the disposal of interior drainage; ap-
purtenant drainage structures; and about 17,900 feet of electric trans-
mission line with four transformer substations for furnishing power
to the pumping stations. The improvement provides protection for
the city of Wilkes-Barre and Hanover Township against a flood
discharge equal to the maximum flood of record, which occurred in
March 1936. The existing project was authorized by the Flood Con-
trol Act approved June 2, 1936, and modified by the Flood Control
Act approved June 30, 1948. The estimated Federal cost of new
work, revised in 1952, is $3,829,000 for construction. The estimated
local costs of lands and damages, revised in 1949, is $216,000. The
completed portions of the project were turned over to local interests
for maintenance and operation.
   Local cooperation.-See pages 4-5 for requirements. All require-
ments have been met.
   Operationsand results during fiscal year.-Plansand specifications
for river bank stabilization were completed, by hired labor, and con-
struction, by contract, was commenced during June 1952. Prepara-
tion of record drawings, final reports, minor modifications and general
cleanup was continued by hired labor. The total costs, all for new
work, were $3,572.65. The total expenditures were $3,039.00.
360        REPORT Of CHIEP OF ENGINEERS, U. S. ARMY, 1952

   Condition at end of fscaZ yea.-Construction of the project was
completed in March 1948 except for construction of river bank stabili-
zation. Responsibility for operation and maintenance of the main
portion of the project was formally transferred to local interests on
March 38,1948, for the first unit of bank stabilization on May 3, 1949,
and for a section of levee raising on June 26, 1950. The work remain-
ing to be done is completion of river bank stabilization, by contract,
and completion of record drawings, final reports, minor modifications
and general cleanup by hired labor. The total costs, all for new work,
were $3,726,940.65, of which $2,854,225.92 was regular funds and
$872,714.73 was Emergency Relief funds. The total expenditures were
$3,726,395.18. In addition, $36,375.38 Emergency Relief funds were
exp~ended prior to adoption of the project.
  Proposed operations--The balance unexpended on June 30, 1952,
$102,561.07, will be applied as follows:
Accounts payable June 80, 1952------             .----------------   -------             $545.47
New work July 1, 1952, to June 30, 1953:
-   Complete construction of river, bank stabilization,
     by contract, including related Government costs. $94, 000. 00
   Complete record drawings, final reports, minor modi-
     fications and general cleanup by hired labor--__              8, 016. 20
        Total      ..      _------------- ---------------                ----        102, 016. 20

           Total......i..---------------------.---                        -----      102, 016. 20
  No work is scheduled for fiscal year 1954. It is anticipated that the
existing project can be completed with available funds.
                                  Copt and4-flnancl saummary
                                             Fiscal year ending June 30




Other new work data:
   Unlobligated balance, June 30, 1952__-------------------                          $55, 387.88
    Unobligated balance available for fiscal year 1953. ...--------                   55, 387. 38
S1ndhides $872784.73 Emedrgency Riefifunds.
SIn addition $36,375.38 Emergency Relief funds were expended for new work prior to adoption of the
projet.
          21. KINGSTON4EDWARDSVILLE, SUSQUEHANNA, RIVER, PA.

   Location.-The boroughs of Kingston and Edwardsville, Pa., are
located in Luzerne County, Pa., on the right bank of the North Branch
of the Susquehanna River approximately 62 miles above its mouth.
.(See U. S. Geological Survey quadrangle sheet, "Pittston, Pa.")
   Exising project.-.-The plan of improvement provides for the con-
struction of a system of levees consisting of the following features:
About 18,169 feet of earth levee along the right bank of the North
Branch of the Susquehanna River, extending from high ground,
near Rutter Avenue and Church Street in Kingston southeasterly to
                FLOQD CONTROIr--BALTI~QRE,               MD.,   DISTRICT


the river, thence downstream along the right bank of the river to
the Kingston-Edwardsville borough line, thence northerly generally
parallel to the Edwardsville borough line to high ground near Toby
Creek and Plymouth Street; a concrete pressure culvert 161/2 feet
in diameter, about 6,659 feet long, with impounding basin, levees,
and intake structure to carry the flow of Tobey Creek; 3 pumping
stations for the disposal of interior drainage; 3,080 feet of concrete
intercepting .sewer; appurtenant drainage ...structures; and about
16,700 feet of electric transmission lines with 2 transformer substa-
tions for furnishing power to the pumping stations. The improve-
ment provides protection for the boroughs of Kingston and Edwards-
ville against a flood discharge equal to the maximum flood of record;
which occurred in March 1936. The existing project was authorized
by the Flood Control Act approved June 22, 1936. The estimated
Federal cost of new work, revised in 1952, is $4,426,970 for con-
struction. The estimated local cost of lands and damages, revised
in 1952, is $378,900.
    Local cooperation.-See pages 4-5 for requirements. Fully com-
plied with.
    Operations and results during fiscal year.--Coastruction of Rutter
Avenue levee extension was completed by contract. Preparation of
record drawings and final reports was continued by hired labor.
Minor modifications and general cleanup were continued by hired
labor. The total costs, all for new work, were $19,707.11 Th total
expenditures were $10,261.49.
    Conditionat end of fiscal year.-The project was operationally com-
plete in 1943, except for minor levee extension work along Rutter
Avenue which was completed in 1952 to the Kingston-Forty Fort
Borough line. Responsibility for operation.and maintenance of the
main portion of the project was formally transferred to local interests
on December 1, 1948. The work remaining to be done is constrtruion
of the levee closure along Rutter Avenue- in the Boi~ough f4trF
Fort, by contract, and 'completion of record drawings, final reports;
and minor modifications and general cleanup by hired laboi. The
total costs, all for new work, were $4,406,838.63, of which $8,244,290.21
was regular funds and $1,162,548.42 was Emergency Relief funds.
The total expenditures were $4,395,370.82. In addition, $225,877.24
Emergency Relief funds were expended prior to adoption of the
project.
   Proposed operations.-The balance unexpended on June 30, 1952,
$25,598.47, will be applied as follows:
Accounts payable June 30, 1952---------------------.--------_                 $11, 467. 81
New work July 1, 1952, to June 30, 1953:
   Complete record drawings and final reports, by
     hired labor, and make final payments for con-
     struction of Rutter Avenue levee,. extension by
     contract ---                           ---------------- $12,,-----------
                                                                   070. 66
   Complete minor modifications and general cleanup
     by hired labor----------------------------                2, 060. 00
                                                                               14, 130,

         Total--------------------------
                  .--------------                                              25, 598,4T
362         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   No work is scheduled during fiscal year 1954.
                                   Cost and financial summary

                                               Fiscal year ending June 30                        Total to June
                                                                                                30, 1952, includ-
                                                                                                ing fiscal years
                                1948          1949          1950         1951         1952        prior to 1948


New work:
   Appropriated       ..--- ------------.------------ $65,000.00 -.               - $8,000.00 1 $4,420,969.29
                                                                              .------
    Cost..---------------
    Expenditures...--------...
                                 $2, 379. 25
                                  2,142.71
                                             $1, 589. 87
                                              1,649. 55
                                                         7, 012. 27 $32, 149.96
                                                         7,182.80    29,957.24
                                                                                    19, 707. 11
                                                                                    10, 261.49   Is4,
                                                                                                1 4, 406, 838. 63
                                                                                                     395, 370.82


Other new work data:
    Unobligated balance, June 30, 1952-            ___---   _______ $9, 613. 19
    Unobligated balance available for fiscal year 1953, ----------      9, 613. 19
   Estimated additional amount needed to be appropriated for com-
      pletion of existing project-------------------       --- -------- 6, 000. 00
1 Includes $1,162,548.42 Emergency Relief funds.
  3 In addition $225,877.24 Emergency Relief funds were expended for new work prior to adoption of the
project.

                     22. PLYMOUTH, SUSQUEHANNA RIVER, PA.

   Location.-The borough of Plymouth is located in Luzerne County,
Pa., on the right bank of the North Branch of the Sesquehanna River,
59.5 miles above its mouth. (See U. S. Geological Survey quadrangle
sheet "Wilkes-Barre, Pa.")
   Existing project.--The plan of improvement provides for the con-
struction of a system of levees consisting of the following features:
About 8,680 feet of earth levee along the right bank of the North
Branch of the Susquehanna River, extending from high ground near
the Carey Avenue Bridge downstream along the right bank of the
river to Mras Street, thence northerly to high ground near Main Street
approximately paralleling Flat Road; a diversion channel about 2,670
feet long on the outside of the levee system from Main Street to the
river, paralleling Flat Road; two pumping stations for the disposal of
interior drainage; appurtenant drainage structures; and about 4,100
feet of electric transmission lines, with one transformer substation for
supplying power to the pumping stations. The improvement provides
protection for the Borough of Plymouth against a flood discharge
equal to the maximum flood of record, which occurred in March 1936.
The existing project was authorized by the Flood Control Act ap-
proved June 22, 1936. The estimated Federal cost of new work,
revised in 1952, is $1,867,189 for construction. The estimated local
cost of lands and damages, revised in 1952 is $112,700.
   Local cooperation.-See pages 4-5 for requirements. All require-
ments have been met.
   Operations and results during -fiscal year.-Preparationof record
drawings and final reports was continued by hired labor. Minor
modifications and general cleanup were continued by hired labor. The
total costs, all for new work, were $12,106.18. The total expendi-
tures were $22,154.51.
   Condition at end of fiscal year.-Construction of the project was
completed in May 1948 except the supplementary sluice gates on
existing outlet structures which were completed during fiscal year
                  FLOOD         CONTROL--BALTIMORE,                                    MD.,      DISTRICT                       363


1951. Responsibility for operation and maintenance of the main
portion of the project was formally transferred to local interests on
July 30, 1948 and for the supplementary gates on July 13, 1951. The
work remaining to be done is completion of record drawings, final
reports, and minor modifications and general cleanup by hired labor.
The total costs, all for new work, were $1,862,389.37, of which
$1,858,032.61 was regular funds and $4,356.76 was Emergency Relief
funds. The total expenditures were $1,861,768.99.
  Praposed operatios.-The balance unexpended on June 30, 1952,
$21,419.77 less a revocation of $16,000, a total of $5,419.77, will be
applied as follows:
Accounts payable June 30. 1952---------------------------                                                                $620.38
New work July 1, 1952 to June 30, 1953:
    Complete minor modifications and general cleanup by
     hired labor-------------------------------         $2, 193. 00
    Complete record drawings and final reports by hired
     labor------        -------------------------------  2, 606. 39
                                                                                                                     $4, 799. 39
       Total                   ----------------------------------------                                     ------ 5, 419. 77
  No work is scheduled for fiscal year 1954.
                                         Cost and financial summary

                                                             Fiscal year ending June 30                             Total to June
                                                                                                                   30, 1952, includ-
                                                                                                                   ing fiscal years
                                   1948                   1949             1950           1951            1952      prior to 1948

New work:
   Appropriated-.....--    -   $24, 500.00 _.                 .      .1$215, 000.00 -$65,168.00      -----------     $1, 883,188. 76
   Cost-------------           278,048.59             $6,113.83           9, 149. 64   112, 823.80   $12,106. 18     11, 862,   389.37
   Expenditures-.........      297, 659. 61             7, 311. 79        8, 626. 98   102, 748.47     22,154.51     11,861, 768.   99

1 Includes $4,356.76 Emergency Relief funds.

Other new work data:
    Unobligated balance, June 30, 1952----------------------                                                        $20, 429. 83
    Revocation for fiscal year ending June 30, 1953- --.----                                                       -16, 000. 00
    Unobligated balance available for fiscal year 1953------------                                                     4, 429. 83
                          23. SUNBURY, SUSQUEHANNA RIVER, PA.
  Location.--Sunbury, Pa., is situated on the Susquehanna River
in Northumberland County, Pa. (See U. S. Geological Survey quad-
rangle sheet--"Sunbury, Pa.")
  Emisting project.--The plan of improvement provides for 10,000 feet
of levee on the right bank of Shamokin Creek, one pumping station,
interceptor sewer and appurtenant works in the Shamokin Creek sec-
tion; approximately 4,000 feet of levee, 12,100 feet of concrete flood
wall, interceptor sewers, 4 pumping stations and appurtenant struc-
tures along the left bank of the Susquehanna River. The improve-
ment will provide protection for the city of Sunbury against a flood
discharge equal to the maximum flood of record, which occurred in
March 1936. The existing project was authorized by the Flood Con-
trol Act approved June 22, 1936, as modified by the Flood Control
Act approved August 18, 1941 (H. Doc. 366, 76th Cong., 1st sess.).
The estimated Federal cost, revised in 1952 is $6,110,000 for construc-
tion exclusive of contributed funds of $140,500. The estimated local
 364              REPORT OF CIITIEF OF ENGINEERS, U. S. ARMY,                                            1952

cost of lands, damages, and utility relocations; revised in 1952 is
$232,800.
   Local cooperatio.- Se pages 4-5 for requirements. All require-
ments have been fulfilled.
   Operations and res elts drin seal year.-Constructionof a man
hole and a storm sewer and tie-in to the manhole was commenced and
completed by contract. Preparation of record drawings and final
reports was continued by hired labor. Minor modifications and gen-
eral cleanup were continued by hired labor. The total costs, all for
new work, were $8,672.55. The total expenditures were $9,736.53.
   Condition at end of fiscal year.--The construction of the project:is
complete. Responsibility for maintenance was formally transferred
to local interests on August 12, 1949, for the Shamokin Creek section,
and on February 20,.1951, for the upper and lower Susquehanna River
sections. The work remaining to be done is completion of record
drawings, final reports, and minor modifications and general cleanup
by hired labor. The total cost for new work, on all- sections, was
$6,057,670.57. The total expenditures were $6,057,665.81. In addi-
tion $140,504.29 was expended from contributed funds for new work.
   Proposed operations.-The balance unexpended on June 30, 1952,
$12,334.19, will be applied as follows:
Accounts payable J'une 30, 1952------------------------------                                                           $4. 76
     Complete minor modifications and general cleanup
      by hired labor      ---------------------------- $6, 123.00
     Complete record drawings-and final reports by hired-
      labor--------------         -------------------- 6, 206. 43
                                                                                                               12, 329.43

             Total                                 --------              --------------                        12, 334. 19
      No work is scheduled for fiscal year 1954.
                                             Cost and financial summary
                                                UNITED STATES FUNDS

                                                      Fiscal year ending June 30                           Total to Jun
                                                                                                          30,1952, includ-
                                                                                                          ing fiscal years
                                         1948        1949         1950          1951          1052            palir to 1948

New work:
      Appropriated -------- $1,874,000.00         $885,600.00 $1,600,000.00 $298, 700. 00 -$35, 000. 00       $6,120,000.00
      Cost-....---- ..---------
                             1,623,964.81 1, 933'035i.9 1,686,497.05          243, 800.81     8, 51L11         6, 57, 70.57
      Expenditures -------   1,583,023.02 1,867,059.48 1,671,635.29           426, 638.18     9, 575.07        6, 57, 665.81

Other new work data.:
    Unobligated balance,;   une 30, 1952--...--------. ------
                                                           _                                               $62, 210. 08
    Revocation for fiscal year ending June 30, 1953-----                                                  -50, 000.90
            Unobligated balance available for fiscal year 1953----------....                                  12,210. 08
                                                CONTRIBUTED          FUNDS
                                                      Foal yar etndinig         =30                        Ta1to June
                                                                                                          ing fiscal years
                                        19          1949         x1950          1951          198E        p        -to   1948




New work                                                                                                       '
   Contributed ------.........--      $27, 0 0.     6, 000.     59,94 15     897.68           $161.-48             4!504. 2
   Cost........---------------.....    10,500.00 -----------.
                                                 ......       .       ....    42.                L                   0     0
   Expenditures.--...                  10,50.00 . .......         ---      1842 83              1. 40                 84904.
            FLOOD CONTROL---BALTIMORE,      MD.,   DISTRICT        365
            24. WILLIAMSPORT, SUSQUEHANNA RIVER, PA.

   Location.-Williamsport, the county seat of Lycoming County,
Pa., is located on the left bank of the West Branch of the Susque-
hanna River, 40 miles above its mouth. (See U. S. Geological Survey
quadrangle sheets--"Trout Run and Williamsport, Pa.")
   Existing project.-The plan of improvement provides for the con-
struction of a system of levees and concrete flood walls and appurte-
nant structures, consisting of the following features: About 26,200
feet of barth levee- and 3,060 feet of concrete flood wall along the
left bank of the West Branch of the Susquehanna River, extending
from high ground near Sheridan St., generally parallel to and on
the right bank of Millers Run to the Susquehanna River, thence
extending upstream along the left bank of the river and Lycoming
Creek; about 29,900 feet of earth levee and 860 feet of concrete flood
wall alongthe left bank of the West Branch of the Susquehanna River,
extending from high ground at Bottle Run generally parallel to
and on the right bank of Lycoming Creek to the Susquehanna River,
thence extending upstream along the left bank of the river to Cario-
thers Lane, thence to high g'round along the Pennsylvania Railroad;
about 11,400 feet of earth levee and 880 feet of concrete flood wall
along the right bank of the West Branch of the Susquehanna River
in South Williamsport, extending from high ground at Central Ave-
nue and Charles Street, along Charles Street to the river, thence
upstream along the river to high ground at Maynard Street; a re-
inforced concrete pressure culvert about 1,390 feet long and a flume
470 feet lonr to provide for control of Hagermans Run; 9 pumping
stations for the disposal of interior drainage; and appurtenant clos-
ure and drainage structures. The improvement will provide pro-
tectibn for the city of Williamsport and the borough of South
Williamsport and part of Old Lycoming Township against a flood dis-
charge equal to the maximum flood of record, which occurred in
March 1936. The existing project was authorized by the Flood Con-
trol Act approved June 22, 1936. The estimated Federal cost of new
work revised in 1952, is $14,500,000 for construction, which does
not include an estimated $81,538 of local -contributions. The esti-
mated local cost of lands, damages, and utility relocations, revised in
1952, is $1,717,800.
   Local cooperation.-See pages 4-5 for requirements. Local inter-
ests have furnished assurances that all the requirements will be
complied with.
   Operations and results during fiscal year.--Levee Unit No. 1: Con-
tract for construction of a seepage control system was commenced
and completed during August 1951.
   Levee Unit No. 2: A contract for construction of the seepage con-
trol system was awarded during June 1952.
   Levee Unit No. 4: Foundation investigations,, engineering studies
and preparation of contract plans and specifications vere continued
during the fiscal year by hired labor.
   Levee Unit No. 5: Plans and specifications were continued and
in progress at the end of the fiscal year by hired labor. Contract for
construction of Units 5A and 5B consisting of levees, drainage struc-
     245554-53-vol. 1-24
366      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

tures, manhole, closure sill, earth ramps and miscellaneous appurte-
nant works, commenced in April 1952, and was in progress at the
end of the fiscal year. The major items of work accomplished under
the contract included excavation and stripping of 62,831 cubic yards
of material and placement of 44,090 cubic yards of levee embankment
and backfill.
   Levee Unit No. 6: Contract for construction of Unit 6B, consist-
ing of levees, flood walls, interceptor sewer, relief wells and appurte-
nances, was completed on July 20, 1951. Contract for construction
of Unit 6C, consisting of levees, flood walls, a pressure conduit, three
pumping stations, closure structures and related facilities, was com-
pleted on May 29, 1952. The major items of work accomplished under
the above contracts included excavation of 32,705 cubic yards of ma-
terial, placement of 44,731 cubic yards of levee embankment and
backfill, 2,713 square feet of steel sheet piling, 1,994 cubic yards of
dumped borrow stone, and 150 cubic yards of reinforced concrete.
   Operations by the Pennsylvania Railroad Co., under a contract,
for cooperative services to enable construction of Hagermans Run
conduit, was continued and completed on June 30, 1952.
   The total costs, all for new work, were $495,397.82. The total
expenditures were $523,668.49.
   Condition at end of fiscal year.-The entire project is 65 percent
complete. Responsibility for operation and maintenance of the com-
pleted work on Units 1, 2 and 3 was formally transferred to local inter-
ests on September 1, 1950. The work remaining to be done is as
follows:
   Levee Units Nos. 1 and 2: Complete corrective measures for con-
trol of underseepage by contract.
   Levee Unit No. 3: Install an additional pump in Basin Street
pumping station by contract.
   Levee Unit No. 4: Complete contract plans and specifications, by
hired labor, and initiate and complete construction of Unit No. 4
by continuing contract.
   Levee Unit No. 5: Complete plans and specifications, by hired
labor, and complete construction by continuing contracts.
   Levee Unit No. 6: Raise railroad and construct levee closure at
downstream end by contract.
   The total costs, all for new work, were $9,541,694.80, of which
$9,497,470.30 was regular funds, $42,337.47 was contributed funds,
and $1,887.03 was Emergency Relief funds. The total expenditures
were $9,470,347.76.
  Proposed operations.--The balance unexpended on June 30, 1952,
$1,060,926.74 plus allotment for fiscal year 1953 of $1,037,500 for new
work, a total of $2,098,426.74 will be applied as follows:
Accounts payable June 30, 1952----------------------------          $71, 347. 04
New work July 1,1952, to June 30, 1953:
    Levee Unit No. 1: Complete additional underseepage con-
        trol system in existing levee, by contract, including re-
        lated Government costs---------------------------           109, 667. 00
   Levee Unit No. 2: Complete seepage control system in exist-
        ing levees, by contract, including Government costs-----     14, 000. 00
   Levee Unit No. 3: Complete installation of additional pump in
        Basin Street pumping station, by contract, including re-
        lated Government costs- ---      -    ----- -----       -    38,000. 00
             FLOOD     CONTROL---BALTIMORE,                      MD.,   DISTRICT            367
New work, July 1, 1952, to June 30, 1953-Continued
   Levee Unit No. 4:
       Continue design and plans by hired labor- ---     $75, 160
       Initiate construction of Bottle railroad bridge,
         levees, flood walls, drainage structures, seep-
         age relief system and appurtenances, by con-
         tinuing contract, including related Govern-
         ment costs---     ------------------------ 400, 000
                                                                                    $475, 160. 00
    Levee Unit No. 5:
        Continue and complete design and plans by
          hired labor__---- ------ ------------------     21, 000
        Complete construction of Units 5A and 5B for
          levees, closure sill, and drainage structures,
          by continuing contract, including related Gov-
          ernment costs_____-------------------          600,118
        Initiate construction of Unit' 50, for levees,
          pumping station, bridge raising, railroad re-
          location and drainage structures, by continu-
          ing contract, including Government costs_-.. 647, 500
                                                                                   1, 268, 618. 00
    Levee Unit No. 6:
        Complete final payments for construction of Unit
          6C, by contract, including related Govern-
          ment costs------------- ------------                           83, 765
        Complete railroad raising and levee closure at
          downstream end, by contract, including re-
          lated Government costs-----------------                        25, 000
                                                                                     108, 765. 00
    All sections:
         Continue minor modifications and general cleanup by
           hired labor or contract------------ ---------                               6,161. 00
         Continue and complete record drawings and final reports
           on completed construction by hired labor- -.      -                          6, 708. 70
             Total--------         ------------------------------                  2, 098, 426. 74
  The additional sum of $1,600,000.00 can be profitably expended for
the following scheduled work during fiscal year 1954:
    Levee Unit No. 4:
        Continue design and plans by hired labor------- $30, 000
        Continue and complete construction of Bottle
          Run diversion, railroad bridge, levees, flood
          walls, drainage structures, seepage relief sys-
          tem and appurtenances, by continuing contract,
          including related Government costs-- -------       738, 000
        Initiate construction of levees, walls, pumping sta-
          tion, railroad relocation, drainage structure and
          appurtenances, by continuing contract, includ-
          ing related Government costs--------------429,000
                                                                                     $1, 197, 000
    Levee Unit No. 5: Continue and complete construction of Unit
         5C, for levees, pumping station, bridge raising, railroad re-
         location, and drainage structures, by continuing contract,
         including related Government costs ------------------                           400, 000
    All sections: Continue minor modifications and general cleanup
         by hired labor or contract---------------------                                   3, 000
           Total----       -----------------------------------                        1, 600, 000
368            REPORT OF CHIEF OF ENGINEERS, U. S.                                                      IMY, 1952


                                          Cost and ftnancial summary
                                              UNITED STATES FUNDS

                                                            Fiscal year ending June 30                                  Total to June
                                                                                                                       30, 1952, includ-
                                                                                                                       ing fiscal years
                                      1948              1949      . . 1950-              4151       .     1952          -prior to 1948

New work:
   Appropriated-......... $2,236;000.900$1,900,000.00 $1,700,000.00                 $330,0.00.      $775,0.00.          $10, 449, 737. 03
      Cost-----------------       1, 221, 763. 66 2, 295, 154.09 2, 172, 905. 35     970, 644. 40       495;397. 82      1 9, 499, 357. 33
      Expenditures......... 1, 203, 403. 782, 224,265. 86 2,246, 028:29              968, 868. 75       523, 668. 49     1 9, 428, 010. 29


Other new work data:
    Unobligated balance, June 30, 1952------_..-------     -                                                           $414, 050. 82
   Appropriated for fiscal year ending June 30, 1953----------                                                         ,037, 500. 00

        Unobligated balance available for fiscal year 1953------       t1,
                                                                         451, 550. 82
        Estimated additional amount needed to be appropriated for
          completion of existing project-------       ---------------- 3,012, 700. 00
                                                  CONTRIBUTED FUNDS


                                                            Fiscal year ending June30                                   Total to June
                                                                                                                       30, 1952, includ-
                                                                                                                       ing fiscal years
                                      1948              1949            1950             1951             1952          prior to 1948

New work:
      Contributed--------.......... $22, 337.47    _.---[           $39, 200. 00   -3,    140.00 --------------    $81, 537. 47
      Cost.....--------------42, 337.47                                                          .----------------------------------------
                                                                                                                    42, 337. 47
      Expenditures ........
                       -- .42,337.47              ---------          ..--- ...                 . -----------.
                                                                                          ..-.--                              42, 337. 47
  1
      Includes $1,887.03 Emergency Relief funds.


                                                   25. TYRONE, PA.

  Location.-Tyrone, Pa., is on the left bank of the ittle Juniast
River, 15 miles above its confluence with the Frankstown Branch, and
116 miles above the mouth of the Juniata River. Bald 3agle Creek
and Sink Run, drainig 53 and 7 square miles, respectively, flow
through the city. (See U. S. Geologicat        Survey quadrangle sheet
"Tyrone, Pa.")
  Existing project.--The plan of improement ponsists of 4,700 feet
of levee and 2,000 feet of coacrete food w4ds         the Litle Juniata             ilong
River, 3,900 feet of channel enlargement and 900 feet of pressure con-
duit along Bald Eagle Creek, 700 feet of chanel enlargement and
1,850 feet of pressure conduit on Sink Run. Interior drainage will
be provided by a pressure conduit on Schell Run, pumping stations,
interceptor sewers, and appurtenant works. The improvement will
provide protection for the city of Tyrone against a flood discharge
equal to the maximum flood of record, which occurred in March
1936. The existing project was authorized by the Flood Control Act,
approved December 22, 1944. (See H. Doc. 702, 77th Cong., 2d sess.)
The estimated Federal cost of new work, revised in 1952, is $7,872,000
and the cost to local interests is estimated to be $595,500 (1952).
  Local cooperation.-See pages 4-5 for requirements.
  Assurances of local cooperation were furnished by the Borough
Council of Tyrone and the Water and Power Resources Board of the
                 FLOOD -CONTROL--BALPIMORE                           MD.,      DISTRICT                  369
Commonwealth of Pennsylvania and were formally accepted June 13,
1949.
   Operations and results during fiscal year.-Engineering studies
and design in connection with interior drainage and possible modifi-
cation of the project plan were in progress by hired labor. The
total costs, all for new work, were $132.05. The total expenditures
were $186.87.
   Condition at end of fiscal year.-Preliminarydesigns and plans are
complete, except for report on interior drainage, and contract plans
and specifications are about 17 percent complete. The remaining work
consists of completing studies of interior drainage and modifications
to the project plan, completion of contract plans and specifications,
and construction of the project. The total costs and expenditures,
all for new work,were $135 171.64.
   Proposed operations.--The balance unexpended on June 30, 1952,
$828.36, will be applied as follows:
New work July 1, 1952 to June 30, 1953: Continue engineering studies
and design in connection with interior drainage and possible modifica-
tion of the project plan, by hired labor --------------------------- $828. 36
  No work is scheduled for fiscal year 1954.
                                 Cost and financial summary

                                              Fiscal year ending June 30                        Total to June
                                                                                               30,1952, includ-
                                                                                               ing fiscal years
                              1948          1949          1950         1951          1952        priorto 1948

New work:
  Appropriated_-           $25,000.00    $35 000.00-----------           -         39,000.00       $136,000.00
  Cost--__   ..-----------   2, 102.48      1,732. 81 $13, 644. 73   $2, 629. 12      132.05        135,171.64
  Expenditurtes-----.....      iT. 78    -1, 185.90    14, 084.47      2,177.7        186.87        135,171 64


Other new work data :
    Unobligated balance, June 30, 1952, ....           ...         $82& 86
    Unobligated balance available for fiscal year 1953 .   .        828. 36
    Estimated additional amount needed to be appropriated for
      completion of existing project-----------------------   7,736, 00. 00

                            26. YORK, CODORUS CREEK, PA.
   Location.-York, Pa., is on Codorus Creek, 10 miles above its con-
fluence with the main Susquehanna River. Codorus Creek with its
tributary branches is located in York County in the south and central
parts of Pennsylvania. (See U. S. Geological Survey quadrangle
sheets "Pennsylvania-York and Hanover.")
   Existing project.-The plan of improvement provides for the con-
struction of Indian Rock Dam, an earth- and rock-fill dam about 1,000
feet long at the top, rising 83 feet above the stream bed, with a reservoir
providing for the controlled storage of 28,000 acre-feet at the elevation
of the spillway crest. The dam site is located on the main branch of
Codorus Creek about 3 miles above York. The outlet works are
located in the right abutment and the uncontrolled spillway is located
on the right bank, discharging upstream from the tunnel outlet. The
reservoir will control the entire drainage area of the main branch of
Codorus Creek and 41 percent of the drainage area above York. The
370     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,           1952

plan also provides for improvements to Codorus Creek Channel in the
vicinity of and through the city of York for a distance of about 22,969
feet extending from 300 feet above Richland Avenue to a point down-
stream from the Pennsylvania Railroad crossing known as Black
Bridge. The improvements, which will increase the channel capacity
to 24,000 cubic feet per second, include widening and deepening the
channel, constructing bank protection, removing the York Roller Mill
Dam, and the construction of a low-water channel approximately
3,900 feet in length in the vicinity of the York Roller Mill Dam. The
improvement will provide protection for the city of York against a
flood discharge approximately 33 percent greater than the maximum
flood of record, which occurred in'August 1933.
    The existing project was authorized by the Flood Control Act ap-
proved June 22, 1936, as amended by the Flood Control Act approved
June 28, 1938.
    The estimated Federal cost of new work, revised in 1952, is $5,100,-
000, of which $4,527,000 is for construction and $573,000 is for lands
and damages.
    Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
    Operations and results during fiscal year.-Excavation of Codorus
Creek Channel was continued and completed by contract. Construc-
tion of the weir on Codorus Creek was commenced and completed by
contract. The major items of work accomplished under the above
contracts included excavation and disposal of 47,836 cubic yards of
material, placement of 215 tons of derrick stone, and 327 cubic yards
of Prepakt concrete. Acquisition of land and reimbursement to own-
ers was continued by hired labor. Operation, maintenance and repair
of Indian Rock Dam and Codorus Creek Channel was continued by
hired labor. The reservoir gates were closed from March 10 through
March 12, 1952 and were most effective in controlling a minor flood
downstream of the dam. Effective November 28, 1951 the plan of
operation of the dam was altered in order to assure a substantial re-
duction of peak flows even if human or mechanical failure should
prevent the gates being operated during a flood. Beginning on that
date, 2 of the 3 gates were kept closed except when water was being
released after a flood. The total costs were $132,876.28, of which
$99,452.10 was for new work and $33,424.18 was for maintenance. The
total expenditures were $135,109.81.
    Condition at end of fiscal year.-The project was operationally com-
plete in December 1949. The Codorus Creek Channel improvement
is complete and Indian Rock Dam is complete except for paving of
the access road to the dam. The work remaining to be done is paving
of the access road to the dam by contract, and completion of record
drawings, final reports, and minor modifications and general cleanup
by hired labor. The total costs were $5,190,160.46, of which $5,020,-
571.08 (regular funds) and $11,588.14 (Emergency Relief funds) were
for new work and $158,001.24 was for maintenance. The total ex-
penditures were $5,182,180.10.
   Proposed operations.-The balance unexpended on June 30, 1952,
$76,376.04, plus accounts receivable of $25.31, plus allotment for fiscal
                       FLOOD CONTROL-BALTIMORE,                               MD.,       DISTRICT                        371
year 1953 of $24,645 for maintenance, a total of $101,046.35, will be
applied as follows:
Accounts payable June 30, 1952 ...........   ___ ....
                                                   __        ..   ....                                           $8, 005. 67
New work July 1, 1952 to June 30, 1952:
  Continue and complete preparation of contract plans and specifi-
    cations for paving of the access road to Indian Rock Dam, by
    hired labor, and commence and complete construction, by con-
    tract, including related Government costs--------------
                                                 .--........                                                     11, 000. 00
  Complete installation of radio transmitter, receiver and auxiliary
    power plant by hired labor_ .........                                                                            567. 00
  Complete reimbursement to owners and obtain certificates of titles
    for lands acquired for the channel portion of the project by
    hired labor---------------------
                         .--               -          ---.------.                                                48, 119. 92
  Continue and complete record drawings and final reports by
    hired labor------          -------------- --------------                                                      4, 080. 00
  Continue and complete minor improvements and general cleanup,
    by hired labor, and make final contract payment for repair of
    weir--           -_..___                                                                                      4,062.00

      Total new work------            ------------------------                                                   67, 828. 92
Maintenance July 1, 1952 to June 30, 1953: Operate and maintain
    Indian Rock Dam and Reservoir and the Codorus Creek Channel
    by hired labor-------------     ----------------------                                                       25, 211.76
          Total---             ------------------------------------                                            101, 046. 35

   The additional sum of $32,200 can be profitably expended during
fiscal year 1954 for the operation and maintenance of Indian Rock
Dam and Reservoir and Codorus Creek Channel.
                                          Cost and financial summary

                                                      Fiscal year ending June 30                               Total to June
                                                                                                              30, 1952, includ-
                                                                                                              ing fiscal years
                                      1948          1949              1950        1951          1952            prior to1948

New work:
   Appropriated......... $100,000.00 $203,100.00 .........-----------...      $90,100.00 ------------
                                                                                           ............         $5, 099, 988. 14
   Cost---------------..................97, 471. 64 51, 804. 74 $126, 485. 81  74,.871.35     $99, 452.10       15,032,159.22
   Expenditures-......... 123, 635. 49              39, 933. 83 135, 089. 18   72, 371. 76      99, 077. 18     1 5, 025, 819. 60
Maintenance:
   Appropriated--..---...           15, 200. 00   14,500.00..   20.500.00      21,100..00     33, 568.00            158, 568. 00
   Cost------
        .................-----      12, 636. 82   21, 273. 08   19, 518. 28    21, 658. 78    33, 424. 18           158, 001. 24
    Expenditures--------.........   12, 812. 54   19, 275. 65   19, 939. 15    18, 626. 38    36, 032. 63           156, 360. 50

  1 Includes $11,588.14 Emergency Relief funds.

Other new work data:
    Unobligated balance, June 30, 1952------       ----------------- $15, 161. 19
    Unobligated balance available for fiscal year 1953------- -----   15, 161.19

27. SNAGGING AND CLEARING UNDER AUTHORITY OF SECTION 2 OF
THE FLOOD CONTROL ACT APPROVED AUGUST 28, 1937, AS AMENDED

  The Flood Control Act approved August 28, 1937, as amended by
the Flood Control Acts approved August 11, 1939, August 18, 1941,
and July 24, 1946, authorized the allotment of not to exceed $1,000,000
from the flood-control appropriations for any one fiscal year for the
removal of accumulated snags and other debris from, and the clearing
and straightening of channels in navigable streams and tributaries
thereof when such work is advisable in the interest of flood control;
provided that not more than $50,000 shall be allotted for this purpose
372         REPORT OF CHIEF OF ENGINEERS,                                     U.   S. ARMY,             1952

for any single tributary from the appropriations for any one fiscal
year.
   Operations and results during fiscal yea.--Removal of growth and
obstructions on two islands and clearing of the left bank of the West
Branch of the Susquehanna River in the vicinity of Milton, Pa., was
completed by contract. A study and review of the snagging and
clearing project at Newton Creek, Bainbridge, N. Y. was in progress,
by hired labor. The total costs, all for new work, were $3,622.26.
The total expenditures were $7,063.84.
   Condition at end of fiscal year.-Removal of debris and channel
clearing on the Lackawanna River and tributaries at Scranton, Pa.,
was completed in fiscal year 1943. Clearing and snagging operations
on the Chenango River at Port Dickinson, N. Y. and downstream
from Cutler Dam at Binghamton, N. Y. were completed in fiscal year
1950. Removal of growth and obstructions on two islands and clearing
of the left bank of the West Branch of the Susquehanna River in the
vicinity of Milton, Pa., was completed in fiscal year 1952. A study
and review of the project on Newton Creek, Bainbridge, N. Y., is
partially complete. The work remaining to be done is completion of
the project on Newton Creek, Bainbridge, N. Y. The total costs, all
for new work, were $84,282.84. The total expenditures were $84,103.61.
  Proposed operations.--The balance unexpended on June 30, 1952,
$15,522.54, will be applied as follows:
Accounts payable June 30, 1952                   _        __-------------_                                     $179.23
New work July 1, 1952 to June 30, 1953: Complete engineering
  studies and prepare contract plans and specifications, by hired
  labor, and accomplish snagging and clearing operations on Newton
  Creek, Bainbridge, N. Y., by contract, including related Govern-
ment costs-------------------------------------------15,                                                        343. 31
        Total --------------                        ---------------------------                            $15, 522. 54

                                      Cost and flnancial summary

                                                    Fiscal year ending June 30                             Total to June
                                                                                                          30,1952, includ-
                                                                                                          ing fiscal years
                                   1948           1949           1950           1951          1952         prior to 1948

New work:
   Appropriated---------.......--------....... $25, 000. 00   $50, 000. 00   $20, 000. 00 -$28,232.95          $99, 626.15
   Cost----                     .28,
               ......-------------------            560. 32     6, 363. 01    35, 173.72:    3, 622; 26         84, 282. 84
   Expenditures------     -           .------------
                                             25,543.54          6,800.25     34,132.45       7,063.84           84,103.61


MOther new work data:
      Unobligated balance, June 30, 1952-_----- -----------------                                          $15, 218. 31
      Unobligated balance available for fiscal year 1953 ------------                                       15, 218. 31
28. PRELIMINARY EXAMINATIONS, SURVEYS AND CONTINGENCIES FOR
                                              FLOOD CONTROL
   The cost of this work during the fiscal year amounted to $8,697.60, of
which $7,592.43 was for preliminary examinations and surveys, and
$1,105.17 was for contingencies. The expenditures were $7,950.44.
                      FLOOD CONTROL -BALTIMORE,                                 MD.,      DISTRICT,

  The balance unexpended on June 30, 1952, $2,487.75, plus allotments
during fiscal year 1953 of $12,300 for preliminary examinations and.
surveys and $2,000 for contingencies, a total of $16,787.75, will be ap-
plied as follows:
Accounts payable June 30, 1952..----....-              ------------ ---                                        $1, 214. 55
Preliminary examinations and surveys, by hired labor, July 1, 1952 to
  June 30, 1953--          --------------------------------                                                      3, 339. 85
Contingencies, by hired labor, July 1, 1952 to June 30, 1953 ------                                              2, 233. 35
          Total ------             ------------------------                     ---------------                16, 787. 75
   The additional sum of $76,100.00 can be profitably expended for the
following schedule of work during fiscal year 1954:
Preliminary examinations and surveys, by hired labor, July 1, 1953 to
  June 30, 1954--      ----------------------------      ---------- $53, 100. 00
Contingencies, by hired labor, July 1, 1953 to June 30, 1954-------- 23, 000. 00

          Total ----------------                       ----------------------------                            76,100. 00

                                        Cost and         financial      summary

                                                       Fiscal year ending June 30                             Total to June
                                                                                                             30, 1952, includ-
                                                                                                             ing fiscal years
                                     1948            1949           1950           1951          1952         prior to 1948


Maintenance:
   Appropriated ........ $155, 000. 00 $245, 000. 00 $243, 000. 00              $76,000.00     $4,100. 00      $1, 218, 551. 38
     Cost----   ----....
                    ----...       148, 238. 50    245,172.95     219, 064.00     94.065. 20     8,697.60         1,217,278.18
     Expenditures- ......         158, 047. 73    233, 783. 79   222, 119. 32   101, 762. 03    7, 950. 44       1, 216, 063.63



                         29. INSPECTION OF COMPLETED PROJECTS

   The cost of this work during the fiscal year amounted to $1,726.36..
The expenditures were $1,902.16. The balance unexpended on June
30, 1952, $276.25, plus $800 allotted during fiscal year 1953, less ac-
counts payable $1.36, a total of $1,074.89, will be applied as needed
during fiscal year 1953 to payment of expenses under this heading.
   The additional sum of $2,000 can be profitably expended for inspec-
tion of completed projects during fiscal year 1954.
                                        Cost and financial summary

                                                       Fiscal year ending June 30                             Total to June
                                                                                                             30, 1952, includ-
                                                                                                             ing fiscal years
                                      1948           1949           1950           1951          1952          prior to 1948

Maintenance:
   Appropriated--------....      .........------------..------- ---------        $1,540.00       $900.00            $2, 440. 00
     Cost -----------------      -----------     I------------ ------------         438. 75     1,726.36             2;166 11
    Expenditures---           ---------------------------------                     261.59     1,902.16              2,163. 7-
374            REPORT OF CHIEF OF ENGINEERS, U.                                           S. ARMY,        1952

                        30. INACTIVE FLOOD CONTROL PROJECTS

                                                                                         Cost and expenditures
                                                                           For last         to June 30, 1952     Estimated
                         Name of project                                 full report,                            amount re-
                          ame o proj                                     see Annual                               quired to
                                                                           Report          New        Main-      complete 4
                                                                             for-          work      tenance

                           - - - - - - - - - - - - - _--------------1937
West Pittston, 2Pa.l- -_------------__               -- --- - --- - -- -- -- -          ------------------------ $854,000
Nanticoke, Pa ....... __     _...................                   .....      1937     ----------------------- 1, 591, 000
Federalsburg, Marshyhope Creek, Md.S_ _____-_-_--                              1941       $4,061.08 ... -----      460,939

  1 No funds have been allotted and no work has been done on this project. In accordance with the pro-
visions of the 1941 Flood Control Act t the 5-year limitation clause on assurances of local cooperation has
been invoked. The project authorization will expire Nov. 22, 1955.
  2 No funds have been allotted and no work has been done on this project. In accordance with the pro-
visions of the 1941 Flood Control Act, the 5-year limitation clause on assurances of local cooperation has
  3
been invoked. The project authorization will expire Oct. 19, 1955.
    Awaiting local cooperation.
  4Estimate of Federal cost revised in 1952.

                                    31. MISCELLANEOUS ACTIVITIES

Status of all investigations for flood control called for by flood control acts and
                              committee resolut io

                                                                                               Date trans-   Docu- Recom-
                     Locality                                    Authorization                 mitted to     ment menda-
                                                                                               Congress       No.   tion

Catatonk Creek Basin in the vicinity                   Commerce Committee resolu-
  of Candor, N. Y. (tributary of the                    tion, June 20, 1944.
  Susquehanna River).'
Chenango and Susquehanna Rivers in                    Flood Control Committee res-
  Broome County, N. Y.1                                 olution, Dec. 18, 1945.
Juniata River and tributaries, Pennsyl-               Flood Control Act, Dec. 22,
  vania, with special reference to pro-                 1944.
  posed Raystown Reservoir.
Lackawanna River, Pa.'l..............     Commerce Committee resolu-
                                            tion, July 8, 1942.
Marshyhope Creek, Md.................     Flood Control Committee res-
                                            olution, Mar. 1, 1946.
Marshyhope Creek and tributaries, Flood Control Act, July 24,
  Maryland.                                 1946.
Nanticoke River and tributaries, Mary- Flood Control Act, May 17,
  land and Delaware, in the interest of     1950.
  flood control and major drainage im-
  provements.
Owego Creek, in the vicinity of Owego, Commerce Committee reso-
  N. Y. (tributary of the Susquehanna       lution, June 20, 1944.
  River).1
Raystown Reservoir, Juniata River and Flood Control Act, Dec. 22,
  tributaries, Pennsylvania.                1944.
Solomon Creek, Hanover Township, Flood Control Committee res-
  Pa., tributary of the Susquehanna         olution, Mar. 22, 1946.
  River.,
Susquehanna River and tributaries for Commerce Committee resolu-
  flood control on Catatonk Creek Basin     tion, June 20, 1944.
  in vicinity of Candor, N. Y.'
Susquehanna River and tributaries for Commerce Committee resolu-
  flood control on Owego Creek in the       tion, June 20, 1944.
  vicinity of Owego, N. Y.1
Susquehanna River, North Branch, Flood Control Committee res-
  N. Y., Pa., and tributaries. (Final re-   olution, July 5, 1946.
  port).
Susquehanna River, West Branch, Pa., Flood Control Committee res-                           -------------r
  and tributaries.                          olution, May 29, 1946.
Susquehanna River, Pa., flood control Flood Control Committee res-
  in Luzerne County, Pa. at and in          olution, Jan. 31, 1946.
  vicinity of Wilkes-Barre, Kingston,
  and contiguous areas.'
    See footnote at end of table.
                  FLOOD CONTROL--BALTIMORE,                             MD.,      DISTRICT                     375

Status of all investigations for flood control called for by flood control acts and
                         committee resolutions---Continued

                                                                                    Date trans-       Docu- Recom
                Locality                            Authorization                   mitted to          ment menda-
                                                                                    Congress           No.   tion

Susquehanna =River, Pa., flood control,.   Flood Control Committee res- .                     ---
                                                                                           ........-----
  on Solomon Creek in Hanover Town-         olution, Mar. 22, 1946.
   ship Pa.1
Susquehanna and Chenango Rivers in         Flood Control Committee res-    ---......................--------
  Broome County, N. Y.1                     olution, Dec. 18, 1945.
Susquehanna and Chenango Rivers in         Commerce Committee resolu-.......................
  Broome County, N. Y.1                      tion, Jan. 14, 1946.
Susquehanna River in vicinity of Endi-     Flood Control Act, Dec. 22, ......---.....--------...--------
  cott, Johnson City, and Vestal, N. Y.      1944.
  (final report).
Susquehanna River, flood protection        Commerce Committee resolu---....-                -.
                                                                                        .......
  for Cortland, N. Y., and vicinity.         tion, Apr. 17, 1946.
Susquehanna River and tributaries,         Flood Control Committee res- .--.--.----...--------
  New York, Pennsylvania, and Mary-          olution, Apr. 19, 1946.
  land, with view to providing flood
  protection at and in the vicinity of
  Nichols, Tioga County, N. Y.1

  1 Report on this investigation contained in the report on Susquehanna River, North Branch, N. Y.
and Pa.

32. EMERGENCY FLOOD CONTROL WORK UNDER AUTHORITY OF THE
         FLOOD CONTROL ACT APPROVED AUGUST 18, 1941

   The Flood Control Act, approved August 18, 1941, as amended
authorizes the allotment of not to exceed $2,000,000 from the flood
control appropriations for any one fiscal year to be expended in rescue
work or in the repair, restoration or maintenance of any flood control
work threatened or destroyed by flood, including the strengthening,
raising, extending, or other modification thereof as may be necessary
in the discretion of the Chief of Engineers for the adequate functioning
of the work for flood control.
   Operations and results during fsoal year.--Emergency wall repairs
along Chauncey Run and Canacadea Creek were continued and com-
pleted by contract. Preparation of contract plans and specifications
for emergency repairs to levee embankment along the right bank of
Lycoming Creek at Williamsport, Pa., was commenced and completed,
by hired labor, and construction, by contract, was commenced and in
progress. The total costs, all for maintenance, were $64,599.31. The
tbtal expenditures were $67,999.14.
   Condition at end of fiscal year.-Emergency wall repairs along
Chauncey Run and Canacadea Creek at Hornell, N. Y., are complete.
Emergency repairs to levee embankment along the right bank of
Lycoming Creek, at Williamsport, Pa., are 10 percent complete. The
work remaining to be done is completion of contract for emergency
repairs at ' Williamsport, Pa. The total costs, all for maintenance,
were $337,772.96 of which $44,300.00 was from contributed funds.
The total expenditures were $339,255.75 of which $44,300.00 was from
contributed funds.
376             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   Proposed operations.--The balance unexpended on June 30, 1952,
$21,310.93,-will be applied as follows:
Accounts payable June 30, 1952__----__..-                        __.-------
                                                                  .-                     ---            -         $891.91

Maintenance July 1, 1952, to June 30, 1953:
   Payment of flood fighting operations completed during the previous
      fiscal year by hired labor-------------------------------1,                090. 10
   Investigation of outlets through levees and flood walls by
      hired labor---------              ------------------------------        9, 535.20
    Complete record drawings and final reports on emergency wall
      repairs to Chauncey Run and Canacadea Creek at Hornell,
      N. Y., by hired labor--------- ...         ------------------------     2, 588. 69
    Complete emergency levee repairs along Lyconing Creek at
      Williamsport, Pa., by contract, including related Government
      costs ----------------   ~-      ..---..                    ---     -7,    205. 03
                Total maintenance....------------                       -------      ------------- 20,419. 02
                Total for all work_------ ---.                                                                 21,310. 93

                                              Cost and financial summary
                                                UNITED STATES FUNDS

                                                      Fiscal year ending June 30                              Total to June
                                                                                                             30, 1952, includ-
                                                                                                             ing fiscal years
                                       1948          1949        1950             1951          1952          prior to 1948

Maintenance:
   Appropriated......               -$2, 708. 91 $216,219. 88 -$41, 500.00 $115, 000.00 -$22,205.25               $315,441. 68
   Cost-----------.......   -----      ----        145,209.26   13,483.05     22,254.29        64,599. 31          293,;472.96
   Expenditures -----------------                 144,903.39     8,$10.45     25,315.72        67,999.14           294, 955.75

                                                CONTRIBUTED FUNDS

                                                      Fiscal year ending June 30                             Total to June
                                                                                                             30, 19562,includ-
                                                                                                             ing fiscal years
                                       1948          1949        1950             1981          1952          prior to 1948

Maintenance:
   Contributed....--------------------               $44, 300 ----------------------.               $826              $45,125
   Cost....------------ -----------                   44, 300 --------------------                                     44, 300
   Expenditures-------------                          44, 300 .-----------------    -             ---.....             44, 300


33. EMALL FLOOD CONTROL PROJECTS UNDER SECTION 205 OF THFI
    FLOOD OONTROL ACT APPROVED JUNE 30, 1948 AS AMENDED

  Section 205 of the Flood Control Act approved June 30, 1948, as
amended by section 212 of the Flood Control Act approved May 17,
1950, authorizes the allotment from flood control appropriations, not
to exceed $3,000,000 for any one fiscal year, for the construction of
small flood-control projects not specifically auithorized by Congress,
and not within areas intended to be protected by projects so au-
thorized, which come within the provisions of section of the Flood
Control Act of June 22, 1936, when in the opinion of the Chief of
Engineers such work is advisable: Provided, That not more than
$150,000 shall be alloted for this purpose at any single locality from
the appropriations for any one fiscal year: Provided further, That
            FLOOD       CONTROL--BALTIMORE,                MD.,   DISTRICT

the provisions of local cooperation specified in section 3 of the Flood
Control Act of June 22, 1936, as amended, shall apply: And provided
further, That the work shall be complete in itself and not commit the
United States to any additional improvement to insure its successful
operation, except as may result from the normal procedure apply-
ing to projects authorized after submission of preliminary examination
and survey reports.
   Pursuant to this act, three projects were approved in this district.
The first, on the Chenango River at Norwich, N. Y., provides for
9,000 feet of channel realinement and clearing through the town at
an estimated Federal cost of $98,000. A second prodect at Greene,
N. Y., provides for improvement of about 1,100 feet of Birdsall Creek
below Birdsall Street by levee construction and rock protection at
an estimated Federal cost of $43,500. The third, on Owego Creek
at Owego, N. Y., provides for clearing the left bank of the Sesque-
hanna River and an island in the river, clearing along the creek and
improving sections of the creek channel at an estimated cost of
$60,000.
   Local cooperation.-See pages 4-5 for requirements: Requirements
have been met on the first two projects. Formal assurances of co-
operation by local interests on the third project, were given on
September 11, 1951 and accepted on November 13, 1951.
    Operations and results during fiscal year.-Record drawings and
final reports for the projects at Norwich, N. Y., and at Greene, N. Y.,
were completed by hired labor. Contract plans and specifications
for clearing and snagging Owego Creek and North Branch Susque-
hanna River at Owego, N. Y., were completed, by hired labor, and
construction, by contract, commenced and was in progress at the end
of the fiscal year. The total costs, all for new work, were $27,579.05.
The total expenditures were $28,994.01.
    Condition at end of fiscal year.-The work along the Chenango
River at Norwich, N. Y., was completed October 31, 1950, and the
work along Birdsall Creek at Greene, N. Y., was completed June 26,
1951. The work remaining to be done is completion of the' project
authorized along Owego Creek and North Branch Susquehanna River
at Owego, N. Y. The total costs, all for new work, were $156,755.72.
The total expenditures were $153,825.42.
    Proposed operations.-The balance unexpended on June 30, 1952,
 $37,674.58, will be applied as follows:
Accounts payable June 30, 1952--------------------------------               $2, 930.30

New work July 1, 1952, to June 30, 1953:
   Complete record drawings and final reports for clearing and
     snagging along Owego Creek at Owego, N. Y. by hired labor -.  2, 030. 00
   Complete construction of snagging and clearing along Owego
     Creek and North Branch Susquehanna River at Owego, N. Y., by
     contract, including related Government costs--------------   32, 714. 28

        Total new work----------------------------------                     34, 744.28

        Total for all work-_-.--------------------------                     37, 674. 58
   No work is scheduled during fiscal year 1954.
378          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                                      Cost and financial summary

                                                   Fiscal year ending June 30                          Total to June
                                                                                                      30, 1952, includ-
                                                                                                      ing fiscal years
                                   1948          1949           1950          1951         1952        prior to 1948

New work:
   Appropriated_-- ----       ___-......... __--- _---. ... $141, 500.00   $60,000.00 -$10,000.00         $191, 500. 00
   Cost----------        ------------------------             53, 315.52    75, 861.15  27, 579. 05        156, 755,72
   Expenditures--------,    ------------------.               50, 522.18    74, 309.23  28, 994.01         153, 825.42


Other new work data:
                                       ..---------------------
    Unobligated balance, June 30, 1952---                                                              $29, 754. 40
    Unobligated balance available for fiscal year 1953------------                                      29, 754. 40
    IMPROVEMENT OF RIVERS AND HARBORS IN THE
            WASHINGTON, D. C., DISTRICT
   The district comprises a portion of south central Pennsylvania,
western Maryland, eastern West Virginia, and northern Virginia
embracing the western part of Chesapeake Bay and its tributaries
from Cove Point, Md., to a line due west through Wolf Trap Light
to the watershed line between the northerly arm of Winter Harbor and
Garden Creek, Va.
   District engineer: Col. Alan J. McCutchen, Corps of Engineers.
   Division engineer of the North Atlantic Division, New York, N. Y.,
comprising the New York, N. Y., Philadelphia, Pa., Baltimore, Md.,
Washington, D. C., and Norfolk, Va., districts: Col. F. F. Frech,
Corps of Engineers, to March 14, 1952; Col. B. B. Talley, Corps of
Engineers, since that date.
                                        IMPROVEMENTS

                Navigation                             Navigation-Continued
                                         Page                                        Page
1. Washington Harbor, D. C__             379 15. Inactive navigation projects_       406
2. Potomac River, North Side                 16. Miscellaneous activities--..        407
      of Washington Channel,
      D.C3
      D  . C ------  ------               382                Flood Control
3. Potomac River at Alexandria,
      Va_--                               384 17. Anacostia River and tribu-
4. Potomac River below Wash-                       taries, flood protection and
      ington, D. C_                       385       navigation improvements,
5. Potomac River and tributar-                      District of Columbia and
      ies at and below Washing-
      ton, D. C., elimination of
                                                     Maryland___
                                              18. Cumberland,
                                                                          -
                                                                     Md., and
                                                                                      408

      waterchestnut             __        387        Ridgeley, W. Va       .....      409
6. Little Wicomico River, Va_-           389 19. Savage River Dam, Md --             412
7. Rappahannock River, Va -.             390 20. Salem Church Reservoir, Va_         414
8. Hoskins Creek, Va_                    392 21. Preliminary examinations,
9. Totuskey Creek, Va .                  393       surveys, and contingencies
10. Broad Crek, Va_                       395       for flood control .......         416
11. Maintenance, operation, and               22. Inactive flood control proj-
      capital outlay of the Wash-                   ects_- -     - .-..          -    416
      ington Aqueduct .......             396 23. Miscellaneous activities ....       417
12. Anacostia Park and the rec-               24. Emergency flood-control
      lamation and development                      works under authority of
      of Anacostia River and                        the Flood Control Act
      Flats from the mouth of                       approved June 23, 1947_.          417
      the river to the district line,         25. Small flood-control projects
      District of Columbia ....           401       under authority of section
13. Examinations, surveys, and                      205 of the Flood Control
      contingencies (general)- .-         404       Act approved June 30,
14. Plant allotment ........-             405       1948, as amended........          418

                         I. WASHINGTON HARBOR, D. C.

  Location.--Washington Harbor is located within the District of
Columbia at the junction of the Anacostia River with the Potomac
River which flows in a southeasterly direction 108 miles to the Chesa-
peake Bay. It is southerly 202 miles by water from Baltimore, Md.,
                                                                              379
380     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,          1952

and northerly 195 miles from Norfolk, Va. (See U. S. Coast and
Geodetic Survey Chart No. 560.)
   Prious projects.---The original project for the Potomat River
was adopted by the River and Harbor Acts of March 2, 1833, July 11,
1870, and August 2, 1882. For further details, see page 1791 of
annual report for 1915, and page 295 of annual report for 1934.\ The
River and Harbor Act of September 19, 1890, authorized an allot-
ment for work on the Anacostia River; joint resolution of Congress
of April 11, 1898, made appropriation for a survey; and a project
was adopted by the River and Harbor Act of June 13, 1902 (H. Doc.
87, 55th Cong., 3d sess., and annual report for 1899, p. 1443). For
further details, see page 430 of annual report for 1932 and page 421
of annual report for 1938.
   Existing project.-This project is a combination and extension of
the latest projects for the Potomac River at Washington, D. C., and
the Anacostia River, D. C. The project provides for: (1) Virginia
Channel, from Giesboro Point to Francis Scott Key Bridge, 24 feet
deep and 400 feet wide, with the width increased as necessary to afford
a low-water cross-section area of 25,000 square feet; (2) Washington
Channel, from Hains Point to the head of Washington Channel, 24
feet deep and 400 feet wide; (3) Anacostia River from Giesboro Point
to Anacostia Bridge, 24 feet deep and 400 feet wide, with turning basin
800 feet wide and approximately 2,400 feet long of same depth oppo-
site the Naval Gun Factory; (4) Anacostia River from Anacostia
Bridge, 24 feet deep and 200 feet wide to turning basin 400 feet square
of same depth at foot of Fifteenth Street SE. The channel lengths
including turning basins are: Virginia Channel, 25,000 feet; Wash-
ington Channel, 10,000 feet; and Anacostia River, 15,000 feet; (5)
operation and maintenance of the inlet gates and lock and the outlet
gates of the Tidal Basin constructed under a previous project to flush
the Washington Channel. The plane of reference is low-water datum
which is 0.35 foot below mean low tide as observed from 1932 to 1942,
Tidal ranges are: Mean, 2.9 feet; irregular, 4.5 feet; and extreme,
10.7 feet.
   The estimate of cost to the Federal Government for new work,
revised in 1952 is $558,000, exclusive of amounts expended under
previous projects. The latest (1950) approved estimate for annual
cost of maintenance is $83,000.
   The existing project was adopted by the River and Harbor Act of
August 30, 1935 (Rivers and Harbors Committee Doc. 22, 74th Cong.,
1st sess.). The latest published maps are in the project document.
   Terminal facilitie -On the Virginia Channel (Georgetown water-
front) there are 10 wharves generally of the bulkhead type, of timber,
stone, and concrete, privately owned. Railroad and crane service
are available at a number of the wharves. On the Washington Chan-
nel are 2 yacht basins with a total capacity for 198 yachts, under
jurisdiction of the District of Columbia and 12 wharves of open pile
and bulkhead construction, all owned by the Federal Government, but
most of which are leased to private: parties or serve governmental
agencies. On the Anacostia River are about 23/4 miles of commercial
waterfront on which are located 7 privately owned and 2 Government
wharves, and 3,500 linear feet of bulkhead with slips for govern-
          RIVERS         AND HARBORS----WASHINGTON,                        D. C.,       DISTRICT              381
mental agencies. In addition, there are numerous small stagings and
floats used by yacht clubs for mooring small boats. Some of the
wharves and slips have transfer and rail facilities. The wharves of
the Washington Harbor are only open to the public by special arrange-
ment, except for the District of Columbia fish wharves on the Wash-
ington Channel.
   Terminal facilities, except for those in the Washington Channel,
are considered adequate for existing commerce.
   Operations and results during fiscal year.-The tidal basin gates
were repaired and operated by hired labor throughout the year at
a cost of $12,722.65, applied to maintenance. Total expenditures
were $12,541.45.
   Condition at end of fiscal year.-The existing project was started
in April 1937 and was about 50 percent complete at the end of the fiscal
year. The channels and basins in the Anacostia River are complete
and those at the forks of the channel at Hains Point are partially
complete. Except for dredging between the limits of 2,000 feet above
and 3,000 feet below the Memorial Bridge, no new work has been done
downstream of Key Bridge in Virginia Channel.
   The controlling depths in the channels throughout the harbor were
as follows:

                           Name of channel                                      Controlling
                                                                                  depth                   Date

                                                                                    Feet
Potomac River, Virginia Channel from Giesboro Point to Key Bridge___                        20.3      April 1949.
Washington Channel from Giesboro Point to 14th St. Bridge....------------
Anacostia River from Giesboro Point to Anacostia Bridge_---------------
                                                                                           118.9
                                                                                            24.2
                                                                                                      February 1950.
                                                                                                      March 1950.
Anacostia River from Anacostia Bridge to 15th St., SE.------------------                   8 21. 1    October 1947.


1 For 200-foot width.         2   For 400-foot width.        a   For 100-foot width.

   The work remaining to be done to complete the project consists of-
   (1) Removal of rock in Virginia Channel upstream of Memorial
Bridge.
   (2) Dredging in Virginia Channel from Giesboro Point upstream
to a point 3,000 feet below Memorial Bridge.
   Total costs for the existing project were $868,300.92, of which $162,-
006.33 was for new work and $706,294.59 was for maintenance. This
is exclusive of $4,000 for emergency dredging under provisions of Sec-
tion 3 of the River and Harbor Act of March 2, 1945. The total ex-
penditures were $866,613.76.
   Proposed operations.-The balance unexpended June 30, 1952,
$1,464.51, plus an allotment of $24,500 made during the fiscal year
1953, a total of $25,964.51, will be applied as follows:
Accounts payable, June 30, 1952,-                                                                    .------------
                                                                                                        $1, 687. 16

Maintenance:
   Operation and repair of the tidal gates, Tidal Basin, Washing-
      ton, D. C., by hired labor (July 1, 1952-J'une 30, 1953)-------- 16, 077. 35
   Miscellaneous inspections and reports (July 1, 1952-June 30,
      1953)     -----   ------------------------------------       ---  8, 200. 00
        Total maintenance______------                    --------------------                          24, 277. 35
        Total for all work.___--------------                          --        -             -        25, 964.51
       245554- 53-vol. 1-- 25
382           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                       1952

  The additional sum of $22,000 can be profitably expended during
the fiscal year 1954 as follows:
Maintenance:
   Operation and repair of the tidal gates, Tidal Basin, Washington,
      D. C., by hired labor (July 1, 1953-June 30, 1954) ---                                                               $10, 000
   Hydrographic survey of the Virginia Channel between Hains Point
      and Easby Point by Government plant and hired labor (April
      and May 1954)                                                                                                           4, 000
   Miscellaneous inspections and reports (July 1, 1953-June 30,                                                             8,0
         194------------------------- --------------
                                                 -1954)
                                                  -          ------                                                           8, 000
          Total for all work .......--------------------------------------                                                  22, 000

                                          Cost and financial summary

                                                        Fiscal year ending June 30                                    Total to June
                                                                                                                     30, 1952, includ-
                                                                                                                     ing fiscal years
                                      1948            1949            1950            1951            1952             prior to 1948

New work:
    Appropriated---------,                .-----------------------.            ------------           ------------      $3, 191,007.11
    Cost ...----------------.            ------------                                      ----------
                                                                                   _-------------     ------------       3, 191,007. 11
    Expenditures--                       ......--------...................................
                              ..----------------------------------------------.                                          3, 191,007. 11
Maintenance:
    Appropriated-.........        $11, 750. 00 $197,182. 87 $204,100. 00         -$24,651.45      $12, 500. 00         1 2, 537,681. 56
    Cost------------.... --.       13, 233. 31 195, 907. 27 172, 327. 02           10, 134.30      12, 722. 65         1 2, 537, 904.21
    Expenditures--------......     12,195. 98 186,845.83     182,362. 61            8, 691.72'     12,541.45           1 2, 536, 217.05


Other new work data: Estimated additional amount needed to be ...        -.- --
appropriated for completion of existing project------------ ---- $396, 000
  1 Exclusive of $4,000 for emergency dredging under provisions of section 3 of the River and Harbor Act of
March 2, 1945.


   2. POTOMAC RIVER, NORTH SIDE OF WASHINGTON CHANNEL, D. C.

   Location.-The area covered by the project is the waterfront
channelward of Maine Avenue on the north side of Washington
Channel, extending upstream from Fort Leslie J. McNair (War
College) at Maine Avenue and P Street a distance of approximately
5,123 feet to the foot of 14th Street SW., in the District of Columbia.
 (See U. S. Coast and Geodetic Survey Chart No. 560.)
   Existing project.--This provides for development of the commer-
cial waterfront of Washington Channel by construction of (1) a
yacht harbor in four sections on the upstream half of the section,
with berthing space for about 286 boats; (2) two wharves for activities
of the District of Columbia; (3) three wharves for existing trans-
portation lines and general service; (4) construction of bulkhead
walls; and (5) removal of the old and dilapidated existing structures.
The project further provides that during the construction period
the district engineer be given jurisdiction over the entire waterfront
except the municipal fish wharf, and that the completed work as well
as the maintenance and administration thereof should be under the
Commissioners of the District of Columbia.
   The estimate of cost to the Federal Government for new work,
revised in 1952 is $7,169,100, exclusive of $389,000 to be contributed
by the District of Columbia to cover the cost of the two wharves for
District of Columbia activities. The latest (1950) approved estimate
for annual cost of maintenance is $1,600.
        RIVERS   AND   HARBORS-WASHINGTON,        D.   C:,   DISTRICT   383
     The existing project was adopted by the River and Harbor Act of
August 30, 1935 (Rivers and Harbors Committee Doc. 13, 73d Cong.,
  1st sess.).
     Detailed plans approved by the Chief of Engineers, September 24,
  1945, provide for the following modifications in the items of con-
struction: (1) A yacht harbor in three sections on the upstream half
  of the waterfront with berthing space for about 356 boats; (2) one
wharf for the combined use of the police and fire departments of the
District of Columbia; (3) three wharves for existing transportation
  lines and general service; (4) construction of bulkhead walls; and (5)
removal of the old and dilapidated existing structures.
     Local cooperation.-Fully complied with.
     Terminal facilities.-The entire waterfront is Government-owned
  and facilities are leased to individuals or serve governmental agenices.
Two yacht basins to accommodate 198 yachts and small boats together
with a public sales and service pier, a concrete pier 340 feet long and
100 feet wide for general commercial use, and a concrete pier 340 feet
long and 75 feet wide for use by excursion boats have been completed
under the existing project. Of the 12 commercial piers only 5 can
be classed as modern. The only wharves open to the public are those
owned by the District of Columbia at the municipal fish market where
daily rental rates are charged. The facilities are considered inade-
quate for existing commerce.
    Operations and results during fiscal year.-A dilapidated wharf on
the site of pier 3 was removed in March 1952 by Government plant
and hired labor at a cost of $2,999.33, chargeable to new work. Un-
improved properties not required for construction were leased for
private use at a cost for the year of $2,051.97 chargeable to mainte-
nance.
    Total costs for the fiscal year were $5,051.30, of which $2,999.33
was for new work and $2,051.97 was for maintenance, all United
States funds. Total expenditures were $5,172.99, United States
funds.
    Condition at end of fiscal year.-The existing project was started
in April 1938 and was approximately 24 percent complete at the
end of the fiscal year. Construction of yacht basins No. 1 and 2 was
completed in November 1940 and the basins were leased for com-
mercial use and transferred to the District of Columbia for operation
and maintenance on December 3, 1940. Commercial pier No. 5 was
completed in December 1941, and was transferred to the District of
Columbia for operation and maintenance on March 21, 1942. The
excursion pier (pier 4) was completed in March 1951 and was trans-
ferred to the District of Columbia for operation and maintenance
on April 25, 1951. Plans and specifications for yacht basin No. 3 were
75 percent complete, and for piers No. 2 and No. 3, were 7 percent
complete. The work remaining to be done to complete the project
consists of (1) construction of two yacht basins; (2) construction
of two piers for activities of the District of Columbia; (3) construc-
tion of a pier for existing transportation lines and general service;
(4) completion of bulkhead walls; and (5) completion of removal of
existing structures.
384            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952.

   Total costs were $1,752,899.59, of which $1,744,692.34 was for new
work and $8,207.25 was for maintenance. Total expenditures were
$1,752,794.83 In addition, $389,000 from contributed funds was
expended for new work.
  Proposed operatione.-The balance unexpended June 30, 1952,
$89.05 for new work and $224.33 for maintenance, plus an allotment
of $2,000 made during the fiscal year 1953 for maintenance, a total
of $2,313.38, will be applied for work during the fiscal 1953 as follows:
No work is scheduled for the fiscal year 1953.
Accounts payable, June 30, 1952----- ------          --------           $104. 76
Maintenance: Leasing and managing unimproved properties not re-
    quired for immediate construction, July 1, 1952 to June 30, 1953__ 2,119. 57

          Total for all work,-----------------------------------                                                                2,224..33
          Unallocated balance       --------------------------------                                                                89. 05
  The additional sum of $402,000 can be profitably expended during
the fiscal year 1954 as follows:
New work: Initiation of a continuing contract for construction of pier
   No. 3 (July 1953 through June 1954)      -______________-_-__ $400, 000
Maintenance: Leasing and managing unimproved properties not re-
   quired for immediate construction (July 1953 through June 1954).    2, 000
          Total for all work-----                                 -----------------------------                                   402, 000

                                             Cost and financial summary

                                                             Fiscal year ending June 30                                       Total to June
                                                                                                                          30, 1952, includ-
                                                                                                                           ing fiscal years
                                          1948             1949              1950              1951           1952            prior to 1948


New work:
   Appropriated- .. __...   $400,000.00                $54, 994.22 $349, 700. 00 ............------         $3, 276. 00       1$1,744,781.39
       .............---.... 183, 931.14
   Cost--------                                        289, 444.48   50, 689. 43 $302. 087. 39               2, 999. 33        1 1,744, 692. 34
   Expenditures-......... 141, 663. 26                 262, 276. 89  86, 007. 57 321, 284. 72                3, 096. 73        1 1, 744, 692. 34
Maintenance:
    Appropriated--..............------------....... ......-------------............----------- 6, 726. 82    1,600. 00                8, 326. 82
    Cost   ..---------                           ----------------- ------
                                      .------------                                            6,155. 28     2, 051.97                8, 207. 25
    Expenditures--......... ...........------------...........------------------------         6, 026. 23    2, 076. 26               8,102. 49
                                                                                                                          _


Other new work data:
    Unobligated balance, June 30, 1952 _.-_...                               $89. 05
    Unobligated balance available for fiscal year 1953_ .....   _- _          89. 05
    Estimated additional amount needed to be appropriated for
      completion of existing project-..                       -      5, 424, 000. 00
  SExclusive of $389,000 contributed funds (see Annual Report for 1949).

                            3. POTOMAC RIVER AT ALEXANDRIA, VA.

   Location.-Alexandria is 3 miles below Washington, D. C., on the
right bank of the Potomac River, which flows in a southeasterly
direction into the Chesapeake Bay 105 miles downstream. (See U. S.
Coast and Geodetic Survey Chart No. 560.)
   Existing project.-This provides for a depth of 24 feet in front of
Alexandria between the =through channel and a line drawn 20 feet out-
side of the established pierhead line. This area is about 6,700 feet
in length and averages 300 feet in width. The plane of reference is
mean low water. Tidal ranges are: Mean, 2.8 feet; irregular, 4.5 feet;
and extreme 10.6 feet.
             RIVERS            AND         iHARBORS-WASHINGTON,                         D.   C.,   DISTRICT           85

   The cost to the Federal Government for new work for the com-
pleted project was $95,215. The latest (1950) approved estimate for
annual cost of maintenance is $9,000.
   The existing project was adopted by the River and Harbor Act of
June 25, 1910 (H. Doc. 1253, 60th Cong., 2d sess.). The latest pub-
lished map is in the project document.
   Terminal facilities.-Alexandriahas 12 regular shipping wharves or
landings; 9 of these are privately owned (of which 4 are open to the
public by special arrangement) and 3 owned by the United States.
The terminal and transfer facilities are considered adequate for
existing commerce.
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was started in
September 1910 and was completed in December 1911. The control-
ling depth in August 1947 was 24.7 feet in the lower section and 24.2
feet in the upper section. Total costs and expenditures were $310,-
956.38, of which $95,214.52 was for new work and $215,741.86 for
maintenance.
   Proposed operations.-An allotment of $1,500 for maintenance will
be used for making a hydrographic survey in the Potomac River
along the Alexandria waterfront by Government plant and hired
labor (October 1952).
   No work is scheduled for the fiscal year 1954.
                                                  Cost and financial summary

                                                           Fiscal year ending June 30                     Total to June
                                                                                                          30, 1952, includ-
                                                                                                          ing fiscal years
                                           1948           1949       1950         1951             1952     prior to 1948

New work:
   Appropriated-----------.............--   -----------        -----------     ------------------------         $95,214.52
   Cost..------.........-- ...--------......------------------      ------------------------------....           95,214.52
   Expenditures----------------------------                        ----- ------------------------------          95,214.52
Maintenance:
    Appropriated---
                 ..----------------............      -$5, 714. 36       $900 --------------------               215, 741.86
    Cost.--------------.              $28,261.22-                        900-215,741.86
    Expenditures--------                27,992.32       1,100.00         900 ------------                      215,741.86



                      4. POTOMAC RIVER BELOW WASHINGTON, D. C.

   Location.-The Potomac River is formed 21 miles below Cumber-
land, Md., and flows southeasterly about 285 miles and enters Chesa-
peake Bay, about 80 miles from the Atlantic Ocean. Washington,
D. C., is located 108 miles upstream of the mouth, and the head of
tidewater is at mile 117. (See U. S. Coast and Geodetic Survey
Charts Nos. 557, 558, 559, and 560.)
   Existing project.-This provides for a channel 24 feet deep and
200 feet wide between the mouth of the river land Giesboro Point at
Washington, D. C., a distance of 108 miles. The plane of reference
is mean low water. Tidal ranges are: Mean, 1.3 feet at the mouth,
2.9 feet at Washington; irregular, 2 feet at the mouth, 4.5 feet at
Washington; extreme, approximately 6 feet at mouth, 10.7 feet at
Washington.
386               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   The cost to the Federal Government for new work for the com-
pleted project was $153,836. The latest (1950) approved estimate
for annual cost of maintenance is $20,000.
   The existing project was adopted by the River and Harbor Act
of March 3, 1899 (H. Doc. 33, 52d Cong., 1st sess.). The latest pub-
lished map is in the annual report for 1902, page 1038, and in House
Document 859, Sixtieth Congress, first session.
   Terminal facilities.-In general, the improvement is a main river
channel, and terminal facilities are only served where the channel
runs close to either bank of the river. In all, 13 wharves are thus
served. These wharves are of open and solid fill construction and
bulkhead type. The facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year.--A hydrographic survey
was made in May 1952 of Kettle Bottom Bar to determine channel
condition by Government plant and hired labor at a cost of $6,439.06
chargeable to maintenance. Expenditures for the year were $4,667.06.
   Conditionat end of fiscal year.-The existing project was started in
March 1900 and completed in June 1905. Controlling depths for the
project width of 200 feet were as follows:

                                        Name of bar                                                 Miles above Controlling              Date
                                                                                                       mouth          depth (feet)

Kettle Bottom..--------------------------------------------                                                      38          23.2    May 1952.
Lower Smith Point-Maryland Point----------------------------                                                     68          24.8    October 1949.
                                                  -..................-......
Upper Smith Point --------------------..................                                                         71          24.4        Do.
Mattawoman .......-- --------------------------------------------............................................    83          23. 7   Jan. 1951
Marshall Hall...............................................--------------------------------------------         95          23.0    June 1947.
Naval Magazine--------------                           ----------------------------                             107          25.9    August 1950.


  Total costs were $1,040,107.72, of which $153,836 was for new work
and $886,271.72 for maintenance, which includes $1,000 for each of
the following tributaries: Little Wicomico River, Va.; Herring
Creek, Md.; Coan River, Va.; and $20,000 under allotments to tribu-
taries for waterchestnut eradication. Total expenditures were
$1,038,335.72. In addition, a total of $101,161.92 of United States
Public Health Service funds has been expanded for removal of
waterchestnuts.
    Proposed operations.-The balance unexpended June 30, 1952,
 $3,332.94, plus an allotment of $7,400 made during the fiscal year 1953,
a total of $10,732.94, will be applied as follows:
Accounts payable, June 30, 1952------------------------------- $1, 772.00
Maintenance: Hydrographic survey of four bars in the lower Potomac
   will be made by Government plant and hired labor (October and
  November 1952) ---      --------------------------------------    8, 960. 94

              Total for all work--.-----.-----                                              --------------------- 10, 732. 94
      No work is scheduled for the fiscal year 1954.
                 RIVERS AND                     HARBORS--WASHINGTON,                           D.      C.,    DISTRICT            387

                                                   Cost and financial summary

                                                               Fiscal year ending June 30                                Total to June
                                                                                                                      30, 1952, includ-
                                                                                                                      ing fiscal years
                                               1948           1949          1950           1951              1952       prior to 1948


New work:
     Appropriated-------...   ..... -----------......-----------
                                     ..----                                              .....------------------------      $153,836.00
     Cost..--    -------------------------------------                                 -------------------          --       153, 836. 00
   Expenditures--..................----...---......--------------..    -----------------------------------                   153, 836.00
Maintenance:
     Appropriated-... ..                    $11, 000.00    $27, 500.00 $137,000.00     -$53,954.94       $8,000.00          1 887, 832.66
     Cost---------------.................    33, 124.81     13, 314. 17  98, 662. 95      3, 181. 53      6,439.06          1886, 271. 72
     Expenditures-........----.              18, 598. 17    37, 690. 24 101, 549. 92      5, 183. 73      4, 667.06         1884, 499. 72

   1In addition, $101,161.92 of U. S. Public Health Service funds were expended for waterchestnut eradica-
tion.

5. POTOMAC RIVER AND TRIBUTARIES AT AND BELOW WASHINGTON,
            D. C., ELIMINATION OF WATERCHESTNUT

    Location.-The waterchestnut, botanically known as Trapa natans,
is an annual fresh-water plant infesting the navigable portions of the
Potomac River and its tributaries between Key Bridge in the District
of Columbia and Maryland Point, 48 miles downstream of Washing-
ton, D. C. Washington, D. C., is located 108 miles upstream of the
mouth of the river. At the height of infestation in 1939, it covered
about 10,000 acres of navigable waters between these limits. (See
U. S. Coast and Geodetic Survey Charts Nos. 559 and 560.)
   Existing project.--This provides a, plan for complete eradication
of the waterchestnut from the Potomac River and its tributaries at
and below Washington, D. C., by (a) 4 years of mechanical cutting
in heavily infested areas with manual removal of scattered plants;
 (b) 3 years of intensive patrol and manual removal of scattered plants;
 (c) 2 years of concentrated patrol during the growing season; (d) 6
years of patrolling the entire area every 2 years. The tidal ranges
are: Mean 1.1 feet at Maryland Point and 2.9 feet at Washington;
irregular, 2 feet at Maryland Point and 4.5 feet at Washington; ex-
treme, approximately 7.5 feet at Maryland Point and 10.7 feet at
Washington.
   The estimate of cost to the Federal Government, made in 1947, was
$142,000, which is the total of annual costs over a 15-year period,
decreasing from $32,000 during the first year to $3,500 for the ninth
year and an average of $1,000 for each of the six years thereafter.
This is an average of $9,467 annually for the 15 years. If a longer
period is required, the average annual cost for each subsequent year
is estimated to be $1,000. The work is maintenance.
   The existing project was authorized by the River and Harbor Act
approved May 17, 1950 (H. Doc. 113, 81st Cong., 1st sess.). The
latest published map is in the project document.
   Operations and results during fiscal year.-Removal of waterchest-
nut growth was in progress during July and August 1951 and June
1952 in the following areas: Washington Harbor, Potomac River at
Alexandria, Va., Potomac River at Mt. Vernon, Va., Occoquan Creek,
Va., and Potomac River below Washington, D. C., by Government
plant and hired labor at a cost of $22,344.86.
388      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

    The cost for the year was $22,344.86 for maintenance. Expenditures
were $24,598.20.
    Condition at end of fiscal year.-Work on the elimination of water-
chestnuts has been in progress since 1939 under allotments for main-
tenance of five existing river and harbor projects. Prior to the
adoption of this project and through the fiscal year ending June 30,
1950, a total of 25,000 acres of the growth has been cut and recut from
the Potomac River and its tributaries between Washington, D. C.
and Maryland Point. All infested areas have been cut at least once.
Two years of mechanical cutting in heavily infested areas and manual
removal of scattered plants as listed for accomplishment under the
eradication schedule for the existing project have been completed
under maintenance of other existing river and harbor projects prior
to adoption of the eradication project.
    Prior to the adoption of the project and through the fiscal year
ending June 30, 1950, maintenance funds in the amount of $310,187.08
were expended for removal of waterchestnuts. This amount includes
;$10,000 allotted under Section 3 of the River and Harbor Act of July
3, 1950 and $10,000 allotted under Section 3 of the River and Harbor
Act of October 17, 1940 to 10 tributaries of the Potomac River, and
the following maintenance funds from existing river and harbor
projects in the affected area: Washington Harbor, D. C. $19,725.55;
Potomac River at Alexandria, Va., $22,023.26; Potomac River below
Washington, D. C., $200,936.54; Potomac River at Mount Vernon,
Va., $18,201.73; and OccoquanfCreek, Va., $29,300.
    In addition, a total of $101,161.92 contributed by the United States
Public Health Service was expended.
    Total costs for the existing project were $39,832.99 all for main-
tenance. Total expenditures were $34,916.71.
   Proposed operations.-The balance unexpended June 30, 1952, $22,-
583.29, plus an allotment of $16,600 made during the fiscal year 1953,
plus accounts receivable in amount of $206.75, a total of $39,390.04,
will be applied as follows:
Accounts payable, June 30, 1952----------------------------- $5,123.03

Maintenance:
   Patrol and removal of scattered and isolated waterchestnut plants
      from the following locations: Washington Harbor, D. C.,
      Potomac River at Alexandria, Va., Occoquan Creek and Bay,
      Va., Potomac River at Mt. Vernon, Va., Potomac River and other
      minor tributaries below Washington, D. C., by Government
      plant and hired labor. (July and August 1952 and May and
      June 1953) -----------------------------------                 24, 967. 01
   Miscellaneous inspections and reports (July 1952 through
      June 1953) --------------------------------------               9, 300. 00
        Total maintenance--------------------------------              34,267.01
        Total for all work--------------------- ------         -----   39, 390.04
  The additional sum of $26,000 can be profitably expended during
the fiscal year 1954 as follows:
          RIVERS          AND HARBORS---WASHINGTON,                     D. C.,    DISTRICT            398

Maintenance:
   Eradication of waterchestnut growth from the Potomac River and
      its tributaries by Government plant and hired labor (July and
      August 1953 and May and June 1954)---------------------$17,         000
   Miscellaneous inspection and reports (July 1953 through June 1954)_ 9, 000
           Total for all work ----------------------------                                        26, 000

                                  Cost and financial summary

                                           Fiscal year ending June 30                       Total to June
                                                                                           30, 1952, includ-
                                                                                           ing fiscal years
                               1948       1949        1950        1951           1952-       priorto 1948

Maintenance:
                                           ------------- $30, 500. 00 $27, 000.1)0
   Appropriated------...................---------------.............                             $57, 500. 00
         ................ ----
   Cost----------------          ------------------------ 17, 488. 13  22, 344. 86                39, 832. 99
   Expenditures...-----                           ..........10, 318. 51
                          --------------------------------                   24, 598. 20          34, 916. 71


                            6. L1 TTLE WICOMICO RIVER, VA.

   Location.-Little Wicomico River is a tidal estuary 6 miles in length
lying in Northumberland County, Va., flowing in a southeasterly
direction to the Potomac River, which it enters on the right bank
one-half mile upstream of its mouth and 1071/2 miles downstream
from Washington, D. C. (See U. S. Coast and Geodetic Survey
Chart No. 557.)
   Existing project.--This provides for a channel 8 feet deep, 150
feet wide, and 4,800 feet long, extending from deep water in Potomac
River to deep water in Little Wicomico River, for two stone jetties
extending to the 8-foot contour in Potomac River, and for bulkhead
walls from the inner ends thereof extending sufficiently into Little
Wicomico River to stabilize the dredged inner channel. The plane
of reference is mean low water. The tidal ranges in the Potomac
River at the entrance are: Mean, 1.2 feet; irregular, 2.5 feet; and
extreme, approximately 7 feet. The mean tidal range within the
river is approximately 1 foot.
   The cost to the Federal Government for new work, for the com-:
pleted project was $81,885, exclusive of $5,000 to be contributed by
local interests. The latest (1950) approved estimate for annual cost
of maintenance is $6,600.
   The existing project was adopted by the River and Harbor Act
of August 30, 1935 (Rivers and Harbors Committee Doc. 24, 74th
Cong., 1st sess.). The latest published map is in the project document.
 . Local cooperation.-Fullycomplied with.
   Terminal facilities.-There are two wharves open to the public and
numerous small wharves and stagings for private use, an oyster shuck-
ing and packing plant, and a marine railway and boat-building yard.
These facilities are considered adequate for present commerce.
   Operations and results during the fiscal year.--None.
   Condition at end of fiscal year.-The existing project was started
in October 1936 and was completed in December 1937. The control-
ling depth in the entrance channel between the jetties in June 1950
was 3.2 feet at mean low water for a width of 150 feet. The control-
ling depth within the creek in July 1945 was 7.9 feet for a width of
390         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

150 feet. Total costs and expenditures under the existing project
were $179,525.17, of which $81,885.43 was for new work and $97,639.74
was for maintenance. In addition, $5,000 contributed funds were ex-
pended for new work.
  Proposed operations.-No work is scheduled for the fiscal year 1953.
  The sum of $14,650 for maintenance can be profitably expended
for the fiscal year 1954 as follows:
      Dredging by contract to restore project dimensions (November
       1953)-----------               ------                        $12,500
      Hydrographic survey by Government plant and hired labor
        (September 1953) ----------------------------------           2, 000
      Miscellaneous inspections and reports (July 1953 through June
       1954)-------------------------------------------------            150
            Total for all work-----------------------------------                                                             14, 650

                                     Cost and financial summary

                                                     Fiscal year ending June 39                                        Total to June
                                                                                                                       30, 1952, includ-
                                                                                                                       ing fiscal years
                                1948              1949               1950              1951              1952           prior to 1948

New work:
               ........
   Appropriated------      ........------------....------------------------------------..........
                                                                      ...........       ............----............         81, 885, 43
   Cost,.-----------I------------.------------------------------------------                                                181, 885.43
   Expenditures-..... ----------- ------------                 ------------------------
                                                                            ,           ------------                        1 81, 885. 43
Maintenance:
   Appropriated......... $38, 500.00        -----------          $16, 400. 00     -$2, 538.10 ..-------..........             97, 639. 74
   Cost---------------.     30, 883. 46        $7, 933. 72        14, 227. 23         -127. 92 ............                   97. 639. 74
   Expenditures---------...  5, 275. 91        35, 844. 89        13, 873. 26           226. 05 ............                  97, 639. 74

  1 In addition, $5,000 of contributed funds was expended for new work.

                             7. RAPPAHANNOCK RIVER, VA.

   Location.-Rappahannock River rises in the Blue Ridge Moun-
tains, in Virginia, and flows southeasterly about 212 miles to enter
Chesapeake Bay, about 40 miles north of Old Point Comfort, Va.
 (See U. S. Coast and Geodetic Survey Charts Nos. 534, 535, 536.)
   Previous projects.-The original project was adopted by the River
and Harbor Act of March 3, 1871, and modified in 1879. For further
details see page 1793 of annual report for 1915 and page 433 of?
annual report for 1938.
   Existing project.-This provides for a channel 12 feet deep and
200 feet wide between the mouth and Port Royal and 12 feet deep and
100 feet wide between Port Royal and Fredericksburg by dredging
and the construction of 20,401 feet of crib and pile dikes and 1,906
feet of riprap-stone dikes being designed to retain the excavated ma-
terial deposited behind them. The length of waterway included in the
project is 107 miles. The plane of reference is mean low water. Tidal
ranges are: Mean, 2.8 feet at Fredericksburg, 1.6 feet at Tappahan-
nock; irregular, 3.5 feet at Fredericksburg, 2.5 feet at Tappahannock;
extreme, 6 feet at Fredericksburg, 5 feet at Tappahannock.
   The cost to the Federal Government for new work, for the com-
pleted project was $217,487, exclusive of amounts expended under
previous projects. The latest (1950) approved estimate for annual
cost of maintenance is $30,000.
            RIVERS AND HARBORS-WASHINGTON,                                   D. C., DISTRICT               391

  The existing project was adopted by the River and Harbor Act of
March 3, 1905 (annual report for 1906, pp. 1110-1113). The latest
published map is in the annual report for 1910, page 1364.
   Terminal facilities.-In the section under improvement extending
from Fredericksburg, Va., to Tappahannock, Va., a distance of 65
miles, there are 26 wharves, of which 9 are solid bulkhead type and
17 are open pile structures. From Tappahannock to the mouth there
are 15 open-pile wharves. Most of the wharves are open to the public.
The terminals are considered adequate for existing commerce.
   Operationssandresults during fiscal year.--A hydrographic survey
was made of Mangoright Bar in April 1952 to determine channel
condition by Government plant and hired labor at a cost of $1,262.37.
Cleanup work and burning of old timbers removed from reconstructed
dikes was accomplished by Government plant and hired labor at a cost
of $1,806.07.
   Total costs and expenditures for the fiscal year were $3,068.44, all
applied to maintenance.
   Condition at end of fiscal year.-The existing project was started
in July 1908 and completed in April 1910. The controlling depth
was 11 feet at Lower Spottswood Bar in February 1951. The total
costs and expenditures under the existing project were $1,208,329.84,
of which $217,487.20 was for new work and $990,842.64 was for main-
tenance, which includes $994.59 for Parrotts Creek and $1,000 each
for Greenvale, Mill, Beach, and Queens Creek. In addition, the cost
and expenditures from contributed funds for maintenance on Queens
Creek was $600.
   Proposed operations.-The balance unexpended June 30, 1952, was
$531.56, plus an allotment of $33,000 made during the fiscal year 1953,
a total of $33,531.56, will be applied as follows:
Maintenance:
      Dredging by contract to restore project dimensions (October
       and November 1952) -------------------------          ---    $31,531. 56
      Miscellaneous inspections and reports (July 1952 through June
       1953) ------------------------------------------               2, 000. 00
             Total for all work------------                   --------------------                 33, 531.56
   No work is scheduled for the fiscal year 1954.
                                       Cost and financial summary

                                                Fiscal year ending June 30                        Total to June
                                                                                                 30, 1952, includ-
                                                                                                 ing fiscal years
                                    1948       1949         1950          1951         1952       priorto 1948

New work:
   Cost....--------------                                   .........------------
                                                           ----------
                                             . .........-----
                                                                                     -....---.....---.
   Appropriated.....----........------......-------------...................-------....
                                                                               ----------- -------             --
                                                                                                                     $414. 633.03
                                                                                                                      414,633.08
   Expenditures---.........-----------........... .......------------.......    ..........----------------------..
                                                                                                 ..........-----------414, 633.03
Maintenance:
   Appropriated-......... $56, 097.73 $78, 000.00 $53, 500.00 $81, 802.56                         $1, 600.00       11,104. 874. 20
    Cost------------.... ----..   86,670.97   78,199.95   53, 226.56   80, 076.00    3,068.44      11,104, 342.64
    Expenditures...-------..      85,119.25   78,734.16   54, 244.07   80,076.00     3, 068.44     11,104, 342.64


   IIn addition $600 contributed funds were expended for maintenance on Queens Creek.
392           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                                    8. HOSKINS CREEK, VA.

   Location.--Hoskins Creek is a tributary 2.5 miles long flowing in
an easterly direction and entering the right bank of the Rappahannock
River in Essex County, Va., 42 miles upstream from its mouth in
Chesapeake Bay and one-half mile downstream from the town of
Tappahannock, Va. The creek is 102 miles northerly of Norfolk, Va.
 (See U. S. Coast and Geodetic Survey Chart No. 535.)
   Existing project.-This provides for a channel 10 feet deep from
that depth in the Rappahannock River to the highwaybridge three-
quarters of a mile above the mouth with widths of 100 feet through
the bar in the Rappahannock River and 80 feet within the creek,
suitably widened at bends, and a turning basin of the same depth
250 feet long and 200 feet wide at the public landing one-half mile
above the mouth of the creek. The total length of the improved
section is 1.1 miles. The plane of reference is mean low water. The
tidal ranges are: Mean, 1.6 feet; irregular 2.5 feet; and extreme,
approximately 7.5 feet.
   The cost to the Federal Government for new work, for the completed
project was $44,100. The latest (1950) approved estimate for annual
cost of maintenance is $2,500.
   The existing project was adopted by the following river and harbor
acts:
       Acts                       Work authorized                            Documents and reports

Aug. 26,1937     Channel 8 feet deep and 100 feet wide in the Rappa-    Rivers and Harbors Committee
                   hannock River, 60 feet wide within the creek, with    Doc. 8, 75th Cong., 1st sess. -
                   a turning basin 250 feet long and 200 feet wide.
Mar.    2,1945   Increasing channel depth to 10 feet and width within   H. Doc. 129, 77th Cong., 1st sess.
                   the creek to 80 feet.                                 (The latest published map is in
                                                                         H. Doc. 129.)


   Local cooperation.-The requirements under the project prior to
the 1945 modification have been fully complied with. Modification
of the project was approved subject to the provisions that local
interests furnish, free of cost to the United States, all lands, ease-
ments, and rights-of-way and maintenance, when and as required,
and hold and save the United States free from claims for damages
resulting from the improvement. It is expected that these require-
ments will be met promptly.
   Terminal facilities.-Two bulkhead landings and two wharves are
now in the creek. The facilities are considered adequate for
navigation.
   Operationsand results during the fiscal year.--None.
   Conditions at end of fiscal year.--The existing project, as modified
in 1945, was started and completed in December 1948. The control-
ling depth in June 1952 was 5.4 feet for a width of 100 feet in the
entrance channel and 10.5 feet within the creek. Total costs and
expenditures under the existing project were $71,117.90 of which
$44,100.12 was for new work and $27,017.78 was for maintenance.
In addition, $500 from contributed funds was expended for new work.
  Proposed operations.-No work is scheduled for the fiscal year 1953.
  The sum of $22,650 can be profitably expended during the fiscal
year 1954 as follows:
              RIVERS AND             fARBORS---WASHINGTON,                            D.     C., DISTRICT                393
Maintenance:
   Dredging by contract to restore project dimensions (October
      1953)       ----------------------------------------------- $22,500
    Miscellaneous inspections and reports (July 1, 1953-June 30,
      1954) --------------------------------------------------        150
          Total for all work                   --------------------------------------                                 22, 65Q

                                       Cost and financial summary

                                                   Fiscal year ending June 30                                   Total to June
                                                             .   ...      ...                                  30, 1952, includ-
                                                                                                               ing fiscal years
                                    1948         1949                  1950       1951             1952          prior to 1948

New work:
   Appropriated--------
                  ........    ..........---------. $24, 737. 90 --------------------------------                     $44, 100. 12
   Cost-.-------------                    .------------
                                                    24, 737.90 ---------------------------------                     1 44,100.12
   Expenditures ------------------                  24, 737. 90                                                      144,100.12
Maintenance:
   Appropriated...-------......   $1,000.00    17,617. 78 -----------------------------------                         27, 017. 78
   Cost----------------              863. 25   17, 754. 53 -...........                                               27,017. 78
   Expenditures..---------           863. 25   17, 754. 53 ........................-------------------------------    27, 017. 78

  1In addition, $500 of contributed funds was expended for new work.

                                       9. TOTUSKEY CREEK, VA.

  Location.-Totuskey Creek, located in Richmond County, Va., flows
in a southerly direction about 15 miles to the Rappahannock River,
which it enters on the left bank about 35 miles upstream from its
mouth. The creek is 97 miles northerly of Norfolk, Va. (See U. S.
Coast and Geodetic Survey Chart No. 535.)
  Ecisting project.-This provides for a channel 10 feet deep from
that depth in the Rappahannock River to and including a turning
basin below Totuskey Bridge, 4.5 miles upstream, with a width of
150 feet through the bar at the entrance and 100 feet thence upstream,
suitably widened at bends, and the construction of a dike at Booker
Bar. The plane of reference is mean low water. The tidal ranges are:
Mean, 1.6 feet at the mouth and 2 feet at Totuskey Bridge; irregular,
2 feet at the mouth and 2.5 feet at Totuskey Bridge; and extreme,
approximately 7.5 feet at the mouth.
  The estimate of cost to the Federal Government for new work,
revised in 1952 is $157,600. The latest (1950) approved estimate for
annual cost of maintenance is $3,500.
  The existing project was adopted by the following river and harbor
acts:

       Acts                            Work authorized                                              Documents

June 14,1880      Dike construction at Booker Bar_---        ---------------         Annual Report for 1880, vol. 1,
                                                                                      p. 768.
Aug. 30,1935      Channel 8 feet deep and 150 feet wide at mouth, 80                 H. Doec. 183, 72d Cong., 1st sess.
                   feet wide upstream and repair of dike at Booker
                   Bar.
Mar.     2,1945   Channel 10 feet deep and 150 feet wide at mouth and                H. Doc. 686, 76th Cong., 3d sess.
                   100 feet wide upstream.                                            (The latest published map is in
                                                                                      H. Doc. 686.)



  Local cooperation.-The requirements under the project prior to
modification have been fully complied with. Modification of the
project was approved subject to the provisions that local interests fur-
394             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

nish free of cost to the United States all lands, easements, and rights-
of-way and spoil-disposal areas for the initial work and for subse-
quent maintenance when and as required; hold and save the United
States free from claims for damages resulting from the improvement,
and contribute the sum of $1,000 toward the first cost. The sum of
$1,000 has been contributed for modification of the project by local
interests and it is expected that the other requirements will be met
promptly.
   Terminal facilitics.-There are 2 county-owned wharves and 13
privately owned wharves or landings. Terminal facilities are consid-
ered adequate for existing and future commerce.
   Operations and results during fiscal year.-Surveys, plans, and
specifications for dredging five bars in Totuskey Creek were prepared
at a cost of $2,275.12. A total of 35,000 cubic yards was dredged under
contract from Mouth Bar during June 1952, at a cost of $13,971.26.
Dredging was in progress at the end of the fiscal year. Total costs
for the year were $16,246.38, all for maintenance. Total expenditures
were $2,330.58.
   Condition at end of fiscal year.-The existing project as modified in
1945 is about 25 percent complete. The project prior to modification
was started in December 1936 and completed in February 1937. The
work remaining to be done to complete the project consists of dredg-
ing to the increased depth and width as modified in 1945. The con-
trolling depth in June 1952 was 5.2 feet on Cool Spring Bar. Total
costs under the existing project were $94,602.99, of which $37,648.46
was for new work, and $56,954.53 was for maintenance. The total
expenditures were $80,687.19. In addition, $1,000 from contributed
funds was expended for new work.
   Proposed operations.-The balance unexpended June 30, 1952,
$37,669.42 will be applied as follows:
Accounts payable June 30, 1952----------------------------                                                                  $13, 915. 80
Maintenance: Completion of dredging by contract on Bridge, Straw-
berry Hill, Booker and Cool Spring Bars (July 1952) -----------                                                             23, 753.62

             Total for all work- --------                             --------------------------                             37, 669. 42
      No work is scheduled for the fiscal year 1954.
                                                Cost and financial summary

                                                              Fiscal year ending June 30                                   Total to June
                                                                                                                           30, 1952. includ-
                                                                                                                           ing fiscal years
                                         1948               1949               1950                1951         1952         priorto 1948


New work:
  Appropriated....--..... ..........---------..-------------- ------------.............----------.......----...-------         1$37,648.46
      Cost               -------- -----------                 ----------------------------------                                1 37, 648. 46
   Expenditures--.........                                    ............----------
                                        ............--------------         -----------....---------------------.........          37, 648. 46
Maintenance:
      Appropriated------------------                      $1, 908. 15 ...........            $18,273.18    $21, 726. 82           80, 708. 15
      Cost....-------------------------                    2,000.00       -----         ------------
                                                                                           ............     16, 246. 38           56, 954. 53
      Expenditures------ --- ----------               -      319.50         $1,680.50        -----------      2, 330. 58          43, 038. 73


Other new work data: Estimated additional amount needed to be ap-
  propriated for completion of existing project...---------.----2 $120,000
  1In addition, $1,000 of contributed funds was expended for new work.
  I   Exclusive of $1,000 contributed funds.
          RIVERS AND                HARBORS-WASHINGTON,                                       D.       C.,   DISTRICT             395

                                           10. BROAD CREEK, VA.

  Location.-Broad Creek is a small tidal estuary in Middlesex
County, Va., 1 mile long, flowing in a northerly direction into the Rap-
pahannock River, which it enters on the right bank about 1 mile up-
stream of its mouth at Chesapeake Bay. The creek is 61 miles north-
erly of Norfolk, Va. (See U. S. Coast and Geodetic Survey Chart No.
534.)
   Existing project.--This provides for a channel 7 feet deep, 100 feet
wide and 4,100 feet long from deep water in the Rappahannock River
to deep water in Broad Creek. The plane of reference is mean low
water. The tidal ranges are: Mean, 1.2 feet; irregular, 2 feet; and
extreme, approximately 7.5 feet.
   The cost to the Federal Government for new work, for the completed
project was $27,888. The latest (1950) approved estimate for annual
cost of maintenance is $900.
   The existing project was adopted by the River and Harbor Act
of March 2, 1945 (H. Dec. 381, 76th Cong., 1st sess.). The latest pub-
lished map is in the project document.
   Local cooperation.-Fullycomplied with except that local interests
shall furnish, free of cost to the United States, suitable spoil-disposal
areas when and as required for subsequent maintenance, and hold and
save the United States free from claims for damages that may result
from dredging.
   Terminal facilities.-There are 14 privately owned wharves and
landings on the creek, many of which are open to the public by special
arrangements. There is one marine railway on the creek. The
terminal facilities are considered adequate for present commerce.
   Operationsand results during the fiscal year.-A hydrographic sur-
vey of the entire project was made by Government plant and hired
labor in March 1952 to determine channel conditions at a cost and ex-
penditure of $824.47 all for maintenance.
   Condition at end of fiscal year.-The project was started in October
and completed in November 1948. The controlling depth in March
1952 was 6.9 feet at mean low water. Total costs and expenditures
under the existing project were $28,712.39 of which $27,887.92 was for
new work and $824.47 was for maintenance.
   Proposed operations.-Nowork is scheduled for the fiscal year 1953
and 1954 as it is believed that maintenance will not be necessary.

                                        Cost and financial summary

                                                         Fiscal year ending June 30                                    Total to June
                                                                                                                       30, 1952, includ-
                                                                                                                       ing fiscal years
                                    1948               1949              1950              1951              1952        prior to 1948

New work:
   Appropriated-----------------            $27,887.92 ------- --------------------------                                    $27,887.92
   Cost-----------------------------         27,887.92 -----------------------------------                                    27,887.92
   Expenditures--------          .----------- 27, 887.92 ---------------------------------...                                 27, 887.92
Maintenance:
   Appropriated               --------------------------------------------............            --         $824.47              824.47
   Cost_--------     -----------------------------------------                                                824.47              824.47
  ' Expenditures..------------------------------------                                   -----------         824. 47              824. 47
396     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,         1952

   11. MAINTENANCE,   OPERATION, AND CAPITAL OUTLAY OF THE
                      WASHINGTON AQUEDUCT
   Location.-The diversion dam and raw water intakes are located
on the Potomac River at Great Falls, 131/2 miles northwest of Wash-
ington, D. C.; the two collecting conduits, part of the Dalecarlia re-
ceiving reservoir, and the booster pumping plant that lifts the water
from the forebay to the main body of the Dalecarlia Reservoir are
located in Maryland; and all other structures of the water-supply-sys-
tem including part of the raw-water collecting system, the purification
plants, pumping stations, storage reservoirs, and transmission mains
are located in the District of Columbia (see U. S. Geological quad-
rangle, Washington and vicinity).
   The control of the water-supply system is vested in the Chief of
Engineers (see acts of March 3, 1859, and March 2, 1867, and Sec. 1800
of Revised Statutes).
   Existing project.-The existing project provides for (a) operation,
maintenance, repair, and protection of the water-supply facilities and
reservations including collection, treatment, purification, pumping,
transmission, and storage facilities; MacArthur Boulevard; and
meters on all Federal water services as authorized by law and (b)
the planning and construction of increased supply facilities in ac-
cordance with House Document 480 Seventy-ninth Congress, second
session, August 15, 1945, as provided in Public Law 538, Eighty-first
Congress, chapter 218, second session, H. R. 8578, approved June 2,
1950.
   By act, Public Law 378, Sixty-fourth Congress, approved March 3,
1917, the furnishing of water to adjacent Maryland areas from the
Washington water-supply system was authorized by the Congress; by
act, Public Law 119, Sixty-ninth Congress, approved April 14, 1926,
the furnishing of water to Arlington County, Va., from the Wash-
ington water-supply system was authorized by the Congress; and,
by act, Public Law 118, Eightieth Congress, approved June 26, 1947,
the furnishing of water to Falls Church or any other competent State
or local authority in the Virginia metropolitan area, similarly, was
authorized.
   A description of the District of Columbia water-supply system and
of previous capital-improvement and operation-and-maintenance
projects is printed on pages 2206-2208 and 2218-2220 of the annual
report of the Chief of Engineers, 1930; in an information pamphlet
published June 1939 and revised December 1950; and in House Docu-
ment 480, Seventy-ninth Congress, second session.
   Local cooperation.-Priorto July 1, 1880, the expenses of the Wash-
ington aqueduct for construction, operation, and maintenance were
paid wholly out of the revenues of the United States. From July 1,
1880, to July 1, 1916, the expenses of construction, operation, and
maintenance were paid one-half by the United States and the other
half out of the general revenues of the District of Columbia. From
July 1, 1916, to June 30, 1924, the expenses of construction were paid
60 percent out of the general revenues of the District of Columbia and
40 percent by the United States. From July 1, 1924, to June 30, 1927,
expenses of construction of the Washington aqueduct were paid wholly
out of the general revenues of the District of Columbia to which the
       RIVERS AND    HARBORS--WASHINGTON,        D.   C.,   DISTRICT   397

United States contributed annually a lump sum. The expenses of
operation and maintenance, since July 1, 1916, to date, have been
paid wholly out of the water revenues of the District of Columbia.
From July 1, 1927, to date, all expenses for construction have been
paid out of the water revenues of the District of Columbia.
   By act approved June 10, 1920, $25,000 was appropriated wholly
from United States revenues to prepare, among other things, a report
to assure an increased and adequate water supply for the District of
Columbia and this report was the basis for the improvements con-
structed from 1922 to 1927. Included in the District of Columbia
appropriation acts of 1941 and 1942, approved June 12, 1940, and
July 1, 1941, respectively, a total of $40,000 was appropriated from
the water fund, District of Columbia, for the preparation of a report
"for the development of a plan to insure an adequate future water
supply for the District of Columbia and metropolitan area." This
report, published as House Document 480, Seventy-ninth Congress,
second session, contains the comprehensive plan and program for the
improvements and additions to the water system safely and adequately
to meet the anticipated water demands to the year 2000.
   Annually, since July 1, 1916, on a percentage basis, and since July 1,
1924, on a lump-sum basis, the United States has contributed to the
support of the District of Columbia but no part of such annual per-
centage or lump-sum contributions has been allocated to the water
fund, District of Columbia, before July 1, 1947.
   Beginning with the fiscal year 1948, pursuant to act, Public Law
195, Eightieth Congress, approved July 16, 1947, an annual payment
of $1,000,000 was authorized for water consumed by the Federal
Government. This sum is taken from the annual lump-sum contribu-
tion of the United States to the District of Columbia.
   Act Public Law 533, Eighty-first Congress, Chapter 218, second ses-
sion, H. R. 8578, approved June 2, 1950, authorized the Secretary of
the Treasury to lend with a limit of $23,000,000 to the Commissioners
of the District of Columbia such sums as may hereafter be appropri-
ated to finance expansion and improvement of the water system when
sufficient funds therefor are not available from the District of Colum-
bia Water Fund established by law (D. C. code 1940 edition, title
1943, ch. 15) .
   Operations and results during the fiscal year.---An uninterrupted
and adequate supply of purified water was furnished to the District
of Columbia; to Arlington County, Va.; and to Federal establish-
ments in Arlington County, Va., and in Montgomery and Prince
Georges Counties, Md. The maximum daily consumption was 239,-
630,000 gallons and the average daily consumption was 174,395,000
gallons. Based upon the estimated average number of consumers of
935,000 in the District of Columbia and 150,000 in Arlington County,
the average per capita daily consumption was 160.73 gallons. The
average daily consumption in the District of Columbia alone was
158,730,491 gallons or an average per capita consumption of 169.765
gallons per day. The average daily amount of water furnished to
Arlington County and Falls Church, Va., was 14,659,032 gallons or
an average per capita consumption of 97.73 gallons per day. The
     245554-53--vol. 1--26
398     REPORT OF CHIEF OF ENGINEERS, U. S. ARMIVY, 1952

gross cost for the supply furnished the Virginia communities was
reimbursed to the Water Fund D. C. The average daily consumption
of water in all Federal Government establishments including parks,
zoological garden, etc., was 28,701,133 gallons. A total of 367,978,000
gallons or an average of 1,005,404 gallons per day was delivered to
Maryland communities during the fiscal year 1952 by the Water Divi-
sion D. C., through connections to the Washington Suburban Sanitary
District's system. On June 23, 1952, fluoridation equipment was put
in service and the application of sodium silicofluoride started.
    The average turbidity of the raw water from the Potomac River
was reduced from 88 parts per million to 0 part per million and the
average bacterial content was reduced from 2,200 to 1.5 per milliliter.
Analyses were made for bacterium colon on 88,392 tubes of water taken
from 135 sampling points in the purification and distribution systems.
After sterilization of the filter effluent, the average number of bac-
terium colon per 100 milliliters was found to be 0.02 at Dalecarlia and
0.05 at the McMillan filter plant. The average alkalinity of the:
filtered water was 53 parts per million and the average pH value was
7.7 parts per million from the Dalecarlia filter plant and 7.7 from the
McMillan filter plant. The average hardness was 109 parts per mil-
lion from Dalecarlia and 102 parts per million from McMillan.
Fluorine content of 871 water samples was determined.
   The direct operating costs of water treated and delivered to the
system per million gallons was $28.18 as compared with the cost of
 $26.24 per million gallofis in fiscal year 1951. The over-all cost of
water delivered, including depreciation and interest was $53 per
million gallons as compared with $51.17 in 1951.
   Construction work authorized with "no year" funds not previously
reported as completed, was as follows:
   McMillan filter plant improvements, 97 percent; repair and rehabili-
tation of McMillan filter plant, 55 percent; circulating facilities in
first and second high service reservoirs, 71 percent; remodeling of
Georgetown reservoir, 100 percent; Georgetown Castle gatehouse, 19
percent; 6 filters at Dalecarlia, 100 percent; modifications to provide
quality control of filtered water, 23 percent; improving conveying
equipment for chemicals, 69 percent; 30 million-gallon clear-water
basin at Dalecarlia, 38 percent; conduit repairs (periodic), 100 per-
cent; extension of office space at McMillan, 100 percent; overhaul of
wash-water valves, 71 percent; acquisition of supplementary land,
29 percent; purchase and installation of Federal meters (periodic),
48 percent.
   The preparation of plans for capital outlay projects for increasing
the water supply progressed as follows:
   Thirty million-gallon clear-water basin at Dalecarlia, 100 percent;
reservoir at Fort Reno (first half), 95 percent; 11/2 million-gallon
Reno water tower, 30 percent; fourth high-service pumping station
at Reno, 10 percent; 48-inch pipeline from Dalecarlia to Reno, 80
percent; crosstown interconnecting main from Dalecarlia to low-serv-
Ice area, 12 percent; McMillan filter plant improvements, 95 percent;
new chemical building and operating center at McMillan, 20 percent;
Georgetown Reservoir improvements, 100 percent; Dalecarlia pump-
ing station, 43 percent; office extension at McMillan, 100 percent;
         RIVERS AND HARBOr---WASHINGTON,                              D. C., DISTRICT              39
Little Falls drainage channel, 100 percent; Great Falls intake struc-
ture, 10 percent; Federal meters, 60 percent; land acquisitions, 35
percent; and conduit repairs (periodic), 50 percent; Little Falls
pumping station, dam, and tunnel, 20 percent.
  System costs: The total cost for the fiscal year was $3,164,818.26,
distributed as shown below.
  Financial statement:
    1. Operating expenses: 1
        Collecting system_   ----            _--
                                             _--------   $268,356.16
        Purification system --          ------------ 1,026, 257.51
        Pumping system---------------------- 462, 707. 18
        Transmission system--__,_ ---------            -   21, 691.23
                                                                                      $1, 779,012.08
    2. Capital outlay:
        Distribution baffles, Georgetown Reservoir_                     1, 994. 20
        McMillan filter plant improvements ......                          260. 67
        Utility relocations. ......-- _........_.                      96, 214. 92
        Federal meters ----          _-_.          ----                 4, 299. 67
        Floc-Sed. Basin No. 4 ----                          __..
                                                       ..--------       3,318. 27
        Advance planning.__......._.---.                               33, 589. 71
        Repairs and rehabilitation, McMillan filter
          plant-------------------------------                         22, 607. 45
        Circulation facilities and conduit repairs__                   42, 844.19
        Remodeling Georgetown Reservoir ......                        145, 121.20
        Land purchases-                                                  7, 942. 02
        Six new filters-------- --------                              119, 337. 36
        Dalecarlia Pumping Station _______                              79,461.43
         Dalecarlia 30 million-gallon clear-water
          basin-----      ----------------------                      679, 046. 77
        New McMillan Chemical Building, and Op-
          erating Center____-__                   _ _ ----              2, 228. 66
        Extension of office space, McMillan .....                      25, 279. 82
        Improving conveying equipment for chemi-
          cals         --                                              29, 442. 74
        3d high Service transmission main.......                       13, 633. 17
        Great Falls intake structure                                    3, 568. 98
         Overhaul of wash-water valves __                     .__      29, 556. 69
        Modifications, quality         control filtered
          water -----------------------------                              346. 65
        McMillan clear-water basin-------.---                           1, 002. 98
                                                                                       1, 341, 097. 55
    3. Deferred accounts---------------------__                     ------    -            44, 708. 63
            Total cost for fiscal year 1952- -....              _____....             3, 164, 818. 26
I Operating expenses, cost per million gallons, $28.18.

  Accident prevention:
                                          Government            Contractors                Total
Man-hours exposure------------. 597, 772                            62, 252              660, 024
Accidents -----------------------      2                                  3                     5
Lost time (days) ---------------      29                             6, 053                6, 082
Frequency (accidents per million
  man-hours worked) ----------         3. 35                             48. 19                    7. 58
Severity (days lost per 1,000 man-
  hours worked) --------------          .05                              97. 23                    9. 21
  Visitors: 1,566 persons were conducted through the water treat-
ment and pumping plants and the bacteriological and chemical labora-
tories. College engineering, science students, public school pupils
and public officials numbered 1,531. Foreign visitors from South
America, Europe and Asia totaled 35.
  Control: All funds were expended in conformity with the legis-
lative provision contained in the annual appropriation act which was
as follows:
   Nothing herein shall be construed as affecting the superintendence and control
of the Secretary of the Army over the Washington Aqueduct, its rights, appur-
tenances, and fixtures connected with the same and over appropriations and
expenditures therefor as now provided by law.
   Condition at end of fiscal year.-The intakes, conduits, reservoirs,
filter plants, pumping stations, mechanical equipment, and structures
with the exception of the McMillan filter structures on which repairs
are in progress were in a generally good condition. However, the
demands upon the supply system have exceeded its nominal capacity
and, for several years, its operation has been in the overload category.
During maximum consumption demand periods, the basic raw-water
supply was exceeded and emergency equipment had to be utilized.
                           Cost and financiaf summary as of June 30, 1952
Net appropriations---                                                                             $60, 741, 343. 66.
Unexpended balance------- $8, 217,760. 37
Accounts receivable- --------  14, 916. 78
                                                                      $8, 232, 677. 15
Less: Audited liabilities carried to cost------                        -306, 921. 33
NT, tn     vil    hl                                                                                     7.    2E7552         R
1Ve      ava     ae                                                                                       ,
                                                                                                         1m0I.o   ,--.----------------


               Total costs ----------------------                                    ------         52, 815, 587. 84
                                             Division of costs

                                                                                       Paid by--
                       Units                United States
                                                                  District of        Water Depart-                Total
                                                                  Columbia               ment

Construction .--          ---------------   $10, 965, 377. 11    $9, 109, 312. 82     $9, 708, 592. 73        $29, 783, 282. 66
Maintenance -_______--____..---------         1, 250, 656. 31         955, 473. 18    20, 512, 01. 48          22, 718, 731. 02
Spring-water supply .--. .__.....__.            223, 621.81 ..-----------------                                    223, 621. 81
                    __..._
Deferred charges .................      _       ........     ................              89, 952. 35              89, 952. 35
         Total-------------...----------     12,439,655.28      110,064,786.00        30,311,146.56            52,815,587.84

  1 Includes such part of the annual lump-sum contribution by the United States to the District of Colum-
bia that could be considered a direct Federal expenditure.

  Proposed operations.-The balance unexpended June 30, 1952,
$8,217,760.37, and a cash appropriation of $8,928,000, plus additional
contract authorization of $1,138,000 made by the District of Columbia
Appropriation Act, approved July 5, 1952, or a total of $18,283,760.37,
will be applied as follows:
Unliquidated obligations minus accounts receivable, June 30,
    1952 ----   ------      --                                      $2, 078, 766. 92
Unobligated balance of expired fiscal year appropriations .......        78, 165. 51
Operating expenses (payable from water fund): For expenses
    necessary for the operation, maintenance, repair, and protec-
    tion of Washington water supply facilities and their acces-
    sories, and maintenance of MacArthur Boulevard; including
    replacement and maintenance of water meters on Federal
    services; purchase of two passenger motor vehicles; and fluori-
    dation of water; Provided, That transfer of appropriations
    for operating expenses and capital outlay may be made be-
    tween the Water Division of the District of Columbia and the
    Washington aqueduct upon mutual agreement of the Commis-
    sioners and the Secretary of the Army,____       _______----     1,942, 000. 00
        RIVERS AND HARBORS--WASHINGTON,                   D. C.,' DISTRICT        401
Capital outlay (payable from water fund). For continuing con-
    struction of new Dalecarlia pumping station and connecting
    pipelines; continuing construction of a 30-million-gallon
    clear water basin and connecting conduits and control cham-
    ber; construction of Little Falls pumping station, dam and
    rising tunnel; construction of new raw-water intakes and
    conduits at I)alecarlia Reservoir; miscellaneous betterments,
    replacements, and engineering planning, including contin-
    uing raw-water conduit rehabilitation, continuing repairs
    to culverts and bridges, improvement to McMillan filter
    plant facilities, and utility relocations and plant and system
    rearrangements of interconnections; acquisition by gift,
    exchange, purchase, or condemnation of supplementary
    land; and for developing increased water supply for the Dis-
    trict of Columbia and environs in accordance with House
    Document 480, Seventy-ninth Congress, second session; and
    necessary expenses incident thereto; including services as
    authorized by Section 15 of the Act of August 2, 1946
     (5 U. S. C. 55a), but at rates for individual consultants not in
    excess of $150 per diem; to remain available until expended,
    $6,986,000, of which $1,138,000 shall not become available
    for expenditure until July 1, 1953; and of the total amount
    appropriated $6,900,000 is appropriated from any moneys in
    the Treasury not otherwise appropriated, to be advanced by
    the Secretary of the Treasury pursuant to the provisions
    of the Act of June 2, 1950 (Public Law 533, 81st Cong.) .-          $6, 986, 000. 00
For completion of items authorized in prior fiscal years--------         7, 198, 827. 94
      Total for all work --- _--_-_...   --------..         -_-     -   18, 283, 760.37
  The sum of $6,383,000 can be profitably expended during fiscal year
1954 for the following schedule of work:
Operating expenses (payable from water fund): For expenses
    necessary for the operation, maintenance, repair, and protection
   of Washington water supply facilities and their accessories, and
   maintenance of MacArthur Boulevard; including replacement
    and maintenance of water meters on Federal services; purchase
    of two passenger motor vehicles; and fluoridation of water:'
   Provided, That hereafter transfer of appropriations for opera-
    ing expenses and capital outlay may be made between the Water
    Division of the District of Columbia and the Washington aque-
    duct upon mutual agreement of the Commissioners and the
    Secretary of the Army----------        ------------------------ $2, 040, 000
Capital outlay :
    1. Third High Reservoir at Reno first half-       -   $1,563, 000
    2. Little Falls pumping station, dam and tunnel--      2, 510,000
    3. Miscellaneous betterments, replacements and engi-
         nering planning of water supply facilities------     270,000
      Total capital outlay       -   ---------------------------------      4,343, 000

           Total for all work------------------------------                  6,383, 000
12. ANACOSTIA PARK AND THE RECLAMATION AND DEVELOPMENT OF
    ANACOSTIA RIVER AND FLATS FROM THE MOUTH OF THE ,RIVER
    TO THE DISTRICT LINE, DISTRICT OF COLUMBIA
  Location.-The Anacostia River enters the Potomac River at
Washington, D. C.
  Previous projects.--For the part of the project below the Ana-
costia Bridge, which is also a river and harbor improvement, see
annual report of the Chief of Engineers for 1919, page 553, under
heading "Existing project." For a description of the previous proj-
402         REPORT OF CHIEF OF ENGINEERS, U. S.                               MY, 19 52

ects for the improvement extending upstream from the Anacostia
Bridge see annual report of the Chief of Engineers for 1923, page
1990 under heading "Existing project."
   Existing project.--This provides for the improvement of the river
and for the reclamation and development of the adjacent flats from
the mouth of the river upstream to the District of Columbia boundary
line, a distance. of about 61/4miles, to afford a river channel 15 feet
deep in the section between the foot of 15th Street SE., and Massa-
chusetts Avenue, 9 feet deep thence to Benning Road. The section
from the mouth upstream to the foot of 15th Street SE., was dredged
to a depth of 24 feet under a river and harbor project. The dredged
material is to be used for fills.
   The project includes a constant-level lake or lateral basin on the
west side of the river, to be known as Lake Kingman, and a smaller
lake on the east side of the stream. The normal surface elevation
of the lakes is to be 2 feet above mean low tide, and they are to be
dredged to a depth of 6 feet. A culvert or small bridge is to be
constructed over Lake Kingman on the line of Benning Road, and
a lock and bridge is to be built at the lower.end of Lake Kingman.
Influent and effluent gate-control works are to be constructed to
provide circulation and maintain a constant level in both lakes.
   Masonry sea walls on a riprap substructure are to be constructed
along the tidal channel of the river to extend 6 feet above mean
low-water; the walls of the lakes are to extend 3 feet above mean
low-water or 1 foot above the level of the lake.
   A portion of the reclaimed tract is to be set aside for develop-
ment by the Agriculture Department for a national arboretum and
botanical garden. A strip of waterfront land on the right bank of
the river between the Anacostia Bridge and the Pennsylvania Rail-
road freight bridge is to be set aside for commercial purposes. The
estimated cost of the project is $6,717,000, revised in 1952.
   The acts of Congress authorizing and defining the present plan
of improvement are as follows:
District of Columbia Appropriation Act-                                          Documents or reports
     Mar. 2, 1911--------------------------------------------36 Stats. 1005.
    July 2, 1914-----------------------------------------38 Stats. 549.
    Mar. 3, 1915------                ------------------------                    --- 38 Stats. 923.
    Mar. 3, 1917----------                    ---------------------------- 39 Stats. 1040.
    Aug. 31, 1918----------------------------------40                                      Stats. 950.
    July 11, 1919---------------------------------------------41 Stats. 99.
    June 5, 1920-----------                             ----------------------- 41 Stats. 954.
    Feb. 28, 1923--------                  ---------------------------                 42 Stats. 1364.
    June 7,1924-----.     -----------                      --------------------        43 Stats. 572.
    Mar. 3, 1925--------------------------------------43                                   Stats. 1246.
    May 10, 1926       ------------------------------------                            44Stats. 448.
    Mar. 2, 1927---------                     -----...--------------------- 44 Stats. 1328.
    Feb. 25, 1929-----------------                           ------------------- 45 Stats. 1295.
    July 3, 1930------------------------------------46                                     Stats. 986.
    Feb. 23, 1931--------------------------------------46                                  Stats. 1410.
    June 29, 1932--------------------------------------47                                  Stats. 376.
    June 14, 1935----------------                             ------------------- 49 Stats. 369.
    June 23, 1936       ---           ------------------------------                   49 Stats. 1883.
    June 29, 1937-----------------                                 ------------------ 50 Stats. 385.
    Apr. 4, 1938--------                     ----------------------------- 52 Stats. 156.
    July 15, 1939 -------.                ----------------
                                                 _..                                   53 Stats. 1004.
    June 12, 1940                                                                          Stats. 332.
                                                                                      _--------------.54
     July 1, 1941---
                 ....               -------                          -         ---   55 Stats. 499.
            RIVERS AND HARBORS--WASHINGTON,                                   D. C., DISTRICT             403

   The latest published map is found in Annual Report of Chief of
Engineers, 1924, at page 1994.
   The District of Columbia Appropriation Act approved March 2,
1911, 36 Stat. 1005 (Public No. 44), in authorizing the project pro-
vided that the work is to be carried on under the supervision of the
Chief of Engineers, United States Army, upon plans prepared under
the direction of, and to be approved by, a board of engineers to con-
sist of the Engineer Commissioner of the District of Columbia, the
officer in charge of public buildings and grounds, and the engineer
officer in charge of the improvements of the Potomac River.
   Executive Order No. 6166, dated June 10, 1933, transferred the func-
tions of the Office of Public Buildings and Grounds to the National
Park Service, Department of Interior. Accordingly, the Director of
the National Park Service has become a member of the board of engi-
neers in lieu of the officer in charge of public buildings and grounds.
   Local cooperation.-The funds for this project have been appro-
priated by the District of Columbia appropriation bills, which through
the fiscal year ended June 30, 1920, provided for half of the expense
to be borne by the District of Columbia. From that date to June 30,
1924, the expense was borne 60 percent by the District of Columbia
and 40 percent by the United States. Beginning July 1, 1924, the
District of Columbia paid all required above the lump sum appro-
priated from United States revenues.
   Operations and results during fiscal year.-None. Construction
work on the project was deferred in 1941 as a result of the war, and
has not been resumed due to lack of appropriations.
   Costs in the amount of $1,931.31 for operating equipment for sluice
gates and other materials to be installed in the project, carried as a
deferred item, were distributed to proper construction units. Re-
planning of the project was carried on during the year at a cost of
$194.42.
   Condition at end of fiscal year.-The existing project is 58 percent
completed. The controlling depths are as follows:

                                                                                       Con-
                                 Location                                      Width trolling        Date
                                                                                      depth

                                                                                        Feet
                                  ---------------------------------
Downstream of Anacostia Bridge .....                                             400     19. 4   March 1950.
Under drawspan of Anacostia Bridge .      ..------------------------------       100     21.1    October 1947.
Anacostia Bridge to foot of 15th St. SE----.-------------------------            200     21.1       Do.
Foot of 15th St. SE., to Pennsylvania Ave. Bridge....--------------------        200     12. 5   August 1942.
Pennsylvania Ave. Bridge to Pennsylvania R. R. bridge.      ---------------      200     14.8    February 1938.
Pennsylvania R. R. bridge to Benning Bridge...-----------------------            100      6. 0      Do.
Benning Bridge to Magruder Bridge....-------------------------------               60     0. 8   January 1944.
Lake Kingman.........----------------------------------------------------...              2.8    May 1946.
404              REPORT OF CHIEF OF ENGINEERS,                                                  U.      S.    ARMY,           1052


  The work accomplished and costs thereof for the project to June 30,
1952, are indicated in the following table:
                             Itemized statement of cost and work to June 30, 1956

                                                 Item                                                        Work accom-                  Cost
                                                                                                                plished




Study and Investigation--......------------------------------------........                                           ----------------...    $46,343.42
Reclamation:
    (a) Dredging...................................--------------------------------..cubic yards.                            11, 331, 970  1,421,429. 80
     (b) Dump fills....-----------------------------------------------------------                                                             81,999.91
Sea walls:
     (a) Channel-foundations                        ......                                        linear feet.
                                                                                              ..-----------------------            40,828    558, 544. 84
     (b) Channel-masonry...............................------------------------------do....                                        40, 828   501,947. 69
     (c) Lake and islands-foundations.--.....__-..                                                   -do       ...                 29,194    348, 797. 70
     (d) Lake and islands-masonry                        ........----------------------- do....                                    16, 068   100, 054. 82
Land ..............----------- - ----                  --...-----------------------            .         acres--                 404,646     511,497.   79
Allen Bridge---------------------                                      ------------------------                                                81, 503.91
Plant and repair yard......................................--------------------------------------------...-------.............--(1)
Lock, bridge, and influents ...............................---------------------------------------------------................               135, 500. 96
E fluent house and controls ...... . , ...                                .......      ......... __.          . ................              .59, 589. 96
Contingencies        .....................--------------------------------------------- ----------------................                       63, 370. 71
Engineering and clerical expenses--..-.----____                                     -__---------................. (1)
Miscellaneous surveys ..                    ------------------------------------------.-------------                                          ()

        Total cost--------------..............--......--------------------------- ----------------                                      3, 910, 581.60

  1 Cost under these items included in totals for the other items.
  t To be distributed to above items.
  S Distributed to above items.


  The total expenditures were $3,910,498.32.
  Proposed operations.-The balance unexpended June 30, 1952,
$4,128.72, will be applied to new work for completion of restudy and
redesign of Anacostia Park in order to meet new requirements and
conditions and preparation of revision report (July 1, 1952, to June 30,
1953).
     No work is scheduled for fiscal year 1954.
                                                 Cost and financial summary

                                                                 Fiscal year ending June 30                                         Total to June
                                                                                                                                   30, 1952, includ-
                                                                                                                                   ing fiscal years
                                             1948              1949              1950                1951             1952           priorto 1948

New work:
   Appropriated.........    ......                             ....     ....------------------------      ------------                 $3, 914, 722. 04
   Cost..-. -----       _  $1,855. 44                          $276.54         $170.34                        $2, 125. 73               3,910, 581. 60
   Expenditures--..-------
                  .....     5,006.81                            378. 23           12.35           $170. 34        111. 14               3,910,498.32



Other new work data:
    Unobligated balance, June 30, 1952___                         $4, 128. 72
    Unobligated balance available for fiscal year 1953 _           4, 128. 72
    Estimated additional amount needed to be appropriated for
      completion of existing project__                        2, 802, 00. 00
            RIVERS AND HARBOR--WASHIINGTON,                                       D. C., DISTRICT                   405
    13. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

   The cost of work during the fiscal year was $35,253.49, of which
 -$12,853.34 was for examinations and surveys and $78,106.83 was for
contingencies. The total expenditures were $38,400.74. The balance
unexpended at the end of the fiscal year, $363.94 for examinations and
surveys and $1,917.70 for contingencies, a total of $2,281.64, plus
allotments for fiscal year 1953 of $2,000 for examinations and surveys
and $14,000 for contingencies, a total of $18,281.64, will be applied
during fiscal year 1953 as follows:
Accounts payable, June 30, 1952------------------------- ------ $2, 133. 08
Examinations and surveys-----------        ---------------------- 2, 000. 00
Contingencies                                                                                               14, 148. 56

         Total for all work. -----------------------------                            ------------ 18, 281.464
  No work on examinations and surveys is scheduled for fiscal year
1954. The additional sum of $24,200 can be profitably expended
during fiscal year 1954 for contingencies.
                                       Cost and financial summary

                                                     Fiscal year ending June 30                           Total to June
                                                                                                         30, 1952, includ-
                                                                                                         ing fiscal years
                                    1948           1949         1950           1951          1952         prior to 1948


Maintenance:
    Appropriated-........        $131, 780. 00 $169, 350.00 $139,000.00     $44,000. 00   $29, 513.37       $1, 447, 551. 13
    Cost--         ...----------- 139, 951.70 160, 105.67     96, 196..28    97, 518.09    35, 253. 49       1,447, 402. 57
    Expenditures-- --      .--.   138, 251. 69  158, 707. 45 102, 168.31     92, 371.72    38, 400. 74       1, 445, 269.49



           14. PLANT ALLOTMENT, WASHINGTON, D. C., DISTRICT
                                       Cost and financial summary

                                                     Fiscal year ending June 30                           Total to June
                                                                                                         30, 1952, includ-
                                                                                                         ing fiscal years
                                    1948           1949         1950           1951          1952         prior to 1948


Maintenance:
   Appropriated-......... -$91, 000.00 $82, 877. 02--------...... .......----------.... 44,386.63   $694, 087.16
   Expenditures --
   CosExpenditures -----     41,997.    55       3, 744.-------
                              1.9.5.,4.4.$493.1-1,.7.4       $24, 943.-51 $15, 576.--94 1,.9.5
                                                                                        14, 395. 75  571, 377. 79
                                                                                                     57,377
406           REPORT OF CHIEF OF ENGINEERS,                                       U.    S. ARMY, 1952

                             15. INACTIVE NAVIGATION PROJECTS

                                                                                       Cost and expenditures
                                                                       For last           to June 30, 1952          Estimated
                        Name of project                              full report                                     amount
                                                                     see annual                                    required to
                                                                     report for-       New work       Mainte-       complete
                                                                                                      nance

1. Potomac River at Mt. Vernon, Va.. ---------------                    1950        $17,000.00 $51,485.88                    $11, 000
2. Accotink Creek, Va.--------1878                                                                    ............ 37, 200
                                                                                        5,000.00------------
3. Occoquan Creek, Va.....------------          ------------            1950         41,   252. 95 112,686. 17                22, 700
4. Neahsco Creek, Va.l .._--- .---.--- -                      ---..     1884           5, 000. 00 .........
                                                                                                           --            ..   127, 000
5. Aquia Creek, Va. .-----------------------------        l             1928         52,   464.   84     11,  750.00         (3)
6. Potomac River at Lower Cedar Point, Md. ....... 1920                              10, 233. 51           6, 216. 49        (3)
7. Upper Machodoc Creek, Va.s __               -       ---------- 1916               20, 281. 28           6, 118.72         (3)
8. Colonial Beach, Va., shore protection '.-                    --      1950 ---.--.-----.-.                                  43, 400
9. Monroe Bay and Creek, Va.--.
                               --
10. Neale Sound, Md.....................---
                                                   ..-------- ----
                                                                     ___ 1950.
                                                                         1950
                                                                                      12, 460.07
                                                                                    6 12, 600. 00
                                                                                                          19, 163.86
                                                                                                               900. 00
                                                                                                                              (3)
                                                                                                                              (3)
11. St. Catherine Sound, Md.'_----------..............                   1949-................                                 26, 600
12. St. Patricks Creek, Md.'s ------------------------ 1950                         -             ----          -----          19, 300
13. Breton Bay, Md.,-         ........................ - 1950                         10, 423. 55         12, 621. 18          31, 200
14. Nomini Bay and Creek, Va.= .................. 1946                                78, 446. 21         31, 233. 86          20, 500
15. Lower Machodoc Creek, Va.s' ...-...........                          1904           9, 916. 47             600. 00        (a)
16. Channel to Island Creek, St. George Island, Md.                      1949---------.........------------..............      26, 300
17. Smith Creek, Md.--- --------------...........                        1936           5, 252. 22 ............--             ()
18. Coan River, Va.s                                                --   1937       -............       ...........     -      81,000
19. Patuxent River, Md.s 7                                               1905         14, 000. 00 ............ 14, 000
20. Hellen Creek. Md.                                                     95011,000.................------......
21. t. Jeromes Creek, Md.'.---.----.----------- -                        1951         17, 856. 95         24, 379. 81              (8)
22. Cockrell Creek,Va.-____
                         ....-.......-----.                              1949      ---........................                115, 600
23. Dymers Creek, Va..........----------------------.....---.............1912             , 581.99         3, 418. 01         (a)
24. Rappahannock River -at- --Bowlers
                               - - - - - -Wharf,
                                            - - - - - -Va........
                                                        - -- - - - - - - 1950 -----------------------                       163, 000
25. Mulberry Creek, Va.                                                  1950           2, 392. 60          1, 767. 10        (3)
26. Urbanna Creek, Va..-------------------------------                   1951         38, 811. 77         46, 821. 77          16, 200
27. Whitings Creek, Va. ..------                                         1949 ------------.........------------                30, 200
28. Carters Creek, Va. 4-.............---------                          1951         28, 397. 55 8 3, 175. 71                 23, 200
29. Locklies Creek, Va. --------------------------- 1928                              11, 581.22               518. 78        (3)
30. Mill Creek, Va.'-. .-............. ..--------                        1937           5, 444. 95 ..........            (s)
31.   Jackson Creek, Va. ......               --..
                                    -..............      1950   8, 500.00       490. 53 (3)
32.   Milford Haven, Va.-...-------------------------    1950  24, 568. 25  14, 277. 88 (3)
33.   Bransons Cove, Lower Machodoc River, Va. .....     1950  15, 754. 83 ..----...--------......
                                                                                        ()
34.   Cranes Creek, Va-----------------------------      1950   6, 274. 29 ............------------
                                                                                        ()
35.   Snagging and clearing under authority of section 3
        of the River and Harbor Act approved March 2,
        1945--------------- ------.......................--------..............---------
                                                         1949                3, 000. 00
                                                              --------............      (3)

  1 No commerce reported.
  s Channels adequate for commerce.
  8 Completed.
  4Awaiting local cooperation.
  aNo funds available.
  * Exclusive of $1,000 contributed funds.
  7 Abandonment recommended in 1903 (Rivers and Harbors Committee Dac. 32, 61st Cong., 2d sess.).
  8Exclusive of $700 contributed funds.
               RIVERS           AND        HARBORS---WASHINGTON,                   D.   C.,    DISTRICT              407
                                      16. MISCELLANEOUS                    ACTIVITIES

Status of all investigations for navigation called for by river and harbor acts
                           and4 committee resolutions

                                                                               Date trans-    Document         Reco-
                   Locality                            Authorization act        mitted to                     mendalon
                                                                                Congress
ti..                                                                                .         - -   ,        ..


Anacostia River and Flats, Wash-                    Senate Public Works
ington, D. C.                                        Committee resolution,
                                                      Mar. 4, 1950.
Anacostia and Potomac Rivers and                    River and Harbor Act,
adjacent waters in and near Dis-                     Mar. 2, 1945.
trict of Columbia, for comprehen-
sive and coordinated improve-
  ment and development of such
  waters and their shores.
Anacostia and Potomac Rivers at                     River and Harbor Act,
and near Washington, D. C., to                      Mar. 2, 1945.
  provide a municipal sailing base.
Bonum Creek, Westmoreland Co.,                      River and Harbor Act,
Va.                                                  Mar. 2, 1945.
Cubitt Creek, Va................-----------------   River and Harbor Act,
                                                      May 17, 1950.
District of Columbia, for compre-                   River and Harbor Act,
hensive and coordinated im-                         Mar. 2, 1945.
provement and development of
Anacostia and Potomac Rivers
and adjacent waters and their
shores.
Hacks Creek, Northumberland                   River and Harbor Act,
  County, Va.                                   June 30, 1948.
Herring Creek, St. Marys County,              House Public Works Com-
Md.                                            mittee resolution, Aug.
                                                17, 1949.
Hull Creek, Va..                              River and Harbor Act,
                                   .------------
                                               July 24, 1946.
Jules Creek, Va.------------------            River and Harbor Act,
                                                May 17, 1950.
McKans Bay, Va. (McKanes Bay)__ River and Harbor Act,
                                                May 17, 1950.
Monroe Bay and Creek, Westmore- Senate Public Works
  land County, Va.                              Committee resolution,
                                                July 22, 1947.
Pecks Creek, Va..................---------    River and Harbor Act,
                                                May 17, 1950.
Point Lookout Creek, in the vicinity River and Harbor Act,
  of Point Lookout, St. Marys                  July 24, 1946.
  County, Md.
Popes Creek, Va................._.. River and Harbor Act,
                                               May 17, 1950.
Potomac and Anacostia Rivers and River and Harbor Act,
  adjacent waters in and near Dis-             Mar. 2, 1945.
  trict of Columbia, for compre-
  hensive and coordinated improve-
  ment and development of such
  waters and their shores.
Potomac and Anacostia Rivers at River and Harbor Act,
  and near Washington, D. C., to                Mar. 2, 1945.
  provide a municipal sailing base.
Potomac River at and near Wash- River and Harbor Act, .....                       -
                                                                        ................. ---                     Unfavor-
  ington, D. C.                                 Mar. 2, 1945.                                                      able.
Queens Creek, Mathews County, Rivers and Harbors Com- Apr. 30,1952----------       ............
  Va.                                           mittee resolution, Nov.
                                                20, 1946.
Washington, D. C., to provide a River and Harbor Act,
  municipal sailing base on the                 Mar. 2, 1945.
  Anacostia and Potomac Rivers
  at and near.
Washington, D. C., Potomac River River and Harbor Act,
  at and near.                                  Mar. 2, 1945.
                                                        i                                                i
408      REPORT Of 'dHIi       OF' NGINE R,            t   ~.   M   i29
17. ANACOSTIA RIVER AND TRIBUTARIES, FLOOD PROTECTION AND
  NAVIGATION. IMPROVEMENTS, DISTRICT OF COLUMBIA AND MARY-
  LAND
   Location.-This project is located on the Anacostia River at the
confluence of northeast and northwest branches at Bladensburg, Md.,
about 9 miles above the mouth at Washington, D. C. (See U. S. Geo-
logical Survey Quadrangle "Washington, D. C. and Vicinity.")
   Existing project.-The project provides for channel improvement
of Anacostia River from the foot of 15th Street SE. in the District of
Columbia, to the junction of northeast and northwest branches at
Bladensburg, Md.; channel improvement in northeast branch from
mouth upstream to near Longfellow Street in Riverdale, Md.; channel
improvement in northwest branch from mouth upstream to vicinity of
38th Street in Brentwood, Md.; levees along both banks of the streams
to protect Bladensburg, Edmonston, Riverdale, Cottage City, and
Colmar Manor, Md.; interior drainage facilities in these communities,
including four pumping stations and the necessary intercepting sew-
ers; and alterations and reconstruction of highway and railroad
bridges. The portion of the channel improvement of Anacostia River
from the vicinity of 15th Street SE. in the District of Columbia to near
Defense Highway bridge on U. S. Route 50, provides for a navigation
channel 8 feet deep and 80 feet wide with a commercial boat basin, and
a recreational boat basin having a capacity of 150 boats, both on the
left bank of the river near Bladensburg, Md. The estimate of cost to
the Federal Government for new work, revised in 1952, is $7,553,000;
the estimate of cost to local interests for construction, lands and
damages is $5,670,000; a total of $13,223,000.
   The existing project was authorized by the Flood Control Act ap-
proved May 17, 1950 (H. Doc. 202, 81st Cong., 1st sess.). The latest
map is in the project document.
   Local cooperation.-Seepages 4-5 for requirements. Local interests
have indicated acceptance of the plan of improvements, and assur-
ances of local cooperation have been furnished.
   Operations and results during fiscal year.--Engineering investiga-
tions were initiated during the fiscal year for revision of hydrologic
and hydraulic data, field surveys of flood damages, and preliminary
planning of flood control structures.
   Total costs for the year were $9,325.54, all for new work. Total ex-
penditures were $9,833.25.
   Conditionat end of fiscal year.-Preliminaryengineering investiga-
tions and planning for the project were 6 percent completed at the
end of the fiscal year.
   Total costs to June 30, 1952 were $9,325.54, all for new work. Total
expenditures were $9,833.25.
   Proposed operations.-The balance unexpended June 30, 1952, $15,-
166.75, plus accounts receivable of $517.71, and an allotment of $50,000
made during the fiscal year 1953, a total of $65,684.46, will be applied as
follows:
Accounts payable, June 30, 1952----- ------------------------------      $10. 00
New work: Engineering investigation and studies by hired labor (July
  1, 1952 to June 30, 1953) -----------------------------------      65, 674. 46
      Total for all work----       -----------------                      65, 684. 46
                FLOOD          CONTROL -- WASHINGTON,                        D.    C.,   DISTRICT                 409


  The additional sum of $200,000 can be profitably expended for new
work during the fiscal year 1954 for continuing preliminary engineer-
ing studies and the preparation of plans and specifications by hired
labor for initial construction (July 1, 1953 to June 30, 1954).
                                        Cost and flnancial summary

                                                      Fiscal year ending June 30                         Total to June
                                                                                                        30, 1952, includ-
                                                                                                        ing fiscal years
                                     1948           1949          1950         1951         1952         prior to 1948

New work:
   Appropriated.....-----....--------------------------------------                      $25,000.00           $25, 000.00
   Cost...----------.................--- --------------    -------------- ------------     9, 325. 54           9, 325. 54
                                                              -----------------------
   Expenditures-.............---.....------------.......-------.....                       9,833.25             9, 833.25


Other new work data:
    Unobligated balance, June 30, 1952                                   ----------------------
                                                                   $15, 674. 46
    Appropriated for fiscal year ending June 30, 1953------------. 50, 000. 00

       Unobligated balance available for fiscal year 1953 --------     65, 674. 46
     Estimated additional amount needed to be appropriated for
       completion of existing project     .   -_-______---_--      7, 478, 000.00

                   18. CUMBERLAND, MD., AND RIDGELEY, W. VA.

  Location.-Cumberland,Md., and Ridgeley, W. Va., are located on
the North Branch of the Potomac River, 21 miles upstream from its
junction with the South Branch of the Potomac River and 197 miles
upstream from Washington, D. C. (See U. S. Geological Survey
quadrangles, Frostburg and Flint Stone, Md., W. Va., and Pa.)
   Existing project.-This project provides for channel improvements
of North Branch of Potomac River from western Maryland Railway
bridge in-South Cumberland upstream to the mouth of Wills Creek,
with levees and fill along the left bank and levees along the right
bank from the downstream corporate limits of Ridgeley, W. Va., to
a point about 150 feet above Johnson Street Bridge; channel improve-
ments and flood walls along Wills Creek from its mouth upstream to a
point in the Narrows about 500 feet upstream from highway bridge on
U. S. Highway No. 40; levee and flood wall in West Cumberland, Md.,
on left bank of North Branch of Potomac River from mouth of Wills
Creek upstream to Kelly Boulevard; levee and flood wall in Ridgeley,
W. Va., on right bank of North Branch of Potomac River from Car-
penter Avenue upstream to Patapsco Street near the upstream corpo-
rate limits of Ridgeley, W. Va.; interior drainage facilities in Cumber-
land and West Cumberland, Md., and Ridgeley, W. Va.; removal
of Chesapeake and Ohio Canal dam and construction of a new in-
dustrial dam on North Branch of Potomac River immediately above
mouth of Wills Creek; and alteration and reconstruction of highway
and railroad bridges.
   The estimate of cost to the Federal Government for new work,
revised in 1952, is $14,738,100, exclusive of $1,280,000 to be contributed
by local interests. The estimated total cost to local interests is
$2,500,000.
410        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

  The existing project was authorized by the following flood-control
acts:

    Acts                      Work authorized                         Documents and reports

June 22,1936 Levees, retaining walls, a movable dam and chan-    H. Doc. 101, 73d Cong., 1st sess.
                nel clearing for Cumberland, West Cumberland
                and South Cumberland, Md., and Ridgeley,
                W. Va.
July 24,1946 Levees, walls, channel improvement, removal of      Report on file in the Office of the
                Chesapeake and Ohio Canal dam and construction    Chief of Engineers.
                of new industrial dam.



   Local cooperation.-See pages 4-5 for requirements. Assurances of
local cooperation with the project plan have been received. A total
of $2,500,000 will be the cost to local interests of which $1,280,000 will
be in cash towards construction and the balance will be for lands re-
quired for construction of the project and damages incurred. Funds,
lands, and rights-of-way are being furnished as required.
   Operationsand results during the fiscal year.-Construction,by con-
tract, of pressure conduits, sewers, and water lines in group 2 for the
interior drainage system, in Cumberland, West Cumberland, Md., and
Ridgeley, W. Va., was completed in December 1951. Cost for the year
was $369,209.57 of which $309,549.81 was Federal funds and $59,659.76
contributed funds. A contract with the Baltimore & Ohio Railroad Co.
for construction of temporary bridges and tracks to permit construc-
tion of pressure conduits         -for
                               group 2 was in progress at the beginning
of the fiscal year and was completed during January 1952 at a cost for
the year of $33,380.44. Work under a contract with the city of Cum-
berland for replacement of sidewalks and pavements and alteration
of utilities in group 2, for the interior drainage system, was com-
pleted during May 1952 at a cost for the year of $59,535.34. Plans and
specifications for section 1 of the Wills Creek channel improvement
were completed in November 1951 and were advertised for construc-
tion. Costs for the year were $81,334.60. A continuing contract was
awarded in January 1952, and work was started in April 1952 on
section 1, of the Wills Creek channel improvement. The work was 4
percent complete at the end of the fiscal year. Cost for the year was
$70,438.81. Costs in connection with lands and damages were
$10,903 throughout the year.
   Total:costs for the fiscal year for new work were $624,801.76, of
which $565,142 was Federal funds and $59,659.76 was contributed
funds. Total expenditures for fiscal year 1953 were $639,841.97, of
which $550,182.21 was Federal funds and $89,659.76 contributed
funds.
   Condition at end of fiscal year.-The existing project was about 20
percent complete at the end of the fiscal year. Construction of the
first unit of the project, consisting of four pressure conduits and con-
           FLOOD    CONTROL---WASHINGTON,                  D.   C.,   DISTRICT         411
necting sewers, was started in March 1949 and completed in November
1949. Construction of the second and final unit of interior drainage
pressure conduits and sewers, started in November 1949 under a con-
tinuing contract, was completed in December 1951. Construction of
section 1 of the Wills Creek channel improvement, started in April
1952 under a continuing contract, was 4 percent complete at the end
of the fiscal year. Designs and construction plans for section 2 of
the Wills Creek channel improvement were 80 percent complete, and
for sections 3 and 4, 20 percent and 5 percent respectively; for sections
1 and 2 of the Potomac River channel, 5 percent and 30 percent, re-
spectively; and for the industrial dam, 80 percent complete at the end
of the year.
   Total costs for existing project to June 30, 1952 have been $3,326,-
891.97 of which $2,887,234.36 was regular funds, $49,997.85 Emergency
Relief Funds and $389,659.76 contributed funds, all for new work.
Total expenditures have been $3,184,382.55, consisting of $2,744,724.94
regular funds, $49,997.85 Emergency Relief Funds and $389,659.76
contributed funds.
   Proposed operations.-The balance unexpended June 30, 1952,
$1,043,138.89, representing $1,000,446.94 Federal funds and $42,691.95
contributed funds, plus accounts receivable of $745.39, and an allot-
ment of $1,144,000 made during the fiscal year 1953, a total of $2,187,-
884.28, will be applied as follows:
Accounts payable June 30, 1952----           -----------        -------        $143, 254. 81
New work:
   Continuation of construction by contract of section 1 of the
     Wills Creek channel improvement (July 1952 through June
     1953) ------------      -----------------------------          1,868,629.47
   Purchase of lands required for continuation of the construction
     program---------------------------------------------              85,000.00
   Completion of plans and specifications for reconstruction of the
     industrial dam, and the construction of section 1 of the
     Potomac River channel (July 1952 through June 1953)_....          91,000.00
        Total new work-         -
                             -----------------             _              _   2, 044, 629. 47
      Total for all work     ---------------------------------
                                                             2, 187, 884. 28
  The additional sum of $1,200,000 can be profitably expended during
the fiscal year 1954, for the following schedule of work:
New work :
    Complete the construction under a continuing contract of section
      1, Wills Creek channel improvement_ ---------------                          $156, 000
    Initiate construction of the industrial dam under a continuing
      contract, including removal of the old C. & O. canal dam-------               654, 900
   Purchase lands required for continuation of the construction
      program-------------------------------------- ------                          309,100
    Planning and miscellaneous services-------------- ----------                     80, 000
      Total for all work-------....----------------------                      - 1, 200, 000
412          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                                        Cost and financial summary
                                             UNITED STATES FUNDS

                                                       Fiscal year ending June 30                                 Total to June
                                                                                                                 30, 1952, includ-
                                                                                                                 ing fiscal years
                                     1948            1949            1950           1951            1952          priorto 1948

New work:
   Appropriated..--------.......   $78, 000.00    $500, 000. 00   $744, 100. 00 $1,154,000.00    $946, 000.00     1 $3, 795,169. 73
   Cost----------------               283. 34
                                    69,            302, 918.04     702, 502. 00   939,.842. 57    565, 142. 00     12, 937, 232. 21
   Expenditures-- ---....---        61, 997. 35    258, 593.92     576, 416. 22   986, 938. 25    550, 182. 21     1 2, 794, 722. 79


Other new work data:
    Unobligated balance, June 30, 1952--------------- --------                                                  $23, 633. 31
    Appropriated for fiscal year ending June 30, 1953--                                                        , 144, 000. 00
                                                                                                              1---------
        Unobligated balance available for fiscal year 1953      1,167, 633. 31           ---------
      Estimated additional amount needed to be appropriated for
       completion of existing project__------------------------ 9, 848, 900. 00
  1Includes $49,997.85 expended from Emergency Relief funds and $113,069.73 from a previous project.

                                             -CONTRIBUTED FUNDS


                                                       Fiscal year ending June 30                                Total to June
                                                                                                                 30, 1952, includ-
                                                                                                                 ing fiscal years
                                     1948            1949            1950           1951            1952          priorto 1948

New work:
   Appropriated$---- ------------ ------------                      500, 000 1-$50,000 2--$17,648.29                  $432, 351. 71
   Cost ------------------------------------                        330, 000 -----------  59, 659. 76                  389, 659. 76
   Expenditures-....---           ------------    ------------       300,000 ------------.        89,659.76            389, 659.76


Other new work data:
    Unobligated balance, June 30, 1952 ---           ---
                                                      ____--_ ---- -   $12, 030. 95
    Unobligated balance available for fiscal year 1953_ --      --   -  12, 030. 95
    Estimated additional amount needed to be appropriated for com-
      pletion of existing project---    ___                            847, 600. 00
1 Refund of contributed funds-$50,000.
2 Refund of contributed funds-$70,000.

                                     19. SAVAGE RIVER DAM, MD.

   Location.--On the Savage River, in Garrett County, Md., approxi-
mately 4.5 miles above the junction with North Branch of the Potomac
River, and immediately downstream of the junction of Crabtree
Creek and Savage River, and approximately 4 miles northwest of
Bloomington, Md. (See U. S.Geological Survey quadrangle, Grants-
ville, Md.-Pa.)
  Existing project.-The construction of an earth- and rock-fill dam,
with a maximum height of 184 feet above the stream bed, was started
in 1939 as a project of the Works Progress Administration, under
sponsorship of the Upper Potomac River Commission. Work was
suspended in December 1942, due to the war. The present project
provides for completion of the earth- and rock-fill dam by the Corps
of Engineers, United States Army, and includes placing about 850,000
cubic yards of earth- and rock-fill embankment and 5,200 cubic yards
          FLOOD CONTROL--WASHINGTON,         D.   C.,   DISTRICT   413
of concrete in spillway and intake structure, installation of control
equipment in tunnel control chamber, and construction of operating
house and other appurtenant structures. The estimate of cost of the
project to the Federal Government, revised in 1952, is $2,306,000 ex-
clusive of $200,000 to be contributed by local interests. The project
is primarily for regulation of stream flow for industrial purposes,
and pollution abatement, with some incidental flood control. The
reservoir will have a storage capacity of 20,000 acre-feet. Authoriza-
tion for the project is contained in the Flood Control Act approved
July 24, 1946 (H. Doc. 622, 79th Cong., 2d sess.).
   Local cooperation.-Local interests are required to make a cash
contribution of $200,000 toward the cost of the work. The Upper
Potomac River Commission has contributed $200,000 toward com-
pletion of the dam.
   Operations and results during the fscal year.--Construction under
a continuing contract of the spillway, outlet and intake structures
control chamber and miscellaneous structures was completed. Final
payments were made on contracts covering fabrication of slide gates
and hydraulic equipment and for clearing of reservoir area completed
during the previous fiscal year. Construction under contract on re-
pairs to a settled section of the relocated road was completed. A.
contract with the State of Maryland for stabilizing and reforesting
borrow areas was completed. Grouting of the shaft to the control
chamber was initiated by hired labor. The work was 20 percent com-
plete at the end of the fiscal year.
   Preparation of the reservoir regulation manual, operation and
maintenance manual, sedimentation studies, surveys and miscellaneous
engineering was performed by hired labor.
   Total costs for the year were $181,142.55, all of which were Federal
funds. Total expenditures were $215,237.51.
   Condition at end of fiscal year.-The existing project was approxi-
mately 60 percent completed by the Works Progress Administration
prior to the termination of the work in 1942. Construction work,
started under the adopted project in March 1949 under a continuing
contract, to complete the embankment portion of the dam was com-
pleted in May 1950. A supply contract for fabrication of slide gates
and hydraulic equipment was awarded in August 1949 and completed
in August 1950. A contract for repairs to the relocated road was
awarded June 1951 and completed in October 1951. A continuing con-
tract for the completion of the spillway and outlet structures and
miscellaneous work, initiated in March 1950, was completed in Janu-
ary 1952. A contract for clearing the reservoir area was awarded
in November 1950 and completed in May 1951. The entire project
was 97 percent complete at the end of the fiscal year and was placed
in operation January 1952.
   Total costs to June 30, 1952 were $2,231,959 of which $200,000 was
contributed funds and $2,031,959 was Federal funds. Total expendi-
tures were $2,225,73.97 of which $2,025,732.97 was Federal funds and
$200,000 was contributed funds.


     245554-53-vol. 1-   27
414             REPORT OF CHIEF OF ENGINEERS,                                     1. S. ARMY,              1952

  Proposed operations.-The balance unexpended June 30, 1952,
$80,267.03, plus accounts receivable $43.55, a total of $80,310.58, will
be applied as follows:
Accounts payable June 30, 1952-... ---                                  -- $6,269.
                                                                                ,---------------------
                                                                                        58
New work:
    Completion of continuing contract for spillway and outlet struc-
     tures and miscellaneous work (July 1 to Aug. 31, 1952) --------          7, 900.00
    Completion of contract for cover planting of borrow areas (July
     1 to Aug. 81, 1952) --------------          ------------------
   Completion by hired labor of grouting and waterproofing shaft to
                                                                              2,        00                      21021.
     control chamber (July 1 to Aug. 31, 1952) _.-------                     20, 500. 00
   Completion by hired labor of sedimentation survey, reservoir reg-
     ulation and operation manuals, and miscellaneous planning
      (July 1, 1952, to June 30, 1953) -------                ---------   -31,000.00
    Model study of spillway (June 1 to Dec. 31, 1952) -----------             4, 000. 00
    Construction of combined minor features and contingencies to
     complete entire project (July 1, 1952, to June 30, 1953) -------         8, 620. 00

               Total new work ----------------------------------                                               74,041.00
               Total for all work---------------- -----------                                          --      80,310. 58
  It is expected that the project will be completed during the fiscal
year 1953' with funds on hand. No work is scheduled for the fiscal
year 1954.
                                            Cost and financial summary

                                                         Fiscal year ending June 30                          Total to June
                                                                                                            30, 1952, includ-
                                                                                                            ing fiscal years
                                         1948          1949          1950          1951         1952         priorto 1948

New work:
   Appropriated-......--              $41, 000. 00 $400, 000. 00 $1,265,000.00 $450, 000. 00 -$65,000.00     1 $2,106, 000.00
                                 --.47,340. 63
   Cost..............-------------                  192, 661.54 871, 212. 66 732, 490. 04 181, 142. 55        1 2,031, 959.00
   Expenditures-------....             42,563.04     86, 008.38 878,192.91      797,035.60 215,237.51         1 2,025,732.97



Other new work data :
    Unobligated balance, June 30, 1952-----------       -        $63, 861.85
   Unobligated balance available for fiscal year 1953------------63, 861.85
1 Exclusive of $200,000 contributed funds (see annual report for 1950).

                                     20. SALEM CHURCH RESERVOIR, VA.
   Location.-The Salem Church multiple-purpose reservoir, to be
located on the Rappahannock and Rapidan Rivers in Spotsylvania,
Stafford, Orange, Culpeper, and Fauquier Counties, Va., would be
created by a concrete gravity dam on the Rappahannock River, 5.6
miles above Fredericksburg, Va., and 113 miles above the mouth.
 (See Army Map Service Quadrangle, Salem Church Va.)
   E~isting project.-The plan of improvement provides for construc-
tion of a concrete gravity dam, approximately 1,460 feet long, with a
maximum height of 205 feet above bedrock, and earth embankments
extending from both abutments, totaling 13,710 feet in length, with
a maximum height of 35 feet. The spillway, located in the concrete
gravity section of the dam, would be controlled by 8 crest gates 52
feet long by 35 feet high, and would have a discharge capacity of
567,000 cubic feet per second. The project provides for a powerplant,
to be constructed on the left bank of the river immediately downstream
from the dam, containing two 32,000-kilowatt generating units. The
reservoir will afford flood protection for Fredericksburg, Falmouth,
                    FLOOD CONTROL--WASHINGTON,                                   D.      C., DISTRICT                     415
and areas downstream for a flood of 140,000 cubic feet per second,
which is equal to the greatest flood of record, and will reduce the
severity of floods of greater magnitude. Estimated cost of the project
to the Federal Government, revised in 1952, is $41,084,000, of which
$2,584,000 would be for lands and damages. Authorization for the
project is contained in the Flood Control Act approved July 24, 1946,
which stipulated that the maximum elevation of the power pool should
not exceed elevation 220 feet mean sea level. The latest published
maps are in the project document. (See H. Doc. 119, 80th Cong., 1st
sess.)
   Local cooperation.-Nonerequired.
   Operations and results during the fiscal year.-Foundationinvesti-
gations were continued, and a hydrographic survey of the 2 miles of
river immediately downstream from the dam site was accomplished.
Laboratory analysis of samples was begun. The Public Health Serv-
ice made a field investigation of the river in the reservoir area and
downstream therefrom and issued a report on low-flow control for
pollution abatement. Engineering and economic studies were con-
tinued, and a design memorandum was prepared. The total costs, all
for new work, were $70,220.34. The total expenditures were
$77,838.96.
   Condition at end of fiscal year.-No construction work has been
done. Field investigations in conjunction with preliminary design
are approximately 60 percent complete. Further engineering studies
have been indefinitely postponed. The work remaining to be done
is completion of field investigation, planning, and engineering studies;
initiation and completion of detailed design; preparation of contract
plans and specifications, all by hired labor; and construction of the
project by contract. The total costs, all for new work, were $138,-
770.87. The total expenditures were $134,552.18.
   Proposed operations.-The balance unexpended on June 30, 1952,
$7,447.82, will be applied as follows:
Accounts payable, June 30, 1952_--------------------------------    $4, 218. 69
New work: Completion of laboratory analyses, and miscellaneous re-
  ports, by hired labor, July 1, 1952, to June 30, 1953------------  3,229. 13
                                                                     3--,
          Total for all work-----------------------                                        -----------            7, 447. 82
   No work is scheduled for the fiscal year 1954.
                                         Cost and financial summary

                                                     Fiscal year ending June 30                               Total to June
                                                                                                              30, 1952, includ-
                                                                                                              ing fiscal years
                                      1948         1949          1950             1951            1952          prior to1948

New work:
   Appropriated ........           $10,000.00 ------------          ...--------$100,000.00     $32,000. 00        $142,000.00
   Cost-------------         ---        21. 33  $4, 437. 33   $5,541.34          58, 550. 53    70, 220.34         138, 770. 87
   Expenditures---------.......         21.33    5, 664. 25    4, 314. 42        46, 713. 22    77, 838. 96        134, 552.18


Other new work data:
    Unobligated balance, June 30, 1952------------------------                                                  $1, 331. 37
    Unobligated balance available for fiscal year 1953----------                                                 1, 331. 37
     Estimated additional amount needed to be appropriated for
       completion of existing project -- -------------         40, 942, 000. 00
416              REPORT OF CHIEF OF ENGINEERS,                                          U.      S.       ARMY,       1952


21.PRELIMINARY                         EXAMINATIONS, SURVEYS,                                    AND         CONTINGENCIES
                                           FOR FLOOD CONTROL

   The cost of work during the fiscal year was $3,203.97. Total ex-
penditures were $3,010.77. The balance unexpended June 30, 1952,
amounting to $1,283.76, plus an allotment for fiscal year 1953 of
$1,500, a total of $2,783.76, will be applied during fiscal year 1953 as
follows:
Accounts payable, June 30, 1952---------------------------------- $782. 11
Contingencies______ ___________    _              -------------- 2, 001. 65
              Total for all work-----------------------------------                                                          2, 783. 76
   The additional sum of $9,500 can be profitably expended during
fiscal year 1954 for contingencies.
                                             Cost and financial summary

                                                          Fiscal year ending June 30                                      Total to June
                                                                                                                         30, 1952, includ-
                                                                                                                         ing fiscal years
                                         1948           1949               1950               1951           1952          priorto 1948

Maintenance:
   Appropriated.........              $48,000. 00    $36, 250.00     $35, 000. 00     $23, 500. 00 -$4, 000.00                $894, 700. 00
       Cost                           49, 076.63
                                 .--------------- 37, 294.89          32, 838.74        26, 639.37          3, 203.97          894, 198.35
      Expenditures--------.........    47, 033. 97    34, 961. 21     35, 061.50        28, 713.02          3, 010. 77         893, 416. 24



                            22. INACTIVE FLOOD CONTROL PROJECTS

                                                                                  Cost and expenditures to
                                                                For last                June 30, 1952                      Estimated
                      Name of project                          full report I                                               amount re-
                                                              see Annual                                                    quired to
                                                              Report for-           New work               Mainte-          complete
                                                                                                           nance


1.   Washington, D. C. and vicinity 1.......----.....               1950    2 $331, 926.59 ...........------------.            $1, 475,000
2.   Harpers Ferry, W.4 Va......--------------------
                        -                                           1937                                                           432, 000
3.   Moorefield, W. Va.                   ___________               1941         7, 928. 12 ............--------                 3 327, 400
4.   Waynesboro, Va.---------------------                                                   ............
                                                                    1950---------------------------                             2, 846, 000
5.   Emergency flood-control work under au-
       thority of the Flood Control Act approved
    Aug. 18, 1941--..-------------------------                      1950       ---------------            $56, 274. 18     ----------
6. Snagging and clearing under authority of
    section 2 of the Flood Control Act ap-
    proved Aug. 28, 1937, as amended--------.......                 1950    ---------------                18,418.30
7. Emergency flood-control work under au-
    thority of section 208 of the Flood Control
    Act approved June 30, 1948---- ---------                        1951---          .-....          .    105, 812. 71

     1 Awaiting local cooperation.
2 In addition, $161,995.39, expended for work included in the Boelling Field project authorized by the
Emergency Relief Appropriation Act approved June 22, 1936 and $5,000 reimbursed by the District of
Columbia covering its share for construction of earth embankment over Stickfoot Branch sewer.
  3 Cost revised in 1952.
  4 Recommended for abandonment.in Survey report on Potomac River dated 30 Apr. 1944, published as
H. Doec. 622, 79th Cong., 2d sess.
  6 No funds available.
                 FLOOD CONTROL---WASHINGTON,                              D. C., DISTRICT                   417
                             23. MISCELLANEOUS ACTIVITIES

Status of all investigations for flood control called for by flood control acts and
                              committee resolutions

                                                                           Date trans-       Document  Recom
               Locality                       Authorization act            mitted to           No.    mendation
                                                                            Congress                  menda

Big Wills Creek, Pa., for flood con-      Flood Control Committee        --------------      ------------
  trol at and in the vicinity of Hynd-      resolution, July 23, 1946.
  man Borough, Pa.
Front Royal, Va., flood control on       Flood Control Commit-             -------------     ------------
  Happy Creek, Va., tributary of           tee resolution, July 5,
  the Potomac River.                       1946.
Gilbert Run, Charles County, Md.,        Flood Control Act, May            .r   -----    _

  for flood control and drainage.          17, 1950.
Happy Creek, Potomac River, flood        Flood Control Committee                             -----------
  protection for Front Royal, Va.          resolution, July 5, 1946.
Hyndman Borough, Pa., for flood          Flood Control Committee                             -----------
  control on Big Wills Creek, tribu-       resolution, July 23, 1946.
  tary of the Potomac River.
Little Wills Creek, Pa., for flood       .....do....................     ---------------     ---- -------

  control at and in vicinity of Hynd-
  man Borough, Va.
North River and tributaries, Va., for    House Public Works Com-          --------------     ------------
  flood control of Potomac River.          mittee resolution, Oct.
                                           15, 1949.
Port Tobacco Run, Charles County,        Flood Control Act, May                              -----------
  Md., (Tobacco Run) for flood con-        17, 1950.
  trol and drainage.
Potomac River and tributaries, for        Flood Control Committee        -------------       ------- - -
  protection along Big Wills and Lit-      resolution, July 23, 1946.
  tle Wills Creek, Pa., at and in the
vicinity of Hyndman Borough, Pa.
Potomac River, flood control on           Flood Control Committee
  Happy Creek for Front Royal and          resolution, July 5, 1946.
  vicinity, Va.
Potomac River for flood control on       House Public Works Com-                    ._




  North River and tributaries, Va.        mittee resolution, Oct.
                                          15, 1949.
Potomac River for flood control on       House Public Works Com-         ---------------

  the South Branch and tributaries,       mittee resolution, June
  W. Va., in Grant, Hardy and Pen-        27, 1950.
  dleton Counties.
Potomac River and tributaries,           Senate Public Works
  South Branch, Md., Va., W. Va.,         Committee resolution
  and Pa.                                 Jan. 20, 1950.
Potomac River and tributaries, for       House Public Works Com-         ---------------
  flood control in vicinity of Wil-       mittee resolution, Aug.
  liamsport, Md.                          17, 1949.
South Branch of Potomac River and        House Public Works Com-
  tributaries, W. Va., for flood con-     mittee resolution, June
  trol in Grant, Hardy and Pendle-        27, 1950.                      ---------------
  ton Counties.
South Branch of Potomac River and        Senate Public Works
  tributaries, Md., Va., W. Va., and       Committee resolution,
  Pa.                                      Jan. 20, 1950.
Williamsport, Md., vicinity of, for      House Public Works Com-
  flood control on Potomac River           mittee resolution, Aug.
  and tributaries.                         17, 1949.
Wills Creek (Big and Little), Pa., for   Flood Control Committee         ----------------

  flood control at and in the vicinity    resolution, July 23, 1946.
  of Hyndman Borough, Pa.



24. EMERGENCY FLOOD-CONTROL WORK UNDER AUTHORITY OF THE
          FLOOD CONTROL ACT APPROVED JUNE 23, 1947

  Public Law 102, Eightieth Congress, approved June 23, 1947, auth-
orized the sum of $15,000,000 to be appropriated as an emergency fund
to be expended under the direction of the Secretary of the Army and
the supervision of the Chief of Engineers for the repair, restoration,
and strengthening of levees and other flood-control works which have
been threatened or destroyed by recent floods, or which may be threat-
ened or destroyed by later floods.
418        REPORT OF             CHIIEF        OF ENGINEERS,                 U. S. ARMY,          1952

   Pursuant to this act emergency repairs were made to the upper
4,000 feet of the Anacostia levee located on the left bank of the
Anacostia River at river mile 1.5 in the District of Columbia, with
an allotment of $36,000, made in the fiscal year 1948. The work con-
sisted of repairs, by contract, for restoration of a section of levee to
its original grade and cross section. Plans and specifications were
completed in the fiscal year 1948 at a cost of $2,483.02. Construction
work consisting of 4,635 cubic yards of earth fill, 1,282 cubic yards of
topsoil and 2.3 acres of soil preparation and seeding was started in
July 1948 and completed in November 1948.
   Studies were made throughout the year for construction of emer-
gency flood protection works for Washington, D. C., and vicinity at a
cost of $475.78. Expenditures were $244.22.
   Total costs to June 30, 1952 were $29,303.43. Total expenditures
were $29,043.28.
   The balance unexpended June 30, 1952, $6,956.72, less accounts pay-
able of $260.15, will be used for completing the preparation of plans
and specifications for the construction of emergency flood protection
structures for Washington, D. C., and vicinity.
                                     Cost and financial summary

                                                    Fiscal year ending June 30                      Total to June
                                                                                                   30,1952, includ-
                                                                                                    ing fiscal years
                                 1948             1949             1950       1951         1952         prior to 1948


Maintenance:
   Appropriated ------       $36,000.00 -------------------------------                  ------------       $36,000.00
   Cost-----------------        2,483.02      $23, 050. 78--$3,                293. 85      $475. 78         29, 303. 43
   Expenditures   .....--------.. 1, 129.07    24, 380.48          $24. 25   3,265. 26       244.22          29, 043.28



25. SMALL FLOOD-CONTROL PROJECTS UNDER AUTHORITY OF SEC-
  TION 205 OF THE FLOOD CONTROL ACT APPROVED JUNE 30, 1948 AS
   AMENDED BY SECTION 212 OF THE FLOOD CONTROL ACT APPROVED
   MAY 17, 1950
    The Flood Control Act approved June 30, 1948, as amended by Sec-
tion 212 of the Flood Control Act approved May 17, 1950 authorizes
allotments of not to exceed $3,000,000 for any one fiscal year for the
construction of small flood-control projects not specifically authorized
by Congress, and not within areas intended to be protected by projects
so authorized, which come within the provisions of Section 1 of the
Flood Control Act of June 22, 1936, when such work is advisable;
provided that not more than $150,000 shall be allotted for this pur-
pose at any single locality for any one fiscal year; that the provisions
of local cooperation specified in Section 3 of the Flood Control Act
approved June 22, 1936, as amended, shall apply and that the work
shall be complete in itself and not commit the United States to any
additional improvement to insure its successful operation.
   Pursuant to this act the sum of $95,000 was allotted in the fiscal
year 1950, and $45,000 in the fiscal year 1951, a total of $140,000, for
the construction of earth levees and appurtenances in the town of
Bridgewater, Va., at the junction of North River and Dry River. The
plan of improvement provides for construction of approximately
                  FLOOD CONTROL---WASHINGTON,                                D.    C., DISTRICT                    419
4,610 lineal feet of earth levee extending upstream from high ground
near the junction of North and Dry Rivers, along the low ridge to
high ground at a point approximately 2,000 feet from the left bank
of Dry River. The levee varies in height up to 17 feet and has an
average height of approximately 10 feet with a top width of 10 feet
and side slopes of 1 on 21/. Two county roads and a farm road pass
over the levee. Two drainage structures are included.
   The total estimated cost to the Federal Government, made in Octo-
ber 1950, is $140,000, and to local interests $29,400.
  Local cooperation.-See pages 4-5 for requirements. The town
council of Bridgewater has given assurances that the required local
cooperation will be furnished.
   Operations and results during fiscal year.-A contract for construc-
tion of the earth levee and drainage structures was completed in April
1952. Costs for the fiscal year were $113,932.76, Federal funds, all for
new work. Total expenditures were $90,719.53, Federal funds.
   Conditionat end of fiscal year.-Constructionof the levee and drain-
age structures was completed in April 1952. Total costs to June 30,
1952, were $136,513.02, Federal funds, all for new work. Total ex-
penditures were $111,357.48, Federal funds.
  Proposed operatians.-The balance unexpended June 30, 1952,
$28,642.52, will be applied as follows:
Accounts payable June 30, 1952_----          --------------------      $25,155. 54
New work :
   Preparation of operating regulations and final payment for work
     unobligated at end of fiscal year (July 1 to Sept. 30, 1952)....    1, 486. 98
   Unallocated funds --------     -----.-. --------               __ _-2, 000. 00
        Total for all work_-----------------                                      --       _-             28, 642. 52
   The project will be completed with available funds and no addi-
tional work is scheduled for the fiscal year 1954.
                                         Cost and financial summary

                                                   Fiscal year ending June 30                            Total to June
                                                                                                        30,1952, includ-
                                                                                                        ing fiscal years
                                    1948          1949           1950          1951         1952         prior to 1948

New Work:
   Appropriated_ -------------.------------                  $95, 000. 00   $45,000.00 -------------          140, 000. 00
   Cost--....------......----.......------ ----------------- 3, 363. 86     19, 216.40 $113,932.76            136, 513. 02
   Expenditures.........
              ---------------                 ------------     3, 147. 78   17, 490. 17   90, 719. 53         111, 357. 48


Other new work data:
    Unobligated balance, June 30, 1952 -_        ___--_------------$3, 486.98
    Unobligated balance available for fiscal year 1953___
                                                       ----------    3, 486. 98
													   
													   
IMPROVEMENT OF RIVERS AND HARBORS IN THE NORFOLK, VA., DISTRICT*
 This district comprises a small portion of southeastern West Vir-
ginia, central and eastern Virginia, and a portion of northern North
Carolina embraced in the west shore drainage basins tributary to the
southern part of Chesapeake Bay south of the watershed line between
the northerly arm of Winter Harbor and Garden Creek, Va., and the
eastern shore drainage basins south of and including Onancock River,
Va.; the drainage tributary to the Atlantic Ocean from White Creek
and Gargathy Inlet, inclusive, to the Virginia-North Carolina State
line; the Roanoke River Basin above Weldon, N. C.; the Meherrin
River Basin above Murfreesboro, N. C.; and the Chowan River Basin
above the confluence of the Nottoway and Blackwater Rivei, Va.
It also includes the Virginia portion of the Intracoastal Waterways
between Norfolk, Va., and Beaufort Inlet, N. C., and the portion of
the waterway from Norfolk to the sounds of North Carolina north
of Albemarle Sound.
   District engineer: Col. W. F. Powers, Corps of Engineers.
   Division engineer of the North Atlantic Division, New York, N. Y.,
comprising the New York, N. Y., Philadelphia, Pa., Baltimore, Md.,
Washington, D. C., and Norfolk, Va. districts: Col. F. F. Frech,
Corps of Engineers to March 14, 1952; Col. B. B. Talley, Corps of
Engineers since that date.
                                    IMPROVEMENTS

                 Navigation                          Navigation-Continued
                                     Page                                          Page
1.   Quinby Creek, Va .               422   15. Plant allotment_       --          452
2.
3.
      Oyster Channel, Va ---
      York Spit Channel, Va --
                                --     423
                                       425
                                             16. Inactive navigation projects.
                                             17. Miscellaneous activities ...
                                                                                    453
                                                                                    453
4.   Thimble Shoal Channel, Va_       427
5.   Little River (Creek), Va.--      428                 Flood Control
6.   James River, Va__ --      --     430
7.   Nansemond River, Va -----        434   18. Roanoke River basin, Va.
8.   Willoughby Channel, Va       .   435         and N. C-                        455
9.   Newport News Creek, Va___        436   19. John H. Kerr Reservoir,
10.   Channel to Newport News,                     Roanoke River basin, Va.
        Va--_-                         438         and N. C_ _-_ ---                457
11. Norfolk Harbor, Va -.....          439   20. Philpott Reservoir, Roanoke
12. Hampton Roads and the                          River basin, Va_                 461
     harbors of Norfolk and                  21. Gathright Reservoir and Fall-
      Newport    News,    Va.-                     ing Spring Reregulating
        Collection and removal of                  Dam, James River basin,
        drift _                _       446         Va__------                       463
13. Atlantic Intracoastal Water-             22. Preliminary       examinations,
        way between Norfolk, Va.                   surveys, and contingencies
      and the St. Johns River,                     for flood control, general _     464
     Fla. (Norfolk district) -_        447   23. Inactive flood control proj-
14. Examinations, Surveys, and                     ects    _ _- _-                  465
      Contingencies (General) -        452   24. Miscellaneous activities ..        465
                                                                             421
422     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                         1. QUINBY CREEK, VA.

   Location.-This creek is an indeterminate natural channel on the
Atlantic Ocean side of the Delmarva Peninsula about 32 miles north
of Cape Charles and about 33 miles south of Chincoteague, Va. The
creek extends in a generally southeasterly direction between Quinby
Landing at Quinby, Va., and the head of Tony's Rock Drain, a distance
of 6,900 feet. (See U. S. Coast and Geodetic Survey Chart No. 1221.)
   Existing project.-This provides for a channel 8 feet deep at mean
low water and 80 feet wide from that depth in Upshurs Bay to a point
600 feet bayward from Quinby Landing, thence 60 feet wide from
Quinby Landing, a total distance of about 6,900 feet, and a turning
and mooring basin of the same depth, 200 feet wide and 400 feet long
opposite the public terminal and landing. The mean range of lunar
tides is 4.4 feet with variations caused by storms of from 2 feet below
to 12 feet above mean low water.
   The estimate of cost for new work, revised in 1952, was $124,900.
The latest (1950) approved estimate for annual cost of maintenance
is $6,000.
   The existing project was adopted by the River and Harbor Act
of May 17, 1950 (H. Doc. 241, 81st Cong., 1st sess.). The latest
published map is in that document.
   Local cooperation.-The River and Harbor Act of May 17, 1950,
in adopting the existing project, imposed the conditions that respon-
sible local interests give assurances satisfactory to the Secretary of
the Army that they will (a) provide without cost to the United States
all lands, easements, rights-of-way, and spoil-disposal areas for con-
struction and subsequent maintenance of the project, when and as
required; (b) hold and save the United States free from damage due
to the construction and maintenance of the project, including such
damage as may occur to public or leased oyster and clam beds; (c)
provide at their own expense suitable mooring facilities within the
basin and terminal facilities adjacent thereto with suitable access
road and parking area all of which shall be open to all on equal terms;
and (d) establish and enforce suitable regulations governing the
movement and anchorage of craft in the vicinity of the improvement.
Assurances of local interests that the conditions of local cooperation
would be met were approved by the Secretary of the Army on Feb-
ruary 28, 1952. Easements to the turning basin area and spoil-disposal
permits have been furnished.
   Terminal facilities.-There are two open-pile wooden wharves and
about 125 feet of wooden bulkhead at Quinby, Va. The wharves are
privately owned but the bulkhead is public and is open to all on equal
terms. There is also one marine railway which is not now in use.
With the construction of the facilities required of local interests, it is
considered "that these facilities will be adequate for existing and
reasonably prospective commerce.
   Operations and results during fiscal year.--New work preliminary
engineering, consisting of surveys, investigation of disposal areas,
preparation of plans and specifications, etc., with Government plant
an hired labor, for partial completion of the existing project, was
carried on during the year at a cost of $1,226.29.
                  RIVERS AND HARBORS---NORFOLK, VA.,    DISTRICT                423
   New work dredging, by contract, for partial completion of the
existing project to a depth of 3 feet at mean low water over bottom
widths of 35 and 40 feet in the channel and 53 feet in the turning
basin, was commenced May 23, 1952 and continued to the end of the
fiscal year. There were removed 35,130 cubic yards of material, place
measurement. The cost of the work was $18,238.52.
   The total cost of the work was $19,464.81, all for new work. The
total expenditure was $4,592.04.
   Condition at end of fl~cad year.-The existing project was about 15
percent complete at the end of the fiscal year. Construction of a
portion of the existing project to provide for reduced widths and
depths was commenced in May 1952 and was still in progress at the
end of the fiscal year. The controlling depths at mean low water are
3.8 feet in the channel and 4.7 feet in the turning basin.
   The head of navigation for boat traffic is Quinby Landing at Quinby,
Va. Navigation is practicable throughout the year.
   The work remaining to complete the project consists of deepening
the channel to a depth of 8 feet at mean low water over a width of 80
feet from that depth in Upshur Bay to a point 600 feet wide to
Quinby Landing, a total distance of 6,900 feet, and a turning and
mooring basin of the same depth, 200 feet wide and 400 feet long
opposite the public terminal and landing.
   The total cost of the existing project to June 30, 1952 was $19,464.81,
all for new work. The total expenditure was $4,592.04.
   Proposed operations.-The unexpended balance on June 30, 1952 in
the amount of $18,683.96 will be applied as follows:
Accounts payable June 30, 1952- -_-_-_              ._-_--.-----_-.  $14, 872. 77
New work: Dredging to complete contract in the channel and turning
  basin to a partial depth of 3 feet at mean low water and widths of
  35 and 40 feet, 0.5 month, July 1952--------.....----------------    3, 811. 19

         Total for all work-_-_-_----...                                 -
                                                                        _-_-__- ----                            _-            18, 683. 96
  No work is scheduled for the fiscal year 1954.
                                                Cost and financial summary

                                                                  Fiscal year ending June 30                                Total to June
                                                                                                                            30,1952, includ.
                                                                                                                            ing fiscal years
                                            1948                1949              1950               1951        1952        priorto 1948


New work:
   Appropriated--                - ------------------                   ----------------------               $23,276. 00          $23,276.00
                                           .
   Cost-----------------------.................. --------------------                            ------------ 19, 464. 81          19, 464.81
   Expenditures.........               ----------------------------------------------                           4, 592.04           4,592.04


Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project----........-------- $101, 624

                                                2. OYSTER CHANNEL, VA.

  Location.-Oyster Channel is located on the lower eastern side
of the Delmarva Peninsula which separates Chesapeake Bay from
the Atlantic Ocean. It is about 11 miles north of Cape Charles
and about 57 miles south along the Atlantic coast from the Virginia-
424       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                  1952

Maryland State line.            (See U. S. Coast and Geodetic Survey Chart
No. 1222.)
  -Fi  sting project.--This provides for a channel, about 0.9 mile
long, 60 feet wide, and 6 feet deep at mean low water, from deep
water in Liscombes Channel to and including a turning basin of
the same depth 200 feet long and 125 feet wide along the water-
front at Oyster, Va. The mean range of tide is about 4.4 feet.
Greater fluctuations in water level are caused by prolonged high
winds along this section of the Atlantic coast.
   The cost for new work for the completed project was $54,600.
The latest (1950) approved estimate for annual cost of maintenance
is $1,000.
   The existing project was adopted by the River and Harbor Act
of March 2, 1945 (H. Doc. 716, 76th Cong., 3d sess.). The latest
published map is in the project document.
   Local cooperation.-Fully complied with as to initial construc-
tion. Local interests are required to furnish suitable spoil-disposal
areas for future maintenance.
   Terminal facilities.--There are five privately owned timber wharves
and one publicly owned wooden bulkhead with a total wharfage space
of about 1,100 feet along the waterfront at Oyster, Va. There is also
a marine railway which will accommodate vessels up to 50 feet in
length. The facilities have highway connection with the county and
State systems. The facilities are considered adequate for existing
commerce.
    Operations and results during fiscal year.-None.
   Condition at end of fscal year.-Construction of the existing project
was commenced January 1948 and completed in May 1948. The
controlling depths at mean low water are as follows:

                                                                       Controlling
                                                                   depths, 80 per-
                                                                   cent of project     Date deter-
                         Name of channel                           width, 40 per-        mined
                                                                   cent on either
                                                                    side of center
                                                                      line (feet)

Channel----.------------------------------------------------------         5.0         May 1950.
Turning basin-------------------------------------------------------       4.5              Do.


  The head of navigation for boat traffic is about 200 feet above the
turning basin at the head of the project. Navigation is practicable
throughout the year.
  The total cost and expenditure of the existing project to June 30,
1952 was $61,536.23, of which $54,600 was for new work and $6,936.23,
for maintenance.
  Proposed operations.--No work is scheduled during the fiscal year
1953.
  The sum of $23,000 can be profitably expended for the following
schedule of work during the fiscal year 1954:
                    RIVERS             AND HARBORS-NORFOLK,                                          VA.,    DISTRICT                      425
Maintenance:
       Dredging by contract, to restore channel and turning basin to project
        dimensions, 1 month, February 1954----------------------- $20, 000
       Condition survey, with Government plant and hired labor, 0.5 month,
         October 1953--3,----------------------------------------            3000

          Total for all work                              -------------------------------------                                         23, 000

                                                   Cost and financial summary

                                                                  Fiscal year ending June 30                                   Total to June
                                                                                                                              30,1952, includ-
                                                                                                                              ing fiscal years
                                              1948               1949           1950                1951         1952          priorto 1948

New work:
   Appropriated- ..... .   $54; 600                               ------------                                                         $54, 600. 00
   Cost.-----------------54,    600 --------------------------------------------                                                        54, 600. 00
   Expenditures             .....---------     54, 600 --                    _54,                                                          600. 00
Maintenance:
    Appropriated-------
                ........                           ...------------ $5, 000    $5, 000. 00        -$3, 063. 77 -------------              6, 936. 23
    Cost--...............                     --                  -5,000       1, 936. 23 -----------------------                        6,936. 23
    Expenditures ---------------------                             5, 000      1, 936. 23 ----------------------                   -     6, 936. 23



                                               3. YORK SPIT CHANNEL, VA.

   Location.-York Spit Channel lies in the lower Chesapeake Bay op-
posite the mouth of York River and about 20 miles northerly from
Atlantic Ocean at the entrance of Chesapeake Bay. (See U. S. Coast
and Geodetic Survey Chart No. 1222.)
   Previous project.-The original project was adopted March 3, 1905.
For further details see page 389 of the annual report for 1932.
   Existing project.--This provides for a channel approximately 6.77
miles long, 1,000 feet wide, and 39 feet deep at mean low water be-
tween the contours of that depth in Chesapeake Bay opposite York
Spit. Under ordinary conditions the mean tidal range is 2.5 feet and
extreme 3.3 feet. The extremes of irregular fluctuation, due to com-
bined wind and tides, referred to mean low water, are minus 2 feet
and plus 9.5 feet.
   The cost for new work for the completed project was $673,410. The
latest (1950) approved estimate for annual cost of maintenance is
$36,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                                  Work authorized                                                  Documents

Mar.    3,1905      A channel 35 feet deep and 600 feet wide_----                           H.    Doc. 186, 57th Cong., 2d sess.
Mar.    4, 1913     Channel width increased to 1,000 feet....----                           H.    Doc. 1190, 62d Cong., 3d sess.
July    3. 1930     Channel depth increased to 37 feet....----------                        H.    Doc. 29, 71st Cong., 1st sess.
Mar.    2, 1945     Channel depth increased to 39 feet......----------                      In    accordance with report on file in office
                                                                                                 of the Chief of Engineers dated June 30,
                                                                                                 1942. (Contains latest published map.)


  LoQal cooperation.-None required.
   Terminal facilities.-York Spit Channel is an access channel be-
tween lower and upper Chesapeake Bay. No terminal facilities are
located on the project.
426     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                1952

   Operations and results during fiscal year.-New work dredging, to
complete the existing project, with the United States hopper dredge
SOomer,   which was suspended to accomplish more urgent work, was
resumed on February 1, 1952 and continued to February 22, 1952 when
the work was completed. There were removed 243,075 cubic yards of
material, credited place measurement. The cost of the work was
$97,323.78.
   Maintenance revisions and adjustments to a raydist hyperbolic
control system, with Government plant and hired labor, were made
during the year at a cost of $986.02.
   Maintenance repairs and upkeep to the tide gage structure and light,
with Government plant and hired labor, were made during the year
at a cost of $785.08.
   The total cost of the work was $99,094.88, of which $97,323.78 was
for new work and $1,771.10 for maintenance. The total expenditure
was $98,699.69.
   Conditionat end of fiscal year.-Constructionof the existing project
was commenced in 1932 and continued intermittently to February 1952
when the project was completed. The controlling depths as ascer-
tained in March 1952 were 40 feet in midchannel and 40 feet along the
edges. Depths are referred to mean low water.
   The total cost and expenditure of the existing project prior to fiscal
year 1942 was included in the project for Baltimore Harbor and
Channels, Md. Since that date, the total cost and expenditure to
June 30, 1952 was $1,509,485.86, of which $673,410.32 was for new work
and $836,075.54 for maintenance.
   Proposedoperations.-The unexpended balance on June 30, 1952 in
the amount of $13,551.90 will be applied as follows:
Accounts payable June 30,-1952------------------------------            $936.02
Maintenance :
    Condition survey, with Government plant and hired
      labor, 0.5 month, September 1952-------------- $7,000. 00
    Revisions and adjustments to raydist hyperbolic
      control system, with Government plant and hired
      labor, intermittently, July 1952-June 1953------   3, 615. 88
    Maintenance and repairs to tide gage structure and
      light, with Government plant and hired labor, when
      and as needed----------------------------          2, 000. 00

        Total maintenance--        ------------------------------   $12, 615. 88

        Total for all work----     ------------------------------     13, 551.90
   The additional sum of $117,500 can be profitably expended for the
following schedule of work during the fiscal year 1954:
Maintenance:
    Dredging, with a United States hopper dredge, 1 month,
      April 1954---------------------------------------$100, 000. 00
Condition survey, with Government plant and hired labor, 1 month,
October 1953----------         --------------------------------    10, 000. 00
Miscellaneous inspections and reports, with Government plant and
hired labor, 12 months, July 1953-June, 1954 ..-------------------  7, 500. 00

      Total for all work .--..--------------------------.--         117, 500. 00
                 RIVERS AND IHARBORS--NORFOLK;                                        VA.,        DISTRICT                 427
                                         Cost and financial summary

                                                       Fiscal year ending June 30                                 Total to June
                                                                                                                 30,1952, includ-
                                                                                                                 ing fiscal years
                                     1948           1949            1950             1951           1952           prior to1948

New work:
   Appropriated------          ------------.........
                                          $8, 500.00 $400,000.00
                                       ............ 5, 747.03 401, 612. 80
   Cost .........--------------------------
                                                                                  $300, 000. 00 -$100,000.00
                                                                                    94, 368. 13    97, 323. 78
                                                                                                                     $682, 858. 58
                                                                                                                     1 673, 410. 32
   Expenditures--------.........------------............ 5, 747.03 401, 612. 80     93,107. 05     98, 584. 86       1 673, 410. 32
Maintenance:
   Appropriated-.........        $172, 000. 00    146, 000. 00        650. 00        5, 500. 00    12,500. 00          848, 691.42
   Cost---------------            146, 708. 13    178, 623. 99      1,139. 75        3, 613. 02     1, 771. 10       1 836,075.54
   Expenditures--........         146, 708.13     178, 623.99       1,139. 75        4, 333.27         114. 831       835, 139. 52


Other new work data:
   Unobligated balance, June 30, 1952__------------------------$9, 448. 26
   Revocation for fiscal year ending June 30, 1953----------- ---- 9, 448. 26
  1Costs and expenditures prior to fiscal year 1942 are included in the project "Baltimore Harbor and
Channels."

                                4. THIMBLE SHOAL CHANNEL, VA.

   Location.-Thimble Shoal Channel lies in lower portion of Chesa-
peake Bay between Hampton Roads and the ocean, and is 20 miles
northeast of the center of Norfolk Harbor, extending southeasterly 11
miles from a point 11/4 miles east of Thimble Shoal Lighthouse toward
the entrance to Chesapeake Bay. (See U. S. Coast and Geodetic Sur-
vey Chart No. 1222.)
   Previousprojects.-Adopted by River and Harbor Act of June 25,
1910. For further details see page 470, annual report for 1932.
   Existing project.-This provides for dredging a channel 11 miles
long, 750 feet wide, and 40 feet deep at mean low water. Under ordi-
nary conditions the mean tidal range is 2.6 feet and the extremes 2
and 3 feet. The extremes of irregular fluctuation, due to combined
wind and tides, referred to mean low water, are minus 2 feet and
plus 9.5 feet.
   The cost for new work, for the completed project, was $2,283,773,
exclusive of amounts expended on previous projects. The: latest
 (1952) approved estimate of cost of annual maintenance is $26,500.
   The existing project was adopted by the River and Harbor Act of
August 8, 1917 (H. Doc. 140, 65th Cong., 1st sess.). The latest pub-
lished map is in House Document No. 551, Sixty-first Congress, sec-
ond session.
   Local cooperation.-None required.
   Terminal facilities.--This project serves as an entrance channel to
Hampton Roads. For a description of terminal facilities, see this
heading under "Norfolk Harbor, Va.," "Channel to Newport News,
Va." etc.
   Operations and results during fiscal year.--A maintenance condi-
tion survey, with Government plant and hired labor, was made during
the year at a cost of $4,319.22.
   Maintenance revisions and adjustments to a raydist hyperbolic con-
trol system, with Government plant and hired labor, were made dur-
ing the year at a cost of $1,187.66.
   The total cost of the work was $5,506.88 all for maintenance. The
total expenditure was $2,811.04.
428             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   Condition at end of fiscal year.-Construction of the existing proj-
ect was commenced in December 1917 and continued intermittently to
June 1929 when the work was completed. The controlling depth, as
ascertained in June 1952, was 40.0 feet in midchannel and 40.0 feet
along the edges. Depths are referred to mean low water.
   The total cost of the existing project to June 30, 1952, was $3,395,-
203.46, of which $2,283,772.56 was for new work and $1,111,430.90,
for maintenance. The total expenditure was $3,392,507.62.
  Proposed operations.-The unexpended balance on June 30, 1952
in' the amount of $6,1'88.96 plus an allotment of $131,506.88 for fiscal
year 1953, a total of $137,695.84 will be applied as follows:
Accounts payable June 30, 1952------------------------------$2, 695. 84
Maintenance :
    Dredging with a United States hopper dredge, 1.2
      mont s, February-March 1953 ---------------     $127,000
    Prelimi ary engineering for maintenance dredging,
      consisting of surveys, preparation of plans and
      specifications, etc., with Government plant and
      hired labor, 1 month, December 1952____________    8, 000
                Total maintenance..-------------1------------------35, 000. 00

                Total for all work----------                                                                      -                             137, 695. 84
                                                                                                                                      -____________
  The additional sum of $7,000 can be profitably expended for the
following schedule of work during the fiscal year 1954:
Maintenance: Condition survey, with Government plant and hired labor,
1 month, May 1954_              -----------------         ------     $,0--------
                                                                      $7,000
           Total for all work ----------                                                 ---------------------------                                          7, 000

                                                       Cost and financial summary

                                                                           Fiscal year ending June 30                                                Total to June
                                                                                       ...                                                           30,1952, includ.
                                                                                                                                                     ing fiscal years
                                                  1948                  1949                   1950                   1951               1952         priorto 1948
New work:
   Appropriated------------------.........-------............-------------.......... ..........------------........................                    $2, 617, 381.44
   Cost              ---------------------------------------------------------------                                                                    2, 617, 381.44
   Expenditures                         ---------------------------------------------------------                                                       2,617,381.44
Maintenance:
    Appropriated------                         $3,050.00             $8, 500. 00             $5, 000. 00         $1, 062.94            $9, 000. 00      1,114, 924. 02
    Cost----------------                        1,937. 49            10,101. 23               4, 350. 10          3, 215. 02            5, 506. 88      1,111, 430. 90
    Expenditures---------                       1,937.49             10,101. 23               4, 350. 10          3, 215. 02            2,811.04        1, 108, 735. 06



                                                5. LITTLE RIVER (CREEK), VA.

  Location.-Little Creek is a tidal estuary entering the south side
of Chesapeake Bay, Va., about 31/2 miles east of the corporate limits
of the city of Norfolk and 9 miles west of Cape Henry. (See U. S.
Coast and Geodetic Survey Charts Nos. 481 and 1222.)
  Existing project.-This provides for maintenance of an existing
channel 20 feet deep and 400 feet wide extending inshore from that
depth in Chesapeake Bay to the terminals of the Pennsylvania Rail-
road System, a distance of about 1.4 miles, including a basin adjacent
to the terminals of the same depth 400 to 1,240 feet wide and 1,160
                RIVERS AND HARBORS-NORFOLK,                                      VA.,    DISTRICT                  429
feet long. All depths are referred to mean low water. Under ordi-
nary conditions the mean tidal range is 2.6 feet, with extremes of
-2 and +9.5 feet occurring during storm periods.
   The estimate of cost (1950) for annual maintenance is $20,000.
   The existing project was authorized by the River and Harbor Act
of March 2, 1945, in accordance with a report on file in the office of
the Chief of Engineers.
   Local cooperation.-None required.
    Terminal facilities.-The Pennsylvania Railroad maintains at its
terminal a small pier, two ferry slips and two floating bridges for
transfer of freight cars to and from its ferries, and berth for mooring
tugs and car ferries, aggregating approximately 950 lineal feet. The
Virginia Ferry Corp. maintains a ferry slip and foot wharf at the
railroad terminal. Extensive Government-owned facilities are main-
tained on the waterway and at the head of the project. There are
no publicly owned facilities on the waterway. The facilities are con-
sidered adequate for existing commerce.
    Operations and results during fiscal year.-None.
    Condition at end of fiscal year.-This is an artificial channel, origi-
nally dredged to a depth of 17 feet and width of 300 feet, supple-
mented by protection works consisting of stone jetties and wood bulk-
heads, all of which were provided by the Pennsylvania Railroad Co.
under War Department permit. The dredging was completed in 1930.
The cost is unknown. The channel was subsequently enlarged by the
Navy Department to the existing project dimensions. The enlarge-
ment was commenced on April 5, 1942, and completed on May 26, 1943.
The cost of the work was $185,618.40, of which $168,623.40 was Federal
funds expended by United States Navy and $16,995 was contributed
by the Pennsylvania Railroad Co. The controlling depths, as ascer-
tained in May 1951 were' 20.0 feet in midchannel and 20 feet along
the edges. All depths are referred to mean low water. The total cost
and expenditure for maintenance of the existing project to June 30,
1952, was $104,547.39.
    Proposed operations.-Theallotment of $3,000 for fiscal year 1953
will be applied as follows:
Maintenance: Condition survey, with Government plant and hired
labor, 0.5 month, October 1952--------------------------------                                                  $3, 000
   No work is scheduled during the fiscal year 1954.
                                        Cost and financial summary

                                                     Fiscal year ending June 30                            Total to June
                                                                                                          30,1952, includ-
                                                                                                          ing fiscal years
                                    1948           1949            1950          1951         1952         priorto 1948

Maintenance:
   Appropriated...........................-----------...
                                          ------------... ------------....   $106, 600. 00 -$2, 052. 61        $104, 547. 39
   Cost---       -------------------------------------                        104, 547. 39 ------------         104, 547. 39
   Expenditures .........-----------                                          104, 547.39------------           104, 547. 39




        245554-53-vol. 1                 28
430            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                1952

                                         6. JAMES RIVER, VA.

   Location.--This river is formed by the junction of the Cowpasture
and Jackson Rivers in Botetourt County, Va., flows easterly 340 miles,
and empties into Hampton Roads at Newport News, Va. (See U. S.
Coast and Geodetic Survey Charts Nos. 529, 530, and 531.)
   Previous projects.-Adopted by River and Harbor Act of July
11, 1870. For further details see page 1797 of annual report for
1915, and page 461 of the annual report for 1938.
   Existing project.-This provides for a channel 25 feet deep and
300 feet wide from the mouth to Hopewell, 69.2 miles; thence 25
feet deep and 200 feet wide, following the cutoff route between
Hopewell and the Richmond deep-water terminal, 17.2 miles; thence
a channel 18 feet deep and 200 feet wide from the deepwater terminal
to the Richmond lock, 4.4 miles, and the removal of the obstruction
in Richmond Harbor known at Trigg cofferdam; for a turning basin
200 feet wide, 600 feet long and 18 feet deep in Richmond Harbor;
and for maintenance of the turning basin at Richmond deepwater
terminal to a depth of 25 feet.
   Depths of channels are referred to mean low water. The total
length of channel included in the project is 90.8 miles, which is the
navigable section.
   The mean tidal ranges under ordinary conditions for different
parts of the river are as follows: Mouth, 2.7 feet; Jamestown, 1.85
feet; City Point, 2.8 feet; Dutch Gap, 3.5 feet; Richmond, 3.9 feet.
Following are the extreme ranges under ordinary conditions at the
same localities: Mouth, 2.1 to 3 feet; Jamestown, 1.6 to 2.3 feet; City
Point, 2.3 to 3.2 feet; Dutch Gap, 2.9 to 3.9 feet; Richmond, 3.2 to
4.2 feet. The ordinary fluctuation of stage at Richmond, due to
floods, are 6 to 12 feet above mean low water. The extreme fluctua-
tions are 16 to 32 feet. The flood heights below Richmond diminish
rapidly, the extreme, according to available information, being about
11 feet lower at Dutch Gap, 14 miles below, and 17 to 18 feet lower
20 miles below.
   The cost for new work, for the completed project was $6,796,240,
exclusive of the amount expended on previous projects. The latest
 (1952) approved estimate of cost for annual maintenance is $334,500.
   The existing project was authorized by the following river and
harbor acts:

       Acts                           Work authorized                                              Documents

July     5,1884    Channel 22 feet deep from mouth to Richmond and                   S. Ex. Doe.     147, 47th Cong., 1st
                    construction of spur and training dikes.                           sess.
June 13,1902       Extension of improvement to Richmond lock gate....
Mar.     3,1905    Forming a turning basin by widening channel at                    H. Doc. 234, 56th Cong., 1st sess.
                    Richmond.
July     3, 1930   Existing project dimensions-...         --.....................   H. Doc. 314, 71st Cong., 2d sess.I
Aug. 26,1937       Removal of the Trigg cofferdam......................              Rivers and Harbors Committee
                                                                                                             1
                                                                                        Doc. 68, 74th Cong., 1st sess. 1
Mar.     2,1945    Turning basin in Richmond Harbor ..--                            H. Doc. 738, 77th Cong., 2d sess.
                                                                         ..-----------.                               1
May 17,1950        Maintenance of turning basin at Richmond deep-                    H. Doec. 191, 81st Cong., 1st sess.
                    water terminal.

  1 Contains latest published maps.
         RIVERS AND I-ARBORS--NORFOLK,        VA., DISTRIC?      431
   Local cooperation.-The conditions of local cooperation imposed
by the River and Harbor Acts of July 3, 1930, August 26, 1937, and
March 2, 1945, have been fully complied with.
   The River and Harbor Act of May 17, 1950, in modifying the
existing project to provide for the maintenance of the turning basin
at Richmond deepwater terminal to a depth of 25 feet at mean low
water, imposed the conditions that responsible local interests give
assurances satisfactory to the Secretary of the Army that they will
(a) maintain a berthing area 75 feet wide and to equal depth immedi-
ately adjacent to the deep-water terminal and extending for the
entire length of the turning basin; (b) reimburse the United States
for the cost of dredging all materials in the turning basin above a
depth of 25 feet at mean low water, with 1 on 3 side slopes, at the
time that the United States accomplishes the initial maintenance
dredging; (c) hold and save the United States free from damages;
and (d) furnish free of cost to the United States suitable spoil-
disposal areas for future maintenance when and as required. Assur-
ances have been furnished by the city of Richmond which were ap-
proved by the Secretary of the Army on July 25, 1951. The initial
dredging has been accomplished.
   Terminal facilities.-The river's commerce at Richmond is handled
at the city-owned terminals, city wharf, and Richmond dock, and
at 14 privately owned wharves located within or in the immediate
vicinity of Richmond Harbor. The Richmond deep-water terminal
at the head of the 25-foot depth serves oceangoing vessels and the
larger ships engaged in coastwise trade. Below the deep-water ter-
minal the improvement is served by 42 wharves. The Richmond
terminals and wharves, together with the wharves between Richmond
and the river's mouth, are adequate for the river's commerce.
   Operations and results during fiscal year.-Maintenance dredging,
by contract, in Tribell Shoal Channel, Goose Hill Channel, and
Dancing Point-Swann Point Shoal Channel was commenced July 9,
1951 and continued intermittently to December 21, 1951 when the
work was completed. There were removed 1,491,162 cubic yards of
material, place measurement. The cost of the work was $319,163.55.
   Maintenance dredging, by contract, in Richmond Harbor 18-foot
channel and turning basin was commenced August 3, 1951 and con-
tinued to September 22, 1951 when the work was completed. There
were removed 71,514 cubic yards of material, place measurement.
The cost of the work was $21,519.04.
   Maintenance dredging by contract, in the 25-foot channel and in the
turning basin at Richmond deepwater terminal was commenced Sep-
tember 26, 1951 and continued intermittently to January 14, 1952
when the work was completed. There were removed 121,292 cubic
yards of material, place measurement, of which 100,743 cubic yards
were removed from the 25-foot channel and 20,549 cubic yards were
removed from the allowable over depth in the turning basin. The
cost of the work was $35,360.88.
   Preliminary engineering for maintenance dredging, consisting of
surveys, investigation of disposal areas, preparation of plans and
specifications, etc., with Government plant, and hired labor, was
accomplished during the year at a cost of $23,623.41.
432        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                    1952

   Maintenance revisions and adjustments to a raydist hyperbolic
control system, with Government plant and hired labor, were made
during the year at a cost of $2,206.11.
  Miscellaneous condition and control surveys, with Government
plant and hired labor, were made during the year at a cost of $1,308.89.
   The total cost of the work was $403,181.88 all for maintenance.
The total expenditure was $409,172.64.
   Condition at end of fiscal year.-Construction of the existing
project was commenced in 1884 and continued intermittently through
the various modifications of the project to November 1947, when
the work was completed. Construction of the 25-foot channel between
Hopewell, Va., and the mouth was commenced in January 1931 and
completed in March 1932. Construction of the cutoffs between Hope-
well, Va., and Richmond, Va., was commenced in February 1933,
and completed in October 1937. The remainder of the channel between
Hopewell and Richmond was completed in October 1938 with the
exception of rock removal at Falling Creek and between Richmond
deep-water terminal and Richmond which was accomplished between
April and November 1947. Construction of the turning basin in
Richmond Harbor was commenced in October 1947 and completed
in November 1947. The controlling depths at mean low water are
as follows:
                                                            Controlling depths

                                                                  Mid-
              Name of channel                      Left          channel            Right              Date determined
                                                  outside        for half          outside
                                                  quarter        project          quarter
                                                   (feet)         width            (feet)
                                                                  (feet)

Mouth to Hopewell:
   Rocklanding Shoal Channel...      ._               25. 0           25. 0                  25.   0   September 1950.
   Tribell Shoal Channel.----------------------       25. O0          24. 7                  24.   6   May 1952.
   Goose Hill Channel---           -                  25. 0           25. 0                  25.   0   September 1951.
   Dancing Point-Swann --------------------
                                 ._                   25. 0           25. 0                  25.   0   January 1952.
   Point Channel
   Weyanoke Point Channel----- .---------             25. 0           25. 0                  25. 0     April 1948.
   Jordan Point-Harrison Bar-Windmill                 20. 5           23.4                   23. 7     May 1952.
     Point Channel.
   City Point Channel                                 25. 0           25. 0                  25. 0     August 1949.
Hopewell to Richmond Deepwater Terminal___            24. 4           24. 9                  24. 1     May 1952.
Richmond Deepwater Terminal to Buxton                 16. 4           17. 6                  18. 0     March 1950.
Line dock.
Buxton Line Dock to a point 200 feet down-                5. 8         6. 7                   8. 6     May 1952.
stream from Richmond Lock.
A point 200 feet downstream from Richmond   ------------.......... 15. 9      ............             March 1950.
lock to the lock.


   The head of navigation for boat traffic is at Richmond, Va.; naviga-
tion is practicable throughout the year.
   The total cost of the existing project to June 30, 1952, was $10,-
823,624.36, of which $6,796,240.22 was for new work, representing
$6,212,403.69 from regular funds and $583,836.53 from Public Works
funds, and $4,027,384.14, for maintenance, including $837.98 applied
to the removal of shoals in Bennetts Creek, Va., under the provisions
of section 3 of the River and Harbor Act approved October 17, 1940.
The total expenditure was $10,829,568.92.
   Proposed operations.-The unexpended balance on June 30, 1952,
in the amount of $230,132.15 plus accounts receivable in the amount
of $5,944.56 plus an allotment of $219,921.41 for fiscal year 1953,
            RIVERS AND HARBORS---NORFOLK,                   VA., DISTRICTr           433
plus a transfer of unexpended balances from other projects within
the district in the amount of $12,221.05, a total of $468,219.17, will
be applied as follows:
Accounts payable June 30, 1952           --------------------------              .. $0. 00
Maintenance :
    Dredging, under one contract, in Richmond Harbor, at Rich-
      mond deepwater terminal, and in Jordan Point Harrison
      Bar-Windmill Point Channel, 3 months, August-November
      1952 ----     ---   ------------------------------------                 112, 002. 17
    Dredging, by contract, in Rocklanding Shoal, Tribell Shoal,
      Goosehill Shoal and Dancing Point to Swann Point Shoal
      channels, 2 months, March-April, 1953              ___----- -       --   165, 000. 00
    Dredging, by contract, turning basin at Richmond deepwater
      terminal and channel between that point and Hopewell, after
      freshets, when and as needed-------                                       89, 221. 00
    Dredging, by contract, in Richmond Harbor and channel from
      Richmond to Richmond deepwater terminal, to remove shoals
      after freshets, when and as needed_----------------------34, 500. 00
    Preliminary engineering for dredging, consisting of surveys, in-
      vestigation of disposal areas, preparation of plans and specifi-
      cations, etc., with Government plant and hired labor, when
      and as needed--------------------------------------                       18, 500.00
    Condition surveys with Government plant and hired labor, 2
      months December 1952-January 1953--------------                           16, 541.00
    Restoration of horizontal and vertical control, revisions, adjust-
      ments, and expansion to Raydist hyperbolic control system,
      with Government plant and hired labor, intermittently,
      July 1952-June 1953----------------                      ---------------  15, 000. 00
    Maintenance and repairs to fixed dredging ranges, with Govern-
      ment plant and hired labor, when and as needed------------2, 000. 00
    Miscellaneous water level investigations, stream gaging, etc.,
      with Government plant and hired labor, intermittently,
      July 1952-June 1953---------------------------------                       6, 455. 00
    Miscellaneous inspections and reports, with Government plant
      and hired labor intermittently July 1952-June 1953 ---------               9, 000. 00
                            ------------------------- ------ 468, 219. 17
         Total for all work,--
  The additional sum of $517,700 can be profitably expended for the
following schedule of work during the fiscal year 1954.
Maintenance:
   Dredging, by contract, shoals between Hopewell and the mouth
      of the river, 5 months, February-June 1954---------------.... $336, 000. 00
   Dredging, by contract, turning basin at Richmond deepwater
      terminal and channel between that point and Hopewell, after
      freshets, when and as needed------------------------78,                   200. 00
   Dredging, by contract, in Richmond Harbor and channel from
      Richmond to Richmond deepwater terminal, to remove shoals
      after freshets, when and as needed        -------------------- 35, 000. 00
   Preliminary engineering for dredging, consisting of surveys, in-
      vestigation of disposal areas, preparation of plans and speci-
      fications, etc., with Government plant and hired labor, when
      and as needed-------------          ---- -------------------- 18, 000. 00
   Condition surveys, with Government plant and hired labor, 2
      months October-November 1953--------------              ---           32, 000. 00
   Extension, revision, and adjusting Raydist hyperbolic control
      system, with Government plant and hired labor, intermit-
      tently, July 1953-June 1954__----------------------                   3, 0000. 00
   Miscellaneous water level investigations, stream gaging, and
      maintenance of fixed dredging ranges with Government plant
      and hired labor, intermittently July 1953-June 1954---------- 5, 000. 00-
   Miscellaneous inspections and reports, with Government plant
      and hired labor, intermittently July 1953-June 1954      --.......... 10,500. 00
         Total for all work- ....--          __ ------------                  517, 700.00
434           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                1952

                                            Cost and financial wrummary

                                                          Fiscal year ending June 30                                     Total to June
                                                                                                                        30,1952, includ-
                                                                                                                        ing fiscal years
                                       1948             1949             1950              1951            1952          prior to 1948

New work:
   Appropriated-...-....                $80,000.00 -- $30,172.39 -..-----                   -----      ............       $7, 559, 240. 22
   Cost....--------------..............597, 400. 69 ......................................------------------........       7, 559, 240. 22
   Expenditures......... 613, 374. 20 ....................................-------............                              7, 559, 240. 22
Maintenance:
   Appropriated.........           234, 700. 00                             0 $465, 157.41 $248, 500. 00
                                                    496, 250. 00 $288, 500.00.                                             4, 263, 460.85
   Cost....--------------...       439,228.39       372, 725.67      393, 723.09       98, 426.84      403,181.88          4, 027, 384.14
   Expenditures.........           439, 521.46      278, 678. 57     483, 964. 99     102,185. 84      409,172. 64         4,033, 328. 70



                                          7. NANSEMOND RIVER, VA.

   Location.-This river, a tidal stream, rises in Nansemond County,
Va., flows northerly 25 miles, and empties into James River immedi-
ately above the mouth of the latter stream in Hampton Roads. (See
U. S. Coast Geodetic Survey Chart No. 529.)
   Previous project.-The original project for Nansemond River was
adopted by the River and Harbor Act of March 3, 1873, and modified
by the act of June 1878. For further details, see page 1797 of annual
report for 1915, and page 412 of annual report for 1935.
   Existing project.-This provides for dredging a channel between
the mouth and a point 0.45 mile above the highway bridge at Suffolk,
a distance of about 18.66 miles, 12 feet deep and 100 feet wide, with a
turning basin 200 feet square at Suffolk; and dredging a channel in
the Western Branch between its mouth and Reids Ferry, a distance
of about 2 miles, to a depth of 10 feet over a bottom width of 80 feet.
Depths of channels are referred to mean low water.
   The mean tidal ranges under ordinary conditions for different parts
of Nansemond River are as follows: Suffolk bridge, 3.4 feet; New-
mans Point, 2.8 feet. The extreme ranges under ordinary conditions
at the same localities are as follows: Suffolk bridge, 2.8 feet to 4 feet;
Newmans Point, 2.3 feet to 3.3 feet.
   The cost for new work, for the completed project was $137,477, ex-
clusive of the amount expended on previous projects. The latest
 (1950) approved estimate for annual cost of maintenance is $3,500.
   The existing project was adopted by the following river and harbor
acts:

       Acts                                 Work authorized                                                  Documents

Aug. 11,1888       Channel 12 feet deep, 400 to 200 feet wide, Town                           Annual report for 1887, p. 1001.
                    Point to mouth of Western Branch; thence, 12 feet
                     deep, 100 feet wide to Suffolk; turning basin 200 feet
                    square at Suffolk; and spur dikes and training
                    walls at mouth of Western Branch.
July     3,1930    Existing project dimensions.........-------------.-------H. Doc. 184, 70th Cong., 1st sess.

  For lateSt published map, see H. Doc. 1246, 62d Cong., 3d sess.

  Local cooperation.-Fully complied with.
  Terminal facilities.--.There are two wooden wharves and about 950
feet of wooden bulkhead at SUffolk, Va. There is also one wooden
wharf and about 550 feet of wooden bulkhead located about 9 miles
                       RIVERS AND HARBORS---NORFOLK,                                                                  VA., DISTRICT                             435
downstream from Suffolk. These facilities are privately owned and
are considered adequate for existing commerce.
  Operations and results during fiscal year.-Maintenance dredging,
by contract, between the mouth of the river and Suffolk, Va., in
progress at the beginning of the fiscal year was continued to July 28,
1951, when the work was completed. There were removed 70,736 cubic
yards of material, place measurement. The cost of the work was
$28,398.61. The expenditure was $47,510.83.
  Condition at end of fiscal year.-Construction of the existing
project was commenced in February 1931 and completed in February
1932. The controlling depth in Nansemond River, as ascertained in
July 1951, was 12 feet and in the Western Branch, as ascertained in
March 1932, was 10 feet. Depths are referred to mean low water.
   The head of navigation for boat traffic is at the junction of Smiths
and Cahoons Creek, which form the Nansemond River, 19 miles above
the month. Navigation is practicable throughout the year.
   The total cost of the existing project to June 30, 1952, was $352,-
399.91, of which $137,477.11 was new work and $214,922.80 for
maintenance. The total expenditure was $343,421.99.
  Proposed operations.-Theunexpended balance on June 30, 1952, in
the amount of $10,242.90 will be applied as follows:
Accounts payable.......------------------------------------------                                                                                         $100. 00
Unallocated ---------------------------------------------                                                                                               10, 142. 90
           Total ---------------                                           ----------------------------                                                 10, 242. 90

                                                       Cost and financial summary

                                                                           Fiscal year ending June 30                                                 Total to June
                                                                                                                                                      30, 1952, includ-
                                                                                                                                                      ing fiscal years
                                                  1948                  1949                  1950                  1951                  1952         prior to 1948

New work:
   Appropriated--------------....      __..---------------------                                          ----------------------                           $167,477.11
   Cost---------------................ -----------............ ------.................-------.....---------.........----...------------............         167, 477.11
   Expenditures-------......... ------------............-----------............----.........-------..........----------------..........                     167, 477.11
Maintenance:
    Appropriated------.......--..       -------------                   $10, 000 $211, 882.10 -$52,838.14                           ............            223,187. 78
    Cost----- ----------......    _10, -- -                                  000    2, 743.96 126, 636. 41                          $28, 398.61             221,922. 80
    Expenditures ....--------------------                                10, 000    2, 743. 96  98, 546. 27                           47, 510. 83           212, 944. 88



                                               8. WILLOUGHBY CHANNEL, VA.

  Location.-This channel is located in Hampton Roads and extends
from deep water in Hampton Roads to the entrance to Willoughby
Bay. (See U. S. Coast and Geodetic Survey Charts Nos. 400 and
1222.)
   Existing project.-This provides for dredging a channel 10 feet
deep at mean low water, over a bottom width of 300 feet, from deep
water in Hampton Roads to a point opposite the extreme tip of Wil-
loughby Spit, a distance of approximately 8,400 feet. Under ordinary
conditions the mean tidal range is 2.7 feet and the extremes -2 and
+9.5 feet.
   The cost for new work for the completed project was $8,500. The
latest (1950) approved estimate for annual cost of maintenance is
$500.
436          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   The existing project was adopted by the River and Harbor Act of
July 3, 1930 (H. Doc. 507, 70th Cong., 2d sess.). The latest published
map is in the project document.
   Local cooperation.-None required.
   Terminal facilities.-Thereis a ferry wharf, owned by the Virginia
Department of Highways and used by its ferries operating between
Willoughby Spit and Old Point Comfort, and a private yacht basin
on this project. The yacht basin has facilities for berthing, supplies,
and engine repairs open to the public at nominal charges. The facili-
ties have connections to a State highway and are considered adequate
for existing commerce.
   Operationsand results during fiscal year.---Miscellaneous office com-
putations in connection with a proposed maintenance condition survey
were made during the year at a cost of $166.96. The expenditure was
$59.25.
   Condition at the end of fiscal year.--The existing project was con-
structed in June 1931. The controlling depth as ascertained in June
1952 was 8.9 feet at mean low water.
   The total cost of the existing project to June 30, 1952, was $25,767.23,
of which $8,500 was for new work and $17,267.23, for maintenance.
The total expenditure was $25,659.52.
   Proposed operations.-The unexpended balance on June 30, 1952
in the amount of $2,440.75 will be reserved for payments to accounts
payable in the amount of $107.71 and to unliquidated obligations in
an amount of $254.89 in connection with a condition survey made
during fiscal year 1952. The balance of $2,078.15 is unallocated.
   No work is scheduled for the fiscal year 1954.
                                       Cost and financial summary

                                                     Fiscal year ending June 30                            Total to June
                                                                                                           30, 1952, includ-
                                                                                                           ing fiscal years
                                    1948           1949           1950           1951           1952        priorto 1948

New work:
   Appropriated............------------------------..------------------------......------------8, 500. 0
   Cost...------...--------------            ---------------......
                                                          ------.-..-----------........----------.                 8, 500.00
   Expenditures ...                  ...------------
                                    ...------------  ------------
                                                                .......               ...------------------------. 8, 500. 00
Maintenance:
    Appropriated--------......... $1, 500. 00 -------     ------------------------           $2, 500. 00          19, 600. 27
    Cost-----------------             633. 41         $866. 59 _-----------------------          166. 96          17, 267. 23
    Expenditures--------.........     633. 41          866. 59 ----------------.-------.          59. 25          17, 159. 52



                                  9. NEWPORT NEWS CREEK, VA.

   Location.-Newport News Creek, Va., is located on the southern
end of the peninsula between the James and York Rivers and within
the corporate limits of the city of Newport News. (See U. S. Coast
and Geodetic Survey Chart Nos. 400 and 1222.)
   Existing project.-This provides for a channel 12 feet deep at mean
low water with widths varying from 200 to 60 feet from deep water
in Hampton Roads to and through the municipal boat harbor en-
trance, thence 12 feet deep at mean low water and 150 feet wide to
and including a turning basin and anchorage of the same depth 220
                RIVERS       AND HARBORS-NORFOLK,                          VA.,     DISTRICT                437 .
feet wide and 400 feet long in the upper end of the harbor. The mean
tidal range is 2.7 feet and the extremes 2.1 and 3 feet respectively.
The extremes of irregular fluctuations due to combined wind and tides
referred to mean low water, are -2 feet and + 9.5 feet.
   The cost for new work, for the completed project was $135,600.
The latest (1950) approved estimate for annual cost of maintenance
is $7,000.
   The existing project was adopted by the River and Harbor Act of
July 24,1946 (H. Doc. 559, 79th Cong., 2d sess.). The latest published
map is in the project document.
   Local cooperation.--Fully complied with as to initial construction.
Local interests are required to simultaneously dredge certain areas
adjacent to the project during periods of future maintenance.
   Terminal facilities.--There are 4,210 linear feet of steel and wood
bulkhead, two marine railways which can accommodate vessels up
to 85 feet in length, one ferry terminal and one wooden pier 400 feet
long on Newport News Creek. The city of Newport News maintains
400 feet of bulkhead and the pier open to the public without charge
and operates a pleasure boat marina with 18 finger piers at which a
nominal wharfage fee is charged. The remaining facilities are pri-
vately owned or are leased by the city to private firms. These facilities
are considered adequate for existing commerce.
   Operationsand results during fisoal year.-None.
   Condition at end of fiscal year.-Constructionof the existing project
was commenced in January 1948 and completed in April 1948. The
controlling depths at mean low water are as follows:

                                                              Controlling depths

                                                                    Mid-
               Name of channel                           Left      channel         Right      Date determined
                                                       outside     for half       outside
                                                       quarter     project        quarter
                                                        (feet)      width          (feet)
                                                                    (feet)

Entrance channel      -----.......-. .-- . -----   -       12.0         12. 0         11.8    April 1950.
Newport News Creek-                    -         -         12. 0        12. 0         11. 5      Do.
Turning Basin------
              .......     ------------------------         12.0         11. 1         12.0       Do.



   The head of navigation for boat traffic is the upstream end of the
turning basin at the head of the project. Navigation is practicable
throughout the year.
  The total cost and expenditure of the existing project to June 30,
1952, was $140,353.88, of which $135,600 was for new work and
$4,753.88 for maintenance.
  Proposed operations.-The allotment of $2,500 for fiscal year 1953
will be applied as follows:
Maintenance: Condition survey, with Government plant and hired
labor, 0.5 month, October 1952---------------------------------$2,                                     500. 00
   No work is scheduled for the fiscal year 1954.
438          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                                         Cost and      nancial summary

                                                   Fiscal year ending June 30                        Total tQ June
                                                                                                    30, 1952, includ-
                                                                                                       fpscal years
                                                                                                     ,ig
                                      1948         1949        1950      * 1951           1952       prior to 1948

New work:
    Appropriated---------.........   $145, 000     -$9, 400 .......-------------------------------                   $135, 600. 00
    Cost...............-------------.135, 600 ----..........---------.....------....------------....... ------------  135, 600.00.
    Expenditures---------.........    135, 600 ............-----------------------...............................--   135,600.00
Maintenance:
    Appropriated ---------------------              2,000    $4,    00 -$1, 246.12 -------------            4, 753. 88
    Cost_- ------------- ------------               2, 000    2,753.88 -----------........------------      4, 753. 88
    Expenditures--------------------............    2,000     2, 753. 88 ....--------------------------     4, 753. 88


                             10. OHANNEL TO NEWPORT NEWS, VA.

  Location.--This channel lies to the west of the north entrance to
Norfolk Harbor Channel and connects deep water in James River with
Hampton Roads. (See U. S. Coast and Geodetic Survey Chart No.
400.)
  Previous projects.--Adopted June 13, 1902. For further details, see
page 1797 of annual report for 1915, and page 459 of annual report
for 1938.
  Existing project.-This provides for dredging a channel 40 feet
deep at mean low water, 600 feet wide, increased to 1,000 feet at the
ends, and 31/4 miles long through the shoal north of Middle Ground
Light. Under ordinary conditions the mean tidal range is 2.7 feet
and the extremes 2.1 and 3 feet. The extremes of irregular fluctuations
due to combined wind and tides, referred to mean low water, are -2
feet and + 9.5 feet.
  The cost for the new work, for the completed project, was $1,252,262,
exclusive of amount expended on previous projects. The latest (1952)
approved estimate for annual cost of maintenance is $12,700.
  The existing project was authorized by the following river and.
harbor acts:

    Acts                                 Work authorized                                   Documents

June 25, 1910     Channel 35 feet deep and 400 feet wide..,.----------- H. Doc. 550, 61st Cong., 2d sess.
Aug.   8,1917     Channel 35 feet deep and 600 feet wide................       H. Doc. 605, 63d Cong., 2d sess.
                                                                 (Contains latest published map.)
Jan. 21, 1927                                            ------ H. Doe. 486, 67th Cong., 4th sess.
                  Existing project dimensions-------------...................--.......


  Local cooperation.--None required.
   Terminal facilities.-There are four piers at Newport News, which
are the property of the city, and which are open to general public
use on equal terms. All of the other piers and wharves served by
this improvement are owned by private corporations or companies.
The principal terminal and transfer facilities are those of the Chesa-
peake & Ohio Railway Co. and the Newport News Shipbuilding &
Dry Dock Co. There are also at Newport News a wharf used by
steamers of the Eastern Steamship Co. and a small boat harbor. The
facilities are considered adequate for present commerce.
   Operations and results during fiscal year.--A maintenance condi-
                      RIVERS AND HARBORS--NORFOLK,                                                             VA.,          DISTRICT                 439

tion survey, with Governmrent plant and hired labor, was made during
the year at a cost of $1,900.92.
   Maintenance revisions and adjustments to a raydist hyperbolic con-
trol system, with Government plant and hired labor, were made
during the year at a cost of $16.59.
   The total cost and expenditure of the work was $1,917.51, all for
:maintenance.
   Condition at end of fiscal year.--Construction of the existing proj-
ect was commenced in March 1929 and continued intermittently to
June 1931 when the work was completed. The controlling depth
as ascertained in December 1951 was 40 feet in midchannel and 40 feet
along the edges. Depths are referred to mean low water.
   The total cost and expenditure of the existing project to June 30,
1952, was $1,558,712.05, of which $1,252,261.99 was for new work and
$306,450.06, for maintenance.
   Proposed operations.--The unexpended balance on June 30, 1952
in the amount of $1,582.49 plus an allotment of $1,500 for fiscal year
1953, a total of $3,082.49, will be applied as follows:
Maintenance: Condition survey, with Government plant and hired
labor, 0.5 month January 1953,--------.. ---   ----------- ,  $3, 082. 49
   No work is scheduled for the fiscal year 1954.
                                                    Cost and financial summary

                                                                       Fiscal year ending June 30                                           Total to June
                                                                                                                                            30, 1952, includ-
                                                                                                                                            ing fiscal years
                                                1948                 1949                 1950                1961              1952         prior to 1948

New work:
   Appropriated-------       .                               ...........
                                              .....-------------------              --         ---------------------------                    $1, 477. 261.99
   Cost  ------------------..................   ------------                -----        ----------       ------------             ----        1, 477, 261.99
   Expenditures--------------------------
                                      ...............................------....                                                                 1,47 21.99
Maintenance:
   Appropriated..------......--             $2,500.00            $7,259.80           $4,000.00          --$3, 45. 08          $3, 500.000         320, 52.55
   Cost-----------------                        78. 96            9, 628. 55            415. 26               201.96           1,917. 51          318, 960.0
   Expenditures--------.........                78. 96            9, 628. 55            415. 26               201. 95          1, 917. 51         318,940.06



                                                 11. NORFOLK HARBOR, VA.

  Location.--Norfolk, Va., is 187 miles south of Baltimore, Md., and
30 miles from the entrance to Chesapeake Bay at Cape Charles and
Cape Henry. The harbor extends from the 40-foot contour in
Hampton Roads to a point 2,500 feet above the Norfolk & Western
Railway bridge over the Southern Branch of the Elizabeth River,
a distance of 16.03 miles. (See U. S. Coast and Geodetic Survey
Charts Nos. 400 and 452.)
  Previous projects.--Adopted by River and Harbor Acts of Au-
gust 14, 1876; July 5, 1884; modified June 30, 1885; and by River
and Harbor Acts of September 19, 1890; June 3, 1896; July 7, 1898;
June 13, 1902; March 3, 1905; and March 2, 1907. For further details
see page 1795 of annual report for 1915, and page 454 of annual
report for 1938.
  Existing project.-This provides for a main channel 40 feet deep,
750 feet wide, from Hampton Roads to the mouth of Southern Branch
of the Elizabeth River, and 450 feet wide up this branch to the Belt
440     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,          1952

Line Railroad bridge, a total distance of 13.2 miles, including an
approach and turning area to the same depth over a maximum width
of 830 feet opposite the Norfolk Naval Shipyard, extending down-
stream 3,250 feet from the Belt Line Railroad bridge; thence 35 feet
deep, 375 feet wide and 1.0 mile long to the Virginian Railway bridge;
thence 35 feet deep, 250 feet wide, and 3.1 miles long to a point 1,900
feet above the Norfolk & Western Railway bridge, with adequate
widening of the channel at the bends, a turning basin 35 feet deep
and 600 feet by 600 feet at the upstream end, making a total distance
of 17.3 miles; a channel in the Eastern Branch, 25 feet deep, 500
feet wide, and 1.09 miles long, from the 40-foot channel at the
mouth to the Norfolk & Western Railway bridge, including within
its limits, for a distance about 1,000 feet above the mouth, a chan-
nel 30 feet deep and 300 feet wide to a point opposite the terminal
of the Imperial Tobacco Co. in Berkeley; thence 25 feet deep, 300
feet wide, and 0.55 mile long, to the Campostella Bridge; thence
25 feet deep, 200 feet wide, and 1.20 miles long to the Virginian
Railway bridge; and for maintenance at a depth of 25 feet of the
existing turning basin approximately 51/ acres in extent at the,
head of the existing project just below the Virginian Railway bridge;
a channel in the Western Branch, between: the 40-foot channel at
the mouth and a point about 3,000 feet above the West Norfolk
Highway Bridge, a distance of about 1.72 miles; 24 feet deep, 300
feet wide, 0.78 mile, and 200 feet wide, 0.37 mile to the bridge; thence
18 feet deep, 150 feet wide, 0.57 mile; a channel in Scotts Creek be-
tween the 40-foot channel at the mouth and a point 100 feet above
the Atlantic Coast Line Railroad bridge (about 0.73 mile upstream),
12 feet deep and 100 feet wide; anchorage areas on the west side
of the 40-foot channel opposite Lambert Point and south of Craney
Island aggregating 171 acres, consisting of: One anchorage space
1,200 by 2,400 by 30 feet deep; one anchorage divided into two spaces,
each 1,200 by 1,200 by 22 feet deep; one space 900 by 1,900 by 16 feet
deep; and another anchorage of 45 acres, 12 feet deep, near Pinner
Point; and a trapezoidal-shaped disposal area of about 2,500 acres
of flats adjacent to and north of Craney Island, enclosed by stone-
faced levees of sand pumped from existing deposits adjacent to and
within the disposal area, three sluiceways in the westerly levee, two
rehandling basins, each 200 by 800 feet, 40 feet deep, spaced 500
feet apart, an approach and exit area 3,800 feet long, 600 feet wide,
and 28 feet deep connecting the rehandling basins with the 40-foot
channel. All depths are referred to mean low water.
   The mean tidal range is 2.7 feet and the extreme 3 feet. The
extremes of irregular fluctuations, due to combined effect of tides
and wind, referred to mean low water, are -2 feet and +9.62 feet.
   The estimate of cost for new work, revised in 1952, exclusive of
          RIVERS AND HARBORS-NORFOLK,          VA.,   DISTRICT     441
amounts expended on previous projects, is $16,034,700. The latest
(1950) approved estimate for annual cost of maintenance is $943,500.
   Operations and results during fiscal year.-New work on Craney
Island disposal area, consisting of subsurface investigations, engineer-
ing studies, designs and drawings for the definite project report,
with Government plant and hired labor, in progress at the beginning
of the fiscal year was continued intermittently to the end of the year.
The cost of the work was $4,324.10.
   Maintenance dredging in Norfolk Harbor 40-foot channel, with the
United States hopper dredge Comber, was-commenced September 16,
1951, and continued intermittently to the end of the fiscal year. There
were removed 1,346,063 cubic yards of material, credited place
measurement. The cost of the work was $286,699.05.
   Preliminary engineering for maintenance dredging, consisting of
surveys, preparation of plans and specifications, etc., with Govern-
ment plant and hired labor, was accomplished during the year at a
cost of $13,664.81.
   Maintenance condition surveys, with Government plant and hired
labor, were made during the year at a cost of $8,877.74.
   Maintenance revisions and adjustments to a raydist hyperbolic
control system, with Government plant and hired labor, were made
during the year at a cost of $1,592.26.
   Maintenance of the dredging range beacons on Norfolk Harbor
40-foot channel, consisting of inspections, repairs, checking lights,
batteries, etc., was accomplished during the year at a cost of $171.94
   The total cost of the work was $315,329.90, of which $4,324.10 was
for new work and $311,005.80 for maintenance. The total expendi-
ture was $318,709.54.
   Condition at end of fiscal year.-The existing project was about 49
percent complete at the end of the fiscal year. Construction of the
40-foot channel from Hampton Roads to the Belt Line Railroad bridge
was commenced in July 1917, and continued intermittently to May
1931, when the work was completed. Construction of the Southern
Branch 35-foot channel was commmenced in May 1950 and completed
in March 1951, except for dredging at the Norfolk-Portsmouth Belt
Line bridge. Construction of the Eastern Branch 25-foot channel
was commenced in February 1928, and completed in June 1928. A
modification to widen a portion of this channel was commenced in
August 1948 and completed in September 1950. Construction of the
Western Branch 24-foot channel was completed in 1914. Construc-
tion of the Western Branch 18-foot channel was commenced in April
1931, and completed in May 1931. Construction of Scotts Creek
was commenced in September 1931, and completed in December 1931.
Construction of Pinner Point anchorage was completed in 1939.
Construction of the Craney Island 30-foot anchorage was commenced
442         REPORT OF CHIEF OF ENGINEERS,                             U.        S.   ARMY,        1952

in January 1931, and completed in May 1931.                                               The controlling
depths at mean low water are as follows:
                                                             Controlling depths

                                                                    Mid-
                   Name of channel                  Left           channel           Right        Date determined
                                                   outside         for half          outside
                                                   quarter         project           quarter
                                                   (feet)          width              (feet)
                                                                   (feet)

40-foot channel:
    Hampton Roads to junction of branches-.-           38. 5            39. 0             37. 7   March 1952.
    Junction of branches to Belt Line R. R.            40. 0            40.0              40.0    May 1951.
      bridge.
Southern Branch, Belt Line R. R. bridge to             35. 0            35. 0             35. 0   April 1951.
  point 2,500 feet above Norfolk & Western Ry.
  bridge.
Eastern Branch:
    Junction of branches to Norfolk & Western          25. 0            25. 0             25. 0   May 1951.
      Ry. bridge.
    Norfolk & Western Ry. bridge to Virginian          24. 5            24.2              24. 4       Do.
      Ry. bridge.
Western Branch:
    Mouth to West Norfolk highway bridge - -....       13. 9            15. 7             16. 6   January 1949,
    West Norfolk highway bridge to point 3,000         18:0             18.0              18.0        Do.
      feet upstream.
Scotts Creek..------------------------------                6. 9         7.4               7. 9   December 1948.


   The work remaining to be done to complete the project consists of
dredging a channel 30 feet deep and 300 feet wide in the Eastern
Branch between the 40-foot channel at the mouth and a point opposite
the terminal of the Imperial Tobacco Co., a distance of about 1,000
feet; completion of dredging three additional anchorage basins south
of the present Craney Island 30-foot anchorage (two anchorage spaces,
each, 1,200 by 1,200 feet to a depth of 22 feet, and one anchorage
space, 900 by 1,900 feet to a depth of 16 feet) ; construction of a trape-
zoidal-shaped disposal area of about 2,500 acres on the flats adjacent
to and north of Craney Island, including sluiceways, rehandling
basins, approach and exit areas, etc.; and dredging at the Norfolk-
Portsmouth Belt Line bridge where the present structure is replaced
by a new bridge under the Truman-Hobbs Act. Depths are referred
to mean low water.
   The total cost and expenditure of the existing project to June 30,
1952, was $14,265,528.55, of which $7,790,088.65 was regular funds and
$49,978.50, Emergency Relief funds, a total of $7,840,067.15 for new
work; and $6,425,461.40 regular funds for maintenance. The expen-
ditures were $14,194,993.98 regular funds and $49,978.50 Emergency
Relief funds, a total of $14,244,972.48. The sum of $23,935.71 was
expended from contributed funds for new work.
   The existing project was authorized by the following river and
harbor acts:
                   RIVERS AND I-ARBORS-NORFOLIt,                                   VA.,     DISTRICT                 443

       Acts                              Work authorized                                         Documents

                          HAMPTON ROADS AND          ELIZABETH RIVER

Mar.     2, 1907   A channel 30 feet deep to the navy yard..............            H. Doc. 381, 59th Cong., 1st sess.
June 25, 1910      Depth of 35 feet to the navy yard__ .................            H. Doe. 561, 61st Cong., 2d seas.
Aug. 8,1917        Depth of 40 feet and width of 750 feet to the mouth              H. Doc. 140, 65th Cong., 1st sess.
                     of the Southern Branch.
                                        SOUTHERN BRANCH

June 25,1910       For a channel with depths of 22 and 25 feet .-----......         H. Doc. 551, 61st Cong., 2d sees.
Aug. 8,1917        Depth of 40 feet and width of 450 feet from the mouth            H. Doc. 140, 65th Cong., 1st sess.
                     to the Belt Line R. R. bridge.
Mar.     3,1925    Channel 30 feet deep and 375 feet wide to the Vir-               H. Doc. 226, 68th Cong., 1st sess.
                     ginian Ry. bridge, thence 25 feet deep and gener-
                     ally 200 feet wide to the Norfolk & Western Ry.
                     bridge.
Aug. 30,1935 2     Depth of 25   1e6tand width of 200 feet from the Nor-            H. Doc. 182, 73d Cong., 2d sees.
                     folk & Western Ry. bridge to a point 2,500 feet
                     above, with a turning basin 500 feet square.
June 30, 1948      Approach and turning area 40 feet deep and a maxi-               H. Doc. 545, 80th Cong., 2d sess.
                     mum width of 830 feet opposite Norfolk Naval
                     Shipyard, thence a channel 35 feet deep and 375
                     and 250 feet wide to a point 1,900 feet above the
                     Norfolk & Western Ry. bridge and a turning basin
                     35 feet deep and 600 feet by 600 feet at the upstream
                     end.
                                        EASTERN BRANCH

July          Improvement of the Eastern Branch ...........-..-.
         5, 1884                                                                    Annual Report, 1885, p. 1015.
Mar.          Width of 500 feet and depths of 25 feet and 22 feet.....
         2, 1907                                                                    H. Doc. 373, 59th Cong., 1st sess.
    Do --....--Removal of shoals at the mouth______... _    --.......               Specified in act.
Mar. 3,1925 Depth of 25 feet and width of 200 feet from the Nor-                    H. Doc. 226, 68th Cong., 1st sess.
                folk & Western Ry. bridge to the Virginian Ry.
                bridge.
July 3, 1930  The 30-foot channel to a point opposite the terminal                  H. Doe. 37, 71st Cong., 1st sess.
                of the Imperial Tobacco Co. in Berkley.
Mar. 2, 1945 Depth of 25 feet and width of 300 feet from the Nor-                   H. Doc. 224, 76th Cong., 1st sess..
                folk & Western Ry. bridge to the Campostella
                     bridge.
                                        WESTERN BRANCH

Mar.     4,1913    Channel with depth of 24 feet and widths of 300 and              H. Doc. 566, 62d Cong., 2d sess.
                     200 feet to the West Norfolk highway bridge.                                                            t
July     3,1930    For the 18-foot channel to a point about 3,000 feet              H. Doe. 265, 70th Cong., 1st sess.
                     above the West Norfolk highway bridge.
                                          SCOTTS CREEK

       Do......    For the existing project dimensions-----............-------.......-- H. Doc. 180, 70th Cong., l6t sess.
                                          ANCHORAGES

June 25,1910       A 30-foot anchorage at Lambert Point .......-                    H. Doc. 551, 61st Cong., 2d sess.
Aug. 8,1917        A 12-foot anchorage at Pinner Point and 35-foot                  H. Doc. 605, 63d Cong., 2d sess.
                     anchorage opposite Lambert Point.
July     3,1930    Existing project dimensions of anchorage opposite                H. Doe. 143, 70th Cong., 1st sess.
                     Lambert Point and elimination of the 35-foot
                     anchorage authorized by the act of Aug. 8, 1917.
Oct.    17,1940    Extension of present 30-foot anchorage to afford 2               H. Doc. 683, 76th Cong., 3d sess.
                     anchorage spaces 22 feet deep and 1 anchorage space
                     16 feet deep.
                                         DISPOSAL AREA
                                                                                                                         1
July 24,1946       A trapezoidal-shaped area of about 2,500 acres of flats          H. Doc. 563, 79th Cong., 2d sess.
                     adjacent to and north of Craney Island, including
                     sluiceways, rehandling basins and approach and
                     exit areas.


  1 Contains latest published maps.
  2 Included in the Emergency Relief program, May 28, 1935.
444      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

    Local cooperation.-The River and Harbor Act of July 3, 1930, in
adopting the project for a channel in the Eastern Branch, 30 feet
deep and 300 feet wide, extending from the 40-foot channel to a point
opposite the terminal of the Imperial Tobacco Co., imposed the con-
dition that local interests give assurance satisfactory to the Secretary
of War and the Chief of Engineers that they will provide and main-
tain, without cost to the United States, a branch channel of equal
depth to the tobacco terminal. This condition has not been complied
with.
   All prior requirements and conditions imposed by the River and
Harbor Acts of August 30, 1935, October 17, 1940, July 24, 1946 and
June 30, 1948, have been complied with.
    Terminal facilities.-The terminal facilities within the limits of
this improvement include about 227 wharves, piers, etc., with an
aggregate length available for wharfage purposes of about 32 miles.
It is considered that the facilities are adequate for the present com-
merce of the port.
   Proposed operations.-The unexpended balance on June 30, 1952
for maintenance in the amount of $50,296.40, plus accounts receivable
in the amount of $3,379.64, plus allotments for the fiscal year 1953
of $35,000 for new work and $381,711.02 for maintenance, a total of
$470,387.06 will be applied as follows:
Accounts payable June 30, 1952------------------------------                     $0. 00
New work : Advance planning, consisting of completion of the definite
    project report, with Government plant and hired labor, inter-
    mittently July 1952-June 1953__--       -----     ----
                                                      __--                  3--- 000. 00
                                                                            35,
Maintenance :
   Dredging, with a United States hopper dredge, in
      Norfolk Harbor 40-foot channel, 2.5 months, July
      1952 and Jan-Feb 1953----          ---------------   $264, 000. 00
   Dredging, by contract, in Eastern Branch of the
   Elizabeth River, 25-foot channel, 1 month, Feb-
      ruary 1953--------------------------------90, 000. 00
   Preliminary engineering, for dredging, consisting of
      surveys, preparation of plans and specifications,
      etc., with Government -plant and hired labor,
      2 months, November-December 1952------------           15, 000. 00
   Condition surveys, miscellaneous investigation of
      complaints, etc., with Government plant and
      hired labor, intermittently, July 1952-June 1953__     29, 625. 53
   Restoration of horizontal and vertical control,
      revisions, adjustments, and expansion to raydist
      hyperbolic control system, preparation of con-
      trol maps, etc., with Government plant and hired
      labor, intermittently, July 1952-June 1953 _-- -       10, 861. 53
   Miscellaneous inspection and reports, with Govern-
     ment plant and hired labor, intermittently July
     1952-June 1953 ____             ____                    18, 900. 00
   Miscellaneous water level studies, tide gaging, etc.,
     with Government plant and hired labor, inter-
     mittently, July 1952-June 1953          _____--- ---     5, 000. 00
   Maintenance and repairs to fixed dredging ranges,
     with Government plant and hired labor when
     and as needed------------------------------              2, 000.00
        Total for maintenance________-____-___________                     435, 387. 06
        Total for all work__   --------------------------------            470, 387. 06
                RIVERS AND HARBORS---NORFOLK,                                  VA.,      DISTRICT                 AAA
The additional sums of $1,000,000 for new work and $320,500 for
maintenance can be profitably expended for the following scheduled
work during the fiscal year 1954:
New work :
   Initiate construction on Craney Island disposal area:
        Contract: retaining levees-------------------     $759, 200
        Hired labor :
            Land acquisition ------------------------       17, 500
            Purchase of private rights to oyster ground
              leases------------------------------         136, 500
            Engineering (plans and specifications) _-----   86,800
                                                                                                         $1, 000, 000
Maintenance:
   Dredging in Norfolk Harbor 40-foot channel, with a
      United States hopper dredge, 2.5 months, March-
      May 1954---------         ------------------------- 242, 000
   Preliminary engineering for dredging, consisting of
      surveys, preparation of plans and specifications,
      etc., with Government plant and hired labor, 1
      month, January 1954--------------------------            8, 000
   Condition surveys, miscellaneous investigation of
      complaints, etc., with Government plant and hired
      labor, intermittently, July 1953-June 1954             34, 000      ---------
   Revisions, adjustments and expansion to raydist
      hyperbolic control system, with Government plant
      and hired labor, intermittently July 1953-June 1954_    6, 000
   Miscellaneous inspections and reports, with Govern-
      ment plant and hired labor, intermittently, July
     1953-June 1954_-- ---------                     ___   -22, 500
   Maintenance of tide gage structure and dredging
      range structures, and compilation of tidal data,
      with Government plant and hired labor, inter-
      mittently July 1953-June 1954------------------         8, 000
                                                                                                             320, 500
           Total for all work -----------------                                  ------------             1, 320, 500

                                    Cost and financial summary

                                                 Fiscal year ending June 30                             Total to Juno
                                                                                                    .   30, 1952 includ-
                                                                                                        ing fiscal years
                                 1948          1949            1950          1951            1952        prior to 1948

New work:
   Appropriated.--.....$18,000.00 $128, 000.00 $554,123.41 $767,000.00-$131,834.54    $10, 377, 35. 71
   Cost---......... -     -_9, 039.55  82, 591. 13 273, 521.48 965, 812. 61  4,324.10 110, 377, 835. 71
   Expenditures ---------   9, 039. 55 67,173.01    66, 553. 29 1,188,198.92 4,324.10 1 10,377,835. 71
Maintenance:
   Appropriated-.........    530,000.00     334, 780.93    130, 000.00    290, 043.64    344, 552. 61      6, 551,176.71
   Cost--------------.... .. 597, 853. 10   255, 219. 50   204, 894. 14   284, 570. 77   311,005. 80       6, 497, 500. 67
   Expenditures-......... 597, 853. 10      206, 218. 96   253, 894. 68   284, 570. 77   314,385.44        6, 500, 880. 31


Other new work data:
   Appropriated for fiscal year ending June 30, 1953------------- $35, 000
   Unobligated balance available for fiscal year 1953 -----------  - 35, 000
   Estimated additional amount needed to be appropriated for
      completion of existing project--- ----------------------    8,183, 569
1In addition, $23,935.71 expended from contributed funds for new work,




       245554-53-vol. 1-20
446      REPORT OF CHIEF-OF ENGINEERS, U. S. ARMY,               1952

12. HAMPTON ROADS AND THE HARBORS OF NORFOLK AND NEWPORT
        NEWS, VA.-COLLECTION AND REMOVAL OF DRIFT
  Location.-Hampton Roads is a natural harbor located 300 miles
south of New York and 180 miles south of Washington, D. C. Its
principal tributaries are James River, affording a natural deep harbor
at Newport News, Va.; the Elizabeth River, with its Southern, East-
ern and Western Branches, providing harbors for Norfolk and Ports-
mouth, Va.; and Hampton Creek serving the harbor at Hampton, Va.
 (See U. S. Coast and Geodetic Survey Charts Nos. 400 and 452.)
   Ewisting project.-This provides for the collection and removal of
drift in Hampton Roads and its tributary waters and authorizes the
Secretary of the Army to allot such amounts as may be necessary
for the work from appropriations for the maintenance and improve-
ment of existing river and harbor works or from other available
appropriations, and that this work shall be carried on as a separate
and distinct project. It is wholly a work of maintenance. The
purpose of the work is to afford relief from variable conditions of
obstruction, and no advance estimate of the amount of work required
and its proper cost can be made.
   The existing project was authorized by the River and Harbor Act
of May 17, 1950, as specified in the act.
   Termnial facilities.-For a description of the terminal facilities
on this project see this heading under "Norfolk Harbor" and "Channel
to Newport News, Va."
   Operationsand results during fiscal year.-Maintenanceoperations,
consisting of collection and disposal of drift material in the harbors
of Norfolk and Newport News, Va. and their tributaries, with Gov-
ernment plant and hired labor, was carried on during the year at a
cost of $17,108.65. The expenditure was $17,988.72.
   Condition at end of fiscal year.-The existing project is one of
continuous maintenance for which no percentage of completion exists.
Operations under the existing project were commenced July 1, 1950.
Costs and expenditures for the removal of drift previous to that time
were carried under the project "Norfolk Harbor, Va."
   The total cost of the existing project to June 30, 1952, was $31,683.50,
all for maintenance. The total expenditure was $32,503.57.
   Proposed operations.-Theunexpended balance on June 30,1952, in
the amount of $2,496.43 plus accounts receivable in the amount of
$920.07 plus an allotment of $11,683.50 for fiscal year 1953, a total of
$15,100, will be applied as follows:
Accounts payable June 30, 1952-------------------------------$100
Maintenance:
    Operation of plant for collection and removal of drift material, with
      Government plant and hired labor, 12 months, July 1952-
      June 1953.--------------------------------------------15,           000
        Total for all work--------------- -----------        -          15,100
                RIVERS AND HARBORS---NORFOLK,                                      VA.,       DISTRICT               447
  The additional sum of $20,000 can be profitably expended for the
following scheduled work during the fiscal year 1954:
Maintenance:
    Operation of plant for collection and removal of drift material,
      with Government plant and hired labor, 12 months, July 1953-
      June 1954        ------------------------    -------------     $20, 000

                                        Cost and financial summary

                                                     Fiscal year ending June 30                             Total to June
                                                                                                           30, 1952, includ-
                                                                                                           ing fiscal years
                                    1948           1949            1950           1951          1952        prior to 1948


Maintenance:
   Appropriated-        ......- -               ............-............        $20,000.00   $15,000.00         $35,000.00
   Cost-----------------................-------------------............ --------  14,514.85    17,168.65          31,683.50
   Expenditures----------...................---------------      ............14,514.85         17,988.72          32,503.57



13. ATLANTIC INTRACOASTAL WATERWAY BETWEEN NORFOLK, VA.,
       AND THE STI. JOHNS RIVER; FLA. (NORFOLK DISTRICT)
   Location.-The improvement described herein consists of two
inland water routes approximately paralleling the Atlantic coast
south of Norfolk, Va., and located (1) between a point in the Southern
Branich of Elizabeth River, Va., 2,500 feet above the Norfolk &
Western Railway bridge and the Virginia-North Carolina State line
in North Landing River, a distance of 27.2 miles, and (2) between
the mouth of Deep Creek, Va., and the mouth of Pasquotank River,
N. C., a distance of 64.6 miles. These routes are shown on United
States Coast and Geodetic Survey Charts Nos. 452, 1227, 829, and 830.
   Previous projects.-Partialprojects were adopted by River and
Harbors Acts of March 3, 1873, June 18, 1878, March 3, 1879, June
14, 1880, March 3, 1881, and September 19, 1890. For further details
see page 497, annual report for 1932, and page 476, annual report
for 1938.
   Existing project.-This provides for a channel 12 feet deep at
mean low water and 90 feet to 250 feet wide following the South-
ern Branch of Elizabeth River, 5.2 miles, the Virginia Land Cut
8.3 miles, and North Landing River, 13.7 miles; the construction of
a tidal guard lock at Great Bridge, Va.; and for the protection of
the canal property in the vicinity of the lock against flooding by
storm tides through construction of necessary dikes and appurtenant
works. It also provides for channels 10 feet deep at mean low water
and 80 feet to 100 feet wide in Deep Creek, 3.1 miles, Turners Cut,
4.3 miles, and Pasquotank River, 35.1 miles; maintaining Dismal
Swamp Canal, 22.1 miles, to a depth of about 9 feet mean canal
level over a width of 50 feet; the protection of banks in Turners Cut
with sheet piling, and cutting certain sharp points in Pasquotank
River to shorten its course.
448           REPORT OF CHIEF OF ENGINEERS,                                 U.    S. ARMY,        1952

                    Data relative to the completed locks included in the project



                                        Dimensions           Depth   on
                                                             miter sills

Miles                                      Great-                                                   Year
from                                         est                                  Character of    opened       Actual
Nor-               Location        Width length                                   foundation      to navi-      cost
folk,                                 of   avail- Lift Upper Lower                                 gation
Va.                               cham-    able (feet) (feet) (feet)
                                     ber for full
                                    (feet) width
                                            (feet)

  12. 4    Albermarle and Ches-        75      600    2. 7   (1)      (1)        Piles in sand     1932      $499, 913.00
             apeake Canal                                                          and shells.
             (Great Bridge,
             Va.)
  10. 7    Dismal Swamp Ca-            52      300   12        12          12  Natural earth       1940      348,878. 83
             nal (Deep Creek,                                                    with cut-oft
             Va.)                                                                walls.
  33. 1    Dismal Swamp Ca-            52      300   12        12                     .........
                                                                           13 ..... do--------     1941       372, 556.40
            nal (South Mills,
             N. C.)

  116 feet at mean low water.

   The Southern Branch of Elizabeth River and the Deep Creek
sections of the two routes are tidal, the mean range being about
2,7 feet with extreme of -2 and + 9.6 feet. The remaining sections
are nontidal with fluctuations of 1 to 2 feet in level due to winds.
  The estimate of cost for new work, made in 1950, was $3,435,300.
The latest (1952) approved estimate of cost for annual maintenance
was $544,300, including $405,500 for operating and care.
  The existing project was authorized by the following river and
harbor acts:

       Acts                           Work authorized                                       Documents

Mar.      3,1899    Existing project dimensions and original route, water-
                                                                        H. Doc. 317, 54th Cong., 1st sess.
                     way from Norfolk, Va., to sounds of North Carolina. and annual report 1896, p. 1086;
                                                                         H. Doc. 131, 55th Cong., 3d sess.,
                                                                         and annual report, 1899, p. 1485.
July 25,1912 Original route of the Norfolk-Beaufort Inlet section...--- H. Doc. 391, 62d Cong., 2d sess.
    Do-.......Purchase of Cheaspeake & Albemarle Co. canal-....... H. Doc. 589, 62d Cong., 2d sess.
Mar. 3,1925 Purchase of Lake Drummond Canal (Dismal Swamp Rivers and Harbors Committee
                 Canal).                                                 Doc. 5, 67th Cong., 2d sess.
July 3, 1930 Construction of a tidal lock at Great Bridge at a limit S. Doc. 23, 71st Cong., 1st sess.t
                 of cost not to exceed $500,000.
June26, 1934s Operating and care of the works of improvement pro-
                 vided for with funds from War Department appro-
                 priations for rivers and harbors.
Mar. 2,1945 Construction of dikes for protection of canal property H. Doc. 117, 76th Cong., 1st sess.
                 against flood tides.

 ' Contains latest published map, both routes.
  2 Permanent Appropriations Repeal Act.

  Local cooperation.-None required.
  Terminal facilities.-Terminal facilities serving the two water
routes at the northern terminus are described in the report for Norfolk
Harbor, Va. South of Norfolk there are 3 piers, 15 wharves, 6 land-
ings, 5 marine railways, and 3 bulkheads serving these routes. The
          RIVERS   AND   HARBORS-NORFOLK,      VA.,   DISTRICT     449
landings are publicly owned and are open to the public without charge.
The remaining facilities are privately owned and are open to the public
at a nominal charge. These facilities are considered adequate for
existing commerce.
   Operations and results during fiscal year.--Replacement of the
North Landing Bridge, by contract, with a new double-leaf horizon-
tal swing bridge in progress at the beginning of the fiscal year was
continued to October 15, 1951 when the work was completed. The
cost of the work was $106,632.81.
   Consulting engineer services to the contract for replacement of the
North Landing Bridge were completed during the year at a cost of
$2,197.11.
   Maintenance dredging, by contract, in Lower North Landing River
and in the Southern Branch of the Elizabeth River, was commenced
June 23, 1952, and continued to the end of the fiscal year. There were
removed 84,000 cubic yards of material, place measurement. The
cost of the work was $16,212.22. The contract is approximately 34
percent complete.
   Maintenance snagging and bank trimming, with the United States
derrick boat Roanoke, were commenced September 1, 1951, and con-
tinued intermittently to the end of the fiscal year when the work was
completed. The cost of the work was $45,954.84.
   Preliminary engineering for maintenance dredging, consisting of
surveys, investigation of disposal areas, preparation of plans and
specifications, etc., with Government plant and hired labor, was accom-
plished during the year at a cost of $4,862.
   Maintenance condition surveys, with Government plant and hired
labor, were made during the year at a cost of $3,351.70.
   Replacement of explanatory and directional signs along the water-
ways, with Government plant and hired labor, was made during the
year at a cost of $3,467.21.
   Miscellaneous studies, tide gaging, water level and salinity studies,
etc., with Government plant and hired labor were made during the
year at a cost of $8,284.30.
   Maintenance development of a raydist hyperbolic control system
and working maps for the waterways, with Government plant and
hired labor, was carried on during the year at a cost of $3,228.83.
   Operation and care of the locks, bridges, spillways, wharves, canal
plant, grounds, roads, etc., was carried on during the year as required.
The cost of the work was $160,081.98 for operation and $63,767.36 for
ordinary maintenance and repairs, a total of $223,849.34.
   The total cost of the work was $418,040.36, of which $194,191.02 was
for maintenance and $223,849.34 for operation and care. The total
expenditure was $424,158.92.
   Condition at end of fiscal year.-The existing project was about
99 percent complete at the end of the fiscal year. Construction of
the Southern Branch of the Elizabeth River and North Landing
River portions of the project was commenced in 1915 and continued
intermittently to May 1920, when the work was completed. The
Albemarle & Chesapeake Canal was acquired by the United States
450             REPORT OF CHIEF OF ENGINEERS,                    U.   S. ARMY,                 1952

from the Albermarle & Chesapeake Canal Co. on April 30, 1913, for
$500,000. Construction of the Deep Creek, Turners Cut, and Pasquo-
tank River portions of the project was commenced in August 1899,
and continued intermittently to June 1902, when the work was com-
pleted. The Dismal Swamp Canal was acquired by the United States
from the Lake Drummond Canal and Water Co. on March 30, 1929, for
$500,000.
  A tidal guard lock in the Albemarle & Chesapeake Canal at Great
Bridge, Va., was completed in 1932. Locks at Deep Creek, Va., and
South Mills, N. C., on the Dismal Swamp Canal were built in 1940
and 1941 respectively. (See table in paragraph "Existing project.")
The locks are in good condition.
  The controlling depths at the end of the fiscal year are as follows:

                                                                   Controlling
                                                                 depths: 80 per-
                                                                 cent of project
                                 Name of channel                 width, 40 per-             Date determined
                                                                 cent on either
                                                                  side of center
                                                                    line (feet)

Southern Branch of the Elizabeth River, Va.                                1 8.7          February 1952.
Virginia Cut, Va -- _---..---------------.....---.-----2                   12.0           July 1948.
North Landing River, Va--                                                  10.0 January 1952.
                                                                          a-----------------------
Deep Creek, Va- ------------------------------------------                 19. 8 January-April 1951.
Dismal Swamp Canal-------------------------------------                  -8.9       March 1952.
Turners Cut, N. OC ...............................           .            681....8.9.44   May-June 1951.
Pasquotank River, N. C----------...-......................                                January-February
                                                                                            1947.

  1Depths are referred to mean low water.
  s Depths are referred to Virginia Cut datum.
  =Depths are referred to North Landing River datum.
  4 Depths are referred to canal datum.
  5 Depths are referred to ordinary low water.

  The work remaining to be done to complete the project consists
of protection to canal property in the vicinity of the lock at Great
Bridge, Va., against flooding by storm tides, through construction
of necessary dikes and appurtenant works.
   The total cost of the existing project to June 30, 1952, was $11,-
733,937.37, of which $3,396,276.30 (including $1,000,000 for the pur-
chase of the Albemarle & Chesapeake Canal and the Dismal Swamp
Canal) was for new work; $4,033,875.29 for maintenance; and $4,303,-
785.78 for operation and care.
  The total expenditure was $11,721,629.98.
  Proposed operations.-The unexpended balance on June 30, 1952,
in the amount of $98,163.50 plus accounts receivable in the amount
of $4,578.62 plus allotments of $30,477.19 for maintenance and $233,-
000 for operation and care for fiscal year 1953, a total of $366,219.31,
will be applied as follows:
             RIVERS AND HARBORS--NORFOLK,                        VA., DISTRICT             451
Accounts payable June 30, 1952----------                         --------------      $16, 886.01
Maintenance:
   Dredging, by contract, to complete contract in progress
      at beginning of fiscal year in Lower North Landing
      River and Southern Branch of the Elizabeth River,
      0.7 month, J'uly 1952___   ---- __------------_$31,                 650. 00
    Snagging and bank trimming on Albemarle and Chesa-
      peake Canal route, with a United States derrick
     boat, 4 months, July-October 1952_.---.-------                    20,000.00
   Condition surveys on both waterways, with Govern-
     ment plant and hired labor, 2 months, November-
     December 1952 ---------------------------                         11, 760. 00
   Planning and developing a raydist hyperbolic control
     system and working maps for Lower North Landing
     River, intermittently July 1952-June 1953            _------       6, 000. 00
   Miscellaneous water level investigations, salinity stud-
     ies, maintenance of tide gages, etc., with Govern-
     ment plant and hired labor, intermittently, July
     1952-June 1953--------------------------------                     5,939.09
   Miscellaneous inspections and reports, with Govern-
     mnent plant and hired labor, intermittently July
     1952-June 1953----         --------------------- ----              2, 500. 00

      Total maintenance-------------------------------                77, 849.09
Maintenance (operation and care) :
   Operation of locks, bridges, spillways, etc -------- $163, 000. 00
   Ordinary maintenance and repairs         .------   __------_108,
                                                              484.21

      Total operation and care__-----------..........-----....                     271, 484. 21

      Total for all work------------                ---------------------- 366,219.31
  The additional sum of $434,500 for maintenance can be profitably
expended for the following scheduled work during fiscal year 1954:
Maintenance:
   Snagging and bank trimming on both waterways, with a
      United States derrick boat, 10 months, October 1953-
      June 1954----            ------------------------ -------  $50, 000
   Condition surveys on both waterways, with Government
      plant and hired labor, 2 months, November-December
      1953 --------------------------------------               -10, 000
   Miscellaneous water level investigations, salinity studies,
      and compilation of data, with Government plant and
      hired labor intermittently, July 1953-June 1954___,-        10,000
   Miscellaneous inspections and reports, with Government
      plant and hired labor, intermittently, J'uly 1953-June
      1954       -----------------------------------------         2, 500

      Total maintenance------------------------------------ $72, 500
Maintenance (operation and care) :
   Operation of locks, bridges, spillways, etc------------ $170,000
   Ordinary maintenance and repairs---  ....... ------      123, 000
   Improvement and reconstruction--. __,,_----------...... 67, 000

      Total maintenance (operation and care) ---------------------- 360, 000

      Total for all work-------            ------------------------------ 432, 500
452           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                                         Cost and financial summary

                                                       Fiscal year ending June 30                            Total to June
                                                                                                            30, 1952, includ-
                                                                                                            ing fiscal years
                                     1948           1949           1950           1951           1952        prior to 1948


New work:
   Appropriated ........               -----.............--------------      --------------------
                                                                                     ----         -------      $3,688,371.95
   Cost...----     ---------------------------------------------------------                                    3, 688,371.95
   Expenditures...-----              ------------------------------------------------                           3,688,371.95
Maintenance:
   Appropriated-------.....$463, 300.00 $471,344.68 $777, 350.00 $453, 456.31 $297, 432.00                      8, 476, 321.53
   Cost.....--------------. 461, 306. 85 496, 823. 22 469, 435. 42 604, 687. 88 418, 040. 36                    8, 390, 465. 42
   Expenditures-------.......-- 462, 541.55 498, 713.52 469, 435.42 586, 261.93 424, 158. 92                    8, 378,158. 03


Other new work data: Estimated additional amount needed to be ap-
propriated for completion of existing project------------------- $39, 000

     14. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

  The total cost of the work during the fiscal year was $78,633.06. The
total expenditure was $79,719.56. The unexpended balance for ex-
aminations and surveys on June 30, 1952, in the amount of $1,485.31
plus accounts receivable in the amount of $831.03 plus an allotment
of $9,300 for fiscal year 1953, a total of $11,616.34, will be applied
during the year to payment of expenses to be incurred under this
heading. The unexpended balance for contingencies on June 30, 1952,
in the amount of $3,170.14 plus an allotment of $34,500 for fiscal year
1953, a total of $37,670.14, will be applied during the year to accounts
payable in the amount of $166.57 and to payment of expenses to be
incurred under this heading.
   The additional sum of $116,500 can be profitably expended during
fiscal year 1954, df which $9,900 will be applied to examinations and
surveys and $106,600 to contingencies.
                                        Cost and financial summary

                                                       Fiscal year ending June 30                            Total to June
                                                                                                            30,1952, includ-
                                                                                                            ing fiscal years
                                     1948          1949           1950            1951          1952         priorto 1948

Maintenance:
   Appropriated,........ $148, 349. 87 $210, 550. 00 $159, 690. 00 $112, 000.00              $48, 250.00      $1, 730,680. 96
   Cost--....  ......------------.117, 434. 58 225, 434. 53 167, 916. 16 98, 626. 29          78, 633. 06     i 1, 725, 361.05
   Expenditures----.........      117,434. 58 225, 434. 53 161, 420. 16 104, 700. 25          79, 719. 56     11,  726, 025. 51

   In addition, $4,862.50 expended from contributed funds for beach erosion studies.

                 15. PLANT ALLOTMENT, NORFOLK, VA., DISTRICT
                                        Cost and financial summary

                                                       Fiscal year ending June 30                           Total to June
                                                   _    _..           .       .    .-                       30, 1952, includ-
                                                                                                            ing fiscal years
                                    1948           1949           1950            1951          1952          prior to 1948

Maintenance:
   Appropriated......... -$150,000.00 ............  ............ $4,629,552.19 -$39, 600. 79                  $4, 747, 800. 98
   Cost ...........  .    ...........
   Expenditures.........   -74,095.96 $129, 592. 21 -$221,229.60 4,721,974.92     39, 490. 69                  4, 520, 885. 77
                        RIVERS             AND HARBORS-NORFOLK,                                           VA.,        DISTRICT                       453
                                     16. INACTIVE NAVIGATION PROJECTS

                                                                                                          Cost and expenditures
                                                                                           For last          to June 30, 1952                   Estimated
                                             Name of project                              full report                                            amount
                               Name o project                                             see Annual                                            required to
                                                                                          Reportfor-      New work              Mainte-          complete
                                                                                                                                nance

  1.   Onancock River, Va._---------------------_-----...                                    1951     $154, 364. 89 $75, 689. 11                    (a)
2.    Nandua Creek Va.1 ......                            ...........                .      1950           6, 987. 81           2, 987. 76         (3)
3.    Occohannock Creek, Va.l ..........----------
                                               - - - - - - - - - - - - - - - - - -           1951         13, 859. 14           36, 723. 48         $83, 600
4.    Little Machipongo River, Va.                                                          1950         15, 000. 00           12, 596. 44         (3)
5.    Kings Creek, Va.=                                                                     1950        --------........        .........           113, 300
6.    Cape Charles City Harbor, Va.------------------                                       1950       648, 381.02             80, 716. 38          192, 400
7.    Winter Harbor, Va ..................-...........                                      1950-----------------------............                 221, 200
8.    Davis Creek, Va.'.-----------------------------_.1950                                          ........................                        91, 700
9.    Mattaponi River, Va. _____________---                           ___                   1950         32, 586. 39           82, 078. 85          148, 900
10.    Pamunkey River, Va._-----               __-_________---------                         1951         31, 376. 44 154, 345. 55                    32, 900
11.    York River, Va.' .             .------
                                    __--.---------------------                               1941       180, 904. 20 173, 354. 65                    128, 000
12.    Portsmouth Harbor, Va. Channel to Nansemond
         Ordnance Depot 1-1_.               .1947                                                       165, 565. 50            66, 162. 32         (3)
13.    Hampton Creek, Va. _..--------------------------                                      1950       237, 205. 90            14, 128. 75         (3)
14.    Channel from Phoebus, Va. to Deep Water in
         Hampton Roads 1__  --                -_-____--_________-____1944                              411, 500.00 11, 750. 00                      (3)
15.    Deep Creek, Va..------...........---...........-----------------....                  1951         25, 637. 45           57,177. 98          185, 500
16.    Lafayette River, Va. .'-------.....................------------------....             1950         12, 048. 19            1, 000. 00         (3)
17.    Knobbs Creek, Va.'                               __......... .          _.._____
                                                                                ....         1950         80, 500. 00           25, 000. 13         (8)
18.    Blackwater River, Va.......--------                          .........----------------1950         22, 044. 33           76, 455. 67         281, 600
19.    Horn Harbor, Va-----------_____           ___         ------__-             -----     1950         11, 486. 79           21, 471. 60         (3)
20.    Channel connecting York River, Va. with Black
         Creek to Slaight Wharf ___- _ . ......-.-         -               .....
                                                                       ____-1950                          14, 854. 71           19, 827. 93         (3)
21.    Appomattox River, Va---    ....-.. _________-                         -____           1950       847, 841. 39           530, 815. 23         334, 500
22.    Pagan River, Va..----                             .............--------------------..1950          30, 754. 48 256, 414. 22                  (3)


  1Channels   adequate for commerce.
  s Construction funds not available.
  3 Completed.
  4 In addition, $1,199.57 expended from contributed funds.


                                           17. MISCELLANEOUS                                 ACTIVITIES

btatus of all investigationsfor navigation called for by river and harbor acts and
                              committee resolutions

                                                                                                        Date trans-          Document            Recom-
                     Locality                                   Authorization act                        mitted to             No.              mendation
                                                                                                         Congress

Aberdeen Creek, Gloucester                               River       and Harbor Act,
  County, Va.                                             July      24, 1946.
Albemarle Sound and Pasquotank                           River      and Harbor Act,                -------------
   River, side channel 12 feet deep                       Mar.      2, 1945.
  to Elizabeth City from Norfolk,
  Va., to Beaufort, N. C., Inland
  Waterway.
Back Bay, Va., with a view to re-                        Senate Public Works Com-
lieving inundation and improv-                           mittee resolution, June
ing drainage conditions in those                         9, 1948.
  portions of Princess Anne
  County.
Back River, York County, Va.,                            River and Harbor                   Act,                 - - -- - - - - - - - - - - -
                                                                                                            - - --
channel connecting Back River                            June 30, 1948.
with Front Cove.
Beaufort, N. C., to Norfolk, Va.,                        River and Harbor                   Act,
  Inland Waterway, side channel                           Mar. 2, 1945.
  12 feet deep to Elizabeth City,
  N. C., via Pasquotank River
  and Albemarle Sound.
Bennetts Creek, York County, Va                          River       and Harbor             Act,
                                                          June      30, 1948.
Browns Bay, Gloucester County,                           River      and Harbor              Act,
                                                                                                   ---------------
  Va., and channel connecting                             Mar.      2, 1945.
  with Mobjack Bay.
Chuckatuck Creek, Nansemond                            -----   do-- ....--------------
  and Isle of Wight Counties, Va.
Elizabeth City, N. C., side channel                    -....
                                                        -do--         .----------------
  12 feet deep to Elizabeth City
  from Norfolk, Va., to Beaufort
  N. C., Inland Waterway.
454           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

Status of all investigations for navigation called for by river and harbor aots
                     and committee resolutions--Continued

                                                                              Date trans-                 Document   Recomn
                Locality                         Authorization act            mitted to                      o   mendo
                                                                               Congress                     No.    mendation

Elizabeth River, Eastern Branch,           Senate Public Works Com-         ---- ---- ----
Norfolk Harbor, Va.                         mittee resolution, June
                                             10, 1947.
Elizabeth River, Southern Branch           Senate Public Works Com-         ----- -----
  Norfolk Harbor, Va., including             mittee resolution, Mar. 4,
  Norfolk Creek.                             1947.
Finneys Creek, Accomack County,            River and Harbor Act,            ---- ---- ----
  Va., and channel connecting said           Mar. 2, 1945.
  creek with Wachapreague Inlet
  and the Atlantic Ocean.
Front Cove to Back River, Va.,             River and Harbor Act,            ---- ---- ----
  channel conncting.                        June 30, 1948.
Hampton Creek, Va----------_._..           House Public Works Com-          ---------------
                                            mittee resolution, Apr. 5,
                                            1949.
Hopewell, Va., at or near with a           River and Harbor Act,             -------------
  view to construction of a harbor          July 24, 1946.
  for light draft vessels.
tones Creek and Pagan River, Va_.       House Public Works Com- ---------------
                                          mittee resolution, Sept.
                                          27, 1951.
Lafayette River, Va---------------- River and Harbor Com-                        ------------

                                          mittee resolution, Mar. 2,
                                          1939.
Little Creek, Princess Anne River and Harbor Act, ---- ,---------,
   County, Va.                            Mar. 2, 1945.
Lynnhaven Inlet and Bay and ---.....do---.....---------------            ---------------
   connecting waters, Va., with a
   view to preparing a plan of im-
   provement and estimate of cost,
   particularly to prevent shoaling,
   in the interest of shellfish produc-
   tion and navigation.
Mobjack Bay, and channel con- .....          do.....           ....---------------------------------
  necting, Browns Bay, Gloucester
   County, Va.
Nansemond River, Va., improve- River and Harbor Com- ------- ------
  ment and maintenance of channel         mittee resolution, July
  through Bennett Creek.                  20, 1946.
Newport News, Va., Salters Creek_ River and Harbor Act, ---- ---- ----
                                          July 24, 1946.
Norfolk Harbor, Va.                     Senate Public Works Com-
                                          mittee resolution, June              - - --   - -   - -   - -



                                          17, 1949.                      ---- ---- ----
Norfolk Harbor, Va., including Senate Public Works Com-
   Norfolk Creek, Southern Branch         mittee resolution, Mar. 4, --- --- --- --
   of Elizabeth River.                    1947.
Norfolk Harbor, Va., Eastern Senate Public Works Com-
   Branch of Elizabeth River.             mittee resolution, June --- --- --- --
                                          10, 1947.
Norfolk Harborand Thimble Shoal Senate Public Works Com-
   Channel, with a view to increas-       mittee resolution, Oct.
   ing project dimensions of main         14, 1949.
   channels serving the Port of
   Norfolk.
Norfolk, Va., to Beaufort, N. C.,       River and Harbor Act,
   Inland Waterway, side channel          Mar. 2, 1945.
   12 feet deep to Elizabeth City,
  N. C., via Pasquotank River
  and Albemarle Sound.
Norfolk, Va., to Beaufort Inlet, Senate Public Works Com-
  Inland Waterway with view to            mittee resolution, June 9,
  relieving inundation and improv-        1948.
  ing drainage of farm lands in
  Princess Anne County along
  Back Bay and North Landing
   River, Va., and tributaries.
North Landing River, Va., and
  tributaries, with a view to reliev-
  ing inundation and improving
  drainage conditions in those por-
  tions of Princess Anne County.
Oyster, Va., to Atlantic Ocean, Senate Public Works Com- ---------------
  channel.                               mittee resolution, Nov.
                                          8, 1948.
Pagan River and Jones Creek, Va. House Public Works Com- ---------------
                                          mittee resolution, Sept.
                                         27, 1951.
               RIVERS AND HARBORS-NORFOLK,                                  VA.,      DISTRICT          455
Status of all investigations for navigation called for by river and harbor acts
                      and committee resolutions--Continued

                                                                         Date trans-      Document  Recom-
              Locality                    Authorization act               mitted to       Do.      mendation
                                                                          Congress

Pasquotank River and Albemarle        River and Harbor Act, -...........-.- ....-.--....
Sound, side channel 12 feet deep      Mar. 2, 1945.
to Elizabeth City from Norfolk,
Va., to Beaufort, N. C., Inland
Waterway.
Pasquotank River, N. C., water-       River and Harbor       Com- .....................
way from Norfolk, Va., to the          mittee resolution,    Jan.
sounds of N. C.                        27, 1937.
Port of Norfolk, project dimensions   Senate Public Works    Com-..........               ...........
of main channels serving the.          mittee resolution,    Oct.
                                        14, 1949.
Queens Creek, York County, Va.,       House Public Works      Com- .               ...........
with a view to determining if          mittee resolution,    June
improvement in interest of navi-       17, 1948.
  gation is advisable at this time.
Salters Creek, Newport News, Va_ River and Harbor Act, .............. ............          -
                                        July 24, 1946.
South Norfolk Basin (Norfolk Senate Public Works Com-......................
  Creek), Va.                           mittee resolution, Mar. 4,
                                        1947.
Thimble Shoal Channel and Senate Public Works Com- ......................--             ---
  Norfolk Harbor, Va., with a view     mittee resolution, Oct.
  to increasing project dimensions      14, 1949.
  of main channels serving the Port
  of Norfolk, Va.
Virginia Beach, Va., Beach erosion River and Harbor Act, .........................
study.                                 July 3, 1930; Act of Con-
                                        gress, July 31, 1945.
Willoughby Channel, Va---------...... Senate Public Works Com----------         ------------
                                        mittee resolution, Mar.
                                        12, 1949.


                    18. ROANOKE RIVER BASIN, VA. AND N. C.

  Location.-The works covered by this project consist of a series of
dams and reservoirs in the Roanoke River and its tributaries in Vir-
ginia and North Carolina, within a radius of 100 miles from Danville,
Va.
   Existing.project.-The Flood Control Act approved December 22,
1944, approved the general plan for the comprehensive development
of the Roanoke River Basin for flood control and other purposes as
set forth in House Document 650, Seventy-eighth Congress, second
session, and authorized the construction of the John H. Kerr Reservoir
(formerly known as the Buggs Island Reservoir) on the Roanoke
River in Virginia and North Carolina, and the Philpott Reservoir on
the Smith River in Virginia as the initial step of this development.
   Following is a list of the dams and reservoirs included in the
comprehensive plan. The estimates of cost as given were revised in
1952.
                                                                                           Dam8 and reservoirs                                                                                                        4

                                                                                                                 DtcEstimated                                                                  cost                   LBJ
                                                                            Distance                                                    Reservoir      Power de-
               Name                             Nearest city                 above                Height of dam and type                 capacity     velopment
                                                                             (miles)                                                    (acre-feet)   (kilowatts)   Construc-      Land and             Total
                                                                                                                                                                       tion        damages?2


                                                                                                                                                                                                                      0-
John H. Kerr, Va. and N. C.4_ Boydton, Va--------------                         178. 7   144 feet, concrete gravity and earth fill-.... 2, 808, 000      204, 000 $62, 800, 000 $24, 350, 000         $87, 150, 000   N
                                                                                                                                                                                                                      ITJ
Philpot, Va.t-.........                 Bassett, Va_-         -   -         -_ 336. 2    220 feet, concrete gravity 5 --       -           249, 800       14, 000   12, 200, 000    1, 140, 000        13, 340, 000
Gaston, Va. and N. C- ...           -    Roanoke Rapids, N. C ...               144. 9   108 feet, concrete gravity and earth fill__.__    432, 000       54, 000   24, 200, 000    3, 100, 000        27, 300, 000   0
Roanoke Rapids, N. C.6 ......          ---- do                                  137.0    75 feet, concrete gravity_ ----------           -_ 59, 300       83, 700   28, 100, n00       700, 000        28, 800, 000
Smith Mountain, Va---------...... Altavista, Va -.                              314. 2   244 feet, concrete gravity ----------------- 825, 000            41, 000   25, 080, 000    3, 420, 000        28, 500, 000
Leesville, Va____..          ........----- do..--------------------             293. 7   95 feet, concrete gravity and earth fill .....     76, 900       20, 000    8, 200, 000       900, 000         9, 100, 000
Taber, Va-........-.        .....__     ..  do-------------------               275. 0   54 feet, concrete gravity _------- -----------     34, 000       12, 000    7, 200, 000    1, 500, 000         8, 700, 000
Melrose, Va _.       ._____       __.    Brookneal, Va_. ---                    262. 9   110 feet, concrete gravity and earth fill ...     120, 000       43, 000   15, 900, 000    5, 400, 000       721, 300, 000
Randolph, Va_ __ ____---                 Chase City, Va -               -       227.8    147 feet, concrete gravity and earth fill---      305, 000       48, 000   19, 800, 000    4, 300, 000        24, 100, 000
Stuart, Va. and N. C--------...          Spray, N. C---------------297.              2   138 feet, earth fill______________________        163, 000       15, 000    8, 100, 000    1, 000, 000         9, 100, 000
                                                                                                                                                                                                                      0
Schoolfleld, Va. and N. C_ ....          Danville, Va ...------------           265. 9   126 feet, concrete gravity and earth fill....     248, 000       80, 000   24, 900, 000    5, 800, 000        30, 700, 000


  1Mouth of Roanoke River at Albemarle Sound.                                                                6 Based on modified plan developed in fiscal year 1949.
  s Includes highway, railroad, and utilities relocation.                                                    7 Includes cost of earth dam on Whipping Creek, diversion conduit, p)ower canal,
  a Exclusive of transmission lines.                                                                       powerhouse, etc.
  4 Details of these project items are given in individual reports.
  5 Authorizing legislation provided for earth dam; concrete gravity dam now under
                                                                                                                                                                                                                      0


construction.                                                                                                                                                                                                         ti:
                                                                                                                                                                                                                      h1


                                                                                                                                                                                                                      n

                                                                                                                                                                                                                      t.
             FLOOD CONTROL--NORFOLK,       VA.,   DISTRICT         457
  Local cooperation.-See pages 4-5 for requirements.
  John H. Kerr. and Philpott Reservoirs are the only projects in the
comprehensive plan that have been authorized for construction in
accordance with the above authorization, and individual reports on
the two reservoirs are given in the following pages. All operations
previously reported under the heading "Roanoke River Basin, Va.
and N. C.," for those two projects are now contained in the individual
reports, and previous costs and expenditures have also been transferred
to those reports.
19. JOHN H. KERR RESERVOIR, ROANOKE RIVER BASIN, VA. AND N. C.

   Location.-The site for the John H. Kerr Dam is on the Roanoke
River, about 178.7 river miles above the mouth. It is in Mecklenburg
County, Va., 20.3 miles downstream from Clarksville, Va., 18 miles
upstream from the Virginia-North Carolina State line, and 80 miles
southwest of Richmond, Va. At the elevation of the top of gates,
the reservoir will extend upstream on the Roanoke River 56 miles and
on the Dan River 34 miles.
   Existing project.--This project provides for the construction of a
concrete gravity dam with wing and saddle dikes on the right and
left banks, with a total length of approximately 22,285 feet. The,
main dam will consist of a nonoverflow concrete section on the right
bank 629 feet long, a concrete spillway section 1,092 feet long, a con-
crete power intake section 614 feet long, and a concrete nonoverflow
section on the left bank 450 feet long. The right bank earth wing and
saddle dikes will total 9,050 feet in length and the left bank wing and
saddle dikes will total 10,450 feet in length. The maximum height of
the concrete section will be 144 feet above bed rock and the earth-fill
dikes will vary in height to a maximum of 45 feet. At the elevation
of the top of gates, the dam will provide a total storage capacity of
2,808,000 acre-feet of which 1,278,000 acre-feet will be flood storage;.
1,046,000 acre-feet, power draw-down; and 484,000 acre-feet in dead
storage below the surface of the minimum power pool. The reservoir
will be operated as a unit of a coordinated system of reservoirs in the
Roanoke River Basin for the control of floods, the generation of hydro-
electric power, the regulation of low-water flow for the abatement of
pollution, and for other purposes. The power installation will be
204,000 kilowatts.
   The estimate of cost, revised in 1952, is $62,800,000 for construction
and $24,350,000 for lands and damages, including the relocation of
highways, railroads, and utilities, a total of $87,150,000 for new work.
   The existing project was authorized by the Flood Control Act ap-
proved December 22, 1944, which approved the general plan for the
comprehensive development of the Roanoke River Basin for flood'
control and other purposes as set forth in House Document 650,.
Seventy-eighth Congress, second session. The latest published map is
printed in the project document.
   Local cooperation.-See pages 4-5 for requirements.
    Operations and results during fiscal year.-Operations, by hired
labor, consisted of preparation of contract plans and specifications
for the construction of the project and land acquisition activities.
458     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,           1952

The acceptance of options and filing of condemnation proceedings on
an additional 14,504 acres of land were accomplished. All segment
maps, and negotiations with the town of Clarksville as to relocations
of water and sewer facilities, were completed. Letter agreements
relating to all highway and railroad relocations were completed.
Four utility relocation agreements were completed and two additional
agreements were being processed. Four hundred fourteen parcels
of land were leased for agricultural purposes. Planning for recre-
ation and other land uses, for reservoir regulation, for malaria con-
trol, and for maintenance of sedimentation records was continued
during the year.
   Operations, by contract, were continued to completion for con-
struction of the concrete dam and powerhouse substructure, Island
Creek Dam, the earth wing and saddle dikes, closure of the temporary
culverts, and for furnishing station service turbines, trash racks,
guides and lifting beams, mobile crane, gantry crane, and Island
Creek sluice valves. Contracts for clearing 10 parcels of the reservoir
area were completed and the two remaining groups of cemeteries
were relocated. Alterations to Staunton River State Park were
made and contracts for relocation of the Southern Railway over
Roanoke River, the Southern Railway connection at Clarksville and
N. C. secondary highway north of Drewry were completed. Con-
tracts were continued for construction of the powerhouse and switch-
yard and for furnishing cement, turbines, governors, generators,
transformers, oil circuit breakers, generator main leads and cubicles,
powerhouse elevator, main control switchboards, PAX equipment,
station auxiliaries, switchyard steel, high voltage pipe cable system,
intake gates, guides and hoists, and Island Creek pumps and motors.
Construction of Island Creek substation, relocation of U. S. Highway
58 over Butchers and Rudds Creeks and N. C. Highway 39 over Flat
and Crooked Run Creeks, and clearing the reservoir area were also
continued during the year. Contracts were initiated during the
fiscal year for construction of Island Creek pumping station, Island
Creek transmission line, the access highway on the right bank, for
furnishing coupling capacitors, and lightning arrestors and insula-
tors, and for relocation of U. S. Highway 15 over Bluestone Creek
and Va. Highway 49 over Goodells Creek, U. S. Highway 15 and
Southern Railway south of Clarksville, U. S. Highway 58 west of
Clarksville, Atlantic and Danville Railway, U. S. Highways 15 and
58 over Roanoke River, N. C. secondary highway over Andersons
Swamp, Mill and Nutbush Creeks, Va. Highway 712 over Island
Creek, Va. Highways 688 over Butchers Creek and 693 over Pan-
handle Branch, N. C. secondary highway over Grassy and Spewmar-
row Creeks, and Va. Highways 609, 640, and 702. Contracts were
also initiated for relocation of the water and sanitary facilities at
Clarksville and settlements have been made with the Carolina Power
and Light Co., American Telephone & Telegraph Co., Piedmont
Electric Membership Corp., and the Carolina Telephone & Telegraph
Co. for alterations to their facilities affected by the project.
   The total cost of the work for the fiscal year was $19,168,521.70, all
for new work. The total expenditure for the fiscal year was
$18,733,322.88.
             FLOOD CONTROL--NORFOLK,       VA., DISTRICT         459
   Condition at end of fjcal year.--Construction of the project was
initiated in February 1946, and the project as a whole is 78 percent
complete as of June 30, 1952; 107,175 acres or 91 percent of the
entire reservoir area have been acquired. The, project is already
providing partial flood control.
   The :Government construction camp, access highway on the left
bank, access railroad, concrete dam and powerhouse substructure,
Island Creek Dam, and earth wing and saddle dikes are completed.
Supply contracts for furnishing sluice gates and controls, draft tube
gates, plate steel penstocks; stop logs, guides and lifting beams;
tainter gates, operating machinery and controls; intermediate tur-
bine; station service turbines; anchor bolt assemblies; mobile crane;
station service generators; powerhouse crane; gantry crane; con-
crete aggregate; trash racks, guides and lifting beams; Island Creek
sluice valves; and freight elevator in the dam have been completed.
Closure of the temporary culverts has been made. Parcels "A"
through "L" of the reservoir area have been cleared and all ceme-
teries have been relocated. Alterations to Staunton River State
Park and relocation of the Southern Railway over the Roanoke
River, the Southern Railway connection at Clarksville, Va., and N. C.
secondary highway, north of Drewry, N. C., have been completed.
   Construction of the powerhouse and switchyard is approximately
69 percent complete. Other items of work under contract include
the furnishing of cement, turbines, governors, generators, trans-
formers, generator main.leads and cubicles, main control switch-
boards, intake gates, guides and hoists, station auxiliaries, oil
circuit breakers, switchyard steel, Island Creek pumps and motors,
PAX equipment, powerhouse elevator, high voltage cable system,
coupling capacitors, and lightning arrestors and insulators. Con-
tracts are also underway for the relocation of the water and sanitary
facilities at Clarksville, Va., for construction of Island Creek sub-
station, pumping station and transmission line; for construction of
the access highway on the right bank; for relocation of U. S. High-
way 58 over Butchers and Rudds Creeks; N. C. Highway 39 over Flat
and Crooked Run Creeks; U. S. Highway 15 over Bluestone Creek
and Va. Highway 49' over Goodells Creek; U. S. Highway 15 and
Southern Railway, south of Clarksville; U. S. Highway 58 west of
Clarksville; Atlantic and Danville Railway; U. S. Highways 15 and
58 over Roanoke River; N. C. secondary highway over Andersons
Swamp, Mill and Nutbush Creeks; Va. Highway 712 over Island
Creek; Va. Highways 688 over Butchers Creek and 693 over Pan-
handle Branch; N. C. secondary highway over Grassy and Spew-
marrow Creeks; and Va. Highways 609, 640, and 702; and for clear-
ing the remainder of the reservoir area. Settlements have been made
with the Carolina Power & Light Co., American Telephone & Tele-
graph Co., Piedmont Electric Membership Corp., and the Carolina
Telephone & Telegraph Co. for alterations to their facilities affected
by the project.
   The total cost of the existing project to June 30, 1952, was
$67,800,395.58 all for new work. The total expenditure was
$63,367,050.35.
460      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                   1952

  Proposed operation.--The unexpended balance on June 30, 1952,
in the amount of $14,032,949.65, plus allotments for fiscal year 1953,
of $6,806,000.00 for new work and $93,200.00 for maintenance, a total
of $20,932,149.65 will be applied as follows:
Accounts payable June 30, 1952--------------------------- $4, 461, 736. 25
New work :
    Contracts:
        Dam and appurtenances ------------           $370, 000. 00
        Powerhouse and appurtenances----------6, 620,000. 00
        Alterations and relocations---6---------    , 520, 000. 00
        Reservoir clearing___ ------------------- 520, 000. 00
        Island Creek dam and pumping station -.       430, 000. 00
        Administration, maintenance and service
          facilities -------------------------        215, 000. 00
        Equipment for operations and maintenance
          of project--    -----------------------     160, 000. 00
    Hired labor :
        Land acquisition___---------------------      850, 000. 00
        Operation and maintenance of buildings
          and grounds during construction -------- 140, 000. 00
        Operation and maintenance of project dur-
          ing construction, fiscal year 1953-------   329, 400. 00
        Engineering and design-.---------------- 222, 813. 40

       Total for new work--------------------------------- 16, 377, 213. 40
      Operation of dam, powerhouse, reservoir, etc__ $78, 000. 00
      Ordinary maintenance and repairs------------    15, 200. 00

       Total for maintenance -------------------------
                               _                                        93, 200. 00

       Total for all work       -------------------------------
                                                             __20,     932, 149. 65
  The additional sums of $2,580,000 for new work and $435,000 for
operation and maintenance can be profitably expended for the follow-
ing scheduled work during fiscal year 1954:
New work :
   Contract :
       Powerhouse and switchyard--------------$620, 000
       Equipment for powerhouse and switchyard_-      740, 000
       Alterations and relocations-----------------370, 000
       Administration, maintenance and service facil-
         ities----------     ---------------------    100, 000
       Recreation facilities----------------------00, 000
       Equipment for operation and maintenance of
         project ------------------------------- 110, 000
   Hired labor :
       Land acquisition-------------------       --   500, 000
       Engineering and design_.. __-____
                                   ---    -40,      _      000

      Total for new work---------------------------------              $2, 580, 000
Operation and maintenance:
    Operation of dam, powerhouse, reservoir, etc----- $385, 000
   Ordinary maintenance and repairs -------------       50,000
       Total maintenance-___------ -----------------                        435, 000
        Total for all work-__            --
                                    ------    --       --------         3,015, 000
                   FLOOD         CONTROL---NORFOLK,                       VA.,     DISTRICT                          461
                                    Cost and financial summary

                                             Fiscal year ending June 30                                    Total to June
                                                                                                           30, 1952. includ-
                                                                                                           ing fiscal years
                     1948              1949              1950              1951              1952           priorto 1948

New work:
Appropriated_   $4, 800, 000. 00 $10, 200, 000. 00 $15, 800, 000. 00 $25, 500, 000. 00 $17, 000, 000.00    $77, 400, 000. 00
Cost---------    2, 622, 876. 59 7,945. 337.98 16,182,125. 78 19,144, 021.31 19,168, 521. 70                67, 800, 395. 58
Expenditures     2,778, 866. 51 .6, 817, 191.36 14, 293,125.29 18, 229, 758.33 18, 733,322.88               63, 367, 050.35


Other new work data:
   Unobligated balance, June 30, 1952-----------------------                                               $9, 188. 44
   Appropriated for fiscal year ending June 30, 1953-----------                                        6, 806, 000. 00
      Unobligated balance available for fiscal year 1953---------. 6, 815, 188. 44
    Estimated additional amount needed to be appropriated for
      completion of existing project---------      -------------   2, 944, 000. 00
            20. PHILPOTT RESERVOIR, ROANOKE RIVER BASIN, VA.
   Location.-The site for the proposed Philpott Dam is on Smith
River, Va., 44.3 miles above its junction with the Dan River near
Leaksville, N. C., and 35 miles upstream from the Virginia-North
Carolina State line. It is in Franklin and Henry Counties, 34 air
miles south of Roanoke, Va. At spillway crest elevation, the reser-
voir will extend upstream about 16 miles.
   Existing project.-This project provides for the construction of
a concrete gravity dam 892 feet long with a maximum height of
220 feet. The dam will consist of a nonoverflow concrete section on
the right bank 280 feet long, a concrete power intake section 92
feet long, an ungated spillway section 120 feet long, and a concrete
nonoverflow section on the left bank 400 feet long. The powerhouse,
located at the toe of the dam, will have a total installation of 14,000
kilowatts.
   At the elevation of the maximum flood-control pool, the reservoir
will have storage capacity of 249,800 acre-feet, of which 82,400 acre-
feet will be reserved for the control of floods, 111,100 acre-feet for
the development of hydroelectric power, and 56,300 acre-feet will be
dead storage. The reservoir will be operated as a unit of a coordi-
nated reservoir system for the control of floods in the Roanoke River
basin, the generation of hydroelectric power, the regulations of low-
water flow for the abatement of pollution, and for other purposes.
   The estimate of Federal cost, revised in 1952, is $12,200,000 for
construction and $1,140,000 for lands and damages, including high-
way and other relocations, a total of $13,340,000 for new work.
   The existing project was authorized by the Flood Control Act
approved December 22, 1944, which approved the general plan for
the comprehensive development of the Roanoke River basin for flood
control and other purposes as set forth in House Document 650,
Seventy-eighth Congress, second session. The latest published map
is printed in the project document.
   Local cooperation.-See pages 4-5 for requirements.
   Operations and results during; fiscal year.-Operations, by hired
labor, consisted of preparation of contract plans and specifications
for the construction of the project and land acquisition activities.
   Operations, by contract, were continued to completion for con-
      245554     53-vol.1            30
462       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                      1952

struction of the concrete dam and for furnishing intake gate hoists,
generators, turbines, transformer, governors, powerhouse crane, draft
tube gates, and steel reinforcement for bridge on Virginia Highway
623. Contracts for clearing the reservoir area and for drilling and
grouting under the dam were completed. Contracts were initiated
during the fiscal year for construction of the powerhouse, for furnish-
ing accessory electrical equipment, and for relocating Virginia
Highway 623.
   The total cost of the work for the fiscal year was $2,111,790.96,
all for new work. The total expenditure for the fiscal year was
x$2,673,498.87.
   Condition at end of fiscal year.--Construction of the project was
initiated in March 1948 and the project as a whole is 88 percent com-
plete. Preliminary work is about 92 percent complete; 9,337 acres or
98 percent of the entire reservoir area have been acquired.
   The access highway Government field offices, and concrete dam have
been completed. Contracts for furnishing sluice gates, appurtenances
and controls; intake gates; frames and guides; intake gate hoists;
stop logs, guides and lifting beams; generators; turbines; transformer;
plate steel penstocks; 36-inch Dow valve; governors; powerhouse
crane; draft tube gates; and reinforcing steel for bridge on Virginia
IHighway 623 have been completed. Alterations to Fairy Stone State
Park Dam and cemetery relocations have been made; the reservoir
has been cleared, and drilling and grouting under the dam has been
completed. Filling the reservoir was commenced in December 1951.
Contracts are underway for furnishing accessory equipment and for
relocating Virginia Highway 623.
  The total cost of the existing project to June 30, 1952 was $11,716,-
774.54, all for new work. The total expenditure was $11,212,971.90.
  Proposed operations.--The unexpended balance on June 30, 1952
in the amount of $1,827,028.10 plus allotments for fiscal year 1953 of
$300,000 for new work and $101,800 for maintenance, a total of
$2,228,828.10, will be applied as follows:
Accounts payable June 30, 1952___-_---     _-- ___--------___    --- __-   $508, 125. 95
New work:
    Contracts:
        DI)am and appurtenances--_--------...                $30, 000. 00
        Powerhouse and appurtenances         .------- 1, 020, 000.00
       Alterations and relocations- ------------- 280, 000. 00
       Administration maintenance, and service
          facilities__ _--     -     ---------               100, 000. 00
        Equipment for operation and maintenance
          of project__-------------------------- 60, 000. 00
   Hired labor :
       Land acquisition------------------------20, 000. 00
        Operation and maintenance of buildings
          and grounds and construction of gaging
          stations-----------------------------               20, 000. 00
        Engineering and design_---
                                 .------                      88, 902.15
             Total for new work---------------               ---------- $1, 618, 902. 15
Maintenance:
   Operation of dam, powerhouse, reservoir, etc__            $82, 900. 00
   Ordinary maintenance and repairs-------.....               18, 900. 00
      Total for maintenance..------......---------------                    101, 800. 00
           Total for all work-.......------------------------- 2, 228, 828. 10
                      FLOOD CONTROL--NORFOLK,                             VA.,        DISTRICT                       463
  The additional sum of $131,000 can be profitably expended for the
following scheduled work during fiscal year 1954:
      Operation of dam, powerhouse, reservoir, etc----------------                                         $106, 000. 00
      Ordinary maintenance and repairs__ -----                              --------------                   25, 000. 00

         Total for all work---------.........-------------------------                                      131, 000. 00

                                     Cost and financial summary

                                                  Fiscal year ending June 30                                Total to June
                                                                                                           30,1952. -includ-
                                                                                                           ing fiscal years
                                  1948          1949            1950           1951           1952          prior to 1948


New work:
   Appropriated----.........   $250,000.00 $1,900 030.00 $2,500,000.00 $5,235,000.00 $2,705,000.00          $13,040,000.00
    Cost-----------------      260,145.02     670, 799. 39 3,135,141. 99 5, 363, 381.04 2,111, 790. 96       11, 716, 774.54
    Expenditures--------       246, 867. 84   622, 369. 88 2, 442, 627. 855, 053, 469.00 2, 673, 498. 87     11, 212, 971.90


Other new work data:
   Unobligated balance, June 30, 1952-    -     -___-------------                                          $231, 360. 23
   Allotment for fiscal year ending June 30, 1953---------------..... ......                                300, 000. 00

          Unobligated balance available for fiscal year 1953_-----------                                    531, 360. 23

21. GATHRIGHT RESERVOIR AND FALLING SPRING REREGULATING
                DAM, JAMES RIVER BASIN, VA.

   Location.--The sites of the proposed Gathright and Falling Spring
Dams are on the Jackson River, a tributary of the James River, at
miles 43.4 and 35.1, respectively. The Gathright Dam site is located in
the reach of the Jackson River known as the Gorge, about 19 miles
upstream from Covington, Va. The Falling Spring Dam site is lo-
cated about 11 miles upstream from Covington and 1 mile south of
the community of Falling Spring, Va. Both dam sites are in Alle-
ghany County. At the elevation of the top of gates, Gathright Reser-
voir will extend upstream about 15 miles. (See Falling Spring and
Mountain Grove, Va.-W. Va., quadrangles of the United States
Geological Survey.)
   EExisting project.-This project provides for the construction of the
Gathright Dam and the Falling Spring Reregulating Dam on the
Jackson River. The Gathright Dam will be a rock-fill dam with
impervious earth core having a maximum height of 248 feet above
stream bed and a crest length of 800 feet with a gated side-channel
concrete spillway. At the elevation of the top of gates, the dam will
provide a total storage capacity of 417,000 acre-feet, of which 110,000
acre-feet will be flood storage; 264,000 acre-feet, power draw-down;
and 43,000 acre-feet, dead storage. The powerplant will have an
installed capacity of 34,000 kilowatts. The variable flow from this
power installation will be reregulated by the Falling Spring Dam,
which will be a low, gravity-type, concrete structure, with an earth
embankment at the right abutment. The Falling Spring Dam will
have a maximum height of 64 feet and a crest length of 850 feet, of
which 640 feet will be concrete and 210 feet will be earth fill. The
storage at spillway crest elevation will be 4,700 acre-feet, of which
4,000 acre-feet will be available for stream-flow regulation.
464        REPORT OF CHIEF OF ENGINEERS,                                   U.    S. ARMY,          1952

  The estimate of Federal cost for the project, including both dams
and reservoirs, revised in 1952, is $21,060,000 for construction and
$1,740,000 for lands and damages, including highway, railroad, and
utility relocation, a total of $22,800,000 for new work.
  The project, as set forth in House Document 207, Eightieth Con-
gress, first session, was authorized by the Flood Control Act approved
July 24, 1946. The latest published map is printed in the project
document.
  Local cooperation.-See pages 4-5 for requirements.
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-No work on this project has been
accomplished.
  Proposedoperations.-An allotment of $100,000 for fiscal year 1953
will be applied as follows:
                                         ------------------------
Accounts payable June 30, 1952__________________-----                       $
New work, hired labor, engineering and design------   --------- ----- 100, 000
  The additional sum of $200,000 can be profitably expended for the
following scheduled work during the fiscal year 1954:
New work, hired labor, engineering and design-------------------                                           $200, 000

                                     Cost and financial summary

Other new work data:
    Appropriated for fiscal year ending June 30, 1953---------       $100, 000
    Unobligated balance available for fiscal year 1953__ __________-100, 000
    Estimated additional amount needed to be appropriated for com-
      pletion of existing project ___________ _____----            22, 700, 000

22. PRELIMINARY EXAMINATIONS, SURVEYS, AND CONTINGENCIES
                FOR FLOOD CONTROL,GENERAL

  The cost of the work during the year was $3,077.68. The expenditure
was $3,855.84. The unexpended balance on June 30, 1952, in the
amount of $524.35 plus an allotment of $3,200.00 for fiscal year 1953, a
total of $3,724.35, will be applied to expenses to be incurred under this
heading.
  The additional sum of $30,000 can beprofitably expended for this
work during fiscal year 1954.
                                     Cost and financial summary

                                                  Fiscal year ending June 30                           Total to June
                                                                                                       30, 1952, includ-
                                                                                                       ing fiscal years
                                  1948           1949          1950             1951        1952        priorto 1948

Maintenance:
   Appropriated-......      . $20, 000.00    $25, 000.00    $41, 000.00    $8, 000. 00 -$5,100.00        $1, 143, 250. 00
   Cost......------------      19, 926.06     24, 896. 70    29, 224. 73   11, 362. 99    3, 077. 68      1, 142, 725.65
   Expenditures----........    21, 039. 58    25, 006. 80    27, 856.08    12, 035. 35    3, 855. 84      1,142,725.65
                        FLOOD         CONTROL---NORFOLK,                      VA.,       DISTRICT                     465
                          23. INACTIVE              FLOOD-CONTROL PROJECTS

                                                             For last          Cost and expenditures to          Estimated
                                                           full report              June 30, 1951                  amount
                   Name of project                         see annual                                            required to
                                                             .report                                              co
                                                              for-           New work             Maintenance     complete

Snagging and clearing under authority of sec. 2               1950              $1,000.00     ---------------        (1)
  of the flood control act approved Aug. 28,
  1937, as amended.

  1Completed.
                                  24. MISCELLANEOUS ACTIVITIES

Status of all investigations for flood control called for by flood control acts and
                              committee resolutions

                                                                                    Date trans-      Document  Recom-
                Locality                          Authorization act                 mitted to          No.    mendation
                                                                                     Congress

Back Bay, Va., with a view to                Senate Public Works Com-           -
  relieving inundation and im-                 mittee resolution, June
  proving drainage conditions in               9, 1948.
  portions of Princess Anne
  County.
Chowan River and tributaries,               Flood Control Act, June ..
  Virginia and North Carolina.                30, 1948.
James River and tributaries,                Senate Public Works Comn-       --
  Lynchburg, Va., and vicinity.               mittee resolution, Sept.
                                              16, 1948.
Lynchburg, Va., and vicinity,- .... do .-------------------
   review of James River and
   tributaries.
Mattaponi River, Va ...........------------Flood Control Act, May ..--
                                              17, 1950.
iNorfolk, Va., to Beaufort Inlet, Senate Public Works Com-
   Inland Waterway, with a view               mittee resolution, June
   to relieving inundation and                9, 1948.
  improving drainage of farm
   lands in Princess Anne County
   along Back Bay and North
   Landing River, Va., and trib-
   utaries.
North Landing River, Va., and Senate Public Works Com-.....................
   tributaries, with a view to reliev-        mittee resolution, June 9,
   ing inundation and improving               1948.
   drainage conditions in portions of
   Princess Anne County.
Roanoke River and tributaries, Senate Public Works Com- ..                    ...................
   South Boston, Va., and vicinity.           mittee resolution, Jan.
                                              20, 1948.
South Boston, Va., and vicinity, Senate Public Works Com---
   review of report on Roanoke                mittee resolution, Jan.
                                                                         .-----                   ------------
    River and tributaries.                    20, 1948.
  IMPROVEMENT OF RIVERS AND HARBORS IN THE
          WILMINGTON, N. C., DISTRICT

  This district comprises central and eastern North Carolina embraced
in the drainage basins tributary to the Atlantic Ocean from the south-
ern boundary of Virginia to Shallotte River, inclusive, with the
exception of the Roanoke River Basin above Weldon, N. C.; the
Meherrin River Basin above Murfreesboro, N. C.; and the Chowan
River Basin above the confluence of the Nottaway and Blackwater
Rivers. It includes the portions of the Atlantic Intracoastal Water-
way from the northern boundary of North Carolina to Little River,
S. C., and the portion of the waterways from Norfolk, Va., to the
sounds of North Carolina, south of the north shore of Albemarle
Sound.
  District engineer: Col. R. C. Brown, Corps of Engineers.
  Division engineer of the South Atlantic Division, Atlanta, Ga.;
comprising the Wilmington, N. C., Charleston, S. C., Savannah, Ga.,
Jacksonville, Fla., and Mobile, Ala., districts: Col. C. K. Harding,
Corps of Engineers.
                                      IMPROVEMENTS

               Navigation                              Navigation-Continued
                                        Page                                       Page
1. Atlantic Intracoastal Water-               14. Cape Fear River, N. C.,
      way between Norfolk, Va.,                      above Wilmington ......       491
       and the St. Johns River,                15. Wilmington Harbor, N. C__       494
       Fla. (Wilmington district)_      467    16. Examinations, surveys, and
2. Roanoke River, N. C ......          472          contingencies_,_              497
3. Manteo (Shallowbag) Bay,                   17. Plant allotment_                498
       N. C_                            474    18. Inactive projects_              498
4. Far Creek, N. C __                  475    19. Miscellaneous activities ----   499
5. Channel from Pamlico Sound
      to Avon, N. C__                   477                 Flood control
6. Pamlico and Tar Rivers,
       N. C_----------                  478 20. Pasquotank River, N. C __          501
7. Rollinson Channel, N. C ...         480 21. Snagging and clearing under
8. Silver Lake Harbor, N. C___         481       authority of section 2 of
9. Drum Inlet, N. C _-.       -__.     482       the Flood Control Act, ap-
10. Waterway connecting Pam-                      proved August 28, 1937,
      lico Sound and Beaufort                     as amended_                      502
      Harbor, N. C -_.....              483 22. Preliminary    examinations,
11. Morehead      City   Harbor,                  surveys, and contingencies
       N. C-                            486       for flood control-               503
12. Beaufort Harbor, N. C .-. _         488 23. Inactive projects ........         504
13. Channel from Back Sound to              24. Miscellaneous activities ....      504
      Lookout Bight, N. C.....          490

1. ATLANTIC INTRACOASTAL WATERWAY BETWEEN NORFOLK, VA.,
     AND THE ST. JOHNS RIVER, FLA. (WILMINGTON DISTRICT)
  Location.--This waterway is a sea-level route through coastal
sounds and marine marshes, approximately paralleling the Atlantic
coast between Norfolk, Va., and St. Johns River, Fla. (See U. S.
Coast and Geodetic Survey Charts Nos. 830 to 842, inclusive.)
                                                                            467
468     REPORT OF CHIEF OF ENGINEERS,        U.   S.   ARMY,   1952

   The section within the Wilmington district begins at the Virginia-
North Carolina State line and extends generally southerly to Beaufort,
thence southwestward to Cape Fear River, and thence westward to
Little River, S. C., 308 statute miles.
   Previous projects.-Adopted by river and harbor acts of July 4,
1836; March 3, 1837; July 7, 1838; June 18, 1878; March 3, 1879;
June 14, 1880; March 3, 1881; August 2, 1882; August 5, 1886; Septem-
ber 19, 1890; March 3, 1905; June 25, 1910; and August 8, 1917. For
further details see page 1803 of annual report for 1915; pages 585, 587,
and 589 of annual report for 1917; page 522 of annual report for 1926;
page 497 of annual report for 1932; and pages 476 and 523 of annual
report for 1938.
   Existing project.-This provides for a waterway 12 feet deep at
mean low water, with bottom widths varying from 90 feet in land cuts
to 300 feet in open waters; for the construction, operation, and main-
tenance of suitable bridges; for a tidal lock in the land cut near the
Cape Fear River; for a channel 12 feet deep at mean low water and 90
feet wide on the bottom in New River between the Inland Waterway
and the Atlantic Coast Line Railroad bridge at Jacksonville, N. C., 21
miles, and a basin at Jacksonville of the same depth and varying in
width; for a side channel 12 feet deep and 90 feet wide to a turning
basin of the same depth, 200 feet wide and 350 feet long, opposite the
principal wharves at Swansboro; for an entrance channel 6 feet deep
and 90 feet wide at New River Inlet, with connecting channel of same
dimensions to the Intracoastal Waterway near the mouth of New
River; for six mooring basins at various locations along the waterway;
for a channel 14 feet deep and 400 feet wide across the ocean bar at
Masonboro Inlet, thence 12 feet deep and 90 feet wide to the channel of
the Inland Waterway at Wrightsville by way of Banks and Motte
Channels; a turning basin 15 feet deep having a maximum width of 300
feet and length of 700 feet on the east side of Banks Channel near
Masonboro Inlet, with three 15-pile dolphins therein; for a jetty on
each side of Masonboro Inlet extending to the 14-foot depth in the
ocean; for a yacht basin 230 feet wide, 450 feet long, and 12 feet deep
near the town of Southport, connected with the waterway by a suitable
channel of the same depth; and for salt-water-intrusion preventive
measures in the vicinity of Fairfield, N. C., as follows: Construction
of a pumping plant and a dam, with control gates and appurtenant
works on Fairfield Canal near the Inland Waterway; restoration and
ehlargement where necessary of Boundary Canal from the vicinity of
Swindell Canal to the vicinity of Baum Canal, together with appur-
tenant works necessary to cut off inflow from other areas; and con-
struction of dams with 30-inch automatic floodgates across Swindell,
Florida, Burris, and Baum Canals near Mattamuskeet Lake.
   That portion of the waterway north of the mouth of Neuse River
is nontidal; variation in the water surface, due to winds, seldom ex-
ceeds 2 feet above or below mean stage. In the section between Beau-
fort and Cape Fear River the tidal range varies from 31/2 feet at the
inlets to 1 foot at points between. The tidal range for New River
varies from 31/2 feet at New River Inlet to 1 foot at the head of the
marshes, and nothing at Tar Landing, 31 miles above. The mean
range of the tide in the section from Cape Fear River, N. C., to Little
             RIVERS AND HARBORS--WILMINGTON,                                               N.   C.,   DISTRICT           469

River, S. C., varies between 4.7 feet in Cape Fear River, 4 feet at inter-
mediate inlets, and 2 feet at points midway between inlets.
  The estimate of cost for new work, revised in 1952, exclusive of
amounts expended on previous projects, is $10,277,200, exclusive of
jetties at Masonboro Inlet, and $11,867,200.55 including the jetties.
The latest (1952) approved estimate for annual cost of maintenance is
$447,100, which includes $95,000 for operating and care of five high-
way bridges.
   The existing project was authorized by the following river and
harbor acts:

     Acts                                  Work authorized                                             Documents

July 25,1912 Original route of the Norfolk-Beaufort Inlet section...                       H. Doc. 391, 62d Cong., 2d sess.
             Purchase of canal---.........---.........-----............---------------..
    Do-. --....                                                                            H. Doec. 589, 62d Cong., 2d sess.
Aug. 8,1917   Change in route; following changes approved by                               H. Doc. 1478, 63d Cong., 3d sess.,
               Secretary of War, Apr. 14, 1919:                                             and H. Doec. 1136, 64th Cong., 1st
                  Albemarle Sound-Pamlico Sound section:                                    sess.1
                   Chat~ged from "Alligator River-Rose Bay route"
                      to "Alligator River-Pungo River route."
                  Pamlico Sound-Neuse River section:
                    Changed from "Pamlico Sound-Brant Shoal-
                    Neuse River route" to "Goose Creek-Bay
                      River route."
    Do....... A 3-foot channel 100 feet wide from Beaufort to                              H. Doe. 1775, 64th Cong., 2d sess.
                Swansboro, thence 40 feet wide to Jacksonville.
July 18,1918 Alligator River-Pungo River route (proposed land                              Approved by Secretary of War,
               cut connecting the rivers): Changed from a straight                          May 15, 1919.
               line to a bent line approaching nearer the town of
               Fairfield N. C.
Jan. 21,1927 A 12-foot channel 90 feet wide from Beaufort to Cape                          H. Doc. 450, 69th Cong., 1st sess.
               Fear River, N. C.
July 3,1930 A waterway 8 feet deep and 75 feet wide from Cape                              H. Doc. 41, 71st Cong., 1st sess.
                Fear River to Winyah Bay.
Mar. 4,19332 Construction of a suitable bridge near Fairfield, N. C_  Rivers and Harbors Committee
                                                                       Doc. 5, 72d Cong., 1st sess.
June 26,1934a Operating and care of the works of improvement
                provided for with funds from War Department
                appropriations for rivers and harbors.                                                  1
Aug. 30,1935 A 10-foot channel 90 feet wide in New River from the H. Doec. 67, 74th Cong., 1st sess.
                Inland Waterway to Jacksonville.
Aug. 26, 1937 Increasing dimensions of waterway to 12 feet deep Rivers and Harbors Committee         2
                and 90 feet wide.                                      Doc. 6, 75th Cong., 1st sess.
    Do....... A 12-foot side channel 90 feet wide to Swansboro- ....- Rivers and Harbors Committee
                                                                       Doc. 16, 75th Cong., 1st sess.'
June 20,1938 To provide a yacht basin near Southport, 12 feet         H. Doe. 549, 75th Cong., 3d sess.'
                deep 230 feet wide, and 450 feet long, with connect-
                ing channel.
    Do...... A 6-foot channel 90 feet wide from New River Inlet H. Doc. 691, 75th Cong., 3d sess.'
                to the Inland Waterway.
Mar. 2,1945 6 mooring basins--__--------------------------            H. Doc. 660, 76th Cong., 3d sess.'
    Do-...... An 8-foot channel 90 feet wide from waterway to H. Doc. 346, 77th Cong., 1st sess.'
                Masonboro Inlet.
Ise   30,1948 A 12-foot channel in New River...--..------------       H. Doc. 421, 80th Cong., 1st sess.'
May 17,1950 Viciniity of Fairfield, drainage.------... ---- .   ..-.. H. Doc. 723, 80th Cong., 2d sess.'
    Do-.......Masonboro Inlet and connecting channels-.........       H. Doc. 341, 81st Cong., 1st sess.'

  IContains latest published maps.
  s Public, No. 433, 72d Cong.
  * Permanent appropriations repeal act.

  Recommended modifications of project.-To provide a side channel
to Peltier Creek, west of Morehead City, the Chief of Engineers,
July 28, 1949, recommended that the project be modified to provide
for a channel 12 feet deep, 90 feet wide, and about 1,850 feet long
extending from the 12-foot depth curve in the Intracoastal Waterway
in Bogue Sound into Peltier Creek, with a basin 12 feet deep, 200 feet
wide, and 600 feet long at the inner end, all at an estimated cost of
$32,000 for construction, subject to certain conditions of local cooper-
ation (H. Doc. 379, 81st Cong., 1st sess.).
-470     REPORT OF CHIEF OF ENGINEERS,         U.   S. ARMY,   1952

    Local cooperation.-Compliedwith, except for the following:
    a. Channel in New River (H. Doec. 421, 80th Cong., 1st sess.), which
requires that local interests give assurances satisfactory to the Secre-
tary of the Army that they will furnish, free of cost to the United
States, all lands, easements, rights-of-way, and suitable areas for dis-
posal of dredged material during construction and for subsequent
maintenance, as and when needed; hold and save the United States
free from damages due to the construction works and subsequent main-
tenance, including damages to oyster beds, and provide adequate
terminal facilities at Jacksonville, open to all on equal terms.
    b. Vicinity of Fairfield (H. Doec. 723, 80th Cong., 2d sess.), which
requires that local interests provide, without cost to the United States,
all lands, easements, and rights-of-way necessary for construction,
maintenance, and operation of the project; hold and save the United
States free from damage due to the construction works, and from all
past damage in the area herein under consideration, which may have
been caused by salt-water intrusion as a result of construction of the
land cut of the Inland Waterway obtain and hold rights of way to
present canals involved in the improvement, including the extin-
guishing of all present claims of rights, title, and interest to any of
the canals; construct all necessary bridges and culverts for roads, and
construct, enlarge, and clean all canals and ditches necessary for the
efficient operation of the project; and maintain and operate the works
after completion (the Hyde County board of commissioners has ex-
pressed its willingness and ability to fulfill the local cooperation re-
quirements).
    c. Masonboro Inlet and connecting channels (H. Doec. 341, 81st
Cong., 1st sess.), which requires that responsible local interests give
assurances satisfactory to the Secretary of the Army that they will
provide, without cost to the United States, all lands, easements, rights-
of-way, and spoil-disposal areas necessary for the construction and
subsequent maintenance of the project, when and as required, and
hold and save the United States free from damages due to the con-
struction and maintenance of the improvements.
    Terminal facilities.-There are numerous wharves and landings
along the present- waterway, used mostly for shipping agricultural
and timber products and docking commercial and pleasure fishing
boats. These wharves are of the open pile and timber type. The
facilities are considered adequate for existing commerce.
   Operations and results during fiscal year.-The work consisted of
maintenance dredging by contract, repair, and replaceinent of direc-
tional signs with Government plant and hired labor, operation, and
care of five bridges, miscellaneous surveys, and purchase of spoil-
disposal area.
   Between April 1 and May 14, 1952, the contract dredge Marion
removed 107,203 cubic yards from shoals in the through waterway, at
a cost of $39,505.55.
   Between March 4 and April 2, 1952, the United States derrickboat
Northeast and hired labor repaired and replaced directional signs as
needed on the through waterway, at a cost of $6,699.82.
   The bridges at Coinjock, Fairfield, Wilkerson Creek, Hobucken,
and Core Creek were operated and maintained, at a cost of $103,366.86.
        RIVERS   AND HARBOR---WILMINGTON,             N.     C.,   DISTRICT    471

   Miscellaneous surveys cost $21,875.39.
   Purchase of spoil-disposal areas in Adams Creek-Core Creek land-
cut section cost $3,348.13.
   The total costs were $174,795.75 for maintenance. The expenditures
were $173,258.43.
   Condition at end of fiscal year.-The existing project was about 92
percent completed. That portion of the project between the Virginia-
North Carolina State line and Beaufort, N. C., was commenced in
August 1923 and completed in February 1930; the 12-foot channel
between Beaufort and Cape Fear River was commenced in March
1927 and completed in December 1932; the 12-foot side channel to
Swansboro was commenced in December 1938 and completed in Janu-
ary 1939; the 10-foot channel in New River to Jacksonville was com-
menced in July 1939 and completed in October 1939; the 6-foot chan-
nel from New River Inlet to the Waterway was commenced in March
1940 and completed in June 1940; the 12-foot channel from Cape
Fear River, N. C., to Little River, S. C., was commenced in February
1939 and completed in June 1940; and the yacht basin at Southport
was dredged during September 1940. No work has been done on pro-
viding a tidal lock in the land cut near the Cape Fear River, six moor-
ing basins at various locations, a 12-foot channel in New River,
dredged channels in Masonboro Inlet and connecting channels, jet-
ties at Masonboro Inlet, or salt-water-intrusion preventive measures
in the vicinity of Fairfield, N. C. At the close of the fiscal year the
controlling depths were as follows: Between Virginia State line and
Beaufort, 10.9 feet; Beaufort to Cape Fear River, 10.6 feet; side
channel to Swansboro, 12 feet; channel in New River to Jacksonville,
N. C., 8 feet; channel to New River Inlet, 3 feet; and between Cape
Fear River, N. C., and Little River, S. C., 11 feet.
   The total costs under the existing project to June 30, 1952, were
$16,044,987.71, including $80,282.36 Public Works funds, of which
$9,401,800.55 was for new work and $6,643,187.16 for maintenance.
The total expenditures were $16,042,551.43, including $80,282.36
Public Works funds.
   Proposed operations.-The balance unexpended June 30, 1952,
$5,613.93, plus an allotment of $149,500 for the fiscal year 1953, plus
accounts receivable $4.97, a total of $155,118.90, will be applied as
follows:
Accounts payable June 30, 1952-----------------------------              $2, 441. 25

Maintenance:
   Dredging, by contract, critical shoaled areas, December 1, 1952
      to February 28, 1953----------------------------------             43, 677.-65
   Condition surveys..------. -------------------------------             3,000.
                                                                            ,     00
   Miscellaneous inspections and reports----------------------             ,000.00

      Total maintenance---------         -----------------------        49677.65
Maintenance (operating and care): Operating Coinjock, Fairfield,
   Wilkerson Creek, Hobucken, and Core Creek Bridges, and
   ordinary maintenance and repair of above bridges---------103, 000. 00

      Total for all work----
                        .....-----------------------------              155, 118. 90
472            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952'

  The additional sum of $395,000 can be profitably expended for the
following schedule of work during fiscal year 1954:
New work: Drainage improvement and prevention of salt intrusion
   in vicinity of Fairfield, by contract, July 1, 1953, to June 30, 1954__ $135, 000
Maintenance: Dredging, by contract, condition surveys and miscel-
   laneous inspections and reports------ --------              ------.--    150, 000
Maintenance (operating and care): Operating Coinjock, Fairfield,
   Wilkerson Creek, Hobucken, and Core Creek Bridges, and main-
   tenance and repair of above bridges-------------------------110, 000

           Total for all work------------..----------------------                                                                395, 000,

                                             Cost and financial summary

                                                             Fiscal year ending June 30                                    Total to June
                                                                                                                          30,1952, includ-
                                                                                                                          ing fiscal years
                                          1948             1949             1950             1951             1952          priorto 1948

New work:
                      ......... ......----------------............
   Appropriated---------                                                  .........---------....--..--------------------...     $9, 600, 507. 47
   Cost ...........------------....-------------............----.................-----------------------------------........... 9, 600, 507. 47
   Expenditures-------- ----.........----............-----------.....
                                                                   ....                                                          9, 600, 507.47
                                                                           ----------..........-........ ..-------......-----------...
Maintenance:
   Appropriated-........ $444, 000. 00 $449, 500. 00 $236, 800. 00 $243, 962.19 $163, 500. 00                                    6, 753, 998. 7T
     Cost- ....-.                     316, 809. 73     636, 085. 35     249, 100. 23     230, 981.45      174, 795. 75         6, 750, 821. 10
     Expenditures _-_. ...            236, 461.43      704,146. 56      252, 178. 07     231, 367.47      173, 258. 43         6, 748, 384. 82'


Other new work data:
    Estimated additional amount needed to be appropriated for com-
      pletion of existing project without jetties at Masonboro Inlet_. $875, 400
    Estimated additional amount needed to be appropriated for com-
      pletion of project, including jetties at Masonboro Inlet-____    2, 465, 400

                                             2. ROANOKE RIVER, N. C.

  Location.-This stream rises in the Blue Ridge Mountains, west of
Roanoke, Va., and flows southeasterly about 200 miles to Clarksville,
Va., where it is joined by Dan River, its principal tributary; and
thence in the same general direction about 198 miles and empties into
the westerly end of Albemarle Sound, N. C. (See U. S. Coast and
Geodetic Survey Chart No. 1228 and Post Route Map of North
Carolina.)
   Eafisting project.-This provides for dredging a channel 12 feet
deep and 150 feet wide from the 12-foot contour in Albemarle Sound
into Roanoke River and thence upstream to about 1 mile above Ply--
mouth, N. C., 10 miles; thence a channel 10 feet deep and 100 feet
wide to Hamilton, 53 miles; thence a channel 8 feet deep and 80 feet
wide to Palmyra Landing, 18 miles, with a cut-off channel of like
dimensions about 2 miles above Hamilton; and thence a channel 5
feet deep and 50 feet wide to Weldon, N. C., 50 miles, by dredging,
snagging, and regulation. Depths of channels are referred to mean
low water. The rise and fall of the river from freshets is from 18
to 33 feet for about 70 miles below Weldon, but this fluctuation
diminishes toward the mouth, the variations in water levels being
from 1 to 2 feet in the lower 15 or 20 miles. The total length of chan-
nels included in the project is 131 miles.
  The estimate of cost for new work (1952) is $638,500. The latest
(1952) approved estimate for annual cost of maintenance is $30,000.
              RIVERS         AND       HARBORS---WILMINGTON,                                N.   C.,     DISTRICT             473
  The existing project was authorized by the following river and
harbor acts:

       Acts                                Work authorized                                               Documents

Mar.     3,1871     Improvement of the river between the mouth and S. Doc. 23, 42d Cong., 2d sess., and
                      Weldon.                                                     annual report, 1872, p. 726.    1
July 3, 1930        Entrance channel 10 feet deep and 150 feet wide-....... H. Doe. 211, 70th Cong., 1st sess.1
June 29, 1988       Present project dimensions............--------------------- H. Doc. 694, 75th Cong., 3d sess.

  2 Contains latest published maps.

   Local cooperation.-Fully complied with.
   Terminal facilities.-There are eight wharves at Plymouth. One
mile farther upstream there are a large wharf and bulkhead, a tran-
sit shed, and crane runway for handling wood pulp and pulp ma-
terials. Between that point and Hamilton there are 10 wharves.
Between Hamilton and Halifax there are 13 log landings. These
facilities appear to be adequate for existing commerce.
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal y ear.-The existing project has been
completed to the practicable limit. Dredging to obtain the present
project dimensions from the mouth to Palmyra was commenced in
September 1940 and completed in August 1941. As it is impracticable
to obtain and maintain the project above Palmyra by dredging, snag-
ging, and regulation, the percentage of completion is uncertain. At
the close of the fiscal year the limiting depths at local mean low
water were as follows: Between Albemarle Sound and 1 mile above
Plymouth, 11 feet; thence to Hamilton, 7.6 feet; thence to Palmyra,
2.4 feet; and thence to Weldon, 1 foot. The work remaining to be
done consists of completing by dredging, snagging, and regulation, a
channel between Palmyra and Weldon to a depth of 5 feet and mini-
mum width of 50 feet. The total costs and expenditures under the
existing project to June 30, 1952, were $404,584.34 for new work
and $235,019.16 for maintenance, a total of $639,603.50.
   Proposed operations.--No work is scheduled for fiscal year 1953.
   The sum of $38,000 can be profitably expended for the following
scheduled work during the fiscal year 1954:
Maintenance: Snagging, dredging, condition surveys, and miscellaneous
   inspections and reports----------------------------------          $38, 000

                                           Cost and financial summary

                                                         Fiscal year ending June 30                                   Total to June
                                                                  . ...    ...                                    30,1952, includ-
                                                                                                                  ing fiscal years
                                        1948            1949              1950          1951             1952         prior to 1948

New work:
   Appropriated ---------                  ------------------------
                                                    ......------------------------.......                                $404, 584.34
    Cost- -----------          -----------.-----------.------------                 -----------        ------------       404, 584. 34
   Expenditures-------------------------------------------------....------------                                          404, 584.34
Maintenance:
       Appropriated-......... -$30, 300.00           $17,000.00 ...----- -------- ------ ------------                     235, 019.16
       Cost----------------........... 17, 735. 62    17, 240. 17     $283. 49- ..----------- ------------                235, 019. 16
       Expenditures.........           17, 735. 62    17, 240. 17       283. 49 ------------ ------------                 235, 019 16
474        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                   1952

                      3. MANTEO (SHALLOWBAG)                     BAY, N. C.

   Location.-Manteo Bay, or Shallowbag Bay, a natural indenta-
tion of the shore line, is on the northeastern side of Roanoke Island,
N. C. Oregon Inlet, the northernmost existing inlet in the barrier
beach, is southeast of Roanoke Island, 13 miles southeast of Manteo.
 (See U. S. Coast and Geodetic Survey Chart No. 1229.)
   Eisting project.-This provides for a channel 14 feet deep and
400 feet wide from the Atlantic Ocean over the bar and through
Oregon Inlet, thence 12 feet deep and 100 feet wide via Old House
Channel to that depth in Pamlico Sound; a channel 12 feet deep
and 100 feet wide from Oregon Inlet to and including a turning
basin 12 feet deep, 200 feet wide, and 600 feet long at Manteo; a
side channel 12 feet deep and 100 feet wide from the Manteo-Oregon
Inlet Channel in Roanoke Sound to the wharves in Mill Creek near
Wanchese, including a turning basin 200 feet square; and a channel
6 feet deep and 100 feet wide connecting the Manteo-Oregon Inlet
Channel near the mouth of Manteo Bay with water of that depth
in the north end of Roanoke Sound. The total length of channels
included in the project is about 25 miles. The variations of the
water surface are due to winds and seldom exceed 2 feet above or
below mean stage. The extreme range of wind tides, determined by
1 year's gage readings at Manteo, is 5.1 feet. The estimate of cost
for new work, revised in 1952, is $1,168,170. The latest (1952) ap-
proved estimate of annual cost of maintenance is $122,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                        Work authorized                                  Documents
                                                                                                           1
June 25,1910   Channel 6 feet deep and 100 feet wide from Roanoke     H. Doc. 906, 60th Cong., 1st sess.
                Sound to Manteo.
Oct. 17,1940   Connecting channel of same dimensions to Oregon        H. Doc. 313, 76th Cong., 1st sess.t
                Inlet.                                                                                     1
May 17,1950    Channel 14 feet deep, 400 feet wide, from Atlantic     H. Doc. 310, 81st Cong., 1st sess.
                Ocean through Oregon Inlet, thence 12 feet deep,
                100 feet wide, via Old House Channel to Pamlico
                Sound; channel 12 feet deep, 100 feet wide, from
                Oregon Inlet to and including turning basin 12
                feet deep, 200 feet wide, 600 feet long, at Manteo;
                side channel 12 feet deep, 100 feet wide, from
                Manteo-Oregon Inlet Channel to and including
                200-foot-square turning basin in Mill Creek near
                Wanchese.

1 Contains latest published maps.

   Local cooperation.-Complied with, except as follows: Conditions
in House Document 310, Eighty-first Congress, first session, which
require that local interests furnish, without cost to the United States,
all lands, easements, rights-of-way, and spoil-disposal areas for initial
work and subsequent maintenance, when and as required; remove
existing structures from the rights of way; continue the maintenance
of the public landing in Mill Creek; and hold and save the United
States free from damages due to the construction and maintenance
of the project. Local interests appear willing and able to meet the
local cooperation requirements.
   Terminal facilities.-There are 12 timber wharves on the improved
          RIVERS AND HARBORS---WILMINGTON,                                  N. C., DISTRICT               475
portion of Manteo Harbor, with a total frontage of approximately
1,100 feet, which are privately owned. Mill Creek has 7 timber
wharves with a total berthing space of 600 feet, of which 6 are pri-
vately owned; the other is owned and operated by Dare County, N. C..
The existing facilities are considered adequate for present commerce.
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was about 5
percent completed. The 6-foot channel from Roanoke Sound to Man-
teo was dredged during August and September 1911. The channel
to Oregon Inlet was commenced in August 1941 and completed in
November 1941. No work has been done on the 14-foot channel from
the Atlantic Ocean over the bar and through Oregon Inlet, nor on the
12-foot channels from Oregon Inlet to Manteo, Pamlico Sound, and
Mill Creek. At the close of the fiscal year the controlling depth in
the channel to Manteo was 6 feet and to Oregon Inlet 3 feet. The
total costs and expenditures under the existing project to June 30,
1952, were $63,383.84 for new work and $134,456.58 for maintenance,
a total of $197,840.42.
   Proposed operations.-No work is scheduled for fiscal year 1953.
   The sum of $50,000 can be profitably expended during the fiscal
year 1954 for maintenance dredging, condition surveys, and miscel-
laneous inspections and reports.
                                    Cost and financial summary

                                               Fiscal year ending June 30                       Total to June
                                                                                               30, 1952, includ-
                                                                                               ing fiscal years
                                1948         1949         1950        1951            1952      priorto 1948

New work:
   Appropriated---...----           ----------------
                                ---....                 -------------------------------              $63,383.84
                  -----------------
   Cost..................---------          --------- ------    -----------
                                                                 ..
                                       ......... ---------- ------------
                                                                             -------    --            63 383.4
                                                                                                       3,383.5t
   Expenditures
   Expenditures--------     ------------------------                         ------------             6,383.84
Maintenance:
   Appropriated-----      -. $50, 000.00 -$1, 000. 00     $3, 500       $0.46 ------..---...         134,456. 58
   Cost      .----------------
                           2,212.70        46, 787.30      3,420        80.46 ...-------.--          13446.58
   Expenditures--------        2,211.60    46,788.40       3, 420       80.46 ----------             134,456.58


Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project-------------- $1, 104, 770

                                       4. FAR CREEK, N. C.

   Location.-Far Creek is in Hyde County N. C., and flows east-
erly into Pamlico Sound about 95 miles south of Norfolk, Va. (See
U. S. Coast and Geodetic Survey Chart No. 1232.)
   Existing project.-This provides for a channel 12 feet deep and
100 feet wide from that depth in Pamlico Sound along the general
alinement of the existing channel through the wide section of the
creek, and thence 12 feet deep and 80 feet wide to about 200 feet
below the highway bridge at Engelhard, with a turning basin of
the same depth with maximum width and length of about 200 feet
and 900 feet, respectively, at the head. The total length of channels
included in the project is about 2.7 miles. There is some lunar tide
in Pamlico Sound, but the principal variations in the level of the
476           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

water surface are due to winds. Ordinary winds cause a variation
of about 1 foot, while severe storms will double or triple this variation.
   The estimate of cost for new work, revised in 1952, is $134,500.
The latest (1952) approved estimate for annual cost of maintenance
is $21,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                          Work authorized                                   Documents

July     3, 1930   Channel 7 feet deep, 60 feet wide, from Pamlico          H. Doc. 112, 71st Cong., 1st sess,
                     Bound to about 200 feet below highway bridge at
                     Engelhard, with a turning basin at the head.                                               1
May 17, 1950       Present project dimensions...........-----------------   H. Doc. 770, 80th Cong., 2d sess.

I Contains latest published map.

  Local cooperation.-Compliedwith, except as follows: Conditions
in House Document 770, Eightieth Congress, second session, which re-
quire that local interests furnish, free of cost to the United States, all
necessary rights-of-way and suitable spoil-disposal areas for the new
work and subsequent maintenance, when and as required; set aside
suitable space for a public landing; and hold and save the United
States free from any damages resulting from construction and main-
tenance of the improvement, including furnishing releases from dam-
ages to oyster grounds. The Hyde County board of commissioners
has signified its ability and willingness to fulfill such provisions of
local cooperation.
  Terminal facilities.-Thereare 8 wharves at Engelhard, with a total
frontage of about 618 feet, all privately owned. The existing facili-
ties are considered inadequate for present commerce.
   Operations and results during fiscal year.-The work consisted of
maintenance dredging by contract.
   Between May 12, and June 1, 1952, the contract dredge Savan-
nah removed 50,285 cubic yards from shoals in the waterway. The
costs were $24,419.34 for maintenance. The expenditures were
$24,131.40.
   Condition at end of fiscal year.-The existing project was about 25
percent completed. The 7-foot channel was commenced in March and
completed in May 1931. No work has been done on increasing the
depth of the channel and turning basin to 12 feet. At the close of
the fiscal year the controlling depth to Engelhard was 7 feet. The
total costs under the existing project to June 30, 1952, were $34,500
for new work and $102,559.68 for maintenance, a total of $137,059.68.
The total expenditures were $136,771.74.
   Provosed operations.-The balance unexpended June 30, 1952,
$868.60, less a revocation of $565.08 resulting in a balance of $303.52,
will be applied during fiscal year 1953 to liquidate accounts payable.
   The additional sum of $100,000 can be profitably expended for the
following scheduled work during the fiscal year 1954:
New work : Dredging, by contract, Aug. 1 to Nov. 1, 1953---_------                            _--_ $100, 000
            RIVERS" AND HARBORS-WILMINGTON,                                          N.   C.,   DISTRICT         477
                                             Cost and financial summaryl.

                                                            Fiscal year ending June 30                  Total to Jung
                                                                                                       30, 1952. includ-
                                                                                                       ing fiscal years
                                        1948               1949        1950        1951         1952    prior t( 1948


New work:
   Appropriated         ..            ..------------... ...-------. .----
                                 ..---------                           ...-----------------           $34, 500. 00
   Cost .-------------------------------                    ------------------------.....-- -- .....
                                                                                                  ---  34,500.00
   Expenditures ....-------------------------                                                          34,5. 00
                                                     -.........-------------.......----------------.......
Maintenance:
   Appropriated--------.........------------............   $1, 000                         $25,000.00
                                                                        $2, 000 -----------............      103, 140.84
   Cost......----.....--------------------.......
                                       ............         1,000        2,000-----------
                                                                                ............24,419.34        102,55. 6
   Expenditures.........------------............            1, 000                      24,131.40
                                                                        2,000 ............                   102, 271.74


Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project- -------------                                           $100, 000

               5. CHANNEL FROM PAMLICO SOUND TO AVON, N. C.

  Location.-The village of Avon is on the narrow barrier beach
between Pamlico Sound and the Atlantic Ocean, 9 miles north of
Cape Hatteras. West of the village the sound is 25 miles wide. About
4 miles offshore in the sound, a shoal or bar parallels the beach from
Hatteras Inlet, 15 miles southwest of Avon, to Oregon Inlet, 30 miles
north of Avon. Cape Channel, a natural opening in the bar 6 miles
southwest of Avon, has a controlling depth of 6 feet; from that open-
ing a depth of 5 feet is available to Black Hammock Channel, .a basin
with depths of over 10 feet, 1,500 feet from the shore line at Avon.
Shoreward of the basin the water is very shallow. (See U. S. Coast
and Geodetic Survey Chart No. 1232.)
  Emisting project.-This provides for a channel from Pamlico Sound
to Avon, 6 feet deep and 100 feet wide, with a basin at the shore end,
same depth, 100 feet wide and 300 feet long. Lunar tides are im-
perceptible. Normal variations in the water surface due to wind
action seldom exceed 1 foot, but may be as much as 5 feet during
severe storms. The cost to the Federal Government for new work for
the completed project was $28,000. The latest (1952) approved esti-
mate for annual cost of maintenance is $1,000.
   The existing project was adopted by the River and Harbor Act
of March 2, 1945 (H. Dec. 316, 76th Cong., 1st sess.). The latest
published map is in that document.
  Local cooperation.-Fully complied with.
   Terminal facilities.-There are two wharves in the basin at Avon,
with a total frontage of about 150 feet. The existing facilities are
considered adequate for present commerce.
  Operations and results during fiscal year.--None.
  Condition at end of fiscal year.--The existing project ,was com-
menced in: September and completed in October 1946. At the close
of the fiscal year the controlling depth to Avon was 6 feet. The total
costs and expenditures under the existing project to June 30, 1952,
were $28,000 for new work.



        245554--53-vol. 1--31
478         REPORT OF CHIEF OF ENGINEERS, U.                                               S. ARMY, 1952

Proposed operations.-An allotment of $600 for the fiscal year 1953
will be applied as follows:
Maintenance:
   Condition surveys------------------------------------                                                                       $50G
   Miscellaneous inspections and reports-----------------------                                                                 100,

        Total for all work---------....-------------------------                                                                 600
  No work is proposed during fiscal year 1954.
                                      Cost and financial summary

                                                            Fiscal year ending June 30                                 Total to June
                                                                                                                  30, 1952,.includ-
                                                                                                                   ing fiscal years
                                 1948                      1949        1950             1951           1952            prior to 1948


New work:
                                      .....------------..
   Appropriated-.... ..------------......                                 ..------------.
                                                     ..........------------....             ------------                      $28, 000
   Cost------ -- --- -- -------------- --------------- --------                        --------------                          28000,
   Expenditures-----------      ------------------------                  -----------          ---- ----      ------           28,0(




                           6. PAMLICO AND TAR RIVERS, N. C.

   Location.-The two names are applied to the same river, known
as the Pamlico below Washington, N. C., and as the Tar above
that point. This stream rises in Person County, flows generally
southeasterly 217 miles, and empties into Pamlico Sound.
lico River is 38 miles long. (See U. S. Coast and Geodetic Survey
                                                                  Pam-                                          _The
Chart No. 537.)
   Previous projects.-Adopted by River and Harbor Acts of July
4, 1836, and August 30, 1852. For further details see page 502 of
annual report for 1938.
   Existing project.-TThis provides for a channel 12 feet deep at mean
low water and 200 feet wide from the 12-foot contour in the river
below Washington to the Atlantic Coast Line Railroad bridge at
Washington; 12 feet deep and 100 feet wide from Washington to
a turning basin of the same depth, 200 feet wide and 300 feet long,
in Hardee Creek, 1,500 feet above its mouth; 6 feet. deep and' 75
feet wide to Greenville; 20 inches deep and 60 feet wide to Tarboro;
thence to clear the natural channel above Tarboro to Little Falls.
The length of section under improvement is 97 miles, extending
from a point 14 miles below Washington to Little Falls. The stream
is nontidal; variations in the water surface at Washington, due to
prevailing winds, seldom exceed 2 feet. The extreme range of the
flood or freshet stage for the upper section is 34 feet at Tarboro.
For the lower section, the extreme range due to winds is 8.3 feet.
   The cost to the Federal Government for new work in completing
the existing project was $674,651.38, exclusive of amounts expended
on previous projects. The latest (1952) approved estimate for annual
cost of maintenance is $66,000.
   The existing project was authorized by the following river and
harbor acts:
              RIVERS      AND HARBORS-W--ILMINGTON,                                       N.       C.,       DISTRICT               479

       Acts                                Work authorized                                                   Documents

Aug. 14,1876       Channel 9 feet deep and 100 feet wide from the mouth                   H.      Doc. 68, 45th Cong., 3d sess.,
                    to Washington.                                                              and Annual Report, 1879, p. 700.
Mar. 3,1879        Clearing the channel to Tarboro-...--------------------
Aug. 11,1888       Clearing the channel between Tarboro and Little                        Annual report, 1889, p. 1130.
                    Falls (Rocky Mount).
Mar.     2,1907    Channel 4 feet deep and 60 feet wide between Wash-                     H. Doc. 342, 59th Cong., 2d sess.
                    ington and Greenville.                                                                                               1
July 25,1912       A 10-foot depth and 200-foot width from the mouth                      H. Doc. 270, 62d Cong., 2d sess.
                    to Washington, thence 6-foot depth and 75-foot
                    width to Greenville.
July     3, 1930   Present 12-foot project to the Atlantic Coast Line                     Rivers and Harbors Committee    1
                     R. R. bridge at Washington.                                            Doc. 11, 71st Cong., 1st sess.
Aug. 26,1937       Present 12-foot project from Washington to a turning                   Rivers and Harbors Committee
                     basin in Hardee Creek.                                                     Doc. 22, 75th Cong., 1st sess.1

  1 Contains latest published maps.

   Recommended modifications of project.-Abandonment of this im-
provement above Tarboro, N. C., is recommended in House Documerit
467, Sixty-ninth Congress, first session.                         ...........
   Local cooperation.-Fullycomplied with.
   Terminal facilities.-There are 54 wharves on the portion of this
river under improvement, of which 34 are along the water front at
Washington, 19 between Washington and the mouth, and only 1 in
usable condition above Washington. They have a total frontage of
3,570 feet. The existing facilities are considered adequate for existing
commerce.
   Operationsand results duringfiscal year.-None.
   Condition at cnd of fiscal year.--The existing project was com-
pleted in 1939. The 12-foot channel below Washington was com-
menced in March 1931 and completed in July 1931. The 12-foot
channel between Washington and Hardee Creek was commenced in
July 1939 and completed in December 1939. The controlling depth
at the close of the fiscal year was 11.7 feet to Washington, 5.3 feet
to and including the turning basin in Hardee Creek, 3.5 feet to Green-
ville, and 1 foot to the mouth of Fishing Creek, The total costs and
expenditures under the existing project to June 30, 1952, were
$674,651.38 for new work and $532,352.78 for maintenance, a total of
$1,207,004.16.
  Proposed operations.--Nowork is scheduled for fiscal year 1953.
  The sum of $30,000 can be profitably expended during the fiscal
year 1954 for maintenance, dredging, condition surveys, and miscel-
laneous inspections and reports.
                                           Cost and financial summary

                                                        Fiscal year ending June 30                                       Total to June
                                                                                -30,                                "
                                                                                                                        ing 1952,
                                                                                                                            fiscalinclud.
                                                                                                                                   years
                                        1948          1949           1950              1951              1952            prior Co 1948


New work:
   Appropriated------      --------              ------------         -----------------------       -----.                  $689, 651.38
   Cost                                                                                                                     $--------------------689,651.38
   Expenditures.------                  .-----
                                          --------------------------..             .-----------------           ------       689, 651.38
Maintenance :
    Appropriated..--------            $4,000.00 ---                                                                          532 352.78
    Cost...4,                            00.00        ------------            ------------ --------                          532, 352. 78
    Expenditures      -......          3,188.17        $811.83--                                                             532, 352. 78
480           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                               1952

                             7. ROLLINSON CHANNEL, N. C.

  Location.-This channel extends from deep water in Pamlico Sound
to the village of Hatteras, near Hatteras Inlet, N. C. (See U. S.
Coast and Geodetic Survey Chart No. 1232.)
  Existing project.-This provides for a channel 100 feet wide and
6 feet deep at mean low water from deep water in Pamlico Sound
to and including a basin at Hatteras. Variation in the water surface
due to winds seldom exceeds 1 or 2 feet above or below mean stage.
Severe windstorms will double or triple this variation. The estimate
of cost for new work, revised in 1952, is $75,100. The latest (1952)
approved estimate of annual cost of maintenance is $15,000.
  The existing project was authorized by the following river and
harbor acts:

    Acts                        Work authorized                                 Documents

Aug. 30,1935   A 6-foot channel, 100 feet wide, from deep water in   H. Doc. 218, 72d Cong,, 1stseas.
                Pamlico Sound to natural inner basin.
Mar. 2,1945    Extension of 6-foot channel to and including basin    H. Doc. 236, 76th Cong., 1st sess.
                same 'depth at Hatteras.                               (Contains latest published map.)


   Local cooperation.-The River and Harbor Act of March 2 1945,
provided that local interests furnish, free of cost to the United States,
all lands, easements, rights-of-way, and spoil-disposal areas for the
initial work and for subsequent maintenance as required; set apart
suitable space for a public landing; and hold and save the United
States free from claims for damages resulting from the improvement.
The board of county commissioners, Dare County, has signified its
intention of meeting all local cooperation requirements.
   Terminal facilities.-There are 8 wharves in the basin at Hatteras,
with a total frontage of about 1,400 feet. The existing facilities are
considered adequate for present commerce.
   Operations and results during fiscal year.-The work consisted of
maintenance dredging by contract and miscellaneous surveys.
   Between March 18, and April 1, 1952, the contract dredge Wash-
ington removed 69,974 cubic yards from shoals in the waterway,
at a cost of $32,439.73. Miscellaneous surveys cost $1,118.90. The
total costs and expenditures were $33,558.63 for maintenance.
   Condition at end of fiscal year.-The existing project was about 27
percent completed. The 6-foot channel, 100 feet wide, from deep
water in Pamlico Sound to the natural inner basin was commenced in
October, and completed in December 1936. No work has been done on
the extension of the 6-foot channel to and including the basin at Hat-
teras. At the close of the fiscal year the controlling depth in the
completed portion was 6 feet and 6 feet to and including the existing
basin at Hatteras. The costs and expenditures under the existing
project to June 30, 1952, were $20,125.43 for new work and $122,377.90
for maintenance, a total of $142,503.33.
  Proposed operations.-An allotment of $900 for the fiscal year 1953
will be applied as follows:
               RIVERS:AND               HARBORS-WILIIINGTON,                             N.     C.,      DISTRICT             481
Maintenance :
    Condition surveys-----$-------------------------                                                         ------            $800
    Miscellaneous inspections and reports-.--------------------------                                                           100
              Total for all work----------------------------------------------                                                  900
   The additional sum of $16,000 can be profitably expended during
the fiscal year 1954 for maintenance, dredging, condition surveys, and
miscellaneous inspections and reports.
                                           Cost and financial summary

                                                         Fiscal year ending June 30                                   Total to June
                                                                                                                   30.1952, includ-
                                                                                                                   ing fiscal years
                                        1948           1949            1950           1951              1952          priorto 1948

New work:
       Appropriated-----------------------------------------------------------                                            $20,125.4
       Cost------------------------------                               ------------------------------------               20,125.43
       Expenditures....                 -----------------------------------------------------------                        20,125.43
Maintenance:
   Appropriated- ..                $..  0
                                   $20,000.00 --------              $7, 500.00 -$2, 280. 73       $33, 558.63             122, 377. 90
       Cost----------      ---       19, 286.54        $713. 46      4, 660.46         558.81         33, 558.63          122,377.90
       Expenditures---.... ,          1, 662. 85     18, 337.15      2,683.24        2,536.03         33, 558.63          122, 377. 90


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project------------------ $55, 000

                                     8. SILVER LAKE HARBOR, N. C.

   Location.-Silver Lake Harbor is at the westerly end of Ocra-
coke Island, a portion of the barrier separating Pamlico Sound from
the Atlantic Ocean. Beaufort Harbor lies about 50 miles southwest;
Belhaven is about 60 miles northwest. (See U. S. Coast and Geodetic
Survey Chart No. 1232.)
   Existing project.-This provides for a channel 10 feet deep from
that depth in Pamlico Sound to and including an anchorage basin of
the same depth in Silver Lake Harbor, with widths of 100 feet across
Big Foot Slough bar, and 60 feet in the entrance channel, together
with a training wall 300 feet long to protect the outer end of the
entrance channel from northeast storms. The ordinary range of tide
is about 1 foot within the lake and about 21/2 feet at the outer end of
the connecting channel. Severe storm tides have been known to raise
the water surface of the lake as much as 5 feet.
   The cost to the Federal Government for new work for the completed
project was $67,241.30. The latest (1952) approved estimate for an-
nual cost of maintenance is $7,500.
   The existing project was authorized by the following river and
harbors acts:

       Acts                               Work authorized                                               Documents

July     3,1930     Entrance channel 5 feet deep and 50 feet wide from                  Rivers and Harbors Committee
                     Pamlico Sound to the 3-foot contour in the lake                     Doc. 3, 70th Cong., 1st sess.
                     and training wall at entrance.
Oct. 17,1940        Channel 10 feet deep and anchorage basin of same                    H. Doc. 325, 76th Cong., 1st sess.
                     depth, 100 feet wide across Big Foot Slough and 60                   (Contains latest published map.)
                     feet wide in entrance.
482             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   Local cooperation.--Fully complied with.
   Terminal facilities.-There are 12 small wharves extending from
the shore to the deeper waters in the lake. These facilities are con-
sidered adequate for the present commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was com-
menced in June and completed in August 1942. At the end of the
year the controlling depth was 3.6 feet in Big Foot Slough bar chan-
nel and 10 feet in the entrance channel and basin at Ocracoke. The
total costs and expenditures under the existing project to June 30
1952, were $114,442.55, of which $67,241.30 was for new work and
$47,201.25 for maintenance.
   Proposedoperations.-An allotment of $600 for the fiscal year 1953
will be applied as follows:
Maintenance:
       Condition surveys------------     ------------ -------------    $500
       Miscellaneous inspections and reports--------------------------100

            Total for all work ----------                              ---------                                                   --        6-----------
                                                                                                                                             600
    No work is proposed for fiscal year 1954.
                                               Cost and financial summary

                                                               Fiscal year ending June 30                                       Total to June
                                                                                                                              30,1952, includ-
                                                                                                                               ing fiscal years
                                           1948              1949              1950             1951              1952           prior to 1948

New- work:
     Appropriated--.........--..----               -----------------------.........                                  -----              $------------
                                                                                                                                        $67,241.30
     Cost---------- ---                 --------------------            -----------------------------------                             67,241.30
   Expenditures--...........------------..................... ....------------............----------...-----------.........------------........
                                                                                                                                          67, 241.30
Maintenance:
   Appropriated-......... $15, 000.00 -$9, 000. 00 ..------------ -----------------                                                       47, 201.25
   Cost..............--------------- 5, 287. 94       712. 06 ..-                                                                         47, 201.25
   Expenditures-------.... -         1, 138. 83    4, 861. 17 -----------..------------------------                                       47, 201.25



                                                   9. DRUM INLET, N. C.

   Location.-Drum Inlet is an opening through the barrier beach
which separates Core Sound from the Atlantic Ocean. It is about
1,100 feet wide and is about 35 miles northeast of Beaufort and opposite
the village of Atlantic.
   Existing project.-This provides for a channel 12 feet deep at mean
low water and 200 feet wide from the gorge in the inlet to the fed-
erally improved channel in Core Sound, about 1 mile. The mean
range of tide is 3.8 feet in the ocean and 0.3 foot in Core Sound at
Atlantic.
   The cost to the Federal Government for new work for the completed
project was $52,828.22. The latest (1952) approved estimate for
annual cost of maintenance is $25,000.
   The existing project was adopted by the River and Harbor Act of
June 20, 1938 (H. Doc. 414, 75th Cong., 2d sess.). The latest pub-
lished map is in that document.
   Local cooperation.-Fullycomplied with.
    Terminal facilities.-There are no wharves along this waterway,
               RIVERS AND HARBORS-WILMINGTON,                                                            N. C.,          DISTRICT                483
and, as it is only a part of a through waterway, none are deemed
necessary.
   Operations and results during fiscal year.-The work consisted of
surveys and preparation of plans and specifications for maintenance
dredging. The costs were $2,908.85 for maintenance. The expendi-
tures were $2,666.03.
   Condition at end of fiscal year.-The existing project was com-
menced in October 1939 and completed in February 1940. At the
close of the fiscal year the controlling depth was 2.5 feet in the com-
pleted portion. A depth of 7 feet was available on the ocean bar.
The total costs under the existing project to June 30, 1952, were
$52,828.22 for new work and $118,195.84 for maintenance, a total of
$171,024.06. The total expenditures were $170,781.24.
  Proposed operations.-The balance unexpended June 30, 1952, $46,-
833.97, will be applied during fiscal year 1953 as follows:
Accounts payable June 30, 1952      -----------------------------      $242. 82
Maintenance: Dredging, under existing contract, during July, August,
  and September 1952---......----------------------------------      46, 591.15
            Total for all work------------                                           ------- --------------                                46, 833. 97
     No work is proposed for fiscal year 1954.
                                                   Cost and financial summary

                                                                   Fiscal year ending June 30                                          Total to June
                                                                                                                                      30, 1952, includ-
                                                                                                                                      ing fiscal years
                                              1948              1949               1950               1951               1952           prior to 1948

New work:
   Appropriated--------.............--------........------------------------------............                         ----------            $52, 828. 22
   Cost---.............-----------...----------------------------------...............................................------------------      52, 828. 22
   Expenditures----......---...-------- -------- -----------------------------------                                                          52, 828. 22
Maintenance:
     Appropriated-......... $57, 300. 00                    $29, 000. 00        $2, 752. 96             $31.68      $49, 500.00              164, 786. 99
     Cost....             _.............57, 300. 00              818.88         30, 934.08               31. 68       2, 908. 85             118, 195. 84
     Expenditures--------.......        57, 008. 82           1, 110. 06        30, 934. 08              31. 68       2, 666. 03             117, 953. 02



      10. WATERWAY CONNECTING PAMLICO SOUND AND BEAUFORT
                          HARBOR, N. C.

  Location.-This waterway begins at the southeast corner of Pamlico
Sound, passing southwesterly through Wainwright Slough, Core
Sound, and The Straits, to Beaufort Harbor, a total length of 33.9
miles. (See U. S. Coast and Geodetic Survey Chart No. 1233.)
  Previous projects.-No previous project exists for this waterway as
a whole. The River and Harbor Act of March 4, 1913, authorized a
channel 23/4 miles long connecting Core Sound and Beaufort Har-
bor. For further details see page 520 of the annual report for 1938.
  Existing project.-This provides for a channel 7 feet deep at mean
low water and 75 feet wide from Pamlico Sound to Beaufort Harbor
by way of Wainwright Slough, Core Sound, and The Straits; also
for an alternative route of the same width and depth through Back
Sound by way of channels at east and west ends of Harkers Island;
for a channel 7 feet deep and 75 feet wide from the main channel in
Core Sound to the town of Atlantic; for a side channel 5 feet deep,
75 feet wide, with basin 150 feet by 130 feet, same depth, at Davis;
484           REPORT OF CHIEF OF ENGINEERS,                            U. S. ARMY,            1952

for a side channel 7 feet deep, 75 feet wide, with basin 200 feet by 500
feet, same depth, at Sealevel; and for a side channel 6 feet deep, 60 feet
wide, with basin 100 feet by about 600 feet, same depth, at Marshall-
berg. On June 14, 1948, the Chief of Engineers approved transfer
of the Taylors Creek reach of this project to the project for Beaufort
Harbor, N. C. (H. Doc. 111, 81st Cong., 1st sess.).
   The estimate of cost for new work, revised in 1952, is $217,600, exclu-
sive of amounts expended on previous projects. The latest (1952) ap-
proved estimate for annual cost of maintenance is $14,800.
   The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                    Documents     I


Sept. 22,1922    A 7-foot channel 75 feet wide from Core Sound to          H. Doc. 88, 67th Cong., 1st sess.
                  Beaufort Harbor.
Aug. 30,1935 2 A 7-foot channel 75 feet wide from Pamlico Sound to         H. Dec. 485, 72d Cong., 2d sess,
                 Beaufort Harbor via Wainwright Channel,
Aug. 26,11937    A 7-foot side channel   75 feet wide to Atlantic------. Rivers and Harbors Committee
                                                                          Doc. 92, 74th Cong., 2d sess.,.-
Mar.    2,1945   Channels 7 feet deep, 75 feet wide, at east and west      H. Doec. 99, 77th Cong., 1st sess.
                   ends of Harkers Island and side channel 5 feet deep,
                   75 feet wide, with basin 150 feet by 130 feet, same
                   depth, at Davis.
    Do-......    A 7-foot side channel 75 feet wide, with basin 200 feet   S. Doc. 247, 77th Cong., 2d sess.
                   by 500 feet, same depth, at Sealevel.
May 17,1950      A 6-foot side channel 60 feet wide, with basin 100 feet   H. Doec. 68, 81st Cong., 1st sess.
                   by about 600 feet, same depth, at Marshaliberg.

  1 These documents contain the latest published maps.
  * Included in the Public Works Administration program Jan. 3, 1934.


   Local cooperation.-The River and Harbor Act of March 2, 1945,
provided that local interests furnish, free of cost to the United States,
all necessary rights-of-way and spoil-disposal areas for new work and
subsequent maintenance, remove all structures from the area to be
dredged, release the United States from all claims for damages inci-
dent to the work of improvement, and provided further that local
interests be required to contribute $1,000 toward the cost of dredging
the side channel and basin at Sealevel. The River and Harbor Act
of May 17, 1950, provides that responsible local interests furnish,
without cost to the United States, all lands, easements, rights-of-way,
and spoil-disposal areas necessary for the construction of the project
and subsequent maintenance, when and as required; hold and save
the United States free from all damages due to the construction and
subsequent maintenance of the project; and provide at their own ex-
pense suitable space for public landing at Marshallberg, open to all
on equal terms.
   Terminal facilities.-Between Pamlico Sound and the southern end
of Core Sound there are 15 small wharves, which are open to all when
not required by the owners. Marshallberg has 4 privately owned
wharves with about 700 feet of berthing space and a public dock with
200 feet of berthing space. Additional wharves are needed at several
of the communities along Core Sound.
   Operations and results during fiscal year.-The work consisted of
maintenance dredging by contract.
  Between April 3 and May 4, 1952, the contract dredge Washington
removed 43,388 cubic yards from shoals in the through channel, 9,692
           RIVERS          AND HARBORS--WILMINGTON,                               N. C., DISTRICT                  485

cubic yards from shoals in the side channel to Atlantic and 7,293
cubic yards from shoals in the basin at Davis, N. C. The costs and
expenditures were $30,533.74 for maintenance.
   Condition at end of fiscal year.--The existing project was about 40
percent completed. That portion of the project providing for a
through channel from Pamlico Sound to Beaufort was commenced in
August and completed in December 1934; the side channel to Atlantic
was commenced in January and completed in February 1937; under
authority of section 3 of the river and harbor act approved October 17,
1940, a side channel and basin at Sealevel, practically coinciding with
the existing project, were dredged to a depth of 6 feet during December
1943 and January 1944, and the side channel and basin at Davis, N. C.,
was commenced and completed in January 1948. No work has been
done on the 7- by 75-foot connecting channels east and west of Harkers
Island, the side channel and basin at Sealevel, nor the harbor and ap-
proach channel at Marshallberg. At the end of the fiscal year the
controlling depth in the completed portion was 7 feet. The total costs
and expenditures under the existing project for the through waterway
and for the side channels and basins at Sealevel and Davis to June 30,
1952, including $40,000 Public Works funds for new work and $1,000
contributed by local interests, were $315,844.07 of which $72,842.89
was for new work and $243,001.18 for maintenance. The total cost
of the side channel to Atlantic, for new work, was $18,584.53, of which
$13,171.72 was Works Progress Administration funds and $5,412.81
was contributed by local interests.
   Proposedoperations.-An allotment of $1,100 for the fiscal year 1953
will be applied as follows:
Maintenance:
   Condition surveys---
                      .....-------------------------------                                                      $1, 000
   Miscellaneous inspections and reports------                                   ------------------                 100
         Total for all work----------,--                                 ---------------------                    1, 100
  The additional sum of $21,100 can be profitably expended during
the fiscal year 1954 for maintenance dredging, by contract, condition
surveys, and miscellaneous inspections and reports.
                                        Cost and financial summary

                                                    Fiscal year ending June 30                            Total to June
                                                                                                         30,1952, includ-
                                                                                                         ing fiscal years
                                     1948          1949          1950          1951            1952       prior to 1948


New workt
   Appropriated....------        -$2, 812.15 -    -......-....                                               1 $92, 842. 89
   Cost ...--------------          4, 815.61 --------------------------------------------                      92,842.89
   Expenditures------...           4, 815.61----------------------------------------............               92, 842. 89
Maintenance:
   Appropriated--------.......    26, 750.00     $9, 750.00 ------------  $519.54          $30, 533.74        243, 001.18
   Cost..---------------          12,082.18      21,417.82 -------------   519.54           30,533.74         243,001.18
   Expenditures..._...             9,984.95      23,515.05 -------------- 519.54            30,533.74         243,001.18


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project..----......---------                                        $131, 600
1In   addition the Works Progress Administration spent $18,584.53 (of which $5,412.81 was contributed
by local interests) for new work.
  2In addition $10,000 of contributed funds was expended under previous projects.
486           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                   1952

                            11. MOREHEAD CITY HARBOR, N. C.

   Location.-This harbor is on the northern shore of Bogue Sound,
adjacent to Beaufort Harbor and Inlet. New Bern, N. C., the nearest
city of importance, is about 43 miles by inland waterway to the north-
west. (See U. S. Coast and Geodetic Survey Chart No. 420.)
   Previous project.-The channel across the ocean bar was formerly
improved under the title of Beaufort Inlet, N. C. The project was
adopted by the River and Harbor Act of March 3, 1905 (H. Doc. 563,
58th Cong., 2d sess.). For further details, see page 470 of annual report
for 1935.
   Existing project.-This provides for a channel 30 feet deep and 400
feet wide across the ocean bar at Beaufort Inlet, thence same depth
and 300 feet wideto tohe marine terminals at Morehead City, enlarged
to 600 feet to form a turning basin at that point, and for construction
of jetties at the inlet; for a channel 12 feet deep and 100 feet wide from
the 30-foot channel to Sixth Street, Morehead City, thence same depth
and 200 to 400 feet wide to Tenth Street, thence 6 feet deep and 75
feet wide to deep water in Bogue Sound. The average rise of the
tide is about 21/2 feet at Morehead City and 31/2 feet at the inlet.
Observations made in 1907 showed an extreme range of 4.8 feet.
   The estimate of cost of new work, revised in 1952, is $3,488,100.
The latest (1952) approved estimate for annual cost of maintenance
is $200,000.
   The existing project was authorized by the following river and
harbor acts:
       Acts                         Work authorized                                  Documents

June 25,1910      Channel 10 feet deep and 100 feet wide to the wharves   H. Doc. 649, 61st Cong., 2d sess.
                   at Morehead City, thence 200 feet wide in front of
                   the wharves.
July     3,1930   Channel 12 feet deep and 100 feet wide from the outer   H. Doc. 105, 70th Cong., 1st sess.
                   harbor to 6th St., in Morehead City, thence 200 to       (Contains the latest published
                   400 feet wide to 10th St., and a channel 6 feet deep    map.)
                    and 75 feet wide connecting with Bogue Sound.
Aug.26,19371      Channel 30 feet deep and 400 feet wide across the bar   Senate Committee       print,   74th
                   at Beaufort Inlet, thence 30 feet deep and 300 feet      Cong., 1st sess.
                   wide to the marine terminals at Morehead City.

  1 Included in Public Works Administration program, July 5, 1934, under the National Industrial Re-
covery Act of 1933.

   Local cooperation.-The project provides that local interests fur-
nish, free of cost to the United States, spoil-disposal areas as required
for new work and for future maintenance and all other lands needed
for the improvement, and to the further condition that local interests
give assurances satisfactory to the Secretary of War that an adequate
terminal open to the public on uniform terms will be available by
the time the channel is completed. Terminals have been completed
and spoil-disposal areas for new work furnished. Lands needed in
connection with the construction of jetties have not been furnished.
  Terminal facilities.-There are 37 wharves along the main water
front of the town, with a total frontage of about 1,182 feet. The
marine terminals provide 1,350 feet of berthing space with a depth
alongside of 27 feet at mean low water, and facilities for transfer of
cargoes between rail and water carriers. The existing facilities are
considered adequate for existing and prospective commerce.
       RIVERS AND          HARBORS-WILMINGTON,                      N. C.,   DISTRICT      487


   Operations and results during fiscal year.-The work consisted of
maintenance dredging with Government plant and hired labor, prep-
aration of plans and specifications for maintenance dredging, and
miscellaneous surveys.
   Between February 1, and March 31, 1952, the United States hopper
dredge Lyman removed 504,596 cubic yards from the ocean-bar chan-
nel and the outer end of the inside 30-foot channel at a cost of
$109,434.80.
   Preparation of plans and specifications for maintenance dredging
in the turning basin and approach channel cost $1,466.41. Miscel-
laneous surveys cost $5,537.52. The total costs were $116,438.73 for
maintenance. The expenditures were $116,416.18.
   Condition at end of fiscal year.--The existing project was about
19 percent completed. The part of the existing project providing
for a 12-foot channel to Morehead City, thence a 6-foot channel west-
ward to Bogue Sound was commenced in February and completed
in March 1931; the part providing for the 30-foot channel to the termi-
nals was commenced in November 1935 and completed in August 1936.
No work has been done on the jetties proposed for Beaufort Inlet.
At the close of the fiscal year a depth of 30 feet was available in the
ocean-bar channel; 27.9 feet in the 30-foot channel (inside) to the
terminals at Morehead City; 12 feet from deep water in the outer
harbor to the foot of 10th Street, Morehead City, and thence 6 feet
westward to Bogue Sound. The total costs under the existing project
to June 30, 1952, were $2,232,216.51, of which $613,106.40, including
$59,630.54 regular funds and $553,475.86 Public Works funds, was for
new work and $1,619,110.11 for maintenance. The total expenditures
amounted to $2,232,146.31, including $553,475.86 Public Works funds.
   Proposed operations.-The balance unexpended June 30, 1952,
$78,135.29, plus an allotment of $194,500 for the fiscal year 1953, a
total of $272,635.29, will be applied as follows:
Accounts payable June 30, 1952 --------------------------------   $70. 20
Maintenance:
   Dredging Ocean Bar channel with United States hopper dredge,
      2 months, February 1 to March 31, 1953--- ----------      __-110, 000, 00
   Dredging, under existing contract, during July, August, and
      September 1952     --------------------------------------       65, 007. 00
   Dredging in turning basin, tangent C, and inner portion of
      tangent B, by contract, May 1 to June 30, 1953------------      93, 058. 09
   Condition surveys         ------------------------------------- 3, 000. 00
   Miscellaneous inspections and reports                           -   1--------------
                                                                       1, 500. 00
      Total-     ----------------------------------------                           272, 565. 09
      Total for all work-----
                           .....-                 _ ___-------__--272,                  635. 29
  The additional sum of $200,000 can be profitably expended for the
following scheduled work during fiscal year 1954:
Maintenance:
   Dredging Ocean Bar channel with United States hopper dredge,
      2 months      -------------------------------------------                       $110,000
   Dredging inside channels by contract------------------------                         84, 000
    Condition surveys and miscellaneous inspections and reports...                       6, 000
      Total for all work-....                         ___-----
                                                      ---------------          --       200, 000
488         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                               1952

                                     Cost and financial summary

                                                 Fiscal year ending June 30                           Total to June
                                                                                                     30, 1952, includ-
                                                                                                     ing fiscal years
                                 1948          1949          1950           1951          1952        prior to 1948


New work:
   Appropriated- ...----------          - ------------ ----------------------------------                  $657, 590.64
   Cost------..    -----------------------------------------------------------                              657,590.64
   Expenditures---------...............----------------------------------------------------------           657, 590.64
Maintenance:
   Appropriated--......... $175,000.00 $150, 000.00 $145,000.00 $131, 700.00 $194, 000.00               1,981,  732.64
   Cost------------     -- 153, 994.39 188, 625.07 184, 854.25 131,196.18 116, 438. 73                  1, 903, 667.55
   Expenditures       ----.........
                            154, 006.15 188, 577.01 184,149. 63  132, 889. 46 116, 416.18               1, 903, 597.35


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project-- -_-----    $2,875, 000

                                 12. BEAUFORT HARBOR, N. C.

   Location.-This harbor is just inside Beaufort Inlet adjacent to
Morehead City Harbor. New Bern, N. C., the nearest city of impor-
tance, is about 43 miles by inland waterway to the northwest. (See
U. S. Coast and Geodetic Survey Chart No. 420.)
   Previous projects.--Adopted by River and Harbor Act of July
4, 1836. The total cost and expenditure was $5,000 for new work.
For further details see page 1803 of annual report for 1915.
   Existing project.-This provides for the stopping of erosion at
the inlet by jetties and sand fences at Fort Macon and Shackleford
Points and other shore protection; for a channel 12 feet deep at
mean low water, 100 feet wide in Bulkhead and Gallants Channels
and 600 feet wide in front of the town of Beaufort; for the construc-
tion of a stone bulkhead from Town Marsh across Bird Shoal to
the westerly end of Carrot Island; and for a channel 12 feet deep
at mean low water, 100 feet wide in Taylors Creek to extend about
2.6 miles easterly from about opposite Marsh Street in Beaufort
to Lenoxville Point at North River. On June 14, 1948, the Chief
of Engineers approved transfer of the Taylors Creek reach of the
project Waterway connecting Pamlico Sound and Beaufort Harbor,
N. C., to this project (H. Doc. 111, 81st Cong., 1st sess.). The distance
from the inlet to the upper end of Gallants Channel is about 5 miles.
The average rise of tide is 2 feet at Beaufort and 3V2 feet at the
inlet. The extreme range of tides is 5 feet.
   The estimate of cost for new work, revised in 1952, exclusive of
amount expended on previous projects, is $423,900. The latest (1952)
approved estimate for annual cost of maintenance is $24,700.
   The existing project was authorized by the following river and
harbor acts:
              RIVERS     AND IIARBORS---WILMINGTON,                          N.   C.,   DISTRICT           489


       Acts                          Work authorized                                     Documents

Mar.     3,1881   A 9-foot channel 200 feet wide through Bulkhead            Annual Report, 1881, p. 1013.
                    Channel to Beaufort; a 6-foot channel 100 feet wide
                    to North River and Core Sound; and the construc-
                   tion of jetties on Shackleford Point.
   Do--.          Reduced channel 100 feet wide and 7 feet deep through      Annual Report, 1890, p. 1134.
                    Bulkhead Channel to Beaufort.
Mar.     2,1907   Repairs to Fort Macon jetties and additional jetties       Specified in act.
                   and shore protection.
June 25,1910      A 10-foot channel 60 feet wide from Beaufort through       H. Doc. 511, 61st Cong., 2d sess.
                    Gallants Channel to the inland waterway.
Mar.     2,1919   Turning and anchorage basin 10 feet deep in front of       H. Doc. 1108, 63d Cong., 2d sess.
                    Beaufort.
Mar.     3,1925   Bulkhead across Bird Shoal.........---------------------   Rivers and Harbors Committee
                                                                               Doec. 8, 68th Cong., 2d sess.' 1
July     3,1930   Increase in depth to 12 feet in Bulkhead Channel,          H. Dec. 776, 69th Cong., 2d sess.
                    Gallants Channel, and in front of Beaufort.
Mar.     2,1945   Increase in width and length of basin in front of          H. Doec. 334, 76th Cong., 1st sess.l
                    Beaufort, all to depth of 12 feet.                                                            1
May 17, 1950      Increase in depth to 12 feet and in width to 100 feet      H. Doec. 111, 81st Cong., 1st sess.
                    in Taylors Creek.

1 Contains latest published maps.

   Local cooperation.-The River and Harbor Act of March 2, 1945,
in authorizing the increase in width and length of the basin in front
of Beaufort, provided that local interests furnish, free of cost to the
United States, as and when required, all lands, easements, and rights-
of-way and spoil-disposal areas required for initial work and for
subsequent maintenance, and hold and save the United States free
from claims for damages resulting from the improvement. The River
and Harbor Act of May 17, 1950, in authorizing increased depth and
width in Taylors Creek, imposed similar conditions of local coopera-
tion.
   Terminal facilities.-There are 50 wharves contiguous to this har-
bor. They have a total frontage of about 2,000 feet. The existing
facilities are considered adequate for present commerce.
   Operations and results during fiscal year.-The work consisted of
maintenance dredging by contract.
   Between May 5 and 7, 1952, the contract dredge Savannah removed
7,013 cubic yards of material from Gallants Channel. The costs and
expenditures were $3,387.79 for maintenance.
   Condition at end of fiscal year.-The existing project was about 64
percent completed. The deepening of Bulkhead and Gallants Chan,
nels and the basin in front of Beaufort was commenced in March
and completed in July 1931. No work has been done on increasing
the width and length of the basin in front of Beaufort nor dredging
the 12-foot channel in Taylors Creek. At the close of the fiscal year
the controlling depth in the completed portions was 12 feet. The
stone jetties and training wall were in fair condition. The costs and
expenditures under the existing project to June 30, 1952, were
$269,667.38 for new work and $356,315.80 for maintenance, a total of
$625,983.18.
490           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                           1952

  Proposed operations.-The balance unexpended June 30, 1952
$519.84, plus an allotment of $88.08 for the fiscal year 1953, a total oi
$607.92 will be applied as follows:
Maintenance :
   Condition surveys      -------------------------------------- $500.00
   Miscellaneous inspections and reports _--___---------------    107. 92

          Total for all work----                          _------------___------------                                       607. 92
  The additional sum of $15,600 can be profitably expended during
the fiscal year 1954 for maintenance, dredging, condition surveys, and
miscellaneous inspections and reports.
                                           Cost and financial summary

                                                           Fiscal year ending June 30                                 Total to June
                                                                                                                      30,1952. includ.
                                                                                                                      ing fiscal years
                                       1948              1949              1950                1951       1952         priorto 1048

New work:
   Appropriated--.......------..                                           -----------------------------------
                                                     ------------................................................           $274,667.38
   Cost....                -----------------------------------------------                                     ------------  274,667.38
   Expenditures.....------------------------ ----------- ------------                                  ------------          274, 667. 38
Maintenance:
   Appropriated--------.......         $17, 500       $8, 500.00       $5, 000. 00      $16,371.98      $3, 907.63          356, 835.64
   Cost...----------------              17, 500        8, 500.00        4, 668.92        16, 703.06      3, 387. 79         356, 315. 80
   E xpenditures ....---                17,430         8, 569. 69       4, 636. 92       16, 735.06      3, 387. 79         356, 315. 80


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project....----------------......                                               $154, 200

         13. CHANNEL FROM BACK SOUND TO LOOKOUT BIGHT, N. C.

   Location.-This channel extends from a point near the eastern end
of Harkers Island, about 8 miles east of Beaufort, through the shallow
waters of Back Sound and Lighthouse Bay, to and through Shackle-
ford Banks, and into the Atlantic Ocean at Lookout Bight, and is
about 4 miles long. (See U. S. Coast and Geodetic Survey Chart
No. 420.)
   Existing project.-The project provides for a channel 100 feet wide
and 7 feet deep at mean low water from deep water in Back Sound,
through Shackleford Banks to deep water in Lookout Bight., The
mean range of tide is 3.8 feet in Lookout Bight and 1.3 feet in Back
Sound, and the extreme range is 8.2 feet in Lookout Bight and 3.8
feet in Back Sound.
   The estimate of cost for new work, revised in 1952, is $129,700.
The latest (1952) approved estimate for annual cost of maintenance
is $27,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                                Work authorized                                                  Documents

Aug. 26, 1937     A 5-foot channel, 50 feet wide from Back Sound to                             H. Doc. 251, 75th Cong., 1st sess.1
                   Lookout Bight.
Mar.     2,1945   Present project dimensions.............---...------------------...........    H. Doc. 746, 77th Cong., 2d sess.'

  I Contains latest published maps.
          RIVERS        AND HARBORS-WILMINGTON,                                N.       C.,   DISTRICT           491

  Local cooperation.-Fullycomplied with.
   Terminal facilities.-None. Not required.
   Operations and results during fiscal year.-The work consisted of
maintenance dredging by contract.
   Between April 24 and 28, 1952, the contract dredge Washington re-
moved 11,506 cubic yards of material from the channel. The costs
and expenditures were $7,729.19 for maintenance.
   Condition at end of fiscal year.-The existing project was about 19
percent completed. The channel 5 feet deep, 50 feet wide, was com-
menced in August and completed in October 1938. No work has been
done on increasing the depth to 7 feet and the width to 100 feet. The
controlling depth at the close of the fiscal year was 5 feet. The costs
and expenditures under the existing project to June 30, 1952, were
$24,676.08 for new work and $175,514.59 for maintenance, a total of
$200,190.67.
   Proposed operations.--The balance unexpended June 30, 1952,
$2,270.81, less a revocation in the amount of $1,663.54 resulting in a
balance of $607.27, will be applied as follows:
Maintenance:
   Condition surveys-------------------------------------$500.                                                      00
     Miscellaneous inspections and reports---------------------                                              107. 27

        Total for all work-             ----------------------------------                                    607. 27
   The additional sum of $12,000 can be profitably expended during
the fiscal year 1954 for maintenance dredging, condition surveys, and
miscellaneous inspections and reports.
                                    Cost and flnancial summary

                                                 Fiscal year ending June 30                            Total to June
                                                                                                       30,1952, includ-
                                                                                                       ing fiscal years
                                 1948          1949           1950           1951             1952      priorto 1948

New work:
   Appropriated_ ...--------------------------------                       ------------   ------------      $24, 676.08
   Cost--------------------------------------------------------------------                                  24,676.08
   Expenditures       -------------                ----------------------------------------------            24,676. 08
Maintenance:
   Appropriated- ..    --.       $17, 000   $34, 000.00     $2, 247.04    $3, 497. 14    $10, 000.00        177, 785.40
   Cost--------------..--         17, 000    31, 247.04      4,190.65      4, 306.49       7, 729.19        175, 514.59
   Expenditures------ -           17, 000     7, 322.29     27, 952. 86    4, 469.03       7, 729.19        175, 514.59


Other new work data: Estimated additional amount needed to be ap-
propriated for completion of existing project------------------  $105, 000

               14. CAPE FEAR RIVER, N. C., ABOVE WILMINGTON

  Location.-This river is formed by the confluence at Moncure, N. C.,
in Chatham County, of the Deep and Haw Rivers. It flows southeast-
erly and empties into the Atlantic Ocean at Cape Fear, near the
southern extremity of the State. (See U. S. Coast and Geodetic
Survey Charts Nos. 424 and 425.)
  Previous projects.-Adopted by acts of March 3, 1881, and June
13, 1902. For further details see page 1805 of annual report for 1915
and page 535 of annual report for 1938.
  Ecmisting project.-This provides for a navigable depth of 8 feet
at lowwater from Navassa to the head of navigation at Fayetteville,
492           REPORT OF CHIEF OF ENGINEERS,                                       U. S. ARMY,              1952


115 miles above Wilmington, by constructing three locks and dams
and by dredging river shoals between Navassa and Fayetteville, and
for a dredged channel from Wilmington to Navassa (4 miles), 25
feet deep and generally 200 feet wide with a cut-off across Horseshoe
Bend and a turning basin 550 feet long and 400 feet in average width
at its head. Data regarding locks and dams are as follows:
                                                                             Distance       Distance     Maximum
          Lock and dam                              Location                 from Wil-       above        available     Lift
                                                                              mington        mouth       dimensions

                                                                              Miles           Miles         Feet        Feet
No. 1 ....         .                           Kings Bluff ---------------
                            .......---------------------..                     39              69         200 by 40     11
No. 2 ....----------...............---------- Browns Landing..----..------     71             101         200 by 40      9
No. 3                              .
                .--------------------.         Tolars Landing-----------       95             125         300 by 40      9


                 Available
                 depth on,              Character           Kind of                                      Year of
    o k:andiam :miter sills             of founda,           dam         Type of construction            comple- Actual oost
                  at low                    tion              am                                           tion
                   water

                            Feet
No. t............            9          Sand......     Fixed.--_. Concrete lock timber crib               1916     1 $565, 856
                                                    S ...........  dam, rock filled.
   .      ----------         12        _do-.._...       do-       Concrete lock, dam rock                 1917        1909, 633
                                                                   filled.
  o. ----------               9         .. do........do-...... Concrete lock, concrete                    1935         660, 930
                                   ....      .........             dam...

  SIncludes $96,184 for increasing lift.
  SIncludes $356.443 for reconstruction and repairs.

    The tide ranges from 3.4 feet at Wilmington to 1 foot at Lock
No. 1, Kings Bluff, N. C., 39 miles above. The extreme range of lunar
tides is 6.4 feet at Wilmington and 1.5 feet at Kings Bluff.                                                            The
maximum variation due to floods ranges from 70 feet at Fayetteville
to 5 feet at Wilmington.
   The cost to the Federal Government for new work for the completed
project was $2,339,797.63. The latest (1952) approved estimate for
annual cost of maintenance is $105,000, including $45,000 for opera-
tion and care of locks and dams.
   The existing project was authorized by the following river and
harbor acts:
       Acts                             Work authorized                                               Documents

June 25,1910      The 8-foot channel and construction of 2 locks and                  H. Doc. 890, 60th Cong., 1st sess.
                    dams.
July    3,1930    Channel 22 feet deep to Navassa. (No work was                          Rivers and Harbors Committee
                    done on this project.)                                                Doc. 39, 71st Cong., 2d sess.
June 26, 19341    Operation and care of locks and dams provided for
                    with funds from War Department appropriations
                    for rivers and harbors.
Aug. 30,1935 2    Construction of Lock and Dam No. 3 and repairs                      H. Doc. 786, 71st Cong., 3d sess.'
                    and alterations to Locks and Dams Nos. 1 and 2.
Aug. 26,1937      Present project dimensions from Wilmington to                          Rivers and Harbors Committee
                    Navassa with cut-off across Horseshoe Bend, and                       Doc. 17, 75th Cong., 1st sess.3
                    a turning basin.

  4Permanent    Appropriations Repeal Act.
  s Included in Public Works Administration program, Sept. 27, 1933.
  3 Contains latest published maps.


   Local cooperatio.--Fully complied with.
   Terminal facilities.-There are six wharves between Wilmington
         RIVERS AND HARBORS-WILMINGTON,                             N.   C.,   DISTRICT     493
and Fayetteville, including the public, terminal at that point. They
have a total frontage of about 700 feet. The terminals appear to be
adequate for existing commerce.
   Operations and results during fiscal year.--The work consisted of
maintenance dredging with leased plant, clearing and snagging with
Government plant and hired labor, miscellaneous surveys, and opera-
tion and maintenance of three locks and dams.
   Between June 28 and 30, 1952, the leased dredge Marion on mainte-
nance dredging removed 6,479 cubic yards from shoals in the vicinity
of mile 93 in the 8-foot channel to Fayetteville, at a cost of $1,696.30
for inspection and supervision and preliminary work.
   Between October 15, 1951, and January 12, 1952, the U. S. der-
rickboat Northeast removed 474 obstructions from the channel and 16
obstructions from the banks between miles 1 and 106, at a cost of
$6,009.39. Miscellaneous surveys cost $2,759.66. The three locks and
dams were operated and maintained at a cost of $39,749.22. Coopera-
tion with U. S. Weather Bureau on hydroclimatic network cost $280.00.
The total costs were $50,494.57 for maintenance. The expenditures
were $50,762.26.
   Condition at end of fiscal year.-The existing project is completed.
The construction of Locks and Dams 1 and 2, and dredging of river
shoals, were commenced in August 1912 and completed in July 1917.
The construction of Lock and Dam 3 and repairs and alterations to
Locks and Dams 1 and 2 were commenced in January 1934 and com-
pleted in July 1935. The dredging of the 25-foot channel to Navassa
was commenced in November 1938 and completed in January 1939.
The controlling depths are 25 feet from Wilmington to Navassa, 4
miles; thence 18 feet to 9 miles above Wilmington; thence 6.2 feet to
Fayetteville, 115 miles above Wilmington. The total costs under the
existing project to June 30, 1952, were $3,881,630.41 of which
$2,339,797.63 (including $1,104,390.72 Public Works funds) was for
new work, $826,530.49 for maintenance, and $715,302.29 for operating
and care. The total expenditures to Jtne 30, 1952, were $3,881,714.26,
of which $2,601,497.98 was regular funds, $1,104,390.72 Public Works
funds, and $175,825.56 expended between November 1, 1916, and June
30, 1935, on the operating and care of the works of improvement under
the provisions of the indefinite appropriation for such purposes.
   Proposed operations. The balance unexpended June 30, 1952,
$54,077.78, plus an allotment of $272,400 for fiscal year 1953, plus ac-
counts receivable $533.56, a total of $327,011.34, will be applied as
follows:
Accounts payable June 30, 1952-------------------------------                             449. 71

Maintenance :
    Dredging, by contract, May 1 to June 30, 1953----------------                    30, 408. 66
    Snagging with United States plant and hired labor, Oct. 1 to
     Nov. 30, 1952.--------------------------                                         8, 000. 00
    Dredging, under existing contract, during July and August 1952.                  33, 367. 00
    Condition surveys-------------------------------------                            1, 400. 00
    Miscellaneous inspections and reports ........---------------------.              1, 000. 00

       Total      -----       -----------------------------------                    74,175. 66

      245554   -53'--vol. 1     -32
494           REPORT OF CHIlEF OF ENGINEERS, U. S. ARMY, 1952

Maintenance (operating and care) :
    Operating locks and dams Nos. 1, 2, and 3, July 1, 1952, to June
      30, 1953, and ordinary maintenance and repair-----------                                                     $43, 500.00
    Improvement and reconstruction of fender system at locks Nos.
      1 and 2_------------------       ---------------------- ---                                                  208, 885. 97

          Total                   ---------                 ----------------------------                           252,385. 97
          Total for all work-                              _-_--_---------------------                             327, 011. 34
  The additional sum of $282,500 can be profitably expended for the
following schedule of work during fiscal year 1954:
Maintenance:
   Dredging between Navassa and Fayetteville, by contract-------- $25, 500
   Snagging between mile 26 and mile 115 by hired labor--------      12, 000
   Condition surveys and miscellaneous inspections and reports------  2, 500
           Total           -----------------------------------------------                                                 40,000

Maintenance (operating and care) :
   Operating locks and dams No$. 1, 2, and 3, July 1, 1953, to June 30,
      1954, and ordinary maintenance and repair- -----          --        45, 500
   Improvement and reconstruction of fender system at locks Nos. 2
      and 3, and installation of power mechanism at locks 1, 2, and 3___ 197, 000

           Total----------------------------------------------                                                           242, 500

           Total for all work-------                         ----------- --------                                        282, 500
                                            Cost and financial summary

                                                         Fiscal year ending June 30                                Total to June
                                                                                                                  30, 1952, includ-
                                                                                                                   ing fiscal years
                                       1948            1949            1950            1951            1952         priorto 1948

New work:
   Appropriated-------------.........-----............--............       ---------.......------------..
                                                                            .........--...                                   $2916.
                                                                                                                .........----------.--.. 82
                                 ------------------.................------------..........-----------.....-----------
   Cost-----...............................----                                                                               2      16 82
   Expenditures---------........ -.....----........     ----------..............-----------------.........-----. -----------  2,488,916. 82
Maintenance:
     Appropriated......... $91, 500.00             $19,000.00 $152, 400.00         $68, 097.74     $95, 000.00         1, 604, 172. 08
          ................52,258. 91
     Cost---------------                            55, 617. 21 130, 220. 65        85, 351.48      50, 494. 57        1, 550, 010. 45
                          -
     Expenditures---......... 47, 279. 69           60, 580. 43 128, 273.83         87, 130.46      50, 762. 26        1, 550, 094. 30



                                     15. WILMINGTON HARBOR, N. C.

   Location.-Wilmington Harbor, N. C., consists of a dredged ship
channel from the ocean across the entrance bar and up the Cape Fear
River to the mouth of Northeast (Cape Fear) River, thence 2.75 miles
up the latter to a turning basin at the upstream end. (See U. S. Coast
and Geodetic Survey Charts Nos. 424 and 425.)
   Previousprojects.-Authorized by River and Harbor Acts of March
2, 1829; July 22, 1854; July 11, 1870; March 3, 1873; June 23, 1874;
September 19, 1890; June 13, 1902; and March 2, 1907. For further
details, see page 1804 of annual report for 1915 and page 533 of annual
report for 1938.
   Existing project.--This provides for a channel 35 feet deep and 400
feet wide from the 35-foot contour in the Atlantic Ocean through the
ocean-bar channel, thence 34 feet deep and 400 feet wide to the upper
end of the anchorage basin (foot of Castle Street) at Wilmington,
thence 32 feet deep and 400 feet wide to Hilton Bridge over Northeast
           RIVERS AND HIARBORS--WILMINGTON,                              N. C.,     DISTRICT           495
(Cape Fear) River, with increased widths at bends; for an anchorage
basin at Wilmington 34 feet deep, 2,000 feet long, 900 feet wide at the
upper end, 1,100 feet wide at the lower end, with approaches 1,500
feet long at the upper end and 4,500 feet long at the lower end with
some widening of the transition channel at the downstream end; for
a turning basin opposite the principal terminals at Wilmington, 32
feet deep, 1,000 feet long, 800 feet wide, with suitable approaches at
each end; for a channel 12 feet deep and 100 feet wide in the Cape
Fear River, from a point near the eastern entrance of the Intracoastal
Waterway to a connection with the main river channel at a point about
3 miles above; and for a channel 25 feet deep, 200 feet wide, from
Hilton Bridge over Northeast (Cape Fear) River to a turning basin
of the same depth, 600 feet wide, 11/4 miles above. The plane of refer-
ence is mean low water. The length of the section under improvement
is about 311/4 miles, the upper limit being 11/4 miles above Hilton
Bridge over Northeast (Cape Fear) River. The average rise of tide
is 4.7 feet at the ocean bar, 3.6 feet at Keg Island, and 3.4 feet at
Wilmington. The extreme range of tides is abort 8.5 feet at the oeean
bar, 7.3 feet at Orton Cove, and 6.4 feet at Wilmington.
   The estimated cost for new work, revised in 1952, is $6,703,200,
exclusive of amounts expended on previous projects. The latest (1952)
approved estimate for annual cost of maintenance is $500,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                             Work authorized                                 Documents

July 25,1912    Channel 26 feet deep and 400 feet wide across the bar,   H. Doc. 287, 62d Cong., 2d sess.
                 thence same depth and 300 feet wide, increased at
                 bends, to Wilmington.
Mar.   2,1919   Channel 30 feet deep and 400 feet wide, across the       H. Doec.746, 65th Cong., 2d sess.
                 ocean bar. (No work was done on this project.)
Sept. 22,1922   A new channel across the ocean bar 30 feet deep and      H. Doc. 94, 67th Cong., 1st sess.
                 400 feet wide from Baldhead Point.
July   3,1930   A 30-foot project to Hilton Bridge at Wilmington, and    Rivers and Harbors Committee
                  a turning basin.                                         Doc. 39, 71st Cong., 2d sess.
Mar.   2,1945   Increase channel widths from 300 to 400 feet, turning    H. Doc. 131, 76th Cdng., 1st sess.
                  basin from 600 to 800 feet, and a channel 12 feet
                  deep, 100, feet wide, from Inland Waterway to
              river channels.
            Increase length of southerly approach to anchorage
   Do-.......                                                            S.Doc. 83, 76th Cong., 1st sess.'
              basin from 1,500 to 4,500 feet, and increase depth of
              channel from outer end of ocean bar to Wilming-
              ton, including turning basin, from 30 to 32 feet.                                               1
            Channel 25 feet deep, 200 feet wide, from Hilton
   Do-.......                                                            S. Doc. 170, 76th Cong., 3d sess.
              Bridge, Northeast (Cape Fear) River, to a turning
              basin, same depth, 14 miles above.                                                              1
May 17,1950 Increase depth to 35 feet over ocean bar, thence 34          H. Doec. 87, 81st Cong., 1st sess.
              feetto upper end of anchorage basin, including
              anchorage basin, and with some widening of the
              transition channel at the anchorage basin.

  1 Contains latest published maps.

   Local cooperation.-The River and Harbor Act of May 17, 1950,
provided that local interests furnish, without cost to the United States,
all lands, easements, rights-of-way, and spoil-disposal areas necessary
for construction and subsequent maintenance of the project, when
and as required; and hold and save the United States free from
damages due to the construction and subsequent maintenance of the
project. Local interests appear willing and able to fulfill the local
cooperation requirements.
496     REPORT OF    CCHIEF   OF ENGINEERS, U. S. ARMY, 1952

   Terminal facilities.-Thereare 61 wharves of all classes at Wilming-
ton, with a combined berthing space of 22,986 linear feet, and depths
of water alongside from 10 to 30 feet at mean low water. Additional
port terminal facilities are being constructed by the State of North
Carolina at the shipyard site near the downstream end of the anchor-
age basin. Below Wilmington there are 27 wharves, which are con-
sidered adequate for present needs. For further details, see Port
Series No. 11, revised 1944, Corps of Engineers.
   Operations and results during fiscal year.-The work consisted of
maintenance dredging by contract and with Government plant and
hired labor, construction of permanent spillways and increasing
height of dike for disposal area by contract, and miscellaneous
surveys.
   Between November 26, 1951, and April 9; 1952, the contract dredges
Charlestonand Washington on maintenance dredging removed 1,088,-
485 cubic yards from the river channel, anchorage basin and turning
basin, at a cost of $206,379.45.
   Between January 3 and 31, 1952, the United States hopper dredge
Lyman removed 656,566 cubic yards of material from Baldhead Shoal
 (ocean bar) channel at a cost of $56,362.80.
   Between September 10 and November 15, 1951, the contractor con-
structed three permanent spillways for Eagle Island disposal area,
at a cost of $13,124.63.,
   Between June 23 and 30, 1952, the contractor increased-the height
of 610 feet of the existing dike at Eagle Island disposal area to 12 feet
above mean low water, at a cost of $1,762.70. Miscellaneous surveys
cost $25,785.69. The total costs were $303,415.27 for maintenance..
The expenditures were $303,842.10.
   Condition at end offiscal year.-The existing project was about
61 percent completed. Deepening and widening the river channel to,
32 feet by 400 feet, enlarging and deepening the anchorage basin and
southern approach thereto, and deepening the ocean-bar channel to,
32 feet, was commenced in April 1947 and completed to the foot of
Castle Street at Wilmington in May 1949. Dredging the 25- by 200-
foot channel and basin in Northeast (Cape Fear) River above Hilton
Bridge was commenced in October 1948 and completed in November
1948. Dredging the 12- by 100-foot channel from the Intracoastal
Waterway to the ship channel in the river was commenced in Novem-
ber 1948 and completed in December 1948. No work has been done on
the 32-foot project on that portion of the river channel above Castle
Street, except increasing the width of the turning basin to 800 feet, 30
feet deep, and widening the east side of the river channel, in the vicin-
ity of the turning basin, to the harbor line, to a depth of 30 feet. No
work has been done on deepening the ocean-bar channel to 35 feet nor
the river channel and anchorage basin to 34 feet. At the close of the
fiscal year the controlling depths were 31.5 feet in the ocean-bar chan-
nel, 31.7 feet in the river channel up to Castle Street at Wilmington,
30.8 feet to and in the turning basin, 25 feet to and in the turning basin
in Northeast (Cape Fear) River, and 8 feet in the connecting channel
with the Intracoastal Waterway. The total costs under the existing
project to June 30, 1952, were $4,103,711.80 for new work and
             RIVERS AND HARBORS---WILMINGTON,                                           N. C., DISTRICT                     497
$6,634,991.29 for maintenance, a total of $10,738,703.09. The total
expenditures were $10,737,734.07.
  Proposed operations.--The balance unexpended June 30, 1952,
$20,663.41, plus an allotment of $352,700 for the fiscal year 1953, a
total of $373,363.41, will be applied as follows:
Accounts payable June 30, 1952                         .------------------------------                                $969. 02
Maintenance:
   Dredging, by contract, November 1, 1952, to March 31, 1953 ...                                                 289, 694. 39
   Dredging with United States hopper dredge, December 1
      to 31, 1952---------------------------------------------                                                      55, 000. 00
   Construction of dike for Eagle Island Disposal Area, under
      existing contract, July 1 to December 24, 1952_ ----------                                                    15, 000. 00
   Condition surveys---- ------------
                                  ___      --- _  --        ---                                                    - 5, 100. 00
   Miscellaneous inspections and reports_- ....   ---- -- -------                                                    7, 600. 00
          Total----------               ----------------------------------                                        372, 394. 39

          Total for all work _-------___                           --      ----                  --               373,363. 41
  The additional sum of $932,800 can be profitably expended for the
following schedule of work during the fiscal year 1954:
New work:
   Dredging in lower portion of anchorage basin, transition channel,
     and river channel, by contract, September 1, 1953, to Jan-
     uary 31, 1954        ---------------------------------------- $300,000
   Dredging, H. L., in ocean-bar channel, November 1, 1953, to
     January 31, 1954------..-------     ------------------------- 282, 800
          Total__-----------------------------------------------_                                                     582,800

Maintenance:
    Dredging bar channel with United States hopper dredge 1 month..                                                     55, 000
    Dredging in river channel, by contract- ----..------  ___----                                                      279, 000
    Condition surveys and miscellaneous inspections and reports....                                                     16, 000

      Total                  ------------------------------------------------                                         350, 000

       Total for all work                        ....--------------------------------------                            932, 800

                                        Cost and financial summary

                                                      Fiscal year ending June 30                                 Total to June
                                                                                                                 30,1952, includ-
                                                                                                                 ing fiscal years
                                    1948            1949           1950             1951              1952         prior to1948

New work:
    Appropriated......... $302, 812. 15 $774, 500. 00 -$8, 082. 82--......-------......------------                $8, 729, 326. 47
    Cost--------------- 885, 937.44 1, 005,163.06--------------------------------                                   8, 729, 326.47
    Expenditures --------- 688, 678.16 1,207,802.88        100 00               ----------
                                                                                     ------------                   8, 729, 326.47
Maintenance:
   Appropriated -...----.....     250, 000. 00    204, 000. 00   246,000.00 $246, 000.00 $304,000.00                7,257, 299. 93
    Cost---------------....       295, 196. 59    195, 170. 95   230, 653. 78     270, 484.33     303, 415. 27      7,237, 605. 54
    Expenditures--------.......   276, 151.23     214, 193. 63   229, 495. 95     270, 268. 99    303, 842. 10      7, 236, 636. 52


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project-- ------ -                                      _-               $2,599, 500

               16. EXAMINATIONS, SURVEYS, AND CONTINGENCIES
  The costs during the fiscal year were $4,749 for examinations and
surveys and $19,067.05 for contingencies, a total of $23,816.05. The
balance unexpended June 30, 1952, $3,613.62 for examinations and
498           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

surveys and $2,297 for contingencies, a total of $5,910.62, plus allot-
ment for fiscal year 1953 of $6,200, of which $2,600 was for examina-
tions and surveys and $3,600 for contingencies, will be applied as
needed during the fiscal year 1953 to payment of expenses incurred
under this heading.
   The additional sums of $13,200 for examinations and surveys and
$3,600 for contingencies, a total of $16,800, can be profitably expended
during fiscal year 1954.
                                             Cost and financial summary

                                                            Fiscal year ending June 30                                            Total to June
                                                                                                                                 30,1952, includ-
                                                                                                                                 ing fiscal years
                                         1948             1949             1950              1951                  1952            priorto 1948

Maintenance:
   Appropriated-.........            $32, 550. 00     $44, 650. 00     $50, 100. 00      $59, 100. 00      $22,140. 00                 $599, 032. 21
   Cost-------- -     -               29, 094. 84      44, 202. 45      55, 356. 06       52, 006. 30       23, 816. 05                 594, 905. 41
   Expenditures       --------.       28, 260. 17      45, 024. 27      53, 196.85        54, 185.88        22, 037.31                  593, 121. 59


               17. PLANT ALLOTMENT, WILMINGTON, N. C., DISTRICT

                                             Cost and financial summary

                                                            Fiscal year ending June 30                                             Total' to June
                                                                                                                                  30, 1952, includ-
                                                                                                                                  ing fiscal years
                                         1948             1949             1950              1951                  1952            prior to 1948

Maintenance:
    Appropriated-.----               $577,565.23.------                            ...------.------.
                                                                                                 .-      --- $12, 996. 19
                                                                                                ---------..                            $494, 837.12
    Undistributed cost------    ....       -------------------------------------------------                                            239, 336.95
    Expenditures -------.........-- 180, 291. 63 $18, 715. 24 $79, 508.44 $28, 910.82 -259,925.66                                       244, 920. 75


                                              18. INACTIVE PROJECTS

                                                                   For last            Cost and expenditures to                        Estimated
                                                                 full report,                June 30, 1952
                    Name of project                              see Annual                                                            reqamount
                                                                     Repor-           New work               Maintenanc                required to
                                                                     for-             New work               Maintenance                complete


1. Waterway-Norfolk, Va., to sounds of N. C.
      (Wilmington district).'l.._................                     1946 2                                                               (2)
2. Meherrin River, N. C...                                           1950               $47, 734. 34                $49, 591. 20
                                  -
3. Newbegun Creek, N. C.1 ..............                             1928 2               4, 802. 08                     246. 58          (3)
4. Perquimans River, N. C.1__.................                       1910 2              13, 750. 00     ................
5. Chowan River, N. C___________.__....              ..              1950        ---.------------                                         $30, 000
6. Edenton Harbor, N. C_....................                         1950              73, 750. 00
                                                                                  ----------------
                                                                                                    2, 970. 84                             (8)
7. Pembroke Creek, N. C___.__..               __.__.
                                                 .                    1950                                                                   15, 000
8. Cashie River, N. C-----------------_-----                         1950                40,  73
                                                                                            402.                       15, 394. 93         (3)
9. Fishing Creek, N. C.4 6___________________                        1931                22, 715.   10                 8, 632. 85          (5)
10. Mackay Creek, N. C.1___                                           1938 2              13,374.    60                 4, 773.03           (3)
11. Scuppernong River, N. C___                                        1950                81, 163.   63                76, 846. 73          (3)
12. Stumpy Point Bay, N. C._._                                        1950                40, 582.   82                                    (3)
13. Channel from Pamlico Sound to Rodanthe,
      N . C . .- - --.....          ...-       - - -
                                              .-                      1950                                                                   45, 000
14. Belhaven Harbor, N. C            ______                           1950               126, 687. 41                     2, 188. 81       (3)
15. Waterway connecting Swan Quarter Bay
      with Deep Bay, N. C_............_.....                          1950                 8, 550. 98                  10, 433. 40           50, 000
16. South River, N. C.1_______                                        1936                12, 452. 02                  21,469. 88
17. Bay River, N. C .............                                     1950                44, 381.56                  49, 518. 44          ()
18. Neuse River, N. C- .............-........                         1950               403, 066. 04                288, 845. 63          (3)
19. Contentnea Creek, N. C.1 7..............._                        1941                64, 394. 56                 32, 247. 15
20. Swift Creek, N. C.1___.._..........._..._...                      1940                 1, 600. 00                  5, 422. 00
21. Trent River, N. C__.__............._.....                         1946               115,199. 45                  69, 786. 75            24,600
    See footnotes at end of table.
          RIVERS AND HARBORS-WILMINGTON,                                        N.       C.,         DISTRICT            499
                                                   L
                                                     For last            Cost and expenditures to                   Estimated
                                                   full report,                June 30, 1952                         amount
               Name of project                     see annual                                                       required to
                                                      report
                                                       for-          New work                Maintenance             complete
                                               -    -I--------I                          I     __I



22. Smiths Creek (Pamlico County), N. C.1 -_-           1950              $14, 471. 80               $23, 780. 07       (3)
23. Channel connecting Thoroughfare Bay
      with Cedar Bay, N. C__                            1950              9,   000. 00                15, 549. 01        $30, 000
24. Harbor of Refuge, Cape Lookout, N. C.1_.            1934         1, 368,   798. 72                32, 853. 75     8, 800, 000
25. Northeast (Cape Fear) River, N. C ._....            1950             10,   687. 96                61, 138. 57        (3)
26. Black River, N. C ..- - -       --                  1941             12,   358. 40                36, 071.85         (3)
27. Smiths Creek (Wilmington, N. C.) _-____             1950              8,   507. 45                     17. 61        (3)
28. Lockwoods Folly River, N. C _....._.                1950             17,   818. 50                13, 093. 92        147, 700
29. Shallotte River, N. C___        3                   1950             18,   181. 37                 6, 467. 81        (3)
30. Snagging & Clearing under Sec. , R & H
      Act, 2 Mar. 1945 -----  -------                   1951      ---------------                    119, 687. 37 ----------

  I Channels adequate for commerce.
2 Report of Norfolk, Va., district.
3 Completed.
4 No commerce reported.
5 Completed to practicable limit.
6 Abandonment recommended in 1926 (H. Doc. 467, 69th Cong., 1st sess.)

7 Abandonment of portion above Snow Hill recommended in 1926 (H. Doc. 467, 69th Cong., 1st sess.)


                            19. MISCELLANEOUS ACTIVITIES
Status of all investigations for navigation called for by river and harbor acts
                           and committee resolutions

                                                                            Date trans-                cument        Reco
             Locality                      Authorization act                 mitted to               Do     ent
                                                                             Congress                    o.         mendatio
                                                                                                         ,Cogrs


Albemarle Sound, N. C., channel        River and Harbor           Act,
to Thoroughfare, either via Lower      Mar. 2, 1945.
  Cashie River, Middle River, and
Bachelors Bay, or via any other
route.
Albemarle Sound, Inland Water-         House Public Works Com-
way from Norfolk, Va., to Beau-        mittee resolution, Apr.
fort Inlet, N. C., with a view to      13, 1948.
determining the extent that the
Inland Waterway affects the
farm lands between Albemarle
  Sound and the Pungo River.
  (Final report.)
Albemarle Sound, Inland Water-         Senate Public Works Com-
way from Norfolk, Va., to Beau-         mittee resolution, Apr.
fort Inlet, N. C., with a view to       20, 1948.
  determining the extent that the
  Inland Waterway affects the
farm lands between Albemarle
  Sound and the Pungo River.
  (Final report.)
Bachelors Bay, N. C., Lower            River and Harbor           Act,    ....------.-------
  Cashie River and Middle River,        Mar. 2, 1945.
  Channel via, from Thoroughfare
  to Albemarle Sound, N. C., or
  via any other route.
Beaufort Inlet, N. C., to Norfolk,     House Public Works Com-
  Va., with a view to determining       mittee resolution, Apr.
  the extent that the Inland Water-     13, 1948.
  way affects the farm lands and
  timber lands between Albemarle
  Sound and Pungo River. (Final
  report.)
Beaufort Inlet, N. C., to Norfolk,     Senate Public Works Com-
  Va., with a view to determining       mittee resolution, Apr.
  the extent that the Inland Water-     20, 1948.
  way affects the farm lands and
  timber lands between Albemarle
  Sound and Pungo River. (Final
  report.)
Beaufort Harbor, N. C., channel        Senate Public Works Com- ---------------
  from Pamlico Sound through             mittee resolution, Apr.
  Core Sound, in the vicinity of         13, 1950.
  Sealevel.
500          REPORT OF CHIEF OF ENGINEERS, U.                                      S. ARMY,   1952

Status of all investigations for navigation called for by river and harber acts
                      and committee resolutions-Continued

                                                                          Date trans-    Document  Recom-
              Locality                       Authorization act             mitted to       No.    mendat
                                                                           Congress

Belhaven Harbor, N. C., to modify       Rivers and Harbors Com-         Feb. 26,1952     H. Doe.     Favor-
existing project for timber break-      mittee resolution, Sept.                         389, 82d    able.t
waters at mouth of Pantego              25, 1945.                                        Cong.,
Creek.                                                                                   2d sess.
Bogue Inlet and Swansboro Har-       House Public Works Com-
bor, N. C:                            mittee resolution, June
                                       27, 1950.
Cape Channel, Pamlico Sound, House Public Works Com-
  N. C.                                mittee resolution, Mar.
                                       15, 1949.
Carolina Beach, N. C.............. River and Harbor Act,                                   ............
                                       July 24, 1946.
Casey Island, Pamlico Sound, ----...          ..................... Sept. 5, 1951
                                         do---------------------                           ............ Unfavor-2
  Channel via, from Wallace Chan-                                                                         able.
  nel to Sheep Island Slue, N. C.,
  Cross-Rock Channel. (Final                                                               ... - -- --
  report.)
Cashie (Lower) River, N. C., River and Harbor Act,
  Middle River, and Bachelors          Mar. 2, 1945.
  Bay, channel via, from Thorough-                                                         .. .       ..
                                                                                                    ---
  fare to Albemarle Sound, N. C.,
  or any other route.
Core Sound to Beaufort Harbor Senate Public Works Com- ...............-
  from Pamlico Sound, in vicinity      mittee resolution, Apr.
  of Sealevel.                         13, 1950.
Cross-Rock Channel between Wal- River and Harbor Act, Sept. 5,1951.                                      Unfavor-
  lace Channel and Sheep Island        July 24, 1946.                                                     able.
  Slue, via Casey Island, Pamlico
  County, N. C. (Final report.)
Harkers Point Basin, at Harkers       .----
                                          do.....                ..     . ...............
                                                                    ..----------
  Island, Carteret County, N. C.
HatterasInlet, channel to Hatteras, Rivers and Harbors Com-           ..............

  N. C.                                mittee resolution, June
                                       19, 1945.
Hatteras, N. C., Rollinson Chan- House Public Works Com-              ...............

  nel, N. C., to provide break-        mittee resolution, May
  waters at entrance to harbor.        13, 1947.
Holden Beach, Brunswick County, River and Harbor Act,                 ...............

  N. C.                               July 24, 1946.
Middle Creek, N. C._.............    River and Harbor Act,
                                       May 17, 1950.                       ...............
Middle River, N. C., Lower River and Harbor Act,
  Cashie River, and Bachelors          Mar. 2, 1945.
  Bay, channel via, from Thorough-                                    ...............

  fare to Albemarle Sound, N. C.
Morehead City Harbor, N. C_...... Senate Public Works Com-
                                       mittee resolution, July 1, ...............
                                       1949.
Neuse River, N. C................. House Public Works Com-
                                       mittee resolution, Apr. ...............
                                       21, 1950.
Neuse River and tributaries, N. C_. Senate Public Works Com-
                                       mittee resolution, Apr. ...............
                                       13, 1950.
Neuse and Trent Rivers, N. C..... River and Harbor Act,
                                       July 24, 1946.
Norfolk, Va., to Beaufort Inlet, House Public Works Com-
  N. C., Inland Waterway, with a       mittee resolution, Apr.
  view to determining its effects on   13, 1948.
  farm lands and timber lands be-
  tween Albemarle Sound and
  Pungo River. (Final report.)
Norfolk, Va., to Beaufort Inlet, Senate Public Works Com-
  N. C., Inland Waterway, with a      mittee resolution, Apr.
  view to determining its effects on  20, 1948.
  farm lands and timber lands
  between Albemarle Sound and
  Pungo River. (Final report.)
Pamlico Sound, N. C., Cape House Public Works Com-
  Channel.                             mittee resolution, Mar.
                                       15, 1949.
Pamlico Sound to Beaufort Harbor, Senate Public Works Com-
  N. C., waterway via Core Sound,     mittee resolution, Apr.
  in vicinity of Sealevel.            13, 1950.
    See footnotes at end of table.
            RIVERS        AND HARBORS--WILMINGTON,                             N.   C.,     DISTRICT        501

Status of all investigations for navigation called for by river and harber acts
                      and committee resolutions-Continued

                                                                        Date trans-         Document  Recom-
               Locality                     Authorization act            mitted to            No.    mendation
                                                                         Congress

Pamlico Sound, N. C., channel           River and Harbor Act,          Sept. 5,1951                     Unfavor-
from Wallace Channel to Sheep           July 24, 1946.                                                  able.'
  Island Slue, via Casey Island,
  N. C., Cross-Rock Channel.
  (Final report.)
Pantego Creek, N. C., Belhaven          Rivers and Harbors Com-        Feb. 26,1952         H. Doc.     Favor-1
Harbor, N. C., to modify exist-          mittee resolution, Sept.                           389, 82d    able.
ing project.                             25, 1945.                                          Cong.,
                                                                                             2d sess.
Pungo River, Inland Waterway            House Public Works Com-
  Norfolk, Va., to Beaufort Inlet,       mittee resolution, Apr.
  N. C., with a view to determin-        13, 1948.
  ing the extent that the Inland
  Waterway affects the farm lands
  and timber lands between Albe-
  marle Sound and. (Final re-
  port.)
Pungo River, Inland Waterway           Senate Public Works Com-
  Norfolk, Va., to Beaufort Inlet,       mittee resolution, Apr.
  N. C., with a view to determin-        20, 1948.
  ing the extent that the Inland
  Waterway affects the farm lands
  and timber lands between Albe-
  marle Sound and. (Final re-
  port.)
Rollinson Channel, N. C., to pro-      House Public Works Com-
  vide breakwaters at entrance to       mittee resolution, May
  the harbor at Hatteras, N. C.          13, 1947.
Sealevel, N. C., Pamlico Sound to      Senate Public Works Com-
  Beaufort Harbor via Core Sound,       mittee resolution, Apr.
  in vicinity of.                        13, 1950.
Shallotte River, N, C..............    Senate Public Works Com-
                                        mittee resolution, Mar.
                                         12, 1949.                     Sept. 5,1951 ..---------..
Sheep Island Slue to Wallace Chan-     River and Harbor Act,           Sept.    595,1951),;--,-         Unfavor
                                                                                                              2
  nel, via Casey Island, Pamlico        July 24, 1946.                                                   able.
  Sound, N. C., Cross-Rock Chan-
  nel. (Final report.)
Smiths Creek, N. C        ---.............. Rivers and Harbors Com-
                                             mittee resolution, Apr.
                                             1, 1946.
Swansboro Harbor and Bogue House Public Works Com-
  Inlet, N. C.                               mittee resolution, June
                                             27, 1950.
Thoroughfare, channel to Albe- River and Harbor Act,
marle Sound, N. C., either via              Mar. 2, 1945.
  Lower Cashie River, Middle
  River, and Bachelors Bay, or
via any other route.
Topsail Inlet, N. C-_---------..-- River and Harbor Act,
                                             May 17, 1950.
Trent and Neuse Rivers, N. C..... River and Harbor Act,
                                             July 24, 1946.
Wallace Channel to Sheep Island ..... do----........----------------   Sept. 5, 1951.----------         Unfavor-
Slue, via Casey Island, Pamlico                                                                         able.3
  Sound, N. C., Cross-Rock Chan-
nel. (Final report.)

1Favorable to providing basin in Wynne's Gut; unfavorable to modification of breakwaters.
 ! Favorable to improvement of Wallace Channel (Interim report) (H. Doc. 453, 81st Cong., 2d sess.),
unfavorable to other improvement.

                               20. PASQUOTANK RIVER, N. C.

  Location.-The work covered by this project is adjacent to that
portion of Pasquotank River in Newland Township, Pasquotank
County, N. C., northwest of Elizabeth City, N. C., between points
about 38 and 45 miles above Albemarle Sound.
  Existing project.-This provides for flood control on Pasquotank
River by construction of a low dike, with gates in Newland Canal
and Shepard and Eight-Foot Ditches, extending from U. S. Highway
502     REPORT OF CHIEF OF ENGINEERS,           U.   S. ARMY,   1952


158, below the Gates-Pasquotank County line, about 3.6 iniles north-
eastward and eastward through the swamp, terminating about 700
feet south of the Pasquotank River. The estimated Federal cost of
construction, revised in 1952, is $125,000. The project was authorized
by the Flood Control Act approved May 17, 1950. (See H. Doc. 306,
81st Cong., 1st sess., which contains the latest published maps.)
   Local cooperation.-The Flood Control Act of May 17, 1950,
provided that local interests furnish, without cost to the United States,
all lands, easements, and rights of way necessary for the construction
of the project; hold and save the United States free from damages
due to the construction works; and maintain and operate all the works
after completion in accordance with regulations prescribed by the Sec-
retary of the Army.
   Operations and results during fiscal year.--None.
   Condition at end of fiscal year.-No work has been done.
   Proposedoperations.-No work is scheduled for fiscal year 1953.
   The sum of $125,000 can be profitably expended for the following
scheduled work during the fiscal year 1954:
New work: Construction of dike and appurtenances, by contract,
  Oct. 1, 1953, to Mar. 31, 1954_--------$-------_------------_-           ;$
                       Cost and Financial Summary
Other new work data: Estimated additional amount needed to be ap-
  propriated for completion of existing project-------------------     $125, 000

21. SNAGGING AND CLEARING UNDER AUTHORITY OF SECTION 2 OF
THE FLOOD CONTROL ACT APPROVED AUGUST 28, 1937, AS AMENDED

   The flood control act approved August 28, 1937, as amended by the
flood control acts approved August 11, 1939, August 18, 1941, and
July 24, 1946, authorized the allotment of not to exceed $1,000,000
from the flood-control appropriations for any one fiscal year for the
removal of accumulated snags and other debris from, and clearing and
straightening of channels in, navigable streams and tributaries thereof
when such work is advisable in the interests of flood control; provided
that not more than $50,000 shall be allotted for this purpose for any
single tributary from the appropriations for any one fiscal year.
   An allotment of $34,000 was made for fiscal year 1949 for new work
snagging and clearing on New River, Onslow County, N. C., between
mile 31 and mile 44.6.
   During the fiscal year 1952 an allotment of $50,000 was received,
plus $15,000 contributed by local interests, a total of $65,000, for
clearing and snagging Trent River between Trenton (mile 38) and
the Jones-Lenoir County line (mile 75.5).
   Operations and results during fiscal year.--Between April 2 and
June 30, 1952, Government plant and hired labor removed obstruc-
tions from the channel and banks beginning at the Jones-Lenoir
County line to a point 9.2 miles below, at a cost of $19,465. The ex-
penditures were $13,246.92.
   Condition at end of fiscal year.-The project was about 25 percent
completed. The total costs to June 30, 1952, were $19,465. The
expenditures were $13,246.92.
                 FLOOD CONTROL---WILMINGTON,                             N. C.,      DISTRICT                   503
  Proposed operations.-The project will be completed during fiscal
year 1953.
                                      Cost and financial summary
                                NEW RIVER, ONSLOW COUNTY, N. C.

                                                  Fiscal year ending June 30                            Total to June
                                                                                                     .30, 1952, includ-
                                                                                                       ing fiscal years
                                  1948          1949          1950          1951          1952           prior to 1948

New work:
   Appropriated_..-..         -............ $34, 000 .....-------------------            -$104. 45          $33, 895. 55
   Cost---------------------------------
                                      ............ $33, 895. 55         .----..-..---....-.-     [           33, 895. 55
   Expenditures.......... .   . . ............ 33, 895. 55 --                      -------
                                                                           .--.. _--                   -     33, 895. 55

TRENT RIVER BETWEEN TRENTON, N. C., AND JONES-LENOIR                                              COUNTY LINE,
                       JONES COUNTY, N. C.

                                                  Fiscal year ending June 30                           Total to June
                                                                                                      30,1952, includ-
                                                                                                      ing fiscal years
                                  1948          1949          1950          1951          1952         prior  to 1948

New work:
                                         ------------............
   Appropriated----------------......... ----............         ---------------- $50, 000.00              $50,000.00
   Cost--------------............----....-----------------------------
                                              ............                    ----- 19, 465.00               19, 465.00
   Expenditures........------------------
                             ............ ----------............ ----------------- 13, 246.92                13, 246.92


Other new work data:
    Unobligated balance, June 30, 1952-----------       --------------                                      $30, 535
    Unobligated balance available for fiscal year 1953---------------                                        30, 535

TRENT RIVER BETWEEN TRENTON, N. C. AND JONES-LENOIR                                               COUNTY LINE,
                      JONES COUNTY, N. C.

                                                  Fiscal year ending June 30                           Total to June
                                                                                                      30,1952, includ-
                                                                                                      ing fiscal years
                                   1948         1949          1950          1951           1952         prior to 1948

New work: Appropriated. --------------------.--                     .
                                                                ----..        .
                                                                            ----..        $15,000           1$15, 000
   ]Funds contributed by local interests.

Other new work data:
    Unobligated balance, June 30, 1952-------------------------                                             $15, 000
    Unobligated balance available for fiscal year 1953--------------15,                                          000

22. PRELIMINARY                 EXAMINATIONS, SURVEYS,                             AND    CONTINGENCIES
                                   FOR FLOOD CONTROL

  The costs during the fiscal year were $2,567 for examinations and
surveys and .$2,105.01 for contingencies, a total of $4,672.01. The
expenditures were $5,332.38. The balance unexpended June 30, 1952,
$1,171.40, plus allotment for fiscal year 1953 of $6,300, of which $5,100
was for examinations and surveys and $1,200 for contingencies, a total
of $7,471.40, will be applied as needed during fiscal year 1953 for
payment of expenses incurred under this heading.
   The additional sums of $22,900 for examinations and surveys and
$1,750 for contingencies, a total of $24,650, can be profitably expended
during fiscal year 1954.
504               REPORT OF CHIEF OF ENGINEERS,                                           U.    S.      ARMY,1952

                                                Cost and financial summary

                                                             Fiscal year ending June 30                                 Total to June
                                                                                                                        30, 1952, includ-
                                                                                                                        ing fiscal years
                                            1948           1949               1950          1951            1952          prior to1948

Maintenance:
   Appropriated-.......                  $40, 000. 00   $45, 000. 00   $40, 000. 00      $26, 500. 00     $2,000.00         $209, 481.29
   Cost---------------................    28, 135. 83    61, 581.36     36, 213. 16       22, 674. 86      4, 672. 01        208, 536. 84
   Expenditures--------                   27, 147. 52    57, 854. 74    40, 761. 29       22, 859.07       5,332.38          208, 309.89


                                                 23. INACTIVE PROJECTS


                                                               For last          Cost and expenditures to                 Estimated
                                                             full report,              June 30, 1952                      amount re-
                    Name of project                          see annual                                                    quired to
                                                             report for-        New work               Maintenance         complete

1. Tar River, N. C.........................                      1939                $81, 265. 61...............        Completed.
2. Goldsboro, Neuse River, N. C.........                         1950                 50, 429.62............               Do.


                                         24. MISCELLANEOUS ACTIVITIES

Status of all investigati                   ons for flood control called for by flood control acts and
                                                  committee resolutions

                                                                                           Date trans-       Document  Recom-
                    Locality                             Authorization act                 mitted to            No.   menatment
                                                                        ...                 Congress



Cape Fear River, N. C., for flood Flood Control Committee ...........................
  control.                             resolution, May 2, 1946.
Cape Fear River, N. C.. for flood Flood Control Committee ....                .       ...............
  control on the Northeast (Cape       resolution, Oct. 8, 1945.
  Fear) River.
Core Creek, N. C., Neuse River,           do--------              --...............................
  for flood control.
Cucklers Creek and Pantego Creek, Flood Control Act, June ............... ............
  N. C.                                30, 1948.
Edenton, N. C., for flood control Flood Control Act, May 17, ...............              ............
  along Filberts Creek, N. C.          1950.
Filberts Creek at Edenton, N. C., ....- do-.........-----..------------.. ----------............
  for flood control.
Neuse River, N. C., for flood con- Flood Control Committee.........                  ............
  trol along Core Creek, N. C.         resolution, Oct. 8, 1945.
Neuse River and tributaries, for Flood Control Committee ...........................
  flood control between Smith-         resolution, Mar. 1, 1946.
  field and Wayne County line,
  N. C.
Neuse River, N. C., and tribu- Senate Public Works Comn- .                   _..........................
  taries, for flood control, naviga-   mittee resolution, Apr.
  tion, and other purposes.            13, 1950.
Neuse River, N. C., and tribu- House Public Works Com- ..........................
  taries, for flood control, naviga-   mittee resolution, Apr.
  tion, and other purposes.            21, 1950.
Northeast (Cape Fear) River,     for Flood   Control Committee .........................
  flood control.                       resolution, Oct. 8, 1945.
Pantego Creek and Cucklers Creek, Flood Control Act, June ...........................
  N.C.                                 30, 1948.
                                     Flood Control Act, May ...........................
Perquimans River, N. C--------...........
                                       17, 1950.
Six Runs River, N. C.............. House Public Works Com- ...........................
                                       mittee resolution, Aug.
                                       16, 1950.
Smithfield and Wayne County Flood Control Committee ...........................
  line, N. C. Neuse, River and         resolution, Mar. 1, 1946.
  tributaries, for flood control
  between.
    IMPROVEMENT OF RIVERS AND HARBORS IN THE
            CHARLESTON, S. C., DISTRICT
  This district comprises all of South Carolina (except the local
watersheds draining into the Savannah River), western-central North
Carolina, and a very small portion of southwestern Virginia. It
embraces the drainage basins tributary to the Atlantic Ocean between
Little River and Port Royal Sound, except the watersheds of Mackay
and Skull Creeks, and excluding Hilton Head Island. It includes the
Atlantic Intracoastal Waterway in the same reach.
  District engineer: Col. C. L. Landaker, Corps of Engineers.
  Division engineer of the South Atlantic Division, Atlanta, Ga.,
comprising the Wilmington, N. C., Charleston, S. C., Savannah, Ga.,
Jacksonville, Fla., and Mobile, Ala., districts: Col. C. K. Harding,
Corps of Engineers.
                                    IMPROVEMENTS

              Navigation                            Navigation-Continued
                                     Page                                        Page
1. Atlantic Intracoastal Water-             7. Inactive navigation projects.      517
     way     between     Norfolk,           8. Miscellaneous activities. --       517
     Va., and the St. Johns                              Flood Control
     River,    Fla.   (Charleston
     District) ------- -------        505 9.    Yadkin River, N. C.-.....        518
2. Georgetown Harbor, S. C....        508 10.   Preliminary      examinations,
3. Charleston Harbor, S. C ..         510         surveys, and contingen-
4. Shipyard River, S. C.. ----        514         cies for flood control--..      519
5. Examinations, surveys, and             11.   Inactive flood-control proj-
     contingencies (general) _..      516         ects--------------------        519
6. Plant allotment- ---- - - -        516 12.   Miscellaneous activities.-----    520

1. ATLANTIC INTRACOASTAL WATERWAY BETWEEN NORFOLK, VA.,
    AND THE ST. JOHNS RIVER, FLA. (CHARLESTON DISTRICT)

   Location.-This section of the waterway begins at Little River
near the North and South Carolina State line, and extends generally
southerly along the coast of South Carolina to Winyah Bay, 62
miles; thence 63.5 miles to Charleston; thence 84.5 miles to and in-
cluding Port Royal Sound; a total distance of 210 miles. (See U. S.
Coast and Geodetic Survey Charts Nos. 835, 836, 837, and 838.)
   Previous projects.-Adopted by River and Harbor Acts of March
3, 1881, and June 13, 1902. For further details see page 613, annual
report for 1932.
   Existing project.--This provides for a waterway 12 feet deep at
mean low water and not less than 90 feet wide from Little River to
and including Port Royal Sound, with a branch channel of the same
dimensions to McClellanville, a total of 210 miles; for the construc-
tion of three bridges crossing the waterway in Horry County, S. C.;
and for an anchorage basin 125 feet wide, 335 feet long, and 12 feet
deep near Myrtle Beach, S. C. The mean range of tide at Little
River is 5 feet; Winyah Bay, at Georgetown, 3.3 feet; at Charleston,
5.1 feet; and at Port Royal Sound, 7.2 feet.
                                                                          505
506           REPORT OF CHIEF OF ENGINEERS, U.                                S. ARMY,         1952

   The estimate of cost for new work, revised in 1952, is $7,361,600
The latest (1952) approved estimate for annual cost of maintenance
is $199,600.
   The existing project was authorized by the following river and
harbor acts:

       Acts                          Work authorized                                     Documents

Sept. 19,1890     Channel from Minim Creek to Winyah Bay---------..........   Annual report, 1889, p. 1184.
June 13,1902      Channel from Charleston to a point opposite McClel-         H. Doc. 84, 56th Cong., 1st sess.,.
                   lanville.                                               and annual report 1900, p. 1908.
Mar.     2,1907   Branch channel to McClellanville_        ---.....-- ... Annual report, 1903, p. 1133.
Mar.     2,1919   Extending the channel to Minim Creek, thence                H. Dec.178, 63d Cong., 1st sess.
                    through the Estherville-Minim Creek Canal to
                    Winyah Bay.
Mar. 3, 1925   Cut across the Santee Delta at Four Mile Creek......           H. Doec. 237, 68th Cong., 1st sess.
   Do-         Widening and deepening the waterway from Charles-              S.Doec.178, 68th Cong., 2d sess.
                ton to Beaufort.
July 3,1930 A waterway 8 feet deep and 75 feet wide from Cape                 H. Dec.41, 71st Cong., 1st sess.
                 Fear River to Winyah Bay.
Aug. 30, 19351 Construction of bridges across the waterway in                 Rivers and Harbors Committee
                    Horry County, S. C.                                         Doec. 14, 72d Cong., 1st sess.
Aug. 30,1935 2 Cut-off between Ashepoo and Coosaw Rivers-........       H. Doe. 129, 72d Cong., 1st sess.
   Do....... Enlarging the channel from Winyah Bay to Charles- Rivers and Harbors Committee
                ton, including the branch channel to McClellan-          Doec. 11, 72d Cong., 1st sess.
                ville, to depth of 10 feet and bottom width of 90 feet.
Aug. 26, 1937 Increasing dimensions of waterway to 12 feet deep Rivers and Harbors Committee            3
                and 90 feet wide.                                        Doec. 6, 75th Cong., 1st sess.
Mar.     2,1945   Anchorage basin 125 feet wide, 335 feet long, 12 feet       H. Dec.327, 76th Cong., 1st sess.
                    deep, near Myrtle Beach, S. C.

  1Included in Public Works Administration program Sept. 6, 1933.
  2Included in Emergency Relief Administration program May 28, 1935.
  3 Contain latest published maps.




   Local cooperation.--Fully complied with, except for condition, in
House Document 327, Seventy-sixth Congress, first session, which
require that local interests furnish, free of cost to the United States,
as and when required, all lands, easements, and rights of way.and
spoil-disposal areas for the initial work and for subsequent mainte-
nance; and give assurances, satisfactory to the Secretary of War,
that they will provide and maintain suitable mooring piles, walkways,.
and road connections open to the public without cost, and will provide
and operate servicing facilities for recreational craft, open to all on
equal and reasonable terms, all as may be required by the Secretary
of War.
   Terminal facilities.-There are rail-water terminals at Georgetown,
Charleston, Yonges Island, and Port Royal, and numerous open-pile
wharves mostly for shipping agricultural products, fish, oysters, and
pulpwood. These facilities are considered adequate for existing
commerce.
   Operationsand results dwring fiscal year.-Project dimensions were
restored at 9 shoals in a 26-mile reach between mile 343, four miles
south of Little River highway bridge, and mile 369, four miles south
of the combination railway-highway bridge by the pipeline dredge
Cherokee, by contract, removing 107,046 cubic yards of material at
a cost of $51,829.58. Project dimensions were restored at 11 shoals
in a 51-mile reach between Winyah Bay, mile 411, and the highway
bridge at mile 462, by the pipeline dredge Northwood, by contract,
removing 378,283 cubic yards of material at a cost of $80,895.61.
Project dimensions were restored at 6 shoals in a 49-mile reach be-
tween the highway bridge in Wappoo Creek, mile 471, and Coosaw
       RIVERS      AND HARBORS-CHARLESTON,                  S.   C.,      DISTRICT               507

River, mile 520, by the pipeline dredge Cherokee, by contract, re-
moving 177,948 cubic yards of material at a cost of $38,585.76.
   The cost of surveys and supervision was $6,830.70. Total costs
during the year were $178,141.65 for maintenance. The expenditures
were $177,843.81.
   Conditin at end of fiscal year.- The existing project was about
99 percent completed. That portion of the existing project pro-
viding for a channel 12 feet deep and 90 feet wide was completed
in 1940; the work remaining consisted of providing an anchorage
basin 125 feet wide, 335 feet long and 12 feet deep near Myrtle
Beach, S. C. Surveys during June 1952 showed a controlling cen-
ter-line depth of 9.5 feet at mean low water between mile 342 at
Little River, S. C., and mile 337 at Bucksport, S. C., in the Little
River to Winyah Bay section; thence 10 feet at mean low water
between mile 411 at the Winyah Bay end of the Esterville-Minim
Creek Canal and mile 464 at Charleston Harbor in the Winyah Bay
to Charleston section; thence 10 feet at local mean low water between
miles 470 and 552 in the Charleston to Port Royal Sound section.
Surveys during June 1952 showed a controlling center-line depth
of 6.2 feet in the branch channel to McClellanville.
   The cost of the existing project to the end of the fiscal year for
new work has been $4,011,951.06 from regular funds, $3,259,294.02
from Public Works funds and $74,642.87 from Emergency Relief
funds, a total of $7,345,887.95. The costs at the end of the fiscal
yead for maintenance have been $4,695,865.22 from regular funds,
$13,308.01 from Public Works funds, and $54,915.78 from Emergency
Relief funds, a total of $4,764,089.01. The total cost of all work has
been $12,109,976.96. The expenditures have been $8,706,932.59 from
regular funds, $3,272,602.03 from Public Works funds, and $129,558.65
from Emergency Relief funds, a total of $12,109,093.27.
   Proposed operations.--The balance unexpended June 30, 1952,
$8,181.86, plus an allotment of $115,400 during the fiscal year 1953,
a total of $123,581.86, will be applied as follows:
Accounts payable June 30, 1952--.--.-            --- _---.----------                   .      $883. 69

Maintenance :
   Dredging by contract to restore project dimensions at intermit-
      tent critical shoal reaches between Little River and Enter-
      prise, S. C., November 1952; Charleston and Beaufort, S. C.,
      Jan. 1 to Mar. 15, 1953 ....---------------------        -                           114,298. 17
   Condition surveys--------------------------------------                                   3,600.00
   Miscellaneous inspections and reports (contingencies)               -------.. . .         4, 800. 00

      Total maintenance .----.......... -----------                                        122, 698.17
    Total for all work----------------------.-------.--..                                  123, 581. 80
  The additional sum of $232,200 can be profitably expended during
the fiscal year 1954 as follows:
Dredging by contract to restore project dimensions at intermit-
  tent critical shoal reaches between Little River and Beaufort,
  S. C--------------------------------------------------                                     $221,000
Condition surveys---.-----....-----------------------....                                       8, 000
Miscellaneous inspections and reports (contingencies)        ---------                          3, 200
      Total for all work --------------------                        -
                                                                   .232,                           200
508               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                           1952

                                              Cost and financial summary
                                                             Fiscal year ending June 30                                    Total to June
                                                                                                                         30,1952, includ-
                                                                                                                          ing fiscal years
                                          1948             1949             1950             1951            1952          priorto 1948


New work:
       Appropriated-.----------.------------.----..-------.------------------------$7,455,377.59
       Cost.  .       ..----------             ---- --------
                                                        . .,---------------------           ------------ ---------             7, 455,377. 59
       Expenditures.........
                 ---................----------                                            ------------ ...........------------ 7, 455, 377. 59
                                                     ...........--------- ..........-----------........
Maintenance:
       Appropriated-......... $403, 000. 00 $429,000.00 $133, 646.03                    $50, 542. 54 $185,195.00              4, 840, 809. 46
       Cost ..                -     377, 304.73
                         ...--------.---        295. 242. 33 295, 541.39                 53, 455. 18 178, 141.65              4, 833, 511. 29
       Expenditures-...----.... 377, 301. 17 286, 883. 00 305, 835. 98                   52, 937. 63 177, 843.81              4, 832, 627. 60


Other new work data: Estimated additional amount needed to be ap-
  propriated for completion of existing project-....----   __------ $15, 700

                                       2. GEORGETOWN HARBOR, S. C.
   Location.-On the coast of South Carolina, 50 miles northeast of
Charleston Harbor and 90 miles southwest of the entrance to Cape
Fear River, N. C. (See U. S. Coast and Geodetic Survey Chart
No. 787.)
   Previous projects.-Adopted by River and Harbor Acts of August
2, 1882; August 5, 1886; and June 25, 1910. For further details see
page 1806 of annual report for 1915; page 549 of annual report for
1938; and page 442 of annual report for 1944.
   Existing project.-This provides for a channel 27 feet deep from
that depth in the Atlantic Ocean to and including a turning basin
in Sampit River, 600 feet wide across the outer bar and in the gorge
and 400 feet wide thence to a turning basin at the head of the project
via a cut-off across the peninsula in Sampit River, with a side channel
2,400 feet long and not less than 250 feet wide leading to a turning
basin at the upper end of the built-up portion of the city waterfront,
widened at the bends, to be secured and maintained by two jetties of
stone on brush mattresses, springing respectively from North and
South Islands, the north jetty having a length of 11,139 and the south
jetty 21,051 feet. The project also provides for the continued main-
tenance to a depth of 18 feet for a width of 400 feet of the bypassed
portion of Sampit River opposite the city of Georgetown.
   The cost to the Federal Government for new work in completing
the existing project was $4,615,903.55. The latest (1952) approved
estimate for annual cost of maintenance is $313,500.
   The mean range of tide at Georgetown is 3.3 feet; spring tides have
a mean range of 3.9 feet.
   The existing project was authorized by the following river and
harbor acts:
       Acts                                  Work authorized                                                 Documents

Aug.     5,1886      Jetties and earthen dike to protect south jetty..------                  H. Ex. Doc. 258, 48th Cong., 2d
                                                                                               sess., and annual report, 1885,
                                                                                                pp. 1154-1170, and H. Ex. Doc.
                                                                                                117, 50th Cong., 2d sess., and an-
                                                                                                nual report, 1889, pp. 1110-1115.
June 25,1910         Previous project channel dimensions and training                         H. Doc. 398, 58th Cong., 2d sess.
                       wall.                                                                   -and     annual report, 1904, pp.
                                                                                               1591-1609.
Mar.     2,1945     27-foot    channel from         ocean, including a turning                H. Doc. 211, 76th Cong., 1st sess
                     basin in Sampit River.                                                   (Contains latest published map.)
June 30,1948        Cut-off and side channel in Sampit River ....                           S. Doc. 21, 81st Cong., 1st sess.
                                                                                       .--------
       RIVERS AND HARBORS--CHARLESTON,          S. C., DISTRICT    509
   Local cooperation.-Fully complied with.
   Terminal facilities.-The terminal facilities at the port of George-
town served by this improvement consist of 4 wharves of ordinary
timber construction, 1 of creosoted-timber construction, suitable for
oceangoing vessels, and a number of smaller wharves and landing
places. These are considered adequate for the present commerce of
the port.
   Operationsand results during fiscal year.-New work: The derrick
boat Little Boss, under contract, completed the removal of logs,
stumps, and debris from a depth of about 25 feet in the entrance
channel, at a cost of $15,012.62 to the end of the fiscal year. The
expenditures were $35,290.30.
   Maintenance: The pipeline dredge Hampton Roads, by contract,
completed restoring project dimensions in the Sampit River, upper
Winyah Bay and Eastern Channels of the project July 10, 1951, at a
costof $89.85, and on February 18, 1952 the pipeline dredge Pullen,
by contract, commenced dredging to restore project dimensions in the
same channels, and to the end of the fiscal year removed 1,295,869 cubic
yards of material at a cost of $209,692.19. The pipeline dredge
Barlow, by lease, commenced dredging to restore project dimensions
in the entrance channel, and to the end of the fiscal year had worked
54 days at a cost of $392,996.19.
   The cost of surveys and supervision was $3,697.11. The total cost
during the year was $606,475.34. Expenditures were $428,952.43.
   Condition at end of fiscal year.-The existing project was completed
in 1951. The jetties were completed in 1903-04. The crest elevations
range from 8 to -4 feet and are as much as 12 feet below their original
height. Dikes of various forms have been built to protect the South
Island beach and the shore end of the south jetty. An earth dike 4,100
feet long has been constructed east of the Eastern Channel, largely
from original channel excavation, to assist in maintaining the channel.
The Sampit River entrance is protected 'on the east side by a timber and
brush training wall 2,000 feet long.
   Surveys in June 1952 showed a controlling depth of 27 feet at mean,
low water for 400-foot width from the ocean to the Gorge Channel,
thence 27 feet for 300-foot width through the Gorge and Eastern
Channel, thence a controlling depth of 27 feet for 300-foot width to
the head of the project via the Sampit River cut-off. The side channel
and turning basin have a controlling depth of 20 feet. Center-line
surveys made in June 1952 showed a controlling depth of 8.5 feet in
the bypassed portion of Sampit River.
   The costs of the existing project to the end of the fiscal year have
been $4,615,903.55 for new work and $2,721,551.14 for maintenance,
a total for $7,337,454.69. The expenditures have been $7,086,752.40.
  Proposed operations.-The balance unexpended June 30, 1952,




     245554-53-vol. 1   33
510         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                             1952

$430,377.63, plus an allotment of $134,400 during the fiscal year 1953,
a total of $564,777.63, will be applied as follows:
Accounts payable June 30, 1952------------------------------ $250, 702. 29
Maintenance:
   Complete dredging by contract to restore project dimensions
      in entrance channel, July 1-13, 1952--------------- ----- 145, 003. 81
   Complete dredging by contract to restore project dimensions
      in Inner Harbor, July 1-18, 1952------------------------       29, 320. 81
   Dredging by contract to restore project depth of 27 feet for safe
     navigable widths at the most critical shoaled reaches between
      the head of the project in Sampit River and the lower end of
      Eastern Channel, Mar. 1 to May 15, 1953 --------------- 135, 350. 72
   Condition surveys----------1,     ---------------------------- 1         .00.
   Miscellaneous inspections and reports (contingencies) ---------    3, 000. 00
        Total maintenance--                                                                14, 075. 34
                                                                      ------------------- 3-------------

        Total for all work--------------------------------564,777.63
  The additional sum of $390,800 can be profitably expended for the
following scheduled work during the fiscal year 1954:
Maintenance :
   Dredging by contract to remove the most critical shoals as re-
      quired to restore project depth in the upper reaches of the
     project         ---------------------------------------------           $255, 000
   Dredging by United States hopper dredge Lyman to restore project
      depth in the entrance channel from the Ocean, Apr. 1 to June
      30, 1954--------------------------------------------                    130, 000
   Condition surveys------------------- -------------------- -                  3, 000
   Miscellaneous inspections and reports (contingencies)           .----------- 2,800
        Total for all work-----------------------------------------                                         390, 800

                                    Cost and financial summary

                                                Fiscal year ending June 30                             Total to June
                                                                                                       30, 1952, includ-
                                                                                                       ing fiscal years
                                1948           1949          1950           1951           1952          prior to1948

New work:
   Appropriated-......... $800, 000.00 $1,447,686.25 $400, 000. 00 $480, 000.00------------              $7,061, 755.40
    Cost--------------  ---   808,155.16 1, 971, 369.56    578, 684.84    361, 336. 97   $15, 012.62      7, 061, 755.40
    Expenditures.--------     687, 035.69 1, 621, 848.52   948,102. 70    444, 709. 70    35, 290.30      7, 061, 755.40
Maintenance:
   Appropriated -- -----        5, 000.00---------         323, 996.67    366, 442.59    781, 898.13      3, 015, 782. 85
   Cost ----------------           666. 00   2, 300.40     319, 055.98    370,466. 99    606, 475.34      2, 836, 107.51
   Expenditures--- ------          666.00    2, 300.40     281, 983. 76   334, 359. 83   428, 952.43      2, 585, 405. 22



                               3. CHARLESTON HARBOR, S. C.

  Location.-On the coast of South Carolina, about 15 miles southerly
of the midpoint of the coast line, 50 miles southwest of Winyah Bay,
S. C., and 80 miles northeast of the mouth of the Savannah River.
(See U. S. Coast and Geodetic Survey Charts Nos. 1239 and 470.)
  Previous projects.--Adopted by River and Harbor Acts of August
30,1852; June 18, 1878; August 11, 1888; March 3, 1899; June 25, 1910;
August 8, 1917; and July 18, 1918.
  For further details see page 1808, annual report for 1915; page 579,
annual report for 1926; page 562, annual report for 1938.
              RIVERS AND HARBORS-CHARLESTON,                                     S. C., DISTRICT                511

   Exsting project.--This provides for commercial purposes a channel
35 feet deep, 1,000 feet wide from the sea to the inner end of the jetties,
thence 600 feet wide to Town Creek, thence 500 feet wide through
Town Creek thence 600 feet wide to the navy yard, and thence 400
feet wide to Goose Creek, with a turning basin 700 feet wide at the port
terminals, together with a channel 30 feet deep, 600 feet wide in
Cooper River around the east and north sides of Drum Island; also an
anchorage area 30 feet deep in the water area between Castle Pinckney
and Fort Moultrie; also a channel in Shem Creek 10 feet deep and 110
feet wide from a flared entrance from Hog Island channel to and in-
cluding a turning basin 130 feet wide and 400 feet long with the upper
end 250 feet upstream of the Mount Pleasant public wharf.
   The estimate of cost for new work, revised in 1952, is $4,412,000,
exclusive of amounts expended under previous projects. The latest
 (1952) approved estimate of annual cost of maintenance is $642,700.
   The existing project includes the maintenance of two entrance jetties
completed in 1895 under previous projects. These jetties are of stone
on log-mattress foundation, the north jetty 15,443 feet long and the
south jetty 19,104 feet long; the distance between their axes at the
outer end is 2,900 feet. The height as originally built, except the sub-
merged inner portions and the gap left in the south jetty, was 12 feet
above mean low water for the greater part of their length.
   The project also provides for a 40-foot channel 1,000 feet wide from
the sea to the inner ends of the jetties, described above, thence 600 feet
wide to the south pier at the navy yard, and thence 1,000 feet wide to
the commandant's wharf, at an estimated first cost of $3,603,000 and
$250,000 annually for maintenance, both figures being additional to
the estimates for the commercial project given above, and that it be
considered as a national defense rather than a commercial measure and
be prosecuted only as found necessary in the interest of national
defense.
   The mean tidal range is 5.2 feet, though this is increased to 7 or 8
feet under the influence of northeast winds or prolonged storms.
   The existing project was authorized by the following river and
harbor acts:

       Acts                                 Work authorized                                 Documents

June 18,1878      2 jetties 1------------                                       Annual report, 1878, pp. 553-572.
Aug. 8,1917       Increase in depth to 30 feet with width of 500 feet be-       H. Doec. 288, 62d Cong., 2d sess.
                    tween the jetties and 1,000 feet seaward thereof.
July 18,1918      The 40-foot channel to the navy yard.         (Act provided   H. Doc. 1946, 64th Cong., 2d sess.,
                    that the 40-foot channel should not be undertaken             pt. 1, pp. 21-29, 57, 58, and 61-63.
                    "until the proposed new drydocks at this navy
                    yard, carrying a depth of 40 feet of water over the
                    blocks, has been authorized."             This dock   was
                    authorized in the naval appropriation act approved
                    July 1, 1918 (40 Stat. L. 725).
Jan. 21,1927      Present project dimensions of the channels for com-           H. Doc. 249, 69th Cong., 1st sess.
                    mercial purposes, and for the present project widths          (Contains latest published maps.)
                    of the 40-foot channel which was authorized as a
                    national-defense measure.
Oct.    17,1940   The 35-foot channel depth from the sea to the head            H. Doc. 259, 76th Cong., 1st sess.
                   of the project via Cooper Rives and Town Creek,
                   also a channel in Shem Creek to Mount Pleasant,
                   110 feet wide and 10 feet deep, including a turning
                   basin at the upper end.
Mar.    2,1945    An anchorage area 30 feet deep in the water area be-          H. Doc. 156, 77th Cong.. 1st sess.
                   tween Castle Pinckney and Fort Moultrie.

1 Completed under       previous projects.
512    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,          1952

    Local cooperation.-Thisproject authorized in the River and Har-
bor Act of October 17, 1940 (H. Doc. 259, 76th Cong., 1st sess.), is
subject to the requirements that local interests furnish, free of cost
to the United States, suitable spoil-disposal areas as and when re-
quired for initial work and for subsequent maintenance. All prior
requirements have been fully complied with.
    Terminal facilities.-Piersand slips extend for about 1 mile along
the eastern waterfront of the city of Charleston, and an additional
mile is covered by marginal wharves. The South Carolina State
Ports Authority operates the terminal at Columbus Street, large piers
near Market Street and operates the belt-line railway serving all
wharves and warehouses, and connecting with trunk lines entering
the city. Modern facilities are also at the Southern Railway coal pier
and the wharves of the Standard Oil Co., the Charleston Shipyards,
Inc., the Seaboard Air Line Railroad, the Southern Railway Co., the
Concentration Warehouse & Compress Co., and the Charleston Tide-
water Terminals, Inc.
    On Cooper River above the navy yard a compress and warehouse
company has a marginal wharf 750 feet long; the Texas Corp., the
Sinclair Refining Co., and the Cooper River Terminals, Inc., maintain
piers at their properties; and the South Carolina State Ports Author-
ity operates a large terminal capable of berthing four cargo vessels.
The facilities are considered adequate for existing commerce. For
further details, see Port Series No. 13, revised 1950, Corps of Engi-
neers.
    Operations and results during fiscal year.--The pipeline dredges
Pullen and Washington, by contract, completed restoring project
dimensions in Cooper River and Town Creek Channels on October 20,
1951, removing 1,573,921 cubic yards of material during the fiscal year
at a cost of $301,609.39. The United States hopper dredge Gerig and
hired labor restored project dimensions in the entrance and South
Channels and in the Cooper River Channel east of Drum Island, re-
moving 1,444,755 cubic yards of material at a cost of $120,034.53.
On May 1, 1952 the pipeline dredge Admiral, by contract, commenced
  dredging to restore project dimensions in Cooper River and Town
  Creek Channels and to the end of the fiscal year removed 787,278
cubic yards of material at a cost of $169,257.67. Tests of improve-
  ment plans in the model of Charleston Harbor constructed at the
United States Waterway Experiment Station, Vicksburg, Miss., were
completed during July 1951, and the report of results is being pre-
pared by that station. Companion prototype studies in Charleston
Harbor were made by the district office personnel. Costs in connec-
tion with the model study were $57,008.94.
    The cost of surveys and supervision was $8,366.94. The total cost
  for the year was $656,277.47 for maintenance. The expenditures were
  $600,215.74.
     Conditionat end of fiscal year.-The existing project was about 43
  percent completed. The jetties protecting the entrance channel across
  the bar were completed in 1895. These jetties are described in the
  "Existing project." The existing project was completed during May
  1949 except for the anchorage area 30 feet deep in the water area
between Castle Pinckney and Fort Moultrie.
        RIVERS AND HARBORS-CHARLESTON,                               S. C.,   DISTRICT      513
   Surveys during the latter part of the fiscal year in the entrance,
South and Cooper River Channels showed a controlling depth of 32
feet for 400-foot width from the 35-foot contour in the ocean to
the head of the project, except at a shoal in Town Creek where the
controlling depth is 30 feet for 300-foot width, and a shoal in the
northerly end of the Cooper River Channel on the east side of Drum
Island, where the controlling depth is 26 feet for 300-foot width.
A center-line survey in Shem Creek during June 1952 showed a con-
trolling depth of 6 feet.
   The cost of the existing project has been $1,857,964.34 from regular
funds and $57,813.37 from Public Works funds, a total of $1,915,777.71
for new work, and $5,314,468.72 from regular funds and $56,086.63
from Public Works funds, a total of $5,370,555.35 for maintenance,
a grand total of $7,286,333.06, exclusive of $600 contributed funds.
   Expenditures have been $7,091,516.97 from regular funds and
$113,900 from Public Works funds, a total of $7,205,416.97. In
addition, $600 from contributed funds were expended for maintenance.
   Proposed operations.--The balance unexpended June 30, 1952,
$331,433.13, plus an allotment of $505,800 during the fiscal year
1953, a total of $837,233.13, will be applied as follows:
Accounts payable June 30, 1952--..-----------------------------                       $80,916.09
Maintenance:
    Complete dredging by contract to restore project dimensions in
      Town Creek and Cooper River Channels, July 1 to Septem-
      ber 15, 1952      ----------------------------------------                      237,290.00
    Dredging to restore project dimensions as required in the
      Entrance and South Channels by United States hopper dredge
      Gerig and hired labor, Jan. 1 to Feb. 28, 1953_ ------------   177,000.00
    Dredging by contract to restore project dimensions at inter-
     mittent shoals in Town Creek and Cooper River Channels,
     Feb. 1 to Apr. 30, 1953--- ---------------------------          256,736.04
    Construct by contract dikes around spoil areas on Drum
     Island---------------------------------------------30,000.00
    Continuation of model and prototype studies of Charleston
      Harbor and preparation and completion of final report, July
      1, 1952 to June 30, 1953-----------------------------           45,491.00
    Condition surveys -    -----------------------------------        4, 500.00
    Miscellaneous inspections and reports (contingencies)          -     -------.
                                                                       5,300.00
      Total maintenance ---- ----               ------------------            -----    756,317.04

      Total for all work------         ---------------------------                    837,233.13
  The additional sum of $800,000 can be profitably expended for the
following scheduled work during the fiscal year 1954:
Maintenance.:
   Dredging by the United States hopper dredge Gerig in the lower
      harbor and entrance channel from the ocean, to restore safe
      navigable dimensions as required, Jan. 1 to Feb. 28, 1954----,                     $180,000
   Dredging by contract at critical reaches between the lower harbor.
      and the head of the project at the former ordnance dock, as
      may be found necessary by condition surveys               ------------              407,000
   Repair by contract the north masonry pile of the engineer
      whaf ....L---------    -L-,;~-   --------------                                  90,009~
                                                                      i,-- ------- -- 15
    Construct by contract earthen dikes around the spoil areas on
     Daniels Island---------       _-----------1 -.        -    -----                      50,000
    Condition surveys-,-- -,-------- -------------          ..........                      6,000
    Miscellaneous inspections and reports (contingencies).    i:.:.                         7,0
      Total for all work-------
                           ...         -----------------....                              800,000
514         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                                    Cost and financial summary

                                                  Fiscal year ending June 30                           Total to Jane
                                                                                                       30, 1952, includ-
                                                                                                       ing   scal   years
                                1948             1949         1950          1951            1952        priorto 1948


New work:
    Appropriated --    ..---------------- $178,000.00 -------------------------------         $8,502,232.82
    Cost ----.----------      $182,919.29 178,000.00 ---------.------------------------ 8,502.232.82
    Expenditures-....... 182, 919. 29 175, 770. 50                                             8, 502, 232. 82
                                                          $2, 229. 50 -----------..........--........---------....
Maintenance:
    Appropriated.........    541,000.  00   349, 000.. 0   759, 825. 82 $667, 872. 32   609, 393. 87     1 6, 023. 061.89
    Cost--------------       661, 459. 54   297, 714. 27   807, 980. 46 370, 471.68     656, 277. 47     1 5, 772, 544. 85
    Expenditures-.........   700, 648. 11   295, 464. 94   708, 804. 61 451, 452. 46    600, 215. 74     1 5, 691,628. 76



Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project--------------- $2,496, 000
  1Does not include $600 contributed    funds.

                                    4. SHIPYARD RIVER, S. C.

   Location.-This waterway is a salt-water tidal tributary of Charles-
ton Harbor, S. C. It has its source about one-half mile below the
United States navy yard, whence it flows southerly about 3 miles and
empties into Cooper River about three-fourths mile above Drum
Island. (See U. S. Coast and Geodetic Survey Chart No. 470.)
   Previous projects.--Adopted by River and Harbor Acts of July
25, 1912; March 3, 1925; July 3, 1930; August 30, 1935; and August
26, 1937.
   For further details of previous projects see page 610, annual report
for 1932, and page 463, annual report for 1944.
   Existing project.--This provides for a channel 30 feet deep at
mean low water and 200 feet wide, widened at the entrance, from deep
water in Cooper River to the vicinity of the plant of the Pittsburgh
Metallurgical Co., with a turning basin 30 feet deep opposite the Gulf
Oil Corp. terminal and a turning basin 30 feet deep at the upper
end of the project. The mean tidal variation is 5.2 feet.
   The cost of new work for the completed project exclusive of
amounts expended on previous projects, was $487,824. The latest
 ,(1952)approved estimate of annual cost of maintenance is $127,400.
   The existing project was authorized by the following river and
harbor acts:

    Acts                           Work authorized                                          Documents

July 3,1930     Channel depths of 12 and 2Qfeet--...----......---.....--........
                                                                        Rivers and Harbors Committee
                                                                         Doe. 13, 71st Cong., 2d sess.
Aug. 20,1935    A 28-foot channel from Cooper River to the Gulf Oil Rivers and Harbors Committee
                  Corp.'s terminal, and the deepening of the channel     Doc.43, 73d Cong., 2d sess.
                 above that point to 20 feet from the depth of 12 feet
                 previously authorized without local cooperation.
Aug. 26, 1937 1 Enlargement of the channel to a depth of 30 feet and Rivers and Harbors Committee      1
                 a width of 200 feet up to the Gulf Oil Corp.'s ter.     Doc. 38, 75th Cong., 1st sess.
                  minal with a turning basin 30 feet deep at the latter
                  point.
hag. ',  1945 Extension of the existing 30-foot channel to vicinity H. Doc. 93,79th Cong., 1st sess.
                 of the Pittsburg Metallurgical Co. plant, with a
                 turning basin at the upper end.

i Included in Emergency Relief Administration program May 28, 1935.
SContains latest published map.
         RIVERS AND HARBORS---CHARLESTON,                                S. C.,   DISTRICT      515

   Local cooperation.-Fully complied with.
   Terminal facilities.-In the lower three-quarter mile of the channel
are the large marginal wharves of the Gulf Oil Corp. and the Ship-
yard River Terminal Co., the latter handling chiefly fertilizer and
fertilizer materials. These wharves accommodate deep-draft, ocean-
going vessels. On the upper channel is the Pittsburgh Metallurgical
Co.'s wharf for handling ores.
  Operations and results during fiscal year.-The pipeline dredge
Pullen, by contract, restored project dimensions over the entire project,
removing 564 191 cubic yards of material at a cost of $122,019.27.
   The cost of surveys and supervision was $193.73. The total costs
during the year were $122,213.00 for maintenance. The expenditures
were $122,213.00 for maintenance and $14,389.60 for new work. The
total expenditures were $136,602.60.
   Condition at end of fiscal year.-The existing project, providing for
a 30-foot channel in Cooper River to the Pittsburgh Metallurgical Co.,
including a turning basin at the latter point and at the Gulf Oil
Corp. wharf, together with a flared entrance at Cooper River, was
completed during June 1951 and a survey showed project dimensions
had been obtained.
  The costs to the end of the fiscal year have been $456,260.39 from
regular funds and $31,563.71 from Emergency Relief funds, a total of
$487,824.10 for new work; and $1,234,388.23 from regular funds for
maintenance, a total of $1,722,212.33.
  The expenditures have been $1,690,648.62 from regular funds, and
$31,563.71 from Emergency Relief funds, a total of $1,722,212.33.
  Proposed operations.-The balance unexpended June 30, 1952,
$2,300, plus an allotment of $105,100 during the fiscal year 1953, a
total of $107,400, will be applied as follows:
Maintenance:
   Dredging by contract to restore project dimensions from the mouth
      to the head of the project, including the turning basins opposite
      the Gulf Oil Corp. and the Pittsburgh Metallurgical Co., Nov. 1
      to Dec. 31, 1952--------------------------------------                 $105,300
   Condition surveys---------                ---------------------------------     00
   Miscellaneous inspections and reports (contingencies)..                        200
                                                                                1-----------,
       Total for all work         ------------------------------------                       107, 400
  The additional sum of $141,800 can be profitably expended for the
following scheduled work during the fiscal year 1954:
Maintenance:
   Dredging by contract to restore project depth, Oct. 1 to Dec.
      31, 1953        -------------------------------------------     $139, 000
   Condition surveys          ----------------------------- ---------    2, 000
   Miscellaneous inspections and reports (contingencies) ...........        800
-      Total for all work----------
                         ...... _   --                       .      -      - --        -141,     800
516           REPORT OF CHIEF OF ENGINEERS, U. S, ARMY, 1952

                                         Cost and financial summary

                                                            Fiscal year ending June 30                          Total to June
                                                                                                               30, 1952, includ-
                                                                                                               ing fiscal years
                                      1948            1949             1950           1951         1952         prior  to 1948.

New work:
   Appropriated---.....          -----------------------............ $375,000.00     . ..-----............          $491, 974.10
   Cost,        -------------                                            4,162.06 $370,837.94-4                           974.10
   Expenditures---                .......------------......------------  4, 081. 74 356,528. 66 $14,389.60           491, 974.10
Maintenance:
   Appropriated-......... $75, 700.00 $100, 000.00                      69,100. 00 66, 811.36 124, 513.00          1,236, 688. 28
   Cost--.....----------              44, 638. 23 126, 948. 45 38,997.41 107, 289.40 122, 213.00                   1, 234, 388.23
   Expenditures--------.........      34, 977. 61           92, 697. 83 82, 908.65 107, 289. 40 122, 213. 00       1,234, 388.23

  s Includes $31,563.71 Emergency Relief funds.

     5. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                                                       (GENERAL)

  The cost of the work during the year was $7,518 for examinations
and surveys, and $16,928.47                                 for
                                   contingencies, a total of $24,446.47
from regular funds. The expenditures during the year were $7,518
for examinations and surveys and $16,648.47 for contingencies, a total
of $24,166.47. The unexpended balance June 30, 1952, of $1,249.22
for examinations and surveys and $1,588.63 for contingencies, a total
of $2,837.85, plus allotments for fiscal year 1953 of $5,000 for exam-
inations and surveys and $5,800 for contingencies during the fiscal
year 1953, a total of $13,637.85, will be applied to the payment of
expenses to be incurred under this heading during the fiscal year.
  The additional sums of $19,900 for examinations and surveys and
$5,800 for contingencies can be profitably expended during the fiscal
year 1954.
                                          Cost and financial summary

                                                            Fiscal year ending June 30                           Total to June
                                                                                                                30,1952, includ-
                                                                                                                ing fiscal years
                                      1948            1949             1950           1951         1952        i prior to 1948
Maintenance:
   Appropriated-.........         $45, 000.00    1 $58,000.00       $45, 300. 00   $52,100.00 -$2, 765. 00        $1, 214,639.85
   Cost_................           52, 616.37      68, 241.16        48, 416.60     40,197.96   24,446.47          1,212;082. 00
   Expenditures--------....        52, 651. 60     68, 426.50        48, 673. 69    40, 206. 96 24,166. 47         1, 211, 802. 00

  1 Does not include $3,238 contributed funds.

                6. PLANT ALLOTMENT, CHARLESTON, S. C., DISTRICT

                                          Cost and financial summary

                                                            Fiscal year ending June 30                          Total to'June
                                                                                                               30,1952, includ-
                                                                                                               ing fiscal years
                                      1948            1949             1950           1951         1952          prior to 1948

Maintenance:
   Appropriated-......... -$50, 000. 00...----------......... -$50, 000. 00------------
                                                                           ............          ----------............
                                                                                                                $177,086.97
    Cost-        _           -------------           ----                                        $6, 391.00           47,902 37
    Expenditures----      -----     14,095.74 -$133,101.49i            7,644.50     $1,712.52      8,043.02           35,733.83
                RIVERS            AND HARBORS--CHARLESTON,                                                                S. C., DISTRICT                       517

                                    7. INACTIVE NAVIGATION PROJECTS

                                                                                      For last              Cost and expenditures to June                Estimated
                                                                                    full report                        30, 1952                           mount re
                        Name of project                                             see annual                                                           amrunt to
                                                                                       report                                                             quired
                                                                                        for-                  New work               Maintenance          complete

1. Yadkin River, N. C.1             3_....................                               1892         $102, 808.91 ................---------    $4,191.00
2. Salkahatchie River, 8. C.1 1___-_........                                             1896            15,840.73                .....--........ ()
3. Lumber River, N. C. and S. C.1---------..                                             1897            19, 000. 00 ............               16,000.00
4[Lynchles River and Clark Creek, S. C.1s...                                             1910             9, 500.00--............             . (2)
5. Little Pee Dee River, S. 0C.1        s _-1919                                                         19, 549. 99         $25, 650.01        30, 450. 01
6. Edisto River, S. C.1_-___-              _ ...---... .                                 1938           33,102. 65                  900.00        (5)
7. Wateree River, S. C.---  ....--..---------------...............                       1940           60, 000. 00           151, 783 83         (5)
8. Abbapoola Creek, S. C-------------------                                              1947 ---------------         -__16,100.00
9. Beresford Creek, S. C--------------------                                             1947 -  ---- ---------------                           29, 900.00
10. Russell Creek, S. C....---_..---------                           .                    1947 -   -     -        -        -        -        -   23,000.00
11. Snagging and clearing under authority of
     section 3 of the river and harbor act ap-
      proved Mar. 2, 1945- --..... ..-- ...-                           -                  1949             ................                4, 402.20          (4)
12. Waccamaw River N. C. and S. C.A.........                                              1950                  262, 813. 58             197, 813.29           ()
13. Great Pee Dee River, S. C.-.........                                                  1950                  183, 712. 41             269, 673. 06         (3)
14. Mingo Creek, S. C.1...----------------------....................                      1950                   29, 050. 00               7,150. 00           (s)
15. Santee River, S. C--------------..........                                            1950                   99, 750. 00             178, 544. 05          (s)
16. Congaree River, S. C.1_..........-..-.-...                                            1950                  364, 823. 87             541,859.87            163, 500
17. Ashley River, S. C----------------------.........................                     1951                  260, 996.41            * 391, 065. 51 ...........--------

  1No commerce reported.
  s Abandonment recommended in 1926 (H. Doe. No. 467, 69th Cong., 1st sess.).
  3 Completed.
  4 Revoked in fiscal year 1950, $597.80.
  5 Curtailment recommended in 1926 (H. Doe. No. 467, 69th Cong., 1st sess.
  e Does not include $700 expended from contributed funds.

                                           8. MISCELLANEOUS ACTIVITIES

Status of all investigations for navigation called for by river and harbor acts
                           and committee resolutions


                                                                                                                       Date trans-
                                                                                                                               to           Document
                                                                                                                                              o.m     Recom
                                                                                                                                                      enao
                   Locality                                             Authorization act                              mitted
                                                                                                                       Congress               No.    mendatim

Beaufort, S. C., construction of                                River and Harbor Act,
boat basin at or near on the                                    July 24, 1946.
  Intracoastal Waterway.
Buckingham Landing site, South                                  River and Harbor                           Act,   --------------- r----------
Carolina, on Santee-Congaree                                    Mar. 2,1945.
  River.
Charleston Harbor, S. C., with a                                River and Harbor                           Act,           r-----
                                                                                                                  ----------            -----------
  view to extending Shem Creek                                   July 24, 1946.
  Channel.
Charleston Harbor to the Pinop-                                 River and Harbor                           Act,
olis power plant, South Caro-                                   Mar. 2, 1945.
lina, Cooper River, S. C.
Charleston, S. C., to Columbia,                                Commerce Committee res-                             .
  S. C., waterway, Cooper River                                 olution, Mar. 27, 1944.
between Charleston and Pin-
opolis Dam, S. C.
Charleston"Harbor, S. C., increase                             Public Works Committee
channel depths from 30 to 35                                   resolution, May 12, 1950.
feet east and north of Drum
Island.
Cooper River, Charleston Har-                                     do..............----------------------
                                                              --....
bor, S. C., increase channel
depths from 30 to 35 feet east
and north of Drum Island.
Cooper River, S. C., diversion of                              Commerce Committee res-                             Feb. 28,1952...--------.....  Unfavor-
flood waters from Santee River,                                olution, Apr. 2, 1941.                                               I          [ able.
Cooper River, S. C., from                                      River and Harbor Act,
  Charleston Harbor to the Pin-                                 Mar. 2, 1945.
opolis power plant.
Cooper River between Charles-                                  Commerce Committee res-                                       _...........
ton and Pinopolis Dam, S. C.                                   olution, Mar. 27, 1944.
  (Review of waterway from
  Charleston to Columbia, S. C.)
518          REPORT OF CHIEF OF ENGINEERS, U.                                    S. ARMY,          195

Status of all investigations for navigation called for by river and harber acts
                     and committee resolutions-Continued

                                                                              Date trans-   Document        Recom.
               Locality                        Authorization act               mitted to      No.          mendation
                                                                               Congress

Congaree-Santee Bucking ham River and Harbor Act,
  Landing site, South Carolina        Mar. 2, 1945.
  (navigation, flood control, and
  development of power).
                                                                          I
Edisto Beach, Pawleys Island and River and Harbor Act, Feb. 11,1952 ............ 1 Unfavor-
  Hunting Island, S. C. (coopera-     July 3, 1930.                                                                      able.
  tive beach erosion control study).
Hunting Island, Edisto Beach and River and Harbor Act, Feb. 11, 1952 ----------............                             Unfavor-
  Pawleys Island, S. C. (coopera-     July 3, 1930.                                                   I                I able.
  tive beach erosion control study).
Little River, N. C. and S. C....... Rivers and Harbors Com-
                                      mittee resolution, Apr.
                                      30, 1940.
Myrtle Beach, 8. C., with view River and Harbor Act, I-.....--------..........---..........--
  to establishing harbor for light-   July 24, 1946,
  draft vessels.
Pawleys Island, Edisto Beach, and River and Harbor Act, Feb. 11,1952 ........--.... Unfavor
  Hunting Island, S. C. (coopera-    July 3, 1930.                                                        I            I able.
  tive beach eroson control study).
Pinopolis Dam, S. C., to Charles- Commerce Committee res-                      --...........--  ---
  ton via Cooper River (Review       olution, Mar. 27, 1944.
  of waterway from Charleston
  to Columbia, S. C.).
Pinopolis power plant to Charles- River and Harbor Act, --------------...                                     -----
  ton Harbor, S. C., via Cooper       Mar. 2, 1945.
  River.
Santee-Congaree Bucking ham ..... do-------------.....................-----.........-------....--------.....----------
  Landing site, South Carolina
  (navigation, flood control, and
  development of power).
Santee River, N. C. and 8. C., Commerce Committee reso- Feb. 28,1952 ............ Unfavor-
  salt-water intrusion and diver-    lution, Apr. 2, 1941.                                                               able.
  sion of water into Cooper River.
Santee River (Lower), N. C. and Sec. 6, River and Harbor ------------...............
  S. C. (navigation and irriga-      Act. Aug. 30, 1935.
  tion).
Santee River system, North Car- Rivers and Harbors Com- .......................
  olina and South Carolina.          mittee resolution, Dec.
                                     28, 1946.
Shem Creek Channel, Charles- River and Harbor Act -----------                                         ----------
  ton Harbor, S. C.                  July 24, 1946.


                                       9. YADKIN RIVER, N. C.

   Location.-The Yadkin River rises on the eastern slope of the Blue
Ridge Mountains in western North Carolina, flows generally north-
easterly 100 miles to the vicinity of Donnaha, N. C., thence south-
easterly 104 miles to a point near Badin, N. C., to its confluence with
the Uwharie River where its name changes to the Great Pee Dee
River. (See U. S. Geological Survey map of North Carolina, 1944.)
   Existing project.-This project provides for the construction of
4 detention reservoirs, 2 on the Yadkin River and 2 on Reddies River,
a tributary entering the stream at North Wilkesboro, N. C.
   The estimate of Federal cost for new work, revised in 1952, is
$13,385,000.
   The project was recommended by the Chief of Engineers in report
dated June 19, 1946, and authorized by the flood control act approved
July 24,1946.
   Local cooperation.-None.
   Operationsand results during fiscal year.-None.
                        FLOOD CONTROL--CHARLESTON,                                               S. C., DISTRICT                                  519
  Condition at end of fiscal year.-Preliminaryengineering studies
and planning have been completed. Further new work, including
detailed plans and specifications, has been deferred.
  Proposed operations.--No work is scheduled for the fiscal years
1953 and 1954.
                                                   Cost and financial summary

                                                                    Fiscal year ending June 30                                            Total to June
                                                                                                                                      30,1952, includ-
                                                                                                                                      ing fiscal years
                                               1948               1949               1950           1951                1952            prior to 1948

New work:
   Appropriated_--------                   $70,000.00          $70,000.00       $70, 000.00 -$78,500.00------------                             $131, 500
   Cost.............-------                  55, 867. 31        42, 426. 53      29, 423.00    3, 783.16 ------------                            131, 500
   Expenditures-----                         44, 404.26         51, 696.23       31, 613.46    3, 786.05------                                   181, 500


Other new work data: Estimated additional amount needed to be
    appropriated for completion of existing project-------................                                                           $13,253, 500

  10. PRELIMINARY                           EXAMINATIONS, SURVEYS, AND CONTINGENCIES
                                               FOR FLOOD CONTROL

   The cost of the work during the year was $4,016.88. The expendi-
tures were $4,802.15. The balance unexpended June 30, 1952, $952.45,
plus an allotment of $3,500 for fiscal year 1953, a total of $4,452.45,
will be applied to the payment of expenses to be incurred under this
heading during the fiscal year.
   The additional sum of $9,500 can be profitably expended during
fiscal year 1954.
                                                    Cost and financial summary

                                                                    Fiscal year ending June 30                                         Total to June
                                                                                                                                      30,1952, includ-
                                                                                                                                      ing fiscal years
                                               1948               1949               1950           1951                1952            prior to1948

Maintenance:
   Appropriated--------........            $5, 000. 00       $25, 00. 00       $16, 100 00     $22, 000. 00 -$8, 200. 00                     $301, 405.00
   Cost-....---------------                 5, 794. 45        13, 191.36        27, 508. 35     13, 117. 21    4, 016. 88                     300, 452. 55
   Expenditures........                     6, 459. 96        11, 143. 17       25, 981.06      15, 920. 77    4, 802. 15                     300, 452. 56


                                11. INACTIVE FLOOD-CONTROL PROJECTS


                                                                         For last full      Cost and expenditures to June                    Estimated
                                                                         report, see                   30, 1952                               amount
                        Name of project                                    annual                                                             aquiu t
                                                                           report                                                             oeuieto
                                                                            for-              New work              Maintenance

1. Edisto River, S. C-----------------------..........................        1947             1 $6,378.86 -------------...............         $288, 600

   IThe sum of $3,621.14 was revoked during the fiscal year 1948.
520           REPORT OF CHIEF OF ENGINEERS, U.                        S. ARMY, 1952

                             12, MISCELLANEOUS                 ACTIVITIES

.S   tatus of all investigations for flood-control called for by flood-control acts
                              and committee resolutions

                                                                   Date trans-       Document               Recom-
                Locality                   Authorization act        mitted to           No.                mendaton
                                                                    Congress

Black River and tributaries flood Flood Control Act, May                             -----        ----

   control and drainage.               17, 1950.                   --------------'
Broad River, Combahee River, ----....do----   ..........
   and tributaries, flood control
   and drainage.                                                   ---------------
Buck Creek and tributaries, S. C. House Public Works Com-
   (survey)..                          mittee resolution, June
                                       19, 1952.
Buckingham Landing Site, S. C. River and Harbor Act,
   on Santee-Congaree River.           Mar. 2, 1945.
Combahee River, Broad River Flood Control Act, May ------- "---
   and tributaries, flood control      17, 1950.
   and drainage, South Carolina.
Congaree-Santee Buckingham ----. do--........----....               -------------
   Landing Site S.C.
Coniway, S. d., flood protectioni Flood Control Committee
                                                                                 ------------




   Waccamaw River, N. C. and           resolution, July 23, 1946. -------------- -----------
   8.C.
Great Pee Dee River, Willow' House Public Works Com-
   Creek, S. C. (flood control.        mittee resolution, Aug.
   drainage, and allied purposes).     6, 1948.
Johns Island and vicinity (streams). Flood Control Act, May ------------         I
                                                                              1---
                                                                                     -   -   --    -   -



°'South Carolina flood control and     17, 1950.
   drainage.                                                                     ------------



Lynches River S. C. clear chan- House Public Works Com-
   nel below Welch's Bridge.           mittee resolution, July --------------
                                       6, 1949.                                  ------------


Pee Dee-Yadkin River and Tribu- House Public Works Com-
   taries, North Carolina and South    mittee resolution, Mar. ---------- --- ---
   Carolina.,                          5, 1952.                                  ------------



Reedy River, S. 0.------------ House Public Works Com-
                                       mittee resolution, June --------.-------
                                       27, 1950.
Santee-Congaree Buchingham            River and Harbor Act,
   Landing Site, S. C. (navigation,    Mar. 2, 1945.
   flood control, and development
   of power).
Santee River (lower), N. C. and Sec. 6, River and Harbor
   S. C. (navigation and irrigation).  Act, Aug. 30, 1935.
Santee River, N. C. and S. C., Senate Public Works Com- Oct. 23, 1951                       Un fav or-
   Wateree River in vicinity of        mittee resolution, Feb.                                able.
   Boykin, S. C. (major drainage       25, 1949.
   and channel straightening).
Simpson Creek, Waccamaw River, House Public Works Com-
   N. C.,. and S. C. (flood control    mittee resolution, Feb.
   and drainage).                       17, 1949.
Waccamaw River, N. C. and S. C., .....----do...............-----......
   Simpson Creek (flood control
   anddrainage).
Waccamaw River, N. C. and S. C., Flood Control Committee
   for flood protection of Conway,     resolution, July 23, 1946.
   S. C.
Wateree River in vicinity of Boy- Seante Public Works Com- Oct. 23,1951                     Unfavor.
   kin, S. C., Santee River, N. C.,    mittee resolution, Feb.                                able.
   and S. C. (major drainage and        25, 1949.
   channel :straightening).
Willow Creek, S. C., Great Pee House Public Works Com-
   Dee River (flood control, drain-    mittee resolution, Aug. 6,
   age, and allied purposes).           1948.
Yadkin-Pee Dee River and tribu- House Public Works Com-
   taries, North Carolina and South    mittee resolution, Mar.
   Carolina.'                          5, 1952.

     1Limited to preliminary examination scope.
  IMPROVEMENTS OF RIVERS AND HARBORS IN THE
            SAVANNAH, GA., DISTRICT
   This district comprises a very small portion of southwestern North
Carolina, western South Carolina, eastern Georgia, and a small por-
tion of northeastern Florida embraced in the drainage basins tribu-
tary to the Atlantic Ocean between Port Royal Sound, S. C., and the
harbor at Fernandina, Fla. It includes the Atlantic Intracoastal
Waterway between these points.
   District engineer: Col. Robert Erlenkotter, Corps of Engineers.
   Division engineer of the South Atlantic Division, Atlanta, Ga.,
comprising the Wilmington, N. C., Charleston, S. C., Savannah, Ga.,
Jacksonville, Fla., and Mobile, Ala., districts: Col. C. K. Harding,
Corps of Engineers.
                               IMPROVEMENTS
           Navigation                                     Flood control
                                        Page                                         Page
1. Atlantic Intracoastal Water-                10. Savannah River Basin, Ga.
     way between Norfolk, Va.,                       and S. C-__                      540
     and, the St. Johns River,                 11. Hartwell Reservoir, Sa-
     Fla. (Savannah District)- -_        521         vannah River Basin, Ga.
2. Savannah Harbor, Ga    -----.         525         andS.C--------
                                               12. Clark Hill Reservoir, Sa-
                                                                                      541
3. Savannah River below
     Augusta, Ga_____                    530         vannah River Basin, Ga.
                                                     and S. C-                        542
4. Brunswick Harbor, Ga_ .....           534   13. Macon, Ga ...-          _          546
5. Fernandina Harbor, Fla .....          537   14. Preliminary       examinations,
6. Examinations, surveys, and                        surveys, and contingencies
     contingencies (general) ....        539         for flood control .......        547
7. Plant allotment___       - -__--      539   15. Inactive flood-control proj-
8. Inactive navigation projects
9. Miscellaneous activities:
                                   --    539         ects          ___..
                                               16. Miscellaneous activities:
                                                                            .         547
     status of investigations ....       540         status of investigations.. --    548

    1. ATLANTIC INTRACOASTAL WATERWAY BETWEEN NORFOLK,
      VA., AND THE ST. JOHNS RIVER, FLA. (SAVANNAH DISTRICT)

   Location.--This section of the waterway connects Port Royal
Sound, S. C., with Fernandina, Fla. (See U. S. Coast and Geodetic
Survey Charts Nos. 838-841, inclusive.) For Cumberland Sound
to St. Johns River section see page 550.
   Previous projects between Savannah, Ga., and Fernandina,Fla.
Previous improvements in this section were authorized by River and
Harbor Acts of August 2, 1882, August 11, 1888, July 13, 1892, and
March 3, 1905.
   For further details see pages 1814, 1821-1823, annual report for
1915, and page 585, annual report for 1938.
   Existing project.--This provides for a waterway 12 feet deep at
mean low water and not less than 90 feet wide between Port Royal
Sound, S. C., and Savannah, Ga.; for a waterway 12 feet deep at mean
low water, with widths of 90 feet in land cuts and narrow streams and
150 feet in open waters, between Savannah, Ga., and Fernandina, Fla.,
                                                                              521
522           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

to follow in general the alinement of the existing waterway, except for
such cutoffs or other changes in the route as may be found desirable
and justified by the resultant benefits to navigation; and for a suitable
anchorage basin at Thunderbolt, Ga. The total distance from Port
Royal Sound, S. C., to Fernandina, Fla., is 165 miles. The project
also provides for the following: (1) removing logs and snags from
Generals Cut, Ga.; (2) an alternative and more protected route 7 feet
deep at mean low water from Doboy Sound to Brunswick Harbor, via
Darien River, Three Mile Cut, Altamaha River, One Mile Cut, Butter-
milk Sound, Mackay River, Back River, Clubbs Creek, and Plantation
Creek; (3) a protected channel 7 feet deep at mean low water and
75 feet wide around St. Andrews Sound, extending from the main
route of the waterway in Jekyll Creek through Jekyll Sound, Little
Satilla River, Umbrella Cut, Umbrella Creek and its south branch,
through Dover Cut to Dover Creek, thence up Dover Creek and
through a narrow neck of land to Satilla River, thence through a
land cut south of Todd Creek and through Floyd Creek to the main
route of the waterway in Cumberland River; (4) a channel 5 feet
deep at mean low water and 50 feet wide to connect Baileys Cut to
Satilla River and Dover Creek, Ga.; (5) a loop 8 feet deep at mean
low water to reach the wharves at the southern end of Cumberland
Sound; (6) an alternative route 9 feet deep and 150 feet wide in
that part of Frederica River, Ga., not now traversed by the main route,
at no additional cost to the United States. In general, the work is to
be accomplished by dredging, supplemented by training walls as
necessary.
  The mean tidal range between Port Royal, S. C., and Fernandina,
Fla., is from 6 to 8 feet, with fluctuations from 11/2 to 21/2 feet, due
to winds and lunar phases.
   The project has been completed at a cost of $763,599.20 for new
work, exclusive of amounts expended under previous projects. The
latest (1952) approved estimate for annual cost of maintenance is
$300,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                           Work authorized                                            Documents

                      BEAUFORT, S. C., TO SAVANNAH,       GA., SECTION

June 3,1896       Route No. 2 adopted...--------------------------H. Doe. 295, 53d Cong., 3d sess.
Mar.     3,1899   Route No. 1 adopted_-............-.-----                       -       Do.'
July 25,1912      Provided for Archer Creek (this route now aban-                    H. Doe. 513, 62d Cong., 2d seas.
                   doned).
                     SAVANNAH,    GA., TO IERNANDINA, PLA., SECTION

July 13,1892      Original 7-foot channel   ....                             H. Doc. 41, 524 Cong., 1st sess.
                                                         ..-------------------------
Mar. 3,1905       Provided for Skidaway Narrows........----------------- H. Doc. 450, 58th Cong., 2d seas.
July 25,1912      Incorporated alternative routes previously improved                H. Dec. 1236, 60th Cong., 2d eess.t
                   as separate projects and the auxiliary channels.
                   CUMBERLAND SOUND, GA., AND PLA., TO ST. JOHNS
                               RIVER, TLA., SECTION

Mar.     4,1913   For a channel 7 feet deep and 100 feet wide-------..........       H. Doe. 808, 62d Cong., 24dsess.
Aug.     8,1917   Consolidation of the 3 sections, shown above, into
                   "Waterway between Beaufort, S. C,, and St. Johna
                   River, Fla."
  See footnote at end of table.
                   RIVERS AND HARBORS--SAVANNAH,                           GA.,    DISTRICT               523

       Acts                           Work authorized                                  Documents

                    BEAUFORT, S. C., TO CUMBERLAND      SOUND, GA., AND
                                       FLA.. SECTION

Mar. 2,1919        Removing logs and snags from Generals Cut- .......      H. Doc. 581, 63d Cong., 2d sess.
   Do----.......   Improving Back River to provide a channel 7 feet        H. Doc. 1391, 62d Cong., 3d sess.
                     deep and 150 feet wide.
Mar.     3,1925    Channel 75 feet wide between BeaufOrt, S. C., and       S. Doc. 178, 68th Cong., 2d sess.
                     Savannah, Ga.                                                                         1
July 3,1930        Channel from Baileys Cut to Dover Creek---------
                                                              ......... S. Doe. 43, 71st Cong., 2d sess.
Aug. 26,1937       A 7-foot protected channel around St. Andrew Sound-- Senate Committee 1      Print, 74th
                                                                             Cong., 1st sess.
   Do-....... A 12-foot channel between Beaufort, S. C., and Sa-           Rivers and Harbors Committee
               vannah, Ga., via Beaufort River and Port Royal               Doe. 6, 75th Cong., 1st sess.
                Sound.
June 20,1938 A 12-foot channel between Savannah, Ga., and                  H. Doc. 618, 75th Cong., 3d sess.
                Fernandina, Fla., various cut-offs; and anchorage
                    basin at Thunderbolt, Ga.
Mar.     2, 1945   An alternative route 9 feet deep and 150 feet wide in   H. Doe. 114, 77th Cong., 1st sess.
                    that part of Frederica River, Ga., not now traversed
                    by the main route, at no additional cost to the
                     United States.

  1 Contains latest published maps.


   Local cooperation.-Fullycomplied with.
   Terminal facilities.-Exclusive of terminal facilities at the ports
of entry, this improvement serves numerous wharves, some of which
are open to the public on equal terms. These facilities are considered
ample for existing commerce.
   Operations and results during fiscal year.-Maintenance: Between
July 1 and September 14, 1951, the contract dredge Savannah removed
610,191 cubic yards of material from the main route of the waterway
 (North River Crossing, mile 652.6 to mile 653.2, Buttermilk Sound,
mile 663.1 to mile 663.7, and Jekyll Creek, mile 683 to mile 685) at a
cost of $70,345.73.
   Preparation of plans and specifications was commenced and then
stopped because dredging operations were deferred until fiscal year
1953. The cost was $133.82.
   Repairs to speed and directional markers cost $223.02. Miscel-
laneous surveys cost $11,827.69.
   The total cost for maintenance was $82,530.26. The expenditure
was $116,712.74.
   Condition at end of fiscal year.--The main 12-foot channel of the
existing project was completed in 1941. The 7-foot protected route
around St. Andrew Sound was completed in 1939. The training walls
and closure dams were completed in 1912, and are in satisfactory
condition. All other improvements were completed in 1932.
   Since March 1943, the previous route of the Intracoastal Waterway,
through the westerly end of South Channel and the northerly end of
Wilmington River, has been superseded by the route through the
Elba-McQueens Island Cut and the northwesterly end of St. Augus-
tine Creek. The former route will be maintained to a depth of 7
feet for traffic moving from Savannah to points south of Savannah
Harbor and for northbound traffic from southern points below Savan-
nah Harbor to Savannah, Ga. In June 1952, the main route had a
controlling depth of 12 feet or more except as follows: Fields Cut
(mile 573.5), 10 feet; Elba-McQueens Cut (mile 577), 8 feet; Wil-
mington River (mile 578.5 to mile 583.3), 8 feet; Hell Gate (mile
524         REPORT OF CHIEF OF ENGINEERS, U. S, ARMY,                                                   1952

601.7), 9 feet; Florida Passage (mile 607.4), 10 feet; Doboy Sound
(mile 649.4), 11 feet; Rockdedundy River (mile 653), 10 feet; Little
Mud River (mile 654 to mile 656), 10 feet; Buttermilk Sound (mile
663 to mile 664.2), 8 feet; Mackay River (mile 668.8), 11 feet; St.
Simon Sound (mile 677.5), 11 feet; and Jekyll Creek (mile 681.4 to
mile 685), 10 feet.
  The costs under the existing project to June 30, 1952, were $763,-
599.20 for new work and $3,919,870.37 for maintenance, a total of
$4,683,469.57. The expenditures were $4,683,349.61.
  Proposed operations.--The balance unexpended June 30, .1952,
$3,168.95, plus an allotment of $230,500, a total of $233,668.95, will be
applied as follows:
Accounts payable June 30, 1952--------------------------_---                                                        $119. 96

Maintenance:
   Dredging in the main route of the waterway between the south-
      ern entrance of Port Royal Sound and Cumberland Sound
      with contract pipeline dredge, 5 months, October 1952 through
      February 1953-------------         ------------------------                                             220,000.00
   Repairs and replacement by hired labor of speed and directional
      navigation markers-----      ----------------------------                                                 i, 500.00
    Periodic condition surveys---------------------------                                                      10, 048. 99
   Miscellaneous inspections and reports---------   _     ---     -                                             2, 000. 00

        Total maintenance                         _---
                                                  ------------               --------------                  233, 548. 99

        Total for all work _-----. --------------                                  __                -__     233, 668. 95
   The additional sum of $297,500 can be profitably expended during
fiscal year 1954, as follows:
Maintenance :
   Dredging in the main route of the waterway between the southern
      entrance to Port Royal Sound and Cumberland Sound with con-
      tract pipeline dredge, 6 months between July 1953 and June
      1954                                                                                                                000
                                                                                                                   $----------------------------
   Periodic condition surveys ---------------------    _------                                                        15, 000
   Miscellaneous inspections and reports-------------------------                                                      2, 500
        Total for all work__ -------                     ---       -----------                          _--297,            500

                                      Cost and financial summary

                                                   Fiscal year ending June 30                                Total to June
                                                                                                             30, 1952, includ.
                                                                                                             ing fiscal years
                                   1948           1949           1950            1951           1952           prior to 1948

New work:
   Appropriated----                 -------             ----------- ----------------------- -----------            $958,096.16
   Cost...-----------------------------------------------------------------                                         958,096.16
   Expenditures--------              ----------------------- ------------------------ ------------                  958, 096.16
Maintenance:
   Appropriated--------        $238,000.00 $230, 000.00 $149, 600.00 $174,420.91 -$46, 900.00                     4, 057, 716. 99
   Cost------ ---------         164, 897.55    306, 948.27     30,159. 51      174, 830.49     82, 530.26         4, 054, 668.00
   Expenditures------    --     163, 648. 83   308, 409. 57    31, 380. 89     140, 852.08    116, 712. 74        4, 054, 548. 04
         RIVERS    AND      HARBORS-SAVANNAH,     GA.,   DISTRICT    525
                           2. SAVANNAH   HARBOR, GA.

   Location.-The entrance is 75 statute miles south of Charleston
Harbor, S. C., and 70 statute miles north of Brunswick Harbor, Ga.
 (See U. S. Coast and Geodetic Survey Chart No. 440.)
   Previous projects.-Adopted by specific acts of Congress May 18,
1826; March 3, 1855; August 7, 1856; and by River and Harbor Acts
of March 3, 1873; June 23, 1874; September 19, 1890; June 3, 1896;
and June 13, 1902. For further details, see page 1810, annual report
for 1915, and page 578, annual report for 1938.
   Existing project.-This consists of eliminating the regulating dam
across South Channel, relocating the inland waterway in the vicinity,
further extending training walls, revetments, and jetties, and provid-
ing for-
   (a) Channels 36 feet deep and 500 feet wide across the ocean bar
between stations 245 and 194, 9.7 miles; thence 34 feet deep and gen-
erally 400 feet wide, increased to 550 feet opposite the Atlantic Coast
Line terminals, between stations 194 and 103, with a turning basin
34 feet deep at the Mexican Petroleum Corp. refinery, 17.2 miles;
thence 30 feet deep and 300 feet wide to the foot of Kings Island, 0.6
mile; thence 30 feet deep and 200 feet wide to the vicinity of the At-
lantic Creosoting Co. terminal, with a turning basin 30 feet deep, 2.1
miles; thence 30 feet deep and 200 feet wide to a point 1,500 feet
below the Atlantic coastal highway bridge, with a turning basin
30 feet deep at the upper end, 1.45 miles; a total length of 31.05 miles;
and with such modifications thereof as the Secretary of the Army and
the Chief of Engineers may consider desirable.
   (b) Enlargement of contracted portions of the channel and such
enlargements of the channel as may be necessary to smooth out abrupt
changes and for otherwise improving the hydraulic conditions with
a view to reducing shoaling.
   (c) The maintenance of the channels, anchorage basins, enlarge-
ments at Drakies Cut, Kings Island, West Broad and Barnard Streets,
mooring dolphins near Fort Oglethorpe, and the existing training
walls and jetties.
   The plane of reference is mean low water, which varies for different
parts of the harbor. The mean range of tide is 7.6 feet at the upper
end of the harbor and 7.1 feet at the lower end. Extreme ranges
are about 10.5 feet and 11 feet, respectively. Tides below mean low
water occur 6 or 7 times a month and minus 2-foot tides occur from
6 to 8 times a year. The improvement has increased the mean tidal
range by about 2.8 feet at the upper end.
   The estimate of cost for new work, revised in 1952, is $8,980,700,
exclusive of amounts expended on previous projects. The latest
(1952) approved estimate for annual cost of maintenance is $1,500,000,




     245554---53-vol. 1-    34
526           REPORT OF CHIEF OF ENGINEERS, U.                               S. ARMY,         1952

  The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                     Documents

June 23,1874      Regulating works ................... ......... . ..       Annual report 1873 p. 747.
Mar. 2,1907       Tentative provision for a 26-foot channel from the        H. Doe. 181, 59th Cong., 1st sess.
                    quarantine station to the Seaboard Air Line Ry.
                    bridge.
June 25,1910      Definite provision for the 26-foot channel ............
July 25,1912      A 21-foot channel from the Seaboard Air Line Ry.          H. Doc. 563, 62d Cong., 2d sess.
                    bridge to the foot of Kings Island.
Aug. 8,1917       A 30-foot depth from the sea to the quarantine station_   H. Doe. 1471, 64th Cong., 2d sess.
Jan. 21,1927      A 21-foot channel above Kings Island ..............       H. Doc. 261, 69th Cong., 1st sess.
    Do.......     Channel 30 feet deep with general width 500 feet,         H. Doc. 262, 69th Cong., 1st seas.
                    from the ocean to the quarantine station, thence
                    26 feet deep, general width 400 feet, to the Seaboard
                    Air Line Ry. bridge, thende 21 feet deep and 300
                    feet wide to Kings Island.
                  Widening at West Broad and Barnard Sts.; anchor-
                    age basin; mooring dolphins; regulating dam across
                    South Channel; relocation of the inland waterway;
                    dredging Drakies Cut to 13 feet; widening to 525
                    feet at Kings Island; extension of training walls,
                    revetments, and jetties. Consolidation of projects
                    relating to Savannah Harbor.
July    3,1930    Channel 26 feet deep and 300 feet wide from the Sea-      S. Doe. 39, 71st Cong., 1st seas.
                    board Air Line Ry. bridge to the foot of Kings
                    Island.
Aug. 30,1935      Authorized the 30-foot project and eliminated from        H. Doc. 276, 73d Cong., 2d sess.
                    the project (a) the regulating dam across South
                    Channel; (b) the relocation of the inland waterway;
                    and (c) the further extension of training walls,
                    revetments, and jetties.
Mar.     2,1945   Deepening the channel and turning basin above the         H. Do.   283, 76th Cong., 1st sess.l
                    Seaboard Air Line Ry. bridge from 26 to 30 feet and
                    widening the channel opposite the Atlantic Coast
                    Line Terminals to a maximum of 550 feet for a
                    length of 5,000 feet.
Nov.    7,1945    Deepening the channels to 36 feet deep and 500 feet       H. Doe. 227, 79th Cong., 1st sess.l
                    wide across the ocean bar between stations 245 and
                    194; 34 feet deep and generally 400 feet wide, in-
                   creased to 550 feet opposite the Atlantic Coast
                   Line terminals, between stations 194 and 103, with
                   a turning basin 34 feet deep at the Mexican Petro-
                   leum Corp. refinery; and with such modifications
                   thereof as the Secretary of War and the Chief of
                   Engineers may consider desirable.
July 24,1946      Extending channel 30 feet deep, 200 feet wide, up-        H. Doe. 678, 79th Cong., 2d sess.1
                   stream from Atlantic Creosoting terminal to a
                   point 1,500 feet below the Atlantic coastal high-
                   way bridge, with turning basin 30 feet deep at up-
                   per end.

1Contains the latest published maps.

   Local cooperation.-The River and Harbor Acts approved Novem-
ber 7, 1945, and July 24, 1946, impose the conditions that local inter-
ests shall: (a) Provide, free of cost to the United States, all lands and
rights-of-way required for the initial construction and subsequent
maintenance when and as required; (b) hold and save the United
States free from damages due to the construction works. To date,
local interests have obtained temporary easements for 1-year periods
for spoil areas over about one-half the area that requires maintenance
dredging. All easements furnished by local interests have been of
short duration and are becoming increasingly difficult to obtain, due
to the marsh land being built up by dredge spoil, making the prop-
erties suitable for industrial development. Short term or temporary
easements are also unsatisfactory in that many of the areas must be
diked at considerable expense, and there is the danger that the ex-
penditure may be lost if the easements are not of sufficient duration
to provide for the full utilization of the diked areas. The city of
                RIVERS AND HARBORS--SAVANNAH,                                  GA.,       DISTRICT                        527
Savannah has been notified that the failure to provide easements as
required will necessitate the cessation of maintenance dredging in
the Savannah Harbor. The city has appropriated $10,000 to its agent,
Savannah District Authority, to finance the obtaining of necessary
easements. Two 20-year easements have been obtained during the
fiscal year and the city is preparing to ask the United States to con-
demn additional easements over which it does not have the right
of eminent domain.
   Terminal facilities.-There are 51 piers and wharves to serve water-
borne commerce of the port. These facilities, with the use of dolphins,
have a combined berthing space of 33,800 feet, with depths of water
alongside ranging from zero to 32 feet at mean low water. Six of
these terminals are opposite the city on Hutchinson Island; the re-
maining 45 are on the south side of the river between 3 miles below
and 6.8 miles above the center of the city. Thirteen piers and wharves
are operated by railroads, 5 by oil companies, 2 by coal companies,
1 by a cotton warehouse company, 5 by ship repair companies, 1 by a
local steamship company, 7 by various private industries, and 1 by
the Georgia Ports Authority. The latter wharf, with existing facil-
ities, is being developed for State port terminals. The site of a former
shipyard has been acquired by the city of Savannah for future devel-
opment of industrial sites. There is a large municipal wharf at the
center of the city. All have railway and highway connections except
the 6 on Hutchinson Island, which have rail connections only. The
facilities are considered adequate for existing commerce. For further
details see Port Series No. 14, Corps of Engineers (revised 1946).
    Operations and results during fiscal year.-New work: The con-
tract dredge Baltimore operated in the upper harbor during the period
October 8, 1951, to January 11, 1952, removing 955,198 cubic yards
of material at a cost of $192,334.68. Preparation of plans and speci-
fications cost $3,868.71. The contract dredge Baltimore, under a sep-
arate contract, for reconstruction of the Seaboard Air Line Railroad
bridge, operated within the limits of the Seaboard Air Line Railroad
bridge during January 1952, removing 18,509 cubic yards of material
at a cost of $20,546.81. Engineering studies and surveys cost $2,621.94.
The total cost was $219,372.14. The expenditure was $200,211.28.
    The following tabulation shows the name of plant, sections of
harbor over which work was performed, yardage removed, and method
of dredging:

                                  Name of channel                                       Station
                                                                                         station
                                                                                         Name   to
                                                                                             ofchannel Cubic yards
                                                                                                     removed,  regu.
                                                                                                       lar dredging

Dredge Baltimore:
   Kings Island............------------   -------------------------------              103-106+845                        629, 384
    Marsh Island.......................................            ........--------------------------------------------
                                                                                         106+845-1Q9                      344,323
       Total cubic yards removed-------------------------------------------------------                                   973, 707


  Maintenance: The contract dredge Baltimore operated in the upper
harbor during the period November 20, 1951, to January 11, 1952,
removing 814,496 cubic yards of material at a cost of $159,064.88. The
United States pipeline dredge Henry Bacon operated in the inner
528         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

harbor during the period July 1, 1951, to February 29, 1952, removing
4,922,554 cubic yards of material at a cost of $463,625.41. Increasing
height and cross section of the existing spoil impounding dikes cost
$35,647.42. Investigation and model study cost $26,133.06. Engi-4
neering studies and surveys, not applicable to other work, cost $38,-
482.99. Preparation of plans and specifications for proposed contract
dredging during fiscal year 1953 cost $1,470.43. Supervision in con-
nection with proposed hopper dredging during fiscal year 1953 cost
$215.14. The sum of $195,555.15 was charged off in absorbing the
debit balance in plant rental account due to the United States hopper
dredge Gerig being transferred from the district. The total cost for
maintenance was $920,194.48. The expenditure was $920,583.49.
   The following tabulation shows the name of plant, sections of the
harbor over which work was performed, yardage removed, and method
of dredging:

                                                                                                     ttion Cubic yards
                                Name of channel                                       Station to    removed, regu-
                                                                                              station lar dredging

Dredge Henry Bacon:
   City front----           ----------------------------------------                         122-127            1,923, 003
   Wrecks .....---.............-----------.....------.....-------------------------          127-136            1, 939, 278
   5-fathom hole------........ -- .......------------------------------                      136-140              449, 946
   Obstructions----.--------------------------------------                                   140-147              187, 470
   Lower   flats-      -     -------------------------------
Dredge Baltimore: Marsh Island
                                                               -----    162-171
                                       -------------------------------- 109-117
                                                                                                                  422,857
                                                                                                                  814,496
      Total cubic yards removed ............------------------------------            ------------              5,737, 050



   Condition at end of fiscal year.-The existing project was about 97
percent completed. The 30-foot channel and extension of the harbor
above the Seaboard Air Line Railroad bridge was completed February
5, 1948. The 34-foot channel from Quarantine to 2,155 feet below the
Seaboard Air Line Railroad bridge was completed May 20, 1949. The
34-foot channel from 2,155 feet below the bridge to 3,845 feet above the
bridge, opposite the Mexican Petroleum Corp. refinery, was completed
January 11, 1952, except for a small wedge-shaped area on either side
of the bridge. The new vertical lift span of the Seaboard Air Line
Railroad bridge was placed in operation June 24, 1952. The 36-foot
bar channel was completed April 15, 1951. The previous 30-foot proj-
ect from the sea to old quarantine station was completed in 1930, and
the rest of the 30-foot channel in 1937. That part of the previous 26-
foot channel from the Seaboard Air Line Railroad bridge to the foot
of Kings Island was completed in 1931; the rest, from the foot of Kings
Island to the Atlantic Creosoting wharf, including the turning basin.
opposite the Savannah Sugar Refinery's wharf, in 1937. Cross-tides
channel was closed with a hydraulic fill in 1937. The anchorage basin
and mooring dolphins near Fort Oglethorpe were completed in 1926;
of the 10 dolphins originally constructed, all have been destroyed.
The channel enlargements at Drakies Cut, Kings Island, and at West
Broad and Barnard Streets, were completed in 1931, 1929, and 1924,
respectively. Whitehall channel training wall was completed in 1929
            RIVERS AND HARBORS---SAVANNAH,                                                                                       GA.,           DISTRICT                529
and was replaced by three spur dikes in 1937; these spur dikes are in
good condition. Fig Island training wall was raised and extended
in 1940 and is in good condition. Long Island training wall hydraulic
fill was completed in 1931 and other training walls and jetties prior to
1929, and are in fair condition. The work remaining to complete the
project is as follows: Dredging of a small wedge-shaped section ad-
jacent to and on the upstream and downstream side of the Seaboard
Air Line Railroad bridge and construction of bank protection and ex-
tension of permeable dikes in the upper reaches of the harbor.
   In June 1952, least depths in midchannel for half project width at
mean low water were 32 feet from the sea to Blinker 24 (in the vicinity
of Fort Pulaski); thence 29 feet to and through the Seaboard Air
Line Railroad bridge; thence 27 feet to the wharf of the Southern
Paperboard Corp.; thence varying from 27 feet to 12 feet at the ex-
treme upper limit of the harbor. The turning basins had the follow-
ing controlling depths: Kings Island Turning Basin, 36 feet; White-
hall Turning Basin, 32 feet; and Port Wentworth Turning Basin, 23
feet.
    The costs under the existing project to June 30, 1952, have been $8,-
668,925.91 for new work and $20,671,551.73 for maintenance, a total
of $29,340,477.84. The expenditure was $29,314,685.60.
   Proposed Aperations.-The balance unexpended June 30, 1952,
$89,544.26, plus an allotment of $993,500, a total of $1,083,044.26, will
be applied as follows:
Accounts payable June 30, 1952-----------------------$25,                                                                                                             792. 04
New work:
   Complete, by existing contract, dredging in 34-foot channel
     within the limits of the new navigation span of the Seaboard
     All Line Railroad Co.'s bridge-----
                                      ......-----------------                                                                                                      28, 000.00
   Complete dredging and realinement of 34-foot channel im-
     mediately above and below Seaboard Air Line Railroad
     Co.'s bridge by contract...    ...................       ___                                                                                                  35, 752. 22
                                                                                                                                                                   63, 752. 22
Maintenance:
   Dredging in 30- and 34-foot channels between station 194 and
      upper end of harbor with leased contract pipeline dredge
      between October 1952 and June 1953..---.-..........                                                                                                        626, 841. 84
    Dredging in 36-foot channel between station 194 and outer
      end of harbor with United States hopper dredge Gerig, 3
                                                     _.
      months between July 1952 and June 1953..........  ...                                                                                                      258, 000. 00
    Increasing height and cross section of existing spoil-im-
      pounding dikes and constructing new dikes with Govern-
      ment dragline and hired labor.__..............                                                                                                               37, 500. 00
    Investigation and engineering study of harbor............                                                                                                      30,000.00
    Periodic condition surveys__.-----.----..------------                                                                                                          32, 000. 00
    Miscellaneous inspection and reports..........-------- -                                                                                                        6,000.00
    Absorbing debit balance in plant rental account, United States
       hopper dredge Gerig------- ------------- -----------                                                                                                 .       3,158.16
         T otal-
         J6W     - -- -
              %of&JL      -     -
                              - - - -
                                        -     -   -
                                            - - - - -
                                                        -     -     -
                                                            - - - - - -
                                                                          -      -
                                                                              - - -
                                                                                      -
                                                                                      - - -
                                                                                              -
                                                                                                  - -
                                                                                                        - - - - --
                                                                                                        - - -   - - - -   - -   - -
                                                                                                                                      -- -- -
                                                                                                                                      - - - -   - - - - -        993, 500.00
                                                                                                                                                                1, 083,044. 26
                                                                                                                                                            C



         Total for all work.                                  ---       ----.--            -
                                                                                          -p            -------             ------          ------
530            REPORT OF CHIEF OF ENGINEERS, U.- S. ARMY, 1 52

   The additional sum of $1,568,000 can be profitably expended during
fiscal year 1954, as follows:
Maintenance:
   Dredging in 30- and 34-foot channels between station 194 and
      upper end of harbor with leased contract pipeline dredge be-
      tween July 1953 and June 1954      --------------------------               $900, 000
   Dredging in 36-foot channel between station 194 and outer end
      of harbor with United States hopper dredge Gerig, 3 months
      between July 1953 and June 1954 .....------------            ------------ 258, 000
   Increasing height and cross section of existing spoil-impounding
      dikes with Government dragline and hired labor----                .........
                                                                ....---------       50, 000
   Construction of additional spoil-impounding dikes on Back River
      side of Hutchinson Island by contract pipeline dredge......---------          60, 000
   Investigation and engineering study of harbor, including con-
      struction and operation of model .......-------------------------            250, 000
   Periodic condition surveys---------------------------------                      40, 000
   Miscellaneous inspections and reports------------------------                    10, 000
          Total for all work----....                        ------------------------------                              1, 568, 000
                                                Cost and financial summary

                                                             Fiscal year ending June 30                               Total to June
                                                                                                                     30, 1952. includ-
                                                                                                                     ing fiscal years
                                            1948           1949           1950           1951           1952          prior to ,1948

New work:
   Appropriated-----.........           $300, 000.00 $1,065,000.00 $405, 000. 00 $540, 000. 00 $245, 000.00           $15, 993, 062. 11
    Cost---__             -       .-     841, 644. 59 1, 406, 452. 14   400, 946. 19   512, 417. 56   219, 372. 14      15, 929, 309. 89
    Expenditures--------.........        636, 119. 25 1, 602, 032. 88   418, 681.94    512, 415. 71   200, 211.28       15,910,096.64
Maintenance:
   Appropriated .....-                 1, 024, 220. 00   653, 777.09    747, 350.00    619, 852. 74   887, 400. 00     20, 970, 445. 99
    Cost- ....-------------- 934, 390. 98                804,452. 401 786, 076.49      635, 478. 12   920, 194. 48      20 970, 445. 09
    Expenditures-....... 1, 003, 720.141                 808, 400. 76 I 797, 276. 80   603, 340. 72   920, 583. 49      20, 963, 867. 20


Other new work data:
    Unobligated balance, June 30, 1952------------------------ $40, 241.22
    Unobligated balance available for fiscal year 1953-------------40, 241. 22
    Estimated additional amount needed to be appropriated for com-
      pletion of existing project----------------------            248, 000. 00

                          3. SAVANNAH                    RIVER BELOW AUGUSTA, GA.
   Location.--This river is formed by the confluence of the Tugaloo
and Seneca Rivers on the northwestern part of the South Carolina-
Georgia boundary line. It flows southeast 314 miles, forming the
boundary line, and empties into the Atlantic Ocean 16.6 miles below
Savannah, Ga. (See U. S. Geological Survey maps of South Carolina
and Georgia.)
   Previous project.-Adopted by the River and Harbor Act of March
3, 1881. A subdivision between new work and maintenance is not
possible. For further details see page 1813, annual report for 1915,
and page 581, annual report for 1938.
   Emisting project.-Provides for a channel 9 feet deep and 90 feet
wide (at ordinary summer flow, which corresponds to a discharge of
5,300 second-feet at Augusta, Ga., with the Clark Hill power plant
in operation), from the upper end of Savannah Harbor to the head
of navigation at Augusta, 3 miles above Fifth Street Bridge, about
199 miles. The improvement is to be obtained by construction of one
lock and dam at New Savannah Bluff, use of contraction works, closure
of cut-offs, bank protection, dredging, removal of snags, overhanging
                   RIVERS AND HARBORS--SAVANNAH,                        GA., DISTRICT                  531
trees and wrecks, and open-river regulation. The mean tidal varia-
tion at the mouth of the river is 7.1 feet. The freshet variation above
the normal pool level (elevation 114.5 mean sea level) of the New
Savannah Bluff lock and dam at the head of the improvement is,
ordinarily, about 13 feet, with an extreme of 34 feet. Pertinent data
for the lock and dam are given in the following table:
                              Lock and dam at New Savannah Bluff
                                           Augusta, Ga., 13 miles.
Nearest railroad station.------------------.
Distance above Bull St., Savannah, Ga------188 miles.
                                          ......
                                           56 by 360 feet.
Lock dimensions.....-....-----..........--....
Lift of lock-----------------------.       15 feet.
Depth on lower miter sill at low water     10 feet.   -------
                                           13.5 feet.
Depth on upper miter sill at normal pool level_.-
Character of foundations .....------------ -----
                                           Piles in sand, clay, and
                                             gravel.
Kind of damF----------------------------ixed. 1
Type of construction---------------------- Concrete.
Completed ----------------        ----     1937.
Total cost--------------------------$1,473,812.10.
  The estimate of cost for new work, revised in 1952, is $6,758,800,
exclusive of amount expended on previous projects. The latest (1952)
approved estimate for annual cost of maintenance is $375,800, includ-
ing $32,500 for operating and care.
  The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                Documents

Sept. 19, 1800     For a 5-foot channel------------. --------------  H. Doc. 255, 51st Cong., 2d sess.
                                                                      and annual report, 1890; p. 1328.
June    25,1910    Special improvement by bank protection work of 20 H. Doc. 962, 60th Cong., 1stsess.
                    or 25 miles of the river immediately below Au-
                    gusta.
July    8,1930     The present 6-footchannel project and the lock and   H. Doe. 101, 70th Cong., 1st sees.
                    dam.
Aug.   80, 19351   Provision made for locating the lock and dam at New Senate committee print, 73d Cong.,
                     Savannah Bluff.                                     2d sess.
Aug. 26, 1937      Conditions of local cooperation modified-.........-----....
                                                                       Rivers and Harbors Committee
                                                                         Doc. 39, 75th Cong., let sees.
May 17,1950                                                             . Doc. 6, 81st Cong., 1stseass.
                   Provides for a 9-foot channel--------------------..........................

IIIncluded in the Public Works Administration program, Sept. 27, 1933.
   Contains latest published map.

   Local cooperation.-The project provides that local interests fur-
nish, without cost to the United States, all necessary rights of way
and spoil-disposal areas for the new work and subsequent maintenance,
when and as required; hold and save the United States free from
any damage resulting from construction and maintenance of the im-
provement; and provide and maintain adequate terminal and transfer
facilities, including a suitable public terminal at Augusta, Ga., open
to all on equal terms.
   Terminal facilities.-The only water terminals served by this im-
provement are at Augusta and at or near Savannah. The city of
Augusta owns and operates, on equal terms to all, a wharf and ware-
house; a short distance below this terminal the Pure Oil Co. has a
terminal (storage capacity of 27,500 barrels) for berthing and dis-
  a5 steel ve2tical-lift etest control gates, set between concrete piers and resting on
concrete sill.
532     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

charging oil barges; and just outside the eastern city limits is the
Merry Bros. Brick & Tile Co.'s terminal. This company also has
terminal facilities at Savannah. At Savannah there is one municipal
wharf, suitable for berths for river steamers, open to the public on
equal terms. In addition, there are extensive facilities at Savannah,
privately owned, for oceangoing and smaller vessels. Along the river
there are numerous natural landings without wharves or railway
connections. The terminal facilities are considered ample for existing
commerce.
   Operations and results during fiscal year.-Maintenance: The
United States snagboat Macon and hired labor did maintenance snag-
ging during July 1951 from mile 114 downstream to Savannah re-
moving 24 obstructions at a cost of $3,443.39 and during May and
June 1952 removing 859 obstructions between mile 37 and mile 107
at a cost of $19,218.30, a total of 883 obstructions at a cost of $22,661.69.
Surveys and engineerin studies cost $717.31.
   The minimum daily fow of the river at New Savannah Bluff Lock
and Dam during the fiscal year 1952 was 1,710 cubic feet per second
on September 7, 1951. Minimum weekly flow was 3,250 cubic feet
per second. The minimum daily and weekly flows of record prior to
1952 were 1,105 and 1,220 cubic feet per second, respectively.
   Power plants with storage on the river are the Stevens Creek plant,
9 miles above Augusta, and the 6 plants of the Georgia Power Co. on
the headwaters. No regulation of the flow is required at headwater
plants, but the Stevens Creek plant is required to pass the natural
flow of the river when this is at or below 6,550 cubic feet per second
at the:New Savannah Bluff Lock and Dam. The Stevens Creek
plant has so operated during the past year, but the effect of the head-
water plants on the natural flow of the river has not been determined.
In December 1951 flow conditions changed as impoundment of water
began at Clark Hill Reservoir. The minimum reservoir release dur-
ing impoundment, which will continue into the next fiscal year, is
sufficient only for the present needs of navigation and the Stevens
Creek plant, and is about 4,000 cubic feet per second.
   Maintenance (operating and care) :The lock and dam at New Sa-
vannah Bluff was operated, and ordinary repairs, improvements and
reconstruction to the structure and appurtenant works were made at
a cost of $26,322.33.
   The total cost of work from regular funds was $49,701.33, of which
$23,379 was for maintenance and $26,322.33 for operating and care.
The expenditure was $52,667.20.
   Condition at end of fiscal year.-The existing project was about 41
percent completed. The lock and dam at New Savannah Bluff was
completed in 1937. The lock and dam is in good repair. In general,
the open-channel works are in fair condition; a few of the structures
are in need of repairs, however, this work will be accomplished by
the present modification to the existing project. The controlling
depth at ordinary summer low water was 4 feet or greater for about
60 percent of the fiscal year. This depth corresponds to a height of
3.7 feet on the Butler Creek gage and to a discharge of 4,000 second
feet at Augusta. The work remaining to be done to complete the
project is as follows: Deepen the channel to 9 feet and widen to 90
               RIVERS AND HARBORS---SAVANNAH,                                GA.,     DISTRICT                     533

feet between the upper end of Savannah Harbor and the present head
of navigation at Augusta, Ga.
   The cost and expenditures on the project to June 30, 1952, were
as follows :
                                                                Regular            Public Works             Total
                                                                  funds               funds


Costs:
   New work------------              ---------------------    $1, 117,237. 02      $1,634,562.24          $2, 751, 799. 26
               .............-----
   Maintenance-----------              -------          1,735, 099. 66 .....----. ..                       1,735, 099. 66
   Operation and care---...--------------------------414,288.58---- .....------                              414, 288. 58
    Total----------- ------        ----------------            3, 266, 625. 26      1, 634, 562. 24        4,901, 187. 50
Expenditures......-----------------------------------          3, 264, 034. 65      1, 634, 562. 24        4, 898, 596. 89

   Proposed operations.-The balance unexpended June 30, 1952,
$15,691.21, plus an allotment for fiscal year 1953 of $71,000, a total of
$86,691.21, will be applied as follows:
Accounts payable June 30, 1952- .... _-__--_-___-____                                     -               $2, 590. 61

Maintenance:
   Continuation of emergency snagging of channel for barge traffic
      by United States snagboat Macon, 4 months, July through Oc-
     tober 1952--------.......------.....--------------------------- 48,754. 61
   Miscellaneous inspection and reports     _            ----------------
                                                                    -1, 000. 00
         Total----------------------------------------                                                    49, 754. 61

Maintenance (operating and care)-New Savannah Bluff Lock and
      Dam:
   Operations    -----     --------------     ---- --------------- 15, 400. 00
   Ordinary maintenance and repairs ....----------------- _--      14, 520. 00
   Improvements and reconstruction_.-------------------- 4, 425. 99

         Total------         -----------             ----------------------------                         34, 345. 99
         Total for all work-------------                 ---.-------------------                          86, 691. 21
   The additional sum of $279,500 can be profitably expended during
fiscal year 1954, as follows:
Maintenance:
   Snagging with U. S. snagboat Macon, 7 months between June 1953
      and July 1954-------------------------------------------                                              $70, 000
   Construction, by contract, of pile dikes and bank revetment at
      Fritz Cut, mile 198.8, and Bailey Cut, mile 197.5 (mileage above
      mouth of Savannah River) ----------------           -------------                                     100, 000
   Repairs by hired labor to open-channel works (pile dikes and bank
      revetment) between mile 61.8 and 201.0 (mileage above mouth
      of Savannah River)       ------------------------------------                                           30, 000
   Periodic condition surveys--------------------------------..                                                5, 000
   Miscellaneous inspections and reports-..--......_.-_                                                        1, 500
         Total------------            --------------------------------..                           ---.     206, 500
Maintenance (operating and care)--New Savannah Bluff Lock and
Dam:
    Operations---------------------------------------------                                                   15, 500
    Ordinary maintenance and repairs--........ -__ --------------                                             12, 500
   Improvements and reconstruction--------------------------                                                  45,000
         Total....-----------------------------------------                               ----------- 7000
         Total for all work               _...----------...                          -.        .            279, 500
534             REPORT OF CHIEF OF ENGINEERS,                                                        U.      S.     ARMY,            1952

                                                   Cost and financiel summary

                                                                    Fiscal year ending June 30                                                Total to June
                                                                                                                                              30, 1952, includ-
                                                                                                                                              ing fiscal years
                                               1948               1949               1950                1951                1952              prior to 1948

New work:
    Appropriated ..------- ----------- -----------............ ------------------........................         --------...........-          $2, 845,2799.35
M   Cost----------------................-------------......----------------------------------........                                  ...-      2, 845, 279. 35
r   Expenditures ..---------.....................----------------------------------------------........................                          2, 845, 279. 35
Maintenance:
    Appropriated- ......               $110,  100. 00 $106, 090.00 $110,100.00                      $76, 430. 56       $52, 000. 00              2,162, 488. 84
    Cost ..--------------                106, 321.31   106, 387. 16 114, 194.68                      77, 121. 61        49, 701.33               2, 149, 388. 24
    Expenditures- .......                110, 772. 57 104, 270. 74  116, 761. 53                     71, 920. 73        52, 667. 20              2, 146, 797. 63


Other new work data: Estimated additional amount needed to be ap-
propriated for completion of existing project------- -------                                                                                  $4, 007, 000

                                               4. BRUNSWICK HARBOR, GA.

   Location.-The harbor entrance is 70 statute miles south of the en-
trance to Savannah Harbor, Ga., and 25 statute miles north of the en-
trance to Fernandina Harbor, Fla. (See U. S. Coast and Geodetic
Survey Chart No. 447.)
   Previous project.-Adopted by River and Harbor Acts of July 4,
1836; August 5, 1886; June 3, 1896; and June 13, 1902. For further
details see page 1818, annual report for 1915, and page 591, annual re-
port for 1938.
   Existing project.-This provides for a stone jetty 4,350 feet long at
the entrance to East River and for the following channels:
     32 feet deep and 500 feet wide across the bar;
     30 feet deep and 400 feet wide through St. Simon Sound, Bruns-
       wick River, and East River to the foot of Fifth Street;
     30 feet deep and 300 feet wide in Turtle River to the wharf of the
       Atlantic Refining Co.;
     27 feet deep and 350 feet wide in East River from Fifth Street
       to the confluence with Academy Creek.
     24 feet deep and 150 feet wide in Academy Creek; and
     A cut from Academy Creek to Turtle River, if later decided
        advisable.
     A channel in Back River 20 feet deep and 150 feet wide from St.
        Simon Sound to the mouth of Mill Creek.
     A channel in Terry Creek 10 feet deep and 80 feet wide from its
       mouth to a point immediately above the wharf of the Glynn
       Canning Co.
   The project channels extend from the 32-foot contour in the ocean
across the bar, through St. Simon Sound, Brunswick River, and
Turtle River to the upper end of the Atlantic Refining Co.'s wharf,
20.4 miles; from Brunswick River through East River to the upper
end of the project in Academy Creek, 2.7 miles; from St. Simon Sound
through Back River to Mill Creek, the upper end of Back River im-
provement, 2.9 miles; from Back River through Terry Creek to the
upper end of the Glynn Canning Co.'s wharf, 1.8 miles; a total of
27.8 miles.
   All depths refer to mean low water. The mean tidal range on the
bar is 6.5 feet, at the city of Brunswick 7.3 feet,~
                                                  and at the upper end
                   RIVERS     AND HARBORS-SAVANNAH,                          GA.,    DISTRICT               535
of the harbor 7.6 feet, with minor fluctuations due to wind and lunar
effects.
   The estimated cost of new work, revised in 1952, (exclusive of
amounts expended on previous projects), is $3,923,600 including $10,-
000 contributed by local interests. The latest (1952) approved esti-
mate for annual cost of maintenance is $214,800.
   The existing project was authorized by the following river and har-
bor acts:

       Acts                           Work authorized                                    Documents

Mar.     3,1879    Construction of East River jetty-----------------....     Annual report, 1880, p. 959.
Mar.     2, 1907   Channels in the inner and outer harbors of 30-foot        H. Doec. 407, 59th Cong., 1st sess.
                    depth at mean high water6 with widths varying
                    from 150 feet in Academy reek to 400 feet across
                    the outer bar, extension of training wall in East
                    River, and construction of 2 spur dikes.
Mar.     2,1919    Channels 27 feet deep at mean low water over the bar      H. Doc. 393, 64th Cong., 1st sess.
                    and at Brunswick Point; and 24 feet deep at mean
                     low water in the inner harbor, and provides for a cut
                     from Academy Creek to Turtle River, if deemed
                     advisable.
July 3, 1930       A channel in Back River 20 feet deep and 150 feet wide_   S. Doe. 57, 71st Cong., 2d sess., 1
    Do- ...        Increased channel dimensions of the bar; Brunswick        S. Doe. 132, 71st Cong., 2d sess.
                     Point, East River, and Turtle River, as given in
                     the then existing project.                                                                1
June 20,1938       A 10-foot channel in Terry Creek -------------            H. Doe. 690, 75th Cong., 3d sess. 1
May 17, 1950       Increased channel dimensions of the bar, St. Simon        H. Doe. 110, 81st Cong., 1st sess.
                     Sound, Brunswick River, East River, and Turtle
                     River, as given in the existing project.

  1 Contains the latest published map.


   Local cooperation.-The project provides that local interests give
assurance satisfactory to the Secretary of the Army that they will
provide, at their own expense, terminal facilities suited to prospective
commerce; furnish, free of cost to the United States, all lands, ease-
ments, and rights-of-way for the initial construction and future
maintenance of the project, when and as required; and hold and save
the United States free from damages due to construction and future
maintenance of the project.
   Terminal facilities.-Thisimprovement is served by 23 wharves and
piers (19 in East River, 2 in Turtle River, 1 in Terry Creek, and 1 in
Academy Creek), having a total berthing space of 8,287 feet. Practi-
cally all the wharves are privately owned. The majority of the
structures are of pile-and-timber construction. The city of Bruns-
wick has acquired the site of a former shipyard for future develop-
ment as a terminal site. Plans are being prepared for the construction
of a State Port Terminal to be located in Brunswick River 2.7 miles
:below the center of the city. The facilities are considered adequate
for existing commerce. For further details see Port Series No. 14,
Corps of Engineers (revised 1946).
   Operations and results during fiscal year.-Office engineering work
and miscellaneous surveys cost $2,484.67. The expenditure was
$2,461.91.
: Condition at end of fiscal year.-The existing project is about 57
percent completed. Academy Creek was completed in 1926. Upper
and Lower Turtle River and Back River were completed in 1931.
Brunswick Point and East River were completed in 1932. Brunswick
536                  REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                                     1952

Bar was completed in 1936. Terry Creek was completed in 1939.
East River training wall and spur dike are in satisfactory condition.
  The work remaining to be done to complete the project is as follows:
Deepen the existing channels to 32 feet and 500 feet wide across the
entrance bar, 30 feet deep and 400 feet wide through St. Simons Sound,
Brunswick River, and East River to the foot of Fifth Street, and 30
feet deep and 300 feet wide in Turtle River to the wharf of the
Atlantic Refinery Co. and construct 2 turning basins, 1 opposite the
former J. A. Jones Shipyard at the mouth of Turtle River, and the
other opposite the Atlantic Refinery Co.'s wharf in Upper Turtle
River.
  The controlling depths at mean low water were as follows:

                                                                                                       Project depth               Controlling
                                                                                                      mean low water                depth on            Date deter-
                                                                                                           (feet)                 center range           mined
                                                                                                                                       (feet)

Bar   .------ ------------------------------------------                                                                32                        23   March 1952.
Brunswick River:
    Cedar Hammock Range          -----------............................                                                30                        25      Do.
   Brunswick Point Cut range--.---------------- . --...                                                                 30                        26      Do.
East River (to 5th St.) ---------------------------------                                                               30                        18      Do.
East River (5th St. to Academy Creek) ---     _--------..                                                               27                        18      Do
Academy Creek            ---------------------------                                                                    24                         8      Do.
Lower Turtle River- ----------.                --------------------                                                     30                        28      Do.
                       --     -----------------------
Upper Turtle River....................................                                                                  30                        27      Do.
Back River----------------...................---------------------------..........................                      20                         9   April 1952.
Terry Creek---............----.....------------------..........................                                         10                         3   January 1948.


The costs and expenditures on the existing project to June 30, 1952,
were as follows:

                                                                                                          Regular funds           Public        orks       Total


Costs:
       New work---------------------------------..........................................                 $2, 123, 600. 29            $97,520.95       $2, 221,121.24
       Maintenance __..............    --     --........................                                    2, 409,146. 16               4, 995. 08      2, 414,141. 24
    Total......-------------------------      ------.                                                      4, 532, 746. 45             102, 516. 03      4, 635, 262. 48
Expenditures     ....---------------------------------                                               --    4, 532, 723. 69             102, 516.03       4, 635, 239. 72



  In addition, the costs and expenditures from contributed funds
were $10,000 for new work.
  Proposed operations.-The balance unexpended June 30, 1952,
$38.09, plus allotment of $176,900, a total of $176,938.09, will be
applied as follows:
Accounts payable June 30, 1952-------------------------------                                                                                                $22.76
Maintenance:
    Dredging in 32-foot channel on bar and 30-foot channel in the
      inner harbor with U. S. hopper dredge Gerig, 2 months, Sep-
      tember and October 1952-------      ---------------------   174, 400. 00
   Periodic condition surveys-----------------------------          2, 015.133
   Miscellaneous reports and inspections------------------------500.00
                             -------------------                                            ----           -otal              ------                   176, 915.33
               Total for all work-----------------------                                                                       ---------               176, 938.09
      No work is proposed during fiscal year 1954.
               RIVERS AND HARBORS--SAVANNAH,                                                GA.,     DISTRICT                   537
                                      Cost and financial summary

                                                      Fiscal year ending June 30                                     Total to June
                                                                                                                     30, 1952, includ.
                                                                                                                     ing fiscal years
                                   1948             1949              1950              1951             1952         prior to 1948


New work:
                .........
    Appropriated--                         ..........------------------------------------------     ------------         2, 864, 586.42
   Cost..........-------.......------------- ---------------------------- ------------                                  2, 864, 586. 42
   Expenditures--.........------ ----- ------------         -------------        ..-------------------                  2, 864, 586. 42
Maintenance:
   Appropriated--------            $6, 950. 00  $3, 600. 00   $4, 800.00 -$1, 901.67      $2, 500. 00                    2, 468, 570. 64
    Cost-.........-..             6, 193.59       3, 535.04         4, 970.77              41. 14       2, 484. 67       2, 468, 555. 31
    Expenditures.........         6, 504. 13      2, 649.99         4, 011.80          1, 751. 93       2,461. 91        2,468, 532. 55


Other new work data: Estimated additional amount needed to be"
appropriated for competion of existing project----.....------------- $1, 692, 500
  i In addition $10,000 contributed funds were expended for new work.

                                 5. FERNAIVDINA HARBOR, FLA.
   Location.--The harbor entrance is 221/2 statute miles north of the
entrance to Jacksonville Harbor, Fla., and 95 statute miles south of
the entrance to Savannah Harbor, Ga. (See U. S. Coast and Geodetic
Survey Chart No. 453.)
   Existing project.-This provides for two stone jetties at the harbor
entrance, the north jetty 19,150 feet long and the south jetty 11,200
feet long; for a channel 32 feet deep at mean low water from deep
water in the Atlantic Ocean to deep water at the junction of Lance-
ford Creek with Amelia River, 400 feet wide below Calhoun Street
in the city of Fernandina, and generally 300 feet wide above; and
for widening the channel at the first bend below Lanceford Creek to
800 feet to form a turning basin. The length of the section included
in the project is about 7 miles. The mean tidal range on the bar is
5.8 feet and in the inner harbor 6 feet, with minor fluctuations due to
wind and lunar effects.
   The estimated cost of new work, revised in 1952, is $3,554,100.
The latest (1952) approved estimate for annual cost of maintenance
is $71,000.
   The existing project was authorized by the following river and
harbor acts:
     Acts                              Work authorized                                                    Documents

June 14,1880      Entrance jetties----    ------                                            Annual report, 1879, p. 792.
July 13,1892      Raising and extending jetties so as to provide 19-foot                    Annual report, 1891, pp. 1565-1598.
                   depth.                                                                   Annual report, 1896, p. 1289.
Mar. 2,1907       Improvement of inner harbor to obtain depth of 20                         H. Doc. 388, 59th Cong., 1st sess.
                    to 24 feet and channel widths of 400 to 600 feet.
June 25,1910      Combining improvement of Fernandina Harbor and
                   Cumberland Sound under the general heading of
                    "Fernandina Harbor."
Mar. 3,1925       Provided for a 26-foot channel.. .H.                                            Doc. 227, 68th Cong., 1st sess.
June 20,1938      Provided for the 28-foot channel and turning basin-....                   H. Doc. 548, 75th Cong. 3d sess.
Mar. 2,1945       Provided for reducing the maximum width of the                            H. Doc. 284, 77th Cong., 1st sess.
                    turning basin from 1,000 to 800 feet, for shifting the                    (Contains the latest published
                    channel line in this vicinity 50 feet northwesterly,                      maps.)
                    and for including in the authorized project, at no
                    additional cost, the small area dredged by Ray-
                    onier, Inc.
May 17,1950       Provided for 32-foot channel and turning basin-.......                    H. Doc. 662, 80th Cong., 2d sess.


    Local ooperation.-The project provides that local interests fur-
nish, free of cost to the United States, all lands, easements, rights
538          REPORT OF CHIEF OF ENGINEERS,                                  U.      S.   ARMY~.,-         f52

of way, and spoil-disposal areas required for the new work and sub-
sequent maintenance when and as required; hold and save the United
States free from damages due to the construction works; and provide,
when needed, additional terminal facilities open to all on equal terms.
   Terminal facilities.-There are 16 wharves and piers (including
a municipal wharf) having a total berthing space of 4,973 feet along
the 2 miles of water frontage. The present facilities are considered
ample for existing commerce. (For further details, see Port and
Terminal Facilities at the Ports of Fernandina, Fort Pierce Harbor,
Palm Beach, Port Everglades, Miami, Key West, and Tampa, Fla.,
1941 Edition, Corps of Engineers.)
   Operations and results during the fiscal year.--Surveys and office
engineering work cost $1,091.79. The expenditure was $1,057.01.
   Condition at end of fiscal year.-The existing project is about 92
percent completed. The two stone jetties were completed in 1905 and
are in need of repairs. In June 1952 the controlling depths for half
project width were as follows: 27 feet over the outer harbor, except
for a shoal area on the south half of the channel near nun buoy 8,
where the depth was 17 feet, and 26 feet over the inner harbor, except
for a section between Rayonier's wharf and Lanceford Creek where
the depth was 12 feet. The turning basin had a controlling depth
of 24 feet. The work remaining to be done to complete the project
is as follows: Deepen the existing outer and inner harbor channel and
turning basin to 32 feet.
   The cost under the existing project to June 30, 1952, was $3,286,-
818.06 for new work and $897,704.41 for maintenance, a total of
$4,184,522.47. The expenditure was $4,184,487.69.
   Proposed operations.--The balance unexpended June 30, 1952,
$442.99, plus an allotment of $1,300, a total of $1,742.99, will be applied
as follows:
Accounts payable June 30, 1952__-                           -------------------         __________                 $34. 78

Maintenance :
   Periodic condition surveys___---------__    -----------                                                      1, 40& 2
   Miscellaneous inspections and reports ----------------------                                                    300. 00

         Total---------------------------------------------                                                     1, 708. 21

         Total for all work-----------------                               ------------------                   1, 742. 99
   No work is scheduled for fiscal year 1954.
                                        Cost and financial summary
                                                     Fiscal year ending June 30                            Total to June
                                                                                                          30,1952, includ-
                                                                                                          ing fiscal years
                                    1948           1949          1950            1951        1952           prior to 1948


New work:
   Appropriated----------------               ----------------------------------------------                $3, 286, 818.06
   Cost..------------     --- --------------
                                             ---------- ------------ ----------- ------------
                                        -----------------------------------------------
                                                                                                                3, 286,818. 06
                                                                                                                3, 286,818.06
   Expenditures---------------
Maintenance:
   Appropriated------.......--    $75, 200. 00 -$13, 700. 00    $2, 800.00 -$6, 769.99      $1, 500. 00           898, 112. 62
   Cost---------------_      --    53, 597. 14     4, 718. 40    2, 048. 98      39.29       1,091. 79            897, 704. 41
   Expenditures-------.........    53, 168. 34     4, 436. 06    2,116. 91      705.83       1, 057. 01           897, 669. 63


Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project ---- ._------
                                                             -$267,                                                      300
                 RIVERS           AND     ITARBORS-SAVANNAH,                                 GA.,          DISTRICT                 539

         6. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)
  The costs during the year were $8,694.18 for examinations and
surveys, and $42,007.36 for contingencies, a total of $50,701.54. The
expenditures were $51,769.53. The balance unexpended June 30,
1952, $5,012.08, less accounts payable of $22.94, plus an allotment of
$30,200 for fiscal year 1953 for contingencies, a total of $35,189.14,
will be applied during fiscal year 1953 to expenses incurred under
this heading.
  The additional sum of $5,000, for contingencies, can be profitably
expended during fiscal year 1954.
                                         Cost and financial summary

                                                       Fiscal year ending June 30                                         Total to June
                                                                                                                         30.1952, includ-
                                                                                                                         ing fiscal years
                                      1948           1949              1950             1951                    1952       prior to 1948

Maintenance:
   Appropriated---.....     $70, 360.08 -$7, 500.00                $19, 600. 00     $25, 000. 00          $52, 247. 00       $865, 805. 73
   Cost---.--------       -----
                             58, 652. 25  18, 095. 73               18,717. 06       21, 943. 23           50, 701. 54       1859,633.65
   Expenditures...--------. 58, 404. 46   20, 974. 92               19, 053. 85      22, 030. 75           51, 769. 53         860, 793. 65

     1 In addition there was expended $1,800 contributed funds.


                   7. PLANT ALLOTMENT, SAVANNAH, GA., DISTRICT
                                          Cost and financial summary

                                                       Fiscal year ending June 30                                         Total to June
                                                                                                                         30, 1952, includ-
                                                                                                                         ing fiscal years
                                   1948           1949              1950              1951                     1952        priorto 1948


Maintenance:
   Appropriated-....... -$398,459.96          -$50, 000.00 -$100,000.00'$4,467,745.15                  -$4,470,725.37        $852,915.62
       Cost
       Expenditures          306. 22
                  .......-360,                   16, 656. 43 -269, 547. 31 4, 584, 368. 37 -4, 471, 231. 67                    509, 288. 47


                              8. INACTIVE NAVIGATION PROJECTS

                                                      For last full           Cost and expenditures to                     Estimated
                 Name of project                      seereport,
                                                         report,
                                                           annual                    June 30, 1952
                                                                                     June        30,   1952                amount   re-

                                                                                                                            quired to
                                                     report for-           New work                    Maintenance          complete


1. Savannah River at Augusta, Ga.' ......                 1929             5 $200, 556. 30                $17, 443. 70 Completed.
2. Savannah River above Augusta, Ga.' 3__                 1929                   69, 599.   99              5, 870.01      (4)
3. Sapelo Harbor, Ga.' 3__      __----------- 1929                               17, 905.   73             17, 094. 27 Completed.
4. Darien Harbor, Ga.                                     1950
                                           __-------------------              6 199, 722.   65             44,183.20      Do.
5. Altamaha, Oconee and Ocmulgee Rivers,                  1951                   60, 847.   16            938, 135. 15     (7)
     Ga.5
6. Fancy Bluff Creek, Ga.---------------................  1935                   8, 000. 00                    4, 200. 00 Completed.
7. Satilla River, Ga.'   .--------------------1951                               9, 451. 59                   37, 792. 99   Do.
8. St. Marys River, Ga. and Fla., and                     1951                  15, 688. 36                   56,860.33       1, 014, 800
     North River, Ga.

  1 Project recommended for abandonment in H. Doc. No. 467, 69th Cong., 1st sess.
  9 In addition, $185,000 was expended from contributed funds: $172,150.72 for new work and $12,849.28 for
maintenance.
  3 No commerce reported.
  4 About 84 percent completed. Owing to construction of 2 power dams which have submerged much of
the work under the present and former projects, this improvement cannot be completed as originally
planned.
     6Channel adequate for commerce.
     6 Includes $54,929.44 expended on Doboy Bar.
     7 Existing project is such that percentage of completion cannot be stated.
 540           REPORT OF CHIEF OF ENGINEERS, U.                            S. ARMY,         1952

                               9. MISCELLANEOUS                 ACTIVITIES
Status       of all investigations for navigation called for by river and harbor acts
                                  and committee resolutions

                                                                      Date trans-     Document       Rco-
                 Locality                   Authorization act         mitted to          No.        mendation
                                                                       Congress

Buckingham Landing, Beaufort House Public Works Comrn-.....................
   Co., Hilton Head Island, S. C.... mittee resolution, Apr.
                                       25, 1951.
Savannah Harbor, Ga., with a Committee on Public                                      _
                                                                                      ....
                                                                           ................
   view to determining if advisable    Works, House of Repre-
   to modify existing project at this  sentatives, Apr. 25, 1951.
   time.
Savannah River, Ga. (supple- Sec. 6, River and Harbor ..............-..........
   mental 308 report).
Savannah Harbor,1 Ga. (survey).--
                                       Act, Aug. 30, 1935.
                                      Committee on Public _..............
                                       Works, House of Repre-
                                                                                     -....--.....
                                       sentatives, July 21, 1950.
Hilton Head Island, S. C., Buck- House Public Works Com-.....................
  ingham Landing, Beaufort             mittee resolution, Apr.
   County, S. C.                       25, 1951.

   I   Limited to preliminary examination scope.

                     10. SAVANNAH RIVER BASIN,                      GA. AND S. C.

  Location.-The works covered by this project consist of a series
of 11 dams and reservoirs on the Savannah River and its tributaries
in Georgia and South Carolina. (See U. S. Geological Survey Maps
of Georgia and South Carolina.)
  Existing project.-The Flood Control Act approved December
22, 1944, approved the general plan for the comprehensive develop-
ment of the Savannah River basin for flood control and other purposes
recommended in House Document 657, Seventy-eighth Congress, sec-
ond session, and authorized the construction of the Clark Hill Reser-
voir on the Savannah River in Georgia and South Carolina as the
initial step of this development at an estimated cost of $35,300,000.
The Flood Control Act approved May 17, 1950, authorized $50,000,000
to be appropriated for the construction of the Hartwell Reservoir
in the general plan for the comprehensive development of the Savan-
nah River basin.
  Following is a list of the dams and reservoirs included in the com-
prehensive plan. The estimated costs given were revised in 1952.
                                         Dams and Reservoirs

                                                                         Estimated cost

                 Name                     River            truRelocations
                                                         tion       Lands         and rights of       Total
                                                                                      way

Clark Hill, Ga. and S. C---------..........
                                     Savannah-..... 65, 536, 500    $6,111,500       $5, 152, 000   $76, 800, 000
Hartwell, Ga. and S. C---------..... --  do-........ 66,831,  400    8,120, 000      11, 255, 000    86,206,400
Goat Island, Ga. and S. C        ..... do ........   29,696,000        482,000        4,245, 000     34, 423, 000
                                  __--do-----.--
Middleton Shoals, Ga., and S. C_---                  14, 660,000       135, 000          779, 000    15, 574, 000
Chattooga Units (4), Ga. and S. C. Chattooga-        37, 706, 000      310, 000       1,437,  000    39, 453, 000
                                     Broad......... 34,111,000
Tallow Hill, Ga------------...................                       1,081,000        1,693,000      36, 885, 000
Anthony Shoals, Ga..       .   . _.  ..
                                    _do        -  -. 14, 517,000       940, 000       1,620, 000     17, 077, 000
Newry-Old Pickens, S. C-                             23, 875, 000
                                         w-Keowee.--"...             1,990,000"       2,003,000      27,868,000
            FLOOD CONTROL--SAVANNAH,         GA.,   DISTRICT       541
  Local cooperation.-None required.
  Clark Hill and Hartwell Reservoirs are the only projects in the
comprehensive plan that have been authorized for construction. Indi-
vidual reports on those two reservoirs are given in the following pages.
11. HARTWELL RESERVOIR, SAVANNAH RIVER BASIN, GA. AND S. C.

   Location.--The site of the Hartwell Dam is on the Savannah River
305 miles above its mouth and 89 miles upstream from Augusta, Ga.
At full-power-pool elevation, the reservoir will extend 7.1 miles up
the Savannah River to the confluence of the Tugaloo and Seneca, 41
miles up the Tugaloo, 27 miles up the Seneca to the mouth of upstream
Little River, S. C., thence 2 miles up Little River to the Newry site
and 7 miles up the Keowee to the Old Pickens site, and 8 miles up
Deep Creek. (See U. S. Geological Survey maps of Georgia and
South Carolina.)
   Existing project.-The Flood Control Act approved May 17, 1950,
authorized $50,000,000 to be appropriated for constructing the Hart-
well Reservoir in the general plan for the comprehensive development
of the Savannah River basin approved in the Flood Control Act of
December 22, 1944, in addition to the authorization for project con-
struction in the act of December 22, 1944, recommended in House
Document No. 657, Seventy-eighth Congress, second session. This
project, as now planned, provides for a gravity-type concrete dam
1,972 feet long with earth embankments at either end, 9,497 feet long
on the Georgia side and 6,341 feet long on the South Carolina side.
The total length of the dam will be about 17,810 feet, with a roadway
over the top 24 feet wide. The main dam will consist of 2 nonoverflow
goncrete sections on the right and left bank each 470 feet long, a
gravity-type concrete spillway 568 feet long equipped with 12 Tainter
gates 40 by 35 feet, in the channel, and an intake section 436 feet long
with the powerhouse on the South Carolina side of the river. The
maximum height of the concrete section will be 204 feet above river
bottcimi and the earth-fill embankments will vary in:height to a maxi-
mum of about 87 feet. At full-power-pool elevation 660 the reservoir
will provide a total storage of 2,562,600 acre-feet of which 1,559,900
acre-feet will be usable. The initial power installation will be about
180,000 kilowatts, and the ultimate will be about 300,000 kilowatts.
   The estimated cost, revised in 1952, is $66,831,400 for construction,
$8,120,000 for lands, and $11,255,000 for relocations and rights-of-way,
a total of $86,206,400. The estimate for annual cost of maintenance
and operation is $474,000.
   Local cooperation.-None required.
   Operationsand results during fiscal year.-Advance planning report
was continued. Hydrology, hydraulic and power studies were in
progress. Geological investigations were completed for the planning
stage of the investigation. Contract was awarded for complete
mapping of the reservoir area.
   The cost was $234,925.18. The expenditure was $193,317.88.
    Condition at end of fiscal year.-Study and planning are about 45
percent complete. Hydrology and hydraulic studies are about 70 per-
     245554-53-vol. 1   35
542               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

cent complete. Power studies are about 84 percent complete. Geo-
logical investigations for the planning stage are complete. Contract
for reservoir mapping has been let; the area has been flown and flight
pictures have been furnished.
  The cost of new work under the existing project to June 30, 1952,
was $306,870.28. The expenditure was $262,048.31.
  Proposed operations.-The balance unexpended June 30, 1952,
$80,551.69, plus an allotment of $300,000 for fiscal year 1953, a total
of $380,551.69, will be applied as follows:
Accounts payable June 30, 1952    ----------------------------                                                                           $44, 821. 97
Planning: Surveys and preliminary engineering------ ----------                                                                           335, 729. 72

             Total for all work--_ ------------------------------                                                                        380, 551. 69
  The sum of $4,000,000 can be profitably expended during fiscal
year 1954, as follows:
New work:
   Clearing and grubbing of site, earth embankment, paving road-
     way and access road to powerhouse-- ----------------- $2, 214, 000
   Construction bridge        -                                  195, 000
   Project office and laboratory-------                            0, 000
                                                                  7----------------------
   Water supply                                                       000
                                                                  2-------------------------
   Electric power substation---------------------------------    100, 000
   First stage cofferdam-----------------------------------      313, 000
   Relocate U. S. Highway 29--------------------------------     111, 000
   Subsurface explorations quarry site-------------------------   25, 000
   Land acquisition____---      -----     ------------           150, 000
   Engineering and design----------------------------------      800, 000
             Total for all work                             ----------------------------------                                             4, 000, 000

                                                   Cost and financial summary

                                                                    Fiscal year ending June 30                                          Total to June
                                                                                                                                        30, 1952, includ-
                                                                                                                                        ing fiscal years
                                              1948                1949              1950               1951               1952           priorto 1948

New work:
   Apropriated---------.........--............
                                      ------..----------------..........                         ---     $170, 000.00 $172, 600.00
                                                                                                 ---............                             $342,600.00
   Cost-------------------------------------------.............................................              71, 945. 10 234, 925. 18         306, 870. 28
   Expenditures-----------------------------.........      ............ ............         --------............
                                                                                                             68, 730. 43 193, 317. 88         262,048. 31


Other new work data:
   Unobligated balance, June 30, 1952_                                                                                                   $28, 847. 36
   Appropriated for fiscal year ending June 30, 1953---------                                                                            300,000.00
   Unobligated balance available for fiscal year 1953 ......- _                                                                          328, 847. 36
   Estimated additional amount needed to be appropriated for
      completion of existing project----__----        -
                                                  _____---      85,                                                                      563, 800. 00

12. CLARK HILL RESERVOIR, SAVANNAH RIVER BASIN, GA. AND S. C.

  Location.-The work covered by this project is a dam and reservoir
on the Savannah River and its tributaries in Georgia and, South
Carolina. (See U. S. Geological Survey maps of Georgia-and South
Carolina.)
  Existing project.-The Flood Control Act approved December 292,
1944, approved the general plan for the comprehensive development
of the Savannah River Basin for flood control and other purposes as
             FLOOD   CONTRO---SAVANNAH,      GA.,   DISTRICT         543
recommended in House Document No. 657, Seventy-eighth Congress,
second session, and authorized the construction of the Clark Hill
Reservoir on the Savannah River in Georgia and South Carolina.
The estimated cost, revised in 1952, is $76,800,000. The latest (1950)
approved estimate for annual cost of maintenance and operation is
 $392,000.
    The Clark Hill Reservoir is on the Savannah River, 237.7 miles
above its mouth and about 22 miles upstream from Augusta, Ga.
The dam will have a total length of 5,680 feet, consisting of a concrete
section 2,282 feet long with a maximum height of 200 feet, and. a
controlled-spillway section 1,096 feet long. The concrete section
will be flanked on the west by a rolled-earth embankment extending
2,069 feet to the abutment, and on the east by a similar embankment
1,329 feet long. The reservoir will have a total storage capacity of
2,900,000 acre-feet, of which 390,000 acre-feet will be reserved for
flood control and 1,340,000 acre-feet will be used for the storage of
water for generating hydroelectric power. The power installations
will consist of 7 generating units of 40,000 kilowatts each, a total of
280,000 kilowatts.
    Local cooperation.-Nonerequired.
    Operations and results during the fiscal year.-Sixteen piers,
surmounting the spillway of the concrete dam, were completed. All
Tainter gates, together with operating machinery, were installed.
The spillway piers were bridged, and the roadway over the dam,
with approaches, guard rails, curbs, gutters, and sidewalks, was con-
structed. The floating bulkhead for emergency closure of the spill-
way openings was completed. Stone slope protection was completed
on the east embankment, and partially completed on the west down-
stream bank. Sluice gate operating equipment was installed. The
installation of power and lighting circuits in the dam was well
advanced. The elevator was installed in the dam. The construc-
tion trestle was removed from the west bank to block 30, the concrete
mixing and aggregate producing plants disassembled, and the quarry
site fenced.
    Contracts for relocating county roads in Lincoln County, Ga., South
Carolina State highways near Parksville, S. C., electric lines in South
Carolina, were entered into and completed. Two contracts for relo-
cating the C & WC Railroad were negotiated, and work on these, as
well as on a previously negotiated contract with the Georgia State
Highway Department, progressed satisfactorily. An additional con-
tract for relocating South Carolina highways was completed.
    Reservoir clearing was completed, a total of 28,826 acres being
cleared during the year. Impoundment of water was begun in
December 1951, and the lake rose to the spillway crest at elevation
300 feet on March 3, 1952. Temporary flood conditions during March
increased the water elevation to 314 feet on March 27, 1952, and
damage to downstream lowlands was prevented by operation of the
Tainter gates. Upon the return of the normal flow of the river, only
sufficient water was passed to satisfy the needs of navigation, and
the requirements of the downstream hydroelectric plant.
544     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,           1952

   Powerhouse construction was continued. Structural steel was
erected to the roof of the control bay, service bay, and in units Nos.
I and 2 of the generating room. Concrete walls were completed to the
roof at units Nos. 1 and 2, and to varying heights from 10 to 30 feet
below the roof at the remaining units. Scroll cases were completed
and encased in Prepakt Concrete at units Nos. 1 and 2, and were in
process of erection at units Nos. 3 and 4. Draft tube liners were
placed in units Nos. 5 and 6, and the speed ring placed in unit No. 5.
The turbine was installed in unit No. 1, and assembly of the gener-
ator at this unit was started. The powerhouse crane was erected,
end operated at unit No. 1 and in the service bay. The draft tube
gantry crane was assembled and tested. Draft tube gate guides were
completed at units Nos. 1, 2, 3, 4, and 5, and assembly of the draft tube
gates was begun. Work was commenced on the installation of cable
trays in the tunnel to the switchyard.
   All foundation work for the 115-kv switchyard was completed, and
structural steel was erected. Assembly and installation of disconnect
swithches, potential devices, carrier current equipment, and lightning
arresters was begun.
    The total cost of new work during the year was $14,894,523.90, and
expenditures amounted to $14,198,451.47.
    Condition at end of fiscal year.-The project, commenced in Novem-
ber 1945, was 83 percent completed. Of the total of 165,173 acres of
land required for the project, 162,961 had been acquired, and the
right of entry obtained for the remainder. The reservoir pool area,
totaling 65,140 acres, had been completely cleared. All relocations,
including roads, railroads, power lines and cemeteries were under
contract, and with few minor exceptions, had been completed.
    The contract for the dam and appurtenant works was 98 percent
completed, only the removal of th downstream arm of the east cof-
ferdam, and a few minor items of construction remaining to be ac-
complished. Water had been impounded to an elevation of 303 feet.
    The powerhouse was 60 percent completed. Walls and roof slabs
had been completed at units Nos. 1 and 2, and partially erected for
the remaining monoliths. Structural framing and the roof slab for
the service bay had been completed, and floors and walls were in
process of construction. Turbine and generator installations were
progressing, with operation of unit No. 1 anticipated in October 1952.
The station-service turbines and generators, and.other accessory elec-
trical equipment were in process of installation. The cable tunnel to
the switchyard had been completed.
    Switchyard structural framing had been erected, and installations
of electrical equipment was in process.
    Access roads, boat launching ramps, and other features necessary
to the maintenance and operation of the reservoir, were under con-
struction.
    Work remaining to be done consisted of completing legal action
for acquiring land under condemnation, completing existing contracts
for the dam, powerhouse, generating units, switchyard, and accessory
                 FLOOD     CONTROL--SAVANNAH,                      GA.,    DISTRICT              545
electrical and mechanical equipment; hired labor operations for the
provision of reservoir management facilities, and such operational
activities as will be necessary during the construction of the project.
   The total cost to June 30, 1952, was $63,982,962.08, and total expen-
ditures amounted to $61,218,384.81.
  Proposed operations.-The balance unexpended June 30, 1952,
$7,480,429.19, plus accounts receivable, $1,001,697.04, plus an allotment
of $4,079,000 for fiscal year 1953, a total of $12,561,126.23, will be
applied as follows:
Accounts payable June 30, 1952------------------                                      $2, 836, 477. 28

New work :
   Dam and appurtenant works-------------------                 -       495, 000. 00
   Land acquisition__---                                                 78, 000. 00
   Relocations of roads and railroads_                                  171, 000. 00
   Supply contracts for main turbines, station-service turbines
     and generators, main and auxiliary control boards, tele-
     phone code call, machine shop equipment, high tension
     cables, governors, generators, transformers, 15KV switch-
     gear and bus work________-----------------      ----            4,649,000.00
   Powerhouse, construction, including elevator_____.___- -          2, 732, 952. 00
   Switchyard construction ____________---------------                   99, 000. 00
   Supply contracts for disconnect switches, high voltage bus,
     coupling capacitors, lightning arrestors, metering equip-
     ment, carrier current, oil circuit breakers-----                   491, 000. 00
   Contract larviciding; photography, miscellaneous equip-
     ment --------------        -------------------------------          74, 000. 00
   Hired labor features----------------------- ----------- 134, 696. 95
   Preliminary engineering---------------------           ---- -----     87, 000. 00
   Operation and maintenance-----------------------------               588, 000. 00
   Reservoir management construction --------------------               125, 000. 00

       Total -----------------                  ------------------------               9, 724, 648. 95
       Total for all work---------                  ---------------- ------ 12, 561, 126. 23
  The additional sum of $2,725,000 can be profitably expended dur-
ing fiscal year 1954 for the following schedule of work:
New work:
   Construction of powerhouse     ------------------------------ $645, 000
   Governors, generators, transformers, switchgear and bus work,
     and oil circuit breakers--------        ------ ---------------- 1,436, 000
   Construction engineering and design------------------------75, 000
   Hired labor features------ -------------------------------           60, 00
   Reservoir management construction         -----------------------    87, 000
   Recreational facilities-----------------------------------           12, 000

       Total for all new work-               ---------------------------                  2,315, 000

Maintenance:
   Operations --------------       ------------------------------                            295, 000
   Maintenance and repairs ...-----------------------------                                  115, 000
       Total -      ----------------------------------------                                 410, 000

       Total for all work----                  ...---------------------------             2, 725, 000
546         REPORT OF CHIEF OF ENGINEERS,                                U.    S. ARMY,          1952

                                     Cost and financial summary

                                              Fiscal year ending June 30                              Total to June
                                                                                                      30,1952, includ
                                                                                                      ing fiscal years.
                           1948         1949            1950            1951            1952           prior to 1948


New work:
   Appropriated __$5,000,000.00 $9,198,814.00 $13, 000, 000. 00 $19, 800, 000. 00 $17, 200, 000. 00    $69, 698, 814. 00
   Cost               3, 602, 035. 6910,704,801.00 14,43, 061. 51 17, 860, 994. 38 14, 894, 523. 90
              ..---------                                                                               63, 982, 262. 08
   Expenditures__ 3, 621, 352. 71 9,376,888.98 14, 330, 581. 19 17, 375, 354. 47 14, 198, 451. 47       61, 218, 384.81


Other new work data:
    Unobligated balance, June 30, 1952____--------------                                           $130, 191. 09
    Appropriated for fiscal year ending June 30, 1953--------                                     4, 079, 000. 00

        Unobligated balance available for fiscal year 1953_ .. __--                              4,209, 191. 09
      Estimated additional amount needed to be appropriated for
        completion of existing project_--__-- ----------                                          3, 022, 200. 00

                                             13. MACON, GA.

   Location.-This project is on the west bank of the Ocmulgee River
and extends from the Fifth Street Bridge at Macon, Ga., downstream
13,000 feet, thence westward from the river to the Southern Railway
embankment, a total of 5.5 miles. The city of Macon, Ga., is 205 river
miles above the junction of the Ocmulgee and Oconee Rivers, which
form the Altamaha River 137 miles from the Atlantic Ocean. (See
U. S. Geological Survey map of Georgia.)
   Existing project.-The existing project was authorized by the
Flood Control Act approved July 24, 1946. (See H. Doc. 560, 79th
Cong., 2d sess.) This provides for increasing the height and cross
section of the existing levee, which is 2.4 miles long, and constructing
an extension to that levee for 3.1 miles, with appurtenant structures.
The project was completed October 13, 1950, and turned over to local
interests January 5, 1951, for operation and maintenance. The total
cost for the completed work was $363,580.49.
  Local cooperation.-Fullycomplied with.
   Operations and results during fiscal year.-The operating manual
was completed, and turned over to local interests for use in operation
and maintenance of the project. The cost and expenditures were $4.01
"fornew work.
   Condition at end of fiscal year.-The project was completed and
under operation and maintenance by local interests.
  The total cost and expenditures to June 30, 1952, have been $363,-
580.49.
  Proposed operations.-None.
                       FLOOD         CONTROL--SAVANNAH,                           GA.,      DISTRICT                       547
                                          Cost and financial summary

                                                       Fiscal year ending June 30                                Total to June
                                                                                                                30,1952, includ-
                                                                                                                ing fiscal years
                                      1948            1949            1950           1951           1952         priorto 1948

New work:
   Aporopriated __ _ __            $25, 000. 00 $200, 000.00 $184, 000. 00 ..---------- -$45, 419. 51                $3-3, 580. 49
   Cost--.----                      20, 381. 3-   31,330. 61 209,616. 58 $102, 247. 96          4.01                  3-3, 580. 49
   Expenditures- ......--           19, 187.3     30, 043. 10 171, 208. 77 143, 137.22          4.01                  363, 580. 49



14. PRELIMINARY                    EXAMINATIONS, SURVEYS,                                AND CONTINGENCIES
                                       FOR FLOOD CONTROL

   The cost during the year was $341.93. The expenditures were $345.-
98. The balance unexpended June 30, 1952, $406.55, less accounts
payable of $1.24, plus an allotment of $1,500 for fiscal year 1953, a total
of $1,905.31, will be applied during the year to payment of expenses
incurred under this heading.
   The additional sum of $15,900 can be profitably expended during
fiscal year 1954.
                                         Cost and financial summary

                                                       Fiscal year ending June 30                                 Total to June
                                                                                                               S30,1952, includ-
                                                                                                                 ing fiscal years
                                      1948           1949             1950          1951            1952          prior to 1948

Maintenance:
   Appropriated_-........ $120, 000. 00 $125, 500. 00            $29, 500. 00    $24, 000. 00 -$15,000.00            $808, 500. 00
   Cost   ------------------73, 595. 40 157, 623. 37              36, 156. 32     16, 511. 72       341. 93           808, 094. 69
   Expenditures      ---------
                            67, 202. 42 167, 789. 06              32, 060. 14     17, 228. 33       345. 98           808, 093.45



                          15. INACTIVE FLOOD-CONTROL PROJECTS


                                                        For last             Cost and expenditures to             Estimated
                                                       full report,                June 30, 1952                  amount re-
                Name of project                        see annual                                                  quired to
                                                      report for-        New work           Maintenance            complete


1. Augusta, Savannah River, Ga ......----. 1941-------.......         $643,016.49 ----------------              Completed.
2. Emergency flood-control work under        1949----....-------------------                      $6, 530.87       Do.
     authority of the Flood Control Act
     approved August 18, 1941, as amended.
3. Snagging and clearing under authority 1950 ......                        8,772. 42 ----------------               Do.
     of sec. 2 of Flood Control Act approved
     August 28, 1937.
548         REPORT OF CHIEF OF ENGINEERS, U.                                          S. ARMY,   1952

                             16. MISCELLANEOUS ACTIVITIES

Status of all investigations for flood control called for by flood-control acts and
                              committee resolutions

                                                                             Date trans-    Document  Recoim-
              Locality                        Authorization act               mitted to       No.    mendation
                                                                              Congress

All streams in the State of Georgia     Flood Control Act, May 17,         ........
  flowing into the Atlantic Ocean         1950.
  between the Ogeeche River and
  Altamaha River.
Altamaha River, Ga .............        Flood Control Act, June 22,
                                          1936.
Altamaha River and the Ogeechee         Flood Control Act, May 17,
  River, all streams in the State of      1950.
  Georgia, flowing into the At-
  lantic Ocean.
Atlantic Ocean, all streams in the         do ....
                                        .....
  State of Georgia, the Ogeechee
  River and Altamaha River.
Ogeechee River and Altamaha             ....----do.-------...-- ----------------
   River, all streams in the State of
  Georgia, flowing into the Atlantic
   Ocean.
St. Marys River, Ga. and Fla.;             do ...
                                        .....                  -- - - --. -. . . . . .        ..---------
  Suwannee River, Ga. and Fla.;
  Satilla River, Ga.; for flood con-
  trol; navigation, and other bene-
  ficial uses.
Satilla River, Ga.; St. Marys           ..... do-.....------------   .
   River, Ga. and Fla.; Suwannee
   River, Ga. and Fla.; for flood
  control, navigation, and other
  beneficial uses.
Savannah River, Ga. (supplemen-          River and Harbor Act,............
  tal 308 report).                         Aug. 30, 1935.
Suwannee River, Ga. and Fla.;            Flood Control Act, May 17, -------------
   St. Marys River, Ga. and Fla.;          1950.
  Satilla River, Ga.; for flood con-
  trol, navigation, and other bene-
  ficial uses.
    IMPROVEMENT OF RIVERS AND HARBORS IN THE
           JACKSONVILLE, FLA., DISTRICT
  This district comprises a portion of central-southern Georgia and
all of peninsular Florida except a small northeastern portion, em-
bracing the watersheds tributary to the Atlantic Ocean and the Gulf of
Mexico from, but not including, the harbor at Fernandina, Fla., to
and including the Aucilla River. It also includes Puerto Rico, the
Virgin Islands of the United States, and other nearby islands.
  District engineer: Col. Richard W. Pearson, Corps of Engineers,
to February 15, 1952, and Col. Herman W. Schull, Jr., Corps of En-
gineers, since that date.
  Division engineer of the South Atlantic Division, Atlanta, Ga.,
comprising the Wilmington, N. C., Charleston, S. C., Savannah, Ga.,
Jacksonville, Fla., and Mobile, Ala., districts: Col. C. K. Harding,
Corps of Engineers.
                                    IMPROVEMENTS

                Navigation                            Navigation-Continued
                                       Page                                          Page
1. Atlantic Intracoastal Water-              20. Snagging and clearing under
      way between Norfolk, Va.,                     authority of section 3 of
      and the St. Johns River,                      the River and Harbor Act
       Fla. (Jacksonville     Dis-                  approved March 2, 1945_          620
      trict) _--------                  550   21. Examinations, surveys, and
2. Jacksonville Harbor, Fla __         552         contingencies (general) ___      620
3. St. Johns River, Fla., Jack-              22. Plant allotment (navigation)       621
      sonville to Lake Harney _         557   23. Inactive navigation projects-      621
4. Oklawaha River, Fla ......          561   24. Miscellaneous activities ...       622
5. Intracoastal        Waterway,
      Jacksonville     to Miami,                             Flood control
      Fla _ _ _                        564
6. Canaveral Harbor, Fla ....         571    25. Central and Southern Flori-
7. Fort Pierce Harbor, Fla ---        576          da_-_                        _   632
8. Palm Beach Harbor, Fla- .          578    26. Snagging and clearing under
9. Port Everglades Harbor, Fla-       582          authority of section 2 of
10. Miami Harbor, Fla _                586          the Flood Control Act ap-
11. Okeechobee Waterway, Fla_          590          proved August 28, 1937,
12. Intracoastal Waterway, Ca-                      as amended_                      642
      loosahatchee River to Anc-              27. Preliminary     examinations,
      lote River, Fla _-.-          .- 597          surveys, and contingencies
13. Charlotte Harbor, Fla .....        600          for flood control ........       643
14. Tampa Harbor, Fla ..        .....  602    28. Plant allotment (flood con-
15. Withlacoochee River, Fla. .-. 609               trol) -----------------          643
16. Arecibo Harbor, P. R     -----
17. San Juan Harbor, P. R_ __.
                                       612
                                       614
                                              29. Inactive flood-control proj-
                                                    ects _ . .                 .     644
18. Mayaguez Harbor, P. R .. -         616    30. Miscellaneous activities....       644
19. Removing the water hyacinth
      from navigable waters in
      the State of Florida ....        618
                                                                              549
550           REPORT       OF CHIEF OF ENGINEERS,                          U.   S. ARMY,        1952

1. ATLANTIC INTRACOASTAL WATERWAY BETWEEN NORFOLK, VA.,
     AND THE ST. JOHNS RIVER, FLA. (JACKSONVILLE DISTRICT)

  Location.-This section includes that part of the Intracoastal
Waterway between the southerly limit of Fernandina Harbor, Fla.,
at the junction of Lanceford Creek and Amelia River, and the St.
Johns River, Fla. (See U. S. Coast and Geodetic Survey Chart No.
577.) (For Beaufort, S. C., to Cumberland Sound section, see p. 523.)
  Previous projects.-The first project for the improvement of that
part of the waterway was authorized by the River and Harbor Act of
May 23, 1828, and modified by River and Harbor Act of June 23, 1874.
For further details see annual report for 1915, page 1823, and annual
report for 1938, page 605.
  Existing project.-This provides for dredging and maintaining a
channel 12 feet deep, with widths of 90 feet in land cuts and narrow
streams and 150 feet in open waters, following in general the aline-
ment of the existing waterway from Fernandina Harbor to St. Johns
River, about 21.9 miles, with a cutoff in Kingsley Creek just north of
the Seaboard Air Line Railroad bridge, and with such additional
cutoffs or other changes in the adopted route as may be found desirable
and justified by the resultant benefits to navigation. The mean range
of tide is 6 feet at Fernandina and 3.8 feet in the St. Johns River,
with fluctuations from 1.5 to 3 feet, due to winds and lunar phases.
   The actual cost of new work was $263,659.41, exclusive of amounts
expended under previous projects. The latest (1952) approved esti-
mate for annual cost of maintenance is $13,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                           Work authorized                                      Documents

Mar.     4,1913   For a channel 100 feet wide and 7 feet deep......---------    H. Doc. 898, 62d Cong., 2d sess.
June 20,1938      For a channel 12 feet deep with present authorized            H. Doe. 618, 75th Cong., 3d sess.
                    widths and including a cut-off in Kingsley Creek,            (Contains the latest published
                    subject to the provision of additional cutoffs or             maps.)
                    changes in routing upon the approval of the Secre-
                    tary of War.


   Local cooperation.-Fullycomplied with as to original construction.
The River and Harbor Act approved June 20, 1938, included the
requirement that local interests furnish spoil-disposal areas for
subsequent maintenance as may be required. The Florida Inland
Navigation District, a special taxing district empowered by Florida
State law to comply with features of local cooperation, has furnished
rights-of-way and spoil-disposal easements for maintenance dredging
to provide for the rectification of the channel alinement and has fur-
nished temporary spoil-disposal areas as and when needed. By letter
dated June 12, as modified by letter dated December 6, 1944, the district
engineer requested the Florida Inland Navigation District to furnish
spoil-disposal areas in perpetuity adequate for a 25-year maintenance
program. The Navigation District has furnished a considerable num-
       RIVERS AND HARBORS-JACKSONVILLE,                FLA.,     DISTRICT      551

ber of the required spoil-disposal areas, and others are being furnished
at a satisfactory rate.
  Terminal facilities.-There are no terminal facilities along this
section of the Intracoastal Waterway.
   Operations and results during fiscal year.-Maintenance: Prelimi-
nary plans and specifications for contract dredging not yet begun cost
$1,619.06. Periodic condition surveys and inspections cost $3,064.50.
The cost was $4,683.56 for maintenance. The expenditures were
$4,625.76.
  Condition at end of fiscal year.-A 7-foot channel was dredged be-
tween October 1913 and February 1915, and was deepened to 12 feet
with present authorized widths between November 1940 and September
1941, thereby completing the existing project. The length of the
waterway was reduced 2.4 miles between May and October 1943 by
making five cutoffs and widening bends at three localities. To safe-
guard navigation through bridge openings and to permit breaking
tows when tidal conditions are adverse, 14 protective and 10 tieup
dolphins have been constructed at the Sisters Creek bridge at the
southerly entrance to the waterway, and 8 protective and 10 tieup
dolphins have been constructed at the Kingsley Creek bridges, about
4 miles south of Fernandina. At the Kingsley Creek bridges, three
of the four center protective dolphins-one on the north side and two
on the south side-have been destroyed. In July 1951, the controlling
depth was 6.4 feet in midchannel for half project width and 7.3 feet
and 2.6 feet in the easterly and westerly outside quarters, respectively.
   The costs of the existing project have been $263,659.41 for new work
and $777,786.69 for maintenance, a total of $1,041,446.10. The
expenditures have been $1,041,135.32.
  Proposed operations.-The balance unexpended June 30, 1952,
$49,624.24, plus an allotment of $2,800 during fiscal year 1953, a total
of $52,424.24, will be applied as follows:
Accounts payable June 30, 1952     -------------------------------          $310. 78
Maintenance:
   Complete, under existing contract, dredging to restore project
      dimensions at nine shoal areas, July-September 1952---------49, 262. 00
   Install, by contract, direction and marker signs, February 1953___ 1, 500. 00
   Miscellaneous inspections and reports (contingencies)  ----------- 1,351. 46

                                                                        52, 113.46

        Total for all work-----------------           ---- 52, 424. 24
                                                    -----         --
   The additional sum of $3,100 can be profitably expended for the
following scheduled work during fiscal year 1954:
Maintenance:
   Remove 10 tie-up dolphins near Kingsley Creek bridges, August
      1953-----    -----------------------------------------                 $1, 500
   Miscellaneous inspections and reports (contingencies) -----------         1,  600
      Total for all work_...------- --      -...-.
                                                -------     ---------         3,100
552          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                                            Cost and financial summary

                                                           Fiscal year ending June 30                                      Total to June
                                                                                                                          30, 1952, includ-
                                                                                                                           ing fiscal years
                                        1948              1949             1950             1951              1952          priorto 1948


New work:
   Appropriated--.........---------..........----- ........---------...------------......-------..---                 --
                                                                                                         --------.........--.........
                                                                                                                                  $361, 224. 96
   Cost...-------------------------- ----------------                       -----------------------------                           361,224.96
   Expenditures......------...------- ----------------------.......-------.......-------..............--------.....                 361, 224. 96
Maintenance:
   Appropriated-....... _             $2, 500.00       $3, 000. 00 ....------------      $1, 670. 71      $50, 750.00             827, 100. 15
   Cost_.------- --------              3, 348.'38       1, 378.37         $242. 24           438. 87        4, 683. 56            777, 786. 69
   Expenditures...------....     --    3, 157.27        1, 633. 26         218. 96           185. 89        4, 625. 76            777, 475. 91



                                      2. JACKSONVILLE HARBOR, FLA.

   Location.-The St. Johns River rises in the marshes of Brevard
County, Fla., near the east coast, and flows northwesterly to Jack-
sonville, thence easterly into the Atlantic Ocean, 122 miles south
of Savannah River. Its total length is about 285 miles. (See U. S.
Coast and Geodetic Survey Chart No. 577.)
   Previous projects.-Six appropriations for surveys and experi-
mental dredging on the bar were made from 1852 to 1878. Projects
for permanent improvement were adopted by the River and Harbor
Acts of June 14, 1880 and June 3, 1896. For further details see page
1823, annual report for 1915, and page 607, annual report for 1938.
   Existing project.-This provides for: (a) A channel 34 feet deep
from the ocean to Commodore Point via a cutoff channel from St.
Johns Bluff (Fulton) to Dame Point and via Terminal Channel along
the west bank of the river just below Commodore Point, and thence
30 feet to the Florida East Coast Railway bridge at Jacksonville, with
widths of 800 feet at the entrance and between the jetties, from 900 to
1,200 feet in Pilot Town Cut, from 1,050 to 1,335 feet in Mayport Cut,
generally 500 feet in the St. Johns Bluff-Dame Point Cutoff, 1,200 feet
at Dame Point, 590 feet in Terminal Channel (with the westerly
edge 60 feet from the new pierhead-bulkhead line), from 400 to 900
feet in other cuts, increasing to as much as 1,115 feet at bends, and
300 feet in Arlington Cut, which is 30 feet deep and generally parallel
to Terminal Channel; (b) a depth of 24 feet between that depth
contour and the pierhead line at Jacksonville from Hogan Creek to
the foot of Laura Street; (c) a depth of 28 feet to within 60 feet of the
pierhead line in the area between the foot of Laura Street and the St.
Elmo W. Acosta Bridge (formerly Duval County highway bridge);
 (d) a navigation and floodway channel 26 feet deep and 200 feet wide
along the south side of the Commodore Point terminals, terminating
in deep water at each end; (e) an approach and mooring basin 20 feet
deep, 1,300 feet long at the 20-foot depth contour and 600 feet long at
the pierhead line, in front of the Naval Reserve Armory in South
Jacksonville; and (f) construction of training walls and revetments.
   All depths are referred to local mean low water. No dredging is
to be done within 60 feet of a pierhead line, except at the Naval Reserve
Armory. Natural depths of 34 feet or more, for adequate width, exist
in midchannel from Commodore Point to the Florida East Coast
Railway bridge at Jacksonville.
   Two converging rubblestone jetties, built at the entrance under a
           RIVERS AND HARBORS-JACKSONVILLE,                                  FLA.,     DISTRICT           553
previous project, are maintained under the existing project. The
north jetty is 14,300 feet long and the south jetty is 11,183 feet long.
The jetties are parallel and 1,600 feet apart for 4,022 feet from the
sea ends. Stone training walls have been built at seven localities,
involving about 7 miles of this class of structure. Stone revetments
at five localities provide about 3.5 miles of shore protection. The
training walls and revetments are located between Dame Point and
Wards Bank, near the inner ends of the jetties.
   The length of section included in the project is 26.1 miles via the
cutoff channel. The mean tidal range is 5.3 feet on the bar, 4.5 feet at
Mayport, 2.6 feet at Dame Point (12 miles above the entrance), and
1.1 feet at Jacksonville (St. Elmo W. Acosta Bridge). The extreme
range varies from about 9 feet on the bar to about 1.5 feet at Jackson-
ville. Strong northeasterly winds raise the water level about 2 feet at
Mayport and Jacksonville. Strong southwesterly winds lower the
water about 1.5 feet at Mayport and 1 foot at Jacksonville.
   The estimate of cost for new work, approved in 1952, is $11,844,000
exclusive of amounts expended on previous projects. The latest (1952)
approved estimate for anual cost of maintenance is $300,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                           Work authorized                                     Documents

                    ST. JOHNS RIVER, FLA., OPPOSITE THE CITY OF
                                   JACKSONVILLE

Mar.   2,1907   A depth of 24 feet at mean low water between the 24-       H. Doec. 663, 59th Cong., 1st sess.
                 foot curve and the pierhead line at Jacksonville
                 from Hogan Creek to the Florida East Coast Ry.
                 bridge.
                                ST. JOHNS RIVER, FLA.

June 14,1880    Jetties at the entrane (maintenance only; new work         Annual report for 1879, pp. 767-
                  completed under a previous project).                       792.
June 3,1896     Extension of jetties, etc. (maintenance of jetties only;   H. Ex. Doe. 346, 53d Cong., 3d
                  new work completed under a previous project).              sess., and annual report for
                                                                            1895, pp. 1586-1604.
June 25,1910    Main channel, 30 feet deep at mean low water, and in       H. Doc. 611, 61st Cong., 2d
                                                                                                     4 s.
                 general 300 feet wide (via Arlington Cut), increas-
                 ing to as much as 600 feet at bends and through the
                 jetties; for an anchorage basin at Mayport, 800 feet
                 in width beyond the channel limits; and for train-
                 ing walls and revetments, all subject to modifica-
                 tion in detail by the Chief of Engineers.
                ST. JOHNS RIVER, FLA., JACKSONVILLE TO THE OCEAN

June   5,1920Consolidation of the above two projects to form a             Specified in act.
               single project.
July 3,1930  Widening the bend at Dame Point (to 900 feet). ------         H. Doc. 483, 70th Cong., 2d sess.
Aug. 30,1935 Widening Drummond Creek, Trout Creek, and Six                 Senate committee print,74th Cong.
              Mile Creek Cuts to 400 feet; and Terminal Channel              1st sess.
               30 feet deep and 400 feet wide along the terminals at
               Jacksonville.
Mar. 2,1945 Maintenance of channel widths as they now exist;               H. Doc. 322, 77th Cong., 1st sess.'
               widening Terminal Channel (30 feet deep) to a
               width of 590 feet; dredging the 28-foot-depth area
               between the foot of Laura St. and the St. Elmo W.
               Acosta Bridge; the navigation and floodway chan-
              nel along the south side of the Commodore Point
               terminals; and the approach and mooring basin in
              front of the Naval Reserve Armory.
             The 34-foot channel depth via the existing channels
   Do----.......                                                           S. Doc. 230, 78th Cong., 2d sess.l
              and Terminal Channel.
   Do.------ A cutoff channel between Dame Point and St. Johns             S. Doe. 179, 79th Cong., 2d sess.'
               Bluff, .34 feet deep, in lieu of deepening the existing
              channel.

  I Contains latest published maps.
554      REPORT OF CHIEF OF ENGINEERS,        U.   S. ARMY,   1952

    Local cooperation.-All work authorized by the River and Harbor
Act of March 2, 1945, is subject to the conditions that local interests
furnish, free of cost to the United States, all lands, easements, and
rights-of-way and spoil-disposal areas for the initial work and for
subsequent maintenance when and as required, and hold and save
the United States free from claims for damages resulting from the
improvement. It is provided that these requirements as to the 28-
foot-depth dredging between the foot of Laura Street and the St.
Elmo W. Acosta Bridge and the dredging in front of the Naval
IReserve Armory may be waived or modified if in the discretion of
.the Chief of Engineers such action is necessary in the interest of
national defense (H. Doc. 322, 77th Cong., 1st sess.). The deepen-
ing of the improvement to 34 feet is subject to the additional require-
ment (S. Doc. 230, 78th Cong., 2d sess.) that local interests give
assurances satisfactory to the Secretary of War that they will modify
terminal facilities as necessary to permit full utilization of the deeper
channel. A resolution adopted January 4, 1946, by the Jacksonville
Chamber of Commerce, agreeing to comply with the above-mentioned
features of local cooperation, was accepted by the Secretary of War
on February 11, 1946, as satisfactory assurance of compliance. All
spoil-disposal areas and rights-of-way required in connection with the
new-work dredging between Commodore Point and the ocean and for
the cutoff channel have been furnished.
    Terminal facilities.-There are 81 piers and wharves serving the
water-borne commerce of the port. The depths of water vary from
31 feet at the larger terminals to a few feet at the inner end of the
slips and at barge berths. The Jacksonville municipal terminals at
Talleyrand Avenue consist of three piers. There are 35 other piers
and wharves used for handling the water-borne commerce of the port
or mooring vessels, 11 of which are open to the public. All have
railway and highway connections except nine of the smaller piers,
which have highway connections only. Of the remaining piers, 26
are used in connection with shipyards and marine repair plants, 2
for recreational craft, 8 for industrial purposes, and 7 are not used.
In addition, privately operated piers and wharves are available at
Mayport, Fla., to serve the fishing industry, and facilities for serv-
icing recreational craft are available at Fulton. The facilities are
considered adequate for existing commerce. (See Port Series No.
15, revised 1947, Corps of Engineers.)
    Operations and results during fiscal year.-New work: Dredging,
under continuing contract, to provide the 34- by 500-foot Dame Point-
Fulton cutoff channel, which was begun July 10, 1950, and 89 percent
completed at the beginning of the fiscal year, was completed August 3,
1951; the dike on the south side of the cutoff was completed October
24, 1951. Contract dredge Philadelphiaremoved 273,709 cubic yards
of material at a cost of $211,684.64. Dredging, under continuing
contract, to deepen the existing channel between Fulton and Mayport
to 34 feet, which was 32 percent completed at the beginning of the
fiscal  year, was completed December 24, 1951. Contract dredge Bar-
low removed 1,171,778 cubic yards of material at a cost of $568,752.43.
Clean-up operations, consisting of dynamiting hard rock left by
the Barlow, were completed January 9, 1952. Dredging, to deepen the
      RIVERS AND HARBORS--JACKSONVILLE,         FLA.,   DISTRICT   555
existing channel between Mayport and the Ribault Bay entrance
channel, which was in progress and 67 percent completed at the
beginning of the fiscal year, was accomplished with the United States
hopper dredges Comber, between July 1 and 18, 1951, and Gerig, be-
tween October 1 and November 4, 1951. Removal of 1,036,679 cubic
yards of material, bin measurement, cost $160,522.46. Hired-labor en-
gineering studies to verify Dame Point-Fulton cutoff model study cost
$852.94. Preliminary engineering by hired labor cost $4,576.93.
    Maintenance: Dredge Barlow removed 44,608 cubic yards of ma-
terial between Fulton and Mayport at a cost of $22,175.98, concur-
rent with new-work dredging. The United States hopper dredge
Gerig removed 70,775 cubic yards of material, bin measurement, at a
cost of $13,581.39, concurrent with new work dredging, between May-
port and the Ribault Bay entrance channel. Leased dredge Philadel-
phia removed 495,723 cubic yards of material from shoals in Drum-
mond Creek and Dunn Creek, and Brills and Dame Point Cuts between
March 3 and April 7, 1952, at a cost of $119,273.24. United States hop-
per dredge Hyde removed 176,069 cubic yards of material, bin measure-
ment, from shoals in Terminal Channel and Long. Branch Cut, be-
tween December 21, 1951, and January 16, 1952, and between March
29 and April 24, 1952, at a cost of $92,384.15. Hired-labor periodic
condition surveys and inspections and surveys to relocate and re-
establish Jacksonville harbor-line reference monuments, cost
 $2,101.76.
    The total costs for the year were $946,389.40 for new work and
 $249,516.52 for maintenance, a total of $1,195,905.92. The expendi-
tures were $1,597,462.94.
    Condition at end of fiscal year.-The existing project was about 97
percent completed. Dredging was begun about November 1910. A
channel at least 30 feet deep and of practicable width from the en-
trance to Jacksonville was completed in March 1922. Widening the
30-foot channel to authorized widths was completed in July 1937,
except Terminal Channel, which was only 400 feet wide. Deepening
the existing channels to 34 feet including widening Terminal Channel
to 575 feet was begun in July 1947, and was completed in December
  1951. The Dame Point-Fulton Cutoff was opened to traffic in June
  1951. The easterly end of Bar Cut was dredged to depths of 40 and
42 feet and 700 feet wide between April and September 1951. Those
depths were obtained to accommodate United States Navy aircraft
carriers at no cost to the project. A depth of 24 feet was provided
between the 24-foot contour and the pierhead line at Jacksonville,
  from Hogan Creek to the Florida East Coast Railway bridge, between
  October 1907 and January 1912. The two jetties at the entrance,
constructed between December 1880 and June 1904 under a previous
project, have been maintained under the existing project. About
  3,555 linear feet of the inner end of the north jetty has been capped
with concrete. All training walls and revetments considered neces-
sary on 30-foot project were constructed between July 1892 and May
  1894 by Duval County, and by the United States, under the former
and existing project, intermittently between October 1903 and Septem-
ber 1927. The easterly end of Wards Bank training wall has been
  revetted with granite riprap. Material dredged near the westerly
556        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

end of Bar Cut and deposited along the north side of the north jetty
near the Fort George River encroachment has effectively prevented
further erosion adjacent to that structure. The jetties are in fair
condition except as follows: South jetty: Capstone has been dis-
placed in isolated locations and at the outer 800 feet. North jetty:
The north shore line has receded about 1,000 feet leaving the jetty
exposed. Capstone has been displaced in the outer 300-foot section
and in the 1,200-foot section seaward of the monolithic cap. Revet-
ments and training walls: Wards Bank training wall, having been re-
inforced with heavy capstone at the easterly end by the Navy Depart-
ment, is in good condition. The 800-foot westerly extension, a Wake-
field-pile wall, is in poor condition. Mile Point training wall is in
good condition. The adjacent shore at the east end is eroding.
White Shells training wall is in poor condition, but prevents erosion
of the shore. Fulton training walls are in good condition; however,
due to Dame Point-Fulton Cutoff they are no longer in the proper
location to prevent the erosion now occurring. Dame Point training
wall is in poor condition but is apparently preventing erosion. Bank
erosion, apparently resulting from recent dredging operations, is
visible at several locations, and if it continues, remedial measures
will be required. One area is at the easterly end of Mile Point
training wall, on the south river bank at the mouth of Pablo Creek.
Another is at the downstream entrance to Fulton-Dame Point Cutoff
on the south bank.
   The controlling depths in the middle half of the channels were as
follows: Bar Cut inner end 34.1 feet (Dec. 1951); thence to Pilot
Town range 33.5 feet (Dec. 1951); thence 34 feet to Jacksonville
except for shoaling in the middle section of Trout Creek Cut 33.8 feet
 (June 1951); Terminal Channel with a limiting depth of 33.2 feet
(May 1952) ; and Arlington Cut and city limits range, 26.5 feet (Nov.
1948). The limiting depth in the left and right outside quarters of
the channels from the ocean to Jacksonville was 30.2 feet at left side
of Bar Cut. A controlling depth of 24 feet was available to the pier-
head line between Hogan Creek and the foot of Laura Street in 1934,
and to within 60 feet of the pierhead line, thence to the St. Elmo W.
Acosta Bridge in 1938.
   The work remaining to be done to complete the project is as follows:
Dredge the area between the foot of Laura Street and the St. Elmo
W. Acosta Bridge to a depth of 28 feet; dredge the navigation and
floodway channel along the south side of Commodore Point terminals;
and dredge the approach and mooring basin in front of the United
States Naval Reserve Armory.
   The total costs and expenditures under the existing project to June
30, 1952, have been as follows:

                                                               Costs
                Funds                                                                          Expenditures
                                            New work       Maintenance          Total


Regular--.-....-----------------------     $11,160,230.40  $10, 679,175.86 $21,839,406.26      $21, 839, 562. 39
Public works.....--------------------- ---     290,013.37 ----------------     290, 013.37          290, 013.37
                   -------------- 11, 450, 243. 77
      Total--..-------.........................    10, 679, 175. 86         22, 129, 419. 63    22,129, 575. 76
               RIVERS AND HARBORS--JACKSONVILLE,                                            FLA.,       DISTRICT              557

   Proposed operations.--The balance unexpended and accounts re-
ceivable June 30, 1952, $1,178.62, plus an allotment of $179,950 during
fiscal year 1953, a total of $181,128.62, will be applied as follows:
                                    ___-----------------___
Accounts payable June 30, 1952______--                                                                                   $100. 00

Maintenance:
   Dredging to restore project depth of 34 feet in Bar Cut, Mayport
      Cut, and Pilot Town Cut with United States hopper dredge
      Gerig, about 1    months, November and December 1952....                                                      170, 000. 00
    Condition survey of the project channels, September 1952                                         ------           1, 850. 00
    Miscellaneous inspections and reports (contingencies)                                           --------          9, 178. 62

            Total for all work------------------------------                                             ----       181, 028. 62

  The additional sum of $177,300 can be profitably expended for the
following schedule of work during fiscal year 1954:
Maintenance:
    Dredge to restore project depth of 34 feet in Terminal Channel, Bar
       Cut, Mayport Cut, and Pilot Town Cut, United States hopper
       dredge Gerig, 1 month, April 1954____-       ___- __-----__    --- $87, 000
    Dredge, by contract, to restore project depth between Long Branch
       Cut and Fulton, August-September 1953________
                                                -----------                80, 000
Miscellaneous inspections and reports, (contingencies) ___        -____--___10,300
           Total for all work                         _-----------------------------------177,300

                                                Cost and financial summary

                                                             Fiscal year ending June 30                             Total to June
                                                                                                                    30, 1952, includ-
                                                                                                                    ing fiscal years
                                             1948          1949          1950          1951            1952           prior to1948

New work:
   Appropriated-......... $300, 000.00 $721, 000.00 $735, 000.00 $1,600,000.00 $987, 000.00                          $14, 970,381. 16
   Cost-----...---------. 1, 354, 932. 17 1, 168, 695.32 135,441. 51 2,240, 169. 09 946, 389.40                       14, 970,381. 16
   Expenditures_----.-- 1, 145, 388. 95 1, 178, 998. 40 329, 415. 68 1, 844, 149. 66 1, 347, 796. 28                  14, 970, 303, 09
Maintenance:
   Appropriated-------
               ........-- 45, 600.00                      19, 000. 00   58, 050.39    40, 000.00     249, 500.00      11, 223, 653.00
    Cost.....----....-----------.........   96, 667. 19   17, 888. 97   44, 922. 61   53, 976. 70    249, 516. 52     11, 222, 574. 38
    Expenditures-------........             96, 741. 13   17, 694. 29   43, 646. 98   55, 456. 83    249, 666. 66     11, 222, 808. 8


Other new work data,:
    Unobligated balance, June 30, 1952------------------------- -$32. 50
    Unobligated balance available for fiscal year 1953-__.---------   -32. 50
    Estimated additional amount needed to be appropriated for comple-
      tion of existing project------ -------------------              394, 000

       3. ST. JOHNS RIVER, FLA., JACKSONVILLE TO LAKE HARNEY

  Location.-Forlocation of St. Johns River see page 552. (See U. S.
Coast and Geodetic Survey Charts Nos. 685-688).
  Previous projects.-Adopted by River and Harbor Acts of June
14, 1880, and July 5, 1884. For further details see page 1824, annual
report for 1915, and page 611, annual report for 1938.
  Ewisting project.-This provides for a channel 13 feet deep and
200 feet wide from the Florida East Coast Railway bridge at Jackson-
ville to Palatka (54.5 miles), thence 12 feet deep and 100 feet wide
to Sanford (86.1 miles), with a side channel of like dimensions to
            245554-53-vol. 1--36
558               REPORT OF CHIEF OF ENGINEERS,                                     U.    S. ARMY,         1952

Enterprise and with cutoffs and easing of bends, and thence 5 feet
deep and 100 feet wide to Lake Harney (20.9 miles), with a cutoff
channel 5 feet deep and 75 feet wide between Lake Monroe and the
vicinity of Osteen Bridge; and for a channel 8 feet deep, 100 feet wide
across the bar at the mouth of Deep Creek, and thence 50 feet wide to
Hastings Landing, 5 miles above the mouth. The plane of reference
is local mean low water. The length of the project is 161.5 miles in
the St. Johns River, 5 miles in Deep Creek, 2.7 miles in the approach
channel to Enterprise, and 0.9 mile in the alternative approach channel
to Sanford. Two pile-and-stone jetties at Volusia Bar at the head
of Lake George, built under a previous project, are maintained under
the existing project. The jetties are 3,400 and 2,200 feet long,
respectively.
   The mean tidal range is 1.1 feet at Jacksonville and 1.2 feet at
Palatka. At low-water stages, tidal influence is perceptible at San-
ford, 140.6 miles above Jacksonville, and upstream currents are some-
times noticeable as far as Lake Harney. The extreme tidal range is
about 1.5 feet at Jacksonville and 2 feet at Palatka. Brisk northerly
and northeasterly winds raise the water level about 2 feet at Jackson-
ville and 1 foot between Palatka and Sanford. Brisk southerly and
southwesterly winds lower it about 1 foot between Jacksonville and
Sanford. Flood stages in the river usually occur during the fall;
and the usual maximum is about 2 feet at Palatka, 3 feet at Lake
George, 8 feet at Sanford, and 9 feet at Lake Harney.
   The estimate of cost for new work, approved in 1952, is $1,289,700,
exclusive of amounts expended on previous projects. The latest (1952)
approved estimate for annual cost of maintenance is $27,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                                Work authorized                                           Documents

                     ST. JOHNS TIVER, FLA. JACKSONVILLE TO PALATKA

Mar. 3,1899          A channel 13 feet deep and 200 feet wide from Jack-                 H. Doc. 523, 55th Cong., 2d sess.,
                      sonville to Palatka.                                                 and Annual Report, 1898, p. 1343.
Mar.     2,1919      The improvement of Deep Creek-----------------...................   H. Doe. 699, 63d Cong., 2d sess.'
                     ST. JOHNS     RIVER, FLA., PALATKA TO LAKE HARNEY

June 14,1880         Two jetties at Volusia Bar (maintenance only; new                   Annual Report for 1879, pp. 795-
                      work completed under a previous project).                            798.
June 25,1910         A channel 100 feet wide, 8 feet deep from Palatka to                H. Doc. 1111, 60th Cong., 2d sess.
                       Sanford with a side channel to Enterprise, and
                      thence 5 feet deep to Lake Harney.
July     3, 1930     Cutoffs at Butcher Bend, Snake Creek, and Starks,                   H. Doc. 691, 69th Cong., 2d sess.
                       and easing bends at other points.
Mar.     2,1945      A channel 10 feet deep and 100 feet wide from Palatka               H. Doc. 603, 76th Cong., 3d sess.
                       to Sanford, with a side channel to Enterprise, and
                       with cutoffs and easing of bends.
                    ST. JOHNS RIVER, FLA., JACKSONVILLE TO LAKE HARNEY
                                                                                                                              1
    Do-- ......      Combining the two projects above into a single project              H. Doc. 445, 78th Cong., 2d sess.
                      for St. Johns River, Fla., Jacksonville to Lake
                       Harney, and for a cutoff 5 feet deep and 75 feet wide
                       between Lake Monroe and the vicinity of Osteen
                       Bridge.                                                                                                1
July 24,1946         A channel 12 feet deep and 100 feet wide from Palatka               S. Doec. 208, 79th Cong., 2d sess.
                      .to Sanford, and in the branch to Enterprise.

  1Contains        latest published maps. The latest published detailed maps of the section from Jacksonviile
to Palatka are printed in annual report for 1900, p. 1976.
       RIVERS AND    HARBORS-JACKSONVILLE,        FLA.,   DISTRICT   559
   Local cooperation.-All requirements prior to those imposed by
the River and Harbor Act approved March 2, 1945, have been fully
complied with. The requirements imposed by that act and the River
and Harbor Act approved July 24, 1946, have been fully complied
with as regards new work except for furnishing rights-of-way and
spoil-disposal areas for Beresford Cutoff, which is not to be provided
at this time. Those acts imposed the requirement, among others,
that local interests furnish, free of cost to the United States, suitable
spoil-disposal areas for subsequent maintenance. The cutoff chan-
nel between Lake Monroe and the vicinity of Osteen Bridge (H. Doc.
445, 78th Cong., 2d sess.) is subject to the additional requirement that
local interests agree to hold and save the United States free from any
damages resulting from this work. Deepening to 12 feet between
Palatka and Sanford and in the branch to Enterprise (S. Doc. 208,
79th Cong., 2d sess.) is subject to the additional requirement that
responsible local interests will give assurances satisfactory to the
Secretary of War that they will provide and maintain, without cost
to the United States, adequate terminal facilities, when and as re-
quired, which shall be open to all on equal terms.
   A resolution adopted July 5, 1945, by the Board of County Com-
missioners for Seminole County, agreeing to comply with the con-
ditions imposed by House Document No. 445, Seventy-eighth Congress,
second session, was accepted by the Secretary of War on October 3,
1945, as satisfactory assurance of compliance. Local interests at
Sanford have indicated that they will construct additional terminal
facilities when and as required by the traffic on the waterway. The
present facilities are considered adequate for the existing commerce.
   Termninal facilities.-There are ample wharves and terminals at
Jacksonville and about 24 piers and wharves at various points on the
river above Jacksonville. These include the following: Municipal
piers or wharves at Mandarin, Green Cove Springs, Federal Point,
and Palatka; a municipal recreational pier at Sanford; and six pri-
vately owned piers at Palatka, five at Sanford, and eight at other
points along the river between Palatka and Sanford. Five of the pri-
vate piers have nearby tank storage for petroleum products as follows:
One at Palatka, one at Lake Monroe, one at Enterprise, and two at
Sanford. All piers have highway connections and one at Palatka
has railway connections. In addition, there are a number of small,
privately owned piers and wharves for recreational craft at various
points along the river. The facilities are considered adequate for
existing commerce.
    Operations and results during fiscal year.-Maintenance: Hired-
labor condition survey of reported shoals between Jacksonville and
Green Cove Springs during April 1952 cost $608.29. The expendi-
tures were $608.29.
    Condition at end of fiscal year.-The existing project is about 89
percent completed. Dredging between Jacksonville and Palatka
was begun in April 1900 and completed in November 1915 except for
the work in Deep Creek, which is about 50 percent completed. In
1939, the Department of the Navy deepened the channel between
Jacksonville and the United States Naval Air Station at Black Point
to 18 feet. A channel 8 feet deep and 100 feet wide from Palatka to
560     REPORT OF CHIEF OF ENGINEERS,            U.   S.   ARMY, 1952

Sanford, including side channel to Enterprise, was dredged between
February 1911 and June 1923, except for making three cutoffs, which
were completed in June 1935, and easing a number of bends. Deepen-
ing that channel to 12 feet, including the side channel to Enterprise,
and easing a number of bends was begun in August 1947 and com-
pleted in October 1948. A channel 5 feet deep and 100 feet wide from
Sanford to Lake Harney was dredged between November 1911 and
March 1912, and a cutoff channel 5 feet deep and 75 feet wide between
Lake Monroe and the vicinity of Osteen Bridge was dredged during
February and March 1948. Two converging pile-and-stone jetties
at Volusia Bar at the head of Lake George, built under a previous
project between December 1880 and May 1887, have been maintained
under the existing project.
   When last surveyed, controlling depths were as follows: Jackson-
ville to the United States Naval Air Station, 18 feet for project width
in 1939; thence to Palatka, 9.7 feet in the middle 100-foot width of
channel at Federal Point, with 11.2 feet available in the easterly half
of the channel, in October 1945; from Palatka to Sanford, 12 feet,
based on surveys between November 1947 and May 1949; Enterprise
side channel, 12 feet in February 1948; and Sanford to Lake Harney,
7 feet in Woodruff Creek Cutoff and 4.2 feet in midchannel elsewhere,
with a limiting edge depth of 2.5 feet, April 1949; and at the en-
trance to Deep Creek, 7 feet, date of survey unknown.
   The work remaining to be done to complete the project is as follows:
Dredging a cutoff channel across Beresford Peninsula, and complet-
ing two cutoffs and easing five bends in Deep Creek.
   The costs and expenditures under the existing project have been
$1,141,676.66 for new work and $430,626.98 for maintenance, a total
of $1,572,303.64.
   Proposed operations.-An allotment of $6,100 during fiscal year
1953 will be applied as follows:
Maintenance:
    Condition survey of the project channels, May 1953--                     $2, 000
    Miscellaneous inspections and reports (contingencies)   -----------       4, 100

      Total for all work-------------------------------             -   --    6, 100
  The additional sum of $35,700 can be profitably expended for the
following scheduled work during fiscal year 1954:
Maintenance:
    Dredging to remove critical shoaling at isolated localities in the
      12-foot channels between Palatka and Sanford, October 1953.. $30, 000
   Miscellaneous inspections and reports (contingencies) -----------   5, 700
      Total for all work-------------------------------------35,                700
           RIVERS AND HARBORS-JACKSONVILLE,                                                     FLA.,         DISTRICT             561
                                        Cost and financial summary
                                                      Fiscal year ending June 30                                          Total to June
                                                                                                                         30,1952, includ-
                                                                                                                         ing fiscal years
                                    1948            1949               1950               1951               1952         priorto 1948


New work:
   Appropriated-........  $300, 000.00          $85, 100. 00 -$1, 304. 95 ..----.....----            ............          $1, 171, 242. 92
   Cost....--------------  460, 773.85          147, 772.32------------......--------.........------------............      1, 171, 242. 92
   Expenditures-....--_..414, 226. 41           192, 391.30       -941. 60 ...............-----------------------....       1, 171, 242. 92
Maintenance:
   Appropriated ..--..-----....------------............
                                                   4, 000.00        40, 600.00       -2, 073.38             $608.29            456, 464. 98
                       -----
   Cost_----------.........          132.17        3,886.78         19, 220.81        19, 896. 87            608. 29           456, 464.98
   Expenditures---------......       519.39        4, 300. 20       12, 626. 16       26, 067.33             608.29            456. 464. 98


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project- ..-------------- $148, 000. 00
                                      4. OKLAWAHA RIVER, FLA.
  Location.-This river has its source in the system of large lakes in
the central part of the Florida peninsula and flows generally northerly,
then easterly, emptying into the St. Johns River 22 miles above
Palatka. The extreme head of the system may be taken as Lake
Apopka, 120 miles above the mouth of the river.
  Previous projects.-The first improvement was authorized by an
act of Congress approved February 24, 1835. For further details see
page 1825, annual report for 1915, and page 613, annual report for 1938.
  Existing project.-This provides for deepening the channel to 6
feet at mean low water from the mouth to the head of Silver Springs
Run, 57.7 miles; for clearing the channel of obstructions from Silver
Springs Run to Lake Griffin, including the Kyle and Young Canal
and its extension to Morrisons Landing and the J. D. Young Canal
from Morrisons Landing to Starkes Ferry (clear title to the canals and
sufficient land adjacent thereto to provide for future widening has been
conveyed to the United States); and for maintaining the dikes with
a view to obtaining a navigable depth of about 4 feet to Leesburg,
85.7 miles above the mouth. The work embraces dredging, snagging,
making cutoffs at sharp bends, removing overhanging trees and
obstructive aquatic vegetation, and constructing a lock and dam at
Moss Bluff to maintain the water level in Lake Griffin. The project
includes, under maintenance, the operation and care of that lock and
dam.
                          Lock and dam, a t Moss Bluff
Distance to nearest town._ ....---                     20.2 miles by canals.
Name of nearest town___......        ._.._             Leesburg, Fla.
Distance above mouth of river                _........ 65.5 miles by canals.
Distance above mouth of Silver Springs
  Run--.--------------------             .             13.2 miles.
Width of lock chamber      _                           30 feet.
Greatest available length for full width__ 125 feet.
Lift above low water__                                 16 feet.
Depth on upper miter sill at normal
  pool level-----    ---------             ----        9 feet.
Depth on lower miter sill at low water___ 4.5 feet.
Character of foundation ..............                 Piles in sand and clay.
Character of construction__..........                  Concrete, with timber gates.
Kind of dam . . . ..       . . . . . .                 Movable.
Type of dam-                                           Needle.
Completed                                              1925.
Total cost---------.--      ----------                 $161,000.
562           REPORT OF CHIEF OF ENGINEERS,                          U. S. ARMY, 1952

  The river is nontidal except for a short distance above the mouth
at the St. Johns River, where the mean range at low-water stage is
about 0.5 foot. The mean fluctuation due to rainfall is about 2 feet
at the mouth, about 3 feet at the mouth of Silver Springs Run, and
about 2.5 feet at Lake Griffin. The extreme fluctuation is about 3
feet at the mouth, 5 feet at Silver Springs Run, and about 4.5 feet at
Lake Griffin.
  The estimate of cost for new work, revised in 1952, is $437,400,
exclusive of amount expended on previous projects. The latest (1952)
approved estimate of annual cost of maintenance is $18,000, including
$12.000 for operation and care of the lock and dam.
  The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                  Documents

Sept. 19,1890    Clearing the river of obstructions to obtain a naviga-   Annual report for 1889, pp, 1360-
                  ble channel about 4 feet deep from the mouth to          1364.
                   Leesburg.
Mar.    2,1907   Deepening the channel to 6 feet at mean low water        H. Doc. 782, 59th Cong., 1st sess.
                   from the mouth of the river to the head of Silver
                   Springs Run.
June 25,19101 Maintenance of levels in the lakes at the head of the} Specified
                                                                            in-act.
July 25,1912      river.
July 27,1916     Acceptance of certain artificial waterways and exten-       Do.
                  sions thereof between Heather Island and Lake
                   Griffin as part of the waterway in lieu of portions
                  of the natural bed of the river.
       (1)       Operation and care of the lock and dam provided for
                  with funds from War Department appropriations
                  for rivers and harbors.

1 Permanent Appropriation Repeal Act of June 26, 1934.

  The latest published maps are in House Document No. 514, Sixty-
third Congress, second session, and Annual Report for 1891, page 1626.
  Local cooperation.-Fullycomplied with.
   Terminal faclities.-There are numerous privately owned landings
along this river, more or less in disrepair, and a municipal wharf at
Leesburg; no charges for wharfage. The facilities are considered
adequate for existing commerce.
   Operation and results during fiscal year.-Maintenance: The lock
and dam at Moss Bluff were operated and maintained by hired labor,
and the buildings and grounds were cared for. The cost was $11,617.96
for operation and $1,000.93 for ordinary maintenance and repairs, a
total of $12,618.89. The expenditures were $12,458.69.
   Condition at end of fiscal year.-The existing project was about 72
percent completed. By dredging, making cutoffs, and snagging inter-
mittently between January 1892 and June 1914, a clear channel with a
depth of about 6 feet at ordinary stages was obtained to a point about
32 miles above the mouth and thence about 4 feet deep to the head of
Silver Springs Run, 57.7 miles above the mouth. A channel 4 feet
deep at mean low water and 30 feet wide between Silver Springs Run
and Moss Bluff lock was dredged between late 1924 and November
       RIVERS    AND HARBORS-JACKSONVILLE,              FLA.,      DISTRICT      563
1929. A lock and dam at Moss Bluff were constructed between about
March 1923 and late 1925. For further details relative to this lock
see paragraph "Existing project." The United States reservation
comprises 13.0 acres of land, two dwellings, a storehouse, and other
small buildings. Most of the original dredging of the canal between
Heather Island (6.3 miles above the mouth of Silver Springs Run)
and Starkes Ferry near Lake Griffin was done by private interests
between 1911 and 1923. Between June 1929 and June 1930, the canal
between Moss Bluff lock and Starkes Ferry was enlarged to 8 feet deep
by 50 feet wide to provide for control of Lake Griffin. The dike on
the east side of the canal was repaired and improved as a maintenance
feature from June to December 1936.
   At the close of the fiscal year, the river below Moss Bluff lock was
in poor condition, but passable with an open channel of 10 to 50 feet
wide; the lock and dam, and the canals and dikes above the lock were
in fair condition. The controlling depths at normal stages were ap-
proximately as follows: Mouth of the river to Silver Springs Run,
4.5 feet; Silver Springs Run, 5 feet; and Silver Springs Run to Lees-
burg, 3 feet.
   The work remaining to be done to complete the project consists of
easing several sharp bends and obtaining project dimensions in the
section between the mouth of the river and the mouth of Silver Springs
Run, which work is not considered necessary at this time.
   The costs of the existing project have been $311,352.45 for new
work, $336,983.73 for maintenance, and $169,417.97 for operating and
care, a total of $817,754.15. The expenditures have been $817,633.71.
In addition, $11,414.41 were expended between August 1, 1929, and
June 30, 1935, on the operation and care of the works of improvement
under the provisions of the permanent indefinite appropriation for
such purposes.
   Proposed operations.The balance unexpended June 30, 1952,
$2,534.57, plus an allotment for the fiscal year 1953 of $12,250, a total
of $14,784.57, will be applied as follows:
Accounts payable June 30, 1952_ -___----- -------                             $120. 44
Maintenance (operation and care) :
    Operation of lock and dam at Moss Bluff------------ $13, 764. 13
    Ordinary maintenance and repairs ________---_____---800. 00
    Improvement and reconstruction-----_          ___----    100. 00
                                                                         14, 664.13
               for all
        TotalTotalfor    wor------------------------------------141_____14,
                      al work_...                                    784.57
                                                                      8.5
  The additional sum of $17,400 can be profitably expended for the
following schedule of work during fiscal year 1954:
Maintenance (operation and care) :
    Operation of lock and dam at Moss Bluff-----------------------            $13,400
   Ordinary maintenance and repairs___ __-_------___-4,                           000
        Total for all work--                       ---.-...----------          17, 400
564          REPORT OF CHIEF OF ENGINEERS,                                           U.     S. ARMY, 1952

                                          Cost and financial summary

                                                         Fiscal year ending June 30                                     Total to June
                                                                                                                       30,1952, includ-
                                                                                                                       ing fiscal years
                                       1948            1949             1950              1951           1952           priorto 1948


New work:
   Appropriated----............--......----.......----------.........-----------....------------........------------       $315, 264.40
   Cost-------------- -----.-- - - ----.-------------------------------------------                                         315, 264.40
   Expenditures ....---------....-------              --..----..------.-----         -----------.-----------                315, 264. 40
Maintenance:
   Appropriated-........          $16,400. 00      $30, 000. 00     $20, 350. 00    $15, 630. 97     $14,000. 00            520, 230. 24
   Cost ....---------------        16, 754. 53      30, 033. 30      20, 837. 93     16, 002. 66      12, 618. 89           517, 816. 11
   Expenditures.........
                   --- ---         15, 653. 29      28, 203. 55      23, 230. 00     16, 449. 04      12, 458. 69           517, 695. 67


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project._----------  $126, 000. 00

   5. INTRACOASTAL WATERWAY, JACKSONVILLE                                                           TO MIAMI,               FLA.

   Location.-The waterway extends from Jacksonville to Miami,
Fla., following the St. Johns River to the mouth of Pablo Creek,
20 miles, and thence following in general the line of a canal con-
structed by the Florida Coast Line Canal & Transportation Co.
 (See U. S. Coast and Geodetic Survey Charts Nos. 842-847.)
   Previous projects.-Adopted by River and Harbor Acts of June
15, 1844, July 13, 1892, August 18, 1894, and Deficiency Act of
February 26, 1896. For further details, see page 1825, annual report
for 1915; page 655, annual report for 1926; and page 618, annual report
for 1938.
   Existing project.-This provides for an inland waterway 12 feet
deep at local mean low water and generally 125 feet wide from
Jacksonville to Miami, with such modifications in cutoff and other
questions of alinement as may be required by the Chief of Engineers;
for a turning basin 8 feet deep, 400 feet wide, and 800 feet long
in the vicinity of Jacksonville Beach, Fla.; for an entrance channel
8 feet deep and 100 feet wide from the Intracoastal Waterway
to and including a turning basin of the same depth, 300 feet wide and
600 feet long, at Sebastian, Fla.; and for a basin 8 feet deep extending
from the Intracoastal Waterway to the easterly shore, about 1,140
feet wide at the waterway and 280 feet wide at the shore line, at
or near Vero Beach, Fla. The length of the waterway is 370 miles,
of which 20 miles are included in the project for improvement of
Jacksonville Harbor, Fla. The project also includes the operation
and maintenance of the bridge near Palm Valley, the title to which
was passed to the United States, along with all other property of the
Florida Coast Line Canal & Transportation Co., under the conditions
of local cooperation.
   The mean range of tide is 3.8 feet at the St. Johns River, 0.7
foot in the Indian River at Fort Pierce, 1.8 feet in Lake Worth at
the Port of Palm Beach terminals, 2.3 feet at the Port Everglades
terminals, and 2 feet in Biscayne Bay. The extreme range is about
7 feet at the St. Johns River, 1.5 feet at Fort Pierce, and 3 feet
in Biscayne Bay. Tidal effect is imperceptible at points along the
waterway distant from inlets.
   The estimate of cost for new work, approved in 1952, is $26,303,800,
              RIVERS AND HARBORS-JACKSONVILLE,                                  FLA.,     DISTRICT            565
exclusive of amounts expended on previous projects. The latest
(1952) approved estimate for annual cost of maintenance is $322,000,
including $16,000 for the operation and care of the bridge near Palm
Valley.
  The existing project was authorized by the following river and
harbor acts:

       Acts                           Work authorized                                     Documents

Jan.    21,1927    For a channel 8 feet deep and 75 feet wide from Jack-      H. Doc. 586, 69th Cong., 2d seas.
                     sonville to Miami.
July     3, 1930   For a width of 100 feet .......-------------------------   S. Doc. 71, 71st Cong., 2d sess.
        (1)        Operation and care of the bridge near Palm Valley
                    provided for with funds from War Department
                    appropriations for rivers and harbors.                                                       5
Aug. 26, 1937      Turning basin in the vicinity of Jacksonville Beach_._     H. Doe. 180, 75th Cong., Ist sess.
Mar. 2,1945        A channel 12 feet deep and 125 feet wide----............   H. Doe. 740, 79th Cong., 2d sess.*
   Do .....-       A side channel and basin at Sebastian---.... ---------     H. Doe. 336, 76th Cong., 1st sess.s
                                        .............................
       Do ......--- A basin at Vero Beach__----                               H. Doc. 261, 76th Cong., I1st sess.'

  I   Permanent Appropriation Repeal Act of June 26, 1934.
  2   Contains latest published maps.

  Local cooperation.-The conditions imposed by the River and
Harbor Acts approved January 21, 1927, and July 3, 1930, have
been fully complied with, including furnishing suitable spoil-disposal
areas for subsequent maintenance of the improvement as and when
required. Subsequent acts authorizing enlargement of the waterway
have imposed the same requirement with respect to spoil-disposal areas
for maintenance. The Florida Inland Navigation District, a special
taxing district empowered by State law to comply with certain features
of local cooperation, was requested to furnish additional spoil-dis-
posal areas in perpetuity for a 25-year maintenance program in the
southerly and northerly halves of the waterway on May 15 and July 1,
1944, respectively. Numerous areas have been furnished and the
Navigation District is actively engaged in securing other areas by
negotiation or, when necessary, by condemnation. The areas are
being furnished at a satisfactory rate. Temporary spoil-disposal
areas for maintenance have been and are being furnished as and when
required.
  The work authorized by the River and Harbor Act of August
26, 1937, is subject to the condition that local interests provide, free of
cost to the United States, all lands and rights-of-way necessary for
the improvement and for its subsequent maintenance when and as re-
quired, and to the further condition that local interests provide, with-
out cost to the United States, suitable highway connections and a
bulkhead along the south side of the basin on plans approved by the
Chief of Engineers, and agree to maintain said bulkhead and the land
approaches thereto as a public terminal open to all on equal terms. A
resolution adopted by the city council of Jacksonville Beach, Fla.,
agreeing to comply with those conditions, was accepted by the Chief
of Engineers on October 18, 1945, as satisfactory assurance of compli-
ance. The lands needed for rights of way and spoil-disposal have
been furnished. A highway from Jacksonville to Jacksonville Beach,
opened to traffic on December 14, 1949, satisfies the requirements as to
highway connections.
566     REPORT   OF CHIEF OF ENGINEERS,        U.   S. ARMY,   1952

   All work authorized by the River and Harbor Act of March 2, 1945,
is subject to the conditions that local interests furnish, free of cost to
the United States, all lands, easements, and rights of way and spoil-
disposal areas for new work and for subsequent maintenance, when
and as required, and hold and save the United States free from claims
for damages resulting from the improvement. The act imposed addi-
tional requirements as follows: (a) Deepening the waterway to 12 feet
is subject to the conditions (H. Doc. 740, 79th Cong., 2d sess.) that
local interests bear the cost of all alterations of bridges, cables, pipe-
lines, and other structures made necessary by the improvement and
that, if for any cause the Secretary of War finds it advisable, he may
cause proceedings to be instituted in the name of the United States for
acquirement by condemnation or otherwise of any lands, easements,
rights of way, and spoil-disposal areas needed for the improvement,
after receipt of assurances satisfactory to him from responsible local
agencies that they will reimburse the United States for the costs; (b)
provision of a side channel at Sebastian is subject to the condition
 (H. Doc. 336, 76th Cong., 1st sess.) that local interests give assurances
satisfactory to the Secretary of War that they will provide and main-
tain suitable terminal facilities open to all on equal terms; (c) pro-
vision of the basin at Vero Beach is subject to the requirements
 (H. Doc. 261, 76th Cong., 1st sess.) that 4ocal interests furnish assur-
ances satisfactory to the Secretary of War that they will protect the
shore line with an adequate bulkhead, and provide, maintain, and oper-
ate terminals adequate for full utilization of the improvement, open
to all on equal and reasonable terms.
   A resolution adopted August 2, 1946, by the Florida Inland Navi-
gation District was accepted by the Chief of Engineers December 24,
1946, as satisfactory assurance that the Navigation District will fur-
nish, free of cpst to the United States, all lands, easements, rights of
way, and spoil-disposal areas needed for new work and subsequent
maintenance when and as required, and will hold and save the United
States free from damages resulting from the construction and main-
tenance of the 12-foot project. The Navigation District assumes no
responsibility for the additional requirement that local interests bear
the cost of all alterations of bridges, cables, pipelines, and other struc-
tures made necessary by the improvement (H. Doc. 740, 79th Cong., 2d
sess.), as it is not empowered by State law to comply with such features
of local cooperation. The bridges, cables, pipelines, and other struc-
tures are owned by various individuals and public and private corpora-
tions. Most of those structures were constructed under permits issued
by or under authority of the Secretary of War. Alteration of all
bridges, cables, pipelines, and other structures, made necessary by the
improvement, can properly be required of the owners under existing
Federal law. Procurement by the Navigation District of the required
rights of way and temporary spoil-disposal areas for new work is
virtually complete for some sections of the waterway, and is well ad-
vanced and actively in progress in others. The Navigation District
states that it is in a position to furnish all remaining areas in a short
time after it is evident that funds will become available. No delays
due to lack of suitable rights-of-way and spoil-disposal areas, nor to
         RIVERS            AND HARBORS-JACKSONVILLE,                            FLA.,      DISTRICT           567

alterations of bridges, cables, pipelines, and other structures made
necessary by the improvement, are expected.
    A resolution adopted by the city of Vero Beach on August 8, 1945,
agreeing to comply with the features of local cooperation pertaining
to the basin at Vero Beach, was accepted by the Secretary of War on
November 28, 1945, as satisfactory assurances of compliance. On
March 14, 1946, local interests were informed as to the requirements
imposed in connection with the provision of a side channel at Sebas-
tian, but no assurance of compliance with those requirements has been
received. Local interests have stated that participation by them in
meeting local cooperation requirements is contingent upon the prior
opening of Sebastian Inlet.
    Terminal facilities.-Extensive terminals with railway and street
connections are available at Jacksonville and Miami. Terminals,
with railway and highway connections, for coastwise vessels have been
constructed at Fort Pierce (Indian River), Riviera (Lake Worth),
and Port Everglades Harbor. Municipal piers or wharves have been
constructed at Titusville, Courtenay, Cocoa, Melbourne, and Vero
Beach for handling general freight, and at St. Augustine, Daytona
Beach, New Smyrna Beach, Eau Gallie, West Palm Beach, and Miami
for the use of recreational craft. At Daytona Beach, Titusville, Eau
Gallie, and Fort Pierce, yacht basins open to the public have been pro-
vided. They are connected with the Intracoastal Waterway by chan-
nels 6 to 8 feet deep and 80 to 100 feet wide. At Fort Pierce a channel
6 feet deep and 80 feet wide has been dredged by the United States
from the Intracoastal Waterway to and up Taylor Creek to the U. S.
Coast Guard buoy depot. There are also a number of privately owned
piers, wharves, and landings at various points along the waterway.
The facilities are considered adequate for the existing commerce.
 (For further details on facilities at Jacksonville, Fort Pierce Harbor,
Port of Palm Beach, Port Everglades, and Miami, see Port Series
Nos. 15 and 16, revised 1947, and Port and Terminal Facilities Report,
1941, Corps of Engineers.)
   Operations and results during fiscal year.-The following tabula-
tion shows work accomplished by contract and hired labor during the
fiscal year.

                                                                                            Cubic
      Plant                      Work and locality                      Dates              yards re-        Cost
                                                                                            moved

                          New work:
                           Contract:
Dredge No. 5   --......      Dredging to enlarge existing       July 1 to Nov. 6, 1951__   1, 885, 110   $303, 393. 77
                              channel to 12 by 125 feet be-
                               tween St. Johns River and
                               Palm Valley Bridge, about
                               18 miles (begun June 19, 1951,
                               and 7 percent completed at
                               beginning of fiscal year).
Dredges Jamaica              Dredging to enlarge existing       Nov. 5, 1951, to June      4, 643, 636 1,008, 519.95
Bay and Hamp-                channel to 12 by 125 feet          30, 1952 (99 percent
ton Roads.                    between Palm Valley and            completed).
                               Flagler   Beach,    including
                               Deep Creek Cutoff, about
                              53.2 miles.
         ---------.........
Hallandale                   Dredging to enlarge existing       Mar. 17 to June 30,        1, 234, 321    247, 966.09
                              channel to 12 by 125 feet          1952 (54 percent com-
                              between Flagler Beach and          pleted).
                               Holly Hill, about 16.7 miles.
568         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952


                                                                                                            Cubic
       Plant                  Work and locality                               Dates                       yards re-          Cost
                                                                                                           moved

                      New work-Continued
                        Contract- Continued
Dredge No. 6.......      Dredging to enlarge existing         Mar. 10 to June 30,                          1, 161, 575     242, 720.11
                           channel to 12 by 125 feet           1952 (53 percent com-
                           between Holly Hill and              pleted).
                           Oak Hill, about 25.6 miles,
                           of which 1 mile requires no
                           dredging.
Jamaica Bayg ......      Dredging (continuing con-            June 1 to June 30, 1952                          11, 078      46, 225. 80
                           tract) to enlarge existing           (1 percent com-
                           channel to 12 by 125 feet            pleted).
                           between Oak Hill and Haul-
                           over Canal, about 16.9 miles.
                       Hired labor:
                         Engineering studies, surveys,        July 1, 1951, to June                                         25, 391. 58
                           and preparation of plans             30, 1952.
                           and specifications for 12- by
                           125-foot enlargement not yet
                           placed under contract.

                            Total, new work------------...........................................                       1, 874, 217.30

                   Maintenance:
                    Contract:
Dredge No. 6 .....    Channel relocation at Vero July 1 to July 2, 1951..         3, 257    3, 309. 86
                        Beach bridge (91 percent
                        completed at beginning of
                        fiscal year).
Dredge Admiral___.    Channel relocation at Delray ..... do                       3,110
                                                                 ---.................--     6, 457. 74
                        Beach bridge (74 percent
                        completed at beginning of fis-
                        cal year).
                    Hired labor:
                      Expense incident to acquisi- July 1, 1951, to June                    1, 300.00
                        tion by local interests of     30, 1952.
                        spoil-disposal areas.
                      Periodic surveys and inspec- .....do-----------------......................
                                                                                            6, 410.62
                        tions throughout the project.
                           Total maintenance-I              --..................................-----   I-............      17, 478. 22



   Operation and care: The steel-and-concrete, double-leaf bascule
highway bridge near Palm Valley was operated and maintained by
hired labor. A new submarine power cable for transmitting power
to the west leaf was installed by contract. The costs were $17,902.53
for operation and $5,631.30 for ordinary repairs, including $4,944.41
for work accomplished by contract, a total of $23,533.83.
   The costs for the year were $1,874,217.30 for new work, $17,478.22
for maintenance, and $23,533.83 for operation and care, a total of
$1,915,229.35. The expenditures were $1,741,849.73.
   Conditionat end of fiscal year.-The existing project was 39 percent
completed. A channel 8 feet deepl at local mean low water and 100
feet wide was dredged between March 1930 and May 1935. The pres-
ent width of 100 feet is reduced at 54 localities by bridges, with a
limiting horizontal clearance of 51 feet at the Deerfield Beach Bridge.
A steel-and-concrete, double-leaf bascule highway bridge near Palm
Valley, to replace the temporary pontoon bridge at that locality, was
constructed between September 1936 and July 1937 at a cost of
               RIVERS            AND         HARBORS--JACKSONVILLE,                                    FLA.,    DISTRICT              569

$117,916.77. Enlarging the existing channel to 12 by 125 feet has
been in progress since June 19, 1951. The enlargement has been
completed between the St. Johns River and Flagler Beach. At the
end of the fiscal year enlargement of the reach between Flagler Beach
and Haulover Canal was in progress under several contracts.
  When last surveyed the controlling depths were as follows:

                                                                                                                Minimum    depths in
                                                                                   Dredged dimensions            channel entering from
                                                                                                                 north

                         Reach                                   Date of                                               Mid-
                                                                 survey                                        Left channel Right
                                                                                  Width    Length      Depth outside for half outside
                                                                                  (feet)   (miles)     (feet) quarter project quarter
                                                                                                                (feet)      width     (feet)
                                                                                                                            (feet)

St. Johns River to Palm Valley Bridge___ Dec. 1951                                   125      18          12      11. 9       11. 8      11. 9
Palm Valley Bridge to St. Augustine. ..                              Mar. 1952       125      37          12      12. 0       12. 1      11. 6
St. Augustine to Matanzas Inlet .--------            _               Jun. 1952       125      13          12      12. 2       12. 1      12.6
Matanzas Inlet to Ponce de Leon Inlet .                              Nov. 1951       100      52           8       6.4         6. 8       4. 5
Ponce de Leon Inlet to Haulover Canal.                               Jun. 1952       100      28           8       7. 6        8. 0       8.0
Haulover Canal to Melbourne ...----------                            Dec. 1950       100      48           8       8. 0        8. 0       8. 0
Melbourne to Vero Beach__-------------                               Jun. 1952       100      33. 5        8       8. 0        8. 0       8. 0
Vero Beach to Ft. Pierce__ .---------                                  do--          100      14.0         8       7. 3        6. 7       6. 6
Ft. Pierce to St. Lucie Inlet---------   ..........----             .do     .        100      21. 2        8       6. 9        7. 0       6. 4
St. Lucie Inlet to Palm Beach Harbor_ __ d ....--                                    100      31. 0        8       4. 9        5. 5       3. 9
Palm Beach Harbor to Miami (Municipal
  Docks) .....--------------------------........................--.. do              100      70.8          8       0. 7      6. 8        6. 0



  The work remaining to be done to complete the project is as follows:
Complete enlargement of the waterway to 12 by 125 feet; provide a
turning basin near Jacksonville Beach; provide a side channel and
basin at Sebastian; and provide a basin at Vero Beach.
  The total costs and expenditures under the existing project have
been as follows:

                                                                                    Regular funds   Public works                 Total
                                                                                        Regularfunds   funds


Costs:
   New work............................---------------------------------             $7, 432, 117. 31    $2, 199, 841. 72     $9, 631,959. 03
   Maintenance ...............--------------------------------                        3, 631, 730. 99 ---------------          3, 631, 730. 99
   Operation and care---........--............-----------------------..........          189, 602. 07 ----------------            189, 602. 07

     Total....                ----------------------------------- 11, 253, 450.37                        2, 199, 841. 72      13, 453, 292. 09
Expenditures ......................-------------------..---.........------------... 11, 003, 181. 36     2, 199, 841. 72      13, 203, 023. 08



    In addition, $3,179.07 were expended between July 1, 1934, and
June 30, 1935, on the operation and care of the works of improve-
Sment under the provisions of the permanent indefinite appropriation
for such purposes, and $5,500 were expended from contributed funds
for maintenance.
570      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   Proposed operations.-The balance unexpended June 30, 1952,
$899,299.54, plus allotments totaling $2,121,075 during fiscal year 1953,
a total of $3,020,374.54, will be applied as follows:
Accounts payable June 30, 1952 _-______     _ ___  _ ..                   $250, 269. 01
New work :
    Complete, by existing contract, dredging to
      deepen and widen the waterway to 12 by 125
      feet between Flagler Beach and Holly Hill,
      July 1952 to March 1953__------------------    $170, 253. 00
   Complete, by existing contract, dredging to
      deepen and widen the waterway to 12 by 125
      feet between Holly Hill and Packwood Place,
      July 1952 to March 1953__------------------      179,140. 00
    Complete, by existing continuing contract, to
      deepen and widen the waterway to 12 by 125
      feet between Packwood Place and Haulover
      Canal, July 1952 to October 1953 __ ______      709, 333. 00
    Dredge, by contract, to deepen and widen the
      waterway to 12 by 125 feet between Haulover
      Canal and Cocoa, October 1952 to January
            ------------------------------
      1954 __1,                                     1,569, 907. 00
    Complete, by hired labor, preparation of plans
      and specifications for enlarging the waterway
      between Haulover Canal and Cocoa, July 1952
       to September 1952------------------------         8, 507. 12
                                                                         2, 637,140. 12
Maintenance:
   Dredge, by contract, to remove critical shoaling
      at isolated locations in the existing 8-foot-
      depth channel between Cocoa and Miami, as
      and when required during fiscal year 1953__          54, 500. 00
   Dredge, by contract, to remove critical shoaling
      at known trouble spots in the 12-foot-depth
      channel between Cocoa and St. Johns River,
      as required during fiscal year 1953.........         22, 500. 00
   Condition surveys of the northerly section of
      the waterway from Melbourne to St. Johns
      River, as required during the fiscal year _.          3, 600. 00
    Install, by contract, direction and marker signs
      between St. Johns River and Miami, March-
      April 1953----------------------                     20, 000. 00
    Miscellaneous inspections and reports (contin-
      gencies)----        ----------     ----              11, 950. 70
                                                                           112, 550. 70
Maintenance (operation and care) :
    Operation of Palm Valley highway bridge ..             18, 714. 71
   Ordinary maintenance and repairs-- --......              1, 500. 00
   Improvement and reconstruction___   _....                   200. 00
                                                                            20, 414. 71
      Total for all work.---------.......   -   --------                 3, 020, 374. 54
  The additional sum of $241,850 can be profitably expended for the
following schedule of work during fiscal year 1954:
               RIVERS       AND HARBORS-JACKSONVILLE,                                  FLA.,       DISTRICT                         571
Maintenance :
   Dredge, by contract, to remove critical shoaling
      at isolated locations in the existing 8-foot-
      depth channel between Cocoa and Miami, as
      required during the fiscal year_             __                                  $60, 000. 00
   Dredge, by contract, to remove critical shoal-
      ing in the northerly section of the 12-foot-depth
      channel between Cocoa and the St. Johns
      River, as required during the fiscal year---
   Place stone, by contract, to repair the dikes at
                                                                              -              65, 000.00
      Haulover Canal, January-February 1954___                                           60, 000. 00
   Condition surveys of the entire waterway as re-
      quired during the fiscal year--___------                                           15, 000. 00
   Miscellaneous inspections and reports (contin-
      gencies) -----------------------                                                   14, 350. 00
                                                                                                                   $214, 350. 00
Maintenance (operation and care) :
   Operation of Palm Valley highway bridge__ __                                          18, 300. 00
   Ordinary maintenance and repairs (includes
      $7,500 for riprap replacement and repairs in
      channel section around main bridge piers
      and abutment) ---------------------------                                              9, 000. 00
   Improvement and reconstruction___ -                                                          200. 00
                                                                                                                       97
                                                                                                                       -1,
                                                                                                                           ffnn An
                                                                                                                                  VV
                                                                                                                                .VVV


         Total for all work_____----------------------------                                              -        241, 850. 00

                                     Cost and financial summary

                                                  Fiscal year ending June 30                                       Total to June
                                                            -
                                                                                                               -   n   1
                                                                                                               13Vs, 1v-'L,
                                                                                                                               iic
                                                                                                                                -    i
                                                                                                                              inciual(




                                                                                                                   ing fiscal years
                                 1948           1949              1950            1951            1952              prior to 1948


New   yople:
    Appropriated- .....       $15, 000.00    $10, 431.26        $7, 000. 00 $500, 000:00 $2,150,000.00              $10, 375, 874. 40
                 ........
    Cost---------------...     34, 305. 63    11, 821.39        11, 934. 23 126, 642. 58 1, 874, 217. 30              9, 726, 734. 28
    Expenditures..--------     24, 044. 60     7, 724. 32       16, 000. 00 112, 786. 74 1, 641, 455. 56              9, 480, 116. 70
Maintenance:
   Appropriated .-----... 157, 200. 00       236, 000. 00       95, 090. 56   205, 992. 95       15, 301. 57           14, 037, 624. 79
    Cost...--------------     137, 044. 33   289, 925. 58       94, 318. 29   188, 840. 70       41,012. 05            1 4,037, 734. 38
    Expenditures.------...    139, 857. 71   290, 596. 22       93, 891. 10   126, 227. 01      100, 394.17            1 4, 034, 082. 95


Other new work dataa:
    Unobligated balance, June 30, 1952__ _____________-___-_                                                     $27, 178. 21
   Appropriated for fiscal year ending June 30, 1953-_-.......                                                1, 988, 000. 00
        Unobligated balance available for fiscal year 1953________ 2, 015, 178. 21
      Estimated additional amount needed to be appropriated for
        completion of existing project                              4, 034, 700. 00
                                                                 _ 1_________-------______
  1 In addition, $5,500 were expended from contributed funds for maintenance.

                                6. CANAVERAL HARBOR, FLA.

  Location.-- On the east coast of Florida in Canaveral Bight, about
120 miles south of St. Augustine Harbor and 65 miles north of the
entrance to Fort Pierce Harbor. (See U. S. Coast and Geodetic Sur-
vey Chart No. 1245.)
  Existing project.-This provides for a turning basin 27 feet deep
at mean low water and 1,000 feet wide, with lengths of 900 feet on
the north side and 2,900 feet on the south side, near the easterly shore
of Banana River and inclosed by a dike; an entrance channel 27 feet
deep and 300 feet wide extending from the turning basin through the
572      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

barrier beach, thence flaring to 400 feet wide at the 27-foot contour
in Canaveral Bight, protected at its seaward entrance by two jetties
to the 12-foot depth contour; a barge canal 8 feet deep at local mean
low water and 100 feet wide from the turning basin to the Intra-
coastal Waterway; and a lock 50 feet wide and 250 feet long to: pass
the barge canal through the dike inclosing the turning basin. The
entrance channel is about 1.8 miles long and the barge canal about
7.6 miles long. The total length of the project is 9.8 miles. Present
plans will provide only one jetty, 1,520 feet long, on the south side.
                       Data relative to the proposed lock
Distance to nearest town-...-        - --     .- -     10.7 miles via 8-foot barge
                                                          canal and Intracoastal
                                                          Waterway.
Name of nearest town _____________________             Cocoa, Fla.
Distance from Intracoastal Waterway Channel .          7.2 miles.
Lock dimensions-------------------------- 50 by 250 feet.
Lift_------     -----------------------------          Varies with the tide.
Depth on miter sills----_------------------- 14 feet below mean low
                                                          water.
Character of foundation_----------            -    -   Piles in sand.
Kind of dam----------------------             -------- None.
Estimated cost----------------------------             $1,936,000.

   The mean range of tide is about 3.5 feet and the maximum range
about 6 feet. Onshore winds generally raise the water level from
4 to 6 feet above mean low water. There is no perceptible tidal effect
in Indian and Banana Rivers in the general vicinity, but the level of
the water is considerably affected by winds, northerly winds causing
a lowering of the waters and southerly winds causing them to rise
above normal. Easterly winds cause a rise at the western shores and
westerly winds a rise at the eastern shores.
   The estimate of cost for new work, revised in 1952 is $4,943,500,
including $850,000 contributed by local interests, but excluding $90,000
received from the sale of dredged material. The estimate also in-
cludes $932,000 for construction of jetties, which may not be required.
The latest (1952) approved estimate for annual cost of maintenance
is $80,900, including $28,000 for operation and care of the lock. The
existing project was authorized by the River and Harbor Act ap-
proved March 2, 1945 (H. Doc. 367, 77th Cong., 1st sess.). The latest
published map is in the project document.
   Local cooperation.-The authorized work is subject to the con-
ditions that local interests contribute 50 percent of the estimated
first cost of the improvement, but not to exceed $850,000, and furnish
assurances satisfactory to the Secretary of War that they will: (1)
Furnish, free of cost to the United States, all lands, easements, rights-
of-way, and spoil-disposal areas required for the improvement and
its subsequent maintenance, when and as required; (2) construct,
without cost to the United States and in accordance with plans ap-
proved by the Secretary of War, adequate piers, slips, warehouses, and
transit sheds, a precooling plant with a capacity of at least 120,000
standard boxes of citrus fruit per week, a shipside citrus packing plant
with a capacity of at least 50,000 standard boxes per week, direct and
       RIVERS   AND HARBORS-JACKSONVILLE,           FLA.,   DISTRICT   573
adequate highway connections between the port terminals and the
mainland and all bridges made necessary by the entire improvement;
 (3) agree to operate and maintain, free of cost to the United States,
all port facilities open to all on equal and reasonable terms; (4) agree
to receive and pay for at the rate of 6 cents per cubic yard not less
than 1,500,000 cubic yards of material to be dredged by the United
States from the barge canal or turning basin and deposited upon the
right-of-way for the causeway carrying the highway between the port
terminals and the mainland; and (5) provide, operate, and maintain,
free of cost to the United States, adequate railroad connections be-
tween the port and the rail lines on the mainland when the Secretary of
War shall require it.
   An act of the Florida State Legislature in 1939, as amended in 1941,
created the Canaveral Port District in Brevard County, and a govern-
ing body known as the Canaveral Port Authority with authority to
construct and maintain in the district a deep-water harbor with
terminal facilities; to borrow not to exceed $5,000,000 through the
issuance of revenue certificates and bonds; and to levy an ad valorem
tax on real and personal property in the port district. Bond issues are
to be ratified by the freeholders of the port district in a public election.
   By letter dated February 22, 1947, the Canaveral Port Authority
informed the district engineer that the authority had caused plans
and specifications for the essential port facilities to be prepared by
contract. On January 19, 1949, the Canaveral Port AuthQrity adopted
a resolution agreeing to assume full responsibility for the require-
ments of local cooperation. That resolution was accepted by the As-
sistant Secretary of the Army on November 21, 1949, as satisfactory
assurance of compliance. A bond issue of $1,365,000 for meeting
certain of the requirements of local cooperation was sold September
29, 1949. On November 28, 1949, the port authority contributed the
required $850,000 toward the cost of the improvement, and has ten-
dered payment of $90,000 for purchase of 1,500,000 cubic yards of
material to be dredged by the United States from the barge canal and
turning basin and deposited upon the right-of-way for the causeway
carrying the highway between the terminals and the mainland. All
rights-of-way and spoil-disposal areas required for original dredging
have been furnished.
   Terminal facilities.-A marginal wharf, 400 feet long, is under con-
struction on the south side of the turning basin.
    Operations and results during fiscal year.-New work: Dredging,
by contract, to provide the 8-foot-depth barge canal, and the 27-foot-
depth turning basin and the barrier cut to the 12-foot contour in the
ocean, and placing fill on causeway and constructing dike enclosing
turning basin, in progress since June 26, 1950, and 77 percent com-
pleted at the beginning of the fiscal year, was completed January 15,
1952. Contract dredges Ventnor, No. 5, and No. 3 removed 1,795,716
cubic yards of material at a cost of $268,132.51. A pilot cut through
the barrier beach was opened on October 2, 1951. Leased-plant opera-
tions to place fill on the dike and causeway, begun May 26, 1951, and


      245554--58--vol. 1-387
574           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

63 percent completed at the beginning of the fiscal year, were com-
pleted September 23, 1951. Dredge Ventnor placed 1,292,892 cubic
yards of material at a cost of $220,419.23. The U. S. hopper dredge
Hyde removed 382,178 cubic yards, bin measurement, from the en-
trance channel January 17 to March 26, 1952, at a cost of $124,943.72.
A shore-line survey to determine effects of improvement on adjacent
beaches cost $2,138.00. Surveys, engineering studies, and prepara-
tion of plans and specifications for the lock cost $929.20.
   The costs for the year were $189,701.16 United States funds and
$426,861.50 contributed funds, a total of $616,562.66. The expendi-
tures were $385,942.10 United States funds and $426,861.50 contributed
funds, a total of $812,803.60.
   Condition at end of fiscal year.-The existing project was about 35
percent completed. Dredging to provide the 8-foot-depth barge canal
and the 27-foot-depth turning basin and barrier cut to the 12-foot
contour in the ocean and placing fill on causeway and constructing
dike enclosing turning basin, in progress since June 1950, was com-
pleted in January 1952. Dredging the 27-foot entrance channel sea-
ward of the 12-foot contour in the ocean was begun January 12, 1952,
and terminated March 26, 1952, because of lack of progress. At
termination the work was 90 percent completed. The adjacent
beaches and entrance channel have not yet stabilized. A sand spit,
which grew rapidly at first, extends about 105 feet into the channel
from the south shore of the land cut. The controlling depths are
as follows:

                                                               Project          Controlling depths

                 Name of channel                                          Left chel
                                                                         Left             Rigd- Date surveyed
                                                                                channel Right
                                                           Depth Length outside for half outside
                                                                        quarter project quarter
                                                                                 width

                                                            Feet      Miles    Feet    Feet      Feet
Entrance channel----------------------------                 27. O0    0. 95    21.7    25. 1     21.4    March 1952.
Land cut..........-----------------------------------        27.0      0. 90   +4.4    +4.3       23.0    June 1952.
Turning basin-------....---.........--------------------     27. 0     0. 47    29.5    28. O0    26. 2   March 1952.
Barge canal, east section..------...--------------8. 0                 0.44     8.3      8. 7      8. 4      Do.
Barge canal, west section------------------        8. 0                6.8      8.0      8.5       8.5    January 1952.


   The work remaining to be done to complete the project is as follows:
Construction of the lock; construction of the jetty; and construction
of the channel revetment. The costs under the existing project have
been $847,731.55 United States funds and $937,654.00 contributed
funds, a total of $1,785,385.55 for new work. The expenditures have
been $848,427.99 United States funds and $937,654.00 contributed
funds, a total of $1,786,081.99.
   Proposedoperations.-Thebalance unexpended and accounts receiv-
able June 30, 1952, $25,779.45, plus an allotment of $27,700 during
fiscal year 1953, a total of $53,479.45, will be applied as follows:
         RIVERS AND HARBORS-JACKSONVILLE,                                         FLA.,      DISTRICT            575
Accounts payable June 30, 1952 ... ___---------------------------                 $165. 00
New work: Hired labor surveys, investigation and planning for jetties
    and revetment, August 1952 to June 1953_.-.-         __---_______------     25, 614. 45
Maintenance:
    Dredge to remove the most obstructive shoaling from
      about 800 linear feet of the 27-foot-depth entrance
      channel in sufficient quantity to insure that the inlet
      will not be completely closed, United States hopper
      dredge Lyman, about one-half month during August
      1952 -----------        --------------------------            $27, 500
    Miscellaneous inspections and reports (contingencies)--                 200
                                                                                27, 700. 00
            Total for all work- ---------------------                                                     53,479. 45
   The additional sum of $42,750 can be profitably expended for the
following scheduled work during fiscal year 1954:
Maintenance:
   Dredge to increase the restricted cross section of the
      27-foot-depth entrance channel to insure that the inlet
      will not be completely closed, United States hopper
      dredge Lyman, about 1 month, February-March 1954__ $42, 500
    Miscellaneous inspections and reports (contingencies)_-   250

        Total ----------------------------------------------                                                 $42, 750

                                       Cost and financial summary
                                           UNITED STATES FUNDS


                                                    Fiscal year ending June 30                           Total to June
                                                                                                        30,1952, includ-
                                                                                                        ing fiscal years
                                    1948          1949          1950          1951           1952        priorto 1948

New work:
   Appropriated       -----------             -----------------------                    $40, 500.00         $871,000. 00
    Cost -..........           $37, 553. 67    $24. 036. 10 -$90,141.61   $640,495. 41   189, 701. 16         847, 731. 55
    Expenditures--  ------      34, 683. 29     26,417. 11 -99,262.09      453,549.98    385, 942.10          848,427. 99

Other new work data:
    Unobligated balance, June 30, 1952_-_--                                 ------------      $23, 318. 45
    Unobligated balance available for fiscal year                         1953------------     23, 318. 45
    Estimated additional amount needed to be                              appropriated for
      completion of existing project-......---                            ----------       3, 222, 500. 00
                                              CONTRIBUTED FUNDS

                                                   Fiscal year ending June 30                            Total to June
                                                                                                        30,1952. includ-
                                                                                                        ing fiscal years
                                    1948          1949          1950          1951          1952          prior to1948

New work:
   Appropriated......-------------------............         $940, 000.00 ......-------- --.....--
                                                     -------...........                                       I$940, 000
   Cost--------- ---..-----------------------............ 183,861.72 $326,930.78 $426,861.50                   1937,654
   Expenditures..--------------........--------....-----      183,861.72 326, 930. 78 426 ,861. 50             1937, 654


Other new work data:
    Unobligated balance, June 30, 1952-----------      -------------                                      $2, 296. 00
    Unobligated balance available for fiscal year 1953- .----.---- -                                       2, 296. 00
i Includes $90,000 received from local interests
                                              in payment for 1,500,000 cubic yards of material for cause-
way fill--a local cooperation requirement.
576        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                             7. FORT PIERCE HARBOR, FLA.

  Location.-On the east coast of Florida, about 218 miles south of
the entrance to St. Johns River and about 124 miles north of the
entrance to Miami Harbor. (See U. S. Coast and Geodetic Survey
Chart No. 582.)
   Existing project.-This provides for the maintenance, enlargement,
and deepening of the project developed by private interests, to provide
a channel 350 feet wide at the 27-foot contour in the ocean, tapering
                                              +
to 200 feet wide at station 100 00 near the westerly side of the inlet,
thence 200 feet wide across Indian River to station 30 + 00, and thence
flaring on the southerly side to form a turning basin 1,650 feet long
on the northerly side, 750 feet long on the southerly side, and 900 feet
wide, the depth to be 25 feet in the basin and in the channel to station
130+ 00, and thence 27 feet to the 27-foot contour in the ocean; and
for maintenance of the jetties at the ocean end of the inlet, and of
shore revetments within the inlet in prolongation of the jetties. The
two parallel rubblestone jetties with revetment extensions, constructed
by local interest to protect the entrance, are 900 feet apart, the north
jetty and revetment being about 3,500 feet long, and the south jetty and
revetment about 3,200 feet long. The length of the section included
in the project is about 3.5 miles. The mean range of tide is about 2.6
feet at the entrance and 0.7 foot at the terminal, with northeast tides
as high as 5 feet above mean low water.
   The actual cost of new work was $337,182.67. The latest (1952)
approved estimate of annual cost of maintenance is $30,000.
   The existing project was authorized by the following river and
harbor acts:

              Acts                            Work authorized                          Documents

Deficiency Act of Mar. 4, 1931.... The expenditure of $20,000 for dredging   Specified in act.
                                    the channel, provided that local in-
                                    terests agree to maintain said chan-
                                    nel.
War Department Appropria- The expenditure of up to $30,000 for                   Do.
  tion Act, Mar. 4, 1933.           dredging the channel.
Aug. 30, 1935 (maintenance in. For maintaining the channels, jetties,        H. Doc. 252, 72 Cong., 1st
  cluded in Public Works Ad-         and revetments, and enlarging the        sess. Rivers and Harbors
  ministration program, Sept. 6,     channels and turning basin to the        Committee Doc. 21, 74th
  1933).                             existing project dimensions.              Cong., 1st sess. (Contains
                                                                              latest published maps.)


   Local cooperation.--Fully complied with as to original construc-
tion. The River and Harbor Act approved August 30, 1935, imposed
the condition that local interests furnish suitable spoil-disposal areas
for subsequent maintenance. Adequate spoil-disposal areas have been
furnished in perpetuity.
   Terminal facilities.-These consist of two earth-filled piers retained
by steel sheet piling and forming a slip 200 feet wide by 330 to 350
feet long with bulkhead wharf at inner end. These facilities afford
a berthing space of about 1,653 feet. The south pier and the bulkhead
wharf are municipally owned, the pier having a berthing space of 524
feet, with depths of 25.5 to 18 feet. The bulkhead is used for tieup
of Government vessels. A warehouse 75 by 280 feet is on the mu-
nicipal pier, and a precooling plant 102 by 365 feet occupies the north
                   RIVERS AND                            HARBORS-JACKSONVILLE,                                          FLA.,     DISTRICT                 577

pier, just landward of which is another warehouse, 50 by 100 feet.
A fruit-packing house 170 by 225 feet is at the west end of the slip.
The north pier is served by railway and both piers by highway con-
nections. North of the turning basin there is a bulkhead wharf with
a depth of 15 to 12 feet and with tank storage in the rear for
petroleum products. The facilities are considered adequate for exist-
ing commerce. (See Port and Terminal Facilities Report, 1941,
Corps of Engineers.)
   Operations and results during fiscal year.-Maintenance: U. S.
hopper dredge Hyde removed 63,412 cubic yards of material, bin
measurement, between November 27 and December 9, 1951, at a cost
of $23,542.02. Minor repairs to inshore end of north jetty was ac-
complished by hired labor and rental crane. About 250 surplus con-
crete blocks were rearranged to form a spur dike to close a low gap
in the jetty at a cost of $390.72. Periodic condition surveys and in-
spections cost $771.41. The cost for the year was $24,704.15. The
expenditures were $25,904.15.
   Conditionat end of fiscal year.-The existing project was completed
in February 1938. Dredging was begun in July 1936 and completed
in February 1938. Restoration of the jetties originally constructed
by local interests was begun in October 1933 and completed in August
1934 as a maintenance feature. Both jetties are in good condition.
The revetments are in poor condition; both are ragged, with nearly
vertical faces along the water side resulting from loss of numerous.
stones into the water. The westerly 500 feet of the south revetment
is in very poor condition; of that section, the westerly 200 feet has dis-
appeared and needs replacing to prevent further shore erosion.
Stones should also be replaced in the adjacent 300 feet of that section.
   The controlling mean-low-water depths in January 1952 were as
follows :

                                                                                                                             Controlling depths

                                      Name of channel                                               Project                       idchh el
                                                                                                           depth Let               for half            Right
                                                                                                                outside                               outside
                                                                                                                quarter             width             quarter


                                                                                                       Feet             Feet         Feet               Feet
Bar cut----------...............................................---------------------------------             27          27.0          27. 3                  27.0
Land cut (between revetment)...----------......                                -------------..............    25          27. 9             25.0               25. 0
Channel across Indian River--..........------------------------                                               25          24.0              25.5               27.5
Turning basin------...---.. --------------   ---------------                                                  25          24. 0             25.0               24. 0



  The total costs and expenditures under the existing project to June
30, 1952, have been as follows:

                                                                                                                   Costs and expenditures
                                             Funds
                                                                                                      New work           Maintenance                Total

Regular........................----------------------------------------                                $337,182.67          $466, 534.80            $803, 717.47
Public works------......................--------------------------- ---------------............                              250,000.00              250,000.00
         Total............................................                                               337, 182. 67        716, 534. 80          1, 053, 717. 47
578          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   Proposed operations.-An allotment of $2,750 during fiscal year
1953 will be applied as follows:
Maintenance:
   Condition survey of the entrance channel and turning basin,
      June 1953-------------------------------------------           $2, 000
   Miscellaneous inspections and reports (contingencies) -----------     750

         Total for all work-----------                                         ------------------- --------                                   2, 750
   The additional sum of $80,000 can be profitably expended for the
following scheduled work during fiscal year 1954:
Maintenance:
   Place stone, by contract, to repair the rubblestone shore revetments
      on the north and south sides of the inlet, October-November
      1953__------------------------------------------------ $77, 000
   Condition survey of the entrance channel and turning basin, Jan-
      uary 1954-----      ---------------------------------------       2, 000
   Miscellaneous inspections and reports (contingencies) --------       1, 000
         Total for all work ----------                                             ---------------------                                     80, 000

                                               Cost and financial summary

                                                               Fiscal year ending June 30                                             Total to June
                                                                                                                                      30, 1952, includ-
                                                                                                                                      ing fiscal years
                                           1948              1949               1950              1951               1952              prior to 1948

New work:
   Appropriated------- ----------- ----...........-----------------............ .......----....--.------------                             $337, 182.67
   Cost-----------------.................. ----------............---------------------..--.......--........------------............         337,182. 67
   Expenditures-------......... ------------............ ------------........................------------........... ----.
                                                                                                                        -----------         337, 182. 67
Maintenance:
   Appropriated-......... -$5, 000. 00                    --------............$65,462. 72      $2, 510. 64      $24, 704. 15                716, 534. 80
   Cost----------------................. 2,427. 09        $1, 973. 53          65, 462. 72      2, 510. 64       24, 704. 15                716, 534. 80
   Expenditures-------.........          -951. 01         "2, 018. 20          65, 462. 72      1, 310. 64       25, 904. 15                716, 534. 80



                                        8. PALM BEACH HARBOR, FLA.

  Location.-On the east coast of Florida about 71 miles north of the
entrance to Miami Harbor. It is the entrance channel to the Port
of Palm Beach. (See U. S. Coast and Geodetic Survey Chart No.
1248.)
   Existing project.-This provides for maintaining, deepening, and
enlarging the improvements constructed by local interests to provide
a channel 25 feet deep at mean low water (plus 2 feet of overdepth
from the ocean to station 65+00 and 1 foot of overdepth thence to
and in the turning basin), and 300 feet wide from deep water in the
ocean to station 69+00, thence reducing to a width of 200 feet at station
65+00, near the westerly side of the inlet, thence 200 feet wide across
Lake Worth to station 31+54 (with widening at the junction with the
turning basin, thence flaring to foim a turning basin of the same
depth on the westerly side of the lake, of irregular shape, varying in
length from about 1,375 feet on the north side to 900 feet on the south
side, and with a minimum width of 1,250 feet over the westerly 900
feet of its length; for removing the obstructive point on the south side
of the inlet; for reveting the banks of the inlet; and for restoring the
existing jetties. The jetties constructed at the entrance by local
interests consist of two parallel rubblestone structures 800 feet apart,
           RIVERS AND HARBORS-JACKSONVILLE,                            FLA.,    DISTRICT           579

the north jetty and revetment being about 1,800 feet long and the
south jetty, 1,700 feet long. The length of section under improvement
is about 1.5 miles. The mean range of tide is 2.8 feet at the inlet and
1.8 feet at the Port of Palm Beach terminals. The extreme range is
about 4.5 feet at the inlet and 3 feet at the terminals.
   The actual cost of new work was $1,688,740.62. The latest (1952)
approved estimate of annual cost of maintenance is $31,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                         Work authorized                                Documents

     (1)       Maintenance of improvement previously constructed     H. Doc. 185, 73d Cong., 2d seas.
                by local interests.
     (5)       Deepening the channels and turning basin, as con-     Recommended by Chief of En-
                structed by local interests, to 20 feet.                gineers to Public Works Admin-
                                                                       istration Oct. 17, 1934.
Aug. 30,1935   Authorized the work previously approved by Public H. Doc. 185, 73d Cong., 2d seas.,
                Works Administration, and widening the channels         and Rivers and Harbors Corn-
                to existing project dimensions, enlarging the 700-      mittee Doe. 42, 74th Cong., 1st
                foot-square turning basin eastward, removing the        seas.
                obstructive point on south side of the inlet, revet-
                ing the banks of the inlet, and restoring existing
                jetties.
Mar. 2,1945    Deepening the channels and turning basin to 25 feet.... H. Doe. 530, 78th Cong., 2d sess.
May 17,1950    Extending the turning basin 550 feet southward over H. Doc. 704, 80th Cong., 2d seas.
                a 900-foot width, with a flare to the east: Provided    (Contains latest published map.)
                that local interests may be reimbursed not to ex-
                ceed $305,000 for work done by them on this modi-
                fication subsequent to July 1, 1949.


2
1 Public Works Administration program Mar. 13, 1934.
   Public Works Administration program Dec. 10, 1934.

   Local cooperation.--The conditions imposed by the River and
Harbor Act of August 30, 1935 (H. Doc. 185, 73d Cong., 2d sess.) have
been complied with except for furnishing perpetual easements for
access to the easement areas adjacent to the channel through the inlet.
The River and Harbor Act of March 2, 1945, among other conditions,
imposed the requirement that local interests give assurances satis-
factory to the Secretary of War that they will provide additional
berthing space and terminal facilities when needed to accommodate
any increase in the commerce of the port, and furnish suitable spoil-
disposal areas for subsequent maintenance of the work as and when
required. A resolution adopted August 1, 1945, by the Port of Palm
Beach District agreeing to comply with all conditions imposed by the
act was accepted by the Secretary of War on October 3, 1945, as satis-
factory assurance of compliance. All other requirements imposed by
the act of 1945 have been fully complied with.
   The River and Harbor Act approved May 17, 1950 (H. Doc. 704,
80th Cong., 2d sess.), imposed the condition that local interests fur-
nish assurances satisfactory to the Secretary of the Army that they
will furnish, free of cost to the United States, all lands, easements,
rights-of-way, and spoil-disposal areas for the work and subsequent
maintenance, when and as required; and will provide and maintain,
in accordance with plans approved by the Chief of Engineers, a new
slip with highway and rail connections and other appurtenances, open
to all on equal and reasonable terms. In partial compliance local
interests have partially completed slip No. 2 as described in the
paragraph "Terminal facilities."
580    REPORT OF CHIEF OF ENGINEERS, U.         S. ARMY, 1952

   While not required under the conditions of local cooperation, the
Port of Palm Beach District, during 1944, dredged the area south and
southeast of the then-existing project turning basin to a depth of
12 to 15 feet or to rock. During 1946 the port district widened the
turning basin generally 200 feet to the south and east to a depth of
22 feet.
   Terminal facilities.-These consist of 2 slips: No. 1 is 690 feet
long, 210 feet wide, and 26 feet deep, with a wharf on either side and
a bulkhead at the inner end; No. 2 is 500 feet long, 250 feet wide, and
32 feet deep, with 450 feet of bulkhead on the northerly side at the
easterly end; in addition, there are 2 shore wharves and the face of
the pier between the two slips has been bulkheaded. Slip No. 2 will
eventually be extended to 800 feet, with the same width and depth.
Adjacent to the bulkhead, a 180- by 450-foot area has been paved with
limerock slag on asphalt for open storage of bulk cargoes. These
facilities afford a total berthing space of 2,742 feet, with depth rang-
ing from 17 to 32 feet. All wharves belong to the Port of Palm Beach
District. A 70- by 620-foot steel-and-concrete warehouse, a 70- by 140-
foot wooden frame building, and an office building have been con-
structed on the north side of the slip; a 36- by 124-foot precooling
plant north of the warehouse has been remodeled for use as a ware-
house for express traffic. One nearby storage tank for imported
fountain syrup and two storage depots for petroleum products are
connected with the terminal by pipelines. Equipment for transfer
of railroad freight cars to and from car ferries has been installed
and is extensively used. Rail and highway connections, water supply,
and other facilities have been provided to the warehouses and to ship-
side of the slips. A new 60- by 300-foot steel warehouse with con-
crete flooring was completed on pier 2, June 1, 1952, and is in use.
A new spur railroad track has been completed south of slip No. 2,
to serve the 125,000 kw. plant of Florida Power & Light Co. On the
port property west of the Federal highway, the West Indian Fruit
& Steamship Co. has completed a 40- by 800-foot roofed platform
for handling Cuban fruit and vegetables. One mile of spur track
for storage has been built to serve this facility. Paved roadway and
parking area to this facility consist of a 100- by 300-foot entrance
roadway, a 30- by 900-foot paved area on the north side of the shed,
and a 60- by 900-foot paved area on the south side of the shed. The
facilities are considered inadequate for existing commerce, until com-
pletion of slip No. 2 extension and appurtenant features. (See Port
and Terminal Facilities Report, 1941, Corps of Engineers.)
   Operations and results during fiscal year.-New work: Local inter-
ests were reimbursed $238,842.77 on November 27, 1951, for the turn-
ing basin enlargement accomplished by them as authorized by section
101 of the River and Harbor Act of May 17, 1950.
   Maintenance: The United States hopper dredge Hyde removed
57,120 cubic yards, bin measurement, restoring project dimensions
throughout the harbor, December 9 to 19, 1951, at a cost of $20,621.72.
Five obstructive boulders were removed from the entrance channel by
contract derrick barge in November 1951 at a cost of $859.93. Periodic
condition surveys and inspections cost $2,224.56.
       RIVERS   AND HARBORS-JACKSONVILLE,        FLA.,   DISTRICT   581
   The costs for the year were $238,842.77 for new work and $23,706.21
for maintenance, a total of $262,548.98. The expenditures were
$263,353.78.
   Conditionat end of fiscal year.-The existing project was completed
in July 1950. Between 1918 and 1920, local interests dredged a channel
15 to 18 feet deep, 300 feet wide through the inlet, and 150 feet wide
across Lake Worth, with a turning basin on the western shore of the
lake, and constructed two stone jetties and revetment extensions to
protect the channel at the entrance. The United States deepened the
entrance channel and turning basin to 20 feet and widened the channel
across Lake Worth to 200 feet between February 1935 and December
1937, and restored the stone jetties and revetments and removed the
obstructive land point at the south side of the inlet between October
1936 and June 1938. The entrance channel and turning basin were
further deepened to 25 feet, plus overdepth, between March 1947 and
November 1948. During July 1949, local interests began dredging, on
a reimbursable basis, to extend the turning basin 550 feet southward,
with a flare to the east. The work was later discontinued, but was
resumed by them during June 1950 and completed in July1950. Local
interests were reimbursed for the work in November 1951.
   As reconstructed, the north jetty and revetment are 950 and 1,500
feet long, respectively; 850 feet of the shoreward end of the jetty has
been capped with concrete, and voids in the granite enrockment at the
seaward end of the structure have been filled with asphaltic concrete
which is now in poor condition. The south jetty and revetment are
1,890 and 420 feet long, respectively; 1,790 feet of the shoreward end
of the jetty has been capped with concrete. Repairs by contract were
performed on the south jetty and revetment, and new granite base
rocks were placed on both sides of the concrete cap for its full length.
The work was completed September 8, 1950. Rebuilding of the north
revetment was completed in April 1950. Both jetties were in good
condition except for hurricane and storm damages to the south jetty
as follows: The outer 500 feet of concrete cap has settled generally
from 1 to 6 inches, due to displacement and scattering of outlying
granite base rocks formerly protecting the concrete cap; two 40-foot
sections of the concrete cap were badly cracked longitudinally-one
400 feet from the east end of the concrete cap, the other near the land
end; and the 100-foot section of nonbonded rubble granite at the
seaward end has about disappeared. A 15- to 25-foot strip along the
landside of the west half of the north jetty has washed out to depths
from 1 to 2 feet at low water. Sand is continuing to pass through the
jetty. Filter rocks placed in the area to counteract such action were
ineffective and were carried away by sea action. Larger stones will be
required to remedy the condition.
   In January 1952 controlling depths were about as follows: Sea buoy
to seaward end of jetties, 28.5 feet in midchannel for half project
width with a limiting depth of 27.0 feet in the right outside quarter
and 28.2 feet in the left outside quarter; the channel between the
jetties and through the land cut and thence across Lake Worth to
the turning basin, 27.8 feet in midchannel for half project width, with
limiting depths of 26.0 feet in the right outside quarter and 27.8 feet
in the left outside quarter; and in the turning basin, 27 feet.
582               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

  The total costs and expenditures under the existing project to June
30, 1952, have been as follows:
                                                                                                        Costs and expenditures
                                      Funds
                                                                                           New work              Maintenance               Total


Regular....................--------------------------------------                          $1, 608, 740. 62           $745, 034. 52     $2, 353,775. 14
Public works-----------------------------------.......................................          80, 000. 00             30, 000. 00         110, 000. 00

         Total..........---------------               ---------------------                 1,688, 740. 62             775, 034. 52      2, 463, 775. 14



   Proposed operations. An allotment of $30,700 during fiscal year
1953 will be applied as follows:
Maintenance:
   Dredge to remove the most obstructive shoaling in the 25-foot-depth
      entrance channel and turning basin, United States hopper dredge
      Lyman, about one-half month during January 1953------------ $27, 500
   Condition survey of the entrance channel and turning basin, Novem-
             ber 1952                    ----------------------------------------                                                              2,000
         Miscellaneous inspections and reports (contingencies) ---------                                                                       1,200

             Total for all work--------------------------------------30,                                                                           700
  The additional sum of $3,500 can be profitably expended for the
following work during fiscal year 1954:
Maintenance:
   Condition survey of the entrance channel and turning basin, April
      1954      ----------------------                                                                                                       $2, 000
   Miscellaneous inspections and reports (contingencies) -----------                                                                          1, 500
             Total for all work ---------------                                              ------           -----        --------            3, 500

                                                    Cost and financial summary

                                                                     Fiscal year ending June 30                                       Total to June
                                                                                                                                      30,1952, includ-
                                                                                                                                      ing fiscal years
                                                1948               1949                  1950          1951               1952         priorto 1948


New work:
   Appropriated-......... $96,300.   00 -------       -$11,366.13 ............                  $238, 842. 77                           $1, 688, 740. 62
   Cost_....-------------  138,651.89 $188,989. 30 .......---------..--.........---------......  238,842.77                              1, 688, 740. 62
   Expenditures-......... 120, 600. 95 213,208.48         -100. 00 ....--------......            238, 942. 77                            1, 688, 740. 62
Maintenance:
                ........--
   Appropriated-------       2, 000. 00 ..--.........  316, 441. 70 $42, 500. 00                  23,156. 03                               775, 034. 52
   Cost----------------....265. 74         2, 209. 30 200, 759. 78 160, 387. 72                   23, 706. 21                              775, 034. 52
   Expenditures           ----------
                                153.38     1,693. 42 117, 106. 01 243, 880. 40                    24, 411. 01                              775, 034. 52



                                      9. PORT EVERGLADES HARBOR, FLA.

   Location.-On the east coast of Florida, about 23 miles north of
Miami and about 48 miles south of Palm Beach Harbor, Fla. The
site of the harbor is in Lake Mabel. (See U. S. Coast and Geodetic
Survey Chart No. 546.)
   Existing project.-This authorizes the maintenance, enlargement,
and deepening of the improvements constructed by local interests
to provide a channel 500 feet wide at its seaward end, converging
to 400 feet at the jetty entrance, thence converging to 300 feet at a
point 1,000 feet within the jetty entrance, and thence 300 feet wide,
              RIVERS AND ITARBORS--JACKSONVILLE,                               FLA.     DISTRICT          583

and flaring at the inner end to a turning basin 1,200 feet long and
2,250 feet wide over the major portion of its length, all to a depth
of 35 feet at mean low water; and the maintenance of two converging
rubblestone jetties constructed at the entrance to protect the channel,
and of two parallel steel-sheet-piling bulkheads 800 feet apart to
protect the land points of the inlet from erosion. The entrance
channel is about 7,300 feet long. The jetties are 700 feet apart at
the outer ends and 1,200 feet apart at the shore ends. The north
jetty is angular and about 1,450 feet long; the south jetty is straight
and about 1,250 feet long. Both jetties were built to 6 feet above mean
low water with top widths of 6 feet at the shore ends and 12 feet at
the sea ends, and with side slopes of 1 on 11/2. The mean range of
tide is 2.5 feet at the entrance and 2.3 feet at the terminals; the
extreme range is about 4.5 feet, with storm tides of about 6.5 feet.
   The actual cost of new work was $2,200,538.11. The latest (1952)
approved estimate of annual cost of maintenance is $42,500.
   The existing project was authorized by the following river and
harbor acts:

       Acts                          Work authorized                                    Documents

July     3,1930   Maintenance of the harbor as constructed by local          H. Doc. 357, 71st Cong., 2d sess.
                    interests.
Aug. 30, 1935     For enlarging the entrance channel to existing project     Rivers and Harbors Committee
                    dimensions and completing the turning basin to            Doc. 25, 74th Cong., 1st sees.
                    1,200 feet square.
June 20,1938      For enlarging the turning basin by adding a trape-         H. Doc. 545, 75th Cong., 3d sess.
                    zoidal area 350 feet wide on the north side.
July 24,1946      For general widening of the turning basin by 200 feet      H. Doc. 768, 78th Cong., 2d sess.
                    on the north and 500 feet on the south ,and for en-        (Contains the latest published
                   larging the flare of the entrance channel at the basin,    maps.)


   Local cooperation.--The River and Harbor Acts approved August
30, 1935, and June 20, 1938, imposed the condition, among others, that
local interests provide suitable areas for the disposal of dredged ma-
terial for maintenance. In addition, the latter act included the re-
quirement that local interests agree to provide the slips, piers, and
other terminal facilities necessary for the full utilization of the im-
provement. A resolution adopted January 26, 1939, by the Broward
County Port Authority, agreeing to provide suitable and sufficient
slips, piers, and other terminal facilities necessary for the full utiliza-
tion of the improvement, was accepted by the Chief of Engineers
February 20, 1939, as satisfactory assurance of compliance with that
part of the required local cooperation. In partial compliance with
the conditions, the port authority has provided slip No. 2 described
below under "Terminal facilities." . All other requirements affecting
original construction as imposed by the two acts have been fully com-
plied with. Sufficient temporary spoil-disposal areas have been fur-
nished for maintenance as and when required.
   The River and Harbor Act approved July 24, 1946, imposed the
conditions that responsible local interests agree to (a) provide, free
of cost to the United States, all necessary lands and rights-of-way and
suitable spoil-disposal areas, diked as necessary, for new work and
for subsequent maintenance, when and as required; (b) promptly
dredge and bulkhead slip No. 3 and the berth at the east end of pier
584     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,             1952

No. 3 on completion of the improvement in the southern part of the
turning basin by the Government; and (c) hold and save the United
States free from damages resulting from the work. A resolution
adopted by the Broward County Port Authority on October 23, 1947,
assuming responsibility for compliance with the above provisions of
local cooperation, was accepted by the Chief of Engineers on October
30, 1947, as satisfactory assurance of compliance. All new-work spoil
areas and easements in perpetuity for required rights-of-way have
been furnished. Slip No. 3 has been dredged to the dimensions and
depth stated below under "Terminal facilities."
   While not required under the conditions of local cooperation, the
Broward County Port Authority, in 1946, partially completed dredg-
ing an area of about 125,000 square feet on the westerly side, and
within the project limits, of the 500-foot extension to the southerly
side of the turning basin.
   Terminal facilities.---These consist of seven commercial wharf fa-
cilities at Port Everglades owned and operated by Broward County
Port Authority, all open to the public. They are on the three slips
that have been dredged off the turning basin. Slips No. 1 and 2 are
35 feet deep and 300 feet wide, and are respectively 1,200 feet and 700
feet long, with steel-sheet-pile bulkheads on both sides of each slip
and at the end of slip No. 1. Slip No. 2 was so constructed as to
permit future extension to a length of 1,200 feet. Slip No. 3, 1,200
feet long and 300 feet wide, is 35 feet deep but is inactive at present due
to pending bulkhead construction. A modern steel transit shed has
been constructed on pier No. 2, and a privately operated precooling
plant on pier No. 1. All wharves have railway and highway con-
nections and pipeline connections to one or more of the 13 storage
depots for petroleum products, one of which is also for blackstrap
molasses. The facilities are considered inadequate for the existing
commerce. (See Port Series No. 16, revised 1947, Corps of Engineers.)
   Operations and results during fiscal year.-Maintenance:Periodic
condition survey during May 1952 cost $2,584.07. The expenditures
were $2,500.99.
   Conditionat end of fiscal year.-The existing project was completed
in January 1949. Local interests dredged an entrance channel 210
feet wide, 35 feet deep, and about 6,900 feet long, from the ocean to
a partially completed turning basin 1,200 feet square, and constructed
two converging angular-stone jetties to protect the entrance channel
and two steel-sheet-pile bulkheads to protect the land points. The
United States enlarged the entrance channel to project dimensions,
completed the 1,200-foot-square turning basin to a depth of 35 feet,
widened it to a maximum width of 2,250 feet, and enlarged the flare of
the south side of the entrance channel at the basin between December
1936 and January 1949, and reconstructed the jetties as a maintenance
feature between May and September 1932. The seaward end of the
south jetty was straightened in connection with jetty repairs between
June and August 1940. Both jetties are in good condition. The
steel-sheet-pile bulkhead at the inner end of the south jetty is in poor
condition, and the similar bulkhead on the north side of the land cut
is in fair condition. The sheet piling, except for a short section at
the seaward end, was cut off at the low-tide line during construction
            RIVERS AND HARBORS-JACKSONVILLE,                                                      FLA.,         DISTRICT             585

for concrete capping, which was never placed. The tie-back piles and
deadman timbers have been virtually destroyed above earth line by
marine borers.
   In May 1952 controlling depths were as follows: Sea buoy to sea-
ward end of jetties, 33.1 feet in midchannel for half project width
with a limiting depth of 33.2 feet in the right outside quarter and 33
feet in the left outside quarter; the channel between the jetties and
through the land cut and across Lake Mabel, 34 feet in midchannel for
half project width, with limiting depths of 32.8 feet in the right out-
side quarter and 29.1 feet in the left outside quarter; and in the turning
basin the central 400 feet from the junction of the turning basin and
channel to slip No. 1 has a controlling depth of 35.0 feet; the balance:
of the turning basin is shoaled with balance on the right having a
controlling depth of 30.5 feet and the balance on the left side having
a controlling depth of 29.4 feet.
   The costs under the existing project have been $2,200,538.11 for new
work and $356,286.40 for maintenance, a total of $2,556,824.51. The
expenditures have been $2,556,741.43.
   Proposed operations.--The balance unexpended June 30, 1952,
 - $50.99, plus an allotment of $135,700 during fiscal year 1953, a total
of $135,649.01, will be applied as follows:
Accounts payable June 30, 1952__ ________               __--___ ---                                                               $83. 08
Maintenance:
    Dredging to remove the most obstructive shoaling
      in the 35-foot-depth entrance channel with United
      States hopper dredge Gerig, about one-half month,
      December 1952- -----
    Dredge, by contract, to remove obstructive shoaling
                                                       -      -   _------
                                                                    $46, 000. 00

      in the 35-foot-depth turning basin, December 1952_ 87, 500. 00
    Miscellaneous inspections and reports (contingen-
      cies) --------------       ..-----. -------------               2,065. 93
                                                                                                                          135, 565. 93

              Total for all work------------------------------                                                           -135,    649. 01
  The additional sum of $4,750 can be profitably expended for the
following scheduled work during fiscal year 1954:
Maintenance:
   Condition survey of the entrance channel and turning basin, April
      1954    -----------------------------------------------        $2, 000
    Miscellaneous inspections and reports (contingencies)             2, 750                            ------------
           Total for all work                          --------------------------------------4, 750
                                           Cost and financial summary

                                                           Fiscal year ending June 30                                    Total to June
                                                                                                                         30,1952, includ-
                                                                                                                         ing fiscal years
                                       1948              1949              1950              1951               1952      prior to 1948


New work:
   Appropriated        _........ $410, 000.     00 $356,000. 00 -$2, 315. 72                          -----.--.
                                                                                          .----------.-.                   $2, 200,538. 11
   Cost---....--         ..---------410, 000.   00   353, 684. 28 ...--- --------------------------                         2, 200, 538. 11
   Expenditures-........ 410,000.               00   353, 499. 77        184. 51                        ..........          2, 200, 538. 11
Maintenance:
   Appropriated-------........       96, 000.   00 -----------          17, 705. 22          $148. 18      $2, 450. 00           356, 152. 33
   Cost----....           ...        92, 221.   12       630. 25        20, 853. 85           148. 18       2, 584. 07           356, 286. 40
   Expenditures ......               92, 901,   30      -79. 37         20,883. 29            148. 18       2, 500:99            356, 203. 32
586     REPORT OF CHIEF OF ENGINEERS,         U.   S. ARMY,   1952

                        10. MIAMI HARBOR, FLA.
   Location.--Miami is near the northerly end of Biscayne Bay, about
335 miles southeasterly from the entrance to Jacksonville Harbor.
Miami River has its source in the Everglades and flows southeasterly
to enter Biscayne Bay at Miami. (See U. S. Coast and Geodetic
Survey Charts Nos. 547 and 1248.)
   Existing project.-This provides for the following: (a) A channel
30 feet deep and 500 feet wide from the 30-foot contour in the ocean
to near the outer end of the north jetty, thence 300 feet wide through
the entrance and across Biscayne Bay to and including a turning basin
1,400 feet long and 1,350 feet wide on the westerly side of Biscayne
Bay in front of the municipal terminals at Miami; (b) two parallel
rubblestone jetties at the entrance, 1,000 feet apart and 3,000 and 2,750
feet long, respectively; (c) an approach channel 300 feet wide and a
turning basin of irregular shape about 2,000 feet square, both 30 feet
deep, at Virginia Key, and dredging 12,060,000 cubic yards of material
from the bay bottom in addition to that to be dredged from the ap-
proach channel and turning basin to provide fill for the island, with
such modifications as in the discretion of the Secretary of the Army
and the Chief of Engineers may be advisable; (d) a channel 15 feet
deep and 200 feet wide from the mouth of Miami River to the turning
basin at the municipal terminals; (e) a channel 8 feet deep and 200
feet wide from the mouth of Miami River to the Intracoastal Water-
way and thence 100 feet wide to Government Cut; (f) a channel at the
mouth of Miami River, 15 feet deep at mean low water, 250 feet wide
at the outer end and tapering to 170 feet wide at Brickell Point in a dis-
tance of about 1,400 feet; thence a channel in Miami River, 15 feet
deep under flood conditions, 150 feet wide for 3 miles, thence 125 feet
wide for 1.1 miles, and thence 90 feet wide for 1.4 miles; (g) a channel
12 feet deep and 100 feet wide from Miami River to a harbor of refuge
in Palmer Lake, the location of the harbor of refuge and channel
leading thereto being subject to modification at the discretion of the
Chief of Engineers; (h) an approach channel 6 feet deep and 700 feet
wide to the harbor line at the seaplane base at Dinner Key, with an
enlargement at the inner end and with a channel 8 feet deep and 50
feet wide along the easterly edge of the widening.
   The plane of reference is mean low water, except for the 15-foot
channel in Miami River where depths are based on flood conditions.
The total length of the waterway under improvement is about 17.7
miles, including about 6 miles of entrance channel from the ocean to
and including the turning basin at the municipal terminals, 1.6 miles
of aproach channel to Virginia Key, 5.8 miles in Miami River, 3.5
miles in the connecting channels leading therefrom into the bay, and
0.8 mile at Dinner Key Airport.
   The mean tidal variation is 2.5 feet at the entrance and 2 feet in the
bay. The extreme variation is about 4.5 feet at the entrance and 3
feet in Biscayne Bay. Strong easterly winds raise the water level
about 1.5 feet at the entrance and 1 foot in the bay. Strong westerly
winds lower the water level about 1 foot at the entrance and about 0.5
foot in the bay.
   The estimate of cost for new work, approved in 1952, is $14,604,400,
excluding $23,000 to be contributed by local interests. The latest
              RIVERS    AND     HARBORS----JACKSONVILLE,                 FLA.,    DISTRICT         587


(1952) approved estimate of annual cost of maintenance is $75,000.
  The existing project was authorized by the following river and
harbor acts:

       Acts                       Work authorized                                 Documents

                                    MIAMI RIVER

July    3,1930   The 15-foot channel in Miami River, 150 feet wide at Specified in act.
                  the mouth.
       (1)       The channel at the Dinner Key Airport ------------. S.Doc. 95, 72d Cong., 1st sess. and
                                                                       specified in act.'
                                   MIAMI HARBOR

June 13,1902   An 18-foot channel in a land cut across the peninsula   H. Doc. 662, 56th Cong., 1st sess.
                 and construction of the north jetty.                    (Annual Report, 1900, p. 1987.)
Mar. 2,1907 Construction of the south jetty and increase of channel Specified in act.
                width to 100 feet.
July 25,1912 Enlarging the channel to 20-foot depth and 300-foot H. Doc. 554, 62d Cong., 2d sess.
                width and extending the jetties.
Mar. 4,1913 Modification of local cooperation requirements im- Specified in act.
                posed by the act of July 25, 1912.
Mar. 3, 1925 A channel 25 feet deep with present project widths        H. Doc. 516, 67th Cong., 4th sess.
                from the ocean to Biscayne Bay, thence 200 feet
                wide across the bay to but not including the muni-
                 cipal turning basin, and extension of both jetties.
July 3,1930 A channel width of 300 feet across the bay and en- Rivers and Harbors Committee
                 larging the municipal turning basin, with expendi-      Doc. 15, 71st Cong., 2d sess.
                 tures thereon limited to $200,000.
Aug. 30, 1935s A depth of 30 feet from the ocean to and in the turn- Senate     Committee Print, 73d
                 ing basin, with the existing authorized project         Cong., 2d sess.
                widths, including the 300-foot width in the channel
                 across the bay.
Aug. 26,1937 Extending the turning basin 200 feet to the south- Rivers and Harbors Committee
                ward.                                                    Doc. 86, 74th Cong., 2d sess.
Mar. 2,1945 The Virginia Key improvement---_. ---------              - S. Doc. 251, 79th Cong., 2d sess.'
    Do--...... For incorporation of the project for Miami River in     H. Doc. 91, 79th Cong., 1st sess.'
                 that for Miami Harbor; the widening at the mouth
                 of Miami River to existing project widths; the
                 channels from the mouth of Miami River to the
                 turning basin and to Government Cut; and the
                channel from Miami River to the harbor of refuge,
                provided that local interests contribute one-third
                of the cost.

1 War Department Appropriation Act approved July 14, 1932.
9   Contains latest published maps.
8   Included in the Public Works Administration program Jan. 3, 1934.

  Local cooperation.-All work authorized by the River and Har-
bor Act approved March 2, 1945, is subject to the conditions that
local interests furnish, free of cost to the United States, all lands,
easements, and rights-of-way and suitable spoil-disposal areas for
the initial work and subsequent maintenance, as and when required,
and hold and save the United States free from claims for damages
resulting from the improvement. Additional requirements imposed
by the act of March 2, 1945, are as follows: (a) The Virginia Key
improvement is subject to the conditions that local interests give
assurances satisfactory to the Secretary of War that they will provide
auxiliary channels and suitable airport and harbor terminal facilities
at Virginia Key generally in accordance with the plans submitted by
the district engineer and subject to such modifications as the Chief
of Engineers may require, and provide such operating facilities as the
United States may require; (b) the provision of a channel from
Miami River to the harbor of refuge is subject to the conditions that
local interests contribute one-third of the initial cost of the channel
furnish assurances satisfactory to the Secretary of War that they will
provide and maintain suitable depths in the harbor of refuge and
construct and maintain adequate mooring facilities therein, and agree
588     REPORT OF CHIEF OF ENGINEERS,        U.   S. ARMY,   1952

that, at any time upon the approach of a hurricane or severe storm
and specifically upon the request of the district engineer or his
authorized representative, the refuge basin will be open to all without
charge until storm danger is past.
   On March 21, 1945, local interests were informed as to the
requirements of local cooperation imposed in connection with the
Virginia Key improvement. No assurance of compliance with
those requirements has been received. On September 5, 1945, the
Commission of the City of Miami, Fla., adopted a resolution agree-
ing to assume responsibility for compliance with the local coop-
eration requirements imposed in House Document No. 91, Seventy-
ninth Congress, first session, except those pertaining to the channel
from Miami River to the harbor of refuge in Palmer Lake. On May
9, 1946, that resolution was accepted by the Secretary of War as
satisfactory assurance of partial compliance.
   All prior requirements have been fully complied with.
   Terminal facilities.-These consist of 42 piers and wharves, of
which 5 are on the east side of Biscayne Bay at Miami Beach, 1
is on Fisher Island, 5 are along the south side of MacArthur Cause-
way, 7 are on the west side of the bay at Miami, and 18 are on Miami
River. Seven of the facilities are open to the public for handling
general cargo. Four of these, including three municipal piers on
the west side of the bay and a privately owned pier near the east
end:of MacArthur Causeway, can accommodate deep-draft vessels.
They other three general cargo facilities are suitable for small ves-
sels, and include the Florida East Coast Railway wharf south of
the municipal piers and two privately owned wharves on Miami
River. All of the general cargo wharves have highway and railway
connections except the causeway terminal, which has highway con-
nections only. A municipal yacht anchorage and basin and a munic-
ipal wharf are open to the public for recreational craft. Of the
remaining piers and wharves, 7 in the bay and 2 on Miami River are
used for handling petroleum products, 17 are used in connection with
ship-repair activities, 6 are used for mooring vessels or handling
private freight, and 2 are idle. Three of these facilities have railway
connections, and all have highway connections except a petroleum
wharf on Fisher Island. In addition, numerous landing facilities
in and around Miami, especially on Miami River, are designed for
and used exclusively by recreational craft. The facilities are con-
sidered inadequate for the existing commerce. (See Port Series
No. 16, revised 1947, Corps of Engineers.)
   Operations and results during fiscal year.-Maintenance: Periodic
surveys and inspections cost $2,210.91. Maintenance of reservation
and bank revetment on north side of entrance channel cost $12,569.08.
   The cost for the year was $14,779.99 for maintenance. The ex-
penditures were $14,483.26.
   Condition at end of fiscal year.-The existing project was about
49 percent completed. The main 30-foot entrance channel from the
ocean to and including the turning basin was dredged progressively
between August 1904 and March 1939. A land cut 20 feet deep and
300 feet wide was dredged across the peninsula to Biscayne Bay
between August 1904 and October 1923; a channel 25 feet deep from
              RIVERS AND HARBORS-JACKSONVILLE,                                              FLA.,        DISTRICT              589

the ocean to and including the former municipal turning basin at
Miami (200 feet wide across the bay, and following the alinement
of the former municipal channel) was dredged between July 1926
and December 1933, and was deepened to 30 feet, including widening
the channel across the bay to 300 feet and enlarging the turning basin,
between April 1934 and March 1939. A channel 15 feet deep at mean
low water and 150 feet wide along the land point at the mouth of
Miami River for 1,400 feet, and thence northerly along the bay front
for about 1,200 feet, and a channel in Miami River for 5.5 miles above
its mouth, 15 feet deep under flood conditions and of project widths,
were dredged between March 1932 and August 1933. The channels
at the Dinner Key seaplane base were dredged between February and
August 1933. These facilities are no longer used by aircraft, and
the Dinner Key base was taken over by the city of Miami in 1947,
converted to accommodate pleasure boats, and is now known as the
Dinner Key Marina. The two stone jetties at the entrance were con-
structed to the 18-foot contour between March 1904 and October 1908,
extended 405 feet each in 1922, and extended to their present lengths
between September 1926 and March 1929. The north jetty and
revetment is 4,688 feet long, and the south jetty and revetment is
3,850 feet long.
 * The south jetty, both revetments, and that part of the north jetty
landward of the low-tide shore line in the ocean are in good condition.
Seaward of the low-tide shore line the north Jetty is in fair condition;
that section was damaged during the hurricane of November 1935.
Numerous pieces of granite were dislodged from the upper part of the
jetty and now rest on the ocean bed along the jetty. At several
points in the jetty, the crest has been lowered to the plane of mean
high tide. No sand encroachment toward the channel has taken place
through the lowered sections. When last surveyed, the controlling
depths were as follows:

                                                                         Project         Controlling depths,
                                                                       dimensions         mean low water

                      Name of channel                                                          Mid-            Date
                                                                                       Left channel Right surveyed
                                                                    Width       Depth outside for half outside
                                                                                      quarter project quarter
                                                                                              width

Main entrance:                                                        Feet       Feet   Feet      Feet        Feet
   From ocean through land cut and across Bis-
     cayne Bay---------------------------------                     500 to
                                                                       300         30 --------     31.0 --             June1952.
      Turning basin--.........-------....--...--.   -----------       1, 350       30    26. 9     30. 0       27. 1       Do.
Miami River:
      Biscayne Bay to South Fork, Miami River-....                       150      1 15    8. 4     12. 1        9.1    June 1944.
      South Fork. Miami River to Tamiami Canal                           125      1 15   10. 4     13. 6       10. 8      Do.
      Tamiami Canal to 36th St. bridge-----------............             90      1 15-------.      6.9....               Do.
Dinner Key Airport:
      Approach channel                   --------........................ 700       6      5. 7     5. 7        5. 7   May 1940.
      Channel along easterly edge of widening......                       50        8      8.0      8.0        8.0     1935.

  1 Under flood conditions.
  s This channel is not used by aircraft. It is now used as entrance channel to Dinner Key Marina. Break-
water now lies across 700-footchannel at its junction with Turning Basin.



          245554---583-vol. 1-                 38
590           REPORT OF CHIEF OF ENGINEERS,                                     U.    S. ARMY, 1952

  The work remaining to be done to complete the project is as follows:
Provide an approach channel and turning basin 30 feet deep at Vir-
ginia Key, and dredge 12,060,000 cubic yards of material from the
bay bottom in addition to that to be dredged from the approach
channel and turning basin to provide fill for the island; widen the
channel at the mouth of Miami River by 20 to 100 feet for 1,400 feet;
widen the existing channel along the southerly end of Bayfront Park
north of Miami River to 200 feet, and thence provide a channel 15
feet deep and 200 feet wide to the turning basin in front of the munici-
pal terminals; provide a channel 8 feet deep, 200 feet wide from the
mouth of the river to the Intracoastal Waterway, and thence 100 feet
wide to Government Cut; and provide a channel 12 feet deep and 100
feet wide from Miami River to a harbor of refuge in Palmer Lake.
  The total cost, all funds, has been $8,773,512.62, of which $7,218,-
373.86, including $2,202,126.04 Public Works funds, was for new work
and $1,555,138.76 for maintenance. The total expenditures have been
$8,773,097.29, including $2,202,126.04 Public Works funds.
  Proposed operations.-The balance unexpended June 30, 1952,
$957.97, plus an allotment of $9,500 during fiscal year 1953, a total of
$10,457.97, will be applied as follows:
Accounts payable June 30, 1952 ._______________.__-_____                                                           $415.33
Maintenance :
    Maintenance, by hired labor, of the United States reser-
      vation and bank revetments on the north side of the
      entrance channel and along the south side of the
      reservation during the fiscal year ___________--
                                                  -     -    $3, 500.00
    Miscellaneous inspections and reports (contingencies)_ 6, 542. 64
                                                                                                               10, 042. 64

      Total for all work - ----------------------------------- 10, 457.97
   No work is scheduled for fiscal year 1954.
                                          Cost and financial summary

                                                       Fiscal year ending June 30                             Total to June
                                                                                                             30, 1952, includ-
                                                                                                             ing fiscal years
                                      1948            1949           1950         1951           1952          priorto 1948

New work:
   Appropriated---........---------       -$65,631.26            -                             -$267.78         $7, 218, 373. 86
   Cost--- -------------        $158. 38         85. 46              $38. 52     -$38. 52     ------------       7, 218, 373. 86
   Expenditures----....  .        134. 28        85. 46              231. 14     -231. 14 ............           7, 218, 373. 86
Maintenance:
    Appropriated--...--....         42, 000. 00   110, 500. 00    12, 300. 00   13, 539. 27    14, 600.00        1, 555, 681.40
    Cost_       .------.--      _   10, 268. 78    67, 357. 87    93, 290. 77   12, 847. 15    14, 779. 99       1, 555, 138. 76
    Expenditures--....----.....      9, 636. 05    25, 253. 70   136, 124. 20   12, 809. 38    14, 483. 26       1, 554, 723. 43


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project-----_--------.1$7, 386, 000
1 In addition, $23,000 to be contributed.

                                11. OKEECHOBEE WATERWAY, FLA.

  Location.-CaloosahatcheeRiver has its source in Lake Okeechobee
and flows generally southwesterly, emptying into the Gulf of Mexico
through San Carlos Bay, about 30 miles south of the entrance to
Charlotte Harbor. (See U. S. Coast and Geodetic Survey Charts
Nos. 473, 1247, 1255, and 1289.)
         RIVERS AND HARBORS-JACKSONVILLE,         FLA.,   DISTRICT   591
   Lake Okeechobee is a large, fresh-water lake in south-central
Florida. (See U. S. Coast and Geodetic Survey Chart No. 1289.)
   St. Lucie Canal was constructed by the Everglades Drainage Dis-
trict as a control canal for Lake Okeechobee. It begins at about the
middle of the east shore of Lake Okeechobee and empties into the
south fork of the St. Lucie River at St. Lucie lock. The length of
the canal is 23.9 miles. (See U. S. Coast and Geodetic Survey Chart
No. 1289.)
   St. Lucie River, South Fork, flows north from the entrance of the
St. Lucie Canal about 7.4 miles to Stuart, where it joins North Fork to
form the St. Lucie River, thence east, southeast, and east about 7.7
miles, emptying into the Indian River opposite St. Lucie Inlet. (See
U. S. Coast and Geodetic Survey Charts Nos. 1247 and 1289.)
   Taylor Creek is formed by several small streams in central Okeecho-
bee County, and flows generally southeasterly, emptying into Lake
Okeechobee at its most northerly extremity. (See U. S. Coast and
Geodetic Survey Chart No. 1289.)
   (For description of above waterways see p. 705, annual report for
1932.)
   Previous projects.-Original projects for Caloosahatchee River
below and above Fort Myers were adopted by River and Harbor Acts
of August 2, 1882, and August 11, 1888, respectively. The next proj-
ect was adopted by the River and Harbor Act approved June 25, 1910,
which authorized the present project depths in Caloosahatchee River
from Fort Myers to the Gulf of Mexico, with a turning basin at Fort
Myers, and was modified by the River and Harbor Acts approved
July 3, 1930, and August 30, 1935, under the title "Caloosahatchee
River and Lake Okeechobee drainage areas, Florida," to provide,
among other things, for a navigable channel across the State and for
control of Lake Okeechobee, including construction of locks at Ortona
and Moore Haven. For further details see page 1828, annual report
for 1915; page 707, annual report for 1932; pages 878-888, annual
report for 1948; and pages 785 and 831, annual report for 1949.
   Existing project.--This provides for: (a) Replacing old locks Nos.
1 and 2, St. Lucie Canal, by a single new lock with a usable width of
50 feet, a usable length of 250 feet, a depth of not less than 8 feet over
the sills, and a new weir structure; (b) a channel 8 feet deep from
Fort Myers to the Intracoastal Waterway near Stuart, with widths
of 90 feet from Fort Myers to Moore Haven, thence 80 feet along the
southerly shore of the lake to the hurricane gate at Clewiston, thence
100 feet across Lake Okeechobee to and in the St. Lucie Canal to St.
Lucie lock, and thence 80 feet to the Intracoastal Waterway; (c) a
channel 8 feet deep and 100 feet wide from the project turning basin
to the existing municipal yacht basin at Fort Myers; (d) a basin 8
feet deep, 200 feet wide, and 400 feet long at Stuart; and (e) under
maintenance, the operation and care of St. Lucie lock.
   The project also includes maintenance of features completed under
previous projects as follows: (a) A channel 12 feet deep and 200 feet
wide from the Gulf of Mexico to Punta Rasa, about 3.8 miles, thence
10 feet deep and 100 feet wide to Fort Myers (Edison Memorial
Bridge), about 16.3 miles, with a turning basin at that point; (b) a
channel in Taylor Creek 6 feet deep when the lake is at elevation 12.56
592              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

mean sea level (elevation 14 feet Lake Okeechobee datum), and 60 feet
wide from the town of Okeechobee into the lake, 4 miles; (c) a naviga-
tion channel 6 feet deep and 80 feet wide following in general the
south shore of Lake Okeechobee from Clewiston to the St. Lucie Canal,
36.7 miles; and (d) the operation and care of the Moore Haven and
Ortona locks.
   The total length of the waterway from the Gulf of Mexico to the
Intracoastal Waterway is about 154.6 miles via the channel across Lake
Okeechobee, or about 165.3 miles via the channel along the south
shore of the lake.
   On July 1, 1947, mean sea level datum, which is 1.44 feet above the
Lake Okeechobee datum previously used between the St. Lucie and
Ortona locks, was adopted for use throughout the project. Project
depths are based on minimum water elevations referred to mean sea
level, as follows:
                                                                                                                                           Feet
St. Lucie River, Indian River (Intracoastal Waterway) to St. Lucie
  lock ----       --- ---------------------------------                 -- 0.                                                                  49
St. Lucie Canal and Lake Okeechobee, St. Lucie lock to Moore Haven
  lock ------------      ------------------------------    ----------- 13.                                                                     00
Caloosahatchee Canal, Moore Haven lock to Ortona lock ...-------------.   10.                                                                  06
Caloosahatchee River, Ortona lock to the Gulf of Mexico ------------    -0.                                                                    88
  The following table shows the principal features of the locks and
dams (spillways are maintained under the flood-control project for
Central and Southern Florida) :

                                                         St. Lucie Canal                               Caloosahatchee Canal

                                                      St. Lucie lock 1 and               Moore Haven lock                   Ortona lock and
                                                              dam                                                                dam

Distance from Lake Okeechobee_.                      23.9 miles_-            ---.............---........... -..           15.5 miles.
Nearest town (Florida)---------...........           Stuart, 8 miles-........ Moore Haven, • 0.75                         La Belle, 8 miles.
                                                                                           mile.
Lock dimensions a ..-............                    50 x 250 feet------...........    50 x 250 feet-----...----.......   50 x 250 feet.
Lift with minimum water eleva-                       13 feet___------------- 2.5 feet-------------..............          11.5 feet.
  tions.
Depth over sills:
      Upper---.------------------- 13.8 feet------------10                                 feet--------------             12 feet.
   Lower ------------------                          12.2 feet------------              11 feet-.------------- 11feet.
Character of foundation.---------                    Pile_---_--------                  Pile--.-------------- Pile.
Kind of dam_-.---                      __------.     Movable------------                None-------------- Movable.
Type of construction:
   Lock------......................-----------....   Concrete and steel- Concrete and steel-                              Concrete and steel-
                                                      sheet piling.            sheet piling,                               sheet piling.
      Dam..........................                  Concrete, Tainter-gate ........................                      Concrete, Tainter-
                                                      controlled.                                                          gate controlled.
Date of completion----..........-------....          (4)-...........----........    1935--------                          1937.
Actual cost------------------.....................   $2,019,355.21      --......... $556,849.92----------............     $856,904.15.

  I Old lock No. 2, constructed by Everglades Drainage District, is adjacent to the new lock and serves
as an auxiliary. This lock is 30 by 130 feet in the clear, with a limiting depth of 6 feet on the lower sill.
  3 Combined hurricane gate and lock.
  3 Width of chamber and greatest length available for full width.
  4 Substantially completed in 1943 except for the installation of the Tainter gates in the dam in 1950.
   i Includes $79,474.21 for removing old lock No. 1.



   The mean range of tide at Punta Rasa is 1.7 feet and at Fort
Myers, 0.7 foot. The extreme range is about 4.5 feet at Punta Rasa
and about 2 feet at Fort Myers. At low-river stage, tidal influence
is perceptible at the Ortona lock, 57.3 miles above Punta Rasa. The
mean range of tide at St. Lucie Inlet is 2.6 feet and the extreme range,
about 4.5 feet. Tidal effect is perceptible to St. Lucie lock, 15.1 miles.
              RIVERS     AND HARBORS-JACKSONVILLE,                         FLA.,     DISTRICT          593
Lake Okeechobee is maintained, so far as possible, between elevations
13 and 15 feet, mean sea level.
  The estimate of Federal cost for new work, approved in 1952
exclusive of amounts expended on previous projects, is $3,808,000.
The latest (1952) approved estimate for annual cost of maintenance is
$232,500, including $119,000 for operation and care of locks.
  The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                   Documents


Aug. 26,1937      For construction of a new lock and weir structure in   Rivers and Harbors Committee
                    St. Lucie Canal.                                      Doc. 28, 75th Cong., 1st sess.
Mar.     2,1945   For deepening to 8 feet, with present widths, from     H. Doc. 696, 76th Cong., 3d sess.'
                   Fort Myers to the Intracoastal Waterway near
                   Stuart via the existing channel along the southerly
                   shore of the lake to Clewiston and a channel across
                   Lake Okeechobee.
   Do-.......     For a channel from the project turning basin to the    H. Doc. 736, 79th Cong., 2d sess.1
                   municipal yacht basin at Fort Myers; and for a
                   basin at Stuart.
       (2)        Operation and care of locks and dams provided for
                   with funds from War Department appropriations
                   for rivers and harbors.

1 Contains latest published maps.
2 Permanent Appropriation Repeal Act of June 26, 1934.



   Local cooperation.-All work authorized by the River and Harbor
Act approved March 2, 1945, is subject to the conditions that local
interests furnish, free of cost to the United States, all lands, ease-
ments, rights of way, and spoil-disposal areas when and as required
for the initial work and for subsequent maintenance, and hold and
save the United States free from all claims for damages resulting
from the improvement. The provision of a channel from the project
turning basin to the municipal yacht basin at Fort Myers and of a
basin as Stuart is subject to the additional requirements that local
interests provide, maintain, and operate adequate mooring and serv-
icing facilities open to all on equal and reasonable terms, make addi-
tional improvements to protect the Fort Myers yacht basin from wave
action, and inclose the Stuart basin in accordance with plans to be
approved by the Chief of Engineers.
   A resolution adopted November 10, 1945, by the Board of Commis-
sioners of the Okeechobee Flood Control District (an agency created
by the State of Florida to comply with the requirements imposed
by the River and Harbor Act of July 3, 1930) agreeing to comply
with the requirements of local cooperation imposed in reference to
deepening the waterway to 8 feet between Fort Myers and the Intra-
coastal Waterway (H. Doc. 696, 76th Cong., 3d sess.) was accepted
by the Chief of Engineers on Februray 18, 1946, as satisfactory assur-
ance of compliance. All lands and spoil-disposal areas required
for the initial work of deepening the waterway to 8 feet have been
furnished. On July 28, 1949, the Okeechobee Flood Control District
adopted two resolutions transferring the agreements, commitments,
and assets of the Okeechobee Flood Control District to the Central
and Southern Florida Flood Control District. On July 14, 1949,
the Central and Southern Florida Flood Control District adopted a
resolution accepting the assets of the Okeechobee Flood Control Dis-
594     REPORT OF CHIEF OF ENGINEERS, 13.        S.   AtMY, 1952


trict and assuming its agreements and commitments as of midnight
July 31, 1949. On November 25, 1949, the Chief of Engineers author-
ized the Jacksonville district engineer to notify both districts that the
subject transfer was satisfactory to the Corps of Engineers.
   A resolution adopted November 17, 1949, by the City Council of
Fort Myers, agreeing to comply fully with all the requirements in con-
nection with the side channel at Fort Myers as set forth in House
Document 736, Seventy-Ninth Congress, second session, was accepted
by the Chief of Engineers on January 23, 1950, as satisfactory assur-
ance of compliance. On March 14, 1945, the chamber of commerce
and city of Stuart, Fla., were requested to furnish a similar resolution
in respect to the basin at Stuart, but no action has been taken.
   All prior requirements have been fully complied with.
   Terminal facilities.-In the vicinity of Fort Myers on the Caloo-
sahatchee River, these consist of three freight piers, one railroad
terminal pier, one municipal recreation pier, four privately owned
piers, and a municipal yacht basin. A mooring basin has been pro-
vided at La Belle. There are numerous small wooden-pile landings
along the upper Caloosahatchee River, along the lake shore, on St.
Lucie Canal, and on St. Lucie River, including one railroad terminal
pier, a municipal pier, and a pier for handling petroleum products at
Stuart. A marginal wharf 30 feet long and other limited facilities
with highway and railway connections are available on Taylor Creek
at the town of Okeechobee. The facilities are considered adequate for
existing commerce.
   Operations and results during fiscal year.-1Maintenance: Leased
dredge Monroe removed 21,108 cubic yards of material from shoals in
St. Lucie River near Palm City Bridge between February 19 and 24,
1952, at a cost of $14,762.46. Hired labor periodic condition surveys
and inspections cost $4,940.13. Hired labor removal of floating and
submerged snags and obstructions cost $62.88.
   Operation and care: Moore Haven and Ortona locks on the Caloo-
         e
saTeh-aTheT    iatiiand St. Lucie lock on the St. Lucie Canal were oper-
ated and maintained. Approach fender system at Ortona lock was
revised and reconstructed by contract. The costs for the year were
$53,806.24 for operations, $27,992.95 for ordinary repairs, and $34,-
704.73 for improvement and reconstruction, including $32,483.90 for
the work done by contract.
   The costs of all work during the fiscal year were $1976~.4Z for
maintenance and $116,503._2        for operating and care, a total of
$136,269.39. The expenditures were $122,277.09.
   Condition at end of fiscal year.-The existing project was about
99 percent completed. Construction of St. Lucie lock and spillway
at the lower end of St. Lucie Canal near Stuart was begun in August
1939 and completed in June 1943 except for installation of Tainter
gates in the spillway, which was completed in March 1950. An auxil-
iary lock gate has been installed in the upstream end of old lock No.
2. That lock, constructed by the Everglades Drainage District, is
adjacent to and supplements the new lock. Dredging to deepen the
waterway to 8 feet between Fort Myers and the Intracoastal Waterway
near Stuart, with over-depth in St. Lucie Canal, begun in June 1948,
was completed, together with dredging to provide a channel 8 feet
       RIVERS   AND   HARBORS-JACKSONVILLE,      FLA.,   DISTRICT   595

deep and 100 feet wide to connect the project turning basin with the
municipal yacht basin, August 9, 1950.
   Features completed under the previous project and maintained
under the existing project are as follows: A channel 12 feet deep
and 200 feet wide from the Gulf of Mexico to Punta Rasa, and thence
10 feet deep and 100 feet wide to Fort Myers, with a turning basin
at that locality, January 1911 to January 1913; the improved Caloo-
sahatchee Canal and River channel from Moore Haven to Fort Myers,
56.5 miles, providing a floodway and navigation channel at least 7
feet deep and 90 feet wide, and with a discharge outlet capacity of
2,500 cubic feet per second from Lake Okeechobee, February 1931 to
June 1937; a channel 8 feet deep and 80 feet wide in St. Lucie River
between Palm City bridge and St. Lucie lock, about 2.8 miles, Sep-
tember to December 1931; a channel 6 feet deep and 60 feet wide in
Taylor Creek from the town of Okeechobee to Lake Okeechobee, about
4 miles, July 1936 to March 1938; 58.3 miles of navigation channel
from Moore Haven lock to St. Lucie Canal, generally 8 feet or more
deep with a minimum width of 80 feet, following in general the south
shore of the lake, January 1932 to March 1936; a lock at Ortona, and
a combined lock and hurricane gate at Moore Haven, November 1934
to June 1943.
   For work constructed under previous projects and now maintained
under the flood control project for central and southern Florida, see
paragraph "Existing project," Central and Southern Florida.
   For information relative to the St. Lucie, Moore Haven, and Ortona
locks, see table in the paragraph "Existing project." Depths in excess
of 8 feet exist in the St. Lucie Canal and across Lake Okeechobee by
following in general the south shore of the lake. St. Lucie Canal was
constructed 8 feet deep and 150 to 165 feet wide by the Everglades
Drainage District between 1916 and 1928 as a control canal for Lake
Okeechobee. The controlling depths when last surveyed were as fol-
lows: Gulf of Mexico to Punta Rasa, 12 feet for a width of 200 feet
in August 1950; Punta Rasa to Fort Myers, 10 feet for a width of 100
feet in August 1950; Fort Myers to Ortona lock, 8 feet for a width of
90 feet in August 1950; Ortona lock to Lake Okeechobee at Moore
Haven, 8 feet for a width of 90 feet in April 1949; Lake Okeechobee
from Moore Haven to St. Lucie Canal via southshore channel, 9 feet
for a width of 50 feet in April 1949; via Liberty Point floodway chan-
nel and open lake, 5 feet for a width of 60 feet in April 1950; via
Clewiston approach channel, 8 feet for a width of 100 feet in March
1950; Lake Okeechobee to St. Lucie lock, 9 feet for a width of 80 feet
in November 1949; St. Lucie River from the lock to Intracoastal
Waterway near Stuart, 8 feet for a width of 80 feet in March 1950;
and Taylor Creek from the town of Okeechobee to Lake Okeechobee,
6 feet for a width of 60 feet in February 1949. The present controll-
ing channel width of 80 feet is reduced to 50 feet at locks and at 19
localities by bridges, with a limiting horizontal clearance of 50 feet
at the highway bridge near La Belle.
   The work remaining to be done to complete the project is to dredge
a basin 8 feet deep, 200 feet wide, and 400 feet long at Stuart.
   The costs under the existing project have been $3,803,447.47 for new
work, $312,687.02 for maintenance, and $680,005.75 for operation
596         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                               1952

and care, a total of $4,796,140.24. The expenditures have been
$4,712,209.79.
   Proposed operations.--The balance unexpended and accounts re-
ceivable June 30, 1952, $30,242.45, plus an allotment of $123,050 during
fiscal year 1953, a total of $153,292.45, will be applied as follows:
Accounts payable June 30, 1952------------------------------       $16, 857. 41
Maintenance:
    Remove, by hired labor, floating and submerged ob-
      structions from the navigation channels, as re-
      quired during fiscal year-------------------- $5, 000. 00
    Install, by contract, direction and marker signs,
      May 1953--------------------------------         11, 000.00
    Condition surveys of the navigation channels as
      required during the fiscal year--------------     4, 700. 00
    Miscellaneous inspections and reports (contin-
      gencies)     ----------------------------------   1, 389. 83
                                                                                                           22, 089.83
Maintenance (operation and care) :
   Operation of navigation locks______-------------                                   52, 031. 21
   Ordinary mainltenance and repairs ----------                                       44, 100. 00
   Improvement and reconstruction       ------------                                  18, 214. 00
                                                                                                         114, 345.21

               Total for all work_____                                                                   1----------------------53,292.4
  The additional sum of $86,900 can be profitably expended for the
following schedule of work during fiscal year 1954:
Maintenance:
   Condition surveys of the navigation channels to de-
      termine the need for dredging, as required during
     the fiscal year__          --------------         --                                  $5, 000
   Miscellaneous        inspections and reports (contin-
   gencies) --------------------------           -----                                       1, 400
                                                                                                                $6, 400
Maintenance (operation and care) :
   Operation of navigation locks -__----------                                        -   50, 600
   Ordinary maintenance and repair------------                                          - 20,800
   Improvement and reconstruction__ --------                                           -   9, 100
                                                                                                               80, 500

        Total for all work-------------------------------------                                                86, 900

                                      Cost and financial summary

                                                   Fiscal year ending June 30                           Total to June
                                                                                                        30. 1952, includ-
                                                                                                        ing fiscal years
                                  1948           1949           1950           1951          1952        prior to 1948

New work:
   Appropriated-........      $1,612,700.00---------- $300, 000. 00 -$48, 829. 56 ...----------....... I $20, 025, 722. 87
   Cost_-----...........   .     75, 863. 79 $1,352,620.40 553, 253. 16 25, 682. 78- --------.          1 20, 025, 722. 87
   Expenditures ....---------    58, 823.36 1, 227, 888.46 673, 669.54  46, 873.60....---------......-- 1 20, 025, 722.87
Maintenance:
   Appropriated --------.       834, 600. 00   351, 550.00    361, 000. 00    62, 000.00 $131,395.97      18, 519, 669. 67
   Cost ...---------------      499, 920. 74   609, 989. 49   354, 235.76    172, 346.98 136, 269. 39     18, 573, 843.13
   Expenditures.----..  --      446, 644. 40   635, 360. 22   359, 609. 51   191, 210. 80 122, 277.09     1 8, 489, 912. 68



Other new work data: Estimated additional amount needed to be appro-
priated for completion of existing project----------------------- $4, 500
  1 In addition, $500,000 were expended for new work and $1,000 for maintenance from contributed funds
on the previous project.
      RIVERS AND HARBORS-JACKSONVILLE,          FLA.,   DISTRICT   597
  12. INTRACOASTAL WATERWAY, CALOOSAHATCHEE               RIVER TO
                   ANCLOTE RIVER, FLA.

   Location.--The waterway extends from the mouth of the Caloo-
sahatchee River at Punta Rasa, Fla., to the mouth of Anclote River,
Fla., following in general an almost continuous series of protected
inside waterways along the Gulf coast of Florida. (See U. S. Coast
and Geodetic Survey Charts Nos. 1255-1257.)
   Previous projects.-Adopted by the following river and harbor acts:
For the improvement of the inside passage from Punta Rasa to
Charlotte Harbor (Pine Island Sound), act of June 13, 1902; for
Caseys Pass (Venice Inlet), act of August 30, 1935; for Sarasota Bay
 (including Little Sarasota Bay), acts of September 19, 1890, June 3,
1896, March 2, 1907, March 2, 1919, and August 26, 1937; and for
Channel from Clearwater Harbor through Boca Ciega Bay to Tampa
Bay, acts of June 25, 1910, and March 2, 1919.
   For further details see page 291, annual report for 1904; page
776, annual report for 1918; page 662, annual report for 1938; pages
720, 724-725, and 733-734, annual report for 1940; pages 692-694,
annual report for 1941; and page 767, annual report for 1945.
   Existing project.-This provides for improvement of the section
of the Intracoastal Waterway from the Caloosahatchee River, Fla.,
to Anclote River, Fla., to a depth of 9 feet at mean low water and a
width of 100 feet, including deepening the existing 100-foot-wide en-
trance channel at Caseys Pass (Venice Inlet) ; and for the construc-
tion of a highway bridge over the land cut at Venice, the operation
and maintenance of the bridge to be assumed by local interests. In
the area between Venice and Lemon Bay, the Secretary of the Army,
acting through the Chief of Engineers, is authorized to use the orig-
inal or such other route as may be deemed feasible by the Chief of
Engineers and approved by the Secretary of the Army. Two
parallel jetties 300 feet apart, each 659.4 feet long and consisting
of 19 steel-sheet-pile cylinders connected by steel-sheet-pile curtain
walls, together with the wood-sheet-pile bulkhead extensions and rip-
rap shore revetments, were constructed at the Caseys Pass entrance
under a previous project and are maintained under the existing proj-
ect. The waterway will include the existing improved channels in
Pine Island Sound from Punta Rasa to Charlotte Harbor, in Little
Sarasota Bay and Sarasota Bay from Nokomis to Tampa Bay, through
the entrance from the Gulf of Mexico at Caseys Pass (Venice Inlet),
and in Boca Ciega Bay from Clearwater Harbor to Tampa Bay. On
November 4, 1949, the Secretary of the Army tentatively approved a
modification of the route between Caseys Pass and Lemon Bay to pro-
vide a channel through Venice approximately paralleling Park
Boulevard.
   The total length of the waterway is 147.8 miles; the length of the
entrance channel at Caseys Pass is 0.67 mile. The mean ranges of
tide are 1.7 feet at Punta Rasa, 1 foot at Port Boca Grande, 1.4 feet
in Tampa Bay at Anna Maria, and 2 feet at the entrance to Anclote
River. The extreme ranges are about 4.5 feet at Punta Rasa, about
3 to 4 feet between Port Boca Grande and Corey Causeway over Boca
Ciega Bay, and about 5.5 feet at the entrance to Anclote River. South-
598           REPORT OF CHIEF OF ENGINEERS,                           U.    S. ARMY,           1952

erly winds over the area generally raise the water level by 1 to 1.5
feet; northerly winds lower the water level by 1 to 2 feet.
   The estimate of cost for new .work, approved in 1952, is $5,595,400,
exclusive of amounts expended on previous projects. The latest
 (1952) approved estimate for annual cost of maintenance is $87,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                    Documents

Mar.     2,1945   The 9- by 100-foot channel: deepening the existing       H. Doc. 371, 76th Cong., 1st sess.
                   channel through Caseys Pass to 9 feet; and con-           (Contains the latest published
                   struction of a highway bridge at Venice, operation        maps.)
                   and maintenance to be assumed by local interests.
June 30,1948      Use of the original or one of three designated alter-    Specified in act.
                   native routes between Caseys Pass and Lemon
                   Bay, provided that the cost to the United States
                   shall not exceed the cost of the original route.
May 17,1950       Use of such previously authorized routes or any          Specified in act.
                   other route in the Venice and Lemon Bay area as
                   may be deemed feasible by the Chief of Engineers
                   and approved by the Secretary of the Army.



   Local cooperation.-The act which adopted the project imposed
the conditions that local interests furnish, free of cost to the United
States, all lands, easements, rights-of-way, and spoil-disposal areas
for the initial work and for subsequent maintenance, when and as
required; hold and save the United States free from claims for dam-
ages resulting from the improvement; and give assurances satisfac-
tory to the Secretary of War that they will assume maintenance and
operation of the highway bridge to be constructed near Venice. The
West Coast Inland Navigation District, a special taxing district
created by the Florida State Legislature in 1947 to comply with
requirements of local cooperation, adopted a resolution on July 28,
1947, furnishing assurances of compliance. That resolution was ap-
proved by the division engineer on September 19, 1947, as satisfactory
assurance of compliance.
   Upon request, the district engineer furnished the West Coast In-
land Navigation District maps showing the spoil areas and rights-of-
way to be acquired for the sections of the waterway from Tampa
Bay to Anclote River and from Caloosahatchee River to Tampa Bay
on May 7 and July 15, 1948, respectively. The Navigation District
has indicated that it is ready to take immediate action toward pro-
curement of lands required for rights-of-way and spoil disposal upon
request of the district engineer. On April 13, 1950, the West Coast
Inland Navigation District adopted a resolution obligating itself to
pay $59,770, representing the estimated excess cost for constructing
the Park Boulevard route over that of the original route. That
resolution was forwarded to the Chief of Engineers on May 5, 1950.
   Terminal facilities.-These consist of one phosphate-loading wharf
at Port Boca Grande; 1 municipal concrete pier, 1 railway pier, 1
freight wharf, 1 marginal wharf 500 feet long on the terminal island,
and 10 privately owned buildings, all at Sarasota; 6 wharves along
Boca Ciega Bay; and a number of small, privately owned piers and
wharves at various points along the waterway for use of commercial
fishing boats and recreational craft. The municipal pier and the
          RIVERS AND           HARBORS-JACKSONVILLE,                                   FLA.,   DISTRICT            599
freight wharf at Sarasota are open to the public. The railway pier
:at Sarasota is used mainly for storing Pullman cars. All other piers
have highway connections only. The facilities are considered ade-
quate for the existing commerce.
    Operations and results during fiscal year.-Maintenance: Hired
labor erection of 5-warning signs at Casey's Pass jetties and bulkheads
was completed in December 1951 at a cost of $577.86. Hired labor
.surveys, and preparation of plans and specifications for repairs to
bulkheads and jetties at Caseys Pass cost $1,109.15. The costs and
expenditures for the year were $1,687.01.
   Condition at end of fiscal year.-The existing project was about 3
percent completed. Work has been limited to completion of about
28 percent of the required detail planning. Under previous projects,
channels, following in general the alinement of the project waterway,
have been dredged and jetties constructed as follows:

                     Work                           Depth        Width Length                       Dates

                                                     Feet         Feet         Miles
-Channel from Punta Rasa through Pine                    7          100        26       April to October 1903.
  Island Sound to Charlotte Harbor.
CChannel in Little Sarasota Bay from Nokomis               4      50-75        18       1898 to June 1927.
'Channel
  to Sarasota.
          in Sarasota Bay from
  Tampa Bay.
                                    Sarasota to            7         100       38       October 1891 to July 1939.
Entrance channel from the Gulf of Mexico                   8         100        0.67    June to October 1937.
at Caseys Pass (Venice Inlet).
Two jetties, each 659.4 feet long and with bulk-   --------------------                 February to July 1937.
  head extensions at Caseys Pass (maintained
  under the existing project).
CChannel from Tampa Bay to Boca Ciega Bay_.                8         100        1.25    January to July 1920.
'Channel through lower Boca Ciega Bay to                   7         100        7.75    August 1911 to March 1912.
  Blind Pass.
'Channel from Blind Pass to Clearwater Harbor.             5              50   17       November 1910 to April 1915.



   When last surveyed the controlling depths in midchannel for one-
half of former project widths were as follows: From Punta Rasa
through Pine Island Sound to Charlotte Harbor, 6 feet in February
1940; Little Sarasota Bay from Nokomis to Sarasota, 3 feet, and
thence in Sarasota Bay to Tampa Bay, 7 feet, in November 1945;
entrance channel from the Gulf of Mexico at Caseys Pass (Venice
Inlet), 7.6 feet in December 1951; channel between Tampa and Boca
Ciega Bays, 8 feet, and thence through lower Boca Ciega Bay to Blind
Pass, 7.1 feet, in November 1939; and from Blind Pass to Clearwater
Harbor, 5 feet in April 1940.
   The costs and expenditures under the existing project have been
$167,364.41 for new work and $35,848.84 for maintenance, a total of
$203,213.25
   Proposed operations.-The balance unexpended June 30, 1952,
$612.99, plus an allotment of $500 during fiscal year 1953, a total of
$1,112.99, will be applied as follows:
Maintenance:
    Condition survey of a short section of the channel in the vicinity
                                        ....
       of Pass-a-Grille, September 1952__---    -------------.                                                  $300. 00
    Miscellaneous inspections and reports (contingencies) ------------                                           812. 99

            Total for all work --------------------------                                           __       - 1, 112. 99
    No work is scheduled for the fiscal year 1954.
600         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                                 Cost and financial summary

                                              Fiscal year ending June 30                       Total to June
                                                                                              30,1952, includ-
                                                                                              ing fiscal years
                              1948          1949           1950        1951        1952        prior to 1948

New work:
   Appropriated- ..... $10,000.00       -$9, 000.00            -- --              - $744. 38      $682,843.83
   Cost....-------------  19, 282.63      22, 902. 58    $5, 705. 24   $431.66 ..........          682, 843. 83
   Expenditures---------. 18, 725. 20     23, 409. 83     5,571. 28     382. 52 ------------       682, 843. 83
Maintenance:
   Appropriated------- _-____-_           25, 000. 00   -6, 729. 38 ----------    2, 300.00         487, 211. 15
   Cost-...-----------------              17, 688.20        582.42-1,687.01                         486,598.16
   Expenditures._.           -            17,940. 53        330. 09 -----------   1, 687.01         486,598.16


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project --------------- $5, 428, 000

                             13. CHARLOTTE HARBOR, FLA.

   Location.-This harbor is a large bay on the west coast of Florida.
The entrance is 68 miles south of the entrance to Tampa Bay and 150
miles north of Key West. (See U. S. Coast and Geodetic Survey
Chart No. 1255.)
   Previous projects.-Appropriationsfor removing obstructions from
Peace River (formerly Peace Creek) were made in 1881, 1882, and
1886. Improvement of Charlotte Harbor and Peace River was au-
thorized by act of September 19, 1890. A project for improvement
of Pine Island Sound is now included in "Previous projects" for Intra-
coastal waterway, Caloosahatchee River to Anclote River, Fla. For
further details see page 152, annual report for 1890; page 1828, annual
report for 1915; and page 769, annual report for 1945.
   Existing project.-This provides for a channel 32 feet deep at mean
low water and 300 feet wide, increased to 700 feet wide at the bend,
from the Gulf of Mexico to Port Boca Grande, just inside the entrance,
thence 10 feet deep and 100 feet wide to the municipal terminal at
Maud Street, Punta Gorda, with a turning basin 200 feet square at the
outer end of the terminal. The length of waterway included in the
project is about 4.5 miles from the Gulf of Mexico to Port Boca
Grande, and thence about 25 miles to Punta Gorda.
   The mean tidal range is 1 foot at Port Boca Grande and 1.4 feet at
Punta Gorda. The extreme range is about 3 feet at Port Boca Grande
and 3.8 feet at Punta Gorda. Strong southwesterly winds raise the
water level about 1'.5 feet, and strong northerly and easterly winds
lower it about 1 foot.
   The estimate of cost for new work, revised in 1952, exclusive of
amounts expended on previous projects and $15,562.78 contributed by
local interests, is $439,500. The latest (1952) approved estimate of
annual cost of maintenance is $29,000.
   The existing project was authorized by the following river and
harbor acts:
                RIVERS                AND HARBORS--JACKSONVILLE,                                  FLA.,            DISTRICT                 601

       Acts                                            Work authorized                                             Documents

July 25,1912             A 24-foot channel 300 feet wide from the Gulf of Mexico                H. Doc. 699, 62d Cong., 2d sess.
                            through the Boca Grande entrance.
Mar.      3,1925         A depth of 27 feet at the entrance and a width of 500                  H. Doc. 113, 66th Cong., 1st sess.
                            feet at the bend.
July      3,1930         The 10-foot depth to Punta Gorda and the turning                       Rivers and Harbors Committee    1
                          basin at that point.                                                    Doc. 1, 70th Cong., 1st sess.
Aug. 26,1937             The 30-foot depth at the entrance and the 700-foot                     Rivers and Harbors Committee
                          width at the bend.                                                      Doe. 95, 74th Cong., 2d sess.
May 17,1950              Deepening the entrance channel to 32 feet.. ..
                                                                  ----------.                   H. Doe. 186, 81st Cong., 1st sess.'

  ' Contains latest published maps.


   Local cooperation.-Deepeningof the entrance channel to 32 feet
(H. Doc. 186, 81st Cong., 1st sess.) is subject to the condition that
local interests furnish assurances satisfactory to the Secretary of the
Army that they will hold and save the United States free from damages
due to construction of the improvement.
   All prior requirements have been fully complied with.
   Terminal facilities.-These consist of a phosphate wharf at Port
Boca Grande and a municipal earth-fill pier about 850 feet long, re-
tained by steel-sheet piling, at Punta Gorda. Both wharves are open
to the public. Railway connections are available at Port Boca
Grande, and highway and railway connections are available at Punta
Gorda. The facilities are considered adequate for existing commerce.
 (For further details see Port Series No. 8, Corps of Engineers.)
   Operations and results during fiscal year.-Maintenance: United
States hopper dredge Gerig removed 291,049 cubic yards of material,
bin measurement, in restoring project depth, April 6 to 26, 1952, at a
cost of $68,819.18. Condition survey cost $120.61. The cost for the
year was $68,939.79. The expenditures were $69,698.28.
   Condition at end of fiscal year.-The existing project was about
44 percent completed. A channel 24 feet deep and 300 feet wide
from the Gulf of Mexico to Port Boca Grande was dredged between
November 1912 and April 1913; was deepened to 27 feet (500 feet
wide at the bend) between August and December 1946; and was fur-
ther deepened to 30 feet (700 feet wide at the bend) between August
1.938 and August 1939. The 10-foot channel to Punta Gorda was
dredged from February to April 1931. The work remaining to
be done to complete the project is dredging to deepen the existing
entrance channel to 32 feet.
   When last surveyed the controlling depths were as follows:

                                                                                        Controlling depths

                   Name of channel                                 Project                 Midchannel              Date surveyed
                                                                    length       Leftout- :for. half   Right out-
                                                                               side quarter project   side quarter
                                                                                             width

                                                                   Miles           Feet        Feet                Feet
Outer Bar Cut ....---------------................ --                   1. 76          27. 5      30. 0               28. 9        April 1952.
Elbow ...............---------------------------                        .40           28.1       30. 8               32.1            Do.
Widener----------............................-------------------        .40           31.2       32.1                    30. 6        Do.
Inner Bar Cut........------...........--------------...                1.40           30.0.      31.2                    30. 0        Do.
Channel to Punta Gorda..............                                  25. 0    ............       9.5    ----------............   February 1950.
602               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

  The costs under the existing project have been $193,964.76 for new-
work and $744,582.33 for maintenance, a total of $938,547.09. The ex-
penditures have been $938,570.76. In addition, $15,562.78 were
expended from contributed funds for new work in Boca Grande
entrance channel.
  Proposed operations.-The balance unexpended and accounts
receivable June 30, 1952, $7,475.39 less a revocation of $3,475.00, a
total of $4,000.39 will be applied as follows:
Maintenance:
   Condition survey of the entrance channel to Port Boca Grande,
      May 1953---------------------         ------ ------- --------- $2, 500. 00
   Miscellaneous inspections and reports (contingencies) ----------- 1, 500. 39

                 Total for all work----------------------------------                                                  4, 000. 39
  The additional sum of $245,000 can be profitably expended for the
following scheduled work during fiscal year 1954:
New work: Dredge to complete the project by deepening the entrance
   channel to 32 feet, United States hopper dredge Gerig, about 2
   months, May-June 1954-----------------------------------                                                            $245, 000

                                                    Cost and financial summary

                                                                    Fiscal year ending June 30-                    Total to June
                                                                                                                   30, 1952, includ-
                                                                                                                   ing fiscal years
                                               1948                1949         1950         1951      1952         prior to 1948

New work:
   Appropriated-----------------------------------------------............                                 $306,964. 76
                                                                             ............----------......................
      Cost    --------...... ---------------------------------------------------------
                               .                                                                                       1 306, 964. 76
                                            -----------------------............
      Expenditures.......-----------..................                          ---------- -----------                   306, 964. 76
Maintenance:
      Appropriated-------------.........-----............ $2,000. 00 $75, 085.37  $2, 448. 54       $76,150.00           752, 057. 72
                                                           1, 745. 70
      Cost-----------------.................--------............      75, 428. 13  2,183. 36         68,939. 79          744, 582. 33
      Expenditures------.......----..       ---------      1, 845. 70 75, 328. 13  1, 448. 54        69, 698. 28         744, 606. 00


Other new work data : Estimated additional amount needed to be appro-
priated for completion of existing project-------------------- $245, 000
   1 In addition, $15,562,78 were expended from contributed funds for new work on existing project.


                                                    14. TAMPA HARBOR, FLA.

  Location.--This harbor is a large natural indentation of the Gulf:
of Mexico about midway of the western coast of the peninsula of
Florida.: The entrance is about 220 miles north of Key West, about
330 miles from Pensacola, 360 miles from Mobile, and 512 miles
from New Orleans. (See U. S. Coast and Geodetic Survey Charts
Nos. 586, 587, and 1257.)
  Previoue projects.--Adopted by the following river and harbor
acts: For Tampa Bay, acts of June 14, 1880, and August 11, 1888;
for Tampa and Hillsboro Bays, acts of June 14, 1880, March 3,
1899, and March 3, 1905; for Hillsboro River, act of June 14, 1880.
For further details see pages 1829, 1830, and 1831 of the annual report
for 1915, and page 665, annual report for 1938.
  Existing project.--This provides for: (a) Channels from the Gulf
of Mexico through Tampa and Hillsboro Bays and upper Tampa
Harbor to the city of Tampa, and through Tampa Bay to Port
Tampa City, 36 feet deep and 600 feet wide in Egmont Channel,
              RIVERS AND HARBORS-JACKSONVILLE,                              FLA.,     DISTRICT         603
thence 34 feet deep with widths of 500 feet in Mullet Key Cut, 400
feet in Tampa Bay, Hillsboro Bay, Port Tampa, and Sparkman Chan-
nels, and 30 feet deep with widths of 500 feet in Ybor Channel and 300
feet in Seddon and Garrison Channels; (b) widening the bend between
Sparkman Channel and Cut D of Hillsboro Bay Channel by 250
feet; (c) a turning basin 30 feet deep at the mouth of Hillsboro
River (west end of Garrison Channel), involving cutting back the
northwest corner of Seddon Island by 150 feet; (d) a turning basin
34 feet deep at the'entrance to Ybor Channel, including widening
the bend between Sparkman and Garrison Channels by cutting back
the northeast corner of Seddon Island (to about 950 feet from the point
of intersection of the edges of the two channels) and cutting off
the resulting corners; (e) a turning basin at the entrance to the Port
Tampa City terminals, 34 feet deep, 2,000 feet long, and 750 feet
wide; (f) maintenance of a channel dredged in Hillsboro River under
a previous project, 12 feet deep, 200 feet wide, and 2,400 feet long,
from the turning basin at the mouth to a point 100 feet south of
the Lafayette Street Bridge, and provision of a channel 9 feet deep
and 100 feet wide, thence to a point 2,000 feet upstream from the
Columbus Drive (formerly Michigan Avenue) Bridge, with removal
of snags, wrecks, and piling, thence to the Florida Avenue Bridge;
 (g) a channel 30 feet deep and 200 feet wide from the ship channel
in Hillsboro Bay to and including the existing turning basin in the
Alafia River, to be enlarged to a depth of 30 feet, a width of 700
feet, and a length of 1,200 feet; (A) construction of a breakwater
of dredged material at Peter O. Knight Field, Davis Islands, about
2,000 feet long and partially inclosing a landing basin for seaplanes
 (maintenance to be assumed by local interests). The length of the
section included in the existing project is about 64.1 miles, including
about 7.7 miles in the Hillsboro River and about 3.6 miles in the
Alafia River Channel. The plane of reference is mean low water.
    The mean range of tide is 1.3 feet at the lower end of the bay,
1.6 feet at Port Tampa City, and 1.8 feet at Tampa. The extreme
range is about 3.8 feet at the lower end of the bay and 4.8 feet
at Tampa. Strong southwesterly winds raise the water level about
1.5 feet. Strong northerly winds, which usually occur in winter,
lower the water level about 2 feet.
    The estimate of cost for new work, revised in 1952, is $20,993,700,
exclusive of amounts expended on previous projects. The latest
 (1952) approved estimate of annual cost of maintenance, exclusive of
the breakwater at Peter O. Knight Field, is $172,500.
    The existing project was authorized by the following river and
harbor acts:

       Acts                          Work authorized                            Documents and reports

                                       TAMPA BAY

Mar. 3,1899        For a channel 27 feet deep from the Gulf of Mexico to   H. Doc. 52, 55th Cong., 3d sess.
                     Port Tampa City, 500 feet wide across the bar and       (also printed in Annual Report
                    300 feet wide in the bay.                                1899, p. 1640).   Channel dimen-
                                                                             sions specified in act.
Mar.     8, 1905   For a channel depth of 26 feet with sufficient width
                    from the Gulf of Mexico to Port Tampa City.
                                                                           Specified in act.
604         REPORT OF CHIEF OF ENGINEERS, U.                                     S. ARMY,            1952


    Acts                              Work authorized                                 Documents and reports
       --       I                                                            I
                               TAMPA AND HILLSBORO BAYS

June 25,1910        For a depth of 24 feet in Hillsboro Bay-..............       H. Doc. 634, 61st Cong., 2d sess.
Aug. 8,1917         For a 27-foot depth from Gulf of Mexico up to and in         H. Doc. 1345, 64th Cong., 1st sess.
                      the several channels of Hillsboro Bay, the widths
                      to be 500 feet on the bar, 300 feet in Tampa Bay,
                      Ybor and Garrison Channels, and 200 feet in Hills-
                      boro Bay, Sparkman and Seddon Channels, with
                      turning basins at the mouth of Hillsboro River
                      and at Ybor Estuary.
                                      HILLSBORO RIVER

Mar.   3,1899       For a 12-foot channel to within 100 feet of the Lafay-       H. Doc. 545, 55th Cong., 21 seass.,
                     ette St. highway bridge (maintenance only; new               and Annual Report for 1898, pp.
                     work completed under a previous project under                1357-1360.
                      the title "Improving Hillsboro Bay, Fla.").
                                       TAMPA HARBOR

Sept. 22,1922  Consolidation of the above projects to form a single              Specified in act.
                 project for Tampa Harbor.
July 3,1930 Increasing the depth of Egmont Channel to 29 feet                    H. Doe. 100, 70th Cong., 1st sess.
                 and the width of Sparkman Channel to 300 feet.
Aug. 30, 19351 For a depth of 32 feet and a width of 600 feet on Eg-             S. Doc. 22, 72d Cong., 1st sess.
                 mont Bar, a depth of 30 feet and a width of 400 feet
                 in Mullet Key Cut, and a depth of 30 feet and a
                width of 300 feet in all other project channels in
                 Tampa Harbor (except in Hillsboro River and in
                 the channel leading to Alafia River); and for a
                 turning basin 2,000 feet long and 550 feet in maxi-
                mum width at the entrance to the Port Tampa
                 City terminals.
June 20,1938 For widening the bend between Sparkman Chan-                        S. Doc. 164, 75th Cong., 3d sess.
                 nel and Cut D of Hillsboro Bay Channel by 250
                 feet; widening Ybor Channel to 400 feet; and ex-
                 tending the turning basin at the west end of Garri-
                 son Channel (mouth of Hillsboro River) easterly
                 for 300 feet.
    Do....---- For construction of a breakwater at Peter O. Knight               Senate Committee 5      Print,     76th
                 Field, Davis Islands, its maintenance to be as-                   Cong., 1st sess.
                 sumed by local interests.
Mar. 2,1945    For widening Sparkman Channel to 400 feet and                     S. Doc. 183, 78th Cong., 2d sess.
                 Ybor Channel to 500 feet; widening the bend be-
                 tween Sparkman and Garrison Channels an addi-
                 tional 250 feet to extend the turning basin westerly;
                 and widening the bend between Seddon and Gar-
                 rison Channels by 150 feet (in lieu of 300 feetpre-
                 viously,authorized)- to extend the 'turning basin
                 easterly.
    Do...... For a channel 9 feet deep and 100 feet wide in the                  H. Doc. 119, 77th Cong., 1st sess.'
                 Hillsboro River for about 2.4 miles above the upper
                 end of the existing 12-foot channel, and for the
                 removal of obstructions thence to the Florida Ave.
                  Bridge.
    Do....... For a channel 25 feet deep and 150 feet wide from the              S. Doc. 16, 77th Cong., 1st sess.
                  Hillsboro Bay Channel to and including a turn-
                  ing basin in the Alafia River. (Revoked by act of
                  May 17, 1950.)
May 17,1950    For deepening Egmont Channel to 36 feet; enlarging                H. Doe. 258, 81st Cong., 1st sess.'
                  Mullet Key Cut, Tampa Bay Channel, Hillsboro
                  Bay Channel, Port Tampa Channel, and Port
                  Tampa turning basin to present project dimen-
                 sions; deepening Sparkman Channel and Ybor
                  turning basin to 34 feet; a channel 30 feetepp and
                 20(10fettl8-' d rmdt Hillsboro Bay Channel to and
                 including a turning basin in Alafia River, 700 feet
                 wide and 1,200 feet long (in lieu of the improve-
                 ment previously authorized); .and         substantial
                 widening at entrances, bends, and turns.


  1Included in Public Works Administration program, Sept. 6, 1933.
  4 Contains the latest published maps.

  Recommended modification of project.-Under date of March 9,
1950, the Chief of Engineers recommended modification of the exist-
ing project to provide for removal of snags, wrecks, piling, and
similar obstructions from the channel of Hillsboro River between the
upstream end of the existing project at the Florida Avenue Bridge
       RIVERS AND HARBORS-JACKSONVILLE,            FLA.,   DISTRICT   605
and the city waterworks dam, at an estimated cost to the United States
of $14,400 (1949) for new work with no increase in the annual cost
of maintenance in addition to that now required, subject to certain
conditions of local cooperation (H. Doc. 567, 81st Cong., 2d sess.).
   Local cooperation.-The River and Harbor Act of June 20, 1938
 (S. Doc. 164, 75th Cong., 3d sess.), authorized widening the bend
between Sparkman Channel and Cut D of Hillsboro Bay Channel
by 250 feet, widening Ybor Channel from 300 to 400 feet, and extend-
ing the turning basin at the west end of Garrison Channel easterly
for 300 feet, subject to the conditions that local interests furnish, free
of cost to the United States, necessary rights-of-way and suitable
spoil-disposal areas for new work and for subsequent maintenance as
required, and move and reconstruct all bulkheads, wharves, buildings,
roads, railroad tracks, and all other structures as may be necessary.
   The River and Harbor Act of March 2, 1945, authorized the further
widening of Ybor Channel to 500 feet, widening Sparkman Channel
to 400 feet, widening the bend between Garrison and Sparkman
Channels, and reducing the widening between Seddon and Garrison
Channels from 300 to 150 feet (S. Doc. 183, 78th Cong., 2d sess.),
subject to the conditions that the city of Tampa agree to commence
and complete promptly the construction of the belt-line railroad and
the paving of streets on the north and east sides of Ybor Channel (first
required by River and Harbor Act of August 8, 1917, and complied
with as regards the west side of the channel) when necessary in the
judgment of the Secretary of War; and provided further, that local
interests furnish, free of cost to the United States, all lands required
for the provision of the improvements and for the disposal of dredged
material during construction, and for subsequent maintenance as
and when required, and construct such bulkheads and retaining walls,
and strengthen or move adjacent structures, as may be required to
safeguard both the channels and the adjacent lands and structures,
all in a manner satisfactory to and approved by the Chief of Engineers
and the Secretary of War, and agree to hold and save the United
States free from claims for damages resulting from the improvement.
   In 1945 the Florida Legislature adopted a bill creating the Hills-
borough County Port Authority as the governing body and authority
of the area defined in the act as Hillsborough County Port District,
comprising approximately the northwest quarter and part of the
southwest quarter of Hillsborough County. It includes all channel
and terminal areas of Tampa and Port Tampa, but excludes the Alafia
River and the relatively undeveloped area east of the upper harbor.
On September 9, 1949, the Hillsborough County Port Authority
adopted a resolution agreeing to comply with all conditions imposed
in Senate Document 164, Seventy-fifth Congress, third session. On
October 11, 1949, the port authority adopted a resolution agreeing to,
and assuming full responsibility for compliance with, the require-
ments as set forth in Senate Document 183, Seventy-eighth Congress,
second session, except any requirement to extend the trackage of the
municipal belt-line railroad (extension not now required in accord-
ance with the provisions of the River and Harbor Act of May 17,
1950), but specifically including the obligation in respect to the portion
     245554-53--vol. 1i   39
606     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

thereof already completed. The Chief of Engineers accepted those
resolutions on November 21 and December 28, 1949, respectively, as
satisfactory assurance of compliance. The port authority has fur-
nished, or caused to be furnished, all lands, easements, rights of way,
and spoil-disposal areas required for new work provided for in those
documents. All streets on the west side of Ybor Channel have been
paved, and the through streets on the north and east sides have been
paved. In addition, the port authority has furnished evidence satis-
factory to the district engineer that the United States will be held
harmless in the event of sloughing of banks as a result of dredging.
The width of Ybor Channel has been restricted to a minimum of 480
feet at some localities to make unnecessary the construction of bulk-
heads and retaining walls and the strengthening or moving of
structures.
    The River and Harbor Act approved March 2, 1945, authorized
certain improvements in Hillsboro River (H. Doc. 119, 77th Cong.,
1st sess.) subject to the conditions that local interests furnish, free
of cost to the United States, all lands, easements, rights-of-way, and
suitable spoil-disposal areas for initial work and subsequent mainte-
nance when and as required; agree to make at their expense necessary
alterations to structures crossing the river; and hold and save the
United States free from claims for damages resulting from the im-
provement. The Hillsborough County Port Authority has indicated
that it will comply with these requirements when it becomes evident
that funds will be made available.
    The work authorized by the River and Harbor Act approved May
17, 1950, is subject to the conditions that for new work responsible
local interests give assurances satisfactory to the Secretary of the
Army that they will: (a) provide without cost to the United States
all lands, easements, rights-of-way, and spoil-disposal areas neces-
sary for construction and subsequent maintenance of the project, when
and as required; (b) hold and save the United States free from dam-
age due to the construction and subsequent maintenance of the works;
 (c) construct such bulkheads and retaining works, and strengthen or
move adjacent structures as may be required, prior to dredging, to
safeguard the channels, basins, and adjacent lands and structures, in
accordance with plans approved by the Chief of Engineers; (d) pro-
vide, prior to or concurrently with the Federal improvement, addi-
tional or enlarged slips and berthing space with necessary terminal
facilities at Port Tampa City in accordance with plans approved by
the Chief of Engineers; (e) open existing terminal facilities in Alafia
River to all at the same rates and charges that apply to other Tampa
Harbor terminals and expand those facilities as and when required
to meet the needs of commerce; and (f) open the terminal facilities
at Tampa Harbor to all on equal terms. The project document fur-
ther provides: (1) that the existing conditions of local cooperation
whereby approval of wharfage charges by the Secretary of War is
required (River and Harbor Act of August 8, 1917), be revoked;
 (2) that the requirements pertaining to the municipal belt-line rail-
road imposed by the River and Harbor Act of August 8, 1917 (H.
Doc. 1345, 64th Cong., 1st sess.) and by the River and Harbor Act of
March 2, 1945 (S. Doc. 183, 78th Cong., 2d sess.) be modified so as
       RIVERS AND    HARBORS-JACKSONVILLE,       FLA.,   DISTRICT   607
to require no further extension of trackage with the understanding
that the city's obligation with respect to the completed portion shall
remain in force until relieved by the Chief of Engineers.
   All other and prior requirements have been fully complied with.
    Terminal facilities.-There are 57 piers and wharves at Tampa,
including 14 on Hillsboro River at Tampa, 28 other piers within the
Tampa City limits, 1 at East Tampa, 13 on the slip at Port Tampa
City, and 1 on Old Tampa Bay at Rattlesnake, Fla. Those on
Hillsboro River are suitable for small vessels drawing up to 11 feet;
all others are used by deep-draft vessels. The municipal terminals
are on Ybor Channel and consist of a slip 778 feet long, 250 feet wide,
with a wharf on either side, one of which has a steel-frame transit
shed. The city of Tampa also owns a shore wharf on Hillsboro River
and another on Garrison Channel. Forty-eight of the facilities, in-
cluding the municipal slip, have railway connections, and all have
highway connections. The municipal terminals, 1 city wharf, and
10 private terminals are open to the public. The piers and wharves
on the various channels are used principally as follows: 39 for general
cargo and private commodities, 10 for mooring or berthing vessels at
shipyards, and 3 for various industrial purposes; 5 are not in use.
The facilities are considered adequate for the existing commerce ex-
cept at Port Tampa City. (See Port Series No. 17, revised 1947,
Corps of Engineers.)
    Operations and results during fiscal year.-Maintenance: United
States hopper dredge Gerig removed 878,275 cubic yards of material,
bin measurement, from upper harbor channels, December 26, 1951, to
April 3, 1952, at a cost of $202,967.43. Periodic condition survey of
the upper harbor channels cost $495.08. The cost for the year was
$203,462.51. The expenditures were $204,866.17.
   Condition at end of fiscal year.-The existing project was about 49
percent completed. Dredging was begun in August 1899 to provide
a channel 24 feet deep and of sufficient width from the Gulf of Mexico
to Port Tampa City, and in November 1910 to provide a channel of
the same depth in Hillsboro Bay to Tampa. Dredging has been coi-
tinued intermittently to secure greater depths and widths as author-
ized from time to time. Egmont Channel, 29 feet deep and 500 feet
wide was completed in July 1931, and channels 30 feet deep, 400 feet
wide at Mullet Key Cut and Tampa Bay Channel Cut A, 300 feet wide
thence to and including the Port Tampa Channel, Hillsboro Bay
Channel, Seddon Channel, Sparkman Channel, Ybor Channel, and
275 feet wide in Garrison Channel were completed in June 1936.
Egmont Relocation Channel, to replace the old channel alinement on
Egmont Bar, was dredged 32 feet deep and 600 feet wide from Feb-
ruary 1938 to May 1939. Sparkman Channel was widened to a total
width of 400 feet and the bends between Sparkman Channel and Cut
D of Hillsboro Bay Channel were widened to project dimensions
between July 1947 and May 1949. A turning basin 2,750 feet long
and 550 feet wide was dredged at the entrance to the Port Tampa
City terminals between November 1933 and December 1935. The
turning basin at the entrance to Ybor Channel was completed in
July 1947, and that at the west end of Garrison Channel (mouth of
608               REPORT                OF       CHIEF OF            ENGINEERS,            U.       S.     ARMY,               1952


Hillsboro River), in May 1949. Ybor Channel was widened to a
total width of 500 feet between April and June 1950.
  A channel 12 feet deep and 200 feet wide in Hillsboro River from
the mouth to within 100 feet of the Lafayette Street Bridge was
dredged between December 1899 and about June 1905 under a previ-
ous project, and has been maintained under the existing project.
The breakwater of dredged material at Peter O. Knight municipal
airport was constructed from August 1940 to January 1941, and the
City of Tampa has formally assumed responsibility for its care, pres-
ervation, and maintenance.
  When last surveyed the controlling depths were as follows:
                                                                                            Dredged                      Minimum depth
                                                                                          dimensions
             Date                                          Section
                                                                                                            Left Cforhalf Right
                                                                                       Width         Depth outside
                                                                                                           otsi    dredged outside
                                                                                                           quarter .width quarter


                                                                                         Feet            Feet      Feet          Feet     Feet
December 1950 ....-           Egmont Relocation Channel-.........             600                           32      31. 1        33.0      32.0
October 1949_......           Mullet Key Cut .....................            400                           30      30. 9        31. 4     30. 0
January 1948...--------       Tampa Bay Channel:
                                  Cut A ...       . . ..--------- -------- 400                             30          30. 0     30.0       31.0
                                  Cuts B to F ........           __........   300                          30          30.5      30.0       31.0
June 1950 ...-------        - P ort T ampa Channel ... ._ ..... ..... 300                                  30          20.5      24.7       26.0
January 1948__- .----- Port Tampa turning basin ...........                   550                          30          24.2      30.0       27.6
                              Hillsboro Bay Channel:
     Do ..----....---------       Cut A ---.--.....----             ..--      300                          30          30.0      30.0       30.0
April 1952 .......                             ---...--.
                                  Cut C ......----                            300                          30          32.7      30.        30.0
     D o --------------- C ut D ..... ...................                     300                          30          31.3      30.        30. 0
                              Upper harbor:
     Do
     Do__------------
                                  Seddon   Channel___           _________     300                          30          27.8      26.2       26.2
     Do ....-.......              Sparkman Channel_                           400                          30          28. 8     28.8       29. 5
     Do----  --- -_--              Garrison Channel (west to east)___        1275                          30          26.8      24.8       25. 2
June 1951_ ........           Ybor Channel ....                ___
                                                         .......        -_-_ 2480                          30          28. 2     29.0       30.3
April 1946 -__-__       .___. Alafia River Channel 3 ___________              150                          23          14.7      17.0       11.0
                              Hillsboro River:
March 1944 -..     _...           Mouth to Lafayette Street Bridge__          200                           12          9.0       10.9        9.0
1939     .---------- Thence to a point 2,000 feet upstream
        ---                                                                  S100                          49      -               4.1         --
                                from Columbus Drive Bridge

  1 Project width 300 feet.
  2Project width 500 feet.
  3 As dredged by local interests; project depth is 30 feet, and width 200 feet.
  SProject dimensions; no work has been done by the United States.

  The work remaining to be done to complete the project is as follows:
Dredge a channel 9 feet deep and 100 feet wide in Hillsboro River for
about 2.4 miles above the upper end of the existing 12-foot channel,
and thence remove obstructions to the Florida Avenue Bridge; 'and
the improvements authorized by act of May 17, 1950 (H. Doc. 258,
81st Cong., 1st sess.).
  The costs and expenditures under the existing project to June 30,
1952, have been as follows:
                                                                                     Costs
                          Funds                                                                                                  Expenditures
                                                              New work           Maintenance                    Total


Regular    --------------------------
            ......                                           $7, 391, 413. 41    $2, 722, 572. 18        $10, 113, 985. 59       $10,114,024.97
Public works.....................                             1,329, 300. 47 .......------------           1, 329, 300. 47         1,329, 300. 47
Emergency relief--....................----------------..      1, 463, 000. 00-- _----_                     1, 4 3, 000.00          1, 463, 000.00

                      --              -------------
        Total............................                    10, 183, 713.88      2, 722, 572. 18         12, 906, 286.06         12, 906, 325. 44
            RIVERS           AND HARBORS-JACKSONVILLE,                                 FLA., DISTRICT                   609
   Proposed operations. The balance unexpended and accounts re-
ceivable June 30, 1952, $782.86, plus an allotment of $185,100 during
fiscal year 1953, a total of $185,882.86, will be applied as follows:
Maintenance:
   Dredge to remove the most obstructive shoaling in 30-foot-depth
      channels of Tampa Harbor, United States hopper dredge
      Gerig, about 11/2 months, April-May 1953---------------      $174,000.00
   Condition surveys of the project channels, January 1953            2,100. 00                  ------
   Miscellaneous inspections and reports (contingencies) ---------    9, 782. 86

          Total for all work-_ -------------------------------                                                  85, 882. 86
   The additional sum of $987,450 can be profitably expended for the
following scheduled work during fiscal year 1954:
New work: Begin dredging by continuing contract, a channel 30 feet
   deep and 200 feet wide from the ship channel in Hillsboro Bay
   to and including a turning basin, 700 by 1,200 feet in Alafia
   River, March-June 1954--..----------- -------------------                                                     $800, 000
Maintenance:
   Dredge to remove critical shoaling in 30-foot channel of
      Tampa Harbor with United States hopper dredge
      Gerig, 2 months, March-April 1954-------------- $174, 000
   Condition survey of the project channels, December
      1953---------------------------------------            2, 500
   Miscellaneous inspections and reports (contingencies)_   10, 950
                                                                                                                   187, 450
             Total for all work ----------------------------------                                                 987, 450
                                      Cost and financial summary

                                                    Fiscal year ending June 30-                               Total to June
                                                                                                              30,1952, includ-
                                                                                                              ing fiscal years
                                  1948            1949           1950            1951              1952        priorto 1948

New work:
   Appropriated __-..
                   -- . -$30,000.00 $600, 000.00 $414, 986. 80 -$25,605.38 ............                        $11,036, 764. 34
   Cost-__________-_ 305, 306. 14 585, 342. 66 333, 668. 05      72, 248. 51 ............                       11, 036, 764. 34
   Expenditures-......         316, 081.82    603, 765. 26    164, 878. 83                         --
                                                                             224, 502. 59 ......-----......     11, 036, 764. 34
Maintenance:
    Appropriated- ........     150, 000. 00   -55, 000. 00     65, 300. 00   257, 059. 75 $202, 800.00           2, 740, 462. 28
    Cost---------------.... 92, 271. 76          4, 265. 05   62, 490. 15    260, 133. 67     203, 462. 51       2, 739, 679. 42
    Expenditures-........   87, 274. 34          9, 523. 56   61, 466. 13    259, 438. 15     204, 866. 17       2, 739, 718. 80


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project---------------                                               $10,810,000

                               15. WITHLACOOCHEE RIVER, FLA.
  Location.-This river rises in the central part of the peninsula of
Florida and flows generally northwesterly and westerly, emptying
into the Gulf of Mexico about 20 miles southeast of Cedar Key, Fla.,
and 95 miles north of the entrance to Tampa Bay. (See U. S. Coast
and Geodetic Survey Chart No. 1259.)
  Previous projects.-A project for the improvement of the entrance
was adopted by the River and Harbor Act of June 13, 1902. For
further details see page 1832 of the annual report for 1915, and page
523 of annual report for 1934.
  Existing project.-This provides for securing and maintaining a
channel 10 feet deep at mean low water and 100 feet wide from the
Gulf of Mexico to Port Inglis, just within the river entrance, by
610           REPORT OF CHIEF OF ENGINEERS,                            U.   S. ARMY, 1952

dredging and rock excavation; maintaining the channel between the
river mouth and Inglis (steam-electric plant) 10 feet deep and gen-
erally 70 feet wide; and removing snags, overhanging trees, and
loose rock, and cutting through shoals in the upper river, to make a
draft of 2 feet available for about half the year as far as Croom
 (formerly Pembertons Ferry), 85 miles above the mouth. The Second
Deficiency Appropriation Act, 1944, approved June 28, 1944, author-
ized the use of appropriations for rivers and harbors for the improve-
ment, in the interests of national defense and subject to the approval
of the Chief of Engineers, of the channel between the mouth of the
river and Inglis. The authorized work comprises the provision of a
practical channel 10 feet deep at mean low water and 70 feet wide,
with easing of bends, from Port Inglis to the steam-electric plant at
Inglis, by dredging and rock excavation. The lengths of the sections
included in the project are 4.1 miles from the Gulf to Port Inglis,
thence 6.4 miles to the steam-electric plant at Inglis, and thence about
78.6 miles to Croom. The mean tidal range at the mouth is 2.8 feet
and the spring range about 3.5 feet. The effect of the tide is per-
ceptible for about 11 miles above the mouth. Strong southwesterly
winds raise the water level at the mouth about 1 foot, and strong
northerly winds, which usually occur during the winter, lower the
water level about 1.5 feet. Freshets raise the water level in the upper
river from 4 to 6 feet and at the mouth about 1 foot.
   The estimate of cost for new work, revised in 1952, is $663,900,
exclusive of amounts expended on previous projects, but including
$299,859.38 for the improvement of the channel between the mouth
and Inglis. The latest (1952) approved estimate of annual cost of
maintenance is $5,500.
   The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                     Documents

Mar. 3,1881       Improving river from mouth to Hays Ferry, 79 miles.       Annual Report, 1880, pp. 1110-1119.
Aug. 5, 18861     Extending improvement to Croom (Pembertons                Annual Report, 1885, pp. 1277-1278.
                    Ferry), 6 miles above Hays Ferry.
Mar.     2,1907   A depth of 10 feet below mean low water from the          H. Doc. 483, 59th Cong., 2d sess.
                    Gulf to Port Inglis.
June 28, 19442    Use of appropriations for rivers and harbors for im-      Specified in act.
                   proving the channel between the mouth and Inglis.
July 24,1946      Maintaining the channel 10 feet deep and generally        H. Doc. 293, 79th Cong., 1st sess.
                    70 feet wide between the river mouth and Inglis.          (Contains latest published maps.)

  1 Modified in accordance with recommendations in Annual Report for 1885.         (See also Annual Report for
1887, p. 1248.)
  2Second     Deficiency Appropriation Act, 1944.

  Local cooperation.-The River and Harbor Act approved July 24,
1946, imposed the condition that local interests agree to furnish, free
of cost to the United States, all rights-of-way and spoil-disposal areas
necessary for the maintenance work when and as required, and hold
and save the United States free from damages due to the maintenance
work.
   Terminal facilities.--These consist of one small timber dock at
Inglis, with shore facilities for fuel-oil storage; one dock at Yankee-
town, with shore facilities for gasoline storage; two small docks for
        RIVERS AND HARBORS-JACKSONVILLE,               FLA.,   DISTRICT      611
handling fish-one each at Yankeetown and Inglis; one small dock
at Panasoffkee, open to public use; and several privately owned docks
along the river. The facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year.-Periodiccondition sur-
veys cost $3,876.81 for maintenance; the expenditures were $3,632.14.
   Condition   at end of fiscal year.-The existing project as a whole
was about 88 percent completed. The entrance channel was about 85
percent completed. A channel 10 feet deep and 85 feet wide from the
10-foot contour in the Gulf of Mexico to Port Inglis was dredged
between April 1908 and November 1914. A practical channel 10 feet
deep and 70 feet wide, with easing of five sharp bends, from the mouth
of the river to the steam-electric plant at Inglis was provided by
dredging and rock excavation between June 1945 and March 1946.
Removal of snags, overhanging trees, sunken logs, loose rock and
boulders, and some rock ledges from the river between its mouth and
Croom was begun in March 1882 and was practically completed in
1892, thereby enabling light-draft boats to ascend the river to Croom,
except ,at low-water stages. Under permit granted by the Secretary
of War on April 16, 1904, a power dam and a lock 134 feet by 36 feet,
now owned and operated by the Florida Power Corp., were built about
11.4 miles above the mouth of the river. The dam creates a pool ex-
tending nearly to Dunnellon, 24.5 miles above the mouth. The lock,
which had been inoperative since installation of the gates in 1916
except for about 7 months during 1926, was restored to operating con-
dition in January 1942. When last surveyed, controlling depths were
as follows: Gulf of Mexico to the power plant at Inglis, 10 feet in
May 1952; Inglis to Dunnellon, 4 feet in May 1940; and thence to
head of navigation at Croom, about 2 feet during half the year with
1 foot during low stages. The depths are referred to mean low water.
Gulf datum, between the entrance and the dam, and to local low-water
stage of the river above that point. The river from the Florida
Power Corp. dam, including Rainbow Run, to Stokes Ferry was in
poor condition, and from Stokes Ferry to Croom, the river was in fair
condition due to fewer fallen trees.
   The work remaining to be done to complete the project is the 15-
foot widening of the entrance channel to Port Inglis.
   The costs under the existing project to June 30, 1952, have been
$584,911.60 for new work and $179,324.54 for maintenance, a total of
$764,236.14. The expenditures have been $764,034.14.
   Proposed operations.-The balance unexpended June 30, 1952,
$47.57, plus an allotment of $2,900 during fiscal year 1953, a total of
$2,947.57, will be applied as follows:
Accounts payable June 30, 1952----------------------------------         $202. 00
Maintenance:
    Condition survey of the 10-foot entrance channel from
      the Gulf of Mexico to Inglis, April 1953------------$2, 100. 00
    Miscellaneous inspections and reports (contingencies)_    645. 57
                                                                        2, 745. 57
        Total for all work-------------------------------------         2,947. 57
612          REPORT OF CHIEF                          OF ENGINEERS, U.                        S. ARMY,              1952

  The additional sum of $25,780 can be profitably expended for the
following scheduled work during fiscal year 1954:
Maintenance:
   Dredge, by contract, to remove shoaling to restore project depth
      in the 10-foot-depth entrance channel from the Gulf of Mexico
      to Inglis-   -------------------------------------------        $25, 000
   Miscellaneous inspections and reports (contingencies) ------------      780

            Total for all work -----------------------------------------                                                         25, 780

                                            Cost and financial summary

                                                         Fiscal year ending June 30-                                      Total to June
                                                                                                                          30, 1952, includ-
                                                                                                                          ing fiscal years
                                       1948              1949             1950            1951             1952             priorto 1948

New work:
   Appropriated--.......------------          .....------------..............        ------------------------                  $614, 911. 60
   Cost .-----------             ------------
                                ......                        ------------                                 -----------
                                                                                       -----............----.....               614, 911. 60
   Expenditures----........-----------------                 --------           -.------------             ------------         614, 911. 60
Maintenance:
   Appropriated .......            $25, 000. 00      $7, 000. 00     $45, 028. 79    -$7,189. 73        $3, 679. 71             179, 170. 11
   Cost  -     - -                   2, 085. 44      28,148. 06       13, 644. 02      26, 123. 58       3, 876. 81             179, 324. 54
   Expenditures .. __--              2, 218. 64      28, 064. 86          641. 47      39, 118. 80       3, 632. 14             179,122. 54


Other new work data: Estimated additional amount needed to be appro-
  priated for completion of existing project --------------------- $79, 000

                                        16. ARECIBO HARBOR, P. R.

   Location.-The harbor is on the north shore of Puerto Rico about
40 miles west of San Juan Harbor. (See U. S. Coast and Geodetic
Survey Chart No. 903.)
   Previous projects.-A previous project was authorized by the River
and Harbor Act approved August 30, 1935, subject to certain con-
ditions of local cooperation. Local interests were unable to comply
with those conditions, and further, the type of deep-water terminal
proposed was objectionable to navigation interests. As a result no
work was done, and no expenditures were made under the project.
For further details see pages 1619 and 1620 of annual report for 1936.
   Existing project.-This provides for construction of a stone break-
water 1,200 feet long extending from Point Morrillos to Cocinera
Rock; dredging an entrance channel 25 feet deep at mean low water
and 400 feet wide, flared to 650 feet wide at the ocean entrance and
widened for the inner 650 feet of its length to form a maneuvering
area of the same depth and 900 feet wide, fronting the proposed deep-
water terminal. The mean tidal range is 1.1 feet; the extreme varies
between about 1 foot below and about 2.8 feet above mean low water.
   The actual cost of new work was $1,128,074.86, excluding $288,000
contributed by local interests. The latest (1952) approved estimate
of annual cost of maintenance is $20,000. The existing project was
adopted by the River and Harbor Act of August 26,1937. (See Rivers
and Harbors Committee Doc. 43, 75th Cong., 1st sess.)
   Local cooperation.-A deep-water terminal constructed by local in-
terests in accordance with plans and specifications approved by the
Secretary of the Army as required by Rivers and Harbors Committee
          RIVERS        AND HARBORS-JACKSONVILLE,                       FLA.,       DISTRICT          613
Document No. 43, Seventy-fifth Congress, first session, was completed
in May 1952.
    Terminal facilities.-The only facility is the deep-water terminal
constructed by local interests as a required feature of local coopera-
tion; it provides 550 feet of berthing area fronting the northerly
project limit. As the production of the tributary area has increased
approximately 265 percent during the past 12 years, the existing
terminal facilities are not considered adequate for present commerce.
However, local interests propose to resort to lighterage for unloading
and loading ships at anchor until additional berthing space is made
available.
    Operations and results during fiscal year.-Maintenance: Repair
and reconstruction of damaged and deficient rock sections of break-
water by contract was begun November 26, 1951, and was 94 percent
completed at the end of the fiscal year. Placement of 8,260.49 tons
of granite stones cost $80,168.64. Hired-labor condition survey cost
$1,886.57. The cost for the year was $82,055.21 for maintenance. The
expenditures were $29,654.07.
   Condition at end of fiscal year.-The existing project was completed
in 1944.
   The controlling mean-low-water depths were as follows:

                                                          Controlling depths

      Name of channel          Length                                                              Date
                                             Left out- Left inside Rightin-      Right out-      surveyed
                                           side quarter quarter    side quarter side quarter

                               Miles          Feet         Feet         Feet         Feet
Ocean entrance channel .__ _      0. 04         26. 1        25. 1          24. 9        24. 0   April 1952.
Entrance channel                    . 17        23. 4        23. 4          22. 2        19. 8    Do.
Terminal channel_   .. ... .        . 13        21. 0        18. 1     1 2 to 18     2 2 to 8     Do.

1 Partially dredged.
2 Not dredged.


  The costs under the existing project to the end of the fiscal year
have been $1,128,074.86 for new work and $84,485.23 for maintenance,
a total of $1,212,560.09. The expenditures have been $1,160,158.95.
In addition, $288,000 were expended from contributed funds for
new work.
  Proposed operations.-The balance unexpended June 30, 1952,
$80,845.93, less a revocation of $5,000, a total of $75,845.93 will be
applied as follows:
Accounts payable June 30, 1952__--------------------_   ------------         $52, 401. 14
Maintenance:
   Complete, by existing contract, repairs to the rubble-
      mound breakwater, July 1 to 15, 1952            _        $23, 240. 00
   Miscellaneous inspections and reports (contin-
      gencies)   ---------------------------------                   204. 79
                                                                              23, 444. 79
      Total for all work  ----------------------------------- 75, 845. 93
   No work is scheduled for fiscal year 1954.
614             REPORT OF CHIEF OF ENGINEERS,                                                               U.      S. ARMY,                     1952

                                                     Cost and financial summary

                                                                       Fiscal year ending June 30-                                                 Total to June
                                                                                                                                                  30, 1952, includ-
                                                                                                                                                  ing fiscal years
                                                1948                 1949                 1950                 1951                 1952           priorto 1948

New work:
   Appropriated--...........--------.........-----------............---...............---....--------------------------............                 $1,128 074.86
   Cost--------------             .............------------...------------------------............-----------
                                                                                                  ..........-----------                             11,128, 074. 86
   Expenditures ..........----------.....--------                                         ..------------------------..........-----------.....       1, 128, 074. 86
Maintenance:
   Appropriated--_-........--           $11, 900        $2, 647. 20 -$16,042.32        ...........     ----------
                                                                                                        $110, 500. 00                                   112, 930. 02
   Cost--------......--       --..................----------.....-------------------...................
                                                                                     ------------         82,055.     21                                 84, 485. 23
   Expenditures--------------------                            ----------------------............----------.....                 29, 654. 07             32, 084. 09

1 In addition, $288,000 were expended for new work from contributed funds.

                                                 17. SAN JUAN HARBOR, P. R.

   Location.-The harbor is on the north coast of Puerto Rico, about
30 miles west of Cape San Juan and 1,150 miles southeast of Jackson-
ville, Fla. (See U. S. Coast and Geodetic Survey Charts Nos. 908 and
920 and U. S. Navy Hydrographic Office Chart No. 1411.)
   Previous projects.-Before the American occupation, about $647,000
had been expended under the Spanish administration. The original
project by the United States was authorized by the River and Harbor
Act of March 2, 1907. For further details see page 2007 of annual
report of 1915, page 1718 of annual report for 1916, and page 1939
of annual report for 1938.
   Existing project.-This provides for an entrance channel 800 feet
wide and 38 feet deep at mean low water across the outer bar, a dis-
tance of about 1,700 feet, to the bend in the channel; thence, 1,200 feet
wide and 30 feet deep at mean low water, narrowing to 1,000 feet
wide at the inner harbor, about 4,000 feet distant from the bend;
dredging the inner harbor to the same depth over about 329 acres, and
extending this depth easterly into the San Antonio Channel for about
3,400 feet with a width of about 1,100 feet at its mouth, narrowing to
600 feet at 1,200 feet from the mouth, and increasing to 800 feet at
the easterly end; removal to a depth of 8 feet at mean low water of
Anegado, Largo, and Capitanejo Shoals; construction of a channel
about 6,000 feet long and 400 feet wide, 30 feet deep at mean low water,
from the existing anchorage to and including a turning basin of the
same depth, 1,000 feet wide and 2,200 feet long, in front of the graving
dock in the southeast arm of the harbor; and maintenance of a channel
about 6,000 feet long and 300 feet wide, 30 feet deep at mean low water,
from the graving-dock channel to and including a turning basin with
an average width of 1,000 feet and a length of about 1,700 feet, in
front of the Army terminal in Pueblo Viejo Bay. The mean tidal
range is 1.1 feet; tide heights vary from about 1 foot below to about
2.8 feet above mean low water.
   The estimated cost of new work, revised June 1952 is $3,739,000 ex-
clusive of amounts expended under previous projects and $100,000
contributed by local interests. The existing project includes the en-
trance channel and turning basin to the Army terminal which cost
$1,543,711.84; this expenditure was made from military appropriations
and is not included in the estimate hereinbefore stated. The latest
              RIVERS       AND HARBORS-JACKSONVILLE,                           FLA.,     DISTRICT          615
approved   estimate (1952) for annual cost of maintenance of the exist-
ing project, including the Army terminal channel and turning basin,
is $200,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                          Work authorized                                     Documents

Aug.    8,1917     Anchorage area (203 acres) and San Antonio Channel        H. Doc. 865, 63d Cong., 2d sess.
                     to depth of 30 feet.
Sept. 22, 1922     Substituted for an area of 68 acres to depth of 30 feet   H. Rept. 775, 67th Cong., 2d sess.
                     along easterly and southerly sides of anchorage
                     basin, an area of 25 acres of the same depth extend-
                     ing easterly from eastern end of San Antonio pro-
                    ject channel.
July 3,1930        Modified the conditions of local cooperation....---------... H. Doc. 45, 71st Cong., 2d sess.
Aug. 30,1935       Entrance channel across the outer bar to 38 feet deep        River and Harbor Committee
                    and 800 feet wide, Anegado Reach Channel 30 feet              Doc. 38, 74th Cong., 1st sess.
                    deep and 700 feet wide, and increasing anchorage
                    area to 239 acres and a depth of 30 feet.
Aug. 26,1937       Widening of the Anegado Reach and increasing an- River and Harbor Committee Doc.
                    chorage area to 329 acres.                                    42, 75th Cong., 1st sess.
Oct.    17, 1940   Removal to a depth of 8 feet of Anegado, Largo, and H. Doc. 334, 76th Cong., 1st sess.
                     Capitanejo Shoals, and construction of a channel             (Contains latest published map.)
                    400 feet wide, 30 feet deep, from existing anchorage
                    to and including turning basin of same depth, 1,000
                     feet wide, 2,200 feet long, in front of the graving
                    dock.
Mar.     2, 1945   Maintenance of existing entrance channel and turn-        Public Law 14, 79th Cong., 1st sess.
                    ing basin to Army terminal.


   Local cooperation.-Local cooperation required by the River and
Harbor Act of October 17, 1940, was approved by the Chief of En-
gineers on January 23, 1941.
   Local interests are required to furnish suitable bulkheaded disposal
areas for subsequent maintenance as it becomes necessary. All prior
requirements have been fully complied with.
   Terminal facilities.-There are 23 piers and bulkhead wharves
capable of docking deep-draft vessels; 16 on the north shore, 3 front-
ing the graving-dock turning basin, and 4 at the Army terminal turn-
ing basin, with an aggregate berthing length of about 21,000 feet.
Ten are publicly owned, 10 are United States Government property,
and 3 are owned by the Government of Puerto Rico. Thirteen are
open to general public use on equal terms; 21 are equipped with
mechanical transfer facilities; 14 have direct connection with the rail-
road system. These facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year.-Maintenance: United
States hopper dredge Hyde worked intermittently in August, Sep-
tember, and October 1952, removed 38,270 cubic yards of material,
bin measurement, from shoals in Army terminal channel and turning
basin at a cost of $14,408.28. Hired labor condition survey cost
$800.77. The cost for the year was $15,209.05 for maintenance. The
expenditures were $12,986.53.
   Conditionat end of fiscal year.-The existing project was completed
in 1942, except for 16,000 cubic yards of rock remaining in the en-
trance channel that were not removed by the contractor, the contract
having been terminated by supplemental agreement.
   The controlling depths are as follows: Entrance channel, as of Sep-
tember 1949, 37 feet for a width of 400 feet along the center of the
616            REPORT OF CHIEF OF ENGINEERS,                                                     U.        S. ARMY,         1952

channel to the bend; thence 30 feet for a width decreasing from 500
feet to 350 feet along the center of the channel from the bend to the
maneuvering area; 29 feet in the maneuvering area; 29 feet in the
anchorage area; 29 feet in San Antonio Channel; 29 feet in the grav-
ing-dock channel and turning basin; and 30 feet in the Army terminal
channel and turning basin in June 1951.
  The total costs and expenditures under the existing project to June
30, 1952, have been as follows:

                                                                                                      Costs and expenditures
                                    Funds
                                                                                     New work               Maintenance              Total

Regular---             ----------------------------------- $3, 155, 918. 58                                  $1, 114, 000. 48     $4, 269,919. 06
Public works .....------------------------------------         427, 068. 34                                       24, 737. 18         451, 805. 52
      Total United States-....-------------------------                              3, 582, 986. 92          1, 138, 737. 66       4, 721, 724. 58
Contributed....-------------------------                       ------------              100, 000. 00 -----                             100, 000. 00
            Total ...................                                                    3, 682, 986. 92
                                                       ...............---------------------------------       1,138, 737. 66       4, 821, 724. 58



  Propooe operations.-No funds are available, and no work is
scheduled for fiscal year 1953.
  The sum of $157,650 can be profitably expended for the following
scheduled work during fiscal year 1954:
Maintenance:
   Dredge, by contract, or by the United States hopper dredge Lytman,
      to restore project depth of 30 feet in Army terminal channel, and
      other channels if necessary___________________________                                                                        $150, 000
   Condition survey of the project channels, July 1953-------------                                                                    5,000
   Miscellaneous inspections and reports (contingencies)                                                     -----------               2, 650

          Total for all work-----                            --------------------------------                                           157, 650

                                               Cost and financial summary

                                                               Fiscal year ending June 30-                                      Total to June
                                                                                                                                30, 1952, includ-
                                                                                                                                ing fiscal years
                                           1948              1949                1950              1951             1952         priorto 1948


New work:
    Appropriated ........----..........------------............---------------........................------------............ $4, 330,671.20
    Cost---.....------   --------------- ------------                 ------------        --------------- --------- 4, 330, 671. 20
    Expenditures------._       -.----.---              -----.-- -----------------                  ------------------             14,
                                                                                                                                   330, 671. 20
Maintenance:
   Appropriated-.........               $37, 000.00      $19, 000.00          $23, 000.00 $169, 714.71           $7, 917. 74       1, 183, 468. 52
   Cost------------------                29, 188.37       28, 458. 37          25, 426.06 162, 423. 40           15, 209. 05       1,183, 438. 52
   Expenditures---------.........        28, 574. 04      29, 072. 70          25, 426.06 164, 645. 92           12, 986.53        1, 183, 468. 52


Other new work data : Estimated additional amount needed to be appro-
priated for completion of existing project---------------------$156, 000
  1In addition, $100,000 were expended from contributed funds.

                                          18. MAYAGUEZ HARBOR, P. R.

  Location.-The harbor is on the west coast of Puerto Rico, about
110 miles by water from San Juan Harbor. (See U. S. Coast and
Geodetic Survey Charts Nos. 920 and 931.)
  Existing project.-This provides for an approach channel to the
deep-water terminal, 30 feet deep, 1,000 feet wide at the outer end,
              RIVERS AND HARBORS-JACKSONVILLE,                                                     FLA.,      DISTRICT              617
decreasing uniformly in width to 500 feet opposite the westerly end
of the terminal, thence continuing with the same width to the inshore
end of the terminal. The mean tidal range is 1.1 feet.
   The actual cost of new work was $168,186.69. The latest estimate
of annual cost of maintenance, approved in 1952, is $20,000. The
project was authorized lby the Public Works Administration on
September 6, 1933, and adopted by the River and Harbor Act of
August 30, 1935 (H. Doc. 215, 72d Cong., 1st sess., and Rivers and
Harbors Committee Doc. 1, 73d Cong., 1st sess.). The latest published
map is in the former document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-The terminals consist of two piers, used by
lighters, located on shoal water in the east-central section of the
harbor; and a modern deep-water terminal in the northeast section of
the harbor, consisting of a bulkhead wharf about 1,270 feet long with
a storage shed 800 feet long and 60 feet wide immediately shoreward
thereof. The facilities appear adequate for the normal needs of
commerce.
   Operations and results during fiscal year.-Maintenance: Pro rata
share of demobilizing United States hopper dredge Hyde to the United
States cost $9,233.85. The expenditures were $7,660.05.
   Condition at end of fiscal year.-The existing project was completed
in 1934.
   Controlling depth was 30 feet in the approach channefland marnm-
vering area, except for an isolated shoal in the southeasterly corner
 (not used by shipping) with a least depth of 26.8 feet. Soundings
to 1951.
   The total costs and expenditures under the existing project to June
30, 1952, have been as follows:

                                                                                              Costs and expenditures
                                  Funds
                                                                                 New work            Maintenance               Total
Regular ....------------------------------------------------                         $21,000.00        $138,117.79             $159,117.79
Public works                  ------------------- ----------...
                             ..------                                                147, 186. 69 ---------   .--               147,186. 69

        Total....                -----------------
                        ..----------                      ------------    .          168,166. 69         138, 117. 79           306, 304. 48



  Proposedoperations.-No funds are available, and no work is sched-
uled for the fiscal years 1953 and 1954.
                                              Cost and financial summary

                                                            Fiscal year ending June 30-                                   Total to June
                                                                                                                          30, 1952, includ-
                                                                                                                          ing fiscal ye rs
                                          1948             1949               1950          1951              1952         prior to 1948


New woIk:
   Appropriated                     ..........----- ...----.---------------------- ------------ -----------                   $168, 186. 69
   Cost--------------                         -------             ------------------------------------------------             168,186.69
   Expenditures------                        ..........---------------------------------------------- ------------             168,186.69
Maintenance:
   Appropriated --------...                   $28, 000. 00 -$21,1'2.60 -----------             $57, 000. 00 -$413. 46           138, 117. 79
   Cost..........---------------...               6, 837. 40 ..........-----------------------  47, 352.69   9, 233. 85         138, 117.79
     Expenditures - -- -                6, 837.40 ....--------------------
                                                          __ _                            48, 923. 49       7, 6t0. 05          138,117. 79
618           REPORT OF CHIEF OF ENGINEERS,                            U.   S. ARMY,            1952

19. REMOVING THE WATER HYACINTH FROM NAVIGABLE WATERS IN
                   THE STATE OF FLORIDA

   Location.-The water hyacinth is found in the fresh-water streams
and lakes in various parts of the district.
   Existing project.-This provides for the destruction or removal of
the water hyacinth in the navigable waters of the State so far as they
constitute an obstruction to commerce, using any mechanical, chemical,
or other means not injurious to cattle, and the use of log booms to close
sloughs and backwaters as an auxiliary means. No estimate of the
final cost of the work has been made. The latest (1952) approved
estimate of annual cost of maintenance is $100,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                          Work authorized                                    Documents

Mar.     3,1899    For the construction and operation of a suitable ves-    H.    Doc. 91, 55th Cong., 3d sess.
                     sel, and for the use of log booms as adjuncts to the        and Annual report, 1899, pp.
                     operation of the vessel, for the removal of water           1613-1623.
                     hyacinths in the navigable waters of the State of
                     Florida.
June 13,1902       For the extermination and removal of water hya-          Specified in act.
                     cinths by any mechanical, chemical, or other
                     means.
Mar.     3,19005   Prohibits the use of any chemical process injurious            Do.
                     to cattle.


   Local cooperation.-None required.
   Operationsand results duringfiscal year.-Maintenance: Upper St.
Johns River system: Hyacinth destruction operations were accom-
plished as necessary throughout the fiscal year by hired labor at a cost
of $65,044.07. Camp Rosa boom, which was placed across the St.
Johns River near Palatka several years ago as a hyacinth control
measure, was removed by contract during April 1952 at a cost of
$5,328.18. Navigation lights at Camp Rosa boom were tended by
hired labor until removal of boom.
    Okeechobee Waterway and tributary streams: Hyacinth destruc-
tion operations were conducted by hired labor, as necessary, through-
out the fiscal year, at a cost of $2,722.43.
    Withlacoochee River and tributary streams: Hyacinth destruction
operations were conducted by hired labor throughout the fiscal year,
as necessary, at a cost of $3,473.53.
    The cost of all work was $76,568.21, including $5,328.18 for work
done by contract, which was all for maintenance. The expenditures
were $76,503.08.
    Condition at end of fiscal year.-The project is for maintenance.
A chemical for spraying was tested in August and September 1900;
spraying was begun in November 1902, but was discontinued in Feb-
ruary 1906 because of the injurious effect on cattle. Subsequent op-
erations through the fiscal year 1938 consisted chiefly of breaking up
jams and drifting, except from November 1909 to February 1918 when
an elevator was used to either place the plants on shore or to form them
in deep piles that could be carried away by the currents. Later opera-
tions, through April 1948, have consisted principally of construction
         RIVERS AND HARBORS--JACKSONVILLE,                                    FLA.,    DISTRICT              619
of temporary and permanent traps at strategic points, and shredding
with cutter boats. Spraying with a new chemical, which is not in-
jurious to cattle or fish, was begun in March 1948 to supplement other
methods, and has proven to be highly effective. Since that date,
spraying has gradually become the principal method of destruction,
supplemented by the methods previously in use. During September
1949, large areas of hyacinths in the St. Johns River were sprayed by
airplane, with very satisfactory results. At the close of the fiscal
year, the St. Johns River and tributary streams, Okeechobee Water-
way and Hillsboro and Withlacoochee Rivers were open and in good
condition.
   The total cost to the end of the fiscal year has been $1,304,858.68 for
maintenance. The expenditures have been $1,303,436.53.
  Proposed operations.--The balance unexpended June 30, 1952,
$70.21, plus an allotment of $57,500 during fiscal year 1953, a total of
$57,570.21 will be applied as follows:
Accounts payable June 30, 1952.--------------------------------- $1, 422.15
Maintenance:
    Removal or destruction, by hired labor, of water hya-
      cinths in the St. Johns River and tributary streams
      during the fiscal year ________       _ ______---__ $51, 748. 06
    Removal or destruction, by hired labor, of water hya-
      cinths in Withlacoochee River and tributary
      streams during the fiscal year_------------------- 2,400. 00
    Removal or destruction by hired labor, of water hya-
      cinths in the Okeechobee waterway and tributary
      streams during the fiscal year---------- ----         2, 000. 00
                                                                                  -------            56,148. 06

        Total for all work- -.           ----           ------        __-----      -        ----     57, 570. 21
  The additional sum of $70,000 can be profitably expended for the
following scheduled work during fiscal year 1954:
Maintenance:
   Removal or destruction, by hired labor, of water hyacinths in
      the St. Johns River and tributary streams during the fiscal
      year    -----------------------------------------------                                           $62, 500
   Removal or destruction, by hired labor, of water hyacinths in the
      Withlacoochee River and tributary streams, during fiscal year,                                       4, 000
   Removal or destruction, by hired labor, of water hyacinths in the
      Okeechobee waterway and tributary streams, during the fiscal
      year      -------------------------------------------------                                          3, 000
   Removal or-destruction, by hired labor, of hyacinth jams at bridges
      on the Hillsboro River and other navigable waterways along
      the Gulf coast, as required during the fiscal year--------------                                        500

        Total for all work-________                     ___-_------_--_-----                              70, 000

                                 Cost and financial summary

                                                Fiscal year ending June 30-                        Total to June
                                                                                                   30,1952, includ-
                                                                                                   ing fiscal years
                              1948          1949           1950          1951          1952         priorto 1948


Maintenance:
   Appropriated-........   $75, 000.00   $75, 000. 00 $102, 500. 00   $57, 800.00 $750, 000. 00      $1,303, 506. 74
   Cost---------------      79, 643.65    63, 467. 10 107, 888.64      63, 727.99   76, 568. 21       1,304, 858. F8
                 -------
            e_^____
   Expenditures-    ....... 81,795. 53            400110, 750.98
                                          60, 008.40                   C0, 975.47   76, 503.08              ,4 66
                                                                                                       1,303,436.53
620         REPORT OF CHIEF OF ENGINEERS,                                 U.    S.     ARMY,      1952

20,. SNAGGING AND CLEARING UNDER AUTHORITY OF SECTION 3 OF
        THE.RIVER AND HARBOR ACT APPROVED MARCH 2, 1945

   The River and Harbor Act approved March 2, 1945, authorized
the allotment of funds, not to exceed $300,000 for any one fiscal year,
from river and harbor appropriations for removing accumulated
snags and other debris and for protecting, clearing, and straightening
channels in navigable harbors and navigable streams and tributaries
thereof when such work is advisable in the interest of navigation or
flood control.
   During the fiscal year $1,929.98 was allotted for work under this
heading.
   Hillsboro Inlet, Fla.-During January 1952, 20 stones which were
a hazard to navigation were removed from Hillsboro Inlet at a cost
of $1,929.98. The expenditures were $1,929.98.
   The costs and expenditures under this heading to June 30, 1952,
have been $39,287.60 for new work and $193,734.13 for maintenance,
a total of $233,021.73.
                                    Cost and financial summary

                                                Fiscal year ending June 30-                           Total to June
                                                                                                      30, 19n2; iteid-
                                                                                                      ing fiscal years
                                 1948          1949           1950          1951          1952         prior to 1948


New work:
    Appropriated.-------.......-  .......-              ------------ ------------ ------------
                                                    .....-----------.........----------..--                  $39,287.60
    Cost----------------------------------------------------------- ------------                              39,287. O
    Expenditures------ -.....-----------------------------------..------------ ------------                   39, 287. 60
Maintenance:
   Appropriated-..----....
   Cost------------------
   Expenditures------- -
                              58, 567.  C9
                             $51, 500. 00
                              59, 531. 96
                                            $47, 515. 44
                                             15, 623. 44
                                             13, 575. 18
                                                           $31, 600. 00 -$3, 311. 29
                                                            43,139.08
                                                            45,187. 34
                                                                          73, 509.67
                                                                          73, 509.67
                                                                                        $1, 929. 98
                                                                                         1, 929. 98
                                                                                         1,929. 98
                                                                                                             193, 734.13
                                                                                                             193, 734. 13
                                                                                                             193, 734. 13


    21. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GEE AL)

   The costs during the year were $39,026.56 for examinations and
surveys, and $72,585.29 for contingencies, a total of $111,611.85.
The expenditures were $111,359.90. The balance unexpended and
accounts receivable June 30, 1952, $10,842.65, plus allotment for
fiscal year 1953 of $15,800 for examinations and surveys and $45,750
for contingencies, a total of $72,392.65, will be applied during fiscal
year 1953 to payment of accounts payable, $892.19, and expenses to
be incurred under this heading.
   The additional sum of $98,550, including $82,300 for examinations
and surveys, and $16,250 for contingencies, can be profitably expended
during fiscal year 1954.
               RIVERS AND HARBORS-JACKSONVILLE,                                                      FLA.,          DISTRICT                   621
                                               Cost and financial summary
                                                      UNITED STATES FUNDS

                                                              Fiscal year ending June 30                                            Total to June
                                                                                                                                   30, 1952, includ-
                                                                                                                                   ing fiscal years
                                          1948              1949             1950             1951                 1952             prior to 1948


Maintenance:
   Appropriated_ .- ..-              $247, 700. 00 $256, 650. 00 $249, 172. 32 $110, 000. 00                   $59, 866. 00          $3, 861, 391. 39
   Cost__----------  -                218, 888.22 266, 065.43 213, 092.44 132, 194. 79                         111, 611.85            3, 851, 440. 93
     Expenditures --- -               228, 705. 69     268, 348. 63       201, 171. 28     142, 221. 24        111, 359. 90           3, 850, 709. 54


                                                      CONTRIBUTED               FUNDS

                                                              Fiscal year endi ng June 30                                           Total to June
                                                                                                                                   30, 1952, includ-
                                                                                                                                   ing fiscal years
                                          1948              1949              1950            1951                 1952              prior to 1948


Maintenance:
   Appropriated------........ .........------------........----------..        $5, 2250       $13,130 -...........                            $25, 350
   Cost .-------------------------------------                                  5, 250         13, 130 ----------                              25, 350
   Expenditures .....- ----------.........                                      5, 250         13,130 --........                               25, 350


           22. PLANT               ALLOTMENT, JACKSONVILLE,                                            FLA., DISTRICT
                                           (NAVIGATION)
                                               Cost and financial sunmmary

                                                              Fiscal year ending June 30                                           Total to June
                                                                                                                                   30, 1952, includ-
                                                                                                                                   ing fiscal years
                                          1948              1949              1950            1951                 1952              priorto 1948

Maintenance:
   Appropriated-......... -$85, 101. 11 $1,009,988.29 -$360,000.00 -$300,000.00 $3,967,139.49                                        $7, 119, 658. 47
   Cost---------------------------
   Expenditures......... --        42, 630. 41 1, 017, 665. 63 -223, 599. 94 -470, 830. 25 4, 106, 803. 87                              6, 786, 667. 15


                                23. INACTIVE NAVIGATION PROJECTS

                                                                                           Cost and expenditures to
                                                                           For last              June 30, 1952                          Estimated
                        Name of project                                   full report, _                                                amount re-
                                                                          see annual                                                     quired to
                                                                          report for         New work                Mainte-             complete
                                                                                                                     nance

                                                         1
1. Lake Crescent and Dunns Creek,       3 Fla. 2._ _
2. Atlantic-Gulf Ship Canal, Fla. ___..........
                                                                             1931
                                                                             1939
                                                                                               $10, 276. 25
                                                                                           <5, 099,152.55
                                                                                                                       $8, 166. 27
                                                                                                                   ...-____ ___
                                                                                                                                             $53, 800

  3. Intracoastal Waterway, Cross-Florida Barge
       Canal_
            ---- _--.                                                        1951          5 1, 465,   080.   57                          94, 090, 100
4. St. Augustine Harbor, Fla ....____________                               1951            6 464,    090.   56     159,   582.   29      2, 524, 200
5. Courtenay Channel, Fla.1 7_-.__                    .                     1940                22,   845.   70                             (8)
6. Eau Gallie Harbor, Fla.' 7____.___                                       1940                 9,   626.   78                             (8)
7. Melbourne Harbor, Fla.'1_ ....                ....     ....              1939                17,   696.   27                             (8)
8. St. Lucie Inlet, Fla.'L_................--.-.                 ..         1949               123,   602.   26                             (8)
9. Palm Beach, Fla., side channel and basin a .....                         1946                                                          10140, 000
10. Palm Beach, Fla., beach-eroson control 9 ...
11. New River, Fla.9_-      - ---                   _-_
                                                                 -           1950
                                                                             1950
                                                                                                                                             11 7, 500
                                                                                                                                               94, 500
                                                                     9
12. Intracoastal Waterway, Miami to Key West, Fla.                           1950               203,367.53          238, 742. 96           2, 777, 000
13. Key West Harbor, Fla.'l_-__-                                             1950            1, 040, 408. 75                               2, 006, 000
14. Channel, Naples to Big Marco Pass, Fla. '                  -_.           1950                37, 524. 85         47, 328. 69
                                                                                                                      8, 574. 27             (8)
15. Orange River, Fla.---               ----                                 1937                 2, 000.00          25, 202. 14             (8)
16. Kissimmee River, Fla.' _             -      -                            1931                23, 479. 18                                 (8)
17. Manatee River, Fla.'          -                                          1938              123, 349. 56         101, 214. 04               14, 400
18. Little Manatee River, Fla.o     )        --                              1949                                                            153, 000
19. St. Petersburg Harbor, Fla.o      )             --        ---            1950              221, 578. 31 1269, 696. 79                    262, 500
    See footnotes at end of table.
           245554-53            vol. 1           40
622             REPORT OF CHIEF OF ENGINEERS,                                           U.           S. ARMY,               1952


                                                                                        Cost and expenditures to                     Estimated
                                                                       For last               June 30, 1952                          amount re-
                       Name of proiect                               full report,                                                     quired to
                                                                     see annual                                                       complete
                                                                      report for         New work                   Mainte-
                                                                                                                    nance
                                                                fI                                            II
20.   Ozona Channel, Fla......___..............___                      1950                                                             $88, 000
21.   Anclote River, Fla._._.......................
                                        9                               1950                $178, 427. 04          $88, 957. 36           65, 000
22.   Pithlachascotee River, Fla. ..................                    1950                                   -.........                157, 500
23.   Hudson River, Fla...____...............                           1950                                   ......        -....       383, 000
24.   Homosassa River, Fla.l .__.                         ___           1937             133, 998.64      697. 04                        (8)
25.   Crystal River, Fla.1 _.-.......................                   1941              25, 000. 00 19, 993. 12                        (8)
26.   Cedar Keys Harbor, Fla.l_ 4     ....            _________ ..      1932             147, 020. 98 30, 000. 00                        3, 500
27.   Suwannee River. Fla.1 - ..................                        1940              76, 417.96 37, 394. 06                         200, 000
                                                                                    ----------------
28.   Horseshoe Cove, Fla. .........................                    1950                                                   237, 000
29.   Steinhatchee River, Fla.1_______ ___.___......___                 1940                   135, 053. 37         513. 85    (8)
30.   Ponce Harbor, P. R..___________________________                   1949              15176, 293. 60        57, 946. 23 1, 215, 000
31.   Guayanes Harbor, P. 9R. _ _____                      ____-        1945        ..............             -----.-----18155, 000
32.   Fajardo Harbor, P. R. _________________________                   1945                                   -----------17407, 000
33.   St. Thomas Harbor, V. I.o____________________                     1949                                   -------..----3, 339,000
                                         -------------------.                       ----------------

34.   Christiansted Harbor, V. I.                                       1950        -------.---------                                    356, 000

   1 Channels adequate for commerce.
  S Awaiting local cooperation.
  3 Project not formally adopted by Congress. Modified project is recommended in H.Doc. 194, 75th Cong.,
1st sess.
  4 Emergency Relief funds.
  5$119.43 revoked during year.
  o In addition, $137,500 were expended from contributed funds.
  7 No commerce reported.
  8 Completed.
  o No funds available.
  10In addition, $202,000 to be contributed by local interests.
  11The estimate of $7,500 represents the extent to which the Federal Government is authorized to partic-
ipate and is one-third the cost chargeable to publicly owned shore frontage. The estimated cost to local
interests is $242,500.
   I1In addition, the cost and expenditures from contributed funds have been $6,353.43.
  I1 In addition, $1,000 were expended from contributed funds.
  14Curtailment of existing project recommended in H. Doc. 467, 69th Cong., 1st sess.
  15In addition, $21,960.30 were expended from contributed funds.
  16 In addition, $40,000 to be contributed by local interests.
  1TIn addition, $30,000 to be contributed by local interests.

                                    24. MISCELLANEOUS ACTIVITIES

Status of all investigations for navigation called for by river and harbor acts
                            and committee resolutions

                                                                                           Date trans-             Document  Recom-
                   Locality                          Authorization act                     mitted to                 No.    mendation
                                                                                            Congress

Aguadilla Harbor, P. R_......_...-              House Public Works Com-
                                                  mittee resolution, Feb.
                                                  17, 1950.
Anclote River to Caloosahatchee                 Senate Committee on Pub-
  River, Fla. (Intracoastal Water-                lic Works resolution, June
way), channels from, in Sarasota                 15, 1950.
  Bay, to Gulf of Mexico through
New Pass, and Big Sarasota
  Pass, and to city pier yacht basin,
and Payne Terminal at Sarasota.
Anclote River to St. Marks, Fla.,               Commerce Committee res-
Intracoastal Waterway, and con-                 olution, Feb. 6, 1940.
nection across Florida with St.
Johns River.
Anclote River to Tampa Bay, Fla.,               Senate Committee on Pub-
  Caloosahatchee River to With-                  lic Works resolution, Dec.
lacoochee River, Intracoastal                   20, 1950.
  Waterway.
Apalachicola Bay to Withlacoochee               Commerce Committee'res-
  River, Fla., Intracoastal Water-               olution, Feb. 6, 1940.
  way, section from Anclote River
to St. Marks, Fla., Intracoastal
Waterway.
Apopka Lake, Fla., Oklawaha                     River and Harbor Act,
  River and connecting waterways.                Mar. 2, 1945.
Arecibo Harbor, P. R., modifica-                   do
                                              ---.....        --..............
  tions in authorized project.
           RIVERS AND HARBORS-JACKSONVILLE,                                         FLA.,     DISTRICT        623
Status of all investigations for navigation called for by river and harbor acts
                     and committee resolutions--Continued

                                                                              Date trans-     Document     Recom-
              Locality                           Authorization act             mitted to        No.
                                                                               Congress                   mendation
                                        I-                                                               4,
Atlantic Ocean to Gulf of Mexico,            Commerce Committee res-         .- - - - - - -
and Intracoastal Waterway from               olution, Feb. 6, 1940.
  Anclote River to St. Marks, Fla.
Bakers Haulover Inlet, Fla ... - ---         River and Harbor Act,
                                              Mar. 2, 1945,
Big Marco Pass to Naples Bay and             Senate Committee on Pub-
  Gordon Pass, Fla.                            lic Works resolution, Feb.
                                               14, 1950.
Big Pass, Fla., channel from Clear-          River and Harbor Act,
  water Bay, Fla., to deep water               Mar. 2, 1945.
  in the Gulf of Mexico.
Big Sarasota Pass, Fla., and New             Senate Committee on Pub-
  Pass, channels from Intracoastal            lic Works resolution, June
  Waterway (Caloosahatchee River              15, 1950.
  to Anclote River) in Sarasota
  Bay to Gulf of Mexico through
  New Pass and Big Sarasota Pass,
  and to city pier, yacht basin, and
  Payne Terminal at Sarasota.
Black Creek, Fla., waterways via,            River and Harbor        Act,
  from Camp Blanding, Kingsley                Mar. 2, 1945.
  Lake, Fla., to the St. Johns River.
Boca Raton Inlet, Fla., including            River and Harbor Act,           Apr.   30,1952               Unfavor-
  connection with the Intracoastal            July 24, 1946.                                               able.
  Waterway.
Boot Key Harbor, Fla., side chan-            Senate Committee on Pub- .- - - - - - -
  nel and turning basin, to the                licWorks resolution, Apr.
  Intracoastal Waterway, Miami to              13, 1950.
  Key West, Fla.
Booth Point, Fla., to Old Tampa              River and Harbor Act,
  Bay.                                        May 17, 1950.
Caloosahatchee River to Anclote              Senate Committee on Pub-
   River, Fla. (Intracoastal Water-           lic Works resolution, June
  way), channels from, in Sarasota            15, 1950.
  Bay, to Gulf of Mexico through
  New Pass and Big Sarasota Pass,
  and to city pier, yacht basin, and
  Payne Terminal at Sarasota.
Caloosahatchee River to Withla-              Commerce Committee res-
  coochee River, and Anclote River            olution, Feb. 6, 1940.
  to St. Marks River, Fla., Intra-
  coastal Waterway.
Caloosahatchee River to Withla-              Senate Committee on Pub-
  coochee River, Fla., Intracoastal            lic Works resolution, Dec.
  Waterway between the Anclote                 20, 1950.
   River and Tampa Bay.
Camp Blanding, Fla., waterways               River and Harbor         Act,
  via Black Creek and/or via Black            Mar. 2, 1945.
   Creek and Doctors Inlet, from
   Camp Blanding, Kingsley Lake,
  to the St. Johns River.
Camp Blanding, Fla., waterway                -___ do _.. ... ..   -..--. .
  via Santa Fe River from Camp
   Blanding, Kingsley Lake, to
   Suwannee River.
Canaveral Harbor, Fla_-----.---              Senate Committee on Pub-
                                               licWorks resolution, Apr.
                                               26, 1951.
Caseys Pass, Fla., Sarasota (Little)         Rivers and Harbors Com-
Bay, Fla.                                     mittee resolution, June
                                               28, 1946.
Caseys Pass and Little Sarasota              River and Harbor Act, ---------------
  Bay, Fla., with a view to provid-           July 24, 1946.
ing a channel across Roberts
  Bay (Venice Bay) with a suitable
turning basin at eastern end
thereof.
Caseys Pass (Venice Inlet), Fla.,            River and Harbor         Act,
  channel from Caseys Pass and                Mar. 2, 1945.
  Sarasota Bay through Dona Bay
  to bridge on U. S. No. 41, with
  turning basin at eastern terminus.
624        REPORT       OF CHIEF        OF ENGINEERS,           U.      S.   ARMY,      1952


Status of all investigations for navigation called for by river and harbor acts
                      and committee resolutions-Continued

                                                                 Date trans-        Document
             Locality                   Authorization act        mitted to                      Recom-
                                                                  Congress
                                                                                       No.     mendation
                                  4
                                                                       -iI



Clearwater Bay, Fla., channels River and Harbor Act,
  through Big Pass and Little Pass           Mar. 2 1945.
  to deep water in the Gulf of
  Mexico.
Cocoa, Fla., interconnecting water-      ---   do.--------------.
  way to Palatka, Fla., Florida
  east coast, interlocking open-river
  and analized channels.
Collier County,Fla., channel and _ -do .--                        - -------
  harbor at Everglades.
Cross - Florida Waterway,           and Commerce Committee res-
  waterway from Anclote River               olution, Feb. 6, 1940.
   to St. Marks, Fla.
Dexter Lake, Fla.,interconnecting       River        and Harbor Act,
   waterway to Lake Harris, Fla.,            Mar. 2, 1945.
   Florida east coast,     interlocking
   open-river and canalized chan-
  nels.
Doctors Inlet, Fla., waterways - - -.do ........              ..... --------
  from Camp Blanding, Kingsley
   Lake, to the St. Johns River via
   Black Creek and/or via Black
  Creek and Doctors Inlet.
Dona Bay, Fla., channel through _ _        . do-- ---------- . ..------
   Dona Bay from Caseys Pass
   (Venice Inlet)  and    Sarasota Bay
   to bridge on U. S. No. 41, with
   turnig'basirr at easternterminus.
Dora Lake, Fla., Oklawaha River, ---- do-----------------
   Fla., and connecting waterways.
Eau Gallie, Fla., waterway from ---.....      do-----------. --.......
   Indian River to St. Johns River
  at Palatka, Fla., Florida east
  coast, interlocking open-river and
  canalized channels, etc.
Estero Island, Fort Myers Beach,        River and Harbor Act,
  Fla., to Gulf of Mexico.
Eustis    Lake,     Fla.,    Oklawaha
   River, Fla., from Lake Apopka
                                            May 17, 1950.
                                        River       and Harbor Act,
                                            Mar. 2, 1945.
                                                                     ---------- -
  through Lake Dora to Lake
  Eustis, etc.
Eustis Lake, Oklawaha River, to -do................-------------------I-------I-...............----............
  Lake Griffin, thence to Silver
  Sprifg Run,Fla.
Everglades, CollierCounty, Fla.,        River and Harbor Aft,
  channel and harbor at.                    Mar. 2, 1945.
Fajardo Harbor, P. R., modifica- House Public Works Com-
  tions in authorized project.              mittee resolution, Mar.
                                            15, 1949.
Flagler Beach, Fla., side or spur       River and Harbor Act,
  channel from the Intracoastal             Mar. 2, 1945.
   Waterway (Jacksonville to
  Miami), and turning basin or
  harbor at.
Florida east coast, interlocking ..... do--------------------
                                                   ....................--------...................
  open-river and canalized chan-
  nels having a depth of 12 feet
  and suitable width, through
rivers and lakes and by land
  cuts, for navigation, flood con-
  trol, and water conservation.
Fort Myers Beach, Estero Island,        River andWHarbor Act,
  Fla., to Gulf of Mexico.                  May 17, 1950.
Fort Pierce, Fla., side or spur         River and, Harbor Act,
  channel from the Intracoastal            Mar. 2, 1945.
  Waterway (Jacksonville to
  Miami), and turning basin or
harbor at.
Fort Pierce Harbor, Fla-............    Rivers and Harbors Com-
                                            mittee resolution, Feb.
                                            1, 1946.
Gordon Pass to Naples Bay and           Senate Committee on Pub-
  Big Marco Pass, Florida, chan-           lic Works resolution, Feb.
nel.                                      14, 1950.
Griffin Lake to Lake Eustis,            River and Harbor Act,
  Oklawaha River, and to Silver            Mar. 2, 1945.
  Springs, Run Fla.
           RIVERS         AND    HARBORS---JACKSONVILLE,                                       FLA.,     DISTRICT              625

Status of all investigations for navigation called for by river and harbor acts
                     and committee resolutions--Continued

                                                                                         Date trans-      Document   Recom-
               Locality                           Authorization act                       mitted to
                                                                                          Congress          oNo. menmendation
                                                                                                                           on
                                                                                          Congress

Gulf of Mexico, Fla., channels           Senate Committee on Pub-
from    Intracoastal   Waterway          licWorks resolution, June
 (Caloosahatchee River to An-             15, 1950.
clote River)  in Sarasota Bay to
Gulf of Mexico through New
Pass and Big Sarasota Pass and
to city pier, yacht basin, and
Payne Terminal at Sarasota.
Gulf of Mexico, Fla., channels           River and Harbor                       Act,   ---------------   ------------
through Big Pass and Little Pass         Mar. 2, 1945.
from Clearwater Bay.
Gulf of Mexico, Fla., to Fort            River and Harbor                       Act, ---------------     ------------
Myers Beach, Estero Island,              May 17, 1950.
Fla.
Gulf of Mexico, Fla., Channel to         House Committee on Pub-
Lemon Bay, Fla.                          blic Works resolution,
                                           Aug. 17, 1949.
Hatchett Creek, Fla., channel            Rivers and Harbors Com-
  from Little Sarasota Bay to             mittee resolution, June
  bridge on U. S. No. 41, with            28, 1946.
  suitable turning basin at eastern
  end.
11aulover (Bakers) Inlet, Fla--....      River and Harbor                       Act,
                                          Mar. 2, 1945.
lHigh Springs, Fla., waterway from        -..   do--------------------
   Suwannee River via Santa Fe
    River to High Springs, and
   thence      to Camp      Blanding,
   Kingsley Lake.
Hillsboro Inlet, Fla., in the vicinity    Sdo--------------------                       Apr. 30,1952 ..         -       .. Unfavor-
   of Pompano.                                                                                                              able.
Humacao Playa, Punta Santiago,           _-- do .----------------
   P. R.
Indian River, Fla., from Sebastian,      --....
                                            do _.            ----------------
   Melbourne, Eau Gallie, Cocoa,
   or such other locality most suit-
   able, to St. Johns River at
   Palatka, Fla., Florida east coast,
   interlocking open-river and canal-
  ized channels, etc.
Indian River to St. Johns River,         Rivers and Harbors Com-
   channel from Sanford to Titus-         mittee resolution, Jan.
   ville, Fla.                            27, 1937.
Intracoastal Waterway (Caloosa-          Senate Committee on Pub-
   hatchee River to Anclote River),       lic Works resolution, June
   channel from, in Sarasota Bay,         15, 1950.
   to Gulf of Mexico, through New
   Pass and Big Sarasota Pass, and
   to the city pier, a yacht basin
   and Payne Terminal at Sarasota.
Intracoastal Waterway, Caloosa-          Senate-Committee on Pub-
   hatchee River to Withlacoochee          lic Works resolution, Dec.
   River, between Anclote River            20, 1950.
   and Tampa Bay, Fla.
Intracoastal Waterway (Jackson-          River and Harbor                       Act,
   ville to Miami), channel through       July 24, 1946.
   Boca Raton Inlet and connec-
   tion with the Intracoastal Water-
  way.
Intracoastal Waterway (Miami to          Senate Committee on Pub-
   Key West), side channel and            lic Works resolution, Apr.
  turning basin at Boot Key Har-          13, 1950.
  bor, Fla.
Jacksonville to Miami, Fla., Intra-      River and Harbor                       Act,
  coastal Waterway; side channels         Mar. 2, 1945.
  or spur channels to, and turning
  basins or harbors at, the various
  communities on or near the banks
  of said waterway, particularly at
  Titusville, Flagler Beach, New
  Smyrna, Fort Pierce, and to the
  Lighthouse Service depot at
  Taylor Creek, adjacent to Fort
  Pierce Harbor.
Jupiter Inlet, Fla.                Commerce Committe reso-
                                    lution, Nov. 8, 1943.
                                          and Harbor Act,
    Do_---.-------.-----
                              ____ River
                           -----I   Mar. 2, 1945.                                      ---------------
                                                                                       ---------------
626         REPORT OF CHIEF OF ENGINEERS,                                      U.       S. ARMY,           19 52

Status of all investigations for navigation called for by river and harbor acts
                     and committee resolutions--Continued

                                                                                   Date trans-      Document  Recom-
              Locality                            Authorization act                mitted to          No.    mendatis
                                                                                    Congress

Key West Harbor, Fla.......______        Senate Committee on Pub-
                                           lic Works resolution, Mar.          -    --------   --
                                           15, 1951.
Key West to Miami, Fla., Intra-          Seante Committee on Pub-              ---------------
  coastal Waterway, side channel           lic Works resolution, Apr.
and turning basin to Boot Key             13, 1950.
  Harbor, Fla.
Kingsley Lake, Fla., waterways           River and Harbor Act,                 ---------------
from Camp Blanding to St.                Mar. 2, 1945.
Johns River via Black Creek
  and/or via Black Creek and
  Doctors Inlet.
Kingsley Lake, Fla., waterway           ..._do       ....................      ---------------
  via Santa Fe River from King-
  sley Lake to Suwannee River.
Kissimmee River, Fla .______....        _...do ... _------------
                                                              ---------------
Kissimmee River, Fla., from Lake          -
                                         ...     do .     ----------------     ---------------
  Tohopekaliga to Lake Okeecho-
  bee and the Okeechobee Cross-
   Florida Canal, Florida east
  coast, interlocking open-river
  and canalized channels, etc.
Kissimmee River, Fla., waterway          River and Harbor Act,                                      ------------
  from St. Johns River to Kissim-          Aug. 30, 1935.
  mee River and thence to Okeecho-
  bee Cross-Florida Canal.
Lake Apopka, Fla., Oklawaha              River and Harbor Act,                                      -----------

  River from Lake Apopka through           Mar. 2, 1945.
  Lake Dora to Lake Eustis and
  adjoining waterways.
Lake Dexter, Fla., from St. Johns                                                                   ------------
   River to Leesburg on Lake
  Harris, Florida east coast, inter-
  locking open-river and canalized
  channels, etc.                        . ...do .....
                                                   .................
Lake Dora, Fla., Oklawaha River             do ----------------
                                        .....                                                       ------------
  from Lake Apopka through Lake
  Dora to Lake Eustis and adjoin-
  ing waterways.
Lake Eustis, Fla., Oklawaha River
  from Lake Apopka through Lake
   Dora to Lake Eustis and adjoin-
  ing waterways.
                                            do---------------------
                                        . ...                                                       ------------
Lake Eustis, Fla., Oklawaha River
   from Lake Eustis to Lake Griffin
   and thence to Silver Springs
   Run.
Lake Griffin, Fla., Oklawaha
    River from Lake Eustis to Lake
                                         -...do_
                                                                                                    ------------
    Griffin and thence to Silver
   Springs Run.
Lake Harris, Fla., Leesburg to
                                        -- ..    do ... .- ..   --. .... ...
                                                                                                    ------------
   Lake Tohopekaliga, Florida east
   coast, interlocking open-river                                                                   ------------
   and canalized channels, etc.         ....-----
                                                do     ...............
Lake Harris, Fla., to St. Johns
   River near Lake Dexter, or to                                                                    ------------
  Wekiwa (Wekiva) River, thence
   to St. Johns River, Florida east
  coast, interlocking open-river
  and canalized channels, etc.
Lake Okeechobee and its tributary                do_
  streams, Florida, with a view to
  removing the water hyacinth.
Lake Okeechobee, Fla., from                     ._do--------.--------              .   ------- I     ---           -I...
   Okeechobee Cross-Florida Canal
   via Kissimmee River and Lake
   Tohopekaliga to Oklawaha, St.
  Johns, and Indian Rivers, Florida
  east coast, interlocking open river
  and canalized channels, etc.
          RIVERS        AND   HARBORS-JACKSONVILLE,                            FLA.,         DISTRICT       627

Status of all investigations for navigation called for by river and harbor acts
                          and committee resolutions-Continued

                                                                  Date trans-                Document    Recom-
             Locality                    Authorization act         mitted to                    No.     mendation
                                                                   Congress

Lake Tohopekaliga, Fla., to Lees-         River and Harbor Act,
  burg on Lake Harris, Florida               Mar. 2, 1945.
  east coast, interlocking open-
  river and canalized channels, etc.
Lake Tohopekaliga, Fla., to               _-- do.              -
  Okeechobee Cross-Florida Canal
  via the Kissimmee River and
  Lake Okeechobee, Florida east
  coast, interlocking open-river and
  canalized channels, etc.
Lake Tohopekaliga, Fla., to St.            .. do .....................
  Johns River and thence to Titus-
   ville, Florida east coast, inter-
  locking open-river and canalized
   channels, etc.
Lake Worth Inlet, Fla_ ...        ...... House Committee on Pub-
                                                                 -----
                                                                ---  -
                                             lic Works resolution, June
                                             7, 1952.
      Do _-- _      _ - ..   ..-
                               - -.--
                                   -      Senate Committee on Pub-
                                             lic    Works      resolution,
                                             May 27, 1952.         -   - - -   - - -   - -



Leesburg, on Lake Harris, Fla.,            River and Harbor Act,
  to Lake Tohopekaliga, Florida              Mar. 2, 1945.
  east coast, interlocking open-
  river and canalized channels,
  etc.
Lemon Bay, Fla., channel to Gulf House Committee on Pub-
   of Mexico, Fla.                           lic Works resolution, Aug.
                                              17, 1949.
Lighthouse Service depot, Taylor           River and Harbor Act,
   Creek, Fla., side or spur channel          Mar. 2, 1945.
   from the Intracoastal Waterway
      (Jacksonville to Miami), and
   turning basin or harbor at.
Little Pass, Fla., channel from ----... do....------------
    Clearwater Bay, Fla., to deep
   water in the Gulf of Mexico.
Little Sarasota Bay and Channel River and Harbor Act,
   through Caseys Pass, Fla., with           July 24, 1946.
   a view to providing a channel
  across Roberts Bay (Venice Bay),
   with a suitable turning basin at
   the eastern end.
Little Sarasota Bay, Fla., chan-           Rivers andiHarbors Com-
   nel from Little Sarasota Bay               mittee resolution, June
   across Roberts Bay (Venice Bay)            28, 1946.
   to bridge on U. S. No. 41 at Hat-
   chett Creek, with suitable turn-
   ing basin at eastern end.
Louisiana and other States af- Rivers and Harbors Com- ------ --- ---
    fected, extermination and re-             mittee resolution, Feb.
   moval of water hyacinth and                6, 1945.
   other marine vegetable growth
   from waters of.
Matanzas Bay, St. Augustine and Senate Committee on Pub- ---------------
    vicinity, Fla.                            lic Works resolution, Feb.
                                              14, 1950
Maximo Point near St. Petersburg,          River and Harbor Act, ---------------
    Fla., channel north from Tampa            Mar. 2, 1945.
    Bay Channel.
Melbourne, Fla., waterway from ---....          do-------         ---
    Indian River to St. Johns River
   at Palatka, Fla., Florida east
    coast, interlocking open-river
    and canalized channels, etc.
Miami, Fla., to Jacksonville, Fla., .....do              -------
                                                             -     ---------
    Intracoastal Waterway, auxiliary
    side channel from Titusville to,
    and at, or near Eau Gallie, Fla.
Miami Harbor, Fla., with a view            Commerce Committee res-
    to increasing the depth from 30           olution, Aug. 18, 1944.
    to 35 feet.
Miami Harbor, Fla., with a view            Commerce       Committee res-
    to widening main ship channel.            olution, July 10, 1945.
Miami to Key West, Fla., Intra-            Senate    Committee     on Pub-
     coastal Waterway, side channel           lic Works resolution, Apr.
    and turning basin to Boot Key              13, 1950.
     Harbor, Fla.
628         REPORT       OF    CHIEF OF            ENGINEERS,            VJ.    S.     ARMY,            1952


Status of all investigations for navigation called for by river and harbor acts
                            and committee resolutions-Continued


                                                                          Date trans-         Document  Recom-
              Locality                       Authorization act             mitted to            No.    mendation
                                                       •ogrs
                                                                           Congress

Miami River and central and south-      Senate Committee on Pub-
ern Florida, locks and dams in          lic Works resolution, Mar.
Miami River.                             12, 1949.
Mullet KeyJa., with view to pro-        River and Harbor Act,
viding protected harbor and turn-       Mar. 2, 1945.
ing basin and channel directly
north from Tampa Bay Channel.
Naples Bay to Gordon Pass and           Senate Committee on      Pub-
Big Marco Pass, Fla., channel,          lic Works resolution,   Feb.
for improvement of Gordon Pass.          14, 1950.
New Pass, Fla., and Big Sarasota        Senate Committee on      Pub-
Pass, channels from Intracoastal        lic Works resolution,   June
Waterway (Caloosahatchee Riv-            15, 1950.
er to Anclote River) in Sarasota
Bay to Gulf of Mexico through
New Pass and Big Sarasota Pass,
and to city pier, yacht basin, and
  Payne Terminal at Sarasota.
New Smyrna, Fla., side or spur          River and Harbor          Act,
channel from the Intracoastal            Mar. 2, 1945.
Waterway (Jacksonville to Mi-
ami), and turning basin or har-
bor at.
Okeechobee Cross-Florida Canal,             do ---------------------.
                                       --....
interconnecting      waterway to
  Lake Tohopekaliga, via Lake
  Okeechobee and the Kissimmee
  River, Florida east coast, inter-
locking open-river and canalized
channels, etc.
Okeechobee Cross-Florida Canal,         River and Harbor          Act,
waterway from St. Johns River           Aug. 30, 1935.
to Kissimmee River and thence
to Okeechobee        Cross-Florida
Canal.
Okeechobee Lake, Fla., intercon-        River and Harbor          Act,
necting waterways to Lake To-           Mar. 2, 1945.
hopekaliga and to the Okeecho-
bee Cross-Florida Canal, Florida
east coast, interlocking open-river
and canalized channels, etc.
Okeechobee Lake and its tributary      -- -. do .....................
streams, Florida, with a view to
removing the water hyacinth.                                                    -------- ----------
Oklawaha River and its tributar-
ies, Florida, for navigation, flood
                                        River and Harbor
                                           Mar. 2, 1945.
                                                                  Act,           -------- ----------
control, and related purposes.
Oklawaha River, Fla., from Lake           d o .....................
                                       ---..
Apopka through Lake Dora to
Lake Eustis and adjoining water-
ways.
Oklawaha River, Fla., from Lake.       - - -- do _................
Eustis to Lake Griffin, and
thence from Lake Griffin to
Silver Springs Run.
Old Tampa Bay, Fla., channel            River and Harbor Act,
in vicinity of Booth Point.                May 17, 1950.
Orange Lake Basin, Fla .__-__-_-__      River and Harbor Act,
                                           Mar. 2, 1945.
Palatka, Fla., St. Johns River          .--_ do ..-----------------
to Indian River at Sebastian,
Melbourne, Eau Gallie, Cocoa,
or such other locality most suit-
  able, Florida east coast, inter-
locking open-river and canalized
  channels, etc.
Peace River, Fla_....______________    --..do--..-------------------     Nov.        6,1951   .------.....---...   Unfavor-
                                                                                                  II                able.
Pinellas County, Fla., Beach-          Sec. 2, River and Harbor
erosion study.                         Act, July 3, 1930.
Pompano, Hillsboro Inlet, Fla.....     River and Harbor Act,             Apr. 30,1952----------....                Unfavor-
                                         Mar. 2, 1945.                                                              able.
Ponce de Leon Inlet, Fla-..........    Rivers and Harbors Com-
                                         mittee resolution, Mar.
                                         25, 1938.
             RIVERS      AND HARBORS                  JACKSONVILLE,                   FLA.,   DISTRICT             629

Status of all investigations for navigation called for by river and harbor acts
                     and committee resolutions-Continued

                                                                               Date trans-    Document         Recom-
              Locality                         Authorization act                mitted to       No.           mendation
                                                                                   Congress

Punta Santiago, Humacao Playa,          River    and Harbor        Act,       ..
P. R.                                   Mar.    2. 1945.
Putnam County, Rice Creek, Fla__        River    and Harbor        Act,       Apr. 25,1952    H.      Doc.    Favorabl ,e.
                                         July    24, 1946.                                         446, 82d
                                                                                                   Cong.,
                                                                                                   2d sess.
Rice Creek, Putnam County, Fla -                                 __do_.-- -
                                       .-___do---------.---.---.---                           -__do..__.        Do.
Roberts Bay (Venice Bay), Fla.,            do _-------------------
   channel through Caseys Pass,
   Little Sarasota Bay, and across
   Roberts Bay, with suitable turn-
  ing basin at eastern end.
Roberts Bay (Venice Bay), Fla.,         Rivers and Harbors Com-
  channel from Little Sarasota Bay       mittee resolution, June
  to bridge on U. S. No. 41 at           28, 1946.
  Hatchett Creek, with suitable
  turning basin at eastern end.
St. Augustine Harbor and vicinity,     Senate      Committee   on         .
  Fla., reduction of damage in           Public Works resolution,
  Matanzas Bay.                          Feb. 15, 1951.
St. Johns River, Fla., channel         Rivers and Harbors Com-
  from Sanford to Indian River,          mittee resolution, Jan.
  near Titusville.                       27, 1937.
St. Johns River, Fla., from Palatka    River and Harbor Act,
  to Indian River at Sebastian,          Mar. 2, 1945.
  Melbourne, Eau Gallie, Cocoa,
  or such other locality most suit-
   able, Florida east coast, inter-
   locking open-river and canalized
   channels, etc.
St. Johns River, Fla, near Lake         River and Habor            Act,
  Dexter, to Leesburg on Lake            Mar. 2, 1945.
   Harris, or alternately via the
  Wekiwa (Wekiva) River, Florida
  east coast, interlocking open-
  river and canalized channels, etc.
St. Johns River, Fla., to Indian        -__. do....
   River at Titusville, and to Lake
  Tohopekaliga, Florida east coast,
  interlocking open-river and canal-
  ized channels, etc.
St. Johns River, Fla., waterways           do _------. --------------
                                       --..-

  from Camp Blanding, Kingsley
  Lake, to the St. Johns River via
  Black Creek and/or via Black
   Creek and Doctors Inlet.
St. Johns River, Fla., waterway        River and Harbor            Act,
  from St. Johns River to Kissim-        Aug. 30, 1935.
  mee River and thence to Okee-
  chobee Cross-Florida Canal.
St. Johns River, Fla., near Dexter      River and Harbor Act,
   Lake, interconnecting waterway         Mar. 2, 1945.
  to Lake Harris, Fla., Florida east
  coast, interlocking open-river and
  canalized channels, etc.
St. Marks, Fla., to Anclote River,     Commerce Committee
  Intracoastal Waterway, and con-       resolution, Feb. 6, 1940.
  nection across Florida with St.
  Johns River.
St. Petersburg, Fla., channel from     River and Harbor            Act,   _
  Maximo Point to Tampa Bay              Mar. 2, 1945.
   Channel.
St. Petersburg Harbor, Fla., to        ._-- do ..
  provide for channel up to depth
  of 30 feet from main Tampa Bay
  ship channel past Port of St.
  Petersburg in front of recreation
  pier.
Sanford, Fla., channel from St.        Rivers and Harbors Com-
  Johns River to Indian River           mittee resolution, Jan.
  near Titusville.                      27, 1937.
San Juan Harbor, P. R-- ._------       Rivers and Harbors Com-
                                        mittee resolution, Dec.
                                        21,1945.
    D o .-    -......
               ....   .............    House Committee on
                                        Public Works resolution,
                                        Sept. 27, 1951.
630        REPORT OF         CHIEF OF        ENGINEERS,          U.    S.   ARMY,         1952


Status of all investigations for navigation called for by river and harbor acts
                     and commvittee resolutions-Continued

                                                                  Date trans-       Document        Recom-
             Locality                    Authorization act         mitted to        Document        Recom n
                                                                   Congress             o.         mendation


Sante (Santa) Fe River, Fla.,           River and Harbor Act,                   _         .
  from the Suwannee River to the          Mar. 2, 1945.
  bridge on U. S. No. 41, near
  High Springs, and thence up-
  stream to Camp           Blanding,
   Kingsley Lake, Fla.
Sarasota Bay, Fla., channel from --.. ----do - , ..----.......
  Caseys Pass (Venice Inlet),
  through Dona Bay to bridge on
  U. S. No. 41, including turning
  basin at eastern terminus of the
  channel.
Sarasota Bay, Fla., channel in, Senate Committee on
  from Intracoastal Waterway              Public Works resolution,
   (Caloosahatchee River to Anclote       June 15, 1950.
   River) to Gulf of Mexico through
  New Pass and Big Sarasota Bay
  and to the city pier, yacht basin,
  and Payne Terminal at Sarasota.
Sarasota,    Fla.,  channels from ....do _..        ... .. .... ....
  Intracoastal Waterway (Caloosa-
  hatchee River to Anclote River)
  in Sarasota Bay to city pier,
  yacht basin, and Payne Terminal
  at Sarasota, and to the Gulf of
  Mexico through New Pass and
  Big Sarasota Pass.
Sarasota (Little) Bay and channel       River and. Harbor Act,
  through Caseys Pass, Fla., with         July 24, 1946.
  a view to providing a channel
  across    Roberts Bay (Venice
   Bay), with a suitable turning
  basin at the eastern end.
Sarasota (Little) Bay, Fla., be- Rivers and Harbors Com-
   tween Sarasota and Venice, and         mittee resolution, June
  channel through Caseys Pass,            28, 1946.
   Fla., to provide channel across
   Roberts Bay (Venice Bay).
Sebastian Inlet, Fla .    .. _--____    River and Harbor Act,
                                          July 24, 1946.
     Do_ ______---_ - - -            .. Senate Committee on
                                          Public Works resolution,
                                          June 1, 1948.
Sebastian, Fla., waterway from          River and Harbor Act
  Indian River to St. Johns River         Mar. 2, 1945.
  at Palatka, Fla., Florida east
   coast, interlocking     open-river
  and canalized channels, etc.
Silver Springs Run, Fla., Okla- -- -_do --- - -- - - -- - -     ---------------
                                                                                    ------------
  waha River from Lake Eustis to
   Lake Griffin and thence to Silver
   Springs Run.
Suwannee River, Fla. and Ga.,           Sec. 1, River and Harbor---------------
                                                                                    ------------
   for navigation, flood control,         Act, Jan. 21, 1927.
  power, and irrigation (308 re-
port).
Suwannee River, Ga. and Fla., River and Harbor Act,                           ------------
                                                                ---------------

  with a view to improvement in    Mar. 2, 1945.
  the interest of navigation and
  flood control.
Suwannee River, Fla., waterway .... do....------------------- --------------- ------------
  via Santa Fe River from Suwan-
  nee River to Camp Blanding,
  Kingsley Lake.
Tampa Bay Channel, channel ....d o ---------------------                      ------------
                                                                ---------------

  directly north to vicinity of
  Maximo Point near St. Peters-
  burg, Fla.
Tampa Bay Channel, channel _-- d o ................... --------------- ------------
  directly north to vicinity of
  Mullet Key and with a view to
  providing protected harbor and
  turning basin.
Tampa Bay Channel, channel -----.....do----------------------
  up to depth of 30 feet past port
  of St. Petersburg in front of
  recreation pier.
            RIVERS AND HARBORS-JACKSONVILLE,                                       FLA.,      DISTRICT      631
Status of all investigations for navigation called for by river and harbor acts
                     and comm/ittee resolutions--Continued

                                                                             Date trans-      Document  Recom-
               Locality                         Authorization act             mitted to         No.    mendation
                                                                              Congress

Tampa Bay to Anclote River,                Senate Committee on
  Fla., Caloosahatchee River to             Public Works resolu-
  Withlacoochee    River, Intra-            tion, Dec. 20, 1950.
  coastal Waterway.
Tampa Harbor, Fla ..............           Senate Committee on
                                             Public Works resolu-
                                             tion, July 22, 1950.
    Do.....       -          -             House     Committee on
                                             Public Works resolu-
                                            tion, Aug. 16, 1950.
Taylor Creek, Lighthouse Serv-
  ice depot adjacent to Fort
                                           River and Harbor Act,
                                            Mar. 2, 1945.
                                                                       I                  I-----
                                                                                     .-------
   Pierce Harbor, Fla., side or
  spur channel from the Intra-
  coastal Waterway (Jacksonville
   to Miami), and turning basin or
  harbor at.
Titusville, Fla., channel from Rivers and Harbors Com-
   Indian River to St. Johns River    mittee resolution, Jan.
  at Sanford.                         27, 1937.
Titusville, Fla., from Indian River and Harbor Act,
   River to St. Johns River and       Mar. 2, 1945.
   thence to Lake Tohopekaliga,
   Florida east coast, interlocking
  open-river and canalized chan-
   nels, etc.
Titusville, Fla., side or spur __..do....----------------I------I-----
   channel from the Intracoastal
   Waterway (Jacksonville to Mi-
   ami), and turning basin or har-
   bor at.
Tohopekaliga Lake, interconnect- ....   do...----------------          ---------------
   ing waterway to Okeechobee
   Cross-Florida Canal, via the
   Kissimmee River and Lake
   Okeechobee, Florida east coast,
   interlocking     open-river   and
   canalized channels having depth
   of 12 feet, etc.
Tohopekaliga Lake, interconnect- .... do....-------------              ---------------
  ing waterway to the St. Johns
   River, Fla., Florida east coast,
   interlocking     open-river   and
   canalized channels having depth
   of 12 feet, etc.
Venice Bay (Roberts Bay), Fla., Rivers and Harbors Com-
   channel from Little Sarasota       mittee resolution, June
   Bay to bridge on U. S. No. 41,     28, 1946.
   at Hatchett Creek, with suit-
   able turning basin at eastern
  end.
Venice Bay (Roberts Bay), Fla., River and Harbor Act,
   channel through Caseys Pass,       July 24, 1946.
   Little Sarasota Bay, and across
   Roberts Bay, with suitable
   turning basin at the eastern end.
Venice Inlet (Caseys Pass), Fla., River and Harbor Act,
   channel from Venice Inlet and      Mar. 2, 1945.
   Sarasota Bay through Dona
   Bay to bridge on U. S. No. 41,
   with turning basin at eastern
   terminus.
Water hyacinth and other marine Rivers and Harbors Com- ....
   vegetable growth, extermina-       mittee resolution, Feb.
   tion and removal of, in waters     6, 1945.
   of Louisiana and other States af-
   fected.
Water hyacinth, removal of, on River and Harbor Act, --..........--.                       ............
   Lake Okeechobee and its tribu-     Mar. 2, 1945.
   tary streams, Florida.
Wekiwa (Wekiva) River, Fla., .....----do-..........----------         ------ ----------------
   from St. Johns River to Lees-
   burg on Lake Harris, Florida
   east coast, interlocking open-
   river and canalized channels, etc.
632         REPORT OF              CHIEF OF ENGINEERS,                  U.   S. ARMY, 1952

Status of all investigations for navigation called for by river and harbor acts
                     and commnittee resolutions-Continued

                                                                        Date trans-   Document        Recom-
             Locality                         Authorization act         mitted to       No.          mendation
                                                                         Congress

Withiacoochee :River,      Fla.,    for   Sec. 1, River and Harbor                    ............
navigation, flood control, power,         Act, Jan. 21, 1927.
and irrigation (308 report).
Withlacoochee    River, Fla. (final       Rivers and Harbors Com-
report).                                  mittee resolution, May
                                           20, 1942.
   Do ......-----------------------       Senate       Committee   on
                                           Public Works resolu-
                                           tion, May 12, 1950.
Withlacoochee River to Anclote            Senate   Committee  on
River, Fla., Intracoastal Water-           Public Works resolu-
way between the Anclote River             tion, Dec. 20, 1950.
and Tampa Bay.
Withlacoochee   River to Apa-             Commerce Committee res-
lachicola Bay, Fla., Intracoastal         olution, Feb. 6, 1940.
Waterway,      section   from     An-
clote River to St. Marks, Fla.




                          25. CENTRAL AND SOUTHERN FLORIDA

   Location.-The project area includes Lake Okeechobee, its regula-
tory outlets, and a large portion of the Everglades and east coast areas
to the south, all near the southern end of the Florida Peninsula. (See
U. S. Coast and Geodetic Survey Charts Nos. 473, 1247, 1248 and 1289
and "Florida Everglades Drainage District," Soil Conservation Serv-
ice maps Nos. 1524 to 1561, July 1946.)
   Lake Okeechobee and its regulatory outlets lie in Palm Beach, Mar-
tin, Okeechobee, Glades, Hendry, and Lee Counties. St. Lucie Canal
flows from the lake to the Atlantic Ocean; the Caloosahatchee River,
from the lake to the Gulf of Mexico.
   The lower east coast region embraces the populous urban and agri-
cultural areas in Dade, Broward, and Palm Beach Counties. The
region lies along the coast from the St. Lucie Canal south to near the
tip of the State, and extends 9 to 20 miles inland.
   The conservation areas lie in Dade, Broward, and Palm Beach
Counties west of the lower east coast region, and include 1,344 square
miles of the Everglades suitable only for water and wildlife
conservation.
   Lake Okeechobee agricultural area lies south of the lake, mostly in
western Palm Beach County, but including part of Hendry County.
The area embraces 1,130 square miles of muck and peat land which is
suited for long-term agricultural use.
   Previous projects.-Previous projects consist of completed works
for control of Lake Okeechobee included in and constructed under
the navigation project for Okeechobee Waterway, Fla. (formerly
Caloosahatchee River and Lake Okeechobee Drainage Areas, Florida)
under provisions of River and Harbor Acts approved July 3, 1930,
and August 30, 1935. For further information, see pages 877-882,
annual report for 1948, and page 785, annual report for 1949.
   Existing project.-This provides for modification and expansion of
the previous project to include the first phase of the comprehensive
plan for flood control and other purposes in central and southern
          FLOOD CONTROL-JACKSONVILLE,          FLA.,   DISTRICT      633
Florida, as recommended by the Chief of Engineers in House Docu-
ment 643, Eightieth Congress, second session; and authorizes the
appropriation of $36,300,000 for partial accomplishment of that plan.
The first phase of the plan provides forthe following:
   a. Everglades-lower east coast area: (1) An east-coast protective
levee from the Homestead area north to West Palm Beach Canal;
 (2) improvements for partial completion of conservation areas for
water impoundment and flood discharge in the Everglades area west
of the east-coast protective levee, including levees within the conserva-
tion area separating it into three parts, with gated spillways for dis-
charge of water from one part to the next and, finally, through
Tamiami Trail to the undeveloped area to the south, and a bridge
culvert where Tamiami Trail intersects the proposed canal and levee
on the west side of the conservation area; (3) local protection works in
the area along the east coast from northern Palm Beach County to
southern Dade County, including pump stations and complete pro-
tective works in the Davie agricultural area, canal improvements and
enlargements, new canals, spillway-headworks at the edge of the
conservation area, bridge crossings, and outlet barriers.
   b. Okeechobee-Everglades area: (1) A levee and canal encircling
the developed portion of the Lake Okeechobee agricultural area from
Caloosahatchee River via Bolles Canal to Miami Canal, thence south
on Miami Canal about 9 miles, thence eastward to Hillsboro Canal,
thence southeastward to the limit of the agricultural area, thence north-
ward crossing West Palm Beach Canal and continuing to St. Lucie
Canal; (2) enlargement of Miami, North New River, Hillsboro, and
West Palm Beach Canals within the protected area; (3) five feeder
canals within the protected area; (4) four pumping stations at Lake
Okeechobee and pumping stations at the eastern edge of the protected
area on West Palm Beach and Hillsboro Canals, with installation of
partial pumping capacities; (5) a spillway at the eastern edge of the
agricultural area on the new-canal crossing West Palin Beach Canal,
and culverts in West Palm Beach Canal on both sides of the new
canal; (6) improving control of Lake Okeechobee by enlarging St.
Lucie Canal, including modification of spillways and structures;
 (7) a spillway at Moore Haven, with an outlet canal to Caloosahatchee
River; (8) enlargement of Caloosahatchee River to provide increased
discharge capacity; (9) enlargement of existing Lake Okeechobee
levees, including paving and revetment, and construction of levees on
northeast and northwest shores of Lake Okeechobee; (10) initiation
of construction and operation of a system of meteorological and hydro-
logical stations; and (11) under maintenance, the operation and care
of the spillway to be constructed at Moore Haven and the main
spillways of the conservation area.
   Upon completion, local interests are to assume maintenance and
operation of all works in subparagraphs (a) and (b) above, except
the gated spillways referred to in subparagraph (a) and features (6)
through (11) in subparagraph (b), which works will be operated and
maintained by the United States. In addition, the project includes
maintenance (since July 1, 1950) of control works completed with
river and harbor funds under the previous navigation project for
Okeechobee Waterway, Fla. (formerly Caloosahatchee River and
634           REPORT OF CHIEF OF ENGINEERS,                                            U.    S. ARMY, 1952

Lake Okeechobee drainage areas, Florida) as follows: (a) A levee
about 67.8 miles long from Fisheating Creek to St. Lucie Canal, fol-
lowing in general the south shore of the lake, and a north-shore levee
15.74 miles long (those levees are to be improved and enlarged under
the existing project) ; (b) four auxiliary floodway channels extending
into Lake Okeechobee at or near Liberty Point, mouth of Fisheating
Creek, mouth of Kissimmee River, and mouth of Taylor Creek; (c)
collection and evaluation of meteorological data; and (d) operation
and care of spillways at the St. Lucie and Ortona locks, 5 hurricane
gates on Lake Okeechobee, 16 drainage culverts through the west-,
south-, and east-shore levees and 4 on the north shore of Lake Okee-
chobee, 16 drainage spillways along the St. Lucie Canal, and an
intercommunicating radiotelephone network of 8 stations.
   The following table shows the principal features of the hurricane
gates constructed under previous projects for the Okeechobee Water-
way, Fla., and maintained under the existing project since July 1,
1950:

Hurri-                       Nearest town
  cane                                                                  Depth over          Character of        Year
  gate                                                  Distance        sills (feet)        foundation          c                  cost
                                                                                                                           Actualplete
  No.'                     Name                         (miles)pleted
                                                        (miles)




      2     Clewiston, Fla--...----------          -              0               10 Pile----------                 1935   $309,748.18
      3     Lake H arbor, Fla.--------____...                     0.5             10 Rock ...---------              1935    316, 938.28
      4     Belle Glade, Fla-------...........   .___             4.0             10 ...  do ..                     1935    350, 025.30
      5     Canal Point, Fla......----------                      0               10 __.._do                        1935    262, 464.60
      6     Okeechobee, Fla-----------         ----               6.0              7 Pile     -----------           1936    373,273.30

  1All are 50 feet wide, with available length unlimited. They are constructed of concrete with steel sector
gates, and have no lift. Hurricane gate No. 6 has an auxiliary culvert spillway with automatic control.

  Lake Okeechobee is maintained, so far as possible, between elevations
13 and 15 feet, mean sea level.
  The estimate of cost for new work, revised in 1952, is $96,345,900
United States funds and $15,352,000 contributed funds, exclusive of
river and harbor funds expended on previous projects. The latest
(1952) approved estimate for annual cost of maintenance is $355,200,
including $66,900 for operation and care of protective works.
   The existing project was authorized by the following flood control
acts:

     Acts                                Work authorized                                                 Documents

June 30,1948      The first phase of the comprehensive plan for flood                       H. Doc. 643, 80th Cong., 2d sess.
                   control and other purposes, and authorized to be                           (Contains   latest   published
                     appropriated $16,300,000 for partial accomplishment                      maps.)
                   of the first phase.
May 17,1950       Authorized to be appropriated an additional $20,000,000                   Specified in act.
                   for continuation of the first phase.


   Local cooperation.-TheFlood Control Act approved June 30, 1948
 (H. Doc. 643, 80th Cong., 2d sess.), imposed the conditions that local
interests shall provide all lands, easements, and rights of way; make
a cash contribution of 15 percent of the estimated construction cost for
each part of the work prior to its initiation (with the provision that
the total cash contribution for the entire comprehensive plan shall
                FLOOD          CONTROL-JACKSONVILLE,                                     FLA.,     DISTRICT              635
not exceed $29,152,000) ; and furnish assurances satisfactory to the Sec-
retary of the Army that they will hold and save the United States free
from damages due to the construction and operation of the works and
that they will maintain and operate all the works after completion
in accordance with regulations prescribed by the Secretary of the
Army, except the levees, channels, locks, and control works of the
St. Lucie Canal, Lake Okeechobee, and Caloosahatchee River, and the
main spillways of the conservation areas.
   In May 1949, the Florida State Legislature passed legislation pro-
viding for creation of districts for flood control, reclamation, conser-
vation, and allied purposes in cooperation with the United States;
for creation of the Central and Southern Florida Flood Control
District, and for consolidation of the former Everglades Drainage
District with that district; and for other measures necessary for full
compliance with all requirements of local cooperation. A resolution
adopted August 1, 1949, by the Central and Southern Florida Flood
Control District, assuming full responsibility for compliance with the
requirements of local cooperation as set forth in the project document,
was accepted by the Chief of Engineers on November 25, 1949, as
satisfactory assurance of compliance. The Flood Control District has
furnished rights-of-way and other interests in land, and has con-
tributed the required 15 percent of the estimated construction cost for
each feature of the project, when and as requested by the district
engineer. In response to a request of local interests on June 10, 1950,
urging construction of the eastern boundary levees of the conservation
areas to an intermediate grade, the Chief of Engineers outlined a
general policy permitting such construction, provided that local inter-
ests agree to maintain the levees at those heights pending completion
to full grade. The Central and Southern Florida Flood Control
District has agreed to assume full responsibility for maintenance of
the levees so constructed.
   Operationsand results during fiscal year.-The work accomplished
during the fiscal year is tabulated below.

             Work and locality                                      Period                        Quantity             Cost


New work:
   Contract:
       Additional      compensation       allowed ...------------                 ---..---------------     -------   $13, 274.56
         contractor for work accomplished
         in prior fiscal year (construction
         of levee 35-A).
       Cost adjustment on construction of .....................-------------------------------------..............     8,830.39
        levees 35 and 36 (completed in
         previous fiscal year).
       Cost adjustment on construction of -----------------------------------------                                    1, 431. 19
        northerly 3.8 miles of levee and
         canal 8 (completed in previous fis-
         cal year).
       Pumping station, two 54-inch cul-               --------------------------------------                         98, 812. 00
        verts, and 3 timber bridges on
         levee and canal 8. The cost of all
         items borne by local interests.
       Construction of the northern 2.6                 July 1 to 2, 1951 (100              462 cubic yards exca-     44, 426. 78
        miles of levee 40, located between                percent completed).                vation.
        the Hillsboro and West Palm
          Beach Canals and about 18 miles
         west of West Palm Beach to inter-
         mediate height at elevation 24
         feet.' (99 percent completed at
         beginning of fiscal year.)
  See footnote at end of table.
636         REPORT OF CHIEF OF ENGINEERS,                                  U.       S.   ARMY,           1952


             Work and locality                              Period                        Quantity                    Cost
                                               I                               1            -   --   -    -   I-
                                                                                                              1--




New work-Continued
   Contract--Ccatinued
      Construction of levees 33 and 37,
        about 14.8 miles long, located
                                                   July 1, 1951, to Feb.
                                                     1952 (100 percent
                                                                         r,        1,254,069 cubic yards
                                                                                      embankment.
                                                                                                                   $309, 041. 47
        between the Miami and North                  completed).
        New River Canals, to interme-
        diate height at elevation 18 feet,
        including control structures 32
        and 34 (26 percent completed at
        beginning of fiscal year).
      Construction of levee 30, 13.9 miles         July 1, 1951, to June 30,       1,98!,341 cubic yards        1, 164, 098. 23
        long, about 12 miles west of Miami,          1952 (99 percent com-           embankment.
        to intermediate height at eleva-             pleted).
        tion 18 feet, and control structure
        32A (3 percent completed at begin-
        ning of fiscal year).
      Construction ofsoutherly 21.1 miles          July 1, 1951, to June 30,       818,365 cubic yards ex- 1, 228, 126. 38
        of levee 40, located between the             1952    (70 percent             cavation, 1,9;17,701
        Hillsboro and West Palm Beach                completed).                     cubic yards em-
        Canals, to intermediate height at                                            bankment.
        elevation 24 feet (1 percent com-
        pleted at beginning of fiscal year).
      Construction of northern 21.7 miles          July 1, 1951, to June 30,       2,802,272 cubic yards            884, 010.96
        of canal and levee 8 and 2.1 miles           1952 (82 percent com-            excavation.
        of tie-bank levee to final grade at          pleted).
        elevation 24 feet and control struc-
         ture 7S (14 percent ccmpleted at
        beginning of fiscal year).
      Construction of control structure 39      Aug. 8, 1951, to June                                               143, 781. 44
         between levees 40 and 36.                30, 1952 (98 percent
                                                  completed).
        Compaction of poolside slopes of Feb. 25 to June 30,                                                         43, 751.33
          levees 30, 33, and 37, about 28.7       1952    (53 percent
          miles long, including $)08.1 for        completed).
          tests performed to determine best
          method of accomplishment.
        Construction of northern 10.8 miles March 20 to June 30, 422,794 cubic yards                                313, 513.17
          of levee 31 to interim grade, slop-     1952 (50 percent         embankment.
          ing from elevation 17.4 feet at         completed).
          Tamiami Trail to elevation 14
          feet at sotl      end, -and control
          structures 24 and 24A.
        Construction of structure 11 in U. S.   May 13 to June 30,                                                     2, 918. 4
          Highway 27 at south side of con-        1952 (2 percent com-
          servation area No. 2.                   pleted).
        Government cost preparatory to                                                                                   128. 06
          construction of structures 5A-E,
          5A-W, and 5A-S, auxiliaries to
          structure 5A at intersection of
         levees 8 and 40.
        Removal of 1,025-foot shoal, with July 1, 1951, to June                                                          612. 60
          leased plant, from levee 8 canal        30, 1952 (18 percent
          near south tie-back levee and           completed).
          borrow pit of south tie-back
          levee.
        Surveys, design, plans and speci- July 1, 1951, to June                                                     334, 031.64
          fications for project features (hired   30, 1952.
          labor).
                                                   .
        Preparation of definite project report .-__ d o ....   ...........                                          631, 694. 27
          hired labor).
        Contract work in connection with .                                                                           20, 249. 85
          preparation of definite prcject re-
          port.
        Division and district real estate .-.. do ...                                                                  1, 045.34
          expense incident to procurement
          of rights-of-way and spoil-disposal
          areas by local interests (hired
         labor).
            Total, new work ........._.._                                                                       5, 743, 808.14
Maintenance:
   Contract:
       Modification of existing levee cross July 1 to 8, 1951 (100                 491 cubic yards exca-               9,057.40
         sections, and paving lakeside        percent completed).                    vatiorn.
         slopes and Lake Okeechobee levee
         crown, between Clewiston and
         South Bay, Division 2. (Begun
         January 15, 1951, and 99 percent
         completed at beginning of tscal
         year.)
                FLOOD         CONTROL---JACKSONVILLE,                             FLA.,      DISTRICT               637

             Work and locality                                Period                         Quantity            Cost

Maintenance-Continued
   Contract-Continued
       Modification of existing levee cross          July 1 to 19, 1951 (100       29,497 cubic yards ex-      $101, 433.01
          sections, and paving lakeside                percent completed).            cavation; 32,426
          slopes and Lake Okeechobee levee                                            square yards pav-
          crown near Bacom Point, divi-                                              ing.
          sion 2. (Begun May 7. 1951, and
          60 percent completed at beginning
          of fiscal year.)
       Rock revetment repair of 750 linear           June 3 to 28, 1952 (100       1,986 tons of 100- to         23, 227.46
         feet of eroded bank along toe of              percent completed).            500-pound granite
          dike on south bank St. Lucie                                                stones.
          Canal, 1.2 miles above St. Lucie
         lock.
   Hired labor:
       Collection and compilation of                 Fiscal year--......-------         -------------------     24,372.19
          meteorological data, stream gag-
          ing, and maintenance and opera-
          tion of meteorological instru-
          ments.
       Removal of obstructions from flood-                                                         224.75
                                                     .....do.............-----.............----...-----------........
          way channels constructed under
          previous projects and maintained
          under existing project.
       Periodic and miscellaneous surveys,           .....                                       2,270.52
                                                         do--.......................--------------........--.......-
          contingencies, and inspections or
          flood-control features constructed
         under previous project and main-
          tained under existing project.
       Patrol, inspection, and maintenance              do................-------------------------........
                                                     .....                               40, 469.29
         of levee slopes, ramps, protective
          planting and cattle fences, and
         maintenance of toe ditching, Lake
          Okeechobee levees (L-D1, L-D2,
          L-D3, 1--D4, and L-D9).
       Periodic inspections of completed             .....                                        449. 99
                                                         do........................................-----------------
         flood-control features constructed
         under existing project.
       Cleanout of ditch along landside toe                                                                      7,818.65
         of levee (L-D9) on east shore be-
         tween culvert No. 11 and hurri-
         cane gate structure No. 5, 7.3
         miles.
       Emergency cleanout of approach                October 1951..--             .--     .---------------------- 2,956.55
         channels landward of Lake Okee-
         chobee culverts 5, 5-A, 9, 11, 14,
         16, 10-A, and 13.
       Reconstruction of about 0.5 mile of              do ----------
                                                     .....---                          --------
                                                                                  ------.....................
                                                                                                     205.11
         demolished fence along Fisheat-
         ing Creek levee extension, and
         spot repairs to other sections of
        fence damaged by floodwaters.
            Total maintenance---------............                                                             212, 484. 92

  tAll elevations refer to mean-sea-level datum.


   Operation and care: The spillway at Ortona and St. Lucie locks,
5 hurricane gates on Lake Okeechobee, 16 drainage culverts through
the west-, south-, and east-shore levees and 4 on the north shore of
Lake Okeechobee, 16 drainage spillways along the St. Lucie Canal,
and an intercommunicating radiotelephone network of 8 stations were
operated and maintained. Payment to contractor for work accom-
plished in prior fiscal year on hurricane gate No. 6 was $312.39. Hur-
ricane gates Nos. 2 and 5 were dewatered and desilted by hired labor,
and metal surfaces sandblasted and painted by contract between April
25, 1952, and June 3, 1952, at a cost of $17,750.19. Repair by contract
of damaged gate and seal ring of culvert 11 was 1 percent completed
at end of fiscal year, at a cost of $527.76. The costs for the year were
$13,462.33 for operation, $36,354.92 for ordinary repairs, $226.99 for
improvement and reconstruction, a total of $50,044.24.
        245554-53--vol. 1                 41
638            REPORT OF CHIEF OF ENGINEERS,                                  U.      S.   ARMY,         1952

   The total costs for the year were as follows:

                                                                     Costs
               Funds                                                                                         Expenditures
                                         New work          Mainte-
                                                           nance        Operation
                                                                        and care              Total

United States....-----..----------       4, 864, 386.26 $212, 484. 92   $50, 044. 24       $5,126, 915. 42    $5, 098, 257. 11
Contributed...------------------            879, 421. 88                  .....-----------------------
                                                                                               879, 421.88        791,277.36
      Total-----------------..........   5, 743, 808.14   212, 484.92    50, 044.24        6, 006, 337.30      5, 889, 534.47


   Regulation: Regulation of Lake Okeechobee during fiscal year 1952
consisted of maintaining lake stages as nearly as possible between ele-
vations 13 and 15 feet,. mean-sea-level datum. Under that plan of
regulation, which became effective May 29, 1951, the lake receded to
a minimum elevation of 12.65 feet by June 12, 1951, thus providing
adequate capacity for hurricane rainfall expected during the rainy
season, June through October. A tropical disturbance of less than
hurricane intensity moved inland over the west coast of Florida be-
tween Fort Myers and Punta Gorda, and after centering over the
Fisheating Creek basin during the morning of October 2, 1951, passed
a short distance north of Lake Okeechobee. Associated rainfall over
the lake during the storm averaged 10 inches. A maximum lake stage
of 15.97 feet for the fiscal year occurred on October 14, 1951, as a
result of heavy rainfall between September 28 and October 2, 1951.
The maximum rise in stage of 1.64 feet occurred during the period
October 2-8, 1951. A minimum stage of 12.75 feet for the year oc-
curred on June 26, 1952. Average rainfall over Lake Okeechobee for
fscal year 1952 was 50.8 inches with the heaviest rainfall (9.71 inches)
occurring over the lake during October. Average observed pan evap-
oration for the fiscal year was 62.03 inches. Average daily inflow
from the tributary area varied from about 950 cubic feet a second on
July 1, 1951, to 62,080 cubic feet a second on October 3, 1951, and
totaled about 2,633,000 acre-feet for the year. The heavy inflow asso-
ciated with the tropical disturbance of September 28 to October 2,
1951, made regulatory discharge from the lake necessary in order to
lower the lake to the maximum desired elevation of 15 feet. Regu-
latory discharge averaged 6,860 cubic feet a second through St. Lucie
Canal from October 4 to November 10, 1951, and an average of 3,410
cubic feet a second through the Caloosahatchee River from October
15 to December 15, 1951. The discharge through the St. Lucie Canal
was discontinued November 10, 1951, when the lake had been lowered
to elevation 15.2 feet. Regulatory discharge through the Caloosa-
hatchee River was delayed until October 15, 1951, to allow local flood-
waters to run off, as the Caloosahatchee River was in flood stage below
Ortona lock. Discharge, as effected through the Miami, North New
River, Hillsboro, and West Palm Beach Canals, and various pump
units, to meet agricultural demands and other purposes during the fis-
cal year, varied from about 10 to 2,180 cubic feet a second.
   Condition at end of fiscal year.-The project was about 9 percent
completed.
   The following features were constructed under previous projects
                     FLOOD CONTROL-JACKSONVILLE,                                  FLA.,      DISTRICT                 639
for the Okeechobee Waterway, Fla., and are maintained under this
project: A levee 67.8 miles long from Fisheating Creek to St. Lucie
Canal, following in general the south shore of the lake, January 1932
to March 1936; a north-shore levee 15.74 miles long, July 1936 to Feb-
ruary 1938; the spillway at Ortona lock, November 1934 to August
1937; 4 auxiliary floodway channels extending into Lake Okeechobee
at or near Liberty Point, mouth of Fisheating Creek, mouth of Kissim-
mee River, and mouth 'of Taylor Creek, June 1932 to February 1938;
5 hurricane gates through the levees at entrance to canals at Clewiston,
Lake Harbor, South Bay, Canal Point, and Taylor Creek, November
1933 to December 1936; 16 drainage culverts through the west-, south-,
and east-shore levees, and 4 similar culverts through the north-shore
levee, December 1933 to December 1936; and 16 drainage spillways at
drainage openings along the banks of the St. Lucie Canal, November
1934 to September 1935.
   Planning for the existing project was begun in November 1948 and
has been continued. Construction has been accomplished as follows
Levee 35A, 6 miles long to intermediate height at 20 feet, January to
July 1950; levees 35 and 36, 16.2 miles long to intermediate height at
elevation 20 feet, March 1950 to May 1951; canal 42, 5.4 miles long,
June to August 1950; levee 43, 1,400 feet long, September to October
1950 (severely damaged during October 1951 flood; must be recon-
structed in part and extended); levees 33 and 37, 14.8 miles long to
intermediate height at elevation 18 feet and culverts 32 and 34, March
1951 to February 1952. Culvert 32A was completed in October 1951.
   On January 1, 1952, levees 35, 35A, and 36, and canal 42 were trans-
ferred to the Central and Southern Florida Flood Control District
for maintenance.
   At the end of the fiscal year levees 8, 30, 31, and 40, and structures
11, 24A, and 39 were under construction, and structures 5A-E, 5A-W,
5A-S, 24, 29, 76, machinery for pump station 5-A and part of canal
9 were under contract. The work remaining to be done to complete
the project is complete construction of features under contract and
all remaining works described in the paragraph "Existing Project."
   The costs and expenditures under the existing project to June 30,
1952, have been as follows:

                                                                        Costs
                Funds                                                                                       Expenditures
                                             New work         Mainte-      Operation         Total
                                                              nance        and care

United States---------------............... $8, 563, 418.49 $902, 606.62 $86, 993. 79  $9,553,018.90         $8, 702,980.  28
Contributed....           -...............   1, 207, 777.43  ..--- ------------------- 1, 207, 777.43         1, 119, 632. 91

      Total........----------------.......   9, 771,195.92   902, 606.62    86, 993.79    10, 760, 796.33     9,822, 613.19


   Proposed operations.-The balance unexpended at the end of the
fiscal year, $6,130,101.81, plus accounts receivable, $1,002,256.50, an
allotment for new work, $4,974,000, an allotment derived from con-
tributed funds, $1,393,300, and an allotment for regular maintenance,
$90,000, a total of $13,589,658.31, will be applied as follows:
640       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

Accounts payable----------------------------           .                  $940, 439. 64
New work:
    Excess funds contributed or to be contributed
      by local interests and credited to their
      account-------_.                                                     957, 954. 00
   Continue, by hired labor and contract, engineer-
     ing studies, field investigations and prepara-
     tion of definite project report, July 1952-
     June 1953----------------------------               $36, 370. 00
   Continue by hired labor surveys and prepara-
     tion of plans and specifications, July 1952-
     June 1953-----------------------------           $536, 370. 00
   Hired labor expense in connection with local
     interest's procurement of lands- -----------          1, 000. 00
   Hired labor and leased plant removal of shoals
     in levee 8 and extension of levee 8 July-
     September 1952-------------- ----------- 16, 008. 00
   Continue and complete or partially complete,
     by contract, construction of levees 8, 30, 40,
     31 (north 10.8 miles), section 3 of canal 9,
     structures 5A-E, 5A-W, 5A-S, 11, 24, 24A,
     29, 32A, 39, and 76, machinery for pump sta-
     tion 5A, and compaction of poolside slopes on
     levees 30, 33, and 37, July 1952-June 1953-- 4, 014, 591. 00
   Begin and complete or partially complete, by
     contract, construction of sections 1 and 2
     of canal 9, extension of levee 43 part 1 of
     levee 1, canals 11, 12, 13, pump stations 9 and
     13, structures 33 and 36 and levee 7, Septem-
     ber 1952-June 1953----- -------------           6, 574, 086.00
   Additional cost incurred in prior fiscal year
     on levees 33 and 37------------------------3,           493. 08
                                                                        11, 590, 865.08
Maintenance :
   Patrol, inspect, and maintain levee slopes,
     ramps, crown roads, protective plantings,
     and cattle fences during the fiscal year ...         39, 700. 00
   Repair, by hired labor, levee slopes and levee
     crown road from St. Lucie lock to Arundel
     Shops, October 1952_ ._._           _.._ _     ...    2, 800. 00
   Place rock and marl material, by hired labor,
     to repair fire damages to the landside toe of
     Division 2 levee for about 2,200 linear feet,
     November 1952__-------------.--                       2,500.00
   Cleanout, by hired labor, hyacinths and other
     growth from approach channels landward
     of culverts Nos. 5, 5A, 9, 11, 16, 14, 10A, and
     13 to facilitate the runoff of floodwaters, as
     required during the fiscal year....        __...._    1, 800. 00
    Collect and compile meteorological data,
      stream gaging, and maintain and operate
      meteorological instruments during the fiscal
      year------------------------------                  18, 000. 00
   Operate a system of meteorological and hydro-
     logical stations during the fiscal year__...          1, 500.00
   Remove floating and submerged obstructions
     from floodway channels by hired labor, as
     required during the fiscal year __ __-...               500. 00
   Periodic surveys and inspections of flood-con-
     trol features__              __                       1, 000. 00
   Inspect completed features of the project as
     required during the fiscal year            .            299. 59
   Review applications submitted to the Central
     and Southern Florida Flood Control District
     for permits to cover structures connecting
     with facilities of the Central and Southern
     Florida project______                  __             2,500. 00
              FLOOD CONTROL--JACKSONVILLE,                      FLA.,       DISTRICT             641
Maintenance-Continued
   Operation and care of spillways, control struc-
     tures, and protective works:
       Operation -_----------------      -------                        $3, 600. 00
       Ordinary maintenance and repairs--------                         25, 700. 00
   Improvement and reconstruction___----------                              500. 00
                                                                                        $100, 399.59
       Total for all work-- --            -___--_-_-   -----            -    -        13, 589, 658. 31
  The sum of $6,105,000 together with $1,005,600 to be contributed by
local interests, a total of $7,110,600, can be profitably expended for the
following schedule of work during fiscal year 1954:
New work:
   Continue, by hired labor and contract, engineering
     studies, field investigations, surveys, preparation
     of definite project report, and preparation of plans
     and specifications during fiscal year 1954 .--.----- $1, 000, 000
   Continue and complete, by contract, levee 7 and begin
     and partially complete, levees 15, 14, 12, 19, and 20
     and pump station 6, July 1953 to June 1954 .----      6, 005, 600
                                                                                          $7,005,600
Maintenance:
    Patrol, inspect, and maintain levee slopes, ramps,
      crown roads, protective planting, and cattle fences
      during the fiscal year -------------------------                       34, 000
    Cleanout, by hired labor, ditch along landside toe of
      levee on the east shore of Lake Okeechobee in Divi-
      sion 9 between culvert No. 11 and hurricane gate
      structure No. 5 to facilitate runoff into Lake Okee-
      chobee during flood periods, as required during the
      fiscal year--------       --------         -------------               6, 000
    Cleanout, by hired labor, hyacinths and other growth
      from approach channels landward of culverts Nos.
      5, 5A, 9, 11, 16, 14, 10A, and 13 to facilitate the
      runoff of flood waters, as required during the fiscal
      year ----------------------------------------                          1,800
   Remove silt and sand material from approach chan-
      nels of hurricane gate structures Nds. 3, 4, 5, and 6
      during fiscal year-----------------------------                        7, 000
    Collect and compile meteorological data, stream
      gaging, and maintain and operate meteorological in-
      struments during fiscal year --------------------                    15, 000
   Operate a system of meteorological and hydrological
      stations during fiscal year- __ --              - -__ _____-           1, 500
   Remove floating and submerged obstructions from
      floodway channels, by hired labor, as required
      during fiscal year ----------------------------                        - 700
   Periodic surveys and inspections of flood-control
      features-------------                   .1------------------------    1, 000
   Inspect completed features of the project as required
      during fiscal year_ .__-..              ______--_____-             -      500
   Review applications submitted to the Central and
      Southern Florida Flood Control District for per-
      mits to cover structures connecting with facilities
      of the Central and Southern Florida project, fiscal
      year 1954--- ---------------------------                      ----    3,000
   Operation and care of spillways, control structures,
      and protective works:
         Operation -------------------------------                          4, 000
         Ordinary maintenance and repairs --.               -------        30, 000
         Improvement and reconstruction---....              -------        -500
                                                                                             105, 00
          Total for all work----...... -----------         ----------                     7,110, 600
642          REPORT OF CHIEF OF ENGINEERS,                                          U. S. ARMY,                1952

                                              Cost and financial summary
                                                    UNITED STATES FUNDS

                                                          Fiscal year ending June 30--                               Total to June
                                                                                                                    30, 1952, includ-
                                                                                                                    ing fiscal years
                                       1948               1949              1950      1951             1952          prior to 1948


New work:
   Appropriated......--------- -----...............- ----------- $1,500,000.00 $6,300,000.00 $6,000,000.00           $13, 800,000.00
   Cost------------............                           $2, 110. 37 728, 740. 63 2, 968, 181. 23 4, 864,386. 26      8, 563, 418. 49
                                                     ----------
   Expenditures ......-------............--............               503, 016. 03 2, 601,481.47 4,653, 940. 96        7, 758, 438. 46
Maintenance:
   Appropriated                                              ............
                             ------------ ------------.........                     900, 000. 00    100, 000. 00        1,000. 000. 00
   Cost--.................                                          ............
                                                             --........             727, 071.25     262, 529. 16          989, 600. 41
   Expenditures--.........-_      ......-..............             ............    500, 225. 67    444, 316. 15          944, 541.82


Other new work data:
    Unobligated balance, June 30, 1952_ __---____--             $2, 693, 239. 38
    Appropriated for fiscal year ending June 30, 1953_- ---- ___ 4, 974, 000. 00
    Unobligated balance available for fiscal year 1953_________ 7, 667, 239. 38
    Estimated additional amount needed to be appropriated for
      completion of existing project--------------------------77, 571, 900. 00
                                                     CONTRIBUTED FUNDS

                                                          Fiscal year ending June 30-                                Total to June
                                                                                                                    30, 1952, includ-
                                                                                                                    ing fiscal years
                                       1948               1949              1950      1951            1952            prior to1948

New work:
   Appropriated------.........---------120, 000. 00 $505, 740,00 $697,325.00 $829, 650.00                              $2, 152, 715.00
   Cost...----__------__----_-------- -117, 889.63 507, 850.37 -297,384.45    879, 421.88                               1, 207, 777. 43
   Expenditures-----------------         117, 889. 63 507,850. 37 -297.384.45 791, 277. 36                              1, 119, 632.91


Other new work data:
    Unobligated balance, June 30, 1952 -___-___-________--                 $377, 407. 58
    Appropriated for fiscal year ending June 30, 1953--------............ 1, 393, 300. 00
    Unobligated balance available for fiscal year 1953 ..-------          1, 770, 707. 58
    Estimated additional amount needed to be appropriated for
      completion of existing project------------------------- 11, 914,285. 00

26. SNAGGING AND CLEARING UNDER AUTHORITY OF SECTION 2 OF
THE FLOOD CONTROL ACT APPROVED AUGUST 28, 1937, AS AMENDED

   The Flood Control Act approved August 28, 1937, as amended by
the Flood Control Acts approved August 11, 1939, August 18,. 1941,
and July 24, 1946, authorized the allotment from flood-control appro-
priations, of funds not to exceed $1,000,000 for any one fiscal year, for
the removal of accumulated snags and other debris from, and the clear-
ing and straightening of channels in navigable streams and tribu-
taries thereof when such work is advisable in the interest of flood con-
trol; provided that not more than $50,000 shall be allotted for this
purpose for any single tributary from the appropriations for any one
fiscal year.
   The unexpended balance June 30, 1951, $18,954.93, less $4,302.16
revoked during the fiscal year, a net total of $14,652.77, was available
for work under this heading.
   Mills Creek (near Callahan, Fla.) : Removal, by Government plant
and hired labor, of 17,286 obstructions over 16 miles of creek, July 2
to-Aiigust 31, 1951, cost $7,212.16.
                       FLOOD               CONTROL--JACKSONVILLE,                               FLA.,        DISTRICT                         643
  Withlacoochee River: Removal, by hired labor, of four fallen trees
and log jam at Seaboard Railroad bridge early-in the fiscal year cost
$1,543.74.
  The total cost for the fiscal year was $8,755.90. The expenditures
were $14,652.77.
  The total costs and expenditures under this heading to June 30, 1952,
have been $206,544.35 for new work.                                                     In addition, $35,000 were ex-
pended from contributed funds for new work.

                                                      Cost and financial summary

                                                                Fiscal year ending June 30-                                     Total to June
                                                                                                                               30,1952. includ-
                                                                                                                                ing fiscal years
                                                   1948         1949             1950            1951              1952           priorto 1948

New work:
                  -------
    Appropriated.........                       $95,700.00 $38.289.30     ..              $27, 000.00
                                                                                     ..-----------           -$4, 302.16              1$206, 544. 35
    Cost---------------                          97, 790. 54 27, 538.34        $1,429.20   23, 474.40            8, 755. 90            1206, 544.35
    Expenditures-                               101, 808.01  27, 538.35         1,429.20   17, 577.53          14, 652. 77            1   206, 544. 35

  1 In addition, $35,000 were expended from contributed funds.

  27. PRELIMINARY EXAMINATIONS, SURVEYS, AND CONTINGENCIES
                      FOR FLOOD CONTROL

   The costs during the year were $3,114.69. The expenditures were
$4,093.87. The balance unexpended June 30, 1952, $1,409.16 plus allot-
ment for fiscal year 1953 of $7,000, a total of $8,409.16, will be applied
during fiscal year 1953 to the payment of accounts payable, $72.95, and
expenses to be incurred under this heading.
   The additional sum of $29,700 can be profitably expended during
fiscal year 1954.
                                                      Cost and financial summary

                                                                 Fiscal year ending June 30                                     Total to June
                                                                                                                               30,1952, include
                                                                                                                               ing fiscal years
                                                   1948         1949             1950            1951              1952         prior to 1948


Maintenance:
    Appropriated_--.----           $115, 000.00 $75, 000.00                $31, 200.00 $12, 000. 00             $1, 700.00             $556,771.00
    Cost....--------------          116, P52. 58 64, 198. 07                3q,610.62 19,3 3.45                  3, 114.69              555, 434.79
    Expenditures---------......... 127,821.60 65, 476. 76                   35, 069. 88 22, 241.85               4,093.87               555, 361.84



              28. PLANT ALLOTMENT, JACKSONVILLE, FLA., DISTRICT
                              (FLOOD CONTROL)
                                                      Cost and financial summary

                                                                 Fiscal year ending June 30                                     Total to June
                                                                                                                               30,1952, includ-
                                                                                                                               ing fiscal years
                                                   1948         1949             1950            1951              1952          prior to 1948


Maintenance:
    Appropriated------.....----------............1$128,500.00                         .........--.......-----------------------....
                                                                          ............--------                                     $128, 500. 00
    Cost----...............-----------------....--------         ------------ ------------------- -----------               ----------------
                                                                                                                            i
    Expenditures----.......-------...-----...               115,825.08    -$6, 059.47      -$2, 149. 16       $20, 883. 5           128,500. 00

   1 Advanced by the Savannah, Ga., District.
   2 $128,500 returned to Savannah, Ga., District, and the assets and liabilities of this flood control project
transferred during the year to navigation plant allotment of the Jacksonville District.
644         REPORT OF CHIEF OF ENGINEERS,                                  U.    S. ARMY, 1952

                      29. INACTIVE FLOOD-CONTROL PROJECTS

                                                            For last       Cost and expenditures to                Estimated
                                                           full report           June 30, 1952                      amount
                   Name of project                         see annual                                              required
                                                             report                                                 to com-
                                                               for        New work     Maintenance                    plete

1. Emergency flood-control work under authority
    of the Flood Control Act approved Aug. 18, 1941.          1948                                  $4,244.61         (1)
2. Emergency flood-control work under authority
    of Public Laws Nos. 138 and 318, 78th Cong.,
    Public Law No. 75, 79th Cong., and Public
    Laws Nos. 102 and 858, 80th Congress-------.........      1951-      ---..             1,184, 300.00              (1)


I Completed.

                              30. MISCELLANEOUS ACTIVITIES

Status     of all investigations for flood control called for by flood control acts
                              and committee resolutions

                                                                                  trans-
                                                                             Date trans-      Document              Recom-
               Locality                       Authorization act               mitted to       Do.                  meudatnn
                                                                              Congress

Apopka Lake, Fla., Oklawaha
  River and connecting waterways.
Broward County, Fla., in vicinity
                                         River and Harbor Act,
                                           Mar. 2, 1945.
                                         Senate Committee on Pub-
                                                                           ---------------

                                                                          ---------------
                                                                                              -- --- --
                                                                                             ---------
of Hollywood, Intracoastal                lic Works resolution, Jan.
Waterway (Jacksonville to                 6, 1950.
Miami), for flood control.
   D o .............- ..---.... .. .     House Committee on Pub-          ---------------      ----         ----

                                           lic Works resolution, Feb.
                                           17, 1950.
Bucani River and tributaries,            Flood Control Act, Aug.  ---------------            - --     ---    ---

  Puerto Rico.                             18, 1941.
Central and Southern Florida,            Senate Committee on Pub- ---------------              ----         ----

  (Martin County), for flood con-          lic Works resolution, July
trol.                                     22, 1950.
Chico River and tributaries,             Flood Control Act, Aug.  --------------- - --- -- --
Puerto Rico.                              18, 1941.
Cocoa, Fla., waterway from Indian        River and Harbor Act,    --------------- --- --- ---
  River to St. Johns River at              Mar. 2, 1945.
  Palatka, Fla., Florida east coast,
  interlocking open-river and canal-
  ized channels, etc.
Corkscrew River (Horse Creek), Senate Committee on Pub- ---------------
  Estero River, Imperial River,       lic Works resolution,
                                                                                                ------
                                                                                               --
  Gordon River, Rock Creek,           Mar. 4, 1950.
  Hendry Creek, Mulock Creek,
  and Six Mile Creek Slough, Fla.,
  for flood control.
Dexter Lake, Fla., interconnecting River and Harbor Act, ---------------
  waterway to Lake Harris, Fla.,      Mar. 2, 1945.
  Florida east coast, interlocking
  open-river and canalized chan-
nels.
Dora Lake, Fla., Oklawaha River, .....do--------....................
                                                                  ---------------
  Fla., and connecting waterways.
Eau Gallie, Fla., waterway from .....--  do ...................   ---------------
Indian River to St. Johns River
at Palatka, Fla., Florida east
coast, interlocking open-river and
canalized channels, etc.
Estero River, Imperial River, Senate Committee on Pub- ---------------
  Corkscrew River (Horse Creek),     lic Works resolution, Mar.
  Gordon River, Rock Creek,          4, 1950.
  Hendry Creek, Mulock Creek,
and Six Mile Creek Slough, Fla.,
for flood control.
Eustis Lake, Fla., Oklawaha River and Harbor Act, ---------------
  River, Fla., from Lake Apopka      Mar. 2, 1945.
through Lake Dora to Lake
Eustis, etc.
Eustis Lake Oklawaha River, to ---..... do-------
                                            .....................
  Lake Griffin, thence to Silver
  Springs Run, Fla.
               FLOOD CONTROL-JACKSONVILLE,                              FLA.,          DISTRICT               645

Status of all investigations for flood control called for by flood control acts
                     and committee resolutions-Continued


              Locality                      Authorization act            mitted to            No.         mendatio
                                                                         Congress



Flagler, Putnam, and St. Johns         Flood Control Act, May
  Counties, Fla., streams in, for        17, 1950.
  flood control.
Florida, Central & Southern,           Senate Committee on Pub-
                                                                       ------ ------
  Martin Co.                            lic Works resolution, July
                                        22, 1950.
Florida east coast, interlocking       River and Harbor Act,
  open-river and canalized chan-        Mar. 2, 1945.
  nels having a depth of 12 feet and
  suitable width, through rivers
  and lakes and by land cuts, for
  navigation, flood control, and
  water conservation.
Gordon River, Estero River,            Senate Committee on Pub-
  Imperial River, Corkscrew River       lic Works resolution, Mar.
  (Horse Creek), Rock Creek,            4, 1950.
  Hendry Creek, Mulock Creek,
  and Six Mile Creek Slough, Fla.,
for flood control.
Griffin Lake to Lake Eustis,           River and Harbor Act,
  Oklawaha River, and to Silver
Springs Run, Fla.
                                        Mar. 2, 1945.                      M-----
                                                                      --------------                ---
Hendry Creek, Estero River,
Imperial River, Corkscrew River
                                       Senate Committee on Pub-
                                         lic Works resolution, Mar.
                                                                      ------------ ----------
  (Horse Creek), Gordon River,           4, 1950.
  Rock Creek, Mulock Creek, and
  Six Mile Creek Slough, Fla., for
flood control.
Hollywood, Fla., in Broward            Senate Committee on Pub-
  County, Intracoastal Waterway,         lic Works resolution, Jan.
  (Jacksonville to Miami), for flood     6, 1950.
control.
    Do.----       ------------         House Committee on Pub-        ---------------I------------
                                         lic Works resolution, Feb.
                                         17, 1950.
Imperial River, Estero River,          Senate Committee on Pub-       ---------------    ------------
   Corkscrew River (Horse Creek),        lic Works resolution, Mar.
   Gordon River, Rock Creek,             4, 1950.
  Hendry Creek, Mulock Creek,
  and Six Mile Creek Slough, Fla.,
  for flood control.
Indian River, Fla., from Sebastian,    River and Harbor Act,
  Melbourne, Eau Gallie, Cocoa,         Mar. 2, 1945.
  or such other locality most suit-
  able, to St. Johns River at
  Palatka, Fla., Florida east coast,
  interlocking open-river and canal-
  ized channels, etc.
Indian River to St. Johns River,       Rivers and Harbors Com-
  channel from Sanford to Titus-        mittee resolution, Jan.
  ville, Fla.                           27, 1937.
Intracoastal Waterway (Jackson-        Senate Committee on Pub-
  ville to Miami) in vicinity of        lic Works resolution, Jan.
  Hollywood, Fla., Broward              6, 1950.
  County, Fla., for flood control.
    Do............................. House Committee on Pub- ---------------
                                     lic Works resolution, Feb.
                                      17, 1950.
Kissimmee River, Fla ........... _ River and Harbor Act, ---------------
                                     Mar. 2, 1945.
Kissimmee River, Fla., from Lake ..--...
                                       do--.................. ----------
                                                                      m
Tohopekaliga to Lake Okeecho-
bee and the Okeechobee Cross-
Florida Canal, Florida east coast,
interlocking open-river and canal-
ized channels, etc.
Kissimmee River, Fla., waterway River and Harbor Act,
from St. Johns River to Kissim-     Aug. 30, 1935.
mee River and thence to Okee-
chobee Cross-Florida Canal.
Lake Apopka, Fla., Oklawaha River and Harbor Act,
  River from Lake Apopka through     Mar. 2, 1945.
Lake Dora to Lake Eustis and
adjoining waterways.
646         REPORT OF CHIEF OF ENGINEERS,                                       U.   S. ARMY, 1952

Status of all investigations for flood control called for by flood control acts
                    and committee resolutions-Continued

                                                                                 Date trans-   Document    Recom-
              Locality                         Authorization act                  mitted to      No.      mendation
                                                                                  Congress

Lake Dexter, Fla., from St. Johns       River and Harbor Act, ......
  River to Leesburg on Lake              Mar. 2, 1945.
  Harris, Florida east coast, inter-
locking open-river and canalized
channels, etc.
Lake Dora, Fla., Oklawaha River            do ...---------
                                       .....                        ----.
from Lake Apopka through Lake
  Dora to Lake Eustis and adjoin-
ing waterways.
Lake Eustis, Fla., Oklawaha            .....   ---------------- I---------
                                           do....
  River from Lake Apopka through
  Lake Dora to Lake Eustis and
  adjoining waterways.
Lake Eustis, Fla., Oklawaha River       ... do -----------------
  from Lake Eustis to Lake Griffin
  and thence to Silver Springs Run.
Lake Griffin, Fla., Oklawaha                do
                                        ...--      .------------- ------
   River from Lake Eustis to Lake
   Griffin and thence to Silver
  Springs Run.
Lake Harris, Fla., Leesburg to          _--- do-----------                  -
  Lake Tohopekaliga, Florida east
  coast, interlocking open-river
  and canalized channels, etc.
Lake Harris, Fla., to St. Johns            do----------------------
                                       ---....
   River near Lake Dexter, or to
  Wekiwa (Wekiva) River, thence
  to St. Johns River, Florida east
  coast, interlocking open-river
  and canalized channels, etc.
Lake Okeechobee, Fla., from               do----
                                             ...
                                       ----....                    --
   Okeechobee Cross Florida Canal
  via Kissimmee River and Lake
  Tohopekaliga to Oklawaha, St.
  Johns, and Indian Rivers, Flor-
  ida east coast, interlocking open-
  river and canalized channels, etc.
Lake Tohopekaliga, Fla., to Lees-          . do ...--------
                                          -----                                 .---------
                                                                                .I
  burg on Lake Harris, Florida
  east coast, interlocking open-
  river and canalized channels,
  etc.
Lake Tohopekaliga, Fla., to Okee-          d o-..........................
                                       .....
  chobee Cross-Florida Canal via
  the Kissimmee River and Lake
   Okeechobee, Florida east coast,
  interlocking open-river and canal-
   ized channels, etc.
Lake Tohopekaliga, Fla., to St.        .....                 - . - ..--
                                          do .......................  .....---------
   Johns River and thence to Titus-
   ville, Florida east coast inter-
  locking open-river and canalized
   channels, etc.
Leesburg, on Lake Harris, Fla.,        .....
                                          do....                            .... ....... . .
                                                              ........................
  to Lake Tohopekaliga, Florida
  east coast, interlocking open-
  river and canalized channels,
  etc.
Manatee River, Fla., for flood          Flood Control Act, May
  control.                                17, 1950.
Martin County (Central and              Senate Committee on Pub-
  Southern Florida), for flood con-       lic Works resolution, July
  trol.                                   22, 1950
Melbourne, Fla., waterway from          River and Harbor Act,
  Indian River to St. Johns River         Mar. 2, 1945.
  at Palatka, Fla., Florida east
  coast, interlocking open-river
  river and canalized channels, etc.
Miami River, and Central and            Senate Committee on Pub-
  Southern Florida, locks and dam         lic Works resolution, Mar.
  in Miami River.                         12, 1949.
Mulock Creek, Estero River,             Senate Committee on Pub-
  Imperial River, Corkscrew River,        lic Works resolution, Mar.
   (Horse Creek), Gordon River,            4, 1950.
   Rock Creek, Hendry Creek, and
   Six Mile Creek Slough, Fla., for
  flood control.
                FLOOD CONTROL--JACKSONVILLE,                           FLA.,     DISTRICT               647
Status of al        investigations for flood control called for by flood control acts
                          and committee resolutions-Continued

                                                                      Date trans-    Document       Recom-
              Locality                      Authorization act          mitted to       No.         mendation
                                                                       Congress

Okeechobee Cross Florida Canal, River and Harbor Act, j-----------...............I.
   interconnecting waterway to             Mar. 2, 1945.
   Lake Tohopekaliga, via Lake
   Okeechobee and the Kissimmee
   River, Florida east coast, inter-
  locking open-river and canalized
   channels, etc.
Okeechobee Cross-Florida Canal, River and Harbor Act, ..
   waterway from St. Johns River          Aug. 30, 1935.
   to Kissimmee River and thence
   to Okeechobee Cross-Florida
   Canal.
Okeechobee Lake, Fla., intercon- River and Harbor Act, ...............
  necting waterways to Lake               Mar. 2, 1945.
   Tohopekaliga and to the Okee-
  chobee Cross-Florida Canal,
   Florida east coast, interlocking
  open-river and canalized chan-
  nels, etc.
Oklawaha River and its tributa- ....do----...................------- .. ----...              --....
  ries, Florida, for navigation,
  flood control, and related pur-
  poses.
Oklawaha River and its tributa- Flood Control Act, Dec.              ------------- ------------
  ries, Fla., and of adjacent areas       22, 1944.
   in Alachua and Marion Coun-
   ties, Florida.
Oklawaha River, Fla., from Lake River and Harbor Act, ---------------              I------------
   Apopka through Lake Dora to            Mar. 2, 1945.
   Lake Eustis and adjoining water-
   ways.
Oklawaha River, Fla., from Lake .... do ....................
   Eustis to Lake Griffin, and
   thence from Lake Griffin to
   Silver Springs Run.
Orange Lake Basin, Fla..       ..--------River and Harbor Act,
                                          Mar. 2, 1945.
Palatka, Fla., St. Johns River --... do-.....--------------
   to Indian River at Sebastian,
  Melbourne, Eau Gallie, Cocoa,
  or such other locality most suit-
   able, Florida east coast, inter-
  locking open-river and canalized
   channels, etc.
Peace River, Fla................... ----... do-----.----.......---   Nov. 6,1951--..-------           Unfavor-
                                                                                                        able.
Portuguez River and tributaries, Flood Control Act, Aug.
   Puerto Rico.                           18, 1941.
Putnam, Flagler, and St. Johns Flood Control Act, May
   Counties, Fla., streams in, for        17, 1950.
   flood control.
Rice Creek, Fla., a tributary of Flood Control Act, June Jan. 17,1952                  -----............ Do.
   St. Johns River, Fla.                  30, 1948.
Rock Creek, Estero River, Im- Senate Committee on Pub-
   perial River, Corkscrew River          lic Works resolution, Mar.
   (Horse Creek), Gordon River,           4, 1950.
   Hendry Creek, Mulock Creek,
  and Six Mile Creek Slough, Fla.,
   for flood control.
St. Augustine Harbor and vicinity, Senate Committee on Pub-
   Florida, reduction of damage in        lic Works resolution, Feb.
  Matanzas Bay.                           15, 1951.
St. Johns, Flagler, and Putnam Flood Control Act, May
   Counties, Fla., streams in, for        17, 1950.
  flood control.
St. Johns River, Fla., to Indian River and Harbor Act,
   River at Titusville, and to            Mar. 2, 1945.
  Lake Tohopekaliga, Florida east
  coast, interlocking open-river
  and canalized channels, etc.
648         REPORT OF CHIEF OF ENGINEERS,                                U.        S. ARMY, 1952

Status of all investigations for flood control called for by flood control acts
                      and committee resolutions-Continued

                                                                           Date trans-      Document  Recom-
              Locality                       Authorization act              mitted to         No.    mendation
                                                                            Congress

St. Johns River, Fla., near Lake        River and Harbor Act,
   Dexter, to Leesburg on Lake            Mar. 2, 1945.
   Harris, or alternatively via
  the Wekiwa (Wekiva) River,
   Florida east coast, interlock-
  ing open-river and canalized
   channels, etc.
St. Johns River, Fla., from Pa-         ....----
                                            do------------................................--------
  latka to Indian River at Sebas-
   tian, Melbourne, Eau Gallie,
   Cocoa, or such other locality
   most suitable, Florida east
   coast, interlocking open-river
   and canalized channels, etc.
St. Johns River, Fla., waterway          River and Harbor Act,           ---------------   -----------
   from St. Johns River to Kis-           Aug. 30, 1935.
   simmee River and thence to
    Okeechobee Cross-Florida Ca-
   nal.
St. Johns River, Fla., channel            Rivers and Harbors Com-        --------------     ----------
   from Sanford to Indian River,            mittee resolution, Jan.
   near Titusville.                         27, 1937.
Sanford, Fla., channel from St.         ---.....do..---------------                 ---- ----
                                                                        ---------- l--     r------       -
   Johns River to Indian River
   near Titusville.
Sebastian Fla., waterway from            River and Harbor Act,
   Indian River to St. Johns              Mar. 2, 1945.
    River at Palatka, Fla., Florida
   east coast, interlocking open-
   river and canalized channels,
   etc.
Silver Springs Run, Fla., Okla-             do------------................................---I-------
                                        .....
   waha River from Lake Eustis
   to Lake Griffin and thence to
   Silver Springs Run.
Six Mile Creek Slough, Estero           Senate    Committee on
    River, Imperial River, Cork-          Public Works resolu-
   screw River (Horse Creek),             tion, Mar. 4, 1950.
    Gordon River, Rock Creek,
   Hendry Creek, and Mulock
   Creek, Fla., for flood control.
Streams in St. Johns, Flagler,          Flood Control Act, May
   and Putnam Counties, Fla.,             17, 1950.
   for flood control.
Suwanee River, Fla. and Ga.,
   for navigation, flood control,
                                         Sec. 1, River and Harbor
                                           Act, Jan. 21, 1927.
                                                                        ---.---         -------
                                                                                  ----------  ---
   power and irrigation (308 re-
    port).
Suwannee River, Ga. and Fla.,            River and Harbor        Act,
   with a view to improvement             Mar. 2, 1945.
   in the interest of navigation
   and flood control.
Suwannee         River, Fla., from       Flood Control Act, Apr.        ---------------
   Florida-Georgia State line to           10, 1936.
    Gulf of Mexico.
Titusville, Fla., channel from           Rivers and Harbors Com-        ---------------
   Indian River to St. Johns River         mittee resolution, Jan.
   at Sanford.                            27, 1937.
Titusville, Fla., from Indian            River and Harbor Act,
    River to St. Johns River and          Mar. 2, 1945.
   thence to Lake Tohopekaliga,
   Florida east coast, interlocking
   open-river and canalized chan-
   nels, etc.
Tohopekaliga        Lake, intercon-         do----------------.....................----..............
                                        .....
   necting waterway to Okeecho-
   bee Cross-Florida Canal, via
   the Kissimmee River and Lake
   Okeechobee, Florida east coast,
   interlocking     open-river    and
   canalized channels having depth
   of 12 feet, etc.
               FLOOD CONTROL---JACKSONVILLE,                       FLA.,    DISTRICT            649
Status of all investigations for flood control called for by flood control acts
                     and committee resolutions-Continued

                                                                   Date trans-   Document  Recom-
             Locality                    Authorization act          mitted to      No.    mendation
                                                                    Congress

Tohopekaliga Lake, interconnect- River and Harbor Act, .--...........-..........--
ing waterway to the St. Johns               Mar. 2, 1945.
  River, Fla., Florida east coast,
interlocking     open-river     and
canalized channels having depth
of 12 feet, etc.
Wekiwa (Wekiva) River, Fla., River and Harbor Act, ...........................
from St. Johns River to Lees-               Mar. 2, 1945.
burg on Lake Harris, Florida
east coast, interlocking open-
river and canalized channels, etc.
Withlacoochee River, Fla-------........--. Flood Control Act, June .............-............
                                             22, 1936.
Withlacoochee River, Fla., for Sec. 1, River and Harbor -.............. ............
navigation, flood control, power,           Act, Jan. 21, 1927.
and irrigation (308 report).
Withlacoochee River, Fla. (final Rivers and Harbors Com-
report).                                    mittee resolution, May
                                             20, 1942.
   IMPROVEMENT OF RIVERS AND HARBORS IN THE
             MOBILE, ALA., DISTRICT

  This district comprises a small portion of southeastern Tennessee,
western Georgia, western Florida, all of Alabama south of the Ten-
nessee River Basin, eastern Mississippi, and a small portion of south-
eastern Louisiana embraced in the drainage basins tributary to the
Gulf of Mexico, west of the Aucilla River Basin, to and including the
Pearl River Basin. It includes the sections of the Gulf Intracoastal
Waterway from St. Marks River, Fla., to Lake Borgne Light No. 41,
Louisiana.
  District engineer: Col. W. K. Wilson, Jr., Corps of Engineers.
  Division engineer of the South Atlantic Division, Atlanta, Ga.,
comprising the Wilmington, N. C., Charleston, S. C., Savannah, Ga.,
Jacksonville, Fla., and Mobile, Ala., districts: Col. C. K. Harding,
Corps of Engineers.
                                            IMPROVEMENTS

                 Navigation                                Navigation-Continued
                                              Page                                     Page
  1. Gulf Intracoastal Waterway                   22. Emergency channel work for
       between Apalachee Bay,                          navigation under authority
       Fla., and the Mexican bor-                      of section 3 of the River
      der (Mobile District) ....              652      and Harbor Act approved
  2. Apalachicola, Chattahoochee,                       March 2, 1945    -..  .        702
       and Flint Rivers, Ga. and
       Fla-----------------                   656                Flood control
3. Port St. Joe Harbor, Fla ...              662
4. Panama City Harbor, Fla_-_                664 23. Allatoona Reservoir, Coosa
5. East Pass Channel from the                          River Basin, Ga                702
       Gulf of Mexico into Choc-                  24. Snagging and clearing under
      tawhatchee Bay, Fla       ----          666       authority of Section 2 of
6. Pensacola Harbor, Fla .....               667       the Flood Contrbl Act ap-
7. Mobile Harbor, Ala ...--                  669       proved August 28, 1937, as
8. Removing the water hya-                             amended__--                    704
      cinth, Mobile District .-.              673 25. Preliminary      examinations,
9. Alabama-Coosa Rivers, Ala.                          surveys, and contingencies
      and Ga--------------                    675       for flood control       -      705
10. Black Warrior, Warrior, and                   26. Inactive flood-control proj-
      Tombigbee Rivers, Ala _ -               678       ects-----------------          706
11. Waterway connecting the                       27. Miscellaneous activities --      706
      Tombigbee and Tennessee                     28. Emergency bank protection
      Rivers, Ala. and Miss .          --     684       under authority of Section
12. Pascagoula Harbor, Miss_                  686       14 of the Flood Control
13. Pascagoula River, Miss           .        688       Act approved July 24,
14. Harrison County,           Missis-                  1946----------------           708
      sippi,      shore     protection            29. Emergency       flood-control
      project___-----------                   689       work under authority of
15. Biloxi Harbor, Miss __-_.                 690       Section 210 of the Flood
16. Gulfport Harbor, Miss ....                693       Control Act approved May
17. Pearl River, Miss. and La_                694       17, 1950-----------            709
18. Examinations, surveys, and                    30. Emergency      flood-control
      contingencies (general) __              697       work under authority of
19. Plant allotments------                    697       Section 205 of the Flood
20. Inactive navigation projects_             698       Control Act approved June
21. Miscellaneous activities-     --          698       30, 1948, as amended           710
                                                                                 651
652        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                    1952

1. GULF INTRACOASTAL WATERWAY BETWEEN APALACHEE                                                    BAY,
      FLA., AND THE MEXICAN BORDER (MOBILE DISTRICT)

     Location.-This section of the Gulf Intracoastal Waterway ex-
tends generally westward from Apalachee Bay through Ochlocko-
nee Bay, Ochlockonee, Crooked, and Carrabelle Rivers, and St.
George Sound to Apalachicola Bay; thence through Apalachicola
River, Jackson River, Lake Wimico, Searcy Creek, a land cut, and
Wetappo Creek to St. Andrew Bay, Fla.; thence through a land
cut to Choctawhatchee Bay, Fla.; thence through Santa Rosa Sound
to Pensacola Bay, Fla.; thence through Big Lagoon and Old River,
Fla., Perdido Bay, Fla. and Ala., Bay La Lanche, Wolfe Bay, Portage
Creek, Oyster Bay, and Bon Secour Bay, Ala., to Mobile Bay, Ala.;
thence through Mississippi Sound, Miss., and Lake Borgne, La., to
  the Rigolets.
     Previous projects.-Adopted by the River and Harbor Acts ap-
  proved May 23, 1828, and July 25, 1912, for the section between Mobile
Bay and Mississippi Sound. For further details see page 906, an-
nual report for 1930.
     Existing project.-This provides for a waterway 12 feet deep and
125 feet wide at mean low water from Apalachee Bay, Fla., to Mobile
Bay, Ala., and 12 feet deep and 150 feet wide from Mobile Bay,
'Ala., to the Rigolets, La. (Lake Borgne Light No. 41); for a
tributary channel (the Gulf County Canal), 9 feet deep, 100 feet
  wide, and about 6 miles long connecting the Intracoastal Waterway
  at White City, Fla., with St. Joseph Bay; and for the construction
of a movable span in the Georgia, Florida & Alabama Railroad
bridge crossing the Ochlockonee River near McIntyre, Fla. Length
of the waterway between the 12-foot depth contour in Apalachee
Bay and Lake Borgne Light No. 41 at the Rigolets is 379 miles.
     The estimated cost of new work, revised in 1952, is $6,692,000.
The latest (1952) approved estimate for annual cost of maintenance
is $246,000.
    .The existing project was authorized by the following river and
harbor acts:

    Acts                         Work authorized                                  Documents

                  APALACHICOLA BAY TO ST. MARKS RIVER, FLA

Aug. 26,1937   A channel 9 feet and 100 feet wide at mean low water   H. Doc. 291, 75th Cong., 1st sess.'
                from Apalachicola Bay, Fla., via St. George Sound.
                 Carrabelle, Crooked, and Ochlockonee Rivers and
                 Ochlockonee and Apalachee Bays to St. Marks
                 River, Fla.
                 APALACHICOLA RIVER TO ST. ANDREW BAY, FLA.

June 25,1910   A channel 5 feet deep at mean low water and 65 feet    H. Doc. 670, 61st Cong., 2d sess.
                 wide at the bottom.
     (2)       A channel 9 feet deep at mean low water and 100 feet   Rivers and Harbors Committee
                 wide at the bottom.                                    Doc. 52, 72d Cong., 2d sess.1
                   CHOCTAWHATCHEE BAY TO WEST BAY, FLA.

Aug. 30,1935   A channel 9 feet deep at mean low water and 100 feet   H. Doc. 259, 72d Cong., 1st sess.t
                wide at the bottom.
June 25,1910   A channel 6 feet deep at mean low water, with no       H. Doc. 565, 61st Cong., 2d sess.
                reference to width.
   See footnotes at end of table.
                  RIVERS      AND HARBORS-MOBILE,                     ALA.,      DISTRICT                 653

        Acts                        Work authorized                                    Documents


                   CHOCTAWHATCHEE BAY TO PENSACOLA BAY, FLA.

Aug. 30,1935      A channel 9 feet deep at mean low water and 100 feet    Rivers and Harbors Committee
                   wide at the bottom.                                       Doc. 42, 73d Cong., 2d sess.'

                      PENSACOLA   BAY, FLA., TO MOBILE BAY, ALA.

July     3,1930   A channel 9 feet deep at mean low water and 100 feet    H. Doc. 42, 71st Cong., 1st sess.
                   wide at the bottom.
                       MOBILE BAY, ALA., TO NEW ORLEANS, LA.

    Do....... A channel 300 feet wide and 10 feet deep from the 10-       Rivers and Harbors Committee
                   foot contour in Mobile Bay to the 10-foot contour         Doc. 4, 71st Cong., 1st sess.1
                   in Mississippi Sound.
    Do-.......    A channel 100 feet wide and 9 feet deep from Lake       H. Doc. 341, 71st Cong., 2d sess.
                   Pontchartrain to Mississippi Sound.

                     APALACHEE BAY, FLA., TO NEW ORLEANS, LA.

July 23,1942      A channel 12 feet deep and 125 feet wide at mean low    Public Law 675, 77th Cong., and
                   water, except in the section between Mobile, Ala.,        H. Doc. 96, 79th Cong., 1st sess.
                   and New Orleans, La., where the width is to be
                   150 feet.
June 17,1943      Conditional acquisition of Gulf County Canal, Fla.,     H. Doc. 257, 76th Cong., 1st sess.,
                   and enlargement of the canal to 9 feet deep and 100      and Public Law 75, 78th Cong.,
                   feet wide.                                               1st sess.                        1
Mar.     2,1945   Construction of a movable span in the Georgia, Flo-     H. Doc. 442, 76th Cong., 1st sess.
                   rida & Alabama R. R. bridge crossing the Ochlock-
                   onee River.
May 17,1950       Abandonment and closure of original channel be-         H. Doc. 325, 81st Cong., 1st sess.'
                   tween Big Lagoon and Pensacola Bay and con-
                   struction of a new channel to enter the bay north of
                   original entrance.

1 Contain    the latest published maps.
2 E.    R. A. Act, May 28, 1935, and River and Harbor Act, Aug. 30, 1935.

   Local cooperation.-The requirements of local cooperation for this
project have been fully complied with except for the section from
Apalachee Bay to Carrabelle, Fla.
   The requirements of local cooperation for the section from
Apalachee Bay to Carrabelle, Fla., provide that local interests under-
take all necessary modifications of bridges over the waterway, except
the construction of a movable span in the Georgia, Florida & Alabama
Railroad bridge over the Ochlockonee River near McIntyre, Fla.,
furnish, free of cost to the United States, necessary rights-of-way and
suitable spoil-disposal areas for new work and for subsequent mainte-
nance as required, and release the United States from all claims for
damages incidental to the work of improvement. Conditions of local
cooperation required by the 9- by 100-foot project authorized by the
River and Harbor Act of August 26, 1937, were fulfilled with the
exception of the provision concerning alteration of the Georgia, Flor-
ida & Alabama Railroad bridge at McIntyre, Fla., which condition
was removed by authority of the River and Harbor Act of March 2,
1945. Local interests were notified January 9, 1951, of the condi-
tions of local cooperation as altered by the authorization of a 12- by
125-foot waterway in Public Law 675, Seventy-seventh Congress
 (July 23, 1942) and by revised regulations pertaining to bridge clear-
ances across the Gulf Intracoastal Waterway.
   Terminal facilities.-Terminal facilities available for public use
are located at Carrabelle, Apalachicola, Panama City, and Pensacola,
Fla.; Mobile and Bayou La Batre, Ala.; Pascagoula, Biloxi, Gulf-
           245554-53-vol. 1------42
654          REPORT OF CHIEF OF ENGINEERS,                                       U.     S.    ARMY,         1952

port, Pass .Christian, and Bay St. Louis, Miss. These facilities are
considered adequate for existing commerce.
   Operations and results during fiscal year.-Repairs to the erosion
protective works on the Choctawhatchee Bay-West Bay section of the
waterway were carried on by Government plant and hired labor from
July 24 to 31, 1951, and January 2 to June 30, 1952, at a cost of $7,054.
The U. S. pipe-line dredge Blackwater removed 363,215 cubic yards
of material from the Apalachicola Bay-Carabelle section October 18
to November 17, 1951, at a cost of $34,542; 25,304 cubic yards from the
Apalachicola River-St. Andrew Bay section October 1 to 5, 1951, at a
cost of $5,448; and 32,857 cubic yards from the Gulf County Canal
October 6 to 17, 1951, at a cost of $12,298. The U. S. dragline No. 2
removed 19,750 cubic yards of material from the Gulf County Canal
March 5 to 11, and April 22 to June 2, 1952, at a cost of $10,080. The
U. S. snagboat Albany removed 1,244 snags from the channel in the
Apalachicola River-St. Andrew Bay section January 11 to February 8,
1952, at a cost of $9,303. Preparatory work in connection with pro-
posed additional dredging in the Gulf County Canal cost $336.
Miscellaneous investigations and surveys of the entire waterway cost
$13,578.
   The cost for the fiscal year was $92,639.08, charged to maintenance.
The expenditures were $92,134.80.
   Condition at end of fiscal year.-The existing project, commenced
in 1911, was about 87 percent completed. The latest examinations
show minimum depths, at mean low water, available to navigation
as follows:

                                                                                        Minimum depth


   Date                          Section
                                 Section                            Projct                   Mid-chan-
                                                                                   Left out- nel fohaRight out-
                                                                  depth (feet)    sidequar-project     side quar-
                                                                                      ter (feet)     width (feet)   ter (feet)

June 1952 Apalachicola Bay to Carrabelle, Fla--- _                         12                 9. 5           9. 7           9. 5
Dec. 1951  Apalachicola River to St. Andrew Bay, Fla_                      12                12.0           12.0           12.0
May 1952 Gulf County Canal, Fla----....-----------------.......             9                 4. 4           8. 5           6. 4
Oct. 1951  Choctawhatchee Bay to West Bay, Fla ....                        12                12. 0          12. 0          12. 0
Jan. 1952 Choctawhatchee Bay to Pensacola Bay, Fla_                        12                12. 0          12. 0          12. 0
  Do--.....Pensacola Bay, Fla., to Mobile Bay, Ala....                     12                10.0       .   10. 0          10. 0
Dec. 1951  Mobile Bay, Ala., to the Rigolets, La......                     12                10.5           10.5           10.5



   The work remaining to be done to complete the project consists
of dredging to project dimensions the section from Carrabelle, Fla.,
to Apalachee Bay, Fla., via Carrabelle, Crooked, and Ochlockonee
Rivers, and Ochlockonee and Apalachee Bays, Fla.; and dredging
a channel to project dimensions from Big Lagoon to Pensacola Bay
along an alinement north of the present channel. Due to abandon-
ment of the Georgia, Florida & Alabama Railroad under Interstate
Commerce Commission permit, disposal of the rail, and removal of the
fixed bridge across the Ochlockonee River at McIntyre, construction
of a new bridge with a movable span at that location, as authorized in
the act of March 2, 1945, is no longer necessary.
                 RIVERS AND HARBORS-MOBILE,                                   ALA.,    DISTRICT                    655
  The cost and expenditures for the existing project to June 30, 1952,
w~ere as follows:

                                                                      Costs
                                                                                                          Expenditures
                                               New work            Maintenance           Total


Regular funds------------.                     $5, 494, 823.18       $3, 141,069. 29   $8, 635, 932. 47   1 $8,635,327. 5
Emergency Relief funds-----....                    310, 000. 001 ...
                                                  30310,                          .            000.00          310, 000.00
      Total          .          ......------------------------
                                                  5, 834, 863.18     3,141, 069.29      8, 975, 932.47     18,975,327.65
  1 Reflects an adjustment of $3,580.12 applicable to previous projects. (See costs and expenditures for all
previous projects as given on p. 707 of Annual Report for 1938.)

  Proposedoperations.--The balance unexpended June 30, 1952, $44,-
551.19, plus an allotment of $119,000, a total of $163,551.19, will be ap-
plied as follows:
Accounts payable June 30, 1952------        ------------------                                                $604. 82
Maintenance:
    Dredging at most critical locations to provide neces-
      sary dimensions for existing navigation in the fol-
      lowing sections, about 5Y2 months during fiscal
      year:
        Government plant and hired labor:
             Apalachicola Bay to Carrabelle, Fla          $40, 000. 00  ------
             Gulf County Canal, Fla- __-----___--     -    34, 640. 00
             Choctawhatchee Bay to West Bay, Fla__..       20, 000.00
             Pensacola Bay, Fla., to Mobile Bay, Ala___ 29, 306.37
    Snagging in the Apalachicola River-St. Andrew Bay
      section with U. S. snagboat Albany about 11/2
      months, January, February 1953_____________           9, 000. 00
    Repairing erosion-protective works in the Choctaw-
      hatchee Bay-West Bay section by hired labor dur-
      ing fiscal year-___ -______-____---                  10, 000. 00
    Miscellaneous examinations, surveys, inspections, re-
      ports, and contingencies of the entire waterway by
      hired labor during fiscal year ------.-------.       20,000. 00
                                                                                                          162.946.
                                                                                                           v    ...
                                                                                                                    37
                                                                                                                    ..


              Total for all work---------------------------------                                         163, 551.19
    The additional sum of $322,000 can be profitably expended for the
following scheduled work during fiscal year 1954:
New work:
     Dredging to provide a new channel 12 feet deep, 125 feet wide,
        and about 6,200 feet long, connecting Big Lagoon and Pensacola
        Bay                                                                                                    $97, 000
.. aintenance :
     Dredging to restore project dimensions, where neces-
        sary, about 6 months, by contract--- ---.-----          $180, 000
      Snagging with U. S. snagboat Albany, about 2 months_         9,000
      Maintaining dikes, ditches, and other protective works
        in the Choctawhatchee Bay-West Bay section by
        hired labor during the fiscal year_.....    _--------.    15, 000
      Miscellaneous surveys and investigations, permits, in-
        spections, etc., as necessary, during the fiscal year__   21, 000
                                                                                                               225   000n
              Total for all work               ----------------------------------- 322, 000
656         REPORT OF CHIEF OF ENGINEERS,                              U.     S. ARMY,       1952

                                     Cost and financial summary

                                                Fiscal year ending June 30-                       Total to June
                                                                                                 30,1952, includ-
                                                                                                 ing fiscal years
                                 1948          1949         1950         1951         1952         priorto 1948

New work:
    Appropriated-----__      -- $667.26      $2,695.00 -----------------------------               $5, 880, 467.77
    Cost....-----------------------------     2, 695.00 -----------------------------------          5, 880, 467.77
   Expenditures---...- ----         3.18      2, 695.00 ----------    ---------------------- 5, 880, 467. 77
Maintenance:
    Appropriated--------...   224, 000.00   373, 000.00 $198, 500.00 $117,100.00 $127,147.35        3,250,153.07
    Cost--------------        209, 509.17   440, 742. 70 157, 838.27 159, 021.36   92, 639. 08      3, 206, 206. 70
    Expenditures ....- ..     170, 713.71   475, 606.40 158, 826.62 159, 310.28    92,134.80        3, 205, 601.88


Other new work data: Estimated additional amount needed                                    to be
   appropriated for completion of existing project -------------------                               $857, 000

        2. APALACHICOLA, CHATTAHOOCHEE, AND FLINT RIVERS,
                            GA. AND FLA.

   Location.--The Apalachicola River is formed at the southwest
corner of the State of Georgia by the junction of the Chattahoo-
chee and Flint Rivers and flows south 108 miles, emptying into
Apalachicola Bay. The Florida River enters the Apalachicola River
from the east, 45.4 miles above its mouth, and the River Styx also
enters from the east, 36.7 miles above its mouth. (See U. S. Coast
and Geodetic Survey Chart No. 1262.)
   The Chattahoochee River, 418 miles long, rises in northeast Georgia
and flows southwesterly to West Point, and thence southerly to join
the Flint River at the southwest corner of Georgia, forming the
Apalachicola River. (See U. S. Geological Survey maps for north-
west Georgia.)
   The Flint River, 330 miles long, rises in west-central Georgia,
flows generally southeasterly to Albany, and thence southwest to the
southwest corner of the State, where it joins the Chattahoochee River
to form the Apalachicola River. (See U. S. Geological Survey maps
for southwest Georgia.)
   Previous projects.-Expenditures on the Apalachicola River were
made between 1828 and 1831, but apparently under no definite proj-
ect. In 1835 and 1836, appropriations were made for the Chipola
River. For further details see page 690, annual report for 1938.
Projects for the Apalachicola River were adopted by the River and
Harbor Acts of June 23, 1874, June 13, 1902, January 6, 1934, and
June 20, 1938. For further details see the existing project for Apala-
chicola River, page 568, annual report for 1944.
   Projects for the Flint River, Ga., were adopted by River and Harbor
Acts of June 23, 1874, and June 14, 1880. For further details see the
existing project for Flint River, Ga., page 570, annual report for 1944.
   The River and Harbor Act of July 13, 1892, made an appropria-
tion for the section of the Chattahoochee River between West Point
and Franklin, Ga., and appropriations therefor were continued until
1899, when they were discontinued. For further details see page
1834, annual report for 1915, and page 696, annual report for 1938.
          RIVERS   AND   HARBORS-MOBILE,     ALA.,   DISTRICT     657
The River and Harbor Act of June 23, 1874, adopted the project
for the Chattahoochee River from its mouth to Columbus, Ga. For
further details see existing project for that river on page 572, annual
report for 1944.
   For total cost and expenditures on all previous projects see Cost
and Financial Summary for the Apalachicola, Chattahoochee, and
Flint Rivers, Georgia and Florida, for the fiscal year 1945.
   Existing project.-Priorto the River and Harbor Act approved
March 2, 1945, the existing project for the Apalachicola River pro-
vided for a channel therein 6 feet deep at low water and 100 feet
wide, to be secured by removing snags and overhanging trees and by
widening and straightening Moccasin Slough, for a channel 5 feet
deep and 60 feet wide through the Cut-off, Lee Slough, and lower
Chipola River, together with snagging and dredging to a depth
of 6 feet the lower 2,500 feet of Styx River and improving of Florida
River by dredging a new outlet 6 feet deep, 80 feet wide, and about
600 feet downstream of its present mouth; for the Chattahoochee
River, a channel 4 feet deep at low water and 100 feet wide from the
mouth to Columbus, Ga., 164 miles, by removing timber obstructions,
dredging, contraction works, and shore protection; and for the Flint
River, a channel 100 feet wide and 3 feet deep at extreme low water
from the mouth to Albany, 103 miles, to be obtained by dredging,
rock excavations, contraction works, and removal of snags, together
with a channel for light-draft steamers at moderate stages from
Albany to Montezuma, 79 miles, to be obtained by removing loose
rocks, snags, and overhanging trees.
   The River and Harbor Act of March 2, 1945, approved the gen-
eral plan presented in House Document No. 342, Seventy-sixth Con-
gress, first session, which document contains the latest published map,
for the full development of the Apalachicola, Chattahoochee, and
Flint River system in the combined interest of navigation and power,
and authorized for the initiation and partial accomplishment of
that plan modification of the then-existing projects for the Apala-
chicola, Chattahoochee, and Flint Rivers to provide for the construc-
tion of two of the locks and dams for the 9-foot project, one at Fort
Benning and one at the Junction, supplemented by dredging and
contraction works, to provide a navigable depth of 6 feet to Colum-
bus on the Chattahoochee and to Bainbridge on the Flint at an esti-
mated cost for new work of $6,500,000, with annual maintenance of
$200,000 in addition to that previously authorized. The remaining
elements of the approved plan included navigation-power dams with
locks at the Florence, Fort Gaines, Columbia, and Paramore Land-
ing sites on the Chattahoochee between the Junction and Fort Ben-
ning sites; storage-power reservoirs on the upper Chattahoochee
at the Roswell, Cedar Creek, and Lanier sites; storage-power reser-
voirs on the upper Flint at the Woodbury No. 2, Potato Creek, and
Auchumpkee Creek sites; dredging, cut-offs, contraction works, or
other open-river methods, to provide, with the aforementioned dams
and flow regulation, channels 9 feet deep and 100 feet wide from the
mouth of the Apalachicola River to Columbus, 7 feet deep and 100
658            REPORT OF CHIEF OF ENGINEERS,                                                      U.    S. ARMY,             1952

feet wide in the Flint River from its mouth to Bainbridge, and 5
feet deep and 100 feet wide thence to Albany, at an estimated con-
struction cost to the United States of $66,629,000 for the full devel-
opment.
   The River and Harbor Act of July 24, 1946, approved modifi-
cation of the general plan presented in House Document 342, Seventy-
sixth Congress, first session, to include the improvements now pro-
posed by the Chief of Engineers in lieu of the corresponding works
of that plan, and authorized for the initiation and partial accom-
plishment of the modified plan the construction of Buford multi-
purpose reservoir, Fort Benning lock and dam, and the Upper Colum-
bia and Jim Woodruff, formerly Junction, multiple-purpose develop-
ments, and supplemental channel work to provide a channel depth
of 9 feet for a minimum width of 100 feet in the Apalachicola River,
to Columbus, Ga., on the Chattahoochee River, 268 miles, and to
Bainbridge, Ga., on the Flint River, 29 miles above its junction with
the Chattahoochee River.
   The following table gives the various features of the proposed
locks and dams and multiple-purpose developments included in the
existing project:
                                                      Proposed structures

                                           Jim Woodruff              Upper Columbia                    Fort Benning lock        Buford D
                                          lock and dam                lock and dam                          and damam

Miles above mouth-.........            107.61 .........------------49.5 2..........__         .        139.5 2
                                                                                                             -----    -
                                                                                                                     ....      348.5.2
Nearest town---------                  Chattahoochee,              Columbia, Ala. .-                   Cusseta, Ga-.......     Buford, Ga..
                                         Fla.
Distance (miles)......---              1---------------- 2-------------..........                      9------------------     5.
Greatest lock length avail-            450 ....-----------.........
                                                                  450------..............----.         450-.............
  able for full width (feet).
Width of chamber (feet)--..--          82------------        82 --------------
                                                                      ..                  82 .-------------
Lift (feet) ...-------...........---   33.0_------         . 88.0 3..-----....----..      25.0.
Elevation of normal pool               77.0---------------   165.0...----.......--------. 190.0-...........__ 11,065.0.
  surface (msl).
Depth over sills at low                14.0-------------.1          14.0-----------............        14.0 .......
  water (feet).
Character of foundation....- Limestone-----........         Limestone, marl__. Piles in sand, clay,                            Rock.
                                                                                             gravel.
Kind of dam..............            Fixed...........       Fixed ----                    Fixed..-..........                   Fixed.
Height of dam (feet) ....... 67......---------......----    106............... 40 ...............                              192.
Type of construction .....           Concrete----.......... Concrete_.......              Concrete-......-_-                   Earth.
Reservoir capacity (acre- 385,000.---........- 775,000............                                                             2,077,000.
  feet).
Power development (kilo- 30,000----------...........1 65,000--------------------------------                                   86,000.
  watts).
Percent complete-.......... 40_-...0... ---               . 0........       ......        O
                                                                                      . 0__
                                                                                 .............                                 8.
Year opened to navigation .. $46,379,000..-------------......
                                                            $48,530,000........$11,975--------------,900 .....                 $4--------------,013,000.
Estimated cost---------............. $46,379,000_-          $48,530,000-                 $11,975,900-                         $41,013,000.

  1Above mouth of Apalachicola River.
  2 Above mouthof Chattahoochee River.
  8 Double lift.



   The estimated cost for new work, revised in 1952, is $148,877,900.
The latest (1952) approved estimated annual cost for maintenance
is $1,085,000 (includes $875,000 for operating and care). The mean
range of tide at the mouth of the Apalachicola River is 1.6 feet; at
the point where the river is formed the variation between low and
high water is about 37 feet. On the Chattahoochee River, the varia-
tion between average low and high water is about 20 feet, and the
           RIVERS   AND HARBORS-MOBILE,        ALA.,   DISTRICT      659,
extreme fluctuation is 65.3 feet at Eufaula. On the Flint River, the
extreme fluctuation of stage due to floods was 40 feet, while the average
variation between low and high water is about 21.5 feet.
    Local cooperation.-This provides that local interests agree to fur-
nish, free of cost to the United States, all lands, easements, rights-
of-way, and spoil-disposal areas, and as when required, for provision
and maintenance of the channel in Apalachicola River below Jim
Woodruff Dam, to maintain and operate at their expense all utility
and highway facilities which are relocated or otherwise altered as a
part of the improvement, to provide suitable public terminal facilities
open to all on equal terms, and to hold and save the United States free
from damages which might arise from the construction of the
improvement.
    Terminal facilities.-At Apalachicola, Fla., the facilities consist of
several marginal pile-and-timber wharves. The landing at Blounts-
town, Fla., is a natural one. A private wharf at River Junction, Fla.,
is used for landing and storing sand and gravel. On the Flint River
there is a natural landing at Bainbridge, Ga., and also at Albany, Ga.
On the Chattahoochee River the terminals consist of natural landings
at Columbus, Ga., and Eufaula, Ala., and a masonry marginal landing
at Columbus. These facilities are considered adequate for the existing
commerce.
    Operations and results during fiscal year.-New work: Jim
Woodruff Dam: Contract: The contractor continued construction of
the lock and fixed-crest spillway at a cost of $3,660,949. Final cost
on the east-bank access road was $4,469. Work on the contract for
the gated spillway, powerhouse, and switchyard was started at a cost
of $996,118. Cost on contract for purchase of oil circuit breakers was
$153. Relocation of Fort Scott monument cost $706. Cost on con-
tracts for turbines and generators was $848,187.
    Hired labor: Acquisition of land and payment of damages cost:
$491,859. Plans and specifications were continued at a cost of:
$175,548. Purchase of tools and equipment and maintenance of and
collection for quarters resulted in a net cost of $22,745.
    Upper Columbia lock and dam: Hired labor: Preparation of the
definite project report was continued at a cost of $28,069.
    Buford dam and reservoir: Hired labor: Acquisition of land and
damage payments cost $1,078. Purchase of tools and equipment cost
$11,484. Preparation of definite project report and plans and speci-
fications cost $64,923. Cost in connection with design of turbines,
butterfly valve, and generators was $502.
    Contract: Final cost on construction of saddle dike No. 3 and spill-
way was $14,767. Cost in connection with construction of saddle dikes
Nos. 1 and 2, access road, and excavation for forebay, tunnels, and
tailrace was $1,468,188. Design of powerhouse plant cost $237,776.
   Mapping of the Apalachicola River, by hired labor, was continued
at a cost of $14,712.
   Maintenance. The U. S. snagboat Albany removed 1,887 obstruc-
tions from the mouth of the Florida River August 6 to 31, 1951, at a
cost of $7,491, and 1,121 obstructions from the Apalachicola River
660     REPORT OF CHIEF OF ENGINEERS,         U. S. ARMY, 1952

December 3 to 21, 1951, and January 1 to 10, 1952, at a cost of $9,488.
   The total cost was $8,059,212.04, of which $8,042,232.76 was for
new work and $16,979.28 for maintenance. The expenditures were
$7,491,655.11.
   Condition at end of fiscal year.-Access roads, permanent housing,
and overflow dike have been completed, and the lock and fixed-crest
spillway at Jim Woodruff Dam have been practically completed.
Work on the contract for the gated spillway, powerhouse, and switch-
yard was in progress. Work in connection with the design and manu-
facture of governors, generators, turbines, etc., was in progress.
Preparation of plans and specifications continued. The overall proj-
ect for the Jim Woodruff Dam was about 40 percent completed.
Saddle dike No. 3 and spillway at Buford Dam were complete. Work
was in progress on saddle dikes Nos. 1 and 2, access road, excavation
for forebay, etc. Work continued on land acquisition and plans and
specifications. The overall project for the Buford Dam was about
8 percent completed. The definite project report for the Upper
Columbia lock and dam was in progress. Mapping of the Apalachi-
cola River for channel improvement continued. The controlling
depths in the channels at the times shown were as follows: Apalachi-
cola River, 4.5 feet, June 1950; the Cut-off, Lee Slough and Lower
Chipola River, 5 feet, October 1943; mouth of Florida River and
River Styx, 6 feet, October 1947; Chattahoochee River, mouth to
Columbus, 3 feet, June 1945; Flint River, mouth to Bainbridge, 2.6
feet, and Bainbridge to Albany, 1.5 feet, June 1941. Ordinarily, boats
drawing 5 feet can operate throughout the year on the Apalachicola
River at a stage of zero on the River Junction gage. Greater depths
are usually available from January to July of each year. On the
Chattahoochee River, vessels drawing less than 3 feet may operate
throughout the year, and 5 feet can ordinarily be carried from
December to June. The head of boat traffic on that river is Columbus,
Ga. On the Flint River, greater depths than those shown are gen-
erally available between November and June of each year. The head
of navigation for boat traffic on that river is Albany, Ga. The work
remaining to be done to complete the project consists of improving
the channel of the Apalachicola River from the mouth to Jim
Woodruff Dam, completing construction of Jim Woodruff Dam, and
constructing Upper Columbia lock and dam, Fort Benning lock andt
dam, and Buford Dam.
   The total cost under the existing project was $21,966,490.21, of
which $21,717,955.03 was for new work and $248,535.18 for mainte-
nance. The expenditures were $20,700,025.98.
  Proposed operations.- The balance unexpended June 30, 1952,
$4,755,661.16, plus allotments of $13,245,000, a total of $18,000,661.16,
will be applied as follows:
              RIVERS AND HARBORS-MOBILE,                        ALA.,   DISTRICT            661
Accounts payable June 30, 1952_                -  -..--.-.---                     $1, 228, 431. 57
New work:
    Jim Woodruff Dam:
        Plans and specifications____---------                  $123, 461.19
        A quisition of land and damages --------- 1, 382, 972. 30
        Relocation                                                47, 844. 47
                                                                 1---------------------------
        Reservoir clearing____________-----2, 900, 000. 00
        Construction of lock and fixed-crest spill-
          way -----------------------------                      150, 474. 37
        Curtain grouting_ __                __________-__-        43, 145. 46
        Design and manufacture of turbines------                 362, 946. 72
        Design and manufacture of generators __               1, 245, 606. 05
        Design and manufacture of governors-__.                  125, 000. 00
        Construction of gated spillway, power-
          house, intake structure, and switchyard
          fill ------------------------------                 5, 906, 630. 86
        Sp:llway gantry cranes----------------- 450, 000. 00
        Powerhouse crane_                 --- ______-__- --       70, 000. 00
        Powerhouse and switchyard electrical and
          miscellaneous equipment __              -____-----     220,000. 00
        CO system----------------------------                       5,  000.00
        Reservoir management facilities----------                100, 000. 00
        Oil circuit breakers ---------------------                 65, 800. 00
        Transformers -------------------------                    26, 000. 00
                Total for Jim Woodruff Dam_______--____                13, 324, 881. 42
     Buford Dam:
         Planning -----_        ----------------- ___      59, 000. 00
         Plans and specifications________________         470, 436. 16
         Excavation for forebay, tunnels, and tail-
            race, and construction of right-bank sad-
           dle dikes and access road______--  -      - 1, 933, 581. 04
         Design and manufacture of turbines------          70, 500. 00
         Design and manufacture of generators.__           66, 900. 00
         Intake structure, tunnel lining, sluice still-
           ing basin------- -------------       ------- 400, 000. 00

            Total for Buford Dam ___   ______-_- ____-      3, 000, 417. 20
     Upper Columbia Dam:
        Planning----------------------------------------196,        930. 97
                Total for all work___---                 __------   -   ____     18, 000, 661.16
  The additional sum of $23,764,700 can be profitably expended during
the fiscal year 1954 for:
New work:
   Jim Woodruff Dam:
       Plans and specifications ___--               ____---    .____$36, 000
       Design, manufacture, and delivery of turbines__              331, 900
       Design, manufacture, and delivery of gen-
          erators
              eraor --------------------------------                127, 000
                                                                   1700
       Design, manufacture, and delivery of gover-
          nors -----------------------------------                     4, 200
       Construction of gated spillway, powerhouse, in-
          take structure, and switchyard fill __             -_ 6, 373, 000
       Spillway gantry cranes________ __-- _____---250,                   000
       Powerhouse crane________________------------37, 700
       Circuit breakers, transformers, COs system ----              136, 200
       Powerhouse electrical and miscellaneous equip-
          ment ----                      ---------------             06,100
                                                                    1-----
       Facilities for reservoir management ______--115,                   000
       Reservoir clearing-- -------                __ -_______2, 602,000
       Reservoir rim and abutment treatment--------                 350, 000
           Switchgear, s'witchyard         electrical equipment,
            and miscellaneous                                            130, 900
                Total for Jim Woodruff Dam .......                                  $10, 600, 000
662          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

New work-Continued
   Buford Dam:
      Plans and specifications--------------             $300, 000
       Land acquisition and relocations------------     4, 200, 000
      Design and manufacture of turbines-----------450, 000
       Design and manufacture of generators--------- 400, 000
       Powerhouse equipment----------------------          100, 000
       Construction of intake structure, tunnel lining,
         and sluice stilling basin ------------------   3, 770, 000
              Total for Buford Dam--------     ----------------- $9, 220, 000
      Upper Columbia Dam:
         Planning--------------------------------        256, 200
          Plans and specifications--------------- ----- 500, 000
         Land acquisition and relocations------------    750, 000
         Dam and powerhouse --------     -------------   293, 800
         Design and manufacture turbines, governors,
            and generators---------------- --------- 200, 000
              Total for Upper Columbia Dam--------------------3,000, 000
      Apalachicola River:
            Channel improvement,                 dredging        and rectifi-
               cation--_-----------------------------944, 700
                Total for all work-------------------------------                                     23, 764, 700

                                      Cost and financial summary

                                                 Fiscal year ending June 30-                           Total to June
                                                                                                      30,1952, includi
                                                                                                      ing fiscal years
                                  1948          1949          1950          1951          1952          prior to1948

New work:
  Appropriated--       ...$1,000000.00 $3,400,000.00 $7,691,000.00 $4.520,000.00 $7,161,151.96         $26,842,268.72
  Cost--------------- 883, 086. 89 1, 223. 694. 90 4, 542, 374.28 6, 538, 549. 28 8, 042, 232. 76       23, 603, 071. 79
  Expenditures....--------  758, 527.04 1, 241, 637. 72 4,142, 861.37 6, 347, 092.51 7, 474, 675.83     22, 336, 607. 56
Maintenance:
    Appropriated ---------       52,280.00     51, 500.00    79, 737.49    12, 079.67     9,487. 73     2, 494, 768.06
    Cost---- ------------..      50, 674.32    53, 007.40    79, 877.83     4, 993.45    16, 979.28     2,494,768.06
    Expenditures--------         50, 667. 04   53, 035.42   80, 247.18      4, 611. 74   16, 979.28     2, 494, 768.06


Other new work data:
    Unobligated balance, June 30, 1952---------------------        $190, 531.36
    Appropriated for fiscal year ending June 30, 1953--------   13, 245, 000. 00
    Unobligated balance available for fiscal year 1953-------- 13, 435, 531. 36
    Estimated additional amount needed to be appropriated for
      completion of existing project-------------- -      --   110, 675, 700. 00

                                3. PORT ST. JOE HARBOR, FLA.

  Location.-On the northwest coast of Florida, 115 miles east of
Pensacola Harbor. (See U. S. Coast and Geodetic Survey Chart No.
1263.)
   Existing project.-This provides for an entrance channel 32 feet
deep, 300 feet wide, and about 6 miles long across the outer shoal; a
north bay (inner) channel 32 feet deep, 200 feet wide, and about 2
miles long; and a south bay (inner) channel 27 feet deep and 200 feet
wide leading to a turning basin 32 feet deep and about 1,000 feet wide
and 2,000 feet long at the Port St. Joe water front. The average
tidal variation is 1.4 feet. The extreme range, except during storms,
is about 4 feet.
   The project has been completed at a cost of $579,988.91 for new
                 RIVERS        AND     HARBORS-MOBILE,                   ALA.,     DISTRICT                  663
work, exclusive of $20,000 contributed by local interests. The latest
 (1952) approved estimate for annual cost of maintenance is $100,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                      Documents

July 25,1912     Project document recommended a width of 350 feet            H. Doc. 660, 62d Cong., 2d sess.
                  and the act limited the width to 300 feet with a
                  depth of 24 feet across the bar at the entrance to
                  the bay.
Aug. 26,1937     An entrance channel 300 feet wide and 29 feet deep,         Rivers and Harbors Committee
                  and a bay channel 200 feet wide and 27 feet deep,            Doe. 10, 76th Cong., 1st sess.
                  with a turning basin at the proposed municipal
                  pier at Port St. Joe.
Mar.    2,1945   The existing project-----.......----.......--------------   S. Dec. 17, 77th Cong., 1st sess.' and
                                                                                report of Chief of Engineers.

  1 Contains the latest published maps.

    Recommended modifications of the project.-Under date of March
9, 1950, the Chief of Engineers recommended modification of the
existing project to provide for an entrance channel 37 feet deep, 500
feet wide at its outer end and diminishing progressively in width to
400 feet at the first bend, thence 400 feet wide to the entrance to St.
Joseph Bay; a north channel in the bay 35 feet deep and 300 feet wide;
and a harbor channel in the turning basin 35 feet deep and 250 feet
wide, with its shoreward edge 100 feet from and parallel to the face of
the existing wharf, at an estimated cost to the United States of
 $1,125,000, with $25,000 annually thereafter for maintenance in addi-
tion to that now required; subject to certain conditions of local coop-
eration (H. Doec. 595, 81st Cong., 2d sess.).
    Local cooperation.--Fully complied with. Local interests are re-
fquired to furnish, free of cost to the United States, suitable spoil-
disposal areas as required for subsequent maintenance.
    Terminal facilities.-The rail- and highway-connected terminal
facilities at this port are considered adequate for existing cormetce.
 (See Port and Terminal Facilities issued in 1941.)
    Operations and results during fiscal year.-The U. S. dragline
No. 2 removed 3,000 cubic yards of material from the turning basin
adjacent to the docks October 10 to 31, 1951, at a cost of $2,799.65.
Miscellaneous investigations and surveys cost $1,500.15. The total
cost was $4,299.80, charged to maintenance. The expenditures were
$4,162.68.
    Condition at end of fiscal year.-The existing project was com-
menced in 1913 and completed in February 1949. The controlling
depths in the channels at the times shown were as follows: Entrance
channel, 32 feet, March 1952; north bay (inner channel), 32 feet,
June 1950; south bay (inner channel), 21.7 feet, June 1950; and turn-
ing basin, 30.8 feet, June 1950. The total cost under the existing
project was $903,583.96, of which $579,988.91 was for new work and
$323,595.05 for maintenance. The expenditures were $903,583.96. In
addition, $20,000 from contributed funds was expended for new work.
664            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

Proposed operations.-An allotment of $63,750 for fiscal year 1953,
will be applied as follows:
Maintenance:
   Dredging to restore project dimensions in the entrance channel
      with United States hopper dredge Lyman about 1 month,
      June 1953------------------------------          ----------- $60, 000
   Miscellaneous examinations, surveys, investigations and contin-
      gencies ------------------------------   -----------------     3, 750

                   Total---------                       ----------------------------------                                        63, 750
  The additional sum of $45,500 can be profitably expended during
the fiscal year 1954 for maintenance dredging, by contract, to restore
project dimensions in the bay channels, and for miscellaneous exami-
nations, surveys, and investigations.
                                               Cost and financial summary

                                                            Fiscal year ending June 30-                                    Total to June
                                                                                                                           30, 1952, includ-
                                                                                                                           ing fiscal years
                                          1948             1949             1950             1951             1952          prior to 1948


New work:
   Appropriated------------
                       ........----............----     $468, 400.00 $12, 517.08 -------.--.........                            $579, 988. 91
   Cost------------------------                          455,882.92 ---------- ------------------------                          579, 988. 91
   Expenditures-......-----...-----------.............. 455, 882. 92 ....................................                        579, 988. 91
Maintenance:
   Appropriated-........                $33, 000.00        5, 000. 00 101, 350.00 $47, 800.00                $3, 719.86          323, 595.05
   Cost--------...... ----- --........... 57, 015. 43         984. 54  100, 428. 91               48,141. 15  4, 299. 80         323, 595.05
     Expenditures.....--------. 56, 590. 34              1, 365.68      100, 341.36       48, 409. 80        4,162. 68           323, 595.05

  1 In   addition, $20,000 was expended from contributed funds.

                                       4. PANAMA CITY HARBOR, FLA.

  Location.-On the northwest coast of Florida, 102 miles east of
the entrance to Pensacola Harbor. (See U. S. Coast and Geodetic
Survey Chart No. 1263.)
  Previous project.-Adopted by the River and Harbor Act of June
25, 1910. For further details see page 541, annual report for 1934
and page 710, annual report for 1938.
  Existing project.-This provides for a channel about 1.8 miles long
extending from deep water in the bay across Lands End to the Gulf
of Mexico, 300 feet wide and 32 feet deep in the bay and across Lands
End and 450 feet wide and 34 feet deep in the approach channel in
the Gulf, and protected by two jetties, each about 700 feet long; and
for a channel in Watson Bayou 100 feet wide and 10 feet deep from
that depth in St. Andrew Bay to the highway bridge, about 13/4 miles.
The mean tidal range is 1.3 feet, and the extreme range, except dur-
ing storms, is about 4 feet.
  The project has been completed at a cost of $687,017.02 for new
work. The latest (1952) approved estimate for annual cost of main-
tenance is $63,000.
  The existing project was authorized by the following river and
harbor acts:
                   RIVERS      AND HARBORS--MOBILE,                          ALA.,    DISTRICT                   665

       Acts                           Work authorized                                       Documents 1

Aug. 30,1935       Channels 27 and 29 feet deep. Abandonment of proj- H. Doc. 33, 73d Cong., 1st sess.
                    ect adopted by act of June 25, 1910.
Mar.     2, 1945   Maintenance of a channel in Watson Bayou 100 feet            H. Doc. 555, 76th Cong., 3d sess.
                    wide and 10 feet deep from that depth in St. An-
                     drew Bay to the highway bridge.
June 30, 1948      Channels 32 and 34 feet deep......--------------------       H. Doc. 559, 80th Cong., 2d sess.

  1Contain the latest published maps. The existing project for St. Andrew Bay was also authorized by the
Public Works Administration, Sept. 6, 1233.

   Local cooperation.--Fully complied with except for work author-
ized in accordance with House Document No. 555, Seventy-sixth Con-
gress, third session, which provides that local interests furnish, free of
cost to the United States, all lands, easements, and rights-of-way and
spoil-disposal areas for maintenance, when and as required, and hold
and save the United States free from claims for damages resulting
from the improvement.
   Terminal facilities.-The terminal facilities at this port are consid-
ered adequate for existing commerce. (See Port and Terminal Facili-
ties issued in 1941.)
   Operations and results during fiscal year.-The U. S. hopper dredge
Gerig removed 369,760 cubic yards (bin measurement) of material in
the Gulf approach channel and the channel across Lands End Febru-
ary 10 to 24, 1952, at a cost of $43,051. Hired labor forces placed
1,981 tons of stone in making repairs to existing jetty structures July 1
to October 8, 1951, at a cost of $21,068. Miscellaneous surveys and
investigations cost $1,854. The total cost was $65,972,83, charged
to maintenance. The expenditures were $65,760.88.
   Condition at end of fiscal year.-The existing project was com-
menced in 1933 and completed in November 1949. The controlling
depths in tile channels at the times shown were as follows: Channel
from bay across Lands End, 30.6 feet, June 1952; approach channel
in the Gulf, 33.7 feet, June 1952; and channel in Watson Bayou, 9.2
feet, April 1942.
   The costs and expenditures on the existing project to June 30, 1952,
were as follows:
                                                                     Costs
                                                                                                       Expenditures
                                                  New work       Maintenance            Total

Regular funds....---- ------------------           $105,058. 16    $1,523,292.79     $1, 628, 350.95    $1, 628, 694.00
Public Works funds....---------------_              581, 958. 86 .                       581, 958.86        581, 958. 86
        Total_......    . .
                        .-         ..----------    687,017.02      1, 523, 292.79     2, 210, 309.81     2, 210, C52.86


  Proposedoperations.-Thebalance unexpended June 30, 1952, $8.91,
and accounts receivable, $343.05, plus an allotment of $32,700, a total
of $33,051.96, will be applied as follows:
Maintenance:
   Dredging to restore project dimensions in the Gulf approach
      channel with U. S. hopper dredge Lyman, about one-half month
      during April 1.953     ----------------------------------                                        $30, 000. 00
    Miscellaneous investigations, surveys, examinations, and con-
      tingencies ------------------------------------------                                               3,051.96
              Total---- ------------------------                                                        33, 051. 98
666                REPORT OF CHIEF OF ENGINEERS,                                                U. S. ARMY,               1952

   The additional sum of $64,000 can be profitably expended during
fiscal year 1954 for maintenance dredging to restore project dimen-
sions in the Gulf approach channel and the channel across Lands End
with a United States hopper dredge, about 1 month.
                                                      Cost and financial summary

                                                                     Fiscal year ending June 30-                                  Total to June
                                                                                                                                 30. 1952, includ-
                                                                                                                                 ing fiscal years
                                                1948                1949          1950            1951            1952            prior to 1948


New work:
       Appropriated--------.........----------                --------                     .......................------------
                                                                             $105, 058.16-----------                                 $890,577.02
       Cost................----------. ----------------------                 105, 058.16----------------.......         ..           890, 577.02
       Expenditures--------......... ---------                                105, 058. 16 -------------------..                      890, 577.02
Maintenance:
       Appropriated---------..       133, 000.00               $80,000.00      70, 650.00     $50, 800.00     $38, 500.00           2, 037, 249.42
       Cost....            ..--------------
                                     103,169.49                112, 271.39     69, 884.84      23, 740.37      65, 972. 83          2, 036, 897. 46
       Expenditures ___.. -          100,887. 79               114, 553.09     69, 612.68      24, 567.53      65, 760.88           2, 037, 240.51



            5. EAST PASS CHANNEL FROM THE GULF OF MEXICO INTO
                         CHOCTAWHATCHEE BAY, FLA.
   Location.-This is an entrance from the Gulf of Mexico into Choc-
tawhatchee Bay at the eastern end of Santa Rosa Island. It is 48 miles
east of the entrance into Pensacola Bay and 49 miles west of the
new entrance to St. Andrew Bay. (See U. S. Coast and Geodetic
Survey Chart No. 1264.)
   Existing project.-This provides for maintenance of a channel 12
feet deep at mean low water, 180 feet wide, and about 3 miles long
from Choctawhatchee Bay into the Gulf of Mexico, and maintenance
of a channel 6 feet deep, 100 feet wide, and about 2,000 feet long from
the East Pass Channel into Old Pass Lagoon. The mean range of
tide is 1.3 feet; the extreme range, except during storms, is 2.5 feet.
   The latest (1952) approved estimate for annual cost of maintenance
is $30,000.
   The existing project was authorized by the following river and
harbor acts:

       Acts                                         Work authorized                                                Documents

July       3,1930       Maintenance of a channel not less than 7 feet deep and                      H. Doc. 209, 70th Cong., 1st sess.
                         100 feet wide from Choctawhatchee Bay into the
                        Gulf of Mexico.
Oct. 24, 19511         Maintenance of entrance channel 12 feet deep and 180                         H. Doec. 470, 81st Cong., 2d sess.'
                        feet wide and channel to Old Pass Lagoon 6 feet
                        deep and 100 feet wide.


1 Public Law 193, 82d Congress.
I Contains latest published map.


  Local cooperation.-Requires that local interests hold and save the
United States free from property damage that might result from
maintenance operations. Compliance not requested.
  Teminal facilities.-The small privately owned pile-and-timber
piers used in connection with the fishing industry in this locality are
considered adequate for existing commerce.
  Operations and results during fiscal year.-The U. S. pipeline
dredge Blackwater removed 139,240 cubic yards of material from
                   RIVERS AND HARBORS-MOBILE,                                   ALA.,       DISTRICT                  667
the entrance channel February 20 to April 16, 1952, at a cost of $51,-
171.87. Miscellaneous investigations and surveys cost $695.12. The
total costs and expenditures were $51,866.99, charged to maintenance.
   Condition at end of fiscal year.-The existing project, which is for
maintenance, was commenced in 1930, and work has been carried on
intermittently since that time. The controlling depths, ascertained
in April 1952, were 12 feet in the entrance channel and 6 feet in the
channel to Old Pass Lagoon. The costs and expenditures under the
existing project were $146,439.14 for maintenance.
   Proposed operations.-An allotment of $700, for fiscal year 1953,
will be applied to miscellaneous investigations, examinations, and
surveys throughout the fiscal year to determine channel depths and
conditions.
   The additional sum of $26,250 can be profitably expended during
fiscal year 1954 for maintenance dredging in the entrance channel,
about 1 month, with a United States pipeline dredge.
                                            Cost and financial summary

                                                     Fiscal year ending June 30-                           Total to June
                                                                                                           30, 1952, includ-
                                                                                                           ing fiscal years
                                       1948          1949          1950          1951          1952         priorto 1948

Maintenance:
   Appropriated-------.........     $28, 900.00    $1,000.00    $15,000.00     $7, 003.74   $51,866.99         $146, 439.14
                              ---
   Cost---------------........ ..    29, 014. 93    1, 040.32    15, 082. 24    7, 053.85    51, 866. 99        146, 439. 14
   Expenditures--------........      29,004.93      1,092. 32    15, 030.35     7,003.74     51, 866.99         146, 439.14



                                      6. PENSACOLA HARBOR, FLA.

   Location.-This harbor is a landlocked bay on the coast of north-
west Florida, about 50 miles east of the entrance to Mobile Bay.
 (See U. S. Coast and Geodetic Survey Charts Nos. 490 and 1265.)
   Previous projects.-Authorized by the River and Harbor Act ap-
proved June 18, 1878, amended and modified by the acts of August
18, 1894, and March 3, 1899. Work under the existing project was
begun in 1903. For further details see page 1835, annual report
for 1915, and page 714, annual report for 1938.
   Existing project.-This provides for an entrance channel 32 feet
deep at mean low water, 500 feet wide, and about 3.4 miles long
from the Gulf of Mexico to deep water in Pensacola Bay, and an
inner-harbor channel parallel to the pierhead line and not less than
50 feet therefrom, 500 feet wide, 30 feet deep, and about 4,000 feet
long, with approach channels 250 feet wide, 30 feet deep, and about
3,700 feet long at each end of the inner-harbor channel and an ap-
proach channel 250 feet wide, 30 feet deep and about 1.2 miles long
to the pierhead line south of the Muscogee wharf; for a channel 21
feet deep and 100 feet wide from that depth in Pensacola Bay to
the mouth of Bayou Chico thence 20 feet deep and 100 feet wide
in the bayou to a point 4,400 feet upstream from the Escambia County
highway bridge, and for a depth of 20 feet in the existing turning
basin, which is 500 feet square, and for strengthening of bridge piers.
The total length of the Bayou Chico improvement is 1.9 miles. The
mean range of tide throughout the harbor is about 1.1 feet near the
668         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

entrance and about 1.6 feet at the head of the bay. The extreme tidal
range, except during storms, is about 3 feet.
   The estimated cost of new work, approved in 1952, is $669,000.
The latest (1952) approved estimate for annual cost of maintenance
is $55,500.
   The existing project was authorized by the following river and
harbor acts:

    Acts                            Work authorized                                       Documents

June 13, 1902   A channel 30 feet deep at mean low water and 500              Specified in act.
                  feet wide from the Gulf of Mexico to the dock line
                  at the east end of the city of Pensacola, and also
                  provided that $150,000 may be used in constructing
                  or purchasing a seagoing suction dredge.
Aug. 30,19351   Modified the existing project to provide for the pres-        H. Doc. 253, 72d Cong., 1st sess.s
                  ent inner channels and the deepening of the en-
                  trance channel to 32 feet.
Aug. 26,1937    Improvement of Bayou Chico-------...........--------          Rivers and Harbors Committee
                                                                                                     s
                                                                                Doc. 96, 74th Cong., 2d sess.
Mar. 2,1945     Modified improvement of Bayou Chico, Fla.....---------.....   H. Doc. 743, 79th Cong., 2d sess.2

  1 Public Works Administratihn, Sept. 6, 1933.
  2 Contain the latest published maps.

  Local cooperation.-Fully complied with except for work author-
ized in accordance with House Document 743, Seventy-ninth Congress
second session, which provides that local interests furnish, free 0o
cost to the United States, all necessary lands, easements, rights-of-
way, and suitable spoil-disposal areas for new work and subsequent
maintenance when and as required, and hold and save the United
States free from claims for damages that may result from the im-
provement. For the work authorized in accordance with Rivers
apd Harbors Committee Document 96, Seventy-fourth Congress,
second session, local interests are required to furnish, free of cost
to the United States, suitable spoil-disposal areas for subsequent
maintenance. Local interests were notified of the requirements of
local cooperation May 27, 1946.
   Terminal facilities.-The modern rail-connected terminal facilities
at this port are considered adequate for existing commerce. (See
Port Series No. 18, revised in 1949.)
   Operations and results during fiscal year.-The costs for miscel-
laneous investigations and surveys were $2,179.65, charged to mainte-
nance. The expenditures were $2,048.66
  Condition at end of fiscal year.-The existing project, commenced
in 1903, was about 75 percent completed. The controlling depths of
the channels at the times shown were as follows: Entrance channel,
32 feet, May 1952; inner-harbor channels to the Frisco Railroad pier,
Tarragona Street pier, and the Muscogee Street pier, 28.5 feet, June
1951; Bayou Chico inner channel, 11.5 feet, outer channel, 15 feet,
and turning basin, 13.5 feet, February 1952. The work remaining
to be done to complete the project consists of dredging a channel
21 feet deep and 100 feet wide from that depth in Pensacola Bay
to the mouth of Bayou Chico, thence 20 feet deep and 100 feet wide
in the bayou to a point 4,400 feet upstream from the Escambia County
highway bridge, deepening the existing turning basin in the bayou
to 20 feet, and strengthening bridge piers.
                   RIVERS AND HARBORS--MOBILE,                                             ALA.,      DISTRICT                      669

  The costs and expenditures on the existing project to June 30,
1952, were as follows:
                                                                                   Costs
                                                                                                                         Expenditures
                                                        New work             Maintenance                Total

Regular funds--....---------        -----------          $381,161. 21        $1, 251, 227.85       $1, 632, 389. 06        $1, 632, 389. 06
Public Works funds-------------------                      119, 672. 91 .-------             _         119, 672.91             119, 672. 91
      Total-----------          .--------------            500, 834. 12        1, 251, 227.85         1,752, 061.97         1, 752, 061.97


  Proposed operations.--An allotment of $33,000 for fiscal year 1953
will be applied as follows:
Maintenance dredging to restore project dimensions in the entrance
channel to Pensacola Harbor with the U. S. hopper dredge Lyman,
about one-half month during May 1953------------------------ $30, 000
Miscellaneous surveys, investigations, examinations, and contingencies_ 3, 000
         Total            ------------------------------------------------                                                       33, 000
   The additional sum of $3,500 can be profitably expended during the
fiscal year 1954 for miscellaneous surveys, investigations, examina-
tions and contingencies.
                                             Cost and financial summary

                                                          Fiscal year ending June 30-                                    Total to June
                                                                                                                        30,1952, includ
                                                                                                                        ing fiscal years
                                        1948             1949             1950              1951            1952          priorto 1948

New work:
    Appropriated----.......--------------..........---............---......... ...---------------------..... ...------------ $1, 095, 522. 67
    Cost--------------------------------------------------------------------                                                 .1,095, 522 67
    Expenditures---....------------------------------- ------------ ----------                                                1, 095, 522. 67
Maintenance:
    Appropriated-.........          $58, 500.00 -$8, 000. 00          $45, 000.00      $28, 500.00       $2,030. 26         1, 377, 877.51
    Cost--.--------------            55, 586.47     2, 595.41          40,151.80        33,364.04         2, 179. 65        1, 377, 877. 51
    Expenditures--------.........    48, 079. 27    2, 643.43          43, 663. 01      29, 942. 26       2, 048. 66        1, 377; 877. 51


Other new work data: Estimated additional amount needed to be ap-
propriated for completion of existing project------------------  $168, 200

                                           7. MOBILE HARBOR, ALA.

  Location.-This harbor, located along the lower 5 miles of Mobile
River, is in southwestern Alabama, 91 miles by water west of Pensa-
cola Harbor, Fla., 90 miles east of Gulfport Harbor, Miss., and 144
miles by water northeast of the mouth of the Mississippi River. (See
U. S. Coast and Geodetic Survey Chart No. 1266.)
  Previous projects.-The original project for the bar channel was
adopted by the River and Harbor Act of June 13, 1902. The original
project for the bay and river channels was adopted by the River and
Harbor Act of May 20, 1826, and subsequent projects were adopted by
the River and Harbor Acts of July 11, 1870, March 3, 1879, August 11,
1888, March 3, 1899, June 25, 1910, and August 8, 1917. For further
details see page 1840, annual report for 1915, pages 802 and 807, an-

         245554-53-vol. 1                      43
670           REPORT OF CHIEF OF ENGINEERS,                          U.   S. ARMY,          1952

nual report for 1916, page 833, annual report for 1929, and page 718,
annual report for 1938.
   Existing project.-This provides for (a) a 36- by 450-foot channel
about 1.5 miles long across Mobile Bar; (b)a 32- by 300-foot channel
in Mobile Bay to the mouth of Mobile River; (c) a 32-foot channel
in Mobile River to the highway bridge, the widths varying from 500
to 775 feet; (d) a 25-foot channel from the highway bridge to and up
Chickasaw Creek to a point 400 feet south of the mouth of Shell
Bayou, the widths being 500 feet in Mobile River and 250 feet in
Chickasaw Creek; (e) an anchorage area 32 feet deep, 200 feet wide,
and 2,000 feet long opposite the U. S. Quarantine Station on Sand
Island; (f) a turning basin 32 feet deep, 2,500 feet long, and 800 to
1,000 feet wide, opposite the Alabama State docks; (g) a 27- by 150-foot
channel from the mouth of Mobile River to and including a turning
basin 250 feet wide and 800 feet long in Garrows Bend, and continuing
thence to a turning basin 800 feet long and 600 feet wide opposite
Brookley Air Force Base ocean terminal, thence a 27- by 150-foot
channel along Arlington pier to the Mobile Bay channel; and (h)
maintenance by snagging Three Mile Creek from its intersection with
the Industrial Canal to Mobile River. The total length of the bay
and river channels is about 41.7 miles. The plane of reference is
mean low water. Under ordinary conditions the mean tidal range
at the lower end of the improvement is 1.2 feet and at the upper end
1.5 feet; the extreme tidal range is 3.4 feet at the lower end and 3.6
feet at the upper end.
   The project was completed at a cost of $1,200,178.48 for new work,
exclusive of amounts expended on previous projects. The latest
 (1952) approved estimate for annual cost of maintenance is $452,000.
   The existing project was authorized by the following river and
harbor acts:
       Acts                         Work authorized                                   Documents 1

July     3,1930
             Present project dimensions across the bar and to the         Rivers and Harbors Committee
               mouth of Mobile River, thence 32 feet deep and              Doc. 26, 71st Cong., 2dgsess.
               300 feet wide to the highway bridge; and for the
               anchorage basin.
Aug. 26,1937 For improvement of Three Mile Creek by snagging              Rivers    and Harbors       Committee
               from Mobile River to the industrial canal.                  Doc.    69, 74th Cong.,   1st sess.
   Do-.......To provide a 500-foot channel 32 feet deep from a            Rivers    and Harbors       Committee
               point about 5,000 feet south of the mouth of Three          Doc.    44, 75th Cong.,   1st sess.
                    Mile Creek to the highway bridge across Mobile
                    River, subject to the provision that no dredging be
                   performed within 50 feet of any pierhead line.
Oct. 17,1940      To provide a channel 27 feet deep and 125 feet wide     H. Doc. 221, 76th Cong., lstsess.
                    from the Mobile River channel at its mouth
                    through Garrows Bend, to and including a turning
             basin of the same depth, 800 feet long and 250
                                                         :feet
             wide.
           Further modified to provide for extension of the
   Do-.......                                                             H. Doc. 282, 76th Cong., lstsess.
                   channel through Garrows Bend 27 feet deep and
                   125 feet wide, to and including a turning basin of
                   the sameedepth, 800 feet long and 600 feet wide.
May 28,1935       Authorized and adopted the improvement of Chick-        Emergency3Relief Act of 1935.
Aug. 30,1935       asaw Creek by snagging and dredging.                   H. Doc. 47, 73d Cong., 1st sess.
  See footnote at end of table.
                 RIVERS AND            HARBORS--MOBILE,               ALA.,     DISTRICT               671

       Acts                         Work authorized                                 Documents 1

Mar.    2,1945   Adoption of existing channel through Garrows Bend        H. Doc. 282, 76th Cong., 1st sess.,
                  from Choctaw Point to Arlington pier, 27 feet deep      H. Doc., 739, 79th Cong., 2d sess,
                  and 150 feet wide, with 2 turning basins.
                 Adoption of the existing channel alongside Arling-
                  ton pier from the Mobile Bay Channel to turning
                  basin at the inner end of Garrows Bend Channel,
                  27 feet deep and 150 feet wide.
                 An anchorage area 32 feet deep, 200 feet wide and ap-
                  proximately 2,000 feet long on the west side of the
                  Mobile Bay Channel at the quarantine station on
                  Sand Island, by extending the present anchorage
                  southward 500 feet and northward to an intersec-
                  tion with the Mobile River Channel.
                 A channel 700 feet wide in Mobile River from the
                  mouth to the first bend, 775 feet wide through the
                  first bend, 600 feet wide thence to Alabama State
                  docks pier A, south and a turning basin opposite
                  the Alabama State docks about 2,500 feet long, 800
                  feet wide at the lower end and 1,000 feet wide at the
                   upper end, all to a depth of 32 feet.
                 A channel 25 feet deep and generally 500 feet wide in
                  Mobile River from the highway bridge to the
                  mouth of Chickasaw Creek, thence 25 feet deep
                  and 250 feet wide in Chickasaw Creek to a point
                  about 400 feet below Shell Bayou.

1 Contain the latest published maps.


   Local cooperation.-Fully complied with. For the work author-
ized in accordance with House Document No. 47, Seventy-third Con-
gress, first session; Rivers and Harbors Committee Document No. 44,
Seventy-fifth Congress, first session; House Document No. 221,
Seventy-sixth Congress, first session; House Document No. 282,
Seventy-sixth Congress, first session; and House Document No. 739,
Seventy-ninth Congress, second session; local interests are required
to furnish necessary spoil-disposal areas for subsequent maintenance
as required.
   Terminal facilities.-The modern rail-connected terminal facilities
at this port are considered adequate for existing commerce. (See
Port Series No. 18, revised in 1949.)
   Operationsand results during fiscal year.--Maintenance: The U. S.
hopper dredge Gerig removed 345,773 cubic yards (bin measurement)
of material in the Mobile Outer Bar channel May 16 to 29, 1952,
at a cost of $51,922. The contractor's pipeline dredge Diesel removed
3,958,663 cubic yards of material in the Mobile Bay channel July 2 to
15, 1951, and May 16 to June 30, 1952, at a cost of $223,930. The
U. S. snagboat J. M. Pratt working intermittently from July 1 to
November 30, 1951, and April 1 to June 30, 1952, removed 2,717
snags in the Mobile River channel at a cost of $36,275, 605 snags in
Chickasaw Creek at a cost of $9,355, and 490 snags in Three Mile
Creek at a cost of $6,675. Miscellaneous investigations and surveys
cost $22,480.
   The cost for the fiscal year was $350,636.98, charged to maintenance.
The expenditures were $250,150.48.
   Condition at end of fiscal year.-The existing project, commenced
in 1931, was completed in July 1949. The latest examinations show
672                REPORT                    OF   CHIEF        OF ENGINEERS,                         U.       S.    ARMY,             1952


minimum depths, at mean low water, available to navigation as
follows:

                                                                                                                            Minimum depth

    Date                                           Section                                      Project
                                                                                                 depth         Left    Left    Right Right
                                                                                                              outside inside  inside outside
                                                                                                              quarter quarter quarter quarter

                                                                                                     Feet          Feet      Feet       Feet        Feet
June 1952    Bar Channel...............................--------------------------------                  36        36. 0      36. 0      36. 0       32. 5
             Bay Channel:
Jan. 1952       South end to Beacon 24___                 ---------------------                          32        27. 5      31.0       31.0         30. 5
    Do--__      Beacon 24 to Beacon 38 .......------------                            --------           32        29. 5      32. 0      32. 0        32. 0
    Do ---      Beacon 38 to mouth of river_------------------                                           32        32. 0      32. 0      32. 0        32. 0
             River Channel:
    Do--..      Mouth to first bend_ ------------------------                                            32        29. 5      32. 0      32. 0        28. 5
    Do-_-_      Through first bend .                                                                     32
                                                                    ..............------------------------.        31. 0      32. 0      32. 0        29. 5
    Do----       Second bend to turning basin .----------------.. 32                                               30. 0      32. 0      32. 0        29. 0
June 1952 Turning basin-------------------------------...................................                32        29. 0      29. 5      28. 5        25. 5
    Do ..-- Turning basin to highway bridge_.__---                                    ---              -_32        29. 5      26. 5      23. 5        20. 0
             Chickasaw Creek:
Jan. 1952        Highway bridge to mouth of creek-..-- _-...-.                                           25         25. 0     25    0    17. 5        16. 5
    Do. ..       Mouth to 400 feet south of Shell Bayou_.....                                            25         23. 0     24.   0    24. 0        22. 5
    Do -_. Arlington Channel .                    ....................----------------------------       27         17. 0     18.   0    18. 0        18. 5
    Do- _    Garrows Bend Channel _------------------------                                              27         22. 5     23.   5    23. 5        21. 5
    Do-_   _ Garrows  Bend     Turning          Basin         ..............-------------------.         27         25. 5     22.   0    22. 5        22. 5
    Do -.    Quarantine Station Basin........----------------------                                      32         24. 0     28.   0    28. 0        32. 0



   A channel 27 feet deep and 150 feet wide alongside of Arlington
Pier from Mobile Bay Channel to the turning basin at the inner end
of Garrows Bend Channel was completed in April 1942. This chan-
nel, constructed with military funds for the Brookley Air Force Base,
was included in the project for Mobile Harbor, Ala., by the River and
Harbor Act approved March 2, 1945 (H. Doc. 282, 76th Cong., 1st
sess., and H. Doec. 739, 79th Cong., 2d sess.).
   The costs and expenditures on the existing project to June 30, 1952,
were as follows:

                                                                                              Costs
                                                                                                                                        Expenditures
                                                                 New work                Maintenance                    Total


Regular funds..............--------- ------------.....         $1, 144, 936.84          $5, 965, 717. 50           $7, 110, 654. 34      $6, 985, 879. 71
Public Works funds-------------------........                       14,000.00         ------------                 -    14, 000. 00           14, 000. 00
Emergency Relief funds_---- ----------                              41, 241.64      ----------------                    41, 241. 64           41, 241. 64

          Total...........................
                       ----------                                 1, 200, 178. 48          5, 965, 717. 50           7, 165, 895. 98         7, 041, 121. 35



   Proposed operations.--Thebalance unexpended June 30, 1952, $129,-
147.56, plus an allotment of $373,000, a total of $502,147.56, will be
applied as follows:
                     RIVERS AND HARBORS-MOBILE,                                       ALA.,      DISTRICT                    673
Accounts payable June 30, 1952----------------------------            $124, 774. 63
Maintenance:
    Complete dredging, by contract, to restore project
      dimensions in lower Mobile Bay Channel. Work
      commenced May 16, 1952; to be completed about
      July 1952         ------------------------------- $41, 468. 00
    Dredging, by contract, to restore project dimensions
      in upper Mobile Bay Channel, about 2 months,
      February and March 1953 _________--------30,904. 93
    Dredging, by contract, to restore project dimen-
      sions in the Mobile River Channels, about 3
      months, between November 1952 and January
      1953 -----------------------------------           252, 000. 00
    Snagging in Mobile River, Chickasaw Creek, and
      Three Mile Creek, with U. S. Derrick boat J. M.
      Pratt, about 5 months, during the fiscal year.._.   30, 000. 00
    Miscellaneous examinations, surveys, inspections,
       and contingenies-- ------               ------.-   23, 000, 00
                                                                       377, 372. 93

                   Total for all work                                  ___--------------------           -         5__ 147. 56
                                                                                                                   502,
  The additional sum of $508,000 can be profitably expended during
the fiscal year 1954 for:
Maintenance dredging, by contract, to restore project dimensions in
  the Mobile Bay and River channels________                         _________________ $420, 000
Snagging, with Government plant and hired labor in Mobile River,
  Three Mile Creek, and Chickasaw Creek ____-___ _-----___-_           --               60, 000
Miscellaneous investigations, surveys, examinations, permits, contin-
  gencies, etc--       --------------------------------------------                     28, 000
            Total ----------------------------------------------                                                        508, 000

                                                Cost and financial summary

                                                          Fiscal year ending June 30--                             Total to June
                                                                                                                   30, 1952, includ-
                                                                                                                   ing fiscal years
                                           1948            1949          1950           1951          1952          prior to 1948

New work:
   Appropriated------......------------............    --------........ . -$28,987.88------------     ---- _--__      $7, 883, 283.16
      Cost........--------------.. $237, 873. 99       $51, 853. 39 j64, 851. 41 -------------                         7,883, 283. 16
      Expenditures-------........       350, 636. 92   -59, 354. 18   111, 940. 09 -----------------------             7, 883, 283. 16
Maintenance:
      Appropriated- .....           _   518, 300. 95   438, 500. 00   549, 250. 00 $216, 030. 92 $306, 050. 00       10, 066, 771. 54
      Cost----__ ---                    527, 530. 48   404, 179. 39   493, 022. 31 257, 944. 84 350, 636. 98         10, 062, 398. 61
      Expenditures--------...     ..    526, 492. 49   378, 275. 41   427, 778. 12 325, 167. 14 250, 150. 48          9, 937, 623. 98



            8. REMOVING THE WATER HYACINTH, MOBILE DISTRICT

  Location.-Streams tributary to the Gulf coast in the Mobile
district.
  Existing project.-This provides for the extermination or removal
of plants from the navigable waters of Florida, Alabama, Mississippi,
Louisiana, and Texas, so far as they are or may become an obstruction
to commerce, by any mechanical, chemical, or other means whatsoever;
for the construction and operation of boats equipped with suitable
machinery for such removal; and for the construction and operation
of log booms to prevent the drifting of plants from one stream to
another.
674           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

  The estimate of cost, made in 1899, was $25,000 each for two boats,
$10,000 for operation in each district, and $1,000 for the establish-
ment of booms. The latest (1952) approved estimate for annual cost
of maintenance is $30,000.
  The existing project was authorized by the following river and
harbor acts:

       Acts                           Work authorized                                      Documents

Mar.     3,1899   Appropriations made for the States of Florida and             H. Doc. 91, 55th Cong., 3d sess.
                   Louisiana and provided for the extermination or
                   removal of plants, the building of boats, and the
                   establishment of booms.
June 13,1902      Use of any mechanical, chemical, or other means
                   whatsoever.
Mar. 3,1905 Appropriation made available for the State of Texas_-
    Do-...... Appropriations made for Florida, provided that no
Mar. 2,1907 J chemical process injurious to cattle shall be used.
July 25,1912 Appropriation made available for the State of Missis-
               sippi, and also made available for use in that State
               the operating plant pertaining to the work in
                    Louisiana.
July 27,1916      Appropriation made available for the State of Ala-
                   bama.



   Local cooperation.-Nonerequired.
   Operations and results during fiscal year.-United States plant
operating in Three Mile Creek, Bayou Sara, Tensaw River, Catfish
Bayou, and various other small waterways tributary to Mobile Har-
bor, Ala., and Pearl River, La., sprayed 219 acres of hyacinth between
July 1 and September 14, 1951, at a cost of $5,422.71. Miscellaneous
investigations cost $155.06. The total cost was $5,577.77 for main-
tenance. The expenditures were $5,048.80.
   Condition at end of fiscal year.-The existing project, which is for
maintenance, was commenced about 1899, and work has been carried
on as required since that time. The total costs and expenditures were
$432,343.19.
   Proposed operations.-An allotment of $10,000 for fiscal year 1953
will be applied to the operation of one United States hyacinth con-
veyor, two spray barges, and one sawboat removing hyacinths and
other aquatic growths in the navigable waterways of the Mobile, Ala.,
district during the fiscal year.
   The additional sum of $20,000 can be profitably expended during
fiscal year 1954 for maintenance operations of one United States
hyacinth conveyor, two spray barges, and one sawboat on the removal
of hyacinths and other aquatic growths in the navigable waterways
of the Mobile, Ala., district.
                                       (ost and financial summary

                                                  Fiscal year ending June 30-

                                                 1949         1950         1951

Maintenance:
   Appropriated......... $40, 000.00          $23,500.00
   Cost..---------............... 31,070.63    29, 523.55
   Expenditures ......... 31, 730.78           28,468.24
           RIVERS   AND   HARBORS-MOBILE,     ALA.,   DISTRICT       675
              9. ALABAMA-COOSA     RIVERS, ALA. AND GA.

    Location.-The Alabama River is formed 18 miles above Mont-
gomery, Ala., by the junction of the Coosa and Tallapoosa Rivers.
Thence it flows southwesterly through Alabama 318 miles, and unites
with the Tombigbee River about 45 miles north of Mobile, in south-
western Alabama, to form the Mobile River. (See U. S. Geological
Survey maps for central and southwest Alabama.)
    The Coosa River is formed at Rome, Ga., in northwest Georgia,
by the junction of the Oostanaula and Etowah Rivers, which have
their sources in northern Georgia. From Rome the Coosa River flows
southwesterly through Georgia and Alabama 286 miles and unites
with the Tallapoosa River near Montgomery, Ala., at about the center
of the State, to form the Alabama River. (See U. S. Geological
Survey maps for northeast Alabama and northwest Georgia.)
    Previous projects.-Previous projects for Alabama River were
adopted by the River and Harbor Acts of June 18, 1878, July 13, 1892,
March 3, 1905, and June 25, 1910. For further details see page 1837,
annual report for 1915, page 725, annual report for 1938, and para-
graph "Existing project," page 592, annual report for 1944.
    Previous projects for the Coosa River were adopted by the River
and Harbor Acts of August 14, 1876, September 18, 1890, July 13, 1892,
June 25, 1910, and June 26, 1934. For further details of previous
projects see page 1837, annual report for 1915, page 728, annual report
for 1938, and paragraph "Existing project," page 594, annual report
for 1944.
   Existing project.-This provides for the initial and ultimate devel-
opment of the Alabama-Coosa Rivers and tributaries for navigation,
flood control, power, and other purposes, substantially in accordance
with plans being prepared by the Chief of Engineers with such modi-
fications thereof from time to time as in the discretion of the Secretary
of War and the Chief of Engineers may be advisable for the purpose
of increasing the development of hydroelectric power; for the initia-
tion and accomplishment of the ultimate plan, it authorizes appropri-
ations in such amounts as Congress may from time to time determine
to be advisable, the total of such appropriations not to exceed $60,000,-
000.
   The initial phase of the ultimate development provides for the con-
struction of Howell Mill Shoals, Jones Bluff, and Millers Ferry multi-
ple-purpose improvements, Claiborne lock and dam, and supplemental
channel work to provide a channel depth of 9 feet for navigation from
the mouth of the Alabama River to Montgomery, Ala. The variation
between average high and low water is 40.4 feet. The extreme varia-
tion is 58 feet, at Montgomery.
676           REPORT OF CHIEF OF ENGINEERS,                                                 U.        S. ARMY, 1952

  The following table gives various features of the proposed locks
and dams and multiple-purpose developments included in the existing
project:
                                                    Proposed structures

                                                          Claiborne            Millers Ferry             Jones Bluff             Howell Mill
                                                        lock and dam          lock and dam             lock and dam              Shoals dam

Miles above mouth_-----------__----                     186--------           1145   --------...       1250       ...--------    106.
Nearest town---------___-_-_---_-- Claiborne,Ala_ Camden,Ala_..                                        Benton, Ala_             Easonville, Alas
Distance (miles)....------------------- 7-----------                         7----------7    ----       ----------.....         1, 5.
Greatest lock length available for full 450 .----------                      450------------           450---...
width (feet).
Width of lock chamber (feet)---------- 82---------                              .....------- 82---------
                                                                              82---
Lift (feet)-..----------------------------...           20-----------         50------------           45 -----
Elevation of normal pool surface(msl)__ 30 -------------                      80_ _------.             125___----------- 505.
Depth over sills at low water (feet) ----- 12 __-______...                    12 ---------             12_____-____
Character of foundation-------- ------               --
                                           Rock .- ____                       Rock__ --.                    .........
                                                                                                       Rock--------      Rock.
Kind of dam.------...- ------__________ Fixed .....--                         Fixed ..--               Fixed........ Fixed.
Height of dam (feet)----------------..     50------------                     85------------           91------------ 132.
Type construction-...-------------                      Concrete     -----    Concrete-----            Concrete-----......      Concrete.
Reservoir capacity (acre feet)          __--------------------370,                 000--------.....    250, 000.......          2,245, 200.
Power development (KW)------------____________                                57,000 -------    51,000-------
                                                                                                       ........                 200,000.
Percent com plete   -....-----   -----------                                 --------------  ..................
Year opened to navigation---------..
Estimated cost --------------------..   .               $15, 359, 800 ...---- $44, 337, 100 .-.        $43, 430, 200 -...       $105,451, 500.

  1 Above mouth of Alabama River.
  2 Above mouth of Coosa River.
  * Power pool.


   The estimated cost for new work, revised in 1952, is $210,248,600,
exclusive of amount expended on previous projects. The latest (1952)
approved estimate for annual cost of maintenance is $1,082,000, in-
cluding $871,000 for operating and care.
   The existing project was adopted by the River and Harbor Act of
March 2, 1945 (H. Doc. 414, 77th Cong., 1st sess.). The latest pub-
lished map of Alabama River will be found in annual report, 1912,
page 2124. Drawings of the Alabama-Coosa Rivers and tributaries
are contained in House Document No. 66, Seventy-fourth Congress,
first session.
   The latest published maps of the Coosa River will be found in an-
nual report, 1890, page 1644, for that portion of the river from lock
No. 4 to Greensport; annual report, 1891, page 1752, for that portion
between Wetumpka and lock No. 4; and annual report, 1913, page
2125, for the upper Coosa.
   Local cooperation.--None required.
   Term nal facilities.-On the east bank at Montgomery, a natural
landing connects with the city streets. The Wofford Oil Co. has a
small wharf about 10 miles below Montgomery equipped for handling
petroleum products. There are also various natural landings along
the river. These facilities and natural landings on the Alabama River
are considered adequate for the existing commerce.
   At Rome, Ga., there is one small wharf on the left bank of Oosta-
naula River, and a private wharf on the left bank of Etowah River,
            RIVERS        AND HARBORS-MOBILE,                  ALA.,   DISTRICT          677

used exclusively by the owners. These facilities and natural landings
on the Coosa River are considered adequate for the existing commerce.
   Operations and results during fiscal year.-New work: Work on
engineering studies and advance planning was continued at a cost of
$243,812.90. The expenditures were $245,126.99.
   Condition at end of fiscal year.-No construction has been performed
on the existing project. The controlling depths on the Alabama River,
ascertained in 1938, were as follows: Mouth to Selma, 4 feet; Selma
to Montgomery, 3.5 feet; Montgomery to Wetumpka, 3 feet. Boats
drawing 3 feet or less can usually operate throughout the year; greater
depths are usually available from November to June each year. Zero
readings on the gages at Selma and Millers Ferry, Ala., indicate that
a depth of 4 feet is available at these locations. A zero reading on
the gage at Montgomery, Ala., indicates that a depth of 31/2 feet is
available. On the Coosa River the controlling depth was 21/2 feet on
several of the bars; from Gadsden, Ala., to Woods Ferry, 37 miles,
the controlling depth was 3 feet, certain shoals being the controlling
points. From Woods Ferry to Lock No. 4, 9 miles, the controlling
depth was 4 feet. These depths are available throughout the year;
increased depths ordinarily exist between January and June, inclusive.
Since all existing locks on this river are inoperative, through naviga-
tion is impossible.
   The cost under the existing project was $1,590,779.84, of which
$1,504,658.65 was for new work, $66,858.27 for maintenance, and
$19,262.92 for operating and care. The expenditures w e r e
$1,589,284.93.
   Proposed operations.-The balance unexpended June 30, 1952,
$22,436.26 and accounts receivable of $100,000 plus allotments of
$100,000, a total of $222,436.26, will be applied as follows:
Accounts payable June 30, 1952---- ------------------------                        $1, 494. 91
New work:
    Howell Mill Shoals Dam:
        Engineering and design, plans, specifications etc----------               220, 941. 35

           Total -------------------------------------------                      222, 436. 26
   The additional sum of $7,000,000 can be profitably expended during
fiscal year 1954 for:
New work:
   Howell Mill Shoals Dam:
       Engineering and design, plans and specifications----------           $835, 000
       Stage 1 cofferdam--------------------------                        -  705, 000
      Land acquisition and damages----------------------------               300, 000
      Relocations ---------------------                                      215, 000
      Turbines and governors--             -----------------------------     100, 000
      Generators---------------                    --- ------------------    100, 000
      Construction of embankment and saddle dikes and concrete
          abutment-left bank-----            ------------------- ------- 4, 745, 000

           Total---------------..---------------------------7,000, 000
678         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952
                                        Cost and flnancial summary
                                                   Fiscal year ending June 30-                               Total to June
                                                                                                            30, 1952, includ-
                                                                                                            ing fiscal years
                                   1948           1949            1950            1951          1952          prior to 1948


New work:
   Appropriated_--..              - $250, 000. 00 $290, 000. 00 $165, 000. 00 $185, 000. 00 $175, 600. 00     $5, 318, 083. 09
   Cost............--------------..... 217, 689.52 301, 077. 90 208, 349. 11 193, 960.47 243, 812 90           5, 197. 141. 74
   Expenditures-......... 207,936. 90 318, 256. 80 200, 985.84 191, 050.44 245, 126i 99                        5,195, 646. 83
Maintenance:
   Appropriated-------.......     7, 500. 00     9, 000. 00    22,188. 03         -51.43   ...--------         3, 064,170. 83
                  ---
   Cost--....-----.........       3, 643. 12    11, 682. 22    23, 776. 52 ....                                3, 064,170. 83
   Expenditures---------          2, 824. 10    12, 522. 73    23, 766. 71 ..            ------------          3,064,170. 83


Other new work data:
   Unobligated balance, June 30, 1952 ___        _____________,__      $119, 481.85
   Appropriated for fiscal year ending June 30, 1953_____----           100, 000. 00
    Unobligated balance available for fiscal year 1953    ---           219, 481. 85
    Estimated additional amount needed to be appropriated for com-
      pletion of existing project ---    __    -     -      -____ ____-208, 523, 000
   10. BLACK WARRIOR, WARRIOR, AND TOMBIGBEE RIVERS, ALA.
   Location.-The Black Warriorand Warrior Rivers, a single stream,
rise in northern. Alabama above Birmingham and flow generally
southwesterly to unite with the Tombigbee River at Demopolis, Ala.
Thence, the Tombigbee flows south, uniting with the Alabama River
to form the Mobile River 45 miles above the head of Mobile Bay.
The distance by water from Mobile to the vicinity of Birmingham
is about 415 miles.
   Previous projects.--The original project for the improvement of
Warrior River, now combined with the Black Warrior and Tombig-
bee Rivers, was adopted by act of March 3, 1875. For further details
see page 1841, annual report for 1915, and page 732, annual report
for 1938.
   Existing project.--This provides essentially for a canalized channel
with minimum depth of 9 feet and a width of 200 feet, where prac-
ticable, from the mouth of the Tombigbee River, 45 miles above
Mobile, to the vicinity of Birmingham, via the Tombigbee and War-
rior Rivers, to mile 447.6 on Sipsey Fork, mile 444.6 on Mulberry
Fork, and mile 420.6 on Locust Fork, a total distance of 426.6 miles.
The lift is accomplished by 15 locks and dams, one of the locks being
a double-lift structure.
   The project also provides for construction of a new lock and dam
near Demopolis, Ala., to replace existing dams 4, 5, 6, and 7, and for
increasing the length of the spillway at dam 1. The River and Harbor
Act of March 3, 1909, granted discretionary authority to the Sec-
retary of War to reconstruct any existing structure whenever recon-
struction is absolutely essential to its efficient and economical main-
tenance and operation. The reconstruction may include such modifi-
cation in plan and location as may be necessary to provide adequate
facilities for existing navigation. Under this authority existing locks
8 and 9 will be replaced by a single lock at mile 266.3, near Eutaw,
Ala., and, during the subsequent phase, locks 1, 2, and 3 on the lower
Tombigbee River will be replaced. The project also provides for
operation and care of all locks and dams.
   The following table gives various features of the existing locks
and dams included in the existing project:
                                                                                                   Existing locks and dams

                                                                      Great-                                                                                     Type of construction
                        Dis                                             est     Width                  Depth
                                                             Dis-     e          of                      over                                                                                         Date of                      Actual cost
                       above
                       Lok          Nearest town                      avail-                   Lift    sills at       Characterof             Kindof                                                              Dateopened          l c
                                                                                              (Lokchain-
                                                                                              (feet)      low         foundation               dam                                                    conpl      to navigation     of lock and
                        bile 1                              (miles)   forfull                           water                                                   Lock                Dam
                       (miles)                                        width     (feet)                   (feet)
                                                                       (feet)

1----------            101. 6     Salitpa, Ala-------            5     281. 9    52               12     s 8.0     Soft Rock-......            Fixed.         Concrete            Concrete                1909   Sept. 6,1908        $560, 290.02
2---------........     172. 6     Pennington, Ala_.              3     286. 0    52                9     10. 0     Hard clay-....            --.. do-....--    do-.......         Timber crib,            1915   Nov. 1, 1914         560, 114. 09
                                                                                                                                                                                      stone-filled.
3.....---------..      194. 6     Whitfield, Ala.-..         9         286. 0    52               10       9.0         -. do------..........--       do      ... do............do......1915                       Sept. 21, 1914      609, 622. 80
4-------               221.6      Demopolis, Ala. .          1         285. 6    52               10       9.0     ...    do-----........--... do ...            do....... ..... do--........             1908    Dec. 1, 1908        479, 000. 00
5----------            236.6      Greensboro, Al            17         285. 6    52               10       9.0    -       do-----                    do ....     do--........do.........                  1908    Sept. 1,1908        501, 000. 00
6-.---------           257.1      Sawyerville, Ala           6         285. 6    52               10       9.0       Piles......----           .. do ... do.......---             ... do.........         1908    Oct.   1,1908       443, 000. 00
7-__---------          272.6      Eutaw, Ala_                6         284. 7    52               10       9.0    ___do                    __
                                                                                                                                           --       do ...       do---------.........do.......            1903    Nov. 7,1903         225, 600. 00
8_--_--------          288. 6     Akron, Ala........         3         284. 7    51. 65           10       9.0       _-. do____---- ----- do ...- . do------ --.... do-........                           1903    Jan. 1, 1903        212, 400. 00
9__--------            305.6      Moundville, Ala.__         7         284.7     52               11       9.0      .... do _____-.do                    ...     do-.....-......do-........1902                  --.. do ..      .    202,440.00
Tucaloosa__            351. 35    Tuscaloosa, Ala___....-___...        460. 0    95               30      10. 8      Hard blue shale_ .__do-...                  do... ...        Concrete___   .... __ 1940      Aug. 29,1939     4, 450, 873. 50
     ......---...
13----                    . 6
                        60-----   Peterson, Ala.....         3         285. 5    52               11      10.7       Hard sandstone_ __do-__ Stone..... Stone....--__                                     1905    July 4, 1905        203, 700. 00
14 ........---------   364. 1     Peterson, Ala......        7         282. 1    52               14       9. 5           do_---------            _--do_       Concrete__ Concrete -- __.                 1910    Mar. 29,1910        414, 714. 89
15 ---------.....      370.6      Northport, Ala..._        20         282.1     52               14      10.0     ---- do--------              -- do__-d.... do-------               .do ...        ..    910    May 2,1910         430,233.87
16 ---------           377.1      Adger, Ala __....         21         285.5     52               21       9. 5         .do---- ---.........---..do ....         do----- --..... do __ ....               1915    Jan.   1,1915       520,853.68
17  -----.......---.   378. 6     Adger, Ala .......        20         285. 5    52               72       9. 5    _... do--...--------- do                  ... do---
                                                                                                                                                                    __        ..         do .-.         . 1915    May 13,1915 4 3, 424, 858. 98
   Total lift__------------------------------------------                                 -      254

       1 Mileage from foot of Government St., Mobile, Ala.
       2 River is tidal below this lock, and depth over the lower miter sill is 9 feet about 91 percent of the time, the minimum depth being 6.9 feet at extreme low tide.
       8 Double lock.
       4 Does not include $1,435,635.76 estimated cost of land submerged, damage to structures, and cost of clearing.
680           REPORT OF        CHIEF OF ENGINEERS,                  U.    S.   ARMY,       1952


   Tidal influence extends from Mobile 101.6 miles to lock 1, where
the tidal effect is apparent only at low stages of river. At Mobile
the mean and extreme tidal ranges are 1.5 and 3.6 feet, respectively.
These are at times slightly increased by the effect of winds. The
greatest fluctuation of river stages is at Demopolis, Ala., the maxi-
mum being 59.7 feet. The maximum fluctuations at other points are
40 feet at lock 1, 101.6 miles from Mobile; 57.8 feet at Tuscaloosa,
Ala., 352.6 miles from Mobile; 13 feet at Birmingport, 409.6 miles
from Mobile; and 27 feet at Cordova, 429.6 miles from Mobile. The
ordinary fluctuations at these points are at lock 1, 20 feet; at Demop-
olis, 35 feet; at Tuscaloosa, 40 feet; at Birmingport, 4 feet; and at
Cordova, 7 feet. The works of improvement have reduced the
amount of fluctuations at different points by 3 to 10 feet.
   The estimated cost of new work, approved in 1952 is $56,293,400.
The latest (1952) approved estimate for annual cost of maintenance
is $750,000, including $350,000 for operating and care.
   The existing project was authorized by the following river and
harbor acts:

       Acts                       Work authorized                                    Documents


July     5,1884Original appropriation for improving Black Warrior
                  River.
               Original project for slack-water improvement au-          Annual report, 1887, pt. 2, p. 1302.
                 thorized by Secretary of War Apr. 19, 1887.
Mar. 3,1899 Construction of the first locks between Tuscaloosa
                 and Demopolis.
Sept. 19, 1890 Maintenance of the section of Tombigbee River be-


    Do-----..
                 low lock 1 to its mouth (66 miles) included in the
                 existing project.
               Construction of locks and dams 1, 2, and 3. Merging
                 of the individual projects for the Black Warrior
                                                                         IH. Doc. 178, 56th Cong., 2d sess.,
                                                                          and Annual Report, 1901, pt. 3.
                                                                           p. 1858.
                 and Warrior Rivers and the Tombigbee River be-          H. Doc. 165, 57th Cong., 1st sess.,
                 low Demopolis.                                            and Annual Report, 1902, p. 1293.
Mar. 2,1907 Construction of locks and dams, 14, 15, 16, and 17_..---
Mar. 3,1909 Provides for reconstruction of obsolete structures,          Public Law No. 317.
                 modified in plan and location, to provide efficient
                 and economical maintenance and operation.
Aug. 22,1911   Lift of lock 17 changed to 63 feet, and construction of   H. Doc. 72, 62d Cong., 1st sess.
                 locks and dams 18 and 19 eliminated from the proj-
                 ect. Extension of slack-water improvement to
                 Sanders Ferry on Mulberry Fork and Nichols
                  Shoal on Locust Fork.
Mar. 2,1919 Raising of various dams 2 feet and raising the lock          Annual Report, 1918, p.876.
                 walls 2 feet at lock 1 to provide a minimum depth
                 of 8 feet at low water, widening the channel to 150
                 feet where practicable.
Aug. 30,1935   For snagging Mobile River from the mouth of Chick-        H. Doc. 728, 71st Cong., 3d sess.
                 asaw Creek to the junction of the Alabama and
                 Tombigbee Rivers.
    Do ...... Extension of the project to its present limits and         H. Doec. 56, 73d Cong., 1st sess.'
                 channel dimensions.
    Do .... Construction of a lock and dam below Tuscaloosa to           Rivers and Harbors Committee
                 replace original locks and dams 10, 11, and 12.           Doec. 26, 74th Cong., 1st sess.
June 26, 19342 Operation and care of locks and dams provided for
                 with funds from War Department appropriations
                 for rivers and harbors.
Mar. 2,1945 Construction of a lock and dam near Demopolis to             H. Doe. 276, 76th Cong., 1st sess.3
                replace existing dams 4, 5, 6, and 7.
    Do....... Provide increased spillway capacity at dam 1.....-..       H. Doc. 382, 77th Cong., 1st sess.


  1 Contains latest published maps of the Tombigbee River and tributaries.
2 Permanent Appropriation Repeal Act.
  = Contains maps of the Warrior River system. For maps of the Warrior and Black Warrior Ri ers, see
annual reports for 1911, p. 1702 and 1918, p. 2144, respectively.


   Local cooperation.-Fullycomplied with.
   Terminal facilities.-Facilitiescomprising loading and transfer sta-
tions, wharves, etc., have been provided where required along this
           RIVERS   AND HARBORS--MOBILE,        ALA.,   DISTRICT      681
waterway. All are privately owned and operated except the terminals
at Tuscaloosa, which are leased to a private company but serve the
general public, and the terminals at miles 357.6 and 409.6 which are
owned and operated by the Inland Waterways Corp., but also serve the
general public. These terminals are considered adequate for the
existing commerce.
    Operations and results during fiscal year.-New work: Demopolis
lock and dam: Design and preparation of contract plans and specifica-
tions continued at a cost of $72,324. Land acquisition and damages
cost $12,641; overburden excavation cost $11,428; well on lock mound
cost $868; construction of lock, dam, and appurtenances cost $2,279,-
725; purchase of tools and equipment cost $6,594. The total cost for
the fiscal year for new work was $2,345,720.78, including a credit of
 $37,849; charge transferred to operating and care.
    Maintenance: The U. S. pipeline dredge Wm. L. Guthrie operating
in the Warrior and Tombigbee Rivers July 1 to October 31, 1951, and
April 10 to June 30, 1952, removed 1,979,299 cubic yards of material at
a cost of $243,431. The U. S. pipeline dredge Blackwater removed
484,943 cubic yards of material from the Tombigbee River July 1 to
24, 1951, and April 26 to June 19, 1952, at a cost of $97,900. The U. S.
snagboat Denison operating in the Warrior and Tombigbee Rivers
July 1 to December 18, 1951, and March 1 to June 30, 1952, removed
9,773 obstructions and 2,720 cubic yards of rock at a cost of $86,525.
The U. S. snagboat Montgomery removed 12,110 cubic yards of ma-
terial, 4,853 obstructions, and 50 cords of drift from the Warrior and
Tombigbee Rivers July 1, 1951, to April 10, 1952, and May 1 to June
30, 1952, at a cost of $105,739. Spraying grass and banks at edge of
water at dam 17 to eliminate mosquito breeding cost $24,756. Miscel-
laneous investigations and surveys throughout the year cost $3,867.
The total cost for maintenance was $562,218.33.
    Operating and care: Government plant and hired labor: Operated
and maintained all locks and dams, telephone lines, 141 miles, and
other equipment and plant; continued work on electrification of miter
gates. Plans and definite project report on the modernization of the
waterway were continued. The cost for hired labor operations was
$699,919.
    Contract: Completed rehabilitation of electric system at lock 17 at
a cost of $12,760.
    The total cost for operating and care for the fiscal year was
$712,678.63.
    The total cost for the fiscal year was $3,620,617.74, of which $2,345,-
720.78 was for hew work, $562,218.33 for maintenance, and $712,678.63
for operating and care. The expenditures were $3,247,363.02.
    Conditionat end of fiscal year.-The existing project was commenced
in 1887. Eighteen locks and dams comprising 70 percent of the orig-
inal project have been built. Three of these (10, 11, and 12) have been
removed and replaced by the Tuscaloosa lock and dam. (See table
under "Existing project.") The channel has been dredged, original
snagging completed, and principal lock houses built at all locks. A
dredged channel through Sunflower Bend cutoff on the Tombigbee
River was completed in 1938. Construction of crest gates on dam 17,
682          REPORT OF CHIEF OF ENGINEERS, U.                                      S. ARMY,        1952

Black Warrior River, was completed in 1938. Construction of Tusca-
loosa lock and dam was completed in 1940. A depth of 9 feet and a
minimum width of 100 feet obtained throughout the improvement, and
all-year navigation is possible within those dimensions, except at lock 1
where the depth over the lower miter sill is 9 feet about 91 percent of
the time with a minimum depth of 6.9 feet at extreme low tide. The
work remaining to be done to complete the project consists of com-
pleting construction of a new lock and dam near Demopolis, Ala., to
replace existing dams 4, 5, 6, and 7; providing increased spillway width
at dam 1; and constructing a new lock and dam near Eutaw, Ala., to
replace existing locks 8 and 9.
   The costs for the existing project to June 30, 1952, were as follows:

                                                                               Costs

                                              New work           Maintenance           Operating
                                                                                       and care            Total

Regular funds __---_---------.---            $19, 419, 436. 62       $6, 416,825. 94 $14, 812,817.06   $40, 649. 079.62
Public Works funds ..----------------.             79, 219.93 .--------------------------                    79, 219.93
Emergency Relief funds-------.....       _      - 607, 307. 56 --.-----     ................                607, 307. 56

      Total-.......---------------------- 20, 105, 964.11         6, 416, 825.94     14, 812, 817.06    41, 335.607. 11



  The total expenditures to June 30, 1952, were $32,002,428.87, of
which $31,315,901.38 were regular funds, $79,219.93 Public Works
funds, and $607,307.56 Emergency Relief funds.
  In addition, the sum of $8,932,686.64 was expended between July
1, 1896, and June 30, 1935, on the operation and care of works of
improvement under the provision of the permanent indefinite appro-
priation for such purposes.
  Proposed operations.--The balance unexpended June 30, 1952,
$3,141,976.17, and accounts receivable, $1,008,200.62, plus allotments
for fiscal year 1953 of $4,547,000 for new work, $395,500 for mainte-
nance, and $525,000 for operating and care, a total of $9,617,676.79, will
be applied as follows:
Accounts payable June 30, 1952------------- --------                                                  $414, 963. 45
New work:
     Demopolis lock and dam:
         Engineering and design---------------       $37, 658. 00
         Well on lock mound-------------------         7, 209. 00
         Overburden excavation------------------46, 302. 00
         Lock, dam, and appurtenances--------     6, 381, 615.08
         Reservoir clearing----------------          400, 000. 00
         Shops and yard------------------------      200, 000. 00
         Land acquisition and relocations-------- 1,062, 698. 00

              Total --------------------------------------   8, 135, 482. 08
        Warrior lock and dam:
           Engineering and design---------------------------     75, 000. 00
           RIVERS AND HARBORS--MOBILE, ALA.,                DISTRICT            683
Maintenance:
   Dredging in river channel between mile 45 and
      head of navigation with U. S. pipeline dredge
      Winm. L. Guthrie and U. S. snagboats Mont-
      gomery and Denison, as necessary---------_ $276, 529. 92
    Snagging in river channel between Chickasaw
      Creek and head of navigation with U. S.
      snagboats Montgomery and Denison, as
      necessary-_--------------------- -------- 90, 000. 00
   Hired labor spraying grass and banks at edge of
      Bankhead Lake and Dam No. 17 pool to elimi-
      nate mosquito breeding------------------- 15, 000. 00
    Surveys, stream gaging, and contingencies------ 13, 000. 00

      Total ----------------------------------------                    $394, 529. 92
Operating and care:
   Operation of 15 locks and dams------------ 250, 000. 00
   Ordinary repairs-------------------------          35, 000. 00
   Improvement and reconstruction-__________         166, 101.34
   Engineering and design, plans and specifications,
      etc., on modernization of waterway--------- 146, 600. 00
        Total        --------------------------------         -----     597, 701. 34

        Total for all work        ---     -__--_-------------- __-
                                                                - 9, 617, 676. 79
  The additional sum's of $11,000,000 for new work, $526,500 for main-
tenance, and $578,000 for operating and care, a total of $12,104,500,
can be profitably expended during fiscal year 1954 for:
New work:
   Demopolis lock and dam:
       Plans and specifications_ -__            -
                                        -____ ____-       $40, 000
       Acquisition of land and damages ___________        336, 000
       Construction of lock, dam, and appurtenances___ 4, 718, 000
       Reservoir clearing_-__--                           748, 000
       Shops and yard-________________-________           175, 000
       Relocation of roads and utilities____------        483, 000
          Total-------------------------------------$6,                     500, 000
    Warrior lock and dam:
       Engineering and design--------------              $366, 000
                                    -___
       Dam and spillway______________                   1,000,000
       Acquisition of land and damages___--------          175, 000
       Construction of lock---------------------        2, 959, 000
           Total        -----------------------------------------   4, 500, 000
Maintenance:
   Dredging in river channel between mile 45 and head of naviga-
      tion with United States pipeline dredge and United States
      snagboats, as necessary; snagging in the river channel be-
      tween Chickasaw Creek and head of navigation with United
      States snagboats, as necessary; hired labor spraying to elim-
      inate mosquito breeding; and surveys, gaging, investigations,
      and contingencies--------------------------------                526, 500
Operating and care:
   Operation of 15 locks and dams; ordinary repairs; improve-
      ment and reconstruction--------------------------------          578, 000
        Total for all work-----          ---------     --           -    12, 104, 500
684         REPORT OF CHIEF OF ENGINEERS,                             U.    S. ARMY,                  959.

                                    Cost and financial summary

                                              Fiscal year ending June 30-                              Total to June
                                                                                                      30, 1952, includ.
                                                                                                      ing fiscal years
                                1948          1949         1950         1951             1952          priorto 1948


New work:
                                           --------.
   Appropriated......----------........-------.....   $1,000,000.00 $2,100,000.00   $4,000,000.00      $24, 382, 603. 30
   Cost------------------   $38, 732.10 $138, 316.53 645, 223. 62 484,158.44        2, 345, 720. 78     20, 712, 894. 89
   Expenditures  ------- -   38, 646. 50 135, 398. 71 520, 580.86 543, 625.58       2, 020, 862.06      20, 320, 233. 59
Maintenance:                                                                                                   M 4
   Appropriated.-----_      977, 400.00 1, 029,149.11 1,062, 300.00 995, 940.00     1,192, 398.07       21, 351, 419.16
   Cost------------------  795, 803. 84 1,186, 094.741,001, 564.05 951, 587. 79     1, 274, 896.96      21, 279, 643.00
   Expenditures--------    798, 710. 461,170, 819. 48 966, 020.671, 042, 380. 85    1, 226, 500. 96     21, 271, 812. 70


Other new work data:
    Unobligated balance, June 30, 1952____--___________----__---     $986, 984. 34
    Appropriated for fiscal year ending June 30, 1953____________ 4, 547, 000. 00
    Unobligated balance available for fiscal year 1953-----------  5, 533, 984. 34
    Estimated additional amount needed to be appropriated for
      completion of existing project___ ___________--_.-__       _    27, 970, 800
   11. WATERWAY CONNECTING THE TOMBIGBEE AND TENNESSEE
                   RIVERS, ALA. AND MISS.

  Location.-From mile 215 on the Tennessee River, this waterway
extends southerly through eastern Mississippi 154 miles and western
Alabama 106 miles, a total of 260 miles, to the confluence of the
Warrior and Tombigbee Rivers at Demopolis, Ala.
  Previous projects.-Work between Demopolis and Columbus was
commenced in 1871 and modified in 1879. For the section above
Columbus there are no previous projects. The total cost and expendi-
ture on the section between Demopolis and Columbus was $63,382.98,
of which $47,342.98 was for new work and $16,040 for maintenance.
For further details see page 1842, annual report for 1915.
  The act of September 19, 1890, provided for improvement and
maintenance of the section between Columbus and Demopolis (H. Doc.
156, 51st Cong., 1st sess., and annual report for 1890, p. 1719); the
acts of March 3, 1873, and August 11, 1888, provided for improvement
and maintenance of that part of the waterway between Columbus and
Walkers Bridge (Annual reports for 1873, p. 548, and 1882, p. 1312);
the act of February 27, 1911, consolidated the improvement from
Demopolis to Walkers Bridge under one head and made one appro-
priation for that section. The River and Harbor Act of August 30,
1935, provided for abandonment of the project for the slack-water
improvement of the Tombigbee River above Demopolis (H. Doc. 56,
73d Cong., 1st sess.). For further details see page 699, annual report
for 1937. The total cost under the previous project was $431,981.44,
of which $197,650.71 was for new work and $234,330.73 for
maintenance.
  Existing project.-This provides for a waterway to connect the
Tombigbee and Tennessee Rivers by way of the East Fork of the
Tombigbee River, Mackeys and Yellow Creeks, to provide a channel
from the junction of the Tombigbee and Warrior Rivers at Demopolis,
Ala., for 260 miles to the Pickwick Pool on the Tennessee River, not
less than 9 feet deep with a minimum bottom width of 170 feet in
           RIVERS AND HARBORS-MOBILE,        ALA.,   DISTRICT      685
the river and canal section and 150 feet in the divide cut; with locks
110 by 600 feet clear inside dimensions.
    The plan of improvement for the waterway may be divided into
three sections as follows: River section from the junction of the
Warrior and Tombigbee Rivers at Demopolis, Ala., to mile 180 on
the Tombigbee River, with a channel 9 feet deep and 170 feet wide,
to be obtained by dredging and construction of 4 locks and dams; the
canal section from mile 180 to mile 221, with a channel 12 feet deep
and 170 feet wide, to be obtained partly by excavation and partly by
levees, and by the construction of 6 locks; the divide section from
mile 221 to mile 260 in the Pickwick Pool on the Tennessee River, with
a channel 12 feet deep and 150 feet wide, by means of a lock and dam
at the Narrows and a 27-mile cut. Passing places 200 feet wide and
1,000 feet long, with transitions 500 feet long at each end, are to be
provided about every 4 miles in the divide section.
   The estimated cost for new work approved in 1952, is $211,194,000.
The latest (1952) approved estimate for annual cost of maintenance
is $811,000.
   The existing project was authorized by the River and Harbor Act
approved July 24, 1946 (H. Doc. 486, 79th Cong., 2d sess.).
   Local cooperation.-Provides that local interests give assurances
satisfactory to the Secretary of War and that they will (a) make and
maintain at their expense alterations as required in highways and
highway bridges and in sewer, water-supply, and drainage facilities;
 (b) provide and maintain at their expense and as required suitable
and adequate river and canal terminals in accordance with plans ap-
proved by the Secretary of War and the Chief of Engineers. Offi-
cials of the State of Mississippi were notified of the requirements of
local cooperation on December 13, 1949, and officials of the State of
Alabama were notified on December 20, 1949. Legislation enabling
boards of supervisors of the various counties concerned to enter into
agreements with the United States relative to navigation projects
was adopted by the State of Mississippi in 1950. Similar legislation
is pending before the Alabama legislature.
   Terminal facilities.-There are no terminal facilities along this
waterway.
   Operations and results during fiscal year.-Preliminary work in
connection with preparation of detailed project plans cost $64,179.20,
charged to new work. The expenditures were $73,993.82.
   Condition at end of fscal year.-No construction work has been
done on the existing project. Some preliminary work in connection
with the definite project report, preliminary planning, and detailed
plans and specifications has been accomplished. Work has been sus-
pended under the curtailed planning program. The total costs and
expenditures under the existing project were $712,981.21.
   Proposed operations.-No work is scheduled for fiscal years 1953
and 1954. The balance unexpended June 30, 1952, $1,530.56, will be
applied to payment for Ohio River Division laboratory tests.



     245554-53-vol. 1-   44
686            REPORT OF CHIEF OF ENGINEERS,                                         U.     S. ARMY,         1952

                                       Cost and financial summary

                                                   Fiscal year ending June 30-                                    Total to June
                                                                                                                  30, 1952, includ.
                                                                                                                  ing fiscal years
                                   1948           1949               1950                 1951        1952         priorto 1948

New work:
       Appropriated-....----_   $600,000.00----------      $200,000.00              $40, 000.00 -$183,488.23           $912,162.48
       Cost------------------    252, 078.98 $82,027. 54     45,634.29              213, 944.74    64,179.20            910, 631. 92
       Expenditures---------     233, 057.25   98, 542. 97   39, 080. 06            213, 346.80    73, 993.82           910, 631. 92
Maintenance:
    Appropriated----..------------           ------------------------------------------                                 234,330.73
    Cost-....------------------------ ---------- - ------------ ------------ ------------                                  330.73
                                                                                                                        234,
       Expenditures--------------------                 ----------------------------                      -----         234, 330.73


Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project--_------------- $210, 479, 500
                                12. PASCAGOULA HARBOR, MISS.
   Location.-This harbor, located along the lower 6.8 miles of
Pascagoula River and the lower 4 miles of Dog River, is in south-
eastern Mississippi, about 61 miles by water west of Mobile Harbor,
Ala., and about 44 miles east of Gulfport Harbor, Miss. (See U. S.
Coast and Geodetic Survey Chart No. 1267.)
   Previous projects.-Appropriations were made for Pascagoula
River by the River and Harbor Acts of March 2, 1827, May 23, 1828,
and August 30, 1852. The first definite project was adopted by the
River and Harbor Act of June 14, 1880. Other projects were adopted
by the River and Harbor Acts of August 5, 1886, August 18, 1894,
June 3, 1896, March 3, 1899, June 13, 1902, and June 25, 1910. For
further details see page 1843, annual report for 1915, and page 741,
annual report for 1938.
   Existing project.--This provides for a through channel of the maxi-
mum dimensions that can be secured by the expenditure of $283,000,
but not exceeding 25 feet deep, 300 feet wide, and 3.1 miles long across
the outer bar at Horn Island Pass, thence 22 feet deep and 225 feet
wide to the railroad bridge at Pascagoula, thence 22 feet deep and 150
feet wide to State Highway 63 bridge, thence a cutoff channel 12 feet
deep and 125 feet wide through Robertson and Bounds Lakes to a point
on Dog River at mile 3.4 and thence up Dog River to mile 4, a total
distance of about 21.7 miles. Under ordinary conditions the mean
tidal range is 13/4 feet and the extreme tidal range is 33/4 feet.
   The estimate of cost for new work,*approved in 1952, is $327,000.
The latest (1952) approved estimate for annual cost of maintenance
is $105,000.
   The existing project was authorized by the following river and
harbor acts:
       Acts                          Work authorized                                                  Documents 1

Mar.     4,1913   Limiting the channel' dimensions subject to local                        H. Doc. 682, 62d Cong., 2d sess.
                    cooperation.
Mar. 4,1915       Modified the required local cooperation and provided                     Rivers and Harbors Committee
                   present project channel dimensions.                                      Doc. 12, 63d Cong., 2d sess.
May 17,1950       Cut-off channel, 12 by 125 feet, from State Highway                      H. Doc. 188, 81st Cong., 1st sess.
                    63 bridge through Robertson and Bounds Lakes,
                    thence up Dog River to mile 4.

I The latest published maps may be found in H. Dec.211, 54th Cong., 2d sess., and H. Dec. 188, 81st
Cong., 1st sess.
          RIVERS AND HARBORS-MOBILE,          ALA.,   DISTRICT      687
   Local cooperation.-Forwork authorized in accordance with House
Document No. 188, Eighty-first Congress, first session, local interests
are required to give assurances satisfactory to the Secretary of the
Army that they will (a) provide, without cost to the United States,
all lands, easements, spoil-disposal areas, and rights of way necessary
for construction of the improvement and its subsequent maintenance
when and as required; and (b) hold and save the United States free
from damage due to the construction works.
   Terminal facilities.-The municipal wharf on the east side of Pas-
cagoula River has an available dockage of 1,094 feet. The Louisville
& Nashville Railroad Co.'s wharf in the Pascagoula River at Pasca-
goula, Miss., just north of their bridge, and the Mississippi Export
Railroad wharf on the Dog River at Moss Point, Miss., have available
dockages of 60 and 380 feet, respectively. The Farnsworth Coal Co.
has a wharf on the Pascagoula River, just north of the Louisville &
Nashville Railroad Co.'s wharf. All private terminals, together with
the municipal wharf, are considered adequate for existing commerce.
 (See Port Series No. 19 revised in 1949.)
   Operations and results during fiscal year.-The contractor's dredge
Diesel removed 628,059 cubic yards of material in the channel between
State Highway 63 bridge and mile 4 in Dog River July 17 to August
10, and September 6 to 14, 1951, at a cost of $74,629.36 for maintenance.
Miscellaneous investigations and surveys cost $2,493.21. The total
cost was $77,122.57, charged to maintenance. The expenditures were
$77,013.51.
   Condition at end of fiscal year.-The existing project, commenced
in 1917, was about 79 percent completed. The controlling depths in
the channels at the times shown were as follows: Horn Island Pass, 30
feet, May 1951; Mississippi Sound channel, 23 feet, May 1951; Pasca-
goula River channel, 18 feet, September 1951. The increased depths
in Horn Island Pass and Mississippi Sound channels were obtained
with contributed funds during the fiscal year 1949. The work remain-
ing to be done to complete the project consists of obtaining a 2-foot ad-
ditional depth in the Pascagoula River channel from the Louisville &
Nashville Railroad bridge to State Highway 63 bridge, thence a cut-
off channel 12 feet deep and 125 feet wide through Robertson and
Bounds Lakes, and thence up Dog River to mile 4.
   The total costs and expenditures under the existing project to June
30, 1952 were $1,777,167.63, of which $258,040.11 was for new work and
$1,519,127.52 for maintenance. In addition, $739,513.49 was expended
by local interests during fiscal year 1949 to deepen the channel south
of the railroad bridge below project depth.
   Provosed operations.-No work is scheduled for fiscal years 1953
and 1954.
688             REPORT OF CHIEF OF ENGINEERS,                                               U.      S. ARMY,                   1952

                                               Cost and financial summary

                                                             Fiscal year ending June 30-                                         Total to June
                                                                                                                                30, 1952, includ-
                                                                                                                                ing fiscal years
                                          1948              1949             1950              1951                1952           priorto 1948

New work:
   Appropriated.........................---------------------          ------------   ------------..------------............      $1, 162, 481. 72
   Cost----             -----------------------------------------------------------                                                1,162, 481.72
   Expenditures.... ----------                      ------------   ------------ -----------------------                            1, 162, 481. 72
Maintenance:
     Appropriated-........   $166, 100. 00                  $36, 000      $6, 417. 13 $110, 000.00 -$27,195.33                     1, 931, 751. 67
         ...-----
     Cost---        ------.   166, 217. 39                   36, 000       6, 417. 13     5, 682. 10 77, 122. 57                   1, 931, 751.67
     Expenditures----....... 166, 173.07                     36, 000       6, 417. 13     5, 791. 16 77, 013. 51                   1, 931, 751. 67


Other new work data: Estimated additional amount needed to be ap-
propriated for completion of existing project__--______-__ ____- $69, 000

                                         13. PASCAGOULA RIVER, MISS.

   Location.-This river, about 89 miles long, is formed by the conflu-
ence of the Leaf and Chickasawhay Rivers near Merrill, in south-
eastern Mississippi, and empties into Mississippi Sound at Pascagoula.
 (See U. S. Geological Survey map of Mississippi.)
   Previous projects.-Adopted by the River and Harbor Act of June
14, 1880. For further details see page 1845, annual report for 1915,
and page 743, annual report for 1938.
   Existing project.-This provides only for the maintenance of the
channel above the mouth of the Dog or Escatawpa River, 82.1 miles,
by the removal of obstructions from time to time. The mean and
extreme tidal variations at the mouth are about 1/2 and 4 feet respec-
tively. The ordinary and extreme fluctuations at Merrill, due to
floods, are 19.4 and 26.2 feet, respectively. The latest (1952) ap-
proved estimate for annual cost of maintenance is $3,500.
   The existing project was authorized by the following river and
harbor acts:

       Acts                                   Work authorized                                                       Documents 1

Aug.     5,1886      The existing project was adopted                     and included            Annual Report, 1879, p. 835.
                        dredging at the mouth of the river.
Mar.     3,1899      Limited the improvement to the section above the
                       mouth of Dog River and appropriations since have
                       been made accordingly.

  1 For latest published map, see H. Doc. 1723, 64th Cong., 2d sess.


  Local cooperation.-None required.
  Terminal facilities.-The natural landings on this river, the munic-
ipal wharf at Pascagoula, and the privately owned wharves at Moss
Point and Pascagoula, Miss., are considered adequate for existing
commerce.
  Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-The existing project, which is for
maintenance, was commenced in 1888, and work has been carried
on intermittently since. The controlling depths at the end of the
fiscal year were 7 feet from the mouth of Dog River to Dead Lake,
32 miles, and 3 feet in the remaining 50 miles of the project above
                     RIVERS           AND HARBORS-MOBILE,                                 ALA.,           DISTRICT                        689
IDead Lake. The head of navigation for boat traffic is Merrill, Miss.
A zero gage reading at Merrill indicates that a 3-foot depth of water
is available; from December through June each year greater depths
are available. The total costs and expenditures under the existing
project, $152,509.52, were for maintenance.
   Proposed operations.---An allotment of $6,000 for fiscal year 1953
will be applied to maintenance snagging in the Pascagoula River
during August and September 1952 with the U. S. derrick boat J. M.
Pratt.
   No work is scheduled for fiscal year 1954.
                                               Cost and financial summary

                                                           Fiscal year ending June 30-                                          Total to June
                                                                                                                               30, 1952, includ-
                                                                                                                               ing fiscal years
                                          1948            1949             1950            1951                  1952            prior to 1948

New work:
   Appropriated ..........            .....------------....         .. ........------------..........-----------............
                                                             ......-----------.....------------                                      $15, 000. 00
   Cost..---------------- --------------------------------------------------                                                          15, 000.00
   Expenditures ..         -------------------------------------------------------                                                    15, 000. 00
Maintenance:
     Appropriated.......---------...--------........   $13, 000. 00   $13, 000. 00         $188.01 ............                      152, 509. 52
     Cost .--- ----------------------            ...     4, 287. 68    18, 888. 03        3,012.30 ............                      152, 509. 52
     Expenditures-.....................                  3, 800. 00    18, 673. 27        3, 714. 74 ------------...........         152, 509. 52



14. HARRISON COUNTY, MISSISSIPPI,                                             SHORE PROTECTION PROJECT

   Location.-Harrison County is on the Gulf coast of Mississippi
about midway between Mobile, Ala., and New Orleans, La.
   Existing project.-This provides for Federal participation of
$1,133,000 toward the repair of the Harrison County seawall and
its protection by the construction of a beach from Biloxi lighthouse
to Henderson Point near Pass Christian, Miss., a net length of about
24 miles. The beach is to have an over-all width of 300 feet above
mean sea level. The existing project was authorized by the River
and Harbor Act approved June 30, 1948, as outlined in House Docu-
ment 682, Eightieth Congress, second session. The estimated Fed-
eral cost of the project is limited to $1,133,000. The estimated cost
to local interests is $1,869,000.
   Local cooperation.-The requirements of local cooperation pro-
vide that local. interests shall (1) adopt the plan of improvement
including repairs and alterations of the seawall as outlined in House
Document 682, Eightieth Congress, second session; (2) submit for
approval by the Chief of Engineers detailed plans and specifications
and arrangements for prosecuting the entire improvement prior to
the commencement of such work; (3) provide all necessary lands,
easements, and rights of way for accomplishment of the work; and
provided further that responsible State or local interests give satis-
factory assurances that they will: (a) Maintain the seawall and
drainage facilities and the beach by artificial replenishment during
the useful life of the works as may be required to serve their intended
purpose; (b) hold and save the United States free from all claims
for damages that may arise either before, during, or after prosecution
690         REPORT OF CHIEF OF ENGINEERS,                                  U.    S.   ARMY,        1952

of work; (c) remedy water pollution that would endanger public
health; and (d) assure perpetual public ownership of the beach and
its administration for public use only. Assurances that the require-
ments of local cooperation would be met were approved by the Chief
of Engineers January 10, 1951, subject to execution of a contract
between the Harrison County Board of Supervisors and the district
engineer. The contract was executed January 23, 1951.
   Operations and results during fiscal year.-Repairs, replacements,
and alterations of drainage structures were completed at a cost of
$747,592.97. Contractors dredged and placed 3,251,434 cubic yards of
material in the protective beach at a cost of $732,479.64 The total
cost for the fiscal year was $1,480,072.61, for new work. The cost
to the United States for the Federal Government's share of the work
was $731,903.64. The expenditures by the United States were
$608.706.88.
   Conditionat end of fiscal year.-The project, commenced in January
1950, was physically completed in June 1952. Repairs to the sea
wall, revision of the drainage system, and construction of the pro-
tective beach were completed. Final inspection will be made in July
1952, and final payments will be made upon acceptance. The total
cost to Harrison County, for new work, was $1,731,725.71. Total
cost to the United States was $1,091,678.00. Total expenditures by the
United States were $968,481.24.
   Proposed operations.-The balance unexpended June 30, 1952,
$164,518.76, and accounts receivable $9.95, a total of $164,528.71, will
be applied to accounts payable June 30, 1952, $123,206.71, and to
final payments of the Federal Government's share of the work per-
formed.
   Physical construction has been completed and no further operations
are scheduled.
                                      Cost and financial summary

                                                 Fiscal year ending June 30-                            Total to June
                                                                                                       30,1952, includ.
                                                                                                       ing fiscal years
                                  1948          1949           1950          1951          1952         priorto 1948

New work:
   Appropriated--.....---------------------............   ............
                                                        ------------     $360, 000. 00 $773, 000. 00     $1,133, 000. 00
   Cost-------...------------------------                        -------- 359, 774.36 731, 903.64         1, 091, 678. 00
   Expenditures.........-----------------------------------....359,774. 36 608,706. 88                       968, 481. 24



Other new work data:
    Unobligated balance, June 30, 1952------------------------------                                           $9.95
    Unobligated balance available for fiscal year 1953 _____--- ____--__                                        9. 95

                                    15. BILOXI HARBOR, MISS.

  Location.-On Mississippi Sound in southeastern Mississippi. It is
32 miles by water west of Pascagoula Harbor, Miss., and 14 miles east
of Gulfport Harbor, Miss. (See U. S. Coast and Geodetic Survey
Chart No. 1267.)
                 RIVERS AND HARBORS-MOBILE,                           ALA.,     DISTRICT                691
  Previous projects.-Adopted by the River and Harbor Acts of
August 2, 1882, and July 5, 1884. For further details see page 1846,
annual report for 1915, page 863, annual report for 1929, and page
744, annual report for 1938.
  Existing project.-This provides for a channel west of Deer Island
10 feet deep and 150 feet wide from the 10-foot contour in Mississippi
Sound to the south waterfront of the city of Biloxi, and thence north
of Deer Island to deep water in Back Bay of Biloxi, an over-all length
of about 7 miles; for maintaining the Coast Guard channel to a depth
of 6 feet and a width of 300 feet; and for maintaining the existing
channel along the northerly side of United States Highway 90 bridge,
from the main channel in Biloxi Harbor to the entrance to Ott Bayou,
to a depth of 6 feet, a width of 40 feet and a length of about 1 mile.
The project also provides for an entrance channel 6 feet deep, 50 feet
wide and about 1,800 feet long into Old Fort Bayou, and an entrance
channel 8 feet deep, 100 feet wide and about 1 mile long through
Cranes Neck into Bayou Bernard. Under ordinary conditions, the
mean tidal range is about 1.8 feet.
  The estimate of cost for new work, approved in 1952, is $64,780,
exclusive of $5,000 contributed by local interests. The latest (1952)
approved estimate for annual cost of maintenance is $24,200.
  The existing project was authorized by the following river and
harbor acts:
    Acts                          Work authorized                                   Documents    1
July 3,1930      Present project dimensions--.--------                   H. Doc. 754, 69th Cong., 2d sess.
                                                              .-----------
June 20,1938     Relocation of channel__--___ _    __-----------__    _ H. Doec. 639, 75th Cong., 3d sess.
Mar. L2,1945     Entrance channel 6 feet deep and 50 feet wide into      H. Doc. 258, 76th Cong., 1st sess.
                  Old Fort Bayou.
   Do..--.....   Entrance channel 8 feet deep and 100 feet wide          H. Doec. 326, 76th Cong., 1st sess.
                  through Cranes Neck into Bayou Bernard.
May 17,1950      Maintain channel 6 feet deep and 40 feet wide from      H. Doec. 256, 81st Cong., 1st sess.
                  Biloxi Harbor to Ott Bayou.

1 Contain latest published maps.

   Local cooperation.--Fully complied with except for the work au-
thorized in accordance with House Document 258, Seventy-sixth Con-
gress, first session, and House Document 326, Seventy-sixth Congress,
first session, which provide that local interests furnish, free of cost
to the United States, as and when required, lands, easements, and
spoil-disposal areas for the initial work and for subsequent mainte-
nance, and hold and save the United States free from claims for
damages resulting from the work.
   For work authorized in accordance with House Document No. 256,
Eighty-first Congress, first session, local interests are required to                                          -

furnish assurances satisfactory to the Secretary of the Army that they
will (a) furnish, free of cost to the United States, all lands easements,
and spoil-disposal areas for maintenance, when and as required; and.
 (b) hold and save the United States free from damage, including
damage to oyster beds, resulting from the work.
   Terminal facilities.-These consist of a number of light timber
wharves at Biloxi, owned by private parties but available to the
692             REPORT OF CHIEF OF ENGINEERS,                                                   U.       S. ARMY, 1952

public. These are considered adequate for the existing commerce.
   Operations and results during fiscal year.-The cost for miscel-
laneous investigations and surveys was $1,064.87, charged to mainte-
nance. The expenditures were $988.86.
   Condition at end of fiscal year.-The existing project, commenced
in 1931, was about 77 percent completed. The controlling depths in
the channels at the times shown were as follows: Mississippi Sound
channel, 8.5 feet, November 1951; entrance to Old Fort Bayou, 1.5
feet, August 1938; Cranes Neck channel, 8 feet, April 1949. The
work remaining to be done to complete the project consists of dredg-
ing a channel 8 feet deep and 100 feet wide through Cranes Neck
into Bayou Bernard, and dredging an entrance channel 6 feet deep
and 50 feet wide into Old Fort Bayou.
  The costs and expenditures for the existing project to June 30,
1952, were as follows:

                                                                                           Costs
                                                                                                                            Expenditures
                                                                   New work          Maintenance             Total

Regular funds-----------------------                                 $49, 780. 16      $316, 706. 82        $366, 486. 98          $366, 486. 98
Contributed funds--------- ------------                                5, 000. 00        10, 200. 00          15, 200.00             15, 200.00

      Total--....-----...----------------..............-.....         54, 780. 16          326, 906.82       381, 686. 98          381, 686.98



  Proposed operations.-An allotment of $26,000 for fiscal year 1953
will be applied as follows:
Maintenance:
   Dredging, by contract, to restore project dimensions in the Biloxi
      Harbor channel, about one-half month during May 1953            $25,000                                      -------
   Miscellaneous investigations, examinations, surveys, and contin-
      gencies    ----------------------------------------------- 1, 000

               Total                 ----------------------------------------------                                                  26,000
   The additional sum of $26,250 can be profitably expended during
fiscal year 1954 for maintenance dredging, by contract, to restore
project dimensions in the Biloxi Harbor channel, and for miscel-
laneous surveys, investigations, examinations, and contingencies.
                                                       Cost and financial summary

                                                                     Fiscal year ending June 30                              Total to June
                                                                                                                            30, 1952, includ-
                                                                                                                            ing fiscal years
                                                1948               1949             1950           1951         1952         priorto 1948

New work:
   Appropriated-------........ .... ......------------                 ..........--------....----------------
                                                      ........------------                             ............--           1$94,162.43
   Cost-----------------.................................------------....-----------------------............-----------          194,162.43
   Expenditures...--------------------- ------------                                    --       ----------------                1 94, 162. 43
Maintenance:
   Appropriated -....... $52, 000.00                            $18, 000.00   $26, 000.00      $25, 730.15 -$2, 422.50         2   403, 016.35
   Cost __           _    48, 078.38                             26, 108.92    26, 000. 00      22, 242. 78    1,064.87        2   403, 016.35
   Expenditures-......._ 47, 591.92                              26, 536.80    26, 058. 58      22, 318. 79      988. 86        2403, 016. 35


Other new work data: Estimated additional amount needed to be appro-
  priated for completion of existing project----------------------                                                                 $15, 000
1 In addition, $5,000 was expended from contributed funds.
2In addition, $10,200 was expended from contributed funds.
          RIVERS   AND HARBORS-MOBILE,       ALA-,   DISTRICT      693
                    16. GULFPORT HARBOR, MISS.

   Location.-On Mississippi Sound in southeastern Mississippi,,
about 44 and 90 miles by water west of Pascagoula Harbor, Miss.,
and Mobile Harbor, Ala., respectively, and 78 miles east of New
Orleans (via the Gulf Intracoastal Waterway). (See U. S. Coast
and Geodetic Survey Chart No. 1267.)
   Previous projects.-Adopted by the River and Harbor Acts of
March 3, 1899 (H. Doc. 120, 55th Cong., 3d sess.), March 2, 1907,
February 27, 1911, and January 21, 1927. For further details see
page 1846, annual report for 1915; page 857, annual report for 1929;
and page 747, annual report for 1938.
   Existing project.-This provides for a channel 32 feet deep, 300
feet wide, and about 8 miles long across Ship Island Bar, a channel
30 feet deep, 220 feet wide and about 11 miles long through Mississippi
Sound, and a depth of 30 feet in the 1,320- by 2,640-foot anchorage
basin at Gulfport. Under ordinary conditions the mean tidal range
is about 13/4 feet, and the extreme tidal range about 31/2 feet.
   The project was completed at a cost of $635,757.76 for new work.
The latest (1952) approved estimate for annual cost of mainte-
nance is $293,000.
   The existing project was adopted by the River and Harbor Act
approved July 3, 1930 (H. Doc. 692, 69th Cong., 2d sess.), and the
River and Harbor Act approved June 30, 1948 (H. Doc. 112', 81st
Cong., 1st sess.). The latest published maps of this locality are in
the project documents.
   Local cooperation.-None required.
   Terminal facilities.-The modern rail-connected terminal facili-
ties at this port are considered adequate for existing commerce.
 (See Port Series No. 19 revised in 1949.)
   Operations and results during fiscal year.-The U. S. hopper
dredge Gerig removed 669,411 cubic yards (bin measurement) of
material in the Ship Island Bar Channel April 30 to May 15, 1952,
at a cost of $54,445. The contractor's pipeline dredge Miami re-
moved 3,669,582 cubic yards of material in the Mississippi Sound
Channel October 9 to November 20, and 513,714 cubic yards of mate-
rial in the anchorage basin November 21 to December 10, 1951, at a
cost of $226,506. Miscellaneous surveys and investigations cost $8,703.
The total cost was $289,654.14 for maintenance. The expenditures
were $289,534.76.
   Condition at end of fiscal year.--The existing project was com-
menced in 1932 and completed in April 1950. The controlling depths
in the channels at the times shown were as follows: Ship Island
Bar Channel, 32 feet, May 1952; Mississippi Sound Channel south
end to beacon 60, 30 feet, December 1951; beacon 60 to south end
of basin, 30 feet, December 1951; and anchorage basin, 30 feet, May
1952.
694               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   The costs and expenditures under the existing project to June 30,
1952, were as follows:
                                                                                             Costs
                                                                                                                                      Expenditures
                                                                    New work            Maintenance                 Total


Regular funds...------------------------......................      $587,874.57         $2,611,727.24          $3,199, 601.81           $3,199, 628. 44
Public works funds-------------...............------                  47, 883.19                                   47, 883.19               47, 883.19
        Total.-------------------------                               635, 757. 76        2, 611, 727. 24        3, 247, 485.00         1 3, 247, 511.63

  1 Reflects an adjustment of $19,341.70 for outstanding liabilities and plant rental applicable to previous
projects. (See Annual Reports for the years 1931 and 1932).

  Proposed operations.-Accounts receivable June 30, 1952, $26.63,
plus an allotment of $186,750, made for fiscal year 1953, a total of
$186,776.63 will be applied as follows:
Maintenance :
   Dredging, by contract, to restore project dimensions in Missis-
      sippi Sound Channel, about 2 months, October to December
      1952       --------------------------------------------      $180, 000. 00
   Miscellaneous investigations, examinations, surveys, and con-
      tingencies     ----------------------------------------         6, 776. 63

                 Total--------------------------                                                                                             766. 63
                                                                                                                                       1----------------------86,
   The additional sum of $221,500 can be profitably expended during
fiscal year 1954 for maintenance dredging, by contract, in the Missis-
sippi Sound Channel and anchorage basin, and dredging in Ship
Island Bar Channel with a United States hopper dredge.
                                                    Cost and financial summary

                                                                      Fiscal year ending June 30                                       Total to June
                                                                                                                                      30, 1952, includ-
                                                                                                                                      ing fiscal years
                                               1948                 1949             1950             1951             1952            priorto 1948

New work:
SAppropriated-------------------.........                 ..-------..........   $557,446.80                 --------------
                                                                                                 -- $40,000.00                            $904, 775.68
      Cost----- --.-----------                           ------------ 517, 446. 80 .........................                               904, 775. 68
tExpenditures---------
              ...                              ----------------..                517,446.80-------
                                                                                            ..........-----.. ..-----.....----.....        904, 775.68
IMaintenance
      Appropriated......... $272, 500. 00 $197, 700. 00                           79, 000. 00     247, 654. 75 $254, 400. 00             4,924, 046. 41
      Cost-.------------     164, 169. 07 196, 886. 50                           177, 394. 17     212, 389. 36 289, 654. 14              4, 924,019. 78
      Expenditures-.........              164, 723.32        196, 395. 23        177, 699. 27     212, 586. 84     289, 534.76           4, 924, 046. 41


                                            17. PEARL RIVER, MISS. AND LA.

   Location.-Pearl River rises in east-central Mississippi and flows
southwest about 172 miles to Jackson, Miss., thence southeast about
269 miles to the head of its delta, where it divides into West Pearl and
East Pearl Rivers. The former flows about 34 miles to the Rigolets, a
tidal pass connecting Lake Pontchartrain with Lake Borgne, an arm
of the Gulf of Mexico.
   Previous projects.-Adopted by the acts of June 14, 1880, and
April 21, 1900. For further details see page 950, annual report for
1922, and page 750, annual report for 1938.
   Existing project.-This provides for a channel suitable for 6-foot
navigation from the mouth of West Pearl River to Bogalusa, La., 59.3
                     RIVERS AND                    HARBORS-MOBILE,                                        ALA.,            DISTRICT                      695
miles, by dredging, snagging, and cut-offs at sharp bends from the
mouth of West Pearl River to a point immediately above Holmes
Bayou to secure a depth of 7 feet at low water; construction of a lateral
canal 7 feet deep and 80 feet wide extending 20.1 miles from the mouth
of Holmes Bayou to Pools Bluff, with three locks of adequate dimen-
sions; and improvement of Pearl River from Pools Bluff to the mouth
of Bogalusa Creek by dredging, snagging, and easing of bends, with
suitable dams or sills in the river channel just below Pools Bluff and
across Bogue Chitto to maintain the levels in the canal and river. At
Bogalusa the mean variation of the water surface is 10 feet and the
extreme, 23 feet.
  The following table gives various features of the locks included in
the existing project:
                                                   Features of ewisting locks

                  Lock                                            1                                         2                                      3

Miles above mouth ._____________..29.4 ------------------                                40.7.......---..--------- _---43.9.
Nearest town___________________    Pearl River, La.....-----                             Bush, La.........-----------..    Sun, La.
Miles to nearest town ..........   9 ___-_-_..........-.                                 3                                 2.
Greatest length available for full 310----------------                                   310---...-----...--..-----....... 310.
width (feet).
Width of chamber (feet)               ...       65--------------                         65----------.......-------.............       65.
Lift (feet)---------------------                26.7----------------                     15.0.........-----........--------..          11.0.
Depths over sills at low water                  10.0 ........-------------------.... ............----......
                                                                                10.0-----------                                        10.0.
 (feet).
Character of foundation- ......               _ Sand, gravel, silt, clay-                Sand, gravel, silt, clay_                     Sand, gravel, silt, clay.
Type of construction ...----------......Concrete and steel....                           Concrete and steel                  - -....   Concrete and steel.
Year completed-------------                     1949...---------------................   1950 ........---------------.........         1950.
Date opened to navigation-..... Not open                        ----------.........      Not open..............                        Not open.
Actual cost of lock..--------...---........     $2,119,110.22._---------                 $1,967,537.20 ---------                       $1,497,539.37.


   The estimated cost of new work, approved in 1952, is $8,275,000.
The latest (1952) approved estimate of annual cost of maintenance
is $130,000, including $70,000 for operating and care.
   The existing project was adopted by the River and Harbor Act
of August 30, 1935, subject to the approval of the Board of Engineers.
This approval is contained in House Document No. 408, Seventy-
fifth Congress, second session, which document contains the latest
published map.
   Local cooperation.-Fully complied with. Local interests are
required to furnish all flowage and dumping easements needed for
subsequent maintenance of the improvement, and to assume full re-
sponsibility for all property damage incident to the maintenance of
the canal. (See H. Doc. 408, 75th Cong., 2d sess.)
   Terminal facilities.--A privately owned wharf at the Pearl River
highway bridge near Pearl River Station, La., is used for unloading
logs. No other facilities exist except natural landings at various
locations on the river. These facilities are considered adequate for
existing commerce.
   Operations and results during fiscal year.-New work: Government
costs on the contract for construction of Bogue Chitto and Pools
Bluff sills were $51,218. Final costs on grassing, sprigging, etc., were
$23. The U. S. dragline No. 2 removed 50 snags from the channel on
June 30, 1952, at a cost of $3,927. Preliminary dredging costs were
$191. Surveys, plans, and specifications costs $20,089.
   Operation and care: Ordinary maintenance and repair of the 3
locks cost $6,383.59.
696       REPORT OF CHIEF OF ENGINEERS, U.                          S. ARMY,     1952Z

   The total cost was $81,831.98, of which $75,448.39 was for new work
and $6,383.59 for operation and care. The expenditures were
$52,982.41.
   Condition at end of fiscal year.-The existing project, commenced
in October 1938, was about 90 percent completed. Lock 1 was com-
pleted in February 1949, lock 2 in June 1950, and lock 3 in May 1950.
The controlling depth for all-year navigation at the end of the fiscal
year was 4 feet from mile 0 to the site of lock 1 (about 30 miles).
During the low-water season, June through December each year, a
depth of 1.5 feet is available along the natural channel between the
mouth of Holmes Bayou and Bogalusa, the present head of naviga-
tion. A minimum depth of 6 feet is usually available over that stretch
of the river from January 1 to June 1 each year; however, naviga-
tion is now impracticable due to numerous logs, stumps, and other
obstructions. The work remaining to be done to complete the project
consists of completing construction of Bogue Chitto and Pools Bluff
sills; clearing the low-water pools of locks 1 and 2; and dredging and
snagging the channel of Pearl River between Pools Bluff and
Bogalusa.
   The cost of the existing project to June 30, 1952, was $7,387,196.14,
of which $7,367,546.06 was for new work, $789.47 for maintenance,
and $18,860.61 for operation and care. The expenditures were
$7,358,367.85.
   Proposed operations.-The balances unexpended June 30, 1952,
$936,035.76, new work, and $4,162.76, operation and care, plus allot-
ments of $2,500 for maintenance and $25,000 for operation and care,
a total of $967,698.52, will be applied as follows:
Accounts payable June 30, 1952_- --      __------------$28,                               828.29
New work :
    Plans and specifications____----- ------------          $8, 484. 51
    Construction of Bogue Chitto and Pools Bluff sills,
       by contract_               -                                   639, 010. 57
      Dredging and snagging to provide project dimen-
        sions between mouth and lock 1 and pools of
        locks 1 and 2   ----------------------------- 259, 735.76
                                                                                     907,230. 84
Maintenance:
   Investigations, surveys, gaging, and contingencies-_- ---- _-                       2, 500. 00
Operation and care :
   Operation of 3 locks--....      -----------            18, 000. 00
   Ordinary maintenance and repair------------             1, 500. 00
   Improvement and reconstruction----                       9, 639. 39
                                                                                      29, 139. 39
        Total for all work__--- -___                                         _            698. 52
                                                                                     9______---______--
                                                                                     967,
   The additional sum of $127,100 can be profitably expended during
fiscal year 1954 for:
Maintenance :
   Maintenance dredging to project depths, as necessary__                 $65, 000
   Snagging throughout the improvement, as necessary.                      15, 000
   Investigations, surveys, and contingencies -----       -                 7, 500
                                                                                         $87, 500
Operation and care:
   Operation of 3 locks_ ____---..----------._ _-----                      38, 000
   Ordinary maintenance and repair __-                  ----.....           1, 600
                                                                                          39, 600
        Total------------ ----------------                                               127,100
                  RIVERS AND HARBORS-MOBILE,                                        ALA.,        DISTRICT                  697
                                          Cost and financial summary

                                                       Fiscal year ending June 30                                 Total to June
                                                                                                                 30, 1952, includ-
                                                                                                                 ing fiscal years
                                     1948            1949             1950           1951            1952          priorto 1948


New work:
   Appropriated--------......-------                    $1,159,259.90 $2,009,000.00---------- $978, 000. 00        $8, 419, 220.21
   Cost....--------------            $1,145,684.98 2, 274, 679. 16 2, 231, 116. 92 $30, 742. 65  75, 448.39         7, 511, 989.37
   Expenditures----      .....----     889, 496. 86 2, 265, 668. 47 2, 423, 616. 08 112, 777. 70 46, 618. 44        7, 483, 184. 45
Maintenance:
   Appropriated.........                 -------------                               15, 789. 47  8,000.00             191,961.11
   Cost--------------------------------------------                                  13, 2,"6.49  6,383.59             187, 821.72
                       -------------
   Expenditures.........                             ------------------------        13, 262. 74  6, 363. 97           187, 798. 35


<Other  new work data:
       Unobligated balance, June 30, 1952------------------------                                                $399, 623.26
       Unobligated balance available for fiscal year 1953 -----------                                             399, 623. 26

    18. EXAMINATIONS,                    SURVEYS, AND CONTINGENCIES                                         (GENERAL)

   The cost during the fiscal year was $74,991.03, of which $23,217.45
was for examinations and surveys, and $51,773.58 for contingencies.
The expenditures were $75,405.43.
   The balance unexpended June 30, 1952, $13,457.76, plus allotments
for fiscal year 1953 of $38,500 for examinations and surveys and
:$27,000 for contingencies, a total of $78,957.76 will be applied to
accounts payable, $919.42, and to payment of expenses to be incurred
under this heading during fiscal year 1953.
   The additional sums of $73,600 for examinations and surveys and
 $27,000 for contingencies, a total of $100,600, can be profitably ex-
pended during fiscal year 1954.
                                          Cost and financial summary

                                                       Fiscal year ending June 30                                 Total to June
                                                                                                                 30, 1952, includ-
                                                                                                                 ing fiscal years
                                      1948            1949            1950           1951            1952          prior to 1948

Maintenance:
   Appropriated-.........         $95, 000. 00   $99, 400.00      $93, 300. 00 $104, 000. 00     $38, 315. 00      $3, 770, 577. 56
   Cost   ---------------          96, 076. 58    95, 089. 78     118, 247. 27   79, 036. 03      74, 991.03        3, 758, 039. 22
     Expenditures--------          95, 857.01      93, 028.80     121, 485. 74     77, 626.83     75, 405. 43       3, 757, 119. 80



                   19. PLANT ALLOTMENT, MOBILE, ALA., DISTRICT

                                          Cost and financial summary

                                                           Fiscal year ending June 30                             Total to June
                                                                                                                 30, 1952, includ
                                                                                                                 ing fiscal years
                                      1948            1949            1950            1951           1952          priorto 1948

Maintenance:
   Appropriated-........         -$62,094.37 ------.....          ---$100,000.00 $130, 284. 18    $12, 996. 19     $1, 250, 986.35
     Cost.,
     Expenditures-..             -130,171.06       54, 735. 19 -188,242.38         28, 164.80 -97,456.39               720, 338. 66
 698               REPORT OF CHIEF OF ENGINEERS, U.                                                       S. ARMY,              1952

                                     20. INACTIVE NAVIGATION PROJECTS

                                                                                  For last        Cost and expenditures to                Estimated
                                                                                full report             June 30, 1952                      amount
                           Name of project                                      see annual                                                 required
                                                                                  Report                                                    to com-
                                                                                     for         New work          Maintenance               plete

  1. St. Marks River, Fla -------.......................----------------...          1951       $229, 741. 50             $6, 701.88               (1) (2)
  2. Ochlockonee (Ochlockney) River, Georgia and
       Florita4 .........._________________                                 ..       1900          5,000. 00 ..........----------------.....            $95, 0001
  3. Carrabelle Bar and Harbor, Fla...............-                                  1950        363, 686. 38          275, 535. 00                     (1)
  4. Apalachicola Bay, Fla. ..----------------------                                 1951        216, 758.09           780, 200. 46                     (1)
  5. Upper Chipola River, Fla., from Marianna to
      its mouth 3 4_________________________________                                 1941         36, 781. 12             63, 193. 43            5 113, 200
  6. Choctawhatchee River, Florida and Alabama 6_                                    1949        171, 884. 50            266, 444. 60              (1)
  7. La Grange Bayou, 3Fla-----------------..
                               - -- -- -- -- -- -- -- -- -- -- -- -                  1951         64, 150. 62             43, 545. 92          2 5103, 800
  8. Holmes River, Fla.                                                              1931          8, 562. 05           7 36, 800.00               (1)
  9. Blackwater River, Fla........................                                   1949         41, 649.90             106, 759.10               (1)
10. Escambia and Conecuh Rivers, Florida and
      Alabama---................------------------------                             1951         118, 336.26             110, 700. 00        (1) (2)
11. Fly Creek, Fairhope, Ala..---..   11- - - ---------------
                                                   - - - - - - - - - --          -   1950        .............-...----                       2 5 14, 000
12. Dauphin Island Bay, Ala.                            .        3                  1950       ............       .-...-                  -2 5 131, 000
13. Oostanaula and Coosawatee
                            a             Rivers, Ga. 4......                        1907           32, 656. 41 ................             5 117, 300
14. Cahaba River, Ala. 4-..........................
                                2                                                    1894         45, 000.00 .............                              (8)
15. Tallapoosa River, Ala. 4.......................                                  1893          43, 971.92 ...............                         ()
16. Bayou Coden, Ala _-           .--..........-----------                     .     1950              650.00 -----------        __---              2  a 4, 000
17. Bayou La Batre, Ala_- -----                       --------                       1951          21,051.56            112, 950. 12               2 589,   000
18. Noxubee River, Miss.          9_____                                             1902          47, 527. 52            14, 472. 48                 (1)
19. Old Town Creek, Miss. 4.......................                                   1887           3, 000. 00-..---         ------ ___              5 30, 001)
20. Leaf and Chickasawhay Rivers, Miss. 4........                                    1919          23, 089. 94            42, 676. 26              5 126, 900

21. Bluff Creek, Miss. ..........................          -----                     1893           1, 000. 00       .-         __-__                 (1)
22. Wolf and Jordan Rivers, Miss.e                  -------------.................   1951          29,195. 19             82, 390.80                  (1)
23. Bayou Galere, Miss.'---__-----
                         3
24. Chitto Bogue, La. 10 .
25. Pass Christian Harbor, Miss.
                                     .
                                                               -----
                                             -..- - - - - ...--------
                                                            - -- -- -- -- --
                                                                                     1946
                                                                                     1909
                                                                                     1947
                                                                                            -    ---- - _--_--------
                                                                                                   14, 912.60             12,929.94
                                                                                                    1,100. 00 .........------
                                                                                                                                  _---
                                                                                                                                               '    2    8, 900
                                                                                                                                                      185,100
                                                                                                                                                    a23, 000
                                  - - - --- -- -- --- -- --- - -
26. East Pearl River, Miss.                                   .       _ .            1951         37, 127. 93             59, 324. 67                (1)
27. Pearl River, Miss., Edinburg to Jackson -......                                  1911         31, 872.06              36, 990.55                  218, 1001


   I Completed.
  2 No work proposed for fiscal years 1953 and 1954.
  3 No commerce reported.
  4 Abandonment recommended in H. Doc. 467, 69th Cong., 1st sess.
  5 Revised in 1952.

  6 Channel adequate for commerce.
  7 Includes $2,160.80 for work on La Grange Bayou and $147.59 for routine surveys during fiscal year 1951.
  8 Considered completed.
  ' That portion of the Noxubee River in Noxubee County, Miss., was declared non-navigable on Feb. 24,
1934, Act S. 2337, 73d Cong., 2d sess. (48 Stat. 356).
  10 Considered unworthy of further improvement.
  11 Recommended modification shown in H. Doc. 394, 82d Cong., 2d sess.


                                          21. MISCELLANEOUS ACTIVITIES

Status of all investigations for navigation called for by river and harbor acts
                            and committee resolutions

                                                                                                   Date trans-         Document                Recom-
                     Locality                                  Authorization act                    mitted to
                                                                                                    Congress                No.           mendation


Alabama      River, waterway to                         River and Harbor Act, --------------
  Escambia River, Fla. and Ala.                          Mar. 2, 1945.
Alabama-Coosa      Branch, deter-                       House Public Works Com- ---------------
  mination of salinity line in the                       mittee resolution, June
  Mobile River and its tributaries.                      11, 1952.
Alabama-Coosa Branch of Mobile                          Commerce Committee res-
  River system and tributaries                           olution, Jan. 18, 1939.
  thereof for flood control, navi-
  gation, hydroelectric power, etc.
  (final report).
Alabama-Coosa Branch of Mobile                          Rivers and Harbors Com-
  River system,      Georgia and                         mittee resolution. Apr.
  Alabama (final report).                                28, 1936.
Apalachicola Bay, Fla. _            ._                  Rivers and Harbors Com-
                                                         mittee resolution, Apr.
                                                         29, 1937.
                    RIVERS          AND         HARBORS--MOBILE,                     ALA.,         DISTRICT          699

Statue of all investigations for navigation called for by river andr harbor acts
                                    and committee resolutions-Continued

                                                                                     Date trans-
                 Locality                               Authorization actj            mitted t
                                                                                      Congress        Document
                                                                                                        No.    mendation
                                                                                                                Recon


Apalachicola River and tributaries,              Sec. 1, River and Harbor
  Georgia, Alabama, and Florida,                   Act, Jan. 21, 1927.
  for navigation, flood control,
  power, and irrigation,
Biloxi Harbor, Miss., 40-foot chan-              River and Harbor Act,
nel, to serve as deepwater outlet                Mar. 2, 1945.
  to Gulf of Mexico.
Bon Secour Bay, Ala., to the Gulf,               Senate Public Works     Com-
  waterway to Oyster Bay.                          mittee resolution,    Mar.
                                                   28, 1949.
Cadet Bayou, Miss................------------    House Public Works      Com-
                                                   mittee resolution,    Dec.
                                                   14, 1950.
Carrabelle, Fla., to determine the               River and Harbor         Act,
feasibility of extending the chan-                May 17, 1950.
nel.
Chattahoochee River, Ga., and                    River and Harbor Act,
connecting waterways.                            July 3, 1930.
Chickasawhay, Leaf, and Pasca-                   House Public Works Com-          July 27,1951                   Unfavor-
goula Rivers, Miss.                              mittee resolution, May                                          able.
                                                   13, 1947.
Chipola River, Ala. and Fla.,                    Rivers and Harbors Com-         ...............
hydroelectric power at Look and                   mittee resolution, Apr.
Tremble Falls, at Dawson Hill-                   24, 1945.
Clarksville site, and at Darling
Slide site.
Chipola River, Ala. and Fla., with               River and Harbor         Act,
a view to its imporvement in the                  Mar. 2, 1945.
interest of navigation, flood con-
trol, power, and other related
purposes.
Chipola River, Fla. and Ala., for                Rivers and Harbors Com-
navigation, flood control, power,                 mittee resolution, Jan.
and related purposes.                             21, 1942.
Choctawhatchee Bay, Fla., water-                 River and Harbor Act,
way to connect Basin Bayou.                       May 17, 1950.
Choctawhatchee Bay, Fla., small-                 ... do--..........._    .....
boat channel at Bay Bridge.
Columbus, Ga., to Pensacola, Fla.,               River and Harbor         Act,
waterway via Chattahoochee,                      Mar. 2, 1945.
Conecuh, and Escambia Rivers.
Coosa River, Ga. and Ala. (final                 Rivers and Harbors Com-
  report).                                        mittee resolution, Apr.
                                                   1, 1936.
Coosa-Alabama Branch of Mobile                   Commerce Committee res-
  River system, and tributaries                   olution, Jan. 18, 1939.
thereof, for flood control, naviga-
tion, hydroelectric power, etc.
  (final report).
Coosa-Alabama Branch of Mobile                   Rivers and Harbors Com-
  River system,       Georgia and                 mittee resolution, Apr.
Alabama (final report).                          28, 1936.                     Mar.- -5, -1952
                                                                              ----          - -
Dauphin Island Bay, Ala., channel                House Public Works Com-                          H. 394, 82d    Favorable.
to Mississippi Sound.                             mittee resolution, June 2,                          Cong.,
                                                   1949.                                              2d sess.
                                                Senate Public Works Com-      .... do.........
Dauphn Island Bay, Ala., channel                                                                .... do....        Do.
to Mississippi Sound.                             mittee resolution, Feb.
                                                   25,1949.
Escambia River, Fla.l..------.---.               House Public Works Com-                        ............
                                                   mittee resolution, June
                                                   11,1952.
Escambia River, waterway to                      River and Harbor Act, ...............          ............
  Alabama River, Fla. and Ala.                     Mar. 2, 1945.
Flnt River, Ga..---------------                  River and Harbor Act,
                                                   July 24,1946.
Flint River to Albany, Ga., with a               Senate Public Works Com-
  view to providing a 9-foot depth                 mittee resolution, June 1, .. .. . . . . .
  for navigation.                                  1948.
Fowl River, Ala., and connection                 Senate Public Works Com-
  with Mississippi Sound.                          mittee resolution, May 1,
                                                   1951.
Gulfport Harbor, Miss., 40-foot                  River and Harbor Act,
channel to serve as deep-water                    Mar. 2, 1945.
outlet to Gulf of Mexico.
Gulfport Harbor, Miss., small craft              Senate Public Works Com-
harbor.                                           mittee resolution, June
                                                   21,1952.
   See footnote at end of table.
700           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

Status of all investigations for navigation called for by river and harbor acts
                      and committee resolutions-Continued

                                                                                 Date trans-
                Locality                           Authorization act              wIitted to         Do                       mendation
                                                                                  Congress
            County, Miss.,n Beach~
        Hariso
Harrison County,         Miss.,   Beach    Rivers and Harbors Com-
erosion study.                              mittee resolution, June
                                             14, 1946.
Heron Bay, Ala...----.............-- River and Harbor Act,
                                             May 17, 1950.
Leaf, Chickasawhay, and Pas- House Public Works Com-                            July   27,1951                                Unfavor-
  cagoula Rivers, Miss.                      mittee resolution, May                                                            able.
                                             13,1947.                                                -----------
Mississippi Sound, a connection            Senate Public Works Com- . . - - -- - - -
  with Fowl River, Ala.                      mittee resolution, May 1,
                                             1951.
Mobile Harbor,     Ala..-----------        House   Public Works Com- .- - - - - - -
                                                                                                    ------------
                                             mittee resolution, July
                                             13,1949.
Mobile Harbor, Ala., 40-foot chan- River and Harbor Act, . . - -- - -- -                            - -   - - - - - -     -

  nel to serve as deep-water outlet          Mar. 2, 1945.
  to Gulf of Mexico.
Mobile     Harbor     &       River,  Ala. House   Public Works Com- .- - - - - - -
  (survey).                                  mittee resolution, Sept.
                                             27,1951.
Mobile Harbor, Ala., small-boat            Senate Public Works Com- .- - - - - - -
  facilities on west side of Mobile          mittee resolution, Jan.
  Bay.                                       18, 1949.
Mobile    Harbor,   Ala.      (fresh water Senate  Public Works Com-                .-- - - - - -
  project). (Mobile R-Blakely Is-            mittee resolution, Apr.
  land,   salt water      intrusion   and    15, 1949.
  34-foot channel).
Mobile River and its tribs., deter- House Public Works Com-
  mination of salinity line (Ala-            mittee resolution, June
  bama-Coosa Branch).                        11, 1952.                            .- - - - - - -
Mobile, Tennessee, and Tombigbee           River and Harbor Act,
  Rivers, 12-foot waterway, Ohio             Mar. 2, 1945.
  River to the Gulf of Mexico
  (report to be made by special
  board).
                                           Rivers and Harbors Com-
    Do............................---------------------
                                             mittee resolution, Oct. 5, . . . -- - -- -
                                             1943.
Ohio River to the Gulf of Mexico, ---...       do...------------------
  12-foot waterway via the Ten-
  nessee, Tombigbee, and Mobile                                                  ..............-
  Rivers (report to be made by
  special board).
    Do............---------------------    River and Harbor Act,                                    ------------
                                             Mar. 2, 1945.
Pascagoula Harbor Miss., 40-foot ....       _do......................
  channel to serve as deep-water                                                                    ------------
  outlet to Gulf of Mexico.
Pascagoula Harbor, Miss----...........     House Public Works Com-
                                             mittee resolution, Aug.
                                             16,1950.
Pascagoula, Leaf, and Chickasa- House Public Works Com-                         July   27,   1951   ------------              Unfavor-
  whay Rivers, Miss.                         mittee resolution, May                                                            able.
                                             13,1947.
Pearl River, Miss., to provide 9-          Rivers and Harbors Com- - - - -- - -- -
  foot channel up to Jackson.                mittee resolution, June                                - -   - --   --   -   -
                                             6, 1939.
Pensacola, Fla., to Columbus, Ga.,         River and Harbor Act, -- - ---. - -
  waterway via Chattahoochee,                Mar. 2, 1945.
  Conecuh, and Escambia Rivers.
Pensacola Bay, Fla., boat basin            River and Harbor Act, -- - -- - -- -
  and channel connecting with                May 17, 1950.
  Bayliss Memorial Wayside Park.
Pensacola Bay, Fla., channel at .....---       do.....-------.........--------- --- - - - - - -
  Bayou Texar.
Pensacola Harbor, Fla..-----..........-- River and Harbor Act,
                                             Mar. 2, 1945.                       --...-..-------
    Do ..........................          Rivers and Harbors Com-
                                             mittee resolution, Nov.
                                             20, 1945.                           -- - -- - -- -      - ---------



Perdido Bay, Ala. and Fla., en- River and Harbor Act,
trance from deep water in the               Mar. 2, 1945.
bay to the Gulf of Mexico via
most practicable route.
Philips Inlet, Fla..................       River and Harbor Act,
                                             May 17, 1950.
                       RIVERS AND HARBORS--MOBILE,                                         ALA.,     DISTRICT          701
Status of all investigations for navigation called for by river and harbor aoe
                     and committee resolutions--Continued

                                                                                           Date trans.    Document  Recom-
                     Locality                                 Authorization act            mitted to        No.    mendation
                                                                                            Congress          o.   mendtion

St. Marks, Fla., canal to Talla-                         River and Harbor Act,
  hassee.                                                 Mar. 2, 1945.
St. Mary de Galvez Bay to Sound                          River and Harbor Act,
  Bay, Fla., waterway across                              July 24, 1946.
  Santa Rosa Peninsula, Fla.
Santa Rosa Island, Fla., channel
  across island.
                                                         River and Harbor Act,
                                                          May 17, 1950.                 I..------.   --.I.---------
Sioux Bayou and connecting water                         River and Harbor Act,
  ways, Miss.                                             July 24, 1946.
Tennessee, Tombigbee, and Mobile                         River and Harbor Act,
  Rivers, 12-foot waterway, Ohio                          Mar. 2, 1945.
  River to the Gulf of Mexico
  (report to be made by special
  board).
Tennessee, Tombigbee, and Mobile                         Rivers and Harbors Com-
  Rivers, 12-foot waterway, Ohio                           mittee resolution, Oct
  River to the Gulf of Mexico                             5, 1943.
  (report to be made by special
  board).
Tennessee and Tombigbee Rivers,                          Rivers and Harbors Com-
  waterway connecting (Warrior                            mittee resolution, Feb.
  River route) (report to be made                         27, 1934.
  by special board).
Texar Bayou, channel to Pensacola                        River and Harbor Act,
  Bay, Fla.
Texar Bayou, Fla-------------..................
                                                          May 17, 1950.
                                                         River and Harbor Act,
                                                                                              I     ---------
                                                                                                   ----
                                                                                                --------
                                                          Mar. 2, 1945.
Tombigbee, Tennessee, and Mobile                        .----do....................
  Rivers, 12-foot waterway, Ohio
  River to the Gulf of Mexico
  (report to be made by special
  board).
    Do--------------------------.....................    Rivers and Harbors Com-
                                                           mittee resolution, Oct.
                                                           5, 1943.
Tombigbee River, Ala. and Miss.,
  and canal connecting the Tom-
                                                         River and Harbor Act,
                                                          Mar. 2, 1945.
                                                                                        I..-------- - ---------
  bigbee and Tennessee Rivers.
Tombigbee River and tributaries,                         Rivers and Harbors Com-
  Miss., improvement of West Fork                         mittee resolution, Apr.
  for navigation, flood control, and                      15, 1946.
related purposes.
Tombigbee and Tennessee Rivers,                          Rivers and Harbors Com-
  waterway connecting (Warrior                            mittee resolution, Feb.
  River route) (report to be made                         27, 1934.
  by special board).
Tombigbee and Warrior Rivers,                            Rivers and Harbors Com-
  Ala. and Miss., construction of                         mittee resolution, Mar.
  impounding dam 1 on Sipsey                              10, 1937.
  Fork of Black Warrior River for
  navigation, flood control, water
  power, irrigation, etc.
Warrior and Tombigbee Rivers,                            House Public Works     Comn-
  Ala. and Miss., between Mobile                           mittee resolution,    Apr.
  and Birmingham, Ala.                                    21, 1950.
Warrior and Tombigbee Rivers,                            Rivers and Harbors     Com-
  Ala. and Miss., construction of                         mittee resolution,    Mar.
  impounding dam 1 on Sipsey                              10, 1937.
  Fork of Black Warrior River for
  navigation, flood control, water
  power irrigation, etc.
Water hyacinth obstruction in                            Rivers and Harbors Com-
  Louisiana and other states                               mittee resolution, Feb.
  affected.                                                6, 1945.

   1Limited to preliminary examination                       scope.




             245554-53-vol. 1                           45
702          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                1952

22. EMERGENCY CHANNEL WORK FOR NAVIGATION UNDER AUTHOR-
   ITY OF SECTION 3 OF THE RIVER AND HARBOR ACT APPROVED
   MARCH 2, 1945

   The River and Harbor Act approved March 2, 1945, authorized the
allotment of not to exceed $300,000 from river and harbor appropria-
tions for any one fiscal year for removing accumulated snags and other
debris, and for protecting, clearing, and straightening channels in
navigable harbors and navigable streams and tributaries thereof, when
such work is advisable in the interest of navigation or flood control.
   The sum of $5,000 was made available during the fiscal year 1952 for
dredging in the channel connecting Old Pass Lagoon at Destin, Fla.,
with the East Pass Channel between the Gulf of Mexico and Chocta-
whatchee Bay, Fla. The U. S. pipeline dredge Blackwoater removed
16,238 cubic yards of material in the channel September 26 to 29, 1951,
at a cost of $5,000, charged to maintenance. The expenditures were
 $5,001.67, including payment of $1.67 for costs incurred under this
authority in fiscal year 1951.
   The total costs and expenditures of work under this heading to
June 30, 1952, have been $11,778.53 for maintenance. Prior work
performed under this heading has been as follows: Bayou Coden, Ala.,
dredging, September 1948; Carrabelle Harbor, Fla., dredging, March
1951.
                                             Cost and financial summary

                                                         Fiscal year ending June 30                         Total to June
                                                                                                           30,1952. includ-
                                                                                                           ing fiscal years
                                       1948             1949         1950         1951         1952          prior to 1948

Maintenance:
   Appropriated ..-------.             ..------------    $3, 000 ------------ $3, 778. 53    $5, 000. 00        $11, 778. 53
   Cost ----------------------------                      3,000 ------------ 3, 778. 53       5,000. 00          11, 778. 53
   Expenditures--------------------                       3, 000 ------------   3, 776. 86    5, 001.67           11, 778. 53


         23. ALLATOONA                       RESERVOIR,             COOSA       RIVER BASIN,                GA.

  Location.--Allatoona Dam is on the Etowah River in Bartow
County, Ga., about 48 miles upstream from Rome, Ga., about 5 miles
due east of Cartersville, Ga., and about 2,000 feet downstream from
the mouth of Allatoona Creek. The reservoir extends about 27 miles
up the Etowah River at maximum-power-pool elevation of 835 feet
above mean sea level.
  Existing project.-This provides for a dam and reservoir for flood
control, regulation of stream flow for navigation, and development
of hydroelectric power. The height above river bottom of the con-
crete gravity-type dam is about 190 feet, from elevation 690 feet to
880 feet above mean sea level. The spillway, with crest at elevation
835, is controlled by nine Tainter gates, 40 feet wide by 25 feet high,
and two Tainter gates 20 feet wide by 25 feet high; it has a dis-
charge capacity of 318,500 cubic feet per second with water surface
at elevation 870.1. One 48-inch-diameter sluicing conduit with free
discharge valve, and four sluices 5 feet 8 inches wide by 10 feet high,
are included in the dam. The reservoir, covering 19,700 acres at ele-
vation 860, has a storage capacity of 722,000 acre-feet. The estimated
                    FLOOD CONTROL--MOBILE,                   ALA.,     DISTRICT         703
cost, revised in 1952, is $31,390,000. The latest (1952) revised esti-
mate for annual cost of operation and maintenance, is $235,000. This
project was authorized by the Flood Control Acts of August 18, 1941,
and December 22, 1944 (Public Law 228, 77th Cong., 1st sess.), as
outlined in House Document No. 674, Seventy-sixth Congress, third
session.
   Local cooperation.-Section2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-The following work in
connection with the project was performed during the fiscal year:
   New work: Hired labor: Preliminary surveys and work incidental
to the design of dam and powerhouse appurtenances, acquisition of
land, repair of road to Macedonia and Goodson Cemeteries, flood-re-
porting network, alterations to powerhouse controls and drilling water
wells.
   Contract: Construction of bridge over Little River, final clearing
of reservoir, alterations to lighting, heating, and electrical systems,
acoustical ceilings in powerhouse, reservoir operations buildings and
utilities and repair of access roads.
   Operation and maintenance: Operating facilities, engineering
studies and investigations, land management and administration,
supervision and engineering, ordinary maintenance and repair.
   The net total cost was $527,853.96, of which $322,769.90 was for
new work and $205,084.06 for operation and maintenance. The ex-
penditures were $517,090.90.
   Condition at end of fiscal year.-The existing project, commenced
in March 1944, was practically completed. The work remaining to
be done to complet'e the project consists of completion of the flood-
reporting network; elimination of mosquito breeding places; com-
pletion of reservoir operations building; and completion of recre-
ational facilities.
   The total cost under the existing project was $31,283,187.49, of
which $30,873,028.16 was for new work and $410,159.33 for operation
and maintenance. The expenditures were $31,145,550.92.
   Proposedoperations.-Thebalance unexpended June 30, 1952, $662,-
319.08, and accounts receivable, $16,207.36, plus an allotment for fiscal
year 1953 of $235,000 for operation and maintenance, a total of
$913,526.44, will be applied as follows:
Accounts payable June 30, 1952 _---------------__------                           $23, 283. 56
New work:
    Surveys, engineering, investigations, maps, etc__ $20, 146. 90
    Installation of flood-reporting radio network ....       60, 271. 84
    Reservoir management and public-use facilities;
      reservoir operations building---------------. 153,170. 09
    Lands and damages--------------- --------                54, 154. 76
    Final payments for reservoir clearing---------          234, 459. 45
    Alterations to lighting, heating, and electrical
      systems ----------------------------------              2, 563. 25
    Alterations and extensions to piping system and
      automatic lubrication system for turbines------. 25, 694. 00
    Fire control communication system _.......-_        ...   3, 500. 00
    Alterations to powerhouse controls, ......--..            2, 218. 00
    Available for continuing construction------..........    94, 625. 66
       Total   --   --------------------   .   ......-..--.---...-.-              650, 803. 95
704           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

Operation and maintenance:
   Operation of dam, powerhouse, and appurtenant
     works-----------------------------               $112, 538.93
   Ordinary maintenance and repair: powerhouse,
     dam, reservoir, grounds, etc---------------...      39, 300. 00
   Improvement and reconstruction------.............     18,500.00
   Reservoir management, sanitation, mosquito con-
      trol, land management, recreational facilities,
          ete
          v          ...--    -      --          -   ---    -     -   --   -      ---    -         -   .r
                                                                                                               53 200 00n(
       Radio reporting networks..................                                                                  4, 800. 00
       Stream gaging                                ..                                                             8, 800. 00
       Sedimentation studies__._       ............                                          ...                   2, 300. 00
          raial ----------- ---
          JLULUI                            ---        --   ---       --   ---    ---   --         ---        --    ---   --     $239, 438.93

          Total for all work .........------------....-.-....                                                                  .-- 913, 526. 44
   The additional sum of $229,000 can be profitably expended during
fiscal year 1954 as follows:
Operation and maintenance:
   Operation of dam, powerhouse, and appurtenant
     works-----------------------------                                                                            $196, 000
   Ordinary maintenance and repair; powerhouse,
      dam, reservoir, grounds__..--... ..........                                                                    33, 000
              Total for all work _-.....                              ------------                          ------------            $229, 000
                                             Cost and financial summary

                                                                Fiscal year ending June 30                                        Total to June
                                                                                                                                 30, 1952, includ-
                                                                                                                                 ing fiscal years
                                          1948              1949               1950             1951                  1952         prior to 1948

New work:
   Appropriated-.........$8,425,000.00 $8,000,000.00 $6,750,000.00 -------.-----                        133,300.00 $31,390,020.00
   Cost--------------.................. 3, 567, 554. 34 9, 685, 104. 68 5, 152, 979. 08 $1,210,291.67  322, 709. 90 30, 873, 028.16
   Expenditures-......... 7, 643, 616. 25 , 518, 740. 995, 781, 882. 81 2,132,994. 3                   304, 244. 7  30,723, 973.06
Maintenance:
   Appropriated-------------------------------------- 223, (. 00 194,250.00 "                                           417, 850.00
   Cost.-----------.                    ---------------------------------                 205 075.27 205,084.0          410,159.33
   Expenditures----.................---.......------.........------------------------     208,731.72 1 196,675.08       405, 406.80


Other new work data:
   Unobligated balance, June 30, 1952-----.... ---      ---------- $344, 119, 44
    Unobligated balance available for fiscal year 1953------------- 344, 119. 44
   FAccounts receivable of $16,171.06                       not included.

24. SNAGGING AND CLEARING UNDER AUTHORITY OF SECTION 2 OF
      THE FLOOD CONTROL ACT APPROVED AUGUST 28, 1937, AS
     AMENDED

   The Flood Control Act approved August 28, 1937, as amended by the
Flood Control Acts approved August 11, 1939, August 18, 1941, and
July 24,1946, authorized the allotment of not to exceed $1,000,000 from
the flood-control appropriations for any one fiscal year for the removal
of accumulated snags and other debris from and the clearing and
straightening of channels in navigable streams and tributaries thereof
when such work is advisable in the interests of flood control; provided
that not more than $50,000 shall be allotted for this purpose for any
single tributary from the appropriations for any one fiscal year..
   Operationsand results during fiscal year.-Snagging and clearing,
by contract, West Fork Tombigbee River (Town Creek) in Lee County,
                  ,FLOOD . CONTROL-MOBILE,                                 ALA.,    DISTRICT                      705
Miss., between miles 10 and 25, was continued between June 1951 and
February 1952. At the end of the fiscal year the work was about
95 percent completed, at a cost of $27,455.61 for new work. The
expenditures were $31,791.65.
   The total cost of the work performed on Town Creek was $35,000,
charged to new work; the total expenditures were $33,502.25.
   Condition at end of fiscal year.-Snagging and clearing operations
on Town Creek, which were commenced in June 1951, were about
95 percent completed. Work under authority of this act was com-
menced in 1939 and has continued intermittently as needed. In addi-
tion to the operations on Town Creek, work under this authority has
been performed as follows: Chattahoochee River in vicinity of West
Point, Ga., 1948 to 1950; Cahaba River, Ala., 1939 and 1940; Tombig-
bee River and tributaries, Miss. and Ala., 1949 and 1950; Sipsey River,
Ala., 1940; Luxapalila River, Miss., and Ala., 1940 to 1942; and Tibbee
Creek, Miss., 1940 to 1942.
   The total cost for work performed under this authority was $301,-
521.63, charged to new work. The expenditures were $300,023.88.
   Proposed operations.--The balance unexpended June 30, 1952,
$3,297.75, will be applied as follows:
Accounts payable June 30, 1952            --.-------------------------- $1, 497. 75
New work : Complete contract for snagging and clearing banks in West
  Fork Tombigbee River (Town Creek), Lee County, Miss., between
miles 10 and 25------------------------------------------               1, 800. 00
       Total           ----------------------------------------------                                       3, 297. 75

                                    Cost and financial summary

                                                  Fiscal year ending June 30                             Total to June
                                                                                                        30. 1952, includ-
                                                                                                        ing fiscal years
                                1948            1949            1950            1951         1952        prior to 1948


New work:
   Appropriated-.........   $45, 000.00     $11, 500. 00    $15, 500. 00     $35,000.00 -$7, 200. 36        $303,321.63
   Cost..................     7, 307. 25      10, 113. 69    40, 302. 84      12, 320. 25 27, 455. 61        301, 521.63
   Expenditures ---------     6, 931.55        9. 489. 52    40, 452. 71       7, 336.46  31,791.65          300023.88


Other new work data:
    Unobligated balance, June 30, 1952       ------------------------   $1, 657. 38
    Unobligated balance available for fiscal year 1953---1, -----------     657.38

  25. PRELIMINARY EXAMINATIONS, SURVEYS, AND CONTINGENCIES
                     FOR FLOOD CONTROL

   The cost during the fiscal year was $26,925.60, the expenditures
were $26,096.40. The balance unexpended June 30, 1952, $7,693.67,
plus allotments of $93,100 for preliminary examinations and surveys
and $1,500 for contingencies, a total of $102,293.67, will be applied
to accounts payable, $532.33, and to payment of expenses to be incurred
under this heading during fiscal year 1953.
   The additional sum of $150,200 can be profitably expended during
fiscal year 1954.
706          REPORT OF CHIEF OF ENGINEERS, U.                                          S. ARMY,        1952

                                      Cost and financial summary

                                                   Fiscal year ending June 30                               Total to June
                                                                                                           30, 1952, includ-
                                                                                                           ing fiscal years
                                   1948          1949            1950             1951         1952          prior to1948

Maintenance:
   Appropriated-........ $85, 000.00 $151, 500. 00 $120, 000. 00 $140, 000. 00 -$7, 000. 00                  $1, 458, 097. 24
   Cost-.................     52, 056. 76 142, 846. 39 160, 660. 21 100, 730. 23 26, 925.60                   1,450, 935.90
   Expenditures--------...... 49, 604. 01 131, 536. 85 167, 066.09 108, 791.90   26, 096.40                  1 1, 450,403. 57

   1Includes a credit of $1,135.46 reimbursement from emergency flood-control work under authority of Sec-
tion 210 of the Flood Control Act approved May 17, 1950. Original work and charge made in fiscal year 1951.

                          26. INACTIVE FLOOD-CONTROL PROJECTS

                                                              For last       Cost and expenditures to            Estimated
                                                            full report            June 30, 1952                  amount
                   Name of project                          see Annual                                           required
                                                              Report                                              to com-
                                                               for         New work          Maintenance            plete

1. Rome, Coosa River, Ga...........-.............                1941     $367, 640.37 ------------                  (1)
2. Tombigbee River, Mississippi and Alabama.....                 1941      134, 801. 39 --.-...-         . --.    15,981,000
3. Prattville, Autauga Creek, Ala_- --------              __--   1946      649, 280. 24 _..............             (1)
4. Collinsville, Ala- ..----------------------------             1940       71, 118. 51--...-..--..-.---            (5)
5. Pearl River, Mississippi and Louisiana, at Jack-
     son, Miss-----------------------------                      1937   -----------              460, 000
                                                                         ............------.........------
6. Inspection of completed projects..--....------..........      1951    ............     $400

  i Completed.
  9 Revised in 1952.
  a Now included in comprehensive plan.
  4 No funds have been allotted and no work has been done on this project.
  * Completed with funds appropriated for the maintenance and improvement of river and harbor works.

                               27. MISCELLANEOUS                     ACTIVITIES

Status of all investigations for flood control called for by flood control acts
                          and committee resolutions

                                                                               Date trans-     Document           Recom-
               Locality                        Authorization act                mitted to        No.             mendation
                                                                                Congress

Alabama-Coosa Branch of Mobile            Flood Control Committee           ........
  River system, Alabama and                 resolution, May 29, 1946.
  Georgia, to provide flood protec-
  tion on Little Cedar Creek near
  Cave Springs, and on Big Cedar
  Creek, Ga.
Alabama-Coosa Branch of Mobile            Rivers and Harbors Com----------------------...........
  River system, Georgia and Ala-            mittee resolution, Apr.
bama (final report).                       28, 1936.
Alabama-Coosa Branch of Mobile            Commerce Committee res- _..................
  River system, and tributaries             olution, Jan. 18, 1939.
thereof, for flood control, hydro-
electric power, and irrigation
  (final report).
Apalachicola River and tribu-             Sec. 1, River and Harbor ---..............------------
taries, Georgia, Alabama, and              Act, Jan. 21, 1927.
  Florida, for navigation, flood
control, power, and irrigation.
Apalachicola and Suwanee Rivers,          Flood Control Act, May .........................---
  coastal streams flowing into Gulf         17, 1950.
  of Mexico between these rivers,
  with a view to their improvement
  in the interest of flood control
  and related purposes.
Big Swamp Creek and tribu-                Senate Public Works Com-
  taries, Ala.                              mittee resolution, Feb.
                                            10, 1950.
                      FLOOD CONTROL-MOBILE,                      ALA.,    DISTRICT                707
Status of all investigations for flood control called for by flood control acts
                      and committee resolutions-Continued

                                                                      Date trans-   Document  Recom-
              Locality                      Authorization act          mitted to      No.    mendation
                                                                       Congress

Blackwater River, Fla.............    Flood Control Act, May
                                         17, 1950.
Blackwater and Perdido Rivers, ..---...do...--..............
   Ala.
Buttahatchee River, Alabama and Flood Control Committee
  Mississippi.                           resolution, Feb. 9, 1939.
     Do....------------------         Rivers and Harbors Com-
                                         mittee resolution, Feb. 1,
                                        4,1939.
Chickasawhay and Pascagoula House Public Works Com-
   River and Chunky Creek, Miss.       mittee resolution, June
                                       26, 1952.
Chipola River, Alabama and Flood Control Act, Dec.
   Florida.                             22, 1944.
Chipola River, Alabama and River and Harbor Act,
   Florida, with a view to its im-      Mar. 2, 1945.
   provement in the interest of nav-
   igation, flood control, power, and
  other related purposes.
Chipola River, Alabama and Rivers and Harbors Com-
  Florida, for navigation, flood        mittee resolution, Apr.
  control, power, and related pur-      24, 1945.
  poses.
Chunky Creek, Chickasawhay House Public Works Com-
  and Pascagoula River, Miss.1          mittee resolution, June
                                        2", 1952.
Chunky River, Miss-----------..       Flood Control Act, July
                                        24, 1943.
Coosa River, Georgia and Ala- Rivers and Harbors Com-
  bama (final report).                  mittee resolution, Apr.
                                        1, 1933.
Coosa River and tributaries, Flood Control Act, June
   Georgia and Alabama.                 22, 1933.
Coosa River and tributaries, at and Flood Control Act, July
  in the vicinity of Rome, Ga.          24, 1946.
Coosa-Alabama Branch of Mobile Flood Control Committee
  River system, Alabama and             resolution, May 29, 1946.
  Georgia, to provide flood protec-
  tion on Little Cedar Creek near
  Cave Spring, and on Big Cedar
  Creek, Ga.
Coosa-Alabama Branch of Mobile Rivers and Harbors Com-
  River system, Georgia and Ala-        mittee resolution, Apr.
  bama (final report).                  28, 1936.
Coosa-Alabama Branch of Mobile Commerce Committee res-
  River system, and tributaries        olution, Jan. 18, 1939.
  thereof, for flood control, naviga-
  tion, hydroelectric power, and
  irrigation (final report).
Luxapalila River, Alabama and Flood Control Committee
  Mississippi.                          resolution, Feb. 9, 1939.
     Do.....--------------------      Rivers and Harbors Com-
                                        mittee resolution, Feb. 1,
                                        1939.
Nacoochee and Sautee Valleys, Sec. 1, River and Harbor
   Ga. (Int. Rept.).                    Act, Jan. 21, 1927.
Noxubee River, Alabama and Rivers and Harbors Com-
  Mississippi.                          mittee resolution, Feb.
                                        1, 1939.
Pascagoula and Chickasawhay House Public Works Com-
  River and Chunky Creek, Miss.       mittee resolution, June
                                       26, 1952.
Pearl River, for flood control in River and Harbor Act,
   Pearl River, Marion, Hinds, and      Mar. 2, 1945.
   Lawrence Counties, Miss.
Pearl River and tributaries, Miss-. Flood Control Act, July
                                        24, 1946.
Perdido and Blackwater Rivers, Flood Control Act, May
  Ala.                                  17, 1950.
Sautee and Nacocoochee Valleys, Sec. 1, River and Harbor
  Ga. (Int. Rept.).                     Act, Jan. 21, 1927.
   See footnote at end of table.
708        REPORT OF CHIEF OF ENGINEERS,                             U.           S. ARMY,            1952

Status of all investigations for flood control called for by flood control acts
                     and commnvittee resolutions-Continued

                                                                       Date trans-
             Locality                    Authorization act              mitted to                   Do.      mendation
                                                                        Congress

Sipsey River, Alabama and Mis-      Flood Control Committee
  sissippi.                           resolution, Feb. 9, 1939.
                                    Rivers and Harbors Com-
   Do....------.......................
                                      mittee resolution, Feb.
                                      2, 1939.
Sucarnoochee Creek, Ala----------   Rivers and Harbors Com-         --- --- --- --
                                      mittee resolution, Apr. 13,
                                      1939.
Suwanee and Apalachicola Rivers,    Flood Control Act, May 17,
  coastal streams flowing into Gulf   1950.
  of Mexico between these rivers,
  with a view to their improve-                                     - - - -   -   - - -   - - - -

  ment in the interest of flood
  control and related purposes.
Tombigbee River and tributaries, Flood Control Committee
  Mississippi and Alabama.              resolution, May 2, 1939.
Tombigbee River and tributaries, Commerce Committee, res-
  Mississippi.                          olution, May 2, 1939.
Tombigbee River and tributaries, Rivers and Harbors Com-
  Mississippi,      improvement of      mittee resolution, Apr.
  West Fork for navigation, flood       15, 1946.
  control, and related purposes.
Tombigbee and Warrior Rivers, Rivers and Harbors Com-
  Alabama and Mississippi, con-         mittee resolution, Mar.
  struction of impounding dam           10, 1937.
  No. 1 on Sipsey Fork of Black
  Warrior River for navigation,
  flood control, water power, irriga-
  tion, etc.
Tombigbee and Warrior Rivers and House Public Works Com-
  tributaries, Alabama and Mis-         mittee resolution, Mar.
  sissippi, for navigation, flood       26, 1952.
  control, hydroelectric power, and
  other purposes.
Warrior River, Ala. (Int. Rept.)--.... Commerce Committee res-
                                        olution and Flood Con-
                                        trol Committee resolu-
                                        tion, May 2, 1939.
Warrior and Tombigbee Rivers, Rivers and Harbors Com-
   Alabama and Mississippi, con-        mittee resolution, Mar.
  struction of impounding dam           10, 1937.
   No. 1 on Sipsey Fork of Black
   Warrior River for navigation,
   flood control, water power, irri-
   gation, etc.
Warrior and Tombigbee Rivers and House Public Works Com-
   tributaries, Alabama and Mis-        mittee resolution, Mar.
   sissippi, for navigation, flood con- 26, 1952.
   trol, hydroelectric power, and
   other purposes.
Yellow River, Florida and Ala- Flood Control Act, May ...............
   bama.                                 17, 1950.

  1 Limited to preliminary examination scope.

28. EMERGENCY BANK PROTECTION UNDER AUTHORITY OF SECTION
      14 OF THE FLOOD CONTROL ACT APPROVED JULY 24, 1946

   The Flood Control Act approved July 24, 1946, authorized the
allotment of not to exceed $1,000,000 from the flood-control appropri-
ations for any one year for the construction of emergency bank-
protection works to prevent flood damage to highways, bridge ap-
proaches, and public works when such work is advisable; provided
that not more than $50,000 shall be allotted for this purpose at any
single locality from the appropriation for any one fiscal year.
   Under this authority $46,200 has been allotted for bank-protection
works at the lower end of Beaverdam Creek near the Kingston
Highway bridge, near Elba, Ala. The costs and expenditures for
                      FLOOD CONTROL--MOBILE,                       ALA.,      DISTRICT                     709
the fiscal year for plans and specifications were $914.48 for new
work. The total costs and expenditures under the existing authority
at this location were $2,614.23, charged to new work.
   The balance unexpended June 30, 1952, $43,585.77, will be applied
during fiscal year 1953 to the reconstruction, by contract, of the
concrete weir at the lower end of Beaverdam Creek, near Elba, Ala.
                                      Cost and financial summary

                                                 Fiscal year ending June 30                       Total to June
                                                                                                 30, 1952, includ*
                                                                                                 ing fiscal years
                                   1948         1949        1950         1951         1952         priorto 1948

New work:
   Appropriated---......... ---------------------       ------------ $48, 000.00    $1, 800.00        $46,200.00
                     ----------------- ------------ ------------
    Cost--------.................----                                   1,699. 75      914. 48           2,614.28
    Expenditures---.......-------..----- -----------..---------         1,699.75       914.48            2, 614.23


Other new work data:
    Unobligated balance, June 30, 1952-----------------------                                    $43, 585. 77
    Unobligated balance available for fiscal year 1953-------------                               43, 585. 77

29. EMERGENCY FLOOD-CONTROL WORK UNDER AUTHORITY OF SEC-
    TION 210 OF THE FLOOD CONTROL ACT APPROVED MAY 17, 1950

   Section 210 of the Flood Control Act approved May 17, 1950, which
amends Flood Control Acts approved August 18, 1941, July 24, 1946,
and June 30, 1948, authorizes an emergency fund in the amount of
$15,000,000 to be expended in rescue work or in the repair, restoration
or maintenance of any flood control work threatened or destroyed by
flood, including the strengthening, raising, extending or other modifi-
cation thereof as may be necessary in the discretion of the Chief of
Engineers for the adequate functioning of the work for flood control,
The act provides further that pending the appropriation of said sum,
the Secretary of the Army may allot, from existing flood-control ap-
propriations, such sums as may be necessary for the immediate prosecu-
tion of the work herein authorized, such appropriations to be reim-
bursed from the appropriation authorized when made.
   The sum of $1,135.46 was appropriated during the fiscal year for
payment of costs incurred in rescue work during the flood of March-
April 1951, in the Pearl, Pascagoula, Tombigbee-Warrior, and Ala-
bama-Coosa River Basins.
                                       Cost and financial summary

                                                 Fiscal year ending June 30                      Total to June
                                                                                                 30, 1952, includ-
                                                                                                 ing fiscal years
                                   1948         1949        1950         1951         1952        priorto 1948

Maintenance:
    Appropriated........-----------------------------------------                   $1,135.46          $1,135.46
    Cost-----               ----------------------------------------------          11,135.46           1,135.46
    Expenditures........--------------------------------------------                11,135.46           1,135. 46

  I Cost incurred in fiscal   year 1951 and previous charged to preliminary examinations and surveys for flood
control.
710     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,         1952

30. EMERGENCY FLOOD-CONTROL WORK UNDER AUTHORITY OF
   SECTION 205 OF THE FLOOD CONTROL AOT APPROVED JUNE 30,
   1948, AS AMENDED

   The Flood Control Act approved Junie 30, 1948, as amended by
section 212 of the Flood Control Act approved May 17, 1950, author-
ized the allotment of not to exceed $3,000,000 from the flood-control
appropriations for any one fiscal year for the construction of small
flood-control projects riot specifically authorized by Congress, and
not within areas intended to be protected by projects so authorized,
which come within the provisions of section 1 of the Flood Control
Act of June 22, 1936, when such work is advisable; provided that not
more than $150,000 shall be allotted for this purpose at any single
locality from the appropriations for any one fiscal year; provided
further that the provisions of local cooperation specified in section 3
of the Flood Control Act of June 22, 1936, as amended, shall apply;
and provided further that the work shall be complete in itself and
not commit the United States to any additional improvement to insure
its successful operation, except as may result from the normal pro-
cedure applying to projects after submission of preliminary ex-
amination and survey reports.
   Operations and results during fiscal year.-On Black Creek, Ala.,
the contractor cleared 43 acres, removed 89,383 cubic yards of mate-
rial, placed 3,306 cubic yards of riprap, placed 671 cubic yards of
filter blanket, and paved 320 square yards of ditches in improving
the channel of the creek at Gadsden, Ala., from July 1 to August 31,
and October 1 to December 31, 1951. The work was about 95 percent
completed at the end of the fiscal year. The cost was $65,327.52,
charged to new work.
   Preliminary plans, survey, and report in connection with proposed
work on Sowashee Creek, Meridian, Miss., cost $3,805.36, charged to
new work.
   Preliminary plans, surveys, and report in connection with proposed
work on Gordon Creek, Hattiesburg, Miss., cost $992.26, charged to
new work.
   The total cost was $70,125.14, charged to new work. The expendi-
tures were $98,877.48.
   Condition at end of fiscal year.--The first work done under the
project, which is for emergency flood control, was commenced in June
1950, on Black Creek, Gadsden, Ala. At the end of the fiscal year
the work on Black Creek was about 95 percent completed, and pre-
liminary planning for proposed work on Sowashee and Gordon Creeks
was about complete. The total cost under the project was $126,431.35.
The expenditures were $124,736.99.
                  FLOOD CONTROL--MOBILE,                    ALA., DISTRICT                                711
  Proposed operations.-The balance unexpended June 30, 1952,
$153,763.01, will be applied as follows:
Accounts payable June 30, 1952------------------------                                             $1,694. 36
New work:
   Complete, by contract, improving channel of Black Creek at
     Gadsden, Ala., about one-half month- __...______       ..  11, 366. 27
   Clear, snag, and enlarge about 10 miles of the channel of
     Sowashee Creek at Meridian, Miss., about 6 months, Novem-
     ber 1952 to May 1953, by contract __- __---    ----  ___- 139, 694. 64
   Complete, by hired labor, preliminary plans and report for
     improving the channel of Gordon Creek at Hattiesburg,
     Miss., about 2 months, July and August 1952                 1-------------
                                                                   , 007. 74
       Total new work----          ------.-------------------                                    152, 068. 65
         Total for all work-..----..         -------------------                                 153, 763. 01

                                Cost and financial summary

                                          Fiscal year ending June 30                             Total to June
                                                                                                30, 1952, includ-
                                                                                                ing fiscal years
                            1948         1949        1950          1951            1952          prior to 1948

New work:
   Appropriated-------                                       5---1---------------------------
                                                             $133, 000.00 $145, 500.00              $278, 500.00
   Cost ----  ------------------------------------ 56, 306.21                   70,125.14            126, 431.35
   Expenditures.....------------------------------------25, 859. 51             98, 877.48           124, 736. 99


Other new work data:
   Unobligated balance, June 30, 1952_..      ._____ ______--                                   $148, 260. 13
   Unobligated balance available for fiscal year 1953_ __--_-----                                148, 260. 13
  IMPROVEMENT OF RIVERS AND HARBORS IN THE
          NEW ORLEANS, LA., DISTRICT
   This district comprises the State of Louisiana, including the drain-
age area of the Red River south of Fulton, Ark., in Arkansas and
Texas, embraced in the drainage basins tributary to the Mississippi
River and the Gulf of Mexico, except the Mississippi River above
mile 318 above Head of Passes in vicinity of Shaw, La., the drain-
age area of the Ouachita-Black River Basin, and small eastern and
western portions of Louisiana tributary to Pearl River and Sabine
River and Lake.
   The district boundary extends in a northerly and westerly direc-
tion from the Gulf of Mexico along the easterly and northerly water-
shed line of the Sabine River and Lake to include the right-bank
tributaries of the Red River south of Fulton, Ark., in the States of
Arkansas and Texas, and the south bank levees immediately above
Fulton, Ark., in Miller County, Ark., and Bowie County, Tex., crossing
the Red River at Fulton, Ark., thence north-northeast to vicinity of
Nashville, Ark., generally southeast along the divide between the
Red and Ouachita-Black River watersheds to the confluence of the
Black and Red Rivers near Acme, La., eastward along the north bank
of the Red River; across Bayou Cocodrie at its confluence with the
Red River southeast from Bayou Cocodrie to a point on the Missis-
sippi River levee 2.5 miles south of Shaw, La.; due east to the thalweg
of the Mississippi River (approximately mile 318 above Head of
Passes); along the thalweg of the Mississippi River to mile 310 above
Head of Passes; thence generally northeast along the divide between
the Buffalo-Homochitto and Amite River water sheds to the dividing
line between the Lower Mississippi Valley and South Atlantic
Divisions near Bogue Chitto, Miss.; thence, along that line and the
westerly watershed line of the Pearl River Basin to the north bank of
the Rigolets; thence, along the north bank of the Rigolets to Long
Point Light; thence, following a line bearing true south crossing the
Intracoastal Waterway to Lake Borgne Light No. 41; thence,
generally easterly to a point 1 mile due south of the southerly point
of Grand Island; thence, to a point 1 mile due north of the north-
easterly tip of the Isle au Pitre group of islands; thence to a point
1 mile due north of the northerly point of the Chandeleur Islands;
and thence, following a line bearing S. 500 E. into the Gulf of Mexico.
   It includes the sections of the Intracoastal Waterway from Lake
Borgne Light No. 41 to the Sabine River, and the Passes of the Mis-
sissippi River. It exercises jurisdiction over flood-control work on
the Mississippi River from Shaw, La., mile 318 above Head of Passes,
to the Gulf of Mexico; on the Red River including its south bank
levees and tributaries from Index, Tex., to its junction with Old
River and the Atchafalaya River; the Atchafalaya River; and in the
Atchafalya Basin; and maintenance of the project navigation
channel of the Mississippi River below mile 320 above Head of Passes,
under the supervision of the president, Mississippi River Commission,
                                                             713
714      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

and the division engineer, Lower Mississippi Valley Division. (For
reports on projects under Mississippi River Commission, see vol. 2-of
this report.)
  District engineer: Col. Charles G. Holle, Corps of Engineers.
                                     IMPROVEMENTS

               Navigation                              Flood control-Continued
                                       Page I                                         Page
1. Red River below Fulton,                     25. Red River below Denison
      Ark-                             715            Dam, levees and bank
2. Overton-Red River Water-                          stabilization (New Orleans
      way, La_-      ____ ___          716            district)                       779
3. Cypress Bayou and Water-                    26. Red River in the vicinity of
      way between Jefferson,                          Shreveport, La_                 781
      Tex., and Shreveport, La_        717      27. Bayou Bodcau Reservoir,
4. Gulf Intracoastal Waterway                        La_          -                  783
      between Apalachee Bay,                    28. Wallace Lake Reservoir, La_       785
      Fla., and the Mexican                     29. Bayou Pierre, La                  787
      Border (New Orleans dis-                  30. Natchitoches Parish, La .____     788
      trict)----------------           719      31. Aloha-Rigolette Area, Grant
5. The Inland Waterway from                          and Rapides Parishes, La_       790
      Franklin to the Mermen-                   32. Pineville, Red River, La_ _       792
      tau River, La _           -      734      33. Lake Pontchartrain, Jeffer-
6. Bayous La Loutre, St. Malo,                       son Parish, La________          793
      and Yscloskey, La ......         736      34. Bayou Teche and Vermilion
7. Mississippi River,       Baton                    River, La____                   794
      Rouge to the Gulf of                      35. Mermentau River, La .....         797
      Mexico, La___________            737      36. Snagging and clearing under
8. Waterway from Empire, La.,                        authority of section 2 of
      to the Gulf of Mexico            747            the Flood Control Act ap-
9. Bayou Lafouche, La                 749            proved Aug. 28, 1937, as
10. Little Caillou Bayou, La ..        751             amended_____                   802
11. Bayou Teche, La___                 752      37. Preliminary       examinations,
12. Petit Anse, Tigre, and Carlin                     surveys, and contingencies
      Bayous, La_______                755            for flood control ........      804
13. Mermentau River, Bayou                      38. Inspection of completed proj-
      Nezpique, and Bayou des                         ects_                           804
      Cannes, La________               757      39. Inactive flood-control proj-
14. Calcasieu River and Pass,                         ects_-     -       -            805
      La ____--                        759      40. Miscellaneous activities ....     805
15. Removing the water hya-                     41. Emergency         flood-control
      cinth (Louisiana) .......        763            work under authority of
16. Channel improvement, under                        Public Laws 138 and 318,
      authority of sec. 3 of the                      78th Cong., Public Law
      River and Harbor Act ap-                        75, 79th Cong.; and Public
      proved Mar. 2, 1945 ....         765            Laws 102 and 858, 80th
17. Examinations, surveys, and                        Cong                            809
      contingencies (general)---       766      42. Emergency bank protection
18. Plant allotment-_-                 767            work under authority of
19. Inactive navigation projects_      767            section 14 of the Flood
20. Miscellaneous activities ....      768            trol Act approved Dec. 22,
                                                      1944, as amended .......        811
             Flood control                      43. Emergency        flood-co ntrol
                                                      work under authority of
21. Red River below Denison                           sec. 5 of the Flood Control
      Dam, New Orleans dis-                           Act approved Aug. 18,
      trict_-----------------          773            1941, as amended_ ___--         812
22. Texarkana Reservoir, Tex _         775      44. Small flood-control projects
23. Ferrells Bridge Reservoir,                        under authority of sec. 205
      Tex          --                  777            of the Flood Control Act
24. Mooringsport Reservoir, La.                       approved June 30, 1948,
     and Tex.--- -- -- -- --           778            as amended_                     812
        RIVERS AND   HARBORS-NEW       ORLEANS,   LA.,   DISTRICT   715
                 1. RED RIVER BELOW FULTON, ARK.

    Location.-Red River rises in the arid regions of eastern New
Mexico, flows in a general easterly and southeasterly direction for
1,300 miles, and enters the Mississippi River at Red River Landing,
La. (See U. S. Geological Survey State maps and Mississippi River
Commission alluvial valley quadrangle maps.)
    Previous projects.-Authorized by River and Harbor Acts of
May 23, 1828; June 10, 1872; June 18, 1878; March 3, 1879; August
2, 1882; July 5, 1884; August 11, 1888; and September 19, 1890. For
further details, see page 1868 of annual report for 1915 and page
895 of annual report for 1938.
    Existing project.-This provides for continuing improvement of
Red River from Fulton, Ark., to the Atchafalaya River, La., 455.6
miles by systematic clearing of the banks, snagging, dredging shoals,
building levees (either alone or in cooperation with riparian States,
closing outlets, revetting caving banks, and preventing injurious cut-
offs. The lower end of the section included in the project is 7.6 miles
above the mouth of the river. No proposed channel dimensions are
given.
    Floods ordinarily cause fluctuations of stage between high and low
water of from 30 to 45 feet. Unusual floods occasionally increase this
range about 10 feet. The flood of March-April 1945 produced
crest stages 1 to 3 feet higher than maximum previously recorded.
    As the work is continuing, no estimate for completion was made.
The latest (1941) approved estimate for annual cost of maintenance
is $27,000.
    The existing project was authorized by the River and Harbor Act of
July 13, 1892 (Annual reports for 1890, p. 1829, and for 1891, p.
,1957), and modified by the River and Harbor Acts of July 24, 1946,
and May 17, 1950, to authorize construction of the Overton-Red River
waterway to Shreveport, La., and provide a channel 9 feet deep and
100 feet wide from the Mississippi River to the north bank of Black
River (mile 35.5). (For latest published maps see H. Doc. No. 378,
74th Cong., 2d sess.)
    Terminal facilities.-None.
    Operationsandresults during fiscal year.-None by the New Orleans
district, CE. The United States dredge Todd, under jurisdiction of
the Vicksburg district, CE, and with funds transferred to that district
by the New Orleans district, CE, in fiscal year 1950 for the purpose,:
removed approximately 58,742 cubic yards from Red River in the
vicinity of Kings Bayou, mile 34 above mouth of Red River, during
the period September 11 and 21, 1951, completing the maintenance
dredging at that location.
   Condition at end of fiscal year.-Maintenance in recent years pro-
vides for navigation to Shreveport, La., at medium and high stages.
The head of navigation is the Arkansas-Oklahoma State line, to which
point boats may occasionally run during high water if snags, over-
hanging trees, or similar obstructions do not interfere. From January
to July the prevailing stage is 6 feet and over, and minimum depths
are about 4 feet to Fulton, 5 feet to Shreveport, and 6 feet to Alex-
andria. During the remainder of the year stages near zero may be
716         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

expected, with minimum depths less than 1 foot from Fulton to Shreve-
port, 1 to 2 feet from Shreveport to Alexandria, 4 feet from Alexandria
to mouth of Black River, and 6.5 feet thence to mouth. Project depth
obtained at the end of the fiscal year.
   Total costs and expenditures under the existing project to June 30,
1952, were $409,928.91 for new work and $1,775,680.17 for maintennace,
a total of $2,185,609.08.
  Proposed operations.-An allotment of $50,000 for maintenance
will be applied to dredging, by hired labor, the shoaled areas in
Red River between the mouth of the Black River and the Mississippi
River (to be done by the Vicksburg district).
   The sum.of $50,000 can be profitably expended for dredging shoaled
areas during fiscal year 1954.
                                        Cost and financial summary

                                                    Fiscal year ending June 30                               Total to June
                                                                                                             30,1952, includ-
                                                                                                             ing fiscal years
                                    1948          1949            1950           1951           1952           priorto 1948


New work:
   Appropriated .. -               --------
                                      ........---     ----------      ----------------------- ------------    $1,963,806.41
   Cost----------------------                  ------------ ---------------------------------                  1,963,806.41
                  ........----------------....................------------------
   Expenditures---------                                                         ------------------------      1, 963,806.41
Maintenance:
   Appropriated --------         $2, 900.00 -$1, 500. 00 $55, 500.00 -$5, 044.95 ...........------------
                                                                                                    1, 775, 680.17
                 -----------
   Cost-----..................       880.07 .......------------ 51,065.42 ----------------------    1, 775, 680.17
   Expenditures--------.........     980. 69         -6.29      50, 946.66                          1, 775,680.17
                                                                                24.43 ............------------

I Includes $1,553,877.50 for previous project.


                       2. OVERTON-RED RIVER WATERWAY, LA.
   Location.-The work covered by this improvement is located in the
State of Louisiana between the junction of the Old and Mississippi
Rivers and Shreveport, La., along the Old and Red Rivers, through
land cuts and natural channels on the south bank of Red River. (See
U. S. Geological Survey State maps and Mississippi River Commis-
sion alluvial valley quadrangle maps.)
   Existing project.-This improvement provides for a channel 206
miles long, 9 feet deep, and 100 feet wide, extending from the Missis-
sippi River at mile 301 above the Head of Passes through Old River
and Red River to mile 31, thence by a lateral canal extending through
land cuts and existing waterways, across the Mississippi-Red River
backwater area and along the south bank of Red River floodplain to
Shreveport, La. The project includes the construction of nine locks,
and a pumping plant on Red River near Shreveport.
   Floods ordinarily cause fluctuations of stage between high and low
water in Old River, Red River, and the backwater area of from 30 to
45 feet; the fluctuation of stages on the south bank tributary streams
are somewhat less.
   The latest (1952) approved estimated cost is $77,500,000 for con-
struction and $700,000 for maintenance, of which $600,000 is for opera-
tion and care and $100,000 is for channel maintenance.
   This improvement in the existing project was authorized by the
River and Harbor Act approved July 24, 1946 (H. Doc. 320, 80th
Cong., 1st sess.). The latest published map is in the project document.
          RIVERS AND           HARBORS---NEW                 ORLEANS,           LA.,     DISTRICT             717
   Local cooperation.--Localinterests are required to furnish free of
cost to the United States all lands, easements, rights-of-way, and
spoil-disposal areas for new work and subsequent maintenance when
and as required; make all necessary changes in existing highways,
highway bridges, and approaches thereto, and all necessary changes
in public utilities, except railroad facilities; maintain parts of all
railroads, highways, bridges, and utilities affected by the improve-
ment; establish, maintain, and operate adequate terminal and transfer
facilities; and hold and save the United States free from damages
incident to construction, maintenance, and operation of the improve-
ment.
   Preliminary negotiations have been conducted with the Department
of Public Works, State of Louisiana, to determine proper agencies to
furnish required local cooperation. Requests for assurances of local
cooperation have not yet been made.
   Terminal facilities.-None.
   Operations and results during fiscal year.-Hydraulic, hydro-
graphic, and other studies, and soil borings for channel excavation,
were carried on by hired labor at a cost of $14,017 for new work;
expenditures were $13,636.29.
   Condition at end of fiscal year.-Only preliminary work has been
done to date.
   The total costs and expenditures under the project to the end of the
fiscal year were $189,763, new work.
   Proposed operations.-No funds are available and no work is pro-
posed during fiscal year 1953.
   The sum of $150,000 can be profitably expended during the fiscal
year 1954 by hired labor for surveys, investigations, designs, and
plans and specifications.
                                   Cost and financial summary

                                               Fiscal year ending June 30                             Total to Tune
                                                                                                     30,1952, includ-
                                                                                                     ing fiscal years
                               1948          1949          1950           1951           1952         priorto 1948

New work:
   Appropriated-......... $75, 000.00 -----------. $50,000.00          $30, 000. 00 -$15,237.00          $189, 763.01
   Cost.-------------- - 78, 794. 29 $11, 355. 86   41, 439. 51         44, 156. 34   14, 017. 00         189, 763.00
    Expenditures--------.    75, 198. 56   14, 834. 82   41, 875. 18    44, 218. 15    13, 636. 29        189, 763. CO


Other new work data: Estimated additional amount needed to be ap-
  propriated for completion of existing project___....--. ___- _  $77, 310, 237

   3. CYPRESS BAYOU AND WATERWAY BETWEEN JEFFERSON, TEX.,
                      AND SHREVEPORT, LA.

  Location.-This bayou rises in northeast Texas and flows in a south-
easterly direction to Caddo Lake, through this lake to Big Willow
Pass, and through Big and Little Willow Passes, Soda Lake, Twelve
Mile Bayou, the new diversion canal, and Cross Bayou to the Red
River at Shreveport, La., a distance of about 132 miles. (See U. S.
Geological Survey State maps.)
        245554     53-vol. 1         46
718        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                      1952

  Cypress Bayou proper ends where it enters Caddo Lake, but the
name is frequently applied to the whole waterway above described.
  Existing project.-This provides for dredging and straightening
the channel, removing obstructions, and clearing the banks for 66 miles
from Red River at Shreveport, to Jefferson, and for the construction
of a dam without a lock at the foot of Caddo Lake.
                                          Caddo Lake Dam

Location--------.           At foot of Caddo Lake, La., and Tex., about 23 miles above
                              mouth of Jefferson-Shreveport waterway.
Below Mooringsport,
  La., 2 miles.
Length___--                 3,400 feet.
Type                          ixed, on pile foundation.
                            F------------
Date of completion_         Dec. 21, 1914.
Cost --------------         $100,553.47.
  Below the dam, fluctuations of water level depend chiefly upon back-
water from Red River, the maximum being about 10 feet. At the
dam, fluctuations are from 2.5 feet below to 13.3 feet above the crest
of the spillway, and at Jefferson the maximum was 30.4 feet.
  The project was completed at a cost of $202,817.48. The latest
(1952) approved estimate for annual cost of maintenance is $5,200,
including $3,500 for operating and care.
  The existing project was authorized by the following river and
harbor acts:

    Acts                          Work authorized                                  Documents I

June 10, 1872   Open channel work ....---------------------------        Annual report, 1872, p. 572.
June 25,1910    Construction of the dam........-----------------------   H. Doc. 220, 60th Cong., 1st sess.

  I The latest published map is in H. Doc. 378, 74th Cong., 2d sess.

  Local cooperation.-None required.
  Terminal facilities.-There is one publicly owned brick warehouse,
50 by 150 feet, at Jefferson, Tex. The following terminal facilities
are located at Mooringsport, La.:
   One privately owned covered dock, 60 by 60 feet, open to all small boats
   One privately owned pipe rack, not decked
   One privately owned boat ways
   The warehouse at Jefferson has not been used for several years,
since no commerce has moved in that vicinity. The wharf, dock, pipe
rack, and boat ways at Mooringsport are all owned by oil companies.
There are no terminal facilities at Shreveport. The existing terminal
facilities are considered adequate for present commerce.
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-The dam at the foot of Caddo
Lake was completed in 1914, completing the project. Its construction
and maintenance insure a 4-foot navigable depth at low water from
that point to Jefferson, the head of navigation, but prevent possible
navigation to Shreveport, except for such light draft boats as may
pass over the dam at high stages. Below the dam, navigation is
largely dependent upon backwater from Red River. A stage of from
15 to 24 feet on the Red River gage at Shreveport, depending on the
             RIVERS AND                HARBORS-NEW                    ORLEANS,             LA.,     DISTRICT              719

runoff from Cypress Bayou drainage area, is necessary to provide a
4-foot depth up to the dam. Such stages are short in duration and
irregular in occurrence.
   The total costs and expenditures to the end of the fiscal year were as
follows:

                                                                       United States        Contributed             Total
                                                                            funds               funds


Cost of new work___.....__-___..-__.----- ..........--- _                $202, 817. 48 _------------__              $202, 817. 48
Cost of maintenance___ ____------------- -------------                    203, 323. 08 --           --------         203, 323. 08
Cost of operating and care-.....--------------------------                137, 198. 07               $50, 000        187, 198. 07
      Total cost--.......--------------------------                         543, 338. 63             50, 000         593, 338. 63

      Total expended__------------------------------                        543, 338. 63             50, 000         593, 338. 63



   Proposed operations.-The balance unexpended at the end of the
fiscal year, $1,068.06, will be applied to maintenance, operating and
care by hired labor, and ordinary repairs to Caddo Lake Dam.
   No work is scheduled for fiscal year 1954.
                                             Cost and financial summary

                                                        Fiscal year ending June 30                               Total to June
                                                                                                                30, 1952, includ-
                                                                                                                ing fiscal years
                                       1948           1949           1950           1951            1952          priorto 1948


New work:
    Cost$
    Appropriated-       ------ -----------       ------------ ------------ ------------ ------------                 202, 817.48
                                                                                                                    $202, 817. 48
    cost--        --------        ------------ --- --------- ------------ ------------ ------------                  202,817.48
    Expenditures.........-------------------------                ----------------- ------------------               202, 817.48
Maintenance:
    Appropriated--------.....      $26, 900. 00   -$3, 780. 00     $2, 100. 00 -$2, 904. 32 --.------- _             341, 589. 21
    Cost_---__--_---___ --           1, 499. 82     20, 708. 14         37. 18 ------------------------              340, 521. 15
    Expenditures--------.......         224. 15     21, 983. 18         37. 18 -----------------------             1 340, 521. 15


   In addition, $50,000 expended from contributed funds for operating and care.

4. GULF INTRACOASTAL WATERWAY BETWEEN APALACHEE BAY, FLA.,
      AND THE MEXICAN BORDER (NEW ORLEANS DISTRICT)
  Location.-The section of the Gulf Intracoastal Waterway within
the New Orleans District extends from Lake Borgne Light No. 41,
near the mouth of the Rigolets, to the Sabine River, La., and Tex.
   The section from Lake Borgne Light No. 41 to the Mississippi River
follows the Rigolets and Lake Pontchartrain to the lake end of the
State-owned Inner Harbor Navigation Canal, thence by way of this
canal to the Mississippi River, a distance of 40.5 miles. By Public
Law No. 675, Seventy-seventh Congress, approved July 23, 1942, the
project was modified to provide for a land cut through the marsh from
the Rigolets to a point on the Inner Harbor Navigation Canal about
2.25 miles from the Mississippi River, eliminatting passage through
Lake Pontchartrain and five drawbridges, a distance of 30.8 miles to
the Mississippi River by this route. From the Inner Harbor Naviga-
tion Canal to the entrance to Harvey lock, the route follows the Mis-
sissippi River for a distance of 5.5 miles.
   The section from the Mississippi River to Atchafalaya River, La.,
leaves the Mississippi River through Harvey lock about 3.3 miles
720     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

above Canal Street and follows Harvey Canal No. 1 and Bayou Bara-
taria to Bayou Villars, a land cut south of Lake Salvador to Harvey
Canal No. 2, Harvey Canal No. 2 to Larose, La., and a land cut to
Houma, La., thence over a land cut south of Bayou Black and Bayou
Cocodrie, thence through Bayou Cocodrie and a land cut to Bayou
Black; thence through Bayou Black, Bayou Chene, and Bayou
Boeuf to the Atchafalaya River, about 0.5 mile south of Morgan City,
La., a total distance of 95.5 miles.
   An alternate connection with. the Mississippi River in the vicinity
of Algiers, La., about 10.3 miles below Harvey lock, consisting of a
lock and land cut about 9 miles in length intersecting the Intracoastal
Waterway at about mile 6, is now under construction.
   An alternate route from the Mississippi River at Plaquemine, La.
 (113 miles above New Orleans), follows Bayou Plaquemine and lower
Grand River to and through a lock at Bayou Sorrel in the East
Atchafalaya Basin protection levee, thence through the levee borrow
pit to Berwick Bay; and thence through Berwick Bay to Morgan City,
La., a total distance of 56 miles. This alternate route is to be enlarged
from the vicinity of Morgan City to Indian Village, La., and to be
extended from Indian Village, La., through Bayou Grosse Tete and
a new land cut to and through a new terminal lock and entrance chan-
nel to the Mississippi River in the vicinity of Port Allen, La., a total
distance of 65 miles.
   The section from the Atchafalaya River to Vermilion River, La.,
begins at the western end of the Mississippi-Atchafalaya section and
follows the Atchafalaya River about 2.5 miles, portions of Little Wax
Bayou, Possum Bayou, cutoffs, a land cut passing through North Bend
Plantation to Bayou Bartholomew; Bayou Bartholomew to Little
Bay, a land cut skirting the north edge of Cote Blanche Island and
the west edge of Weeks Island to Vermilion River, about 24 miles
below Abbeville, La., a total distance of about 63.6 miles.
   Franklin Canal, St. Mary Parish, La., extends southwesterly from
Franklin, La., on Bayou Teche, for 5.15 miles to Bayou Portage, a
section of "The Inland Waterway from Franklin to the Mermentau
River, La.," and through the bayou for 0.75 mile to the Gulf Intra-
coastal Waterway, 121 miles west of Harvey lock.
   The section from Vermilion River to Mermentau River, La., begins
at the western end of the Atchafalaya-Vermilion section and follows
Vermilion River 1.3 miles, a part of the Schooner Bayou cutoff canal,
and a land cut running in a general northwesterly direction to Mer-
mentau River at a point about 0.5 mile above its entrance into Grand
Lake and about 16 miles below the town of Lake Arthur, La., a total
distance of about 42.7 miles. Vermilion lock has been constructed
about 1.75 miles west of Vermilion River to prevent the ingress of salt
water from Vermilion Bay.
   The section from Mermentau River to Calcasieu River, La., begins
at the western end of the Vermilion-Mermentau section and follows
the Mermentau River upstream for about 1.5 miles, a land cut running
in a west-southwesterly direction to Lake Misere, passing north of the
lake and Bayou Misere, westerly to Sweet Lake, south and west of
Sweet Lake, northwesterly to Bayou Tete Bois, through Bayou Tete
       RIVERS   AND IHARBORS--NEW      ORLEANS,   LA.,   DISTRICT   721

Bois, Black Bayou, and cutoffs to a point on Calcasieu River about
16.6 miles below the city of Lake Charles, La., a total distance of about
37.1 miles.
    Calcasieu lock has been constructed near the intersection of Cal-
casieu River and Intracoastal Waterway, mile 238, Gulf section, Cal-
casieu Parish, approximately 16.6 miles below Lake Charles, La.
    The section from the Calcasieu River to Sabine River, La., and Tex.,
begins at the western end of the Mermentau-Calcasieu section, and
follows the Calcasieu River upstream about 1.6 miles, a land cut run-
ning in a southwesterly direction 2.8 miles, thence west 22 miles to
Sabine River at a point about 3 miles below Orange, Tex., a total dis-
tance of about 27.1 miles.
    (See U. S. Coast and Geodetic Survey Charts Nos. 878-884, inclu-
sive, Corps of Engineers, Mississippi River Commission alluvial val-
ley map, and Rigolets, Chef Menteur, St. Bernard, Spanish Fort,
Bertrandville, Barataria, Baton Rouge, Grosse Tete, Chicot Lake,
Foster, Napoleonville, Morgan City, Belle Isle, Bayou Sale, Jeanerette,
and Derouen quadrangles; U. S. Geological Survey maps, New Orleans
 (east), Lake Cataouatche (east), Cutoff, Houma, Gibson, Abbeville
 (southeast), Abbeville (southwest), Schooner Bayou (southeast),
Schooner Bayou (southwest), Schooner Bayou (northeast), Schooner
Bayou (northwest), Grand Lake East (northeast), Grand Lake East
 (northwest), Latania Lake, Lake Misere, Boudreaux Lake, Sweet
Lake, Lake Charles, Moss Lake, Black Lake, Cameron Farms, and
Phoenix Lake quadrangles; and navigation maps of Intracoastal
Waterway, Port Arthur, Tex., to New Orleans, La.)
    Previous projects.-Previous projects for the different sections of
this improvement were adopted by the following river and harbor
acts: August 11, 1888; March 2, 1907; March 3, 1909; June 25, 1910;
February 27, 1911; July 25, 1912; August 8, 1917; July 18, 1918;
March 2, 1919; and September 22, 1922. For further details see pages
878-895 of annual report for 1924.
    Existing project.-This provides for a waterway 383.72 miles long
which is 12 feet deep and 125 feet wide at mean low Gulf, except in
the section between Lake Borgne Light No. 41 and New Orleans
 (via land cut through the marsh and Industrial Canal), 33.1 miles
long where a width of 150 feet is provided; an alternate route 9
feet deep by 100 feet wide between Lake Borgne Light No. 41
and New Orleans (via the Rigolets, Lake Pontchartrain, and Indus-
trial Canal), 40.5 miles long; an alternate connection with the Mis-
sissippi River below Algiers, 12 feet deep and 125 feet wide about 9
miles long; a channel 12 feet deep and 125 feet wide for the Plaque-
mine-Morgan City alternate route from the Mississippi-Atchafalaya
section of the waterway, in the vicinity of Morgan City, through
Lower Atchafalaya River (Berwick Bay) and the borrow pit of the
East Atchafalaya protection levee to and through Bayou Sorrel lock
which was constructed under the existing project "Flood control,
Mississippi River and tributaries," thence through Lower Grand
River to Indian Village, and thence by way of Bayou Grosse Tete
and a new land cut to and through a new terminal lock and entrance
channel to the Mississippi River in the vicinity of Port Allen, La.,
722      REPORT OF CHIEF OF ENGINEERS, U. S. ARMIY, 1952

opposite the lower limit of the Port of Baton Rouge; a channel 9
feet deep and 100 feet wide from Indian Village on the Plaquemine-
Morgan City alternate route through Bayou Plaquemine and Plaque-
mine lock to the Mississippi River at Plaquemine, La.; improvement
of Franklin Canal as a connecting channel from Gulf Intracoastal
Waterway (mile 121) to Franklin, La., to afford a channel 8 feet
deep and generally 60 feet wide with a width of 100 feet in its upper
300 feet; and a salt-water guard lock (Calcasieu lock) in the water-
way at mile 238 west of Harvey lock. The project also provides
for the following: Widening at bends; passing places; mooring basins;
locks or guard locks; such railroad bridges over artificial cuts as are
necessary; purchase of pipeline dredge; construction and operation
of new drainage canals and pumping facilities to restore parish
drainage systems where intercepted; construction of a double-leaf
bascule, four-lane highway bridge with approaches at State High-
way No. 61, Louisiana; construction of movable bridges at Missouri
Pacific Railroad and State Highway Nos. 31 and 996; fixed trestle
bridges for crossing of proposed landside drainage canals; lift bridges
at Louisiana Highway No. 168, Port Allen, La., and at Texas & Pacific
Railway, Port Allen, La., a movable bridge at Texas and Pacific Rail-
way, Morley, La.; construction of bulkheads and jetties at Lake
Borgne and Chef Menteur, La., if found necessary; and for annual
payments to the Board of Commissioners of the Port of New Orleans
for use of a portion of the Inner Harbor Navigation Canal. The
length of the waterway within the New Orleans district is 384.1 miles
via the northerly or Port Allen route, and 299.4 miles via the southerly
or Harvey Canal route.
   Under ordinary conditions the mean range of tide is about 10 inches
and the extreme range is 14 inches. A severe storm may cause a high
tide of from 6 to 9 feet.
   The total estimate of cost for new work, revised in 1952, exclusive
of amounts expended on previous projects, is $53,689,500, divided
as follows: Algiers lock and canal, $14,900,000; Palquemine-Morgan
City route, $20,850,000, and remainder of waterway, $17,939,500. The
latest (1952) approved estimate for annual cost of maintenance is
$1,543,000, including $820,000 for regular maintenance and $723,000
for operation and care of locks and dams and costs pertaining to use
of necessary State-owned facilities in connection with the Inner
Harbor Navigation Canal.
                      Inner Harbor Navigation Canal lock
Miles below New Orleans, La. (Canal St.)------         2.9.
Miles from Mississippi River --- __        ____-- -    0.6.
Width of chamber----------------------                 75 feet.
Length available for full width .------       .....    640 feet.
Lift -----------------------------------               0-17.4 feet.
Depth on miter sill at mean low Gulf level--........   31.5 feet.
Character of foundation---------------            -    Timber piles.
Kind of dam __---------_--------...                    None.
Type of construction-------___--__- -                  Reinforced concrete.
Opened to navigation_... ___.......-------.            February 1923.
Cost----------------------------------                 $8,648,491.53.
          RIVERS      AND HARBORS              NEW      ORLEANS,        LA.,   DISTRICT   723
                                           Harvey lock

Miles above New Orleans, La. (Canal St.)                       3.3.
Miles from Mississippi River-------------                      0.13.
Width of chamber___-----------------              ----         75 feet.
Length available for full width--___--------                   425 feet.
Lift ----------------------------------                        0-19.6 feet.
Depth on miter sill at mean low Gulf level .....               12 feet.
Character of foundation_                                       Timber piles.
Kind of dam-----           ----------------------              None.
Type of construction ............
                              ___.__                .          Reinforced concrete.
Opened to navigation .              .______                    1934 and completed 1935.
Cost (including approaches)                                    $1,775,132.24.

                                 Algiers lock

Miles below New Orleans, La. (Canal St.)               ----    7.
                                                               0.38.
Miles from Mississippi River .....
Width of chamber-----------------------                        75 feet.
Length available for full width __                             760 feet.
Lift --    ---------------             --------                0-18 feet.
Depth on sill at mean low Gulf level                           13 feet.
Character of foundation_                                       Timber piles.
Kind of dam---------------------------                         None.
Type of construction___ _                                      Reinforced concrete.
Opened to navigation______..............                       Under construction.
Cost (including approaches)                                          Do.

                                          Calcasieu lock

Miles below Lake Charles, La-----------        16.6.    ---
Miles from Calcasieu River --------------      0.5.
Width between abutments------------            75 feet.
Length available for full width-------------   1,180 feet.
Lift      --      --------------------------   0-4 feet.
Depth on sill at mean low Gulf level----- ---  13 feet.
Character of foundation-------------------     Concrete slab on preconsoli-
                                                  dated stiff clay.
Kind of dam-------        -------------------- None.
Type of construction __----------__    -, .... Reinforced concrete gate bays
                                                  with earth chamber.
Opened to navigation__-                        December 1950.
Cost-- --    -----------------------------     $2,133,527.

                           Plaquemine lock
Miles above New Orleans, La. (Canal St.)                     ...- 113.
Miles from Mississippi River-                           .---------------
                                                                  0.10.
Width of chamber-----                    -----------------        55 feet.
Length available for full width-------------- 260 feet.
Lift ---------------------------------                            0-34 feet.
Depth on miter sill at mean low Gulf level-                       10 feet.
Character of foundation___---                                     Timber piles.
Kind of dam-----  ......-                                         None.
Type of construction ---------------------                        Concrete.
Completed and opened to navigation ---------- 1909.
Cost...----------------                -------------------        $1,302,006.38.
724           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                                             Bayou.. Sorrell lock
Miles from New Orleans, La. (Canal St.) :
     Via Plaquemine lock                                               1------------------
                                                                       131.
     Via Harvey lock----------- --------- -                            135.
Miles from Mississippi River via Plaquemine
  lock --------------------------------                                18.
Width of chamber-----                   ------------------             56 fA eet.
Length available for full width----.. ----------                       760 feet.
Tift-                                                                  (--21 feet.
Depth on sill at mean low Gulf level........                           14.311 feet.
Character of foundation .....                                          Timlber piles.
Type of construction -------.-- ____.---                               Rein forced concrete gate bays
                                                                           wiith earth chamber.
Opened to navigation--------------------                               J'unee 1951.
Cost----------                                                         Wor ,k not complete.

                                                Vermilion lock
Miles from Abbeville, La------------------           26.
Miles from Vermilion River--- ----------             1.75.
Width between abutments--------------------          56 feet.
Length available for full width ---------            1,182 feet.
Lift-   --    -------------           ,,------------ 0-5 feet, either direction.
Depth on gate at mean low Gulf level ---------       11.3 feet.
Character of foundation_         ---------------     Timber piles.
Kind of dam      ---     ------------------------    Reinforced-concrete     spillway
                                                        dam,     vertical  cast-steel
                                                        gates, timber-pile founda-
                                                        tions.
Type of construction_-----..           -___--------- Reinforced concrete.
Opened to navigation --- __ __-_-                 -- 1933 and completed 1934.
Cost----------------------------------               $330,765.27.
The existing project was authorized by the following river and harbor acts:

       Acts                           Work authorized                                    Documents

Mar.     3,1925     Construction of waterway from New Orleans,        La.,    H. Doc. 238, 68th Cong., 1st sess.
                      to Galveston Bay, Tex.
Jan.    21, 1927    Extension of waterway to Corpus Christi, Tex ...-------       Do.
July     3, 1930    A channel 100 feet wide and 9 feet deep from Lake         H. Doc. 341, 71st Cong., 2d sess.
                      Pontchartrain to Mississippi Sound.
June 26,1934 1 Operation and care of locks and dams provided for
                with funds from War Department appropriations
                for rivers and harbors.
July 23, 1942 Enlargement of waterway from 100 feet wide and 9                H. Doec. 96, 79th Cong., 1st sess.
                feet deep to 125 feet wide and 12 feet deep, from
                      Apalachee Bay, Fla., to Corpus Christi, Tex., and
                      its extension to the vicinity of the Mexican border,
                      except between Mobile Bay, Ala., and New Or-            H. Doc. 230, 76th Cong., 1st sess.t
                     leans, La., where the width shall be 150 feet; and
                     for rental of Inner Harbor Navigation Canal facil-
                     ities.
Mar.     2,1945     Alternate connection with the Mississippi River in        S. Doc. 188, 78th Cong., 2d sess.
                      the vicinity of Algiers at New Orleans.
July 24,1946        Enlargement and extension of the Plaquemine-Mor-          S. Doc. 242, 79th Cong., 2d sess.
                     gan City route from the Mississippi-Atchafalaya
                     section of the waterway, in the vicinity of Morgan
                     City, to and through a new terminal lock and en-
                     trance channel to the Mississippi River in the
                     vicinity of Port Allen, opposite the lower limit of
                     the Port of Baton Rouge.
       Do-.....     Restoration, improvement and maintenance of the           S. Doc. 189, 79th Cong., 2d sess.
                     Franklin Canal as a terminal branch channel, 8
                     feet deep and 60 feet wide from its confluence with
                     the Gulf Intracoastal Waterway to Franklin, La.
       Do--......   A salt-water guard lock in the waterway at mile 238       S. Doec. 231, 79th Cong., 2d sess.
                      west of Harvey lock.

  1Permanent Appropriation Repeal Act.
  I Not mentioned in authorizing act.
       RIVERS AND HIARBORS-NEW        ORLEANS,   LA., DISTRICT     725
   Local cooperation.-Alternate connection with the Mississippi
River in vicinity Algiers at New Orleans, La. (Algiers lock and canal),
Orleans and Plaquemines Parishes, La.: Rights-of-way for the pro-
ject have been made available and right of entry granted for
construction which is under way. Present real estate activities are
in connection with condemnation proceedings filed by the Department
of Justice at the request of local interests (City of New Orleans and
Plaquemines Parish Police jury).
   Franklin Canal, St. Mary Parish, La.: All rights-of-way and spoil
disposal areas have been acquired and made available for construc-
tion which has been completed. Real estate activities continue in
cooperation with local interests' (St. Mary Parish Police jury) legal
adviser in an effort to complete title investigation.
   Calcasieu salt-water guard lock at mile 238 west of Harvey lock.
Calcasieu Parish, La.: All rights-of-way and spoil disposal areas
have been acquired and made available for construction which has
been completed. Real estate activities continue in an effort to com-
plete title investigation based on title evidence furnished by local
interests (Calcasieu Parish Police jury).
   Plaquemine-Morgan City Alternate Route, La. (Port Allen lock),
West Baton Rouge Parish, La.: No real estate activities in connec-
tion with land acquisition have been initiated on this project.
   Terminal facilities.-The terminals at New Orleans which are
most generally used by Intracoastal Waterway traffic are those con-
trolled by the State of Louisiana on the Inner Harbor Navigation
Canal. Since April 1, 1944, the portion of the Inner Harbor Naviga-
tion Canal from the Mississippi River to its intersection with the
New Orleans-Rigolets section of the Gulf Intracoastal Waterway,
exclusive of terminal facilities, but inclusive of the lock and bridges
at St. Claude Avenue and at Florida Avenue, has been under lease
to the United States and is now operated by the United States toll-
free, 24 hours per day. Numerous private wharves are located at
Harvey, La., as well as extensive marine repair facilities and fueling
services. At Morgan City on the Atchafalaya River there are two
large and three small wharves open to all without charge. The facil-
ities are considered adequate for existing commerce.
   Operations and results during fiscal year.-New work by contract:
Alternate connection in the vicinity of Algiers, La., also known as
the Algiers lock and canal: Erection of sector gates, in progress at
beginning of fiscal year, was completed on May 4, 1952, with costs
of $79,528. Construction of the backfill for the lock, guide levees
for the river approach channel to the lock, and emergency dam
storage, in progress at the beginning of the fiscal year and now 85
percent complete, was suspended on October 27, 1951, when phase
I of the contract was completed. Notice to proceed on phase II of
the contract will be issued in July 1952. A total of 665,375 cubic
yards of embankment has been constructed, making the embankment
91 percent complete, and construction of concrete platform and
derrick footings for emergency dam storage is practically complete.
Costs in the amount of $113,759 were incurred.
   Excavation of a portion of the navigation canal and construction
of guide levees in Orleans Parish from the vicinity of the lock
726     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,           1952

structure to State Route No. C-1509, in progress at the beginning of
the fiscal year, were completed November 23, 1951, with 586,251 cubic
yards excavated over a distance of 7,960 linear feet, of which 6,510
linear feet were excavated to project dimensions. Spoil from this
excavation was used in constructing guide levees along the canal.
Work under contract for excavation of an additional portion of the
canal from State Route C-1509, Orleans Parish to Gulf Intracoastal
Waterway, Plaquemines Parish, and excavation for Orleans and
Plaquemines Parishes pumping stations commenced April 7, 1952,
and at the end of the fiscal year 930,925 cubic yards had been exca-
vated over a distance of 12,046 linear feet of the canal. A total of
125,787 cubic yards was excavated in completing the Orleans Parish
pumping station site and practically completing the Plaquemines
Parish pumping station site. Excavation of Plaquemines drainage
canal commenced on April 10, 1952, and at the end of the period
was 34 percent complete, with 290,034 cubic yards removed over a
distance of 6,467 linear feet. The costs on these contracts were
 $384,040.
    Planning for the construction of two vertical lift bridges under
continuing contract and design, plans, and specifications of drainage
pumping station and appurtenances to restore drainage being inter-
cepted in Orleans Parish by the construction of the Algiers lock and
canal project continued with costs of $32,416.
   Construction of guide walls commenced on March 13, 1952, and is 20
percent complete, with 17 percent of the guide wall for the river
approach complete and 31 percent of the canal approach guide wall
complete. Costs were $120,239.
   Fabrication for operating machinery commenced on July 23, 1951,
and is now 85 percent complete. Installation of this machinery and
electrical system commenced on January 8, 1952. Construction of
the powerhouse is approximately 29 percent complete with the build-
ing erected. The electrical system and operating machinery are being
installed and work on navigation signals is 75 percent complete. Costs
were $58,851.
    Costs in the amount of $204,501 were incurred for purchases of equip-
ment for the Plaquemines and Orleans Parishes pumping stations.
    Calcasieu lock: The reservation buildings and appurtenances at Cal-
casieu lock were constructed during the period July 23, 1951, and April
25, 1952, at a cost of $84,060.
   Main waterway: Construction of pontoon bridge and approaches at
Larose, La., incident to relocation of Gulf Intracoastal Waterway be-
tween Larose, La., and Bourg, La., is in progress. There were no costs
during the fiscal year on this cost reimbursable contract.
   New work by hired labor: Procurement of local cooperation; ad-
vance planning; engineering studies, including field surveys and maps;
engineering studies for design of Port Allen lock; investigation of
failure of Algiers lock levee, borings, analysis and piezometer installa-
tions, investigation of stability of Algiers lock; soil borings; boring
additional holes through concrete wall to float well at Algiers lock;
installing relief wells at Orleans Parish pumping station site; pre-
liminary plans and specifications; installing permanent monuments;
design of Plaquemines Parish pumping station; and preparation of
               RIVERS           AND HARBORS--NEW                               ORLEANS,                LA., DISTRICT          727

operations manuals for Calcasieu lock were carried on with cost
charges of $109,815.
   Extension. of the steel sheet piling fender at Calcasieu lock was
accomplished during the period February 6 and April 28, 1952, at
a cost of $20,756, and watering of Algiers lock, testing of gates, and
pouring of asphalt mastic in monolith joints, was accomplished during
the period May 13 and June 30, 1952, at a cost of $6,027.
   Maintenance by contract: During the fiscal year a total of 1,029,598
cubic yards, as follows, was dredged in removing shoals from approxi-
mately 36.58 miles of the Mississippi-Calcasieu section of the water-
way at a cost of $369,412:
   A total of 36,800 cubic yards by the dredge F. J. J. Sloat and 46,312
cubic yards by the dredge Tchefuncta in completing the restoration of
the waterway to project dimensions between miles 0 and 14.7 and
50 and 71, which restoration had commenced in the previous fiscal
year.
   A total of 9,260 cubic yards by the dredge Moreland II in completing
restoration of the waterway between miles 140.3 and 178.5, 0.38 mile of
which was accomplished this fiscal year.
   A total of 809,350 cubic yards by the dredge Tchefuncta and 127,876
cubic yards by the dredge Moreland II in completing restoration of
the channel to project dimensions between miles 192 and 225.5. This
contract is now 89 percent complete.
   Approximately 595,513 cubic yards of shoaled material were re-
moved by leased dredges as follows:

                                                                                                     Diesel     train Tchefuncta
                                                                                                              Pontchar-


Plaquemine-Morgan City route, miles 1.5-18------------.......                     . ----      ....
                                                                                              _---              141,609 ..........
                                                                          ------------
Harvey lock forebay ............................-----------------------------.....---------                      30, 95      21, 020
Inner Harbor Navigation Canal lock forebay .........---------------------      106, 850                         145,975      79, 615
Plaquemine lock forebay---------
                        ...................---....--..-----..-----------------------                             69, 749
                                                                106, 850  388,028    100,635
        Total-------------...............---------------------------------..............................



   This work was done at a cost of $209,678.
   Maintenance by hired labor: Processing leases, procurement of local
cooperation, supervision, inspection, and patrol of the waterway,
removal of snags and other obstructions, maintenance of signs and
markers, gages, observations, and surveys and mapping were continued
at a cost of $88,050.
   Costs of $5,271 were incurred for report and study of caving banks
west of Harvey, La., and $68,504 for bank protection work performed
on east bank of Harvey Canal during the periods January 7 to 9 and
14 to 31, 1952, when 2,810 linear feet of bank protection were accom-
plished with shell blanket, clam shell filling, and asphalt.
   Dredging to remove debris and deposits from gate pits at each end
of Harvey lock was performed at a cost of $674, and clearing willows
from banks of waterway west of Harvey lock which obstructed view
around bend for navigation, was accomplished at a cost of $10,592.
   Construction of mooring facilities in Harvey Canal between miles
1.9 and 2.7 commenced on June 21, 1951, and was completed on July 13,
1951, with costs of $7,916.
728        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

  Removal of shoal from-Plaquemine lock forebay by wheel-wash
operations amounted to $6,315.
  Experimental bank protection in vicinity of Vermilion lock was:
commenced on May 7, 1952, but was suspended on May 9, 1952, due to
the lack of suitable equipment. Costs amounted to $1,674.
  Shoaling was removed from lock recesses and gates, inner Harbor
Navigation Canal, at a cost of $2,500.
   Cost incidental to rental lease for use of inner Harbor Navigation
Canal facilities was $254,400.
  Rainwash restoration was performed at Calcasieu lock during the
period February 6 and April 22, 1952, with costs of $9,392.
  Operation and care: The locks were operated throughout the fisca1
year. The locks, grounds, and structures were maintained in good
condition, and all necessary and routine work thereon performed by
hired labor at the following costs:
Calcasieu lock--                                                                        821
                                                                                  $---------------------------
Inner Harbor Navigation Canal lock- ---                    ___-- --------------   233,975
Harvey lock--------------------------------------------                           121, 242
Plaquemine lock-------------------------------------------                         82, 964
Vermilion lock----..---         ----------------------- ----------                 98, 781

        Total----------           ------------------         ,--------            606, 783
   The cost of operating the Paris Road pontoon bridge and the Florida
Avenue bridge was $50,856.
   Preliminary plans and specifications were prepared by hired labor
at a cost of $6,289.
   The following contract work, commenced during previous fiscal
year, was completed this fiscal year with costs of $134,26,1: Repairs
to Vermilion lock guide wall and fender system completed on Septem-
ber 20, 1951, and painting of the St. Claude Avenue and Florida
Avenue bridges completed on July 16, 1951.
   The total costs during the fiscal year (all funds) were $3,046,559,
of which $1,213,992 was for new work; $1,034,378 for maintenance;
and $798,189 for operation and care; expenditures were $3,077,359.48.
   Condition at end of fiscal year.--Plaquemine lock was completed in
1909; its reservation comprises 19 acres. Vermilion lock was com-
pleted in 1934; the ground on which it is constructed is possessed by
the United States under an easement deed to a strip of land 300 feet
wide along the Intracoastal Waterway. Harvey lock was completed
in 1935; the reservation comprises 3.3 acres. Inner Harbor Navigation
Canal lock was leased by the United States from the Board of Com-
missioners of the Port of New Orleans effective April 1, 1944. Bayou
Sorrel lock, constructed with funds for flood control, Mississippi River
and tributaries, and located in the East Atchafalaya Basin protection
levee, is complete except installation of lower wales on south approach
guide wall and repairs to chamber slopes. The lock was opened to
navigation on June 4, 1951, and has been incorporated as part of the
Gulf Intracoastal Waterway alternate route from Port Allen, La., to
Morgan City, La. Cascasieu lock, which was opened to navigation on
December       .18,
                1950, was physically completed on April 25, 1952.
   Dredging of the canal, except for the work authorized under River
and Harbor Acts of March 2, 1945, and July 24, 1946, was commenced
on December 19, 1942, and completed on June 9, 1944.
       RIVERS   AND.   HARBORS-NEW     ORLEANS,   LA.,   DISTRICT   729

    Dredging Franklin Canal to an interim 8- by 50-foot section was
completed during the period July 26, 1949, and March 14, 1950.
    The alternate connection below Algiers, with new lock, is approxi-
mately 34 percent complete, with the following work having been
accomplished to date at a cost of $5,029,954.50: Excavation of lock site,
driving of all foundation piling and steel sheet piling, placing of
reinforced concrete floor, erection of lock walls, installation of sector
gates, and partial excavation of navigation canal in Orleans Parish.
The following work is now in progress: Construction of backfill for the
lock, guide levees for the river approach channel to the lock, and
emergency dam storage; construction of guide walls; excavation of
portions of navigation canal in Orleans Parish and Plaquemines
Parish; excavation of Plaquemines Parish drainage canal; the fur-
nishing and installation of operating machinery and electrical system;
the purchasing of equipment for drainage pumping stations in
Plaquemines and Orleans Parishes; plans and specifications for reser-
vation building, roads, drainage, fencing, etc.; planning for the con-
struction of two vertical lift bridges and road relocations, under
continuing contract; and engineering service contracts for design,
plans, and specifications of drainage pumping station and appurte-
nances, and of a vertical lift bridge for the New Orleans and Lower
Coast Railroad. Contract for construction of Plaquemines and
Orleans Parish pumping stations was awarded in June 1952, but no
work has been done to date.
     New work remaining to complete the project, besides that which is
now in progress and/or under contract, consists of: Alternate con-
nection below Algiers with new lock: Completion of navigation canal,
including the river approach channel; construction of a vertical lift
railroad bridge for the New Orleans and Lower Coast Railroad cross-
ing and relocation of railroads and utilities. Plaquemine-Morgan
City alternate route: Dredging 12- by 125-foot alternate route between
Port Allen and Morgan City, with construction of lock in vicinity of
Port Allen, three bridges, and relocation of highways, railroads, and
utilities. Lake Borgne Light No. 41 to the Mississippi River: Con-
struction of a permanent bridge at Louisiana Highway No. 61 (Parish
Road), mile 13.0, and construction of bulkheads and jetties at Chef
Menteur and Rigolets at miles 22.7 and 33.7, respectively, all east of
  Harvey lock.
     The controlling depths, mean low Gulf (June 1952), are: Lake
Borgne Light No. 41 to Sabine River: 12 feet throughout main channel,
  except between miles 107.5 and 108, Wax Lake Outlet, where 10 feet
  obtain. Plaquemine-Morgan City route: Mile 0 to mile 1, 7.5 feet;
  to mile 54.5 at Morgan City, 9 feet.
     The total costs under the existing project to the end of the fiscal
  year (all funds) were $34,654,583.83, of which $20,998,628.18 was for
  new work (including $353,541.19, Public Works funds, and $57,102.51,
  contributed funds), $7,632,250.32 for maintenance, and $5,502,220.42
   (excluding $521,484.91, costs for works of improvement under provi-
  sions of the permanent indefinite appropriation for such purpose) for
  operation and care of locks and bridges. The total expenditures were
  $33,967,784.86, including $57,102.51 of contributed funds. In addi-
  tion, the sum of $521,484.91 was expended between January 1, 1927,
730       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

and June 30, 1935, on the operation and care of works of improvement
under the provisions of the permanent indefinite appropriation for
such purpose.
   Proposed operations.--The balance unexpended at the end of the
fiscal year, $6,875,404.32, plus accounts receivable, $2,500,000, and
allotments of $690,728 for maintenance, and $857,000 for operation
and care, a total of $10,923,132.32, will be applied as follows:
Accounts payable, June 30, 1952----------------------------              $267, 124. 01
New work :
    By contract:
        Continuation of construction of alternate
          connection with Mississippi River at
          Algiers, La -------      __-- -    __- -$8,488, 384. 36
        Highway connections with the temporary
          pontoon bridge at Larose, La----------         22, 466. 00
    By hired labor:
        Continuation of construction of alternate
          connection with Mississippi River at
          Algiers, La                                    24, 945. 0o
        Right-of-way within New Orleans district_        25, 114. 00
        Repayment of funds, Franklin Canal __             8, 897. 49
        Establishment of right-of-way markers,
          Franklin Canal- -    ____---    _---- -      -     505. 00
                                                                        8, 570, 311. 85
Maintenance:
   By contract:
        Dredging in waterway east and west of
          New Orleans, La., from July 1, 1952, to
          June 30, 1953---------- -------                238, 489. 36
        Dredging by leased dredge, as required
          from July 1, 1952, to June 30, 1953, in
          lock forebays, chambers, and tailbays___       327, 886. 00
   By hired labor:
        Condition surveys                                 34, 965. 00
        Harvey Canal bank protection_                    134, 000. 00
       Rental payments, Inner Harbor Navigation
          Canal, fiscal year 1952_                       260,000. 00
        Miscellaneous inspections and reports ...         13, 099. 00
        Bank protection, vicinity Vermilion lock__         5, 026. 00
        Rainwash restoration, Calcasieu lock __               608. 00
        Processing leases, procurement of local
          cooperation in obtaining rights-of-way
          and spoil disposal areas                         2,188. 00
        Report and study of caving banks west of
          Harvey Canal                                    13, 729. 00
                                                                        1, 029, 990. 36
Maintenance (operation and care, July 1, 1952, to June 30, 1953) :
   By contract:
        Inner Harbor Navigation Canal lock:
            Improvement and reconstruction_...          344, 620. 00
            Major repairs-------      _    -----         62, 800. 00
                                                                          407, 420. 00
      By hired labor:
          Operation and maintenance of Plaquemine
            lock :
              Operation ---------------------             79, 000. 00
              Ordinary maintenance and repair.__           5, 500. 00
                                                                           84, 500. 00
         RIVERS AND. HARBORS-NEW ORLEANS,                        LA., DISTRICT            731
Maintenance (operation and care)--Continued
   By hired labor-Continued
        Operation and maintenance of Calcasieu
          lock :
            Operation ------------------------                  $70, 000. 00
            Ordinary maintenance ---------                       14, 000. 00
                                                                                  $84, 000. 00
         Operation and maintenance of Harvey
           lock :
             Operation -------------------------                 91, 000. 00
             Ordinary maintenance and repair....                 21, 000. 00
             Repairs to mooring area-__-----                      4, 215. 00
                                                                                  116, 215. 00
          Operation and maintenance of Vermillion
           lock:
              Operation -------------------------                80, 000. 00
              Ordinary maintenance and repair--_                 13, 500. 00
                                                                                   93, 500.00
          Operation and maintenance of Inner Har-
           bor Navigation Canal lock and St.
           Claude Avenue bridge:
              Operation of lock and bridge--------              170, 000. 00
             Ordinary maintenance and repair___                  15, 000. 00
                                                                                  185, 000. 00
          Operation and maintenance of Paris Road
           Bridge:
             Operation --------------        --   -              40, 000. 00
             Ordinary maintenance and repair___                  15, 300. 00
                                                                                   55, 300.00
          Operation and maintenance of Florida
           Avenue Bridge:
             Operation -------------------------                 14, 200. 00
             Ordinary maintenance and repair...                  11, 800. 00
                                                                                   26, 000. 00
          Preliminary plans and specifications on
            ordinary maintenance --------------                   3, 771.10
                                                                                1, 055, 706. 10
               Total for all work__--__---------------------                   10, 923,132. 32
  The sum of $4,014,200 can be profitably expended for the following
schedule of work during fiscal year 1954:
New work:
   By contract:
       Continue construction of al-
         ternate connection with
         Mississippi River at Al-
         giers, La---        -----------        $300, 000.00
       Plaquemine-Morgan City Al-
         ternate Route.               Initiate
         construction of extension
         from Indian Village to Port
         Allen--      ------                   1, 107, 000.00
   By hired labor:
       Plaquemine-Morgan City al-
         ternate      route, advance
         planning----------------193, 000. 00
                                                                               $1, 600,000. 00
732     REPORT OF CHIEF OF ENGINEERS, U. S. ARM\Y, 1952

Maintenance:
   By contract:
        Dredging in waterway as
          required ------------..     $475, 000. 00
   By hired labor:
        Maintenance dredging, clear-
          ing, snagging, inspection
          and patrol of the waterway,
          as required, during fiscal
          year -------------------      335, 200. 00
        Harvey Canal bank protec-
          tion------------------- 400, 000. 00
        Rental payments, Inner Har-
          bor    Navigation    Canal,
          fiscal year 1953----------260, 000. 00

              Total maintenance ...                                      $1, 470, 200. 00
Maintenance (operation and care) :
   By hired labor:
       Operation and maintenance of
         Plaquemine lock :
           Operation -------------         $79, 000. 00
           Ordinary     maintenance
              and repair .---...            6, 500. 00
           Improvement and recon-
              struction ------------       25,000.00
                                                          $110, 500.00
        Operation and maintenance
         of Harvey lock:
           Operation -----------            91, 000. 00
           Ordinary      maintenance
              and repair     .-----         27, 000. 00
           Improvement and recon-
              struction ---------           30, 000. 00
                                                          148, 000. 00
        Operation and maintenance
         of Vermilion lock:
           Operation --------               80, 000. 00
           Ordinary      maintenance
              and repair........            18, 500. 00
           Improvement and recon-
              struction ----------.         90, 000. 00
                                                          188, 500. 00
         Operation and maintenance
          of Inner Harbor Navigation
          Canal lock and St. Claude
          Avenue bridge:
            Operation of lock and
               bridge.......               174, 000.00
            Ordinary         maintenance
               and repair------             14, 000.00
            Improvement and recon-
               struction ---------.          5, 000. 00
                                                          193, 000. 00
        Operation and maintenance
         of Calcasieu lock:
           Operation      --.....          70, 000.00
           Ordinary maintenance_           17, 000. 00
           Improvement and recon-
              struction____________         10, 000. 00
                                                           97, 000. 00
              RIVERS AND HARBORS--NEW ORLEANS, LA., DISTRICT                                                                    733
Maintenance (operation and care)-Continued
   By hired labor-Continued
       Operation and maintenance
          of Paris Road Bridge:
            Operation -------------   $40, 000. 00
            Ordinary    maintenance
              and repair-----------    19, 000. 00
            Improvement and recon-
              struction------------    30, 000. 00
                                                                                        $89, 000. 00
              Operation and maintenance
               of Florida Avenue Bridge
                  Operation ----------                                16, 000. 00
                  Ordinary maintenance-.                              13, 800. 00
                                                                                          29, 800. 00
               Operation and maintenancEe
                of Algiers lock and pump
                ing plants:
                  Operation ----------                                37, 231.00
                  Operation of pumpingg
                     plants.----_----                                 49, 792. 00
                  Maintenance       and re
                     pairs-------------                                 1, 177. 00                         I
                                                                                             88, 200. 00
           Total maintenance (operation and care)                              ----------------                    $944, 000. 00
                  Total for all work-----------------_...----- ------- 4, 014, 200. 00

                                           Cost and financial summary
                                               UNITED STATES FUNDS


                                                        Fiscal year ending June 30                                     Total to June
                                                                                                                   30, 1952, includ-
                                                                                                                   ing fiscal years
                                       1948            1949           1950            1951            1952             priorto 1948


New work:
      Appropriated------.........1,815,000.00 $2,000,000.00 $2,500,000.00 $3,450,000.00 $4,366,543.00                  $33, 550, 370.88
      Cost--    -----------............ 928,882.44 3,032. 310. 54 1. 669, 567. 38 1,327,601.52 1, 213, 992. 60          24, 988, 956. 52
      Expenditures-------.......     899,700. 35 2, 018, 882. 38 1, 643, 614. 3211, 220, 010. 24 1, 213, 006. 35   I    24, 797, 268. 16
Maintenance:
   Appropriated--------.........871, 600.00 1, 641, 375. 51 1, 522,180.002, 310, 450.00 1, 544, 913. 13                 15, 208, 410. 47
      Cost_-----------     -----. 1,179, 001. 33 1,174, 525. 40 1, 435, 515.881,857, 752.32 1,832,567.00                14,659,162.00
      Expenditures_.........        944, 206. 201,380, 996. 981,464, 442. 28 1, 767, 213,38 1, 864, 353.13          414, 595, 006. 3

Other new work data:
    Unobligated balance, June 30, 1952_-- -- --                     $629, 145.62
    Unobligated balance available for fiscal year 1953    .-------- 629, 145. 62
    Estimated additional amount needed to be appropriated for
      completion of existing project_ _----   ---- ------.-       24, 459, 826. 94
  I Includes $4,320,697.82 for previous project.
  9   Includes $353,541.19, NIRA funds.
4sIncludes
   Includes $1,003,206.35 for previous project.
             $1,070,432.58 from permanent indefinite appropriation,
"maintenance and operation of dams and other improvements
                                                                                     and $75,000 from appropriation for
                                                                              of navigable waters."




           245554-53-vol. 1---47
734           REPORT OF CHIEF OF ENGINEERS, U.                                 S. ARMY,            1952

                            Cost and financial summary-Continued
                             ADVANCED AND CONTRIBUTED FUNDS

                                                Fiscal year ending June 30                               Total toJ. e
                                                                                                        30, 1952, inelt.
                                                                                                        ing fiscal years
                                 1948          1949         1950           1951            1952           priorto 1948


New work:
   Appropriated...----------.....---- -----     $66, 000 $4, 000. 00   ........--------          -$4, 000    1 $339, 266. 97
   Cost-----------------------............   ----------- 57, 102. 51          ......---------------------
                                                                                            ............              2 48
                                                                                                                330, 369.
   Expenditures---------                    ------------ 57, 102. 51
                       .........------............                     .....------------. ....-----------...    330, 369. 48


Other new work data :
    Unobligated balance, June 30, 1952_ ______--____------------                                           $8, 897. 49
    Unobligated balance available for fiscal year 1953________----                                          8,897. 49
   includes contributed funds in amount of $295,266.97 and advanced funds in amount of $44,000.
  2Includes contributed funds in amount of $295,266.97 and advanced funds in amount of $35,102.51

              5. THE INLAND WATERWAY FROM FRANKLIN TO THE
                           MERMENTAU RIVER, LA.

  Location.-This canal extends from Hanson lock on Bayou Teche
through Hanson Canal and Bayou Portage to the Intracoastal Water-
way, and along the Intracoastal Waterway to mile 161, west of Ver-
milion Bay. The total length of the waterway is 26.8 miles. (See
U. S. Coast and Geodetic Survey Chart No. 1116; Corps of Engineers,
Mississippi River Commission alluvial valley map, and Foster, Bayou
Sale, Jeanerette, and Derouen quadrangles; U. S. Geological Survey
maps, Abbeville (southeast), and Abbeville (southwest).)
   Existing project.-Thisproject as modified by the River and Harbor
Act approved July 24, 1946 (S.Doc. 231, 79th Cong., 2d sess.) pro-
vides for a waterway from Bayou Teche at or near Franklin, La., to
the western end of Vermilion Bay, having a depth of 5 feet below mean
low Gulf and a bottom width of 40 feet, with appropriate side slopes;
also the purchase of the Hanson Canal.
   This project, reported in the annual report for 1924 under the head-
ings, Intracoastal Waterway, Franklin to Mermentau, La., and Intra-
coastal Waterway from Vermilion River to Schooner Bayou, La.,
has largely been superseded by the project "Gulf Intracoastal
Waterway (New Orleans District)." The River and Harbor Act
approved July 24, 1946 (S.Doc. 231, 79th Cong., 2d sess.), authorized
the incorporation of the existing project "Inland Waterway from
Franklin, La., to the Mermentau River," west of Vermilion Bay, in
the modified Flood Control, General, project "Mermentau River, La."
Under ordinary conditions the mean range of tides is about 10 inches
and the extreme range about 14 inches. A severe storm may cause a
high tide of from 6 to 9 feet.
   The estimate of cost for new work, revised in 1950, was $125,000.
The latest (1952) approved estimate for annual cost of maintenance
is $22,000, including $12,000 for operation and care of Hanson lock.
              RIVERS AND HARBORS-NEW                           ORLEANS,        LA.,    DISTRICT            735
   Data regarding the lock are as follows:
                                       Hanson lock
Miles from Franklin, La                                               1.5
Miles from Bayou Teche___                                             0.
Width of chamber___                                                   2.5 feet.
Length available for full width-_----.----                            937 feet.
Lift     --------------------                                         0-5 feet.
Depth on miter sill at low water ------- ____                         5 feet.
Character of foundation___------------                                Timber piles.
Kind of dam----------                                                 None.
Type of construction- ___------_____.-                                Concrete buttresses, wooder
                                                                         mitering gates, earth-lock
                                                                         chamber.
Compled----------------------------                                   1907. Operated by the United:
                                                                         States since 1923.
Cost---------------                      --------       --------      $65,000, including 4.1 miles of
                                                                         canal.
  The existing project was authorized by the following river and
harbor acts:

       Acts                           Work authorized                                   Documents
          -      i-~-      -




Mar.  2,1907 The general project (waterway from Franklin to the              H. Doc. 640, 59th Cong., 2d sess..
                Mermentau River, La.).
Mar. 3,1909       }Authorized
                           the Secretary of War to make such changes
Feb. 27,1.911 J in lc cation of channel as might be desirable.
July 25, 1912  Authorized the purchase of the so-called Hanson
                 Canal between Bayou Teche and Cote Blanche
                 Bay, at a cost not to exceed $65,000.
Mar. 2,1919 Construction of the Schooner Bayou cut-off._.......              H. Doc. 1336, 62d Cong., 3d sess.
                                                                               (Contains latest published map.)
June 26;,19341      Inclusion of operation and care of locks in project
                      provided for with funds from War Department ap-
                      propriations for rivers and harbors.
July 24,1946        The incorporation of the existing project west of Ver-   S. Doe. 231, 79th Cong., 2d sess.
                      milion Bay in the modified project "Mermentau
                      Rive , La."


  1 Permanent Appropriations Repeal Act.

   Local cooperation.-Fully complied with.
   Operations and results during fiscal year.-Costs in the amount of
$1,572, operation and care, were incurred for maintenance of Hanson
lock, the lock being in an inoperative status throughout the fiscal year;
expenditures were $1,559.24.
   Condition at end of fiscal year.-The project was considered com-
plete prior to the modification by the River and Harbor Act approved
July 24, 1946, which provided for channel enlargement and realine-
ment from Vermilion Bay to White Lake and from White Lake to
Grand Lake* for channel enlargement of North Prong of Schooner
Bayou and for construction of a gated control structure in the new
channel near Schooner Bayou lock, and the incorporation of the exist-
ing project "Inland Waterway from Franklin to the Mermentau River,.
La.," west of Vermilion Bay, in the modified Flood Control, General,
project "Mermentau River, La." The Hanson Canal and lock were
acquired on October 16, 1923; the lockmaster's house was completed
in 1924 and was moved to Berwick lock during the period August 27
and October 26, 1951. The United States property on which the lock:
is situated is a strip of land 300 feet wide between parallel lines run-
ning from Bayou Teche to Bayou Portage, containing 148 acres.
736           REPORT             OF CHIEF OF ENGINEERS,                                       U.      S. ARMY,               1952

Dredging from Vermilion Bay to the Mermentau River was completed
in 1912.
   The controlling depths, mean low Gulf (March 1952), were: From
Mermentau, through Grand Lake, 2 feet; Grand Lake to White Lake,
10 feet; through White Lake, 2' feet; to Schooner Bayou lock, 12 feet;
to Schooner Bayou Canal, 11 feet; to Gulf Intracoastal Waterway, 6
feet; to North Prong of Schooner Bayou, 8 feet; from Gulf Intra-
coastal Waterway to Schooner Bayou, 6 feet.
   The total costs to the end of the fiscal year were $787,745.26, of
which $249,051.81 was for new work, $137,262.45 for maintenance and
$401,431 was for operation and care; expenditures were $787,785.34.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $2,235.38, plus accounts receivable, $40.08, and an allot-
ment for fiscal year 1953 of $2,000, a total of $4,275.46, will be applied
to maintenance of Hanson lock.
   The sum of $2,500 can be profitably expended during fiscal year 1954
for maintenance of Hanson lock.
                                                  Cost and financial summary

                                                              Fiscal year ending June 30-                                            Total to June
                                                                                                                                     0, 1952, includ-
                                                                                                                                 ing fiscal years
                                           1948              1949              1950                1951             1952              prior to 1948


New work:
    Appropriated ........---------------------                                                 ----------- ------------...........
                                                                           ............------------                                      $249, 051.81
    Cost-----------------------------------..........................................-----------.....------------............             249,051.81
   Expenditures ........------- ----------------------------------------------                                ------------                249, 051. 81
Maintenance:
   Appropriated-----........ $17, 300.00                  $8, 182. 23      $10, 800. 00        $7, 950. 00 -$1, 000.00                    540, 968. 91
   Cost....------- --------.. 30, 487. 19                 11, 500. 13       11, 686. 59         4, 647. 04     1, 572. 00                 538, 693. 45
   -Expenditures--------
                    ........  31, 476.30                  10, 387. 16       12, 038. 04         4, 554. 38     1, 559. 24                1538, 733. 53


  1 Includes $165,298.55 from permanent indefinite appropriation.

             6. BAYOUS LA LOUTRE, ST. MALO, AND YSCLOSKEY, LA

  Location.-From their common head at the small settlement of
Yscloskey, Bayou La Loutre flows southeasterly for 29.4 miles to
Eloi Bay, and Bayou Yscloskey northeasterly for 2.2 miles to Lake
Borgne. Bayou St. Malo leaves Bayou La Loutre at mile 19.4 flowing
northwesterly 6.5 miles to Lake Borgne. (See U. S. Coast and Geo-
detic Survey Charts Nos. 1270 and 1271, and U. S. Geological Survey
maps, Shell Beach, Lake Eloi, Lake Eugenie, and Morgan Harbor
quadrangles.)
  Existing project.-This provides for a channel 5 feet deep and
40 feet wide from deep water in Lake Borgne to the shore line at
the mouth of Bayou Yscloskey; a channel 6 feet deep and 40 feet
wide from deep water in Lake Borgne through Bayous St. Malo,
La Loutre, and Eloi to deep water in Lake Eloi; and a channel 5
feet deep and 30 feet wide in Bayou La Loutre between Hopedale
and Bayou St. Malo, the total length of the improvements being 30.0
miles. The normal tidal variation is about 1 foot. Hurricane tides,
6 feet above normal have been reported.
   The estimated cost of new work, revised in 1952, is $98,600. The
latest (1952) approved estimate for anual cost of maintenance is
 $12,(00.
              RIVERS          AND HARBORS--NEW                             ORLEANS,               LA.,       DISTRICT                  737
   The existing project was adopted by the River and Harbor Act of
August 26, 1937 (H. Doc. 275, 75th Cong. 1st sess.), and modified
by the River and Harbor Act of March 2, 1945 (S. Doc. 116, 77th
Cong., 1st sess.). The latest published map is in the project document.
   Local cooperation.-Fully complied with, except for modification
of 1945; request for compliance not yet made.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The project, prior to the modi-
fication adopted by the River and Harbor Act March 2, 1945, which
provided for the dredging of a channel 5 feet deep and 30 feet wide in
Bayou La Loutre between Hopedale and Bayou St. Malo, was com-
pleted in 1940.
   The existing project, as modified, is 45 percent complete.
   The project will be considered complete when the modification of
1945 is accomplished.
   The controlling depths, mean low Gulf, were: Bayou La Loutre
 (May 1951) : Over bar, 2.6 feet; to Bakers Canal, 4.1 feet; to Ysclos-
key, 2.1 feet (Numerous palmetto stumps and roots cover bottom
between miles 14.3 and 20.9. Navigation is practically impossible
in this area at low tide, except for very small craft); Bayou St.
Malo (August 1951): Over bar, 4.2 feet; to mile 6.5 (Bayou La
Loutre), 5.2 feet; Bayou Yscloskey (May 1951): Over bar from
beacon to land end of jetties, 1.4 feet; to Yscloskey, 2.4 feet (Entire
bar and jetty channel in need of dredging. No navigation over
bar at low tide.).
   Total costs and expenditures under the existing project to the
end of the fiscal year were $99,848.63, of which $43,619.54 was for
new work and $56,229.09 for maintenance.
   Proposed operations.-No funds are available and no work is pro-
posed during the fiscal year 1953.
   The sum of $55,000 can be profitably expended during the fiscal
year 1954 for dredging by contract the channel in Bayou La Loutre
between Hopedale and Bayou St. Malo.
                                             Cost and financial summary

                                                          Fiscal year ending June 30-                                          Total to June
                                                                                                                           30, 1952, includ-
                                                                                                                           ing fiscal years
                                         1948            1949             1950            1951               1952              prior to 1948

New work:
   Appropriated--..--------------------------.......
                                              ....-----...................------------------------............                    $43, 619. 54
   Cost--------------------                     ----------------------------------- -----------                                    43, 619. 54
   Expenditures--.......------...-----------------------------------.............................................-----.            43,619.54
Maintenance:
     Appropriated- ........          $25, 600.00 -$3, 700.00             $800.00          $467.86 -...........                     56, 229. 09
     Cost-...------------_
                ............          31, 883.49 ............             816. 51           467. 86 ............------------       56, 229. 09
     Expenditures--------.........    31, 883.89 ............             151.98                     ............
                                                                                         1, 132. 39------------                    56, 229. 09


Other new work data: Estimated additional amount needed to be ap-
propriated for completion of existing project .-.-- _____------  $54, 980. 46

  7. MISSISSIPPI RIVER, BATON ROUGE TO THE GULF OF MEXICO, LA.
  Location.-The Mississippi River between Baton Rouge and the
Gulf of Mexico flows in a general southeasterly direction through the
southeastern portion of the state of Louisiana. At the Head of Passes,
738    REPORT OF CHIEF OF ENGINEERS,        U.   S. ARMY,   1952

233.1 miles below the Louisiana Highway Commission bridge at Baton
Rouge, the river is broken up into three main passes, Southwest Pass,
South Pass, and Pass a Loutre, two of which, Southwest Pass and
South Pass, are improved under the existing project. The distances
from Head of Passes to the mouths of Southwest and South Passes
are 20.1 miles and 13.5 miles, respectively. The mouth of Southwest
Pass is 141 miles west of Mobile, Ala., and 349 miles east of Galves-
ton, Tex. The mouth of South Pass is 18.5 miles northeast of the
mouth of Southwest Pass. (See U. S. Coast and Geodetic Survey
Charts Nos. 1269, 1271, and 1272; Corps of Engineers, Mississippi
River Commission alluvial valley map and Zachary, Baton Rouge,
White Castle, Donaldsonville, Thibodaux, Mount Airy, Bonnet Carre,
Hahnville, New Orleans, St. Bernard, Betrandville, Barataria, Pointe
a la Hache, and Forts quadrangles; and U. S. Geological Survey
maps, Empire, Cubits Gap, Pass a Loutre (West), Pass a Loutre
 (East), Southwest Pass, South Pass, Burrwood, and Mud Pan Bayou
quadrangles.)
  Previous projects.-Previous projects for the different sections
of this improvement were adopted by the following river and harbor
acts: July 4, 1836; March 3, 1837; August 30, 1852; July 8, 1856; and
January 21, 1927. For further details see page 1847, Annual Report
for 1915; page 724, annual report for 1937; and pages 767 and 775,
:annual report for 1938.
   Existing project.-This provides for channel dimensions as follows:
   Between a line one-half mile below the Louisiana Highway Com-
mission bridge at Baton Rouge and the upper port limits of New
Orleans, 35 feet deep (mean low Gulf) by 500 feet, a distance of
128.6 miles.
   Within the limits of the port of New Orleans, where that authority
has jurisdiction over both banks of the river, 35 feet deep (mean
low Gulf) and a maximum width of 1,500 feet, measured from a line
generally 100 feet from the face of the left-bank wharves, but not
closer than 100 feet to wharves on the right bank, a distance of 17.2
miles.
   From the lower limits of the port of New Orleans to the Head of
Passes, 40 feet deep (mean low Gulf) by 1,000 feet wide, a distance
of 86.7 miles.
   Southwest Pass from Head of Passes to the outer ends of the
jetties, 40 feet deep (mean low Gulf) by 800 feet wide, a distance
of 21.2 miles.
   Southwest Pass bar, 40 feet deep (mean low Gulf) by 600 feet
wide.
   South Pass from Head of Passes to the outer ends of the jetties,
30 feet deep (mean low Gulf) by 450 feet wide, a distance of 14.2
miles.
   South Pass bar, 30 feet deep (mean low Gulf) by 600 feet wide.
   The general plan of improvement of Southwest Pass provides for
contracting the pass to a uniform cross section with approximately
1,420-foot surface width by means of jetties, spur dikes, and bulk-
heads; for channel improvement by dredging and retaining' the
dredged material between the dikes, bulkheads, and jetties; for dredg-
ing a channel through the outer bar inclining to the left of the jetty
            RIVERS AND HARBORS-NEW                          ORLEANS,            LA.,    DISTRICT          739
axis; for the construction of small revetted openings through the
narrow portions of the banks of the pass for purpose of strengthening
these banks; for closure of minor outlets not required for maintenance
of the banks; for the construction of sills to prevent the enlargement
of the Jump and Cubits Gap; for dredging to elevation minus 40 feet
in the river at Head of Passes, as far as Cubits Gap, a distance of
3.5 miles; for repairs to sill across Pass a Loutre and bank revetment
at Head of Passes; for construction of dikes with a view to reducing
the width of the river above Head of Passes; for the construction of
a submerged deflecting dike above the Head of Passes; and for other
minor work. The east jetty is approximately 24,950 feet in length and
the west jetty 19,699 feet. The jetties are composed of a substructure
of brush mattresses, originally built to about the elevation of mean
low water, surmounted with a superstructure of concrete and large
riprap. Spur dikes are composed of cribwork of round piling filled
with willows and stone, or with a curtain of round piles along the
upstream face.
   The general plan of improvement of South Pass provides for the
construction and maintenance of jetties and spur dikes; maintenance
of a sill across Pass a Loutre; for dredging a channel 40 feet deep
and no specified width through the shoals of the river between Cubits
Gap and Head of Passes, 31/2 miles, and for seaward extension of east
jetty at mouth of pass; removal of west dike and construction of spur
dikes and bank revetment at Head of Passes; removal of false point
at the head of South Pass to bottom elevation of minus 45 feet and
revetment of new bank line. The east jetty foundation is 12,070 feet
long; the inner east jetty is 11,170 feet long; the west jetty is 7,820
feet long; and the inner west jetty is 4,710 feet long. The jetties are
composed of a substructure of brush mattresses surmounted by a super-
structure of stone and concrete. Spur dikes are composed of a crib-
work of round piling filled with willows and stone.
   The plane of reference is mean low Gulf level. Variation of water
surface is 16 inches at the mouths and 10 inches at the heads of the
passes, due to tides. The extreme range of tides at the mouths of
the passes due to storms is about 28 inches. At New Orleans the
extreme range of water surface is about 20 feet due to floods. At
Baton Rouge the extreme range is about 45 feet due to floods.
   The existing project for Mississippi River, Baton Rouge to the
Gulf of Mexico, La., was authorized by the following river and
harbor acts:
     Acts                           Work authorized                                      Documents

Mar. 3,1875       Authorized James B. Eads and associates to create
June 19, 1878      and maintain a wide and deep channel, South            Specified in acts.
Mar. 3, 1879        Pass.
June 6, 1900 1    For maintenance by the United States and the ap-               Do.
                    propriation of not exceeding $100. annually for
                    that purpose, South Pass.
June 13,1902      For a navigable channel in Southwest Pass of 35-foot    H.     Doc. 329, 56 Cong., 1st sess.,
                    depth, the details of the work subject to modifica-        and annual report, 1900, p. 2287.
                   tion at the discretion of the Secretary of War.
May 28,1908'      Dredging shoals between Head of Passes in Cubits        Specified in act.
                    Gap.
    Do.     .__   For dredging in the river----...- - . ..__.._              Do.
                  Removal of west dike and construction of spur dikes     Report by Board of Engineer offi-
                   and bank revetment at Head of Passes.                   cers (Annual report 1916, pp.
                                                                               2420-2426).
   See footnotes at end of table.
740           REPORT OF CHIEF OF ENGINEERS,                             U. S.     ARMY,           1952


       Acts                             Work authorized                                  Documents

Mar.     3,1909   Provision made for increasing the plant by the addi-       Specified in acts.
                   tion of a large dredge.
       (2)        Further contraction of the lower mile of the jetty         Interim report of board on revised
                   channel in Southwest Pass to a width of 1,420 feet          plan for navigation structures
                    by means of dikes, and removal of the sill across          Cubits Gap to the mouth of the
                    the head of South Pass.                                    Passes, Oct. 20, 1934.
        (2)       Removal of the sill across the head of South Pass. ..          Do.
June 26,1934      For continuing maintenance operations with funds           Permanent Appropriations Re.
                   from regular annual War Department appropria-               peals Act.
                    tions, South Pass.
        (t)       Spur dikes at the head of Southwest Pass and the           Second interim report of board on
                   construction of new dikes and extension of existing        revised plan for navigation struc-
                   dikes on the east bank of the Mississippi River at         tures, Cubits Gap to the mouths
                    Pilottown, La.                                            of the Passes, July 12, 1935.
        (4)       Additional spur dikes at the head of Southwest Pass        Final report of board on revised
                    and construction of new dikes and extension of            plan for navigation structures
                    existing dikes in the lower jetty channel, South-          Cubits Gap to the mouths of the
                    west Pass.                                                 Passes, Dec. 20, 1935.
June 20,1938      Channel 35 feet deep at mean low water and 1,000 feet      H. Doc. 597, 75th Cong., 3d sess.
                    wide, Head of Passes to upper limits of the port of
                    New Orleans, 35 feet deep and 500 feet wide to a line
                     2-mile below river bridge at Baton Rouge, except
                    that within the limits of the port of New Orleans
                    the channel shall be 1,500 feet wide.
        (4)       Dredging in Mississippi River between Cubits Gap           Interim report of board of officers
                    and Head of Passes to bottom elevation of -55 feet         appointed to determine what
                    and construction of bank control structures and            work may be advisable to com-
                    channel correction dredging in Southwest Pass be-          plete the existing project fqr
                   low mile 10.                                                Southwest     Pass,   Mississippi
                                                                               River * * * ; dated June 10, 1938.
        (5)       Improvement at the head of South Pass by removal               Do.
                    of the false point at this locality to a bottom eleva-
                    tion of at least -45 feet, including revetment of the
                   new bank line.
Mar.     2,1945   Combines projects of Mississippi River, Baton              H. Doc. 215, 76th Cong., 1st sess.
                     Rouge to New Orleans, Mississippi River, South            Contains latest published map.
                    Pass, and Southwest Pass, adding thereto project
                    for Mississippi River from New Orleans to Head
                    of Passes, to provide a single project "Mississippi
                     River, Baton Rouge to the Gulf of Mexico," with
                    channel dimensions as follows: Baton Rouge to
                    New Orleans, 35 feet deep, mean low Gulf, by 500
                    feet wide; port limits of New Orleans, 35 feet deep,
                    mean low Gulf, by 1,500 feet wide; New Orleans to
                    Head of Passes, 40 feet deep, mean low Gulf, by
                    1,000 feet wide; Southwest Pass, 40 feet deep, mean
                    low Gulf, by 800 feet wide; Southwest Pass Bar
                    Channel, 40 feet deep, mean low Gulf, by 600 feet
                    wide; South Pass, 30 feet deep, mean low Gulf, by
                    450 feet wide; South Pass Bar Channel, 30 feet
                    deep, mean low Gulf, by 600 feet wide.

  1 Emergency act.
  2 Authority of Secretary    of War,   Oct. 31, 1934.
  8 Authority of Secretary    of War,   Sept. 20, 1935.
  4 Authority of Secretary    of War,   July 22, 1936.
  d Authority of Secretary    of War,   June 30. 1938.


   The estimate of cost for new work, revised in 1952, is $32,261,000.
The latest (1952) revised estimate of cost for annual maintenance is
$1,750,000.
  Local 6ooperation.-None required.
   Terminal facilities.--Some 100 piers, wharves, or docks serve the
port of New Orleans. Practically all wharves on the east or left
bank parallel the river bank forming nearly a continuous covered quay
about 10 miles long.
   A foreign trade zone is located in the port of New Orleans.
   Public wharves controlled by the Board of Commissioners of the
Port of New Orleans (the dock board) cover 62 percent of the im-
proved waterfront. The board also controls the terminal facilities on
the Inner Harbor Navigation Canal (the Industrial Canal) which
connects the Mississippi River with Lake Pontchartrain and turning
       RIVERS AND    HARBORS-NEW       ORLEANS,   LA.,   DISTRICT   741
basin (1,000 by 1,000 feet). Since April 1, 1944, the portion of the
Inner Harbor Navigation Canal from the Mississippi River to its in-
tersection with the New Orleans-Rigolets section of the Gulf Intra-
coastal Waterway, exclusive of terminal facilities, but inclusive of the
lock and the bridges at St. Claude Avenue and at Florida Avenue,
has been under lease to the United States and is now operated by the
United States on a toll-free basis, 24 hours per day. From the turn-
ing basin to the river the canal has a controlling depth of 30 feet. A
quay wharf of reinforced concrete, 265 feet wide by 2,400 feet long
owned by the dock board is located on the west bank of the canal.
   All public port facilities are served by paved roadways (generally
city streets) and by the Public Belt Railroad, municipally owned and
operated, which connects with all 12 trunk lines entering New Orleans.
   The existing terminal facilities at New Orleans include a ship-side
grain elevator, general cargo and cotton wharves, fruit landings,
bunkering facilities, terminal warehouses, railroad terminals, marine
railways, drydocks, and a "Foreign Trade Zone." They are consid-
ered adequate for present commerce. (For further details see Port
Series No. 20, "The Port of New Orleans, La." 1947.)
   Modern terminal facilities were installed by the city of Baton
Rouge in 1926. A reinforced concrete dock for deep-sea vessels, 308
feet in length, has a covered-shed area of approximately 20,000 square
feet and is equipped with a 12-ton locomotive crane. Attached to the
downstream end of the wharf is a floating wharf boat 231 by 401/2 feet,
of 2,000-ton capacity. The facilities are served by a transfer boat and
municipal terminal, having a capacity of 40 cars per day.
   Private terminals for handling oil and other products are located
at points on both sides of the river between New Orleans and Baton
Rouge.
   The facilities are considered adequate for the existing commerce,
except at Baton Rouge where the demands of present commerce indi-
cate that an extension of the harbor is desirable by an authorized new
channel through Devils Swamp, La., as covered in the report of the
President, Mississippi River Commission. (For further details see
"'Terminals and Landings on the Inland Waterways of the United
States," vol. I, November 1941.)
   Operations and results during fiscal year.-New work performed
consisted of a model pilot study of Southwest Pass Channel for use
in preparing plans and specifications for the improvement of the
river and passes to obtain project dimensions.
   Total costs for new work by hired labor were $50.
   Maintenance work performed on the project was as follows:
   a. Baton Rouge to New Orleans.-Maintenance work consisted of
removing 141,104 cubic yards of material by leased dredge Diesel at
Red Eye Crossing, mile 223.5 above Head of Pass, along the aline-
ment of the front and rear range lights for a distance of approximately
2,850 feet. Maintenance dredging was also performed at Medora
Crossing, mile 211.5 above Head of Passes for a distance of approxi-
mately 2,900 feet by hired labor and United States dredge Langfitt
removing 135,736 cubic yards of material. Maintenance work also
consisted of dredging 548,006 cubic yards of material at Granada
Crossing, mile 203.5 above Head of Passes, for a distance of approxi-
742          REPORT OF CHIEF OF ENGINEERS,                                  U.    S. ARMY,          1952

mately 2,600 feet. Of this amount 175,262 cubic yards were removed
by hired labor and United States dredge Comber and 372,744 cubic
yards removed by hired labor and United States dredge Langfitt.
  Surveys were made of Red Eye, Medora, Granada, Bayou Goula,
and Philadelphia Point Crossings, as required.
  Costs for this work were as follows:
Maintenance by contract: Dredging by leased plant----------------- $34, 585
Maintenance by hired labor: Dredging and surveys------------------ 76, 599

          Total -------------------------                                                      -------- 111, 184
  b. New Orleans Harbor.-Maintenance dredging was accomplished
by leased dredges Diesel, Pontchartrainand Tchefuncta, removing 1,-
156,295 cubic yards of material from the channel to provide project
dimensions within the harbor at New Orleans beyond the 100-foot line
from the face of the wharves along the left bank, from Stuyvesant
docks intermittently downstream to and including the Meraux ter-
minal wharf. The distance actually dredged was 20,155 feet and the
following work was performed:

                                                                                                                 Cubic
                                                 Location                                                        yards
                                                                                                               removed


Dredge Diesel:
   Stuyvesant docks.-----------                 ----------------             ----------------------------          69,325
   Erato-Julia St. wharves--------..         ....------            -    --------------                             59,705
   Bienville-Toulouse St. wharves ---------------------------------------------------------                        78, 895
Dredge Pontchartrain:
   Stuyvesant docks .                ...-                                      -------------------------------     77, 035
   Orange-Robin St. wharves-------------------------------......         ....------------------- ---------------   54,125
   Robin-Erato St. wharves ----                -----------------------------------------------------              209,115
   Erato-Julia St. wharves             .--....-----------------                                                    80, 970
   Bienville-Toulouse St. wharves .----               -------------------------------------- ------------          91,265
   Meraux terminal wharf------------------------------ ------------------------------------                        37, 875
Dredge Tchefuncta:
   Stuyvesant docks-..---------------------------_                                                                 69, 055
   Orange-Robin St. wharves -------- ---------------                  ----------------- -----------------          42, 300
   Erato-Julia St. wharves--- .---------------                       -----------           --------------------- 193, 985
   Bienville-Toulouse St. wharves-----------------------....-----..---------------------------........             43, 395
   Meraux terminal wharf......--------------......-------------------.........................-------------------  49, 250



   On November 17, 1947, contract was entered into with the Board of
Commissioners of the Port of New Orleans for a more efficient and
expeditious use of dredges to provide navigable depths in the project
channel in the Port of New Orleans, and within the 100-foot limit
along the left bank wharves. During the fiscal year under this re-
ciprocal agreement 105,901 cubic yards were removed by leased dredges
Pontchartrain,Diesel, and Tchefuncta from within the 100-foot line
and 90,445 cubic yards were removed by the Board of Commissioners
outside the 100-foot line.
   River traffic signal lights in the vicinity of Gretna, La., and Gover-
nor Nicholls Street in New Orleans, to govern the movement of vessels
during flood stages on the Mississippi River in the vicinity of Algiers
Point, Port of New Orleans, were in operation from July 10 to August
2, 1951, from December 23, 1951, to January 26, 1952, from February
4 to 25, 1952, and from March 19 to May 12, 1952.
   Necessary surveys to determine the condition of the channel in the
harbor were made.
       RIVERS AND     HARBORS-NEW         ORLEANS,   LA.,   DISTRICT       743
  Costs were as follows:
Maintenance by contract: Dredging by leased plant---------------    $333, 102
Maintenance by hired labor: Operation of signal lights-------------- 22, 446
      Total                                                            3---------------------------
                                                                       355, 548
   c.Southwest Pass.-Maintenance work consisted of dredging 1,070,-
005 cubic yards of material at the Head of Passes for a distance of
approximately 8,800 feet along the entrance ranges into Southwest
and South Passes. Of this amount 373,725 cubic yards were removed
by United States dredge Comber and 696,280 cubic yards removed by
United States dredge Langfitt. Included in the yardage removed by
the United States dredge Lang/itt are 78,625 cubic yards removed at
miles 3-4 below Head of Passes.
   At the Southwest Pass bar and lower jetty channel, maintenance
work consisted of dredging 6,145,738 cubic yards of material between
mile 19.2 below Head of Passes and buoy No. 1 on the sea bar, a distance
of approximately 9,300 feet. Of this amount 1,527,478 cubic yards
were removed by United States dredge Comber, 948,945 cubic yards
by United States dredge Gerig, and 3,669,315 cubic yards by United
States dredge Langfitt. Channel deterioration in Southwest Pass
resulted in the United States dredge Langfitt removing 1,910,145
cubic yards of material between miles 13 and 16 below Head of Passes.
Excessive shoaling at the Head of Passes made it necessary to restrict
shipping drafts to 27 feet on the entrance range into South Pass and
to 31-33 feet on the entrance range into Southwest Pass as well as on
the Southwest Pass bar and lower jetty channel from January 3 to
February 6, 1952.
   Work on the continuing contract in force at beginning of fiscal year
for capping 11,954 feet of west jetty, Southwest Pass, to complete
repair of this jetty and restore it to established grade and section, was
commenced on July 2, 1951. On February 11, 1952, work was sus-
pended for duration of high water period when 802 blocks had been
poured and 798 blocks had been placed over a distance of approxi-
mately 11,955 linear feet. On March 18, 1952, a wave of very large
magnitude struck the Southwest Pass west jetty and displaced 180
precast concrete blocks which were yet to be grouted. Notice to resume
operations within 10 days after receipt was sent to the contractor on
June 25, 1952.
   During the period July 27 and October 29, 1951, hired labor forces
completed screening, raising, and repairing the permeable pile dikes
in Southwest Pass, at the Head of Passes, and at Pilottown.
   Outlet at mile 8.7, below Head of Passes, Southwest Pass, was closed
off hydraulically by leased dredge Pontchartrainbetween October 12
and 25, 1951. On December 18, 1951, the sand fill crevassed and water
resumed flowing through the outlet.
   Repair and maintenance of outlets and miscellaneous structures,
routine channel surveys, miscellaneous hydraulic investigations and
examinations and observations were made by hired labor forces. Pilot
model study of Southwest Pass was continued. Shore and floating:
plant and the Burrwood Reservation were maintained.
744       REPORT       OF CHIEF OF ENGINEERS,                           U. S. ARMY,               1952


   Costs were as follows:
Maintenance by contract: Repairs to west jetty, Southwest Pass----- $301, 638
Maintenance by hired labor:
    Dredging------       --------------------------------------              671, 294
    Repair and maintenance of dikes, outlets and miscellaneous struc-
      tures-----------             ---------------------------------         449, 555
    Closure of outlet, mile 8.7, below Head of Passes---            .. - -__  42, 544
    Routine channel surveys, miscellaneous observations and opera-
      tion of Burrwood base -            --------------------------------    191, 252
    Pilot model study of Southwest Pass---5,------------ ----------               212
    Plans and specifications, reports and mapping------------------            3, 113
        Total                  ---------------------------------------------                          1, 664, 608
  d. South Pass.-No maintenance dredging was performed on the
South Pass bar channel during the fiscal year.
  A continuing contract was entered into on April 17, 1952, for restor-
ing approximately 2,485 linear feet of east jetty, South Pass, with
concrete capping, and extending landward the rubble dike at mile 13.2
below Head of Passes, west jetty, South Pass. Operations commenced
on June 20, 1952', and at the end of the fiscal year approximately 3,300
tons of stone had been placed over a distance of 860 linear feet on the
east jetty.
   Routine channel surveys and miscellaneous observations were made.
Costs were as follows:
Maintenance by contract: Repairs to east jetty, South Pass            $21, 769       ----------
Maintenance by hired labor: Routine channel surveys and miscellaneous
observations----------      ----- ----                                 4, 385
        Total-       -----------------------------------------------                                         26, 154
  e. Cost for supervision, inspection, and maintenance of channel
patrol from Baton Rouge to the Gulf of Mexico was $8,716.00.
  f. Hydraulic surveys, investigations, and studies continued through
the fiscal year 1952. Data obtained included complete hydrographic
surveys of Southwest and South Passes and the river below Wilder
Flats, as required; continuous water-level records at controlling points
throughout the passes; discharge measurements in each of they three
main passes; and gagings of minor outlets. Periodic surveys were
made of Southwest and South Passes, of both bar channel, at the Head
of Passes, at Pass a Loutre, Cubits Gap, New Orleans Harbor, and
various crossings between Baton Rouge and New Orleans.
  Average discharge at each of the three main passes of the lower
Mississippi River in percentages of the total discharge of the river at
the Head of the Passes during the flood cycles are as follows:

                      1943       1944      1945      1946      1947     1918      1949     1950     1951       1952

Southwest Pass_._     38.37      38.15     34.25     34.28     38.15    34.96     36.07    36.24    35.00       35.00
South Pass .__....    17.28      17.39     18.41     17.36     18.37    18.46     17.43    18.30    20.28       20.65
Pass a Loutre-. .     44. 35     44. 46    47. 34    48. 36    43.48    46. 58    46. 50   45. 46   44. 72      44. 35

      Total.-------100.00       100.00    100.00    100.00    100.00   100.00    100.00    100.00   100.00     100.00



  g. The total costs for the fiscal year were $2,166,260 of which $50
was for new work, and $2,166,210 was for maintenance. The expendi-
tures were $2,137,959.07, all for maintenance.
  Conditionat end of fiscal year.-The project as a whole is 78 percent
complete.
            RIVERS AND              HARBORS-NEW                     ORLEANS,     LA.,       DISTRICT        745
   a. Baton Rouge to New Orleans, New Orleans Harbor, and New
Orleans to Head of Passes.-Thisportion of the project was completed
in 1940 and maintenance dredging is required at river crossings above
New Orleans and in the New Orleans Harbor. Minor deficiencies in
project dimensions at the lower end of Dumaine Street and Governor
Nicholls Street wharves in the New Orleans Harbor were not cor,
rected because of the presence of revetment mattresses at these points.
Existing depths opposite these locations are adequate for present and
anticipated future commerce.
   The normal width of channel between 35-foot contours within the
limits of the port of New Orleans varies from 1,600 to 2,400 feet,
Thalweg depths exceed 100 feet. Shoals along edges of the channel,
which develop at various points during high river stages, make dredg-
ing necessary when river stages fall to maintain project depths to
wharves along the east bank.
   A natural channel of project dimensions or greater was available
throughout the remainder of this portion of the project.
   b. Southwest Pass.--Deepening of the pass and bar channel from 35
to 40 feet, mean low Gulf, as approved by Act of March 2, 1945, is
yet to be performed.
   The east jetty has been restored to effective grade and section.
Some stone is yet to be placed in those areas that have settled which
will complete restoration of the jetty. Observations will be made to
determine the amount of accretion or scour taking place at the root
of the jetty.
   The west jetty under continuing contract was restored to effective
grade and section with concrete capping for a distance of 9,157 feet
during fiscal year. The remaining portion of this work will be comn-
pleted during fiscal year 1953.
   Outlet at mile 8.7 (Jahncke cut) on the east bank of the pass will
be closed again during fiscal year 1953. Closure will probably be made
by hydraulic dredge.
   Between miles 13 and 19 below Head of Passes the channel has
deteriorated, being very narrow and split in some areas by a middle
ground. Dredging has been deferred because of lack of adequate
funds.
   For last complete report on the existing works of this pass, see pages
968-969 of the annual report for 1950.
   Channel conditions on June 30, 1952, were as follows:
                                                                                35-foot channel
                                                                    Length of                            Minimum:
                                                                    channel
                                                                    channel Minimum                       central
                                                                                             Average      depth
                                                                               width          width

                                                                     Miles     Feet           Feet         Feet
Entrance channel into head of the pass . __ __ -_ __....                1.0           560         940               37
Through pass from head to sea end of jetties ............              20. 2           80          680            1 35
Through bar channel at mouth of pass --.......---         .......       1.0           580         750               35

  1Existing condition, except at mile 15.3 below Head of Passes where the 35-foot channel is closed for dis-
tance of 550 feet.

  c. South Pass.-A good channel was available throughout the
length of the pass during the fiscal year.
  Crevasse at mile 2.5, below Head of Passes, on west bank has be-
come stabilized, but stone should be placed to prevent further erosion
of banks on the South Pass side.
746       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                          1952

   All outlets in the pass should be reinforced with stone to prevent
erosion of banks on the South Pass side.
   The east jetty is being raised and repaired under continuing con-
tract.
   For last complete report on the existing works of this pass, see pages
969-970 of the annual report for 1950.
   Controlling channel conditions on June 30, 1952, were 27 feet over
the bar channel at the Gulf entrance to the pass. Dredging will be
performed the early part of fiscal year 1953.
   Total costs under the existing project to the end of the fiscal year
were $57,568,376.75, of which $25,296,901.85 was for new work
and $32,271,474.90 for maintenance. The total expenditures were
$57,806,666.19.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $243,639.21, plus an allotment of $1,860,109, a total of
$2,103,748.21, will be applied as follows:
Accounts payable, June 30, 1952              ----------       ------------------ $69,190.54
Maintenance:
    By contract:
        Repairs to east jetty, South Pass------                   $201, 591. 00
        Repairs to west jetty, Southwest Pass---                 - 18, 483. 00
        Dredging in New Orleans Harbor by leased
          dredge as required between July 1, 1952,
          and June 30, 1953________                 ____-----      250, 000. 00
        Hydraulic closure of Jahncke cut, mile 8.7
          below Head of Passes, Southwest Pass,
          with leased dredge, September 1952_ _--                   50, 000. 00
        Dredging in Southwest Pass, miles 14.5 to
          19.2 below Head of Passes, with leased
          dredge, September-December 1952_.----                    300, 000. 00
    By hired labor:
        Dredging as required between July 1, 1952,
          and June 30, 1953, by United States dredge
          Langfitt:
            Southwest Pass bar and lower jetty
               channel------------------------440, 625. 00
             South Pass bar and channel-----------25, 000. 00
             Head of Passes------------------                      150, 000. 00
        As required between July 1, 1952, and
          June 30, 1953:
             Dredging of crossings between Baton
               Rouge and New Orleans by United
               States dredge Langfitt___-------                    204, 875. 00
             Operation of Burrwood Base---------125, 000. 00
             Repairs and maintenance of dikes, out-
               lets, and other structures, Southwest
               and South Passes_______________ 109, 325. 00
            Operation of signal lights for traffic
               control through New Orleans Harbor
               during high water __ _____-___-                      22, 000. 00
            Routine channel surveys from Baton
               Rouge to Venice, La.---------------12, 000. 00
            Surveys below Venice, La.--------               ---     60, 000. 00
            Discharge     observations,            Mississippi
               River Passes ---------------------                    7, 000. 00
             Stream-gaging pr o g r a m, Mississippi
               River Passes--------_             -        _        - 8, 000. 00
            Channel patrol--------------------__                    14, 000. 00
            Contingencies.-------------------.                      35, 428. 00
              Preliminary plans and specifications...           1, 230. 67
                                                                             2, 034, 557. 67
                 Total for all work-------------------------                 2, 103, 748. 21
             RIVERS         AND       HARBORS--NEW                       ORLEANS,              LA.,    DISTRICT                  747

  The sum of $2,000,000 can be profitably expended for the following
scheduled work during the fiscal year 1954:
Maintenance:
   By contract:
       Dredging by leased dredge in Southwest
         Pass-------------------------------$350, 000
        Dredging in New Orleans Harbor as required
         during fiscal year__350----------------------     000                                 3,
        Minor repairs to jetties, South Pass and
         Southwest Pass-------------- --------- 200, 000
   By hired labor as required during fiscal year:
        Dredging by United States dredge Langfitt at
         bar and jetty channels, Southwest and South
         Passes, and at Head of Passes -----------     60,000
        Dredging of crossings between Baton Rouge
          and New Orleans by United States dredge
         Langtt-----------------------------220,           000
        Channel surveys, examinations, channel patrol,
         and operations of Burrwood base--------- 179, 700
        Operation of signal lights for traffic control
         in New Orleans Harbor during high water-      25, 000
        Contingencies --------------------- __         15, 300
                 Total-----------------------------------------                                                      $2, 000, 000

                                          Cost and financial summary

                                                          Fiscal year ending June 30-                                Total to June
                                                                                                                     30, 1952, includ-
                                                                                                                     ing fiscal years
                                      1948                1949          1950            1951            1952           prior to 1948

New work:
   Appropriated.--------. $25, 000. 00             ---         -------------------------        $7, 181. 20 1 $27,026, 890. 38
   Cost ..---      ...------------- 71, 045. 44          $9, 573. 75  $2,083. 58  $1,326. 84         50.00 1 27,026,890.38
   Expenditures .... ..              70, 337. 94          9, 131. 04   2, 048. 06  1, 362. 36-----------       27, 026, 890. 38
Maintenance:
   Appropriated--....... 1, 566, 700. 00           1, 944, 200. 00 2, 413, 370. 00 1, 897, 626. 93 2, 044, 300. 00   2 32, 922, 458. 65
   Cost.....--------------... 1,761,553.47         1, 705, 874. 15 2, 261, 102. 52 1, 896,146. 71 2,166, 210. 00     232, 440, 530.00
   Expenditures .-..          -_ 1, 668, 455. 79   1, 700, 543. 29 2, 313, 251. 76 1, 842, 308. 72 2, 137, 959. 07   2   32, 678, 819. 44


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project------------ $6, 964, 098. 15
  1 Includes $1,729,988.53 for previous project.
  3 Includes $169,055.10 for previous project and $3,379,675.65 from permanent indefinite appropriation.

       8. WATERWAY FROM EMPIRE, LA., TO THE GULF OF MEXICO

   Location.-Waterway from Empire, La., to the Gulf of Mexico
via Bayous Long and Fontanelle. (See U. S. Geological Survey map,
Empire quadrangle.)
   Existing project.--The plan of improvement provides for construc-
tion and maintenance of a waterway, 10 miles long, from the State-
owned canal and lock at Empire, La., to the Gulf of Mexico to provide
a channel 9 feet deep and 80 feet wide, at an estimated cost to the
United States of $2,443,000 (revised in 1952), including $1,343,000
for extension of the jetties to the 9-foot depth contour if and when
it becomes apparent that such extensions will be more economical
than maintenance dredging of the entrance channel. The approved
estimate of cost for annual maintenance is $40,000.
748      'REPORT    OF CHIEF OF ENGINEERS,             U. S.   ARMY,    195-2

   The existing project was authorized by the River and Harbor Act
approved July 24, 1946. (See H. Doc. 697, 79th Cong., 2d sess.) The
only published map is in this document.
   Local cooperation.-Fully complied with, except for furnishing of
tile information, preparation of which is under way.
   Operationsand results during fiscal year.--Hired labor forces car-
ried on surveys and investigations for studies of the waterway with
costs of $1,880 for new work, and prepared preliminary plans and
specifications with costs of $8,714 for maintenance.
   During the period April 16 and June 14, 1952, the contract dredge
F. J. J. Sloat performed maintenance dredging in the waterway
between mile 10 and the minus 9-foot contour in the Gulf, a distance
of approximately 0.64 mile. A total of 59,555 cubic yards was re-
moved at a cost of $30,985.03 for maintenance. The purpose of this
dredging was to determine if overdredging will provide satisfactory
advance maintenance or if extension of the jetties will be required.
   The total costs were $41,579.03, of which $1,880 was for new work
and $39,699.03 for maintenance; expenditures were $10,846.08.
   Condition at end of fiscal year.-The project is physically complete,
unless at a later date it is found necessary to extend the jetties to the
9-foot depth contour.
   Work on the project was initiated on July 31, 1948, and completed
on June 13, 1950, during which period the 9- by 80-foot channel from
Empire, La., to the Gulf of Mexico, 10 miles, was excavated by
contract.
   A total of 3,736 linear feet of jetties was constructed by contract to
the 6-foot depth contour, 1,818 linear feet on east jetty and 1,918 linear
feet on west jetty, during the period June 23, 1949, and February 18,
1950.
   The controlling depths, mean low Gulf (June 1952), were: Over
the bar, 13 feet; through the jetty channel, 12 feet; (May 1951)
through the channel to Empire, 9 feet.
   The total costs to the end of the fiscal year were $1,098,219, of which
$1,058,100 was for new work and $40,119 for maintenance; expendi-
tures were $1,097,480.33.
   Proposed operations.--The balance unexpended at the end of the
fiscal year, $45,939.64, will be applied as follows:
Accounts payable, June 30, 1952-------------           --------------------- $738. 67
New work by hired labor: Surveys, investigations and studies per-
  taining to existing jetties and probable extension of jetties to
9-foot contour---------------------------------------                      41,900.00
Maintenance by hired labor: Condition surveys------                          3,.300. 97
       Total for all work---------         ------------------- ------- 45, 939. 64
   No work is scheduled for fiscal year 1954.
            RIVERS AND HARBORS-NEW                                  ORLEANS,            LA.,     DISTRICT                  749
                                          Cost and financial summary

                                                      Fiscal year ending June 30-                                Total to June
                                                                                                                 30, 1952, includ-
                                                                                                                 ing fiseal years
                                    1948             1949         1950           1951            1952              priorto 1948

New work:
                           000.00 $220, 000.00 $600, 000.00
   Appropriated-. . ._ $250,                                                  $18, 000.00 ---------          -     $1, 100, 000.00,
   Cost                               17. 22    243, 567.00    809, 045.33      3,590.45       $1,880.00            1,058,100.00
   Expenditurcs-     -   -_           15. 94    224, 946.80    829, 011.01      2, 240. 53      1,885.72            1,058,100.00
Maintenance:
   Appropriated--         --------------       ..----------        800.00       -380.03        43, 000.00              43,419. 97
   Cost                     -..-------------
                    ..-------------               ----------       419.97 ------------         39, 699.03              40,119.00
   Expenditures -----         ---------             --------       419.97    ------------      38, 960. 36             39, 380.33


Other new work data:
    Unobligated balance, June 30, 1952---------------------                                                           $41, 900
     Unobligated balance available for fiscal year 1953-------------    41, 900
     Estimated additional amount needed to be appropriated for com-
       pletion of existing project---------------------------------1,343, 000

                                      9. BAYOU LAFOURCHE, LA.

   Location.-Prior to 1902 Bayou Lafourche was an outlet of the
Mississippi River, its head being at Donaldsonville, La., 80 miles above
New Orleans. It flows in a general southerly direction to the Gulf
of Mexico, a distance of 107 miles. (See U. S. Coast and Geodetic
Survey Charts Nos. 1116 and 1274; Corps of Engineers, Mississippi
River Commission alluvial valley map; Donaldsonville, White Castle,
Napoleonville, Thibodaux, and Lac des Ailemands quadrangles; and
United States Geological Survey map and Houma, Cut-Off, Lake
Felicity, Mink Bayou, Leeville, and Belle Pass quadrangles.)
   Previous projects.--Authorized by River and Harbor Acts of June
18, 1878, and August 11, 1888. For further details, see page 850 of
annual report for 1915, page 833 of annual report for 1925, and page
791 of annual report for 1938.
   Existing project.-This provides for the permanent closure of the
head of the bayou, without a lock; for a channel 6 feet deep and 60
feet wide from Napoleonville to the Intracoastal Waterway at Lock-
port; and a channel of same dimensions from the Intracoastal Water-
way at Larose to the Gulf of Mexico via Belle Pass; the closure of
Pass Fourchon and for a jettied entrance at the mouth of Belle Pass.
The total length of improvement is about 79.25 miles. Under ordi-
nary conditions the mean range of tide is about 3 inches at the head and
10 inches at the mouth of the bayou. Tropical hurricanes have been
known to cause a variation of 10 feet at the mouth and severe rains
and overflow have caused a variation of 3 to 10 feet at the head.
   The estimate of cost for new work, revised in 1952, is $1,003,000.
The latest (1952) approved estimate of cost for annual maintenance
is $50,000.
   The existing project was adopted by the River and Harbor Act
of August 30, 1935 (H. Doc. 45, 73d Cong., 1st sess.). The latest pub-
lished map is in the project document.
   Local cooperation.-Fully complied with.
   Terminal facilities.-There are numerous private warehouses and
wharves and stiff-leg derricks for handling cane along the bayou.
       245554-53--vol. 1-48
750    REPORT    OF CHIEF OF ENGINEERS,        U.   S. ARMY,   1952

At Thibodaux there is a dock with freight transfer and warehouses.
At Lockport the Barker Barge Line has a large wharf with covered
shed, and the Southern Pacific Railroad maintains a large wharf with
covered shed. At Golden Meadow each of the seafood canneries has
docking facilities suitable for its needs. Four oil companies have
docks at Leeville for transferring the production of the Leeville oil
fields to barges. The terminal facilities are considered adequate for
existing commerce.
   Operations and results during fiscal year.-Maintenance costs
amounted to $2,498 for preliminary plans and specifications, condition
survey, and report on Belle Pass jetties.
   A total of 3,326.65 tons of stone, at a cost of $53,104, was used in re-
pairing east jetty at mouth of Belle Pass during the period July 27
and August 27, 1951. These repairs were made over a distance of 315
linear feet and consisted of buttressing the sheet pile section of the
jetties with the stone and closing the openings in the sheet piling,
thus strengthening the jetties considerably and providing protection
to the Gulf entrance of the project.
   The total cost for maintenance was $55,602; expenditures were
;$56,091.78.
   Conditionat end of fiscal year.-The existing project is 27 (revised)
percent complete.
   The dredging between Larose, La., and the Gulf of Mexico was com-
pleted in 1939. The jetties at the mouth of Belle Pass were completed
in 1939, but were subsequently damaged by storm action, which re-
quired the placement of additional stone adjacent to both sides of the
steel sheet pile jetties in 1940, and the repair and extension of the
jetties in 1941.
   During the fiscal year 1948 the stone jetties were repaired and ex-
tended inland about 700 feet from, the shore line; and the steel sheet
pile section was strengthened, for about 250 feet Gulf ward of the stone
jetties, by the placement of stone on both the Gulf and bayou sides.
On May 31, 1949, an automatic tide gage for recording hurricane and
storm tides was installed.
   Work remaining to be done under the existing project consists of
dredging the project channel between Lockport and Napoleonville,
La.
   The controlling depths, mean low Gulf (June 1950), were: Over
bar, 6.3 feet; through Belle Pass, 7.3 feet; to mile 96, 6.3 feet; to Golden
Meadows, 8.3 feet; to Larose, 6 feet; to Lockport (mile 56), 8 feet; to
Thibodaux, 6 feet; and to L'Abadieville, 5 feet.
   The total costs under the existing project to the end of the fiscal
year were $627,132.27, of which $271,088.65 was for new work and
$356,043.62 for maintenance; expenditures were $627,158.58.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $977.39, plus accounts receivable, $26.31, and an allotment
of $49,105 for maintenance, a total of $50,108.70, will be applied as
follows:
            RIVERS AND HARBORS-NEW                                             ORLEANS,               LA.,      DISTRICT                  751
;Maintenance:
    By contract: Repairs to west jetty--$---------------------47, 648. 70
    By hired labor: Condition surveys------------------------ 2, 460. 00

         Total for all work------------                                          ---------------------                          50, 108. 70
  The sum of $219,000 can, be profitably expended for the following
scheduled work during the fiscal year 1954:
Maintenance :
   By contract:
        Dredging bar channel-------------------------------- $50, 000
        Repairs to jetty------------         --------------- ------- 162,900
   By hired labor:
        Surveys and channel investigations -----------------------     2, 500
        Miscellaneous inspections and reports---------------------3, 600
                 Total for all work---------                                -------------------------                                219, 000

                                              Cost and financial summary

                                                           Fiscal year ending June 30-                                         Total to June
                                                                                                                              30, 1952, includ-
                                                                                                                              ing fiscal years
                                         1948              1949              1950              1951              1952           priorto 1948

New work:
   Appropriated-....--................------------......---------------------..........--.......----------...........                1 $524, 024. 13
   Cost----------          -------           ---..------------------------------                         ---.........--------....... 1524, 024.13
   Expenditures------............           ..--------------------
                                            ..
                                 ------------                                               -------------
                                                                                       ..........------                               1 524, 024. 13
Maintenance:
   Appropriated-.........            $97, 500.00       $11,000. 00          $174. 00       $52, 480. 00       $3, 000. 00           1372, 492. 70
   Cost--------------                215, 810. 96        5, 266. 86        1, 808. 99        5, 881. 92       55, 602. 00          2 371, 489. 00
   Expenditures- ......              215, 732. 21        4,809. 71         2, 289. 29        5, 418. 45       56, 091. 78          2 371, 515. 31



Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project--------------- $731, 911. 35
1Includes $252,935.48 from previous project.
s Includes $15,445.38 from previous project.

                                     10. LITTLE CAILLOU BAYOU, LA.

   Location.--Little Caillou Bayou has its source in Bayou Terre-
bonne, 41/ miles below Houma, La., and flows 32.8 miles in a southerly
direction to Terrebonne Bay. (See U. S. Coast and Geodetic Survey
Chart No. 1116 and U. S. Geological Survey maps, Houma and Dulac
quadrangles.)
   Existing project.-This provides for a channel 5 feet deep at
mean low water by 40 feet wide on the bottom from the head of
the bayou, at Bayou Terrebonne, to Robinson Canal, about 20 miles.
The normal fluctuation of tide is 3 to 6 inches, but winds may raise
or lower the water surface about 1 foot.
   The cost of new work, completed in 1929, was $77,761.04. The
latest (1952) approved estimate for annual cost of maintenance is
$9,000.
   The existing project was authorized by the River and Harbor
Act approved January 21, 1927 (Rivers and Harbors Committee Doe.
5, 69th Cong., 1st sess.).
   Local cooperation.-Fully complied with.
   Terminal facilities.-Freight is unloaded directly on or from the
banks. This method is considered satisfactory for existing commerce.
752         REPORT OF CHIEF OF ENGINEERS,                                                   U. S. ARMY,                    1952

  Operations and results during fiscal year.-Supervision, inspection
and patrol of the waterway, removal of snags and other obstructions,.
and maintenance of signs and markers were carried on by hired
labor at a cost of $314.70; expenditures were $314.70.
  Condition at end of fiscal year.-In 1929 the channel was dredged
from the head of the bayou (confluence with Bayou Terrebonne)
to Robinson Canal, 20.6 miles, obtaining a channel 5 feet deep at
mean low Gulf by 40 feet wide on the bottom, and completing the
project. During the period January 8 and July 21, 1949, the channel
was restored to project dimensions by maintenance dredging.
  The controlling depth, mean low Gulf (May 1950), was Bayou
Terrebonne to Robinson Canal, 6 feet.
  The total costs and expenditures under the existing project to,
the end of the fiscal year were $318,209.04, of which $77,761.04 was
for new work and $240,448 for maintenance.
  Proposed operations.-No funds are available and no work is pro-
posed during the fiscal years 1953 and 1954.
                                                  Cost and financial summary

                                                           Fiscal year ending June 30-                                         Total to June
                                                                                                                              30, 1952, includ.
                                                                                                                              ing fiscal years
                                            1948           1949           1950               1951                  1952         prior to 1948


New work:
   Appropriated                     .  .
                                 -----------                   ------------ ---------------
                                                     ------------                                                       --------- $77, 761.04
   Cost-               _         - .- - -            ------- _----             __     ___--------       ----                        77,761.04
   Expenditures----
                ... ...-              .-     ..           -------------                               -- ...----- ....--
                                                                                                                    -               77, 761.04
Maintenance:
   Appropriated-           ---   _ __          $500. 00 $224, 500. 00 -$9, 909. 00           -$1. 49           -$1, 285. 30        240, 448. 00
   Cost .....      .                            225. 30 185, 943. 37
                                    ..-----------------                 27, 329. 84     -                           314. 70        240, 448. 00
   Expenditures ..         -       -...         225. 30 179, 939. 77    33, 323. 95                 9. 49           314. 70        240, 448. 00



                                                   11. BAYOU TECHE, LA.

   Location.-Bayou Teche has its source in Bayou Courtableau, in
St. Landry Parish, and flows in a southeasterly direction, a distance of
125 miles, to where it joins the lower Atchafalaya River, about 101/2
miles above Morgan. City, La. (See U. S. Coast and Geodetic Survey
Chart No. 1116, and Corps of Engineers, Mississippi River Commis-
sion alluvial valley map, and Palmetto, Opelousas, Carencro, Arnaud-
ville, St. Martinville, Loreauville, Derouen, Jeanerette, Foster, and
Belle Island quadrangles.)
   Previous projects.-Authorized by River and Harbor Acts of July
11, 1870, and September 19, 1890. For further details, see page 1851,
Annual Report for 1915, and page 798, Annual Report for 1938.
   Existing project.-This provides for a channel 8 feet deep and 80
feet wide on the bottom from the mouth of the stream to New Iberia,
La., 54.5 miles, thence 6 feet deep and 60 feet wide on the bottom
to Keystone lock, 18 miles, and thence 6 feet deep and 50 feet wide
on the bottom at Arnaudville, La., 34 miles, to be secured by dredging,
removing snags and overhanging trees, and construction of a lock
and dam and regulating works. The plane of reference is mean low
Gulf level.
                RIVERS AND HARBORS-NEW                      ORLEANS,        LA.,   DISTRICT             753
                                                Keystone    ook
-Distance from New Iberia                     ---------------------------.
                                                                        18 miles.
Distance from Intracoastal Waterway------------------- 82.5 miles.
Width of chamber---------                              -                36 feet.
Length available for full width..------------------------- 160 feet.
Lift    ---------------------------------------------                   8 feet.
Depth on miter sill at mean low Gulf level                      _       8 feet.
Character of foundation ....----------------------------- Timber piles.
Kind of dam-------- .---------------------------                        Timber, rock-fill.
Type of construction                  --------------------------------  Concrete.
Year completed                ------------------------------------ 1913.
Cost-     --------------------------------------------                  $257,720.48.
   The raising of the pool level by 3.0 feet above Keystone Dam, by
the installation of movable crest gates on the dam, is provided for in
the flood-control project for Bayou Teche and Vermilion River, La.
   Under the project "Flood Control, Mississippi River and tribu-
taries," East and West Calumet floodgates, with a width of 60 feet
and sill elevation of - 9.02 feet, mean low Gulf level, were constructed
in Bayou Teche at the east and west approaches to Wax Lake outlet
<luring the period February 21, 1949, and September 22, 1950, and a
lock was constructed in the lower Atchafalaya River in the vicinity
of Berwick, La., during the period November 16, 1948, and Septem-
ber 7, 1951. The lock has a length of 300 feet, width of 45 feet, and
sill elevation of -9.02 feet, mean low Gulf level.
   Under ordinary conditions the mean range of tide is about 10 inches
at the mouth, 4 inches just below the lock, and zero above the lock,
the extreme range of tide being about 12 inches, 6 inches, and zero,
respectively. The variation of the water surface above Keystone
lock due to freshets is from. 2 to 7 feet, while just below the lock it
has been as high as 12 or 15 feet and near the mouth about 4 or 5 feet.
   The estimate of cost for new work, revised in 1952, is $1,064,000
exclusive of amount expended on previous projects. The latest (1950)
approved estimate for annual cost of maintenance from mouth to
Arnaudville is $12,000, plus $21,000 for operating and care of the
lock and dam.
   The existing project was authorized by the following river and
harbor acts:

        Acts                          Work authorized                               Documents


Sept. 19, 1890       Improvement of the stream from its mouth to St.     Annual Report 1889, p. 1532.
                       Martinville by removing obstructions and dredg-
                       ing.
Mar.        2,1907   Construction of lock and dam and the extension of   H. Doc. 527, 59th Cong., 1st sess.
                       the improvement to Arnaudville, La.
Mar.        2,1919   Increase of channel dimensions from mouth to Key    H. Doc. 1329, 62d Cong., 3d sess.
                      stone locks.
June 26,1934         Operation and care of lock and dam provided for
                      with fmunds from War Department appropriations
                      for rivers and harbors.

   D   Permanent Appropriation Repeal Act.
   For latest published map, see H. Doc. 288, 65th Cong., 1st sess.


  Local cooperation.-Fullycomplied with.
  Terminal facilities.-Small, privately owned wharves are available
at all the towns along the bayou; public landing is permitted without
charge. There are privately owned terminals for transferring crude
754     REPORT OF CHIEF OF ENGINEERS, U.         S. ARMY,   1952


oil to barges near the towns of Charenton, Jeanerette, Olivier, and
St. Martinville. The facilities are considered adequate for existing,
commerce.
    Operations and results during fiscal year.-Supervision, inspection
and patrol of waterway; maintenance of markers; and snagging and
removal of overhanging trees and other obstructions were continued
by hired labor at a cost of $278 for maintenance. Costs for prep-
aration of preliminary plans and specifications amounted to $528 and
costs of $7,726 were incurred by the Lower Mississippi Valley Divi-
sion Office, for Keystone Dam design drawings and specifications,
both for maintenance.
    Keystone lock was operated throughout the fiscal year, the lock,
dam, structure, and grounds were maintained, as necessary, and in-
stallation of the electric system was completed, all at a cost of $16,546
for operation and care.
    The total costs were $25,078, of which $8,532 was for maintenance
and $16,546 for operation and care; the expenditures were $25,409.56.
    Conditionat end of fiscal year.-The existing project is 67 (revised)
percent complete.
    Keystone lock and dam were completed in 1913. The dredging and
snagging done in 1916 completed that part of the existing project
for the 6- by 50-foot channel from Arnaudville to Keystone lock.
The contract dredging done in 1918-20 completed that part of the
previous project for a 6- by 50-foot channel from Keystone lock to
mile 39.7 above the mouth. The 8- by 80-foot channel from New
Iberia to the mouth is 98 percent complete. From the mouth to mile
5.8 a channel 8 by 80 feet, or greater, already existed, and a new
channel has been excavated, 8 by 80 feet from this point to mile 50.06,
about 3.65 miles below New Iberia, and 8 by 60 feet from this point
to New Iberia. The work required to complete the existing project
is the widening of the channel to a bottom width of 80 feet from
mile 50.06 to New Iberia, and to a bottom width of 60 feet from New
Iberia to Keystone lock.
    Keystone lock is in good condition, and work is in progress on pre-
liminary design plans for a new concrete dam at Keystone lock to
replace the existing structure, which plans are approximately 72
percent complete.
    The controlling depths, mean low Gulf (February 1952), were:
From mile 0 to mile 22, 8 feet (railroad bridge at Oaklawn, mile 22,
has a shoal between fenders, 6 feet; there is also a shoal about 500'
feet long located 1,000 feet west of West Calumet floodgate, 5 feet);
to Charenton drainage canal, 9 feet; to Charenton, La., 11 feet; to
New Iberia, 7.5 feet; and to Breaux Bridge, 6 feet.
    The total costs under the existing project to the end of the fiscal
year were $1,367,914.15, of which $708,625.40 was for new work,
$331,037 for maintenance, and $328,251.75 for operation and care.
The total expenditures were $1,368,188.21. In addition, the sum of
$91,389.25 was expended between July 1, 1913, and June 30, 1935,
on the operation and care of the works of improvement under the
provisions of the permanent indefinite appropriation for such purpose.
    Proposed operations.-The balance unexpended at the end of the
fiscal year, $11,146.34, plus accounts receivable, $290.46, and an al-
             RIVERS AND HARBORS-NEW                                ORLEANS,                 LA.,     DISTRICT              755
lotment of $16,000 for maintenance, a total of $27,436.80, will be
applied as follows:
Accounts payable, June 30, 1952_ __    ___--_-_----__---------                                                         $16. 40
Maintenance :
    By hired labor: Plans and specifications, analysis of
      design for reconstruction or replacement of
      Keystone Dam------- ---------------------- $7, 499. 95
                                                                                                                    7, 499.95
      Maintenance (operation and care) by hired labor:
         Operation and maintenance of Keystone lock_...                                       17, 700. 00
         Ordinary maintenance and repair___--- __-                                             2, 220. 45
                                                                                                                  19, 920. 45
               Total for all work_-------                     ------------------                                  27, 436. 80
  The sum of $23,000 can be profitably expended for the following
schedule of work during fiscal year 1954:
Maintenance:
   Maintenance (operation and care) : Operation and
      maintenance of Keystone lock_____-------------------------                                                 $23, 000. 00

                                     Cost and financial summary

                                                Fiscal year ending June 30-                                      Total to June
                                                                                                                30, 1952, includ-
                                                                                                                ing fiscal years
                                 1948           1949           1950             1951                 1952        priorto 1948

New work:
   Appropriated -------     --------    --------------------------------------------------                          $754, 329. 83
   Cost ..----- - - -
    Expenditures -----.-
                           -     -------
                                   -   -
                               ----------
                                           -
                                            -
                                               -    -
                                                    -
                                                         ---
                                                          ----.------    -
                                                                                  .
                                                                                ---
                                                                                       .
                                                                                      ---
                                                                                              ---..----------
                                                                                                                     754, 329. 83
                                                                                                                    1 754, 329. 83
Maintenance:
    Appropriated ........$106,100. 00       $9, 500. 00   $22, 000. 00       $35, 880. 00      $19, 000. 00          762, 098.40
    Cost...   ...
              --     ..-  93, 787. 44       19, 159. 32    18, 644. 65        24, 991. 58       25, 078. 00          750, 678. 00
    Expenditures   -_ .   95, 778. 28       17, 825. 78    18, 416. 26        25, 165. 92       25, 409. 56        ' 750, 952. 06



Other new work data:
Estimated additional amount needed to be appropriated for com-
  pletion of existing project_----- -------     -     ------- $355, 374. 60
1Includes   $45,704.43 from previous project.
2Includes   $91,389.25 from permanent indefinite appropriation.

               12. PETIT ANSE, TIGRE, AND CARLIN BAYOUS, LA.

   Location.--Bayou Tigre is a tributary of Bayou Carlin; Bayou
Carlin is a tributary of Bayou Petit Anse. Bayou Petit Anse has
its source in Iberia Parish, about 5 miles northwest of New Iberia.
It flows in a southwesterly direction for about 15 miles to its inter-
section with the Intracoastal Waterway, thence for a distance of
about 3 miles to Vermilion Bay. Bayou Tigre has its source in
Vermilion Parish about 6 miles northeast of Abbeville and flows in
a southerly direction for about 7 miles to its junction with Bayou
Carlin. Bayou Carlin has its source in Lake Peigneur in Iberia
Parish and flows in a southerly direction about 7.5 miles to its con-
fluence with Bayou Petit Anse at a point about 2.3 miles above the
Intracoastal Waterway. (See U. S. Coast and Geodetic Survey Chart
No. 1116, Corps of Engineers, Mississippi River Commission alluvial
valley map and Derouen quadrangle, and U. S. Geological Survey
map Abbeville, N. E., quadrangle.)
756        REPORT OF CHIEF OF ENGINEERS, U.                             S.   ARMY,   1952

   Existing project.--This provides for dredging a channel in Bayou
Petit Anse 9 feet deep and 80 feet wide from the Intracoastal Water-
way to the north end of Avery Island; a channel 5 feet deep and 40
feet wide from the Intracoastal Waterway via the McIlhenny Canal
 (Avery Canal) to deep water in Vermilion Bay; and a channel 9 feet
deep over a bottom width of 80 feet in Bayou Carlin from Bayou
Petit Anse to Lake Peigneur. The total lengths of the improvements
is 16.1 miles. Under ordinary conditions the mean range of tide is
about 10 inches.
   The cost of new work for the project completed in fiscal year 1950
was $298,313.79. The latest (1950) approved estimate for annual
cost of maintenance is $10,000.
   The existing project was authorized by the following river and
harbor acts:

    Acts                        Work authorized                                  Documents

Aug. 30,1935 1 A channel in Bayou Petit Anse 60 feet wide and 9 feet H. Doc. 225, 72d Cong., 1st sess.
                 deep from the intracoastal Waterway to a point 3.2
                 miles upstream, thence 40 feet wide and 5 feet deep
                 to highway bridge at head of Avery Island; and a
                 channel in Bayou Carlin 40 feet wide and 5 feet
                 deep from Bayou Petit Anse to Lake Peigneur.
Aug. 26,1937 A channel in Bayou Petit Anse 9 feet deep and 80 feet Rivers and Harbors Committee
                 wide from the Intracoastal Waterway to the north     Doc. 40, 75th Cong., 1st sess.
                 end of Avery Island and a channel 5 feet deep and
                 40 feet wide from the Intracoastal Waterway to
                 Vermilion Bay by way of the McIlhenny Canal
                 (Avery Canal).
Mar. 2, 1945 A channel in Bayou Carlin 9 feet deep and 80 feet wide H. Doc. 594, 78th Cong., 2d sess.2
                from Bayou Petit Anse to Lake Peigneur.
June 30,1948 Protecting piers of railway bridge crossing Bayou Public Law 858, 80th Cong., 2d
                 Carlin at Deicambre, La.                                sess.

1 Included in the Public Works Administration program Sept. 6, 1933.
2 Contains latest published map.


   Local cooperation.-Fully complied with, except for furnishing
:suitable terminal at head of Avery Island; however, assurances have
been accepted by the Department of the Army. All rights-of-way
have been conveyed to the United States and title investigation
completed.
   Under a permit issued March 24, 1937, the Texas Pipe Line Co.
enlarged the 5- by 40-foot channel in Bayou Petit Anse above mile
3.2 to a depth of 9 feet and a width of 80 feet at an estimated cost
of $30,000.
   Terminal facilities.-There is an extensive oil terminal at the head
of the improvement on Bayou Petit Anse and several private docks
and cane hoists. (Terminal facilities are further described in H.
Doc. 225, 72d Cong., 1st sess.) These facilities are considered ade-
quate for existing commerce.
   Operations and results during fiscal year.--No costs were incurred
this fiscal year; expenditures were $0.17.
   Condition at end of fiscal year.-All work under the project, as
existent at that time, was completed in 1939; and the work authorized
by the River and Harbor Act approved March 2, 1945, for a 9-by
80-foot channel was completed in 1947, except dredging in the vicinity
of Texas & New Orleans Railroad bridge and Louisiana State High-
way Department bridge crossing Bayou Carlin, which was accom-
            RIVERS      AND HARBORS-NEW                         ORLEANS,         LA.,     DISTRICT            757
plished during 1949, as was reinforcement of bridge piers under
reimbursable agreement, authorized by River and Harbor Act ap-
proved June 30, 1948. The modified project is complete, except that
the Jefferson Island Salt Co. has partially complied with furnishing
a 9- by 80-foot canal connecting Bayou Carlin with their salt mine, as
provided in the authorized document. The Chief of Engineers has
accepted a 9- by 60-foot channel as partial completion and this 9- by
60-foot channel has been excavated for the full length prescribed.
   The controlling depths, mean low Gulf (February 1952), were:
Bayou Petit Anse: Gulf Intracoastal Waterway to head of naviga-
tion, mile 6.1, 10 feet; Bayou Tigre: Impossible to enter bayou due
to shoal at mouth; Bayou Carlin: Mile 0 to mile 6, 9 feet; to mile 7,
8 feet (shoal about 25 feet long just above highway bridge, mile 6.4,
6 feet) ; to Jefferson Island Canal, 10 feet.
   The total costs and expenditures under the existing project to the
end of the fiscal year were $345,475.79, of which $298,313.79 was for
new work, including $47,858.13, Public Works funds, and $47,162 from
regular funds for maintenance.
   Proposed operations.-An allotment of $115,977 for maintenance
will be applied as follows:
Maintenance:
   By contract: Dredging shoaled areas in Bayous Petit Anse, and
     Carlin----------------- --------------------------------        $108, 716
   By hired labor:
       Condition surveys-----------------------------------------       5, 050
        Miscellaneous inspections and reports ----------------------    2, 211
               Total----------------------- --------------------------                                   115, 977
   No work is scheduled during the fiscal year 1954.
                                   Cost and financial summary

                                               Fiscal year ending June 30-                           Total to June
                                                                                                    30, 1052, includ-
                                                                                                    ing fiscal years
                               1948            1949           1950        1951           1952         priorto 1948

New work:
    Appropriated -----  _________    ..     $30, 000. 00 ............   -$10,176.590 ..                 $298, 313. 79
    Cost__ ________-      $173, 711.38
    Expenditures ________ 176,909.35
                                                  97. 68 $30,145. 24 -           ------------            29., 313.79
                                                 398. 38     29,845. 38 ---------------                1 298,313. 79
Maintenance:
    Appropriated . ___... 21, 500. 00 ---       -     --   13, 500. 00   3,470. 00 -$1, 627.83            47, 162. 00
    Cost- -                6, 937. 40                       1, 525. 98   1,842. 17 .........              47, 162. 00
    Expenditures--------- 6, 387. 44           453. 29      1,343. 79    2, 024. 20          . 17         47, 162. 00

1 Includes $47,858.13 Public Works funds.



          13. MERMENTAU RIVER, BAYOU NEZPIQUE, AND BAYOU
                          DES CANNES, LA.

  Location.-Mermentau River is formed by the junction of Bayous
des Cannes and Nezpique, 2.25 miles above Mermentau, La., flows in a
southwesterly direction, and empties into the Gulf of Mexico.
  Bayou Nezpique rises in Evangeline Parish, flows in a southerly di-
rection, and empties into the Mermentau River.
  Bayou des Cannes rises in Evangeline Parish, flows in a south-south-
westerly direction, and empties into the Mermentau River. (See
758        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                   1952

U. S. Coast and Geodetic Survey Charts Nos. 1116 and 1278, and U. S.
Geological Survey maps, Evangeline, Hathaway, Mermentau, Jen-
nings, Lake Arthur, Gueydan, Thornwell, Latania Lake, Catfish Lake,
Grand Cheniere, and Bayou Lebauve quadrangles.)
   Existing project.-The project provides for the removal of obstruc-
tions to navigation to secure the natural channel throughout the entire
Mermentau River, a distance of 71.5 miles, and through Bayou Nez-
pique from its mouth to 25 miles above, and Bayou des Cannes from
its mouth to Evangeline Bridge (mile 8.5) ; for improving the chan-
nel in Lower Mud Lake by constructing a brush dam to concentrate
the action of the current and by dredging; and for removing a portion
of the wrecked dam 7 miles above the mouth; and for dredging a
channel 9 feet deep over a bottom width of 100 feet from the Intra-
coastal Waterway to the junction of Bayous Nezpique and des Cannes.
   That part of the project below Grand Lake, mile 25, has been super-
seded by the flood-control project "Mermentau River, La."
   Under ordinary conditions the mean range of tide on the Mermen-
tau River near the mouth is 10 inches and near the head about 3 inches,
the extreme range being 14 inches and about 5 inches, respet&vely.
The variation of the water surface near the mouth may be as much as
7 or 8 feet, due to hurricanes on the Gulf, and near the head from 8 to
12 feet, due to freshets. On Bayou Nezpique, under ordinary con-
ditions, the range of tide is about 3 inches at the mouth and nothing at
the head. On Bayou des Cannes, under ordinary conditions, the
range of tide is about 3 inches at the mouth and nothing at the head.
   The cost of new. work completed in 1935, was $57,554.77. The latest
 (1950) approved estimate of cost for annual maintenance is $2,500.
   The existing project was authorized by the following river and
harbor acts:

    Acts                        Work authorized                                  Documents

July 13,1892   General project .__-   _-_                            Annual Report, 1891, p. 1862.
July 27,1916   Removal of portion of wrecked dam near mouth of       H. Doe. 1232, 64th Cong., 1st sess.
                 Mermentau River.
Mar. 2, 1919   Improvement of Bayou des Cannes __-                   H. Doc. 1398, 65th Cong., 3d sess.
Aug. 30,1935 1 Channel in Mermentau River 9 feet deep plus 1 foot    Rivers and Harbors Committee
                 overdepth from Intracoastal Waterway to the          Doec. 36, 72d Cong., 1stesess.
                 source at confluence of Bayous Nezpique and des         (Contains latest published map.)
                 Cannes.

  1 Included in the Public Works Administration program Mar. 28, 1934.


  Local cooperation.-Fully complied with.
   Terminal facilities.-There are several small, privately owned
wharves at Grand Cheniere and a public terminal at the town of Lake
Arthur. At Mermentau, La., the Southern Pacific Railroad owns a
wharf served by a spur track. Privately owned terminals for trans-
ferring crude oil to barges are at the following locations: One on Lake
Arthur near the town of Lake Arthur; one on the Mermentau River
near the town of Mermentau; two on Bayou Nezpique near Jenmings;
and four on Bayou des Cannes, one near Evangeline, one at Mermen-
tau, and two near Jennings. The facilities are considered adequate
for existing commerce.
  Operations and results during fiscal year.-None.
            RIVERS AND HARBORS-NEW                                  ORLEANS,              LA.,      DISTRICT          759

   Conditionat end of fiscal year.-The existing project, except for the
9- by 100-foot channel, was completed in 1917. The 9- by 100-foot
channel was completed in 1935.
   The controlling depths (March 1952), mean low Gulf, were: Mer-
mentau River: Through Grand Lake to Gulf Intracoastal Waterway,
3 feet; dimensions exceeding those of the project obtain through the
rest of the waterway to the head-of navigation at mile 71.5. Bayou
Nezpique: Mile 0 to mile 7.8, 17 feet (Stream blocked with marine
growth and snags above this point. No evidence of barge traffic above
mile 7, highway bridge). Bayou des Cannes: Mile 0 to mile 6, 9 feet
 (nonnavigable above mile 6).
   The total costs and expenditures (regular funds) under the existing
project to the end of the fiscal year were $103,357.11, of which
$27,580.35 was for new work and $75,776.76 for maintenance.
   Proposed operations.-An allotment of $35,886 will be applied as
follows:
Maintenance :
   By contract : Dredging in: MerIa ntau River----------------------__                                          $34, 850
   By hired labor: Condition sufveys------1-------------------------,                                                036
        Total------------------------------------------------------                                               35, 886
   No work is scheduled for the fiscal year 1954.
                                      Cost and financial summary

                                                   Fiscal year ending June 30-                              Total to June
                                                                                                           30, 1952, includ-
                                                                                                           ing fiscal years
                                 1948             1949            1950            1951              1952    priorto 1948


New work:
    Appropriated              ------------.                        --- - ------------  ----------...
                                                                                  .----------                   $57, 554.77
    Cost ___         _ _-
                       -       -
                               ------                               _                 ----
                                                                          ---------- ....--
                                                                  -----....                                      57, 554. 77
    Expenditures                             --------        -           -   ----------- -------------            57,554. 77
Maintenance:
    Appropriated -----    _    $3, 000. 00    $17, 500. 00       $1, 500. 00 -----------------------              75, 776. 76
    Cost .........---
               ---     ..          578. 65     19,914. 49         1, 506. 86 -----------------------              75, 776. 76
    Expenditures        _          578. 65     19, 914. 49        1, 506. 86 ----------. -------------.           75, 776. 76


  2Includes    $29,974.42 from Public Woxksfunds.

                            14. CALCASIEU RIVER AND PASS, LA.

   Location.-CalcasieuRiver has its source in southwestern Louisiana,
and flows in a general southerly direction to the Gulf of Mexico.
About 25 miles from the Gulf it debouches into Calcasieu Lake, which
lake is about 18 miles long. The connection between the lake and
the Gulf, about 7 miles long, is known as Calcasieu Pass. (See U. S.
Coast and Geodetic Survey Charts Nos. 591 and 592; U. S. Geological
Survey maps, Edna, Thompson Bluff, Hecker, Moss Bluff, Lake
Charles, West Lake, Moss Lake, Hackberry, Sweet Lake, Browns
Lake, Holly Beach, Grand Bayou and Cameron quadrangles; and
,Corps of Engineers navigation maps of Intracoastal Waterway and
Atchafalaya River system.)
   Previous projects.-The or-iginal project for this improvement was
adopted by the River and Harbor Act of June 10, 1872. Appropria-
tions were made by the River and Harbor Acts of March 3, 1881,
August 2, 1882, July 5, 1884, and August 11, 1888. The project was
760          REPORT OF CHIEF OF ENGINEERS, U.                             S.   ARMY,       1952

modified by the River and Harbor Acts of September 19, 1890, July
13, 1892, and September 22, 1922. For further details, see annual
report for 1936, page 719, and annual report for 1938, page 819.
   Existing project.-This provides for a channel 35 feet deep and
250 feet wide (47.5 miles long) from the wharves-of the Lake Charles
Harbor and Terminal District by way of Calcasieu River including
Clooney Island Loop, to the head of Choupique cutoff; thence by a
land-and-water cut along the west shore of Calcasieu Lake; thence
to and through Calcasieu Pass by a designated route to the Gulf
of Mexico, subject to such change in alinement as is approved by
the Chief of Engineers; the reconstruction and extension of the ex-
isting jetties initially to the seaward end of the east jetty, and fur-
ther extension to the 15-foot depth contour if found advisable to
reduce maintenance dredging costs; dredging a channel 35 to 37 feet
deep and 250 feet wide between jetties, and an approach channel
37 feet deep and 400 feet wide from the sea end of the jetties to a
depth of 37 feet in the Gulf of Mexico; also for the improvement of
the river from Lake Charles to Phillips Bluff by removing logs, snags,
overhanging trees, and by dredging. Total length of improvement
is 102.1 miles. Under ordinary conditions, the mean range of tide
is 10 inches at the mouth, diminishing to zero at Phillips Bluff, the
extreme range being 14 inches and zero, respectively.
   The estimate of cost for new work, including $5,308,300 for the
extension of the jetties to the 15-foot depth contour, revised in 1952,
is $13,152,000. The latest (1952) approved estimate for cost of main-
tenance is $278,000 annually.
   The existing project was authorized by the following river and
harbor acts:

    Acts                           Work authorized                                  Documents

                 Modification of original project of 1872, dated May     H. Ex. Doec. 46., 46th Cong., 3d
                  12, 1881, provided for general improvement of the       sess.; and Annual Report 1881,
                  river from Phillips Bluff to the mouth by removing      p. 1301.
                  logs, snags, and overhanging trees, and by dredging.
Aug. 26,1937     Channel 30 feet deep and 250 feet wide from the Lake    H. Doc. 299, 75th Cong., 1st sess.
                   Charles docks to the Gulf of Mexico.
Mar.   2, 1945   Channel 30 feet deep and 250 feet wide around Clooney   H. Doc. 465, 77th Cong., 1st sess.
                  Island.
July 24,1946     Channel depth of 35 feet from the wharves of the        S. Doc. 190, 79th Cong., 2d sess.
                  Lake Charles Harbor and Terminal District, in-           (Contains latest published map.)
                  eluding Clooney Island Loop, to the jetty channel,
                  a uniformly increasing depth of 35 to 37 feet in the
                  jetty channel and a depth of 37 feet in the approach
                   channel in the Gulf of Mexico.


  Local cooperation.-Fully complied with.
  Under date of January 5, 1922, a permit was granted by the As-
sistant Secretary of War to the police jury of Calcasieu Parish to
enlarge this river where necessary between Lake Charles and the
eastern end of the Calcasieu-Sabine section of the Intracoastal Water-
way to a depth of 30 feet over a bottom width of 125 feet.
   Terminal facilities.-Terminalfacilities at the Port of Lake Charles
are owned by the Lake Charles Harbor and Terminal District and
operated by a board of commissioners. In addition to the municipally
owned terminals, there are several privately owned and operated
wharf structures located on the existing ship channel. (For further
        RIVERS    AND HARBORS-NEW ORLEANS,            LA.,    DISTRICT     761
details see Port Series No. 21, "The Port of Lake Charles, La.,"
revised 1947.)
   Operations and results during fiscal year.--Hired labor forces car-
ried on the following new work activities during the fiscal year:
Mapping, investigations, and reports, at a cost of $81,741; real estate
operations in the amount of $1,450; and construction of four range
targets during the period September 17 and October 4, 1951, at a
cost of $16,606. Delayed costs for dredging during the previous fiscal
year by the United States dredge Langfitt in the Calcasieu River
approach channel amounted to $10,045.
   During the period April 26 and June 1, 1952, a turning basin was
constructed in Calcasieu River between St. John's Island and vicinity
of Cameron, La., a distance of approximately 1.1 miles. A total of
697,495 cubic yards was removed by the dredge G. A. McWilliams
under contract, with costs of $106,610 for new work.
   Total costs were $216,452 for new work; expenditures were $219,-
288.91.
   Condition at end of fiscal year.-The project as modified is 51 per-
cent complete.
   Dredging under the existing project, prior to the modifications
adopted by the River and Harbor Acts of March 2, 1945, and July 24,
1946, was completed in 1941, and the 30- by 250-foot ship channel was
formally opened to deep draft traffic on July 12, 1941.
   Work on the modified project of deepening the 250-foot channel to
35 feet from Lake Charles Harbor to the 37-foot depth contour in
the Gulf of Mexico was initiated on September 7, 1948, and at the
end of the fiscal year was completed from Lake Charles Harbor, in-
cluding Clooney Island Loop, to the approach channel in the Gulf
of Mexico. This work was accomplished as follows:
35- by 250-foot channel from Lake
   Charles Harbor downstream:
    To Gulf Intracoastal Waterway,            Commenced            Completed
      mile 12.8, dredge Texas--......       Sept. 7, 1948        Feb. 2, 1949
    From Gulf Intracoastal Waterway,
       mile 12.8 to mile 24.1, dredge
      Duplex          -------------         Sept. 5, 1949        Apr.    6, 1950
    From mile 24.1 to mile 30.4, and
       dredging in the 6- by 20-foot con-
      necting channel, dredge Texas
      and two draglines.__--.,.....         Feb. 10, 1949        May 11, 1949
    From mile 30.4 to mile 32, dredge
      Mobile-_                              Jul.   26, 1950      Aug.    6, 1950
    A survey showed that project
      depths obtained between miles 32
      below Lake Charles and the ap-
      proach channel, a distance of
      approximately five miles. Par-
      tial channel in approximately
      seven miles of the 35- by 400-foot
      approach channel in the Gulf of
      Mexico, United States dredge
      Langfitt----------                    Oct.   16, 1950      June 27, 1951
  A turning basin or ship anchorage for vessels using the waterway
was constructed during the period April 26 and June 1, 1952, between
St. John's Island and vicinity of Cameron, La., a distance of approxi-
mately 1.1 miles.
762      REPORT OF CHIEF OF ENGINEERS, U.            S. ARMY, 1952

   The Calcasieu Pass jetties, initiated under the previous project and
completed in May 1942, extend to the 10-foot depth contour and are in
good condition. The east jetty, approximately 8,620 feet long, has
been built to approximately 6 feet abbVe mean low Gulf, and extends
seaward from the existing Gulf shoreline a distance of 6,820 feet. The
west jetty, 8,050 feet long, has been built to approximately 4 feet above
mean low Gulf and extends seaward from the existing Gulf shoreline
a distance of 6,795 feet.
   The jetty structure is considered complete unless at a later date it
is found necessary to extend the jetties seaward to the 15-foot depth
contour, as provided for in the project.
   Work remaining to be done, consists of completing the approach
channel to the 37-foot depth contour in the Gulf, extending the jetties:
seaward to the 15-foot depth contour, if and when found necessary,
and constructing approaches and ramp to ferry crossing Calcasieu
River and Pass.
   The controlling depths, mean low Gulf, were: (March-June 1952)
Bar channel, 27 feet; through jetty channel to the Port of Lake
Charles, 35 feet, except mile 5.5 to mile 9 (Calcasieu Lake), 32 feet;
mile 16.5 to mile 17.0, 32 feet; mile 22.8 to mile 24.5 (Moss Lake),
32 feet, and Clooney Island Loop, 34 feet; (January 1950) Port of
Lake Charles to mile 42, 19 feet; to mile 52.4, 13 feet; to mile 53.5, 4
feet; to mile 56.5 (Old Town), 11 feet; to mile 66.5 (Hecker), 7 feet,
to Phillips Bluff, 5 feet.
   The total costs of the existing project to the end of the fiscal year
were $7,908,577.07, of which $6,755,672.37 was for new work and
$1,152,904.70 was for maintenance. The total expenditures were
$7,913,619.26.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $432,980.38, plus accounts receivable, $655,042.19, a total
of $1,088,022.57, will be applied as follows:
New work:
   By contract: Agreement to be entered into with Louisiana De-
     partment of Highways for construction of approaches and
      ramp to ferry crossing Calcasieu River and Pass (lump-sum
     contract) -----------------------------------------           $65, 134. 00
   By hired labor:
        Channel deepening to 37-foot contour by United States
          dredge Langfltt or another hopper dredge                 017, 130.57
                                                                1-------------,
        Surveys, engineering, and mapping from Lake Charles to
          37-foot contour in the Gulf of Mexico----------------       4,016. 00
        Acquisition of servitudes for right-of-way and spoil
          disposal areas---------------------------------             1,742. 00

               Total for all work------------------------------1, 088, 022.57
  The sum of $200,000 can be profitably expended for the following
scheduled work during the fiscal year 1954:
Maintenance by hired labor:
   Dredging the bar channel with United States dredge Langfitt, as
     required-------------------------------------------------$177,         000
   Surveys and channel investigations---------------------------        18, 000
   Miscellaneous inspections and reports--------------------------       5, 000
      Total-------------------------                                   200,000
              RIVERS    AND     HARBORS-NEW                     ORLEANS,           LA.,   DISTRICT              763

                                      Cost and financial summary

                                                Fiscal year ending June 30-                           Total to June
                                                                                                     30, 152, includ-
                                                                                                     ing fiscal years
                                1948            1949          1950          1951          1952         priorto 1948

New work:
   Appropriated----.-- $550,       000. 00 $500, 000. 00 $900, 000. 00 $600, 000. 00 $1,025,000.00    1 $8, 339, 608. 57
   Cost_----------------      9,   416. 99 937, 028. 19 867, 147. 62 466, 932. 63 216, 452. 00         17, 251, 586. 00
   Expeiditures.---------          358. 61 950, 987. 30 865, 225. 83 466, 467. 44 218, 980. 44         1 7, 256, 628. 19
Maintenance:
   Appropriated -     -..... 80,   000. 00   53, 000. 00    77, 000. 00   2, 360. 00 ..               2 1, 347, 755. 58
   Cost_                     63,   339. 70   67, 366. 49     1, 405. 10   7, 955. 38 ..               2 1, 347, 755. 58
   Expenditures --------     62,   295. 51   67, 436. 75     2, 336. 02   7, 663. 82       308. 47    2 1, 347, 755. 58




Other new work data:
    Unobligated balance, June 30, 1952 ________-- ________-
                                                        -         ___ $429, 793. 82
    Unobligated balance available for fiscal year 1953 -____     ---     429, 793. 82
    Estimated additional amount needed to be appropriated for
      completion of existing project--------------------------__      5, 308,305.06
  1 Includes $495,913.63 from previous project.
  2 Includes $194,850.88 from previous project.


                  15. REMOVING THE WATER HYACINTH (LOUISIANA)

  Location.--Lakes and streams tributary to the Gulf coast.
  Existing project.-This project provides for the removal of plants
from the navigable waters of the States of Florida, Alabama, Missis-
sippi, Louisiana, and Texas, so far as they are or may become an
obstruction to navigation, by any mechanical, chemical, or other
means whatsoever; for the construction and operation of boats
equipped with suitable machinery for such removal; and for the con-
struction and operation of booms to prevent the drifting of plants
from one stream to another. The latest (1950) approved estimate for
annual cost of maintenance is $500,000.
  The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                       Documents

Mar.         Made appropriations for the States of Florida and
         3,1899                                                               H. Doc. 91, 55th Cong., 3d sess.
               Louisiana and provided for the extermination or
               removal of plants, the building of boats, and the
               establishment of booms.
June 13,1902 Authorized the use of mechanical, chemical, or other
               means whatsoever.
Mar. 3,1905 Made the appropriation available for the State of
               Texas.
    Do__--   In making appropriations for Florida, provided that
Mar. 2,1907J no chemical process injurious to cattle shall be used.
July 25,1912 Made the appropriation available for the State of
               Mississippi and also made available for use in that
               State the operating plant pertaining to the work in
               Louisiana.
July 27,1916 Made the appropriation available for the State of
               Alabama.



  Local cooperation.-None required.
  Terminal facilities.-The terminal facilities of the various streams
from which hyacinths were removed are described in the report for
the improvement of these streams.
764     REPORT OF CHIEF OF ENGINEERS,        U.   S.   ARMY,   1952

    Operations and results during fiscal year.-A combination of
  mechanical and chemical methods of destruction was employed to
obtain maximum results with minimum expenditure of funds. How-
ever, because of limited funds available for the work, only. partial
success was achieved. The main waterways carrying the major part
of the waterborne commerce were kept open. Preventative work in
secondary streams and feeder areas was of necessity sharply cur-
tailed with a resultant increase of vegetation in these areas. Some
difficulty was being experienced towards the close of the year in the
main waterways due to the disgorging action of these feeder areas
caused by unusual winds and extreme tides. Some areas previously
cleaned and placed on a patrol maintenance basis are rapidly becoming
critical because of heavy infestations of alligator weed which has
not proved susceptible to chemical treatment.
    A total of 25,014,824 square yards of vegetation was destroyed by
chemicals and 14,589,400 square yards were destroyed by machinery
in streams of the Atchafalaya Basin, Barataria Area, Bayou Black,
Lake Cataouatchie and feeder streams, streams of the Lake des
Allemands Basin, the Intracoastal Waterway, Bayou Lafourche,
streams of the Lake Maurepas Basin, the Bayou Penchant-Bayou
Copassaw Area, the Plaquemine Waterway, streams entering Lake
Pontchartrain, and in Bayou Teche.
    Lack of sufficient operating funds resulted in a complete shutdown
for approximately 1 month and only partial operation during the
remaining period. Work was undertaken only in the principal
streams of the district over which the greater portion of waterborne
traffic moved and in areas where severe hardship would have resulted
if work had not been undertaken.
    The total costs during the fiscal year were $203,629 and the total
expenditures were $200,289.11, all for maintenance.
    Condition at end of fiscal year.-From 1900 to 1902 a boat with
suitable machinery for removing and crushing hyacinths was operated.
From that time until 1937 the problem was handled by the use of a
solution of arsenic and caustic soda sprayed upon the vegetation,
removal by hand crews, and by means of booms and barricades. The
use of arsenic and caustic sdoa has been discontinued and hand
removal has been supplanted by the use of mechanical equipment in
conjunction with the chemical spray, 2,4-dichlorophenoxyacetic acid.
Present methods of control are by means of mechanical rotary saw
type destroyers, chemical treatment, and booms and barricades. Ex-
cellent results are being obtained by these methods. However, the
over-all scope of the work cannot be considered satisfactory due to
the restrictions made necessary by the sharp reduction in funds
available for this work.
   The total costs to the end of the fiscal year were $3,547,027 for
maintenance; the expenditures were $3,541,659.63.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $2,091.87, plus an allotment of $228,395, a total of $230,-
486.87, will be applied as follows:
          RIVERS         AND IHARBORS--NEW                          ORLEANS,           LA.,    DISTRICT            765
Accounts payable, June 30, 1952,    --------------------------                                             $5, 367. 37
Maintenance by hired labor:
   Destruction by chemical means-------------- $118, 000.00
   Destruction by mechanical means--------------
                                     .....                     95, 000. 00
   Operational planning-------------------------                7,587. 50
   Miscellaneous inspections and reports------------ 4,532.00
                                                                                                          225,119. 50
        Total_---------------------------------------                                          -----      230, 486.87
   The sum of $300,000 can be profitably expended during the fiscal
year 1954 for the following maintenance work by hired labor: Destruc-
tion by chemical means, destruction by mechanical means, and'
operational planning.
                                       Cost and financita eummary

                                                  Fiscal year ending June 30--                             Total to June
                                                                                                          30, 1952, includ-
                                                                                                          ing fiscal years
                                  1948            1949            1950          1951           1952         priorto 1948

Maintenance:
   Aupropriated- ........$250, 000. 00        $293, 500. 00   $300, 000. 00 $254, 560. 00 $201, 700. 00     $3,543,751.50
   Cost....                    240, 286. 46
                    ...--------------         290, 254. 18     356, 567. 37 269, 879. 99 203, 629. 00        3, 547, 027. 00
   Expenditures- ....... 238, 676. 68         280, 781. 16     362, 988. 73 271, 172. 86 200, 289. 11        3, 541, 659. 63



16. CHANNEL IMPROVEMENT UNDER AUTHORITY OF SECTION 3 OF
  THE RIVER AND HARBOR ACT APPROVED MARCH 2, 1945 (BAYOUS
  TERRE AUX BOEUFS AND SEGNETTE, LA.)

   The River and Harbor Act approved March 2, 1945, authorized the
allotment of not to exceed $300,000 from river and harbor appropria-
tions for any one fiscal year for the removal of accumulated snags
and other obstructions and for protection, clearing, and straighten-
ing channels in navigable harbors, streams, and tributaries thereof
when such work is advisable in the interest of navigation.
   During the fiscal year 1951, Bayou Terre aux Boeufs was improved
under this authorization when a 5- by 50-foot clear channel was ob-
tained by clearing and snagging between miles 10.5 and 18.25, and by
clearing, snagging, and dredging between miles 18.25 and 19.5. The
work was performed by contract during the period April 4 and 30,
1951.
   During the fiscal year 1951 an allotment of $25,000 was received
to provide an 8- by 50-foot clear channel in Bayou Segnette, La. This
work was commenced on June 7, 1951, by hired labor and was com-
pleted on July 20, 1951, when the channel had been improved between
miles 1.5 and 5.
   The costs this fiscal year were $14,541; expenditures were $20,134.31.




        245554--53-vol. 1-49
766          REPORT            OF     CHIEF         OF ENGINEERS,                    U.     S.       ARMY,     1952


                                             Cost and financial summary
                                                      CONSOLIDATED


                                                       Fiscal year ending June 30-                                   Total to June
                                                                                                                    30, 1952, includ-
                                                                                                                    ing fiscal years
                                       1948            1949             1950              1951          1952          priorto 1948

Maintenance:
   Appropriated-.........------ $20, 000.00          $3, 000.00    $25,000.00       $22, 278.61 -$1,793.00                  $68, 485.61
   Cost--------------- 19,195.05                      5, 083.56        247.30        33, 418.70   14, 541.00                 68,485.61
   Expenditures....-------- 12, 210.12                8, 068.49        168.45        27, 904.24   20,134.31                  68, 485.61



       17. EXAMINATIONS,                      SURVEYS, AND CONTINGENCIES (GENERAL)

   The cost of work during the fiscal year amounted to $188,934.40; the
expenditures were $191,912.81. The balance unexpended June 30,
1952, $327.18, plus accounts receivable, $1,980.82, and allotment of
$30,000 for examinations and surveys and $125,000 for contingencies
including the Regional Statistical office, less outstanding liabilities
in the amount of $983.48, a total of $156,324.52, will be applied as
needed during fiscal year 1953 to payment of expenses incurred under
this heading.
   The sum of $197,100 can be profitably expended during fiscal year
1954 for the following schedule of work:
Examinations and surveys-----       -------------
Contingencies------------------------------------------------------
                                                                        ----      $59, 600                     --
                                                                                   45,000
Commercial statistics, Regional Statistical Office .........-------------------- 92, 500
            Total                    --------------- --           ----------------------------                              197, 100

                                              Cost and financial summary
                                                  UNITED STATES FUNDS


                                                        Fiscal year ending June 30-                                     Total to June
                                                                                                                    30, 1952, includ-
                                                                                                                    ing fiscal years
                                           1948        1949             1950              1951          1952          priorto 1948

Maintenance:
       Appropriated _..- ... $111, 500.00 $179, 614.69 $209, 850.00 $239, 250.00 $154, 800.00                           1$2, 754, 068. 97
       Cost---.....     ---._ 154, 301.77 179, 014. 84 203, 044.13 224, 945.62 188, 034.40                               12, 752, 744. 45
       Expenditures.--------- 152, 783.40 179, 522.23 202, 843.41 223, 034. 78 191, 912.81                               12, 753, 741. 79

   I   Contributed funds, $8,350, accounted for on separate report.
                                                  CONTRIBUTED FUNDS


                                                        Fiscal year ending June 30-                                  Total to June
                                                                                                                    30, 1952, includ-
                                                                                                                    ing fiscal years
                                           1948        1949             1950              .1951         1952            prior to 1948

Maintenance:
   Appropriated -------              $8, 350.00 .-                                                                            $8, 350.00
   Cost ....----------------------                   $6, 162.75 ----------------------------------                             6,162. 75
   Expenditures.-....                  .              6, 162. 75 -......      .--                                   -          6,162. 75
                 RIVERS            AND         HARBORS-NEW                               ORLEANS,              LA.,      DISTRICT                 767

              18. PLANT ALLOTMENT, NEW ORLEANS, LA., DISTRICT
                                                   Cost and financial summary

                                                                  Fiscal year ending June 30-                                            Total to June
                                                                                                                                        30,1952, includ-
                                                                                                                                        ing fiscal years
                                              1948               1949              1950                 1951             1952             priorto 1948

Maintenance:
   Appropriated__               ____      $369, 879.17 $270, 409. 92            $20, 904 32 $4,687,918.81           $250, 000.00          $6, 674,604.31
      Cost-- -------------------                                                                                                      -----------
      Expenditures----- --- 197, 648.26                        42, 777.45       240,     428. 79 4,817, 821.17      -51,558.88         5, 577, 380. 74


                                    19. INACTIVE NAVIGATION PROJECTS

                                                                                       For last         Cost and expenditures to                Esti-
                                                                                       full re-               June 30, 1952                     mated
                              Name of project                                          port see    _                                           amount
                                      Name of project                                    annual                                                required
                                                                                         report         New work              Mainte-          to com-
                                                                                          for-                 work             nance           plete

1. Sulphur River, Ark. and Tex___-----------------__                                     1919           $45, 988.99                    (1)
                                                                                                                         ....--------------........
2. Bayou Dorcheat, Loggy Bayou, and Lake Biste-
      teneau, La. 2 34 2___._-______                       - - ____.----------__
                                           - - -- - - -- - _   -              -- -_       1887               5, 000.00 ..--------------           (1)
3. Bayou Pierre, La. _           _        __              __                 ____        1887               8, 600.00 --------------             (1)
4. Cane River, La.4.--.--------------------------                                        1910               2, 500.00      $1,999.50             (1)
5. Bayou Bonfouca, La.--------------------------___                                      1950              30, 997.27      22, 953. 34           (1)
6. Bayou Lacombe, La-----------.--------                        ------------             1950               4, 715.91       1, 393.70            (1)
7. Chefuncta River and Bogue Falia, La-------------                                      1950              24, 563.24      49, 472. 98           (1)
8. Tangipahoa River, La.....-------------------------                                    1950              11, 500.00      15, 202.52            (1)
9. Pass Manchac, La. -- _---------------                                     -___        1950               1, 374.10      10, 038.68            (1)
10. Tickfaw, Natalbany, Ponchatoula, and Blood
       Rivers, La_.. .....................---...                                          1950           8,115.49              32,   415.63       (1)
11. Amite River and Bayou Manchac, La------------                                         1950          28, 233. 68
                                                                                                        9                      63,   534. 09     (1)
12. Bayou Grosse Tete, La __,.................-------                                     1950          29, 392.49             67,   780.58     183, 600
13. Big Pigeon and Little Pigeon Bayous, La.3 4                                           1936 ----------....                  37,   669.20      (1)
14. Intracoastal Waterway from the Mississippi River
      to Bayou Teche, La__-                __-- __________________                        1950     --                           6, 366.64         (5)
15. Bayou Dupre, La_----------------------------                                          1950         38, 915.00              26, 890.01        (1)
16. Grand Bayou Pass, La_---------------- _                                  ___
                                                                          -----           1950          7, 676.34              14, 480. 43       (1)
17. Baratari Bay, La__--------------------------                                 -....    1950         73, 037.11              47, 550.83        (1)
18. Bayou Terrebonne, La_ ----------------                             __-___             1950      10120,088. 71             231,694.03         (1)
19. Waterway from the Intracoastal Waterway to Bayou
      Dulac, La. (Bayous Grand Caillou and LeCarpe,
      La.).---   --------                    ------..
                                        -----------------..                      __      1950             51,279.83             1,543.42         (1)
20. Bayou Verinilion, La------------------------                               __        1947           1134, 900.00          200,168.83         (1)
21. Bayou Plaquemine Brule, La---______________...                                       1950             32, 759. 90          36, 780.39        (1)
22. Bayou Queue de Tortue, La ---                   ______ _----                --_      1950             33, 355.18            4, 776.10        (1)
23. Lake Charles Deep Water Channel, La____--- _____                                     1950                                 241, 896.14        (7)
24. Vinton Waterway, La-----------------------------                                     1950     -------------------------                     242, 500
25. Removing snags and other floating and sunken
      obstructions in the Atchafalaya and Old Rivers
      from the junction with the Mississippi and Red
      Rivers down the Atchafalaya as far as Melville,
      La.. and from the Mississippi River within the
      limits of the New Orleans district-                           -                      (s)
26. Atchafalaya River, Morgan City to the Gulf of
      Mexico, La-.--------.--------.-----------.......                                   1951           501, 963.23           285, 389. 67       (1)

  1 Completed.
  2 No commerce reported.
  8 Channels adequate for existing commerce.
  4 Abandonment recommended in H. Doc. 1692, 64th Cong., 2d sess., and H. Doc. 467, 69th Cong., 1st sess.
  O This project has not been completed as it has been superseded for most of its length by the 12- by 125-
foot Gulf Intracoastal Waterway which coincides with or parallels it. Costs and expenditures prior to
July 1, 1939, are reported under previous projects of the Gulf Intracoastal Waterway between Apalachee
Bay, Fla., and the Mexican border (New Orleans district).
  6 No work has been performed in the New Orleans district under this title.
  7 This is a maintenanceproject and-no future work is scheduled.
  8 Includes $5221 from previous project.
  9 Includes $29,90082 and $59,243.02, respectively, from previous project.
  10oIncludes $47,063.83 from previous project.
  11Includes $9,900 from previous project.
  12Due to decline of traffic, local interests are no longer sufficiently interested to provide rights-of-way and
dumping privileges.
768               REPORT OF CHIEF OF ENGINEERS,                                                           U.    S.     ARMY,     1962


                                             20. MISCELLANEOUS ACTIVITIES
Status of all investigations for navigation called for by river and harbor acts
                                                 and committee resolutions


                                                                                                       Date trans-       Document       Recom-
                    Locality                           Authorization act                               mitted to          ocument       Reco-
                                                                                                        Congress           No          mendation


Amite River and tributaries,                     River and Harbor Act,                             .
  Lousiana (flood control, irri-                  Mar. 2, 1945.
  gation, navigation and drain-
  age, and for the prevention
  of stream pollution and salt-
  water intrusion).
Amite River and tributaries,                     Flood Control Act, Dec. I...............I .......
  Louisiana (flood control, rice                   22, 1944.
  irrigation, navigation, pollu-
  tion, salt-water intrusion and
  drainage.)
Arkansas, White, and Red River                   Flood Control Act, May I-.....-.....
  Basins; Ark., La., Okla., Tex.,                  17, 1950.            I
  N. Mex., Colo., Kans., and
  Mo.'
Assumption       Parish,   Bayou                 River and Harbor Act,
  Boeuf, La., in the interest of                  Mar. 2, 1945.
  navigation,     flood   control,
  beneficial uses of water, ma-
  larial control, and prevention
  of stream pollution in Bayou
  Lafourche, La., from Don-
  aldsonville to the Intracoastal
  Waterway, and of the location
  of locks at the head of Bayou
  Lafourche at or near Donald-
  sonville.
Atchafalaya (East) Basin pro-                   .... do------------------...................--------
  tection levee, all streams and
  bayous in Louisiana, east to
  the Mississippi River.
     Do--------------------------Flood Control Act, Dec.
                                   22, 1944.
Atchafalaya (West) Basin pro- ---- do--------    ------
tection levee, all streams and
bayous in southwest Louisiana
west of, and south of latitude
of Boyce.
Atchafalaya River, La., Morgan3  River and Harbor Act, ..............
City, La., to Gulf of Mexico      Mar. 2, 1945.
  (partial report Louisiana, all
streams and bayous between
  East Atchafalaya Basin pro-
tection levee and Mississippi
  River).
    Do......----........------------------       Flood Control Act, Dec.
                                                   22, 1944.
Atchafalaya River, La., ade-                     Senate Public Works                                   July 26, 1951    S. Doc. No.    Favorable.
  quate navigable channel from                     Committee resolution,                                                  53, 82d
the Mississippi River via Old                     Sept. 23, 1949.                                                        Cong., 1st
and Atchafalaya Rivers to                                                                                                sess.
Morgan City, La.
Barataria Bay and connecting                     River and Harbor Act, L...........
channels, Louisiana, to pro-                     Mar. 2, 1945.
vide a continuous waterway
from the Gulf of Mexico to •
the Gulf Intracoastal Water-
  way.
Barataria Bay, La., with a view   Riversa nd Harbors Com-
  to providing a connecting         mittee resolution, Nov.
  waterway to Grand Ecaille.3       13, 1946.
Baton Rouge, La., construction    Senate      Public  Works
  of harbor improvement, Mis-       Committee resolution,
  sissippi River.                   May 7, 1951.
Bell City Drainage Canal, La.... River and Harbor Act,
                                    Mar. 2, 1945.
Black Cypress and Cypress         River and Harbor Act,
  Rivers via waterway from          Aug. 26, 1937.
  Shreveport, La., to Jefferson,
  Tex.1
Black Cypress River, Tex., and River and Harbor Act, ..........
  La.,    on    Jefferson, Tex, ,  .June 20, 1938.:
  Shreveport, La., waterway.'
  See footnotes at end of table.
           RIVERS AND             HARBORS---NEW                 ORLEANS,        LA.,     DISTRICT           769
S&tate of all investigations for navigation called for by river and harbor acts
                     and committee resolutions-Continued

                                                                     Date trans-       Document        Recom-
             Locality                       Authorization act         mitted to        D    en        mendation
                                                                      Congress

Boeuf Bayou, Assumption Par- R iver and Harbor Act,
ish, La., in the interest of             Mar. 2, 1945.
navigation,        flood      control,
beneficial uses of water, mala-
rial control, and prevention
of stream pollution in Bayou
Lafourche, La., from Donald-
sonville to the Intracoastal
Waterway.
Boeuf Bayou to Chevreuil                  ._do.......-------------
  Bayou, La., via Grand Bayou.
Boeuf Bayou, Lafourche Par- ... .. do....................
  ish, Louisiana.
Calcasieu River and Pass, La.,... .do.              . ...... ...
  for navigation (separate report
  under authority of all streams
  and bayous in southwest
  Louisiana west of WestAtcha-
  falaya Basin protection levee.
Chandeleur Islands to Industrial Ccommerce Committee res- S ept . 2 5, 8. Doc. No.                    Favorable.
  Canal, New Orleans, La.,                olution, Apr. 19, 1943.   1951.      245,     82d
  40-foot ship channel, Missis-                                                Cong., 1st
  sippi River, emergency outlet                                                sess.
  to Gulf of Mexico.
    Do ......----------------------     R ivers and Harbors Com- ......      ....------
                                                                      do......       do......            Do.
                                       mittee resolution, May
                                       5, 1943
Chevreuil Bayou to Bayou              RLiver and Harbor Act,
Boeuf, La., via Grand Bayou.          Mar. 2, 1945.
Cypress Creek, Tex................--- -_do _........-
Cypress River above Jefferson, Rtiver and Harbor Act,
La., in Jefferson, Texas-              Aug. 30, 1935.
Shreveport, 1 La., Waterway
 (reservoirs)
Cypress and Black Cypress Riv- R iver and Hrbor Act, ...........
ers via waterway from Shreve-          Aug. 26, 1937.
port, La., :to Jefferson, Tex.
 (reservoirs in).'
Cypress River, Tex., and La., RLiver and Harbor Act,
on Jefferson,         Tex.-Shreve-     June 20, 1938.
port, La., Waterway (reser-
voirs in).'
Donaldsonville, Bayou Lafour- R iver and Harbor Act, I..............
che, La., to the Intracoastal          Mar. 2, 1945.I
Waterway via Bayou Boeuf,
Assumption Parish, or other
streams, in the interest of
navigation, flood control, etc.
DuLarge Bayou, La., outlet to R iver and Harbor Act,
  Gulf of Mexico to accommo-            Mar. 2, 1945, Flood
date shrimp vessels of 6- or 7-        Control Act, Dec. 22,
foot draft a (partial report           1944.
Louisiana, all streams and
Bayous east of East Atcha-
falaya Basin protection levee).
Golden Meadow, La., to the Rfiver and Harbor Act,.............................
  Gulf of Mexico, via Bayou             Mar. 2, 1945.
Lafourche.3
Grand        Bayou,
Bayou Boeuf3 and Bayou
                          connecting -.                       --
                                        .- do .....................................

Chevreuil, La.
Grand Caillou Bayou, La., out- .. .. do                          --
                                                         --....................     . .............
let to Gulf of Mexico to ac-
commodate shrimp   3      vessels of
6- or 7-foot draft (partial report
Louisiana, all strtams and
bayous east of East Atcha-
falaya Basin protection levee).
    Do ........---------------------  Flood Control Act, Dec.
                                        22, 1944.
Grand Caillou and LeCarpe Rlivers and Harbors Com-
Bayous, Louisiana.                      mittee resolution, Apr.
                                          4, 1938.
Grand Ecaille, with a view to Rlivers and Harbors Com-
providing a connecting water-   mittee resolution, Nov.
way to Barataria Bay, La.       13, 1946.
  See footnotes at end of table.
770         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                1952

Status of all investigations for navigation called for by river and harbor acts
                     and committee resolutions--Continued

                                                                       Date trans-          Document        Recoi-
             Locality                      Authorization act             mited to            Document   mendation
                                                                         Congress

Gulf Intracoastal Waterway (La.-      House Public Works Com- .....
  Tex. Section) rewidening and          mittee resolution, June
  deepening existing channels.          11, 1952.
Gulf Intracoastal Waterway to         River and Harbor Act, --..-
  Donaldsonville, La., via Bayou        Mar. 2, 1945.
  Boeuf in the interest of naviga-
  tion, flood control, beneficial
  uses of water, malarial control
  and prevention of stream pollu-
  tion in Bayou Lafourche, and
  the location of locks at the head
  of Bayou Lafourche at or near
  Donaldsonville.
Gulf Intracoastal Waterway to         River and Harbor Act, ..
  the Gulf of Mexico, via Bara-         Mar. 2, 1945.
  taria Bay, and connecting
  channels, Louisiana.
Houma, La., outlets to open           River and Harbor Act,            -_-
  waters of Gulf of Mexico, tc          Mar. 2, 1945; Flood Con-
  accommodate vessels of shrimp         trol Act, Dec. 22, 1944.
  trawler type of 6- or 7-foot
  draft (via Bayous Terrebonne,
  Petit Caillou, Grand Caillou
  and DuLarge, Terrebonne Par-
  ish, La.3) (partial report, Loui-
  siana, all streams and bayous
  east of Atchafalaya).
Industrial Canal New Orleans,         Commerce Committee
  La., to Chandeleur Island-           resolution, Apr. 19, 1943.
  Mississippi River emergency
  outlet to Gulf of Mexico, 40-
  foot ship channel.
    Do-..........__...___      -.....Rivers   and Harbors Com- _....
                                        mittee resolution, May
                                        5, 1943.
Jefferson-Shreveport Waterway,        River and Harbor Act,           ---..
   Tex., and La., enlarging exist-      Aug. 30, 1935.
   ing project and establishing
  reservoir on Cypress River
   above Jefferson, Tex.'
Jefferson-Shreveport Waterway,        River and Harbor Act, _
   Tex., and La., via Red River         Aug. 26, 1937.
   to Mississippi River, including
  reservoirs in Cypress and Black
   Cypress Rivers.'
Jefferson-Shreveport Waterway,        River and Harbor Act,            ..--
   Tex., and La., thence via Red        June 20, 1938.
    River to the Mississippi River,
   survey for navigation, flood
   control, power, and irrigation,
   including water supply reser-
   voirs in Cypress and Black
    Cypress Rivers.'
Lafourche Bayou, La., from            River and Harbor         Act, I----------
                                                                     ...
   Donaldsonville to the Intra-        Mar. 2, 1945.
   coastal Waterway, via Bayou
   Boeuf, Assumption Parish, or
  other streams, for navigation,
  flood control, beneficial uses of
  water, malarial control, pre-
  vention of stream pollution,
  and of the location of locks at
  the head of said bayou at or
  near Donaldsonville, La.3
Lafourche Bayou, La., from            River and Harbor Act,           -------...
   Leeville or Golden Meadow           Mar. 2, 1945.
  to the Gulf of Mexico.3
Lafourche Parish, Bayou Boeuf,        -....- do,...................
   La.
Lake Charles Deep Water Chan-   Senate Public Works Com-               Oct. 23,195-----------
                                                                       Oct.   23,   1951_   ......      Unfavorable.
  nel, La., modificatibn (for deepmittee resolution, Sept.
  draft ship traffic).            23, 1949.
   See footnotes at end of table.
            RIVERS AND             HARBORS--NEW                        ORLEANS,                      LA.,         DISTRICT               771
Status of all investigations for navigation called for by river and harbor acts
                     and committee resolutions--Continued

                                                                               Date trans-                   Document               Reco-
              Locality                      Authorization act                   mitted to                    Document               Recm
                                                                                Congress

Lake Charles Deep Water Chan-           R iver and Harbor Act,                Oct. 23, 1951 --.----------.                        Unfavorable.
nel, La., as a part of all streams       Mar. 2, 1945.
and bayous in southwest part
of Louisiana, West Atchafalaya
  Basin (partial).
Lake Charles Deep Water Chan-           F lood Control Act, Dec. .....                do.....................                       Do
nel, La., as part of all streams          22, 1944.
and bayous in southwest part
of Louisiana, West Atchafalaya
  Basin (partial navigation only).
LeCarpe Bayou and Grand                 RLivers and Harbors Com- ..........                          ..............
  Caillou Bayou, La.                      mittee resolution, Apr.
                                          4, 1938.
Leeville, La., to the Gulf of           RLiver and Harbor Act, ........                                     .............
  Mexico via Bayou Lafourche,             Mar. 2, 1945.
Louisiana, all streams and bayous        --- do-........--.........-    ...-................
  between       East Atchafalaya
  Basin protection levee and
  Mississippi River (flood con-
  trol, irrigation, navigation, and
  drainage, and for the preven-
  tion of stream pollution and
  salt watel intrusion.)8
Louisiana,      all streams      and    FFlood Control Act, Dec. ...                           _              -----........--..............
  bayous between East Atcha-              22, 1944.
  falaya Basin protection levee
  and Mississippi River (flood
  control, rice irrigation, naviga-
  tion, pollution, salt water in-
  trusion and drainage.'
Louisiana,      all   streams and       PLiver and Harbor Act, ........................... __
  bayous in southwest part,               Mar. 2, 1945.
  west of West Atchafalaya
  Basin protection levee, and
  south of latitude of Boyce
   (flood control, irrigation, navi-
  gation, and drainage, and for
  the prevention of stream pollu-
  tion and salt-water intrusion).
Louisiana,      all streams      and    FFlood Control Act, Dec. -.---------------------
  bayous in southwest part,               22, 1944.
  west of West Atchafalaya
  Basin protection levee, and
  south of latitude of Boyce
   (flood control, rice irrigation,
  navigation,       pollution,  salt-
  water intrusion, and drainage).
Louisiana, waters of, and other
   States affected by water hya-
                                        ILivers and Harbors Com .........--------------------------
                                          mittee resolution, Feb.
  cinth obstructions.                     6, 1945.
Mandeville, La., protection of          PLiver and Harbor Act, ---------------------------
  shoreline and repairs to exist-         Mar. 2, 1945.
  ing protective works at, on
   Lake Pontchartrain.
Mermentau River and tribu-              Hlouse Public Works Com      ---------
                                                               in .....                                      -----------
  taries, Louisiana, additional           mittee resolution, July
  improvements in the interest of         13, 1949.
  navigation, drainage, flood con-
                                 4
  trol, and salt-water control.
Mississippi River, all streams          FRiver and Harbor          Act, ------- _----------                                 ---
  and bayous in Louisiana west            Mar. 2, 1945.
  of, to the Atchafalaya (East)
  Basin protection levee.
     Do-......--------------------      FFlood  Control Act, Dec.                    _............        -.........----
                                          22, 1944.
Mississippi River, Baton Rouge,         SRenate PublicWorks Com-........                             ..............
La., construction of harbor              mittee resolution, May
improvements.                            7, 1951.
   See footnotes at end of table.
772          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

iStatus of all investigations for navigation called for by river and harbor acts
                      and committee resolutions--Continued

                                                                               Date trans-
                                                                               Date trans-              Document  Recom-
              Locality                         Authorization act                mitted to                 No.    mendation
                                                                                Congress

Mississippi       River,- emergency Commerce Committee                         Sept.25,1951_            S. Doc. No.        Favorable.
outlet to Gulf of Mexico, 40-                   resolution, Apr. 19, 1943.                                245, 82d
foot ship channel from the                                                                                Cong.,
Industrial Canal, New Or-                                                                                 1st sess.
leans, La., eastward to the
  Rigolets and thence to Chan-
deleur Islands.
     D o --------------------------         .. Rivers and Harbors Com-           do...... .....
                                                                              ....-           do..-..                          Do.
                                                 mittee resolution, May
                                                 5, 1943.
Mississippi River at-or near New River and Harbor Act,                        .....do.....--              do.....
                                                                                                       .....                  Do.
  Orleans, La., to the Gulf of                   Mar. 2, 1945.
  Mexico. ship canal via the best
  available route or routes.
Morgan City, La., to Gulf of River and Harbor Act,                            -- - - -- - -
  Mexico, Atchafalaya River, La.                 Mar. 2, 1945.
   (partial report Louisiana all
  streams and bayous between
  East Atchafalaya Basin pro-
  tection levee and Mississippi
  River).
     Do .....-------------------               Flood Control Act, Dec.
                                                 22,1944.
New Iberia Commercial Canal, River and Harbor Act,
  La.,4 extension (for barge traf-               May 17, 1950.
  fic).
New Orleans, La., emergency Commerce Committee res-
  outlet from the Mississippi                    olution, Apr. 19, 1943.
   River to the Gulf of Mexico,
  40-foot ship channel via the
  Industrial Canal eastward to
  the Rigolets, and thence to
  Chandeleur Islands.
     Do--------------------.............       Rivers and Harbors Com-        - - - - - - - - -- -    -- ---- ---
                                                 mittee resolution, May
                                                 5, 1943.
New Orleans, La., to the Gulf River and Harbor Act,                           --------------          ------------
  of Mexico.: ship canal via the                 Mar. 2, 1945.
  best available route or routes,
  Mississippi River at or near
  New Orleans, La.
New Orleans, La., construction River and Harbor Act,                          -------------          ------------     ,,
  of seaplane base on Lake                       Mar. 2, 1945.
  Pontchartrain in vicinity of.
Old and Atchafalaya Rivers, La., Senate Public Works Com-                     --------------          -------------
  adequate         navigable channel             mittee resolution, Sept.
  from Mississippi River to Morgan               23,1949.
   City, La.3
Orleans       Parish,           La.,     Lake Senate Public Works Com-
   Pontchartrain, with respect to                mittee resolution, Jan.
   flood control, navigation, and                28,1949.
  beach erosion control.
Petit Caillou Bayou, La., outlet River and Harbor Act,
   to Gulf of Mexico to accommo-                 Mar. 2,1945.
  date shrimp vessels of 6- or 7-foot
  draft 3 (partial report La., all
  streams and bayous east of East
  Atchafalay a Basin protection
  levee).
Pontchartrain Lake, La., con- River and Harbor Act,                           .........
  struction of seaplane base in                  Mar. 2,1945.
  the vicinity of New Orleans
  and protection of shore line and
  repairs to existing protective
  works at Mandeville, La.
Pontchartrain Lake, with re- Senate Public Works Com-
  spect to flood control, naviga-                mittee resolution, Jan.
  tion, and beach erosion control                28, 1949.
  in Orleans Parish, La.
Red, Arkansas, and White River Flood Control Act, May
  Basins, Ark. La., Okla., Tex.,                 17,1950.
  N. Mex., Colo., Kans., and
  Mo.2
    See footnotes at end of table.
             RIVERS AND                HARBORS--NEW               ORLEANS,        LA.,    DISTRICT        773

Status of all investigations for navigation called for by river and harbor acts
                                  and committee resolutions--Continued

                                                                            Date trans-   Document    Recom-
                 Locality                          Authorization act         mitted to
                                                                             Congrss        No.      mendation

Red River, La., Ark., Okla.,                  Rivers and Harbors Com-
  and Tex., for navigation, flood                mittee resolution, Feb.
  control,1 water power, and irri-              25,1938.
  gation.
Red River, La., Ark., Okla.,                  Flood Control Commit-
  and Tex., and connecting water-                tee resolution, Jan. 26,
  ways, singly or together for                   1939; Rivers and Har-
  navigation, flood control, and                 bors Committee reso-
  irrigation.'                                   lution, Jan. 24, 1939;
                                                 and Commerce Com-
                                                 mittee resolution, Feb.
                                                 8, 1939.
Rigaud Bayou, La---- --------...              Rivers and Harbors Com-
                                                 mittee resolution, Sept.
                                                25, 1945.
Schooner Bayou, North Prong,                  River and Harbor Act,
   Vermilion Parish, La.                        Mar. 2, 1945.
Segnette Bayou, La. --------.------           Rivers and Harbors Com-
                                                mittee resolution, Mar.
                                                12, 1946.
Segnette Bayou, La--------------............   River and Harbor Act,
                                                July 24, 1946.
Segnette Bayou Waterway, La.s--..              Flood Control Act, Dec.
                                                22, 1944; and River and
                                                Harbor Act, Mar-, -194&.
Shreveport-Jefferson Waterway,                  River and Harbor Act,
  La., and Tex., enlarging exist-               Aug. 30, 1935.
  ing project and establishing
  reservoir on Cypress River above
  Jefferson, Tex.
Shreveport-Jefferson Waterway,                 River and Harbor Act,
  La., and Tex., thence via Red                  Aug. 26, 1937.
  River to Mississippi River, in-
  cluding reservoirs in Cypress
  and Black Cypress Rivers.)
Shreveport-Jefferson Waterway,                 River and Harbor Act,
  La., and Tex., thence via Red                 June 20, 1938.
  River to Mississippi      River.
  Survey for navigation, flood
control, water power, and irri-
  gation, including water supply
  reservoirs in Cypress and Black
  Cypress Rivers.'
Water hyacinth obstruction in                  Rivers and Harbors Com-
  Louisiana and other States af-                 mittee resolution Feb.
fected.                                        6, 1945.
White, Arkansas, and Red River                 Flood Control Act, May
  Basins, Ark., La., Okla., Tex.,               17, 1950.
  N. Mex., Colo., Kans., and
Mo.2


   1 Incorporated in a comprehensive report on Red River and tributaries, Louisiana, Arkansas, Oklahoma,
and Texas, for navigation, flood control, power, and irrigation, which has been prepared by the Board of
Engineers for Rivers and Harbors.
   2 A coordinated comprehensive report under preparation by Federal and State agencies for the conserva-
tion and development of land and water resources.
   3 To be reported upon as a separate report as part of "All streams and bayous in Louisiana lying between
the East Atchafalaya Basin protection levee and the Mississippi River" authorized for preliminary examina-
tion and survey by River and Harbor Act of Mar. 2, 1945, and Flood Control Act of Dec. 22, 1944.
  4 To be included in report "All streams and bayous in southwest part of Louisiana west of West Atcha-
falaya Basin protection levee" authorized by River and Harbor Act, Mar. 2, 1945, and Flood Control Act,
Dec. 22, 1944.

    21. RED RIVER BELOW DENISON DAM, NEW ORLEANS DISTRICT

  Location.-The work covered by this project is located on the Red
River and its tributaries below Denison Dam, in Oklahoma, Arkansas,
Texas, and Louisiana.
  Existing project.-The Flood Control Act approved July 24, 1946,
approved the general plan for flood control on Red River below Deni-
son Dam, Tex., and Okla., which provides for the construction of six
774        REPORT          OF CHIEF OF ENGINEERS,                            U.     S. ARMY,          1952

flool control reservoirs in combination with existing or authorized
Federal and non-Federal levee improvements, modified as required,
and channel stabilization at locations where levee setbacks are impos-
sible or uneconomical. This act further authorized the incorporation
of the several separate existing projects for flood control along the
Red River below Denison, above the jurisdiction of the Mississippi
River Commission, into this project. The total estimated cost to the
United States (revised in 1952) is $72,952,336 for construction in
addition to that required for the incorporated projects (H. Doc. 602,
79th Cong., 2d sess.).
   Following are lists of the reservoirs and local protection works con-
sidered in the general flood control plan for the Red River below
Denison Dam, and the existing flood control projects incorporated
into the project, in the New Orleans district:
                                                  New projects

                                                                                      Storage, acre-feet
                                                                 Drainage                                     Estimated
                 Project                          Stream        area square                                      construc-
                                                                   miles           Conserva-       Flood         tion cost
                                                                                     tion         control

Texarkana Reservoir, Tex.--.---...      __ Sulphur River.
                                       ---                              3,400       145,300     2, 509, 000 $33,000,000
Ferrells Bridge Reservoir, Tex._'-___-       Cypress Creek_                850       32, 100       558, 300  20, 100, 000
MooringsportReservoir,La., and Tex.s ....  -     do.......--------      2, 740      150, 000       660,  000 10, 330, 000
Bayou Pierre
           2   in vicinity  of     Shreve-  --.---------                 ------------                            243, 336
  port, La.
Red River levees and bank stabiliza-            --             ---------------------------------............  9, 279, 000
  tion below Denison Dam, Tex.,
Ark., and La.'
      Total-............                     -      .          -----------        ------------------------        72----------,--------
                                                                                                                 72, 952, 336

   1Details presented in individual report.
  ' For last full report, see Annual Report for 1951.

                                           Incorporated projects

                                                                                                                 For last
                Project                            Type of work                     trol Actn- Estimat        see Annualrep
                                                                                                                Report,
                                                                                                                  for-

Hempstead County levee district Levee enlargement------------.........            1938            $200,
                                                                                                      000          1941
  No. 1, Arkansas.'     -- -- -   - - -- -
Red River Parish, La.                        do.-- ..--------------------         1936             180, 000        1939
Natchitoches Parish, La---------...........
                                        Levee and appurtenances.....              1936           1,830, 000         (2)
Grant Parish, below Colfax, La.'___Levees_- .-----------__.                 -   - 1938              71, 000        1941
Aloha-Rigolette area, Grant and Levees and appurtenances--                        1941           1,630, 000         (2)
  Rapides Parishes, La.
Pineville, Red River, La-....                do-_______
                                               ------------
                                            d..----                          _    1941              238,000         (2)
Colfax, Grant Parish, La.'-------..     Cut-off.--------------------- 1938                           50,000        1938
Saline Point, La.'       ...                 do .------....................
                                     ..------------------                         1936              135, 000       1945
Red River in the vicinity of Shreve- Bank protection............--------------. 1944             3, 932, 000        (2)
  port, La.
Black Bayou Reservoir, La.a.......      Flood-control reservoir--------........   1936              660,000        1945
Bayou Bodeau Reservoir, La--.....-------...do---------------------                1938           4, 421, 000 .      (2)
Bayou Bodeau, Red Chute, and Channel improvement--------.......                   1941              319, 200       1948
  Loggy Bayou, La.'
Wallace Lake Reservoir, La_.....        Flood-control reservoir--------........   1936           1,202, 000         (2)
Bayou Pierre, La.' ------- .            Channel enlargement.........              1936             300, 000         (2)

  1Completed.
  s Included in this report.
  $ Work not started.
  Local cooperation.-See individual reports.
          FLOOD CONTROL---NEW       ORLEANS,   LA.,   DISTRICT      775s
                  22. TEXARKANA RESERVOIR, TEX.

   Location.-The work covered by this project is on the Sulphur River
in Cass and Bowie Counties, Tex. The dam site is 44.5 miles above
the mouth of Sulphur River, and approximately 9 miles southwest of
Texarkana, Tex.
   Existing project. The plan of improvement provides for the con-
struction of an earthfill dam 18,500 feet long and 100 feet high, includ-
ing a spillway 200 feet wide and outlet works with a capacity of 27,600
cubic feet per second. The reservoir will control the runoff from
3,400 square miles of drainage area, and will have a storage capacity
of 2,654,300 acre-feet of which 145,300 acre-feet are for conservation
and the remainder for flood control. The current estimated cost of
the project, revised in 1952, is $33,000,000, of which $29,100,000 is for
construction and $3,900,000 is for lands and damages. The existing
project was authorized by the Flood Control Act approved July 24,
1946 (H. Doc. 602, 79th Cong., 2d sess.) The latest published map
is in the road-map-type folder, Texarkana Reservoir, published in
1950 and revised in 1951.
   Local cooperation.-None required.
   Operations and results during fiscal year.-Preliminary plans;
malaria, hydraulic, and engineering studies; preparation of detailed
plans and specifications; procurement and analyses of ground water
samples; surveys, investigations, and studies; gage maintenance and
records and observations of discharge and sediment; establishment of
sediment ranges; installation of piezometers; cooperative stream
gaging; and soil borings and foundation investigations for railroad
bridges, were carried on by hired labor at a cost of $118,024.83.
   Land acquisition costs amounted to $762,311.50.
   Construction of the terrace section and the floodplain section con-
tinued. The terrace section was completed on October 17, 1951, and
the floodplain section is 94 percent complete, with the earthfill dam
92 percent complete. Excavation for the outlet structures under con-
tinuing contract for the construction of the spillway, outlet structures,
and closure section, commenced on July 6, 1951, and is 88 percent com-
plete; the contract is 36 percent complete. Concrete hasbeen poured
in the outlet structure, conduit monoliths, north and south down-
stream wingwall, and wall monoliths of the outlet stilling basin. On
January 14, 1952, the cofferdam across the outlet channel was com-
pleted to elevation 230, thus completing phase I of the cofferdam.
Costs on these contracts amounted to $3,867,062.
   Relocation of State Highway No. 11, designated as U. S. Highway
No. 59, in progress at beginning of fiscal year, was completed on
November 30, 1951, with costs of $334,948.
   Delayed charges in connection with removal of transmission lines
across Texarkana Reservoir amounted to $11,001.
   Engineering services contract, in connection with alteration of State
Highway No. 8, was completed on May 27, 1952, with no costs charged
this fiscal year.
   The total costs were $5,093,347.33 for new work; expenditures were
$4,887,424.18.
776      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 19 52

   Condition at end of fiscal year.-The project is 32 percent complete.
   Construction work on this project was initiated on August 18, 1948,
and to date clearing of the dam site, construction of the terrace section,
relocation of State Highway No. 11, designated as U. S. Highway No.
59, and of County Road, Precinct No. 1, Bowie County, Tex., and.
relocation and alteration of 6.9 miles of transmission lines across
Texarkana Reservoir have been accomplished.
   Construction contract for relocation of State Highway No. 8 has
been executed, negotiations have been completed, and a contract is un-
der preparation for alterations of REA distribution lines in reservoir
area. Plans and specifications are under way for relocation of St.
Louis Southwestern Railroad and those for clearing of reservoir have
been completed.
   The work remaining to complete the project, besides that which is
under contract and in progress, is the reservoir clearing, alteration to
utilities, alteration and relocation of roads, railroads, and cemeteries,
channel improvement, and real estate activities.
   The total costs to the end of the fiscal year were $10,568,267.51 for
new work; expenditures were $10,022,897.36.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $3,277,102.64, plus accounts receivable, $1,000,000, and an
allotment of $4,974,000, a total of $9,251,102.64, will be applied as
follows:
Accounts payable, June 30, 1952_--_---------------                    -        $545,370. 15
New work:
    By contract:
        Completing construction of floodplain sec-
          tion of dam.----------              -------------- $151, 268. 00
        Completing engineering service contract for
           relocation of State Highway 8----------              32, 739. 00
        Continuing construction of spillway, outlet
          structure, and closure section by continu-
          ing contract-----------------------               1, 964, 045. 00
        Initiating relocation of railroad by con-
          tinuing contract------------------- 1,572,641.00
        Initiating relocation of U. S. Highway 67
          by continuing contract-------------- 1,455,000.00
        Relocation of REA lines by contract------               75, 000.00
        Initiating relocation of State Highway 8 by
          continuing contract __---------                   1, 966, 700. 00
        Initiating relocation of American Telephone
           and Telegraph lines-----,----------                  20, 000.00
    By hired labor:
        Continuing real estate activities------- 1, 283,145.00
        Continuing surveys, investigations, and
          design ----------------------------                  185, 194. 49
                                                                              8, 705, 732. 49

            Total for all work_            -..---
                                   ---------            --      -- _--
                                                             ____         .   9,251, 102.-64
                     FLOOD CONTROL--NEW                               ORLEANS,            LA.,     DISTRICT                     777

  The sum of $8,700,000 can be profitably expended for the follow-
ing schedule of work during fiscal year 1954:
New work :
   By continuing contract:
       Continuing relocation of railroad----------$2, 600,000
       Continuing relocation of U. S. Highway 67- _    2, 200, 000
       Continuing construction of spillway, outlet
          structure, and closure section------------- 1, 890, 000
       Completing alteration of State Highway 8 ...        70, 050
       Initiating reservoir clearing by continuing
           contract                                     , 000, 000
                                                       1----------------------------
       Relocation of minor utilities and cemeteries___    142, 950
       Initiating miscellaneous construction----------    122, 000
   By hired labor:
                                             ---
       Continuing real estate activities--_ ____     .    600, 000
       Continuing investigations and design----..----      75, 000
                   Total----------------------------------------                                                     $8, 700, 000

                                                Cost and financial summary

                                                           Fiscal year ending June 30--                               Total to June
                                                                                                                      30, 1952, includ-
                                                                                                                     ing fiscal years
                                           1948           1949           1950            1951           1952          prior to 1948

New work:
   Appropriated-.........               $650,000.00 $3,350,000.00 $5,000,000.00 $1,300,000.00 $4,000,000.00           $14,300,000.00
   Cost--....-- -----------..........    300, 166. 53   707, 308. 86 1, 191, 407. 58 3, 276, 037. 215, 093, 347.33     10, 568, 287. 51
   Expenditures-----........             290, 589.35    697, 991.82 1, 126, 877. 223, 020, 014. 794, 887, 424. 18      10, 022, 897.36


Other new work data:
    Unobligated balance, June 30, 1952 ___      __----------- -     $29, 544. 82
   Appropriated for fiscal year ending June 30, 1953---------    4, 974, 000.00
    Unobligated balance available for fiscal year 1953---------5, 003, 544. 82
   Estimated additional amount needed to be appropriated for
      completion of existing project_ __-------
                                      ------                    13, 726, 000.-00

                              23. FERRELLS BRIDGE RESERVOIR, TEX.

   Location.-The work covered by this project is on Cypress Creek in
Marion, Harrison, Upshur, Morris, Titus, and Camp Counties, Tex.,
9 miles west of Jefferson, Tex.
   Existing project.-The plan of improvement provides for the con-
struction of an earthfill dam, 10,000 feet long and approximately 80
feet high, and includes a 200-foot spillway with a capacity of 68,200
cubic feet per second. The reservoir will control the runoff from 850
square miles of drainage area, and will have a gross storage capacity of
842,000 acre-feet, including 558,300 acre-feet of flood-control storage,
32,100 acre-feet of conservation storage, and 251,600 acre-feet for
municipal and industrial water supply. The reservoir will extend 28
miles upstream. The project will afford substantial flood protection
of Cypress Creek Valley from the dam site to confluence with the Red
River and together with the operation of the other reservoirs pro-
posed in the Red River Basin will provide flood protection along the
main stem of the Red River below Denison Dam.
  The estimated cost (revised in 1952) is $16,668,000 for construction
and $3,432,000 for lands and damages, a total of $20,100,000.
778         REPORT                OF    CHIEF OF            ENGINEERS,              U.     S.     ARMY,       1952


SThe    project was authorized by the Flood Control 'Act approved
July 24, 1946. (H. Doc. 602, 79th Cong., 2d sess., which contains the
latest published map.)
   Local cooperation.-None required.
   Operations and results during fiscal year.--Preliminaryinvestiga-
tions and preparation of planning report for acquisition of lands, de-
tailed plans and specifications, and design drawings and specifications;
surveys, investigations, and hydraulic studies laboratory tests, analy-
ses, and gages and observations, were carried on by hired labor at a
cost of $46,750.52 for new work. Expenditures were $60,784.18.
   Conditionat end of fiscal year.-No construction work has been per-
formed on the project.
   The total costs and expenditures to the end of the fiscal year were
$354,851.67, for new work.
   Proposed operations.-The balance unexpended at the end of the
fiscal year of $140,000, will be applied as follows:
New work by hired labor: Continuing surveys, design, and subsurface
     exploration of dam site-------------------__---___                                                              $140, 000
  The sum of $1,700,000 can be profitably expended for the following
schedule of work during fiscal year 1954:
New work:
   By continuing contract:
       Initiating construction of dam, spillway, and outlet struc-
          ture-----------      -----------------------------        $1,000, 000
       Initiating alteration of Highway 726-----------       --....    200, 000
   By hired labor:
       Continuing surveys, investigations, and design                  100, 000                 ------------
       Initiating land acquisition activities-_____------..            400, 000

                   Total ------------------------------------------                                                 1, 700, 000

                                              Cost and financial summary

                                                         Fiscal year ending June 30-                               Total to June
                                                                                                                  30,1952, Includ-
                                                                                                                  ing fiscal years
                                          1948           1949           1950             1951         1952         prior to 1948


New work:
   Appropriated-........ $100, 000. 00 $130, 000. 00                 $95, 000. 00 $128, 000. 00     $41,851.67        $494, 851. 67
   Cost-----....-----------..........   35, 125. 25   110, 895. 89    98, 326. 91   63, 753. 10     46, 750. 52        354, 851.67
   Expenditures........                 34, 712. 64   105, 738. 37   102, 605.67    51, 010.81      60, 784. 18        354, 851. 67


Other new work data:
    Unobligated balance for fiscal year ending June 30, 1952-....   $140, 000. 00
    Unobligated balance available for fiscal year 1953----------      140, 000. 00
    Estimated additional amount needed to be appropriated for
      completion of existing project ---------------              19, 605, 148. 33

                          24. MOORINGSPORT RESERVOIR, LA., AND TEX.
   Location.-The work covered by this project is in Caddo Parish,
La., and Harrison and Marion Counties, Tex. The dam is located on
Cypress Creek, approximately 25 miles above the mouth and just
east of Mooringsport, La.
   Existing project.--The plan of improvement provides for the con-
struction of an earthfill dam, 22,100 feet long and approximately 40
               FLOOD CONTROL---NEW                        ORLEANS,        LA.,     DISTRICT                   779
feet high, and includes a 750-foot spillway with a capacity of 246,000
cubic feet per second. The reservoir will have a gross storage capacity
of 754,000 acre-feet, consisting of 579,000 acre-feet of flood-control
storage and 175,000 acre-feet of conservation storage. The reservoir
will extend 19 miles upstream. The project will afford substantial
flood protection of Cypress Creek Valley from the dam site to con-
fluence with the Red River and, together with the operation of the
other reservoirs proposed in the Red River Basin, will provide flood
protection along the main stem of the Red River below Denison Dam.
The estimated cost (revised in 1952) is $9,440,000 for construction
and $890,000 for lands and damages, a total of $10,330,000.
   The project was authorized by the Flood Control Act approved July
24, 1946 (H. Doc. 602, 79th Cong., 2d sess., which contains the latest
published map).
   Local cooperation.-None required.
   Operations and results during fiscal year.--None.
   Condition at end of fiscal year.-Some preliminary engineering
work has been accomplished; no construction work has been performed
to date.
   The total costs and expenditures to the end of the fiscal year were
$69,008.01.
   Proposed operations.-No work is scheduled during fiscal years
1953 and 1954.
                                    Cost and financial summary

                                               Fiscal year ending June 30-                           Total to June
                                                                                                    30, 1952, includ-
                                                                                                    ing fiscal years
                               1948            1949          1950         1951          1952         priorto 1948

New work:
   Appropriated--. -                       $100, 000.00
                            ..--- ..---------             $65,000.00 -$53,000.00    -$42,991.99          $69,008.01
   Cost------------------      ........ 27, 865.76
                               -------.......              33,944.39     7, 197.86 --------------         69, 008. 01
   Expenditures-------
                  .                   25, 626. 64
                            ...........                    34, 870. 45   8, 510. 92 ....---....           69, 008. 01


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project. ---_---------- $10, 260, 992

      25. RED RIVER BELOW DENISON DAM, LEVEES AND BANK
             STABILIZATION (NEW ORLEANS DISTRICT)

   Location.-The improvements covered by this project are located
along both banks of Red River from the vicinity of Index, Tex.,
mile 497, to the latitude of Alexandria, La., mile 121 (mile 105, 1946
survey) on the north bank, and to the latitude of Boyce, La., mile 141,
on the south bank.
  Existing project.-The plan of improvement provides for the en-
largement and extension of existing and authorized Federal and non-
Federal levees and other flood control improvements, construction of
new levees on both banks of Red River and on tributaries contiguous
thereto, and for the protection of the valley of the main stem of Red
River by construction of revetment and other bank stabilization works
where needed to protect the banks from caving at locations where levee
setbacks are impossible or uneconomical and to prevent the disruption
780     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,. 1952

to transportation facilities when threatened by caving banks, all
between Denison Dam and the upper limit of the Mississippi River
backwater, below which is under the jurisdiction of the Mississippi
River Commission.
   The existing project was authorized by the Flood Control Act ap-
proved July 24, 1946. (H. Doc. 602, 79th Cong., 2d sess., which
contains the latest published map.)
   The estimated Federal cost of the project (approved in 1952) is
$9,279,000.
   Local cooperation.--Local interests are required to: (a) Provide
without cost to the United States the rights-of-way required for the
work; (b) hold and save the United States free from damages due
to the construction of the works; and, (c) maintain and operate the
works after completion. Local interests have met the requirements
on all work presently under way and have indicated their desire to
comply with the requirements as needed. Projects in Louisiana,
Arkansas, and Texas in the New Orleans District fully complied with.
   Operations and results during fiscal year.-Acquisition of rights-
of-way without reimbursement, preliminary plans and specifications,
surveys, and studies were carried on by hired labor at a cost of
$41,580.32.
   Delayed prior fiscal year costs on hired labor work were $1,481, and
those for contract work were $5,721.
   Emergency bank protection work under authority of section 14 of
the Flood Control Act approved July 24, 1946, was performed at
Armistead, La., with 1,406 linear feet of standard board revetment
constructed during the period February 11 and April 19, 1952, and
at Hanna, La., with 2,483 linear feet of dikes coistructed during the
period February 2 and June 25, 1952. Costs of $159,255 of this con-
struction were charged to this project.
   The total costs were $208,037.32, new work; expenditures were
$198,875.27.
   Condition at end of fiscal year.-The project, on which construction
commenced on February 15, 1948, is 41 percent complete, with ap-
proximately 57 miles of the left bank and 100 miles of the right bank
improved, and 12,937 linear feet of dike and 3,056 linear feet of
board revetment constructed.
   Plans and specifications have been completed for levee enlargement
at two locations; however, the work has not been advertised as the
rights-of-way have not been made available.
   Plans and specifications are in preparation for bank protection work
at Vernon Mayer, La.
   The total costs to the end of the fiscal year were $3,743,099.21 for
new work; expenditures were $3.727,060.96.
   Proposed operations.--The balance unexpended at the end of the
fiscal year, $113,839.04, plus an allotment of $324,000, a total of
$437,839.04, will be applied as follows:
                FLOOD CONTROL--NEW                           ORLEANS, LA., DISTRICT                               781

Accounts payable, June 30, 1952---   ------------------------- $253, 538. 25
New work:
    By contract:
        Amount required to complete existing contract
          work--     ----------------------------- $22,122. 00
        Vernon Mayer dikes, D-289.0-R------------     60, 000. 00
        Contingencies -------------------------       75, 675. 79
    By hired labor:
        Real estate operations------------------           51. 00
        Amount required to complete existing hired
          labor work-------- -------------------- 1, 452. 00
        Surveys, planning, and engineering---------- 25, 000. 00
                                                                  184, 300. 79
              Total for all work__ __---                     __-----------           ----- _            437,839.04
  The sum of $834,800 can be profitably expended for the following
schedule of work during fiscal year 1954:
New work by contract:
   Bank protection:
       Lake End, La        --------------------------------------                                          $149, 800
       Fire Point, La _--- ------- -----------                                                                   000
                                                                                                            1----20.
       McNeely, La----------            ---------------------------                                         280, 000
       Zimmerman Ring levee--------__---------                  ----------                                   50, 000
       Garland floodgate modification, McKinney Bayou----------                                             100, 000
       Garland and McKinney Bayou Levee District, R-385.0-R__.                                               70, 000
       Red River Levee District No. 1, enlargement, R-430-416-L-                                             65, 000

               Total -------------------------------------------                                             834, 800
                                      Cost and financial summary

                                                 Fiscal year ending June 30-                             Total to June
                                                                                                        30,1952, includ-
                                                                                                        ing fiscal years
                                 1948           1949           1950          1951          1952          prior to 1948

New work:
   Appropriated-__ ---- $1,600,000,00 $1,000,000.00 $520, 900. 00 $500,;000. 00- ....-------.......       $3, 620, 900. 00
   Cost -------------- 380, 003. 15 1, 908, 810. 42 693, 929. 37 552, 318.95 $208, 037.32                  3, 743, 099. 21
   Expenditures--------        329, 147.00 1, 913, 918. 82   733,158. 05   551, 961.82   198, 875. 27      3, 727, 060. 96

Other new work data:
    Unobligated balance, June 30, 1952-----------------------                                           $61, 143.23
   Appropriated for fiscal year ending June 30, 1953-----------                                         324, 000.:00
    Unobligated balance available for fiscal year 1953_ --------                                        385,143. 23
    Estimated additional amount needed to be appropriated for
      completion of existing project----------------------                                          5,334,100.00
            26. RED RIVER IN THE VICINITY OF SHREVEPORT, LA.
   Location.-The work covered by this project is located along Red
River in the vicinity of Shreveport, La., from Eagle Bend to Brown-
lee Bend (miles 295-316), including the waterfront of Shreveport on
the west bank (miles 305-308) and Bossier City on the east bank
 (miles 305-309), in Caddo and Bossier Parishes, La. (Reference.U. S.
Geological Survey map, scale 1: 500,000.)
   Existing project.-The plan provides for improvement of Red River
from Brownlee Bend, mile 316, to the lower end of the Bossier City
waterfront, mile 304.6, comprising restoration, enlargement, and ex-
tension of existing protection works where deficient or ineffective, or
their replacement by other types of protection were required, includ-
ing works on the right bank along Twelve Mile Bayou Bend (miles
       245554-53--vol. 1-50
782                 REPORT OF CHIEF' OF ENGINEERS, U. S. ARMY, 1952

313.2-311.0), and along the Shreveport front (miles 306.4-305.7) ; on
the left bank along Brownlee Bend (miles 315.7-314.3), Honore Bend
 (miles 310.9-308.6), and along Bossier City front (miles 305.9-305.8),
a length of approximately 29,000 feet; as well as construction of new
bank protection works where required on the right bank along Douglas
Island Bend (miles 308.7-306.5 and 305.7-304.6), a length of approxi-
mately 18,000 feet.
   The existing project was authorized by the Flood Control Act ap-
proved December 22, 1944.
   The current estimate of cost (revised in 1952) is, Federal Govern-
ment, $3,932,000 for initial construction, local interests, $37,500 for
lands and damages.
   The latest published map is in House Document 627, Seventy-
eighth Congress, second session.
   Local cooperation.-Fully complied with.
    Operationsand results duringfiscal year.-Preparationof plans and
specifications, surveys and mapping, engineering studies, and acquisi-
tion of local cooperation were continued by hired labor at a cost of
$6,297 for new work. Expenditures were $6,317.74.
    Condition at end of fiscal year.-The project, on which active con-
struction commenced on May 16, 1946, is approximately 99 percent
complete.
   A total of 29,009 linear feet of board revetment, protecting approxi-
mately 28,672 linear feet of bank; 9,930 linear feet of pile revetment,
including root and baffle dikes, with 454,970 cubic yards of hydraulic
fill placed behind this revetment, protecting 9,940 linear feet of bank;
7,272 linear feet of pile dikes, including root and baffle dikes, pro-
tecting 10,090 linear feet of bank; 19,780 linear feet of steel fascine
boxes, protecting 4,000 linear feet of bank; 5,300 linear feet of rock
groins, protecting 4,980 linear feet of bank; and 4,800 linear feet of
screen piles, to supplement existing partial bank protection, were
constructed under the plan of improvement for stabilization of both
banks of Red River in vicinity of Shreveport, as follows:
                                                                         [In linear feet]

                                                 Board                     Dikes               Pile revet-              eelfacine             Rock              Screen
                     Item                      revetment                                          ment                   ment                 groins             piles


305.2L -----------------                       ------------         ------------              ------------                   19,780.      ......                  ,
                ------------.
      --- -------......
306.02L           ... .............      3,000..... .........   .     19, 780
                  --..................----....
306.L4R---------......                   i...                                      ..............
                                                                 .......... ...... 1,920..........---
306.8L-------- -----------------------------------------------------------
307.0L..      ----------- -------                         1, 418-
                                                      ----------                 --------------
307.5 .....-------------------------                                                               892
                                                                                                 ,--------1,
307.9R .-----------.................              ----------------------......---....
                                                                    ............                1, 88
312.7R .---------------...............-----.......-----....---------             471           2, 619 " -                                                             4, 800
308.2R_---------------------                             1,23..............                  ..................................
30.2R-----------------------                              900--             --------------------------------------------
308.3R---------------------     1, 827...                                            ............................................
309.L ---------       ---------                                                                       3, ........
                                                                                3,769---------------------                              .....................
                     -------------------------------------------
309.5L-----------------------2,535-----
31.OL__-------------------------------------------                                                                                  -              -3, 380.
310.2L---------------__-----             --- 935------------------------
310.4L--------, ___--------
313.0 R..................                                  870,
                                                        4,................................................
311.1R__--------------------              3, 769
311.9R------------------------------      3, 032
312.OR-----------------         2,260-    -          -    -       -      -       -
313.R___------------------         870------------------------------------------------
315.0L_   .----.---------- - -. 8, 730-
         Totals-..............             .          29, 009                   7, 272                   9, 930              19, 780                 5, 300           4, 800
              FLOOD          CONTROL---NEW                      ORLEANS,          LA.,        DISTRICT                 783
   Some additional bank protection work in vicinity of Bossier City
front will be required before the project is completed.
   The total costs to the end of the fiscal year were $3,916,061.36 for
new work; expenditures were $3,774,005.66.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $7,994.34, plus accounts receivable, $150,000, a total of
$157,994.34, will be applied as follows:
Accounts payable, June 30, 1952__           .----------      ----    -                                             $88. 93
New work:
    By contract: Bank protection, Bossier City front__ $140, 000. 00
    By hired labor:
        Amount required to complete existing hired
          labor work---------       -------------         6,370. 00
        Surveys, mapping, and preparation of plans
          and specifications---------------------- 11, 535. 41
                                                                                                             157, 905.41

                  Total for all work____-----------------------------                                        157, 994. 34
  The project will be completed with the expenditure of the above
funds.
                                       Cost and financial summary

                                                   Fiscal year ending June 30-                                Total to June
                                                                                                     S       30,1952, includ-
                                                                                                             ing fiscal years
                                  1948             1949           1950           1951           1952          priorto 1948

New work:
   Appropriated     -.......
                    _-           $1,000,000.00 $325, 000.
                        1$1,000,000.00                  00 $150,
                                                               000.
                                                                  0C -$18, 000.
                                                                              00                                 932,
                                                                                                               $3,     00
                                                                                                                    000.
   Cost--..                    1, 408, 231. 27
                     ...------------             568, 798. 51   697, 969. 22   538, 554. 51     6, 297. 00      3, 916, 061. 36
   Expenditures.......        , 244, 188. 59     644, 750. 00   692, 667. 77   544, 894. 16     6,317. 74       3, 774, 005. 66


Other new work data:
    Unobligated balance, June 30, 1952____         ___---------$3,
                                                     _                                                            371. 41
    Unobligated balance available for fiscal year 1953___        _____                                            371.41
                                                                                                                3,,

                           27. BAYOU BODCAU RESERVOIR, LA.

   Location.-The work covered by this project is in Red River Basin
on Bayou Bodcau in Bossier Parish, La., 72 miles above the mouth of
Loggy Bayou and 35 miles northeast of Shreveport, La. (See U. S.
Geological Survey State map, scale 1: 500,000.)
   Existing project.-The plan of improvement provides for the con-
struction of an earthfill dam rising 76 feet above the stream bed with
a reservoir providing for a controlled storage capacity of 357,000
acre-feet. The outlet works are located in the south abutment, and
an uncontrolled spillway is located on the north abutment. The res-
ervoir will control 656 square miles, or 53 percent, of the entire drain-
age area of Bayou Bodcau. The construction of a floodway for the
diversion of Bayou Bodcau and Cypress Bayou to improve flood pro-
tection was authorized by the Flood Control Act approved June 22,
1936. This authorization was modified by the Flood Control Act
approved June 28, 1938, which authorized the construction of a reser-
voir and other flood-control works, in lieu of the construction of a
floodway for the diversion of Bayou Bodcau and Cypress Bayou, La.,
to improve flood protection, and further modified by the War Depart-
ment Civil Appropriation Act approved June 28, 1939, which pro-
784           REPORT           OF CHIEF OF ENGINEERS,                               U.    S. ARMY,             1952

vided that the reservoir and other flood-control works on Bayou
Bodcau and Cypress Bayou, La., authorized by the Flood Control Act
approved June 28, 1938, shall be constructed in accordance with
the revised plans and cost estimates in the Office, Chief of Engineers.
The estimated cost (revised in 1952) is $3,364,000 for construction,
and $1,057,000 for lands and damages, a total of $4,421,000. The
latest (1952) estimate of annual cost of maintenance is $15,000.
   The latest published map is in House Document 378, Seventy-fourth
Congress, second session.
   Local cooperation.-None required.
   Operations and results during fiscal year.-Hired labor continued
land acquisition, surveys, flood damage investigations, and check of
structure for scour.
   Maintenance costs for hired labor amounted to $10,615, and covered
routine studies and operation and maintenance of the reservoir.
   The total costs were $91,869.72, of which $81,254.72 was for new
work and $10,615 was for maintenance; expenditures were $97,793.85.
                                                 Reservoir operations

                                                                                         Storage         Inflow         Outflow


July 1, 1951......------------
June 30, 1952------
                               ---               ---       -----------
                               ------------ -----------------------------                        165
                                                                                                     _-----
                                                                                            - 2,840 .............-
Mar. 20, 1952 (maximum) ..........---------------------.....--------------                   44, 800 ........                , 870
Jan. 29, 1952 (maximum) .........................----------------------------------------------                4,160    .

  1 Cubic feet per second.


   Number of visitor-days of recreational use-14,000 (fiscal year
1952).
   Condition at end of fiscal year.-The project is approximately 92
percent complete.
   Construction work was initiated on April 23, 1947, and on Decem-
ber 1, 1948, the main dam and spillway were completed. The outlet
structure was constructed during the period April 8, 1948, and Decem-
ber 17, 1949, and on July 14, 1948, Bayou Bodcau was diverted from
its natural bed and flowed through the outlet structure for the first
time. Relocation and alteration of utilities and roads have been
accomplished as follows:
                                                                                 Commenced                        Completed
Alteration to pipeline, United Gas Pipe Line                                    Oct. 6, 1947                  June 29, 1948
   Co.
Alteration of parish road and bridges-------.                                   Sep. 12, 1949                 Aug.     24, 1950
Relocation of State Highway No. 70-------_.                                     Oct. 25, 1949                 Nov.     21, 1950
Anchoring of seven bridges on State route 182_                                  Nov. 16, 1949                 Nov.     26, 1949
Alteration to pipeline, Triangle Pipe Line Co_                                  Nov. 20, 1949                 Feb.     15, 1950
   All construction work has been accomplished, with only processing
of real estate activities remaining to complete the project.
   The total costs to the end of the fiscal year were $4,081,227.64, of
which $4,053,136.09 was for new work and $28,091.55 for maintenance;
expenditures were $4,085,201.52.
   Proposed operations.--The balance unexpended at the end of the
fiscal year, $31,298.48, plus accounts receivable, $337,131.95, and an
                        FLOOD CONTROL--NEW                                                ORLEANS,        LA.,        DISTRICT                   785
allotment of $11,000 for maintenance, a total of $379,430.43, will be
applied as follows:
Accounts payable, June 30, 1952 -----------------------------                                                                           $1,158. 07
New work by hired labor:
    Completion of real estate activities----------_    $361, 060. 13
    Completion of surveys, investigations, and design_    6, 803. 78
                                                                                                                                       367, 863. 91
Maintenance by hired labor:
    Maintenance of spillway, dam, outlet works, roads,
      and utilities------------------------------4,                400. 00
    Operation of project--------------------------              1,000. 00
    Gage and discharge observations----------------2,186. 00
    Malaria control__ ---------.                    --.--          457. 00
    Flood damage reports ------                                    000. 00
                                                               1,,----------
   Reservoir operations studies__--                  ---------     765. 45
    Cooperative hydrological network---------------               600.00
                                                                                                                                        10, 408. 45

            Total for all work ----------------------------------                                                                      379, 430. 43
  The sum of $13,000 can be profitably expended during fiscal year
1954 for operation and maintenance.
                                                       Cost and financial summary

                                                                        Fiscal year ending June 30-                                    Total to June
                                                                                                                                      30, 1952, includ*
                                                                                                                                      ing fiscal years
                                                  1948                 1949                1950          1951           1952            prior to 1948


New work:
   Appropriated-........ $1,076,800.00 $585, 700. 00 $360,000.00 ------ ---------------                                                 $4, 421, 000. 00
   Cost ..---------------.   909, 636.29 1, 705, 314. 44 781, 424.41 $207,152.86        $81, 254.72                                      4, 053, 136. 09
   Expenditures----.... --.. 855, 795. 91 1, 704, 987.93 835, 867.82 211,662.87          87, 240. 43                                     4, 058, 058. 29
Maintenance:
    Appropriated--------- ----.........-----............        .....----------.......    10, 000. 00    9,000.00       8, 500. 00          27, 500. 00
    Cost_ __- -----------------------                            ---------           --    2, 381.95    15, 094. 60    10, 615.00           28, 091.55
    Expenditures--------...............--..----....--------------............              1, 869. 62   14, 720.19     t, 553. 42           27,143. 23


Other new work data:
    Unobligated balance, June 30, 1952-_--             ----                                                                          __-$13,609.06
    Unobligated balance available for fiscal year 1953 --                                                                                1-------
                                                                                                                                         13, 609. 06

                                        28. WALLACE LAKE RESERVOIR, LA.

   Location.--The work covered by this project is in Red River Basin
on Cypress Bayou, Caddo, and De Soto Parishes, La., 66 miles above
the mouth of Bayou Pierre and about 14 miles southeast of Shreveport,
La. (See U. S. Geological Survey State map, scale 1: 500,000.)
   Existing project.-The plan of improvement provides for the con-
struction of an earthfill dam 4,940 feet long at the top, including 644
feet of spillway and outlet works, rising 48 feet above the stream bed,
with a reservoir providing for storage of 96,100 acre-feet, including a
conservation pool of 7,800 acre-feet. The outlet works and uncon-
trolled spillway are centered about 1,250 feet north of the south abut-
ment. The reservoir will control 260 square miles, or about 20 percent
of the total drainage area of Bayou Pierre, Cypress Bayou, and tribu-
taries combined, and will afford protection against floods for an area
of about 90,000 acres of valley below the dam.
   The existing project was authorized by the Flood Control Act ap-
proved June 22, 1936. (H. Doc. 378, 74th Cong., 2d sess.)       The esti-
786           REPORT OF: CHIEF OF ENGINEERS, U. S. ARMY, 1952

mated cost of new work to the United States (revised in 1952) is
$1,142,064 for construction and $59,936 for preparation of land titles,
a total of $1,202,000. The latest (1952) estimate for annual cost of
maintenance is $10,000.
   The latest published map is in House Document No. 378, Seventy-
fourth Congress, second session.
   The Flood Control Act approved July 24, 1946, incorporated this
project in the new project "Red River below Denison Dam."
   Local cooperation.--Local interests represented by the Board of
Commissioners of Caddo levee district have furnished assurances,
agreeing to furnish free of cost to the United States all land, rights-
of-way, easements, and servitudes required for the project. The dam
site area, which was acquired in fee, has been conveyed to the United
States. Practically half of the flowage easements in the reservoir
area have been acquired by the local agency and conveyed to the United
States. Due to inability to clear title to some tracts and unreasonable
demands of landowners as to prices offered for such easements, the
local agency, by resolution adopted on November 20, 1951, requested
that condemnation proceedings be filed in its behalf to acquire flowage
easements over the remaining portion of the reservoir. It is esti-
mated that approximately 7 declarations of taking will be filed, cover-
ing approximately 100 tracts. It is estimated that real estate activi-
ties in cooperation with the Department of Justice in processing the
condemnation proceedings will be completed on or about December 31,
1955.
   Operations and results during fiscal year.-Hiredlabor forces con-
tinued processing of rights-of-way and checked structure for scour.
Maintenance of the dam, stream gaging and discharge observations,
and malaria, sedimentation, and engineering studies were continued.
   The total costs were $9,870, of which $3,200 was for new work and
$6.670 was for maintenance; expenditures were $9,164.78.
                                                 Reservoir operations

                                                                         Storage             Inflow           Outflow
                                                                        (acre-feet)

July 1, 1951- ..       -------   --------------------         ------         7, 860 .......................
June 30, 1952---------------                                                 7, 550 ...--------.------
Feb. 14, 1952 (maximum)------------------------------------                 33, 710               7, 630         11, 970

  1 Cubic   feet per second.


  Number of visitor-days of recreational use-25,760 (fiscal year
1952).
  Condition at end of fiscal year.-The project is approximately 99
percent complete.
  The main portion of the dam was constructed during the fiscal
year 1943; the stabilization of the railroad embankment was ac-
complished during the period June 19 and November 20, 1946; and
placing of fill in the closure section of the dam was accomplished
during the period November 24 and December 28, 1946.
  All construction work has been accomplished, with only completion
of processing of rights-of-way remaining to complete the project.
                   FLOOD         CONTROI--NEW                     ORLEANS,        LA.,        DISTRICT                 787
   The total costs to the end of the fiscal year were $1,227,590.81, of
which $1,184,358.54 was for new work and $43,232.27 for maintenance.
The expenditures were $1,226,557.88.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $2,942.12, plus an allotment of $8,000 for maintenance,
a total of $10,942.12, will be applied as follows:
Accounts payable, June 30, 1952---------------------------------                                               $1, 032. 93
New work by hired labor: Amount required to complete existing
  work                        ---------------------------------------                                               41. 46
                                                                                                                   6------------
Maintenance by hired labor:
    Maintenance of spillway, dam roads, and utilities ... $2, 363.00
    Operation of project------__---                     -       1, 000.00
    Gage and discharge observations ----..--.-------            1, 549. 00
    Cooperative stream gaging program (U. S. Geological
      Survey) ----------------------------------               1, 350. 00
    Reservoir operation studies -----------------               1,355. 73
    Cooperative hydrological network-------- ---------             750. 00
    Flood damage surveys and reports ---                          -900. 00 -----------
                                                                                                                9,267. 73

          Total for all work_                           _--------------------------              ----          10, 942. 12
  The sum of $8,600 can be profitably expended during fiscal year
1954 for maintenance.
                                           Cost and financial summary

                                                       Fiscal year ending June 30-                           Total to June
                                                                                                             30, 1952, includ-
                                                                                                             ing fiscal years
                                       1948           1949          1950          1951           1952         prior to 1948

New work:
   Appropriated ---------------------------------------------                                  $3, 000. 00     $1, 185, 000. 00
   Cost----_ _------              $4, 647. 63        $2,270. 23     $495. 22      $780. 68      3,200. 00       1, 184, 358. 54
    Expenditures ..  ---------       4, 783. 52      2, 178. 78      210. 33       851. 71      3, 105. 40      1, 184, 263. 94
Maintenance:
                   .......
     Appropriated--------            5, 000. 00     17, 000. 00   10, 000. 00    6, 000. 00     6, 500. 00         44, 550. 00
     Cost___----------------         4, 747. 32      3, 998. 65   18, 524. 98    9, 291. 32     6, 670. 00         43, 232. 27
     Expenditures...---------        4, 141. 70      3, 579. 89   17, 857. 29   10, 655. 68     6, 059. 38         42, 293. 94


Other new work data:
    Unobligated balance, June 30, 1952--_--      -------------------- $94. 54
    Unobligated balance available for fiscal year 1953__.----------    -94. 54
    Estimated additional amount needed to be appropriated for com-
      pletion of existing project-------------                 ----  17, 000. 00

                                              29. BAYOU PIERRE, LA.

  Location.-The work covered by this project is in Red River Basin
below Shreveport, La., along the channel of Bayou Pierre from Bayou
Wincey to its mouth at Grand Ecore, La. (See U. S. Geological
Survey State map, scale 1: 500,000.)
  Existing project.-The plan of improvement provides for the wid-
ening of the channel at intervals from Bayou Wincey, mile 30 to
mouth at Grand Ecore, La., consisting of 12.9 miles of channel widen-
ing and 29.7 miles of snagging. The project will reduce flood dam-
age and improve sanitary and living conditions over a wide area. The
existing project was authorized by the Flood Control Act of June 22,
1936 (H. Doc. 378, 74th Cong., 2d sess.). The cost of new work for
the completed project was $299,529.13. The estimated annual cost of
7 88           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

maintenance is $13,500. The latest published map is in House Docu-
ment No. 378, Seventy-fourth Congress, second session.
   Local cooperation.-Fullycomplied with.
   Operationsand results during fiscal year.--Gages and observations,
flood damage studies, investigations, and reporting for economic
justification were carried on by hired labor at a cost of $6,904 for
maintenance. The expenditures were $6,883.63.
   Condition at end of fiscal year.-New work under the existing
project has been completed.
   The costs and expenditures to the end of the fiscal year were
$261,000 from regular funds and $38,529.13 from Emergency Relief
funds, a total of $299,529.13 for new work; the total costs from regular
funds for maintenance were $59,242.72; expenditures were $59,208.87.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $3,791.13, plus an allotment of $8,000 for maintenance,
a total of $11,791.13, will be applied as follows:
Accounts payable, June 30, 1952 _-------------           ----- ___-----                                                                    $33. 85
Maintenance by hired labor:
    Surveys, engineering studies, plans and specifications_ $2, 319. 28
    Gages and observations_-------_---__----------- 7, 438. 00
    Flood damage investigations, estimates, reporting and
      economic justification- ----     ---------.--          2, 000. 00
                                                                                                                                       11, 757. 28

              Total-------------------------------------------11,791.13
  The sum of $3,800 can be profitably expended during fiscal year
1954 for-maintenance.
                                               Cost and financial summary

                                                            Fiscal year ending June 30-                                              Total to June
                                                                                                                                     30,1952, includ-
                                                                                                                                     ing fiscal years
                                         1948              1949                 1950                1951                 1952         prior to 1948


New work:
              ........----
   Appropriated------------                                                            ------------.......------------............
                                                    ---------------............---............................                           $299, 529.13
    Cost-------------             --        ----      ------------........---------------------------------............-                  299, 529.13
    Expenditures---   ........   ........--------   ------------------------...........------------........
                                                                                               ............------------                   299, 529.13
Maintenance:
   Appropriated-.........          $10,000. 00         $10, 000. 00        $15, 000. 00 -$35,000.00                  $6, 000. 00           63, 000. 00
    Cost----------------               4, 900. 80        8, 358. 93           5, 730. 92          6, 841.96            6, 904. 00          59, 242. 72
    Expenditures-...- -...             5, 577. 93        8, 361. 93           5, 338. 07          7, 221.33            6, 883. 63          59, 208. 87



                                    30. NATCHITOCHES PARISH, LA.

  Location.--The work covered by this project is on the south bank
of Red River in Natchitoches Parish, La., between miles 160 and 202
above the mouth of Red River. (See U. S. Geological Survey State
map, scale 1: 500,000.)
  Existing project.-The plan of improvement provides for the rais-
ing and enlargement of the existing levee and the construction of new
           FLOOD CONTROIr-NEW ORLEANS,          LA.,   DISTRICT      789
levee between the hills near Grand Ecore, La., at mile 202 above the
mouth of Red River, and the hills below Cane River near its mouth
at mile 160 above the mouth of Red River; the construction of a dam
across Cane River near it mouth; the excavation of drainage canals
for intercepted drainage; and a diversion channel from Cane River
to Red Bayou, a distance of approximately 5.5 miles, for protection
of approximately 135,000 acres of land in the Cane Island area from
Red River overflow. The existing project was authorized by the Flood
Control Act approved June 22,1936. (H. Doc. 378, 74th Cong., 2d sess.).
   The estimated cost (approved in 1952) is: Federal Government,
$1,830,000 for construction; local interests, $348,000, of which $250,000
is for construction of Cane River-Red Bayou diversion channel and
 $98,000 for construction of minor drainage structures and for lands
and damages.
   The latest published map is in House Document No. 378, Seventy-
Fourth Congress, second session.
   Local cooperation.-Localinterests (represented by Board of Com-
missioners of Cane River levee and drainage district) furnished as-
surances on January 23, 1952, which were approved by the division
engineer on April 21, 1952, that they will: (a) Provide without cost
to the United States all lands, easements, and rights-of-way necessary
for the construction of the project; (b) hold and save the United
States free from damages due to the construction works; and (c)
maintain and operate the works after completion in accordance with
regulations prescribed by the Secretary of the Army. Local interests
represented by the State of Louisiana, Department of Public Works,
have offered to contribute $250,000 towards the cost of construction
of Cane River-Red Bayou diversion channel. Chief of engineers re-
quested the Comptroller of the Army on June 12, 1952, for authority
to -accept contribution of $250,000 by local interests towards the cost
of the work. The request was approved by the Comptroller of the
Army for the Secretary of the Army on June 17, 1952. District
engineer, New Orleans District, received notification of such authority
on June 30, 1952. No work will be performed until all these funds
are in hand.
   Operations and results during fiscal year.-Preliminaryplans and
specifications, surveys, soil borings, engineering studies, gages and
observations, and local cooperation in connection with Cane River-
Red Bayou diversion channel were carried on by hired labor at a cost
of $37,623 for new work. Expenditures were $37,461.68.
   Condition at end of fiscal year.-The project is 43 percent complete,
with 36.2 miles of levee constructed and enlarged and 5.1 miles of
diversion channel excavated.
   Plans and specifications have been completed for construction of
the Cane River Dam and excavation of the Cane River to Red Bayou
diversion channel, which work remains to complete the project.
   The cost of new work under the existing project to June 30, 1952,
was $780,387.33, $707,645.37 from regular funds and $72,741.96 from
Emergency Relief funds. Total expenditures were $780,226.01.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $348,850.47, plus an allotment of $348,000 and contributed
790           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

funds in the amount of $250,000, a total of $946,850.47, will be applied
as follows:
Accounts payable, June 30, 1952 -----------------------------                                                       $161. 32
New work:
    By contract: Excavation of Cane River-Red Bayou
      diversion channel----------------------- $945, 592. 15
    By hired labor :
         Surveys----------              ----- ------------- 328. 00
        Soil borings-----------------------769.                  00
                                                                                                                946, 689. 15

          Total -----------                          --------              -------------------                  946, 850. 47
  The sum of $352,924 can be profitably expended during fiscal year
1954 for completion of Cane River-Red Bayou diversion channel and
for construction of Cane River Dam and levee.
                                         Cost and financial summary

                                                      Fiscal year ending rune 30-                               Total to Tune
                                                                                                               30, 1952, includ-
                                                                                                               ing fiscal years
                                      1948           1949           1950            1951           1952         prior to 1948

New work:
   Appropriated__ ----------------------           "-----..-----------------.                $360, 000. 00       $1, 129, 076. 48
   Cost -----------------------------------------.............................                   37, 623. 00         780, 387. 33
   Expenditures.........----------------------------------------
                                                        ............           ------............37, 461.68          780, 226.01


Other new work data:
   Unobligated balance, June 30, 1952__---__----------------    $347, 219. 15
   Appropriated for fiscal year ending June 30, 1953-----------348, 000. 00
   Unobligated balance available for fiscal year 1953----------  695, 219. 15
   Estimated additional amount needed to be appropriated for
      completion of existing project __    ____------------      352, 923. 52

31. ALOHA-RIGOLETTE                          AREA, GRANT AND RAPIDES PARISHES, LA.
  Location.-The work covered by this project lies on the left bank
of Red River in Grant and Rapides Parishes, between miles 125 and
171 above the mouth. (See U. S. Geological Survey State map, scale
1: 500,000.)
   Existing project.-The plan of improvement provides for protection
of some 46,000 acres of alluvial plain in the Aloha-Rigolette area, now
subject to overflow by Red River waters, by enlarging and raising the
existing levee from mile 151 to mile 141, and extending it to the hills
on the left bank of Bayou Rigolette. Interior drainage, intercepted
by levee construction, is to be channeled to and through Bayou Rigo-
lette to a sump and a floodgate system in the levee at Bayou Rigolette,
by construction of a diversion ditch from Bayou Darrow to Saline
Bayou, and fills at head of Bayou Darrow, and channel clearing of
Bayou Rigolette and portions of Waden and Saline Bayous.
   The existing project was authorized by the Flood Control Act ap-
proved August 18, 1941, which modified the project for Grant Parish
below Colfax, La., as authorized by the Flood Control Act approved
June 28, 1938, to provide for construction of the above described
works.
   The latest approved 1952 estimate of cost is $1,630,000 (Federal) for
construction and $50,000 (non-Federal) for rights-of-way.
  Local cooperation.-Fullycomplied with.
               FLOOD       CONTROL--NEW                ORLEANS,       LA.,    DISTRICT                  791
   Operations and results during fiscal year.-Surveys, borings, and
mapping; revision of detailed plans and specifications, to include re-
vised design of floodgate; preliminary plans and specifications; and
laboratory work, testing, and analysis for report on Bayou Rigolette
drainage structure, were carried on by hired labor at a cost of $32,158.55
for new work. Expenditures were $33,718.48.
   Condition at end of fiscal year.-The project is 75 percent complete.
Construction commenced on June 3, 1948, and at the end of the fiscal
year approximately 17 miles of new levee and 4 miles of riverside en-
largement had been constructed. Bayou Darrow has been separated
from Bayou Rigolette and its flow diverted into Saline Bayou through
the diversion ditch which was excavated during the period June 28
to November 6,1948. Bridges at miles 0.40, 2.05, and 4.1 over the
diversion ditch were completed during the period October 4, 1948, to
May 24, 1949, and 33.30 miles of waterway were cleared during the
period July 16, 1948, to February 18, 1950. Bayou Darrow closures
were effected during the period May 16 and August 22, 1949.
   Work remaining to complete the project consists of constructing
levee on left bank of Bayou Rigolette to the hills and constructing a
floodgate at Bayou Rigolette.
   The total costs to the end of the fiscal year were $1,221,315.92 for new
work; expenditures were $1,221,160.39.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $319,289.61, will be applied as follows:
Accounts payable, June 30, 1952_--- _---------------------__                                       $155. 53
New work:
    By contract: Construction of Aloha-Rigolette flood-
     gate        --------------------------  ------        $284, 000. 00
   By hired labor :
        Levee embankment, mile 124.5 to hills on left
          bank of Bayou Rigolette ....-----------            26, 108. 08
        Amount required to complete existing hired
          labor work-------------             ------------    9, 026. 00
                                                                                               319, 134. 08
                Total for all work_--------------------------__--_                            319, 289. 61
  The sum of $89,550 can be profitably expended during fiscal year
1954 for completion of levee embankment, mile 124.5 to hills on left
bank of Bayou Rigolette, by hired labor. This work will complete the
project.
                                  Cost and financial summary

                                             Fiscal year ending June 30--                      Total to June
                                                                                              30,1952, includ-
                                                                                              ing fiscal years
                               1948          1949          1950       1951        1952         priorto 1948


New work:
   Appropriated----      -----....
                             .-         $500, 000. 00 $500, 000. 00 ----------------------      $1, 540, 450.00
               ........ $43,090.97 329, 364.95 469, 008.09 $319, 517. 48 $32, 158.55
   Cost-----------------                                                                         1, 221, 315. 92
   Expenditures_--------    35, 486. 85 328, 604. 41 465,196.22 330, 793.00      33, 718.48      1, 221, 160.39


Other new work data:
   Unobligated balance, June 30, 1952------------                - $315, 200. 10
    Unobligated balance available for fiscal year 1953 ---------    315, 200. 10
   Estimated additional amount needed to be appropriated for
      completion of existing project-------------------------...89, 550. 00
792     REPORT OF CHIEF OF ENGINEERS, U.           S.   ARMY,   1952

                    32. PINEVILLE, RED RIVER, LA.
  Location.--The work covered by this project lies on the left bank
of Red River in Rapides Parish between the crossing of the Louisiana
and Arkansas Railway at mile 121 and mile 122.2. (Mississippi
River Commission alluvial valley map, scale 1:250,000, and quadran-
gle maps, scale 1: 62,500.)
  Existing project.-The plan of improvement provides for the en-
largement of 0.2 mile of the Louisiana and Arkansas Railway bridge
approach fill; the construction of 1.2 miles of new levee, three flood-
gates, and one pumping plant, all in the Pineville front area.
  The existing project was authorized by the Flood Control Act
approved August 18, 1941, which modified the project for Grant
Parish below Colfax, La., as authorized by the Flood Control Act
approved June 28, 1938, to provide for construction of the above
described works.
   The estimate of cost (revised in 1952) is $238,000 (Federal) for
construction and $218,000 (non-Federal) for lands and damages.
  Local cooperation.-Fullycomplied with.
   Operations and results during fiscal year.--Hired labor operations
consisted of completion of surveys, borings, and mapping; plans and
specifications; under seepage study; operations and maintenance
manual; and erection of a pumphouse at Pineville, La., with instal-
lation of pumps, motors, and switchboards, during the period Octo-
ber 30 and December 29, 1951, all at a cost of $40,043 for new work.
   On August 9, 1951, work was resumed on Pineville levee,
R-121.2-123.8-L-B, and on August 10, 1951, the clay blanket for thA
drainage structure had been placed, and dressing and seeding around
the outlet structure accomplished. During the period July 6 and
November 30, 1951, 2,687 linear feet of levee, with placement of 102,-
617 cubic yards of fill, was constructed in the town of Pineville, La.,
R-121.2-123.8-L-A, with two drainage structures and street culverts
installed, and 1,241 linear feet of Louisiana and Arkansas Railroad
embankment enlargement constructed, with the placement of 24,012
cubic yards of fill. Costs on these contracts were $85,935.
   The total costs were $125,978; expenditures were $129,293.54.
   Condition at end of fiscal year.-Construction commenced on
July 21, 1950, and the project was practically completed on Decem-
ber 29, 1951, with rainwash restoration and some resodding of the
new levee remaining to be done. Approximately 1.15 miles of new
levee and 0.24 mile of railroad embankment enlargement have been
constructed; a pumping station with equipment erected; and drainage
structures and street culverts installed; all in the town of Pineville, La.
   The total costs to the end of the fiscal year were $232,024.01; expend-
itures were $231,964.62.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $6,025.53, will be applied as follows:
Accounts payable, June 30, 1952-----------------------------             $59.39
New work by hired labor:
   Restoration of levee due to rainwash------------    $4, 616.14
   Resodding of new levee where sod failed to grow- ..  1, 350. 00
                                                                       5, 966.14
        Total -------------------------------------        ------- 6, 025. 53
                  FLOOD CONTROL---NEW                      ORLEANS, LA.,            DISTRICT                793
   The project will be completed with available funds.
                                       Cost and' financial summary

                                                  Fiscal year ending June 30--                      Total to June
                                                                                                   30,1952, includ-
                                                                                                   ing fiscal years
                                     1948        1949           1950        1951        1952        prior to 1948

New work:
   Appropriated.---------.--------. $60,800.00--------------------                   $ 18,000.00       $237, 990.15
   Cost---------------$1, 634.33---------------------$83,      978.42                125, 978.00        232, 024.01
   Expenditures---------.........   1, 658. 24---------------
                                               ............              80,603. 49 129, 293. 54
                                                                ------............                      231, 964. 62


Other new work data:
    Unobligated balance, June 30, 1952----------         ---------- $5, 516.14
    Unobligated balance available for fiscal year 1953-- ...-----    5, 516. 14

              33. LAKE PONTCHARTRAIN, JEFFERSON PARISH, LA.

    Location.-The work covered by'this project lies on the southern
shore of Lake Pontchartrain in Jefferson Parish, between the Or-
leans and St. Charles Parish lines. (Mississippi River Commission
alluvial valley map, scale 1:250,000 and quadrangle maps, scale
1: 62,500.)
    Previous project.-The previous project, authorized by the Flood
Control Act approved July 24, 1946 (H. Doc. 691, 79th Cong., 2d
sess.), was revised by the Flood Control Act approved May 17, 1950
 (S. Doc. 139, 81st Cong., 2d sess.); to become a feature of the project
for flood control, Mississippi River and tributaries.
    Operations and results during fiscal year.-Surveys, engineering,
preparation of plans and specifications, and obtaining rights-of-way
without reimbursement, were continued by hired labor with costs
of $185.
    Additional enlargement of the lake shore levee, initiated in the
previous fiscal year, was completed on November 26, 1951, when a
total of 11,991 linear feet of enlargement was constructed by the
placement of 505,071 cubic yards, and 8,900 linear feet of landside
dikes and 7,500 linear feet of lakeside dikes were! built. Contract
costs were $275,983.
    The total costs were $276,168; expenditures were $276,214.76.
    Condition at end of fiscal year.--Construction work under the
project commenced by contract on December 1, 1948, with the enlarge-
ment of the lake shore levee (stations 260+10 to 595+00) of Lake
Pontchartrain, which was completed to interim grade on December
19, 1949, over its entire length. This levee was topped intermit-
tently over its entire length by hired labor during the period March
30 and July 21, 1950; and enlarged by contract during the period
April 30 and November 26, 1951, between stations 350 + 02 and 469+ 93.
    The St. Charles-Jefferson Parish line levee (stations 0+00 to
260 +10) was enlarged by contract during the period January 26
  and August 16, 1949, between the lake front and the Illinois-Central
  Railroad embankment, and was topped by contract over this stretch
  during the period March 17 and September 22, 1950, and extended
  from the Illinois-Central Railroad embankment to the Airline High-
794           REPORT OF CHIEF OF ENGINEERS, U.                                       S. ARMY,          1952

way by hired labor during the period October 23 and Decem-
ber 22, 1950.
   The levee along the Orleans-Jefferson Parish line from the 17th
Street canal pumping station to Lake Pontchartrain was constructed
by contract during the period June 9 and November 16, 1949.
   During the period June 6 and 10, 1949, hired labor forces extended
the wavewash protection on the lake shore levee with salvaged rubble
removed from behind the lakeside dike at East End.
   Upon exhaustion of "Flood Control, General," funds, all work
remaining to complete the project will be accomplished with "Flood
Control, Mississippi River and tributaries" funds, as they become
available, to which project "Lake Pontchartrain, Jefferson Parish,
La.," was transferred by the Flood Control Act, approved May 17,
1950.
   The total Government costs to the end of the fiscal year were
$1,427,995.22; expenditures were $1,427,995.42. In addition, costs
and expenditures from contributed funds amounted to $626,600.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $12,004.58, will be applied as follows:
New work:
      By hired labor:
          Amount required to complete existing hired labor operations_                                         $228. 00
          Construction of levee topping--------------------                                                  11, 776. 58

                Total-------------------------------------------                              ------       $12, 004. 58
  No further work is scheduled under the "Flood Control, General,"
project.
                                          Cost and financial summary

                                                   Fiscal year ending June 30-                             Total to June
                                                                                                           30, 1952, includ-
                                                                                                           ing fiscal years
                                      1948        1949           1950           1951           1952         prior to 1948


New work:
   Appropriated ..                 ...------------$900, 000. 00 $540, 000. 00- .......--.- ..-...- .         $1,440, 000. 00
   Cost ..---------------.      -----------. 676, 168. 11 392, 440. 97 $83,218.14 $276,168.00                 1, 427, 995. 22
    Expenditures-----
                ...............------------    594, 737. 38   456, 125. 73   100, 917. 55   276, 214. 76    1 1, 427, 995. 42


Other new work data :
      Unobligated balance, June 30, 1952__--------    _ ---                                                $11,776. 78
      Unobligated balance available for fiscal year 1953-------------                                        11, 776. 78
1 In addition $626,600, contributed funds, expended.

                     34. BAYOU TECHE AND VERMILION RIVER, LA.

  Location.-Bayou Teche has its source in Bayou Courtableau, in
St. Landry Parish, and flows in a southeasterly direction a distance of
125 miles to its confluence with the lower Atchafalaya River, about
101/2 miles above Morgan City, La. Vermilion River, also called
Bayou Vermilion, is formed by the junction of Bayous Fusilier and
Bourbeau, west of Arnaudville, La., and flows in a southwesterly
          FLOOD   CONTROL--NEW     ORLEANS,   LA.,   DISTRICT     795
direction to the western end of Vermilion Bay, a distance of 72 miles.
Bayou Teche is connected with the Vermilion River by Bayou Fusilier
at Arnaudville; and by Ruth Canal, an artificial privately owned,
nonnavigable waterway, constructed for diversion of water from
Bayou Teche to Vermilion River for rice irrigation. (U. S. Coast
and Geodetic Survey Charts Nos. 1116 and 1277; Corps of Engineers,
Mississippi River Commission alluvial valley maps; and U. S. Geo-
logical Survey maps.)
   Existing project.-This provides for the excavation of a navigable
channel (51 miles long) 8 feet deep and 80 feet wide from the 8-foot
depth contour in Vermilion Bay to the Gulf Intracoastal Waterway,
thence 9 feet deep by 100 feet wide from the Gulf Intracoastal Water-
way to Lafayette, La. (fixed bridge at Louisiana State Highway No.
1092), with additional enlargement below Abbeville necessary to pro-
vide adequate capacity for flood flows; channel improvement of the
nonnavigable channel of Vermilion River and Bayou Fusilier from
Lafayette, La., to Bayou Teche at Arnaudville, La., of adequate
capacity to carry flood flows of the upper Vermilion Basin, a 1.5-
foot increase in the pool elevation of Bayou Teche above Keystone
Dam and the enlargement of the nonnavigable channel of Bayou
Teche from its head at Bayou Courtableau to a point approximately
21 miles downstream. Under ordinary conditions the mean range
of tide on Vermilion Bay is 1.1 feet. The variation of the water
surface near the mouth may be as much as 7 or 8 feet, due to hurricanes
on the Gulf.
    The plane of reference is mean low Gulf level. (See also individual
report of navigation project for Bayou Teche, La.)
    The current estimated Federal cost of new work approved in 1952
is $2,945,000. The estimated local cost of new work is $150,000.
    The latest (1952) approved estimate of annual Federal cost of
maintenance is $25,000.
    The existing project was authorized by the Flood Control Act of
August 18, 1941. (S.Doc. 93, 77th Cong., 1st sess., which also con-
tains the latest published map.)
    Local cooperation.-Fullycomplied with.
    Operations and results during fiscal year.-Procurement of local
cooperation in obtaining right-of-way was continued by hired labor
at a cost of $3,250.90, new work.
    Delayed new work costs on contracts completed in the previous'
fiscal year amounted to $26,132.
    Preparation of preliminary plans and specifications; acquisition of
rights-of-way; gages, surveys, and observations; supervision, inspec-
tion, and patrol of the waterway; removal of snags and other ob-
structions; and maintenance of signs and markers, were carried on
by hired labor at a cost of $18,848 for maintenance.
    The total costs were $48,230.90, of which $29,382.90 was for new
work and $18,848 for maintenance; expenditures were $76,020.42.
    Condition at end o)f   fiscal year.-The project is approximately 93
percent complete.
796      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                 1952

    Channel improvement on Vermilion River consisted of construct-
ing an 8- by 80-foot channel from the 8-foot depth contour in Ver-
milion Bay to the Gulf Intracoastal Waterway; a 9- by 100-foot
channel from Gulf Intracoastal Waterway to mile 52;'and a 6- by
60-foot channel from mile 52 to mile 57.4. Channel enlargement was
accomplished between miles 3.5 and 17.5 and 57.4 and 76.21. Clear-
ing and snagging was accomplished in Bayou Fusilier and Bayou
Vermilion between miles 67.7 and 79, and an earth dike was con-
structed in Bayou Fusilier. The channel of Bayou Teche was im-
proved between miles 103.8 and 124.8. A new bridge was constructed
over Vermilion River at Woodlawn, the bridge at Milton was re-
constructed; modification of railroad bridge numbered 3.78 and Lou-
isiana State Highway bridges numbered 988 over Bayou Vermilion
and 245 over Bayou Fusilier has been accomplished; the bridge at
Pinhook was altered, and riprap was placed to insure the bridge
against possible damage by bank caving; and excavation and rip-
rapping were performed in the vicinity of Southern Pacific Railroad
bridge, Lafayette, La. Local interests have constructed improve-
ments in Ruth Canal.
    Work remaining to complete the project consists of raising the
crest of Keystone Dam, a feature of the River and Harbor project
 "Bayou Teche, La.," to provide an increase of 1.5 feet in the pool ele-
vation above Keystone Dam, in order to increase the flow through Ruth
Canal into Vermilion River, and miscellaneous minor items.. This
work will be accomplished in connection with the reconstruction of
Keystone Dam under the Bayou Teche, La., project. Due to sedi-
mentation caused by deposits from tributary streams recently exca-
vated by local interests, it will be necessary to redredge the channel
between miles 26 and 52, to reestablish project dimensions. Contract
was awarded on June 24, 1952, for part of this dredging between
miles 36.9 and 46.
    The controlling depths, mean low Gulf, Vermilion River, were:
 (February 1952) Over the bar, 5 feet; to Gulf Intracoastal Waterway,
6 feet; to Abbeville, 8 feet; to Pinhook Bridge (Lafayette), 6 feet;
 (September 1949) to Ruth Canal, 3 feet.
    The total costs under the existing project to the end of the fiscal
year were $2,832,397.37, of which $2,726,473.20 was for new work and
$105,924.17 for maintenance. The total expenditures were $2,832,-
372.80.
    Proposed operations.--The balance unexpended at the end of the
fiscal year. $238,627.20, plus an allotment of $81,000 for maintenance,
a total of $319,627.20, will be applied as follows:
Accounts payable, June 30, 1952- -----------------------------             $24.57
New work:
    By contract: Amount required to complete existing
      dredging contract-------            ------        $146,827. 00
    By hired labor:
        Amount required to complete existing hired
          labor operations------------------------17,        785. 00
             Surveys------------------------------           914. 80
                                                                       165, 526. 80
                   FLOOD CONTRO---NEW                                ORLEANS,               LA.,     DISTRICT                  797
Maintenance:
   By hired labor:
       Amount required to complete existing hired
          labor operations----   ...---------------------                                            $8, 657. 00
        Surveys, engineering studies, plans and speci-
          fications-2-----------------------------                                                    2, 000.00
       Gages and observations-- -------------------                                                   7, 000. 00
        Negotiating with local interests (rights-of-
          way) -----------------------------------                                                      750. 00
        Flood damage investigations, reports, esti-
          mates, and economic justification ---------                                                    500. 00
        Channel patrol-----------------------------                                                    , 000. 00
                                                                                                                     $19., 907. 00
     Regular and extraordinary maintenance by con-
      tract:
        Amount required to complete existing dredging
           contract---------------------------------                                               64, 229. 00
        Initiating channel dredging, Vermilion River,
          mile 26 to mile 36.9, and mile 46 to mile 52_.                                             69, 939. 83
                                                                                                                     134, 168. 83

                     Total for all work--------------------------------319,                                                 627.20
  The sum of $151,400 can be profitably expended for the following
schedule of work during fiscal year 1954:
Ordinary maintenance by hired labor:
    Gages, observations, channel patrol, and normal channel mainte-
       nance---------------------------------------------------- $25, 400
Continue extraordinary maintenance by contract-------------------- 126, 000
         Total-----------------------                                                                                     151, 400

                                             Cost and financial summary

                                                          Fiscal year ending June 30-                                Total to June
                                                                                                                     30, 1952, includ.
                                                                                                                     ing fiscal years
                                         1948            1949           1950             1951             1952        prior
                                                                                                                          to1948

New work:
   Appropriated ....
                  -                .     -___ __...
                                              __  $600, 000. 00 _______-             $375, 000. 00 _...... .           $2,892, 000. 00
   Cost_.--   ------------             075. 84
                                   $269,              456, 986. 20 $209, 171. 86      212, 113. 56 $29, 382. 90         2. 726, 473. 20
   Expenditures-                    247, 465.98       451, 205. 79   237, 824. 80     185, 291.84   57, 013. 18         2, 726, 473. 20
Maintenance:
   Appropriated      --------
   Cost....---------------.............
                                       20, 000. 00
                                        26, 970. 40
                                                       15, 000. 00
                                                        9, 812. 78
                                                                      25, 000. 00-
                                                                      19, 644. 56
                                                                                        -
                                                                                        7, 663. 00
                                                                                                       89, 000.00
                                                                                                       18, 848.00
                                                                                                                          179, 000. 00
                                                                                                                          105, 924. 17
   Expenditures .--------.......        27, 875. 05     9, 917. 73    19, 243. 13       7, 923. 52     19, 007. 24        105, 899. 60


Other new work data:
    Unobligated balance, June 30, 1952------------------------- $18, 682.00
    Unobligated balance available for fiscal year 1953---------------18, 682. 00
   Estimated additional amount needed to be appropriated for
      completion of existing project------------------------------ 53, 000. 00

                                          35. MERMENTAU RIVER, LA.

  Location.--The work covered by this project is located 35 to 70
miles southeast of Lake Charles, La., along the lower Mermentau
River below Grand Lake, mile 25, to the Gulf of Mexico; the In-
land Waterway from Vermilion Bay to White Lake, White Lake to
Grand Lake, and from Schooner Bayou to the Intracoastal Water-

         245554-53-vol. 1--                     51
798    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

way-Gulf section (Schooner Bayou cutoff); the North Prong of
Schooner Bayou; and the waterway from White Lake to Pecan
Island, La., and artificial canal, extending from the 5-foot-depth
contour in White Lake, almost due south for a distance of approx-
imately 1.8 miles to Pecan Island. (See U. S. Coast and Geodetic
Survey Charts Nos. 1277 and 1278, and U. S. Geological Survey
maps.)
   Existing project.-The plan of improvement covers flood control,
navigation, irrigation, and salinity control in the coastal marsh
of the lower Mermentau River Basin and provides for channel en-
largement of the lower Mermentau River below Grand Lake, mile
25, to a minimum section of 3,000 square feet below mean low Gulf
level for discharge of flood flows; construction of a sector gated
control structure at Catfish Point, mile 24 above mouth of Mermentau
River for discharge of flood flows and control of tidal flows and
salt water intrusion in the Mermentau River; channel enlargement
and realinement of the Inland Waterway from Vermilion Bay to
White Lake and from White Lake to Grand Lake to a minimum
section of 3,000 square feet below mean low Gulf level or interfiow
between lakes and discharge of flood flows; construction of a sector
gated control structure in the enlarged channel immediately north
of the existing Schooner Bayou Lock Reservation for discharge of
flood flows and control of tidal flows and salt water intrusion; chan-
nel enlargement of North Prong of Schooner Bayou and Schooner
Bayou cutoff to 6 by 60 feet, mean low Gulf level, for navigation
purposes.; and maintenance of the existing 5- by 40-foot, mean low
Gulf level, waterway from White Lake to Pecan Island, La., for
navigation.
    In addition, the project provides for the incorporation of that
section of the project, '"Inland Waterway from Franklin, La., to
Mermentau River," west of Vermilion Bay, a waterway that included
the Schooner Bayou lock.
    Because of the failure of both east and west gates, Schooner
Bayou lock has been closed by a dike across the east approach
channel and traffic has been routed through the new control structure.
    Under ordinary conditions the mean range of tide on the Mer-
mentau River near the mouth is 1.6 feet and near the head about
3 inches. The variation of the water surface near the mouth may
be as much as 7 or 8 feet, due to hurricanes on the Gulf, and near
the head from 8 to 12 feet, due to freshets.
    The current estimate of cost for new work, approved in 1952,
is $5,000,000. The latest (1952) approved estimate for annual cost
of maintenance and operation is $93,600.
    The existing project was authorized by the following acts:
                  FLOOD CONTROL---NEW                   ORLEANS,           LA., DISTRICT                   799

     Acts                           Work authorized                                    Documents

Aug. 18, 19411    Channel enlargement, lower Mermentau River from           S. Doc. 94, 77th Cong., 1st sess.
                    mile 15 to the Gulf of Mexico; and construction of a
                   lock and control spillway at Catfish Point, mile 24.                                         a
July 24, 1946 s   Channel enlargement; lower Mermentau River below         S. Doc. 231, 79th Cong., 2d sess.
                   Grand Lake, mile 25; construction of a gated control
                   structure at or near Grand Cheniere, mile 7; chan-
                   nel enlargement and realignment of Inland Water-
                   way from Franklin, La., to Mermentau River, La.,
                   from Vermilion Bay to White Lake, via new chan-
                   nel and from White Lake to Grand Lake; channel
                    enlargement of North Prong of Schooner Bayou;
                    construction of a gated control structure in the new
                    channel near Schooner Bayou lock; and inclusion
                    of the project "Waterway from White Lake to Pecan
                   Island, La." and the portion of the project "Inland
                   Waterway from Franklin, La., to the Mermentau
                   River," west of Vermilion Bay in the modified
                   project "Mermentau River, La."

I Flood-control act.
2 River and harbor act.
 * Contains latest published map.

    Local cooperation.-Fully complied with.
    Operations and results during fiscal year.-Approximately 2,146,205
cubic yards were removed from the Mermentau River between miles
 -0.5 and 8.16 during the period August 16, 1951, and June 21, 1952,
99,505 cubic yards by the dredge F. J. J. Sloat and 2,046,700 cubic
yards by the dredge Moreland II, north and south dikes at Schooner
Bayou control structure were seeded during the period July 2 and
24, 1951; and the deficient grade of the Mermentau River dike was
raised to 6.7 feet during the periods July 11 to 19 and August 14 to 16,
1951. The contract costs were $300,108 for new work.
    Preparation of definite project report, acquisition of local coopera-
tion, preliminary plans and specifications, flood damage and investiga-
tions, recheck of Schooner Bayou control structure for scour, and
construction of permanent dike closure at Schooner Bayou during the
period September 4 and 22, 1951, were accomplished by hired labor at
a cost of $42,616.49 for new work.
    Biological investigations of Mermentau River by contract were car-
ried on with costs of $937, and deferred Government costs on contract
completed in previous fiscal year amounted to $262.
    Supervision, inspection, and patrol of the waterway; operational
planning; gages, surveys, and observations; biological investigations
and studies; and removal of shoaling from the White Lake to Pecan
Island waterway during the period August 13 and 31, 1951, when a
5- by 40-foot channel was restored throughout the waterway, a distance
of 1.74 miles; were accomplished by hired labor at a cost of $29,251 for
maintenance.
    Schooner Bayou and Catfish Point control structures were both
operated as navigation structures with costs of $23,596 and $28,539,
respectively.
    The total costs were $425,309.49, of which $342,724.49 was for new
work, and $30,450 for maintenance, and $52,135 for operating and
care. The expenditures were $471,265.06, including $2,000 contrib-
uted funds.
   Condition at end of fiscal year.-The project, on which work com-
menced on April 21, 1947, is approximately 92 percent complete.
800     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,          1952

   Dredging of the 5- by 40-foot waterway from White Lake to Pecan
Island, La., was completed in 1931.
   The excavation of Mermentau River from Grand Lake to Grand
Cheniere Highway Bridge, miles 25 to 8.3, was accomplished during
the period April 21 and September 2, 1947, by the leased dredge
Tohefuncta, and between miles 8.16 and -0.5 during the period Au-
gust 16, 1951, and June 21, 1952, by the contract dredges F. J. J. Sloat
and MorelandII; of Schooner Bayou cutoff during the period January
28 and April 12, 1950, by the contract dredge Illinois; and of North
Prong of Schooner Bayou during the period May 1 and June 10, 1950,
by contract draglines.
   Dredging of channel from White Lake to Vermilion Bay, mile
27.98 to mile 40.02, was accomplished by the dredge Duplex during
the period April 19, 1950, and May 31, 1951; dredging of channel from
Grand Lake to White Lake, mile 7.97 to mile 14.11, was accomplished
during the period August 5, 1950, and May 31, 1951.
   Catfish Point control structure: Excavation, sheet piling, concrete
and appurtenant work was accomplished during the period November
6, 1948, and January 31, 1950. Installation of gates, operating ma-
chinery, and appurtenant work, was commenced January 26, 1950,
and completed October 20, 1950; dredging of the approach channels
was accomplished during the period December 16, 1950, and May 3,
1951. All dikes were completed on August 16, 1951. The reservation
comprises 9.7 acres.
   Schooner Bayou lock and control structures: Schooner Bayou lock
and dam were completed in 1913 and 1914, respectively, and the lock-
master's house in 1917. The lock was closed to navigation on May 7,
1951, and abandoned by authority of the Chief of Engineers October
9, 1951. Construction of the control structure was accomplished dur-
ing the period August 8, 1949, and May 22, 1951. The United States
reservation comprises 6.9 acres.
   Construction of bulkhead, as may be found necessary, at the mouth
of the waterway from White Lake to Pecan Island, La., remains to
complete the project.
   The controlling depths, mean low Gulf, were, Mermentau River:
 (June 1952) Over bar to dredged cut, mile -0.5, 5 feet; to mile
 -0.3, 8 feet; to Grand Cheniere, 15 feet; (March 1952) to Upper Mud
Lake, 8 feet; through Upper Mud Lake and to Catfish Point, 10 feet; to
Gulf Intracoastal Waterway through Grand Lake, 3 feet; Waterway
from White Lake to Pecan Island, La.: (March 1952) Over bar, 4
feet; to Pecan Island, 5 feet.
   The total costs to the end of the fiscal year were $4,779,256.17, of
which $4,597,275.41 was for new work; and $181,980.76 for operation
and maintenance, including $13,163, River and Harbor funds; the
expenditures were $4,744,769.67, including $2,000 contributed funds.
   Proposed operations.-The balance unexpended at the end of the
              FLOOD CONTROL---NEW ORLEANS,              LA.,     DISTRICT             801

fiscal year, $127,393.33, plus accounts received, $324,000, and an allot-
ment of $85,000 for maintenance, a total of $536,393.33, will be applied
as follows:
Accounts payable, June 30, 1952__-
New work :
                                          __-----_-----------                  $34, 486. 50

    Amount required to complete existing contracts___          $33, 403. 00
    Amount required to complete existing hired labor
      operations --------------------------------                4, 667. 00
    Contingencies ----------------------
                                _--                            364, 654. 83
                                                                               402, 724. 83
Maintenance:
    By contract:
        Amount required to complete existing con-
           tract---------..----------..-------------           1, 280. 00
        Continue biological investigations-----------          1, 600. 00
    By hired labor:
        Amount required to complete existing hired
          labor operations---------- ---------------              751. 00
        Biological investigations_--- ------------             2, 900. 00
        Gages and observations_- ----------------             13, 500. 00
        Operational planning- -----------------                5, 651.00
        Channel patrol----          --------------------       1, 000. 00
        Flood damage, investigations, estimates, re-
          porting, and economic justification---------- 1, 500. 00
Maintenance (operating and care) :
    Schooner Bayou control structure:
        Operation and care--- ..             .. $25, 000. 00
        Ordinary maintenance and repair.           3, 000. 00
        Improvement and reconstruction.            6,500. 00
                                                              34, 500. 00
   Catfish Point control structure:
        Operation and care----.........           26, 000.00
        Ordinary maintenance and repair.           2, 500. 00
        Improvement and reconstruction__ 8, 000.00
                                                              36, 500. 00
                                                                               99,182. 00
           Total for all work----------------------------536,                      393. 33
  The sum of $79,500 can be profitably expended for the following
scheduled work during the fiscal year 1954:
Maintenance by hired labor:
    Operational planning_- __---------------._ -----              $2, 000
    Gages and observations.---------_...             ----------- 13, 500
    Channel patrol-----------------------------           -------  1, 000
    Biological investigations__----    _------------               2, 500
    Flood damage investigations, estimates, reporting, and
      economic justification--------       -------..--     ---     1, 500
                                                                                  $20,500
Maintenance (operating and care) :
    Schooner Bayou control structure-......   _._.---.....           29, 500
    Catfish Point control structure--------------------              29, 500
                                                                                   59, 000
      Total------------------------------------------------------                  79, 500
802           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952


                                               Cost and financial summary
                                                    UNITED STATES FUNDS

                                                          Fiscal year ending June 30-                                    Total to June
                                                                                                                        30,1952, includ-
                                                                                                                        ing fiscal years
                                           1948           1949             1950                 1951       1952          prior to 1948


New work:
   Appropriated-------.......--..------$1,300,000.00 $1,500,000.00 $800,000.00 $707,000.00                                $5, 000, 000. 00
   Cost__--------------      $338, 945. 94 413, 250. 31 1, 456., 504. 16 1, 856, 328. 38 342, 724. 49                      4, 597, 275. 41
   Expenditures--.........    352, 018. 54 365, 719. 23 1, 402, 257. 23 1, 881, 290. 16 390, 567. 92                       4, 566, 746. 05
Maintenance:
                               -
   Appropriated.....................          -          16, 163.00       60, 000.00        38, 000. 00   80, 000. 00        194,163. 00
                                 ....
   Cost--- ........-------------------------..           13, 134. 55      34, 589. 21       51, 672. 00   82, 585. 00        181, 980. 76
   Expenditures--------.........---........--------...   12, 936. 10      34, 446. 43       49, 943. 95   78, 697. 14       1176, 023. 62


Other new work data:
    Unobligated balance, June 30, 1952-------------------------- $54, 508. 05
    Unobligated balance available for fiscal year 1953------------ 54, 508.05
1Includes $13,163,        River and Harbor funds.

                                                     CONTRIBUTED FUNDS

                                                          Fiscal year ending June 30-                                    Total to June
                                                                                                                        30, 1952, includ-
                                                                                                                        ing fiscal years
                                          1948            1949             1950                 1951       1952           priorto 1948


Maintenance:
   Appropriated ---------------------------                                           .
                                                                       ----------------------               $2, 000               $2, 000
   Cost---------- ----------------------------------------------                                             2, 000                2,000
   Expenditures.........
              -------------  ------------------------------------                                            2,000                 2, 000


36. SNAGGING AND CLEARING UNDER AUTHORITY OF SECTION 2 OF
  THE FLOOD CONTROL ACT APPROVED AUGUST 28, 1937, AS AMENDED

   The Flood Control Act approved August 28, 1937, as amended by
the Flood Control Acts approved August 11, 1939, August 18, 1941,
and July 24, 1946, authorized the allotment of not to exceed $1,000,000
from flood control appropriations for any one fiscal year for the re-
moval of accumulated snags and other debris, and clearing and
straightening the channel in navigable streams and tributaries thereof,
when in the opinion of the Chief of Engineers such work is advisable
in the interests of flood control: Provided, That not more than $50,000
shall be expended for this purpose for any single tributary from the
appropriations for any one fiscal year.
   During the fiscal year approximately 1.79 miles of snagging and
clearing were accomplished in completing channel improvement of
Wallace Bayou, La.
   Contracts have been awarded, but work has not commenced, for
channel improvement of Sulphur River, Tex., miles 185 to 195; Mus-
tang Creek, Tex., miles 25.60 to 23.47; and Natalbany River, La., from
Springfield, La., to approximately 5 miles upstream.
   Plans and specifications have been prepared for channel improve-
ment of Bayou des Cyprairres, La., and work will be advertised as
soon as rights of way are made available.
   The total costs were $31,797.18; expenditures were $38,067.02.
                       FLOOD             CONTROLr--NEW                           ORLEANS,                 LA.,      DISTRICT                        803
  To date, the following work has been completed under this authori-
zation in the New Orleans district:

                                                                                               Improve-
                                         Item                                                    ment            Completion date                  Cost
                                                                                               (miles)

Barkman's Creek:
   Clearing and snagging------------------------..........................-----......           0.06-5. 2
   Excavation.............................................                                      0.0-0.06         August 1949-.......           $60,357. 27
                                                                                                5. 2-8. 69
Bayou Francois, La., clearing and snagging_----------- ----                                  0-8. 26             April 1948 ......---------.     13, 500. 00
Bayou Galion, La., clearing and snagging--__.                              ---.-.--. . _   10-18.32              September 1947 ..               25, 500. 93
Bayou L'Eau Bleu, excavation ------------------------...........................         3. 16-11. 5             September 1948 -.               44,081.19
Bayou Vincent:
   Excavation_ ......................................                                  . 0. 48-1.35             December 1947._                  13, 000. 00
   Clearing and snagging -.....                        .December                                                         1947....--              13,000.00
Cane Creek:
   Excavation (122,846 cubic yards)--------------------
                                                      ......................             2-39-3.00
                                                                                               3.90-4.75
      Clearing and snagging---------------------------...............................          3.00-3.90         August 1950-....                37, 644. 82
                                                                                               4. 75-5. 45
      Denton Creek             ..            ..          ...---------------------------------
                                                                                          0.00-0.70
    Realinement (25,763 cubic yards)..................------------------- 3.14-3.90 November 1950 ..--
Little Cypress River, Tex.            ----------------------------------- January 1951-.....                             12, 625. 92
Mustang Creek:
    Excavation ---- ..----------------------------------                      26.39-25.60    May 1948......          }25,000.00
    Clearing and snagging- ..--------------------------                       25. 60-19.90 July 1948-_-20__00.00
New River:
    Excavation .-----------------------------------                              0.00-2.22 April 1948 .......
    Clearing and snagging ........                -------------------_ 5.00-11.50 June 1948
                                           ..................
Ponchatoula Creek, clearing and snagging.....----------------                     3. 8-7. 09 May 1949- ........
                                                                                                                     J.1      -.....
                                                                                                                         31,00.00

                                                                                                                         10, 463. 53
Posten Bayou, La. and Ark.:
    Clearing and snagging- _....................                        __8. 76-12. 17
    Excavation (202,450 cubic yards) --------------------....................... 2.20-4.60April 1951--------........    46, 021.00
                                                                                               7.38-8.76
Selsers Creek,.La., clearing and snagging__...................                                         0-4.5    July 1950 .-----.......           4, 958.00
Swan Lake, Ark., clearing, snagging, and channel enlarge-                                         ()             ................
                                                                                                                       ------.                    2,200. 00
  ment.
Wallace Bayou, La., Clearing and snagging -..............          _     0.0-3.2                                September 1951....               11, 502.00
Yellow Water River, La., clearing and snagging ............------------ 0. 0-2. 75                              October 1950-.....                3, 136. 22


  I Due to high stages on Little Cypress River, it was necessary to terminate contract covering this work
by supplemental agreement on Jan. 18, 1951.
  5 The work on Swan Lake was advertised on Oct. 30, 1947; however, the bids were canceled and this work
was accomplished together with that done on Red River levees below Denison Dam.


  The total costs to the end of the fiscal year were $369,244.06 for
new work; expenditures were $368,483.92.
  The balance unexpended at end of fiscal year, $147,632.14, will be
used for accounts payable, $760.14, and accomplishing work on which
contracts have been let and plans and specifications have been
completed.
                                                     Cost and financial summary
                                                                 CONSOLIDATED

                                                                   Fiscal year ending June 30-                                          Total to June
                                                                                                                                       30,1952, includ-
                                                                                                                                       ing fiscal years
                                                  1948            1949                  1950             1951             1952           priorto 1948


New work:
   Appropriated- ........                $50,000.00          $94, 300.00 $115,000.00               $14, 305. 15 $122,009.98                    $516, 116. 06
   Cost __-............                . 114, 341.46          94, 190. 35  29, 371. 74              94, 057. 93   31, 797. 18                   369, 244. 06
   Expenditures__----.                   104, 746. 08        100, 684. 90  31, 417.06               88, 032. 67   38, 067. 02                   368, 483. 92


Other new work data: Unobligated balance, June 30, 1952                                                                -------           $61, 923. 75
804                  REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

37. PRELIMINARY                                         EXAMINATIONS, SURVEYS, AND                                                                      CONTINGENCIES
                                                           FOR FLOOD CONTROL

   The cost of work during the fiscal year was $80,080.34; expendi-
tures, $80,595.60. The balance unexpended on June 30, 1952, $8,-
643.77, plus an allotment for fiscal year 1953 of $54,000, less
outstanding liabilities in the amount of $866.61, a total of $54,777.16,
will be applied as needed during fiscal year 1953 to payment of ex-
penses incurred under this heading.
   The additional sum of $203,060 can be profitably expended during
fiscal year 1954 for the following schedule of work:
Examinations and surveys. -..--------------                                                                 ---               ----                          -------- -               $58, 500
/5(rn    C:nrrr~r.


uolLlniIilngencie
                         i: rr


                             s--,,,,,,,,,,,-,--,--,,                                                                                                                                  59, 560
Arkansas, White, Red River report_                                                        -- .----                 ._-----           -    - ..--        -         -   -         -     85, 000

                X   ULl--------,,-------------                                   ----          --      --         --     --      -       --        --        --       --    -
                                                                                                                                                                                    - 208,060

                                                                 Cost and financial summary

                                                                              Fiscal year ending June 30                                                                    Total to June
                                                                                                                                                                           30, 1952, includ-
                                                                                                                                                                           ing fiscal years
                                                            1948           1949                     1950                      1951                      1952                    priorto 1948

Maintenance:
        Appropriated......... $125, 000. 00                           $95, 000. 00          $79, 400. 00               $94, 000. 00            $53, 720.00                           $625, 370. 00
        Cost---.-----------                            109, 318.34    104, 363.72             75, 516. 53               91, 890.40                  80, 080.34                        617, 592.91
        Expenditures-........                          103, 441. 80   110, 875. 31            76, 887. 50               91, 541. 38                 80, 595.60                        616, 726. 23


                                    38. INSPECTION OF COMPLETED PROJECTS

  The cost and expenditures during the fiscal year were $15. The
balance unexpended on June 30, 1952, $1,188, plus an allotment of
$3,000, a total of $4,188, will be applied as needed during fiscal year
1953 to payment of expenses incurred under this heading.
  The sum of $3,000 can be profitably expended during fiscal year
1954 on inspection of completed works.
                                                                 Cost and financial summary

                                                                              Fiscal year ending June 30                                                                    Total to June
                                                                                                                                                                           30,1952, includ-
                                                                                                                                                                           ing fiscal years
                                                            1948            1949                    1950                      1951                      1952                    prior to 1948

Maintenance:
        Appropriated-----------------------.........           ............-------............        ------............$2, 750. 00           .....-----------                         $2, 750. 00
        Cost-----------------.................. ------------............ -----------............
                                                                                         ............                    1, 547. 00                   $15.00                            1, 562. 00
        Expenditures---------                          -----..   .------------------------                               1,062.56                           499.44                      1, 562.00
                    FLOOD CONTROL---NEW ORLEANS, LA.,                                        DISTRICT                                805
                         39. INACTIVE FLOOD-CONTROL PROJECTS

                                                                                  Cost and expenditures
                                                                For last full        to June 30, 1952                           Estimated
                       Name of project                           report see                                                      amount
                                                                  annual                                                        required to
                                                                report for-- New work                       Mainte-              complete
                                                                                                            nance

1.   Hempstead County Levee District No. 1, Ark.'t...               1941          $88,005.78 ............--                         ()
2.   Black Bayou Reservoir, La.l-.................                  1945         ......................                             660, 000
3.   Red River Parish, La.--------------------------                1939          149, 435. 04 ............                         (2)
4.   Bayou Bodcau, Red Chute, and Loggy Bayou, La.'.                1948          319, 200. 00 ............                          (2)
5.   Bayou Pierre in the vicinity of Shreveport, LaL..              1951        '243, 336. 22- ............-                         (s
6.   Colfax, Grant Parish, La.' 5_                                  1938           70,348.04 ............                           (2)
7.   Grant Parish below Colfax, La. .......-.............           1941           38, 808. 89 ............                          (2)
8.   Saline Point, La.'_--- _............
                             7         ---                          1945          123, 413. 75 ............                         (s)
9.   Bayou des Glaises, La. ....           ..................       1946          197, 237. 87 ............                         ()

     1 These projects have been incorporated in the project "Red River below Denison Dam."
     5 Completed.
  =Work not started; deferred pending further study.
  4 In addition, $87,244.11 was expended from contributed funds.
   5 Completed under provisions of section 7 of the Flood Control Act approved May 15, 1928, as amended
by section 9 of the Flood Control Act approved June 15, 1936, and included in 1939 annual report of the
President, Mississippi River Commission, page 2214.
  6 Costs in the amount of $704.97 were incurred this fiscal year for reimbursement of local interests for rights-
of-way.
  7 Previous project incorporated in project for "Mississippi River and Tributaries" by Flood Control Act
of 1946.

                                40. MISCELLANEOUS                   ACTIVITIES

Status of all investigations for flood control called for by flood-control acts and com-
                                   mittee resolutions

                                                                                Date trans-                Document  Recom-
                 Locality                      Authorization act                 mitted to                   No.    mendation
                                                                                 Congress



Amite River and tributaries, La.           River and Harbor         Act,   I.                .------   I    -----............
 (flood control, irrigation, naviga-        Mar. 2, 1945.
tion, and drainage, and for the
prevention of stream pollution
and salt-water intrusion).
Amite River and tributaries, La.           Flood Control Act, Dec.-..............
 (flood control, rice irrigation,            22, 1944.
navigation, pollution, salt-water
intrusion, and drainage).
Arkansas, White. and Red River             Flood Control Act, May 17,       .-----------
basins, Ark., La., Okla., Tex.,             1950.
N Mex., Colo., Kans., and Mo.
Assumption Parish, Bayou Boeuf,            River and Harbor         Act,    ..........----
     La., in the interest of navigation,    Mar. 2, 1945.
  flood control, beneficial uses of
  water, malarial control, and pre-
  vention of stream pollution in
  Bayou Lafourche, La., from
  Donaldsonville to the intra-
  coastal Waterway and of the loca-
  tion of locks at the head of Bayou
  Lafourche at or near Donaldson-
  ville.
Atchafalaya (east) Basin protection ......----              do---------------....................-------............
levee, all streams and bayous in
  Louisiana, east to the Mississippi
  River.
     Do ...----------------------..................... Flood Control Act, Dec.
                                                         22, 1944.
Atchafalaya (west) Basin protec- .--- do--                                -------
                                                                   .---------
  tion levee, all streams and bay-
  ous in southwest Louisiana west
of and south of latitude of Boyce.
806         REPORT OF CHIEF OF ENGINEERS, U. S., ARMY, 1952

Status of all investigations for flood control called for by flood control acts
                     and commnittee resolutions-Continued

                                                                             Date trans-          Document    Recom-
              Locality                       Authorization act               mitted to              No.      mendation
                                                                              Congress

Atchafalaya River, La., Morgan          River and Harbor Act, ...............-............
  City to the Gulf of Mexico $ (par-     Mar. 2, 1945.
  tial report, all streams and bay-
ous between East Atchafalaya
  Basin protection levee and Mis-
sissippi River).
                                        Flood Control Act, Dec.
    Do-----....................---------....-------
                                         22, 1944.
Avoyelles (south central) and east-     House Public Works Com-
  ern Rapides Parishes, La., area,       mittee resolution, Oct.
  Mississippi River, as drained by       16, 1951.
  Bayous des Glaises diversion
  channel, and Lake Long and trib-
  utaries, for improvement of flood
  control and drainage.
Black Bayou, Terrebonne Parish,         Flood Control Act, Dec.          ---------------
  La., for flood control and drain-      22, 1944.
  age.s
Black Cypress and Cypress Rivers        River and Harbor Act,             --------------
  via Waterway from Shreveport,          Aug. 26, 1937.
  La., to Jefferson Tex.'
Black Cypress River, Tex., and          River and Harbor Act,            ---------------

  La., on Jefferson, Tex., Shreve-       June 20, 1938.
  port, La., waterway.'
Bodcau Bayou, Ark., and La.,            Flood Control Committee              -------------
  construction of reservoir at           resolution, May 2, 1946.
  Braley Bridge or at Mars Hill in
  Lafayette County, Ark.'
Boeuf Bayou, Assumption Parish,         River and Harbor Act,
  La., in the interest of navigation,    Mar. 2, 1945.
  flood control, beneficial uses of
  water, malarial control, and pre-
  vention of stream pollution in
  Bayou Lafourche, La., Donald-
  sonville to the Intracoastal Water-
  way.
Caddo Lake Dam and Jefferson-           Flood Control Act, June          _         -   --   _,-
                                                                                             -


Shreveport Waterway, La., and            22, 1936.
Tex., on Red River.
Calion Lake, Ark., for flood protec-    Flood Control Committee          ---------------
tion, Ouachita River and tribu-          resolution, Nov. 15, 1945.
taries.
Chevreuil Bayou, La., for flood         Flood Control Act, Dec.          ---------------

control, drainage and incidental         22, 1944.
shallow-draft navigation.
Coushatta, La., on Red River;           House Public Works Com-
vicinity of, for flood control,
drainage, and other purposes. 2
                                         mittee resolution, Apr.
                                         21, 1950.                       ---------,,,
Cypress and Black Cypress River,        River and Harbor Act,
reservoirs in Jefferson, Texas-         Aug. 26, 1937.
  Shreveport, La., waterway.'                                                  ,,,----
                                                                         -------



Cypress River above Jefferson,          River and Harbor Act,
Tex., establishment of reservoirs       Aug. 30, 1935.
on Jefferson-Shreveport water-
  way.1
Cypress River, Tex., and La.,           River and Harbor Act,            --------------- ,
water supply reservoir in Jeffer-       June 20, 1938.
son-Shreveport waterway.'
Donaldsonville, Bayou Lafourche,        River and Harbor Act,
La.,to the Intracoastal Waterway        Mar. 2, 1945.
via Bayou Boeuf, Assumption
Parish, or other streams in the
interest of navigation, flood
control, etc.
DuLarge Bayou, La., outlet to           River and Harbor Act,
Gulf of Mexico for shrimp vessels       Mar. 2, 1945; and Flood
of 6- or 7-foot draft ' (partial        Control Act, Dec. 22,
report Louisiana, all streams           1944.
and bayous east of east Atcha-
falaya Basin protection levee).
   See footnotes at end of table.
                  FLOOD CONTROL---NEW                     ORLEANS,           LA., DISTRICT            807
Status of all investigations for flood control called for by flood control acts
                     and committee resolutions--Continued

                                                                         Date trans-    Document  Recom-
               Locality                       Authorization act           mitted to     Do.      mendatlon
                                                                          Congress

Grand Caillou Bayou, La., outlet         River and Harbor Act,
   to Gulf of Mexico for shrimp            Mar. 2, 1945; and Flood
   vessels of 6- or 7-foot drafta          Control Act, Dec. 22,
    (partial report Louisiana all          1944.
   streams and bayous east of East
   Atchafalaya Basin protection
   levee).
Houma, La., outlets to open waters            do----------------......................----.............
   of Gulf of Mexico, to accommo-
   date vessels of shrimp trawler
   type of 6- or 7-foot draft (via
   Bayous Terrebonne, Petit Cail-
    lou, Grand Caillou and DuLarge,
   Terrebonne Parish, La.) s (par-
   tial report, Louisiana, all streams
   and bayous east of Atchafalaya).
Jefferson-Shreveport Waterway;            River and Harbor Act, ............
   Tex., and La., enlarging project         Aug. 30, 1935.
  and establishing reservoirs in
   Cypress1 and Black Cypress
    Rivers.
Jefferson-Shreveport Waterway;            River and Harbor Act, ..............
   Tex., and La., thence via Red           Aug. 26, 1937.
    River to Mississippi         River,
   including reservoirs in Cypress
   and Black Cypress Rivers.'
Jefferson-Shreveport Waterway;            River and Harbor Act,
    Tex., and La., thence via Red          June 20, 1938.
    River to Mississippi River,
   survey for navigation, flood
    control, water power and irri-
   gation, including water supply
   reservoirs in Cypress and Black
   Cypress Rivers.1
Lafourche       Bayou,    La.,
   Donaldsonville to the Intra-
                                   from   River and Harbor Act,
                                           Mar. 2, 1945.
                                                                      I-------------
                                                                       ....
  coastal Waterway via Bayou
   Boeuf, Assumption Parish, or
  other streams, for navigation,
  flood control, beneficial uses of
  water, malarial control, preven-
  tion of stream pollution, and of
  the location of locks at the head
  of said bayou at or near Donald-
  sonville, La.
Loggy Bayou,  1    Red River, La.,        Flood Control Act, June
  east bank.                               28, 1938.
Louisiana, all streams and bayous         River and Harbor Act,       ---------------
  between East Atchafalaya Basin            Mar. 2, 1945.
  protection levee and Mississippi
   River (flood control, irrigation,
  navigation, and drainage, and for
  the prevention of stream pollu-
  tion and salt-water intrusion).
Louisiana, all streams and bayous         Flood Control Act, Dec.
  between East Atchafalaya Basin           22, 1944.
  protection levee and Mississippi
   River (flood control, rice irriga-
  tion, navigation, pollution, salt-
  water intrusion and drainage).
Louisiana, all streams and bayous         River and Harbor Act,        ...
  in southwest part, west of West          Mar. 2, 1945.
  Atchafalaya Basin protection
  levee, and south of latitude of
   Boyce (flood control, irrigation,
  navigation and drainage, and for
  the prevention of stream pollu-
  tion and salt-water intrustion).
Louisiana, all streams and bay-           Flood Control Act, Dec.
  ous in southwest part, west of            22, 1944.
  West Atchafalaya Basin protec-
  tion levee, and south of latitude
  of Boyce (flood control, rice irri-
  gation, navigation, pollution,
  salt-water intrusion, and drain-
  age).
    See footnotes at end of table.
808        REPORT       OF CHIEF OF ENGINEERS,                   U.   S. ARMY,       1952

Status of all investigations for fltod control called for by flood control acts
                    and committee resolutions---Continued

                                                                  Date trans-   Document     Recom-
             Locality                    Authorization act         mitted to       No.       menda-
                                                                   Congress                   tion
Mermentau River and tributaries, House Public Works Com- . . - -- - -- - ............
La., additional improvements in        mittee resolution, July
the interest of navigation, drain-     13, 1949.
age, flood control, and salt water
control.
Mississippi River, all streams and River and Harbor Act,
bayous in Louisiana, west of, to       Mar. 2, 1945; and Flood
the Atchafalaya (east) Basin pro-      Control Act, Dec. 22,
tection levee, (navigation, flood      1944.
control, etc.).
Mississippi River, eastern Rapides House Public Works Com-
and south central Avoyelles Par-       mittee resolution, Oct.
ishes, La., area, as drained by        16, 1951.
Bayou des Glaises diversion
channel and Lake Long and trib-
utaries, for improvement of flood
control and drainage.
Morgan City, La., to Gulf of Mexico River and Harbor Act,
via Atchafalaya River 3 (partial       Mar. 2, 1945; and Flood
report all streams and bayous          Control Act, Dec. 22,
between East Atchafalaya Basin         1944.
protection levee and Mississippi
  River.)
Orleans Parish, La., Lake Pont- Senate Public Works Com-
chartrain with respect to flood        mittee resolution, Jan.
control, navigation, and beach         28, 1949.
erosion control.
Ouachita River and tributaries for Flood Control Committee
flood protection, Calion 2      Lake,  resolution, Nov. 15, 1945.
Ark., development of.
Petit Caillou Bayou, La., outlet to River and Harbor Act,
  Gulf of Mexico for shrimp vessels     Mar. 2, 1945.
of 6- or 7-foot draft (partial report
Louisiana, all streams and
bayous east of East Atchafalaya
Basin protection levee).
Petit Caillou Bayou, La., outlet to Flood Control Act, Dec.
  Gulf of Mexico for shrimp vessels     22, 1944.
of 6- or 7-foot draft (partial report
Louisiana, all streams and
bayous east of East Atchafalaya
Basin protection levee).
Pontchartrain Lake with respect to Senate Public Works Com-
flood control, navigation, and         mittee resolution, Jan.
beach erosion control in Orleans       28, 1949.
Parish, La.
Rapides (eastern) and south cen- House Public Works Com-
tral Avoyelles Parishes, La.,          mittee resolution, Oct.
area, Mississippi        River, as     16, 1951.
drained by Bayou des Glaises
  diversion channel and Lake Long
and tributaries, for improvement
of flood control and drainage.
Red, Arkansas and White River Flood Control Act, May ----------- ,----------------
  Basins, Ark., La., Okla., Tex.,        17, 1950.
N. Mex., Colo., Kans., and Mo.'
Red River, Ark.' ................      Flood Control Act, May ---------------- -----------
                                        6, 1936.
    D o. 1..- .....--------- .-..- .-- Flood Control Act, June
                                        22, 1936.
Red River, La., Ark., Okla., and Rivers and Harbors Com-
Tex., for navigation, flood con-       mittee resolution, Feb.
trol, water power and irrigation.'     25, 1938.
Red River, La., east bank of, Flood Control Act, June
from hill line of south bank of        28, 1938.
Loggy Bayou, thence along east
bank of Red River to Coushatta
Bayou, Red River Parish.'
Red River, La., in vicinity of House Public Works Com-
Coushatta, La., for flood control,     mittee resolution, Apr.
drainage and other purposes.'          21, 1950.
Red River, La., Ark., Okla., and Flood Control Committee
Tex., and connecting waterways,        resolution, Jan. 26, 1939;
singly or together for navigation,     Rivers and Harbors Com-
flood control, and irrigation.'        mittee resolution, Jan.
                                        24, 1939; Commerce Com-
                                        mittee resolution, Feb. 8,
                                        1939.
   See footnotes at end of table.
                   FLOOD CONTROL---NEW                              ORLEANS,               LA.,    DISTRICT           809
Status of all investigations for flood              control called for by-                              food   control acts
                                   and committee resolutions--Continued

                                                                                          Date trans-   Document  Recom-
                 Locality                            Authorization act                    mitted to       No.    mendaton
                                                                                           Congress

Red River, Okla., Tex., Ark., and               Senate Public Works Com-
  La., downstream from Denison                   mittee resolution, Oct.
  Dam, for bank stabilization.                   11, 1951.
Shreveport-Jefferson Waterway and               Flood Control Act, June
  Caddo Lake Dam, La., and Tex.'                  22, 1936.
Shreveport-JeffersonWaterwayLa.,                River and Harbor Act,                -------------
  and Tex., via Red River to                      Aug. 26, 1937.
  Mississippi River, including reser-
  voirs in Cypress and Black
  Cypress Rivers.,
Shreveport-JeffersonWaterway La.,               River and Harbor Act,
  and Tex., thence via Red River                 June 20, 1938.
  to Mississippi River survey for
  navigation, flood control, water
                                                                                    ---------------
  power and irrigation, including
  water supply reservoirs in Cy-
  press and Black Cypress Rivers.'
Sulphur River, Ark.--------..............       Flood Control Act, June
                                                  22, 1936.
     Do. I                                      Flood Control Act, Aug.
                                                  28, 1937.
Sulphur River, Tex.l...............             Flood Control Act, June
                                                  28, 1938.
     Do.   l   ........................         River and Harbor Act,
                                                  June 22, 1936.
Sulphur River, Tex., and Ark.,                  River and Harbor Act,
improvement for navigation,          1           June 20, 1938.
flood control, and water power.
Tangipahoa River and tributaries, River and Harbor Act,
  Louisiana (flood control, irriga-        Mar. 2, 1945.
tion, navigation, and drainage,
and for prevention of stream
pollution and salt-water intru-
sion).
Terrebonne Bayou, La., outlet ..... do........----------------I------.....-----........
to Gulf of Mexico for shrimp
vessels of 6- or 7-foot draft,a partial
report Louisiana, all streams and
bayous east of East Atchafalaya
Basin protection levee.
    Do. a........ .. ........            Flood Control Act, Dec.
                                                 22, 1914.
White, Arkansas and Red River                   Flood Control Act, May
Basins, Ark., La., Okla., Tex.,                 17, 1950.
N. Mex., Colo., Kans., and Mo.'

   1Incorporated in a comprehensive report on Red River and tributaries, Louisiana, Arkansas, Oklahoma,
and Texas, for navigation, flood control, power, and irrigation, which has been prepared by the Board of
Engineers for Rivers and Harbors.
  2 To be incorporated in the comprehensive report on the Arkansas, White, and Red River Basins for the
conservation and development of land and water resources, which will be prepared in the Arkansas-White-
Red office, Southwestern division, Corps of Engineers, U. S. Army, Tulsa, Okla.
  a To be reported upon as a separate report as a part of "All streams and bayous in Louisiana lying between
the East Atchafalaya Basin protection levee and the Mississippi River" authorized by River and Harbor
Act of March 2, 1945, and Flood Control Act of December 22, 1944.
  4 To be included in report "All streams and bayous in southwest part of Louisiana west of West Atchfalaya
Basin protection levee" authorized by River and Harbor Act of March 2, 1945, and Flood Control Act of
December 22, 1944.
   bA coordinated comprehensive report under preparation by Federal and State agencies for the conserva-
tion and development of land and water resources.

41. EMERGENCY FLOOD-CONTROL WORK UNDER AUTHORITY           OF
  PUBLIC LAWS 138 AND 318, 78TH CONGRESS, PUBLIC LAW 75, 79TH
   CONGRESS; AND PUBLIC LAWS 102 AND 858, EIGHTIETH CONGRESS

    Because of the heavy demands for emergency repair work to flood-
control structures damaged or destroyed by the disastrous spring
floods which occured in recent years, Congress in acts listed here-
810             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                 1952

under authorized the appropriation of the amounts shown as emer-
gency funds to be expended under the direction of the Secretary of
War and the supervision of the Chief of Engineers for the repair,
restoration, and strengthening of levees and other flood control works
which had been threatened or destroyed by these floods, or which
may be threatened or destroyed by later floods, including the raising,
extending, or other modification of such works as may be necessary.
  Pursuant to these acts, the amount of $8,927,557.57 was allotted
to the New Orleans district for emergency flood-control work,
$8,860,440.57 prior to June 30, 1951, and $67,117 subsequent to that
date.
  During the fiscal year the following work was completed, at a cost
of $258,237.68 for maintenance:
                                                                            Linear feet
                                    Item                                    of improve-          Commenced                    Completed
                                                                                ment

Contract:
    Armistead, La., standard board revetment,                    2, 867                       August 1951, ......        November 1951.
      R-225.5-R.
    Barbins levee setback, R-68.7-R----------------              2, 537                      October 1951......          December 1951.
    Emmet-Robinson Place levee setback, R-257.5-R.               3, 061                      August 1951-.....           September 1951.
    LaPrairie levee setback, R-54.2-R-----------
                                         ...........---          1, 940                      November 1951....           November 1951.
    Lucas Bend, pile dike repairs, 295.5-R......------------............                     May 1952-.........          May 1952.
    State Line levee setback, R-369.6-L-......-...               4, 052                      May 1952 ......... -        In progress.
    Westdale levee setback, R-265.5-R------..           -------- 3, 365                      April 1952-..-.-.           May 1952.
Hired labor:
    Levee repairs, Lamar County Levee Improve-                      747                      June 1952.........          June 1952.
      ment District No. 1, Texas, NS-3.5-R.

  Delayed costs for work accomplished in previous fiscal year
amounted to $815.
  The total costs during the fiscal year were $259,052.68; expenditures
were $239,565.70.
  The total costs to June 30, 1952, under this authorization were
$8,874,263.45, of which $2,041,230.10 was for new work and
$6,833,033.35 for maintenance. The expenditures were $8,854,044.22.
  The balance unexpended at the end of the fiscal year, amounting to
$73,513.35, will be used for accounts payable, $20,219.23, and for com-
pleting work in progress.
                                                  Cost and financial summary
                                                              CONSOLIDATED

                                                                   Fiscal year ending June 30                                  Total to June
                                                                                                                              30,1952, includ-
                                                                                                                              ing fiscal years
                                              1948                1949          1950             1951            1952           priorto 1948

New work:
   Appropriated ........                 -$83,940.77 -$11,031.12 _-.----.-.             -- $1, 121.32 .........------------     $2, 041, 230. 10
   Cost .--------------..                  21, 119. 66 --.........__...................                    ........              2, 041, 230. 10
   Expenditures                ..          24, 015. 21        422. 00 .......--------------------------------                    2, 041, 230. 10
Maintenance:
   Appropriated ........      -           753, 940. 77 1,084,672.12 $208, 336. 02            556, 041.96       67, 117. 00       6, 886, 327. 47
   Cost..........--------------....--.    540, 096. 12 277, 761. 52 1,043,396.44             523, 832. 75     259, 052. 68       6, 833, 033. 35
   Expenditures- ........----             522, 162. 39 295, 664. 65 1,043,424.16             523, 103. 38     239, 565.70        6, 812, 814. 12


        ubaw
          No.                            Date approved                                        Congress                          authorzed

               138      July 12, 1943.........-----------------..--- Seventy-eighth------- _..---------                           $10,000,000
               318      May 29, 1944........              ....-----------------------
                                                                               do.----------------------------                     12, 000, 000
                75      June 5, 1945-------------------- Seventy-ninth..--------------------                                       12, 000, 000
               102      June 23, 1947                                        Eightieth    ------------------------                 15. 000, 000
               858      June 30, 1948_                      ---          ----     do-..
                                                                                  _..   .....          ..--      ---               25, 000, 000
                  FLOOD         CONTROI-NEW                      ORLEANS,            LA.,      DISTRICT                811
42. EMERGENCY BANKI PROTECTION WORK UNDER AUTHORITY OF
   SECTION 14 OF THE FLOOD CONTROL ACT APPROVED DECEMBER 22,
   1944, AS AMENDED

    The Flood Control Act approved December 22, 1944, as amended by
the Flood Control Act approved July 24, 1946, authorized the allot-
ment from flood-control appropriations of not to exceed $1,000,000 per
year for construction of emergency bank protection works to prevent
flood damages to highways, bridge approaches, and public works,
when, in the opinion of the Chief of Engineers, such work is advis-
able: Provided, That not more than $50,000 shall be allotted for this
purpose at any single locality from appropriations for any one fiscal
year.
    Pursuant to this authorization the amount of $250,286.97 has been
allotted to the New Orleans district for emergency bank-protection
work, $160,000 prior to June 30, 1951, and $90,286.97 subsequent to that
date. In addition, $50,000 was contributed by local interests.
    During the fiscal year the following work was completed by
contract :

                                                                     Linear feet
                               Item                                  of improve-        Commenced              Completed
                                                                         ment

Armistead, La., standard board revetment, R-244.0-R__                       1, 406    February 1952_____      April 1952.
Coushatta, La., standard board revetment, R-239.8-L___                         836    March 1951._.....       August 1951.
Hanna, La., pile dike construction, D-237.8-R-..........                    2, 483    February 1952.....      June 1952.


   The Government costs for the fiscal year were $98,598.50, all for new
work; expenditures were $112,634.34. In addition, costs and expendi-
tures from contributed funds amounted to $16,978.50.
  The total Government costs under this authorization to the end of
the fiscal year were $245,424.97; expenditures were $238,034.13. In
addition, costs and expenditures from contributed funds amounted
to $45,138.
   The balance unexpended at the end of fiscal year, $7,390.84, will be
used for accounts payable.
                                         Cost and financial summary
                                                    CONSOLIDATED


                                                       Fiscal year ending June 30                              Total to June
                                                                                                              30,1952, includ-
                                                                                                              ing fiscal years
                                      1948            1949          1950             1951          1952        priorto 1948


New work:
    Appropriated--------.......        $35, 000   $25, 000.00    $50, 000.00    $50, 000.00    $90, 286. 97       $250,286, 97
    Cost__..__---.............
                    ---.......------------         36, 798. 43    13, 488. 54    96, 539. 50    98, 598. 50      1245, 424. 17
    Expenditures------......------------.
                                ...........        25, 958. 77    24, 328. 40    75, 112. 82   112, 634. 34      1 238, 034. 13

1 Not including costs and expenditures of $45,138 from contributed funds.
812             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                             1952

43. E1MERGENCY FLOOD-CONTROL WORK UNDER AUTHORITY OF
  SECTION 5 OF THE FLOOD CONTROL ACT APPROVED AUGUST 18,
  1941, AS AMENDED

  The Flood Control Act of August 18, 1941, as amended by section 12
of the Flood Control Act of 1946, section 206 of the Flood Control Act
of 1948, and further amended by section 210 of the Flood Control Act
of 1950, authorized an emergency fund in the amount of $15,000,000
to be expended in rescue work or in the repair, restoration or mainte-
nance of any flood-control work threatened or destroyed by flood,
including the strengthening, raising, extending, or other modification
thereof as may be necessary in the discretion of the Chief of Engineers
for the adequate functioning of the work for flood control.
   During the fiscal year the following work was completed under this
authority, by contract, at a cost of $77,126 for maintenance:

                                                                 Linear feet
                                    Item                        of improve-       Commenced              Completed
                                                                    ment

Bargetown levee setback, R-365.5-R ...............                    4, 665   March 1952-.......     May 1952.
                                      _400
Cockfield levee setback, R-187.5-R ................                            May 1952 ....... -     In progress.
Long Point levee setback, R-289.0-R ---------------                   2, 563   April 1952 ........    May 1952.
Lucas Bend, pile dike repairs, 295.5-R-------------.............               May 1952_-___-         May 1952.
Red Lake levee setback, R-440.1-R--------------.................      5, 648   February 1952....      June 1952.



The expenditures were $71,729.22.
   The total costs to June 30, 1952, under this authorization were
$611,739.24, of which $213,000 was for new work and $398,739.24 for
maintenance. The expenditures were $606,342.46.
   The balance unexpended at the end of the fiscal year, amounting
to $84,379.78, will be used for accounts payable, $5,396.78, for comple-
tion of work at Cockfield, La., now in progress, and for delayed costs
of work completed during this fiscal year.
                                              Cost and financial summary
                                                        CONSOLIDATED


                                                         Fiscal year ending June 30                       Total to June
                                                                                                         30, 1952. includ-
                                                                                                          ing fiscal years
                                           1948         1949        1950          1951         1952         priorto 1948

New work:
     Appropriated-----------.....                 -----------------------------------------------                    00
                                                                                                              $213,000.
   Cost ----------------------- ------------------------------   ----------- 213,000.00
   Expenditures-------- -----------------   ----------------------------     213,000.00
Maintenance:
     Appropriated .--------$2, 800. 00                            $302,663. 98
                                                     ......----------                ___----------$174,
                                                                                               23.74           503, 697. 72
     Cost ...-----------   _ 2, 999. 99               $5, 560. 70 ;01, 288. 71--.--- _--- 77,126.00            398, 739. 24
     Expenditures--.. .--- _ 5,150.11                  4, 052.49 301, 288. 71 ------------ 71, 729.22          393, 342.46



44. SMALL FLOOD CONTROL PROJECTS UNDER AUTHORITY OF SEC-
   TION 205 OF THE FLOOD CONTROL ACT APPROVED JUNE 30, 1948,
   AS AMENDED
   The Flood Control Act approved June 30, 1948, as amended by the
Flood Control Act approved May 17, 1950, authorized the allotment of
not to exceed $3,000,000 from flood control appropriations for any
             FLOOD     CONTROL---NEW          ORLEANS,        LA.,   DISTRICT              813
one fiscal year for the construction of small flood-control projects not
specifically authorized by Congress, and not within areas intended
to be protected by projects so authorized, which come within the
provisions of section 1 of the Flood Control Act of June 22, 1936,
when in the opinion of the Chief of Engineers such work is advisable
Provided, That not more than $150,000 shall be allotted for this pur-
pose at any single locality from the appropriations for any one fiscal
year, and that the work shall be complete in itself and not commit the
United States to any additional improvement to insure its successful
operation.
   During fiscal year 1951, $100,000 was allotted for snagging and
clearing Bayou Rapides, La., between miles 3.2 and 25.4, and during
the fiscal year 1952, $2,000 was allotted for preparation of report on
Bayou Choupique, La.
   Approximately 19.82 miles of Bayou Rapides were cleared this
fiscal year, the work having been initiated during previous fiscal year
and completed on December 15, 1951. Report on Bayou Choupique,
La., is in progress.
   The costs at the end of the fiscal year were $88,284; the expenditures
were $93,593.38.
   The total costs to the end of the fiscal year under this authority
were $95,357; expenditures were $95,335.18.
   The balance unexpended at the end of the fiscal year, $1,843.82, will
be used for completing the report on Bayou Choupique.
                             Cost and financial summary
                                      CONSOLIDATED


                                       Fiscal year ending June 30                 Total to June
                                                                                  30, 1952, includ-
                                                                                  ing fiscal years
                          1948        1949       1950         1951      1952        priorto 1948

New work:
   Anoropriated--------
                ........-.     ------------------------
                                                      -- $100,
                                                             000.00 $2,000.00         $102, 000. 00
   Cost --------.------------------------------------ 7,073.00 88,284.00                95,357.00
   Expenditures----..----- -----              ------------ 1,741.80 93, 593. 38
                                    -----------                                         95, 335. 18


Other new work data :
    Unobligated balance, June 30, 1952__ _____       _____-_-_____              _ $6, 142. 00
    Unobligated balance available for fiscal year 1953 --                           6, 142.00=
                                                                               _--------




      245554-53-vol. 1-          52
    IMPROVEMENT OF RIVERS AND HARBORS IN THE
            VICKSBURG, MISS., DISTRICT

   This district comprises a very small portion of southwestern Ten-
nessee, western Mississippi, southern Arkansas, and northeastern Lou-
isiana as embraced in the drainage basins of the eastern tributaries
of the Mississippi River south of Horn Lake Creek to and including
Buffalo River, and of the western tributaries from and including the
Arkansas River from a point 3 miles upstream from Pine Bluff, and
the Ouachita and Black Rivers and tributaries in Arkansas and
Louisiana.
   District engineer: Lt. Col. G. F. Dixon, Jr., Corps of Engineers,
to July 8, 1951, and since October 10, 1951; Lt. Col. Roy D. McCarty,
Corps of Engineers (acting) from July 9, 1951 to October 9, 1951.
   Division engineer of the Lower Mississippi Valley division, Vicks-
burg, Miss., comprising the New Orleans, La., Vicksburg, Miss., and
Memphis, Tenn. districts: Brig. Gen. P. A. Feringa, Corps of Engi-
neers.
                                    IMPROVEMENTS

              Navigation                            Flood control--Continued
                                      Page                                        Page
1. Arkansas River and tribu-                13. Local protection, Pine Bluff,
      taries, Arkansas and Okla-                   Ark__                     _    831
      homa                            815    14. Bayou Bartholomew, Arkansas
2. Ouachita and Black Rivers,
      Arkansas and Louisiana
3. Examinations, surveys, and
                                  -   816
                                                   and Louisiana
                                             15. Existing levees and flood
                                                   walls and extensions there-
                                                                                  832

      contingencies (general)---      820          to from Bastrop, La. to
4. Plant allotment .... ____. _      821          mouth of Boeuf River and
5. Inactive navigation projects      821          at West Monroe, La ....        833
6. Miscellaneous activities ....     822    16. Bawcomville, La_ .........       834
                                             17: Jonesville, La___                835
             Flood control                   18. Big Black River, Miss .....      837
                                             19. Homochitto River, Miss____       838
7. Ouachita River and tributar-             20. Snagging and clearing under
       ies, Arkansas and Louisi-                   section 2 of the Flood Con-
       ana -     -       -            822          trol Act approved August
8. Blakely Mountain Dam on                        28, 1937, as amended ..        840
       Ouachita River, Ark._ _        823    21. Preliminary examinations,
9. DeGray Reservoir, Caddo                        surveys, and contingencies
       River, Ark_____                826          for flood control_ __..        841
10. Little Missouri River Basin,             22. Inactive flood-control proj-
       Ark_                           827          ects_                          841
11. Murfreesboro Reservoir                   23. Miscellaneous activities .. __   842
       Muddy Fork (Little Mis-               24. Emergency flood-control
      souri River, Ark.)-......       830          work                           843
12. Calion, Ouachita River, Ark_      830

1. ARKANSAS RIVER AND TRIBUTARIES, ARKANSAS AND OKLAHOMA

  A consolidated report on this project for the Vicksburg, Little Rock
and Tulsa districts, submitted by the Little Rock district, Southwest-
ern division, is on page 992.
                                                                           815
816    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

          2. OUACHITA AND BLACK RIVERS, ARK. AND LA.

   Location.-Ouachita River rises in Polk County, Ark., and flows
about 600 miles in a general southeasterly and southerly direction
through Arkansas and Louisiana. It is joined by Tensas and Little
Rivers at Jonesville, La., below which place it is called Black River,
and enters Red River 35.5 miles above its mouth. (See Mississippi
River Commission alluvial valley map and Moro Bay, Ingalls, Strong,
Felsenthal, Haile, Drew, Monroe, Columbia, Fort Necessity, Harrison-
burg, Manifest, Tooleys, and Deer Park quadrangle maps.)
   Previous projects.-The project was adopted by the River and
Harbor Acts of March 3, 1871, June 10, 1872, August 14, 1876, and
July 5, 1884. A separate project for work in the Ouachita River be-
tween Camden and Arkadelphia was adopted by the River and Harbor
Act of August 11, 1888. For further details, see page 1869 of the
annual report for 1915, and page 900 of the annual report for 1938.
   Existing project.-This provides for a navigable depth of 61/2 feet
at low water from the mouth of Black River, La., to Camden, Ark.,
a distance of 351 miles, by the construction of six locks and dams,
with necessary dredging, and for removal of logs, wrecks, and over-
hanging trees, etc., between mouth of Black River and Arkadelphia,
Ark., 417 miles, and for a channel 7 feet deep and of suitable width
from the improved channel of the Ouachita River above dam No. 6
to the vicinity of the railroad bridge over Lake St. Mary, thence a
canal of the same depth and 70 feet in width along the south side of
the railroad embankment to high ground with a suitable turning basin
near Felsenthal, a distance of 3,600 feet. The project also provides for
operation and care of all locks and dams included therein.
   The River and Harbor Act of May 17, 1950, authorized the modifica-
tion of the existing project and the project for the Red River below
Fulton, Ark., to provide a channel 9 feet deep and 100 feet wide from
the authorized 9-foot navigation project at mile 31 on the Red River
to the mouth of Black River at mile 35.5, thence from the mouth of
Black River to Camden, Ark., mile 351 on the Ouachita River, to be
obtained by lengthening and deepening the six existing locks, channel
realignment, cut-offs where necessary, rehabilitation of the dams,
dredging and contraction works, including the deepening of the Fel-
senthal Canal below the present authorized depth.
   The location and description of the locks and dams which are in-
cluded in the project are contained in the table following:
                                                                      Locks and dams, Ouachita River, Ark. and La.

                                                                      Great-          Depth
                                             Dis- Above                 es              on                                                                    Year       Year
                                            tance mouth                       Lift at miteroCha                    Kind
No.
No.            Location                     from     of       ch lock able
                                                              of       ale     low    sill at  foondationof
                                                                                              Character             dam of         Type of construction        to        corn-       Cost
                                           nearest Black      cha-    length water normal        undation           dam                                       navi-      ple-                        -
                                            town   River          er  forpool                                                                                gation      tion
                                                                      of lock

                                            Miles    Miles     Feet    Feet   Feet     Feet
   2   Harrisonburg, La.........             0.1      73. 3      55     268    14. 4    6. 9 Piling in clay-...._   Movable- _ Concrete Poiree needle dam;     1918      1921          394.69
                                                                                                                                                                                   $470,
                                                                                                                                steel mitering lock gates.
  3    Riverton, La------------             2.0      134. 0      55     268    14. 8    6. 5 Piling in sand........do----.......----do.--                      1919
                                                                                                                                                    .-----------------   1920         681, 072. 84
  4                     ..-----------.......4. 0
       Monroe, La-......--                           178.1       55     268     8. 9    6. 5 .... do . ..........do__---- ----... do_.....            ..       1915      1915    1 1, 225, 813. 23
  5    Sterlington Reach, La....             .6      208. 3      55     268     6. 9    6.6 Piling in clay........do---......  Concrete Chanoine wicket        1924      1926         901, 096. 17
                                                                                                                                dam; steel mitering gates.
   6   Near Felsenthal, Ark.....              3. 3   238. 7      55     268     9. 7    7. 6 Piling in sand-.....-.. do-....------....do..___----.             1913      1923      * 914, 844. 67
   8   Near Calion, Ark--------.........     10.5    297. 5      55     268    13. 5    6. 5 Piling in clay       -  do..........
                                                                                                                     do.....
                                                                                                                        --...        ------------
                                                                                                                                  do................-------1912          1926      3915, 445. 96
  1 Includes cost of original structure completed in 1915 at a cost of $641,630.23. Dam failed  ' Includes cost of original structure to June 30, 1919 ($559,539.34), and the cost of modifi-
Aug. 10, 1917, and was rebuilt 1918-22 at a cost of $584,183 under permanent indefinite cations to permit elimination of lock and dam 7 ($355,305.33).
appropriation for operating and care of canals. Type of dam now is concrete Poriee              aIncludes actual cost of original structure to June 30, 1919 ($592,922.43), and the cost of
needle pass and Chanoine wicket weir.                                                          modification to permit elimination of locks and dams 7 and 9 ($322,523.53).               -
818           REPORT OF CHIEF OF ENGINEERS,                                       U. S. ARMY, 1952

   Floods ordinarily cause fluctuations of stage from 25 to 45 feet
between high and low water. Extreme floods occasionally increase
this range about 10 feet. The flood of March-April 1945 produced
crest stage at Monroe, La., 0.7 foot higher than the maximum pre-
viously recorded.
  The latest approved (1952) estimate of cost for new work is
$17,388,000 which includes $58,000 for Felsenthal Canal. The latest
approved (1952) estimate of cost for annual maintenance is $500,000.
  The existing project was authorized by the following river and
harbor acts:
       Acts                             Work authorized                                           Documents

Mar.     3,1871    Open-channel work from Arkadelphia to the mouth__                   H. Ex. Doec. 60, pt. 4, 41st Cong.,
                                                                                         3d sess., Annual Report 1876
                                                                                         p. 336.
July 5, 1884       Extension of open-channel work into Black River_____                Annual Report, 1883, p. 1155.
June 13,1902       Construction of locks and dams 4 and 6 (canalization                Specified in act.
                     work based on report contained in H. Doc. 448,
                     57th Cong.; 1st sess.; Annual Report 1902, p. 1435).
Mar.     2, 1907   Construction of locks and dams 2 and 8; elimination                     Do.
                     from the plan of lock and dam 1.
June 25, 1910      Obtaining sites for locks and dams 3 and 7-..........----------.. Do.
July 25,1912       Construction of locks and dams 3 and 7--------------.............       Do.
Aug. 8,1917        Construction of lock and dam 5----......-----------.......----...       Do.
Mar.     2,1919    Modification of locks and dams 6 and 8 by raising                   Rivers and Harbors Committee
                     their pool levels, which with dredging obviates the                 Doc. 7, 65th Cong., 2d sess.
                    necessity for constructing locks and dams 7 and 9.
June 26,19341      Operating and care of locks and dams provided for
                     with funds from War Department appropriations
                    for rivers and harbors.
Aug. 26,1937       For the 7-foot channel and construction of a canal                  Senate committee       print,    75th
                    3,600 feet long to Felsenthal, Ark.                                  Cong., 1st sess.a
Mar.     2,1945    Modification of local cooperation by elimination of                 H. Doc. 104, 76th Cong., 1st sess.
                     requirement for provision of highway from main
                     highway system to the canal terminal, for Felsen-
                     thal Canal.                                                                                         2
May 17,1950        Modification of existing project to provide for 9-foot              S. Doc. 117, 81st Cong., 1st sess.
                     channel and deepening of canal to Felsenthal, Ark.

  1 Permanent Appropriations Repeal Act.                        s This document contains published maps.

  Local cooperation.--Local interests are required to give assurances
satisfactory to the Secretary of the Army that they will furnish free
of cost to the United States all lands, easements, rights-of-way, and
overflow and spoil disposal areas necessary for the construction of
the project and subsequent maintenance as and when required; bear
the cost of alteration or replacement of existing highway bridges
where necessary; provide adequate terminal and transfer facilities,
open to all on equal terms; and hold and save the United States free
from damage due to the construction works. These requirements
have been fully complied with for completed portions of the project.
  Terminal facilities.--At Monroe, La., there is one private electric
crane and one private warehouse. At West Monroe there are two
private warehouses with conveyors. At Camden, Ark., there are
three private warehouses. At Champagnolle Landing there is a
private dock for the loading of gasoline into barges. At Sterlington,
La., there is a private landing dock. At Calion, Ark., there is a pri-
vate conveyor and dock for unloading logs.
  Operations and results during the fiscal year.-Maintenance dredg-
ing was done in the channel of the stream at 25 locations between
Camden, Ark., and the mouth of Black River. A total of 484,008
cubic yards of material was moved by United States cutter-head
dredge Todd.
         RIVERS AND HARBORS--VICKSBURG,           MISS.,   DISTRICT        819

   The six locks and dams were operated and maintained in a satis-
factory condition throughout the fiscal year by hired labor.
   The total costs during the fiscal year were $243,139.50, of which
$2,714.71 were for snagging, $90,640.23 were for maintenance dredg-
ing, and $149,784.56 were for operation and care. The total expendi-
tures were $251,279.40.
   Condition at end of fiscal year.-The project providing for a depth
of 6.5 feet has been completed and is being maintained. New work
under the modified project has not been started.
   The six locks and dams embraced in the existing project for slack-
water improvement of the Ouachita River were completed in 1924
and provide navigation to Camden, Ark. (See table under existing
project.)
   Construction of the canal to Felsenthal, authorized in 1937, has not
been started.
   The head of navigation is Arkadelphia, Ark., to which point boats
may occasionally run during high water if snags, overhanging trees,
or similar obstructions do not interfere. From January to June the
gage at Monroe generally exceeds pool stage (13.3 feet), and mini-
mum depths exceeding 7 feet are usual between the mouth of Black
River and Camden, Ark., a distance of 351 miles. At intervals dur-
ing this period the reading of the Camden gage exceeds 15 feet, and
minimum depths of 7 feet may be expected between Camden and
Arkadelphia. During the remainder of the year the pools furnished
by the six dams, with moderate dredging in Black and Ouachita
Rivers, provide depths of 6.5 feet between the mouth of Black River
and Camden, Ark., and depths of only a few inches may be expected
between Camden and Arkadelphia, Ark.
  As of the end of the fiscal year project depth of 6.5 feet below mean
low water for pool stages was available between Camden, Ark., and
the mouth of Black River.
  The total costs to the end of the fiscal year under the existing project
were $4,574,551.31 for new work, $3,781,509.10 for maintenance, and
$5,275,059.31 for operation and care of locks and dams. Total ex-
penditures were $13,619,666.68.
   In addition, the sum of $2,940,952.07 was expended between Janu-
ary 25, 1913, and June 30, 1936, on operation and care of the works
of improvement under the provisions of the permanent indefinite
appropriation for such purposes.
  Proposedoperations.-Theunexpended balance, $26,252.86, plus ac-
counts receivable, $1,394.94, plus an allotment for fiscal year 1953
of $446,300.00, a total of $473,947.80, will be applied as follows:
Accounts payable June 30, 1952--__--   -----------------------      $12, 847. 98
Maintenance :
    Dredging Ouachita and Black Rivers with United
      States cutter-head dredge Todd, July-October
      1952, May and June 1953------------------     $255, 300.00
    Operation and care of locks and dams Nos. 2, 3,
      4, 5, 6 and 8, as follows:
         Operations------------------------------    178, 846. 03
         Ordinary maintenace and repairs----------- 26,953. 79
                                                                    461, 099. 82
          Total for all work_   -----------------------------       473, 947. 80
820               REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

  The additional sum of $514,000 can be profitably expended for the
following schedule of work during fiscal year 1954:
Maintenance:
   Dredging in Ouachita and Black Rivers__ __   _______------                                                                                   $270, 000
   Operating and care of locks and dams Nos. 2, 3, 4,
      5, 6 and 8 as follows:
                 (lnr*         ti                                                                                            $180 50l
                 veejr    t   LuLJ------------------------                                    -               ---           i,         uw

                 Ordinary maintenance and repairs__----------                                                                    30, 000
                 Improvement and reconstruction___-----------                                                                    28, 500
                                                                                                                                                  239, 000

        Condition surveys----                                --------------------------------------
                                                                                                                                                      2, 500
        Miscellaneous inspections.                           (--------------------------                               -----------                    2, 500

                     Total for all work. -------------------------------------- 514, 000

                                                        Cost and financial summary

                                                                    Fiscal year ending June 30                                              Total to June
                                                                                                                                           30,1952, includ-
                                                                                                                                           ing fiscal years
                                                  1948            1949               1950                1951               1952             priorto 1948

New work:
   Appropriated-------- .........---------------                     ----------------............---............------------...........---........................
                                                                                                                                               $5, 248, 618. 94
   Cost-------------..................-------.......     ------..... ---------------------------------                                            5, 218, 618. 94
                                                                                            -----------
   Expenditures----......... ............................-----------------------------............                    ........------------       5, 248, 618. 94
Maintenance:
   Appropriated ........                  $229, 000.000 $164, 730. 00 $498, 675. 47 $430, 000.00 $185,000.00                                     9, 071, 368. 23
   Cost.---.--....------109, 683.33 101, 124.53 364, 792. 79 525, 871.01 243, 139. 50                                                            9, 056, 568. 41
   Expenditures---....----                 200, 068.99 210, 724. 70 248, 348.08 629, 141. 38 251, 279. 40                                        9, 045, 115. 37


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project------------ $17, 388, 000

        3. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

   The cost of the work during the fiscal year was $18,384.88. Expend-
itures were $19,227.12. The unexpended balance at the end of the
fiscal year, $590.49, plus an allotment for fiscal year 1953 of $6,000
for contingencies, a total of $6,590.49, will be applied to accounts
payable, $589.98, and as needed during fiscal year 1953 for payment of
expenses under this heading.
   The additional sum of $9,000 can be profitably expended for con-
tingencies during the fiscal year 1954.
                                                       Cott atd financial summary

                                                                     Fiscal year ending June 30                                             Total to June
                                                                                                                                           30,1952, includ-
                                                                                                                                           ing fiscal years
                                                  1948            1949                1950               1951               1952             prior to 1948

Maintenance:
   Appropriated....-------- $8, 300. 00 $14, 500.00                              $14, 000. 00       $29, 500. 00       $13, 000. 00              $478. 685. 68
   Cost----------------8,57402           14, 347.95                               14 152, 05         24, 114.61         18, 384. 88               478, 685. 17
   Expenditures.........      --------
                             8, 516. 76  13, 470.94                               14, 578. 10        23, 133. 35        19, 227. 12               478, 095. 19
                 RIVERS AND HARBS--VICKSBURG,                                          MISS.,        DISTRICT                821
                 4. PLANT ALLOTMENT, VICKSBURG, MISS., DISTRICT
                                           Cost and financial summary

                                                         Fiscal year ending June 30                               Total to June
                                                                                                                 30, 1952, includ-
                                                                                                                 ing fiscal years
                                        1948           1949            1950           1951           1952          priorto 1948

Maintenance:
      Appropriated-.......         -$50,000.00      $4,590.08 $179,095.68        ............
                                                                                            ............              $188, 483.74
      Cost-------------------------------------
      Expenditures                    2,4 37.10
                                      ---------       6,859. 86    161, 456. 621 -81, 641. 68      45, 375.45           120, 807.35



                               5. INACTIVE NAVIGATION PROJECTS

                                                                         For last      Cost and expenditures
                                                                       full report        to June 30, 1950            Estimated
                         Name of project                               see annual                                     amount re-
                                                                                     reportquired                            to
                                                                          reor         New work         Mainte-        complete
                                                                                                         nance


1.   Little Missouri River, Ark____ ---..............-                 - -      1873    $19, 991.94 .........----...         (14)
2.   Little Tallahatchie River, Miss----------..                 --------       1913     19, 000.000 ......------------       (1)
3.                                                      ------
      Bear Creek, Miss ..................................---                     1920      3, 346. 62       2, 086. 16       (14)
4.   Tchula Lake, Miss_            ....----------------------------             1921     19, 384. 89     26, 585. 08          (1)
5.   Bayou Bartholomew, La. and Ark----------------.................            1931     45, 873. 53     42, 857. 25      (1 2 3)
6.   Saline River, Ark____.. ............................                       1931     26, 900. 00     12, 791. 67      (1 a 4)
7.   Yalobusha River, Miss........-------------------------.................    1937      7, 000. 00     15, 936. 38      (1 4 a)
8.   Tallahatchie and Coldwater Rivers, Miss---..--------                       1939     43, 481.48 173, 066. 02            (1 6)
9.                               -------------------------- 1895
      Big Black River, Miss .............................                                 15,000.00 ..------------        (1 4 6)
10.   Bie Sunflower River, Miss----------------------......................      1942    560, 026. 65 459, 327. 90          (1 12)
11.   Steele and Washington Bayous and Lake Washing-                             1947     19, 049. 81     10,110.00          (7 8)
        ton, Miss.
12.   Yazoo River, Miss.---------------------------............................. 1947    359, 660. 70 480, 605. 04           (17)
13.   Homochitto River, Miss---    ...._-----_--------                        - 1910      15, 481. 67       8, 518.33          (1)
14.   Removing snags and wrecks from the Mississippi                                    .......... 272, 500. 00
                                                                                 1948 ------------                             (9)
         River below the mouth of Missouri River and
        from the Old and Atchafalaya Rivers.
15.   Mouth of the Yazoo River, Miss_,--------....                               1949   1,179,210.87 133, 271.05             (1 7)
16.   Tensas River and Bayou Macon, La-...............                           1949     38, 366. 57     85, 352.16        (1 10)
17.   Boeuf River, La.--------...          _           .              -.-..    - 1949     30, 000. 00 103, 736. 88       (1 1013)
18.   Bayous D'Arbonne and Corney, La__---...-.--.                            - 1941      19, 000. 00     37, 803. 88      ( 4)
19.   Little River, La...............--__...................                     1890      2, 6500.00 ...-------            (111)

   1 Completed.
  2  Abandonment recommended in H. Doc. 1692, 64th Cong., 2d sess. and H. Doc. 467, 69th Cong., 1st sess.
   3 Channels adequate for existing commerce.
   4 Abandonment recommended in H. Doc. 467, 69th Cong., 1st Sess.
   6 See report of the Mississippi   River Commission for operations in connection with the Yazoo Basin
flood-control project including channel clearing and rectification and Grenada Reservoir on Yalobusha
River.
   6 See report of the Mississippi River Commission for operations in connection with the Yazoo Basin flood-

control project, including Sardis Dam and Reservoir, on the Little Tallahatchie River, Arkabutla Dam,
and Reservoir on Coldwater River, and channel clearing on Tallahatchie and Little Tallahatchie Rivers.
   7 No funds available and no work proposed for fiscal years 1953 and 1954.
   8 Abandonment recommended in H. Does. 1694, 64th Cong., 2d sess., and 467, 69th Cong., 1st sess. See
report of Mississippi River Commission for operations in connection with the Big Sunflower River,jetc.,
Mississippi flood control project, including channel clearing and snagging in Steele Bayou.
   9 No funds available under this project. Work is being carried on under appropriation Flood Control,
Mississippi River and Tributaries.
   10 Report of New Orleans district, p. 919-920 for fiscal year 1949.
   11 Due to decline of traffic, local interests are no longer sufficiently interested to provide rights-of-way
and dumping privileges.
   12 Project curtailment recommended by elimination of work between Pentecost and mouth of Hush-
puckena River. (Abandonment of entire project erroneously recommended in H. Doec. No. 467, 69th
Cong., 1st sess.)
   13 Project curtailment recommended by elimination of work above Girard, La. (Abandonment of entire
project erroneously recommended in H. D. No. 467, 69th Cong., 1st sess.)
822          REPORT OF CHIEF OF ENGINEERS,                                     U.    S. ARMY, 1952

                                 6. MISCELLANEOUS ACTIVITIES
Status of all investigations for navigation called for by river and harbor acts
                           and committee resolutions

                                                                                Date trans-         Document  Recom-
                Locality                         Authorization act               mitted to            No.    mendation
                                                                                 Congress

Arkansas, White, and Red River              Flood Control Act, May ................--------------
  Basins, Ark., La., Okla., Tex.,              17, 1950.
N. Mex., Colo., Kans., and Mo. 1
Red, Arkansas and White River ..... do ....................-.........................--
Basins, Ark., La., Okla., Tex.,
New Mex., Colo., Kans., and
Mo. 1
White, Arkansas and Red River ..... do ....
  Basins, Ark., La., Okla., Tex.,
  N. Mex., Colo., Kans., and Mo. 1

  I A coordinated comprehensive report under preparation by Federal and State agencies for the conserva-
tion and development of land and water resources.

      7. OUACHITA RIVER AND TRIBUTARIES, ARK. AND LA. (FLOOD
                            CONTROL)

   Location.-Ouachita River rises in Polk County, Ark., and flows
about 600 miles in a general southeasterly and southerly direction
through Arkansas and Louisiana. It is joined by Tensas and
Little Rivers at Jonesville, La., below which place it is called Black
River, and enters Red River 35.5 miles above its mouth. (See U. S.
Geological Survey State maps and Mississippi River Commission
Alluvial Valley quadrangle maps.)
   The Ouachita River Basin embraces about 25,000 square miles.
Headwater streams drain about 3,500 square miles of rugged terrain
of the Ouachita Mountains (including some 1;500 square miles of the
Ouachita National Forest). Downstream the basin comprises about
21,500 square miles of hilly uplands and broad plains. Below River-
ton, La., approximately 1,490 square miles are in the Red River
backwater area.
   Existing project.--The River and Harbor Act of May 17, 1950 (S.
Doc. No. 117, 81st Cong., 1st sess.), approved the general plan for
flood control on Ouachita River and tributaries, Arkansas and Lou-
isiana, which provides for the construction of one multiple-purpose
and one flood-control reservoir; protection works for three localities
and channel improvement at several points. This act further author-
ized the incorporation into the general plan of the several separate
existing projects for flood control along the Ouachita River and trib-
utaries in the basin above the lower end of the levees on the east bank
of Ouachita River.
   Following are lists of the reservoirs and local protection works
included in the general flood-control plan for the Ouachita River and
tributaries, and the existing flood-control projects incorporated into
the project:
                      FLOOD          CONTROL--VICKSBURG,                               MISS.,          DISTRICT                     823

                                                          New projects

                                                                           Drainage              Storage, acre-feet
                                                                                          aEstimated
                  Project                              Stream                area                                              construc-
                                                                            square                                Flood        tion cost 1
                                                                             miles            Power              control


De Gray Reservoir, Ark.......                  Caddo River .....                       453       3 420, 000          250, 000 $25, 495, 000
Murfreesboro4 Reservoir, Ark. 6...-- Muddy Fork .....                                  121 -                           71, 400  3, 764, 000
Calion, Ark. 2 6                                Ouachita River.---------. ---------------.-                        ----------      515, 000
Local Protection, Pine Bluff, Ark. .--------------
Bayou Bartholomew, Arkansas --
                                                                        ------------      -----------             -----------      310, 000
                                                        ------------------------------------------                              1, 725, 000
  and Louisiana, including Deep
  Bayou and Overflow Creek.' 6
Extension
      7    of flood wall at Monroe,                                     _
                                                Ouachita River ------------------------                        ------------         88, 000
  La.               - -- - -- -- -- -- --      -- -
Bawcomville, La. ...............          .....     do------.................------------ -----------------------                8 265, 000

  1 1952.
  2 Inactive.
  a Includes 75,000 acre-feet of conservation storage.
  4 Existing project authorized Aug. 18, 1941, and amended by Flood Control Act of May 17, 1950.
  3 Includes 3,400 acre-feet of conservation storage.



  I
  6 Details presented in individual report.
    Details presented in S. Doc. No. 117, 81st Cong., 1st sess.
  8 $155,000 for work under FC G only.

                                                  Incorporatedprojects

                                                                                                       Estimated con- For last full
                     Project                               Type of work                Flood Con-            struction         report see
                                                                                         trol Act            struction          Annual
                                                                                                                cost          Report for-


Blakely Mountain Reservoir, Ark.'-...                 Reservoir    ........------------- 1944            2   $32, 675, 000        (3)
Little Missouri River Basin, Ark.l...                 Reservoir and chan-                1944                213, 411, 700        (3)
                                                       nel improvement.
Existing levees and flood walls and                   Levees and flood walls.            1928           2 3, 055, 956. 49         (3)
extensions thereto from Bastrop, La.                                                    and
to mouth of Boeuf River and at                                                         4 1950
We st Monroe, La.l
Columbia, La__---    ----------------                 Flood protection-         _...      1936               6 204, 739. 73      1941


  i Details presented under individual reports.
  2 Estimated cost approved July 1952.
  3 Included in this report.
  4 River and Harbor Act of May 17, 1950.
  6 Transferred from F. C. M. R. & T.
  6 Actual cost of completed project.


  Local cooperation.-Requirements of local cooperation for flood-
control improvements within the basin have been met except for
new projects authorized by the act of 1950 on which local interests
have indicated their willingness to comply with requirements. See
individual statements for further details.
  Operations and results during fiscal year.-The operations dur-
ing the fiscal year, together with costs and expenditures for those
projects on which work was in progress, are shown in individual
reports.
  Condition at end of fiscal year.-The condition of the various proj-
ects on which work has been initiated is given in individual reports.
  Proposedoperations.-As indicated in individual statements.
           8. BLAKELY MOUNTAIN DAM ON OUACHITA RIVER, ARK.

  Location.-The work covered by this project is at the head of
Lake Hamilton (pool of Carpenter Dam) and approximately 10
miles northwest of Hot Springs, Ark., in Montgomery and Garland
824     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

Counties, Ark. (See U. S. Geological Survey State map, scale
1: 500,000.)
  Previous project.--Authorized by the Flood Control Act of 1938,
this provided for participation by the United States in the cost of
construction of a multiple-use reservoir not to exceed $2,000,000. No
construction was undertaken.
  Existing project.-This provides for construction of Blakely Moun-
tain Dam on Ouachita River for flood control and other purposes in
the Ouachita River Basin with a gross storage capacity of 2,768,000
acre-feet and power installation totaling 75,000 kilowatts (2 units at
37,500 kilowatts each).
   The revised estimated cost (1952) is $32,675,000. The estimated
cost (1952) for annual maintenance and operation is $250,000.
   The project was authorized by the Flood Control Act approved
December 22, 1944, and incorporated into the Ouachita River and
tributaries project by the 1950 River and Harbor Act. (See H. Doc.
647, 78th Cong., 2d sess., which contains the latest published map.)
   Local cooperation.-None required.
   Operations and results during fiscal year.-Under continuing con-
tract, construction of the main dam and intake structures was con-
tinued throughout the fiscal year. A total of 25,720 cubic yards of
material was moved in stripping for embankment, 2,625,904 cubic
yards of material were excavated for borrow, and 2,074,831 cubic
yards of impervious and random compacted fill, 134,918 cubic yards
of pervious compacted fill, were placed. There were 142 cubic yards
of grouted riprap placed in the protection works. There were 5,932
cubic yards of concrete placed in the intake structures, and 136 cubic
yards in the bridge piers and deck. Under continuing contract, de-
sign of the powerhouse, powerplant and switchyard was completed.
Contract for construction of the powerplant was awarded May 27,
1952. Contracts for design and purchase of transformers, butterfly
valves, and powerhouse crane were awarded October 11, 1951, May
19, 1952, and March 24, 1952, respectively. Under contract, clearing
of a portion of the reservoir area was initiated August 30, 1951.
Under contract, clearing of the second and major portion of the
reservoir area was initiated April 8, 1952. Work under contract for
relocation of Possum Kingdom to Mount Tabor Road was completed
January 28, 1952. Relocation of Forest Service trails was in progress.
Relocations of roads in Garland County were completed except the
relocation of Fisher Creek Road.
   Costs during the fiscal year were $3,834,463.68 for new work.
Expenditures were $3,679,928.71.
   Condition at end of fiscal year.-Constructionof the spillway was
completed August 31, 1948. Construction of tunnels and appurte-
nances was completed June 15, 1950. Construction of the main dam
and intake structure is in progress and is 82 percent complete. Coffer-
dam construction and diversion of the river is completed. A total of
353,000 cubic yards of material has been moved in stripping for em-
bankment and 4,242,776 cubic yards excavated for borrow. A total
of 3,255,042 cubic yards of impervious and random compacted fill,
206,712 cubic yards of pervious compacted fill and 28,336 cubic yards
of rock fill have been placed. There were 11,12 cubic yards of dumped
             FLOOD CONTROLG-VICKSBURG,                MISS.,      DISTRICT              825
riprap and 24,832 cubic yards of grouted riprap placed in the pro-
tection works. There were 11,001 cubic yards of concrete placed in
the intake structures, 3,606 cubic yards in the embankment toe and
toe wall, ditch paving and miscellaneous items, and 136 cubic yards in
the bridge piers and deck. Stripping for embankment is 97 percent
complete. Borrow excavation is 88 percent complete. Placing of
impervious compacted fill is 85 percent complete. Placing of pervious
compacted fill is 94 percent complete. The protection works are com-
pleted. The concrete embankment toe is completed. Contract for
design of powerplant, powerhouse and switchyard is complete.
Contract has been awarded for construction of the powerplant. Con-
tracts have been awarded for the design and purchase of turbines,
turbine governing equipment, generators, transformer, butterfly
valves, and powerhouse crane. Relocations of power transmission
lines are completed. Relocation of Possum Kingdom to Mount Tabor
Road is completed. Relocations of roads in Garland County are
completed except relocation of Fisher Creek Road. Relocation of
Forest Service trails is in progress. Negotiations for relocation of
United States Highway No. 270 and of State Highway No. 27 are in
progress. Contract for clearing of a portion of the reservoir area
is 54 percent complete. Contract for clearing of the second and major
portion of the reservoir area is 13 percent complete.
    There is an estimated total of 88,952 acres of lands authorized for
acquisition in the Blakely Mountain Dam and Reservoir. Approxi-
mately 97 percent of this acreage has been acquired.
    The project as a whole is 49 percent complete.
    The total costs to the end of the fiscal year were $15,954,882.71 for
new work. Total expenditures were $15,522,721.70.
    Proposed operations.---The unexpended balance at the end of the
fiscal year, $3,577,278.30, plus accounts receivable, $111.20, plus an
appropriation of $6,568,000 during the fiscal year 1953, a total of
$10,145,389.50, will be applied as follows:
Accounts payable June 30, 1952_                                               $1, 982, 272. 21
                                                                        _......-
New work :
    Contract:
        Dam and intake structures, July 1952 to
          June 1953-----------------------               $1, 104, 677. 84
        Powerhouse and power equipment, July
          1952 to June 1953__, --        __ --    ____    4, 981, 297. 15
        Relocation of roads and utilities, July
          1952 to June 1953----------------.__                 308, 466.84
        Relocation of cemeteries, July 1952 to
          June 1953__------.-------            ___ --    ---    12, 232. 00
        Clearing reservoir area, July 1952 to
          June 1953 _-------------------                     1, 153, 684. 23
    Hired labor:
        Topping of trees in reservoir, June 1953__              50, 000. 00
        Maintenance of completed work, July 1952
          to June 1953--____----,__                      -      12, 000. 00
        Land acquisition, July 1952 to June 1953_              347, 562. 72
        Real estate work in connection with re-
          locations, July 1952 to June 1953_-                     1, 895. 51
        Investigations, studies, design and con-
           tingencies, July 1952 to June 1953...               191, 301. 00
                                                                               8, 163, 117. 29
           Total for all work. --------------------   ____----          _-- 10, 145, 389. 50
826         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

  The additional sum of $6,232,000 can profitably be expended to
perform the following scheduled work during the fiscal year 1954:
New work :
   Contract:
       Powerhouse and power equipment----------$5, 345, 000
       Clearing reservoir area--.-----------------                  150, 000
       Relocations, United States Highway No. 270 and
         State Highway No. 27_-_-- ----                     ------  225, 000
                                       --
       Maintenance shop-- .-------------.                      --    42, 000
       Superintendent's residence__--- ----                  ____-   15, 000
       Grading and landscaping shop and residence
         sites -----------------------------------                    6, 000
       Water supply and sewerage for ship and resi-
         dence----------------------------------13,000
       Access roads-- -----                  ---                    150, 000
   Hired labor :
       Soil conservation, restoration and erosion con-
          trol------------------                  ---- ------------  50, 000
       Topping trees in reservoir------------------                  50, 000
       Investigations, studies, design and contingencies_           104, 000
                                                                                                                   $6, 150, 000
Maintenance :
   Operation -----------------------------------                                                    49, 000
   Ordinary repairs and maintenance- .......-----                                                   33, 000
                                                                                                                          82, 000
         Total for all work -------                             --------------------------                           6, 232, 000
                                         Cost and financial summary

                                                       Fiscal year ending June 30                                   Total to June
                                                                                                                   30,1952, includ-
                                                                                                                   ing fiscal years
                                     1948            1949            1950            1951             1952           priorto 1948

New work:
   Appropriated-........$2,000,000.00            $3,200,000.       00$2,300,000.00$2,800,000.00  $5,700,000.00      $17, 550, 000. 00
   Cost ............--------------- 450, 409. 52 3, 986, 367. 12 2, 970, 782. 13 4, 429, 347. 53 3, 834, 463. 68     15, 954, 882. 71
               .....-- 478, 375. 61 3, 720, 913. 86 2, 997, 419. 61 4, 366, 173. 49 3, 679, 928. 71
   Expenditures------                                                                                                15, 522, 721. 70


Other new work data:
    Unobligated balance, June 30, 1952--_--_-----------------       $1,961.24
    Appropriated for fiscal year ending June 30, 1953---------- 6, 568, 000. 00
    Unobligated balance available for fiscal year 1953---------6, 569, 961.24
    Estimated additional amount needed to be appropriated for
      completion of existing project_---__ __--__--__-__
                                              --                8,557, 000. 00

                      9.    DEiGRAY RESERVOIR, CADDO RIVER, ARK.

   Location.-The work covered by this project is located on Caddo
River (mile 8), a tributary of Ouachita River, in a narrow, rocky
gorge, in Clark and Hot Spring Counties, Ark., approximately 10
miles north of Arkadelphia, Ark. (For latest published map, see H.
Doc. 117, 81st Cong., 1st sess.)
   Existing project.-The plan of improvement provides for the con-
struction of a multiple-purpose flood control and power reservoir at a
site on Caddo River designated as "DeGray", as a feature of the
Ouachita River and tributaries comprehensive plan for flood control.
           FLOOD CONTROL--VICKSB3URG,       MISS.,   DISTRICT        827
The reservoir will provide a gross storage capacity of 670,000 acre-feet.
Power installation will consist of two 16,000 kilowatt units. The
estimated cost (1952) is $25,495,000 for construction and $250,000 for
annual maintenance and operation.
  The project was authorized by the River and Harbor Act approved
May 17, 1950. (See S. Doc. 117, 81st Cong., 1st sess.)
  Local cooperation.--Nonerequired.
   Operationsand results during fiscal year.-None.
   Conditionat end of fiscal year.-The work has not been started.
  Proposed operations.-Nofunds are available and no operations are
proposed for fiscal years 1953 and 1954.
              10.   LITTLE MISSOURI RIVER BASIN, ARK.

   Location.-The Little Missouri River rises in the southeastern cor-
ner of Polk County, Ark., on the southern slope of the Missouri Moun-
tains and flows in a southeasterly direction a distance of 147 miles in a
tortuous course to enter the Ouachita River 27.6 miles above Camden,
Ark.
   Terre Noire Creek rises in the Athens Plateau, midway between
Arkadelphia and Amity in Clark County, and flows in a general south-
easterly direction a distance of about 45 miles to enter Little Missouri
River on the left bank 2 miles above the mouth of the parent stream.
   Ozan Creek, formed by the junction of North Fork, Middle Fork,
and South Fork near Blevins, in Hempstead County, flows in a general
northeasterly direction a distance of about 25 miles to join Little Mis-
souri River on the right bank at mile 73.2 above the mouth.
   Existing project.-The Flood Control Act approved August 18,
1941, approved the plan for the Narrows Reservoir for flood control
and other purposes on the Little Missouri River, Ark., and for local
flood protection on the main river below Murfreesboro, Ark., and on
the Terre Noire and Ozan Creeks, as set forth in House Document 837,
Seventy-sixth Congress, third session, and authorized $3,000,000 for
the initiation and partial accomplishment of the project. The Flood
Control Act approved December 22, 1944, authorized the completion
of the project for Little Missouri River in Arkansas.
   The plan of improvement provides for the construction of the Nar-
rows Reservoir on the Little Missouri River above Murfreesboro,
Ark., with a gross storage capacity of 410,000 acre-feet and a power
plant at the dam site with an initial installation of hydroelectric gen-
erating facilities having a capacity of 17,000 kilowatts and with pro-
visions for future enlargement of those facilties; channel clearing and
snagging on the Little Missouri River above the mouth of Ozan Creek,
and the excavation of 31 cutoffs below the mouth of Ozan Creek;
snagging of the channel of Terre Noire Creek between the Missouri-
Pacific Railroad crossing and the mouth, the enlargement of 0.9 mile
of silted creek channel, the repair of levee crevasses in the side levees,
and the construction of required drainage ditches; and the excavation
of 20 cutoffs on Ozan Creek between the lower end of the existing
drainage ditches and the mouth.
828        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                      1952

  The following is a list of the individual projects included in the
approved plan:

                                                                                Estimated cost
             Location                   Type of protection
                                                                        Federal          Local        Total

Narrows Reservoir (Lake Greeson) Reservoir and power plant....        1 $12,706, 000 -             112, 706, 000
near Murfreesboro, Ark.
Little Missouri River, Murfrees- Channel improvement---......               530,000 $25, 000          1 555, 000
boro, Ark. to the mouth.
Terre Noire Creek, Ark----------............
                                   Channel improvement and                  123, 700     10,000            700
                                                                                                        133,
                                    repairs to levees.
Ozan Creek, Ark................... Channel improvement-.                   11_52, 000     8, 000       160, 000

1 Revised 1952.
Note.--Incorporated into the Ouachita River and tributaries project by the 1950 River and Harbor Act.

   Local cooperation.-See pages 4-5 for requirements. Fully com-
plied with on Terre Noire Creek. Assurances received and approved
for work on Ozan Creek and Little Missouri River.
   Operationsand results duringfiscal year.-NarrowsReservoir (Lake
Greeson) : The facility was maintained and operated and generation
of power was continued throughout the fiscal year. A total of 43,012,-
000 kilowatt-hours was produced, of which 42,247,000 kilowatt-hours
were furnished the Southwestern Gas & Electric Co. under contract
between that company and the Southwestern Power Administration.
   Construction of recreation facilities at various locations in the res-
ervoir area was completed by hired labor. Grading of maintenance
roads at the same locations was completed by hired labor, and contracts
were awarded for surfacing the maintenance roads, and for drilling
water wells. Contract was awarded for construction of office, shop,
and warehouse.
   There were 360,000 visitor-days for recreation.
   Relocation of the facilities of the South Central Electric Coopera-
tive was completed.
   Land acquisition was completed.
   On July 1, 1951, the flood control pool was empty and 190,000 acre-
feet of water were stored in the power pool. Maximum pool elevation
in the reservoir, 554.1 feet mean sea level, occurred April 26, 1952,
when flood control storage was 47,000 acre-feet. Peak inflow was
35,000 cubic feet per second on April 22, 1952. About 47,000 acre-
feet of water was stored in the flood control pool following the April
1952 storm and was released with a maximum rate of 5,100 cubic feet
per second. On June 30, 1952, the flood control pool was empty and
180,000 acre-feet of water remained in the power pool.
   Ozan Creek and Little Missouri River below Murfreesboro: Pre-
liminary engineering studies were continued.
   Total costs during the fiscal year were $247,758.46, of which $77,897.15
was for new work and $169,861.31 was for maintenance. Total ex-
penditures were $248,511.14.
   Conditionat end of fiscal year.--Narrows Reservoir: The project is
complete except for completion of reservoir management and recrea-
tion facilities. Generation of power, and maintenance and operation
of the facility are continuing.
             FLOOD CONTROL--VICKSBURG,            MISS.,   DISTRICT            829
   Terre Noire Creek: The improvement is complete. Repairs to
levees were accomplished with emergency funds.
   Ozan Creek and Little Missouri River below Murfreesboro: Pre-
liminary engineering studies are nearing completion.
   The total costs to the end of the fiscal year were $12,714,601.20 for
new work and $368,348.93 for maintenance. Total expenditures were
$13,072,499.17.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, $122,165.39, plus accounts receivable, $991.32, plus an allot-
ment for fiscal year 1953 of $200,000, a total of $323,156.71, will be
applied as follows:
Accounts payable June 30, 1952-- ......---------                       $12, 564. 15
New work:
    Narrows Reservoir :
        Contract:
            Construction of office, shop and warehouse,
              and facilities, July-December 1952..... $59, 916.48
            Drilling water wells, July-October 1952__       7, 368. 40
            Surfacing maintenance roads, July-August
              1952 ----------------------------            20, 008. 04
        Hired labor :
            Office and shop area; grading, graveling
               and fencing, July-August, 1953--------- 12, 300. 00
            Development of public use facilities, July-
               August 1952-------------.-----------         3, 863. 55
        Lands --------------                 -------------- 2, 976. 32
        Investigations, studies, and design----------4, 159. 77
                                                                 -      110, 592. 56
Maintenance:
   Narrows Reservoir :
       Production operation---      ----------------103,000.00
       Production maintenance ---------------        52, 500. 00
       Malaria control                                3,200.00
       Reservoir management facilities ------------- 22, 650.00
       Investigations, studies and planning--------- 18, 650. 00
                                                                        200, 000. 00
             Total for all work _.-------------------_
                                         .                              323,156.71
  The additional sum of $746,000 can be profitably expended for the
following schedule of work during fiscal year 1954:
New work:
   Ozan Creek:
       Contract: Channel improvement, mile 0-15 -------- $31,500
       Plans, specifications, and contingencies_--- --     8, 000
                                                                           $39, 500
    Little Missouri River below Murfreesboro:
         Contract: Channel improvement, mile 2.9-79.1 .-.446, 700
         Plans, specifications, and contingencies--......... 49, 800
                                                                           496, 500
Maintenance:
   Narrows Reservoir:
        Operation of dam and power plant----------- --.120, 000
        Ordinary repairs and maintenance .............
                                             -          90, 000
                                                                           210, 000
           Total for all work----------------_....--------_                746, 000


      245554-53-vol. 1      53
830          REPORT OF CHIEF OF ENGINEERS,                                U.   S. ARMY,          1952

                                     Cost and financial summary
                                       CONSOLIDATED STATEMENT


                                                  Fiscal year ending June 30                          Total to June
                                                                                                      30,1952, includ-
                                                                                                      ing fiscal years
                                  1948          1949          1950          1951          1952          priorto 1948

New work:
   Appropriated- ....      $2,000,000.00 $2,800,000.00 $3,460,000.00$1,457,105.07 $194, 509. 49        $12, 875, 664. 56
   Cost :. _1,               627, 409. 41 6, 274, 637. 60 3, 106, 450. 59 464, 840. 58  77, 897. 15     12, 714, 601. 20
   Expenditures-------. 1, 533, 107. 41 5, 858, 677. 57 3, 208, 394. 67 903, 532. 68    67, 805. 59     12, 711, 313. 20
Maintenance:
   Appropriated--____ _______       ___ _________             50,000. 00  149,000. 00 170,000. 00          369,000. 00
   Cost ._---         ----          ---... .....-
                                  __43,                           230. 21 155, 257. 41 169, 861.31         368; 348. 93
   Expenditures ..--......                _ _ ....... 36, 957. 71 143, 522. 71 180, 705. 55
                                       -...                                                                361, 185. 97


Other new work data:
    Unobligated balance, June 30, 1952 _--------------------         $6, 183. 12
    Unobligated balance available for fiscal year 1953-------------   6, 183. 12
   Estimated additional amount needed to be appropriated for
      completion of existing project..---------_---------- ----     536, 000. 00

11. MURFREESBORO                   RESERVOIR, MUDDY FORK                            (LITTLE MISSOURI
                                         RIVER, ARK.)

    Location.-The work covered by this project is located on Muddy
Fork (mile 2) of Little Missouri River, in a narrow gorge in Pike
County, Ark., approximately 3 miles northwest of Murfreesboro,
Ark. (For latest published map, see S. Doc. No. 117, 81st Cong.,
1st sess.)
   Ex.isting project.-The plan of improvement provides for the con-
struction of a flood control reservoir as a feature of the Ouachita
River and tributaries comprehensive plan for flood control. The
reservoir will provide a gross storage capacity of 71,400 acre-feet.
The estimated cost (1952) is $3,764,000 for construction.
   The project was authorized by the Flood Control Act approved May
17, 1950. (See S. Doc. No. 117, 81st Cong., 1st sess.)
   Local cooperation.-None required.
   Operationsand results during fiscal year.--None.
   Condition at end of fiscal year.-The work has not been started.
No funds have been authorized for appropriation.
Proposed operations.-No funds are available and no operations
are proposed for fiscal years 1953 and 1954.
                            12. CALION, OUACHITA RIVER, ARK.

    Location.-The work covered by this project is on the west bank
of the Ouachita River near Calion, a small town in Union County,
Ark., about 307 miles above the mouth of Black River and 13 miles
northeast of El Dorado, Ark. (See U. S. Geological Survey map,
scale 1: 500,000.)
    Existing project.-The plan of improvement provides for the con- .
struction of levees and appurtenances for the protection of the town
of Calion, Ark., Calion Lumber Co. property and Lake Calion, at an
estimated cost of $515,000 (1952).                           The existing project was author-
ized by the Flood Control Act of August 18, 1941 (H. Doc. 427,
            FLOOD   CONTROL--VICKSBUJRG,    MISS.,   DISTRICT       831
76th Cong.,-1st sess.) as amended by Flood Control Act of May 17,
1950.
   Local cooperation.-Local interests are required to furnish all
rights-of-way necessary for the improvements without cost to the
United States; maintain the works after completion in accordance
with regulations prescribed by the Secretary of the Army; and hold
and save the United States free from damages that may result from
or be occasioned by construction of the improvement. Local interests
have signified their willingness to comply with these requirements.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-Preliminary work was initiated
in fiscal year 1945 on preparation of plans, but was suspended in view
of the statement of local interests that they were unable to comply
with the requirements of local cooperation. The project was amended
in fiscal year 1950 to include protection work for the expanded area,
with the assurance of local interests that the requirements for local co-
operation will be met. Construction work has not been started. Costs
and expenditures to June 30, 1952 were $109.85 for new work.
  Proposed operations.-No funds are available and no operations
are proposed for fiscal years 1953 and 1954.
              13. LOCAL PROTECTION, PINE BLUFF, ARK.
    Location.-The work covered by this project is located in Jefferson
County, Ark., in the vicinity of Pine Bluff, Ark. (For latest pub-
lished map see S. Doc. 117, 81st Cong., 1st sess.)
    Existing project.-The plan of improvement involves channel im-
provement on the Bayou Bartholomew tributary Pine Bluff outlet
canal, and construction of an intercepting canal from Harding Drain
to Bayou Bartholomew, and clearing of 3 miles of Bayou Bartholo-
mew. The estimated cost (1952) is $310,000 for new work.
    The project was authorized by River and Harbor Act approved
May 17, 1950. (See S. Doc. 117, 81st Cong., 1st sess.)
    Local cooperation.-Local interests are required to furnish without
cost to the United States all lands, rights-of-way and easements neces-
sary for construction of the project; bear the cost of construction of
new highway bridges and alteration or replacement of existing high-
way bridges where necessary; clear the channel of Harding Drain
of obstructions to flood flows and construct the necessary laterals;
hold and save the United States free from damage due to the con-
struction work; and to maintain and operate all the works after
completion in accordance with regulations prescribed by the Secre-
tary of the Army. The officials of the city of Pine Bluff and the
county road supervisor of Jefferson County, Ark., have informally
agreed to the conditions of local cooperation, and are in the process
of organizing a drainage district for the purpose of furnishing
satisfactory assurances.
    Operations and results during fiscal year.--Studies, surveys, and
mapping were completed. Plans and specifications were completed.
    Costs during the fiscal year were $19,610.23 for new work. Ex-
penditures were $19,466.09.
    Condition at end of fiscal year.-The work has not been started.
It will be advertised upon receipt of satisfactory assurances of com-
832             REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

pliance by local interests with the requirements of local cooperation.
The total costs to the end of the fiscal year were $19,610.23 for new
work. Total expenditures were $19,466.09.
   Proposed operations.--The unexpended balance at the end of the
fiscal year, $245,533.91, will be applied to the completion of the project
as follows:
Accounts payable June 30, 1952--------------------------------                                                                 $144. 14
New work:
   Contract: Pine Bluff Outlet Canal enlargement,
     intercepting canal, and clearing and snagging
     upper 3 miles of Bayou Bartholomew --------- $242, 500. 00
   Cooperation with local interests-------- -------- 2, 889. 77
                                                                                                                         245, 389. 77
           Total for all work----------------------------------                                                          245,:533. 91
    No work is scheduled for the fiscal year 1954.
                                              Cost and financial summary

                                                            Fiscal year ending June 30                                    Total to June
                                                                                                                         30, 1952, includ-
                                                                                                                         ing fiscal years
                                         1948             1949             1950            1951             1952          priorto 1948

New work:
   Appropriated-..............------------..... .....----- ------------------............   ---------............ $265, 000. 00 $265, 000. 00
   Cost....................-----.....---------............------......----------.....     ------------
                                                                                          ......-----------......   19,610. 23    19, 610. 23
   Expenditures....................-----------------                 ------------------------
                                                     ------------............                                       19, 466. 09   19, 466. 09


Other new work data:
    Unobligated balance, June 30, 1952-_--------------------- $244, 533.91
    Unobligated balance available for fiscal year 1953------------244, 533. 91
    Estimated additional amount needed to be appropriated for com-
      pletion of existing project   -----------------------------   45, 000. 00

                            14. BAYOU BARTHOLOMEW, ARK. AND LA.
   Location.--The work covered by this project is located in southeast
Arkansas and northeast Louisiana, and includes the channel of Bayou
Bartholomew and its tributaries Deep Bayou and Overflow Creek.
(For latest published map see S. Doec. 117, 81st Cong., 1st sess.)
   Existing project.-The plan of improvement provides for inter-
mittent clearing and snagging and closure of high-water outlets on
the main stem; on Deep Bayou, the enlargement of the channel be-
tween miles 2 and 15 and the diversion of the stream by a canal into
Bayou Bartholomew at a point 10 miles below its present mouth; and
clearing and enlargement of the Overflow Creek channel below mile 23.
   The estimated cost (1952) is $1,725,000.
   The project was authorized by River and Harbor Act approved May
17, 1950. (See S. Doc. 117, 81st Cong., 1st sess.)
   Local cooperation.-Local interests are required to furnish without
cost to the United States all lands, rights of way, and easements neces-
sary for construction of the project, bear the cost of construction of
new highway bridges and of alteration or replacement of existing
highway bridges where necessary; hold and save the United States free
from damage due to the construction works; and maintain and operate
all the works after completion in accordance with regulations pre-
scribed by the Secretary of the Army.
            FLOOD   CONTROL---VICKSBURG,       MISS.,   DISTRICT         833
  Operationsand results during fiscal year.-None.
  Condition at end of fiscal year.-The work has not been started.
  Proposed operations.-No funds are available and no operations
are proposed for fiscal years 1953 and 1954.
15. EXISTING LEVEES, FLOOD WALLS, AND EXTENSIONS THERETO
  FROM BASTROP, LA., TO MOUTH OF BOEUF RIVER AND AT WEST
  MONROE, LA.

   Location.-The work covered by this project is located along the
banks of the Ouachita River from the lower end of the levees on the
east bank and upstream, including existing and projected levee works
and flood walls. (For latest published map see S. Doc. 117, 81st
Cong., 1st sess.)
   Existing project.-The work covered by this project includes exist-
ing levees, flood walls, and extensions thereto from Bastrop, La., to
mouth of Boeuf River and at West Monroe, La. The Bastrop to
Monroe and West Monroe, La. levees, protection works on the east
bank of Ouachita River at Monroe, La. and vicinity, and those on
the east bank of Ouachita River from above Sterlington, La., to below
Monroe, La., and the levee wall at Monroe, La., were constructed as
a part of the Boeuf floodway project, approved May 15, 1928, until
the fiscal year 1936 when the Boeuf floodway project was abandoned.
The works were carried to completion as a' part of the "Ouachita
River Levee System" and under the appropriation for flood control,
Mississippi River and tributaries. The Columbia, La., levee was con-
structed by authority of Flood Control Act of June 22, 1936 (S. Doc.
No. 196, 73d Cong., 2d sess.). The extension of the flood wall at
Monroe, La., to partially close an existing gap, was authorized by the
River and Harbor Act of May 17, 1950 (S. Doc. 117, 81st Cong., 1st
sess.).
  The actual costs of completed works included in this project are
as follows:
Columbia, La., levee------------------------------------------  $204, 739. 73
Monroe levee wall, West Monroe levee wall, Monroe levee, West
Monroe levee, Sterlington to Monroe, La---------------------2, 649, 295.24
Monroe to Sandy Bayou levee (Completed to Indian Mound) -----  2 406, 661.25
   The estimated cost (1952) of the extension of the flood wall at
Monroe, La., is $88,000.
   Local cooperation.-Fullycomplied with for completed projects in
accordance with requirements of the governing acts. Drainage works
have been constructed by local interests from Bastrop to Sandy Bayou
and at West Monroe. Local interests have also contributed funds, as
cited above, in accordance with the requirements under section 6 of
the Flood Control Act approved May 15, 1928. For the partial closure
of the flood wall at Monroe, La., local interests are required to furnish
without cost to the United States all lands, rights-of-way and ease-
ments necessary for construction of the project; bear the cost of con-
struction of new highway bridges and of alteration or replacement
of existing highway bridges where necessary; hold and save the
  SConstructed under F. C. G.
2 Constructed under F. C. M. R. & T. and reported
                                                      in annual report of the
Mississippi River Commission. Costs include $134,875.66 contributed funds.
834     REPORT   OF CHIEF OF ENGINEERS,       U.   S. ARMY, 1952

United States free from damage due to the construction works, and
to maintain and operate all of the works after completion in accord-
ance with regulations prescribed by the Secretary of the Army.
   Operations and results during fiscal year.-Monroe Front, La.:
Contract work, involving the restoration of 68.42 stations of levee
and the placement of 35,466 cubic yards of riverside blanket, was
completed with funds under section 6, Fool Control Act approved
May 15, 1928.
  Government costs and expenditures were $45,340.71 for mainte-
nance.
  Condition at end of fiscal year.-Horseshoe Lake to Bellevue, La.:
Contract work-Construction of landside berm and levee restoration
on the left bank, Ouachita River, in Caldwell Parish, La., has been
completed. A total of 35,478 cubic yards of material was placed in the
berm and 135.05 stations of levee restoration were completed with
funds under section 6, Flood Control Act approved May 15, 1928.
   The total Government costs and expenditures to the end of the fiscal
year were $14,491.37 for maintenance. In addition, costs and expendi-
tures from contributed funds amounted to $7,245.68.
  Monroe Front, La.: Contract for the restoration of 68.42 stations
of levee and the placement of 35,466 cubic yards of riverside blanket
has been completed. The work was prosecuted with funds under
section 6, Flood Control Act approved May 15, 1928.
  The total Government costs and expenditures to the end of the fiscal
year were $46,911.12 for maintenance.
  Proposed operations.-No funds are available and no work is pro-
posed for fiscal years 1953 and 1954.
                        16. BAWCOMVILLE,    LA.
   Location.-The work covered by this project is at Bawcomville, La.,
a small town in Ouachita Parish, La., approximately 2 miles west of
the Ouachita River and approximately 2 miles southwest of Monroe,
La. (See S. Doc. No. 117, 81st Cong., 1st sess.)
   Existing project.-The plan of improvement provides for the con-
struction of a loop levee, and supplementary drainage works, consist-
ing of a pumping plant, floodgates and appurtenant ditches for the
protection of the town of Bawcomville, La., as a feature of the
Ouachita River and tributaries comprehensive plan for flood control.
   The estimate of the total cost of the project (1952) is $265,000. All
work completed to date has been accomplished with funds under
section 6, Flood Control Act of May 15, 1928, and work proposed for
fiscal year 1953 will be accomplished with similar funds. The latest
 (1952) estimate of costs for completion of the project, which will be
accomplished under Flood Control, General, is $155,000.
   The existing project was authorized by the Flood Control Act
approved May 17, 1950. (See S. Doc. No. 117, 81st Cong., 1st sess.)
   Local cooperation.-For the portion of the project authorized
under the Flood Control Act approved May 17, 1950, local interests
are required to provide without cost to the United States all lands,
easements, necessary modifications to roads and highway bridges, and
rights-of-way necessary for the construction works; to hold and save
           FLOOD CONTROL-VICKSBURG,          MISS.,   DISTRICT        835

the United States free from damages due to the construction works;
and to maintain and operate all of the works after completion. As-
surances will be requested when funds become available.
   Operationsand results during fiscal year.-None under Flood Con-
trol, General. Local interests constructed levee gap closures and con-
tributed one-third of the cost of culvert pipe, temporary flap gates,
and concrete flash aprons under section 6, Flood Control Act approved
May 15, 1928.
   Government costs were $10,334.38. Expenditures were $10,429.79.
In addition, costs and expenditures from contributed funds amounted
to $5,214.95.
   Condition at end of fiscal year.-Construction of the Bawcomville
new levee, involving the placement of 283,482 cubic yards of levee
embankment and 234 linear feet of culvert pipe, has been completed
with funds under section 6, Flood Control Act approved May 15, 1928.
   The total Government costs and expenditures to the end of the
fiscal year were $61,872.06 for new work. In addition, costs and
expenditures from contributed funds amounted to $30,936.09.
   Proposed operations.-No work is proposed under Flood Control,
General, for the fiscal year 1953. Under section 6, Flood Control Act
approved May 15, 1928, local interests will contribute one-third of
the cost of concrete and wire fabric to be furnished by the Government.
The estimated cost of the materials is $890.
   The sum of $155,000 can be profitably expended to complete the
project during fiscal year 1954, as follows:
New work:
   Contract:
       Pumping plants and headwalls for drainage structures- -.. $121, 700
       Preparation of definite project report, plans, specifications
         and contingencies ______________33,                           300
           Total for all work______________________________--__    155, 000
                          17. JONESVILLE, LA.
   Location.-The work covered by this project is on the right bank
of Black River at Jonesville, La., 56.5 miles above the mouth.
   Existing project.-The plan of improvement provides for the en-
circlement of the town of Jonesville by earth levees and concrete flood
wall. A floodgate structure will be provided for discharge of surface
water during periods of normal river stages and for exclusion of
stream waters during flood stages. A pumping unit will be provided
for use when high river stages prevent natural drainage.
   The project will protect the people and property of Jonesville, La.,
against floods. The existing project was authorized by the Flood
Control Act approved June 22, 1936 (H. Doc. 196, 73d Cong., 2d
sess.) and was made a feature of the Flood Control, Mississippi River
and tributaries project by River and Harbor Act of 1950. The esti-
mated cost is $517,000 for construction, of which $373,000 (revised
in 1948) is under Flood Control, General. The estimated cost to local
interests is $100,000 for construction and $62,000 for lands and
damages.
   Local cooperation.-Local interests, as represented by the Board of
836     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

Commissioners of the Tensas Basin levee district, Rayville, La., have
contributed the required $100,000 toward construction costs. Exe-
cuted assurances of local cooperation, dated December 13, 1948, re-
ceived from Tensas Basin levee district for levee, retaining wall, and
drainage structures, were approved by the Chief of Engineers on
January 19, 1949. Rights-of-way for the project were made available
by resolution of the Board of Commissioners of the Tensas Basin
levee district dated May 10, 1949.
   Operations and results during fiscal year.-A contract for construc-
tion of pumping plant, floodwall, storm sewer, levee embankment,
highway crossing and closure gaps was continued and is 95 percent
complete.
   Government costs during the fiscal year under Flood Control, Gen-
eral, were $125,407.17 for new work. Expenditures were $112,425.20.
In addition, costs and expenditures from contributed funds amounted
to $24,119.71.
   Condition at end of fiscal year.-Contract work: Construction of
18,328 linear feet of ring levee, involving the placement of 461,950
cubic yards of embankment and three drainage structures, and of
three reaches of floodwall, have been completed. The contract for
construction of pumping plant, floodwall, storm sewer, levee embank-
ment, highway crossing, and closure gaps is 95 percent complete.
   An emergency levee constructed during the 1946 flood at a cost of
$29,595 to the Government and $14,797 to local interests, under sec-
tion 6 of the Flood Control Act approved May 15, 1928, not including
land and damage costs, was of temporary nature, is now largely in-
effective; the effective portion will form only a minor part of the
project works.
   The total costs to the end of the fiscal year under Flood Control,
General, were $372,229.96 for new work. Expenditures were
$358,699.39. In addition, costs and expenditures from contributed
funds amounted to $100,000.
   By authority of Public Law 516, Eighty-first Congress, second
session, this project has been incorporated as a feature of the project
for Flood Control, Mississippi River and tributaries, and report
thereon is included in the Annual Report of the Mississippi River
Commission.
   Proposed operations.-The unexpended balance of funds appro-
priated under Flood Control, General, $14,300.61, will be applied as
follows:
Accounts payable June 30, 1952___- -    _-______      ____---__     $13, 530. 57
New work: Contract: Completion of construction of pumping plant,
  floodwall, storm sewer, levee embankment, highway crossing and
  closure gaps, July-August 1952______-__-____        ______--_ _        770. 04
      Total under Flood Control, General----------------____         14, 300. 61
  No work is proposed for the fiscal year 1954.
                   FLOOD        CONTROL--VICKSBURG,                         MISS.,         DISTRICT                  837

                                       Cost and financial summary
                                                    U. S. FUNDS


                                                    Fiscal year ending June 30                              Total to June
                                                                                                           30, 1952, includ-
                                                                                                           ing fiscal years
                                   1948           1949           1950           1951            1952         priorto 1948

New work:
    Appropriated------..........----------$268, 000. 00 $105, 000. 00-----             ----------------- $373, 000. 00
    Cost----------------............               26, 823.33 161, 344. 22 $58, 655. 24 $125,407. 17
                                         ---------...........                                                   372, 229. 96
    Expenditures- -                  - ............25, 832. 93 156, 103,31  64, 337. 95 112, 425. 20            358, 699. 39


Other new work data:
   Unobligated balance, June 30, 1952_---     ------------                                                      $301. 62
   Unobligated balance available for fiscal year 1953---------------                                             301. 62

                                            CONTRIBUTED FUNDS


                                                   Fiscal year ending June 30                               Total to June
                                                                                                           30,1952, includ-
                                                                                                           ing fiscal years
                                   1948           1949          1950           1951             1952        priorto 1948

New work:
   Appropiated....-----....            $100, 000.00 -$100,
                              ....-----------.......                                                                000. 00
    Cost  -------------........------------.... 9, 227. 01   $40, 571. 01   $26, 082. 27    $24, 119. 71        100, 000.00
    Expenditures....-------------------9, 227. 01             40, 571. 01    26, 082. 27     24, 119.71         100,000.00



                                   18. BIG BLACK RIVER, MISS.

   Location.-The work covered by this project is on Big Black River,
Miss., which flows into the Mississippi River about 25 miles below
Vicksburg, Miss. (See U. S. Geological Survey State map, scale
1: 500,000.)
   Existing project.-The plan of improvement provides for improve-
ment of the flood channel by means of channel clearing and suitable
cutoffs from a point between Choctaw and Webster Counties, Miss.,
to the mouth, 325.6 miles. The project will lessen the frequency and
duration of floods on 180,000 acres of bottom lands. The existing
project was authorized by the Flood Control Act approved June 22,
1936. The cost of the completed work was $910,185.31. The latest
(1952) approved estimate for annual Federal cost of maintenance
is $75,000.
  Local cooperation.-None required. (Sec. 2 of the Flood Control
Act approved June 28, 1938, applies.)
   Operations and results during fiscal year.-Channel maintenance
work, clearing and snagging, was completed on a total of eight miles
of the waterway.
  Cost of maintenance was $17,737.02. Expenditures were $23,046.34.
   Conditionat end of fiscal year.-The existing project was completed
in 1941 and is being maintained.
  The total costs to the end of the fiscal year were $910,185.31 for new
work, and $495,478.32 for maintenance. Total expenditures were
$1,400,669.71.
838       REPORT OF CHIEF OF ENGINEERS,                                U.    S.      ARMY, 1952

  Proposed operations.-The unexpended balance, $15,415.60, plus
accounts receivable, $33, plus an appropriation during the fiscal year
1953 of $58,000, a total of $73,448.60, will be applied as follows:
Accounts payable, June 30, 1952___----------------------                $5, 026. 92
Maintenance:
    Hired labor :
        Channel maintenance, snagging and clearing where
          required, July 1952 to June 1953------       _---$59, 651. 68
        Stream gaging, hydraulic studies and inspections,
          July 1952 to June 1953___---_--_-- ----       _ 8, 070. 00
        Mapping, July 1952 to June 1953__-------------          700. 00
                                                                        68, 421. 68

        Total for all work__--                     --------
                                        ____-----._____                                    ___..            73, 448. 60
   The additional sum of $65,000 can be profitably expended during
fiscal year 1954 for maintenance of the channel.
                                 Cost and financial summary

                                             Fiscal year ending June 30                                     Total to June
                                                                     S_
                                                                      ..             .             .      3 0 , 195 2 , in c lu d -
                                                                                                        --ing fiscal years
                              1948         1949           1950           1951               1952             prior to 1948

Maintenance:
   Appropriated_ ....... $65. 000. 00   $60, 000. 00   $60, 000. 00   $16, 000. 00       $13, 400. 00           $505, 900. 00
   Cost_____________      87, 235. 38    65, 417. 97    50, 459. 31    36, 355. 81        17, 737. 02            495, 478. 32
   Expenditures --------
                     _    79. 776. 26    68, 224. 02    55, 006. 09    26, 290. 06        23, 046. 34            490, 484. 40



                            19. HOMOCHITTO RIVER, MISS.

   Location.-The project is located along the Homochitto River in
Adams and Wilkinson Counties, Miss. (See Corps of Engineers,
Mississippi River Commission alluvial valley maps and Artonish,
Woodville, and Kingston quadrangles.)
   Existing project.-The plan of improvement provides for the con-
struction of a number of cutoffs, aggregating approximately 5.8 miles
in length, which will reduce the length of the river from Rosetta,
Miss., to its mouth from 37.7 miles to 30.6 miles; construction of small
earth dams at points where the new cutoffs leave and reenter the
existing channel; clearing and snagging operations along both banks
from mile 1 to mile 35; and blasting along sides and bottom of the
channel where its development is retarded by stumps or hard non-
erodible clay strata.
   The project will result in clearing the river bed and banks of
obstructions, shortening the channel, and producing a more uniform
slope, thereby resulting in faster runoff of floodwaters in the basin,
minimizing the damages to crops and highways and making prac-
ticable more general use of farm and timber lands which have been
hitherto subject to frequent extended inundation.
   The existing project was authorized by the following flood control
acts:
                     FLOOD CO tTROL---VICKSBURG,                                 MISS.,         DISTRICT                      839

                                                                                                                        Documents
          Acts                                                Work authorized                                              and
                                                                                                                         reports

June 22, 1936   _____...    Small earth dams at heads of minor tributaries and channel improve-                         None.
                             ment for flood control.
June 28, 1938_______-       Additional channel improvements and related works for flood control_                        None.
Aug. 18, 1941-.....         Additional channel improvements and related works for flood control                         None.
                             on main river and tributaries.



   The cost of the completed ivork was $205,000. The latest (1952)
approved estimate for annual Federal cost of maintenance is $25,000.
  Local cooperation.-See pages 4-5 for requirements.
   Operations and results during fiscal year.-No maintenance work
was done. Stream gaging and inspections were continued with main-
tenance funds.
   Cost of maintenance was $1,618.39. Expenditures were $1,481.76.
   Condition at end of fiscal year.-The construction of cutoffs be-
tween miles 4 and 30 above the mouth of the channel has been com-
pleted. In addition clearing and snagging have been completed
between miles 0 and 30. The project is complete. Maintenance is
being carried on by hired labor between miles 0 and 30. Revetment
of the north bank at United States Highway No. 61 bridge by contract
has been completed.
   Total costs to the end of the fiscal year were $205,000 for new work
and $125,619.70 for maintenance. Total expenditures were
$330,481.69.
   Proposed operations.-The unexpended balance, $4,118.31, will be
applied as follows:
Accounts payable June 30, 1952 -------------                                                                             $138. 01
Maintenance:
    Hired labor: Stream gaging, studies and inspections, July 1952
      to June 1953------------------------------        ---------                                                       3, 980. 30
              Total for all work----                     -----------------------------                                  4, 118. 31
   The additional sum of $16,000 can be profitably expended during
fiscal year 1954, to be applied to snagging and removal of drift from
the channel between the mouth and Rosetta, Miss.
                                           Cost and financial summary

                                                        Fiscal year ending June 30                                   Total to June
                                                                                                                    30,1952, includ-
                                                                                                                    ing fiscal years
                                      1948            1949            1950            1951            1952            priorto 1948

New work:
   Appropriated ...--------.. $5, 118. 48 -------------------........--------............----........------------       $205, 000. 00
   Cost_            -         37, 836. 51 -------------------------------------------                                    205, 000. 00
   Expenditures .....         37, 838. 60 -------------------------------------                                          205, 000. 00
Maintenance:
     Appropriated ........ _        24, 881. 52    $20, 000. 00   $25, 000. 00 -___               $13, 400. 00           129, 600. 00
     Cost                           24, 887. 29     10, 586. 02    21, 533. 46    $3, 085. 48       1, 618. 39           125, 619. 70
     Expenditures ..-------         24, 881. 52      4, 283. 12    26, 820. 00     4, 088. 23       1, 481. 76           125, 481. 69
840      REPORT OF CHIEF OF ENGINEERS, U.             S. ARMY,   1952

  20. SNAGGING AND CLEARING UNDER SECTION 2 OF THE DLOOD
      CONTROL ACT APPROVED AUGUST 28, 1937, AS AMENDED

   The Flood Control Act approved August 28, 1937, as amended by
the Flood Control Acts of August 11, 1939, August 18, 1941, and July
24, 1946, authorized the allotment of not to exceed $1,000,000 from the
flood-control appropriations for any one fiscal year for the removal
of accumulated snags and other debris from, and the clearing and
straightening of channels in navigable streams and tributaries thereof
when such work is advisable in the interest of flood control; provided,
that not more than $50,000 shall be allotted for this purpose for any
single tributary from the appropriations for any one fiscal year.
   In addition to funds previously appropriated under this head,
the sum of $40,130.29 was made available during the fiscal year 1952
for completion of clearing and stripping the channel of Baxter Bayou,
La., and for enlargement of the channel and construction of cutoffs
in the lower 5 miles of Ashlog Bayou, Miss. During the fiscal year
the following work was done: With funds previously made available,
contract work consisting of snagging and realinement of 2.03 miles of
the channel of Two Bayou Creek, Ark., involving 160,000 cubic yards
of excavation, was completed; contract work consisting of the enlarge-
ment of approximately 6.5 miles of the channel of Hickahala Canal,
Miss., involving 352,000 cubic yards of excavation, was completed.
Contract work consisting of clearing and stripping of the channel of
Baxter Bayou, La., was completed. Plans and specifications were
completed for the enlargement of the channel of Ashlog Bayou, Miss.,
and construction of cutoffs in the lower 5 miles of the stream. Con-
struction work will be done by hired labor.
   The total costs to the end of the fiscal year were $689,261.91 for new
work.. Total expenditures were $689,236.91. These totals include
costs and expenditures of $90,932.24 which were transferred from the
New Orleans district, Corps of Engineers, during fiscal year 1952.
   Proposed operations.-The unexpended balance, $36,906.93, plus an
allotment of $95,000, a total of $131,906.93, will be applied as follows:
Accounts payable June 30, 1952--------------------------------           $25. 00
New work:
    Contract:
        Little Bayou Boeuf, La., channel improve-
         ment-------------------------------$49, 000. 00
   Hired labor :
        Walker Lake Canal, Miss., channel improve-
          ment--------------------------------46, 000. 00
        Ashlog Bayou, Miss.
          Channel improvement--------. $36, 545. 65
          Contingencies----------------     336. 28
                                                        36, 881.93
                                                                     131, 881. 93
      Total for all work-------    -------------------------- 131, 906.93
                      FLOOD CONTROL--VICKSBURG,                                MISS.,             DISTRICT                                 841
                                          Cost and financial summary
                                                   CONSOLIDATED


                                                      Fiscal year ending June 30                                                  Total to June
                                                                                                                                 30,1952, includ-
                                                                                                                                 ing fiscal years
                                      1948          1949           1950             1951                     1952                 prior to 1948


New work:
   Appropriated _..-....           $30, 300. 00 $112, 700.00    $35, 000. 00 $111, 194. 85            $40, 130. 29                   $726, 143. 84
   Cost ---------------             33, 911.90 117, 271.54       63, 818.43    11, 260. 80            122, 937. 51                    689, 261.91
   Expenditures--------.......      30, 764. 60 112, 249. 05     71, 964. 16   10, 043. 06            124, 155. 25                    689, 236. 91


Other new work data:
   Unobligated balance, June 30, 1952---------------------------$35, 881. 93.
   Appropriated for fiscal year ending June 30, 1953 ---------        95, 000. 00
   Unobligated balance available for fiscal year 1953--------------130, 881. 9a

21. PRELIMINARY                    EXAMINATIONS, SIURVEYS,                                AND               CONTINGENCIES
                                      FOR FLOOD CONTROL
   The cost of the work during the fiscal year was $67,254.43, with
expenditures of $69,512.23.
   The unexpended balance at the end of the fiscal year, $500, plus
an allotment for fiscal year 1953 of $41,000, a total of $41,500 will be
applied as needed during fiscal year 1953 in payment of expenses under
this heading.
   The additional sum of $24,000 can be profitably expended during
fiscal year 1954.
                                          Cost and financial summary

                                                      Fiscal year ending June 30                                                  Total to June
                                                                                                                                 30,1952, incelud-
                                                                                                                                 ing fiscal years
                                      1948          1949           1950             1951                     1952                 prior to 1948

Maintenance:
    Appropriated-......... $120, 000. 00         $45, 000. 00 $100, 600. 00      $87, 000. 00         $38, 000.00                  $1,172, 944. 56
    Cost------------
          ............--    102, 791. 01          59, 144. 80   74, 493. 18       89, 331.00           67, 254.43                   1, 172,444.56
     Expenditures--------.......   97, 492. 49    63, 059. 54    77, 207. 52     86, 817. 12            69, 512. 23                 1, 172, 444.56


                           22. INACTIVE FLOOD-CONTROL PROJECTS

                                                                                      Cost and expenditures
                                                                      For full           to June 30, 1952                            Estimated
                          Name of project                           report see                                                        amount
                                                                     annual                                                required to
                                                                   report for-           New work                   Mainte- complete
                                                                                                                    nance

1. Buffalo River, Miss....----------------------------1940                          ..............---------------......-------         2 $235,000
2. North Little Rock to Gillett, Ark. (Below Plum
     Bayou.).....----------------          --------------------- 1946                      $984, 990. 47 ........                         (3)
3. Boeuf and Tensas Rivers and Bayou Macon, Ark.
    and La....------------------------------------               1946                     1, 114, 000. 00            ..-.-.               (s)
4. Big Sunflower River and tributaries, Deer Creek
    and Steele Bayou, Miss------------------------
                               .........................         1946                        699, 070.00 .........                        (3)

1 Revised 1952.
2 Deferred indefinitely because of insufficient justification under present conditions.
3 Transferred to jurisdiction of Mississippi River Commission by the Flood Control Act of 1946, from
which funds for future work will be allotted.
842          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                         1952

                              23. MISCELLANEOUS ACTIVITIES
Status of all investigations for navigation called for by river and harbor acts
                            and committee resolutions

                                                                         Date trans-
               Locality                         Authorization act         mitted to        Document  Recom-
                                                                          Congress
                                                                                             No.    mendation
                                                                                                   i
                                                                                       i



Arkansas River, protection 2 of          Flood Control Committee
  levees below Pine Bluff, Ark. 5          resolution, April 19, 1945.
Arkansas River and tributaries,          Flood Control Committee
flood control, and bank erosion           resolution, Dec. 8, 1944.
  protection of agricultural lands at
  and in vicinity of the Hannaberry
  Lake area of the 2Farelly Lake
  levee district, Ark. 5
Arkansas, White, and Ouachita            Senate Public Works Com-
   Rivers and tributaries in the           mittee resolution, Feb.
  State of Arkansas for utilization         25, 1949.1 2
  of water resources with particular
  reference to irrigation and water
  supply in connection with im-
  provements in the interest of
  flood control, navigation, hydro-
  electric
        1   power and allied water
  uses.
Arkansas, White, and Red River           Flood Control Act, May
Basins, Ark., La., Okla., Tex.,    3      17, 1950.
N. Mex., Colo., Kans., and Mo.
Bayou Meto Basin and Grand               Senate Public Works Com-
  Prairie Region, Ark., with re-   4
                                           mittee resolution, Sept.
  spect to a ground water supply. 5        28, 1951.
Bear Creek, a tributary of Big           Flood Control Act, July
  Black River, Miss.                       24, 1946.
Big Bayou and Black Pond Slough,         Flood Control Committee
  Ark., Boeuf and Tensas Rivers            resolution, May 23, 1946.
  and Bayou Macon, Ark., and La.,
  to extend 4flood control and drain-
  age work. 5
Big Black River, Miss. (with par-        House Public Works Com-
  ticular 7 reference to its tribu-        mittee resolution, Oct.
  taries).                                 16, 1951.
Black Pond Slough and Big Bayou,         Flood Control Committee
Ark, Boeuf and Tensas Rivers              resolution, May 23, 1946.
and Bayou Macon, Ark., and La.,
  to extend 4flood control and drain-
age work. 5
Boeuf and Tensas Rivers and              .....do--------
                                                  ...      ----------
  Bayou Macon, Ark., and La., to
  extend flood control and drainage
  work up Big Bayou    4   and Black
   Pond Slough, Ark. 5
Boeuf and Tensas Rivers and              Senate Public Works Com-
   Bayou Macon, Ark., and La., for         mittee resolution, June 1,
  flood control and drainage or            1948.
  other features in the4   vicinity of
   Lake Chicot, Ark. 5
Chicot Lake, Ark., Boeuf and              Senate Public Works Com-
  Tensas Rivers and Bayou Macon,           mittee resolution, June
  Ark., and La., for flood control         1, 1948.
  and drainage or  4 other features in
  the vicinity of. 5
Grand Prairie Region and Bayou           Senate Public Works Com-
Meto Basin, Ark., with  4 respect to      mittee resolution, Sept.
  ground water supply. 5                   28, 1951.
Hannaberry Lake area of the              Flood Control Committee
  Farelly Lake Levee District,             resolution, Dec. 8, 1944.
  Arkansas River for flood control,
  and bank erosion2 protection of
  agricultural lands. 5
Macon Bayou, Boeuf and Tensas            Flood Control Committee
   Rivers, Ark., and La., to extend        resolution, May 23, 1946.
  flood control and drainage work
  up Big Bayou   4  and Black Pond
  Slough, Ark. 5
Macon Bayou, Boeuf and Tensas            Senate Public Works Com- .
   Rivers, Ark., and La., for flood       mittee resolution, June
control and drainage or other             1, 1948.
  features in the vicinity of Lake
  C'hicot, Ark.4 6
   See footnotes at end of table.
                   FLOOD        CONTROL-VICKSBURG,                     MISS.,   DISTRICT            843
Status of all investigations for navigation called for by river and harbor acts
                     and committee resolutions-Continued

                                                                        Date trans-   Document  Recom-
               Locality                       Authorization act          mitted to      No.    mendation
                                                                         Congress

Ouachita River and tributaries,           Senate Public Works Com-
   Arkansas and Louisiana, con-            mittee resolution, Mar.
   struction of reservoir or reservoirs    19, 1951.
   for flood control, power and other
   purposes in1 the Saline River
   Basin, Ark.
Ouachita, White and Arkansas              Senate Public Works Com-
   Rivers and "tributaries in the           mittee resolution, 'Fob.
   State of Arkansas for utilization        25, 1949.
   of water resources with particular
   reference to irrigation and water
   supply in connection with im-
   provements in the interest of
  flood control, navigation, hydro-
   electric
         1  power, and allied water
   uses.
Red, Arkansas, and White River            Flood Control Act, May
   Basins, Ark., La., Okla., Tex.,   3      17, 1950.
   N. Mex., Colo., Kans., and Mo.
Saline River Basin, Ark., Ouachita        Senate Public Works Com-
   River and tributaries, Arkansas         mittee resolution, Mar.
   and Louisiana, construction of          19, 1951.
   reservoir or reservoirs for flood
   control, power and other pur-
  poses.'
Tensas River, Boeuf River and             Flood Control Committee
   Bayou Macon, Ark. and La., to           resolution, May 23, 1946.
   extend flood control and drainage
   work up Big Bayou   4   and Black
   Pond Slough, Ark. 5
Tensas and Boeuf Rivers and               Senate Public Works Com-
   Bayou Macon, Ark. and La.,              mittee resolution, June
  for flood control and drainage           1, 1948.
  or other features in 4the vicinity
  of Lake Chicot, Ark. 5
Vicksburg<Yazoo Area, Miss., for          House Public Works Com-
  modification of adopted improve-          mittee resolution, Dec.
  ment.a                                    14, 1950.
White, Arkansas, and Red River            Flood Control Act, May
  Basins, Ark., La., Okla., Tex.,    3      17, 1950.
  N. Mex., Colo., Kans., and Mo.
White, Arkansas, and Ouachita             Senate Public Works Com-
   Rivers and tributaries in the            mittee resolution, Feb.
   State of Arkansas for utilization        25, 1949.
  ,ofwater resources with particular
  reference to irrigation and water
  supply in connection with im-
  provements in the interest of
  flood control, navigation, hydro-
  electric
         1  power, and allied water
  Uses.


  1 To be incorporated in the comprehensive report on the Arkansas, White, and Red River Basins for the
conservation and development of land and water resources, which is under preparation in the Arkanisas-
White-Red Office, Southwestern division, Corps of Engineers, U. S. Army, Tulsa, Okla.
  2 To be included in definite project report on Arkansas River and tributaries.
  3 A coordinated comprehensive report under preparation by Federal and State agencies for conservation
and development of land and water resources.
  4 Field report being made by Mississippi River Commission.
  6 To be summarized in the comprehensive Arkansas, White, and Red River Basins report.
  6 Field report was prepared by Mississippi River Commission.
 ?  Limited to preliminary examination scope.


                        24.    EMERGENCY FLOOD-CONTROL WORK

   Because of the heavy demands for emergency flood-control work oc-
casioned by disastrous floods occuring from year to year, Congress
authorized the appropriation of emergency funds to be expended
under the direction of the Secretary of the Army and the supervision
of the Chief of Engineers for the repair, restoration, and strengthen-
ing of levees and other flood-control works which had been threatened
844           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                                1952

or destroyed by floods, and for the. construction of emergency bank
protection works to prevent flood damage to highway bridge ap-
proaches, and public works, when in the opinion of the Chief of Engi-
neers such work is advisable.
  In addition to funds previously appropriated under this head, the
sum of $46,000.00 was allotted for fiscal year 1952 for emergency work
pursuant to the Act of May 24, 1949.
  During the fiscal year, construction of hydraulic fill for the repair
of Ouachita River levees near Rilla, La., was completed by hired
labor. A total of 126,546 cubic yards of embankment was placed.
Levee repairs were completed by hired labor at Columbia, La. The
work involved the dressing of 37 stations of levee and the placement
of 28,278 cubic yards of earth blanket. Contract work consisting of
the restoration of a portion of the Red River backwater levees,
Louisiana, involving the placement of 61,000 cubic yards of embank-
ment, was completed.
  Total costs during the fiscal year were $153,555.79 for maintenance.
Expenditures were $154,306.63 for maintenance and $1,710.00 for new
work, a total of $156,016.63.
  The total costs to the end of the fiscal year were $674,443.49 for
new work, and $4,478,360.32 for maintenance. Expenditures were
$4,478,360.32 for maintenance and $674,443.49 for new work, a total
of $5,152,803.81.
  In addition, costs and expenditures of $4,677.40 were incurred from
contributed funds.
EMERGENCY FLOOD CONTROL WORK-CONSOLIDATED STATEMENT
FOR WORK UNDER PUBLIC LAWS 138 AND 318, 78TH CON'G.; 75, 79TH
CONG.; 102 AND 858, 80TH CONG., AND 583 AND 759, 81ST CON'G.
                                          Cost and financial summary

                                                          Fiscal year ending June 30                                        Total to June
                                                                                                                            30, 1952, includ-
                                                                                                                            ing fiscal years
                                       1948           1949               1950                1951            1952             priorto 1948

New work:
   Appropriated--------- ------------ -               -      ------------------------      .......       -----------.....       $566, 627. 85
    Cost-------               ----            ---------- ------------------------ ------------                                   566, 627. 85
   Expenditures--------.........     $2,332.28   --------------------------------------                                          566, 627. 85
Maintenance:
   Appropriated-_...... 431, 000.00 $581,359. 00 $123, 580.61 $363, 255.00                               $35, 325.36           3, 981, 693. 71
   Cost---....-------- -... 410, 280. 85           36, 120. 79      426, 943. 46          573, 514. 72   105, 674. 97          3, 981, 043. 32
   Expenditures-....._.. 407, 949. 49              38, 452. 15      397, 836. 97          602, 621. 21   105, 674. 97          3, 981, 043. 32
                          FLOOD        CONTROL--VICKSBURG,                                MISS.,        DISTRICT                        845
EMERGENCY FLOOD CONTROL WORK, UNDER AUTHORITY OF FLOOD
       CONTROL ACT APPROVED 18 AUG. 1941, AS AMENDED
                                               Cost and financial summary
                                               CONSOLIDATED STATEMENT


                                                              Fiscal year ending June 30                                     Total to June
                                                                                                                            30,1952, includ-
                                                                                                                            ing fiscal years
                                          1948              1949              1950             1951             1952          prior to 1948

Maintenance:
   Appropriated .. ...               -$2,800.00 $100,000.00 $19327,000.00 ._           .                    $13, 883.00           $497, 317. 00
    Cost _ _-         -                45, 797. 23 117, 057. 15 259, 809. 08 $20,733.81                      47, 880. 82           497, 317. 00
    Expenditures              ...      43, 190. 80 117, 186. 89 262, 386. 91  20, 245. 08                    48, 631. 66           497, 317, 00



EMERGENCY BANK PROTECTION-WORK UNDER AUTHORITY OF THE
         FLOOD CONTROL ACT APPROVED 24 JULY 1946

                                                Cost and financial summary
                                               CONSOLIDATED STATEMENT


                                                              Fiscal year ending June 30                                     Total to June
                                                                                                                            30, 1952, includ-
                                                                                                                            ing fiscal years
                                          1948              1949              1950             1951             1952          prior to 1948

New work:
   Appropriated--------------------                 $12, 500 $50, 000. 00                  $48, 014. 50 -$2, 698. 86              $107, 815.64
   Cost----------               ------------..------------      1, 145. 07                 106, 670. 57    ..----                  107, 815. 64
   Expenditures.........--- ------------    ------------        1, 145. 07                 104, 960. 57    1, 710. 00              107, 815. 64



    EMERGENCY FLOOD CONTROL WORK PURSUANT TO PUBLIC LAW
         NO. 79TH CONG., 1ST SESS., APPROVED 5 JUNE 1945

                                                Cost and financial summary

                                                              Fiscal year ending June 30                                     Total to June
                                                                                                                            30,1952, includ-
                                                                                                                            ing fiscal years
                                          1948              1949              1950             1951             1952          prior to 1948

Maintenance:
                 ..........
     Contributed------          ------------             ------------------               ------------ ------------............     $4, 677. 40
     Cost-   -------------------------------                                                                                         4, 677. 40
     Expenditures.........  -----------------------------------------------------------                                              4, 677. 40




           245554-53-vol.1                        54
     IMPROVEMENT OF RIVERS AND HARBORS IN THE
              MEMPHIS, TENN., DISTRICT

  This district comprises a portion of southeastern Missouri, the
western portions of Kentucky and Tennessee, a small portion of
northern Mississippi, and northeastern Arkansas. It includes the
area embraced in the drainage basins of the eastern tributaries of
the Miissssippi River south of the Ohio River Basini to Noiloniah
and Horn Lake Creeks, inclusive, and those of the western tributaries
south of the Little River Diversion Channel and Commerce, Mo.,
to the mouth of the Arkansas River but not including any portion
of the Arkansas River Basin nor that of the White River Basin above
Peach Orchard Bluff, mile 168.7.
  District engineer: Col. L. H. Foote, Corps of Engineers, to April
11, 1952; Lt. Col. R. C. Bahr, Corps of Engineers, acting District
engineer, from April 12, 1952 to April 24, 1952; and Col. A. F. Clark,
Jr., District engineer, since that date.
  Division engineer of the lower Mississippi Valley division, Vicks-
burg, Miss., comprising the New Orleans, La., Vicksburg, Miss., and
Memphis, Tenn. districts: Brig. Gen. P. A. Feringa, Corps of
Engineers.
                                   IMPROVEMENTS

           Navigation                             Flood control-Coptinued
                                     Page                                      Page
1. Wolf River (Memphis Har-               7. Prelifhinaty     exariiiations,
     bor), Tenn__--                  847       surveys, and contingencies
                                               for flood control- -            853
2. Examinations, surveys, and             8. Inactive      flood-control
     contingencies (general)_---     849       projects                        854
3. Inactive navigation projects.     850 9. Miscellaneous activities _-_       854
4. Miscellaneous activities ....     850 10. Emergency      flood    control
                                               work under authority of
                                               Public Laws Nos. 138 and
          Flood control                        318, 78th Cong., Public
                                               Law No. 75, 79th. Cong.
5. Memphis, Wolf River, and                    and Public Laws Nos. 102
     Nonconnah Creek, Tenn__         850       and 858, 80th Cong- ...         856
6. Snagging and clearing under           11. Flood control work under
     authority of section 2 of                 authority of section 205
     the Flood Control Act ap-                 of the Flood Control Act
     proved Aug. 28, 1937, as                  approved June 30, 1948,
     amended_-------------           852       as amended       _--            857

             1. WOLF      RIVER    (MEMPHIS       HARBOR),    TENN.

  Location.-Wolf River rises in Benton County, Miss., and flows
generally northwesterly about 100 miles, through Shelby County,
Tenn., emptying into the Mississippi River within the corporate
limits of the city of Memphis, Tenn. (See Mississippi River Com-
mission alluvial valley maps, scale 1: 62,500, and scale 1: 500,000.)
  Previous projects.-The River and Harbor Act of August 18, 1894,
authorized dredging at the mouth of Wolf River as an item in the
                                                                        847
848     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

improvement of Memphis Harbor, the work being carried out under
the supervision of the Mississippi River Commission.
    Existing project.-This provides for a channel 9 feet deep at low
water (71/2 feet below zero on the Memphis gage) from its mouth to
Hindman Ferry Road (5.5 miles) with bottom widths of 250 feet
from the mouth to Keel Avenue and 200 feet from Keel Avenue to
North Second Street Road, and thence 125 feet wide from North
Second Street Road to Hindman Ferry Road.
    The estimate of cost for new work, revised in 1935, is $1,185,000.
The latest (1952) approved estimate of cost for annual maintenance
is $104,000.
    The work of improvement under the existing project up to North
Second Street Road (3.5 miles) was authorized September 6, 1933,
by the Public Works Administration, and the existing project was
adopted by the River and Harbor Act approved August 30, 1935
  (Rivers and Harbors Committee Does. 26, 72d Cong., 1st sess., and
45, 74th Cong., 1st sess.). Sketch maps are printed in the project
documents.
    Local cooperation.--The work under the existing project is subject
to the condition that local interests shall furnish, free of cost to the
United States, all rights-of-way required for channel enlargement and
straightening, and suitable areas with retaining levees where needed
for disposal of dredged material during initial construction and future
maintenance as and when needed, and shall furnish assurances satis-
factory to the Secretary of-the Army saving the United States free
from damages resulting from the work. The work is also subject to the
provision that no works shall be undertaken on any section of the
channel through or above any bridge until such bridge has been altered
in a manner satisfactory to the Secretary of the Army, without cost
to the United States. The conditions as pertaining to the improve-
ment up to North Second Street Road have been complied with. Con-
ditions above that point have not been complied with.
    Terminal facilities.--There are 32 terminals operating in the port
of Memphis, which comprises the upper 2 miles of Tennessee Chute,
2 miles of the Mississippi Liver upstream therefrom, and the lower-
most 3 miles of Wolf River. Five terminals are operated by common
carriers; 3 by contract carriers; and 24 are operated privately.
    Operations and results during fiscal year.-Maintenance dredging
during the fiscal year of 1952 was conducted with leased plant. The
dredge Burlington moved a total of 634,006 cubic yards of material
in maintaining a channel of project dimensions.
    The total costs for the year were $91,930.59 and total expenditures
were $91,438.17.
   Condition at end of fiscal year.-The existing project was about 50
percent complete. At the end of the fiscal year ample depths existed
in the channel to about mile 3. Project depth at low water is main-
tained in this reach by dredging as required.
   From this point to beyond North Second Street Road depths of
from 1 to 2 feet obtain during the low-water season. The work re-
maining to be done to complete the project is the extension of the
channel from North Second Street Road to Hindman Ferry Road.
    Exclusive of maintenance dredging done during the fiscal year 1936
                RIVERS AND -HARBORS----MEMPHIS,'TENN.,                                               DISTRICT                  849


with Mississippi River funds which were included in the annual
report of the Mississippi River Commission for that year under the
caption "Dredges and dredging," the total costs to June 30, 1952, were
$1,649,577.19, of which $586,500 were from Public Work funds for new
work, $1,045,577.19 were from regular funds for maintenance, and, to
cover the cost of retaining levees required of local interests, there
have also been costs charged to contributed funds amounting to
$17,500.
  The total expenditures from Federal funds were $1,631,584.77, the
expenditures from contributed funds were $17,500.
  Proposed operations.-An allocation of $93,230 will be applied on
channel maintenance.
  The sum of $100,000 can be profitably expended during the fiscal
year 1954 for maintenance dredging by leased plant from the mouth
of Wolf River up stream to a point approximately 1/2 mile below the
North Second Street Road.
                                           Cost and financial summary

                                                         Fiscal year ending June 30                                 Total to June
                                                                                                                   30,1952, includ-
                                                                                                                   ing fiscal years
                                       1948            1949            1950            1951            1952          priorto 1948

New work:
   Appropriated-------....................---------------------------------..............-----......-------                                  1$604,000.00
   Cost ....------------------..........------..................------------------------............---...........--.........---------------   604,000.00
   Expenditures_ ..... ..... - .......                            _ .... ........... . ........                          ............ 604, 000. 00
Maintenance:
     Appropriated -----------..--..
                      ..                    _ $112, 000. 00        $90,000. 00     $77, 760. 70    $95,000. 00          1, 048, 646. 60
                 -
     Cost-- .........-   -.... $86, 124.32 100, 657. 83            102, 972. 77     91, 620. 81     91, 930. 59         1, 045, 577. 19
     Expenditures ......-------- 85, 480. 53 102, 909. 51          100, 174. 81     93, 067. 55     91, 438. 17         1, 045, 084. 77


Other new- work data: Estimated additional amount needed to be
  appropriated for completion of existing project_---------------_ $598, 500
  1 United States Funds $586,500, Contributed Funds $17,500.

     2. EXAMINATIONS, SURVEYS, AND OONTINGENCIES                                                          (GENERAL)
   The cost of work during the year amounted to $8,129.91, the ex-
penditures were $7,466.32. The unobligated balance on June 30,
1952 amounting to $321.45, plus an allotment for fiscal year 1953 of
$8,900 for contingencies, will be applied during fiscal year 1953 to
payment of expenses to be incurred under this heading.
   The additional sum of $10,700 can be profitably expended for con-
tingencies during fiscal year 1954.
                                           Cost and financial summary

                                                         Fiscal year ending June 30                                 Total to June
                                                                                                                  30,1952, includ-
                                                                                                                  ing fiscal years
                                       1948            1949            1950            1951            1952          priorto 1948

Maintenance:
     Appropriated .........$12, 500. 00             $2, 567. 52    $10, 000. 00     $8, 500. 00     $7, 200. 00          $277, 159. 55
     Cost---------------15, 105. 17                  8,059. 53       7, 282. 79     12, 087. 99      8, 129. 91           276, 822. 65
     Expenditures--------- 14, 629. 89               8, 128. 03      7, 485.69      12, 341.89       7,466. 32            276, 065.29


Other new work data:
    Unobligated balance, June 30, 1952_-__-----
                                        ....                                                                             $321.45
    Unobligated balance available for fiscal year 1953---_                                        ------            -     321.45
850           REPORT OF CHIEF OF ENGINEERS,                                           U.     S.     ARMY, 1952


                             3. INACTIVE NAVIGATION PROJECTS

                                                                   For last           Cost and expenditures to                  Estimated
                                                                 full report                June 30, 1952                        amount
                     Name of project                             see annual                                                     required to
                                                                   report            N                                           cmplete
                                                                   for-              New work          Maintenance               co


1. St. Francis and L'Anguille Rivers and Blackfish
     Bayou, Ark_--------              __----------------------      1943             $92,000. 34           $300,449.43                (1)
2. Obion River, Tenn.2_______________                               1911              28, 716. 75                                t    ()
3. Forked Deer River, Tenn., including South
     Fork-_             -----------------__ ._from-                 1912              25, 000. 00               12, 818. 50           (1)
4. Removing snags and wrecks from the Mississippi
     River below the mouth of Missouri River and
     from the Old and Atchafalaya Rivers_                           1948             _                        318, 833. 56            (4)
5. White River, Ark. (below Peach Orchard Bluff)                    1951             25, 000. 00           1, 360, 578. 97            (1)

1Existing project is for maintenance only.
2 Recommended for abandonment in H. DOe. 467, 69th Cong., 1st sess.
2 Completed.
4 No funds available under this project. Work is being carried on under Appropriation Flood Control,
Mississippi River and tributaries.


                                   4. MISCELLANEOUS                        ACTIVITIES

Status of all investigations for navigation called for by river and harbor acts
                                          and committee resolutions


                                                                                         Date trans-
                Locality                          Authorization act                       mitted to            Document          Recom-
                                                                                          Congress                No.           mendation
                _                         I                                      i




Arkansas, White and Red River                 Flood Control Act, May                                   .        ..-----------
  Basins, Ark.; La., Okla., Tex.,2              17, 1950.
N. Mex., Colo., Kans., and Mo.
Mississippi River at West Mem-                River and Harbor            Act,
phis, Ark., with a view to the                July 24, 1946.
construction of a harbor.1                                                                                      -- -
                                                                                                           - --_--
Red, Arkansas and White River                 Flood Control Act, May
                                                                                                       ------------
Basins, Ark., La., Okla., Tex.,                17, 1950.
N. Mex., Colo., Kans., and Mo.2
West Memphis, Ark., construction              River and Harbor Act,                                        ------- -- .
of harbor on Mississippi River.'               July 24, 1946.                                                      -
White, Arkansas and Red River                 Flood Control Act, May                                          ---- --
                                                                                                           - .--
Basins, Ark., La., Okla., Tex.,                17, 1950.
N. Mex., Colo., Kans., and Mo.2
White River and tributaries, Mis-             Senate Public Works Com-
souri and Arkansas, with a view                mittee resolution, July
  to channel rectification along                29, 1949.
  main stem between Newport,
  Ark., and the Mississippi River,
in:interest
          3  of navigation and flood
control.

  1 At the request of local interests, this report has been indefinitely postponed.
  s A coordinated comprehensive report under preparation by Federal and State agencies for the con-
servation and development of land and water resources.
  3 To be incorporated in the comprehensive report on the Arkansas, White and Red River Basins for
the conservation and development of land and water resources, which will be prepared in the Arkansas-
White-Red office, Southwestern division, Corps of Engineers, U. S. Army, Tulsa, Okla.

        5.    MEMPHIS, WOLF RIVER, AND NONCONNAH CREEK, TENN.
   Location.-The work covered by this project lies within and adjacent
to the city of Memphis in Shelby County, Tenn., on the left bank of
Wolf River and the right bank of Nonconnah Creek from the conflu-
ence of these streams with the Mississippi River upstream for approxi-
mate distances of 10 and 4 miles, respectively. (See U. S. Geological
Survey map of Tennessee, scale 1: 500,000, and Mississippi River
Commission alluvial valley maps, scale 1: 62,500 and 1: 500,000.)
   Existing project.-The plan of improvement provides for the con-
struction of a system (eight sections) of levees, flood walls, and bank
            FLOOD   CONTROL-MEMPHIS,          TENN.,   DISTRICT          851
protection, consisting of the following features: About 22,000 feet of
earth levee and two concrete railroad floodgates along the right bank
of Nonconnah Creek, extending from high ground near Tennessee
Chute south of Riverside Park to high ground at Bodley Avenue east
of Prospect Street; about 13,300 feet of concrete flood wall, about 2,300
feet of steel cellular wall and 31,500 feet of earth levee along the left
bank of Wolf River, extending from downtown Memphis to high
ground near Douglas Park; construction of six new pumping stations
and eight storage reservoirs with appurtenant works for the disposal
of interior drainage; and the construction of a culvert under North
Bellevue Boulevard near Cypress Creek for the enlargement of the
Cypress Creek Reservoir. The project will provide protection, with
3 feet free-board, for the city of Memphis and adjacent areas against
a Mississippi River flood of 54.5 feet stage, or 4.1 feet higher than the
maximum flood of record, which occurred in February 1937. The
project was adopted by the Flood Control Act approved August 28,
1937, and so modified by the War Department Civil Appropriation Act
approved June 28, 1939, that the cost of providing pumping stations
and outlet works for interior drainage shall be borne by the United
States, and further amended by the FTood Control Act approved July
24, 1946, to increase the total estimated cost of the project by $1,500,-
000. The current (1952) estimated cost of construction, is $13,430,000.
  'Local cooperation.-Generalassurances given by the city of Mem-
phis and Shelby County, Tenn., were approved by the Secretary of
War on August 2, 1938. All rights-of-way for the project have been
provided by local interests with the exception of section 5 and sub-
sections 1-A, 1-B, and 1-E of section 1.
   Operations and results during the fiscal year.-Planningand design
were continued during the year for sections of the project not yet com-
pleted. Section 1-D is 54 percent complete; Marble Bayou pumping
station is 99 percent complete and section 7 is complete, except for
minor restoration. A contract has been awarded on section 1-C but
no work initiated.
   The costs for the year were $476,187.09 and the expenditures were
$521,938.29, all for new work.
   Condition at end of fiscal year.-Sections 8, 6, 4, and 2 levees, sec-
tion 3 wall, Nonconnah Creek, Cypress Creek, May Street, Work-
house, and Fairfax pumping stations, and appurtenant works have
been turned over to local interests for maintenance and operation.
   The total costs to June 30, 1952, were $7,778,910.13, and the total
expenditures were $7,731,367.22, all for new work.
   Proposed operations.-The unobligated balance June 30, 1952, of
$8,760.54, plus an allotment of $697,000 for fiscal year 1953, totaling
$705,760.54, will be applied as follows:
New work:
   Completion of section 7 levee_______________________________       $31, 120
   Completion of Marble Bayou pumping station ____--____               19, 000
   Completion of section 1-D levee ___________---------- -     -       18, 000
   Continue contract for construction of 1-C floodwall_    ____------371, 300
   Bayou Gayoso discharge tubes-----------------------------           22, 560
   Section 1-B floodwall      ---------------------------------       243, 780

      Total for all work .-. ____ _--------------------------         705, 760
852          REPORT OF CHIEF OF ENGINEERS,                                     U.      S. ARMY,                1952

  Additional funds in the amount of $800,000 can be profitably ex
pended in fiscal year 1954 to continue construction of section 1-B flood-
wall under continuing contract of fiscal year 1953.
                                      Cost and financial summary

                                                  Fiscal year ending June 30                                        Total to June
                                                                                                                   30,1952, includ-
                                                                                                                   ing fiscal years
                                 1948           1949            1950             1951                 1952           prior to 1948

New work:
    Appropriated- ........   $1,052,000.00 .... ......    $360, 000. 00 $500, 000. 00 $750. 000.00                      $8, 538, 700.00
    Cost..    ----             502, 213. 65 $811, 991.41 1, 163, 594.08  537, 185. 76 476, 187. 09                       7,778, 910. 13
    Expenditures --------.     505, 647. 95   785, 349. 17 1, 055, 986. 56     589, 852. 66       521, 938. 29           7, 731,367. 22

Other new work data:
    Unobligated balance, June 30, 1952_______________---            $8, 760. 54
    Appropriated for fiscal year ending June 30, 1953__------- -697, 000. 00
    Unobligated balance available for fiscal year 1953             705, 760. 54
    Estimated additional amount needed to be appropriated for
      completion of existing project_-- _---    ----   -----    4, 194, 300. 00
6. SNAGGING AND CLEARING UNDER AUTHORITY OF SECTION 2 OF
  THE FLOOD CONTROL ACT APPROVED AUGUST 28, 1937, AS AMENDED
   The Flood Control Act approved August 28, 1937, as amended
by the Flood Control Acts approved August 11, 1939, August 18,
1941, and July 24, 1946, authorized the allotment of not to exceed
$1,000,000 from the flood control appropriations for any one fiscal
year for the removal of accumulated snags and other debris from,
and the clearing and straightening of, channels in navigable streams
and tributaries thereof when such work is advisable in the interest
of flood control; provided that not more than $50,000 shall be allotted
for this purpose for any single tributary from the appropriations for
any one fiscal year.
  Funds were made available during fiscal year 1952 for snagging and
clearing as follows: on Pond Creek (Obion River system) $47,000;
Muddy Creek (tributary of the Hatchie) $3,869; Obion River near
Rives, Tenn. $40,000; Tuscumbia River (tributary of the Hatchie)
$40,000; and Rutherford Fork (tributary of the Obion) $30,434.
   Channel clearance, consisting of removal of snags, drift, and other
debris by contract was accomplished as follows:
                                                    Summary

                                                                              Pro-                           Fiscal year 1952
                                                                             posed       Com-
                               Item                                           work pleted
                                                                             (miles) (miles)
                                                                                     )                   Cost             Expendi-
                                                                                                                           tures

Pond Creek (Obion River system), Tennessee 1-                                        ....
                                                                                8.6 _._.               $1,059. 51           $1,030. 24
Muddy Creek (tributary of the Hatchie), Mississippi 2 ____.....                 4. 6           4. 6      2, 958.   29        9, 491. 22
Big Muddy Creek (tributary of the Hatchie), Tennessee 1        _                4. 2    ....- .        3 2, 303.   49      82, 303. 49
Town Creek (tributary of the Hatchie),
                             1          Tennessee .......... -                  2. 2    ........       4 3, 557.   49      4 3, 557. 49
Obion River near Rives, Tenn. _-     __     _-___                       -_      1.0                         856.   72           627. 41
Tuscumbia River (tributary of the Hatchie), Mississippi 1-....                  7. 6     .----- 4, 676.04                    4, 671. 65
Loosahatchie River, Tenn_-..........    __.....___ __                   _.      3. 1        0.3         6, 328. 64         36, 218. 11
Rutherford Fork (tributary of the Obion), Tennessee 1...---                     3.9 ---....---..        4, 024. 69          3, 620. 58

  1 Contract has not been awarded.
  2 Work completed
  3 Fiscal years 1951 and 1952.
  4 Funds revoked because local interests did not furnish rights-of-way.
                  FLOOD       CONTROL-MEMPHIS,                         TENN.,         DISTRICT                     853

  Total channel clearance work performed to June 30, 1952, is as
follows:
                                                                                                                   Miles
Hatchie River (and its tributaries), Tennessee and Mississippi---- -- 176. 5
Obion River (and its tributaries), Tennessee --      ------------------224. 8
Mayfield Creek, Ky---------      ---------------------------------       5. O0
Loosahatchie River, Tennessee----___--- ------- ----       ---------     0. 3
   The total costs to June 30, 1952, were $742,315.41, of which
$702,315.41 was from regular funds and $40,000 from emergency re-
lief funds. The total expenditures were $747,925.45.
   Proposed operations.-The balance unexpended on June 30, 1952,
$235,060.59, will be applied to channel improvement by contract.
  From allotments for fiscal year 1953, $35,000 will be expended on
Middle Fork of Forked Deer River, Tenn.; $30,000 on Rutherford
Fork, Tenn.; $50,000 on Middle Fork, Obion River, Tenn.; and $42,000
on Hurricane and Aunt Betty Rodgers ditches, Arkansas.
                                     Cost and financial summary
                                               CONSOLIDATED

                                                  Fiscal year ending June 30                              Total to June
                                                                                                         30,1952, includ-
                                                                                                         ing fiscal years
                                 1948           1949           1950           1951           1952          priorto 1948

New work:
                         $
   Appropriated- ....... 1105, 000. 00       $93, 000. 00 $100, 000. 00    $99, 500. 00 $129, 859. 73         $982, 986. 04
    Cost--------------        174, 037. 05    83, 060. 54    64, 407. 10    29, 935. 47   16, 032. 90          742, 315. 41
    Expenditures ....-   ..   181, 572. 40    81, 534. 34    63, 973. 15    31, 778. 07   21, 809. 30          747, 925. 45


Other new work data:
   Unobligated balance, June 30, 1952_ ---------------------                                            $198, 969.53
   Unobligated balance available for fiscal year 1953_-------                                       -    198, 969. 53

7. PRELIMINARY                EXAMINATIONS, SURVEYS,                              AND       CONTINGENCIES
                                  FOR FLOOD CONTROL

  The cost of work during the fiscal year was $26,784.54. The ex-
penditures were $12,625.55. The unobligated balance June 30, 1952,
amounting to $922.02, plus an allotment of $48,000 in fiscal year 1953,
will be applied as needed during the fiscal year to payment of ex-
penses to be incurred under this heading. The additional sum of
$80,000, can be profitably expended during fiscal year 1954.
                                     Cost and financial summary
                                               CONSOLIDATED

                                                  Fiscal year ending June 30                               Total to June
                                                                                                        . 30, 1952, includ-
                                                                                                          ing fiscal years
                                 1948           1949           1950           1951           1952           prior to 1948


Maintenance:
    Appropriated ........   $60, 000. 00     $60, 000. 00   $50, 000. 00   $49, 000. 00   $7, 780. 00         $607, 975. 97
    Cost--...............--. 45, 006. 10      57, 683. 28    52, 889. 87    48, 838. 76   26, 784. 54          607, 051. 75
    Expenditures--------...  45, 791. 11      55, 615. 58    54, 931. 18    63, 981. 86   12, 625. 55          606, 418. 71


Other new work data:
      Unobligated balance, June 30, 1952__-_---------------------                                              $922.02
      Unobligated balance available for fiscal year 1953  ----------                                            922. 02
854           REPORT OF CHIEF OF ENGINEERS,                                        U. S. ARMY, 1952

                           8. INACTIVE FLOOD-CONTROL PROJECTS

                                                                   For last full Cost and expenditures                        Estimated
                                                                    report see      to June 30, 1952
                       Name of project                               Annual
                                                                                                                                amount
                                                                       Report
                                                                                                                              required to
                                                                      for-       New work     Mainte-                          complete
                                                                                                            nance
                   -                                                                                    -     --      --                  -         --




1. Clarendon to Laconia Circle, White River Basin,
    Ark - . . . . . . .. . . . . . . . . . .                .---       1937                                                         $8, 960, 000
2. Big Creek and L'Anguille River, White River
     Basin, Ark -_....__._            .....................            1937         ------------       ------------                            86, 400
3. Tiptonville to Obion River, Tenn.'1 ...........                     1941         $608,434.27-            .--                               (2)
4. Augusta to Clarendon, White River, Ark.'1 ______..                  1946          608, 285. 78 ..........
5. DeValls Bluff, Ark.'                                                1946           10,000.00- __
6. Emergency flood-control work under authority of
    sec. 5 of the Flood Control Act approved Aug. 18,
     1941, as amended ...............-...........                      1950         __.....- . $271, 527. 30                                  (3)


  1 Previous project incorporated in project Mississippi River and tributaries. See report of Mississippi
River Commission for work done since 1946.
  2 Transferred to jurisdiction of MRC by Flood Control Act of 1946, with work being carried on under
appropriation Flood Control, Mississippi River and tributaries.
  3 Completed.

                                 9. MISCELLANEOUS ACTIVITIES
Status of all investigations for flood control called for by flood control acts and
                               committee resolutions

                                                                                   Date trans-         Document                 Recom-
                Locality                           Authorization act               mitted to             No.                   mendation
                                                                                    Congress
                                          I                                    I                   I                       '-I~--    --              --




Arkansas, White, and Red River                Flood Control Act, May
  Basins, Ark., La., Okla., Tex.,4              17, 1950.
  N. Mex., Colo., Kans., and Mo.
Bayou du Chien, Obion Creek,                  Senate Public Works Com-
  and Mississippi River for flood               mittee resolution, May 9,
  control and drainage.'                        1949.
Big Bay Ditch, Straight Slough                Flood Control Act, July
  and St. Francis Bay, Ark., and                24, 1946.
  tributary area.'
Big Creek, St. Francis River and              .--. d o --------------------.
  its tributaries, Ark., for flood con-
  trol, drainage, and allied pur-
  poses.
Big Creek, White River, Ark., for             House Public Works Com-              May    1, 1952 I__.----.                    Favorable
  flood control, drainage and allied           mittee resolution, Apr.                                                          for sur-
  purposes.' 6                                 21, 1950.                                                                        vey.


Blackfish Bayou, St. Francis River     Flood Control Act, July
  and its tributaries, Ark., for flood   24, 1946.
  control, drainage, and allied pur-
  poses.'
Eight-mile    Creek and Locust         _ do _ . . ..-- ----------
                                       -.
  Creek, and their tributaries,
  Ark.'
Fifteen-mile Bayou, St. Francis ....d o ....................
  River and its tributaries, Arkan-
  sas, for flood control, drainage,
  and allied purposes.'
Frenchman Bayou, St. Francis .. .do ......... .....-------
  River and its tributaries, Arkan-
  sas, for flood control, drainage,
  and allied purposes.'
Hatchie and Tuscumbia Rivers,          House Public Works Com-
  Miss. and Tenn.'                      mittee resolution, Apr.
                                        21, 1950.
Hatchie River, Miss., and Tenn., House Public Works Com-
  with a view to flood control, and     mittee resolution, July 6,
  drainage in Madison, Chester,         1949.
  Hardeman, Fayette, McNairy,
  Tipton, and Haywood Counties.'
    See footnotes at end of table.
                 FLOOD CONTROL-MEMPHIS,                 TENN.,      DISTRICT              855
Status of all investigations for flood control called for by flood control acts
                    and committee resolutions-Continued

                                                           Date trans-     Document    Recom-
             Locality               Authorization act       mitted to        No.      mendation
                                                            Congress

Hatchie and Tuscumbia Rivers Flood Control Act, May .--------------                          ---
  and tributaries, Tennessee, and          17, 1950.
  Mississippi, in the interest  1     of
  flood control and drainage.
Little and Tyronza Rivers, St.           Flood Control Act, July
   Francis River and its tributar-         24, 1946.
  ies, Arkansas, for flood control,
  drainage, and allied purposes.'
Locust Creek and Eight-mile ....do-------......----...........---------------.............
   Creek, and their tributaries, Ar-
  kansas.'
Loosahatchie River and tributar- House Public Works Com- Sept. 26, 1951 Not printed Favorable
  ies, Tennessee, in the interest
                                2     of   mittee resolution, July 6,                    prelim-   for sur-
  flood control and drainage.              1949.                                         inary re- vey.
                                                                                         port.
Loosahatchie River, Tenn., in the House Public Works Com-                          ...........
  interest of flood control and            mittee resolution, Oct.
  drainage.'                               16, 1951.
IMayfield Creek and Mississippi          Senate Public Works Com-
   River, Ky., for flood control and       mittee resolution, Apr.
  drainage in Mayfield Creek Ba-           15, 1949.
  sin, Ky.'
Mississippi River below Cairo, Ill., House Public Works Com-
  for flood control at and in vi-          mittee resolution, Apr.
   cinity of New Madrid Floodway,          18, 1951.
  Mo.' 2
Mississippi River below Cairo, Ill., House Public Works Com-
  for flood control at and in the vi-      mittee resolution, Jan.
   cinity of West Memphis, Ark.3           28, 1947.
Mississippi River, Obion Creek           Senate Public Works Com-
  and Bayou du Chien with re-              mittee resolution, May 9,
  spect to lands in Carlisle, Hick-        1949.
  man, and Fulton Counties, Ky.'
New Madrid Floodway, Mo., flood          House Public Works Com-
  control on the Mississippi River         mittee resolution, Apr.
  below Cairo, Ill.2                       18, 1951.
Obion Creek, Bayou du Chien, Senate Public Works Com-   ---------------
  and Mississippi River, for flood         mittee resolution, May 9,
  control and drainage in Carlisle,        1949.
  Hickman, and Fulton Counties,
  Ky.'
Red, Arkansas and White River            Flood Control Act, May
  Basins, Ark., La., Okla., Tex.,4         17, 1950.
  N. Mex., Colo., Kans., and Mo.
Reelfoot Lake area, Kentucky, and Senate Public Works Com-
  Tennessee, for flood control and         mittee resolution, Dec.
  drainage.'                               20, 1950.
St. Francis Bay, Straight Slough,        Flood Control Act, July
    and Big Bay Ditch,
                    1      Ark.,    and    24, 1946.
  tributaries area.
St. Francis River and its tributar- ----- do ..----------------       I-----
  ies, Arkansas, with special refer-
  ence to Tyronza and Little Riv-
  ers, Big Creek, and Blackfish,
  Fifteen-mile and Frenchman
  Bayous; and the tributaries of
  these streams for flood control,
  drainage and allied purposes.'
St. Francis River, Mo., and Ark.l__ House and Senate Public
                                           Works Committee reso-
                                           lutions, Mar. 20 and 22,
                                           1952, respectively.
Straight Slough, Big Bay Ditch Flood Control........-.....
  and St. Francis Bay, Ark., and
  tributary area.'
Tuscumbia and Hatchie Rivers House Public Works Com-
  and tributaries, Temnnessee, and         mittee resolution, July 6,
  Mississippi, in the interest of flood    1949, and Apr. 21, 1950,
  control and drainage.'                   Flood Control Act, May ---- - -- --- --
                                           17, 1950
Tyronza and Little River, St.            Flood Control Act, July
  Francis River and tributaries,           24, 1946.
  Arkansas, for flood control, drain-
  age, and allied purposes.'
See footnotes at end of table.
856         REPORT OF CHIEF OF ENGINEERS, U.                                   S. ARMY,        1952

Status of all investigations for flood control called for by flood control acts
                     and committee resolutions--Continued

                                                                         Date trans-      Document      Recom-
              Locality                    Authorization act               mitted to       Doc1 ment      ma
                                                                          Congress

West Memphis, Ark., flood control     House Public Works Com-                             _
on Mississippi River, at and in        mittee resolution, Jan.
vicinity of. 3                         28, 1947.
White, Arkansas and Red River
Basins, Ark., La., Okla., Tex.,4
                                      Flood Control Act, May
                                        17, 1950.
                                                                     ---------------.............
N. Mex., Colo., Kans., and Mo.
White River Backwater leveed          Senate Public Works    Com-
area, for improvement by flood        mittee resolution,    Sept.
control and interior drainage. 16     23, 1949.
White River, Big Creek, Ark., for     House Public Works     Com-        May    1, 1952   Not print- Favorable
flood control, drainage and allied     mittee resolution,   Apr.                          ed pre-    for sur-
purposes.2 6                           21, 1950.                                          liminary   vey.
                                                                                           report.
White River and tributaries, Ar- Senate Public Works Com-            -             _      ............
kansas, in the interest of flood   mittee resolution, July
control and navigation by chan-    29, 1949.
nel rectification.' 5
Wolf River, Tenn., in the interest House Public Works Com-               Dec. 13,1951         Not print- Favorable
of flood control.                  mittee resolution, July 6,                                    ed pre-. for sur-
                                    1949.                                                         liminary vey.
                                                                                                  report.
Wolf River, Tenn., in the interest    House Public Works Comrn-..               ...................
of flood control and drainage         mittee resolution, Mar. 5
 (survey).                             1952.

  1 Field report being made by the Mississippi River Commission.
  2 Field report was made by the Mississippi River Commission.
  3 At the request of local interests, this report has been indefinitely postponed.
  SA coordinated comprehensive report under preparation by Federal and State agencies for the con-
servation and development of land and water resources.
  5To be incorporated in the comprehensive report on the Arkansas, White, and Red River Basins for
the conservation and development of land and water resources, which will be prepared in the Arkansas-
White-Red office, Southwestern division, Corps of Engineers, U. S. Army, Tulsa, Okla.
  6 To be summarized in the comprehensive report in the Arkansas, White, and Red River Basins for the
conservation and development of land and water resources, which will be prepared in the Arkansas-White
Red office, Southwestern division, Corps of Engineers, U. S. Army, Tulsa, Okla

10. EMERGENCY FLOOD-CONTROL WORK UNDER AUTHORITY OF PUB-
    LIC LAWS NOS. 138 AND 318, 78TH CONGRESS; PUBLIC LAW NO. 75,
    79TH CONGRESS; AND PUBLIC LAWS NOS. 102 AND 858, 80TH
     CONGRESS
   Because of the heavy demands for emergency repair work to flood
control structures damaged or destroyed by the disastrous floods which
occurred in the springs of 1943, 1944, 1945, 1947, and January and
February 1949, Congress, in the act approved July 12, 1943, Public
Law 138, 78th Congress, in the act approved May 29, 1944, Public Law
318, 78th Congress, in the act approved June 5, 1945, Public Law 75,
79th Congress, in the act approved June 23, 1947, Public Law 102,
80th Congress, and in the act approved June 30, 1948, Public Law 858,
80th Congress, authorized emergency funds to be expended under the
direction of the Secretary of the Army and the supervision of the
Chief of Engineers for the repair, restoration, and strengthening of
levees and other flood-control works which had been threatened or
destroyed by the recent floods.
   The total costs during the fiscal year were $118,064.47, and the ex-
penditures were $113,127.23 for emergency flood-control work.
   The total costs to June 30, 1952, were $2,514,657.75, and expenditures
were $2,505,953.33.
   The unobligated balance on June 30, 1952, amounting to $26,998.77,
will be applied as needed during the fiscal year to complete work now
                      FLOOD CONTROL---MEMPHIS,                                     TENN.,           DISTRICT                     857

under way and to the payment of expenses incurred under this
heading.
                                            Cost and financial summary
                                                        CONSOLIDATED


                                                           Fiscal year ending June 30                                   Total to June
                                                                                                                       30,1952, includ-
                                                                                                                       ing fiscal years
                                        1948             1949             1950              1951           1952          priorto 1948

Maintenance:
    Appropriated- ........          $80, 000. 00 $400, 000. 00 $253, 531.04 $162, 879. 24               $15, 197. 64     $2, 549, 908. 42
    Cost-----------------            39, 190. 45    3, 089. 67 481, 512. 54 258, 331. 49                118, 064. 47      2, 514, 657. 75
    Expenditures--------........     38, 046. 97    2, 046. 29 476, 676. 06 261, 875. 63                113, 127. 23      2, 505, 953. 33



11. IFLOOD CONTROL WORK UNDER AUTHORITY OF SECTION 205 OF
    THE FLOOD CONTROL ACT APPROVED JUNE 30, 1948, AS AMENDED

   The Flood Control Act approved June 30, 1948, as amended by the
Flood Control Act approved May 17, 1950, authorized the allotment
from flood control appropriations of not to exceed $2,000,000 for any
one fiscal year to be expended for the accomplishment of small flood
control projects that are urgently needed, fully justified, and non-
controversial. The law sets a limitation of $150,000 to be expended in
any one locality and indicates that the work shall be complete within
itself.
   The sum of $100,000 was appropriated during fiscal year 1950 for
work on Nixon Creek and its tributary Meridian Creek. Nixon Creek
is a left-bank tributary of the South Fork of the Forked Deer River
in West Tennessee. This work was done by contract and is complete.
Local interests furnished the required assurances of local cooperation
and secured all of the necessary rights-of-way.
   The total cost to June 30, 1952, was $62,821.43 and the expenditures
were $62,821.43.
   Proposed operations.-None.
Other new work data :
    Unobligated balance, June 30, 1952__________________ ______                                                        $26, 998. 77
    Unobligated balance available for fiscal year 1953---__-----                                                        26, 998. 77

                                             Cost and financial summary

                                                           Fiscal year ending June 30                                   Total to June
                                                                                                                       30,1952, includ-
                                                                                                                       ing fiscal years
                                         1948            1949             1950             1951            1952          prior to 1948

New work:
    Appropriated......... ............           ............          $100,000.00     -----------...   $37,178.57          $62, 821.43
    Cost------              ............
                         -----.................. ........---------....    5, 015. 98    $15, 694.65      42, 110. 80         62, 821. 43
    Expenditures......... .........                 .----.-.---..        4, 584.08       15, 201.16      43, 036.19          62,821.43
      IMPROVEMENT OF RIVERS AND HARBORS IN THE
             GALVESTON, TEX., DISTRICT
  This district comprises all of the Texas Gulf Coast exclusive of
the drainage basin of the Rio Grande and its tributaries above and
including the Pecos River; that portion of western Louisiana in the
Sabine Rver and Lake drainage system, exclusive of the Louisiana
section of the Gulf Intracoastal Waterway and tributary waterways;
and the Gulf Intracoastal Waterway in Texas from the Sabine River
to Brownsville, Tex.
  District engineer: Col. Ellsworth I. Davis, Corps of Engineers, to
October 8, 1951, Lt. Col. Edmund Kirby-Smith, Corps of Engineers,
acting to October 22, 1951, Col. James D. Lang, Corps of Engineers,
from that date.
   Division engineer of the Southwestern Division, Dallas, Tex., com-
prising the Galveston, Tex., Fort Worth, Tex., Albuquerque, N. Mex..
Little Rock, Ark., and Tulsa, Okla., districts: Col. Louis W. Prentiss,
Corps of Engineers, to May 8, 1952; Col. Charles H. McNutt, Corps
of Engineers, acting May 8, 1952 to June 23, 1952; Col. Herbert D.
Vogel, Corps of Engineers, from that date.
                                       IMPROVEMENTS

                 Navigation                             Navigation--Continued
                                         Page                                        Page
1.   Sabine-Neches Waterway                    14. Freeport Harbor, Tex ._.-.       896
        Tex-______________               859    15. Channel from Pass Cavallo
2.   Gulf Intracoastal Waterway                      to Port Lavaca, Tex ___        899
        between Apalachee Bay,                  16. Guadalupe River, Tex .....       901
        Fla., and the Mexican                   17. Port Aransas-Corpus Christi
        border (Galveston dis-                        Waterway, Tex__                903
        trict)-     __       -           866    18. Brazos Island Harbor, Tex__      908
3.   Galveston Harbor and Chan-                19. Examinations, surveys, and
        nel, Tex___                      874          contingencies (general) __     914
4.   Texas City Channel, Tex___         878    20. Plant allotment-                 914
5.   Channel to Port Bolivar,                  21. Inactive navigation projects_    915
        Tex__-__ - - - -          -      880    22. Miscellaneous activities......   915
6.   Houston Ship Channel, Tex_         882
7.   Double Bayou, Tex .......          886                  Flood Control
8.   Anahuac Channel, Tex .-.           887
9.   Trinity River and tributaries,         23. Buffalo Bayou, Tex .......          920
        Tex-                   -         888 24. Preliminary     examinations,
10.   Cedar Bayou, Tex-                  891       surveys, and contingencies
11.   Clear Creek and Clear Lake,                  flood control-                    922
        Tex - .       . - -              893 25. Inactive flood-control proj-
12.   Dickinson Bayou, Tex _....         894       ects --                           923
13.   Chocolate Bayou, Tex .....         895 26. Miscellaneous activities ....       923

                      1. SABINE-NECHES WATERWAY, TEX.

  Location.-This is a consolidation of the old improvements of
"Harbor at Sabine Pass and Port Arthur Canal" and "Sabine-Neches
Canal, including Sabine River to Orange and Neches River to Beau-
mont, Texas." Sabine Pass is on the Gulf of Mexico, approximately
58 miles east of Galveston and 280 miles west of Southwest Pass,
Mississippi River. It connects Sabine Lake with the Gulf of Mexico.
The Port Arthur Canal extends from near the upper end of Sabine
                                                                              859
860           REPORT OF CHIEF OF ENGINEERS, U.                                               S. ARMY,               1952

Pass to the Port Arthur docks at the mouth of Taylors Bayou, a dis-
tance of 7 miles. Near its upper end, the Sabine-Neches Canal joins
and extends to the mouth of the Neches and Sabine Rivers. The
waterway next extends up the Neches River to Beaumont and up the
Sabine River to Orange. (See U. S. Coast and Geodetic Survey
Charts Nos. 517 and 533.)
   Previous projects.-The original project for improvement of Sabine
Pass was adopted by River and Harbor Act of March 3, 1875, anid
subsequent projects and modifications by River and Harbor Acts of
August 2, 1882, June 3, 1896, June 13, 1902, and June 19, 1.906. The
Port Arthur Canal was conveyed to the United States free of cost
in 1906, and the River and Harbor Act of July 25, 1912, incorporated
it inthe project. The Sabine and Neches Rivers were first improved
under the River and Harbor Acts of June 18, 1878, and March 3,
1899, and the Sabine-Neches Canal was first improved under the
River and Harbor Acts of March 3, 1905, and March 2, 1907. The
project was enlarged by the River and Harbor Acts of February 27,
1911, July 25, 1912, March 2, 1919, and September 22, 1922.
   For further details, see page 1863 of annual report for 1915 for
the Sabine and Neches Rivers, Sabine Pass, and Port Arthur Canal,
and page 985 of the report for 1916 for Sabine-Neches Canal. (See
also pp. 1100 and 1105 of annual report for 1921 and p. 874 of annual
report for 1926.)
   Existing project.-The existing project dimensions provided for in
the various channels and basins comprising the waterways are shown
in the following tabulation:

                                                                                           Adopted project dimensions

             Section of Sabine-Neches Waterway, Tex.                                                                          Depth in
                                                                                       Bottom width in feet                   feetbelow
                                                                                                                              mean low
                                                                                                                              Gulf level

Sabine Pass outer bar channel_-.............................. 800--
                                                                  ....--------....--------------- 37
Sabine Pass jetty channel-------.-..--_ -.-.. -.-.--.-.-.     500 at inner end, increasing      (1)
                                                                to 800 at outer end.                36
Sabine Pass channel...........---------------------------------500 ...........--------------------------                             34
Sabine Pass anchorage basin_-------.......-.-----.--.-------..                     800 by 3,000 long, exclusive
                                                                                     of channel.                                     36
Port Arthur Canal__------.--------------------------              400 ..........-------------------------                            36
Entrance to Port Arthur turning basin___..-..---.-....----..      250 to 540-------------------
                                                                                 ...................                                 36
Port Arthur:
    East turning basin....                                        420 by 1,800 long------------..........
                                                          ..-------------------------------                                          36
    West turning basin ...-                                                ..-------------------------------
                                                                                    600 by 1,700 long..........------------          36
    Channel from Port Arthur west turning basin to Taylors 250- -----.--------------                      36
     Bayou turning basin.
Taylors Bayou turning basin-----------------............ .. ... 150 to 1,000 by 2,900 long....            36
Sabine-Neches Canal:
    Port Arthur Canal to mouth of Neches River............. 400-------------------------
                                                                    ......................... 36
   Mouth of Neches River to mouth of Sabine River......... 150-..........................                 30
Neches River, mouth to Beaumont turning basin, including 350_--.----                  .-------------      36
cutoffs.
Beaumont turning basin----..... ------------------------ 500 by 1,500 long.........------------..         34
Beaumont turning basin extension-..---.------------------ 350 by 2,300 long------------............       34
Neches River from Beaumont turning basin to vicinity of 200---------------.......................-------- 30
  Pennsylvania shipyard.
Sabine River, mouth to cutoff near Orange_........-...--.---                       125--------------------------                     30
Sabine River to Orange municipal wharf_- -----..........
                                                     ... 200 by 3,000 long------------.........                                      30
Sabine River cutoff to highway bridge_-.................... 150---......--------................                ---------------       25
Adams Bayou--                      -----------------------------------                  100---------------............ ------.............
                                                                                                                                      12
Cow Bayou:
    Channel-----.........------------------------------------------do------------------do......................                       13
    Turning basin          ....
                              ----------------------------------....................... 300 by 500..--..---..--------------13

  136 at inner    end, increasing to 37 at outer end.
            RIVERS       AND HARBORS-GALVESTON,                          TEX.,    DISTRICT             861

   The project also provides for two stone jetties at the Sabine Pass
entrance from the Gulf of Mexico, the western jetty to be 21,860 feet
long and the eastern jetty to be 25,270 feet long. The project further
provides for the removal of the guard lock in the Sabine-Neches
Canal, the construction of suitable permanent protective works along
the Sabine Lake frontage owned by the city of Port Arthur to prevent
dredged material from entering Sabine Lake and to prevent the
erosion of the material deposited, the reconstruction of the Port
Arthur Bridge, and the relocation of the Port Arthur field office.
   The mean tidal variation at the entrance is about 11/2 feet, at Port
Arthur about 1 foot, and at Orange and Beaumont about five-tenths
foot. Prolonged north winds during the winter season have de-
pressed the water surface as much as 3.4 feet below mean low tide while
tropical disturbances have caused heights as much as 7 feet above
mean low tide.
   The estimate of cost for new work, exclusive of $385,500 contributed
funds and value of useful work performed by local interests and of
amounts expended on previous projects, is $15,368,700 (1952). The
latest approved estimate for annual cost of maintenance is $809,000
 (1952).
   The existing project was authorized by the following river and har-
bor acts:

    Acts                                 Work authorized                            Documents


July 25,1912   Existing project dimensions of jetties, a 26-foot chan-   H. Doc. 773; 61st Cong., 2d sess.
                 nel through Sabine Pass, Port Arthur Canal, and
                 Port Arthur turning basin; a new turning basin at
                 Port Arthur 26 feet deep, 600 feet wide, and 1,700
                 feet long; a 25-foot depth in Sabine-Neches Canal,
                 Neches River to Beaumont and Sabine River to
                 Orange, including cutoffs and widening of the
                 channels as recommended by the Chief of Engi-
                 neers and approved by the Secretary of War, and
                 purchase of a new dredge.
Sept. 22,1922 Deepening the channels to 30 feet from the Gulf to         H. Doc. 975, 66th Cong., 3d sess.
                 Beaumont, with increased widths and an anchor-
                 age basin in Sabine Pass 32 fee deep over an area
                 of about 2,000 by 1,000 feet.
    Do--...... Deepening the Port Arthur turning basin and con-          S. Doc. 152, 67th Cong., 2d sess.
                 necting channels thereto to 30 feet. For taking over
                 and deepening Taylors Bayou turning basin and
                 connecting channel to 30 feet. For a 30-foot depth
                 in the channel from the mouth of Neches River
                 to cut-off in Sabine River near Orange.
Mar. 3,1925 Removal of guard lock in Sabine-Neches Canal __              H. Doc. 234, 68th Cong., 1st sess.
Jan. 21,1927 Increased widths of channels as follows: Sabine Pass        HI. Doc. 287, 69th Cong., 1st sess.
                 jetty channel and Sabine Pass to 300 feet; Port
                 Arthur Canal to 200 feet; Sabine-Neches Canal,
                 from Port Arthur Canal to mouth of Neches River,
                 to 150 feet. For dredging 2 passing places in Sabine-
                 Neches Canal, easing of bends, removal and recon-
                 structing Port Arthur field office, extending Beau-
                 mont turning basin upstream 200 feet above the
                 new city wharves, and for an anchorage basin in
                 Sabine Pass, 4,500 feet long, 800 feet wide, and 30
                 feet deep.
Aug 30, 1935 1 A depth of 32 feet in the channels from the Gulf to the   Rivers and Harbors Committee
                 Beaumont turning basin, including all turning            Doc. 27, 72d Cong., 1st sess.
                 basins at Port Arthur.
   Do--...... Deepening the channels to 34 feet with increased           Rivers and Harbors Committee
                 widths from the Gulf to the Beaumont turning             Doc. 12, 74th Cong., 1st sess.
                 basin, including all turning basins at Port Arthur.
   Do--....... Construction of suitable permanent protective works       Specified in act.
                 along the Sabine Lake frontage owned by the city
                 of Port Arthur.
  See footnote at end of table.

       245554--53-vol. 1-           55
862        REPORT      OF CHIEF         OF ENGINEERS,            U.   S.   ARMY,       1952


    Acts                         Work authorized                                 Documents

Aug. 26,1937  Taking over and maintaining channel from Sabine Rivers and Harbors Committee
                 River to Orange municipal wharf.                         Doec. 3, 75th Cong., 1st sess.
    Do-.......Dredging 500 feet from the eastern end of Harbor         Rivers and Harbors Committee
                Island and for abandonment of the channel south          Dec. 20, 75th Cong., 1st sess.
                and west of Harbor Island.
June 20,1938 Increased widths of channels from the Gulf to the H. Doc. 581, 75th Cong., 3d sess.
                Beaumont turning basin and channel connecting
                Port Arthur west turning basin and Taylors Bayou
                turning basin; deepening the Beaumont turning
                basin and Beaumont turning basin extension to 34
                feet; and for dredging a new cutoff from Smiths
                Bluff cutoff to McFaddin Bend.
Oct. 17,1940 Abandonment of the Orange turning basin; dredge a         S. Doc. 14, 77th Cong., 1st sess.
                channel 25 feet deep, 150 feet wide, suitably wid-
                ened on bends, to the highway bridge and dredge
                a cutoff channel opposite Orange 25 feet deep and
                200 feet wide, approximately 2,400 feet long.
Mar. 2,1945 Extension of Beaumont turning basin upstream 300 H. Doc. 685, 76th Cong., 3d sess.
               feet.
              Widening Port Arthur west turning basin to 600 feet. S. Doec. 60, 77th Cong., 1st sess.
    Do-----......
       ...... Dredging a channel from the Beaumont turning
    Do----                                                             S. Doec. 158, 77th Cong., 2d sess.
                basin to vicinity of Pennsylvania Shipyard, 200          (Contains the latest published
                feet wide and 30 feet deep.                              maps.)
July 24,1946 Deepening the Sabine Pass outer bar channel to 37 H. Doec. 571, 79th Cong., 2d sess.
                feet and the Sabine Pass jetty channel to 37 feet at
                the outer end, decreasing to 36 feet at the inner end,
               deepening to 36 feet Sabine Pass Channel, Port
                Arthur Canal, Port Arthur east and west turning
               basins, Taylors Bayou turning basin, and the
               channel from Port Arthur west turning basin to
                Taylors Bayou turning basin; deepening to 36 feet
               and widening to 400 feet the Sabine-Neches Canal
               from Port Arthur Canal to the mouth of Neches
                River except through Port Arthur bridge; deepen-
               ing the Neches River channel from the mouth to
                the Beaumont turning basin to 36 feet with widen-
                ing to 350 feet from Smiths Bluff to the Beaumont
                turning basin; deepening the junction area on
                Neches River at the Beaumont turning basin to 36
                feet; and widening the Sabine-Neches Canal be-
               tween the Neches and Sabine Rivers to 150 feet.
    Do....... Improvement of Cow Bayou, Tex., by the construc- H. Doec. 702, 79th Cong. 2d sess.
                tion of a channel 100 feet wide and 13 feet deep at
               mean low tide and about 7.7 miles long, extending
               from the navigation channel in Sabine River to a
               point 0.5 mile above the county bridge at Orange-
               field, Tex., with a turning basin 300 feet wide, 500
               feet long, and 13 feet deep at Orangefield.
   Do .......Improvement of Adams Bayou, Tex., to provide a            H. Doec. 626, 79th Cong., 2d sess.
               channel 12 feet deep at mean low tidg and 100 feet
               wide on bottom extending from the 12-foot depth
               in the Sabine River to the first county highway
               bridge across the bayou, a distance of about 8,600
               feet.
May 17,1950 Deepening to 36 feet and widening to 400 feet the H. Doec. 174, 81st Cong.,rlst sess.
                Sabine-Neches Canal in the vicinity of Port Arthur
                bridge; reconstruction of the Port Arthur Bridge
                and relocation of the Port Arthur field office.


1 Previously authorized Sept. 6, 1933, by Public Works Administration.


   The project is subject to the condition that no dredging shall be
done by the United States within 50 feet of existing pierheads or
established pierhead lines.
  Local cooperation.-Fully complied with except for certain pro-
visions of the River and Harbor Acts of June 20, 1938, and July
24, 1946. Cooperation remaining consists of (1) furnish free of
cost to the United States rights-of-way and spoil-disposal areas for
initial work and for subsequent maintenance, when and as required,
        RIVERS AND HARBORS-GALVESTON,          TEX.,   DISTRICT    863
and release the United States from any claims for damages due
to construction and subsequent maintenance for widening a part of
the channel connecting Port Arthur west turning basin and Taylors
Bayou turning basin (Act of June 20, 1938), and (2) furnish without
cost to the United States all lands, easements, rights-of-way, and
spoil-disposal areas, which are necessary for construction and mainte-
nance of the upper 0.6 mile of Cow Bayou Channel (Act of July 24,
1946).
   Terminal facilities.-Modern terminal facilities adequate for
present commerce exist. (See pp. 839 and 840, annual report for
1938, and Port Series No. 22 (revised 1946), Corps of Engineers.)
   A number of small privately owned docks have been constructed
at various locations along the waterway since 1946. Terminal facil-
ities have been constructed in the Port Arthur turning basin by
Warren Petroleum Co. and the U. S. Steel Products Co. Moderniza-
tion and enlargement of terminal facilities have been performed at
a number of terminals, including Gulf Oil Corp., Atlantic Refining
Co., Pure Oil Co., Sun Oil Co., and Magnolia Petroleum Co.
   Operations and results during fiscal year.New work: A credit
of $1,212.27 for salvage of pipeline was received from one contract
on the pipeline relocation made on Cow Bayou during last fiscal
year. Preliminary surveys, plans, and specifications for reconstruc-
tion of the bascule bridge at Port Arthur, by contract, were made at
a cost of $1,421.91, and work under the contract during the period
July 1, 1951 to June 30, 1952 amounted to $262,047.29. Preliminary
surveys, plans, and specifications for the relocation of the Port Arthur
field office were completed at a cost of $54.43 and work under the
contract during the period July 1, 1951, to June 20, 1952, amounted
to $88,595.89. Preliminary surveys, plans, and specifications for the
removal of the guard lock from the Sabine-Neches Canal by contract
were made at a cost of $989.32. Work under the contract during the
period September 5, 1951, to June 30, 1952, consisting of the removal.
of 775,286 cubic yards of material and the removal of about 70 percent
of the guard lock structure was performed at a cost of $200,579.90.
Preliminary surveys, plans, and specifications for widening and deep-
ening the Sabine-Neches Canal in the vicinity of the Port Arthur
Bridge and Corps of Engineers slip by contract were made at a cost
of $2,547.15. This removal of the bulkhead at Port Arthur field
office reservation by contract during the period from July 12 to
October 8, 1951, was done at a cost of $17,113.14. Civil works in-
vestigation was made at a cost of $1,400. A total of 846,680 cubic
yards of material was removed by contract from 6,670 linear feet of
the Sabine-Neches Canal during the period July 1 to August 5, 1951
at a cost of $135,435.60.
   Maintenance: Periodic surveys were made at a cost of $25,990.
Repairs to levees around a spoil disposal area at West Port Arthur,
by contract, were made at a cost of $5,295.12 during the period from
July 1 to August 20, 1951. A total of 3,877,965 cubic yards of
864       REPORT OF CHIEF OF ENGINEERS, U.                             S. ARMY,          1952

material was removed, by contract and hired labor, from 22,677 linear
feet of channels and basins at a total cost of $393,361.85, as follows:

Government                                                             Cubic      Linear feet
                       Location
plnt or contract plant or                            Period             yards      of channel      Cost
                          contract                                    removed       dredged

Contract-.......   Port Arthur, turning        Dec. 29,1951 to Mar.   1, 512,382       16, 677   $213,328.71
                    basins, portion Sabine      9, 1952.
                    Pass Channel and An-
                    chorage Basin.
.Government        Outer bar and jetty chan-   Mar. 13 to May 29,     2,365, 583        6, 000   180, 033. 14
hopper dredge      nel.                        1952.
A. Mackenzie.



   The total cost of all work for the fiscal year was $1,133,619.33 of
which $708,972.36 was for new work and $424,646.97 was for mainte-
nance. The total expenditures were $1,237,854.36.
   Condition at end of fiscal year.--The existing project was about 97
percent complete. The Sabine Pass jetties are completed to full proj-
ect dimensions. Enlargement of the Sabine Pass outer bar and jetty
channels, Sabine Pass Channel, Port Arthur Canal, turning basins at
Port Arthur, a part of the Sabine-Neches Canal near its junction with
the Port Arthur Canal and in vicinity of the Neches River, the Neches
River from its junction with the Sabine-Neches Canal to the Beaumont
turning basin, Adams Bayou, Cow Bayou to and including the turn-
ing basin, and relocation of the Port Arthur field office was completed.
The work remaining consists of completing enlargement of the Sabine-
Neches Canal, removal of the guard lock in the Sabine-Neches Canal,
complete widening and deepening of the channel from Port Arthur
west turning basin to Taylors Bayou turning basin, dredging Cow
Bayou above the turning basin near Orangefield, and completing re-
construction of the Port Arthur bridge.
   The controlling depths below mean low tide in the various channels
and basins were as follows: Sabine Pass outer bar channel, 38 feet;
Sabine Pass jetty channel, 36 feet; Sabine Pass Channel, 37 feet;
Sabine Pass anchorage basin, 37 feet; Port Arthur Canal, 32 feet;
Port Arthur entrance to and including east and west turning basins,
32 feet; channel connecting Port Arthur west turning basin with
Taylors Bayou turning basin, 35 feet; Taylors Bayou turning basin,
35 feet; Sabine-Neches Canal from Port Arthur to mouth of Neches
River, 30 feet; Neches River, mouth to Beaumont turning basin, 36
feet; Beaumont turning basin, 32 feet; Beaumont turning basin exten-
sion, 31 feet; Neches River Channel from Beaumont turning basin ex-
tension to vicinity of Pennsylvania shipyards, 25 feet; Sabine-Neches
Canal, mouth of Neches River to mouth of Sabine River, 30 feet;
Sabine River, mouth to cutoff near Orange, 29 feet; Sabine River to
Orange municipal wharf, 27 feet; Sabine River cutoff to highway
bridge at Orange, 23 feet; Adams Bayou, 15 feet; and Cow Bayou,
including turning basin at Orangefield, 11 feet.
   The total cost of the existing project to June 30, 1952, was as follows:
                  RIVERS AND HARBORS-GALVESTON,                                                                   TEX., DISTRICT                           865

                                                                                                   New work               Maintenance                Total

Regular funds...........................---------------------------------                        $13, 527, 962. 75      $11,342, 835. 12 $24,870, 797. 87
Public Works funds-_........------- -------                                                  -     1, 363, 652. 47      ---------------    1,363, 652. 47
        Total United States funds......................
                                             --                                                   14, 891, 615. 22        11, 342, 835. 12         26, 234, 450.34
Contributed funds (existing project) ...................                                             353, 500.00 ..............----------------       353, 500. 00
                                       ------------------................. 15, 245, 115. 22
        Total all funds .....-----...----...                                                  11, 342, 835. 12          26, 587, 950. 34
Value of useful work performed- .....------------                     _         32, 000.00 ..............----------------. 32, 000. 00
        Total cost of project                      ---------..............................        15, 277,115. 22         11, 342, 835. 12         26, 619, 950. 34



   The total expenditures were $26,151,529.31, of which $24,787,876.84
was from regular funds, including $1,p65.49 for Mississippi River
flood relief work, and $1,363,652.47 was from Public Works funds.
In addition, $353,500 was expended from contributed funds for new
work.
   Proposed operations.--The balance unexpended at the end of the
fiscal year, amounting to $489,021.94, plus accounts receivable of
$35,122.41, together with an allotment of $695,150 for the fiscal year
1952, a total of $1,219,294.35, will be applied as follows:
        Accounts payable June 30, 1952__--------------------------                                                                                $83, 543.44

New work:
    Complete construction of extension to bascule bridge at Port
     Arthur under existing contract (July and August 1952)___                                                                                      13, 000. 00
   Complete widening and deepening of Sabine-Neches Canal, in-
     cluding removal of guard lock under existing contract
      (July through October 1952) -----------------------      --                                                                                  42, 300. 00Q
   Widen and deepen Sabine-Neeches Canal, by contract (No-
     vember 1952 to March 1953) ---------------------------                                                                                       353, 545. 38
                Total for new work_--- ---------------------------                                                                                408, 845. 38
Maintenance:
    Dredge Sabine Pass outer bar and jetty channel with Govern-
      ment plant and hired labor (January through March 1953) _                                                                                   200, 000. 00
    Dredge Sabine Pass Channel, Port Arthur Canal, Sabine-
      Neches Canal, east and west turning basins, and Taylors
      Bayou turning basin (December 1952 to April 1953) ...----                                                                                   526, 905. 53
                Total for maintenance-----------....                                              -----------                                 - 726, 905. 53
                Total for all work ----                                .
                                                                    ---------------                                  --           -           1, 219, 294. 35
  The sum of $580,000 can be profitably expended for the following
schedule of work during fiscal year 1954:
Maintenance:
   Dredge outer bar and jetty channels with Government plant
     and hired labor (March and April 1954)
   Dredge portion of Sabine Pass Channel and Sabine Pass an-
                                                                                                       --.---                                       $180, 000
     chorage basin (October to November 1953)
   Dredge shoaled reaches by Port Arthur Canal and turning
                                                                                                           -----.                                    130, 000
      basins, by contract (April to June 1954)                                                       ----------                                      213, 750
   Condition surveys, investigations and reports (July 1953
     to June 1954)--             ---                                                                                                                   52, 700
   Prorata charge for civil works activities by the U. S. Geo-
     logical Survey and the U. S. Weather Bureau (July 1953
     to June 1954)     ----------------------------    --                                                                                               8, 550
               Total------------------                                               -------------- ----                                             580, 000
866           REPORT OF CHIEF OF ENGINEERS,                                         U. S. ARMY,              1952

                                               Cost and financial summary

                                                           Fiscal year ending June 30                              Total to June
                                                                                                                  30,1952, includ-
                                                                                                                  ing fiscal years
                                           1948          1949          1950           1951           1952          prior to 1948


New work:
    Appropriated-.......                $920,000.00 $580, 039.40 $749, 960. 60 $1,500,000.00 $465,000.00 1 $20, 481, 292. 11
    Cost.......----------.......--...    262, 262. 96 705, 538. 29 786, 388. 74 1, 347, 311. 61 708, 972. 36 1 20, 072, 446. 73
    Expenditures--------.........        245, 428. 44 721, 952. 21 636, 706. 57 1, 316,530. 88 806, 328.82 119, 988, 919.69
Maintenance:
   Appropriated--------.........        402, 000. 00   502, 000.00   570, 000. 00   540,381.  57   439,185.00       13, 754, 267. 43
   Cost-_.--------------                189, 250.02    663, 785.26   486, 799. 78   658, 239. 74   424, 646. 97     13, 722, 511. 90
   Expenditures--------.........        180, 711.57    673,192. 77   471, 643.80    666, 569.37    431, 525.54      13, 723,117. 91


Other new work data:
   Unobligated balance, June 30, 1952 .-...    ___-----------        $151, 251. 70
   Unobligated balance available for fiscal year 1953--------         151, 251. 70
   Estimated additional amount needed to be appropriated   for  com-
      pletion of existing project______--------------         ------   68, 200. 00
1 In addition, $931,006.78 was expended from contributed funds for new work.

2. GULF INTRACOASTAL WATERWAY BETWEEN APALACHEE BAY,
     FLA., AND THE MEXICAN BORDER (GALVESTON DISTRICT)

   Location.-This section of the Gulf Intracoastal Waterway extends
from a point on the Sabine River about 3 miles below Orange, Tex.,
to Brownsville, Tex., a distance of about 421 miles; with a flood-
discharge channel, about 7 miles in length, in the Colorado River, ex-
tending from Matagorda, Tex., to the Gulf of Mexico; a tributary
channel in the San Bernard River, extending from the Intracoastal
Waterway crossing to the State highway bridge some 30 miles above
the crossing; a tributary channel, in the Colorado River, extending
from the Intracoastal Waterway upstream a distance of 17 miles; a
tributary channel about 14 miles in length extending from the Intra-
coastal Waterway to Palacios, Tex.; a tributary channel about 2 miles
in length, extending from the Intracoastal Waterway to Rockport,
Tex.; a tributary channel about 6 miles in length extending from the
Intracoastal Waterway near Port Aransas, Tex., to the town of
Aransas Pass, Tex.; a tributary channel about one-fourth mile in
length extending from the Intracoastal Waterway near Port O'Con-
nor, Tex., into Barroom Bay; a tributary channel in Red Fish Bay
extending from the Intracoastal Waterway to Port Mansfield, Tex.,
a distance of about 11/2 miles; and a tributary channel in the Arroyo
Colorado extending from the Intracoastal Waterway to a point near
Harlingen, Tex., a distance of about 31 miles and side channels in the
vicinity of Port Isabel, Tex. (See U. S. Coast and Geodetic Survey
Charts Nos. 1116, 1117, 592, 533, 1279, 1280, 1282, 1283, 1284, 1285, 1286,
1287, and 1288.)
   Previous projects.-Sabine River--Galveston Bay section. None.
   (1) West Galveston Bay and Brazos River Canal, Tex., River and
Harbor Acts of July 13, 1892, July 8, 1896, and June 13, 1902, the
latter providing for the purchase of the Galveston and Brazos River
Canal, and the act of March 2, 1907.
   (2) Channel between Brazos River and Matagorda Bay, Tex., River
and Harbor Acts of June 25, 1910, and March 2, 1919. The act of
         RIVERS   AND HARBORS-GALVESTON,         TEX.,   DISTRICT    867
July 25, 1912, provided for the construction of highway bridges at
points where the waterway intersected existing county roads.
    (3) Channel from Pass Cavallo to Aransas Pass, Tex., River and
Harbor Acts of March 2, 1907, and July 25, 1912.
    For further details, see pages 941, 944, and 947 of annual report for
1926, and page 845 of annual report for 1938.
    Existing project.-The existing project provides for a channel 12
feet deep at mean low water over a bottom width of 125 feet, with such
passing places, widening at bends, locks or guard locks, and railway
bridges over artificial cuts as are necessary from the Sabine River to
Brownsville, Tex.; for the purchase or construction of a 20-inch pipe-
line dredge; for the maintenance of a suitable flood discharge channel
in the Colorado River from Matagorda, Tex., to the Gulf of Mexico;
for a tributary channel 9 feet deep and 100 feet wide in the San Ber-
nard River, extending from the main channel to the State highway
bridge some 31 miles above the mouth of the stream; for a tributary
channel in the Colorado River 9 feet deep and 100 feet wide, extending
from the main channel upstream a distance of 17 miles, with a turn-
ing basin of the same depth, 400 feet wide and 500 feet long at the head
of the improvement; for a tributary channel 9 feet deep and 100 feet
wide from Palacios, Tex., through Trespalacios and Matagorda Bays
to the main channel; for a tributary channel 9 feet deep and 200 feet
wide from the main channel to the harbor at Rockport, Tex., and im-
provement of that harbor to a depth of 9 feet; for rerouting the main
channel along the north shore of Red Fish Bay between Aransas Bay
and Corpus Christi Bay with no change in present authorized dimen-
sions; for a tributary channel 12 feet deep and 100 feet wide from
the main channel near Port Aransas, Tex., to the town of Aransas
Pass, Tex., ending in a basin of the same depth, 300 feet wide and
2,200 feet long; for a tributary channel 6 feet deep and 60 feet wide
from the main channel near Port O'Connor, Tex., into Barroom Bay;
for a tributary channel 12 feet deep and 125 feet wide in Red Fish
Bay from the main channel to Port Mansfield with a turning basin
400 feet by 600 feet and 12 feet deep at Port Mansfield; for a tributary
channel 12 feet deep and 125 feet wide from the main channel to the
vicinity of Harlingen, Tex., via the Arroyo Colorado with a turning
basin 12 feet deep, 400 feet wide, and 500 feet long at the upper end;
for side channels 12 feet deep and 125 feet wide and 6 feet deep and
60 feet wide leading from Laguna Madre around the south part of
Port Isabel, Tex., a total length of 11/2 miles; for an alternate channel
12 feet deep and 125 feet wide across South Galveston Bay between
Bolivar Peninsula and the Galveston Causeway; and for operating
and care of the waterway. From the Sabine River (3 miles below
Orange, Tex.) to the Port Arthur Canal, from Port Bolivar to the
west end of Galveston Channel, from Port Aransas to Corpus Christi
and from Port Isabel to Brownsville, Tex., the waterway coincides
with deep water channels improved and maintained under other
projects.
   The mean tidal variation is 0.5 foot at Orange, 1 foot at Port Arthur,
1.3 feet in Galveston Bay, 1.5 feet at Freeport, 1 foot in Matagorda
Bay, one foot at Corpus Christi, 1.5 feet at Port Isabel, and 1.5 feet at
Brownsville. The extreme ranges of tide under ordinary conditions
868           REPORT OF CHIEF OF ENGINEERS,                         U. S. ARMY,            1952

are 1 foot at Orange, 1.5 feet at Port Arthur, 2 feet in Galveston Bay,
2.0 feet at Freeport, 1.5 feet in Matagorda Bay, 1.5 feet at Corpus
Christi, 2 feet at Port Isabel, and 1.5 feet at Brownsville. The height
of tides is dependent largely on the wind. Strong north winds have
depressed the water surface as much as 2 feet below mean low tide.
   The modified route of the main channel between Aransas Bay and.
Corpus Christi Bay is subject to the provision that no dredging shall
be done by the United States within 50 feet of any wharf or structure,
the proposed drawbridge piers and fenders near Aransas Pass, Tex.,
being excepted from this provision.
   The tributary channel in the Colorado River is subject to the pro-
vision that no dredging shall be done by the United States within 50
feet of any wharf or structure excepting the highway bridge which
crosses the river at mile 8.3.
   The tributary channel from Palacios, Tex., through Trespalacios
and Matagorda Bays, the tributary channel to Aransas Pass, Tex.,
and the tributary channel to Harlingen, Tex., are subject to the pro-
vision that no dredging shall be done by the United States within 50
feet of any wharf or structure.
   The estimate of cost of new work is $29,628,000 (1952) exclusive of
amounts expended on previous projects. The latest approved esti-
mate for annual cost of maintenance is $1,449,700 (1952) including
$306,700 for operation and care of structures.
   The existing project was authorized by the following river and
harbor acts:

       Acts                        Work authorized                                   Documents 1

Mar.     3,1925   Channel 9 feet deep and 100 feet wide, from Sabine      H. Doc. 238, 68th Cong., 1st sess.
                    River to Galveston Bay, and for a 20-inch pipeline
                   dredge.
Jan. 21,1927 Channel 9 feet deep and 100 feet wide, from Galves-              Do.
                   ton Bay to Corpus Christi.
Aug. 26,1937 Maintenance of a flood-discharge channel in the              Senate Committee print, 75th
                    Colorado River.                                         Cong., 1st sess.
June 20,1938 Channel 9 feet deep and 100 feet wide in San Bernard         H. Doc. 640, 75th Cong., 3d sess.
                    River, Tex.
    Do-....... Channel in the Colorado River, 9 feet deep and 100         H. Doc. 642, 75th Cong., 3d sess.
                    feet wide, with a turning basin.
    Do-....... Channel 9 feet deep and 100 feet wide from Palacios        H. Doc. 564, 75th Cong., 3d sess.
                    through Trespalacios and Matagorda Bays.
    Do----....... Channel 9 feet deep and 200 feet wide from the main     H. Doe. 641, 75th Cong., 3d sess.
                    channel to the harbor at Rockport, and improve-
                    ment of that harbor to a depth of 9 feet.
    Do-....... Channel 6 feet deep and 100 feet wide from the main        H. Doc. 643, 75th Cong., 3d sess.
                    channel to Aransas Pass, Tex.
July 23, 1942 Enlargement of waterway from Sabine River to                Public Law 675, 77th Cong.
                    Corpus Christi and its extension to Brownsville,
                    Tex., so as to provide a depth of 12 feet and width
                   of 125 feet throughout.
Mar. 2,1945 Channel 6 feet deep and 60 feet wide from main chan-          H. Doe. 428, 76th Cong., 1st sess.
                   nel near Port O'Connor, Tex., into Barroom Bay.
   Do- .....      Enlargement of channel from main channel to Aran-       H. Doc. 383, 77th Cong., 1st sess.
                   sas Pass, Tex., to provide a depth of 9 feet and
                   width of 100 feet.
   Do-....... Channel 12 feet deep and 125 feet wide from main            S. Doc. 248, 78th Cong., 2d sess.
                   channel to Red Fish Landing, Tex., with a turning
                   basin.
   Do-....... Channel 12 feet deep and 125 feet wide from main            H. Doe. 402, 77th Cong., 1st sess.
                   channel to vicinity of Harlingen, Tex., via Arroyo      (See Public Law 14, 79th Cong.)
                   Colorado, with a turning basin.
  See footnote at end of table.
            RIVERS        AND HARBORS-GALVESTON,                         TEX.,    DISTRICT             869

    Acts                          Work authorized                                   Documents 1

July 24, 1946 Filling a portion of the shallow-draft channel adja-       H. Doe. 627, 79th Cong., 2d sess.
                cent to the Port Isabel turning basin, construction
                of a channel to connect the shallow-draft channel
                with the main channel near the shore line of Laguna
                Madre, and enlargement of the shallow-draft chan-
                nel west of this connection, all to a depth of 12 feet
                and bottom width of 125 feet.
   Do-....... Rerouting the main channel along the north shore of        H. Doe. 700, 79th Cong., 2d sess.
                Red Fish Bay between Aransas Bay and Corpus
                Christi Bay with no change in present authorized
                dimensions and to provide for deepening the tribu-
                tary channel from Port Aransas to the City of Aran
                sas Pass to 12 feet and extension of the turning basin
                to a length of 2,200 feet at the same depth.
May 17, 1950 Alternate channel 12 feet deep and 125 feet wide            H. D. 196, 81st Cong., 1st seas.
                across South Galveston Bay between Port Bolivar
                and the Galveston causeway.
   Do-....... "Red Fish Landing" changed to "Port Mansfield,             Public Law 516, 81st Cong.
                  Tex."


   R. Doc. 230, 76th Cong., 1st sess., and the project documents contain the latest published maps.

  Operating and care of the waterway was included in the project
July 1, 1935, under the provisions of the Permanent Appropriations
Repeal Act approved June 26, 1934.
   Local cooperation.-Fullycomplied with except for the following,
local interests being required to : (1) furnish free of cost to the United
States rights-of-way and spoil disposal areas for construction and
maintenance for rerouting the main channel along the north shore of
Red Fish Bay between Aransas Bay and Corpus Christi Bay (Act of
July 24, 1946); (2) furnish without cost to the United States all
necessary lands, easements, rights-of-way, and suitable spoil disposal
areas for construction and maintenance of the alternate channel across
south Galveston Bay when and as required; and hold and save the
United States free from any damages resulting from construction and
maintenance of the alternate channel (Act of May 17, 1950); (3) for
the upper 31/2 miles of the tributary channel in the San Bernard River,
furnish free of cost to the United States, all lands, easements, rights-
of-way, and spoil disposal areas for initial work and for subsequent
maintenance (Act of June 20, 1938); (4) for the tributary channel
in the Colorado River, provide without cost to the United States, all
lands, easements, rights-of-way, and spoil disposal areas for initial
work and for subsequent maintenance (Act of June 20, 1938); (5)
for the tributary channel into Barroom Bay, furnish, free of cost to
the United States, all necessary lands, easements, rights-of-way, and
suitable areas for disposal of spoil, as and when needed, and hold and
save the United States free from any claim for damages resulting from
the construction and maintenance of the channel (Act of Mar. 2,
1945); and, (6) for the upper 5 miles of the tributary channel in the
Arroyo Colorado to the vicinity of Harlingen, Tex.; provide, free of
cost to the United States, all necessary lands, easements, rights-of-way,
and spoil disposal areas for the initial improvement and its subsequent
maintenance, when and as required (Act of March 2, 1945).
   Terminal facilities.-There are terminal facilities at Orange, Port
Arthur, Galveston, Freeport, Port Aransas, Corpus Christi, Port
Isabel, and Brownsville where this waterway coincides with channels
improved under other projects. (See Port Series No. 22 (Revised
870         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                   1952

1946), No. 23 (Revised 1948), and No. 25 (Revised 1948), Corps of
Engineers, and reports on Freeport Harbor and Brazos Island Harbor,
Tex.). There are privately owned piers and wharves at Palacios,
Rockport, and Aransas Pass, and a municipal pier at Palacios and
Aransas Pass. The facilities are adequate for existing commerce.
   Operations and results during fiscal year.-New work: Prelimi-
nary surveys, plans, and specifications for the construction of locks at
the Colorado River by contract were made at a cost of $3,393.77 and
work under the contract during the period July 1, 1951 to June 30, 1952
amounted to $771,555. For dredging the tributary channel to Har-
lingen, by contract, there was an additional hired labor cost in the
amount of $717.86. Civil works investigations were made at a cost
of $2,500.00.
   Maintenance: Periodic surveys and inspections were made at a
cost of $74,320.93. The removal of snags and logs from the waterway
between Freeport Harbor and the Colorado River were made by
hired labor and Government plant at a cost of $81.28. Reference
lines were reestablished and signs erected between Port Arthur and
Brownsville at a cost of $20,322.33. A total of 10,347,752 cubic yards
of material was removed from a total of 558,905 linear feet of chan-
nels by contract at a cost of $1,016,261.32, as follows:

                                                                                    Cubic          Linear feet
                   Location                                  Period                  yards         of channel      Cost
                                                                                   removed          dredged


Between San Antonio and Aransas                    July 1 to Sept. 19, 1951....      967, 713          59,340    $66, 979.01
Bays.
Port Isabel to Mud Flats ........------------...   Mar. 10 to June 9, 1952 _--     2,195,    263       69, 098   298, 153. 67
Colorado River to Matagorda Bay ..- _              Apr. 1 to July 19, 1951 _._        487,   998       82, 913    38, 667. 66
Port Arthur Canal to High Island.....              May 22 to June 30, 1952_...        941,   719      119, 314    91, 366. 11
High Island to Port Bolivar----------........      Dec. 20, 1951 to Apr. 29,       3, 162,   193      129, 940   246, 646. 83
                                                     1952.
               _____............. . ..
Red Fish Bay ...                                   May 5 to June 8, 1952_.....     1, 103, 519         37, 500   131, 679. 55
Little Boggy to Big Boggy Bayou .....              Jan. 9 to Apr. 4, 1952 ......      793, 952         33, 500    69, 887. 86
Galveston Bay to Bastrop Bay ....--                May 29 to June 30, 1952_ _         695, 395         27, 300    72, 880. 63



   Operation and care: The Mud Bayou Bridge near High Island,
Tex., the Brazos River floodgates near Freeport, Tex., and the Colo-
rado River floodgates near Matagorda, Tex., were operated and main-
tained by hired labor at a cost of $30,170.29, $59,868.98, and $56,985.65,
respectively. Operation of a meteorologic network, flood forecasting,
and stream gaging in cooperation with U. S. Geological Survey was
made by hired labor at a cost of $9,589.38. Also, an auxiliary power
plant and lighting system was provided by hired labor at a cost of
$992.17. The installation of new well pump bowls at the east water
well at the Brazos River floodgate was made by hired labor at a cost
of $2,867.16. Preliminary surveys, plans, and specifications for the
repairs to the west floodgate at the Brazos River by contract was
made at a cost of $2,861.97.
   The total cost of all work for the fiscal year was $2,052,488.09, of
which $778,166.63 was for new work, $1,110,985.86 was for regular
maintenance, and $163,335.60 was for operation and care. The total
expenditures were $1,861,995.61.
               RIVERS           AND         HARBORS--GALVESTON,                             TEX.,        DISTRICT               871

   Condition at end of fiscal year.-The existing project was about 75
percent compThle.      -h~henain                 channel from the Sabine
River to Rockport and from Corpus Christi Bay to Port Isabel was
completed. The tributary channel in the San Bernard River was
completed to 26 miles upstream. The tributary channels to Palacios,
to Aransas Pass, and Rockport, Tex., were completed. Channel to
and turning basin at Port Mansfield were completed. Shallow-draft
side channels in the vicinity of Port Isabel, Tex., were completed.
Construction of a railway bridge near High Island, Tex., of two
floodgates at the Brazos River crossing, and of two floodgates at the
Colorado River crossing were completed. Work remaining consists
of dredging the alternate channel across south Galveston Bay, the
modified route of the main channel in the vicinity of Aransas Pass,
Tex., tributary channel in the Colorado River, completing tributary
channels to Harlingen and in the San Bernard River, dredging branch
channel into Barroom Bay, and converting floodgates at the Colorado
River crossing into locks.
   The controlling depths over usable widths at mean low water were
11 feet from the Sabine River to Galveston; 9.4 feet from Galveston
to Freeport Harbor; 11.1 feet from Freeport Harbor to the Colorado
River; 10 feet from the Colorado River to Port O'Connor; 9.1 feet
from Port O'Connor to Corpus Christi; 10 feet from Corpus Christi
Bay to Baffin Bay; 10 feet from Baffin Bay to the Arroyo Colorado;
12.5 feet from the Arroyo Colorado to Port Isabel; Colorado River
flood discharge channel, 3 feet across Gulf bar, 6 feet to main chan-
nel; 7.1 feet in the lower 26-mile reach and 2.3 feet in the upper reach
of the tributary channel in the San Bernard River; 8.2 feet in the
lower 2-mile reach, 3.3 feet in the lower 8-mile reach and not navigable
in the reach above mile 8 of the tributary channel in the Colorado
River; 7.2 feet in the harbor basin and 8.8 feet in the dredged portion
of the tributary channel to Rockport, Tex.; 6.5 feet in the tributary
channel to Palacios, Tex. ; 10 feet in the tributary channel to Aransas
Pass, Tex.; 0 feet in the branch channel into Barroom Bay; 10 feet
in the channel to Port Mansfield; 5 feet in the completed portion of
the tributary channel to Harlingen, Tex.; and 7.8 feet in the side
channels at Port Isabel, Tex.
   The total cost of the existing project to June 30,1952, was as follows:

                                                        New work            Maintenance             care and
                                                                                                Operation                 Total


Regular funds- ------------
                .                            _        $21, 671, 618. 83 $10, 153, 702. 89          $3, 873, 212. 09   $35, 698, 533.81
Public works funds_--             -------                  466,476. 58 ---------------------------                         466, 476. 58
Other funds 1_    _       _           _      _   _                      ______ .....
                                                         _____-----------_                              33,172. 98          33,172.98
      Total- ----------------------              __    22, 138, 095. 41     10, 153, 702. 89       3, 906, 385. 07     36, 198, 183.37


1 Permanent indefinite appropriation for operation and care purposes.

  The total expenditures were $35 782,460.44, of which $35,315,983.86
was from regular funds and $466,476.58 was from public works funds.
In addition, $33,172.98 was expended between July 1, 1934, and June
30, 1935, for operation and care of the works of improvement under
872       REPORT OF CHIEF OF ENGINEERS,                       U. S. ARMY,           1952

the provision of the permanent indefinite appropriation for such
purposes.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $1,888,267.14, plus accounts receivable of
$11,126.59, together with allotments totaling $2,667,590 for the fiscal
year 1953, a total of $4,566,983.73, will be applied as follows:
Accounts payable June 30, 1952_             --              _---------
                                                  -----__ ....                         $527, 011. 54
New work: Conversion of Colorado River floodgates into locks
  under existing continuing contract (July 1952 to June 1953)_                       2, 023, 355. 85
Maintenance:
    Complete dredging from Port Arthur Canal to
      High Island under existing contract (July
      1952 to October 1952) ------                        _------------$210, 000. 00
    Complete dredging shoaled reaches between
      Galveston Bay and Bastrop Bayou under ex-
      isting contract (July 1952) ----------------                     101, 000. 00
    Dredge, by contract, shoals in Colorado River
      flood discharge channel (October 1952 to Jan-
      uary 1953) ----------------------------                          100, 000. 00
    Dredge, by contract, shoals between Colorado
      River and Matagorda Bay (October 1952 to
      January 1953) ---- __-_--_            __-_---______              300, 000. 00
   Dredge, by contract, shoals between Port O'Con-
      nor and west shore of San Antonio Bay (De-
      cember 1952 to April 1953) -----------                           300, 000. 00
    Dredge, by contract, shoals between Corpus
      Christi Bay and Mud Flats in Laguna Madre
       (January to June 1953) ------------------                       400, 000. 00
    Dredge, by contract, upper reach of channel
      to Harlingen in the Arroyo Colorado (Octo-
      ber 1952 through February 1953) __-                    -         247, 103.95

        Total for maintenance --------------------              1, 658, 103. 95
Operation and care:
    Mud Bayou Bridge:
        Operation        ---------------------     $27, 000. 00
        Ordinary maintenance and repair---------     2, 200. 00
        Improvement and reconstruction -------      33, 000. 00
    Brazos River floodgates:
        Operation ------------------------------    48, 500. 00
        Ordinary maintenance and repair- ____- --   10, 000. 00
        Improvement and reconstruction --------- 149, 812. 39
    Colorado River floodgates:
        Operation----------------------------48,        000. 00
        Ordinary maintenance and repair--------      5, 000. 00
        Improvement and reconstruction ________35, 000. 00

            Total for operation and care_--------               -------------         358, 512. 39
             Total for all work ... - ----                           _-----------
                                                                    _---            4, 566, 983. 73
  The sum of $2,022,750 can be profitably expended for the following
schedule of work during fiscal year 1954:
New work:
   Complete conversion of Colorado River floodgates into
     locks, under continuing contract (July 1953 to De-
     cember 1953) --
                   _      ----------------------------                       $493, 000
       Total for new work_____---- __------------------                      __            $493, 000
            RIVERS AND HARBORS-GALVESTON,                                       TEX.,        DISTRICT                871

Maintenance:
   Dredge shoals in Galveston East and West Bays, Boli-
     var entrance channels, and in Chocolate Bay (August
     and September 1953) ------------------------             $130, 000
   Dredge shoals between Freeport Harbor and Colorado
     River, and from west shore of San Antonio Bay to
     Port Aransas, by contract (October 1953 to May
      1954) -----       ----------------------------------     265,000
   Dredge shoals in tributary channel in San Bernard
     River, by contract (October 1953) -----------------        60, 000
   Dredge between floodgates at Brazos and Colorado
      Rivers, by contract (May 1954) --------------          -80, 000
   Dredge shoals between Corpus Christi Bay and Port
      Isabel, and tributary channels to Port Mansfield and
      to Harlingen, by contract (December 1953 to May
      1954) --------------------------------------             450,000
   Dredge shoals in tributary channel to Palacios, Tex.,
      by contract (April 1954) ---------------------             79,500
   Condition surveys, investigations, inspections, studies
      and reports (July 1953 to June 1954)- -----------        108. 250
        Total for maintenance----------------------------_ $1, 172, 750
Maintenance (operation and care) :
   Mud Bayou Bridge:
        Operation-------------------------------               $27, 500
         Ordinary maintenance and repair---------------           3, 500
         Improvement and reconstruction -----      _------2,         000
   Brazos River floodgates:
         Operation----------------------------------50, 000
         Ordinary maintenance and repair---------------           9, 000
         Improvement and reconstruction ..-...-.....             38, 000
    Colorado River locks:
         Operation----------------------------------57,              000
         Ordinary maintenance and repair- .--.......              8, 000
         Improvement and reconstruction--------------- 162, 000
               Total for maintenance (operation and care)--------------                                          357, 000
               Total for all work-----------------------__                          -.              _---- 2,022,750

                                    Cost and financial summary

                                                  Fiscal year ending June 30                                 Total to June
                                                                                                            30, 1952, includ-
                                                                                                            ing fiscal years
                                 1948           1949            1950           1951            1952           priorto 1948

New work:
   Appropriated......... $2,337,000.00 $2,069,000.00 $600, 000. 00 $880, 000.00 $800, 000.00                 $23, 552, 612. 96
   Cost...........--------------. 2,450,180.82 2,984,574.25 565, 716. 20 712, 732. 59 778, 166. 63            22, 672, 257. 11
   Expenditures-......... 2,131,766.15 3,213,011.48 672, 551.35 603, 948.01 688, 106. 56                      22, 474, 395. 11
Maintenance:
   Appropriated-.........     1,727,200.00   1,922,000.00 1, 802, 409. 00 1, 478, 660. 71 1, 356, 489. 00     15, 980, 413. 20
   Cost --------------...     1,300,103.88     919,742.32 2, 796, 669. 57 1, 562, 860. 17 1, 274, 321.46      15, 480, 551.86
   Expenditures-.........     1,249,476.80     935,436.03 2,486, 094. 09 1,800. 614. 88 1, 173, 889. 05       15, 295, 863. 91


Other new work data:
    Unobligated balance, June 30, 1952----------- ---------- -$124, 026. 74
    Appropriated for fiscal year ending June 30, 1953 -------- 1,143, 000. 00
    Unobligated balance available for fiscal year 1953-------- 1,
    Estimated additional amount needed to be appropriated for
                                                                       973. 26                              018,
      completion of existing project- --------------------     5, 466, 500. 00
874    REPORT OF CHIEF OF ENGINEERS,           U. S. ARMY,     1952

             3. GALVESTON HARBOR AND CHANNEL, TEX.

   Location.-This is a consolidation of the authorized improvements
at Galveston, Tex., which includes the projects formerly identified
as Galveston Harbor, Tex.; Galveston Channel, Tex.; and the Galves-
ton seawall extension. The entrance to Galveston Harbor is located
on the Gulf of Mexico, on the northern portion of the coast of Texas,
328 miles west of Southwest Pass on the Mississippi River and 278
miles northeast from the mouth of the Rio Grande. Galveston
Channel extends from a point in Galveston Harbor between Bolivar
Peninsula and Fort Point across the former inner bar to and along
the wharf front of Galveston, and has a length of about 5 miles and
a width of 1,200 feet. (See U. S. Coast and Geodetic Survey Chart
No. 520.)
   Previous projects.-The original project for the improvement of
Galveston Harbor, Tex., was authorized by the River and Harbor
Acts of June 23, 1874, June 14, 1880, and August 5, 1886. For fur-
ther details see page 1854, annual report for 1915, and page 851,
annual report for 1938.
   Existing project.-The existing project provides for a channel 800
feet wide and 38 feet deep, from deep water in the Gulf of Mexico to
a point between the jetties 2 miles west of the seaward end of the
north jetty, thence 800 feet wide and 36 feet deep to Bolivar Roads;
a channel 36 feet deep at mean low tide and 1,200 feet wide from
Bolivar Roads (outer end of the old inner bar near Fort Point) to
43d Street, thence to 51st Street with a width of 1,200 feet and 32
feet deep, in the city of Galveston, and for its extension to 57th
Street, to a depth of 32 feet and a width of 1,000 feet, when the
interests of navigation and commerce require it; for two rubblestone
jetties extending from Galveston Island (on the south) and Bolivar
Peninsula (on the north) into the Gulf of Mexico (the south jetty
being 35,900 feet long and the north jetty 25,907 feet long); the
construction of 13 groins to protect the sea wall along the Gulf
shore from about 12th to 61st Streets, Galveston, Tex.; for an exten-
sion of the sea wall, which lies along the Gulf front of Galveston,
from its angle at 6th Street and Broadway to the south jetty,
with protection at its junction with the south jetty, and for an ex-
tension of the existing sea wall in a southwesterly direction from
its present terminus near 61st Street for a distance of approximately
16,300 feet along the shore of the Gulf of Mexico.
   Under ordinary conditions, the mean tidal range in Galveston
Harbor is 1.6 feet on the outer bar and 1.4 feet on the inner bar
with extreme ranges of 2.3 and 2.1 feet, respectively. The mean tidal
range in Galveston Channel is about 1.3 feet and the extreme range
about 2 feet under ordinary conditions. The height of the tides
in both Galveston Harbor and Channel is dependent largely on the
wind, and during strong "northers" in the winter season the water
surface may be depressed 2 feet below mean low tide. The estimated
Federal cost of new work is $14,960,000 (1952); the estimated
cost to local interests is $3,580,300; the total estimated cost is $18,540,-
300 (1952). The latest approved estimate for annual cost of main-
tenance of the project is $690,000 (1952).
                   RIVERS     AND     HARBORS-GALVESTON,                      TEX.,     DISTRICT             875

  The existing project was authorized by the following river and
harbor acts:

       Acts                           Work authorized                                     Documents

Aug.     5,1886     Construction of 2 rubblestone jetties at entrance to      H. Doc. 85, 49th Cong., 1st sess.,
                      Galveston Harbor.                                         and Annual Report 1886, p. 1311.
June 13, 1902       A channel 1,200 feet wide and 30 feet deep from Bolivar   H. Doc. 264, 56th Cong., 2d sess.
                      Roads (outer end of the old inner bar near Fort
                      Point) to 51st St.
Mar.     3,1905     Purchase or construction of a hydraulic pipeline          Specified in act.
                     dredge.
Mar.     2, 1907    Extension of the jetties to present project length and    H. Doc. 340, 59th Cong., 2d sess.,
                     construction and operation of a dredge.                    and Rivers and Harbors Com-
                                                                                mittee Doc. 11, 59th Cong., 2d
                                                                                sess.
    Do ...... Extension of Galveston Channel from 51st to 56th                H. Doc. 768, 59th Cong., 2d sess.
                 Sts., with depth of 30 feet and width of 700 feet.
June 25,1910   Conditional extension of the Galveston Channel                 H. Doc. 328, 61st Cong., 2d sess.
                between 51st and 57th Sts., with a depth of 30 feet
                and a width of 1,000 feet.
July 27, 1916 Extension of the sea wall at Galveston from angle at            H. Doc. 1390, 62d Cong., 3d sess.
                6th St. and Broadway to a point abreast of the
                nearest battery at Fort San Jacinto.
July 18,1918 Deepening the harbor channel to 35 feet and widening             H. Doc. 758, 65th Cong., 2d sess.
                to 800 feet for an experimental period of 2 years.
Sept. 22, 1922 Further extension of the sea wall at Galveston to a            H. Doc. 693, 66th Cong., 2d sess.
                junction with the south jetty and protection of this
                junction; and for repairing the seawall in front of
                the Fort Crockett Reservation.
Jan. 21, 1927 Deepening Galveston Channel to 32 feet; and main-               H. Doc. 307, 69th Cong., 1st sess.
                tenance of Galveston harbor channels to dimen-
                sions of 800 feet wide, 35 feet deep on outer bar and
                34 feet deep on inner bar.
Aug. 30, 19351 Maintenance of State Highway Ferry Landing Chan-               R. & H. Comm. Doc. 31, 72d Cong.,
                nels to dimensions of 12 feet deep and 100 feet wide.           1st sess.
Aug. 30, 1935 Construction of 13 groins along Gulf Shore from 12th            H. Doc. 400, 73d Cong., 2d sess.
                to 61st Sts., in city of Galveston, at a limited cost
                of $234,000. (10 groins were constructed under this
                limitation).
    Do....... Deepening Galveston Channel to 34 feet from Bolivar             R. & H. Comm. Doec. 61, 74th
                Roads to 43d St.                                                Cong., 1st sess.
    Do....... Deepening Galveston Entrance Channel to 36 feet                 R. & H. Comm. Doc. 57, 74th
                from the Gulf of Mexico to a point 2 miles west of              Cong., 1st sess.
                seaward end of north jetty.
Apr. 4, 1938 5 Completion of the project for the construction of 13           Public Law No. 463, 75th Cong.
                groins.                                                                                           3
June 30, 1948 Deepening Galveston Harbor to 38 feet from the                  H. Doc. 561, 80th Cong., 2d sess.
                Gulf to a point 2 miles west of seaward end of north
                jetty and 36 feet thence to Bolivar Roads; revoking
                authority for maintenance of ferry channels, and
                deepening Galveston Channel to 36 feet, from
                Bolivar Roads to 43d St., provided that no dredging
                be done by the United States within 50 feet of any
                existing pierhead, pierhead line, wharf, or structure.
May 17,1950 Constructing an extension of the existing Galveston               H. Doc. 173, 81st Cong., 1st sess.3
                seawall from its present terminus near 61st St., in a
                southwesterly direction for a distance of approxi-
                mately 16,300 feet along the shore of the Gulf of
                Mexico.


  I Previously authorized September 6, 1933, by Public Works Administration.
  5 Public No. 463, 75th Cong.
3  Contains latest published maps.


   Local cooperation.-Fully complied with except for the furnishing
by local interests of assurances satisfactory to the Secretary of the
Army that they will hold and save the United States free from claims
for damages due to the construction and maintenance of the Galves-
ton Channel portion of the project as modified by the River and
Harbor Act of June 30, 1948.
   Terminal facilities.-There are no terminals on Galveston Harbor,
but it is the entrance channel leading to the extensive terminal facili-
ties located on Galveston Channel, Texas City Channel, and Houston
Ship Channel. The terminal facilities on Galveston Channel are lo-
876    REPORT OF CHIEF OF' ENGINEERS, U.        S. ARMY,   1952

cated almost entirely on the south side of the channel. The principal
wliarves are owned by the city of Galveston and extend from 10th
Street to 41st Street. Reconstruction of piers and transit sheds is
in progress and timber bulkheads and aprons have been replaced with
steel bulkheads and concrete aprons and concrete slab decks at piers
10, 34, 35, and 36 (code No. 958-917-915-912, Port Series No. 23,
revised 1948.) Facilities are listed in the above Port Series and Port
Series No.6,Part 1,Corps of Engineers, and are considered adequate
for existing commerce.
   Operations and results during fiscal year. New work: Preliminary
surveys, plans, and specifications for the westerly extension of the
Galveston sea wall were made at a cost of $10,851.28 and work under
the contract during the period September 26, 1951, to June 30, 1952,
amounted to $971,927.28, all from contributed funds.
   Maintenance: The Government hopper dredge A. Mackenzie re-
moved 331,941 cubic yards of material from the inner and outer bar
channels during the period from June 1 to 30, 1952, at a cost of
$59,757.54. Preliminary surveys, plans, and specifications were pre-
pared for dredging Galveston Channel by contract at a cost of $96.86
and during the period from July 17 to October 23, 1951, 3,212,051
cubic yards of material were removed at a cost:of $252,719.43. Lights
were furnished and installed on the dredging range towers for dredg-
ing the inner and outer bar channels at a cost of $292.27. Periodic
surveys and inspections of and minor repairs to the existing sea wall
extension slope and pavement were made at a cost of $16,243.29.
   The total cost of all work for the fiscal year was $1,311,887.95, of
which $982,778.56 was for new work and $329,109.39 was for mainte-
nance. The total expenditures were $1,050,534.46.
   Condition at end of fiscal year.-The existing project was about
47 percent complete. The jetties were completed in1910. The 35-foot
harbor channel was completed in 1922. The first seawall extension,
with fill and paving, was completed in 1926. The 36-foot outer bar
harbor channel and the 34-foot Galveston Channel from Fort Point
light to 43d Street was completed in the fiscal year 1938. The groins
along the gulf side of Galveston seawall were completed in 1939. The
inner and outer harbor bar channels were completed in the fiscal year
1950 to depths of 36 and 38 feet, respectively. The work remaining
consists of dredging Galveston Channel to a depth of 36 feet from
Bolivar Roads to 43d Street and to a depth of 32 feet from 43d Street to
57th Street over a 1,200-foot bottom width from 43d Street to 51st
Street and a 1,000-foot bottom width from 51st street, the work on the
latter section being contingent on the development of the waterfront
facilities on the Chicago, Rock Island & Gulf Railway and adjacent
properties; and extending the existing Galveston seawall from its
present terminus near 61st Street in a southwesterly direction for a
distance of approximately 16,300 feet along the shore of the Gulf of
Mexico. The controlling depth below mean low tide in the outer bar
harbor channel, the inner bar harbor channel, and Galveston Channel
were 36 feet, 34 feet, and 32 feet, respectively. The total cost of the
existing project to June 30, 1952, was as follows:
                 RIVERS             AND         HARBORS-GALVESTON,                               TEX.,      DISTRICT                  877

                                                                                          New work        Maintenance            Total


United States funds (regular):
   Channel...----------------------------------------------.. $4,713,760.22 $11,568,589.43 $16,282,349.65
                                                          ----- 2, 289, 213. 54 156, 473. 11
   Seawall .......................................---------------------------.........       2, 445, 686. 65
   Public works funds....................-....-....-.-.....    _ __.........     13, 121. 45     13, 121. 45

     Total United States funds_-        ------------------------          7,002, 973. 76 11,738, 183. 99                      18, 741, 157. 75
Contributed funds (existing project)...............---------------------. 1, 719, 726. 97 -------------                        1, 719, 726. 97

       Total cost of project.....----------............------------------..........      8, 722, 700. 73 11, 738, 183. 99     20, 460, 884. 72


   The total expenditures were $20,173,246, including $710,274.77
contributed funds for original seawall construction and $13,121.45
public works funds.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $2,163,173.50, plus accounts receivable of
$10,796.74, together with an allotment of $581,360 for the fiscal year
1953, a total of $2,755,330.24, will be applied as follows:
Accounts payable June 30, 1952 ___          - -     _-----------------                                                      $298, 435. 46
New work: Complete extension of Galveston seawall from 61st
    westward 5151.5 linear feet under existing contract (July
    1952 to May 1953)----------------------------------                                                                1, 860, 547.80
Maintenance:
    Complete dredging outer bar and jetty channels
      with Government plant and hired labor (July
      and August 1952) _--- -                          $140, 000.00
    Remove shoaling from outer bar and jetty chan-
      nels with Government plant and hired labor
      (May and June 1953) ---------------------           78, 000. 00
    Dredge, by contract, shoaled reaches of Galves-
      ton Channel from station-5+980 to station
      13+900 (March to June 1953) -----------           378, 346. 98
        Total for maintenance _------                    ---- ----
                                                _--_----__                                                                   596, 346. 98

               Total for all work---                                -----------------------                            2, 755, 330. 24
  The sum of $1,230,000 can be profitably expended for the following
scheduled work during the fiscal year 1954:
New work: Extend Galveston seawall westward 1,621 linear feet,
   by contract (September 1953 to June 1954) _-__---_       --                                                               $1, 000, 000
Maintenance: Dredge inner and outer bar of Galveston Harbor with
   Government plant and hired labor (July and August 1953)__                                                                     230, 000

           Total for all work----------------------                                               ------------                1,230, 000
                                                 Cost and financial summary
                                                         UNITED STATES FUND

                                                                  Fiscal year ending June 30                                 Total to June
                                                                                                                            30,1952, includ-
                                                                                                                            ing fiscal years
                                             1948               1949              1950         1951           1952            priorto 1948


New work:
   Appropriated .......................----------......                                                                           $15, 424, 970.33
                                                                            $175, 000. 00- ..........--------...........-----------..
   Cost--------------...............--------........-----------............  175, 000.00----------.........  ...........-----------15, 424, 970.33
   Expenditures--------.........           ----......---...-                 175,000.00---------..................---------------
                                                            .....----------.......                                                 15,424,970.33
Maintenance:
   Appropriated-......... $245, 000.00 $672, 113. 97 557, 136.03 $426, 049. 80 $155, 400.00                                        11, 839, 297. 69
   Cost --------------- 269, 632. 95 479, 885. 74 747, 767. 55 271, 534. 05 329, 109. 39                                           11, 824, 310. 71
   Expenditures .....--------...            267, 689. 24 478, 753. 61 748, 552. 71 271, 987.88 339, 507. 97                        11,835,  097.70


Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project ---------   $7, 957, 000
          245554--53 -vol. 1--56
878          REPORT OF CHIEF OF ENGINEERS, U.                                           S. ARMY,              1952

                                          Cost and financial summary
                                               CONTRIBUTED FUNDS


                                                    Fiscal year ending June 30                                     Total to June
                                                                                                                  30, 1952, includ-
                                                                                                                  ing fiscal years
                                      1948         1949        1950                 1951             1952          prior to 1948


New work:
   Appropriated---_           __--....... ..   _    -------              1$2,870,000.00
                                                                         $............          ...........----     $3, 580, 274.77
   Cost__ _--                                                                     26, 673. 64 $982, 778. 56          1, 719, 726. 97
   Expenditures.-----. .......-.--       -           .--..--     .    .........            -_ . 711, 026. 49         1, 421, 301. 26


Other new work data :
    Unobligated balance, June 30, 1952        _____------------   $253,673. 70
    Unobligated balance available for fiscal year 1953-----------253, 673. 70

                                   4. TEXAS CITY CHANNEL, TEX.

   Location.--Texas City is on the mainland of Texas on the west
side of Galveston Bay, about 10 miles northwest of the city of Galves-
ton. (See U. S. Coast and Geodetic Survey Charts Nos. 520 and
1282.)
   Previous projects.-Adopted by River and Harbor Act approved
March 3, 1899, and enlarged by River and Harbor Act approved June
25, 1910 (H. Doc. 328, 61st Cong., 2d sess.). For further details see
page 1856, annual report for 1915, and page 858, annual report for
1938.
   Existing project.-This provides for a channel 36 feet deep at
mean low tide and 400 feet wide on bottom from deep water in
Galveston Harbor to the harbor at Texas City, a distance of about
61/2 miles, with a pile dike on its north side 28,200 feet long covered
with clay and other material dredged from the channel, with a harbor
1,000 feet wide on bottom and 36 feet deep at mean low tide extending
approximately 4,250 feet to the southward of the south property line
of the Monsanto Chemical Co., and for the construction of a rubble-
mound dike a short distance south of the existing pile dike and
extending between stations -1+600 (the shore) and 26 +000, a dis-
tance of 27,600 feet. Under ordinary conditions the mean tidal range
is about 1.3 feet and the extreme range is about 2 feet. The height of
tide is dependent largely on the wind, and during strong "northers"
in the winter season the water surface may be depressed 2 feet below
mean low tide.
   The estimate of cost for new work is $3,210,000 (1952) exclusive
of amounts expended on previous projects exclusive of $28,740 con-
tributed by local interests. The latest approved estimate of cost of
annual maintenance of the channel and dike is $211,500 (1952).
   The existing project was authorized by the following river and
harbor acts:
                 RIVERS AND         HARBORS--GALVESTON,                       TEX.,       DISTRICT                879


       Acts                         Work authorized                                         Documents

Mar.    4,1913    A channel 300 feet wide and 30 feet deep and con-           H. Doc. 1390, 62d Cong., 3d sess.
                   struction of a pile dike 28,200 feet long north of
                   channel.
July    3,1930    For a harbor 800 feet wide and 30 feet deep at Texas        H. Doc. 107, 71st Cong., 1st sess.
                   City, and the construction of a rubble-mound dike.
Aug. 30,19351     Extension of rubble-mound dike to the shore line.....       Rivers and Harbors Committee
                                                                                   Doc. 4, 73d Cong., 1st sess.
   Do .....-- Deepening the channel and harbor to 32 feet--------..........   Rivers and Harbors Committee
                                                                               Doe.     46, 73d Cong., 2d sess.
   Do ....    __ Deepening the channel and harbor to 34 feet--------
                                                            .........         Rivers     and Harbors Committee
                                                                               Doc.     62, 74th Cong., 1st sess.
Aug. 26,1937      An extension to the harbor, 1,000 feet southward, 800       Rivers     and Harbors Committee
                   feet wide and 34 feet deep, provided that no dredg-         Doc.     47, 75th Cong., 1st sess.
                   ing be done by the United States within 75 feet of
                    any pierhead line or structure.
June 30,1948      Deepen channel and harbor to 36 feet, widening              H.    Doc. 561, 80th Cong., 2d sess.
                    channel to 400 feet and harbor to 1,000 feet and               (Contains latest published map.)
                    changing name of project to "Texas City Channel,
                    Tex.,"    provided no dredging be done by the
                    United States within 50 feet of any existing pier-
                    head, pierhead line, wharf, or structure.

  1 Previously authorized Sept. 6, 1933, by Public Works Administration.

   Local cooperation.--Underthe provisions of the River and Harbor
Acts of August 26, 1937, and June 30, 1948, local interests are required
to furnish free of cost to the United States necessary rights-of-way and
suitable spoil-disposal areas for new work and for subsequent mainte-
nance as required and release the United States from claims for dam-
ages attributable to the work of improvement and furnish assurance
satisfactory to the Secretary of the Army that they will construct a
common-carrier oil terminal substantially as proposed. None of these
conditions have been complied with. All prior requirements have
been fully complied with.
   Terminal facilities.-Modern terminal facilities, privately owned,
are located on the mainland at the inner end of this channel and are
considered adequate for existing commerce. (See Port Series, No.
23, revised 1948, Corps of Engineers.) A sea train terminal, pri-
vately owned, was completed in 1940.
   Operations and results during fiscal year.-Maintenance: Periodic
surveys and inspections were made at a cost of $2,907.69. Seven
reference line pile were replaced by hired labor at a cost of $839.65.
Preliminary surveys, plans, and specifications for dredging the chan-
nel by contract were made at a cost of $1,778.80, and a total of 1,328,933
cubic yards of material was removed by contract from 30,500 linear
feet of channel during the period from February 27 to March 12, 1952
at a cost of $104,270.43.
    The total cost for all work during the fiscal year was $109,796.57.
The total expenditures were $109,711.30.
    Condition at end of fiscal year.-The existing project was 72 per-
cent complete. The work remaining consists of extending the turning
basin 1,000 feet southward and enlarging the project, including the
turning basin extension, to a depth of 36 feet over a bottom width of
400 feet in the channel and 1,000 feet in the turning basin. The chan-
nel and the turning basin, except the authorized extension referred to
above, were completed in 1937 to a depth of 34 feet over bottom widths
of 300 feet and 800 feet, respectively. The pile dike was completed
in 1915; the rubble-mound dike in 1934.
880                REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   The controlling depth in the channel was 35 feet, and in the com-
pleted portion of the turning basin was 29 feet at mean low tide. The
total cost of the existing project to June 30, 1952, was as follows:

                                                                                       New work          Maintenance              Total

Regular funds-.....----                                                    . .----------------------------
                                                                                 $2, 151,680. 52 $4, 222, 550. 81             $6, 374, 231. 33
Public Works funds ..------------                         ----------------------         136, 295. 78 --------------              136,'295. 78
     Total United States funds...
                              ------------                    2,287, 976. 30 4, 222, 550.81
                                                    ..------------                                                             6, 510, 527. 11
Contributed funds-....----------------------------------           28, 740. 68 ---------- ----                                     28, 740. 68
        Total all funds------------------------------......2,                           316, 716. 98      4, 222, 550. 81      6, 539, 267. 79


   The total expenditures were $6,539,202.28, consisting of $6,374,165.82
regular funds, $136,295.78 public works funds, and $28,740.68 contrib-
uted funds for new work.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $19,344.99, will be applied as follows:
Accounts payable June 30, 1952---------------------------------      $65. 51
Maintenance: Condition surveys, upkeep of reference lines, and mis-
  cellaneous inspections and reports (July 1952 to June 1953)---_ 19,279.48

            Total--------------------------------------------19,                                                                   344.99
  The sum of $164,000 can be profitably expended during the fiscal
year 1954 for dredging shoaled reaches of the project, by contract
(August to November 1953).
                                                  Cost and financial summary

                                                                Fiscal year ending June 30                                   Total to June
                                                                                                                            30, 1952, includ-
                                                                                                                            ing fiscal years
                                               1948           1949          1950             1951             1952           prior to 1948


New work:
   Appropriated-------...                   -----------------------------------------------             ------------        1 $2, 654, 798. 78
     Cost....       ------          --            ----------------------------------------------                             1 2, 654, 798. 78
     Expenditures---------...................----------- ....--........--------..------------...            -----------
                                                                                             ...........----------           12,654, 798. 78
Maintenance:
     Appropriated---       .......  ---
     Cost---.......-----------...........
                                             65, 000.00
                                            279, 567.92
                                                            $6, 000.00 $166, 000.00
                                                            12, 069. 92 167, 115. 15
                                                                                         $5, 798. 13 $129,000. 00
                                                                                          5, 799. 95 109, 796. 57
                                                                                                                               4, 436, 913. 50
                                                                                                                               4, 417, 634. 02
     Expenditures--------.........          277, 147.88     12, 691. 63 167, 167. 14      5, 819. 71 109, 711.30               4, 417, 568. 51


Other new work data: Estimated additional amount needed to be ap-
  propriated for completion of existing project------- ---- ----- $922, 000
  1 In addition, $28,740.68 was expended from contributed funds for new work.

                                      5. CHANNEL TO PORT BOLIVAR, TEX.

  Location.-Port Bolivar is at the end of Bolivar Peninsula and 4
miles north of the city of Galveston. The channel connects the port
with the channel in Galveston Harbor. (See U. S. Coast and Geodetic
Survey Chart No. 520.)
  Previous project.-Adopted by the River and Harbor Act of March
2, 1907. For further details see page 1856, annual report for 1915,
and page 860, annual report for 1938.
  Existing project.-This provides for a channel 30 feet deep at mean
low tide and 200 feet wide on botton, beginning at deep water in
Galveston Harbor and extending to a turning basin 1,600 feet long,
               RIVERS AND. HARBORS- (ALv ETON, TEX.,                                 DISTRICT               881
with an average width of about 750 feet and 30 feet deep at mean
low tide in front of the wharves. Under ordinary conditions the
mean tidal range is about 1.3 feet and the extreme range about 2
feet. The height of tides is dependent largely on the wind, and
during strong "northers" in the winter season the water surface may
be depressed 2 feet below mean low tide.
  The estimated cost of new work is $157,200 (1952), exclusive of
amount expended on previous projects. The latest approved esti-
mate for annual cost of maintenance of the channel and of a portion
of the turning basin in front of the highway ferry landing to a depth
of 20 feet over a bottom width of 200 feet is $20,000 (1952), these di-
mensions being sufficient to accommodate existing commerce.
  The existing project was authorized by the following river and
harbor acts:

        Acts                         Work authorized                                 Documents

June 25, 1910.......   Excavation of a channel 30 feet deep and 200     H. Doc. 328, 61st Cong., 2d sess.
                         feet wide with turning basin 1,000 feet
                         square.
Mar. 2, 1919........   Increase length of turning basin to 1,600 feet   H. Doc. 1122, 65th Cong., 2d sess. (Con-
                         and decrease width to about 750 feet.            tains the latest published map.)



   Local cooperation.-None required.
   Recommended modifications of project.-Under date of June 24,
1926, the Chief of Engineers recommended that the project be cur-
tailed by providing for a channel depth of 20 feet, 200 feet wide, with
a turning basin of the same depth 500 feet square (H. Doc. 467, 69th
Cong., 1st sess.).
   Terminal facilities.-The terminals consist of two privately owned
piers, one 400 feet wide by 1,200 feet long, and the other 210 feet wide
by 1,200 feet long. These piers are not in use and are badljr de-
teriorated. A highway ferry landing owned by the State of Texas
is located at the south end of the turning basin. The facilities are
considered adequate for existing commerce.
   Operations and results during fiscal year.--Maintenance: Periodic
surveys and inspections were made at a cost of $154.66. Preliminary
surveys, plans, and specifications for dredging the channel by contract
were made at a cost of $329.40 and a total of 72,594 cubic yards of
material was removed by contract from 700 linear feet of channel
during the period from May 21 to 26, 1952 at a cost of $7,506.27.
   The total cost for all work for the fiscal year was $7,990.33. The
total expenditures were $7,305.77.
   Condition at end of fiscal year.-The existing project was 54 per-
cent complete. The channel, 200 feet wide, and turning basin, 1,000
feet square, were completed in 1912. The work remaining consists
of enlarging the turning basin to project dimensions. Project dimen-
sions have not been maintained in the completed part since lesser
dimensions are adequate for existing commerce.
   The controlling depths at mean low tide over usable widths were 20
feet in the channel, 7 feet in the turning basin at entrance to slip No. 3,
and 26 feet in the channel to the new ferry landing.
   The total cost of the existing project to June 30, 1952, was
882         REPORT OF CHIEF OF EIPEEIS                                       U. S.         ARMY, 1952

$689,847.70, of which $85,213.85 was for new work and $604,633.85
was for maintenance. The total expenditures were $689,163.14.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $868.01, together with an allotment of $870
for the fiscal year 1953, a total of $1,738.01, will be applied as follows:
Accounts payable June 30, 1952--------------------------------                                                 $684. 56
Maintenance: Condition surveys, and miscellaneous inspections and
reports, by hired labor (July 1952 to June 1953) ---------------                                            1, 053. 45
      Total
        Total-----------------------------------------                                                      1,738.01
                                                                                                             1, 738.01

   No work is scheduled to be performed during the fiscal year 1954.
                                        Cost and financial summary

                                                    Fiscal year ending June 30                            Total to June
                                                                                                          30,1952, includ-
                                                                                                          ing fiscal years
                                    1948           1949          1950          1951           1952          prior to 1948

New work:
   Appropriated .......----------------------------------------------------------                             $133, 924. 60
   Cost----------------- -------------------------------------                                                 133, 924. 60
   Expenditures---------
   Expenditures --.                 ------------- ------------ ------------ ------------                      133,924.--60
                                                                                                               133, 924. 60
Maintenance:
   Appropriated---------......... $5, 000. 00 .-      .       $20, 750. 00   $8, 665. 05    $4, 500. 00        650, 918. 05
   Cost-- --------------           4, 611. 66      $662. 73    20, 540. 66    5, 426. 22     7, 990. 33        650, 734. 60
   Expenditures -- __ -_ 4, 611. 66                 672. 50    20, 530. 89    5, 426. 22     7, 305. 77        650, 050.04


Other new work data: Estimated additional amount needed to be appro-
  priated for completion of existing project                          72, 000
                                                                     $-----------------

                               6. HOUSTON SHIP CHANNEL, TEX.

   Location.-The channel connects Galveston Harbor, at a point
opposite Port Bolivar, with the city of Houston, Tex., extending 50
miles in a northwesterly direction across Galveston Bay through the
San Jacinto River and Buffalo Bayou to a turning basin at the head
of Long Reach with a light-draft channel 7 miles long from the turn-
ing basin to Main Street, Houston. (See U. S. Coast and Geodetic
Survey Charts Nos. 1282 and 532.)
   Previous projects.-Authorized by River and Harbor Act of June
10, 1872, modified in 1877, and by River and Harbor Acts of March
3, 1879; March 3, 1899; February 20, 1900; March 3, 1905; and March
4, 1913. For further details see page 1856 of the annual report for
1915 and page 862 of the annual report for 1938.
   Existing project.-This provides for a channel 36 feet deep at mean
low tide from deep water in Galveston Bay to and including the
Houston turning basin, with a width of 400 feet from Bolivar Roads
to 5,000 feet above Baytown, thence 350 feet to the mouth of Boggy
Bayou, thence 300 feet to the Houston turning basin (about 1,000
feet wide); for turning points at the mouth of Hunting Bayou and
at the lower end of Brady Island; for such off-channel silting basins
on any part of the waterway as the Chief of Engineers may consider
advisable; and for suitable widening of the bends at Lynchburg,
Norsworthy, Manchester, and Harrisburg. The project also provides
for suitable widening of the channel in front of the navigation dis-
trict's wharf at Manchester; for certain cutoffs and easing of sharp
bends; for construction of a dike 26,000 feet long to protect the chan-
               RIVERS       AND HARBORS-GALVESTON,                       TEX.,    DISTRICT

nel in upper Galveston Bay; for a light-draft extension of the channel
10 feet deep at mean low tide and 60 feet wide, without easing the
bends, through Buffalo Bayou from the turning basin to the mouth
of White Oak Bayou in Houston, Tex.; and for a branch channel
10 feet deep at mean low tide and 60 feet wide in the old channel
of Buffalo Bayou behind Brady Island. The mean tidal range under
ordinary conditions is 0.6 foot to 1.3 feet in the lower part of Galves-
ton Bay; 0.6 foot to 1.3 feet in the upper bay; and 0.5 foot to 1 foot
in the San Jacinto River and Buffalo Bayou. The extreme ranges
under ordinary conditions are about 2 feet, 1.2 feet, and 1 foot, re-
spectively. Freshets sometimes cause rises of over 12 feet in Buffalo
Bayou. The height of the tides, however, is dependent largely on
the wind, and during strong "northers" in the winter season the water
surface may be depressed 2 feet below mean low tide.
  The estimate of cost for new work is $17,435,500 (1952) exclusive
of amounts expended on previous projects, and exclusive of $1,365,000
contributed by local interests. The latest approved estimate for an-
nual cost of maintenance is $918,000 (1952).
  The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                 Documents

Mar.     5,1905    Easing or cutting off sharp bends and construction    Rivers and Harbors Committee
                    of a pile dike.                                        Doc. 35, 61st Cong., 2d sess.
Mar.    2,1919     A channel 30 feet deep, widening bend at Manches-     H. Doc. 1632, 65th Cong., 3d sess.
                    ter and enlarging the turning basin.
Mar. 3,1925        A light-draft extension of the channel to the mouth   H. Doc. 93, 67th Cong., 1st sess.
                    of White Oak Bayou.
July     3, 1930   Widening the channel through Morgan Point and to      H. Doc. 13, 71st Cong., 1st sess.
                a point 4,000 feet above Baytown and widening
                certain bends.
Aug. 30, 19351 Deepening to 32 feet in the main channel and turning      Rivers and Harbors Committee
                    basin, and for a 400-foot width through Galveston      Doc. 28, 72d Cong., 1st sess.
                    Bay.
    Do--...... Deepening to 34 feet in main channel and widening         Rivers and Harbors Committee
                from Morgan Point to turning basin.                        Doc. 58, 74th Cong., 1st sess.
Mar. 2,1945 Branch channel 2 10 feet deep and 60 feet wide behind        H. Doc. 226, 76th Cong., 1st sess.
                    Brady Island.
    Do-....... Widening the channel from Morgan Point to lower           H. Doc. 256, 76th Cong., 1st sess.
                end of Fidelity Island with turning points at the
                mouth 3of Hunting Bayou and lower end of Brady
                    Island.
   Do-.......      Widening the channel from lower end of Fidelity       H. Doc. 737, 79th Cong., 2d sess.
                    Island to Houston turning
                                          3   basin, and dredging off-
                    channel silting basins.
June 30,1948       Deepening to 36 feet from Bolivar Roads to and in-    H. Doc. 561, 80th Cong., 2d sess.
                    cluding main turning basin at Houston, Tex.,           (Contains latest published map.)
                    including turning
                                 3    points at Hunting Bayou and
                    Brady Island.


I Previously authorized Sept. 6, 1933, by Public Works Administration.
2 No dredging within 15 feet of any wharf or structure.
 = No dredging within 50 feet of any wharf or structure.


   Local cooperation.-Fully complied with except for part of the
work authorized by the River and Harbor Acts of March 2, 1945,
and June 30, 1948, which is subject to the provisions that local
interests shall furnish, free of cost to the United States, necessary
rights-of-way for the widening and deepening of the channel and
suitable areas for the disposal of dredged material during initial
construction and for future maintenance as and when needed, and
release the United States from all claims for damages due to the
construction and maintenance of the project. Release from dam-
884        REPORT       OF CHIEF         OF ENGINEERS,              U.     S.   ARMY,         1952

age liability has been accepted by the Secretary of the Army. Local
cooperation remaining consists of acquiring land easements from
Greens Bayou to the turning basin at Houston, Tex.
   Terminal facilities.-The city of Houston and the Harris County-
Houston Ship Channel Navigation District have constructed modern
terminals which supplement privately owned wharves. The existing
facilities are considered adequate for existing commerce. ,(See Port
Series No. 24 (revised 1948), Corps of Engineers.) Dock No. 9,
500 feet long, and dock No. 16, 598 feet long, have been built in
the turning basin since 1948 by the Navigation District for public
use.
  Operations and results during fiscal year.-New work: Civil works
investigations were made by hired labor at a cost of $3,200. Advance
planning, surveys, and field investigations for enlargement of channels
were made by hired labor at a cost of $527.59. A total of 1,656,108
cubic yards of material was removed by contract from a total channel
length of 44,758 linear feet at a cost of $574,439.34, as follows:

                                                                                    Linear feet
             Location                             Period                 Cubicyards of channel           Cost
                                                                                         dredged


Lynchburg to Shell Refinery- _        July 1, 1951 to Apr. 27, 1952_ .    1, 246, 965       40, 858   $460, 119. 47
Shell Refinery to Hunting Bayou__     Apr. 24 to June 30, 1952 ....          409, 143        3, 900    114, 319. 87



   Maintenance: Periodic surveys and inspections were made at a
cost of $8,717.21. Topographic surveys of existing and proposed
spoil disposal areas to determine capacities were made at a cost of
$1,152.64. Stream gaging, a cooperative program with the U. S.
Geological Survey, was made at a cost of $3,882. Preliminary sur-
veys, plans, and specifications for dredging from Morgan Point to
vicinity of Red Fish Reef by contract were made at a cost of $2,641.98
and work under the contract was performed by hired labor at a cost of
$771.90. Preliminary work for dredging the light draft extension
above the turning basin in Turkey Bend by contract was made at a
cost of $369.64. A total of 4,496,091 cubic yards of material was
removed from 80,964 linear feet of channels at a cost of $1,006,135.93,
as follows:

                                                                           Cubic        Linear feet
             Location                             Period                   yards        of channel       Cost
                                                                          removed        dredged

Lynchburg to Shell Refinery-....... July 1, 1951 to Apr. 27, 1952_...     1,899,  432       40,858    $701, 282.67
Morgan Point to Baytown---------    Feb. 5 to Apr. 21, 1952..--------     2, 280, 453       31, 856    219,110.27
Shell Refinery to Hunting Bayou_    Apr. 24 to June 30, 1952_...___          316, 206        8, 250     85, 742. 99



  The total cost of all work for the fiscal year was $1,601,838.23, of
which $578,166.93 was for new work and $1,023,671.30 was for main-
tenance. The total expenditures were $1,643,877.98.
   Condition at end of fiscal year.--The existing project was 75 per-
cent complete. The 34-foot project was completed in 1941. The
36-foot project has been completed from Bolivar Roads to the vicinity
of Shell Refinery.
            RIVERS AND HARBORS-GALVESTON,                             TEX.,       DISTRICT                885

  Work remaining consists of dredging light-draft extension of chan-
nel from the turning basin to the mouth of White Oak Bayou; con-
structing a dike 26,000 feet long to protect the completed channel in
upper Galveston Bay; dredging a light-draft channel behind Brady
Island; and widening and deepening from the vicinity of Shell Re-
finery to the turning basin, including turning points at Hunting Bayou
and Brady Island.
   The controlling depths were as follows: Bolivar Roads to Morgan
Point, 34 feet; Morgan Point to Baytown, 36 feet; Baytown to Boggy
Bayou, 36 feet; Boggy Bayou to Manchester, 32 feet; Manchester to
the turning basin, 34 feet; in the turning basin, 35 feet; light draft
channel from turning basin to mouth of White Oak Bayou, 6 feet; and
channel behind Brady Island, 3.5 feet.
   The total cost of the existing project to June 30, 1952, was as
follows :
                                                         New work           Maintenance             Total

Regular funds------     -                  -__
                                           _____--
                                             -
                            ____-...........--     $10, 222, 725.27 $15, 646, 033.44 $25, 868, 758. 71
Public Works funds -- __-       ______--_______-_    2, 612, 931. 98 ................ 2, 612, 931.98
     Total United States funds__-...........
                                         .___.___ _     12,835,657. 25      15, 646, 033.44       28, 481, 690.69
Contributed funds-_-                                     1,365, 000. 00 -------------              1, 365, 000.00
      Total all funds------------....................................
                                 --------------     14, 200, 657. 25 15, 646, 033. 44             29, 846, 690. 69


   The total expenditures were $29,752,709.13, consisting of $25,774,-
777.15 regular funds, $2,612,931.98 public works funds, and $1,365,000
contributed funds for new work.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $1,379,642.06, plus accounts receivable of
$92,496.48, together with an allotment of $476,700 for the fiscal
year 1953, a total of $1,948,838.54, will be applied as follows:
Accounts payable June 30, 1952------- ---        -------------                                  $95, 478. 04
New work :
    Advance planning for enlargement of channel
      (July 1952 to June 1953) ---------------              $7, 472. 01
    Complete dredging from Shell Refinery to vicin-
     ity of Hunting Bayou under existing contract
      (July to December 1952) ------------------             15, 405. 73
         Total for new work___------------------------------                                    722, 877. 74
Maintenance:
   Complete dredging from Shell Refinery to vicin-
      ity of Hunting Bayou under existing contract
       (July to October 1952)     __--------       $205,482.76
   Complete dredging from Morgan Point to vicin-
      ity of Red Fish Reef under existing contract
       (July to December 1952) ------------------- 480, 000. 00
    Complete dredging light-draft extension above
      turning basin in Turkey Bend under existing
      contract (July to August 1952)                 25, 000. 00
   Remove shoaling from Houston turning basin,
      by contract (March and April 1953)--------- 180, 000. 00
   Remove shoals between Baytown and Lynchburg,
      by contract (January and February 1953)    .  240, 000. 00

           Total for maintenance         _--__---1------1--------                        -1, 130, 482. 76

           Total for all work -------                                                            948, 838. 54
                                                                                              1-----------------
                                                                                              1,
886         REPORT         OF CHIEF           OF ENGINEERS,                 U.    S. ARMY,           1952

   The sum of $1,067,000 can be profitably expended for the following
schedule of work during the fiscal year 1954:
Maintenance:
   Remove shoals between Red Fish Reef and Bolivar
     Roads, by contract (January to June 1954)------- $450, 000
   Dredge from Greens Bayou to Sims Bayou, by con-
      tract (September 1953 to June 1954) ------------- 280, 000
   Remove shoals from Morgan Point to Baytown, and
      from Lynchburg to Boggy Bayou, by contract
      (August to December 1953) ---------------         290, 000
   Condition surveys, investigations, studies and
      reports ------------------------------------       47, 000
            Total for maintenance__-------------------------                                              $1, 067, 000

                                      Cost and financial summary

                                                   Fiscal year ending June 30                             Total to June
                                                                                                         30,1952, includ-
                                                                                                         ing fiscal years
                                  1948           1949           1950          1951           1952         prior to 1948


New work:
   Appropriated--------
                      ........       --------- $550, 000. 00 $750, 000. 00 $800, 000. 00 $1,000,000.00 1$17, 163, 691.86
        ...
   Cost--------                 -
                               __--------       - 8, 854. 62 1, 207, 093. 17 1, 083, 007.54 578,166.93 1 16, 940, 814.12
   Expenditures--------...-          ------------ 8, 207.36 1, 155, 644. 36 1, 035, 954. 63 600, 593. 97 116, 864, 092. 18
Maintenance:
    Appropriated-......... $1,440,000.00      684, 000.00    796, 000.00    888, 812.35 993, 000. 00      117, 512, 958.60
    Cost--------------     1, 804, 479. 71    883, 251.60    411, 722. 70   589, 161. 96 1,023, 671.30    116,859,175.84
    Expenditures-......... 1, 690, 428. 91    794, 161.88    559,196. 07    602, 017.21 1,043, 284.01     116,841,916. 22


  1 In addition, expenditures from contributed funds were $1,209,178.78 for new work and $200,000 for main-
tenance on previous projects and $1,365,000 for new work on existing project.
Other new work data:
    Unobligated balance, June 30, 1952_---___------------                                                $165, 103. 66
    Unobligated balance available for fiscal year 1953----                                                165, 103. 66
    Estimated addihonal amount needed to be appropriated for
      completion of existing project ---                                                             4, 377, 000. 00

                                      7. DOUBLE BAYOU, TEX.

  Location.-This bayou enters upper Galveston Bay on the east side
about 30 miles north of Galveston and about 81/4 miles south of Ana-
huac. (See U. S. Coast and Geodetic Survey Chart No. 1282.)
   Existing project.-The existing project provides for a channel 6
feet deep at mean low tide and 100 feet wide through the bar at the
mouth of Double Bayou. Under ordinary conditions the mean tidal
range is about 0.5 foot and the extreme range is about 1.2 feet. The
height of tides is dependent largely on the wind, and, during strong
"northers" in the winter season, the water surface may be depressed
11/2 feet below mean low tide.
   The latest approved estimate for annual cost of maintenance is
$14,500 (1952).
   The existing project was authorized by the River and Harbor Act
approved March 3, 1899 (H. Doc. 387, 55th Cong., 2d sess.). The
latest published map is contained in the project document.
   Local cooperation.-None required.
   Terminal facilities.--The terminal facilities on this waterway are
confined to small wharves for local use and an oil dock. They are
considered adequate for the present commerce.
               RIVERS AND HARBORS-GALVESTON,                                 TEX.,     DISTRICT               887

   Operations and results during fiscal year.-Maintenance: Periodic
:surveys and inspections were made at a cost of $292.03. Final sur-
veys and inspections were made for dredging the channel by contract
at a cost of $163.21.
   The total cost for the fiscal year was $455.24. The total expendi-
tures were $16,260.58.
   Conditionat end of fiscal year.--The existing project was completed
in 1941. The controlling depth was 6 feet at mean low tide. The
total cost of the existing project to June 30, 1952, was $215,620.41, of
which $10,309.75 was for new work and $205,310.66 was for mainte-
nance. The total expenditures were $215,620.41.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $38.06, together with an allotment of $920
for fiscal year 1953, a total of $958.06, will be applied to condition
:surveys and upkeep of reference lines, by hired labor, during the fiscal
year 1953.
   No work is scheduled to be performed during the fiscal year 1954.
                                      Cost and financial summary

                                                  Fiscal year ending June 30                         Total to June
                                                                                                    30, 1952, includ-
                                                                                                    ing fiscal years
                                   1948          1949         1950         1951         1952          priorto 1948


New work:
   Appropriated ---------
                  ....                  ---
                                  .--------    ---------------------------           ------------         $10,309. 75
   Cost---------      -----------      ---------------------- ----------------------                       10,309.75
   Expenditures...----------------------------------.....................------------------------          10,309.75
Maintenance:
   Appropriated---------....       $500.00    $30. 000.00 -$2, 000.00 $18, 925.41     -$500. 00          205, 348. 72
   Cost--- ---------------          168. 18    28, 353. 71 ------------ 18, 506. 70       455. 24        205, 310. 66
   Expenditures--------.........    168.18     28,527.16      -173. 45   2, 701.36    16, 260.58         205,310.66



                                   8. ANAHUAC CHANNEL, TEX.

   Location.-The town of Anahuac is on the northeast side of upper
Galveston or Trinity Bay, opposite the mouth of the Trinity River,
38 miles north of Galveston and 25 miles northeas t of Seabrook. (See
U. S. Coast and Geodetic Survey Chart No. 1282.)
   Existing project.-Thereis no definite project for this channel. The
River and Harbor Act approved March 3, 1905, contained an item for
"Improving West Galveston Bay Channel, Double Bayou, and mouths
of adjacent streams, including Trinity River, Anahuac Channel, and
Cedar Bayou," but at the time of the appropriation no recommenda-
tion of definite channel dimensions had been made to Congress. A
channel 6 feet deep at mean low tide and 80 feet wide was dredged in
1905 from Galveston Bay to the wharves at Anahuac, a distance of
16,000 feet. Under ordinary conditions the mean tidal range is about
0.75 foot and the extreme range is about 1.2 feet. The height of tide
is dependent largely on the wind, and during strong "northers" in the
winter season the water surface may be depressed 11/2 feet below mean
low tide.
   The latest approved estimate for annual cost of maintenance is
$35,000 (1952). The latest published map is contained in House Docu-
ment No. 440, Fifty-sixth Congress, first session.
888         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   Local cooperation.-None required.
   Terminal facilities.--The terminal facilities are at Anahuac and con-
sist of several small privately owned wharves and slips for local use.
They are considered adequate for existing commerce.
   Operations and results during fiscal year.-Maintenance: Periodic
surveys and inspections were made at a cost of $725.82. Preliminary
surveys, plans, and specifications were made for dredging the channel
by contract at a cost of $404.46, and work under the contract was
performed by hired labor at a cost of $160.96.
   The total cost of work for the fiscal year was $1,291.24. The total
expenditures were $1,496.39.
   Condition at end of fiscal year.-The existing project was completed
in 1911. The controlling depth was 5 feet at mean low tide. The
total cost of the existing project to June 30, 1952, was $533,324.49, of
which $5,975.10 was for new work and $527,349.39 was for mainte-
nance. The total expenditures were $533,484.02.
   Proposed operations.--The balance unexpended at the end of the
fiscal year, amounting to $30,079.71, plus accounts receivable of $172.11,
a total of $30,251.82, will be applied as follows:
Accounts payable June 30, 1952--------------------------------     $12. 58
Maintenance: Complete channel dredging, under existing contract
    (July and August 1952) ---------    ---------------------- 30, 239.24

        Total3---------------------------------------------0,251.                                                       82
   No work is scheduled to be performed during the fiscal year 1954.
                                       Cost and financial summary

                                                   Fiscal year ending June 30                              Total to June
                                                                                                          30,1952, includ-
                                                                                                          ing fiscal years
                                   1948           1949           1950           1951           1952         priorto 1948

New work:
   Appropriated------------------------------------------------------------$5,975.10
   Cost....--------------------------------------------------------.................................... ----------- 5,975.10
   Expenditures....------------------------------------------------------------5,975.10
Maintenance:
   Appropriated.........       $26, 000.00    $40,000.00     $12, 500. 00   $15, 926. 47   $27, 300. 00         557, 588. 63
   Cost---------------...       26, 007.54        405.07      44, 550.23     19, 269.52      1, 291. 24         527, 349.39
   Expenditures   --------.     26, 002. 14       405.07      44, 550. 23    19, 223.90      1, 496. 39         527, 508. 92



                     9. TRINITY RIVER AND TRIBUTARIES, TEX.

  Location.-This river rises in north-central Texas and flows south-
easterly about 760 miles, discharging into Galveston Bay, 37 miles
northeasterly from Galveston (U. S. Geological Survey base map,
Texas, scale 1: 500,000).
  Previous projects.-The project outlined in House Document No.
409, Fifty-sixth Congress, first session, was adopted in part by the
River and Harbor Acts of June 13, 1902, March 3, 1905, March 2,
1907, June 25, 1910, July 25, 1912, March 4, 1913, and July 27,
1916, each of which acts authorized the construction of certain named
locks and dams. The portion of the project relating to locks and
dams construction was abandoned by the River and Harbor Act of
September 22, 1922. For further details see page 1113 of annual
report for 1921, and page 986 of annual report for 1932.
           RIVERS   AND HARBORS-GALVESTON,     TEX.,   DISTRICT    889

   Existing project.-With abandonment of the lock and dam con-
struction, the improvement of the Trinity River by a channel 6
feet deep and of navigable width from the mouth to Liberty (river
mile 41.4) was left as the existing project, being continued as pro-
vided for in the River and Harbor Act of July 25, 1912. The
existing project was modified by the River and Harbor Act of March
2, 1945, which approved a comprehensive plan of development of
the Trinity River and Tributaries, Texas, in accordance with the
recommendations set forth in House Document No. 403, Seventy-
seventh Congress, first session, subject to such future modifications
as in the discretion of the Chief of Engineers and the Secretary
of the Army may be advisable. That comprehensive plan of de-
velopment provided for a navigable channel from a point in Galves-
ton Bay at the Houston Ship Channel to a terminus at Fort Worth,
Tex. Such navigable channel was to be not less than 9 feet in
depth, and to have a minimum bottom width of 200 feet in Galveston
Bay and 150 feet in the river section on tangents, with shunting places
and suitable widening on curves, and with a turning basin at Liberty.
The navigation locks would have clear inside dimensions of 75 feet
by 400 feet. The 1945 act, however, authorized for construction at this
time only that portion of the channel as far upstream as Liberty
Tex.
   The River and Harbor Act of July 24, 1946, further modified
the comprehensive plan for the Trinity River Basin development
so as to locate the section of the navigation channel below Ana-
huac nearer the eastern shore of Trinity Bay, in accordance with
the recommendations of the Chief of Engineers in House Docu-
nient No. 634, Seventy-ninth Congress, second session. This modi-
fication provides for a navigation channel 9 feet deep and 150 feet
wide from the Houston ship channel near Red Fish Reef along the
easterly  shore of Galveston Bay with a protective embankment to
the mouth of the Trinity River near Anahuac, thence by way of a
lateral canal of the same dimensions along the east side of
the Trinity River to a turning basin near Liberty; and for cutoffs,
pumping plant, siphons, intake structures, and alterations to highway
bridges and utilities.
   The estimated Federal cost of this portion of the comprehensive
plan below Liberty is $7,750,000 (1949), exclusive of amounts ex-
pended on previous projects. The latest approved estimate for
annual cost of maintenance and operation is $120,000 (1952). The
latest published maps are contained in House Document No. 634,
Seventy-ninth Congress.
   The estimated first cost to the United States of the approved
comprehensive plan for canalization to Fort Worth is $96,000,000
 (1939 prices), with $1,760,000 annually for maintenance and operation.
   Under ordinary conditions the mean tidal range in the bay is
from about 0.6 foot to about 1.2 feet. The height of tide is dependent
largely on the wind, and during strong northerly winds in the winter
season the water surface may be depressed 1.5 feet below mean low
tide.
   Local cooperation.-The work recommended in House Document
403, Seventy-seventh Congress, is authorized subject to the conditions
890    REPORT OF CHIEF OF ENGINEERS, U.           S. ARMY,   1952

that local interests furnish necessary rights-of-way, suitable areas for
disposal of dredged material, and make necessary changes in utilities
crossing the natural river channel below Liberty; and give assurances
satisfactory to the Secretary of the Army that they will provide ade-
quate terminal and transfer facilities on the waterway, and hold and
save the United States free from claims for damages that may result
from construction and operation of the improvements. Local inter-
ests have fully complied with conditions contained in House Docu-
ment No. 634, Seventy-ninth Congress, second session, and have
furnished assurances, accepted by the Secretary of the Army February
9, 1949, that they will comply with the requirements set forth in House
Document No. 403, Seventy-seventh Congress, first session, for the
channel between Anahuac and Liberty. All local cooperation for the
project below Anahuac, Tex., has been complied with.
    Terminal facilities.-The only wharves on this river are all in
the first 20 miles above the mouth. They are four in number and
range from 10 to 20 feet in length.. All are privately owned, and
usage is free at all except one. One has a hand derrick; the other
three have no freight-handling facilities. They have no physical
connection with any railroad. They are adequate for the existing
commerce, and there is ample room for future enlargement.
    Operationsand results duringfiscal year.-New work : Office studies
and the preparation of a plan of construction between Anahuac and
Liberty, Tex., were continued and engineering and design work was
accomplished at a cost of $6,913.25.
   Maintenance: Periodic surveys and inspections were made at a
cost of $4,356.96. Preliminary surveys, plans, and specifications for
dredging the channel by contract were made at a cost of $47.60 and
work under the contract was performed by hired labor at a cost of
$97.41.
   The total cost for all work for the fiscal year was $11,415.22 of which
$6,913.25 was for new work and $4,501.97 was for maintenance. The
total expenditures were $11,432.79.
    Condition at end of fiscal year.-The navigation channel below
Liberty, Tex., is 13 percent complete. The original project was com-
pleted in 1925. The channel from its junction with the Houston Ship
Channel to a point 1 mile below Anahuac, Tex., has been dredged to a
depth of 9 feet below mean low tide over a bottom width of 150 feet.
The controlling depth between the Houston ship channel and a point
1 mile below Anahuac, Tex., was 3.5 feet at mean low tide. The
controlling depth between the mouth of the Trinity River and mile
28.5 was 7 feet, and 3 feet thence to Liberty. Authorized construction
remaining under the comprehensive plan consists of completing that
portion of the navigation channel from 1 mile below Anahuac to
Liberty, Tex., with cutoffs, pumping plant, siphons, intake structures,
and alterations to highway bridges and utilities. The total cost of
the existing project to June 30, 1952, was $1,210,066.15 of which
$1,041,465.41 was for new work and $168,600.74 was for maintenance.
The total expenditures were $1,210,121.14.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $14,877.54, plus accounts receivable of $54.99,
               RIVERS AND HARBORS-GALVESTON,                                              TEX.,      DISTRICT                 891
together with an allotment of $5,800 for the fiscal year 1953, a total
of $20,732.53, will be applied as follows:
New work: Surveys, tests, and engineering studies, by hired labor
  (July to December 1952)--------------------------------- $1, 194. 84
Maintenance: Complete dredging in shoaled areas, under existing
  contract (July and August 1952) -----   --------------------- 19,537. 69

          Total for all work----------- ---------------                                                 ----        20, 732.53
   No work is scheduled to be performed during the fiscal year 1954.
                                                 Cost and financial summary

                                                           Fiscal year ending June 30                              Total to June
                                                                                                                  30,1952, includ-
                                                                                                                  ing fiscal years
                                         1948             1949           1950           1951          1952          prior to 1948


New work:
   Appropriated--------..... ..--------............ $750, 000.00 $667, 000. 00      $24, 429.53 -$6, 525.00       13$3, 497, 065.90
   Cost------------------
              ....                 $19,493. 29        28,296. 46  768, 507. 13      105, 999. 56   6, 913. 25       12, 931, 871. 06
   Expenditures--..------....        19, 088. 64      28, 762. 62 667, 145. 09      207, 337.51    6, 875.83        12, 931, 871.06
Maintenance:
   Appropriated------- .......      4, 000. 00        -4, 000. 00 ............        11, 983. 63   17, 460. 00       2   726, 000. 74
   Cost----_ ...------         -----.. --.---.   --            .___ _____--_......... 11, 203.97     4, 501.97        2   712, 263. 05
                               ............-------
   Expenditures-------------.........-----                         -----------        11, 203. 97    4, 556.96        2   712, 318. 04


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project__-______-____ $6, 143. 340
  1In addition, $66,000 was expended from contributed funds for new work.
2 Includes $252,659.92 from permanent indefinite appropriation, 1884, 1909.
8Includes     $564,000 loaned to other projects.

                                                 10. CEDAR BAYOU, TEX.

  Location.-This bayou is about 30 miles long. It flows to the south
and empties into the northwest corner of upper Galveston Bay, about
11/2 miles below the mouth of San Jacinto River and about 281/ miles
north of Galveston, Tex. (See U. S. Coast and Geodetic Survey
Chart No. 1282.)
   Previous projects.-Adopted by the River and Harbor Acts of
September 19, 1890, and July 13, 1892. For further details see page
869, annual report for 1938.
   Existing project.-This provides for a channel 10 feet deep at
mean low tide and 100 feet wide from the Houston Ship Channel to a
point on the bayou, 11 miles above the mouth. The project also
includes the jetties at the mouth of the bayou provided for under the
previous project. Under ordinary conditions the mean tidal range
is about 0.6 foot and the extreme range 1.2 feet. The height of tides
is dependent largely on the wind, and during strong "northers" in the
winter season the water surface may be depressed 2 feet below mean
low tide.
   The estimate of cost for new work is $42,000 (1952), exclusive of
amounts expended on previous projects, and $25,000 to be contributed
by local interests. The latest approved estimate for annual cost of
maintenance is $33,000 (1952).
   The existing project was adopted by the River and Harbor Act of
July 3, 1930 (S. Doc. 107, 71st Cong., 2d sess.). The latest published
map is in this document.
892         REPORT              OF CHIEF                 OF ENGINEERS,                      U.     S.     ARMY,           1952

   Local cooperation.-The River and Harbor Act, approved July
3,'1930, provides that local interests shall contribute 50 percent of the
estimated first cost of the improvement, but not to exceed $25,000, and
shall furnish, without cost to the United States, all necessary ease-
ments, rights-of-way, and dumping grounds.
   These conditions have not been completely met, but local interests
have complied with all the necessary requirements to complete the
channel to the first bend in Cedar Bayou above the mouth.
   Terminal facilities.-The terminal facilities consist of a few small
wharves, privately owned, for local use located at various places along
Cedar Bayou, an oil-loading wharf owned by the Atlantic Pipe Line
Co. located one-half mile above the mouth of the bayou, and an oil-
loading wharf owned by the Sinclair-Prairie Oil Co. located 11 miles
above the mouth of the bayou. The present facilities are considered
adequate for existing commerce.
   Operations and results during fiscal year.-Maintenance: Periodic
surveys and inspections were made at a cost of $750.18.
   The total cost for the fiscal year was $750.18. The total expend-
itures were $801.31.
   Condition at end of fiscal year.-The existing project was about
37 percent complete. The channel was completed in 1931 to project
dimensions from the Houston Ship Channel to the first bend in Cedar
Bayou above the mouth. Two brush and stone jetties have been con-
structed at the mouth of Cedar Bayou. Work remaining consists
of dredging the channel to project dimensions from the first bend
above the mouth to a point 11 miles above the mouth. The controlling
depths at mean low tide were 8 feet from Houston Ship Channel to the
first bend in Cedar Bayou above the mouth and 6 feet thence to a point
in the bayou 11 miles above the mouth.
   The total cost of the existing project to June 30, 1952, was as follows:

                                                                                           New work         Maintenance              Total

Regular funds .  ---------------------------------------                                    $12, 575. 56    $312,049. 49              $324, 625. 04
Contributed funds ...------------------------------------                                    12, 575. 57 ....--------------..........   12, 575. 57
      Total ...................................-----------------------------------------     25,151.13         312, 049. 49          337, 200. 62



  The total expenditures were $337,251.75, consisting of $324,676.18
from regular funds and $12,575.57 from contributed funds for new
work.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounted to $405.26, plus accounts receivable of $51.13,
together with an allotment of $60,900 for the fiscal year 1953, a
total of $61,356.39, will be applied as follows:
Maintenance: Remove shoaling from 3.4-mile reach of channel, by
contract (November and December 1952) -------        --    --  $61, 356. 39
   No work is scheduled to be performed during the fiscal year 1954.
                  RIVERS AND HARBORS-GALVESTON,                                            TEX.,            DISTRICT            893
                                            Cost and financial summary

                                                          Fiscal year ending June 30                                   Total to June
                                                                   .......                                             30,1952, includ-
                                                                                                                       ing fiscal years
                                        1948             1949            1950             1951              1952        priorto 1948

New work:
   Appropriated---         ------------------ ------------ -----.....................                             --
                                                                                                              ......        $51,662. 71
   Cost ..-----        ---------------------------------------------------------                                            1 51,662.71
   Expenditures-....-----          ------------------------------                ------------------------                   151,662. 71
Maintenance:
       Appropriated---....-------------              $58, 000.00 -$10,000.00         $50, 673.01       $1, 200.00           382, 290.01
       Cost-----------...------     $282.38           15, 357.66   33, 052. 92        51,618.43            750.18           381, 833.62
       Expenditures...---------....  282. 38           1,629. 56   46, 781.02         51, 618.43           801. 31          381, 884. 75


Other new work data: Estimated additional amount needed to be appro-
priated for completion of existing project _____________--___       $29, 400
  1 In addition, $12,575.57 was expended from contributed funds for new work.

                          11. CLEAR CREEK AND CLEAR LAKE, TEX.

   Location.-ClearCreek has its source about 13 miles south of Hous-
ton, Tex., and flows southeast for a distance of about 25 miles, empty-
ing into the west side of upper Galveston Bay at a paint 24 milies
northwest of Galveston, Tex. (See U. S. Coast and Geodetic Survey
Chart No. 1282.)
   Existing project.-This provides for a channel 7 feet deep at mean
low tide and 75 feet wide from deep water in Galveston Bay to a new
entrance to Clear Creek, and a channel 7 feet deep and 60 feet wide
in Clear Creek and Clear Lake to the county highway bridge at
League City. Under ordinary conditions the mean tidal range is
about -0.8 foot and the extreme range is 1.4 feet. The height of tides
is depenident largely on the wind and during strong "northers" in the
winter season the water surface may be depressed 2 feet below mean
low tide.
   The latest approved estimate for annual cost of maintenance is
$10,000 (1952).
   The existing project was authorized by the following river and
harbor acts:

       Acts                                Work authorized                                                   Documents

June 13,1902        A channel 4 feet deep and 50 feet wideH           ------------           . Doec.449, 56th Cong., 1st sess.
Aug. 30, 1935       Enlargement of the channel to depth of 6 feet and                       H. Doec. 264, 73d Cong., 2d sess.
                      width of 60 feet.
Mar.     2,1945     Realinement, enlargement, and extension of the                          H. Doec. 319, 77th Cong., 1st sess.
                      channel to the highway bridge near League City.                        (Contains latest published map.)



   Local cooperation.-Fullycomplied with.
   Terminal facilities.-The terminal facilities consist of small pri-
vately owned wharves for local use located at the town of Seabrook,
at the mouth of the creek, and at various points along the length of the
waterway. They are considered adequate for existing commerce.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was completed
June 14, 1950. The controlling depth at mean low tide was 6 feet to
           245554--53-vol. 1--57
894          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

the upper entrance to Clear Creek, thence natural dimensions of the
creek upstream to the end of the project which are considered ade-
quate for existing traffic.
  The total cost and expenditures of the existing project to June 30,
1952, were $168,145.75, of which $66,933.51 was for new work and
$101,212.24 was for maintenance.
  Proposed operations.-The allotment of $1,270 for fiscal year 1953
will be applied to condition surveys and miscellaneous inspections and
reports, by hired labor.
  The sum of $2,000 can be profitably expended during fiscal year
1954 for condition surveys, inspections, and reports by hired labor.
                                        Cost and financial summary

                                                     Fiscal year ending June 30                                Total to June
                                                                                                              30,1952, includ-
                                                                                                              ing fiscal years
                                    1948           1949           1950           1951           1952           priorto 1948


New work:
    Appropriated--...------------------------........................ $54, 700. 00 -$9, 057. 44------------
                                                                                               ............        $66, 933. 51
    Cost-----------------------------             ------------ 45, 642. 56----------- ------------                  66,933. 51
    Expenditures------.......------- --------------                    33, 551. 25             ............
                                                                                     12, 091.31------------         66, 933. 51
Maintenance:
                 .......
    Appropriated-------      $20, 000. 00 -$18, 500. 00......------------         -254. 93------------             101. 212. 24
    Cost___-----------------      324. 07      1, 108. 32                 ............------............
                                                                  312. 68-----------------                         101, 212. 24
                    ....
    Expenditures--------  .       324. 07      1, 108. 32         312. 68 ........................                 101, 212. 24



                                    12. DICKINSON BAYOU, TEX.
   Location.-Thisbayou enters Galveston Bay on the west side about
20 miles northwest of Galveston. (See U. S. Coast and Geodetic Sur-
vey Chart No. 1282.)
   Existing project.-This provides for a channel 6 feet deep at mean
low tide and 60 feet wide along the present route from the natural
6-foot depth in Galveston Bay through Dickinson Bay and Dickinson
Bayou to the Galveston, Houston & Henderson Railroad bridge at
Dickinson, Tex. Under ordinary conditions the mean tidal range is
about 1 foot and the extreme range about 1.4 feet. The height of tides
is dependent largely on the wind, and during strong "northers" in
the winter season the water surface may be depressed 21/2 feet below
mean low tide.
   The latest approved estimate for annual cost of maintenance is
$12,500 (1952).
   Authority for the original dimensions (4 by 50 feet) of this channel
is explained in the annual report for 1931, page 1093. The River and
Harbor Act approved June 20, 1938, authorized the present project
dimensions (H. Doc. 568, 75th Cong., 3d sess.). The latest published
map is in this document.
   Local cooperation.-Fully complied with.
   Terminal facilities.--The terminal facilities consist of small pri-
vately owned wharves for local use. They are considered adequate
for the existing commerce.
   Operationsand results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was completed
in 1940. The controlling depth was 5.5 feet at mean low tide. The
total cost and expenditures of the existing project to June 30, 1952,
                  RIVERS AND                           HARBORS-GALVESTON,                                                 TEX.,             DISTRICT                 895
were $90,825.34, of which $33,942.37 was for new work and $56,882.97
was for maintenance.
  Proposed operations.-The allotment of $670 for fiscal year 1953
will be applied to condition surveys and miscellaneous inspections and
reports, by hired labor.
  No work is scheduled to be performed during the fiscal year 1954.
                                                         Cost and financial summary

                                                                             Fiscal year ending June 30                                                     Total to June
                                                                                                                                                            30,1952, includ.
                                                                                                                                                            ing fiscal years
                                                    1948                  1949                   1950                   1951                  1952            prior to 1948


New work:
   Appropriated------  ....................-------         ...------------------------.........--------............--............------------............        $33,942. 37
   Cost.....-------------------............................---------...--------------------............---............                                            33, 942. 37
   Expenditures--------------........ ..................---------....------......-----.......----.. ......------....---------............                         33, 942. 37
Maintenance:
   Appropriated-.........                     $17,000. 00 -$16,700.00                     ............ - -$360. 91 ............                                   56, 882. 97
   Cost------------------                         226.53         80. 31                   ............ 132.25 ............                                        56,882.97
   Expenditures-------.......                     226. 53        80. 31                  ------------
                                                                                         ............       132. 25 ............                                  56, 882. 97



                                                   13. CHOCOLATE BAYOU, TEX.
   Location.-The source of the bayou is about 25 miles southwest of
Houston and the mouth is in Chocolate Bay, an arm of West Galvestoi
Bay, about 12 miles north of San Luis Pass and 28 miles west of
Galveston. It is tidal throughout its length, and the lowest stages
occur during the winter season. The authorized section extends from
the Gulf Intracoastal Waterway through Chocolate Bay to the mouth
of the bayou, a distance of about 5.6 miles.
   Existing project.-The existing project, adopted by the River and
Harbor Act approved March 2, 1907 (H. Doc. 445, 56th Cong., 1st
sess.), modified by the River and Harbor Act approved March 2, 1945
 (H. Doc. 337, 76th Cong., 1st sess.), and further modified by the
River and Harbor Act approved May 17,1950 (H. Doc. 768, 80th Cong.,
2d sess.), provides for a channel 4 feet deep at mean low tide and 100
feet wide through Chocolate Bay to the extent necessary to afford a
connection between Chocolate Bayou and the Gulf Intracoastal Water-
way. Under ordinary conditions the mean tidal range is about 1 foot
and the extreme range about 11/2 feet. The height of tide is largely
dependent on the force and direction of the wind and during strong
"northers" in the winter season the water surface may be depressed 2
feet below mean low tide.
   The estimate of cost of new work is $54,500 (1952). The latest
approved estimate for annual cost of maintenance is $9,600 (1952).
The latest published map is contained in House Document No. 768,
Eightieth Congress, second session.
  Local cooperation.-None required.
   Terminal facilities.-The terminal facilities consist of small pri-
vately owned wharves located at various points along the bayou. They
are considered adequate for existing commerce.
  Operations and results during fiscal year.-None.
  Condition at end of fiscal year.-The existing project was 12 percent
complete. The controlling depth of the channel from its confluence
with the Gulf Intracoastal Waterway through Chocolate Bay to the
896          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                             1952

mouth of the Bayou was 6 feet at mean low tide over a bottom width of
60 feet.
  The total cost of the existing project to June 30, 1952, was $71,097.40
of which $6,512.12 was for new work and $64,585.28 was for mainte-
nance. The total expenditures were $71,097.40, all from regular
funds.
  Proposed operations.-The allotment of $1,120 for fiscal year 1953
will be applied to condition surveys and miscellaneous inspections
and reports, by hired labor.
  No work is scheduled to be performed during the fiscal year 1954.
                                               Cost and financial summary

                                                                    Fiscal year ending June 30                             Total to June
                                                                                                                          30,1952, includ-
                                                                                                                          ing fiscal years
                                         1948                    1949            1950         1951         1952            prior to 1948


New work:
                                                 ------------------------------------............
   Appropriated---.........---------------................................................                                      $6,512. 12
   Cost--------------------            ------------ ----------------------........-----------...                                 6, 512.12
   Expenditures--.....-------------                     ------------------------------- ------------........................
                                                                                                                   6, 512. 12
Maintenance:
   Appropriated.........------------------------............                                             -----------
                                                                          $33, 000. 00 -$1, 662. 89............                 64, 585. 28
        .............................------------ ............------------ 31, 337. 11 --------------------............
   Cost----------                                                                       ............                            64, 585. 28
   Expenditures---             -------.........
                                         -----------........................   31, 337. 11 ........................              4, 585. 28


Other new work data: Estimated additional amount needed to be appro-
priated for completion of existing project_ -----------     _       $48, 000

                                         14. FREEPORT HARBOR, TEX.
  Location.-Thisharbor is formed by the improvement of the Brazos
River, Tex., from the mouth to Freeport, about 6 miles above. (See
U. S. Coast and Geodetic Survey Chart No. 525.)
  The mouth of the Brazos River is about 47 miles southwest of
Galveston Harbor entrance and about 137 miles northeast of Aransas
Pass (Port Aransas).
  Previous projects.-Authorized by River and Harbor Act of June
14, 1880. For further details see page 1860 of annual report for 1915,
and page 872 of annual report for 1938.
  Existing project.-This provides for a project depth of 38 feet at
mean low tide in the outer bar channel from that depth in the Gulf
of Mexico to a point within the jetties; thence 36 feet in the authorized
channels and basins to and including the upper turning basin about
one-half mile below the Stauffer Chemical Co. plant, with two turning
basins, one 700 by 700 feet at Brazosport and one 600 by 600 feet
at the upper end of the channel, the channel to have a width of 300
feet seaward of the jettied entrance, 200 feet from the jettied entrance
to the Brazosport turning basin, widened at the bend, and averaging
375 feet, thence to the upper turning basin; the widths in the ap-
proaches to the turning basins to converge within a distance of 800
feet from the width of the turning basin to the width of the channel;
and for the extension of the channel with a depth of 30 feet and a
width of 200 feet to and including a turning basin, 500 by 500 feet,
near the Stauffer Chemical Co. plant at Freeport, when required in
the interests of commerce and navigation. The work is to be accom-
plished as may be found desirable, by dredging, by jetties at the
                RIVERS AND HARBORS-GALVESTON,                                    TEX.,     DISTRICT            8t7
mouth of the harbor, and by a diversion dam in the Brazos River, a
diversion channel, and necessary auxiliary works in general accord-
ance with plan No. 6, as proposed by the district engineer, together
with a lock in the diversion dam, approximately 200 feet long, 55
feet wide and 121/2 feet deep over the miter sills. The River and
Harbor Act of July 3, 1930, modified the act of March 3, 1925, so as
to provide that when local interests shall have furnished assurances
satisfactory to the Secretary of the Army that they will maintain
the diversion channel, the United States shall assume the cost of main-
tenance of the navigable channel, estimated at $75,000 annually,
including care and operation of the lock, if provided (Rivers and
Harbors Committee Doc. 18, 70th Cong., 1st sess.).
   Under ordinary conditions the mean tidal range is about 1.5 feet
and the extreme range about 21/2 feet. Freshets in the river, except
under extreme conditions, do not cause a greater variation in the
water surface than the tidal action.
   The estimated cost of new work is $1,633,000 (1952), exclusive of
$758,302.79 contributed funds and $477,697.21 remaining to be con-
tributed by local interests upon request. The latest approved estimate
of cost of annual maintenance is $184,000 (1952).
   The existing project was authorized by the following river and
harbor acts:

       Acts                                Work authorized                                   Documents

Mar. 3,1899          Dredging and such other work as may be deemed               Specified in act.
                      most effective in the judgment of the Secretary of
                      War in improving and developing the harbor; for
                      taking over the jetties and other privately built
                      works at the mouth of the river.
Mar.    2,1907       Examination    authorized.     The work     was   subse-    H. Doc. 1087, 60th Cong., 2d sess.
                      quently confined to maintenance of the jetties.
Feb. 27,1911         Repairs to jetties and dredging--..--......--------------   Specified in act,
Mar.    4,1913       Construction of a seagoing hopper dredge, 4i the cost           Do.
                      to be charged to this improvement and 4 to Aran-
                      sas Pass.
Aug. 8,1917          Purchase of one 15-inch pipeline dredge and equip-          H. Doc. 1469, 63d Cong., 3d sess.
                      ment, its operation for an experimental period of 3
                      years, the operation of the seagoing dredge 3,4 time
                      for 3 years, and repairs to the jetties.
Mar. 3,1925          Diversion dam, diversion channel, and necessary             Rivers and Harbors Committee
                      auxiliary works.                                             Doc. 10, 68th Cong., 2d sess.
July    3,1930       Maintenance of the diversion channel at the expense          Rivers and Harbors Committee
                      of local interest.                                           Doc. 18, 70th Cong., 1st sess.
Aug. 30,19351        Dredging the channels and turning basins to greater         Rivers and Harbors Committee
                      depths. (Project completed to within }3 mile of              Doc. 15, 72d Cong., 1st sess.
                      the upper limit of the channel with Public Works
                      Administration funds and contributed funds.)
   Do-        -...   Maintenance of the present project dimensions of the        Rivers and Harbors Committee
                      channels and turning basins at Federal expense.              Does. 15, 72d Cong., 1st sess. and
                                                                                   29,2 73d Cong., 2d sess.
May 17, 1950         Deepening outer bar channel to 38 feet, mean low            H. Doc. 195 2, 81st Cong., 1st sess.
                      tide, from the Gulf to a point within the jetties;
                      thence 36 feet in the authorized channels to and
                      including the upper turning basin.

1 Included in Public Works Administration program, Sept. 6, 1933.
2 Contains latest published maps.


   Local cooperation.-All required local cooperation has been fully
complied with, except the contribution toward the cost of the exten-
sion of the channel to Freeport, which has not been requested (River
and Harbor Act of Mar. 3, 1925). Construction of a lock in the
diversion dam (River and Harbor Act of Aug. 30, 1935); and local
898        REPORT           OF CHIEF                     OF ENGINEERS,                  U.    S. ARMY,            1952

cooperation requirements for work authorized by the River and
Harbor Act of May 17, 1950 (H. Doc. 195, 81st Cong., 1st sess.).
   Terminal facilities.-The terminal facilities consist of small pri-
vately owned wharves. Other facilities privately owned are one
sulfur-loading dock, two oil docks, an acid dock, and two shell unload-
ing docks. The present facilities are considered adequate for existing
commerce.
   Operations and results during fiscal year.-Maintenance: Periodic
surveys and inspections were made at a cost of $10,839.21. Prelimin-
ary plans and specifications were made for dredging the sea bar and
jetty channel with the Government hopper dredge A. Mackenzie at
a cost of $873.39 and 362,746 cubic yards of material were removed
from a channel length of 6,500 feet from sea bar and jetty channel
during the period December 11 to 31, 1951, at a cost of $50,606.55.
Preliminary surveys, plans and specifications were made for dredging
the jetty channel from the Gulf of Mexico to Quintana Point, by
contract at a cost of $951.64, and a total of 474,788 cubic yards of
material was removed from a channel length of 9,520 linear feet
during the period November 11 to 30, 1951, at a cost of $76,245.31.
   The total cost for the fiscal year was $139,516.10. The total
expenditures were $139,045.94.
   Condition at end of fiscal year.-The existing project was 69 per-
cent complete. The existing project has been improved to a depth of
32 feet to and including the Brazosport turning basin, thence to a
depth of 30 feet to and including the upper turning basin and to a
depth of 25 feet and width of 300 feet above the upper turning basin.
The work remaining consists of deepening the channel to and includ-
ing the turning basin near the Stauffer Chemical Co. plant and con-
structing a lock in the diversion dam in the old Brazos River. The
controlling depths at mean low tide in the various channels and turn-
ing basins were as follows: Channel from deep water in the Gulf of
Mexico to seaward end of jetty, 27 feet; channel from seaward end of
jetty to Brazosport turning basin, 29 feet; Brazosport turning basin, 32
feet; channel from Brazosport turning basin to upper turning basin,
31 feet; upper turning basin, 29 feet; channel from upper turning
basin to turning basin at Stauffer Chemical Co. plant, 19 feet, and the
turning basin at the Stauffer Chemical Co. plant, 20 feet.
   The total cost of the existing project to June 30, 1952, was as follows:

                                                                                     New work         Maintenance           Total

Regular funds_                  -------------------------------------               $1, 101,061. 89 $3, 625, 392. 43    $4, 726, 454.32
Public Works funds__       _ _. ..-----------------------------------                   116, 574. 74                        116, 574. 74
    Total United States funds ..----__ -------- __.____ .   _ 1, 217, 636. 63 3, 625, 392. 43                            4, 843, 029. 06
Contributed funds (includes $225,000 contributed under sec.
4, River and Harbor Act of Mar. 4, 1915).                       758, 302. 79 .........-----                               758, 302. 79
      Total all funds__......   -------.--.--                 .....- .........-.-   1, 975, 939. 42   3, 625, 392. 43    5, 601, 331.85


   The total expenditures were $5,600,842.88, consisting of $4,725,965.35
regular funds, $116,574.74 Public Works funds, and $758,302.79 con-
tributed funds for new work.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $4,702.35, together with an allotment of
               RIVERS AND HARBORS-GALVESTON,                                        TEX.,       DISTRICT                899
$265,300.00 for the fiscal year 1953, a total of $270,002.35, will be
applied as follows:
Accounts payable June 30, 1952_                                     $488. 97
Maintenance:
    Dredge outer bar and jetty channels with U. S. Government
      plant and hired labor (September and October 1952)-------- 125, 000. 00
    Dredge shoals between jetty channel and upper turning basin
      (by contract) (November and December 1952)------------144, 513.38

         Total--               -----------------------------------                                           270, 002.35
  The sum of $190,300 can be profitably expended for the following
schedule of work during the fiscal year 1954:
Maintenance :
   Dredge outer bar and jetty channel with Government
      plant and hired labor (September 1953)---------        $75, 000
   Dredge shoaled reaches of inside channel between jetty
      channel and upper turning basin, by contract (February
      to May 1954) --------        --------------   ------- 100,500
Condition surveys, investigations, studies and reports__ 14, 800
         Total for maintenance _---------____-                                                                   $190, 300
                                        Cost and financial summary

                                                     Fiscal year ending June 30                              Total to June
                                                                                                            30, 1952, includ-
                                                                                                            ing fiscal years
                                    1948           1949           1950            1951           1952         priorto 1948

New work:
   Appropriated---------......... ....--------.......
                                             .......------------------------............                     1 $1,364,735.06
                                                                                    ............------------.........
                                                                                                         ---
   Cost----...          ------------        ---------------------------                 ----------------      1 1,364, 735.06
   Expenditures--..            ------------.------------
                                     ..                                 .---------- .-----------------------.  1.1, 364, 735. 06
Maintenance:
   Appropriated-....... $110, 000. 00 $250,000.00 $265,000. 00 $131, 602. 77 $143, 711.00                       3, 629, 605. 81
   Cost----__ --- ---- --     152, 334. 55 256, 629. 96 252, 504. 14 144, 166. 41 139, 516. 10                  3, 625, 392. 43
   Expenditures-....--    ... 149, 637. 92 257, 204. 95 154, 962. 61 241, 776. 13 139, 045. 94                  3, 624, 903. 46


1In addition, $758, 302. 79 was expended from contributed funds for new work.
Other new work data: Estimated additional amount needed to be ap-
  propriated for completion of existing project-------------------                                              $415, 000

        15. CHANNEL FROM PASS CAVALLO TO PORT LAVACA, TEX.
   Location.-The bar at Pass Cavallo is 125 miles southwest of Gal-
veston entrance and 54 miles north of Aransas Pass. Port Lavaca lies
26 miles to the northwest of the pass, across Matagorda and Lavaca
Bays. (See U. S. Coast and Geodetic Chart No. 1117.)
   Existing project.-This provides for a depth of 9 feet and a width
of 100 feet from Lynns Bayou at Port Lavaca, Tex., to deep water in
Matagorda Bay near Port O'Connor, Tex., a distance of about 11
miles; for channel 6 feet deep and 100 feet wide from Port Lavaca
via Lavaca Bay, Lavaca, and Navidad Rivers to Red Bluff about
mile 3 on the Navidad River, a total distance of 20 miles; and for a
harbor of refuge 9 feet deep near Port Lavaca with an approach
channel 9 feet deep and 100 feet wide. Under ordinary conditions
the mean tidal range is about 1 foot and the extreme range about 2
feet. The height of tide is dependent largely on the wind, and during
strong "northers" in the winter season the water surface may be de-
pressed 2 feet below mean low tide.
900           REPORT OF CHIEF                OF ENGINEERS,              U.   S.   ARMY,       1952

  The estimate of cost for new work, is $460,500 (1952). The latest
approved estimate of cost for annual maintenance is $58,000 (1952).
  The existing project was authorized by the following river and
harbor acts:

       Acts                           Work authorized                                   Documents

June 25, 1910      Channel to Port Lavaca, Tex., 7 feet deep and 80 feet     H. Doc. 1082, 60th Cong., 2d sess.
                     bottom width.
Aug. 30, 1935      Extension of 7-foot channel to the shore line of Lavaca   Rivers and Harbors Committee
                     Bay at the mouth of Lynns Bayou.                          Doc. 28, 74th Cong., 1st sess.
Aug. 26, 1937      Deepen and widen channel to present project dimen-        Rivers and Harbors Committee
                                                                                                    1
                     sions.                                                    Doc. 37, 75th Cong., 1st sess.
Mar.          Extension of the channel 6 feet deep and 100 feet wide
         2, 1945                                                             H. Doe. 314, 76th Cong., 1st sess.'
               from Port Lavaca by way of Lavaca Bay, Lavaca
               and Navidad Rivers to Red Bluff, a distance of 20
               miles.
    Do-...... To provide a harbor of refuge 9 feet deep near Port            H. Doe. 731, 79th Cong., 2d sess.
               Lavaca and an approach channel 100 feet wide and
               equal depth.

  1Contain latest published      maps.

   Local cooperation.-Underthe River and Harbor Act of March 2,
1945, local interests are required to furnish free of cost to the United
States all necessary lands, easements, and rights of way and suitable
spoil-disposal areas for the initial construction and subsequent main-
tenance when and as required; hold and save the United States free
from damages that may result from the construction and maintenance
of the project; and provide necessary mooring facilities to which all
vessels shall have free and equal access during storm periods, none of
which has been complied with. Requirements under prior acts have
been complied with.
   Terminal facilities.--The terminal facilities consist of several prix
vately owned piers and three privately owned slips at Port Lavaca,
and a municipally owned wharf, turning basin, one oil dock, and
refrigerated seafood processing and packing plant at the mouth of
Lynns Bayou. The municipally owned facilities are open to the gen-
eral public and are adequate for existing commerce. In addition,
there is a privately owned channel, turning basin with private
wharves, oil dock, and loading facilities owned by Aluminum Co., of
America at Point Comfort, Tex.
   Operations and results during fiscal year.-Maintenance: Periodic
surveys and inspections were made at a cost of $861.41. Preliminary
surveys, plans and specifications for dredging by contract from Lynns
Bayou to deep water in Matagorda Bay at a cost of $1,196.23 and a
total of 518,764 cubic yards of material was removed from a channel
length of 47,100 linear feet during the period from March 8 to April
11, 1952, at a cost of $37,380.76.
  The total cost for the fiscal year was $39,438.40. The total ex-
penditures were $39,440.84.
   Condition at end of fiscal year.-The existing project was 27 per,
cent complete. The channel from the 9-foot contour in Matagorda
Bay to the mouth of Lynns Bayou was completed in 1939. The work
remaining consists of dredging the channel through Lavaca Bay and
the Lavaca and Navidad Rivers to Red Bluff on the Navidad River
              RIVERS AND HARBORS--GALVESTON,                                                TEX.,         DISTRICT               901
and dredging the harbor of refuge at Port Lavaca. The controlling
depth at mean low water in the completed channel was 9.2 feet. The
total cost of the existing project to June 30, 1952, was $486,009.73 of
which $125,494.49 was for new work and $360,515.24 was for mainte-
nance. The total expenditures were $486,009.73.
    Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $12,923.48, together with an allotment of
$1,200 for the fiscal year 1953, a total of $14,123.48, will be applied to
condition surveys and reestablishment of reference piles in Mata-
gorda Bay by hired labor.
    The sum of $45,500 can be profitably expended during the fiscal
year 1954 for dredging shoaled reaches of the project from deep water
in Matagorda Bay to mouth of Lynns Bayou, by contract (September
and October 1953).
                                         Cost and financial summary

                                                        Fiscal year ending June 30                                      Total to June
                                                                                                                       30,1952, includ-
                                                                                                                       ing fiscal years
                                     1948             1949              1950              1951              1952         prior to 1948

New work:
   Appropriated--                                      .------------.. .-----------
                                                                     .-----------         -----------.------------         $125,494.49
   Cost_-----------------            $455.88 --------------------------------------------                                   125, 494.49
   Expenditures--------.........      465. 88 ........-------------------------------------------                           125, 494. 49
Maintenance:
   Appropriated--------.........   61, 500. 00    $64,000. 00 -$1, 500. 00 -$1, 088. 51                 $52, 300. 00        373, 438. 72
       ---------------
   Cost_                           57, 843. 85      3, 850. 56   60, 375. 30  1, 438. 12                 39, 438. 40        360, 515. 24
   Expenditures.........           57, 007. 02      4, 036. 74   60, 375. 30   1,435. 68                 39, 440. 84        360, 515. 24


Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project_-----..-_--.----                                                        $335, 000

                                     16. GUADALUPE RIVER, TEX.

   Location.-This river has its source in southwestern Texas, approxi-
mately 32 miles south of Junction, Tex., flows in a southeasterly direc-
tion a distance of about 458 river miles and empties into the head of
San Antonio Bay, 60 miles northeast of Corpus Christi and 140 miles
southwest of Galveston. (See U. S. Coast and Geodetic Survey Chart
No. 1285.)
   Previous project.-Authorized in the River and Harbor Act ap-
proved March 2, 1907. For further details see page 1102 of the annual
report for 1922.
   Existing project.--The plan of improvement provides for a naviga-
tion channel 9 feet deep and 100 feet wide extending about 45.5 miles
from the Gulf Intracoastal Waterway by way of Seadrift to a point
on the Guadalupe River 3 miles above Victoria, Tex.
   Under ordinary conditions the mean tidal range is about 1 foot and
the extreme range is about 11/2 feet. The height of tide is dependent
largely upon the strength and direction of winds. During strong
north winds in the winter season the water surface is occasionally de-
pressed 1 foot below mean low tide. In the river section the ordinary
fluctuation is about 2 feet and the extreme fluctuation due to floods
about 20 feet.
902    REPORT   OF CHIEF OF ENGINEERS,      U.   S. ARMY,   1952

   The estimated Federal cost for construction is $13,400,000 (1951);
the cost to local interests for lands and damages and relocations
is $1,066,000 (1945), a total of $14,466,000 (July 1951).
   The latest approved estimate for annual cost of operating and
maintenance is $82,000 (1952).
   The existing project was authorized in the River and Harbor Act
approved March 2, 1945 (H. Doc. 247, 76th Cong., 1st sess.).
   The latest published map is in the project document.
   Local cooperation.-The navigation features of the project were
authorized subject to the provisions that local interests furnish free
of cost to the United States all lands, easements, rights-of-way, and
spoil-disposal areas for construction and for subsequent maintenance
as required, hold and save the United States free from all claims for
damages that may result from the construction and maintenance of
the channel, bear all costs of required bridge modification and give
assurances satisfactory to the Secretary of the Army that they will
provide adequate terminal facilities, including turning basins at Sea-
drift and Victoria, none of which has been complied with.
   Terminal facilities.-Terminal facilities consist of small wharves
located at Seadrift and other locations along the river. These facili-
ties are privately owned but are used to some extent by the public on
equal terms. They are considered adequate for existing commerce.
   Recommended modification of project.-Under date of December
22, 1949, the Chief of Engineers recommended modification of the
existing project to provide a basin for a harbor of refuge for small
craft at Seadrift 9 feet deep at mean low water, 200 feet wide, and
1,000 feet long with an entrance channel 9 feet deep and 100 feet wide
from the authorized side channel to Seadrift, and surrounded by a
protective levee with its top at elevation 20, with such modifications
thereof as in the discretion of the Chief of Engineers may be advisable
at an estimated cost to the United States of $52,000 for construction
and $1,200 annually for maintenance in addition to that now required.
 (H. Doc. 478, 81st Cong., 2d sess.)
   Operations and results during fiscal year.-No work was done and
no costs incurred during the fiscal year.
   The total expenditures were $52.75, all for new work done during
the previous fiscal year from regular funds by hired labor.
   Conditions at end of fiscal year.-A channel 5 feet deep by 40 feet
wide from deep water in San Antonio Bay to Victoria, Tex., was
completed in 1912. The controlling depth at mean low tide in the
channel across San Antonio Bay is about 2 feet. Navigation in the
river is impossible due to logs, snags, and shoals.
   Modification of the channel to Victoria was 2 percent complete.
Preliminary studies, subsurface investigations, and design for prep-
aration of detailed plans was 99 percent complete.
   Total cost under the existing project to June 30, 1952, was $199,-
885.75 all for new work from regular funds by hired labor.
   Total expenditures were $199,885.75.
                 RIVERS AND IIARBORS-GALVESTON,                                                        TEX.,   DISTRICT            903
  Proposed operations.-No work is scheduled for fiscal year 1953.
  The sum of $1,087,000 can be profitably expended during the fiscal
year 1954 for construction of 14.5 miles of channel from the Gulf
Intracoastal Waterway main channel to the north shore of Mission
Lake, by contract (September 1953 to April 1954).
                                                 Cost and financial summary

                                                                 Fiscal year ending June 30                               Total to June
                                                                                                                         30, 1952, includ-
                                                                                                                         ing fiscal years
                                            1948               1949               1950                1951      1952       priorto 1948

New work:
   Appropriated ------------........              . $50, 000. 00
                                             -----....                       $20, 000. 00       $20, 000. 00   -$114. 25    $372, 433. 03
   Cost-- ----------                     $9, 444. 44        92, 209. 76       32, 648. 14        21, 409. 74 ........------------...
                                                                                                                             372, 433. 03
   Expenditures ...---------               9, 749. 78       91, 030. 84       32, 842. 37        22, 036. 34        52. 75   372, 433.03
Maintenance:
     Appropriated---------.----                      ----------------------------------------------                           106,100.36
     Cost-------------------------------------------------------------------106,100.                                                   36
     Expenditures -----------------------------------------------------------                                                 106,100. 36


Other new work data:
    Estimated additional amount needed to be appropriated for
      completion of existing project _----------.----         $13,200, 000

                17. PORT ARANSAS-CORPUS CHRISTI WATERWAY, TEX.

  Location.--This is a consolidation of the old improvements of Port
Aransas, Tex., and the channel from Aransas Pass to Corpus Christi,
Tex. Aransas Pass is on the southern portion of the coast of Texas,
180 miles southwest of Galveston and 132 miles north of the mouth
of the Rio Grande. Aransas Pass connects Corpus Christi Bay and
Aransas Bay with the Gulf of Mexico. The waterway extends from
deep water in the Gulf through the Aransas Pass jettied entrance,
thence westerly 203/4 miles to and including a turning basin at Corpus
Christi, thence westerly 13/4 miles through the Industrial Canal to
and including the turning basin at Avery Point, thence westerly 414
miles to and including a turning basin near Tule Lake. (See U. S.
Coast and Geodetic Survey Charts Nos. 523, 1285 and 1286.)
  Previous projects.-The original project for improvement of Aran-
sas Pass (Port Aransas) was authorized by the River and Harbor
Act of March 3, 1879. The improvement was taken over by the
Aransas Pass Harbor Co. on June 30, 1890, under authority of the
act of May 12, 1890. This company relinquished its rights to the
United States on March 27, 1899. The channel from Aransas Pass
to Corpus Christi was first improved under the River and Harbor
Acts of March 2, 1907, and June 25, 1910.
  For further details, see page 1861 of annual report for 1915 and
page 877 of annual report for 1938.
  Existing project.-The existing project dimensions provided for
904           REPORT      OF CHIEF OF ENGINEERS,                             U.   S. ARMY,            1952

in the various channels and basins comprising this waterway are
shown in the following tabulation:

                                                                      Adopted project dimensicns

Section of the Port Aransas-Corpus                                                                              Depth in
       Christi Waterway, Tex.                                                                                   feet below
                                                                  Bottom width in feet                          mean low
                                                                                                                Gulf level


Aransas Pass outer bar------------       700- ...--                             ..............
                                                        __-------.........---------------      ---------     38
Aransas Pass jetty channel---....-..     600 from inner end to opposite station 90, north jetty,         (1)
                                           thence increasing to 700 at outer end of jetty.
Inner basin at Harbor Island.   -        650 by southerly 1,000 long-----------------                   -----             36
                                                                                                                          30
  basin.                                {650 by northerly 2,000 long_.___.__... -                 --------
Channel to town of Port Aransas ...      100 .............................                  ..-------------------------   12
Channel from Port Aransas to Cor-        400---.........................--------------------------------.                 36
  pus Christi turning basin.
Corpus Christi turning basin-......      1,000 by 5,500 long (includes approach to turning basin)                         36
Industrial Canal....----------------     200_ ------.--------------------------------------                               36
Turning basin at Avery Point-......      1,000 by 1,200 long _-----------------------------------                         36
Channel to vicinity of Tule Lake-....    200___ ----------------------------------------------                            36
Turning basin near Tule Lake ......      900 by 1,000 long ........------------------------------------                   36

  1 36 feet from inner end to opposite station 90, north jetty, increasing to 38 feet at outer end of jetty.


  The project also provides for two rubblestone jetties at Aransus
Pass entrance, extending into the Gulf from St. Joseph and Mus-
tang Islands, the project lengths of which are 11,190 and 8,650
feet, respectively. The project further provides for a stone dike on
St. Joseph Island about 19,100 feet long connecting with the north
jetty and extending up this island to prevent a channel being cut
around the jetty.
   Under ordinary conditions the mean tidal range at Aransas Pass
is about 1.1 feet and the extreme range about 2 feet, and at Corpus
Christi the mean range about 1 foot and the extreme about 11/2
feet. The heights of tides are dependent largely on the strength
and direction of winds, and during strong "northers" in the winter
season the water surface may be depressed as much as 3 feet below
mean low Gulf level.
   The estimated cost for new work exclusive of amounts expended
on previous projects, and exclusive of $217,000 contributed by local
interests, is $15,371,000 (1952). The latest approved estimate for
annual cost of maintenance is $749,000 (1952).
   The existing project was adopted by the following river and harbor
acts:

       Acts                         Work authorized                                            Documents

Mar.     3,1899   Acquisition of the old curved portion of the north              Specified in act.
                   jetty previously constructed by private parties.
Jun. 13,1902      Completion of north jetty in accordance with the                    Do.
Mar. 3,1905        plans of its builders.
Mar. 2,1907       Connection of old curved jetty to St. Joseph Island,            Rivers and Harbors Committee
                   and construction of south jetty.                                 Doc. 5, 59th Cong., 2d sess.
Feb. 27,1911      Dredging roadstead in Harbor Island Basin to depth              H. Doc. 1094, 61st Cong., 3d sess.
                   of 20 feet and construction of 10,000 linear feet of
                   the stone dike on St. Joseph Island.
             RIVERS AND HARBORS--GALVESTON,                             TEX.,     DISTRICT            905

    Acts                          Work authorized                                   Documents

Mar.   4,1913     Deepening of channel between jetties and the Harbor H. Doc. 1125, 62d Cong., 3d seas.
                   Island Basin to depth of 25 feet, extension of jetties
                   seaward, extension of dike on St. Joseph Island
                   9,100 feet, and dredging the approach channel 12
                   feet deep to town of Port Aransas.
Sept. 22, 1922 Dredging channel from Aransas Pass to Corpus H. Doc. 321, 67th Cong., 2d sess.
                   Christi, 25 feet deep, 209 feet bottom width.
July 3, 1930 Deepening entrance channel from Gulf of Mexico to H. Doe. 214, 70th Cong., 1st sess.
                   Harbor Island and provision of an inner basin at
                   Harbor Island of reduced area but greater depth.
    Do.....----   Aransas Pass to Corpus Christi Channel with depth Rivers and Harbors Committee
                   of 30 feet.                                              Doc. 9, 71st Cong., 1st sess.
Aug. 30, 19351 Enlarging all channels from the Gulf to the western         Rivers and Harbors Committee
                   end of basin dredged by Humble Oil & Refining            Doc. 35, 72d Cong., 1st sess. and
                   Co. at its docks on Harbor Island, with Public           40, 73d Cong., 2d sess.
                   Works Administration funds.
    Do-...... Maintenance of channel and maneuvering basin H. Doe. 130, 72d Cong., 1st sess.
                   between breakwater and western shore line of
                    Corpus Christi Bay.
    Do.....------ Maintenance to 30 feet depth, except on strips lying Rivers and Harbors Committee
                   50 feet channelward of any established pierhead          Doc. 13, 74th Cong., 1st sess.
                   lines or within 50 feet of the foot of any wharf or
                   structure of the approach channel, turning basin
                   at Corpus Christi, Industrial Canal and turning
                   basin at Avery Point.
    Do-.......Maintenance and deepening to 32 feet of the channel          Rivers and Harbors Committee
                   from deep water at Port Aransas to and including         Doc. 63, 74th Cong., 1st sess.
                   the turning basin at Corpus Christi.
June 20,1938 Extend the main turning basin at Corpus Christi H. Doc. 574, 75th Cong., 3d seas.
                   westward 2,500 feet at its present width and depth,
                   deepen the existing Industrial Canal and turning
                   basin to 32 feet and for the extension of this canal at
                   a depth of 32 feet and general width of 150 feet,
                   westward along Nueces Bay shore to a turning
                   basin 32 feet deep, 900 feet wide, and 1,000 feet long
                   near Tule Lake.
Mar. 2,1945 To provide a depth of 34 feet in all project channels H.Doc. 544, 78th Cong., 2d seas.
                   and basins from Port Aransas to and including the
                   Tule Lake turning basin, for a width of 250 feet
                   from Port Aransas to the breakwater at Corpus
                   Christi, for a width of 200 feet in the Industrial
                   Canal and in the channel between the Avery Point
                   and Tule Lake turning basins, and for widening
                   the Avery Point turning basin to 1,000 feet.
June 30,1948 Deepen entrance channel to 38 feet from Gulf to outer H. Doe. 560, 80th Cong., 2d sess.
                   end of jetty; 38 feet decreasing to 36 feet thence to     (Contains the latest published
                   station 90, north jetty; and 36 feet in all other deep   map.)
                   water channels and basins except 2,000-foot un-
                   dredged part of inner basin at Harbor Island; and
                   for a width of 400 feet in the channel from Port
                   Aransas to the maneuvering basin at Corpus
                   Christi.

  1Included in Public Works Administration program Sept. 6, 1933, and Feb. 16, 1935.
   Recommended modification of project.--Under date of June 8, 1950,
the Chief of Engineers recommended modification of the existing proj-
ect to provide for an anchorage basin 12 feet deep at mean low water,
from 300 to 400 feet wide, and 900 feet long in Turtle Cove adjacent
to the existing channel and turning basin at Port Aransas, Tex., with
such modifications thereof as in the discretion of the Chief of Engi-
neers may be advisable at an estimated cost to the United States of
$30,000 for new work and $1,000 annually for maintenance in addition
to that now required (H. Doc. 654, 81st Cong., 1st. sess.).
   Local cooperation.-Fullycomplied with except for the provisions of
the River and Harbor Acts of June 20, 1938, March 2, 1945, and June
30, 1948, local interests being required to deepen and maintain at their
own expense the channel through and for a distance of 50 feet on each
side of the bridge at the entrance of the Corpus Christi turning basin,
furnish free of cost to the United States all necessary lands, easements,
rights-of-way, and spoil-disposal areas for the initial work and for
906       REPORT OF CHIEF                  OF ENGINEERS,            U.   S.   ARMY,         1952

subsequent maintenance as and when required, and furnish assurances
satisfactory to the Secretary of the Army that they will hold and save
the United States free from damages due to construction and mainte-
nance of the improvement: And provided further, That construction
of the extension from Avery Point to Tule Lake shall not be under-
taken until and unless local interests furnish assurances satisfactory
to the Secretary of the Army that bona fide arrangements have been
made with various industries to guarantee additional tonnage suffi-
cient to warrant the construction and maintenance of that canal to
any point up to and including the proposed turning basin near Tule
Lake, none of which has been complied with.
    Terminal facilities.-Terminal facilities located on Harbor Island
at the head of Aransas Pass, Ingleside, Corpus Christi, and Avery
Point are considered adequate for existing commerce. (See Port
Series, No. 252 revised in 1948, Corps of Engineers.)
    The following changes were not incorporated in Port Series No. 25:
Humble Oil & Refining Co., Port Ingleside Dock, Port Series No. 25
Map Reference 26, has been removed. Humble Pipe Line Co. barge
dock at Harbor Island, Port Series No. 25 Map Reference No. 27, has
been rebuilt. The reconstructed dock provides a berthing space of
450 feet with dolphins. Humble Pipe Line Co. oil docks at Harbor
Island, Port Series No. 25 Map Reference Nos. 28 and 29 have been
rebuilt. The reconstructed docks provide a berthing space of 1,600
feet, 800 feet at each dock, with dolphins. The Atlantic Pipe Line
Co. oil dock at Harbor Island, Port Series No. 25 Map Reference No. 30
has been rebuilt. The reconstructed dock provides a berthing space
of 845 feet, with dolphins.
    Operations and results during fiscal year.-Maintenance: Periodic
surveys and inspections and maintenance of reference lines and
markers were made at a cost of $25,373.89. Investigation of reported
shoals were made at a cost of $4,307.38. Preliminary surveys, plans
and specifications for driving reference line piles by contract were
made at a cost of $608.03, and 38 piles were driven by contract in the
Bay section of the channel during the period from April 15 to June 2,
  1952, at a cost of $3,909.52. A total of 2,089,302 cubic yards of
material was removed from 43,970 linear feet of channels at a cost of
 $346,291.63, as follows:

   Government                                                             Cubic        Linear feet
     plant or                Location                      Period         yards        of channel      Cost
    contract                                                             removed        dredged

Government hop-       Jetty channel and chan-     Feb. 11 to Mar. 11,      244,097          7,970    $82, 215. 76
  per dredge A.        nelextending to Hum-        1952.
Mackenzie.        ble Basin.
                  Between Harbor Island
Contract..----.....                               July 1 to Aug. 28,     1, 419, 631       23, 200   213, 425. 44
                   and Mc Gloin Bluff.              1951.
                 Inner basin, westerly
Contract-..........                               May 2 to June 30,        425, 574        12,800     50, 650. 43
                   portion of bay section           1952.
                       and main         turning
                       basin.


  The total cost of all work for the fiscal year was $380,490.45. The
total expenditures were $394,917.81.
  Condition at end of fiscal year.-The existing project was 40 per-
cent complete.             The two jetties have been partially completed, the
               RIVERS AND HARBORS-GALVESTON,                                                      TEX.,      DISTRICT               907
north jetty being 9,240 feet long and the south jetty 7,385 feet long.
A stone dike 20,991 feet long connecting with the north jetty was
completed on St. Joseph Island in 1916. The inner basin at Harbor
Island has been dredged to 30 feet below mean low tide over an
area 650 feet wide and about 1,000 feet long. The channel from
the inner basin to town of Port Aransas was completed in 1914. The
34-foot project, except for the Tule Lake extension, was completed
in 1946. In 1949 the Tule Lake extension was dredged to partial
dimensions with contributed funds.
   The work remaining consists of extending the north and south
jetties, 1,950 and 1,265 feet, respectively; extending inner basin at
Harbor Island; deepening the outer bar to 38 feet, the jetty chan-
nel to 36 and 38 feet, all other deep water channels, including the
previously dredged part of the inner basin at Harbor Island, to
36 feet, widening to 400 feet from Port Aransas to the maneuvering
basin at Corpus Christi; removing 200 feet of breakwater and com-
pleting channel from Avery Point turning basin to and including a
turning basin near Tule Lake. Extension of the inner basin at
Harbor Island and extension of the jetties are not required at the
present time.
   The controlling depths below mean low tide in the various chan-
nels and basins were as follows: Aransas Pass outer bar channel,
39 feet; Aransas Pass jetty channel, 37 feet; inner basin at Har-
bor Island, 28 feet, exclusive of main channel; channel from inner
basin to west end of Humble Oil & Refining Co. basin, 37 feet; channel
to town of Port Aransas, 7 feet; turning basin at Port Aransas, 9
feet; channel from west end of Humble Oil & Refining Co. basin
to Corpus Christi turning basin, 28 feet; Corpus Christi turning
basin, 33.5 feet; Industrial Canal, 36 feet; Avery Point turning basin,
36 feet; and channel from Avery Point turning basin to a point
near the proposed Tule Lake turning basin, 13 feet.
   The total cost of the existing project to June 30, 1952, was as
follows:

                                                                                     New work          Maintenance           Total

Regular funds_ .___.-------                 ...--.
                                               ------------                -    _   $5, 651, 471. 32 $10, 528, 655. 23    $16, 180, 126. 55
Public Works funds-               -          -                                          324, 287. 14 -                         324, 287. 14
     Total United States funds-_ ---------                           _-        --    5, 975, 758. 46   10, 528, 655. 23    16, 504, 413. 69
Contributed funds----..... .                             -             -                216, 421.68        152, 555. 09        368, 976. 77
      Total all funds---
                     .................---          ...       ...........             6, 192, 180. 14   10, 681, 210. 32    16, 873, 390. 46




   The total expenditures were $16,828,549.01, consisting of $16,135,-
285.10 regular funds, $324,287.14 Public Works funds, $152,555.09
contributed funds for maintenance, and $216,421.68 contributed funds
for new work.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $130,864.02, together with an allotment of
908       REPORT            OF CHIEF OF ENGINEERS, U. S. ARMY,                                               1952

$323,680 for the fiscal year 1953, a total of $454,544.02, will be applied
as follows:
Accounts payable June 30, 1952_-_---____                                                                             44, 841. 45
                                                                                                                    $-----------------
Maintenance:
    Complete dredging of inner basin, westerly portion of bay sec-
      tion and main turning basin, under existing contract (July
      and August 1952) _____--------------------------------                                                         97, 702. 57
    Dredge outer bar and jetty channels with Government plant
      and hired labor (November and December 1952)-                                                                  25, 000.00
                                                                                                                    1----------
    Dredge bay channel from McGloin Bluff to and including Corpus
      Christi turning basin, and inner basin at Harbor Island,
      by contract (March to May 1953) --------------------                                                          187, 000. 00

        Total --------------------------------------------                                                          454, 544. 02
  The sum of $2,216,000 can be profitably expended for the following
schedule of work during the fiscal year 1954:
New work: Dredge industrial canal extension from Avery Point to
   and including a turning basin at Tule Lake, by contract (Sep-
   tember 1953 to March 1954)-------------                                                                          $1, 215, 000
Maintenance:
   Dredge outer bar and jetty channels with Government
      plant and hired labor (May 1954)                             ---------------
                                                             $75, 000
   Dredge shoals from bay reach of channel, Corpus
      Christi turning basin, and inner basin at Harbor
      Island, by contract (November 1953 to May 1954)___ 250, 000
   Repair rubble stone jetties by closing low places in jet-
      ties and extending concrete cap, by contract (Sep-
      tember 1953 to June 1954) ---------------------        635, 000
   Condition surveys, investigations and reports------ --     41, 000

        Total for maintenance_ .--------------------                                                          -.. 1, 001, 000

        Total for all work----------------------                                                        _             2, 216, 000
                                         Cost and financial summary

                                                       Fiscal year ending June 30                                    Total to June
                                                                                                                    30, 1952, includ-
                                                                                                                    ing fiscal years
                                     1948            1949            1950            1951            1952             prior to 1948

New work:
   Appropriated and
     contributed ........         $308, 000. 00 -$91, 578.32------------
                                                            ............---------------............--............
                                                                                                          -           $7, 564, 714. 57
   Cost-.....-----------------731. 58 216, 421. 68 ....------------------------------                                 17, 564, 714. 57
   Expenditures---------.........        35. 19 216, 421.68 ...-------      ------------ ------------                 1 7, 564, 714. 57
Maintenance:
   Appropriated and
    contributed--.... _ .         525, 000. 00    375, 100. 00 $977, 000. 00 $619, 237. 73 $279, 100. 00 2 10, 829, 684. 75
   Cost----....-----.------       473, 509. 17    209, 714. 96 495, 914. 17 1, 129, 949. 60 380, 490. 45 2 10, 743, 662.18
   Expenditures--....-...         473, 010. 76    203, 210. 95 474, 375. 03 1,099, 062. 57 394, 917. 81 2 10, 698, 820. 73

  a Includes $216,421.68, contributed funds.
  * Includes $152,555.09 contributed funds.
Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project ------------ _                                                    $9, 395, 000
                              18. BRAZOS ISLAND HARBOR, TEX.
   Location.-At the extreme south end of the coast of Texas, about
7 miles north of the mouth of the Rio Grande, and about 125 miles
south of Port Aransas. The harbor is at the inner end of Brazos
Santiago Pass, which lies between Brazos and Padre Islands, and is
the natural outlet from the Laguna Madre to the Gulf of Mexico.
 (See U. S. Coast and Geodetic Survey Chart No. 1288.)
              RIVERS AND           HARBORS-GALVESTON,                       TEX.,    DISTRICT             909
  Previous projects.-Authorized by River and Harbor Acts of
June 18, 1878, March 3, 1881, and March 2, 1919. For further details,
see page 1017, annual report for 1932, and page 882, annual report
for 1938.
  Existing project.-This provides for depths of 38 feet in the channel
from deep water in the Gulf of Mexico through Brazos Santiago
Pass and 36 feet in all other channels and basins; and widths of 300
feet in the channel from deep water in the Gulf of Mexico through
Brazos Santiago Pass, 200 feet in the channel across Laguna Madre,
200 feet in the Port Isabel Channel including the "wye" junction with
the Brownsville Channel, 200 feet in the Brownsville Channel for a
distance of about 12.6 miles and 300 feet for a distance of about 1.4
miles; from 550 feet to 1,000 feet in the Brownsville turning basin
from this point for a distance of 2,610 feet over a bottom width vary-
ing from 550 feet to 1,000 feet; for a small boat basin 12 feet deep,.
300 feet wide and 1,500 feet in length with a connecting channel 12
feet deep and 125 feet wide adjacent to the existing Brownsville
Channel; and for 36 feet in the Port Isabel turning basin for a
distance of 2,0900 feet over a bottom width varying from 200 feet
at its entrance to 1,000 feet, connecting with the existing turning
basin. All depths refer to mean low tide. The project also pro-
vides for two jetties at the Brazos Santiago Pass entrance. Under
ordinary conditions the mean tidal range is about 11/2 feet and the
extreme range about 2 feet. The height of the tides is dependent,
to some extent on the wind, and during strong "northers" in the winter
season the water surface in the southern end of the Laguna Madre
may be raised 4 feet or more above the mean low tide in the Gulf.
   The estimate of cost for new work is $8,039,000 (1952), which is
exclusive of $1,683,257 contributed by local interests and of amounts
expended on previous projects. The latest approved estimate of
annual cost of maintenance is $350,500 (1952).
   The existing project was authorized by the following river and
harbor acts:

       Acts                         Work authorized                                     Documents


July     3,1930   Jetty channel, all inside channels and turning basins,    Rivers    and Harbors Committee
                    and 2 rubble mound jetties.                               Doc.   16, 71st Cong., 2d sess.
May 24,1934       Local cooperation requirements modified to provide        Rivers    and Harbors Committee
  (P. W. A.)        for the contribution of sufficient funds to cover the     Doc.   10, 71st Cong., 1st sess.
Aug. 30,1935        entire cost of the original dredging of all inside
                    channels and turning basins.
Aug. 26,1937      Deepening the jetty channel to 31 feet and all inner      Rivers and Harbors Committee-
                    channels and the Brownsville and Port Isabel              Doc. 32, 75th Cong., 1st sess.
                    turning basins to 28 feet, provided no dredging will
                    be done at public expense within 50 feet of any es-
                    tablished pierhead line, wharf, or other structure.
Mar.     2,1945   Enlargement cf Port Isabel turning basin to 1,000 feet    H. Doc. 335, 76th Cong., 1st Bess.

   Do-- .....
                    by 1,300 feet with a flared entrance.
                  Deepening to 35 feet channel from the Gulf of Mexico      H. Doc. 347, 77th Cong., 1st sess.
                                                                                                                 L
                    through Brazos Santiago Pass; deepening to 33 feet
                    and widening to 200 feet channel across Laguna
                    Madre; deepening to 32 feet channels from Laguna
                    Madre to and including turning basins at Browns-
                    ville and Port Isabel; widening turning basins; and
                    dredging present shallow-draft channel south of
                    Port Isabel from railroad bridge to Laguna Madre
                    and connecting channel to Port Isabel turning basin
                    to provide a depth of 6 feet and width of 60 feet.
  See footnote at end of table.

          245554-53-vol. 1 -           58
910        REPORT OF CHIEF OF ENGINEERS, U.                               S. ARMY,         1952


    Acts                          Work authorized                                     Documents

                                                                                                           1
July 24,1946   An additional connecting channel 150 feet wide and         H. Doc. 627, 79th Cong., 2d sess.
                 32 feet deep between the Port Isabel channel and
                 the Brownsville channel; and transfer shallow-
                 draft channels at Port Isabel to Gulf Intracoastal
                 Waterway.                                                                                     1
May 17,1950    Deepening to 38 feet in outer bar channels and 36 feet     H. Doc. 192, 81st Cong., 1st sess.
                in all other authorized channels and basins; widen-
                 ing all other channels to 200 feet except a section in
                 the Brownsville Channel which will be widened
                 to 300 feet; extending the existing turning basins at
                 Brownsville and Port Isabel; and for construction
                 of a small boat basin with a connecting channel
                 adjacent to the Brownsville ship channel.

IContains latest published maps.
   Local cooperation.-Fully complied with except as required by
the River and Harbor Act of May 17, 1950 (H. Doc. 192, 81st
Cong., 1st sess.), local interests being required to furnish without
cost to the United States all lands, easements, rights of way, and
spoil-disposal areas necessary for construction, maintenance, and
operation of the modified project, when and as required; hold and
save the United States free from damages due to construction and
maintenance of the project; construct suitable docks on the Port
Isabel turning basin extension; and install and maintain in the
small boat basin suitable mooring facilities to which all vessels
shall have free and equal access during storm periods, none of which
has been complied with.
   Terminal facilities.-On the westerly side of the turning basin
at Port Isabel is located a wharf, 550 feet long containing a sheet-
metal transit shed 100 by 350 feet and a precooling plant with a capac-
ity of approximately 24 cars every 8 hours. A sheet-metal warehouse
100 by 200 feet is located about 70 feet west of the transit shed.
About 200 feet south of this wharf is a dock, 600 feet long by 16
feet wide, used for unloading tropical fruits and equipped with
facilities for supplying diesel fuel to ships at the rate of 200 gallons
per minute. Along the north end of the turning basin a two-level
oil dock, 400 feet long, is equipped with facilities for receiving and
loading oil cargoes into barges and for bunkering ships. All of the
above facilities, owned by the Port Isabel-San Benito Navigation
District, are serviced by railroad and highway connections and are
open to all on equal terms. All docks and wharves are equipped
with facilities for servicing ships with fresh water and electric cur-
rent. An oil refinery and two storage tank farms, all privately
owned, are located near the Port Isabel turning basin. This refinery
has a maximum capacity of 15,000 barrels of refined products and
a combined tank storage capacity of 1,224,000 barrels. Adjacent to
the turning basin and having access to the Gulf Intracoastal Water-
way is a shallow draft channel, one and one-half miles long, on which
is located about three-fourths of a mile of privately owned low-
level wharves equipped with facilities for handling tropical fruits,
barge traffic, and sea foods. Additional facilities on this channel
include three marine filling stations, two machine shops, several marine
ways for handling small craft and medium size barges, an ice plant,
and a quick freeze plant for servicing boats handling sea foods.
        RIVERS AND    HARBORS     GALVESTON,    TEX.,   DISTRICT    911
These facilities are privately owned and operated, and are available
on an individual contract basis.
   Along the north side of the Brownsville turning basin the Browns-
ville Navigation District has constructed three concrete wharves.
Two of these wharves are 440 feet long and 165 feet wide with a
timber dock extension 100 feet long and 36 feet wide. A metal
warehouse 120 by 400 feet is located on each concrete wharf. The
third wharf is 400 feet long and 165 feet wide and contains a 120-
:by 390-foot metal warehouse. Also on the north side of the turning
basin is located a concrete decked steel sheet pile dock 1,000 feet
long and 140 feet wide with a 500- by 100-foot metal warehouse
located on the dock. Along the west end of the basin is a concrete
wharf 450 feet long and 165 feet wide containing a 400- by 120-foot
metal warehouse with an adjoining truck-unloading apron 100
feet by 16 feet. All of the above terminals have rail facilities.
On the west end of the basin is a timber dock 400 feet long used
for servicing small craft. Located on the southwest corner of the
turning basin is a marine ways for servicing shrimp boats and other
small craft and a repair shop operated in connection therewith,
all of which are privately owned. On the south side of the turn-
ing basin, towards the west end, is located a concrete barge dock
300 feet long and 100 feet wide with a 400-foot unloading and storage
apron, and a steel warehouse of 25,000 square-foot area, complete
with railroad spur track. Also located on the south side of the
basin is a concrete dock 525 feet long and 20 feet wide, with two
open steel sheds 32 by 280 feet located thereon. This dock is equipped
with complete systems for handling tropical fruits and is served
by two railroad spur tracks. On the west side of the south slip is
located a concrete open dock 500 feet long and 100 feet wide, equipped
with a railroad spur track to the rear of the apron. On the east
side of the turning basin is a timber wharf 10 feet wide and 800
feet long for docking and servicing shrimp trawlers. Back of this
wharf are two 40- by 80-foot privately owned shrimp processing
plants. There are also four marginal timber docks, each 11 feet
wide and 100 feet long, extending into the basin from shore at 52-
foot intervals and equipped with facilities for servicing shrimp
trawlers with ice and fuel. This entire area is served by an open,
hard-surfaced road and parking area. On the north side of the
channel and to the east of the turning basin are located three 500-
foot oil docks with direct pipeline connections to the bulk-oil terminals
and to the chemical refining and separating plants, also a 350-foot
concrete oil-barge dock with direct pipeline connections to the chemical
refining and separating plants. North of the general cargo terminal
is a privately owned, high-density cotton compress, with a storage
capacity of 46,000 bales, covering an area of 347,000 square feet.
Also north of the general cargo terminal is a bonded warehouse
having a storage capacity of 10 acres and equipped with rail facilities.
On the southwest corner of the Navigation District property is
located a privately owned cotton compress and warehouse equipped
with two high-density presses having 320,000 square feet of storage
space and a storage capacity of 60,000 bales. In addition, two cot-
ton compresses are located in the city of Brownsville, Tex. These
912            REPORT OF CHIEF OF ENGINEERS,                                 U. S. ARMY,             1952

compresses have combined storage capacity of 90,000 bales and are
serviced by direct rail and truck connections with port facilities.
The Brownsville Navigation District employs one steam locomotive
crane of 30-ton capacity and one rubber-tired mobile crane of 15-ton
capacity on the terminal. All concrete docks and wharves have com-
plete bunker facilities. All docks and wharves are equipped with
facilities for handling and/or storing crude and refined oil. These
docks all have direct pipeline connections to the various oil storage
terminals. There are five privately owned terminals equipped with
facilities for handling petroleum products having a combined maxi-
mum storage capacity of 1,036,475 barrels. Two chemical refining
and separating plants are located on Navigation District property to
the east of the port proper, and have adequate facilities servicing
the oil loading docks, including railroad and highway connections
which are open to all on equal terms.
   Operations and results during fiscal year.-Maintenance: Periodic
surveys and inspections were made at a cost of $9,834.79. Pre-
liminary surveys, plans, and specifications were made for dredging
Brownsville Channel by contract at a cost of $1,445.24. A total of
4,561,105 cubic yards of material was removed from 85,345 linear
feet of channel at a cost of $645,833.22 as follows:

    Government                                                                    Cubic        Linear feet
        plant or                     Location                   Period            yards        of channel      Cost
       contract                                                                  removed        dredged

Government hop-               Outer bar    and Jetty      Jan. 1 to Feb. 10,       374, 852         6, 000   $89, 308. 93
  per dredge A.                channels.                    1952.
Mackenzie.
Contract---------..........   Port  Isabel   turning      July 1, 1951 to June   2, 971. 523       62, 080   411, 019. 46
                               basin and Brownsville        6, 1952.
                               Channel.
Contract          ----.......... Channel across Laguna    Mar. 20 to May 1,      1, 214, 730       17, 265   145, 504. 83
                                  Madre to Port Isabel,    1952.
                                  Tex.



   The total cost for all work during the fiscal year was $657,113.25
The total expenditures were $612,348.89.
   Condition at end of fiscal year.-The existing project is 66 percent
complete. The 25-foot project channels and jetties were completed
in 1936. The deepening of the sea bar and jetty channels to the 31-foot
depth and of the inside channels and basins to the 28-foot depth was
completed in 1940. Widening and deepening the Port Isabel turning
basin as authorized by the River and Harbor Act of March 2, 1945,
was completed in 1947. The 32-foot project channels and basins were
completed in 1949. Work remaining consists of deepening the en-
trance channel to 38 feet at mean low tide from deep water in the
Gulf of Mexico through Brazos Santiago Pass, deepening to 36 feet
all other channels and turning basins, widening to variable widths cer-
tain sections of the channels, extending the Brownsville and Port
Isabel turning basins and constructing a small boat turning basin with
a connecting channel adjacent to the Brownsville ship channel.
             RIVERS AND HARBORS-GALVESTON,                               TEX.,        DISTRICT                 913
  The controlling depths at mean low tide in the various channels and
basins comprising the waterway were as follows:
                                                             Depth in feet below
                                                              mean low tide
Jetty channel from deep water in Gulf to inside Brazos Santiago Pass_     33. 2
From inside Brazos Santiago Pass to westerly side of Long Island....      35
Westerly side of Long Island to turning basin at Port Isabel---------- 33
Turning basin at Port Isabel     ---------------------------------- 35
Channel from westerly side Long Island to turning basin at Browns-
   ville ---     --------------------------             ------------- 28. 7
Turning basin near Brownsville .........-                                 32
   The total cost of the existing project to June 30, 1952 was as follows:

                                                                  New work          Maintenance            Total

Regular funds__ _-             -       -
                             ------------    --------        __-$1, 860, 747. 15 $3, 033, 463. 87      $4, 894, 211.02
Public Works funds ....-.   -------------------------         . 2, 848, 560. 03 ------- -----.          2, 848, 560. 03
      Total United States funds -------------------- ---- 4, 709, 307. 18 3, 033, 463. 87               7, 742, 771.05
Contributed funds .--      -----------------------------  1, 683, 257. 70 ------------                  1,683, 257. 70
      Total all funds-------.-------------------------------- 6, 392, 564. 88       3, 033, 463. 87     9, 426, 028. 75


  The total expenditures were $9,375,018.71, consisting of $4,843,200.98
regular funds, $2,848,560.03 Public Works funds, and $1,683,257.70
contributed funds for new work.
   Proposed operations.--The balance unexpended at the end of the
fiscal year, amounting to $138,280.78, plus accounts receivable of
$406.26, together with an allotment of $95,370 for the fiscal year 1953,
a total of $234,057.04, will be applied as follows:
Accounts payable June 30, 1952_...........___..___....._.------          $51, 416. 30
Maintenance:
    Complete dredging channel across Laguna Madre to Port Isabel,
      under existing contract (July 1952)    --    --    _--------         5,000. 00
    Complete dredging Brownsville Channel, under existing con-
      tract (July to August 1952) ---------- _--_-------         _        97, 640.74
    Dredge outer bar and jetty channel with Government plant and
      hired labor (April 1953) ----------------------------- 70, 000. 00
    Install dredging ranges, by contract (November 1952)--------........  10, 000. 00

         Total        --------------------------------------------                                    234, 057. 04
  The sum of $1,215,700 can be profitably expended for the following
schedule of work during the fiscal year 1954:
Maintenance :
   Dredge outer bar and jetty channel with Government
     plant and hired labor (November 1953 to February
        1954) _--------------------------------                                     $125, 000
   Dredge shoaled reaches of inside channels and
     basins, by contract (August 1953 to May 1954)___                                375, 000
   Repair rubble stone jetties by reshaping jetties and
      placing of concrete cap, by contract (September
     1953 to March 1954) __--___---------------                                      715, 700

           Total for maintenance. .__             .....       .....          ....          ...        $1, 215, 700
914         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                                    Cost and financial summary

                                                    Fiscal year ending June 30                                    Total"toJune
                                                                                                                 30, 1952, includ-
                                                                                                                 ing fiscal-years
                                1948             1949               1950                 1951        1952          priorto"1948

New work:
   Appropriated ...... $785, 500. 00 $217, 676. 00                                           1$5, 385,162. 48
   Cost---------------575, 771.67     431, 548. 12---_-_------                ------------- 15,385,162. 48
   Expenditures-........ 473,398.                                                             1 5, 385, 162. 48
                                   73 533, 401. 08 ............-----------------------............-----.....
Maintenance:
   Appropriated ........ 250, 000. 00 105, 100. 00 $185, 000. 00 $370, 960. 61 $394, 055. 00    3, 120, 734. 61
   Cost--------------    231, 665. 78 123, 859. 02 189, 598. 09    20, 646. 97 657, 113. 25     3,033,463.87
   Expenditures ..- .. 197, 673. 62 157, 464. 99 189, 535. 83      14, 448. 48 612, 348. 89     2, 982, 453. 83




Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project ------------- $3, 330, 000
  1In addition, $1,806,619.37 was expended from contributed funds for new work.

     19. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

   The cost of work during the fiscal year amounted to $122,615.84
and the expenditures were $122,446.65. The unexpended balance at
the end of the fiscal year of $389.83, plus allotments for fiscal year
1953 of $34,900 for examinations and surveys and $51,000 for con-
tingencies, plus accounts receivable of $700.16, less accounts payable
June 30, 1952, of $15.71, a total of $86,974.28 will be applied as needed
in payment of expenses incurred for work scheduled during fiscal year
1953.
   The additional sums of $88,600 for examinations and surveys and
$52,500 for contingencies, a total of $141,100, can be profitably ex-
pended during fiscal year 1954.
                                    Cost and financial summary

                                                    Fiscal year ending June 30                                    Total to June
                                                                                                                 30, 1952, includ-
                                                                                                                 ing fiscal years
                                1948             1949               1950                 1951        1952          priorto 1948


Maintenance:
   Appropriated-......... $21, 576. 94 $52, 743. 49 $132, 000. 00 $171, 161.00                    $95, 350. 00     $2,927,  358.14
                          152, 545. 67 132, 463. 44 134, 924. 54 143, 984. 54
   Cost--------------..................                                                           122, 615. 84      2, 926, 283. 86
   Expenditures......... 141, 832. 27 132, 881.30 135, 794. 26 144, 841.84                        122, 446. 65      2, 926, 968., 31



            20. PLANT ALLOTMENT, GALVESTON, TEX., DISTRICT
                                    Cost and financial summary

                                                  Fiscal year ending June 30                                      Total to June
                                                                                                                 30, 1952, includ-
                                                                                                                 ing fiscal years
                             1948              1949              1950              1951             1952           priorto 1948

Maintenance:
   Appropriated....... -$324,121.12       -$50, 000.00 -$250,000.00          $4,257,637.14 -$4,626,334.62          $1,428,788.00
   Cost.....................        ..................................................
   Expenditures -        -- 777, 668.48     201, 114.05 -538,       290.48 4, 587,191.91        -4,751,532.27       1,061, 875.03
               RIVERS AND HARBORS-GALVESTON,                              TEX.,      DISTRICT              915
                          21. INACTIVE NAVIGATION PROJECTS


                                                        For last     Cost and expenditures to       Estimated
                   Name of project                    full report          June 30, 1952              amount
                                                      see annual                                    required to
                                                     report for-     New work      Maintenance       complete

1.   Johnsons Bayou, La.1-                               1933
                                      .----------------------       $2, 261.35       $54, 042. 26       (2)
2.                        4 - Tex.l----------------
     Mouth of Trinity River,   - - - - - -             - 1928       79, 540. 44       10, 870. 95       (2)
3.   Bastrop Bayou, Tex. __               ___     ____   1931        9, 920. 22       27, 129. 21          24, 000
4.   Brazos River, Tex., from Velasco to old Wash-       1924     216, 989. 48       223, 010. 52        131, 700
       ington.
5.   East Bay Bayou (Hanna.    Reef), Tex.l ..--------   1922        2, 476. 02           847. 80         73, 300
6.   Oyster Creek, Tex. ------------------------ 1922                6, 942. 24        7, 556. 73       (3)
7.   Corpus Christi, Tex., channel to Navy sea-          1946   1, 194, 344. 69       15, 579. 63       (s)
       plane base, Encinal Peninsula.
8.   Little Bay, Tex.------------------------            1951 ...         ..----     .---------           33, 300

   I Channel adequate for commerce.
     Completed.
     2
     No commerce reported.
     3
  ' The River and Harbor Act of May 17, 1950 (H. Doe. 768, 80th Cong., 2d sess.) revoked the 6-foot channel
for Bastrop Bayou as authorized by the River and Harbor Act of March 2, 1945 (H. Doc. 337, 76th Cong.,
1st sess.), and reauthorized only that portion of the existing 4- by 100-foot project lying westward of the
Gulf Intracoastal Waterway.

                              22. MISCELLANEOUS ACTIVITIES
Status of all investigations for navigation called for by river and harbor acts
                           and committee resolutions

                                                                    Date trans-     Document         Recom-
               Locality                   Authorization act          mitted to        No.           mendation
                                                                     Congress

Alvin, Tex., waterway to Gulf        River and Harbor Act,
  Intracoastal Waterway.              Mar. 2, 1945.
Aransas Pass, Tex., Gulf Intra-      House Public Works Com-
  coastal Waterway in the vicin-      mittee resolution, Sept.
  ity of, maintenance of project.     29, 1949.
Aransas Pass, Tex., Gulf Intra-      House Public Works Com-
  coastal Waterway in the vicin-      mittee resolution Sept.
  ity of and channel from Harbor      29, 1949.
  Island to Aransas Pass.
Arroyo Colorado, Tex., harbor        House Public Works Com-
  of refuge and connecting chan-      mittee resolution, Dec.
  nel for large and small boats       14, 1950.
  at Rio Hondo.
Baffins Bay and Laguna Madre,         Rivers and Harbors Com-
  including a turning basin,           mittee resolution, Dec.
  Louisiana and Texas Intra-           2, 1946.
  coastal Waterway, side chan-
  nel to vicinity of Kingsville,
  Tex.
Baffins Bay and Laguna Madre,         Rivers and Harbors Com-
  side channel through, from           mittee resolution, Apr.
  Louisiana and Texas Intra-           24, 1945.
  coastal Waterway, La. and
  Tex., to Riviera, including
  turning basin at latter point.
Bolivar Peninsula, Tex., Intra-      Senate Public Works Com-       July 31,1951 I--------      .   Unfavorable.
  coastal Waterway, erosion of         mittee resolution, Sept.
  Bolivar Peninsula near Port          24, 1948.
  Bolivar in Galveston Bay.
Brazos Riverand Colorado River       Rivers and Harbors Com-
  crossings, Louisiana and Texas      mittee resolution, June
  Intracoastal Waterway, traffic       7, 1945.
  interruptions.
Buffalo Bayou and Houston ship       House Public Works Com-
  channel, Texas, for navigation      mittee resolution, Apr.
  and flood control throughout        20, 1948.
  Buffalo Bayou watershed in-
  cluding modifications of pres-
  ent approved plan and require-
  ments for local cooperation.
916         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

Status of all investigations for navigation called for by river and harbor acts
                     and committee resolutions-Continued

                                                                   Date trans-      Document    Recom-
             Locality                    Authorization act          mitted to         No.      mendation
                                                                    Congress

Colorado River and Brazos River      Rivers and Harbors Com-
crossings, Louisiana and Texas       mittee resolution, June
  Intracoastal Waterway, traffic      7, 1945.
interruptions.
Colorado River, Tex., suitable       Senate Public Works Com-     ---------------
outlet channel to the Gulf of         mittee resolution, Sept.
Mexico.                               16, 1948.
Corpus Christi-Port Aransas          House Public Works Com-      ---------------
Waterway, Tex.                        mittee resolution, Sept.
                                       27, 1951.
Corpus Christi-Port Aransas          House Public Works Com-      ---------------
Waterway, Tex., in general            mittee resolution, Feb.
  vicinity of LaQuinta.                20, 1951.
Cotton Bayou, Pass Cavallo, or       River and Harbor Act,        ---------------
  any other suitable outlet to the     July 24, 1946.
  Gulf of Mexico, from Port La-
  vaca, Tex., and Palacios, Tex.
Dickinson Bayou, Tex-..........       River and Harbor Act,
                                        Mar. 2, 1945.
Double Bayou, Tex---- ---------     ---- _do ..---      ---   -

Double Bayou, East Bay Bayou Rivers and Harbors Com-
  Oyster Creek, Spindletop Gul-         mittee resolution, July
  ley, and Turtle Bayou, Tex., in       20, 1946.
  interest of navigation, drainage,
  and other purposes.
East Bay Bayou, Double Bayou, Rivers and Harbors Com-
  Oyster Creek, Spindletop Gul-         mittee resolution, July
  ley, and Turtle Bayou, Tex., in       20, 1946.
  interest of navigation, drainage,
  and other purposes.
Edna, Tex., Lavaca and Navidad House Public Works Com-
  Rivers, Channel to.                   mittee resolution, Sept.
                                        27, 1951.
Freeport Harbor, Tex.-_---          ---- do ..----
                                                -   -

Galveston Bay, Tex., shore of, Sec. 2, River and Harbor
  cooperative beach erosion             Act, July 3, 1930.
  study, Galveston County.
Galveston Bay and contiguous River and Harbor Act,
  waters, Texas, with view to           Mar. 2, 1945.
  providing a seaplane channel.
Galveston Bay, Tex., Intra- Senate Public Works July 31,1951                                   Unfavorable.
  coastal Waterway, erosion of           Committee resolution,
  Bolivar Peninsula near Port           Sept. 24, 1948.
  Bolivar.
Galveston Channel, Galveston House Public Works Com-
  Harbor, Channel from Galves-          mittee resolution, Apr.
   ton Harbor to Texas City, and        21, 1950.
   Houston Ship Channel.
Galveston County, Tex., coop- Sec. 2, River and Harbor
   erative beach erosion study of       Act, July 3, 1930.
   shore of Galvestion Bay.
Galveston County, Tex., Gulf Sec. 2, River and Harbor
  shore of Galveston Island from        Act, July 3, 1930; act of
   Galveston south jetty to Eight       Congress, July 31, 1945.
  Mile Road, cooperative beach
  erosion study.
Galveston Harbor, channel from House Public Works Com-
   Galveston Harbor to Texas            mittee resolution, Apr.
  City, Houston ship channel,           21, 1950.
  and Galveston Channel.
Galveston Harbor to Texas City .....do-....................
  Channel, Houston ship chan-
  nel, Galveston Channel and
   Galveston Harbor.
Gulf Intracoastal Waterway at Senate Public Works
  Red Fish Bay (Port Mans-              Committee resolution,
  field), Tex.                          June 17, 1949.
Gulf Intracoastal Waterway at House Public Works Com-
   Red Fish Bay (Port Mans-             mittee resolution, Sept.
  field), Tex.                          29, 1949.
Gulf Intracoastal Waterway, Rivers and Harbors Com-
  Camp John A. Hulen and                mittee resolution, Sept.
  Palacios, Tex., channel to.           13, 1944.
Gulf Intracoastal Waterway, ero- Senate Public Works July 31, 1951                                Do.
  sion of Bolivar Peninsula near        Committee resolution,
  Port Bolivar in Galveston             Sept. 24, 1948.
   Bay.
            RIVERS AND HARBORS--GALVESTON,                                  TEX.,       DISTRICT           917
Status of all investigations for navigation called for by river and harbor acts
                     and committee resolutions--Continued

                                                                      Date trans-      Document        Recom-
            Locality                     Authorization act             mitted to                      mendation
                                                                       Congress           No.

Gulf Intracoastal Waterway in        House Public Works Com-
the vicinity of Aransas Pass,         mittee resolution, Sept.
maintenance of project.               29, 1949.
Gulf Intracoastal Waterway in
the vicinity of Aransas Pass,
                                         do---....---------------
                                    --.....                         ------- ,------
and channel from Harbor Is-
land to Aransas Pass.
Gulf Intracoastal Waterway,
Waterway from Alvin, Tex.,
                                     River and Harbor Act,
                                     Mar. 2, 1945.
                                                                         ------------
                                                                    --------------
to.
Gulf Intracoastal Waterway, re-     House Public Works Com-         -----------r--------------r

widening and deepening exist-       mittee resolution, June
ing channels (Louisiana-Texas       11, 1952.
  Section).
Harlingen, Tex., tributary chan-
nel from Louisiana and Texas
                                    House Public Works Com-
                                     mittee resolution, Feb.
                                                                    --------------- ---r---------
Intracoastal Waterway.              17, 1950.
Houston ship channel and Buf-
falo Bayou, Tex., for naviga-
                                    House Public Works Com-
                                     mittee resolution, Apr.
                                                                    ------- r------- ----r-------
tion and flood control through-     Apr. 20, 1948.
out Buffalo Bayou watershed
including modifications of pres-
ently approved plan and re-
quirements for local coopera-
tion.
Houston ship channel, Galves-       House Public Works Com-
ton Channel, Galveston Har-         mittee resolution, Apr.
bor, and channel from Galves-       21, 1950.
ton Harbor to Texas City.
Houston ship channel, Texas, in     House Public Works Com- ---------------           -------------
vicinity of Turkey Bend.            mittee resolution, Feb.
                                     17, 1950.
Jefferson County drainage dis-      Flood Control Act, July ---------------           -------------
  tricts, Texas, provision of out-   24, 1946.
  lets in interest of providing
  egress of flood waters into ex-
  isting waterways in general
  vicinity of Port Arthur, Tex.,
  including Taylors Bayou, for
  flood control, drainage, and
  navigation.
John A. Hulen, Camp, and Pala- Rivers and Harbors Com-
  cios, Tex., channel to the In-
   tracoastal Waterway.
                                      mittee resolution, Sept.
                                      13, 1944.
                                                                    ----------- -----------
Kingsville, Tex., side channel Rivers and Harbors Com-
  from Louisiana and Texas In-        mittee resolution, Dec.
                                                                        -------- -----------
                                                                       ----
   tracoastal Waterway, via La-       2, 1946.
   guna Madre and Baffins Bay,
   including turning basin.
Laguna Madre and Baffins Bay, --..... do---------------------       ---------------
   including a turning basin, Lou-
   isiana and Texas Intracoastal
   Waterway, side channel to the
   vicinity of Kingsville, Tex., via.
Laguna Madre and Baffins Bay, Rivers and Harbors Com-               ---------------
   side channel through, from         mittee resolution, Apr.
   Louisiana and Texas Intra-         24, 1945.
   coastal Waterway, La. and
   Tex., to Riviera, including
   turning basin at latter point.
LaQuinta, Tex., Port Aransas- House Public Works Com-               ---------------
   Corpus Christi Waterway, trib-     mittee resolution, Feb.
   utary channel to near.             20, 1951.
Lavaca and Navidad Rivers, House PublicWorks Com-
   Channel to Edna, Tex.              mittee resolution, Sept.
                                      27, 1951.
Louisiana and Texas Intracoastal     Rivers and Harbors Com- ---------------
Waterway, traffic interrup-          mittee resolution, June
  tions at Brazos River and Col-      7, 1945.
orado River crossings.
Louisiana and Texas Intracoastal     Rivers and Harbors Com-
Waterway, side channel to the        mittee resolution, Dec.
vicinity of Kingsville, Tex.,        2, 1946.
via Laguna Madre and Baffins
  Bay, including a turning basin.
918         REPORT OF CHIEF OF ENGINEERS,                                     U. S. ARMY,                 1952

Status of all investigations for navigation called for by river and harbor acts
                     and committee resolutions-Continued

                                                                        Date trans-                 Document       Recom-
             Locality                    Authorization act               mitted to                    No.         mendation
                                                                         Congress

Louisiana and Texas Intracoastal   Rivers and Harbors Com-
Waterway, La. and Tex., side        mittee resolution, Apr.
channel through Laguna Madre        24, 1945.
and Baffins Bay to Riviera,
including turning basin at lat-
ter point.
Louisiana and Texas Intracoastal ..... do .....---------------- Oct. 18,1951 I--------.                        - Unfavorable.
Waterway, La. and Tex., side
channel to and through St.
Marys Bay and Mission River
to Refugio, including turning
basin at latter point.
Louisiana and Texas Intracoastal House Public Works Com-
Waterway, tributary channel         mittee resolution, Feb.
to Harlingen, Tex.                  17, 1950.
Mission River and St. Marys        Rivers and Harbors Com- Oct. 18,1951                                              Do.
Bay, side channel to and            mittee resolution, Apr.
through, from Louisiana and         24, 1945.
Texas Intracoastal Waterway,
La. and Tex., to Refugio, in-
cluding turning basin at latter
point.
Navidad and Lavaca Rivers,        House Public Works Com- - - -. - -
Channel to Edna, Tex.               mittee resolution, Sept.
                                       27, 1951.
Neches River to Trinity River,       River and Harbor Act, -- - - - - - -
  Tex.,    waterway via Pine           Mar. 2, 1945.
  Island Bayou and extension.
Oyster Creek, Double Bayou,          Rivers and Harbors Com- -- - -- - -- -
  East Bay Bayou, Spindletop          mittee resolution, July
  Gulley, and Turtle Bayou,           20, 1946.
  Tex., in interest of navigation,
  drainage, and other purposes.
Palacios and Port Lavaca, Tex.,      River and Harbor Act,
  channel to the Gulf of Mexico       July 24, 1946.
  by way of Pass Cavallo, Cot-
  ton Bayou, or any other suit-
  able outlet to the Gulf of Mex-
ico.
Palacios, Tex., and Camp John        Rivers and Harbors Com-
  A. Hulen, channel to the In-
  tracoastal Waterway.
                                      mittee resolution, Sept.
                                      13, 1944.                      -----------
Pass Cavallo, Cotton Bayou, or
  any other suitable outlet to the
                                     River and Harbor Act,
                                      July 24, 1946.
                                                                    ----------
  Gulf of Mexico, from Port La-
  vaca, Tex., and Palacios, Tex.
Pass Cavallo to Port Lavaca,         Rivers and Harbors     Com-    --------------- -------------

  Tex., channel.                      mittee resolution,    Sept.
                                      10, 1946.
Pass Cavallo to Port Lavaca,
  Tex., channel, maintenance of
                                     House Public Works
                                      mittee resolution,
                                                            Com-
                                                            Dec.
                                                                         -------------
                                                                    ---------------
  channel and basin constructed       14, 1950.
  by local interests.
Pine Island Bayou and exten-         River and Harbor Act,          - - - -   - --   -   --   - -

  sion, Neches River to Trinity       Mar. 2, 1945.
  River, Tex., waterway, via.
Port Aransas-Corpus      Christi     House Public Works     Com-
Waterway, Tex.                        mittee resolution,   Sept.   ---- ---- ----
                                       27, 1951.
Port Aransas-Corpus       Christi    House Public Works     Com-
Waterway,      Tex., tributary        mittee resolution,   Feb.    ---- ---- ----
channel to near LaQuinta, Tex.        20, 1951.
Port Arthur Canal and Sabine-        Senate Public Works    Com-
Neches Waterway, Tex., deep           mittee resolution,   Apr.
water channel through Sabine          20, 1948.
Lake.
Port Arthur, Tex., including         Flood Control Act, July
Taylors Bayou, for flood con-         24, 1946.
trol, drainage, and navigation,
in Jefferson County drainage
districts, Tex., provision of
outlets in interests of provid-
ing egress of flood waters into
existing waterways in general
vicinity of.
            RIVERS AND HARBORS-GALVESTON,                                  TEX.,   DISTRICT            919

Status of all investigations for navigation called for by river and harbor acts
                     and committee resolutions-Continued

                                                                   Date trans-     Document     Recom-
            Locality                  Authorization act             mitted to        No.       mendation
                                                                    Congress

Port Bolivar, Tex., Intracoastal   Senate Public Works Com- July 31,1951                       Unfavor.
Waterway, erosion of Boliver       mittee resolution, Sept.                                    able.
Peninsula in Galveston Bay.        24, 1948.
Port Lavaca, Tex., and Palacios,   River and Harbor Act, - - - - - - - - -
Tex., channel to the Gulf of       July 24, 1946.
Mexico by way of Pass Cavallo,
Cotton Bayou, or any other
suitable outlet to the Gulf of
Mexico.
Port Lavaca to Pass Cavallo,       Rivers and Harbors Com-
  Tex., channel.                    mittee resolution, Sept.
                                     10, 1946.                           I-------------
                                                               ---------------
Port Lavaca, channel from Pass
  Cavallo, Tex., to maintenance
                                   House Public Works Com-
                                    mittee resolution, Dec.
                                                                  ---------------------
  of channel and basin con-         14, 1950.
  structed by local interests.
Port Mansfield (Red Fish Bay), Senate Public Works Com-
  Tex., Gulf Intracoastal Water-    mittee resolution, June
  way.                              17, 1949.
Port Mansfield (Red Fish Bay), House Public Works Com-
  Tex., Gulf Intracoastal Water     mittee resolution, Sept.
  way.                              29, 1949.
Red Fish Bay (Port Mansfield), Senate Public Works Com-
  Tex., Gulf Intracoastal Water-    mittee resolution, June
  way.                              17, 1949.
Red Fish Bay (Port Mansfield), House Public Works Com-
  Tex., Gulf Intracoastal Water-    mittee resolution, Sept.
  way.                              29, 1949.
Refugio, Tex., site channel from  Rivers and Harbors Com- Oct. 18,1951                           Do.
  Louisiana-Texas Intracoastal      mittee resolution, Apr.
  Waterway and turning basin        24, 1945.
  at, via St. Marys Bay and
  Mission River, Tex.
Rio Hondo, Tex., harbor of ref- House Public Works Com-
  uge and connecting channel
  for large and small boats.
                                    mittee resolution, Dec.
                                    14, 1950.                  --------------- -------------
Riviera, Tex., side channel from Rivers and Harbors Com-
  Louisiana-Texas Intracoastal      mittee resolution, Apr.
                                                               --------------- ------------
  Waterway, through Laguna          24, 1945.
  Madre and Baffins Bay, and
  turning basin at.
Sabine Lake, Sabine-Neches Senate Public Works Com-
  Waterway and Port Arthur          mittee resolution, Apr.
  Canal, Tex., deep water chan-     20, 1948.
  nel through.
Sabine-Neches Waterway, and ..... do.......------------
  Port Arthur Canal, Tex., deep
  water channel through Sabine
  Lake.
San Bernard River, Tex.........- House Public Works Com-
                                    mittee resolution, Feb.
                                    17, 1949.                Oct. 18,1951
St. Marys Bay and Mission Rivers and Harbors Com-                                                Do.
  River, side channel to and        mittee resolution, Apr.
  through, from Louisiana and       24, 1945.
  Texas Intracoastal Waterway,
  La. and Tex., to Refugio, in-
  cluding turning basin at latter
  point.
Spindletop     Gulley,    Double Rivers and Harbors Com- .--.----.......
  Bayou, East Bay Bayou, Oys-       mittee resolution, July
  ter Creek, and Turtle Bayou,      20, 1946.
  Tex, in interest of navigation,
  drainage, and other purposes.
Taylors Bayou, for flood control, Flood Control Act, July      -.....-   r....--




  drainage, and navigation, in      24, 1946.
Jefferson Country drainage dis-
tricts, Texas, provision of out-
lets in interest of providing
egress of flood waters into ex-
isting waterways in general
vicinity of Port Arthur, Tex.,
including.
920          REPORT OF CHIEF OF ENGINEERS,                                U. S. ARMY,             1952

Status of all investigations for navigation called for by river and harbor acts
                     and committee resolutions-Continued

                                                                        Date trans-         Document      Recom-
              Locality                   Authorization act               mitted to            No.        mendation
                                                                         Congress

Texas City, Tex., channel from       House Public Works Com- _.......................----          .
  Galveston Harbor to Galves-         mittee resolution, Apr.
  ton Channel, Galveston Har-         21, 1950.
  bor and Houston ship chan-
  nel.
Trinity River to Neches River,       River and Harbor Act, ...                      ------............
  Tex., waterway via Line Is-         Mar. 2, 1945.
  land, Bayou and extension.
Turkey Bend, Tex., Houston           House Public Works Comrn- ......
  ship channel in vicinity of         mittee resolution, Feb.
                                      17, 1950.
Turtle Bayou, Double Bayou,          Rivers and Harbors Comrn------------.............-----------
  East      Bay   Bayou,   Oyster      mittee resolution, July
  Creek, and Spindletop Gulley,        20, 1946.
Tex., in interest of navigation,
drainage and other purposes.
Water hyacinth obstruction in        Rivers and Harbors Com- ............... _.....
Louisiana and other States af-        mittee resolution, Feb.
  fected.                              6, 1945.



                                    23. BUFFALO BAYOU, TEX.

   Location.-These improvements are located on Buffalo Bayou, a
tributaryof the San Jacinto River, in Harris County, west and north-
west of the city of Houston, Tex. (See U. S. G. S. quadrangle sheets
for Harris County.)
   Existing project.-This provides for the improvement of Buffalo
Bayou and its tributaries above the turning basin (Houston) of the
Houston Ship Channel to provide for the control of floods, the protec-
tion of the city of Houston from flood damages, and the prevention of
the deposit of silt in the turning basin of the Houston Ship Channel
by means of detention reservoirs, enlargement and rectifications of
channels, the construction of control works, and any diversions which
may be found advisable. The authorized cost of Federal participation
for construction is limited to $9,000,000. The current estimated Fed-
eral cost, approved in 1952, is $9,000,000 for construction and $13,305,-
400 for lands and relocations; the current estimated cost to local inter-
ests approved in 1951, is $22,130,700, a total of $44,436,100. The esti-
mated annual cost for maintenace is $114,600 (1952).
   The existing project was authorized by the River and Harbor Act
approved June 20, 1938 (H. Doc. 456, 75th Cong., 2d sess.), and the
Flood Control Act approved August 11, 1939.
   Local cooperation.-See pages 4-5 for requirements. The require-
ments are being complied with. The offer of the Harris County flood
control district to advance the sum of $2.900,000 to the Department
for prosecution of the Buffalo Bayou project was accepted by the Sec-
retary of War on December 18, 1940, and July 10, 1945.
   Operations and results during fiscal year.-New work: Operations
during the fiscal year consisted of continuation of land acquisition
for Barker Reservoir, Addicks Reservoir, and Buffalo Bayou rectified
channel at a cost of $92,938.07.
                   FLOOD CONTROL---GALVESTON,                                     TEX., DISTRICT                        921
  Maintenance: Routine operations, maintenance and care were car-
ried on from July 1, 1951, to June 30, 1952, on Barker and Addicks
Dams and the rectified channel, at a cost of $78,510.07. The applica-
tion of seal coat, by contract, to a part of the stabilized crown of em-
bankment and cover aggregate of Barker Dam was done during the
period from July 1 to July 6, 1951, at a cost of $7,000.51. Preliminary
surveys, plans and specifications for application of a seal coat by con-
tract to a part of the crown of embankment of Barker Dam were
done at a cost of $400.16.
   The total cost of all work for the fiscal year was $178,848.81, of
which $92,938.07 was for new work and $85,910.74 was for maintenance.
The total expenditures were $186,213.17.
   Condition at end of fiscal year.-The existing project was 27 per-
cent complete. Construction of Barker Dam was completed in 1945.
Addicks Dam and channel rectification to South Canal were completed
in October 1948.
   Land acquistion for Barker and Addicks Dams and channel rectifi-
cation work was 99 percent complete.
   No work was done on the second stage development which includes
construction of South Canal and its appurtenant intersection dam and
rectification work.
   To complete the project, subsurface explorations and detailed de-
sign must be completed and construction of remaining units of the
authorized project accomplished.
   Total cost under the existing project to June 30, 1952, was as
follows:

                                                                           New work           Maintenance         Total

Regular funds...     --------------------------------                      $8,444, 135. 66      $545, 744. 35   $8, 989, 880. 01
Advanced funds-                   ---                       ------          2, 900, 000. 00 .... _- ,-41-        2, 900, 000. 00
     Total for all work ....--------                    --
                                                        ----------------   11, 344, 135. 66      545, 744.35    11, 889, 880.01



   Total expenditures were $11,885,548.05, of which $2,900,000 was from
advanced funds.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, amounting to $113,329.56, plus an allotment of $81,800 for
the fiscal year 1953, a total of $195,129.56, will be applied as follows:
Accounts payable June 30, 1952------------------------------                                                    $4, 331.96
New work: Continuation of land acquisition for Addicks, Barker,
    and channel rectification, by hired labor (July 1952 to June
    1953) -----------------------                ---------- -----                                               93, 891. 95
Maintenance:
    Operation of dams and reservoirs ----------        $14, 000. 00
    Ordinary maintenance and repairs-------------- 54, 000. 00
    Improvement and reconstruction---------------       20, 905. 65
    Engineering studies and investigations----------     8, 000. 00
        Total for maintenance-------------------------------                                                    96, 905. 65
        Total for all work----------------------------------195,129.                                                       56
 922         REPORT           OF CHIEF OF ENGINEERS,                                     U. S. ARMY,             1952

   The sum of $97,000 can be profitably expended for the following
schedule of work during fiscal year 1954.
Maintenance:
    Operation of dams and reservoirs-----
                                   .......------                                                          $14, 000
    Ordinary maintenance and repairs.-------.------------                                                  49, 000
    Improvement and reconstruction---------------------                                                    34, 000
           Total for maiantenance-                         ------------------------------- $97, 000

                                          Cost     and      financial          summary




                                                         Fiscal year ending June 30-                               Total to June
                                                                                                                  30, 1952, includ-
                                                                                                                  ing fiscal years
                                      1948              1949             1950             1951        1952          priorto 1948

New work:
   Appropriated-----......... $1,754,700.00 ...                  ----   --------  $234, 500. 00    $0, 000.00      1$8,538,027.61
   Cost.------- ------- _1, 928, 399. 19 1, 329, 209. 85 $79, 633. 41 203, 333.56                   92, 938.07      18, 444, 135. 66
   Expenditures-----......... 1, 735, 239.   1F     1, 679, 217.96    91, 088.53   198, 886. 09     97, 744. 46     1 8, 444, 135.66
Maintenance:
   Appropriated--------........         80, 000.00      93, 500. 00 116, 900.00     64, 600. 00     90, 000. 00         560, 850. 00
   Cost------................--------- 101,052. 14      92, 356.12    93, 534.68    79, 347.03      85, 910. 74         545, 744. 35
   Expenditures---------                93, 935. 33     98, 275. 28   97, 727. 62   73, 255.32      88, 468. 71         541, 412. 39


Other new work data:
   Unobligated balance, June 30, 1952_ _-_-_------------       -     $1, 689. 60
   Unobligated balance available for fiscal year 1953------------- 1, 689. 60
   Estimated additional amount needed to be appropriated for com-
      pletion of existing project -------------------            13,767, 400. 00
  1   In addition, $2,900,000 advanced by the Harris County Flood Control District was expended.


24. PRELIMINARY                    EXAMINATIONS, SURVEYS,                                    AND     CONTINGENCIES
                                      FOR FLOOD CONTROL

   The cost of the work during the fiscal year amounted to $15,444.09
and expenditures were $20,736.65. The balance unexpended at the
end of the fiscal year, $2,996.54, plus allotment for fiscal year 1953
of $36,800.00, less accounts payable June 30, 1952, of $1,432.87 a total
of $38,363.67, will be applied as needed in payment of expenses in-
curred for work scheduled during fiscal year 1953.
   The additional sum of $160,600 can be profitably expended for work
scheduled during fiscal year 1954.
                                          Cost    and       financial          summary




                                                         Fiscal year ending June 30-                               Total to June
                                                                                                                  30, 1952, includ-
                                                                                                                  ing fiscal years
                                     1948            1949               1950             1951        1952           prior to 1948


Maintenance:
   Appropriated-------........    $65, 000.00 $167, 402.35         $97, 000. 00 $125,000.00        $5, 000. 00      $1,895, 901.06
   Cost-- -------------            66, 300. 99 115, 873.84         145, 684. 54 116, 242. 89       15, 444. 09       1,895, 337.39
   Expenditures......-------..     60, 507. 10 110, 386. 44        148, 388. 47 119, 782. 70       20, 736. 65       1, 893, 904. 52
                  FLOOD CONTROL-GALVESTON,                            TEX.,          DISTRICT                    923
                     25. INACTIVE FLOOD-CONTROL PROJECTS

                                                      For last       Cost and expenditures to          Estimated
                                                     full report           June 30, 1952                 amount
                 Name of project                     see annual                                        required to
                                                       report                                             mplete
                                                        for-         New work         Maintenance       c     lete

1, Snagging and clearing under authority of sec.         1943         $25, 702. 86    -.----    .          (1)
     2 of the Flood Control Act approved Aug.
     28, 1937, as amended.
2. Emergency flood control work under author-            1949 ---------------          $406,075.31         (1)
     ity of the Flood Control Act approved Aug.
     18, 1941, as amended.
3. Emergency flood control work under author-            1949      ---........        1,364, 659.90        (1)
     ity of Public Laws 138 and 318, 78th Cong.,
     and Public Law, 75, 79th Cong.

I Completed.
                             26. MISCELLANEOUS                  ACTIVITIES

Status of all investigations for flood control called for by flood                                   control acts
                          and committee resolutions

                                                                     Date trans-       Document         Recom-
             Locality                    Authorization act            mitted to           No.          mendation
                                                                      Congress

Austin-Washington Soil Con- Flood Control Act, May
  servation      District,     Tex.,     17, 1950.
  streams and their larger tribu-
  taries for flood control and
  drainage.
Bastrop-Fayette Soil Conserva- ...--.do                    ------- ---------------
  tion District, Tex., streams
  and their larger tributaries for
  flood contrcl and drainage.
Brays Bayou, Tex., Buffalo Flood Control Commit- ---------------
  Bayou and Houston ship                 tee resolution, July 16,
  channel, for flood control and         1945.
  drainage.
Brazoria-Galveston Soil Conser- Flood Control Act, June ---------------
  vation District, Tex. streams,         30, 1948.
for navigation, flood control,
  and drainage.
Buffalo Bayou and Houston            Flood Control Commit- ---------------
  ship channel, Tex., for flood          tee resolution, July 16,
  control and drainage for Brays         1945.
  Bayou, Tex.
Buffalo Bayou and Houston            House Public Works Com- ---------------
  ship channel, Tex., for navi-          mittee resolution, Apr.
  gation    and     flood   control      20, 1948.
  throughout      Buffalo    Bayou
  watershed including modifica-
  tions of presently approved
  plan and requirements for local
  cooperation.
Calhoun-Victoria Soil Conserva- Flood Control Act, May ---------------
  tion District, Tex., streams           17, 1950.
  and their larger tributaries for
  flood control and drainage.
Cameron County, Tex., Lower - -- do....                            ---------------
   Rio Grande Valley, including
  streams in Starr, Hidalgo,
  Cameron and Willacy Coun-
  ties, Tex., in the interest of
  flood control and drainage.
Coastal Plains Soil Conservation      Flood Control Act, June      ---------------

  District, Tex., streams, for           30, 1948.
  navigation, flood control, and
  drainage.
Copano Bay Soil Conservation          Flood Control Act, May ---------------
  District, Tex., streams and            17, 1950.
  their larger tributaries for flood
  control and di ainage.
Fayette, 1.astrop,   Soil Conserva- ....-- do_.- ..---------------
   tion District, Tex., streams
  and their larger tributaries for
  flood control and drainage.
924       REPORT       OF    CHIEF      OF    ENGINEERS,         U.   S.      ARMY,   1952


Status of all investigations for flood control called for by flood control acts
                     and commvittee resolutions-Continued

                                                                Date trans-     Document      Recom-
            Locality                   Authorization act         mitted to      Do.          mendation
                                                                 Congress

Galveston, Brazoria, Soil Con- Flood Control Act, June
  servation      District,     Tex.,   30, 1948.
  streams, for navigation, flood
  control and drainage.
Hidalgo County, Tex., Lower Flood Control Act, May ...............
  Rio Grande Valley, including         17, 1950.
  streams in Starr, Hidalgo,
  Cameron and Willacy Coun-
  ties, Tex., in the interest of
  flood control and drainage.
Houston ship channel and Buf- Flood Control Commit-
  falo Bayou, Tex., for flood con-     tee resolution, July 16,
  trol and drainage for Brays          1945.
  Bayou, Tex.
Houston ship channel and Buf- House Public Works Com-
  falo Bayou, Tex., for naviga-        mittee resolution, Apr.
  tion and flood control through-      20, 1948.
  out Buffalo Bayou watershed
  including     modifications     of
  presently approved plan and
  requirements for local coopera-
  tion.
Jefferson County Drainage Dis- Flood Control Act, July ........
  trict, Tex., provision of outlets    24, 1946.
  in interst of providing egress
  of flood waters into existing
  waterways in general vicinity
  of Port Arthur, Tex., includ-
  ing Taylors Bayou, for flood
  control, drainage, and naviga-
  tion.
Lower Rio Grande Valley, in- Flood Control Act, May               -------------
  cluding streams in Starr, Hi-        17, 1950.
  dalgo, Cameron and Willacy
   Counties, Tex., in the interest
  of flood control and drainage.
Matagorda County Soil Conser- Flood Control Act, June
  vation District, Tex., streams,      30, 1948.
  for navigation, flood control,
  and drainage.
Middle Guadalupe Basin Soil Flood Control Act, May ...
   Conservation District, Tex.,        17, 1950.
  streams and their larger tribu-
  taries for flood control and
  drainage.
Navasota Soil Conservation Dis- -- do ...--------------------               -------------
   trict, Tex., streams and their
   larger tributaries for flood con-
   trol and drainage.
Port Arthur, Tex., including         Flood Control Act, July
   Taylors Bayou, for flood con-       24, 1946.
   trol, drainage, and navigation,
   in Jefferson County drainage
   districts, Tex., provisions of
   outlets in interest of providing
  egress of flood waters into exist-
  ing waterways in general vi-
  cinity of.
Port Arthur, Tex., with a view .....      do.......
  to providing protection against
  damages from Sabine Lake re-
  sulting from erosion and from
   floods due to hurricane winds
  and tide.
Sabine Lake, with a view to              _do..............................................
                                     -....
  providing protection for Port
   Arthur, Tex., against damages
  resulting from erosion and
  from floods due to hurricane,
  winds and tide.
Starr County, Tex., Lower Rio        Flood Control Act, May I.....
    Grande     Valley,     including   17, 1950.
   streams in Starr, Hidalgo,
   Cameron, and Willacy Coun-
   ties, Tex., in the interest of
   flood control and drainage.
                FLOOD CONTROL---GALVESTON,                        TEX.,     DISTRICT            925

  Status of all investigations for flood control called for by flood control acts
                     and committee resolutions-Continued

                                                                  Date trans-   Document    Recom-
           Locality                           Authorization act    mitted to       No.     mendation
                                                                   Congress

Taylors Bayou, for flood control, Flood Control Act, July --
drainage, and navigation, in       24, 1946.
Jefferson County drainage dis-
  tricts, Tex., provision of out-
lets in interest of providing
egress of flood waters into ex-
isting waterways in general
vicinity of Port Arthur, Tex.,
including.
Texas City, Tex., with a view to Flood Control Act, June .-....-.....-.- ....-...-....
  providing for its protection      30, 1948.
  against stcrms and erosion.
Trinity Bay Soil Conservation ....- do.........     ----............................
  District, Tex., streams, for
navigation, flood control, and
  drainage.
Victoria, Calhoun, Soil Conser- Flood Control Act, May .............-.............
  vation District, Tex., streams    17, 1950.
and their larger ttibutaries for
  flood control and drainage.
Washington, Austin, Soil Con- .... do...............................---------.........
  servation     District,   Tex.,
  streams and their larger tribu-
  taries for flood control and
  drainage.
Willacy County, Tex., Lower -- do..........................................
  Rio Grande Valley, including
  streams in Starr, Hidalgo,
  Cameron and Willacy Coun-
  ties, Tex., in the interest of
  flood control and drainage.




       24-:7,54 --   ?   ..-.   vol. l---
                                        -5)
      IMPROVEMENT OF RIVERS AND HARBORS IN THE
              FORT WORTH, TEX., DISTRICT
   The district comprises all of Texas south of the Red River drainage
basin exclusive of the drainage basin of the Rio Grande and its tribu-
taries above and including the Pecos River; that portion of western
Louisiana in the Sabine River drainage system, exclusive of the
Louisiana section of the Gulf Intracoastal Waterway and tributary
waterways; and the portion of eastern New Mexico embraced in the
drainage basins of the Brazos and Colorado Rivers.
   It is responsible for supervision and prosecution of all work relating
to flood control and water conservation and utilization within the
territorial limits described above. Excluded from the responsibility
of Fort Worth District are the navigation and major drainage proj-
ects along the coastal plain.
  District engineer: Col. Delbert B. Freeman, Corps of Engineers,
to June 28, 1952. Col. Houghton R. Hallock, Corps of Engineers,.
acting from that date.
  Division engineer of the Southwestern Division, Dallas, Tex., com-
prising the Galveston, Tex., Fort Worth, Tex., Albuquerque, N. Mex.,.
Little Rock, Ark., and Tulsa, Okla., districts: Col. Louis W. Prentiss,.
Corps of Engineers, to May 8, 1952; Col. Charles H. McNutt, Corps
of Engineers, acting May 8, 1952 to June 23, 1952; Col. Herbert D.
Vogel, Corps of Engineers from that date.
                                      IMPROVEMENTS

                Navigation                            Flood control--Continued
                                        Page                                       Page
1.   Neches and Angelina Rivers,              15. Buffalo Bayou, Tex ......       950
        Tex _-                          928    16. Whitney Reservoir, Brazos
2.   McGee Bend Reservoir, An-                      River, Tex_                   950)
        gelina River, Tex .---..        929    17. Belton Reservoir, Leon Riv-
3.   Rockland Reservoir, Neches                     er, Tex                       952'
        River, Tex__                    930    18. Mill Creek, Brazos River,
4.   Dam A Reservoir, Neches                        Tex                           954-
        SR-iver, Tex__                  931    19. Hords Creek, Pecan Bayou,
5.   Dam B Reservoir, Neches                        Tex_                          955'
        River, Tex_                     932    20. Lake Brownwood Reservoir,
6.   Examination and surveys                        Pecan Bayou, Tex .-----       957
        (general)_                      934    21. San Angelo Reservoir, North
7.   Miscellaneous activities ----     935          Concho River, Tex ......      958:
                 Flood control                 22. Navidad-Lavaca        Rivers,
                                                     Tex-_ --------
                                                                  __               960
8.   Trinity River and tributar-              23. Canyon Reservoir, Guada-
        ies, Texas_______________       936          lupe River, Tex .........     961.
9.   Lavon Reservoir, Tex .....        937    24. Small flood control projects
10.   Garza-Little Elm Reservoir,                    not specifically authorized
        Tex _-                          939          by Congress under auth-
11.   Grapevine Reservoir, Tex__        942          ority of section 205 of the
12.   Dallas Floodway, Tex .-.-         944          Flood Control Act ap-
13.   Benbrook Reservoir, Tex___        946          proved June 30, 1948, as
14.   Fort Worth Floodway, Tex__        948          amended _                     963;
                                                                             927
928     REPORT    OF CHIEF     OF ENGINEERS,        U.   S.   ARMY,   1952

       Flood control-Continued                   Flood control-Continued
                                    Page                                      Page
25. Preliminary    examinations,           30. Emergency flood-control work
      surveys, and contingencies                under authority of the
      for flood control---------    964         Flood Control Act ap-
26. Inspection of completed pro-                proved Aug. 18, 1941, as
                                                amended----------------       967
      jects-                        964    31. Emergency flood-control work
27. Plant allotments------------    965         under authority of Public
28. Inactive flood-control proj-                Laws 138 and 318, 78th
      ects--------------------      965         Cong., Public Law 75, 79th
                                                Cong., Public Laws 102
29. Miscellaneous activities-----   965         and 858, 80th Cong ------      67

                1. NECHES AND ANGELINA RIVERS, TEX.

   Location.-The Neches River has its source 60 miles southeast of
Dallas and flows generally southeast 416 miles to Sabine Lake 4 miles
east of Port Arthur, Tex. The Angelina River flows southeast 200
miles to its confluence with the Neches River 126 miles above its mouth.
The authorized features are located as follows: Rockland Dam on
Neches River approximately 3 miles west of Rockland, Tex.; McGee
Bend Dam on Angelina River approximately 10 miles northwest of
Jasper, Tex.; Dam A on Neches River approximately 4 miles west of
Horger, Tex.; Dam B on Neches River approximately one-half mile
north of Town Bluff, Tex. (See U. S. Geological Survey Base Map,
Northeast Texas, Scale 1: 500,000).
   Existing project.-The plan of improvement provides for dams
and reservoirs to be located at the Rockland and McGee Bend dam
sites on the Neches and Angelina Rivers, respectively, which will effect
a large measure of flood protection to agricultural lands in the lower
river valley and to the city of Beaumont, reduce the hazards to navi-
gation resulting from floods, and provide a regulated flow in the
lower river to supply municipal, agricultural, and industrial demands.
In addition these proposed projects would permit the development
of a large amount of firm power and afford opportunities for
recreation.
   The plan also provides for construction of Dam A, located on the
Neches River below Rockland Dam, for the development of power;
and Dam B, located below the confluence of the Angelina and Neches
Rivers, to regulate the daily fluctuations in discharge from the tur-
bines in the upper projects and to develop a limited amount of power.
   Construction of Rockland and Dam A Reservoirs and of power
facilities at Dam B is to be deferred until justified by future
conditions.
   As itemized in the tables below, the estimate of cost for new work,
revised in 1952, is $101,431,500 including $5,000,000 non-Federal costs.
The flood-control works included in the comprehensive plan are listed
below:
               RIVERS AND HARBORS--FORT                                        WORTH,               TEX.,      DISTRICT            929

                                                                                                 Name of dam

                              Rockland
Name...... .......................                                        McGee Bend                 Dam A                Dam B
                                Dam                                          Dam

kearest city__ _______________
               ....                                 Rockland, Tex.         Jasper, Tex.            Horger, Tex.      Town Bluff, Tex.

Distance above mouth of Neches
  River (river mile)                 ___________ 160.4......---------..   151.3 .....---------                  113.7.
                                                                                                  142----------............
Height of dam above river bottom
  (feet)..............                           106-------               128.--   -----          49.-----------     45.
Type of dam___                    ____           Earth fill .             Earth fill- --          Concrete-          Concrete and earth..
Storage capacity-flood control
  (acre-feet).-- .-      .-  .--- ...- .--
Power and regulation of flow (acre-
                                             .-.--
                                                 1,020,100 ...--.         1,148,900- ....               __.....
                                                                                                  None ..            None.
  feet) .........................                1,125,500__--  .....     1,383,500- .....        Poundage-....      Pondage.
Dead storage (acre-feet)----                     1,141,700 .-. ..         1,508,400- .....-       None__-......      None.
Estimated cost (1952):
    Construction .     ...........                      $38, 284, 500         $40, 097, 300           $3, 051, 700            $6, 893, 700
    Lands and damages...                                  5, 750, 500           6, 036, 400                 5, 900             1,311, 500
        Total---------..       ---...----------................
                                                           44, 035, 000       146,133, 700             3, 057, 600              8, 205, 200

   1 Includes $3,000,000 contributed funds.
   2 Includes $2,000,000 contributed funds.

     See individual reports for further details.
                   2. McGEE BEND RESERVOIR, ANGELINA RIVER, TEX.

   Location,-The improvement is located on the Angelina River
25.2 miles upstream from its confluence with the Neches River and
about 10 miles northwest of Jasper, Tex.
   Existing project.-The plan of improvement, a unit of the compre-
hensive plan for flood control, water conservation, and hydroelectric
power development in the Neches-Angelina Rivers Basin, provides
for the construction of a rolled earth fill embankment 10,950 feet in
length, three earthen saddle dikes totaling 7,470 feet, and an uncon-
trolled concrete spillway 400 feet long. The top of the dam will be
about 128 feet above the river bed. The reservoir will have a storage
capacity of 4,040,800 acre-feet including 1,148,900 acre-feet of flood
control storage, 1,383,500 acre-feet of power storage, and 1,508,400
acre-feet of dead storage. The capacity of the initial installation of
hydroelectric generating facilities will be 28,800 kilowatts.
   The estimated cost of the project (1952) is $40,097,300 for construc-
tion and $6,036,400 for lands and damages, a total of $46,133,700,
including $3,000,000 to be contributed by local interests.
   The existing project was authorized by the River and Harbor Act
approved March 2, 1945 (Public Law No. 14, 79th Cong., 1st sess.)
in accordance with the plan of improvement outlined in Senate Docu-
ment No. 98, Seventy-sixth Congress, first session.
   Local cooperation.-The project was adopted subject to the pro-
vision that before construction is started upon any element, the State
of Texas or other responsible local agency give assurances satisfactory
to the Secretary of the Army that upon completion of the entire proj--
ect it will contribute toward the first cost of the work the sum of
$5,000,000. The Lower Neches Valley Authority has furnished assur-
ances, which were accepted by the Assistant Secretary of the Army
on November 13, 1947, that at any time after Congress appropriates
930         REPORT OF CHIEF                OF ENGINEERS,                 U. S.        ARMY,      1952

sufficient funds for the construction of Dam B Reservoir, which by
the addition of $2,000,000 would be sufficient to complete Dam B
Reservoir, upon demand by the Secretary of the Army it will con-
tribute $2,000,000 toward the cost of construction of Dam B Reser-
voir; and upon completion of McGee Bend Reservoir on the Angelina
River, it will contribute $3,000,000 toward the first cost of the work,
To date local interests have contributed $2,000,000 toward the first
cost of Dam B Reservoir.
   Operations and results during fiscal year.-Operationsduring the
fiscal year consisted of review of preliminary investigations and
engineering studies with a view to reducing the size of the project.
   Total cost during the fiscal year was $26,334.38, all for new work
from regular funds by hired labor. Total expenditures were
$42,139.64.
   Condition at end of fiscal year.--The existing project was 1.5
percent complete. Preliminary engineering work was 57 percent
complete.
   Total cost under the existing project to June 30, 1952 was $686,457.08
all for new work from regular funds. Total expenditures were
$686,457.08.
   Proposed operations.-An allotment of $50,000 during fiscal year
1953 will be applied to preliminary investigations and engineering
studies. An allotment of $100,000 can be profitably expended during
fiscal year 1954 for continuation of preliminary investigations and
engineering studies.
                                   Cost and financial summary

                                                Fiscal year ending June 30                            Total to June
                                                             . ...   .      .                         30, 1952, includ-
                                                                                                      ing fiscal years
                                1948          1949           1950          1951          1952           prior to 1948

New work:
   Appropriated__-....... ...      ._----  $140, 000. 00 $200, 000. 00-----
                                                                      ...........   -- $103,742.92        $686, 457. 08
   Cost----------------         1, 956. 18       412.94    81,016. 74 $132,483.41       26, 334. 38        686, 457. 08
   Expenditures   ---------     1, 956. 18       412. 94   71, 626. 23 129, 470. 59     42, 139. 64        686, 457.08


Other new work data:
    Appropriated for fiscal year ending June 30, 1953                      ---------                  $50, 000. 00
    Unobligated balance available for fiscal year 1953 ----
                                                         ----                                          50, 000. 00
    Estimated additional amount needed to be appropriated for
                                      ...----
        completion of existing project---                                 ---------             42, 397, 242. 92

                 3.   ROCKLAND RESERVOIR, NECHES RIVER, TEX.

   Location.-The improvement is located on the Neches River 160.4
river miles above its mouth and 34.4 miles above the mouth of the
Angelina River. The dam site is about 3 miles west of Rockland, Tex.
   Existing project.-The plan of improvement, a unit of the compre-
hensive plan for flood control, water conservation, and hydroelectric
power development in the Neches-Angelina Rivers Basin, provides for
the construction of a rolled earth fill embankment 23,958 feet in length,
and an uncontrolled spillway 600 feet long. The top of the dam will
be about 106 feet above the river bed. The reservoir will have a stor-
          RIVERS         AND HARBORS-FORT                  WORTH,           TEX.,   DISTRICT         931
age capacity of 3,287,300 acre-feet including 1,020,100 acre-feet of
flood control storage, 1,125,500 acre-feet of power storage, and
1,141,700 acre-feet of dead storage. The capacity of the initial in-
stallation of hydroelectric generating facilities will be 13,500 kilo-
watts.
   The estimated cost of the project (1952) is $38,284,500 for con-
struction and $5,750,500 for lands and damages, a total of $44,035,000.
   The existing project was authorized by the River and Harbor Act
approved March 2, 1945 (Public Law No. 14, 79th Cong., 1st sess.), in
accordance with the plan of improvement outlined in Senate Docu-
ment No. 98, Seventy-sixth Congress, first session.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28,1938, applies.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-Preliminary surveys and office
studies for preparation of detailed plans and specifications were 100
percent complete. To complete the project detailed plans and specifi-
cations must be completed and construction accomplished.
   Total cost under the existing project to June 30, 1952, was $510,200,
all for new work for regular funds. Total expenditures were $510,200
   Pr'oposed operations.--No work is proposed for fiscal years 1953
and 1954.
                                      Cost and financial summary

                                               Fiscal year ending June 30                   Total to June-
                                                                                           30, 1952, includ
                                                                                           ing fiscal years
                                  1948        1949        1950        1951          1952    priorto 1948

New work:
   Appropriated --------           ---------------------------------------------------            $510,200
   Cost__-     .-----------     $4,607.81    $427.08  $1,076. 60 ------------------------          510,200
   Expenditures --------
                  .......   _    4, 607. 81   427. 08  1, 076. 60------------
                                                                  ............ ------------        510, 200


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project-------------                              $43, 524, 800

                     4.-DAM A RESERVOIR, NECHES RIVER, TEX.

   Location.-The improvement is located on the Neches River, 142
river miles above its mouth, 15.9 miles above the confluence of the
Angelina River, and 18.4 miles below Rockland Reservoir. The dam
site is about 18 miles west of Jasper, Tex.
   Existing project.-The plan of improvement, a unit of the com-
prehensive plan for flood control, water conservation, and hydroelec-
tric power development in the Neches-Angelina Rivers Basin, provides
for the construction of a rolled earth fill embankment 2,685 feet in
length and a gate controlled spillway 120 feet long. The top of the
dam will be about 49 feet above the river bed, The capacity of the
initial installation of hydroelectric generating facilities will be 2,700
kilowatts.
   The estimated cost of the project (1952) is $3,051,700 for con-
struction and $5,900 for lands and damages, a total of $3,057,600,
932       REPORT          OF CHIEF OF ENGINEERS,                                  U. S. ARMY,                    1952

   The existing project was authorized by the River and Harbor Act
approved March 2, 1945 (Public Law No. 14, 79th Cong., 1st sess.)
in accordance with the plan of improvement outlined in Senate
Document No. 98, Seventy-sixth Congress, first session.
  Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938 applies.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-Preliminary surveys and office
studies for preparation of detailed plans and specifications were 100
percent complete. To complete the project detailed plans and specifi-
cations must be completed and construction accomplished.
  Total cost under the existing project to June 30, 1952, was $21,700
all for new work from regular funds. Total expenditures were
$21,700.
   Proposedoperations.-No work is proposed for fiscal years 1953 and
1954.
                                     Cost and financial summary

                                                  Fiscal year ending June 30                                           Total to June
                                                                                                                      30, 1952, includ-
                                                                                                                      ing fiscal years
                                  1948          1949               1950              1951               1952            prior to 1948


New work:
   Appropriated---.........
                    ----.........------..    ....-----------------------.....------------........           ------------       $21, 700
   Cost--------.---------. $779. 15           $1, 141. 20         $2, 325. 33       ...        ...------------------------      21, 700
   Expenditures.. --------.....    779. 15    1, 141. 20         2, 325. 33         ..             ------------
                                                                                            ...------------                     21,700


Other new work data: Estimated additional amount needed to. be
appropriated for completion of existing project--------------- $3, 035, 900

                      5. DAM B RESERVOIR, NECHES RIVER, TEX.

   Location.-The improvement is located on the Neches River with
dam site about 12.4 miles below the mouth of the Angelina River, one-
half mile north of Town Bluff, Tex., and 93 river miles north of
Beaumont, Tex.
   Existing project.-The plan of improvement, a unit of the com-
prehensive plan for flood control, water conservation, and hydroelec-
tric power development in the Neches-Angelina Rivers basin, provides
for the construction of a concrete and earth dam consisting of 6,100
feet of uncontrolled spillway, 326 feet of gated channel spillway, and
a nonoverflow section 272 feet long. The top of the dam will be about
45 feet above the river bed. The reservoir will have a storage capacity
of 94,200 acre-feet.
   The estimated cost of the project (1952) is $6,893,700 for construc-
tion and $1,311,500 for lands and damages, a total of $8,205,200, in-
cluding $2,000,000 to be contributed by local interests. The estimated
cost of annual maintenance is $62,000 (1952).
   The existing project was authorized by the River and Harbor Act
approved March 2, 1945 (Public Law No. 14, 79th Cong., 1st sess.),
in accordance with the plan of improvement outlined in Senate Docu-
ment No. 98, Seventy-sixth Congress, first session.
        RIVERS AND      HARBORS-FORT          WORTH,     TEX.,   DISTRICT      933
   The River and Harbor Act approved June 30, 1948 modified this
project so as to provide that the local agency which gives assurances
that upon completion of the entire project it will contribute toward
the first cost of the work the sum of $5,000,000, will be permitted to
withdraw from the pool of Dam B not to exceed 2,000 cubic feet of
water per second for its own use (Public Law No. 858, 80th Cong.,
2d sess.).
   Local cooperation.-Fully complied with.
   Operations and results during fiscal year.-Operations during the
fiscal year consisted of continuation of land acquisition; assembly of
operating equipment; construction of operators' quarters; and sta-
bilization of the right abutment.
   Routine maintenance was carried on from July 1951 to June 30,
1952.
   Total cost during the fiscal year was $470,753.09 for new work,
including $311,352.79 from contributed funds, and $60,075.08 for
maintenance, from regular funds. Total expenditures during the
fiscal year were $1,325,562.83 for new work, including $325,598.51
contributed funds, and $54,301.71 for maintenance, from regular
funds.
   Condition at end of fiscal year.-The existing project was 97 per-
cent complete. Detailed plans and specifications were 99.5 percent
complete. Land acquisition was 85 percent complete. The project
was placed in operation during April 1951.
   The cost of new work under the existing project to June 30, 1952
was $5,248,534.80 from regular funds and $1,959,978.03 from con-
tributed funds, a total of $7,208,512.83. Total expenditures for new
work were $7,042,067.31, including contributed funds of $1,930,220.89.
   Total cost of maintenance under the existing project to June 30,
1952 was $60,075.08, from regular funds. Total expenditures were
$54,301.71.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, including accounts receivable June 30, 1952, $1,006,004.35,
plus an allotment for fiscal year 1953 of $37,300 for maintenance,
a total of $1,043,304.35 will be applied as follows:
Accounts payable June 30, 1952__-- _____---------------------         $172, 630. 21
New work:
    Preparation of detailed plans and specifications
      by hired labor___-__          _____---------------11, 648.51
    Install radio telephone and fire safety equipment
      by hired labor     -------------------------------      325. 60
    Spillway and embankment by contract --------          52, 607.39
    Operators quarters by contract-----------                  37. 78
    Access road by contract__-----------------------           98. 63
    Embankment protection to U. S. Highway 190... 715, 000. 00
    Land acquisition by hired labor_--------------       48, 805. 94
                                                                        828, 523. 85
Maintenance:
    Operations--------------------------------            21, 715. 00
    Ordinary maintenance and repair__ __________-10, 543. 00
    Participation in studies for reservoir operations,
      sedimentation, etc----------------------------       9, 892. 29
                                                                         42, 150. 29
       Total for all work --------------------------------            1,043, 304. 35
934           REPORT           OF CHIEF              OF      ENGINEERS,             U.           S.   ARMY,      1952


   The sums of $167,600 for new work and $77,900 for maintenance
can be profitably expended for the following schedule of work during
fiscal year 1954:
New work :
   Construct access road for reservoir management -------  $12, 600
   Public use facilities   -------------------------------    5, 000
   Land acquisition                                        1--------------------------------50,000
                                                                       $167,600
Maintenance:
   Operations_--------------------------------------        39, 400
   Ordinary maintenance and repairs----------------         38, 500
                                                                          77, 900

           Total for all work_ -----                         -----------------------                                   --      245, 500

                                             Cost and financial summary
                                                 UNITED STATES FUNDS

                                                           Fiscal year ending June 30                                   Total to June
                                                                                                                       30, 1952, includ-
                                                                                                                       ing fiscal years
                                          1948           1949            1950            1951             1952           priorto 1948


New work:
   Appropriated......... $2,218,000.00 $1,678,100.00----------                     $970, 100. 00        $61,300. 00         $5, 322, 400. 00
   Cost- .------------               263, 882. 27 1, 387, 230. 60 $1,624,964.51   1, 600, 083. 14       159, 400. 30          5, 248, 534. 80
   Expenditures..---------. 274, 918. 65 1, 215, 403. 41 1, 533, 297. 68             886, 879. 19       999, 964. 32          5, 111, 846. 42
Maintenance:
   Appropriated---------.........    --      ------------      ------------       ------------           64, 925. 37             64, 925. 37
   Cost--
        .................. ---------    ----- ----------------------                -----------          60, 075. 08             60, 075. 08
   Expenditures- -                -       ------------.........
                                                          ------------ -           -_  ----              54, 301. 71             54, 301. 71


Other new work data:
   Unobligated balance, June 30, 1952----       __-------------------$16, 084. 33
   Unobligated balance available for fiscal year 1953_----------       16, 084. 33
   Estimated additional amount needed to be appropriated for
      completion of existing project _-------------------------       882, 800. 00

                                            Cost and financial summary
                                                  CONTRIBUTED FUNDS

                                                           Fiscal year ending June 30                                   Total to June
                                                                                                                       30, 1952, includ-
                                                                                                                       ing fiscal years
                                          1948           1949            1950            1951             1952           priorto 1948

New work:
   Appropriated-....._         .........                _..------   1$1,500,000.00 $500, 000. 00 --------                   $2,000,000.00
   Cost ----------             ------------------------                68,269.40 1,580,355.84 $311,352.79                    1,959,978. C3
   Expenditures ---------------------------                            56, 235. 06 1,548,387.32 325, 598. 51                 1, 930, 220.89



                        6. EXAMINATIONS AND SURVEYS (GENERAL)
   The cost of work during the fiscal year amounted to $23,334.71 and
the expenditures were $32,481.35. The unexpended balance at the
end of the fiscal year, $1,177.54, plus allotment for fiscal year 1953 of
$11,600 for examinations and surveys, will be applied as needed in
payment of expenses to be incurred under this heading during fiscal
year 1953.
   The additional sum of $97,000 can be profitably expended during
fiscal year 1954 for examinations and surveys.
           RIVERS       AND      HARBORS-FORT -WORTH, TEX.,                                                  DISTRICT             935
                                      Cost and financial summary

                                                          Fiscal year ending June 30                                    Total to June
                                                                                                                        30, 1952, includ-
                                                                                                                        ing fiscal years
                                 1948                  1949                    1'950         19519          52            prior to 1948

Maintenance:
   Appropriated --------$179, 543. 06            $72, 256. 51 $120, 000.00 $127, 000.00                  $13, 800.00        $956, 280. 28
   Cost--------------    179, 543.06              53, 100. 09 139, 082 , 79 117, 538. 92                  23, 334. 71        956, 280. 28
   Expenditures----_     179, 543.06              53,100.09 118, 519.09 127, 778.44                       32,481.35          955, 102. 74


                              7. MISCELLANEOUS ACTIVITIES
Status of all investigations for navigation called for by river and harbor acts
                           and committee resolutions

                                                                                         Date trans-      Document          Recom-
             Locality                          Authorization act                          mitted to         No.            mendation
                                                                                          Congress

Angelina and Neches Rivers,              Rivers and Harbors Com- ---------------
  Tex., for additional navigation         mittee Resolution, May
  facilities.                             24, 1946.
Big Sandy Creek, Tex. (tribu-            River and Harbor Act, ---------------
  tary of Sabine River).                  Mar. 2, 1945.
Colorado River, Tex.--.... ---...           do -.....                                  ---------------

Colorado River, Tex., for naviga-        Commerce Committee                            ---------------

  tion and flood control.                 resolution, Aug. 4, 1936.
Garza Dam, Trinity River and             Rivers and Harbors Com- ---------------
  tributaries, Texas, at and              mittee resolution, Nov.
  above.                                  30, 1945.
Guadalupe River, Tex., improve-          Rivers and Harbors Com-                       ---------------

  ment for navigation, flood con-         mittee resolution, Apr.
  trol, power and irrigation (final       8, 1938.
  report).
Guadalupe River, Tex., Victoria          Rivers and Harbors Com-                       ---------------

  to Gonzales, for navigation,            mittee resolution, Mar.
  flood control, power, and re-           29, 1945.
  lated purposes.
Neches and Angelina Rivers,              Rivers and Harbors Com-                       ---------------

  Tex., for additional navigation         mittee resolution, May
  facilities.                             24, 1946.
Neches River and tributaries,            River and Harbor Act, ---------------
  Texas, in the interest of naviga-       Mar. 2, 1945.
  tion, flood control, and other
  water uses.
Neches River to Trinity River,        ----....
                                        -do...............------                       ---------------
  Tex., waterway via Pine Is-
  land Bayou and extension.
Pine Island Bayou and exten-           ----   do.-------------.                        ---------------

  sion, Neches River to Trinity
  River, Tex., waterway, via.
Sabine River and tributaries,         .....   do-------------...............           ---------------
  Texas, for navigation, flood
  control and other water uses.
Sabine-Neches waterway, Texas,        .....
                                         -    do-------...............                 ---------------
  improvements in the interest
  of navigation and prevention
  of damage by floods.
San Antonio River, Tex., im-            River and Harbor                       Act,
  provement for navigation,               June 20, 1938.
  flood control, power, and pre-
  vention of erosion.
Trinity River and tributaries,           Rivers and Harbors Com-
  Texas, at and above Garza               mittee resolution, Nov.
  Dam.                                    30, 1945.
Trinity River and tributaries,           Rivers and Harbors Com-                               - -- -
                                                                                             -----
  Texas, for navigation, flood            mittee resolution, Feb.
  control and allied purposes.            28, 1945.
Trinity River and tributaries,           Rivers and Harbors Com-
  Texas, for navigation and flood         mittee resolution, Mar.
  control.                                31, 1944.
Trinity River to Neches River,           Rivers and Harbor Act,
  Tex., waterway via Pine Is-             Mar. 2, 1945.
  land Bayou and extension.
936        REPORT OF CHIEF OF ENGINEERS,                                                U.    S.      ARMY,                 1952

Status of all investigations for navigation called for by river and harbor acts
                     and committee resolutions-Continued
                                                                                    Date trans-              Document              Recom-
                Locality                   Authorization act                         mitted to                    No.             mendation
                                                                                     Congress

Trinity River in the Richland,       Rivers and Harbors Corn-----------------------
  Chambers and Cedar Creek             mittee resolution, Feb.
  areas, Texas (interim report).       28, 1945.
    Do......--------------------     Rivers and Harbors Com-                        -
                                       mittee resolution, Mar.
                                      31, 1944.
'Trinity River to Liberty, Tex.,     Rivers and Harbors Com-                    .
  including Lake Liberty (in-         mittee resolutions, Mar.
  terim report).                          31, 1944, Feb. 28, 1945.


                      8. TRINITY RIVER AND TRIBUTARIES, TEX.
    Location.-These improvements are located in the upper portion
of the Trinity River Basin within a 50-mile radius of Dallas, Tex.
    Existing project.-The River and Harbor Act approved March 2,
1945, adopted the comprehensive plan of improvement for navigation,
flood control, and allied purposes, in the Trinity River basin, as.out-
lined in House Document No. 403, Seventy-seventh Congress, first
:session. This plan provides for the construction at this time of Ben-
brook, Little Elm, and Grapevine Reservoirs, the modification of
Garza Dam, and the improvement of the levees and floodways at Fort
Worth and Dallas, for flood protection and water conservation. The
act also adopted the modification contained in House Document No.
533, Seventy-eighth Congress, second session, which provides for the
construction of the Lavon Reservoir on the East Fork of the Trinity
River. The River and Harbor Act approved July 24, 1946, modi-
fied the authorized Lavon Reservoir to provide for conservation
storage as may be determined warranted by the Secretary of War
upon 'the recommendations of the Chief of Engineers. The Civil
Functions Appropriation Act of 1952 further modified Lavon Reser-
voir to provide for construction of water conservation and utilization
facilities, the cost of these facilities to be repaid by local interests.
The existing project maps are contained in the project documents. As
itemized in the tables below, the estimate of cost for new work, revised
in 1952, is $77,430,300, including $11,690,000 non-Federal costs. The
flood control works included in the comprehensive plan are listed
below:
                                            Dam and reservoirs

               Name                    Benbrook                     Lavon                        Grapevine                  Garza-Little Elm

Nearest city                       Benbrook ...             Lavon........                    Grapevine        -....         Lewisville.
Distance above mouth (miles)       15__                _    55.9-----------.............     11.7-----------.............   30.
Height (feet)-----------------     130__-----------         69---------                      137.-----------                125.
Type _________--___---------       Earth fll____-_          Earth fll -______                Earth fll-______.              Earth fill.
Reservoir capacity (acre-feet)__   258,630 ..-.....         423,400-- _     _ _. -           434,200-........               1,016,200.
Power development---------.....-   None ----------.......   None ....----------              None.........                  None.
Estimated cost:
    Construction_ .... _......__            $9, 023, 700              $9, 056, 500                     $8, 683, 900                $17, 263, 500
    Lands and damages .......                2, 293, 600               2, 438, 700                      2, 721, 100                  7, 381, 500
      Total..................               11, 317, 300              11, 495, 200                  1 11, 405, 000                3 24, 645, 000


  2
  1Includes $2,174,000 non-Federal costs.
   Includes $3,323,000 non-Federal costs.
                   FLOOD      CONTROL--FORT               WORTH,          TEX.,       DISTRICT                  937
                                       Local protection works

                                                                                            Estimated cost
                                              Dis-
    Location               Stream            above        Type structure          Construc-       Lands
                                             mouth                                Constru-         and        Total
                                                                                    tion         damages


                                             Miles
Fort Worth-_        Clear and West Forks__     560    Levee and channel           $8, 663, 500   $914, 500 1$9,578,000
                                                          clearing.
        --------
Dallas ........     Elm Fork and Trinity       505 ....      do---..--.........    8, 619, 800    370, 000 '8, 989, 800
                     River.

  I Includes $5,318,000 non-Federal costs.
  2 Includes $875,000 non-Federal costs.


    See individual reports for further details.
                                 9. LAVON RESERVOIR, TEX.
    Location.-The improvement is located in Collin County, Tex., on
East Fork of Trinity River, 55.9 miles above its confluence with the
Trinity River and about 22.5 miles northeast of Dallas, Tex.
    Existing project.-The plan of improvement, a unit of the compre-
hensive plan for flood control in the Trinity River Basin, provides for
the construction of an earth-fill dam, approximately 9,499 feet in
length, including a gate-controlled concrete spillway 568 feet in length
located in the right abutment. The dam has a maximum height of
69 feet above the stream bed. The reservoir provides a storage capac-
ity of 275,600 acre-feet for flood control, 100,000 acre-feet for conserva-
tion, and a sedimentation and dead storage reserve of 47,800 acre-feet.
The reservoir extends 10 miles up the East Fork and 16.1 miles up
Pilot Grove Creek.
    The estimated cost of the project (1952) is $9,056,500 for construc-
tion and $2,438,700 for lands and damages, a total of $11,495,200. The
estimated cost of annual maintenance is $78,000 (1952).
    The existing project was authorized by the River and Harbor Act
approved March 2, 1945. (See H. Doc. 403, 77th Cong., 1st sess., and:
H. Doc. 533, 78th Cong.) The project was further modified by the
River and Harbor Act approved July 24, 1946, and the Civil Func-
tions Appropriation Act of 1952. The latest published maps are con-
tained in the project documents.
    Local cooperation.-Section 2 of the Flood Control Act approved:
June 28, 1938, applies. Local interests are required by law to repay
the cost of a water supply intake structure to be constructed under
authorization provided in the Civil Functions Appropriation Act for
1952, approved October 24, 1951 (Public Law 203, 82d Cong., 1st sess.).
The North Texas Municipal Water District, a State authorized agency,
has been organized for the purpose of assuming the required
responsibilities.
    Operations and results during fiscal year.-Operations during the
fiscal year consisted of continuation of Ydetailed plans and specifica-
tions, continuation of land acquisition, continuation of construction of
938      REPORT      OF CHIEF       OF ENGINEERS, U.            S. ARMY,      1952

spillway, completion of relocation of State Highway 78, completion of
reservoir clearing, initiation of relocation of G. C. & S. F. R. R., and
construction of water supply intake structure.
   Routine maintenance was carried on from April to June 30, 1952.
   Total cost during the fiscal year was $1,741,986.77 for new work and
$5,600.29 for maintenance, all from regular funds. Total expendi-
tures were $1,552,296.08 for new work and $5,535.49 for maintenance,
all from regular funds.
   Condition at end of fiscal year.-The existing project was 79 percent
complete. Detailed plans and specifications were 94 percent complete,
land acquisition was 88 percent complete, and construction was 75 per-
cent complete.
   Total cost of new work under the existing project to June 30, 1952,
was $8,945.872.22 from regular funds. Total expenditures were
$8,127,744.48.
   Total cost of maintenance under the existing project to June 30,
1952, was $5,E00.29, from regular funds. Total expenditures were
$5,535.49.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, including accounts receivable, $2,908,928.47, plus allotments
of $160,000 and $30,000 for new work and maintenance respectively
for fiscal year 1953, a total of $3,398,928.47 will be applied as follows:
Accounts payable June 30, 1952               ----------------------------$818, 856. 44
New work:
    Preparation of detailed plans and specifications
      by hired labor -------------------------- $47,              $47, 347.62
                                                                        347. 62
   Completion of relocation of G. C. & S. F. R. R. by
      contract_------------------------------                     910, 003. 62
    Relocation of American Telephone & Telegraph
      by contract ----------------------------                      85, 545. 00
    Completion of embankment by contract--                ..-------503,485. 75
    Completion of spillway by contract---------_                  113, 197. 87
    Construction of water conservation and utiliza-
      tion facilities by contract------------ ---                 300, 000. 00
    Relocation of Collin County roads by contract__ 200, 000. 00
    Construction of operators quarters and mainte-
      nance facilities by contract____---------- 40, 000. 00
    Combined minor construction features--------- 35, 814. 04
    Land acquisition by hired labor---- ---               _       305, 278. 42
    Improvement to access roads under reservoir
      management----------------------------8,                          000. 00
                                                                                2, 548, 672. 32
Maintenance :
    Operations-------------------------------                       13, 918. 00
    Ordinary maintenance-----------------------                      9, 878. 00
    Participation in studies for reservoir operation,
      sedimentation, etc--__-__-             ____-- ------           7, 603. 71
                                                                                    31, 399. 71
          Total for all work__-----____-----____----____                       3, 398, 928. 47
  The sums of $60,000 and $74,000 for new work and maintenance,
respectively, can be profitably expended for the following schedule of
work during fiscal year 1954:
               FLOOD        CONTROL-FORT                   WORTH,            TEX.,       DISTRICT                       939
New work:
   Reservoir management facilities:
       Construct Government boathouse by contract-,__                                           $4, 000
       Construct access roads by contract ------     -                                          46, 000
                                                                                                                   $50, 000
     Public use facilities: Construct latrines, trash re-
       ceptacles, table and bench units and fireplaces by
       contract         --------------------------------------                                    7, 300
     Construct water supply installations by contract.-.,                                         2,200
     Construct directional signs and markers by contract..--                                         500
                                                                                                                     10, 000

                                                                                                                     60, 000
Maintenance :
      Operations  ------------------------------------ 41, 000
      Ordinary maintenance  ---------------------------- 24, 000
      Participation in studies for reservoir operation, sedi-
       mentation, etc------------ ---------------------                                           9, 000
                                                                                                                     74, 000
           Total for all work_______-------------_-------_------                                          -        134, 000
                                   Cost and financial summary
                                                 Fiscal year ending June 30                                    Total to June
                                                                                                              30, 1952, includ-
                                                                                                              ing fiscal years
                                1948           1949            1950            1951            1952            priorto 1948

New work:
   Appropriated-_.......    $500,000.00 $2,800,000.00 $2,604,300.00 $3,436,000.00 $1,500,000.00                $11,035,200.00
   Cost------_ -             245, 452. 62 1, 088, 294. 91 2, 632, 319. 02 3, 047, 814. 31 1, 741, 986. 77        8, 945, 872. 22
   Expenditures- _--_- -_    165, 030.45 1, 099, 131. 16 1, 973, 699. 95 3, 147, 584. 65 1, 552, 296. 08         8, 127, 744. 48
Maintenance:
   Appropriated------------------------------------------------------.
                                                          ...........                          7,000.00               7,000.00
    Cost..-------.---   -   --------.------------- ------------------------                    5, 600. 29             5, 600. 29
    Expenditures---         ------------------------------------------                         5, 535. 49             5, 535. 49

Other new work data:
    Unobligated balance, June 30, 1952_____---------------            $440,585. 19
    Appropriated for fiscal year ending June 30, 1953------------ 460, 000. 00
    Unobligated balance available for fiscal year 1953--    ..--------- 900, 585. 19
                        10. GARZA-LITTLE ELM RESERVOIR, TEX.
   Location:---The improvement is located in Denton County, Tex., on
Elm Fork of Trinty River, 30 river miles above its confluence with
Trinity River and about 22 miles northwest of city of Dallas, Tex.
   Existing project.-The plan of improvement, a unit of the compre-
hensive plan for flood control in the Trinity River Basin, provides
for the construction of a single earth-filled dam and reservoir on Elm
Fork at a site below the existing Garza Dam. This reservior, desig-
nated as the Garza-Little Elm Reservoir, replaces the Little Elm Res-
ervior, the modified Garza Reservoir, and the Aubrey Reservoir. The
reservoir provides a storage capacity of 526,700 acre-feet for flood con-
trol, 436,000 acre-feet for conservation, and a sedimentation reserve of
53,500 acre-feet-a total of 1,016,200 acre-feet. Of the total conser-
vation storage 415,000 acre-feet are to be provided for the city of
Dallas: the incremental cost of which is to be borne by the city.
   The estimated cost (1952.) is $17,263,500 for construction and $7,381,-
500 for lands and damages, a total of $24,645,000, including $3,323,000
to be contributed by local interests. The estimated cost of annual
maintenance is $100,000 (1952).
   The existing project was authorized by the River and Harbor Act
940       REPORT      OF CHIEF OF ENGINEERS,                   U.    S. ARMY,       1952

approved March 2, 1945. (See H. Doc. 403, 77th Cong., 1st sess.,
which contains the latest published map.)
   Local cooperation.-Constructionof the project is subject to the con-
dition that local interests (city of Dallas) contribute the incremental
cost now estimated to be $3,323,000, for which they will receive 310,000
acre-feet of conservation storage. In addition, the city of Dallas will
convey sufficient interests over all lands comprising the existing reser-
voir and appurtenances now controlled by the city of Dallas, to insure
the proper operation and management of the project, the power to
control and limit development, including improvements existing on
Garza Dam, the reservoir lands, and appurtenances and the right to
breach Garza Dam in such manner and degree deemed necessary by the
United States for the Garza-Little Elm Reservoir and in exchange for
these rights and privileges the city of Dallas is to receive 105,000 acre-
feet of additional conservation storage in the Garza-Little Elm Res-
ervoir. To date, $500,000 has been contributed by the city of Dallas,
Tex.
   Operations and results during fiscal year.-Operations during the
fiscal year consisted of preparation of detailed plans and specifications,
completion of spillway excavation and second stage embankment, con-
tinuation of construction of the outlet works, continuation of relocation
of electric, telephone, and gas lines, and continuation of land acquisi-
tion.
   The total cost during the fiscal year, all for new work, was $3,743,-
079.38. Total expenditures were $3,316,203.58.
   Condition at end of fiscal year.-The existing project was 32 per-
cent complete. The preparation of plans and specifications was 75
percent complete, construction was 24 percent complete, and land
acquisition was 40 percent complete.
   Total cost under the existing project to June 30, 1952, was
$7,801,970.41 for new work. Total expenditures were $6,958,485.63.
   Proposed operations.-The unexpended balance at the end of the
fiscal year including accounts receivable, $2,810,409.24, plus an allot-
ment of $4,179,000 for fiscal year 1953, totaling $6,989,409.24, will
be applied as follows:
Accounts payable June 30, 1952 _              ---- ___---
                                                       -___-....                     $843, 779. 65
New work:
      Preparation of detailed plans and specifi-
        cations                            -------------            $192, 502. 12
      Continuation of relocation of electric, tele-
        phone, and pipelines by contract-----------          531, 651.34
      Continuation of relocation of highways and
        railroads by contracts __-----------__         -- 1, 331, 450. 00
      Relocation of cemeteries by contract- -------           70, 000. 00
      Continuation of construction of outlet works
        by continuing contract_----------                 1, 009, 353. 46
      Completion of construction of a portion of
        west embankment by continuing contract_                   573. 60
      Continuation of construction of spillway by
        continuing contract__- __------------.-              495, 772. 35
      Initiation of reservoir clearing by contract- ..       200, 000. 00
      Initiation of completion of embankment by
        continuing contract__ ---------                      334, 022. 00
      Combined minor features__--__----------                 25, 128. 58
      Continuation of land acquisition___      --- ..     1, 955, 176. 14
                                                                                    6. 145. 629. 59

        Total for all work------------------------------                     __     6, 989, 409. 24
                   FLOOD CONTROL---FORT                                    WORTH,              TEX.,           DISTRICT                   941
  The sums of $5,000,000 and $81,000 for new work and maintenance,
respectively, can be profitably expended for the following schedule
of work during fiscal year 1954:
New work:
   Preparation of detailed plans and specifications_..               $52, 100
   Completion of relocation of electric, telephone, and
     pipelines by contract_... ____         -
                                            ____-  ___-___            33, 000
   Completion of relocation of highways and rail-
     roads by continuing contract__----                    -_ ._____--
                                                                     940, 700
   Completion of construction of spillway by continu-
     ing contract--------------------------------                     20, 000
   Continuation of reservoir clearing by contract-- ----             200, 000
   Continuation of completion of embankment by
     continuing contract -.                       ______.____
                                            _______               1, 693, 600
   Combined minor features_- -          __--_-______
                                         --                           34, 100
   Continuation of land acquisition .--             __----- - 2, 005, 000
   Reservoir management facilities:
       Construct access roads by contract -----___              -      6, 500
   Public use facilities:
       Construct access roads and parking areas by
         contract ---------------------------------                    5, 300
       Construct latrines, trash receptacles, table and
          bench units, and fireplaces, by contract-------              9, 700'
                                                                                                                                 $5, 000, 000
Maintenance :
   Operations -----------------------------------                                                                42, 000
   Ordinary maintenance___________ ___ __ ____-                                                                  26, 000
    Participation in studies for reservoir operation,
      sedimentation, etc---------------------------                                                               13, 000
                                                                                                                                       81,000
           Total for all work---___-----------                                ----                              _                 5, 081, 000
                                                Cost and financial summary
                                                    UNITED STATES FUNDS

                                                                Fiscal year ending June 30                                       Total to June
                                                                                                                                30, 1952, includ-
                                                                                                                                ing fiscal years
                                           1948                1949             1950             1951               1952          prior to 1948

New work:
   Appropriated- _---_-                _ - __------ _-_ $500, 000. 00 $2,232,300.00 $3,000,000.00 $3,000,000.00                   $9, 268, 600.00
   Cost -...---------             -    $38, 974. 42 373, 541. 26 835, 645. 52 1, 944, 965. 17 3, 743, 079.38                       7, 301, 970.41
   Expenditures --                       36, 357. 04      354, 970. 32      829, 750. 65 1, 587, 857. 01 3,283, 992. 91            6, 458, 485. 63

Other new work data:
   Unobligated balance, June 30, 1952..___________
                                            ------         -$280.                                                                           99
    Appropriated for fiscal year ending June 30, 1953_.......                                                                  4, 179, 000. 00
    Unobligated balance available for fiscal year 1953--                                                                       4, 179, 280. 99
    Estimated additional amount needed to be appropriated for
      completion of existing project----------------------                                                                     7, 874, 400. 00
                                                     CONTRIBUTED FUNDS

                                                                Fiscal year ending June 30                                       Total to June
                                                                                                                                30, 1952, includ-
                                                                                                                                ing fiscal years
                                           1948                1949             1950             1951               1952          priorto 1948


New work:
   Appropriated .------.....          ...........------------ $500,000 -----------------------.------------.                           $500, 000
    Cost     ----------------------------------------- $500, 000. 00                                                                     500, 000
   Expenditures ------....---..------..----..---------......                ----------- 467, 789. 33            $32, 210. 67             500,000


Other new work data: Estimated additional amount needed to be
                                                 _ ____ ----
contributed for completion of existing project _-------      $2, 823, 000
     245554-53---vol. 1-60
942     REPORT   OF CHIEF OF ENGINEERS,       U.   S. ARMY,   1952

                    11. GRAPEVINE RESERVOIR, TEX.
     Location.-The improvement is located in Tarrant and Denton
  Counties, Tex., on Denton Creek, 11.7 river miles upstream from
  its confluence with the Elm Fork of the Trinity River and about 20
miles northwest of the city of Dallas, Tex.
     Existing project.-The plan of improvement, a unit of the com-
  prehensive plan for flood control in the Trinity River Basin, pro-
  vides for the construction of an earth dam approximately 12,850 feet
in length, including an uncontrolled concrete spillway 500 feet in
length, located in the left abutment. The dam has a maximum height
of 137 feet above the stream bed. The reservoir will provide a storage
capacity of 238,250 acre-feet for flood control, 161,250 acre-feet for
conservation purposes, and a sedimentation reservoir of 36,000 acre-
feet. The reservoir extends 22.2 miles upstream. The estimated cost
of the project (1952) is $8,683,900 for construction and $2,721,100 for
lands and damages, a total of $11,405,000, including $2,174,000 to be
contributed by local interests. The estimated cost of annual main-
tenance is $68,000 (1952).
     The existing project was authorized by the River and Harbor
Act approved March 2, 1945. (See H. Document 403, 77th Cong.,
1st sess.) The project document contains the latest published map.
    Local cooperation.-In accordance with the recommendation con-
tained in the project document, construction of the project is subject
to the condition that local interests (Park Cities) contribute $607,000
toward the cost of the project, for which they will receive 50,000 acre-
feet of conservation storage. The project also provided for an ex-
change of 75,000 acre-feet of storage between Grapevine and Lake
Dallas in order to secure additional flood-control storage in the modi-
fied Lake Dallas (Garza). This exchange is no longer required under
the new Elm Fork Reservoir plan consisting of the Grapevine and
Garza-Little Elm Reservoirs; however, the city of Dallas has re-
quested that the project include 85,000 acre-feet of conservation stor-
age for which the city of Dallas will pay the incremental cost now
estimated to be $1,567,000. To date, Park Cities have contributed the
entire amount required, $607,000, and the city of Dallas has contrib-
uted $1,300,000.
    Operations and results during fiscal year.-Operations during the
fiscal year consisted of continuation of preparation of detailed plans
and specifications, continuation of land acquisition, completion of re-
location of highways and railroads, completion of relocation of power
lines, completion of construction of embankment, and completion of
reservoir clearing.
    Routine maintenance was carried on from July 1951 to June 30,
1952.
    Total cost during the fiscal year for new work was $1,956,823.73,
including $318,763.53 from contributed funds, and $19,300 for main-
tenance, from regular funds. Total expenditures during the fiscal
year were $2,596,200.00 for new work, including $248,172.80 contrib-
uted funds, and $15,617.97 for maintenance, from regular funds.
    Condition at end of fiscal year.-The existing project was 83 percent
complete. Detailed plans and specifications were 94 percent com-
plete, land acquisition 85 percent complete, and construction 81 percent
complete.
            FLOOD     CONTROL--FORT WORTH,                TEX., DISTRICT               943
    The cost of new work under the existing project to June 30, 1952,
was $8,596,049.33 from regular funds and $839,263.53 from contributed
funds, a total of $9,435,312.86. Total expenditures for new work
were $9,227,037.34, including contributed funds of $768,672.80.
    Total cost of maintenance under the existing project to June 30,
1952, was $19,300.00, from regular funds. Total expenditures were
 $15,617.97.
    Proposed operations.-The unexpended balance at the end of the
fiscal year, including accounts receivable, June 30, 1952, $1,919,793.51,
:plus an allotment for fiscal year 1953 of $20,500 for maintenance, a
total of $1,940,293.51, will be applied as follows:
Accounts payable June 30, 1952_ -----------------------  __$711,                     957. 55
New work:
    Preparation of detailed plans and specifications- $29, 962. 64
    Completion of relocation of highways and rail-
      roads by contract_---------------------390,395. 92
    Completion of relocation of power lines by con-
      tract       ------------------------------------   4,438.97
    Completion of construction of outlet work and
      spillway by continuing contract----------              78.36
    Relocation of county roads ___-_
                                   -----------         200, 000. 00
    Construction of maintenance buildings and oper-
      ator's quarters by contract ------
    Install water supply system by contract-------
                                                    __----87,
                                                            610. 47
                                                        21, 255. 00
    Completion of reservoir clearing by contract            695. 32
    Combined minor features----------------------           693. 63
    Complete downstream slope protection by con-
      tract -------------------------------------        7, 796. 65
    Complete land acquisition------------------ 415, 909. 00
    Foundation grouting-----------------------          49, 000. 00
                                                                            1, 207, 835.96
Maintenance:
   Operations-_ -------------------------------               9, 073. 00
   Ordinary maintenance__--                   ____-__ ____    7, 509. 00
   Participation in studies for reservoir operation,
      sedimentation, etc------------------------              3, 918. 00
                                                                                20,500.00
       Total for all work---------            ----------------------- 1, 940, 293. 51
   The sums of $63,900 for new work and $63,500 for maintenance
can be profitably expended for the following schedule of work during
fiscal year 1954:
New work:
   Reservoir management facilities:
     Construct government boathouse by contract---------        $4,000
     Construct access roads by contract ------------------ 34, 900
   Public use facilities:
     Construct access roads by contract------ -------        --  5, 800
     Construct latrines, trash receptacles, table and bench
       units, and fireplaces by contract_ ___ -...-  __-         8, 300
   Construct water supply installation by contract--------       6, 000
   Construct boat launching ramps by contract ---------          4, 400
   Construct directional signs and markers by contract-- ---        500
                                                                                    $63, 900
Maintenance:
   Operations----------------               ------- ---------------    35, 000
   Ordinary maintenance____---- ------------                   __      19, 500
   Participation in studies for reservoir operation, sedimenta-
      tion, etc----------------------------                                9, 000
                                                                              ---    63, 500

       Total for all work       ----------------------                 -            127,400
944          REPORT             OF CHIEF             OF ENGINEERS,                      U.    S.       ARMY,       1952

                                            Cost and financial summary
                                                UNITED STATES FUNDS

                                                          Fiscal year ending June 30                                    Total to June
                                                                                                                       30, 1952, includ-
                                                                                                                       ing fiscal years
                                       1948             1949               1950           1951             1952          priorto 1948

New work:
    Appropriated- ....... $500,000. 00 $3,300,000.00 $3,500,000.00 $1,741,000.00 -$500.000.00                            $9,231,000.   00,
    Cost...----.-----------294, 920. 19 1, 017, 643. 83 2, 153, 382. 75 3, 314, 666. 43 1, 638, 060. 20                   8, 596, 049. 33
    Expenditures..--------   224, 412. 77 850, 654. 57 2, 174, 812. 01 2, 683, 103. 91 2, 348, 027. 20                    8, 458, 364. 54
Maintenance:
    Appropriated-- .... ...........----------------........------......----------.......-----...------.. 19, 300. 00          19, 300.00
    Cost .------------------                  ------------------------ ----------                        19, 300.00           19, 300. 00
    Expenditures -------........--
                             -----------                        ........... .......------------ 15, 617. 97
                                                  --...........--------...........                                            15, 617. 97


Other new work data:
   Unobligated balance, June 30, 1952-----        -  ---------
                                                            _-_                                                        $439, 933. 69-
   Unobligated balance available for fiscal year 1953_____ -                                                            439, 933. 69
                                                 CONTRIBUTED FUNDS


                                                         Fiscal year ending June 30                                     Total to June
                                                                                                                       30, 1952, includ--
                                                                                                                       ing fiscal years
                                       1948             1949              1950            1951            1952          priorto 1948

New work:
   Appropriated- ........        $1,000,000.00 __--------------------                  _------------ $907, 000.00        $1,907,000.00
    Cost.........
         -28,               .            492. 50 $343, 257. 96 $156, 249. 54             $2, 500. 00    318, 763. 53        839, 263. 53
    Expenditures....---------        28, 492. 50     343, 257. 96       138, 749. 54     10,000. 00     248, 172. 80        768, 672. 80


Other new work data:
    Unobligated balance, June 30, 1952_________________-__           $57, 800. 06
    Unobligated balance available for fiscal year 1953-----------     57, 800. 07
    Estimated additional amount needed to be contributed for com-
      pletion of existing project    -__-__-------_---------- -   -267, 000. 00
                                      12. DALLAS FLOODWAY, TEX.
   Location.-The floodway is located on Elm Fork and West Fork
of the Trinity River at Dallas, Tex.
   Existing project.-The plan of improvement, a unit of the com-
prehensive plan for flood control in the Trinity River Basin, provides
for the strengthening of the levees and the clearing of the floodway.
The estimated Federal cost of these modifications (1952) is $8,114,800,
and the estimated cost to local interests is $875,000, which includes
$300,000 cash contribution and $575,000 for lands and damages and
construction, a total of $8,989,800.
   The existing project was authorized by the River and Harbor Act
approved March 2, 1945. (See H. Doc. 403, 77th Cong., 1st sess.)
The latest published map is contained in the project document.
   River and Harbor Act approved May 17, 1950 (Public Law No.
516, 81st Cong., 2d sess.) modified this project so as to provide
improvements for interior drainage within the leveed areas.
   Local cooperaton.-See pages 4-5 for requirements. In addition
the project is authorized subject to the conditions that local interests
authorize and permit the modifications of the levees and floodways
at Dallas, remove or adjust all obstructing bridges and other utilities
and dam as required by the Secretary of the Army, prevent obstruc-
tions and encroachments from being placed in the floodway, construct
              FLOOD     CONTROL---FORT         WORTH,     TEX.,   DISTRICT             945
necessary improvements to the interior drainage facilities for the
-delivery of runoff to the pumps and sluices, and contribute $300,000
in cash toward the construction of the Turtle Creek pressure sewer
when and as required.
    Operations and results during fiscal year.-Operations during the
fiscal year consisted of preliminary investigations and engineering
studies necessary for preparation of detailed plans. Total cost during
the fiscal year was $74,521.30, all for new work from regular funds by
hired labor. Total expenditures were $78,220.58.
    Condition at end of fiscal year.--The existing project was 3 percent
complete. Preliminary investigations and design for preparation of
detailed plans were 85 percent complete. To complete the project,
surveys, soils investigations, and detailed design must be completed
and construction accomplished.
    Total cost under the existing project to June 30, 1952, was $281,-
040.60, all for new work from regular funds. Total expenditures were
$277,603.74.
    Proposed operations.-The unexpended balance at the end of the
fiscal year including accounts receivable, $58,951.33, plus an allotment
of $995,000.00 for fiscal year 1953, a total of $1,053,951.33, will be
applied as follows:
Accounts payable June 30, 1952-----------------------------                     $3, 521.31
New work:
    Engineering studies and design for preparation
      of detailed plans by hired labor_------                 $48, 959.40
    Preparation of detailed plans and specifications
      by hired labor ____            ____--------------       151, 470. 62
    Construction of pumping plant "A" by contract__ 272, 400. 00
    Construction of Noble's Branch diversion by
      contract --------------------------                      75, 500. 00
    Initiation of construction of Lake Cliff pressure
      sewer by continuing contract --------------              80, 000. 00
    Initiation of construction of Pavaho St. pumping
      station by continuing contract-                 ____- -  80, 000. 00
    Initiation of excavation of sump area by
      contract__----------------------------                  175, 000. 00
    Initiation of construction of Turtle Creek pres-
      sure sewer by continuing contract----------             167, 100. 00
                                                                             1, 050, 430. 02

       Total for all work ___ _           __--
                                         ----------------                    1, 053, 951. 33
  The sum of $3,000,000 can be profitably expended for the following
schedule of work during fiscal year 1954:
Preparation of detailed plans and specifications by hired labor------     $54, 300
Completion of Lake Cliff pressure sewer by continuing contract- -__.      156, 600
Completion of Pavaho St. pumping station by continuing contract ---        94, 400
Continuation of excavation of sump area by contract ____-         ___----100, 000
Continuation of Turtle Creek pressure sewer by continuing contract__ 1, 120, 000
Construction of Corinth St. sluice by contract____----                     33, 700
Initiation of construction of Hampton Rd. sluice by continuing
  contract------------------------------------------------                 60,000
Initiation of construction of first stage levees by continuing contract_. 762, 100
Initiation of extension of sewers and conduits by continuing contract_-   140, 000
Initiation of construction of second stage levees by continuing
  contract         ------------------------------------------------       386, 900
Initiation of spot sodding by contract            __-------------92,           000

       Total for all work ---------------------------               ----     _ 3, 000, 000
946         REPORT          OF CHIEF OF ENGINEERS,                                   U.     S. ARMY,              1952

                                         Cost and financial summary

                                                        Fiscal year ending June 30                                       Total to June
                                                                                                                        30, 1952, includ-
                                                                                                                        ing fiscal years
                                    1948              1949              1950              1951            1952            priorto 1948

New work:
   Appropriated_._------                  -__............
                                             ---          -------------              $61, 870. 62      $92, 600. 00         $336, 470. 62'
   Cost.---    _ _ _- _ _ ---   $30, 198. 58 $34, 950. 84            $1, 610. 32      44, 997. 45       74, 521. 30          281,040. 60
   Expenditures----___           28, 842. 70      36, 328. 13           1, 105. 97    38, 344. 25       78, 220. 58          277, 603. 74


Other new work data:
      Unobligated balance, June 30, 1952_ _______ _-_ _ ____-
                                                            _ ---                                                        $54, 973. 04
      Appropriated for fiscal year ending June 30, 1953_________-_                                                       995, 000. 00
      Unobligated balance available for fiscal year 1953______                                                        1, 049, 973. 04
      Estimated additional amount needed to be appropriated for
          completion of existing project ._________--                                            ---                  6, 783, 329. 3&

                                13. BENBROOK RESERVOIR, TEX.

   Location.--The improvement is located in Tarrant County, Tex.,
on Clear Fork of Trinity River, 15 river miles upstream from its
confluence with the West Fork of the Trinity River, about 10 miles
southwest of Fort Worth, Tex.
   Existing project.-The plan of improvement, a unit of the compre-
hensive plan for flood control in the Trinity River Basin, provides
for the construction of an earth-fill dam 9,130 feet in length, including
an uncontrolled concrete spillway 500 feet in length located in the
left abutment. The dam has a maximum height of 130 feet above
the stream bed. The reservoir provides a- storage capacity of 258,600
acre-feet, of which 170,350 acre-feet are for flood control, 72,500 acre-
feet for conservation storage and a sedimentation reserve of 15,750
acre-feet. The reservoir extends 10.6 miles upstream. The estimated
cost of the project (1952), is $9,023,700 for construction and $2,293,600
for lands and damages, a total of $11,317,300. The estimated cost of
annual maintenance is $65,000 (1952).
   The existing project was authorized by the River and Harbor Act
approved March 2, 1945. (See H. Doc. 403, 77th Cong., 1st sess.,
which contains the latest published maps.)
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.--Operations during the
fiscal year consisted of continuation of detailed plans and specifica-
tions, continuation of relocation of G. C. & S. F. Railway, completion
of reservoir clearing, initiation of relocation of Tarrant County roads,.
installation of radio telephone equipment, and continuation of land
acquisition.
   Routine maintenance and care were carried on from July 1951 to
June 30, 1952.
   Total cost of new work during the fiscal year was $864,696.80, all
from regular funds. Total expenditures were $1,267,306.90.
   Total cost of maintenance during the fiscal year was $18,438.89, all
from regular funds. Total expenditures were $17,457.29.
             FLOOD      CONTROL---FORT            WORTH,       TEX.,   DISTRICT            947
  Condition at end of fiscal year.-The existing project was 91 percent
complete. Detailed plans and specifications were 93 percent complete,
construction was 91 percent complete, and land acquisition was 93
percent complete.
  Total cost of new work under the existing project to June 30, 1952,
was $10,343,664.25 from regular funds. Total expenditures for new
work were $10,220,524.24.
  Total cost of maintenance under the existing project to June 30,
1952, was $18,438.89 from regular funds. Total expenditures for
maintenance were $17,457.29.
  Proposed operations.-The unexpended balance including accounts
receivable June 30, 1952, $1,098,659.22, plus an allotment of $21,000
during fiscal year 1953 for maintenance, a total of $1,119,659.22, will
be applied as follows:
Accounts payable June 30, 1952_____________________--------             $124, 646. 86
New work :
    Preparation of detailed plans and specifications__ $33, 670. 12
    Relocate G. 0. & S. F. Ry. by contract_----------- 574, 996. 05
    Relocate Tarrant County roads by contract------ 164, 907. 88
    Conversion of operators quarters by contract-----        9, 500. 00
    Relocation of minor electric and telephone utilities
      by contract-_------ --------------        ---------    2,494. 00
    Combined minor construction items____ _----_             2, 824. 44
    Construction of access road by contract--------- 10, 000. 00
    Land acquisition______ ---         _______-__               __-
                                                           174, 982.76
                                                                         973, 375. 25
Maintenance :
   Operations      ---------------------------------         8, 342, 00
   Ordinary maintenance------------------------               9,442.11
   Participation in studies for reservoir operation, sedi-
      mentation, etc_________---- --- ---         __--_      3, 853. 00
                                                                          21, 637. 11

      Total for all work_ ------------                           _-----__   --   1,119, 659. 22
   The sums of $53,000 for new work and $56,000 for maintenance can
be profitably expended for the following schedule of work during
fiscal year 1954:
New work:
   Reservoir management facilities:
       Construct Government boathouse by contract--------                   $4, 000
       Construct access*roads by contract--.....__       - -                29, 000
   Public use facilities:
       Construct access roads by contract --------------                     4, 900
       Construct latrines, trash receptacles, table and bench
         units and fireplaces by contract-----------------                   9, 600
       Construct water supply installations by contract ..                   4, 000
       Construct boat launching ramps by contract--------                    1,000
       Construct directional signs and markers by contract-                     500
                                                                                      $53, 000
Maintenance :
   Operations-----     --------------------------------                     25, 000
   Ordinary maintenance --------------                                      23, 000
   Participation in studies for reservoir operation, sedi-
      mentation, etc---------------------------------                        8, 000
                                                                                        56,000

      Total for all work_-----------------------------------                          109, 000
948          REPORT OF CHIEF OF ENGINEERS,                                         U.     S. ARMY,            1952

                                          Cost and financial summary

                                                        Fiscal year ending June 30                                  Total to June
                                                                                                                   30, 1952, includ-
                                                                                                                   ing fiscal years
                                      1948            1949            1950              1951          1952          prior to 1948

New work:
   Appropriated-......... $1,600,000.00 $3,200,000.00 $3,500,000.00 $1,947,000.00 $339, 000.00                      $11,317, 300.00
   Cost-----....   ----------.        538, 405.34 2, 437, 010. 31 4,023, 098. 40 2,156, 383. 70 864, 696. 80         10, 343,664. 25
   Expenditures --..------            455, 925. 57 1, 921, 923. 27 4, 284, 031. 461, 970, 129. 841, 267, 306. 90     10, 220, 524. 24
Maintenance:
   Appropriated----------------.........
   Cost---
                                                 -----............
                                                      ............-----
                          -----------------------------------------
                                                                                 -----------
                                                                            -----................... 19, 076. 00
                                                                                                     18, 438. 89
                                                                                                                          19, 076. 00
                                                                                                                          18, 438. 89
   Expenditures --                  -----------------------------------------                        17, 457. 29          17,457. 29


Other new work data :
       Unobligated balance, June 30, 1952_----------------                                                -----       $108,611
       Unobligated balance available for fiscal year 1953___----                                                       108, 611

                                 14. FORT WORTH FLOODWAY, TEX.

   Location.-The floodway is located on the West Fork and Clear
Fork of the Trinity River at Fort Worth, Tex.
   Existing project.--The plan of improvement, a unit of the com-
prehensive plan for flood control in the Trinity River Basin, pro-
vides for raising and strengthening the present levees with ma-
terial excavated from the channel and floodway, clearing the flood-
way of timber and debris, removing obstructions and enlarging bridge
opening by excavation in order to provide a safe capacity in the Clear
Fork portion of 60,000 second-feet and 95,000 second-feet in the West
Fork portion of the floodway downstream of the confluence of the
Clear and West Forks. The estimated Federal cost of this modi-
fication (1952), is $4,260,000. The estimated cost of non-Federal
Participation is $5,318,000.
   The existing project was authorized by the River and Harbor Act
approved March 2, 1945. (See H. Doc. 403, 77th Cong., 1st sess.) The
project document contains the latest published map.
   Local cooperation.-See pages 4-5 for requirements. In addition
the project is authorized subject to the conditions that local interests
authorize and permit the modification of the levees and floodways at
Fort Worth, remove or adjust all, obstructing bridges and other
utilities and dams as required by the Secretary of the Army and pre-
vent obstructions and encroachments from being placed in the flood-
way.
   Operations and results during fiscal year.-Operations during the
fiscal year consisted of preparation of detailed plans and specifications,
continuation of second stage channel excavation, continuation of
alterations to railroad and highway bridges, and initiation of third
stage channel excavation and drainage structures. Total cost during
the fiscal year, all for new work, was $613,721.17 from United States
funds and $20,000 from contributed funds. Total expenditures were
$472,946.94.
   Condition at end of fiscal year.-The existing project was 24 per-
cent complete. Preparation of detailed plans and specifications was
63 percent complete, and construction was 18 percent complete.
                FLOOD         CONTROL---FORT                WORTH,           TEX.,      DISTRICT                     949
   Total cost to June 30, 1952, was $1,038,779.39, all for new work.
Total expenditures were $873,723.87.
   Proposed operations.-The unexpended balance at the end of the
fiscal year including accounts receivable, $1,126,483.74, plus an allot-
ment of $697,000 from United States funds and $51,000 from con-
tributed funds for fiscal year 1953, totaling $1,874,483.74 will be
applied as follows:
Accounts payable June 30, 1952____--- _-----_______-                       __                            $167, 263.13
New work:
    Completion of preliminary studies and prepara-
      tion of detailed plans and specifications by
      hired labor--------------------------- $68, 764. 73
    Continuation of alteration of highway and rail-
      road bridges by contract__- ....             ____-__   -   682, 695. 65
    Completion of second stage channel excavation
      by contract__                           --
                                   __ -- __________---            24, 193. 92
    Continuation of third stage channel excavation
      by contract---------------------------_                    635, 195. 00
    Continuation of erection of project signs by hired
      labor -1------------------------------------                     80. 00
    Initiation of completion of main channel and
      levees by contract_ -- __------                      -__-- 296, 191. 31
                                                                                                        1, 707, 220. 61
        Total for all work                                                                              11,874, 483. 74
  The sum of $1,585,000 can be profitably expended for the following
schedule of work during fiscal year 1954:
New work:
   Preparation of detailed plans and specifications by hired labor_                                            $14, 000
     Completion of third stage channel excavation by contract-- -                                                17, 400
    Completion of erection of project signs by hired labor---------      100
    Completion of alteration of highway and railroad bridges by
      contract ----------------------------------------------          , 500
    Construction of Crestwood and Brookside Channels and levees
      by contract6------------------------------------------39,          000
    Completion of channel excavation by contract-......------       913,000

        Total for all work ---------------------------------                                               1,585, 000

                                      Cost and financial summary
                                          UNITED STATESFUNDS


                                                  Fiscal year ending June 30                               Total to June
                                                                                                          30, 1952, includ-
                                                                                                          ing fiscal years
                                  1948           1949          1950           1951          1952            prior to 1948


New work:
   Appropriated_ ...       .....
                           __               -___, ._____
                                       .__. __             -$500, 000. 00 $650, 000. 00 $700, 000. 00       $1, 978, 000. 00
   Cost--------------          $13, 357.88 $52, 212. 90      115, 065. 25 176, 333. 19 613, 721. 17          1, 018, 779. 39
   Expenditures.....--------. 13, 803. 72      51, 400. 68   112, 078. 82 175, 404. 71 452, 946. 94             853, 723. 87


Other new work data:
    Unobligated balance, June 30, 1952_ ____________         __                                            $2, 207. 61
    Appropriated for fiscal year ending June 30, 1953                         ------------                697, 000. 00
    Unobligated balance available for fiscal year 1953-----------                                         699, 207. 61
    Estimated additional amount needed to be appropriated for
      completion of existing project ___-                       - __------------                        1, 585, 000. 00
950       REPORT       OF CHIEF OF ENGINEERS,                  U.      S. ARMY,     1952

                               Cost and financial summary
                                    CONTRIBUTED FUNDS

                                          Fiscal year ending June 30                   Total to June
                                                                                       30, 1952, includ-
                                                                                       ing fiscal years
                             1948        1949        1950           1951     1952       priorto 1948


New work:
   Appropriated                                 ---------    ------------   $20, 000          $20,000
                                                                            $--------------------
   Cost     -------------------------------------------------------          20, 000             20, 000
   Expenditures-----            ......... ..---------
                       -----------------------------------                   20,000              20,000


Other new work data: Appropriated                  for fiscal year ending June
               _--$51,
                  --
   30, 1.953_ __...1   ------------                    1          -----                            000

                              15. BUFFALO BAYOU, TEX.
   Location.-These improvements are located on Buffalo Bayou, a
tributary of the San Jacinto River, in Harris County, west and north-
west of the city of Houston, Tex. (See U. S. G. S. quadrangle sheets
for Harris County.)
   Existing project.-This project assigned to Galveston district, see
page 920 of annual report for Galveston District for details:
              16. WHITNEY RESERVOIR, BRAZOS RIVER, TEX.
   Location.-The improvement is located on the Brazos River, Tex.,
about 442 miles above the mouth of the river, 5.5 miles southwest of
Whitney, Tex., and about 38 miles upstream from the city of Waco,
Tex. (See U. S. Geological Survey sheets; Waco, Cleburne, and
Grandbury, scale 1: 125,000, and Whitney, Blum, and Morgan, scale
1: 62,500.)
   Existing project.-The plan of improvement provides for a concrete
dam about 1,674 feet long at the top, including an 824-foot gate-con-
trolled spillway section; two earthen embankment sections totaling
8,201 feet; and saddle dikes 7,820 feet long. The top of the dam will
be about 167 feet above the river bed. The reservoir will have a
controlled storage capacity of 2,017,500 acre-feet, including 1,630,500
:acre-feet of flood control storage, 131,700 acre-feet of power storage,
and 255,300, acre-feet of dead storage. A powerhouse will be located
adjacent to the right bank immediately downstream from the non-
overflow section of the dam. The capacity of the initial installation
of hydroelectric generating facilities will be 30,000 kilowatts. The
project will afford substantial flood protection to the city of Waco,
Tex., and the lower Brazos River Valley and will provide for genera-
tion of hydroelectric power, and for other beneficial water uses.
   The estimated cost of the project (1952) is $36,104,700 for con-
struction and $5,402,800 for land damages, a total of $41,507,500. The
estimated cost of annual maintenance is $250,000 (1952).
   The Flood Control Act approved August 18, 1941, approved the
existing project in accordance with the recommendation of the Chief
of Engineers in House Document 390, 76th Congress, first session,
which contains the latest published maps, and authorized $5,000,000
for the initiation and partial accomplishment of the project. The
Flood Control Act approved December 22, 1944, authorized comple-
tion of this project.
           FLOOD CONTROL---FORT           WORTH, TEX.,       DISTRICT            951
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Operationsduring the
fiscal year consisted of continuation of detailed plans and specifica-
tions, continuation of construction of powerhouse and apppurtenant
equipment, continuation of relocation of railroads and county roads,
continuation of relocation of electric, telephone and pipelines, con-
tinuation of reservoir clearing, and continuation of land acquisition.
   Routine maintenance was carried on from July 1951, to June 30,
1952.
   Total cost during the fiscal year was $5,769,419.36 for new work and
$38,231.38 for maintenance, all from regular funds. Total expendi-
tures were $5,745,012.51 for new work and $35,562.65 for maintenance.
   Conditionat end of fiscal year.-The existing project was 92 percent
complete. Detailed plans and specifications were 97, land acquisition
92, and construction 89 percent complete.
   Total cost under the existing project to June 30, 1952, was $37,528,-
804.46 for new work and $38,231.38 for maintenance, all from regular
funds. Total expenditures were $36,674,095.75 for new work and
$35,562.65 for maintenance.
   Proposed operations.-The unexpended balance at the end of the
fiscal year including accounts receivable June 30, 1952, $4,670,342.75,
plus allotments of $174,000 and $110,000 for new work and maintenance
respectively, totaling $1,954,342.75, will be applied as follows:
Accounts payable June 30, 1952_______           ________-----------_ $1, 664,153. 32
New work:
    Preparation of detailed plans and specifications_    $49, 548. 17
    Completion of relocation of county roads by con-
      tract       --------------------------------- 152, 278. 65
    Construction of Blum access road by contract_        125, 000. 00
    Completion of relocation of telephone, electric,
      and pipelines by contract---___---                   9, 449. 75
    Completion of relocation of railroads by con-
      tinuing contract ______ ___--_______--             372, 747. 36
    Completion of construction of main dam and
      spillway by continuing contract------------             111.01
    Foundation grouting______     ________--  -      _    50, 000. 00
    Completion of powerhouse by contract-----          1,121,976.29
    Completion of supply of powerhouse equipment
      by contract-__ ________-_________---               731, 290. 52
    .Alterations to Whitney sewer plant by con-
      tract ---------------------------------             23, 000. 00
    Convert operator's quarters by contract -------       15, 000. 00
    Construct maintenance buildings by contract-          50, 000. 00
    Completion of reservoir clearing by contract--_        7, 001. 59
    Construct Kopperl levee by contract_----------        84, 250. 00
    Combined minor construction features                  17, 612. 71
    Completion of land acquisition___                    357, 949. 76
    Reservoir management facilities: Access roads
      by contract---------------------- ------             9, 805. 00
                                                                        3,977, 020. 81
Maintenance:
    Operations------------         -------------          65, 314. 00
   Ordinary maintenance__------------------               39, 375. 62
    Participation in studies for reservoir operation,
      sedimentation, etc----------      ------------       8, 479.00
                                                                          113, 168. 62

        Total for all work_ --------------------------------            4,954, 342. 75
952         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                    1952

  The sums of $115,000 and $296,000 for new work and maintenance,
respectively, can be profitably expended for the following schedule of
work during fiscal year 1954:
New work:
   Reservoir management facilities:
       Construct Government boathouse by contract..-------- $4, 000
       Access roads by contract _----_---------------        61, 000
   Public use facilities:
       Construct parking areas by contract-.____                , 000
                                                              9_____
       Construct latrines by contract___     __-_______-- --  9, 800
       Water-supply facilities by contract ________-----     12, 000
       Trash receptacles by contract----------------------        500
       Table and bench units by contract- .     ____--____    5,000
       Construct fireplaces by contract-------------------    2, 000
             Swimming beaches by contract_-                                -_---              -       4, 400
             Boat launching ramps by contract ________________-                                      6, 500
             Construct signs and markers by contract-------------                                       800
                                                                                                                    $115, 00
Maintenance:
   Operations    ------------------------------------                                               155, 000
   Ordinary maintenance_---- -----------              ______-_                                       32,300
   Extraordinary maintenance and repair_--_--------                                               - 108, 700
                                                                                                                      296, 000
                                   -
         Total for all work____________-                       _______-               __--                    -       411,000,

                                       Cost and financial summary

                                                    Fiscal year ending June 30                                    Total to June
                                                                                                             S39, 1952, includ-
                                                                                                              ing fiscal years
                          1948           1949             1950               1951                 1952          prior to1948

New work:
Appropriated___-- $5,200,000.00 $4,563,500.00       $10, 500, 000. 00        $14, 745. 00 3, 800, 000. 00        $41,333.500.00
Cost.---------.2, 162,117. 67 6, 307, 085. 35        13, 210, 795. 64     8, 689, 432. 11 5, 769, 419. 36         37, 528, 804. 46
Expenditures_ __ 1, 902, 960. 44 4, 931, 647. 97     12, 746, 912. 46    10, 004, 430. 06 5. 745, 012. 51         36,674,095.75
Maintenance:
                                           ------------                                              41, 400. 00
  Appropriated ....--......------------............---------------................-----.......--......            41, 400. 00
  Cost------------ ---------------                      ------------- ---------------                38, 231.38   38, 231.38
                                                                                                     35, 562. 65
  Expenditures-- ....------------...... .....----.............. .........----------------.......---------------.. 35, 562. 65


Other new work data:
    Unobligated balance, June 30, 1952_-     ---- _______---- -       $5, 101. 15
    Appropriated for fiscal year ending June 30, 1953                1-----000. 00
                                                                  -174,
    Unobligated balance available for fiscal year 1953-----------    179, 101. 15

                      17. BELTON RESERVOIR, LEON RIVER, TEX.

  Location.-The improvement is located on the Leon River about
16.7 miles above the confluence of the Leon and Lampasas Rivers, and
about 3 miles north of Belton, Bell County, Tex. (See U. S. Geo-
logical Survey base map, scale 1: 500,000 and U. S. Geological Survey,
Belton sheet, scale 1: 62,500.)
  Existing project.-The plan of improvement provides for a 1,300-
foot spillway and 3,806 feet of earthen embankment. The top of the
dam will be about 196 feet above the river bed. The reservoir will have
a controlled storage capacity of 1,097,600 acre-feet, including 887,000
acre-feet of flood control storage; 125,700 acre-feet of conservation
            FLOOD     CONTROL--FORT            WORTH,          TEX.,   DISTRICT       953
storage; and 84,900 acre-feet of dead storage. The project will afford
substantial flood protection to Leon River Valley from Belton Dam
site to confluence with Lampasas River; Little River Valley from con-
fluence of Leon and Lampasas Rivers (miles 101.7) to the mouth;
Brazos River Valley from Little River (miles 315.8) to the mouth.
   The estimated cost of the project (1952) is $9,742,000 for construc-
tion and $3,010,000 for lands and damages, a total of $12,752,000. The
estimated cost of annual maintenance is $77,000 (1952).
   The Flood Control Act of 1946, approved July 24, 1946, authorized
construction substantially in accordance with recommendations of the
Chief of Engineers, as contained in his report dated April 19, 1946,
at an estimated cost of $15,500,000.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, a pplies.
    Operations and results during fiscal year.-Operations during the
fiscal year consisted of continuation of detailed plans and specifica-
tions, continuation of land acquisition, continuation of construction
of the outlet works, continuation of relocation of highways, power
lines, and pipelines, initiation of relocation of cemeteries, and initia-
tion of completion of embankment and construction of spillway.
    Total cost during the fiscal year was $1,913,970.59, all for new work
from regular funds. Total expenditures were $1,083,927.34
    Condition at end of fiscal year.-The existing project was 36 percent
complete. Detailed plans and specifications were 82 percent complete.
Land acquisition was 35 percent complete. Construction was 30 per-
cent complete.
    Total cost to June 30, 1952, was $4,596,577.77, all for new work
from regular funds. Total expenditures were $3,568,925.31.
    Proposed operations.-The unexpended balance at the end of the
fiscal year, $5,332,774.69, plus an allotment of $2,488,000 during fiscal
year 1953, totaling $7,820,774.69, will be applied as follows:
Accounts payable June 30, 1952--_-....-...---.----                   _-     $1, 027, 652. 46
New work :
    Preparation of detailed plans and specifi-
      cations------------------------------                  $124, 148. 33
    Completion of outlet works and service bridge
      by contract __------_--------------                --     10, 204. 46
    Continuation of relocation of highways by
      contract_- ------    ___-    __-____1,                  972,441. 13
    Continuation of relocation of Atlantic Pipe-
      line by contract_     ___-----         -----------         6, 484. 01
    Continuation of relocation of cemeteries by
      contract.-------------------------------44,                   108. 13
    Relocation of powerlines by contract--------                39,996.75
    Continuation of construction of spillway and
      completion of embankment by continuing
      contract---------------------------                   2, 454, 920. 06
    Initiation of reservoir clearing by contract___            145, 000. 00
    Combined minor features----------------                     28, 929. 77
    Continuation of land acquisition----       ..-.         1,966, 889. 59
                                                                              6, 793,122. 23
       Total for all work-.        --------------------------------           7, 820, 774. 69
954      REPORT OF CHIEF OF ENGINEERS, U.                                     S. ARMY,        1952

  The sums of $1,120,000 and $66,000 for new work and maintenance,
respectively, can be profitably expended for the following schedule-
of work during fiscal year 1954:
New work:
    Preparation of detailed plans and specifications-            $28, 500
     Completion of relocation of highways by contract ..          44, 800
   Completion of relocation of power and telephone lines
     by contract ---------------------------------- 7, 000
   Completion of spillway and embankment by contin-
     uing contract-- -------------------------                   913,000
   Conversion of operators quarters by contract-------- - 10, 000
   Downstream slope protection by contract----------              10, 000
   Completion of reservoir clearing by contract ---------          5, 000
   Combined minor features__--- ---------                   -74,       500
   Completion of land acquisition _--..----.---     .6,        -       000
   Reservoir management facilities:
        Construct access roads by contract....-------------        6, 200
   Public use facilities:
        Construct access roads and parking areas by con-
          tract-,-------------------------                ----     5,300
        Construct latrines, trash receptacles, table and
          bench units and fireplaces by contract---------.           , 700
                                                                                                   $1, 120, 000'

Maintenance :
   Operations ----------------------------------                                     34, 000
   Ordinary maintenance____---------                           ----------            32, 000
                                                                                                       66, 000
       Total for all work_                                   __---                   _........__ -1,186, 000
                                   Cost and financial summary

                                               Fiscal year ending June 30                          Total to June
                                                                                                   30, 1952. includ-
                                                                                                   ing fiscal years
                                1948          1949         1950             1951       1952         prior to 1948

New work:
   Appropriated-........   $150, 000.00 $500, 000.00 $1,488,200.00 $2,763;500.00 $4,000,000.00       $8, 901, 700. 00
   Cost...----------------   82, 702. 50 258, 498.07 651, 207.04 1, 690, 199. 57 1, 913, 970. 59      4, 596, 577. 77
   Expenditures--------- 70, 258. 50 254, 648. 72 571, 068. 52 1, 589, 022. 53 1, 083, 927. 34        3, 568, 925. 31


Other new work data:
   Unobligated balance, June 30, 1952_____________                     -______-
                                                                      -$726.  67
    Appropriated for fiscal year ending June 30, 1953-----------2, 488, 000. 00
    Unobligated balance available for fiscal year 1953            2, 487, 273.33
    Estimated additional amount needed to be appropriated for
      completion of existing project-.       _____-----           1, 362, 300.00
                        18. MILL CREEK, BRAZOS RIVER, TEX.
  Location.- These improvements are located on Mill Creek, a peren-
nial stream which has its source about 3.5 miles west of Belleville,
Tex., and flows generally southeast about 18.9 miles to its confluence
with the Brazos River at a point 151.9 miles above the mouth.
  Existing project. The plan of improvement provides for enlarge-
ment of creek channel to a minimum bottom width of 50 feet, removal
of all snags and timber from source to mouth, and improvement of
channel alignment.
  Principal benefits to be derived would be the restoration of aban-
doned farm lands and protection from floods for presently cultivated
lands.
                      FLOOD           CONTROL--FORT                     WORTH,           TEX.,     DISTRICT                  955
   The estimated Federal cost for construction (1952) is $581,000;
the estimated cost to local interests including lands and damages is
$38,400, a total of $619,400.
   The existing project was authorized by River and Harbor Act
approved July 24, 1946. (See H. Doc. 707, 79th Cong., 2d sess.)
   Local cooperation.-See pages 4-5 for requirements.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was approxi-
mately 4 percent complete. Preliminary investigations and engi-
neering studies were 100 percent complete.
   Total cost under the existing project to June 30, 1952 was $24,753.14,
all for new work from regular funds. Total expenditures were
$24,753.14.
   Proposed operations.-No work is proposed for fiscal years 1953
and 1954.
                                                Cost and financial summary

                                                                Fiscal year ending June 30                          Total to June
                                                                                                                   30, 1952, includ-
                                                                                                                   ing fiscal years
                                            1948              1949         1950          1951          1952         prior to 1948


New work:
   Appropriated.--------.......       ------------                      $25, 000. 00..    .. _ _       -$246. 86        $24, 753. 14
   Cost .__......               ------------------------                 23, 865. 56     $887. 58 -- -                   24, 753. 14
   Expenditures-         --------------.......          .----------      24, 723. 22        29. 92 ----------            24, 753. 14


Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project------__-___ $556, 246. 86

                  19. HORDS CREEK RESERVOIR, PECAN BAYOU, TEX.

   Location.-The improvement is located on Hord's Creek, a tribu-
tary of Pecan Bayou, about 13.5 creek miles west of Coleman, Tex., and
about 27.8 miles upstream from the mouth of Hords Creek. (See
U. S. Geological Survey sheets, Grosvenor and Zephyr, scale 1: 62,500.)
   Existing project.-The plan of improvement provides for construc-
tion of a compacted earth-fill dam approximately 6,300 feet in length
with a maximum height of 91 feet; and a crown of 24 feet; semi-
automatically controlled outlet works and uncontrolled channel spill-
way; and water supply appurtenances consisting of an approach
channel, intake structure and a 24-inch water line through the dam.
   The reservoir provides a storage capacity of 25,310 acre-feet, of
which 2,860 acre-feet is allocated to dead storage, 5,780 acre-feet to
conservation storage, and 16,670 acre-feet to flood contral storage.
   The project is part of the plan of improvement on Pecan Bayou
for flood control and allied purposes. It affords substantial flood
protection to the city of Coleman, Tex., and to agricultural lands in
the Hords Creek Valley, and provides municipal water supply for the
city of Coleman.
   The estimated cost of the project (1952) is $1,954,800 for construction
and $223,000 for lands and damages, a total of $2,177,800 excluding
$105,078.69 contributed by local interests. The estimated cost of
annual maintenance is $48,000 (1952).
956    REPORT    OF CHIEF OF ENGINEERS,        U.   S. ARMY,     1952

   The Flood Control Act approved August 18, 1941, authorized the
plan of improvement for flood control and allied purposes on Pecan
Bayou and tributaries set forth in House Document 370, Seventy-
sixth Congress, first session, and authorized $1,400,000 for initiation
and partial accomplishment of the plan of improvement. The Flood
Control Act approved December '22, 1944, authorized completion of
the plan.
   Local cooperation.-Fullycomplied with.
   Operations and results during fiscal year.-Operations during the
fiscal year consisted of continuation of foundation grouting, continua-
tion of land acquisition, and installation of radio telephone equipment.
   Routine maintenance was carried on from July 1951 to June 30,
1952.
   Total cost during the fiscal year was $26,889.93 for new work and
$22,430.34 for maintenance, all from regular funds.
   Total expenditures were $14,362.71 for new work and $23,197.24
for maintenance, all from regular funds.
   Condition at end of fiscal year.-The existing project was 99 percent
complete. Land acquisition was 92 percent complete. The project
was placed in operation during June 1948.
   Total cost of new work under the existing project to June 30, 1952,
Svas $2,157,921.58 Federal funds and $105,078.69 contributed funds,
a total of $2,263,000.27. Total expenditures for new work were
$2,250,204.70, including contributed funds of $105,078.69.
   Total cost of maintenance under the existing project to June 30,
1952, was $67,882.96 from regular funds. Total expenditures were
$68,433.70.
   Proposed operations.-The unexpended balance June 30, 1952, $32,-
810.29, plus allotments for fiscal year 1953 of $17,000 for maintenance,
totaling $49,810.29, will be applied as follows:
Accounts payable June 30, 1952----------------------------$12,           829. 83
New work:
    Foundation grouting ------------ -------------  $14, 171. 86
    Land acquisition-----------------------------      5, 716. 56
                                                                      19, 888. 42
Maintenance :
   Operations       ----------------------------------   7, 043.00
   Ordinary maintenance-------------------- ---          8, 277. 00
    Participation in studies for reservoir operation,
      sedimentation, etc------------------------         1, 772. 04
                                                                      17, 092. 04
        Total for all work_----   ----------------------------- 49, 810. 29
  The sums of $32,500 and $31,000 for new work and maintenance,
respectively, can be profitably expended for the following schedule
of work during fiscal year 1954:
                     FLOOD             CONTROL---FORT                            WORTH,         TEX.,          DISTRICT                   957

New work:
   Reservoir management facilities:
       Construct access roads by contract         _----__-- -- $17, 500
   Public use facilities:
       Construct latrines, trash receptacles, table and bench
         units and fireplaces by contract__-- ------------     - 6, 300
       Construct water supply installation by contract------     6, 600
       Construct boat launching ramps by contract-.--__-         1, 500
       Construct directional signs and markers by contracts_.       600
                                                                                                                                     $32,500
Maintenance:
   Operations------- --  --------------------------                                                                     22, 000
   Ordinary maintenance------------------------------                                                                    9, 000
                                                                                                                                       31, 000

          Total for all work ....--------                                 --------------------                                      -..63, 500

                                                  Cost and financial summary

                                                                   Fiscal year ending June 30                                   Total to June
                                                                                                                               30, 1952, includ-
                                                                                                                               ing fiscal years
                                             1948                1949              1950           1951            1952          priorto 1948

New work:
   Appropriated ........ $1,302,800.00 $281, 000.00 ...--------- -$36, 190. 00                                  $13,000.00      1 $2, 177,810.00
   Cost--...-.----    ... 1, 233, 395. 80 182, 403. 56 $82, 842. 13 27, 571. 60                                  26, 889. 93     1 2, 157, 921. 58
   Expenditures-.........1, 149, 020.95 275, 131.39     81, 102. 92 32, 618. 97                                  14, 362. 71     12,145, 126.01
Maintenance:
                     ........
    Appropriated--------              --........----------------............ -    28, 500. 00    16, 960. 00     23, 100. 00          68, 560. 00
    Cost--------------------------  ........................                      27, 399. 33    18, 053.29      22, 430. 34          67, 882. 96
    Expenditures...------....------------............           ---------         27, 492. 81    17, 743. 65     23, 197. 24          68, 433. 70


Other new work data:
    Unobligated balance, June 30, 1952_--__-__----,__-----                                                                       $6, 888.42
    Unobligated balance available for fiscal year 1953_ _-.--- -                                                                 19, 888. 42
  1 Excludes $105,078.69 contributed funds.


            20. LAKE BROWNWOOD RESERVOIR, PECAN BAYOU, TEX.

   Location.-The improvement is located on Pecan Bayou near
Brownwood, Tex., 57.1 miles above the mouth of Pecan Bayou. (See
U. S. Geological Survey sheets, Brownwood, Coleman, and Ballinger,
scale, 1: 125,000.)
   Existing project.-This project is part of the plan for improve-
ment on Pecan Bayou for flood control and allied purposes; it would
afford substantial flood protection to the city of Brownwood and for
the valleys of Pecan Bayou and the Colorado River; it also would
provide additional conservation storage. The plan of improvement
provides for enlargement of the existing earth fill dam and better-
ment of the existing spillway at Lake Brownwood on Pecan Bayou,
Tex.; raising and strengthening the existing dam; installation of
spillway gates and protection against further deterioration of the
present spillway channel. These measures would provide an addi-
tional 17,000 acre-feet of conservation storage, 238,000 acre-feet of
controlled flood storage, and 309,000 acre-feet of storage above the
controlled spillway.
   The estimated cost of the project (1952) is $12,342,000 for construc-
tion and $2,090,000 for lands and damages, a total of $14,432,000.
          245554-53-vol. 1--                         61
958         REPORT OF CHIEF OF ENGINEERS, U.                                   S. ARMY,            1952

   The Flood Control Act approved August 18, 1941, authorized the
plan of improvement for flood control and allied purposes on Pecan
Bayou and tributaries set forth in House Document 370, Seventy-sixth
Congress, first session, and authorized $1,400,000 for initiation and
partial accomplishment of the plan. The Flood Control Act ap-
proved December 22, 1944, authorized completion of the plan of
improvement.
   Local coo peration.-This project was adopted subject to the provi-
sion that the local agency owning and controlling Lake Brownwood
permit the United States to utilize, without cost, the existing dam,
reservoir, and appurtenant works, and any of its lands needed for the
construction and operation of the enlarged dam and spillway, and
maintain and operate the enlarged reservoir upon completion in
accordance with regulations prescribed by the Secretary of the Army.
   Operations and results during fiscal year.-Operations during the
fiscal year consisted of office studies necessary for the preparation of
detailed plans.
   Total cost during the fiscal year was $58.67, all for new work from
regular funds by hired labor. Total expenditures were $750.89.
   Condition at end of fiscal year.-Preliminary surveys, subsurface
investigations, and office studies were 71 percent complete. To com-
plete the project detailed plans must be completed and construction
accomplished.
   Total cost under the existing project to June 30, 1952, was $190,-
444.61, all for new work from regular funds. Total expenditures were
$190,444.61.
   Proposed operations.-No work is proposed for fiscal years 1953
and 1954.
                                  Cost and financial summary

                                                 Fiscal year ending June 30                              Total to June
                                                                                                       . 30, 1952, includ-
                                                                                                        ing fiscal years
                              1948             1949          1950          1951            1952           prior to1948

New work:
   Aoropriated..........------------      -----------------.........------------
                                                          ......................       -$54,755.39           $190, 444. 61
   Cost--end-.......... $14, 468. 95        $14, 786. 79   $6, 288. 19   $6, 284. 93          58. 67          190, 444. 61
   Expenditures--------     12, 725. 25      16, 659. 35    6, 538. 19    6,844. 49       -750. 89            190, 444.61


Other new work data: Estimated additional amount needed to
be appropriated for completion of existing project---------- $14, 241, 555. 39

      21. SAN ANGELO RESERVOIR, NORTH CONCHO RIVER, TEX.

   Location.--This improvement is located on the North Concho River,
a tributary of the Concho River, about 6.6 miles above the mouth of
the North Concho River near the city of San Angelo, Tex. (See U. S.
Geological Survey base map, Texas, scale 1: 500,000, and sheet wall,
scale 1: 62,500.)
   Existing project.-The plan of improvement provides for the con-
struction of the San Angelo Reservoir on the North Concho River
upstream from San Angelo for the control of floods and the conserva-
tion of water.
            FLOOD    CONTROL--FORT         WORTH,      TEX.,   DISTRICT          959
   The dam is of earth-filled type with an uncontrolled concrete spill-
way located in a draw to the south of the dam. The maximum height
of the dam is 128 feet above the valley floor. The reservoir has a total
capacity of 391,500 acre-feet, of which 33,900 acre-feet is allocated to
dead storage, 80,400 acre-feet to conservation storage, and 277,200
acre-feet to flood control storage.
   The reservoir provides substantial flood protection to the flood plains
of the Concho and lower Colorado Rivers and to the city of San
Angelo.
   The estimated cost of the project (1952) is $11,336,700 for construc-
tion and $3,508,400 for lands and damages, a total of $14,845,100. The
estimated cost of annual maintenance is $65,000 (1952).
   The Flood Control Act approved August 18, 1941, authorized the
plan of improvement for flood control on the North Concho River,
Tex., as set forth in House Document 315, 76th Congress, 1st session,
and, authorized $2,000,000 for the initiation and partial accomplish-
nient of the project. The Flood Control Act approved December 22,
1944, authorized completion of this project.
   Local cooperation.-See pages 4-5 for requirements.
   Section 2 of the Flood Control Act approved June 28, 1938, applies
to the San Angelo Reservoir.
   Operations during fiscal year.--Operations during the fiscal year
consisted of completion of railway relocation, completion of relocation
of Humble Pipe Line, initiation of relocation of Tom Green County
roads and continuation of land acquisition.
   Total cost during the fiscal year for new work was $887,948.90, and
$25,439.77 for maintenance from regular funds. Total expenditures
d-uring the fiscal year were $2,211,928.16 for new work, and $23,777.89
for maintenance, from regular funds.
   Condition at end of fiscal year.-The existing project was 97 percent
complete. Detailed plans and specifications were 95 percent complete,
construction was 99 percent complete, and land acquisition was 96
percent complete.
   Total cost of new work under the existing project to June 30, 1952,
was $14,340,372.54 from regular funds. Total expenditures for new
work were $14,234,225.37.
   Total cost of maintenance under the existing project to June 30,
1952, was $25,439.77 from regular funds. Total expenditures were
$23,777.89.
   Proposed operations.-The unexpended balance at the end of the
fiscal year, including accounts receivable, $619,427.59, plus an allot-
ment for fiscal year 1953 of $21,000 for maintenance will be applied as
follows:
Accounts payable June 30, 1952 ......    -     -       -__...
                                                      __________           $111, 551.16
New work:
    Preparation of detailed plans and specifications.__      $19, 375. 25
    Relocation of Tom Green County roads by contract_          18, 455.00
    Construction of maintenance facilities by contract_        45, 800. 00
    Foundation grouting-------------------------               26, 000. 00
    Downstream slope protection by contract..-----            - 7, 100. 00
    Combined minor construction features------------               287. 51
   Land acquisition.------------------------                387, 598. 44
                                                                           504, 616. 20
960             REPORT               OF CHIEF OF ENGINEERS,                                            U.      S. ARMY,            1952

Maintenance:
   Operations      ------------------------------                                                                  $10, 543.00
   Ordinary maintenance- .-----------------------                                                                    10, 293. 00
   Participation in studies for reservoir operation,
      sedimentation, etc_ --------------------------                                                                   3, 424. 23
                                                                                                                                        24, 260. 23
            Total for all work                                                                                                        640,
                                                                                                                                      6--------------------------------
                                                                                                                                            427. 59
  The sums of $31,000 for new work and $50,000 for maintenance can
be profitably expended for the following schedule of work during fiscal
year 1954:
New work :
   Reservoir management facilities:
       Construct access road by contract-----------------$26, 000
   Public use facilities:
       Construct latrines, trash receptacles, table and bench
          units and fireplaces by contract------ ------------- 4, 400
   Directional signs and markers by contract----------------      600
                                                                                                                                           $31, 000
Maintenance :
        Operations .--.----.     ------------------------------                                                                  27, 000
        Ordinary maintenance----------...........--.. -----------------                                                          23, 000
                                                                                                                                             50, 000
            Total for all work--...----..----------------..----------------                                                                  81, 000

                                                    Cost and financial summary

                                                                     Fiscal year ending June 30                                       Total to June
                                                                                                                                      30, 1952, includ-
                                                                                                                                      ing fiscal years
                                               1948                1949               1950                  1951          1952         prior to 1948


New work:
   Appropriated                               $1,000.000.0000.
                                       --.........                         .00 $3,900,000.00 $2,500,000.00 $1,200,000.00               $14, 845 100.00
   Cost............---------------.....           941, 243. 93 2, 167, 746. 92 5, 26, 775. 25 4, 616, 781.471 887. 48. 90               14. 340, 372. 54
   Expenditures-----......---.                    907, 369. 73 1,842, 390.72 4, 800, 941.51 4,052, 350.75 2, 211,           928.
                                                                                                                              16        14, 234,225.37
Maintenance:
   Appropriated----------------........                --............-      ...-----------          ............
                                                                                    ....-----------......----------- 28, 700. 00             28, 700. 00
      Cost----------------------------------------------............ ............--     ............        --------     25, 439.77          25, 439.77
      Expenditures....................-----------------------------------------------                                    23, 777. 8          23, 777.89


Other new work data:
   Unobligated balance, June 30, 1952---      ------------------ $240, 889.67
   Unobligated balance available for fiscal year 1953----------......... 240, 889. 67

                                 22. NAVIDAD AND LAVACA RIVERS, TEX.

  Location.-Lavaca River rises in south central Texas and flows
southeasterly 112 miles into Lavaca Bay, an arm of Matagorda Bay
which is connected with the Gulf of Mexico through Pass Cavallo.
Navidad River is the principal tributary of Lavaca River and flows
southeasterly about 109 miles to the junction about 11 miles above the
mouth of Lavaca River.
   Existing project.-The plan of improvement provides for flood
control on the Lavaca River at Hallettsville consisting of an improved
channel 14,089 feet long from a point about 1.6 miles downstream of
Hallettsville to a point about 1.1 miles upstream of the city, with pro-
tective works to the Southern Pacific Railroad bridge and alterations
to the Second Street low water bridge and to three utility lines cross-
                    FLOOD CONTROL---FORT                       WORTH, TEX., DISTRICT                               961
ing the stream in this reach; and channel clearing, straightening, and
enlargement for flood control upstream on the Lavaca and Navidad
Rivers. The estimated Federal cost of the project (July 1952) is
$245,000 for the Hallettsville unit and $461,000 for the general channel
unit a total of $706,000.
   The River and Harbor Act approved March 2, 1945, authorized the
plan of improvement of the Lavaca and Navidad Rivers, Tex., for
flood control and allied purposes in accordance with the plan set forth
in House Document 659, 77th Congress, second session.
   Local cooperation.--Localinterests are required to provide, without
cost to the United States, all lands, easements, and rights of way for
the improvements and hold and save the United States free from
claims for damages resulting from construction of the work; and it
is further provided that relocation of the railroad bridge by the United
States shall not be undertaken until locl interests furnish assurances
satisfactory to the Secretary of the Army that they will make the neces-
sary alterations to the highway bridge in the vicinity of Hallettsville
without cost to the United States, and maintain and operate the im-
provements in that vicinity in accordance with regulations prescribed
by the Secretary of the Army. The Lavaca County Flood Control
District has furnished necessary assurances of local cooperation for the
Hallettsville unit of the project which were accepted by the Chief of
Engineers on August 31, 1949.
   Uperations and results during fiscal year.-None.
   Condition at end of fiscal year.-The existing project was 6 percent
complete. Definite design studies for the Hallettsville unit were com-
plete. Definite design studies for the general channel unit were 50
percent complete.
   Total cost under the existing project to June 30, 1952, was $43,129.38,
all for new work from regular funds. Total expenditures were
$43,129.38.
   Proposedoperations.-Nowork is proposed for fiscal years 1953 and
1954.
                                           Cost and financial summary

                                                       Fiscal year ending June 30                         Total to June
                                                                                                         30,1952, includ-
                                                                                                         ing fiscal years
                                        1948         1949          1950          1951         1952        prior to 1948

New work:
   Appropriated--------------                   ----------------------         $1,870.62 -           -        $43,129.38
   Cost--------------                $16,395.05      $5,680.88     $53.73    ------------------------          43, 129.38
   Expended-.....---..-------.....     16, 713. 84    4, 996. 60    52. 85                                      3,129. 38
                                                                                                               4------------------------


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project------------  $662, 870. 62

                  23. CANYON RESERVOIR, GUADALUPE RIVER, TEX.

  Location.-The improvement is located in Comal County, Tex., on
the Guadalupe River, 303 miles above its mouth, and about 33 miles
northwest of New Braunfels, Tex.
962        REPORT            OF CHIEF               OF ENGINEERS,                 U. S.          ARMY,       1952

   Existing project.-The plan of improvement provides for the con-
struction of an earth-fill dam 6,990 feet long, consisting of a main
dam 4,540 feet long, a gate controlled concrete gravity saddle spill-
way 896 feet long, and dikes totaling 1,554 feet. Maximum height
of dam is 237 feet above the river bed. The reservoir will have a
total storage capacity of 1,144,800 acre-feet, including 337,700 acre-
feet of flood control storage, 445,100 acre-feet for conservation stor-
age and possible future power development, and 362,000 acre-feet of
dead storage. The power installation will have a total installed
capacity of 45,000 kilowatts.
   The estimated Federal cost of the project (1952) is $29,927,200
for construction and $1,989,800 for lands and damages, a total of
( 31,917,000.
   The existing project was authorized by the River and Harbor
Act approved March 2, 1945 (H. Doc. 247, 76th Cong., 1st sess.) sub-
ject to the following provision:
  That whenever any power project, not under Federal license, is benefited
by the Canyon Reservoir project, the Federal Power Commission after notice.
to the owner or owners of such unlicensed project and after opportunity for
hearing, shall determine and fix a reasonable and equitable annual charge to
be paid to the United States, on account of such benefits by said owner or
owners or other recipients of such benefits.
   The latest published map is in the project document.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Operationsduring the
fiscal year consisted of office studies necessary for preparation of de-
tailed plans.
   Total cost during the fiscal year was $5,120.82, all for new work;
from regular funds. Total expenditures were $4,499.41.
   Condition at end of fiscal year.-The existing project was approxi.
mately 2 percent complete. Preliminary investigations and en-
gineering studies were 100 percent complete. The preparation of
detailed plans and specifications was 9 percent complete.
   Total cost under the existing project to June 30, 1952, was
$555,828.25, all for new work from regular funds. Total expendi-
tures were $555,828.25.
   Proposed operations.-No work is proposed for fiscal years 1953
and 1954.,
                                            Cost and financial summary

                                                         Fiscal year ending June 30                              Total to June
                                                                                                                30, 1952, includ
                                                                                                                ing fiscal years
                                      1948             1949           1950           1951           1952         prior to: 1948

New work:
   Appropriated.........          $25, 000. 00      $90, 000. 00 $150, 000. 00 . $56, 100. 00     -$871.75          $555, 828. 25
   Cost.---------------           - 92,   209. 53    81, 784.44    150, 121.83    104,992. 44      5, 120.82         555, 828. 25
   Expenditures--------........     91, 872. 86      74, 651. 22   154, 007. 72   110, 102. 10     4, 499. 41        555, 828. 25


Other new work data: Estimated additional amount needed to be                                                                     :J
  appropriated for completion of existing project-----------$31, 361, 171.                                                   75i
            FLOOD    CONTROL--FORT       WORTH,     TEX.,   DISTRICT               963
24. SMALL FLOOD CONTROL PROJECTS NOT SPECIFICALLY AUTHOR-
  IZED BY CONGRESS, UNDER AUTHORITY OF SECTION 205 OF THE
  FLOOD CONTROL ACT APPROVED JUNE 30, 1948, AS AMENDED
   Section 205 of the Flood Control Act approved June 30, 1948, as
amended by section 212 of the Flood Control Act approved May 17,
1950, authorized the allotment from any appropriations heretofore
or hereafter made for flood control, not to exceed $3,000,000 for any
one fiscal year, for construction of small flood-control projects not
specifically authorized by Congress, and not within area intended to
be protected by projects so authorized which come within the provi-
sions of section 1 of the Flood Control Act of June 22, 1936, when
in the opinion of the Chief of Engineers such work is advisable:
Provided, That not more than $150,000 shall be allotted for this
purpose at any single locality from the appropriations for any one
fiscal year: Provided further, That the provisions of local cooperation
specified in section 3 of the Flood Control Act of June 22, 1936, as
amended, shall apply: And provided further, That the work shall
be complete in itself and not commit the United States to any addi-
tional improvement to insure its successful operation, except as may
result from the normal procedure applying to projects authorized
after submission of preliminary examination and survey reports.
   Pursuant to these authorities an initial allotment of $93,700 was
made in fiscal year 1951 for a flood-protection project at Pleasanton,
Tex. This project is located at Pleasanton, Atascosa County, Tex.,
on the Atascosa River approximately 56 miles above its confluence with
the Nueces River and 33 miles south of San Antonio, Tex., and pro-
vides for channel enlargement along the Atascosa River for a distance
of 16,385 feet and along Bonita Creek for a distance of 3,900 feet,
clearing the channel of the Atascosa River of brush and small growing
timber from river mile 53 to river mile 57.1, an earth levee, 1,970 feet
long, along the left bank of Bonita Creek, and scour protection in
the excavated channel of the Atascosa River at the Missouri Pacific
Railroad bridge, U. S. Highway 281 bridge, and the county highway
bridge. The estimated Federal cost for construction, revised in 1952,
is $120,600; the estimated cost to local interests including lands and
damages is $22,900, a total of $143,500.
   Total cost under the existing project to June 30, 1952, was $22,259.41,
all for new work from regular funds by hired labor. Total expendi-
tures were $22,661.37.
   The unexpended balance at the end of the fiscal year including
accounts receivable, $71,440.59, plus an allotment of $26,900 during
fiscal year 1953 will be applied as follows:
Accounts payable June 30, 1952 ------------------------------                    None
New work:
    Preparation of detailed plans and specifications by
      hired labor--------------        ---------------- $1,440. 59
    Alter S. A. U. & G. RR. bridge by contract--------
                                                     ...      510.00
    Clearing, channel excavation, levee construction
     and bridge protection by contract----------         095, 790. 00
    Grassing of levee by contract_ .   .      ---...........  600.00

      Total for all work--_                                              $98, 340. 59
                                                                  .-------------------------------
  This project is scheduled for completion in fiscal year 1953.
964          REPORT           OF     CHIEF          OF ENGINEERS,                 U.     S.     ARMY,       1952


                                           Cost and financial summary

                                                         Fiscal year ending June 30                                Total to June
                                                                                                                  30,1952, includ-
                                                                                                                  ing fiscal years
                                       1948             1949         1950              1951         1952            priorto 1948


New work:
   Appropriated......... ............ ----------............-----------............ -- $93, 700.00 ------------        $93, 700. 00
   Cost---
       .......        ------------
                       .               ------------ ----------.. 11,848. 75 810, 410.66                                 22, 259. 41
    Expenditures-......... ............           ............    ...........     11, 797.94      10, 863. 43           22, 661.37


Other new work data:
       Unobligated balance, June 30, 1952-----------------------------                                            $70, 972. 73
       Appropriated for fiscal year ending June 30, 1953______                                                     26, 900.00
       Unobligated balance available for fiscal year 1953------------                                              97, 872. 73

                  25. PRELIMINARY EXAMINATIONS,                                        SURVEYS,         AND
                             CONTINGENCIES FOR FLOOD CONTROL

   The cost of the work during the year amounted to $18,773.40 and the
expenditures were $26,133.21. The balance at the end of the fiscal year
including accounts receivable, $115.98, plus an allotment for fiscal
year 1953 of $14,700, will be applied as needed during fiscal year
1953 to payment of expenses incurred under this heading.
   The additional sum of $140,000 can be profitably expended during
fiscal year 1954.
                                           Cost and financial summary

                                                         Fiscal year ending June 30                                Total to June
                                                                                                                  30,1952, includ-
                                                                                                                  ing fiscal years
                                       1948             1949          1950             1951         1952           prior to 1948


Maintenance:
   Appropriated-.........          $60, 000. 00     $32, 597. 65 $120, 000.00    $62. 000.00     $13, 400.00          $318, 854.02
   Cost---------------.....         59, 353. 10      34,171. 89   100, 460, 68    76, 992.47      18, 773.40           318, 854.02
   Expenditures...-                 59, 353. 10      34,171.89    109, 119. 16    60, 912. 92     26, 133.21           318, 792. 76



                          26. INSPECTION OF COMPLETED PROJECTS

  The cost of work under this heading during fiscal year 1952 was
$6,520.68, and the expenditures were $5,694.93.
  The balance unexpended on June 30, 1952, $693.29, plus an allotment
of $2,500 for fiscal year 1953, will be applied to payment of expenses
incurred for inspection of completed flood-control projects as required.
  The additional sum of $3,000 can be profitably expended for work
under this heading during fiscal year 1954.
                                            Cost and financial summary

                                                          Fiscal year ending June 30                               Total to June
                                                                                                                  30, 1952, includ-
                                                                                                                  ing fiscal years
                                        1948            1949          1950             1951         1952            priorto 1948

Maintenance:
                 ------- -------------------............
   Appropriated .........                                        -----------      $3, 000. 00     $3,900.00             $6, 900. 00
   Cost----------         ------------------------------------                        379. 32      6, 520. 68            6, 900. 00
   Expenditures---------                                                              511. 78      5,694. 93             6, 206.71
                     FLOOD CONTROL--FORT                                   WORTH,       TEX.,            DISTRICT                    965
             27. PLANT ALLOTMENT, FORT WORTH, TEX., DISTRICT
                                              Cost and financial summary

                                                                Fiscal year ending June 30                                Total to June
                                                                                                                         30. 1952, includ-
                                                                                                                         ing fiscal years
                                          1948               1949              1950        1951             1952           prior to 1948

New Work:
   Appropriated......... ............ ............ $80, 000. 00 ........---------...$518, 671. 00                             $598,671.00
   Cost-                 I-........
          _____----------....------            -     -__
                                                    -51,033. 40 -$32, 072. 16 301,316. 37                                      218,210. 81
   Expenditures__--------               ......... -- 33,959.82 --46,397.85 274,274.68                                          193,917.01

Other new work data:
   Unobligated balance, June 30, 1952___      _-----     --       --
                                                                   ___                                                 $235, 244.31
   Unobligated balance available for fiscal year 1953 ----------- _                                                     235, 244. 31

                           28. INACTIVE                    FLOOD            CONTROL PROJECTS

                                                                             For last  Cost and expenditure
                                                                           full report                                     Estimated
                                                                           see annual                                       amount
                        Name of project                                     report for                                    required to
                                                                           Galveston New work      Mainte-                 complete
                                                                              Texas                 nance                  complete
                                                                           District-

1. Eastland, Leon River, Tex.-------------------.....................
                            2 -                                                1948   ............-----------------------............
                                                                                                                                 $183,400. 00
2. Brady, Brady Creek, Tex. __ ...............                                 1949    $72. 077. 61 ............------------1, 780. 922. 39
3. LaGrange, Colorado River, Tex. ................                             1948      15, 097. 26 ............                 597. 902. 74
4. Columbus, Colorado River, Tex.4_--------------                    5.        1949      41,683.37 ............                    261.316 63
5. Eagle Lake to Matagorda, Colorado River, Tex.                               1948    408, 000.00 ............               19. 945, 000.00


  2
  1 No appropriations to date.
    In conformance with provisions of sec. 2 of the 1941 Flood Control Act, local interests were notified on
Feb. 1, 1949 that authorization for construction of the project will expire 5 years from that date unless assur-
ances of local cooperation satisfactory to the Secretary of the Army are received prior to that time.
  s In conformance with provisions of sec. 2 of the 1941 Flood Control Act, local interests were notified on
Oct. 1, 1947 that authorization for construction of the project will expire 5 years from that date unless assur-
ances of local cooperation satisfactory to the Secretary of the Army are received prior to that time.
  4 In conformance with provisions of sec. 2 of the 1941 Flood Control Act, local interests were notified on
Oct. 1, 1947 that authorization for construction of the project will expire 5 years from that date unless assur-
ances of local cooperation satisfactory to the Secretary of the Army are received prior to that time.
    In conformance with provisions of sec. 2 of the 1941 Flood Control Act, local interests were notified on
Feb. 20, 1948 that authorization for construction of the project will expire 5 years from that date unless
assurances of local cooperation satisfactory to the Secretary of the Army are received prior to that time.

                                      29. MISCELLANEOUS ACTIVITIES

Status of all investigations for flood control called for by flood control acts
                           and committee resolutions

                                                                                         Date trans-        Document           Recom
                   Locality                                Authorization act              mitted to           No.             menda
                                                                                          Congress

Big Sandy Creek, Sabine River,                     Flood Control Committee
  for flood control and power                        resolution, Mar. 20, 1945.
  development in.
Brazos River, Tex., access road and                House Public Works Com-                          --

  bridge from the town of Blum,                      mittee resolution, Oct.
  Tex.                                               16, 1951.
Brownwood, Pecan Bayou, Tex.,                      Flood Control Committee             ---------------
  flood protection for the town.                     resolution, Oct. 8, 1945.
Clear Fork of the Brazos River, in                 House Public Works Com-             ---------------
  Jones and Shackelford Counties.                    mittee resolution, June
  Tex.                                               27, 1950. Amended Dec.
                                                     14, 1950.
Colorado River, Tex., improve-                     Commerce Committee res-
ment for navigation and flood                       olution, Aug. 4, 1936.
control.
Colorado River, Tex., above line
between Coke and Runnels
                                                    Flood Control Act, June
                                                      22, 1936.
                                                                                               ------------
                                                                                              I------------
                                                                                       ---------------
  Counties.
Colorado (Lower) River, Tex ......                ...--   do----.....-------------
966         REPORT        OF CHIEF OF ENGINEERS,                        U.       S. ARMIVIY,    1952

    Status of all investigations for flood control called for by flood control acts
                       and committee resolutions-Continued

                                                                          Date trans-       Document    Recom-
               Locality                     Authorization act              mitted to          No.      mendat
                                                                           Congress

Colorado River and tributaries,         River and Harbor Act,
   Texas improvement for naviga-          Aug. 26, 1937.               ---------------
  tion and flood control.
Cypress Creek, Harris County,           Flood Control Act, July        ---------------
  Tex.                                    24, 1946.
-Guadalupe River, Tex., Victoria        Rivers and Harbors Com-
  to Gonzales, for navigation, flood      mittee resolution, Mar.      --------------
  control, power and related pur-         29, 1945.
  poses.
Guadalupe River, Tex., improve-         Rivers and Harbors Com-        ---------------
  ment for navigation, flood con-        mittee resolution, Apr. 8,
  trol, power and irrigation (final      1938.
  report).
Neches River, Tex., for flood con-      Flood Control Committee        ---------------
  trol and power.                         resolution, Mar. 20, 1945.
Neches River and tributaries,           River and Harbor Act,          ---------------
   Texas, in the interest of naviga-      Mar. 2, 1945.
  tion, flood control, and other
  water uses.
Neches River and tributaries,          Flood Control Act. June         ---------------
  Texas.                                 22, 1936.
     Do ....................           Flood Control Act, May
                                         15, 1936.
North Bosque River, in the vicin- House Public Works Com-             ---------------
   ity of Stephenville, Tex.             mittee resolution, Apr.
                                         21, 1950.
Nueces River and tributaries, Flood Control Act, June                 ---------------
   Texas.                                22, 1936.
      Do............................. Flood Control Act, June          ---------------
                                         4, 1936.
Pecan Bayou, Tex., with respect to Flood Control Committee            ---------------
   flood protection for the town of      resolution, Oct. 8, 1945.
    Brownwood, Tex.
Sabine-Neches waterway, Texas, River and Harbor Act,                  ---------------
   improvements in the interest of       Mar. 2, 1945.
   navigation and prevention of
   damage by floods.
Sabine River and tributaries, .....do ...................             ---------------
   Texas, for navigation, flood con-
   trol and other water uses.
Sabine River, Tex., for flood con- Flood Control Committee
   trol and power development in         resolution, Mar. 20, 1945.
                                                                       ---------------
   Big Sandy Creek.
;Sabine River, Tex., for flood con- _ _.-- do---------.........
   trol and power.
                                                                ....   ---------------
San Antonio River, Tex., improve- River and Harbor Act,
    ment for navigation, flood con-      June 20, 1938.                ---------------
    trol, power and prevention of
    erosion.
San Jacinto River and tributaries, Flood Control Act, Aug.
    in Montgomery, Walker, San           28, 1937.
    Jacinto, Grimes, Waller, Liberty
    and Harris Counties, Tex.
Trinity River and tributaries, Rivers andfHarbors Com-
    Texas for navigation, flood con-     mittee resolution, Feb.
   trol and allied purposes (final       25, 1945.
   report).
Trinity River and tributaries, Rivers and Harbors Com-
   Texas, for navigation, and flood      mittee resolution, Mar.
   control (final report).               31, 1944.
Trinity River and tributaries, House Public Works Com-                 --------------
   Texas, for flood control and allied   mittee resolution, Aug. 6,
   purposes on White Rock Creek.         1948.
Trinity River in the Richland, Rivers and Harbors Com-                 ---------------
   Chambers and Cedar Creek              mittee resolution, Feb.
   areas, Texas (interim report).        28, 1945.
Trinity River in the Richland, Rivers and Harbors Com-                 ---------------
   Chambers and Cedar Creek              mittee resolution, Mar.
   areas, Texas (interim report).        31, 1944.
Trinity River to Liberty, Tex., Rivers and Harbors Com-                ---------------
   including Lake Liberty (interim       mittee resolutions Mar.
   report).                              31, 1944; Feb. 28, 1945.
White Rock Creek, for flood control House Public Works Com-
   and allied purposes, Trinity          mittee resolution, Aug.
                                                                        ---------        ~------
    River and tributaries, Texas.        6, 1948.
                  FLOOD           CONTROL--FORT                   WORTH,          TEX.,         DISTRICT                967
30. EMERGENCY FLOOD CONTROL WORK UNDER AUTHORITY OF THE
    FLOOD CONTROL ACT APPROVED AUGUST 18, 1941, AS AMENDED

   The Flood Control Act approved August 18, 1941, as amended by
the Flood Control Acts approved July 24, 1946, June 30, 1948, and May
17, 1950, authorized the allotment from flood-control appropriations
of not to exceed $2,000,000 for any one fiscal year to be expended in
rescue work or in the repair or maintenance of any flood control work
threatened or destroyed by flood.
   Operations from an allotment of $42,935.58 consisted of initiating
repairs on breached sections of levees in three levee districts, and flood
fighting on Trinity River, Pecan Bayou and Sabine River.
   Total cost was $38,469.13 and total expenditures were $36,969.42, to
June 30, 1952. The unexpended balance at the end of the fiscal year,
$36,369.13, will be applied to emergency flood-control work pursuant to
acts referred to above.
                                            Cost and financial summary

                                                           Fiscal year ending June 30                          Total to June
                                                                                                               30, 1952, includ-
                                                                                                               ing fiscal years
                                        1948             1949         1950          1951           1952         priorto 1948

Maintenance:
   Appropriated --               ..     ----..........
                                                  ............ $30, 402. 97 ..........-----------..
                                                                                                $42, 935. 5         $73, 338. 55
   Cost....------- ------------------------------------                          $30, 402. 97     8, 066. 16         38, 469. 13
   Expenditures.........
                    -----------------------------............        --------.    30, 402.97      6, 566. 45         36, 969.42



31. EMERGENCY FLOOD CONTROL WORK UNDER AUTHORITY OF
  PUBLIC LAWS 138 AND 318, 78TH CONGRESS; PUBLIC LAW 75, 79TH
  CONGRESS, AND PUBLIC LAWS 102 AND 858, 80TH CONGRESS

   Because of the heavy demands for emergency repair work to floods
which occurred in the spring of 1943-44 and again in the spring of
1945, Congress, in the act approved July 12, 1943, Public Law 138,
78th Congress, in the act approved May 29, 1944, Public Law 318, 78th
Congress, in the act approved June 5, 1945, Public Law 75, 79th Con-
gress, in the act approved June 23, 1947, Public Law 102, 80th Congress,
and in the act approved June 30, 1948, Public Law 858, 80th Congress,
authorized the amounts of $10,000,000, $12,000,000, $12,000,000,
$15,000,000, and $25,000,000, respectively, to be appropriated as emer-
gency funds to be expended under the direction of the Secretary of
Army and the supervision of the Chief of Engineers for the repair
restoration, and strengthening of levees and other flood-control works
which had been threatened or destroyed by the recent floods.
   Operations during the fiscal year from unexpended funds previously
allotted, and an allotment of $5,983.96, consisted of flood fighting in
the Baffins Bay drainage area near Alice, Tex.
   Total cost was $328,226.47 and total expenditures were $320,323.04,
to June 30, 1952. The unexpended balance at the end of the fiscal year,
$7,903.43, will be applied to emergency flood-control work pursuant to
acts referred to above.
968          REPORT           OF CHIEF             OF ENGINEERS,                  U.    S. ARMY,           1952

                                          Cost and financial summary

                                                        Fiscal year ending June 30                               Total to June
                                                                                                                30, 1952, includ-
                                                                                                               ing fiscal years
                                       1948           1949            1950           1951          1952          prior  to1948

Maintenance:
   Appropriated..................... $207, 000. 00 $104, 520. 18                  $10, 722. 33   $5, 983. 96       $328, 226.47
   Cost------------........................------------ 94, 337. 23 144, 044.39    81,941.42      7, 903.43         328, 226. 47
   Expenditures....................-...........234, 047. 18                        86, 275.86 ---.........          320, 323.04
          FLOOD CONTROL IMPROVEMENTS IN THE
            ALBUQUERQUE, N. MEX., DISTRICT
   The district comprises the watershed of the Canadian River and
tributaries entering the river west of the Texas-New Mexico State line;
the watershed of the Arkansas River and tributaries entering the
river west of and including Walnut Creek, Kans., the watershed of the
Rio Grande and tributaries entering the river west of and including
the Pecos River and its tributaries; and the watershed of the Mimbres
River and its tributaries in New Mexico.
   District engineer: Col. Charles H. McNutt, Corps of Engineers, to
May, 8, 1952; Lt. Col. Herbert N. Turner, Corps of Engineers, acting
May 8, 1952 to June 22, 1952; Col. Charles H. McNutt, Corps of Engi-
neers, from that date.
   Division engineer of the Southwestern Division, Dallas, Tex., com-
prising the Galveston, Tex., Albuquerque, N. Mex., Little Rock, Ark.,
Tulsa, Okla., and Fort Worth, Tex., districts; Col. Louis W. Prentiss,
Corps of Engineers, to May 8, 1952; Col. Charles H. McNutt, Corps of
Engineers, acting May 8, 1952 to June 23, 1952; Col. Herbert D. Vogel,
Corps of Engineers, from that date.
                                     IMPROVEMENTS

              Flood control                          Flood control-Continued
                                       Page                                        Paj e
1. Colorado Springs, Fountaine               12. Inspection     of  completed
      que Bouille River, Colo-.-       970          works_-          -       -     984
2. Pueblo,    Arkansas     River,            13. Plant allotment-                 984
      Colo                             971    14. Inactive flood-control proj-
3. John Martin Reservoir, Ar-                      ects_-       ---- - --
                                                                         ---       984
      kansas River, Colo. (for-               15. Miscellaneous activities----     985
      merly Caddoa Reservoir)          972    16. Emergency flood-control
4. Conchas Dam and Reservoir,                      work under authority of
      Canadian River, near Tu-                      Public Laws 138 and 318,
      cumcari, N. Mex_ ... ___.        974          78th Cong., Public Law 75,
5. Creede, Willow Creek Colo_         976          79th Cong.; and Public
6. Platoro Reservoir,    onejos                    Laws 102 and 858, 80th
      River, Colo_                     977          Cong                           986
7. Chamita Dam and Reservoir,                17. Emergency bank protection
      Rio Chama, N. Mex ____           978          work under authority of
8. Jemez Canyon Dam and Res-                       Flood Control Act, ap-
      ervoir, Jemez Creek, N.                       proved Dec. 22, 1944, as
      Mex-       _             -       979          amended-__                     987
9. Rio Grande Floodway, Rio                  18. Emergency flood-control
      Grande, N. Mex_-_----            981          work under authority of
10. Snagging and clearing under                     sec. 5 of Flood Control Act,
      authority of sec. 2 of the                    approved Aug. 18, 1941, as
      Flood Control Act, ap-                        amended__                      988
      proved Aug. 28, 1937, as                19. Small flood-control projects
      amended..-           --          982          under authority of sec. 205
11. Preliminary     examinations,                   of Flood Control Act, ap-
      surveys, and contingencies                    proved June 30, 1948, as
      for flood control_               983          amended-.--- .--.-...---       989
                                                                            969
970        REPORT       OF CHIEF           OF ENGINEERS,                U.     S. ARMY,       1952

   1. COLORADO SPRINGS, FOUNTAINE QUE BOUILLE RIVER, COLO.

   Location.-This project is located in north Colorado Springs, El
Paso County, Colo., on an intermittent flowing tributary of Moun-
ment Creek, a tributary of the Fountaine que Bouille River, which
is a tributary of the Arkansas River. The project is located approxi-
mately 55 miles upstream from the mouth of the Fountaine que
Bouille River or about 1,333 miles from the mouth of the Arkansas
River. (See U. S. Geological Survey Map, Colorado Springs and
Pueblo quadrangles, scale 1: 125,000.)
   Existing project.-The plan of improvement provides for flood
control in Colorado Springs, Colo., by the construction of a flood-
way channel 10,590 feet long to discharge flows from the mouth of
Templeton Gap directly into Monument Creek. The upstream
8,717 feet of floodway has a depth of 13 feet, a bottom width of 125
feet, and side slopes of 1:2 with a riprap-lined levee forming the
south side. The remaining 1,873 feet has a depth of 15 feet, a bot-
tom width of 12 feet, side slopes of 1: 1.5, and is lined with reinforced
concrete. The Federal cost of the project was $804,008.05 for con-
struction, and the estimated cost to local interests was $285,300, which
includes $242,000 contributed funds and $43,300 for lands and dam-
ages, a total of $1,089,308.05.
   Local coperation.-The city of Colorado Springs was required to
contribute 242,000 toward the cost of construction. In addition
section 2 of the Flood Control Act approved June 22, 1936, as amended
by the Flood Control Act approved December 22, 1944, applies. (See
pages 4-5 for requirements.) All requirements for local cooperation
have been fully met.
   Operations and results during fiscal year.-Operations during the
fiscal year consisted of the installation of an automatic recording
stream gage by hired labor. The costs during the fiscal year were
$1,351.42 for new work. Expenditures were $6,794.91.
   Condition at end of fiscal year.-The project is complete. Total
costs for new work under the existing project to June 30, 1952, were
$1,046,008.05, of which $242,000 was from contributed funds. The
total expenditures were $1,046,008.05, of which $242,000 was from
contributed funds.
   Proposed operations.-None. The project is complete.
                                  Cost and financial summary
                                      UNITED STATES FUNDS

                                               Fiscal year ending June 30                           Total to June
                                                                                                   30, 1952, includ-
                                                                                                   ing fiscal years
                               1948          1949          1950              1951      1952         priorto 1948


New work*
   Appropriated   -
   Cost--------......... $35, 238. 63 471, 702. 93 232, 303. 73 $10. 441. 75
                                                                             -$84,891.95
                        1---,.----------. $427, 100. 00 -$43,200.00 ............
                                                                                 1,351. 42
                                                                                                       $804. 008. 05
                                                                                                       1 804, 008. 05
    Expenditures ----   -    34, 736. 95   295.830. 01   258, 880. 61   154, 814. 65   6. 794.91       1 804,008.05


  1 Does not include $242,000 contributed funds.
         FLOOD    CONTROL--ALBUQUERQUE,          N.   MEX.,      DISTRICT     971
                  2. PUEBLO, ARKANSAS RIVER, COLO.

   Location.-The project is located in the city of Pueblo, Pueblo
County, Colo., on the Arkansas River, about 170 miles downstream
from its source and about 1,278 river miles upstream from its mouth.
 (See U. S. Geological Survey Maps, Pueblo, Colo., quadrangle, scale
1: 125,000.)
  .Existing project.-The plan of improvement provides additional
local flood protection for the area subject to inundation by backwater
at Pueblo, Colo., by the construction of a levee extending from the
north abutment of the Santa Fe Avenue Bridge to high ground adja-
cent to the Missouri Pacific Railroad right-of-way, the levee to have
a 10-foot crown width and a 4-inch filter blanket and 10 inches of rip
rap cover on the river side; and a drainage structure with flap gates
under the levee. The estimated Federal cost of construction is $217,500
and the estimated cost to local interests is $4,950 for lands and dam-
ages, a total of $222,450 (1952).
   The existing project was authorized by the Flood Control Act
approved May 17, 1950. (See H. Doc. 327, 81st Cong., 1st sess.)
   Local cooperation.-Seepages 4-5 for requirements. In addition to
the usual requirements, local interests are required to protect the
flood carrying capacity of the floodway, between river miles 1276.5
and 1281.5, from future encroachments or obstructions and preserve
and maintain unimpaired the capacity of the old channel of the
Arkansas River between the Southern Colorado Power Co.'s dam
and the proposed levee crossing for the purpose of handling internal
drainage.
   Operations and results during fiscal year.-Operations during the
fiscal year consisted of engineering studies, design and preparation
of detailed plans and specifications, and initiation of construction.
The construction of the project was started on May 1, 1952. The costs
during the fiscal year were $112,001.14. The expenditures were
$49,059.64.
   Condition at end of fiscal year.-Construction of the project is 31
percent complete and is scheduled to be completed during November
1952. Total costs under the existing project to June 30, 1952, were
$112,001.14, all for new work. The total expenditures were $49,059.64.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, a total of $168,440.36, will be applied as follows:
Accounts payable on June 30, 1952_------------------------------       $62, 941. 50
New work: Completion of levee extension by contract----------          105, 498. 86
      Total for all work_-----------------_-----------    ----        -168, 440. 36
  With the expenditure of these funds, the project will be completed.
972         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                               1952

                                    Cost and financial summary

                                                Fiscal year ending June 30                              Total to June
                                                                                                       30, 1952, includ-
                                                                                                       ing fiscal years
                                1948          1949          1950           1951             1952        prior to 1948


New work:
   Appropriated.........
              ------------------------------.......                   ............
                                                                    ------------......
                                                                              1217,          500.                500. 00
                                                                                                           $217, 00
                                                                             ---
   Cost..................--------------------------------------------............        112, 001.14        112,001.14
   Expenditures         ----------------------------------------------                   49, 059. 64         49, 059. 64


Other new work data:
    Unobligated balance, June 30, 1952------------------------    $26, 244. 81
    Unobligated balance available for fiscal year 1953-----------26, 244. 81

       3.    JOHN MARTIN RESERVOIR, ARKANSAS RIVER, COLO.
                   (FORMERLY CADDOA RESERVOIR)

  Location.-John Martin Reservoir is located on the Arkansas River
1,155 miles upstream from its mouth, 295 miles downstream from its
source, and in Bent County, about 18 miles upstream from the city
of Lamar, Colo. (See U. S. Geological Survey maps for Lamar and
Las Animas (Colo.) quadrangles, scale 1:125,000.)
  Existing project.-The existing project provides for construction
of a dam and reservoir for flood control and water conservation in
Colorado and Kansas. The dam is a concrete and earth fill struc-
ture approximately 130 feet high with an overflow gated spillway
1,174 feet long. The earth section extending to the abutments flanks
the concrete gravity section in the valley, and earth dikes on each abut-
ment in continuation of the earth section extend to high ground,
making the over-all length of the structure approximately 2.6 miles.
The reservoir, which is one unit of a comprehensive reservoir plan
for flood control in the Arkansas River Basin, has a storage capacity
of 278,700 acre-feet for flood control, and 384,200 acre-feet for con-
servation, a total of 662,900 acre-feet.
   The estimated cost revised in 1952, is $11,523,500 for construction,
$3,546,500 for lands and damages, a total of $15,070,000. The current
estimated annual cost of maintenance and operation is $88,000 (1952).
   The existing project was authorized by the Flood Control Act
approved June 22, 1936, under the title "Caddoa Reservoir, near
Lamar in Colorado." (See H. Doc. 308, 74th Cong., 1st sess., which
contains the latest published maps.) The War Department Civil
Appropriation Act approved June 24, 1940, provided that from and
after the approval of that act, the Caddoa Reservoir project for flood
control and water conservation in Colorado and Kansas should be
known and designated on the public records as the John Martin
Reservoir project.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Regulation of the con-
servation storage in the reservoir was continued under the rules and
regulations of Arkansas River compact until midnight June 1, 1952,
when the reservoir was officially declared empty and administrative
         FLOOD     CONTROL--ALBUQUERQUE,               N.   MEX.,   DISTRICT       973
control passed to the State engineer of Colorado. By agreement of
the water users, a pool elevation of approximately 3779, representing
storage of about 1,000 acre-feet, was maintained as nearly as possible
during the month of June 1952. The reservoir reached a maximum
elevation of 3811 on August 26, 1951 and a minimum elevation of
3778.36 on June 23, 1.952. Total releases for the fiscal year were
233,148 acre-feet, of which 233,036 acre-feet were for irrigation. Con-
duit releases for operational checking were 112 acre-feet. Irrigation
releases ended October 31, 1951 and resumed April 7, 1952.
   The costs during the fiscal year were $3,459.18 for new work and
$106,869.43 for maintenance. The total expenditures were $111,451.20.
   Condition at the end of fiscal year.-The existing project is essen-
tially complete; only some facilities for public use remain to be
completed by hired labor.
   The total costs to the end of the fiscal year under the existing project
were $15,007,960.79 for new work, $663,716.70 for maintenance.
Total expenditures were $15,671,530.09. In addition, costs and expen-
ditures from Emergency Relief Funds for new work have been
$59,977.15.
   Proposed operations.-Operationof the reservoir will be continued
under the control of the State engineer of Colorado until such time
as the Arkansas River Compact Administration determines there is
again water in storage, at which time the Administration will assume
control of conservation storage releases from the reservoir and will
so notify the Corps of Engineers.
   The balance unexpended on June 30, 1952, $1,291.84 plus an allot-
ment of $121,700 for maintenance for fiscal year 1953 and collections
of $2,028 for quarters and utilities, a total of $128,019.84, will be
applied as follows:
Accounts payable on June 30, 1952-----------------------------                  $692.42
New work: Construction of garages for operators' quarters (hired
  labor) --                   --------------------------------                 2, 061.14
Maintenance :
    Operation------    --------------------------- $31, 289. 00
    Ordinary repairs----------------------------34, 550.00
    Improvements and reconstruction--------------              18, 248. 28
    Special studies and records------------------ 41, 179. 00
                                                                             125, 266. 28
      Total for all work-----------------               -----------------    128, 019. 84
  The sum of $156,000 can be profitably expended for the following
schedule of work during fiscal year 1954:
Maintenance (operation and care) :
   Operation---------------------------------------------      $31, 000
   Ordinary repairs------------
                         __--------------------------
                                          --                    32, 000
   Improvements and reconstruction-------------- ------------- 73, 000
   Special studies and records--------------------------------  20, 000
      Total for all work--------- ------------------------------                156, 000




      245554-53----vol. 1-   -62
974          REPORT           OF CHIEF OF ENGINEERS,                               U.     S.       ARMY,       1952

                                           Cost and financial summary

                                                         Fiscal year ending June 30                                   Total to June
                                                                                                                    30, 1952, includ-
                                                                                                                    ing fiscal years
                                       1948            1949            1950            1951            1952           priorto 1948


Now work:
   A l)propriated-......... $450, 000. 00 ---    ..       ..-----. $100, 000. 00 ..-- --                           I_1$15, 010. 021. 93
   Cost ..........--------------.   415, 708. 92 $135, 520. 99       19, 999. 31 $99, 919. 05       $3, 459. 18       1 15, 007, 960. 79
   Ex penditures-......... 416, 912.86 215, 716. 93                  37. 591.80      80, 559. 94     5,471. 89        1 15,007,955. 19
Maintenance:
   A ppropriated--------.........    87, 000. 00    85, 000. 00      70. 000. 00     73, 500. 00     99, 000. 00           665, 800. 00
   Cost---------------.............  59, 448. 37    96, 059. 84 100, 138. 48         66, 656. 28    106. 869. 43           663, 716. 70
   Expenditures------........        56, 771. 95    91, 929. 09 102, 954. 21         70, 198. 75    105, 979. 31           663, 574. 90


Other new work data:
    Unobligated balance, June 30, 1952_-----           __----------------- $1, 364.96
    Unobligated balance available for fiscal year 1953 -------------- , 364.96
  I In addition $59,977.15 was expended from Emergency Relief funds for new work.

        4. CONCHAS DAM AND RESERVOIR, CANADIAN RIVER, NEAR
                          TUCUMCARI, N. MEX.

  Location.-The dam is located in San Miguel County, N. Mex.,
on the Canadian River approximately one-fourth mile downstream
from the confluence of the Canadian and Conchas Rivers. It is
approximately 30 miles northwest of Tucumcari, N. Mex., and 744
miles upstream from the mouth of the Canadian River. The Canadian
River has a total length of approximately 906 miles, rises in the north-
eastern part of New Mexico, and flows south and east to the Arkansas
River in the vicinity of Webbers Falls, Okla. (See U. S. Geological
Survey State map of New Mexico, scale 1: 500,000, and U. S. Geological
Survey topographic map, Tucumcari quadrangle; scale 1: 125,000.)
   Existing project.-The existing project provides for the construc-
tion of a flood-control dam and reservoir which will also be used
for irrigation and water-supply purposes. The dam consists of a
concrete gravity main section 235 feet high and 1,250 feet long
located in the Canadian River Canyon, together with earth dikes
on each side having an over-all length of about 4 miles. The main
section contains conduits located in its base capable of releasing water
to maintain low-water flow and for drainage of the reservoir, and
an overflow spillway 300 feet in length. The earth dikes are of
varying heights up to 100 feet and the north dike contains a con-
crete ogee type emergency spillway 3,000 feet long. The project
involved about 836,000 cubic yards of concrete, 3,600,000 cubic yards
of fill, and 1,300,000 cubic yards of excavation. The reservoir has
a gross storage capacity of 566,000 acre-feet, consisting of 279,000
acre-feet for water conservation and irrigation, 196,000 acre-feet for
flood control, and 91,000 acre-feet dead storage. The Federal cost
was $15,488,908.56, including $2,279,325.70, the cost of initiating
construction of the project under authority of the Emergency Relief
Appropriation Act of 1935. The estimated annual cost of mainte-
nance and operation is $86,000 (1952).
   The project is based on the report of the Canadian River, N. Mex.,
Tex., and Okla., dated June 1, 1931, made in compliance with House
Document No. 308, 69th Congress, first session, and approved by the
            FLOOD      CONTROL---ALBUQUERQUE,            N.   MEX.,   DISTRICT     975

President, July 29, 1935, under the provisions of the Emergency
Relief Appropriation Act of 1935, and adopted by Congress in the
Flood Control Act of June 22, 1936 (H. Doc. 308, 74th Cong., 1st
sess.).
   Local cooperation.-See pages 4-5 for requirements.
   Operations and results during fiscal year.-Repairs to the derrick
stone downstream of the training walls were completed. The con-
struction of facilities for public use was continued by hired labor.
The structures were operated and maintained in a serviceable
condition.
   The reservoir reached a maximum elevation of 4188.93 on August
11, 1951, and a minimum elevation of 4170.12 on June 30, 1952. Ir-
rigation releases ended November 21, 1951, and resumed March 12,
1952. Total releases for the fiscal year were 150,100 acre-feet, of
which 140,895 acre-feet were for irrigation, 1,694 acre-feet for power
production, 104 acre-feet conduit releases and 7,407 acre-feet miscel-
laneous losses. 2,221 acre-feet were released to Bell Ranch for ir-
rigation and 138,674 acre-feet to the canal of the Tucumcari irrigation
project, under development by the United States Bureau of
Reclamation.
   The costs for the year were $97,368.69 for maintenance and $4,455.72
for new work. The expenditures were $95,212.97.
   Condition at end of fiscal year.-The existing project was essentially
completed in 1940. The reservoir and appurtenances were in good
condition and in operation at the end of the fiscal year. Irrigation
of some lands under the project was begun on November 24, 1945.
The costs to the end of the fiscal year from regular funds were $12,-
339,605.11 for new work, and $936,309.08 for maintenance. The total
expenditures were $13,257,273.54.
   The costs and expenditures to the end of the fiscal year from
Emergency Relief funds were $869,977.75 for new work.
   The total costs to the end of the fiscal year for all funds from
departmental appropriations were $13,209,582.86 for new work; and
$936,309.08 for maintenance. The total expenditures were $14,127,-
251.29. In addition, the costs and expenditures for work accomplished
in initiating the project under the provisions of the Emergency Relief
Appropriation Act of 1935 were $2,279,325.70.
   Proposed operations.-Operation of the reservoir will continue
as in fiscal year 1952. The balance unexpended on June 30, 1952,
$27,005.32, and $100,000.00 allotted for maintenance for fiscal year
1953, plus $4,400.00 receipts from quarters and utilities, a total of
$131,405.32 will be applied as follows:
Accounts payable on June 30, 1952-----------
                                   ...........-..-------- ------ $19, 426. 95
Maintenance:
    Operation---------------------------------        $40, 900. 00
    Ordinary repairs-------------------------- ---     39, 700. 00
    Improvements and reconstruction-------------        7, 578.37
    Special studies and records-------    -----------  23, 800. 00
                                                                   111, 978.37
          Total for all work--------------------------                       131, 405.32
976          REPORT             OF CHIEF                 OF ENGINEERS,                       U.       S. ARMY,                   1952

  The sum of $91,500 for operation and maintenance can be profitably
expended for the following schedule of work during fiscal year 1954
Maintenance :
   Operation-----------------------              ---------------------                                                                  $27, 600
   Ordinary repairs---------------------             ------------------                                                                  38, 000
   Improvements and reconstruction_      -----------------                                                                               13, t00
   Special studies and records_                                       -                                                                      000
                                                                                                                                         1--------------------
                                                                                                                                         12,

          Total for all work__----__-_______-------------------                                                                          91, 500

                                              Cost and financial summary

                                                              Fiscal year ending June 30                                           Total to June
                                                                                                                                  30, 1952, includ.
                                                                                                                                  ing fiscal years
                                          1948              1949              1950              1951                1952            priorto 1948

New work:
    Appropriated.....            ----------............ $13, 791. 44 $21, 208. 56          ...--------.......   ...       ....    1$13, 209, 582. 86
                    .....--..-----------.........
    Cost......_-------------                             --------........... 15, 459. 65    $15, 084. 63          $4, 455. 72      113, 209, 582. 86
    Expenditures......... -------.........-- .......------------.. 5, 683. 00                 24, 881. 28           4, 435. 72     113, 209, 582. 86
Maintenance:
    Appropriated- ........            $67, 000. 00     215, 000. 00      159, 600. 00        62, 500. 00         87, 695. 00            944, 673. 75
                  ..-- ..
    Cost___......_--            _      58, 194.49      105, 935. 91      139, 906. 26      189, 431. 28          97, 368. 69            936, 309. 08
    Expenditures---------              55, 753.41      102, 994. 91      140, 347. 54      181, 711.96           90, 777. 25            917, 668. 43


  1 Includes $3,492,695.92 Maintenance and Improvement funds and $869,977.75 Emergency Relief funds
but does not include $2,279,325.70, the cost of initiating the project under authority of the Emergency Relief
Appropriation Act of 1935.

                                    5. CREEDE, WILLOW CREEK, COLO.

   Location.-This project is located in Creede, Mineral County, Colo,
on Willow Creek, a small stream which discharges into the Rio
Grande about 3.3 miles downstream from Creede. (See U. S. Geo-
logical Survey map, Creede quadrangle, scale 1: 125,000.)
   Eaisting project.--The plan of improvement provides for con-
struction of a grouted riprap channel to carry flood waters of Willow-
Creek through the town of Creede. The channel follows approxi-
mately the same alinement as the existing timber-lined channel. The
new channel is approximately 5,527 feet long and is of trapezoidal
cross-section, with bottom width of 8 feet and side slopes of 1 vertical
to 11/2 horizontal except for the lower 617 feet which varies both in
bottom width and side slopes. Channel lining would consist of a
12-inch pavement of grouted riprap for the upper 5,130 feet, the
remaining 397 feet being unlined. The Federal cost of construction
is $219,788.99 and the estimated cost to local interests for rights-of-
way and bridge and utility relocations is $57,700, a total of $277,488.99
(1952).
   Local cooperation.-See pages 4-5 for requirements. In addition
to the usual requirements local interests were required to make neces-
sary bridge and utility changes.
   Operations and results during fiscal year.-Operations during the
fiscal year consisted of the installation of an automatic recording
stream gage by hired labor. The costs during the fiscal year were
$1,403.07 for new work. Expenditures were $1,503.07.
   Condition at end of fiscal year.-Construction of the project is
complete.
              FLOOD          CONTROL-ALBUQUERQUE,                            N.    MEX.,     DISTRICT              977
  The total costs under the existing project to the end of the fiscal
year were $219,788.99 for new work. Total expenditures were $219,-
788.99.
  Proposed operations.-None. The project is complete.
                                        Cost and financial summary

                                                     Fiscal year ending June 30                           Total to June
                                                                                                         30, 1952, includ-
                                                                                                         ing fiscal years
                                     1948          1949          1950             1951        1952        prior to 1948


New work:
   Appropriated---.....----...     $9, 000.00 $159, 700. 00   $43, 200. 00 -$2, 000. 00 -$1, 611.01          $219, 788. 99
   Cost-------....--           .    7, 490. 51  22, 346. 49    97, 348. 99   81, 030. 77    1, 403. 07        219, 788. 99
   Expenditures---------           7, 419. 38   21, 378. 31    89, 471. 24    89, 787. 13   1, 503.07         219, 788.99


                   6. PLATORO RESERVOIR, CONEJOS RIVER, COLO.

   Location.-Platoro Dam is located on the Conejos River, in the
upper portion of the watershed, approximately 80 miles above its
mouth, and about 1 mile upstream from the town of Platoro, Conejos
County, Colo.
   Existing project.-During fiscal year 1952 the Bureau of Recla-
mation completed the construction of the Platoro Reservoir. The
reservoir has a maximum water surface elevation of 10,042 feet with
a capacity of 67,800 acre-feet, and a spillway crest elevation of 10,034
feet with a capacity of 60,000 acre-feet. The maximum storage allow-
able for irrigation is 54,000 acre-feet. In addition to provisions for
6,000 acre-feet of permanent flood control storage, the reservoir will
also be operated for flood control on a seasonal draw-down basis, to
evacuate all or a part of the conservation storage prior to forecasted
spring runoff periods to provide control of floods due to spring runoff.
The 6,000 acre-feet of permanent flood control storage allocated is
that required to control the Conejos River flows at Mogote, Colo.,
to 2,000 cubic feet per second during late summer and fall rainfall-
storm periods to the extent possible by operation of Platoro Dam.
   The project was authorized by the Congress in the Interior Ap-
propriation Act of 1941 (act of June 18, 1940, ch. 395, 54 Stat. 406).
 (See H. Doc. 693, 76th Cong., 3d sess.).
   Local cooperation.-Section 9 (d) of the Reclamation Project Act
of 1939, applies.
   Operation and results during fiscal year.-Flood control storage
in the project was operated under direction of the Corps of Engineers.
Operation of the project during the 1952 spring runoff resulted in
prevention of flood damages estimated at $90,000 in the Conejos
Valley. The total costs during the fiscal year were $809.19. The
expenditures were $613.12.
   Proposed operations.-Under section 7 of Public Law 534, Flood
Control Act approved December 22, 1944, the Corps of Engineers
is responsible for detailed scheduling of operations of storage capacity
reserved for or assigned to flood control in all reservoirs con-
structed wholly or in part with Federal funds, as well as those con-
structed by the Corps of Engineers. The balance unexpended on
978         REPORT            OF CHIEF                OF ENGINEERS,                U.      S.   ARMY,           1952

June 30, 1952, $1,686.88, and $9,000 allotted for operations for fiscal
year 1953, a total of $10,686.88, will be applied as follows:
Accounts payable on June 30, 1952_______--------------                 $196. 07
Maintenance: Flood-control operations and preparation of reservoir
  regulation manual                       --------------         _ 10, 490. 81
                                                                _------__

         Total for all work ----------------------------------                                                        10, 686. 88
  The sum of $1,725.00 can be profitably expended during fiscal year
1954 for scheduling of flood-control operations.
                                           Cost and financial summary

                                                              Fiscal year ending June 30                             Total to June
                                                                                                                    30, 1952, includ-
                                                                                                                    ing fiscal years
                                       1948                1949          1950           1951           1952           prior to 1948

Maintenance:
   Appropriated....--------... ........--        -    --------..-----------------
                                                                         ............                  $2,300. 00         $2, 300.00
   Cost.----------------.      .-----------          ----------          .          i-------
                                                                                          ..------------- 809.19              809.19
   Expenditures.---                .--- ..--------   ----------- ------------     -----------             613.12              613.12



         7. CHAMITA DAM AND RESERVOIR, RIO CHAMA, N. MEX.

   Location.-The project is located in Rio Arriba County, N. Mex.,
on Rio Chama approximately 5 miles upstream from the confluence
of Rio Chama and Rio Grande, about 6 miles northwest of Espanola,
N. Mex. (See U. S. Geological Survey map for Plan and Profile
of Rio Chama, N. Mex., from mouth to mile 103, sheet 1.)
   Existing project.-The plan of improvement provides for construc-
tion of a dam and reservoir for flood control, sediment storage and
possible future power. The dam is an earth fill dam 180 feet above
stream bed with a side channel reinforced concrete spillway con-
structed for future installation of crest gates. The dam has a length
of 4,128 feet for the earth fill plus an additional 442 feet for the
spillway. The reservoir, which is one unit of the flood control phase
of a comprehensive plan for Rio Grande and tributaries, New Mexico,
will have a storage capacity at the spillway crest of 687,700 acre-feet
for flood control and sediment storage.
   The estimated costs are $35,973,300 for construction, and $432,700
for lands and damages, a total of $36,406,000 (1952).
   The existing project was authorized by the Flood Control Acts
approved June 30, 1948 and May 17, 1950.
  Local cooperation.-See pages 4-5 for requirements.
   Operations and results during fiscal year.--Engineering studies
and investigations were continued. The costs during the fiscal year
were $109,202.75 for new work. Expenditures were $92,567.38.
   Conditions at the end of the fiscal year.-Detailed plans are 27
percent complete. Total costs under the existing project to June
30, 1952, were $258,100.00 all for new work. The total expenditures
were $240,104.07.
  Proposed operations.-The balance unexpended on June 30, 1952,
$17,995.93, plus an allotment of $85,000.00 during the fiscal year 1953,
a total of $102,995.93 will be applied to accounts payable on June 30,
             FLOOD          CONTROL--ALBUQUERQUE,                              N.   MEX.,       DISTRICT               979

1952, in the amount of $17,995.93 and the balance will be applied to
continuing engineering studies and investigations.
  The additional sum of $200,000.00 can be profitably expended dur-
ing fiscal year 1954 to continue engineering planning.
                                         Cost and financial summary

                                                          Fiscal year ending June 30                          Total to June
                                                                                                             30, 1952, includ-
                                                                                                             ing fiscal years
                                     1948            1949            1950           1951         1952          priorto 1948


New work:
   Appropriate..........              .----------------           $75, 000.00 $127, 000.00    $56. 100.00        $258, 100.00
   Cost....--------------------------                              36, 694.85 112, 202.40     109, 202. 75        258,100.00
   Expenditures......... ........-          ..- ....               30, 502. 57 117, 034. 12    92, 567.38         240,104. 07


Other new work data:
    Appropriated for fiscal year ending June 30, 1953------- ---- $85, 000. 00
    Unobligated balance available for fiscal year 1953 ----------  85, 000.00
    Estimated additional amount needed to be appropriated for
      completion of existing project_---------------------- 36, 062, 900. 00

   8.    JEMEZ CANYON DAM AND RESERVOIR, JEMEZ CREEK, N. MEX.

    Location.-The project is located in Sandoval County, N. Mex., on
Jemez Creek approximately 2 miles upstream from the confluence of
Jemez Creek and Rio Grande, about 5 miles northwest of Bernalillo,
New Mexico. (See U. S. Geological Survey map for Bernalillo quad-
rangle, scale 1: 125,000.)
   Existing project.-The plan of improvement provides for construc-
tion of a dam and reservoir for flood control and sediment storage.
The dam is an earth fill dam 136 feet above the stream bed with an un-
gated saddle spillway. The dam has a length of 780 feet for the earth
fill section plus an additional 500 feet for the spillway. The reservoir,
which is one unit of the flood control phase of a comprehensive plan for
Rio Grande and tributaries, New Mexico, will have a storage capacity
of 30,000 acre-feet for flood control and 90,000 acre-feet for sediment
storage.
   The estimated costs, (revised 1952) are $4,448,000 for construction
and $12,000 for lands and damages, a total of $4,460,000.
   The estimated cost of annual maintenance is $33,000 (1952).
    The existing project was authorized by the Flood Control Acts ap-
proved June 30, 1948 and May 17, 1950.
   Local cooperation.-See pages 4-5 for requirements.
   Operations and results during fiscal year.-Construction of the
outlet works was completed on April 19, 1952. Detailed plans and
specifications for the dam and spillway and miscellaneous cleanup
work were completed. Construction of the dam and spillway and
miscellaneous cleanup work by continuing contract was initiated June
2, 1952. The costs during the fiscal year were $781,082.06 for new
work, The expenditures were $883,016.82.
   Condition at the end of the fiscal year.-Constructionof the access
road and outlet works is complete. Construction of the dam and spill-
way and miscellaneous cleanup work has been initiated. Engineering
studies and preparation of detailed plans and specifications for the re-
980      REPORT       OF CHIEF OF ENGINEERS,                     U. S. ARMY,            1952

maining features of work are 55 percent complete. Settlements for
all real estate interests have been negotiated and the District is now in
the process of closing. Total costs under the existing project to the
end of the fiscal year were $1,951,450.75 for new work. Total expendi-
tures were $1,900,313.25.
   Proposed operations.-The balance unexpended on June 30, 1952,
$249,686.75, plus accounts receivable in the amount of $194.41 and $2,-
144,000 allotted for fiscal year 1953, a total of $2,393,881.16 will be ap-
plied as follows:
Accounts payable on June 30, 1952--------------------------                                  $51, 331. 91
New work :
   Completion of plans and specifications for
      Santa Ana Pueblo protection works, opera-
      tors' quarters and appurtenances, and pub-
      lic use facilities by hired labor---------- --   $17, 505. 25
    Stream gaging by reimbursement to USGS and
      hired labor-----------------------------          11, 212. 00
    Hydroclimatic network----------------- ---           1, 725. 00
    Establishment of sediment ranges by hired
      labor------------------- -----                     7, 750. 00
    Weather station by hired labor--------------            329. 00
    Complete land acquisition------------                8, 527. 00
    Construction of dam and spillway, miscel-
      laneous cleanup work and public use facili-
      ties (for completion of continuing con-
       tract) ----    --------------------------     , 848, 323.00
    Construction of Santa Ana Pueblo protection
      works by contract----------------------          397, 927.00
    Construction of operators' quarters and ap-
      purtenances by contract-----------------          49, 251.00
                                                                                         2, 342. 549.25
          Total for all work-----                 ---- -------                           2, 393, 881.16
  The sum of $25,800 can be profitably expended during fiscal year
1954 for the following schedule of work:
Maintenance:
        Operation---------------------------------------------
   Operation                        ..                          ---.$220
                                                                    $22, 200
   Ordinary repairs and maintenance---------------- -----------       3, 600
        Total for all work-------------                   -----------------------                   25, 800

                                Cost and financial summary

                                           Fiscal year ending June 30                        Total to June
                                                                                             30,1952, includ-
                                                                                             ing fiscal years
                             1948         1949        1950          1951         1952          prior to 1948

New work:
   Appropriated....-------------- ------------.
                                         .    . $750,000.00 $500, 000.00 $900, 000.00          $2,150, 000.00
   Cost....---------------------------------- 236, 383. 85 933, 984. 84 781, 082. 06            1,951, 450. 75
   Expenditures---------------------       ---     256, 037.03   761,259.40   883, 016. 82      1,900, 313. 25


Other new work data:
    Unobligated balance, June 30, 1952------------------------                                 $8, 915. 72
    Appropriated for fiscal year ending June 30, 1953---------- 2,                            144, 000. 00
    Unobligated balance available for fiscal year 1953--------- 2,                            152, 915. 72
    Estimated additional amount needed to be appropriated for
      completion of existing project    ------------------------                              166, 000. 00
        FLOOD    CONTROL--ALBUQUERQUE,         N.   MEX.,    DISTRICT   981

          9. RIO GRANDE FLOODWAY, RIO GRANDE, N. MEX.

   Location.-The project is located on the Rio Grande in New Mexico.
It covers the section of the river commencing near Hot Springs and
going upstream to the lower end of the Rio Grande Canyon, approxi-
mately 14 miles upstream from Espanola.
   Existing project.-The plan of improvement provides for flood
protection and major drainage improvements by channel rectification
and levee enlargement and construction as a joint undertaking by the
Bureau of Reclamation and the Corps of Engineers between river
miles 123 and 394 (river mile 0 being at the intersection of the New
Mexico-Texas State line with the International Boundary at El Paso).
The portion to be accomplished by the Corps of Engineers will consist
of levee enlargement and construction and bank protection work where
necessary to protect levees. Levees constructed by local interests now
exist through the reach of the river involved, but are not uniform as
to grade, section or standard of construction and in many places are
threatened by the meandering river channel. These levees will be
modified and supplemented by additional levees where required. The
levees as modified or constructed will have a standard section with a
crown of 10 feet, 3 on 1 side slopes and a freeboard of 3 feet above
maximum water surface.
   The estimated costs are $11,785,900 (1952) for the entire project
and $3,811,500 (1952) for the portion to be accomplished by the Corps
of Engineers.
   The project was authorized by the Flood Control Acts approved
June 30, 1948, and May 17, 1950.
   Local coopes ation.-See pages 4-5 for requirements. In addition
local interests must assume responsibility for all highway bridge and
public utility relocations or replacements required.
   Operationsand results during fiscal year.-Engineeringstudies and
investigations were continued. The costs during the fiscal year were
$8,599.82. The expenditures were $7,787.57.
   Condition at the end of the fiscal year.-Engineeringstudies and
investigations and detailed planning are 20 percent complete. Total
costs under the existing project to June 30, 1952, were $44,518.51, all
for new work. The total expenditures were $44,518.51.
   Proposed operations.--There was no unexpended balance on June
30, 1952. The allotment for fiscal year 1953, $349,000, will be applied
as follows:
New work:
   Definite project report-Albuquerque area by hired labor__ $98, 000
   Planning studies for additional reaches by hired labor__ 70, 000
   Plans and specifications for first increment of work-
     Albuquerque area, by hired labor __-----   ________-     15,000
   Construction of levees and levee protective works, Albu-
     querque area, by contract_____-_______     ___--        166,000
        Total for all work__----__------      ------        -$__$349,   000
982        REPORT           OF CHIEF OF                  ENGINEERS,               U. S.        ARMY,           1952

  The sum of $900,000 can be profitably expended for the following
scheduled work during the fiscal year 1954:
New work:
   Planning studies for additional reaches by hired labor---------- $122, 000
   Plans and specifications for second increment of work-Albuquer-
     que area, by hired labor---------------------------------        50, 500
   Construction of levees and levee protective works, Albuquerque
     area, by contract-------------------------------------727, 500
            Total for all work-----------------------------------                                                      900, 000

                                         Cost and financial summary

                                                       Fiscal year ending June 30                                  Total to June
                                                                                                                  30, 1952, includ-
                                                                                                                  ing fiscal years.
                                     1948            1949             1950           1951             1952          priorto 1948

New work:
   Appropriated-........---------............-------....---------......... $50,000.00 $10, 000.00 -$15,481.49          $44, 518. 51
   Cost_
       -------....-------.................------...--     ------------       2, 331. 13 33, 587. 56  8,599.82           44, 518. 51
                                                           ............ 1, 800.62
   Expenditures-------...............--------..-------------                            34, 930.32   7, 787. 57         44, 518. 51


Other new work data:
   Appropriated for fiscal year ending June 30, 1953             $349, 000.00        --------              -
    Unobligated balance available for fiscal year 1953---------    349, 000. 00
    Estimated additional amount needed to be appropriated for
      completion of existing project--------- -------------     3, 417, 981. 49

10. SNAGGING AND CLEARING UNDER AUTHORITY OF SECTION 2 OF
  THE FLOOD CONTROL ACT APPROVED AUGUST 28, 1937, AS AMENDED

   The Flood Control Act approved August 28, 1937, as amended by
the Flood Control Act approved July 24, 1946, authorized the allot-
ment of not to exceed $1,000,000 from the flood control appropriations
for any one fiscal year for removing accumulated snags and other
debris, and clearing and straightening the channel in navigable
streams and tributaries thereof, when in the opinion of the Chief of:
Engineers such work is advisable in the interest of flood control; pro-
vided that not more than $50,000 shall be expended for this purpose
for any single tributary from the appropriations for any one fiscal
year.
   Pursuant to these acts, expenditures were made during fiscal years
1948, 1949, 1950, and 1951 in the amount of $110,828.36 for clearing
Green Horn Creek near Rye, Colo., Rio Grande at Alamosa, Colo.,:
Rio Hondo in the vicinity of Roswell, N. Mex., Wild Horse Creek
near Holly, Colo., and Eight Mile Creek, Florence, Colo. During
the fiscal year engineering studies and design work were continued
on clearing and snagging Rio Grande at Espanola, N. Mex. The
project was advertised on July 3, 1951, and bids were opened on July
24, 1951; however, a contract was not awarded because local interests
were financially unable to continue in support of the necessary assur-
dnces. Engineering studies and design work were initiated on clear-
ing and snagging Rio Grande at Stoeber Lane Bridge near Monte
Vista, Colo.; however, local interests were unable to obtain the neces-
            FLOOD      CONTROL--ALBUQUERQUE,                             N.    MEX.,       DISTRICT               983
sary rights-of-way and the project was cancelled. Engineering
studies and design work were initiated on clearing and snagging on the
Arkansas River, Garden City, Kans., and on the Rio Grande, Velarde
Valley area, New Mexico. A construction contract for the work at
Garden City, Kans., was awarded on June 4, 1952, and construction
was initiated on June 27, 1952. Preliminary work on the Rio Grande
in the Velarde Valley area was suspended in May 1952 because of
high water due to spring runoff and could not be resumed during the
fiscal year.
   Costs during the fiscal year were $4,256.09 and expenditures
were $46,331.60.
   Total costs for all work under this heading to the end of the fiscal
year were $115,112.91. The expenditures have been $157,159.96. The.
balance unexpended on June 30, 1952, $18,408.55, plus accounts re-
ceivable, $42,047.05, a total of $60,455.60, will be applied as follows:
New work:
   Clearing and snagging Arkansas River, Garden City,
     Kans. (contract) -----------------------------   $15,912. 00
   Clearing and snagging Rio Grande, Velarde Valley
     area, New Mexico (contract)----------------42,805.00
   Available for other work under this heading-------- 1,738. 60

        Total for all work_----               --------------
                                                .                             ---------------            $60, 455. 60

                                   Cost and financial summary

                                                Fiscal year ending June 30                               Total to June
                                                                                                       30, 1952, includ-
                                                                                                       ing fiscal years
                               1948            1949          1950             1951          1952         prior to 1948


New work:
   Appropriated-.........   $12,000.00     $99, 589. 34   $15, 713. 65 -$6, 518. 62     $54, 784. 14        $175, 568. 51
   Cost.................     10;571. 63     33, 757. 56    30, 156. 65    36, 370. 98     4, 256.09          115, 112. 91
    Expenditures_ -------    10, 849. 19    32, 286. 89    12, 764. 06    54, 928. 22    46, 331. 60         157, 159. 96


Other new work data:
    Unobligated balance, June 30, 1952____--------------                                                 $6,255. 60
    Unobligated balance available for fiscal year 1953----                                         -6,
                                                                                                -__--     6- 255. 60

11. PRELIMINARY             EXAMINATIONS, SURVEYS, AND                                     CONTINGENCIES
                               FOR FLOOD -CONTROL

   The cost of the work under this heading during the fiscal year was
$67,484.93. The expenditures were $67,957.71. The balance unex-
pended at the end of the fiscal year $792.11, and $81,000.00 allotted for
fiscal year 1953, amounting to a total of $81,792.11, will be applied to
accounts payable on June 30, 1952, $538.92, and as needed during fiscal
year 1953 for expenditures under this heading. Included under this
heading is a comprekinsive basin-wide investigation covering the
Arkansas, White and Red River Basins; Ark., La., Okla., Tex., N.
Mex., Colo., Kans.,-and Mo., as reported on page 854.
   The additional sum of $332,900 is needed to be.appropriated for:
work under this heading scheduled for fiscal year 1954.
984             REPORT              OF CHIEF OF ENGINEERS,                                            U. S. ARMY,                      1952


                                                    Cost and financial summary

                                                                      Fiscal year ending June 30                                               Total to June
                                                                                                                                              30,1952, includ-
                                                                                                                                              ing fiscal years
                                               1948                1949                1950               1951                1952              prior to 1948

Maintenance:
   Appropriated-......... $95, 000. 00 $140, 000. 00 $128, 170. 00 $294, 157. 44                                         $55, 500. 00           $1,628, 265. 81
   Cost ..--------------- 89, 273. 71 156, 601. 77 130, 306. 35 279, 782. 97                                              67, 484. 93            1, 628, 012. 62
                 ........
   Expenditures--------    86, 186. 37 156, 671. 50 129, 393. 64 282, 290. 37                                             67, 957. 71            1, 627, 473. 70


                                 12. INSPECTION OF COMPLETED WORKS

   The cost of the work during the fiscal year under this heading was
$648.18. There were $774.03 expenditures. The balance unexpended
on June 30, 1952, $225.97 plus $1,000 allotted for fiscal year 1953, a
total of $1,225.97, will be applied to the payment of expenses incurred
for inspection of completed flood control works as required during
fiscal year 1953.
   The additional sum of $1,000 can be profitably expended for work
under this heading during fiscal year 1954.
                                                     Cost and financial summary

                                                                      Fiscal year ending June 30                                               Total to June
                                                                                                                                              30, 1952, includ-
                                                                                                                                              ing fiscal years
                                                1948                1949               1950                1951               1962              prior to 1948

Maintenance:
                .....---
   Appropriated--        -------------- ---------- -------- $1, 000. 00 ------------ -                                                              $1, 00. 00
   Cost        -----------------------------------              125.85      $648.18                                                                     774.03
   Expenditures....------------------------------------------------
                                                           ............      774.03                                                                     774.03


         13. PLANT ALLOTMENT,                                        ALBUQUERQUE,                            N.     MEX.,            DISTRICT
                                                     Cost and financial summary

                                                                      Fiscal year ending June 30                                               Total to June
                                                                                                                                              30, 1952, includ-
                                                                                                                                              ing fiscal years
                                                1948                1949               1950                1951               1952              prior to 1948

Maintenance:
   Appropriated---------.........-------------........------------------------............-----------........................ ............        $100, 000.34
   Cost----------------------                                                                       --------------------
   Expenditures.-.             .---- $22, 864.26 $62, 301.09 $70, 790.00 -$138,609.36                                           $56, 444.48         13, 303.33


                                14. INACTIVE                      FLOOD-CONTROL                             PROJECTS


                                                                                   For last           Cost and expenditures
                                                                                  full report,           to June 30, 1952                       Estimated
                            Name of project                                       see annual                          Samount                   aqu-red re-
                                                                                      for-
                                                                                     report            New work       Mainte -                   complete
                                                                                                                                nance



1. Trinidad, Purgatoire River, Colo ...--------------                                  1951              $53,027.93                (1)         s $2,371,172.07
2. Bluewater Floodway, Bluewater Creek, N. Mex_                                        1951       ----------------                 (1)              236, 800.00

  1Maintenance assumed by local interests as required by act authorizing the project.
  2 Pending completion of, and congressional action on, Purgatoire (Picket Wire) River, Colo. review survey
report.
  5 In addition, local interests are required to contribute the sum of $75,000 toward the cost of construction.
              FLOOD      CONTROL--ALBUQUERQUE,                              N.      MEX.,        DISTRICT                                    985
                             15. MISCELLANEOUS ACTIVITIES

Status of all investigations for flood control called for by flood-control acts
                          and committee resolutions

                                                                                 Date trans-         Document                            Recom-
              Locality                              Authorization act             mitted to          Do.                                mendation
                                                                                  Congress
                                              ---                                                                                              .-

Alamogordo Dam and Reservoir,               Flood Control Act, Aug.
  Pecos River, N. Mex., flood con-            11, 1939.
                                                                            ---------------
  trol, irrigation and other uses.
Alamogordo Dam and Reservoir,               Flood Control Act, May
  on the Pecos River, N. Mex.                17, 1950.
Arkansas River and tributaries,            Commerce Committee res-         ------------
  Colo.                                      olution, Sept. 30, 1942.
Arkansas River and tributaries,             Flood, Control Commit-
  (local flood protection along the          tee resolution, July 2,        ---------------
  main stem above Great Bend,                1943.
  Kans.) .2
Arkansas River for flood control            Flood Control Committee
  at and in the vicinity of Great            resolution, Jan. 21, 1944.
  Bend, Kans.'
Arkansas, White, and Red River              Flood Control Act, May
  Basins, Ark., La., Okla., Tex.,             17, 1950.                         ---------------

  N. Mex., Colo., Kans., and Mo.'
Great Bend, Kans, Arkansas                  Flood Control Committee
  River and tributaries (local flood          resolution, July 2, 1943.     ---------------
  protection above.)'
Great Bend Kans., Arkansas River            Flood Control Committee
  for flood control at and in the             resolution, Jan. 21, 1944.
  vicinity of.'
Huerfano River, Colo., tributary            Flood Control Act, June
  of Arkansas River.'                        22, 1936.
Mora River, N. Mex., tributary of           Commerce Committee res-         -----------        ,
  the South Canadian River, for              olution, Nov. 13, 1945.
  flood control and for making ad-
  ditional water available for agri-
  cultural uses.'                                                                        r---L
                                                                                ----------
Pecos River, N. Mex., Alamo-                Flood Control Act, Aug.
  gordo Dam and Reservoir, flood             11, 1939.                      --------------- ------------
  control, irrigation and other uses.
Pecos River, Alamogordo Dam                 Flood Control Act, May
  and Reservoir, N. Mex.                     17, 1950.                                               i------------




                                                                                ------- r-------
Pecos River and Tributaries,                Flood Control Act, June                                  ------------
  Texas and New Mexico.                      28, 1938.
Picketwire (Purgatoire) River,              Flood Control Committee         --------------- ------------
  Colo., flood protection for Trini-         resolution, Mar. 20, 1945.
  dad, Colo.
Purgatoire (Picketwire) River,                 do......................
                                            ...---..
  Colo.. flood protection for Trini-                                        --------------
  dad, Colo.                                                                                          -     _._.._.____



Red, Arkansas and White River               Flood Control Act, May
  Basins, Ark., La., Okla., Tex.,             17, 1950.                     ---------------
  N. Mex., Colo.. Kans. and Mo.'                                                                     - -     - --   --    -     -



Rio Grande at and in vicinity of            Senate Public Works     Com-
  Socorro, N. Mex.                            mittee resolution,    Sept.
                                              8, 1950.                                                     -- - - - - -       - -



Rio Grande and tributaries, in              Senate Public Works     Com-
vicinity of Albuquerque, N.                  mittee resolution,    Aug.
Mex.                                         2, 1950.                                               - -     - - - - - -        -



Rio Grande and tributaries in vi-           House Public Works      Com-        --------------

cinity of Albuquerque, N. Mex.              mittee Resolution,     June
                                             11, 1952.                                               - -     - --   - - -       -



Rio Honde at Roswell, N. Mex.,              Flood Control Act,
                                                         June
  Pecos River and tributaries,               28, 1938.
  Texas and New Mexico (interim
  report covering flood control).
South Canadian River, and tribu- Commerce Committee res-
  taries including Mora River, N.   olution, Nov. 13, 1945.
  Mex., for flood control and for
  making additional water avail-
  able for agricultural uses.'
Trinidad, Colo., Purgatoire (Pick- Flood Control Committee,
  etwire) River, Colo. local flood  resolution, Mar. 20, 1945.
  protection.
White, Arkansas and Red River Flood Control Act, May
  Basins, Ark., La., Okla., Tex.,   17, 1950.
   N. Mex., Colo., Kans., and Mo.'
                                        I                                   I                    I                                  I
  1A coordinated comprehensive report prepared by Federal and State agencies for the conservation and
development of land and water resources.
  2To be incorporated in the comprehensive report on the Arkansas, White, and Red River basins for the
conservation and development of land and water resources, which will be prepared in the Arkansas-White-
Red Office, Southwestern Division, Corps of Engineers, U. S. Army, Tulsa, Okla.
986     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,          1952

16. EMERGENCY FLOOD-CONTROL WORK UNDER AUTHORITY OF
  PUBLIC LAWS NOS. 138 AND 318, 78TH CONGRESS; PUBLIC LAW NO.
  75, 79TH CONGRESS; AND PUBLIC LAWS NOS. 102 AND 858, 80TH
  CONGRESS

    Because of the heavy demands for emergency-repair work to flood-
control structures damaged or destroyed by the disastrous floods
which occurred in the springs of 1943, 1944, 1945, and 1947, Congress
in the act approved July 12, 1943, Public No. 138, 78th Congress; in
the act approved May 29, 1944, Public No. 318, 78th Congress; in the
act approved June 5, 1945, Public No. 75, 79th Congress; in the act
approved June 23, 1947, Public No. 102, 80th Congress, and in the
act approved June 30, 1948, Public Law 858, 80th Congress, author-
ized the amounts of $10,000,000, $12,000,000, ! 12,000,000, $15,000,000
and $25,000,000, respectively, to be appropriated as emergency funds:
to be expended under the direction of the Secretary of War and the
supervision of the Chief of Engineers for the repair, restoration, and
strengthening of levees and other flood-control works which had
been threatened or destroyed by the recent floods.
   Pursuant to these acts expenditures were made during fiscal years
1944, 1945, 1946, 1948, 1949, 1950, and 1951 in the amount of
$742,718.47, including $8,411.46 contributed funds, for repairs on
flood-control structures in the Middle Rio Grande Conservancy Dis-
trict on the Rio Grande in New Mexico, in the Pueblo Conservancy
District on the Arkansas River in Colorado, on Arroyo de la Matanza
in New Mexico, for repairs to existing timber flume through the city
of Creede, Colo., and channel corrective works downstream from
the timber flume, for the initiation of construction on the Rio Grande
in the Santa Cruz Irrigation District, Rio Arriba County, N. Mex.,
and for engineering studies and design on emergency flood-control
work on the Rio Grande at Espanola, N. Mex., and in the Wilroads
Gardens Drainage District on the Arkansas River, Ford County,
Kans.
   During the fiscal year the construction of emergency flood-control
projects on the Rio Grande in the Santa Cruz Irrigation District,
Rio Arriba County, N. Mex., and in the Wilroads Gardens Drainage
District on the Arkansas River, Ford County, Kans., was completed
and the project on the Rio Grande at Espanola, N. Mex., was can-
celed because local interests were financially unable to continue in
support of the necessary assurances. Engineering studies and de-
sign work were completed and construction initiated on a project on
the Arkansas River levee near Garden City, Kans.
   Costs during the fiscal year were $58,201.68 and expenditures were
$63,805.87.
   Total costs for all work under this heading to the end of the fiscal
year from regular funds were $798,141.10. The expenditures have
been $798,112.88. In addition, costs and expenditures from con-
tributed funds were $8,411.46.
   The unexpended balance on June 30, 1952, amounting to $20,005.11,
will be applied to accounts payable on June 30, 1952, in the amount
of $28.22 and as required to complete the work.
             FLOOD       CONTROL---ALBUQUERQUE,                         N.    MEX.,        DISTRICT                  987

                                     Cost and financial summary

                                                 Fiscal year ending June 30                            Total to June
                                                                                                      30,1952, includ-
                                                                                                      ing fiscal years
                                 1948          1949          1950            1951          1952         priorto 1948

Maintenance:
   Aprropriated....-------.... $7, 550. 00 $307, 375. 25 -$16,784.19    $95, 982. 22   $13, 342. 17        1 $818,   117. 99
   Cost---------------- 6.925. 35            44, 602. 97 242, 840. 06    34, 918. 60    58, 201. 68        1 798. 141. 10
   Expenditures .......- 6,925. 35           14, 521. 86 271, 519. 44    30, 687. 92    63, 805. 87         1798, 112. 88

  1 In addition, $8,411.46 was expended from contributed funds.

17. EMERGENCY BANK PROTECTION WORK UNDER AUTHORITY OF
   FLOOD CONTROL ACT APPROVED DECEMBER 22, 1944, AS AMENDED

  The Flood Control Act approved December 22, 1944, as amended
by the Flood Control Act approved July 24, 1946, authorized the allot-
ment from flood-control appropriations of not to exceed $1,000,000
per year for construction of emergency bank protection works to pre-
vent flood damages to highways, bridge approaches and public works,
when in the opinion of the Chief of Engineers such work is advisable,
provided, that not more than $50,000 shall be allotted for this purpose
at any single locality from appropriations for any one fiscal year.
  Pursuant to this act the following amounts have been allocated for
protection works:

                                                                Fiscal        Amount        Contrib-         Costs to
                                                                year of          of          buted           June 30,
                                                              allotment      allotment       funds             1952


United States Highway 50 bridge, Arkansas River near
Las Animas--_-------- -----------------------                   1949         $7, 469.80 ---------            $7, 469. 80
Diversion structure, Otero Irrigation District, Arkan-
sas River near Fowler, Colo....------- -------------            1949          2,846.39 ............ 2, 846.39
•Colorado State Highway 115 bridge, Arkansas River
  near Florence, Colo....---- ------------------------           1950          2, 871.01 ------------          2, 871.00
Colorado State Highway 109 bridge, Purgatoire River
near Higbee, Colo....    ---------------------------            1950         30, 400.00 ------------         30,121.00
Animas Street Bridge, Purgatoire River, Trinidad,
Colo------------------------------------------------            1950                                 3, 880. 00
                                                                               3,880.00 -----------..........
Colorado State Highway 207 bridge, Arkansas River,
Manzanola, Colo....-----------------------------------          1950         32,175.00         $1, 500       33, 675.00
Colorado State Highway 67 bridge, Arkansas River,
Florence, Colo-..--------------------------------               1950         22, 608.00          1, 000      23, 608.00
Bank protection work Arkansas River, vicinity of
Fowler, Colo.....-----------------------------                  1951                                   9, 208. 00
                                                                              10, 700. 00 ....-----------........
Bank protection work, Rio Grande, for Santa Clara
Pueblo Indians, near Espanola, N. Mex-----....------            1951         34, 000.00   .----------        28,175.00
Bank protection work, Arkansas River, Las Animas,
Bent County, Colo....-----------------------------              1952         48, 500.00 ------------          2, 032.00



   Construction of the protective works at United States Highway 50
bridge across the Arkansas River near Las Animas, Colo., was com-
pleted May 1949. Construction of the protective works near Fowler,
Colo., was canceled when local interests failed to provide necessary
rights-of-way. Construction of protective works for Colorado State
Highway 115 bridge near Florence, Colo., was canceled when it became
known that the highway department planned to build a new bridge
downstream from the present structure. Construction of the pro-
tective works on the Animas Street Bridge at Trinidad, Colo., Colo-
rado State Highway 207 bridge at Manzanola, Colo., and Colorado
988         REPORT            OF CHIEF OF ENGINEERS,                                   U.      S. ARMY,          1952

State Highway 67 bridge at Florence, Colo., was completed during
fiscal year 1951.
   During the fiscal year construction of protective works at Colorado
State Highway 109 bridge near Higbee, Colo., on the Arakansas River
in the vicinity of Fowler, Colo., and along the Rio Grande for the
Santa Clara Pueblo Indians near Espanola, N. Mex. was completed.
Engineering studies and design were completed and construction initi-
ated on emergency bank protection on the Arkansas River, Las Animas,
Bent County, Colo.
   Costs during the fiscal year were $47,708.58 and expenditures were
$47,458.57. Total costs for all work under this heading to the end
of the fiscal year were $141,386.17. The expenditures have been
$141,381.93. In addition $2,500.00 have been expended from con-
tributed funds.
   The unexpended balance on June 30, 1952, $46,472.29, plus accounts
receivable, $47.75, a total of $46,520.04, will be applied as follows:
Accounts payable on June 30, 1952------------------------------                                                                 $51.99
New work :
   Emergency bank protection, Arkansas River, Las
     Animas, Bent County, Colo., by contract--------- $30 105.00
   Available for other work under this heading ..-------- 16, 363.05
                                                                                                                     -     46, 46S. 05

         Total for all work                        ---------------------------------                                      46,520.04

                                           Cost and financial summary

                                                          Fiscal year ending June 30                                     Total to June
                                                                                                                         30, 1952, includ-
                                                                                                                         ing fiscal years
                                       1948             1949             1950               1951         1952              prior to 1948

New work:
   Appropriated        -----......... . .
   Cost ......-----------..
   Expenditures------------------
                                                       . $21, 250. 00 $166,302. 39
                                    ------------......... 10, 262. 92
                                                          10, 351. 69
                                                                        33, 380. 70
                                                                        12, 638. 52
                                                                                      $40, 601.93
                                                                                       50, 033. 97
                                                                                       70, 933.15
                                                                                                     $40, 903. 76
                                                                                                      47, 708. 58
                                                                                                       47, 458. 57
                                                                                                                            !67;

                                                                                                                            1 '1  Tli... 22
                                                                                                                                         17
                                                                                                                                141, 381.93


Other new work data :
    Unobligated balance, June 30, 1952  ----------------------                                                           $25,460. 04
   Unobligated balance available for fiscal year 1953----------                                                           25, 460. 04
1In addition, $2,500 was expended from contributed funds.

18. EMERGENCY FLOOD-CONTROL WORK UNDER AUTHORITY OF
  SECTION 5 OF THE FLOOD CONTROL ACT APPROVED AUGUST 18,
  1941, AS AMENDED.

  Section 5 of the Flood Control Act approved August 18, 19 41, as
amended by section 12 of the Flood Control Act approved July 24,
1946, and section 206 of the Flood Control Act approved June 30,
1948, authorized the allotment from flood-control appropriations, not
to exceed $2,000,000 for any one fiscal year to be expended in rescue
work or in the repair, restoration, or maintenance of any flood-control
work threatened or destroyed by flood, including the strengthening,
raising, extending or other modification thereof as may be necessary
in the discretion of the Chief of Engineers for the adequate function-
ing of the work for flood control. Section 210 of the Flood Control
Act approved May 17, 1950, further amended section 5 of the Flood
             FLOOD        CONTROL-ALBUQUERQUE,                               N.   MEX.,        DISTRICT              989
Control Act approved August 18, 1941, and authorized an emergency
fund in the amount of $15,000,000 to be expended in rescue work or in
the repair, restoration or maintenance of any flood control work
threatened or destroyed by flood, including strengthening, raising,
extending or other modification thereof as may be necessary in the
discretion of the Chief of Engineers for the adequate functioning of
the work for flood control.
  Pursuant to these authorities, expenditures were made in the
amount of $204,120.55 during fiscal years 1942, 1943, 1948, 1949, 1950,
and 1951 for emergency repairs and flood fighting in the Middle
Rio Grande Conservancy District on the Rio Grande in New Mexico
and the Pueblo Conservancy District on the Arkansas River in Colo-
rado, for preparation of plans and specifications for emergency repair
work on the Rio Grande in New Mexico, for construction of emergency
repair work on Wolf Creek at Granada, Colo., and Coal Creek at
Florence, Colo., for initiation of engineering studies and design work
and for emergency repair work on the Arkansas River, Pueblo, Colo.
  During the fiscal year construction of the project on the Arkansas
River, Pueblo, Colo., was completed.
  Costs during the fiscal year were $53,209.20 and expenditures were
$59,688.75. Total costs for all work under this heading to the end
of the fiscal year were $198,625.44. The expenditures have been
$204,120.55.
  The unexpended balance on June 30, 1952, amounting to $3,719.63
will be applied as follows:
Accounts payable on June 30, 1952---------- ----------- ----------- $356. 35
Available for other work under this heading__ ___________________3, 363. 28
         Total for all work__                      ___________--_____-_3,                                         719. 63
                                       Cost and financial summary

                                                   Fiscal year ending June 30-                              Total to June
                                                                                                           30, 1952, includ-
                                                                                                           ing fiscal years
                                   1948           1949            1950            1951         1952         priorto 1948

Maintenance:
    Appropriated--..................
                              -                $50, 125. 18   $48, 314. 70   $32, 044. 51   $28, 208. 38       $207,840.18
   Cost--------------................-----------45, 229. 98    36, 440. 50    14, 598. 35    53, 209. 20        198, 625. 44
   Expenditures    -------.........
                             45, 312. 36 23, 467. 01                          26,505. 02     59, 688. 75        204, 120. 55



19. SMALL FLOOD-CONTROL PROJECTS UNDER AUTHORITY OF SECTION
   205 OF THE FLOOD CONTROL ACT APPROVED JUNE 30, 1948, AS
   AMENDED

   Section 205 of the Flood Control Act approved June 30, 1948, as
amended by section 212 of the Flood Control Act approved May 17,
1950, authorized the allotment from any appropriations heretofore or
hereafter made for flood control, not to exceed $3,000,000 for any one
fiscal year, for construction of small flood-control projects not specifi-
cally authorized by Congress, and not within areas intended to be pro-
tected by projects so authorized which come within the provisions of
section 1 of the Flood Control Act of June 22, 1936, when in the opinion
of the Chief of Engineers such work is advisable: Provided,That not
        245554- 53--vol. 1-              63
990        REPORT             OF CHIEF OF                   ENGINEERS,          U.      S. ARMY,         1952

more than $150,000 shall be allotted for this purpose at any single
locality from the appropriations for any one fiscal year: Provided
further, That the provisions of local cooperation specified in section 3
of the Flood Control Act of June 22, 1936, as amended, shall apply:
And provided further, That the work shall be complete in itself and
not commit the United States to any additional improvement to insure
its successful operation, except as may result from the normal pro-
cedure applying to projects authorized after submission of preliminary
examination and survey reports.
   Pursuant to these authorities, expenditures were made in the amount
of $19,916.11 during fiscal years 1951 and 1952 for project reports on
emergency flood-control measures for protection of the city of Socorro,
N. Mex., along Pinon Canon at Trinidad, Colo., and for the Arkansas
River levee, Great Bend, Kans. Instrumental surveys, hydrologic
studies, economic studies and investigations, engineering design, and
cost estimates of the Socorro, N. Mex., project were completed in fiscal
year 1951; however, the report was not submitted for the reason that
investigations revealed that a project providing a higher degree of
protection would be justified. Approval was given to submit the
review report on the Rio Grande in the vicinity of Socorro, authorized
by resolution of the Senate Committee on Public Works adopted
September 8, 1950, in lieu of the project report. The reports on the
Pinon Canon project, Trinidad, Colo., and the Arkansas River levee,
Great Bend, Kans., were completed during the fiscal year.
   Total costs for all work under this heading to the end of the fiscal
year were $19,916.11. The expenditures were $19,916.11. The unex-
pended balance on June 30, 1952, $304.36, is available for other work
under this heading.
                                            Cost and financial summary

                                                          Fiscal year ending June 30-                         Total to June
                                                                                                             30, 1952, includ-
                                                                                                             ing fiscal years
                                        1948              1949        1950           1951        1952         priorto 1948

New work:
               ........-----------------------..............
   Appropriated------                                                 ------- $15, 300. 00     $4, 920. 47         $20, 220. 47
   Cost --            ---------------------------------------                    7, 492.47     12, 423. 64          19, 916. 11
   Expenditures--------------------------------------7,                              314. 18   12, 601. 93          19, 916. 11


Other new work data :
    Unobligated balance, June 30, 1952_____________________                                                       $304. 36
    Unobligated balance available for fiscal year 1953-------------                                                304. 36
  IMPROVEMENTS OF RIVERS AND HARBORS IN THE
          LITTLE ROCK, ARK., DISTRICT
   This district comprises the northern and western portions of Ar-
kansas, a portion of southern Missouri, and a small portion of eastern
Oklahoma embraced in the drainage basins of the Arkansas River and
tributaries above and exclusive of Pine Bluff, Ark., and below the
mouth of Poteau River, near Fort Smith, Ark., and of the White River
and tributaries above Peach Orchard Bluff, Ark.
   District engineer: Col. Hans W. Holmer, Corps of Engineers.
   Division engineer of the Southwestern Division, Dallas, Tex., com-
prising the Galveston, Tex.; Fort Worth, Tex.; Albuquerque, N. Mex.;
Little Rock, Ark.; and Tulsa, Okla., districts: Col. Louis W. Prentiss,
Corps of Engineers, to May 8, 1952; Col. Charles H. McNutt, Corps of
Engineers, acting May 8, 1952, to June 23, 1952; Col. Herbert D.
Vogel, Corps of Engineers from that date.
                                     IMPROVEMENTS

               Navigaton                              Flood control-Continued
                                       Page                                           Page
1. Arkansas River and tribu-                 17. Black River, Poplar Bluff,
      taries, Arkansas and Okla-                    Mo., to Knobel, Ark__ __          1030
      homa-navigation features         992    18. Clearwater Reservoir, White
2. Upper White River, Ark ...        1011          River Basin, Mo _____
                                                                        ..            1032
3. Examinations, surveys,; and               19. Norfork R eservoir, White
      contingencies (general) ---     1013
                                      1014
                                                    River Basin, Ark    -------       1034
4. Inactive navigation projects _            20. Table Rock R eservoir, White
5. Miscellaneous Activities .-       1014          P iver Basin, Mo. and Ark_        1036
                                              21. Bull Shoals Reservoir, White
              Flood control                         Liver Basin, Ark                  1039
                                              22. White Piver Basin, Little
6. Van Buren, Arkansas River,                      Rock District--- ---.       -     1042
      Ark                             1015    23. Snagging and clearing under
7. Crawford County levee dis-                      authority of sec. 2 of the
      trict, Arkansas River, Ark_     1016          Flood Control Act ap-
8. Near Dardanelle, Arkansas                       proved Aug. 28, 1937, as
      River, Ark_                     1017          amended. .....                    1045
9. West of Morrilton, Arkansas               24. Preliminary     examination s,
      River, Ark_                     1018          surveys, and contingencies
10. Conway County levee dis-                        for flood control ........        1046
      trict No. 6, Arkansas River,            25. Inspection of completed
      Ark_-_                          1020          works _-                          1047
11. Conway County levee dis-                  26. Plant allotment-          -         1047
      tricts Nos. 1, 2, and 8,                27. Inactive flood-control proj-
      Arkansas River, Ark _..         1021          ects_-- -..-                      1048
12. South Bank Arkansas River                 28. Miscellaneous activities ....       1048
      (Head of Fourche Island                 29. Emergency flood-control
      to Pennington       Bayou),                   work under authority of
      Ark                             1022          Public Laws 138 and 318,
13. Blue Mountain Reservoir,                        78th Cong.; Public Law 75,
      Arkansas      River   Basin,                  79th Cong.; and Public
      Ark-                            1023          Laws 102 and 858, 80th
14. Nimrod Reservoir, Arkansas                      Cong                   ---        1052
      River Basin, Ark .              1025    30. Emergency flood-control
15. Arkansas River Basin, Little                    work under authority of
      Rock district_                  1028          the Flood Control Act ap-
16. East Poplar Bluff and Poplar                    proved Aug. 18, 1941, as
      Bluff, Mo__                     1029          amended_ _ ..                 _   1053
                                                                               991
992      REPORT   OF CHIEF OF ENGINEERS, U.      S. ARMY,   1952

        1. ARKANSAS RIVER AND TRIBUTARIES, ARK. AND OKLA.,
                       NAVIGATION FEATURES
  Location.-The Arkansas River rises in the Rocky Mountains near
Leadville, Colo., and flows southeastward for about 1,450 miles
through the States of Colorado, Kansas, Oklahoma, and Arkansas to
join the Mississippi River at a point about 575 miles above the Head
of Passes, La. (See U. S. Geological Survey State maps, scale 1: 500,-
000).
  Previous projects.-Previous projects were adopted by the River
and Harbor Acts of July 3, 1832, April 8, 1876, March 3, 1879, June 14,
1880, July 5, 1884, August 5, 1886, August 11, 1888, June 13, 1902, and
March 2, 1907. For further details see page 1066, annual report for
1932, and pages 744, 864, and 881, annual report for 1943.
  Eisting project.-The River and Harbor Act of July 24, 1946,
approved the multiple purpose plan recommended in the report of
the Chief of Engineers dated September 20, 1945 (H. Doc. 758, 79th
Cong., 2d sess.), and letter of the Chief of Engineers dated March 19,
1946, and limited appropriations thereunder to $55,000,000 for initia-
tion and partial accomplishment of the project. The Flood Control
Act of June 30, 1948, increased the authorization for appropriations
by $1,000,000 by authorization to construct, as an emergency measure,
bank protection and control works at Bradens Bend, Okla., thereby
increasing the total authorization to $56,000,000. The River and Har-
bor and Flood Control Acts of May 17, 1950, increased the authoriza-
tion for appropriations an additional $80,000,000 or to a total of
$136,000,000 and modified the multiple purpose plan and the general
comprehensive plan for flood control by substitution of Keystone
Reservoir, located on the Arkansas River 538.9 miles above the mouth,
for the approved Mannford Reservoir on the Cimarron River and by
deletion of the approved Blackburn and Taft Reservoirs on the
Arkansas River as recommended by the Chief of Engineers (Senate
Doc. 107, 81st Cong., 1st sess.). Details concerning the Keystone
Reservoir are shown under flood control, Tulsa district.
   The existing project provides for improvement of the Arkansas
River   4nd tributaries by construction of coordinated developments to
serve navigation, produce hydroelectric power, afford additional flood
control, and provide related benefits in connection with other activities
such as recreation and wildlife propagation. The navigation features
provide for a channel 9 feet deep following generally the Verdigris
River from Catoosa, Okla., 52 miles downstream to the Arkansas
River; thence along the channel of the latter stream to mile 51 (1940
survey) ; thence by a land cut, designated as the Arkansas Post route,
to the White River at mile 18.3; thence along the channel of the White
River to mile 7.8; thence by a land cut to the Mississippi River at a
point about 590.5 miles above the Head of Passes, La. The waterway
would be canalized throughout its length by three navigation locks
and dams on the Verdigris River and 16 navigation locks and dams
and 4 navigation and hydroelectric power dams downstream there-
from. The four navigation and power dams are the Webbers Falls,
Short Mountain, Ozark, and Dardanelle projects. Lock chambers are
               RIVERS              AND          HARBORS--LITTLE                                 ROCK,            ARK.,           DISTRICT               993
110 by 600 feet on the Arkansas and White Rivers and 83 by 600 feet
on the Verdigris River. A minimum channel width of 150 feet is
proposed for the Verdigris River section and 250 feet for the Arkansas
and White River sections.
  The Federal cost of the project (1952) is $820,951,000 for new work
and is itemized in the following table.

                     Feature                                                                      Location 1                                      Estimated
                                                                                                                                                     cost

          TULSA DISTRICT
         MAIN STEM RESERVOIRS

Webbers Falls Dam and Reservoir _ Verdigris River-mile 4.0; Ark. River-mile 432.3......                                                           $67, 600, 000
Short Mountain Dam and Reservoir_ Arkansas River-mile 432.3 to 395.4------------....................-                                             102, 315, 000
        LOCKS AND DAMS
No. 3----.-.......-........-........                        Verdigris River-pool-mile 52.0 to 37.2............----------...   17, 625, 000
No. 2................................                       Verdigris River-pool-mile 37.2 to 19.4-...............            14, 211, 000
No. 1................................                       Verdigris River-pool-mile 19.4 to 4.0--------.................--- 13, 430, 000
Channel cut offs, enlargements, and                         Verdigris River-mile 63.0 to mile 0.0..........-------------      17, 845, 000
canals.
No. 25...............................                       Arkansas River-pool-mile 395.4 to 376.2--.......-------......                          28, 265, 000
D redging .......................                   ...     Arkansas River........................................                                 11, 310, 000
        BANK STABILIZATION AND
         CHANNEL RECTIFICATION

Short Mountain to Wilsons Rock-....                         Arkansas River-mile 395.4 to 376.5------------....................                      8,850,000
Wilsons Rock to Missouri Pacific RR                         Arkansas River-mile 376.5 to 362.0..................--------------                      6, 800, 000
  Bridge.
        Total, Tulsa district----..........--......--.....--....................................--------------------------------------.........   288, 251, 000
    LITTLE ROCK DISTRICT
         MAIN STEM RESERTOIRS

Ozark Dam and Reservoir ...........                         Arkansas River-mile 346.5 to 319.0_.................                                   48, 800, 000
Dardanelle Dam and Reservoir......                          Arkansas River-mile 301.8 to 257.8----............-----------                          84, 600, 000
              LOCKS AND DAMS

No. 22-A............................                        Arkansas        River-pool-mile 376.2 to 346.5-.............                           21,100, 000
Dredging_-----                                          ..--Arkansas        River..................................                                 2,100, 000
No. 19-A..----......................                        Arkansas        River-pool-mile 319.0 to 301.8.............                            15, 800,000
No. 13-A............................                        Arkansas        River-pool-mile 257.8 to 227.9----------..............                 17, 600, 000
Dredging-..........................                         Arkansas        River....        ............                                           5, 200, 000
No. 12-A............................                        Arkansas        River-pool-mile 227.9 to 208.2--.............---                       17,000, 000
No. 11-A............................                        Arkansas        River-pool-mile 208.2 to 193.9.....---------                           15, 700,000
No. 10-A...---......................                        Arkansas        River-pool-mile 193.9 to 170.9.....------.                             16, 800,000
No. 9-A.............................                        Arkansas        River-pool-mile 170.9 to 153.5 .............                           23,100, 000
No. 8-A.............................                        Arkansas        River-pool-mile 153.5 to 145.0-.........-----                          17,600, 000
No. 7----------------------------.......................-- Arkansas         River-pool-mile 145.0 to 128.0.............                            16,600,000
        BANK STABILIZATION AND
         CHANNEL RECTIFICATION

Missouri Pacific RR. bridge to St.                          Arkansas River-mile 362.0 to 353.7 ...................                                  3, 200, 000
  Louis-San     Francisco   Railway
  bridge.
St. Louis San Francisco Ry. bridge
  to Flat Rock Bend.                                        Arkansas River-mile 353.7 to 347.0 ................--                                   2, 750,000
Flat Rock Bend to Vache Grasse                              Arkansas River-mile 347.0 to 342.0----....................                                 250, 000
  Bend.
Vache Grasse Bend to Bluff Contact-                         Arkansas        River-mile 342.0 to 327.0.-----.--.----.                                6, 500, 000
Bluff Contact to Okane Bend.......                          Arkansas        River-mile 327.0 to 302.0....................                              500, 000
Okane Bend to Patterson Bend......                          Arkansas        River-mile 302.0 to 292.5 ...................                           4, 800, 000
Dardanelle Rock to Reeds Ferry....                          Arkansas        River-mile 257.0 to 240.5...................                            6, 700, 000
Reeds Ferry to Morrilton Bridge - -....                     Arkansas        River-mile 240.5 to 221.0 ....................                          6, 500, 000
Morrilton Bridge to Cypress Bend....                        Arkansas        River-mile 221.0 to 217.0 ....................                          1, 500,000
UPS Morrilton cutoff to DS Morril-                          Arkansas        River-mile 215.7 to 209.0---....................                           570, 000
ton cut off.
DS Morrilton cutoff to Cadron                               Arkansas River-mile 209.0 to 204.0--............-------.....-----                       1,010, 000
  Ridge.
   See footnotes at end of table.
994                 REPORT              OF CHIEF                OF ENGINEERS,                      U.      S.      ARMY,             1952



                            Feature                                                           Location 1                                        Estimated


   LITTLE ROCK DISTRICT-
           Continucd

BANK STABILIZATION AND CHANNEL
     RECTIFICATION-continued

Red Hill To Hickmans Bend -. ..-                            Arkansas River- mile 200.5 to 194.0-......-----.-- ---                                $3, 700, 000
Hickmans Bend to Fourche La Fave                            Arkansas River-mile 194.0 to 192.0....................                                    700, 000
  River.
Benedicts Reach to Palarm BluffL..                                                              ..................
                                                            Arkansas River-mile 190.0 to 183.0 ___                           3, 000, 000
Palarm Bluff to Old Rector Chute__                          Arkansas River-mile 183.0 to 177.5__,__,               ..... .__ 3, 000, 000
Old Rector Chute to Waterworks                              Arkansas River-mile 177.5 to 167.0-...................           5, 250, 000
  Bend.
Rock Island RR. bridge to White                             Arkansas River-mile 164.8 to 130.0-...................                                14, 700, 000
  Bluff.
White Bluff to Jefferson County                             Arkansas River-mile 130.0 to 115.6...................                                  5, 700, 000
  Free Bridge.
Dredging plant including channel                           . . . . . . .. . . .. . . .. . .        ..           . . . . . . .. . . .. -. ---  . . . 210, 280, 000
                                                                                                                                         . .. --
  snagging and dredging.
           Total, Little Rock district....                                                                                                      382, 700, 000

      VICKSBURG DISTRICT

                 LOCKSAND DAMS

No. 6- ..............------.............----------------    Arkansas River--pool-mile 128.0 to 65.3 (mile 115.6                                   21, 780, 000
                                                              =mile 71.2).
No. 5 .....--....-----........---------------------         Arkansas River-pool--mile 65.3 to 51.2_..............                                 17, 230, 000
No. 4 _.....__....................                          Arkansas River--pool-mile 51.2 to 37.7 ............                                   18, 150, 000
No. 3.....----..............-----------------               Pool-Arkansas River mile 37.7 to Navigation Route                                     25, 445, 000
                                                             mile 13.2.
No. 2 ...............................                       Pool-Navigation Route mile 13.2 to Navigation route                                    9, 900, 000
                                                             mile 10.3.
No. 1 ......................--......-                       Pool-Navigation route mile 10.3 to navigation route                                    19, 665. 00
                                                             mile 5.7.
          BANK STABILIZATION AND
           CHANNEL RECTIFICATION

Jefferson County free bridge to Rob                         Arkansas River-mile 101.7 to 89.0_..................                                   7, 230, 000
  Roy Bridge.
Rob Roy Bridge to Arkansas Post                             Arkansas River-mile 89.0 to 42.0......................                               28, 760, 000
  Canal.
Arkansas Post Canal to Yancopin                             Arkansas River-mile 42.0 to 23.5......................                                 1, 400, 000
  Bridge.
Yancopin Bridge to mouth- ......._                          Arkansas River-mile 23.5 to 0........................                                     440, 000
           Total, Vicksburg district......                                                                                                      150, 000, 000

               Total navigation project.....                                                                                                    820, 951, 000

   1 Mileage from 1940 survey for Tulsa and Little Rock districts and 1943 survey for Vicksburg district.
   2 Includes cost of all plant and repair depot for entire project.




   The active features of the project are reported individually on
following pages.
  The existing project was authorized by the River and Harbor Act
of July 24, 1946, as amended by the Flood Control Act of June 30,
1948 and the Flood Control Act of May 17, 1950. (See H. Doc. 758,
79th Cong., 2d sess., which contains the latest published maps.)
  Local cooperation.-Local interests are required to provide adequate
terminal and transfer facilities for navigation and bear the increased
cost of maintenance and operation of all altered rail and highway
routes, including bridges and appurtenances, utilities, and other exist-
ing improvements, other than Federally owned.
       RIVERS   AND HARBORS-LITTLE         ROCK,   ARK.,   DISTRICT   995
   Terminal facilities.-Terminal facilities along the Arkansas River
consist of a paved bank slope, under municipal control, at Little Rock;
privately owned log slips at sawmills and stave mills at Little Rock;
and sand and gravel derricks and elevators at Van Buren, Dardanelle,
Little Rock, and Pine Bluff. These facilities, which are adequate for
existing commerce on the river, are located at or near rail connections.
   Operations and results during fiscal year.-Observation and study
of bank caving conditions were continued and plans and specifications
prepared for emergency bank-stabilization and channel-rectification
works at specific localities.
   Contract work for bank stabilization in the reach "Wilsons Rock to
Fort Smith" was initiated. Bank-stabilization work under one con-
tract in the reach "Dardanelle Rock to Reeds Ferry" was initiated
and, in the same reach, another contract for bank-stabilization work
was awarded but construction was not initiated during the fiscal year.
In the reach "Upstream Morrilton Cutoff to downstream Morrilton
Cutoff" contract work for stabilization of the previously completed
cutoff channel was initiated. In the reach "White Bluff to Jefferson
County free bridge" one contract for bank stabilization was continued,
another contract for bank stabilization was awarded but construction
was not initiated, and contract work providing for the excavation of a
pilot channel was completed. Contract work for bank stabilization
in the reach "Jefferson County free bridge to Rob Roy Bridge" was
initiated. In the reach "Rob Roy Bridge to Arkansas Post Canal"
bank stabilization at one locality was initiated with hired labor, work
was initiated under three bank-stabilization contracts, and work was
initiated and completed under another bank-stabilization contract.
Contract work for bank stabilization in the reach "Arkansas Post
Canal to Yancopin Bridge" was also initiated. For further details
see individual reports on following pages.
   The costs during the fiscal year were $1,791,413.07 for new work,
including $208,447.98 for the Tulsa district, $745,416.92 for the Little
Rock district, and $837,548.17 for the Vicksburg district. The ex-
penditures were $1,504,617.02, including $129,370.34 for the Tulsa
district, $625,379.87 for the Little Rock district, and $749,866.81 for the
Vicksburg district.
   Condition at end of fiscal year.-Bank stabilization in the reach
"Dardanelle Rock to Reeds Ferry" is complete at one locality. The ex-
cavation of a pilot channel in the reach "Upstream Morrilton Cutoff to
downstream Morrilton Cutoff" is complete. The excavation of a pilot
channel across Hensley Bar in the reach "White Bluff to Jefferson
County free bridge" is complete. Bank stabilization in the reach "Rob
Roy Bridge to Arkansas Post Canal" is complete at one locality. Bank-
stabilization work is under way at 11 specific critical localities where
the safety of project levees, bridges, or other improvements is en-
dangered by caving banks. For further details see individual reports
on following pages. The controlling depth of the Arkansas River from
the mouth to Fort Smith, 362 miles, is 3 feet or more for 4 months of the
996    REPORT OF CHIEF OF ENGINEERS, U.                  S. ARMY,       1952

year and less than 3 feet for 8 months. Under average conditions
vessels having drafts of 4 feet can navigate to Little Rock between the
middle of February and the middle of July. From the middle of
August to the middle of December the draft is usually limited to 2 feet.
  The total costs to the end of the fiscal year were $3,942,714.02 for
new work, of which $452,260.33 was for the Tulsa district, $2,320,970.30
was for the Little Rock district, and $1,169,483.39 was for the Vicks-
burg district. The expenditures were $3,588,373.78, of which $371,-
486.61 was for the Tulsa district, $2,141,448.54 was for the Little Rock
district, and $1,075,438.63 was for the Vicksburg district.
  Proposed operations.--The balance unexpended June 30, 1952, in-
cluding accounts receivable, $3,808,509.03, plus an allotment of
$3,756,000 for new work during fiscal year 1953, totaling $7,564,509.03,
will be applied as follows:
                                   TULSA DISTRICT

Accounts payable June 30, 1952:
    Bank stabilization, Short Mountain to Wil-
      sons Rock, Okla__                                     $131. 52
    Bank stabilization, Wilsons Rock to Missouri
      Pacific RR. bridge, Fort Smith, Ark__-__            80, 642. 20

          Total accounts payable------------ --------------               $80, 773. 72
New work :
   Planning: Engineering studies and investiga-
     tions in connection with collection of engi-
     neering data and observations relative to
     critical bank caving areas between Short
     Mountain and Wilsons Rock, Okla., by
     hired labor during the period July 1952
     to June 1953-                                       2, 570. 39
   Construction:     Construct emergency bank
     stabilization and channel rectification on
     the Arkansas River from Wilsons Rock,
     Okla., to Missouri Pacific RR. bridge,
     Fort Smith, Ark., as follows:
        Complete construction of bank-stabilizing
          revetments between river miles 376.5
           and 373.5 and between river miles 365.5
           and 364.0, by continuing contract, July
           1952 to April 1953_                      1, 262,183. 28
        Construction of bank-stabilizing revet-
           ments between river miles 373.5 and
           368.7 including cutoff pilot channel, by
           continuing contract, December 1952 to
           June 1953------------.----                  686, 986. 00

            Total new work _-----------------.--------                  1, 951, 739. 6T

            Total for all work, Tulsa district-----------------         2,032, 513. 39
        RIVERS AND        HARBORS        LITTLE   ROCK, ARK.,       DISTRICT         997
                                 LITTLE ROCK DISTRICT

Accounts payable June 30, 1952___ --       -----        --------------      $180, 671. 66
New work :
    Planning: Maintain the Arkansas River un-
      der constant and continuing surveillance
      and perform-the minimum of advance plan-
      ning necessary for the preparation of plans
      and specifications for emergency construc-
      tion by hired labor during the period July
      1952 to June 1953______            _________          $21, 170. 87
    Construction :     Contruct emergency        bank
      stabilization and channel rectification on
      the Arkansas River by contract during
      the period July 1952 to June 1953 as follows :
        Dardanelle Rock to Reeds Ferry-
              Complete construction of bank revet-
                ment on the right bank between
                miles 253.3 and 252.6 by continu-
                ing contract, July 1952 to January
                1953 -- _____________-                      249. 568.00
             Complete construction of bank revet-
                ment on the right bank between
                miles 251.9 and 251.1 by continuing
                contract, July 1952 to November
                1952                                       262, 800. 00
             Construct a cutoff across Holla Bend
                and across point bar immediately
                upstream from Holla Bend cut-
                off by separate contract, January
                1953 to May 1953_                           526, 828. 00
             Construct bank-stabilization works on
                the right bank of the Holla Bend
                cutoff between miles 249.4 and 241.3
                by continuing contract, January
                1953 to June 1955                 __        311, 200. 00
        Reeds Ferry to Morrilton gridge--
             Construct     bank-stabilization     and
                channel-rectification works on the
                right bank between miles 239.2 and
                237 by separate contract, September
                1952 to June 1953_                          500, 000. 00
        Upstream Morrilton Cutoff to down-
           stream Morrilton Cutoff--
             Continue revetment of the left bank
                of the Morrilton Cutoff and con-
                struction of control works at the
                cutoff entrance between miles 215
                and 209.6 by continuing contract
                July 1952 to March 1953_________           378, 140. 00
    White Bluff to Jefferson County free bridge--
        Continue channel-rectification work and
          bank stabilization, both banks between
          miles 127.8 and 115.6 by continuing con-
          tract, July 1952 to May 1953 _.._.....            549, 162. 00
        Continue revetment of the right bank of
          the Hensley Bar cutoff between miles
          120 and 117.6 by continuing contract,
          July 1952 to December 1952_____--                 566, 798. 00
           Total new work- --------------------                            3, 365, 666. 87

           Total for all work, Little Rock district       -------          3, 546, 338. 53
998     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                        1952

                               VICKSBURG DISTRICT

Accounts payable June 30, 1952__-_---------            ---------------     $94, 101. 66
New work:
    Planning: Studies and planning incidental to
      preparation of definite project report by
      hired labor during the period July 1952 to
      June 1953-------------------------                 $22, 575.33
    Construction: Construct emergency bank sta-
      bilization and channel rectification on the
      Arkansas River as follows:
        Jefferson County free bridge to Rob Roy
           Bridge :
              Contract:
                  Plum Bayou to Rob Roy revet-
                    ment, completion, July and
                    August 1952_---_---------            361, 100. 00
                  Plum Bayou to Rob Roy, flank
                    protection, initiation and com-
                    pletion, July-October 1952 ..         34, 378. 60
                  Plum Bayou to Rob Roy, bank
                    stabilization, September 1952-
                    January 1953___                      405, 043. 78
        Rob Roy to Arkansas Post Canal:
              Contract:
                  Brunson's Crossing revetment,
                    completion, J u 1 y-September
                     1952                      -- _-     291, 471.72
                  Brunson's reach at Richland
                    Bend, revetment and pile dikes,
                    initiation and completion, July-
                    December 1952___            __       204, 015.30
                  Below Rob Roy reach, bank sta-
                    bilization,    September-Novem-
                    ber 1952 .......                     175, 018. 76
                  Brunson's Crossing flank protec-
                    tion, initiation and completion,
                    July-October 1952 ---      "----      28,165. 60
              Hired labor :
                  Rob Roy, revetment, completion,
                    July and August 1952 --...            56, 711. 80
        Arkansas Post Canal to Yancopin Bridge:
              Contract:
                  Medford Bend revetment, comple-
                    tion, July and August 1952__ -       278,574.56
    Engineering, surveys by hired labor, July 1952
      to June 1953.      .-------..........               34, 500. 00
           Total new work_----..-------------------------                1, 891, 555. 45
           Total for all work, Vicksburg district.---      .__-------.   1,985, 657. 11
           Grand total for all work, Tulsa, Little Rock, and Vicks-
             burg districts_.......-          __________________         7, 564, 509. 03
  The sum of $10,290,000 for new work and $70,000 for maintenance
can be profitably expended for the following schedule of work
during the Fiscal Year 1954.
        RIVERS AND HARBORS-LITTLE ROCK,                      ARK., DISTRICT             999
                                 TULSA DISTRICT
New work:
   Construction: Continue construction of emer-
     gency bank stabilization and channel rectifica-
     tion on the Arkansas River from Wilsons Rock,
     Okla., to Missouri Pacific RR. bridge, Fort
     Smith, Ark., by contract during the period
     July 1953 to June 1954----- --......            ---        $1, 340, 000
   Maintenance: Repairs to revetments and dikes
     as may be required by hired labor, July 1953 to
     June 1954-------------------------..........                      15, 000
        Total for all work, Tulsa district---....--_---____                       $1,355, 000
                                 LITTLE ROCK DISTRICT
New work:
   Construction : Continue construction of emer-
    gency bank stabilization and channel rectifica-
     tion on the Arkansas River by contract during
     the period July 1953 to June 1954 as follows:
        St. Louis-San Francisco Ry. bridge to Flat
           Rock Bend----------------             ----               $400, 000
        Vache Grasse Bend to Bluff Contact ....                       200, 000
        Okane Bend to Patterson Bend.._.....                       1, 000, 000
        Dardanelle Rock to Reeds Ferry                             1, 000, 000
        Downstream Morrilton Cutoff to Cadron
           Ridge                                                      500, 000
        Red Hill to Hickmans Bend_                                    400, 000
        Rock Island RR. bridge to White Bluff .                    2, 500, 000
        White Bluff to Jefferson County free bridge.               1, 000, 000
   Maintenance: Repairs to revetment and dikes
        as required in the reach from upstream Mor-
        rilton Cutoff to downstream Morrilton Cutoff
        by hired labor, July 1953 to June 1954..-.....                  5, 000
            Total for all work, Little Rock district ............                 7, 005, 000
                                  VICKSBURG DISTRICT
New work:
    Construction: Continue construction emergency
     bank stabilization and channel rectification on
     the Arkansas River from Rob Roy Bridge to
     Arkansas Post Canal by contract during the
     period July 1953 to June 1954__-                              1, 950, 000
    Maintenance: Repair and maintenance by hired
     labor, July 1953 to June 1954, of bank-protec-
     tion works constructed under the fiscal year
     1952 and fiscal year 1953 programs___          .                 50, 000
        Total for all work, Vicksburg district-....          ...       ......     2, 000, 000

        Grand total for all work, Tulsa, Little Rock,
         and Vicksburg districts-----------------------                          10, 360, 000

NAVIGATION LOCKS AND DAMS NOS. 1, 2, AND 3, VERDIGRIS RIVER,
OKLA. (INCLUDING CHANNEL CUT-OFFS AND ENLARGEMENTS AND
CANALS) (TULSA DISTRICT)

  Location.-The sites of navigation dams Nos 1, 2, and 3 on the
Verdigris River are at miles 4, 19.4, and 37.2, respectively, above its
confluence with the Arkansas River. Channel cutoffs and enlarge-
ments and canals are located in the reach of this stream below Catoosa
in Rogers and Wagoner Counties, Okla. (See Corps of Engineers
Muskogee (Okla.) quadrangle and U. S. Geological Survey maps
1000                   REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                             1952

for Okmulgee (Okla.) and Claremore (Okla.) quadrangles, scale
1: 125,000.)
    Existing projects.-The locks and dams are units in the multiple
purpose plan. In addition, canalization of the Verdigris River
would require 11 cutoffs and 8 channel enlargements in the reach be-
tween Catoosa, Okla., and the mouth, and would provide for naviga-
tion of the Verdigris River, in conjunction with the three locks and
dams, with a minimum channel width of 150 feet and a minimum
depth of 9 feet.
    The locations and descriptions of the locks and dams are contained
in the following table.

                                Miles                     Lock chamber            Length of                              Length
                                Lock       and      above                         movable      Number       Number        of sub-
       Lock and                month of                                            dams          of           of         mersible
       Dam No.                  erdigris         Length       Width       Lift    including     gates        gates        dike
                                                            River
                                                              (feet) (feet)
                                                                        (feet)      (feet)                                (feet)

3-----------_           ----        37.2            600            83        17          260            2            1             0
2----------------                   19.4            600            83        17          260            3            0             0
1.- .           _
              .----.     ---         4.0            600            83         8          260            3            0             0


   The estimated cost of the projects (1952) is $45,266,000 for construc-
tion of locks and dams; $17,580,000 for construction of channel cutoffs,
enlargements, and canals; and $265,000 for lands and damages, total-
ing $63,111,000 for new work.
   The existing projects were authorized by the River and Harbor
Act approved July 24, 1946. (H. Doc. 758, 79th Cong., 2d sess., con-
tains the latest published maps.)
   Local cooperation.-See requirements for entire project.
   Operationsand results during fiscal year.-Engineeringstudies were
made to determine present-day construction costs and sequence of
construction as related to the over-all program. Review of engineer-
ing features of the structures, investigations for sedimentation, and
other studies were made.
   Costs and expenditures during the fiscal year were not segregated
for these projects but were applied to the multiple purpose plan as
a whole.
   Condition at end of fiscal year.-Detailed planning studies for these
projects have not been iniated.
  Total costs and expenditures to the end of the fiscal year have not
been segregated for these projects but were applied to the multiple
purpose plan as a whole.
  Proposed operations.-See proposed operations for entire project.
    WEBBERS FALLS DAM AND RESERVOIR, ARKANSAS RIVER, OKLA.
                      (TULSA DISTRICT)
   Location.-Webbers Falls Dam site is on the Arkansas River 432.3
miles above its confluence with the Mississippi River and 5 miles
northwest of Webbers Falls in Muskogee County, Okla. (See Corps
of Engineers Muskogee (Okla.) quadrangle, scale 1: 125,000.)
   Existing project.-The project is a unit in the multiple purpose
plan and provides for navigation of the Arkansas River and genera-
tion of hydroelectric power by construction of an earth dam and con-
       RIVERS AND HARBORS-LITTLE ROCK, ARK.,           DISTRICT    1001
crete spillway 3,610 feet long (including powerhouse intake) 30 feet
above the valley floor, with a reservoir providing for the storage of
164,000 acre-feet for hydroelectric power and navigation. The proj-
ect will include a powerhouse structure, a gate-controlled spillway,
and a single-lift navigation lock. The power-generating equipment
will include four units with a capacity of 7,000 kilowatts each, a total
capacity of 28,000 kilowatts. The entire dam will be topped by a
roadway. The reservoir will be operated as a unit in the approved
multiple purpose plan for development of the Arkansas River and
with other previously authorized reservoir projects in the Arkansas
River basin.
   The estimated cost of the project (1952) is $65,200,000 for construc-
tion and $2,400,000 for lands and damages, totaling $67,600,000 for
new work.
   The existing project was authorized by the River and Harbor Act
approved July 24, 1946. (H. Doc. 758, 79th Cong., 2d sess., contains
the latest published maps.)
  Local cooperation.-See requirements for entire project.
   Operations and results during fiscal year.--Review of engineering
features of the structures, investigations for sedimentation and bank-
stabilization, and other studies were made.
   Costs and expenditures during the fiscal year were not segregated
for this project but were applied to the multiple purpose plan as a
whole.
   Condition at end of fiscal year.--Detailed planning studies for this
project have not been initiated.
   Total costs and expenditures to the end of the fiscal year have not
been segregated for this project but have been applied to the multiple
purpose plan as a whole.
  Proposed operations.-See proposed operations for entire project.
  SHORT MOUNTAIN DAM AND RESERVOIR, ARKANSAS RIVER, OKLA.
                     (TULSA DISTRICT)

   Location.-Short Mountain Dam site is on the Arkansas River
395.4 miles above its confluence with the Mississippi River and 8
miles south of Sallisaw in Sequoyah and Le Flore Counties, Oklahoma.
 (See U. S. Geological Survey maps for Sans Bois (Okla.) and Sal-
lisaw (Okla.) quadrangles, scale 1: 125,000.)
   Existing project.-The project is a unit in the multiple purpose plan
and provides for navigation of the Arkansas River and generation
of hydroelectric power by construction of an earth dam and concrete
spillway 6,700 feet long (including powerhouse intake) 45 feet above
the valley floor, with a reservoir providing for the storage of 500,000
acre-feet for hydroelectric power and navigation. The project will
include a powerhouse structure, a gate-controlled spillway, and a
single-lift navigation lock. The power-generating equipment will
include 4 units with a capacity of 27,500 kilowatts each, a total ca-
pacity of 110,000 kilowatts. The dam will be topped by a roadway..
The reservoir will be operated as a unit in the approved multiple
purpose plan for development of the Arkansas River and with other
previously authorized reservoir projects in the Arkansas River basin.
   The estimated cost of the project (1952) is $96,365,000 for construc-
1002         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

tion and $5,950,000 for lands and damages, totaling $102,315,000 for
new work.
   The existing project was authorized by the River and Harbor Act
approved July 24, 1946. (H. Doc. 758, 79th Cong., 2d sess., contains
the latest published maps.)
   Local cooperation.--See requirements for entire project.
   Operations and results during fiscal year.-Review of engineering
features of the structures, investigations for sedimentation and bank-
stabilization, and other studies were made.
   Costs and expenditures during the fiscal year were not segregated
for this project but were applied to the multiple purpose plan as a
whole.
   Condition at end of fiscal year.-Detailedplanning studies for this
project have not been initiated.
   Total costs and expenditures to the end of the fiscal year have not
been segregated for this project but have been applied to the multiple
purpose plan as a whole.
   Proposedoperations.-See proposed operations for entire project.
      NAVIGATION LOCK AND DAM NO. 25, ARKANSAS RIVER, OKLA.
                        (TULSA DISTRICT)

  Location.-The site of navigation Lock and Dam No. 25 is on the
Arkansas River 376.2 miles above its confluence with the Mississippi
River and about 10 miles southwest of Fort Smith, Ark., in Sequoyah
and Le Flore Counties, Okla. (See U. S. Geological Survey maps
for Fort Smith (Ark.-Okla.) and Sallisaw (Okla.) quadrangles, scale
1:125,000.)
  Existing project.-The lock and dam is a unit in the multiple pur-
pose plan and, in conjunction with the navigation locks of the Web-
bers Falls and Short Mountain Dams, provides for navigation of the
Arkansas River above Fort Smith, Ark.
  The location and description of the lock and dam are contained in
the following table.

                          above
                         Miles          Lock chamber            Length of                         L
Lock and Dam
Locdams              mouth of                                   movable      Number
                                                                              of gates Number       ength of
                                                                                        of gates submers-
      No.             Arkansas
                       River    Length     Width      Lift        dams
                                                                including     of gates
                                                                              15' x 80' of
                                                                                        20'gates
                                                                                            x 80'       dike
                       River     (feet)     (feet)                                                ible dike
                                                     (feet)    piers (feet)                          (feet)

25..---------------       376. 2     600       110        17         1,520           0        17         130



  The estimated cost (1952) is $28,015,000 for construction, $250,000
for lands and damages, and $11,310,000 for necessary dredging be-
tween Fort Smith, Ark., and Short Mountain Dam and Reservoir,
totaling $39,575,000 for new work.
  The existing project was authorized by the River and Harbor Act
approved July 24, 1946. (H. Doc. 758, 79th Cong., 2d sess., contains
the latest published maps.)
  Local cooperation.-See requirements for entire project.
   Operations and results during fiscal year.-Review of engineering
features of the structures, investigations for sedimentation, ahd other
studies were made.
           RIVERS       AND HARBORS-LITTLE                           ROCK,      ARK.,     DISTRICT         1003
  Costs and expenditures during the fiscal year were not segregated
for this project but were applied to the multiple purpose plan as a
whole.
  Condition at end of fiscal year.-Detailed planning studies for this
project have not been initiated.
  Total costs and expenditures to the end of the fiscal year have not
been segregated for this project but have been applied to the multiple
purpose plan as a whole.
  Proposed operations.-See proposed operations for entire project.
BANK STABILIZATION AND CHANNEL RECTIFICATION,                                                     ARKANSAS
          RIVER, ARK. AND OKLA. (TULSA DISTRICT)

  Location.-The bank-stabilization, cutoffs, and channel-improve-
nent work are located in the reach of the Arkansas River between
Short Mountain Dam site and Fort Smith, Ark., river miles 395.4 and
362, respectively. (See U. S. Geological Survey maps for Sans Bois,
(Okla.) Sallisaw (Okla.), and Fort Smith (Ark.-Okla.) quadrangles,
scale 1: 125,000.)
  Existing project.-The project consisting of training dikes, cutoffs,
revetment, and other channel work, forms a unit in the multiple pur-
pose plan and provides for navigation of the Arkansas River. The
reach, project number, and location of each bank-stabilization and
channel-rectification project are contained in the following table.

                              Reach                                            Project      Location of reach


Short Mountain to Wilsons Rock..-..._._      .   ..........             _ _.         2   Mile 395.4 to mile 376.5.
Wilsons Rock to Missouri Pacific RR. bridge_                  -------------          1   Mile 376.5 to mile 362.0.



   The estimated cost (1952) is $15,650,000 for new work.
   The existing project was authorized by the River and Harbor Act
approved July 24, 1946. (See H. Doc. 758, 79th Cong., 2d sess.)
   Since the corrective bank stabilization in the reach between Wilsons
Rock and Missouri Pacific RR. bridge will also protect the critical
location on the right bank of Arkansas River in vicinity of Bradens
Bend, Okla., the bank protection work under the Bradens Bend project
as authorized by the Flood Control Act of June 30, 1948, will not be
performed. Other data concerning the Bradens Bend project are
shown under flood control, Tulsa District.
   Local cooperation.-See requirements for entire project.
   Operations and results during fiscal year.-Construction of bank-
stabilization and channel-rectification work on the Arkansas River
between Wilsons Rock, Okla., and the Missouri Pacific Railroad bridge
at Fort Smith, Ark., was initiated by the first continuing contract on
April 16, 1952. At the end of the fiscal year, all required pile dikes
were 2.4 percent complete and all revetment works were 1.1 percent
complete.
   The costs during the fiscal year were $201,830.72 and the expendi-
tures were $121,188.52, all for new work.
   Condition at end of fscal year.--First phase of required bank-
stabilization and channel-rectification work on the Arkansas River
1004    REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,           1952

between Wilsons Rock, Okla., and Fort Smith, Ark., has been initiated
and the work continues. Similar work required on the river from
Short Mountain Reservoir dam site to Wilsons Rock, Okla., has not
been initiated. However, preliminary engineering studies incidental
to preparation of plans and specifications are under way.
  The total costs to the end of the fiscal year were $201,830.72 and the,
total expenditures were $121,188.52, all for new work.
  Proposed operations.-See proposed operations for the entire
project.
       OZARK DAM AND RESERVOIR, ARKANSAS            RIVER, ARK.
                   (LITTLE ROCK DISTRICT)
   Location.-Ozark Dam site is on the Arkansas River in Franklin
County, Ark., about 9 miles upstream from the town of Ozark and
319 miles above the mouth. (See U. S. Geological Survey map f6r
Magazine Mountain (Ark.) quadrangle.)
   Existing project.--The project is a unit in the multiple purpose
plan and provides for navigation of the Arkansas River and genera-
tion of hydroelectric power by construction of a gravity concrete and
earth-fill dam and controlled spillway 2,841 feet long and 89 feet above
the stream bed, with a reservoir providing for the storage of 92,000
acre-feet for navigation and hydroelectric power. The power-gen-
erating equipment will include four units with a capacity of 6,000
kilowatts each. The navigation lock will be 110 by 600 feet in size,
with a lift of 24 feet.
   The estimated cost (1952) excluding the cost of bank stabilization in
the upper reaches of the reservoir, is $46,760,000 for construction and
$2,040,000 for lands and damages, totaling $48,800,000 for new work.
   The existing project was authorized by the River and Harbor Act
approved July 24, 1946. (House Doc. 758, 79th Cong., 2d sess.)
   Local cooperation.-See requirements for entire project.
   Operations and results during fiscal year.-No work was done.
   Condition at end of fiscal year.-The work has not been started.
   Proposed operations.-No work is scheduled for the fiscal years
1953 and 1954.
  DARDANELLE      DAM AND RESERVOIR, ARKANSAS           RIVER, ARK.
                     (LITTLE ROCK DISTRICT)
  Location.-DardanelleDam site is on the Arkansas River in Pope
and Yell Counties, Ark., about 2 miles upstream from the town of
Dardanelle and 257.8 miles above the mouth. (See U. S. Geological
Survey map for Dardanelle (Ark.) quadrangle.)
  Existing project.-The project is a unit in the multiple purpose
plan and provides for navigation of the Arkansas River and generation
of hydroelectric power by construction of a gravity concrete dam
and controlled spillway 2,569 feet long and 70 feet above the stream
bed, with a reservoir providing for the storage of 495,000 acre-feet for
navigation and hydroelectric power. The power-generating equip-
ment will include four units with a capacity of 30,000 kilowatts each.
The navigation lock will be 110 by 600 feet in size, with a lift of 52
feet.
  The estimated cost (1952) excluding the cost of bank stabilization in
              RIVERS        AND HARBORS-LITTLE                           ROCK,     ARK.,       DISTRICT           1005
the upper reaches of the reservoir, is $77,270,000 for construction and
$7,330,000 for lands and damages, totaling $84,600,000 for new work.
   The existing project was authorized by the River and Harbor Act
approved July 24, 1946. (House Doc. 758, 79th Cong., 2d sess.)
   Local cooperation.-See requirements for entire project.
   Operationsand results during fiscal year.-No work was done.
   The costs during the fiscal year were $118 for an adjustment of cost
accounts. Unsegregated expenditures during the fiscal year for Dar-
danelle Dam and Reservoir, navigation locks and dams, and bank
stabilization were $625,379.87 for new work.
   Condition at end of fiscal year.-Planningwas not advanced during
the year and was estimated to be about 54 percent complete at the
end of the fiscal year.
   The total cost for new work to the end of the fiscal year was $251,003.
Total unsegregated expenditures for Dardanelle Dam and Reservoir,
navigation locks and dams, and bank stabilization to the end of the
fiscal year were $2,141,448.54 for new work.
   Proposedoperations.-No work is scheduled for fiscal years 1953 and
1954.
ARKANSAS RIVER NAVIGATION LOCKS AND DAMS NOS. 7, 8-A, 9-A, 10-A,
     1l-A, 12-A, 13-A, 19-A, AND 22-A (LITTLE ROCK DISTRICT)

  Location.-The sites of the locks and dams are at various points on
the Arkansas River from 128 miles (lock and dam No. 7) to 346.5 miles
(lock and dam No. 22-A) above the mouth.
    Eisting project.-The several locks and dams are units in the
multiple purpose plan and provide for navigation of the Arkansas
River, in conjunction with the Dardanelle and Ozark Dams and Reser-
voirs and channel clearing and dredging, with a minimum channel
width of 250 feet.
  The location and description of the locks and dams are contained
in the following table.
                     Miles above            Lock chamber                  Length of                       Length of
Lock and Dam         mouth of            Mieaboe
                                            Lckcb                         movable
                                                                           dams         Number
                                                                                        of gates Number     ngth o
                                                                                                 of gates submers-
        No.            Arkansas       Length       Width     Lift         including     15' x 80'   20' x 80'   ible dike
                         River         (feet)      (feet)    (feet)      piers (feet)                             (feet)

22-A ---             ---............. 346. 5 600       110          16         1, 070           4           8       1, 565
19-A.------------- 301.8                     600       110          10         1,070            2          10            0
13-A -------------
        ...........                   227. 9 600       110          14         1,160            3          10            0
12-A.........-------------.           208.2  600       110          13         1,070            1          11            0
11-A ........-------------.           193. 9 600       110          13         1, 070           4           8            0
10-A-.........----------...           170. 9 600       110          13         1, 250           3          11          475
9-A ............                      153. 5 600       110          12         1, 430          10           6       2, 530
8-A ...........-----------            145. 0 600       110          10         1, 250           7           7          790
7----------------................     128. 0 600       110          13         1,160            0          13            0


  The estimated costs (1952) are $168,140,000 for construction and
$460,000 for lands and damages, totaling $168,600,000 for locks and
dams; and $10,280,000 for snagging and dredging for the entire
project including $9,800,000 for snagging and dredging plant, in-
cluding repair depot, a total of $178,880,000.
  The existing project was authorized by the River and Harbor Act
approved July 24, 1946. (H. Doc. 758, 79th Cong., 2d sess.)
          245554-53-vol. 1--              64
1006          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                      1952

  Local cooperation.-See requirements for entire project.
   Operations and results during fiscal year.-No work was done.
  The costs during the fiscal year were $977 for an adjustment of
cost accounts in connection with planining a typical navigation lock
and dam (No. 7), and $9,963 in connection with the work of the in-
vestigative staff, House of Representatives. The unsegregated ex-
penditures during the fiscal year for Dardanelle Dam and Reservoir,
navigation locks and dams, and bank stabilization were $625,379.87
for new work.
  Condition at end of fiscal year.-Studies leading to the development
of a definite plan for navigation and the preparation of a definite
project report for lock and dam No. 7 were not advanced. Planning
work for the lock and dam No. 7 definite project report was estimated
to be 40 percent complete.
   The total cost to the end of the fiscal year for a typical navigation
lock and dam was $77,763, and planning for other navigation features,
including investigative staff work, was $89,339 for new work. Un-
segregated expenditures to the end of the fiscal year, including
Dardanelle Dam and Reservoir and bank stabilization, were $2,141,-
448.54 for new work.
  Proposed operations.-No work is scheduled for fiscal years 1953
and 1954.
              BANK STABILIZATION AND CHANNEL RECTIFICATION,
               ARKANSAS RIVER, ARK. (LITTLE ROCK DISTRICT)
   Location.-The several bank-stabilization and channel-rectification
projects are laid out in various reaches extending from fixed point to
fixed point on the Arkansas River from 115.6 to 362.0 miles above
the mouth.
   Existing project.-The bank stabilization and channel-rectifica-
tion program is a part of the general over-all long range plan for
multiple purpose development of the Arkansas River. The program
of bank-stabilization and channel-rectification work has been set up
in 18 reaches between fixed points in order to provide an orderly
and logical method of proceeding with the over-all program.
   The reach, project number, and location of each bank-stabilization
and channel-rectification project are contained in the following table.

                                       Reach                                            nProject        Location of reach

Missouri-Pacific RR. bridge to St. Louis-San Francisco Ry. bridge                               18   Mile   362.0   to   mile   353.7.
St. Louis-San Francisco bridge to Flat Rock Bend-_                        ------
                                                                       --...                    17   Mile   353.7   to   mile   347.0.
Flat Rock Bend to Vache Grasse Bend--------------------------.........................          16   Mile   347.0   to   mile   342.0.
Vache Grasse Bend to Bluff Contact.....-----.......................-------------------------... 15   Mile   342.0   to   mile   327.0.
Bluff Contact to Okane Bend................-----------------------------------14                     Mile   327.0   to   mile   302.0.
Okane Bend to Patterson Bend ...........-               __-............___...                   13   Mile   302.0   to   mile   292.5.
Dardanelle Rock to Reeds Ferry----........-----------------------------.......................  12   Mile   257.0   to   mile   240.5.
Reeds Ferry to Morrilton Bridge         ---------------------------------
                                                      __                                        11   Mile   240.5   to   mile   221.0.
Morrilton Bridge to Cypress Bend .........................--------------------------------      10   Mile   221.0   to   mile   217.0.
Upstream Morrilton cut-off to downstream Morrilton cut-off........                               9   Mile   215.7   to   mile   209.0.
Downstream Morrilton cut-off to Cadron Ridge -....................                               8   Mile   209.0   to   mile   204.0.
Red Hill to Hickmans Bend----------------------------------
                               ....................................                              7   Mile   200.5   to   mile   194.0.
Hickmans Bend to Fourche La Fave River--------- ----------------                                 6   Mile   194.0   to   mile   192.0.
Benedicts Reach to Palarm Bluff---   ........------------------------------                      5   Mile   190.0   to   mile   183.0.
Palarm Bluff to Old Rector Chute --------------------------------                                4   Mile   183.0   to   mile   177.5.
Old Rector Chute to Waterworks Bend ..----------------------------                               3   Mile   177.5   to   mile   167.0.
Rock Island RR. bridge to White Bluff ..---------------------------                              2   Mile   164.8   to   mile   130.0.
White Bluff to Jefferson County free bridge-------
                                            .............---                          -1             Mile 130.0 to mile 115.6.
       RIVERS AND HARBORS-LITTLE ROCK, ARK.,             DISTRICT   1007
   The estimated cost (1952), is $69,438,800 for construction and
$981,200 for lands and damages, totaling $70,420,000 for new work.
   The existing project was authorized by the River and Harbor Act
approved July 24, 1946. (House Doc. 758, 79th Cong., 2d sess.)
   Local cooperation.-See requirements for entire project.
   Operationsand results during fiscal year.-Plans and specifications
were prepared for emergency bank-stabilization and channel-rectifica-
tion works at specific critical localities, and construction operations
were initiated or continued from the previous fiscal year as follows:
   a. In the reach "Dardanelle Rock to Reeds Ferry," bank-stabiliza-
tion work was initiated by contract on the right bank below Dardanelle
 (mile 253.3 to mile 252.6) and 500 linear feet of two-row single-pile
revetment with rock fill was placed during the fiscal year. A continu-
ing contract for bank stabilization on the right bank below Dardanelle
 (mile 251.9 to mile 251) was awarded, but contract operations were
not started.
   b. In the reach "Upstream Morrilton Cutoff to downstream Mor-
rilton Cutoff," work was initiated under a continuing contract for
revetment of the concave (left) bank of the cutoff and the construction
of control works for the upstream entrance to the cutoff. During the
fiscal year 700 linear feet of standard revetment without mattress was
placed.
   c. In the reach "White Bluff to Jefferson County free bridge," bank-
stabilization work under a continuing contract awarded in 1950 was
continued. Contract operations included placement of 5,246 linear
feet of standard 85-foot-wide revetment, 416 linear feet of pile revet-
ment with rock fill, and 170 linear feet of pile dikes with rock fill. In
the same reach, excavation of a pilot channel across Hensley Bar by
contract was completed. The amount of material removed under the
pilot channel contract during the fiscal year was 1,027,687 cubic yards.
A continuing contract for bank stabilization on the right bank of the
Hensley Bar cutoff was awarded, but contract operations were not
initiated during the fiscal year.
   The cost during the fiscal year for new work was $734,359. The un-
segregated expenditures during the fiscal year for Dardanelle Dam and
Reservoir and navigation locks and dams, including bank-stabilization
and channel-rectification works, were $625,379.87 for new work.
   Condition at end of fiscal year.-Planning studies in connection
with a program of observation of bank-caving conditions were in
progress. Construction operations were under way at specific critical
localities where the safety of project levees, bridges, or other improve-
ments was involved. Complete bank-stabilization and channel-recti-
fication projects include:
   a. In the reach "Dardanelle Rock to Reeds Ferry," bank-stabiliza-
tion work on the right bank between miles 252.6 and 251.9 and a pile
dike on the left bank at mile 254 were initiated in June 1950 and com-
pleted in December 1950.
    b. In the reach "Upstream Morrilton Cutoff to downstream Mor-
rilton Cutoff," excavation of a pilot channel for the cutoff was initiated
in March 1950 and completed in May 1950.
   c. In the reach "White Bluff to Jefferson County free bridge," exca-
1008         REPORT OF CHIEF OF ENGINEERS,                                   U.      S.     ARMY, 1952

vation of a pilot channel across Hensley Bar was initiated in June 1950
and completed in January 1952.
Status of projects under way at end of fiscal year was as follows:
   a. In the reach "Dardanelle Rock to Reeds Ferry," bank-stabiliza-
tion work on the right bank between miles 253.3 and 252.6 was 14
percent complete. Work under the contract for bank-stabilization
work on the right bank between miles 251.9 and 251 had not been
started.
   b. In the reach "Upstream Morrilton Cutoff to downstream Morril-
ton Cutoff," revetment of the concave (left) bank of the cutoff and
the construction of control works for the upstream entrance to the cut-
off was 16 percent complete.
   c. In the reach "White Bluff to Jefferson County free bridge," bank-
stabilization work initiated in June 1950 was 72 percent complete.
Bank-stabilization work on the right bank of the Hensley Bar cutoff
had not been started.
   The total cost to the end of the fiscal year for bank-stabilization and
channel-rectification works was $1,902,865 for new work. Unsegre-
gated expenditures to the end of the fiscal year, including Dardanelle
  am and Reservoir, were $2,141,448.54 for new work.
  Proposed operations.-Seeproposed operations for entire project.
ARKANSAS RIVER NAVIGATION LOCKS AND DAMS NOS. 1, 2, 3, 4, 5, AND
                 6 (VICKSBURG DISTRICT)

   Location.-The sites of the locks and dams are at various points
along the approved navigation route. Following downstream from
lock and dam No. 6 the approved navigation route follows the chan-
nel of the Arkansas River to mile 51 (1940 survey) ; thence by a land
cut about 8.7 miles to White River (White River mile 18.3) designated
as the Arkansas Post route; thence along the channel of White River
for 10.5 miles (White River mile 7.8); thence by a land cut about 1
mile to the Mississippi River at a point about 590.5 miles above Head
of Passes, La.
   Existing project.-The project, consisting of the construction of 2
land cuts, 6 locks and dams, and bridge and utility alterations, forms
a unit in the multiple purpose plan and provides for a minimum navi-
gation channel width of 250 feet and a minimum depth of 9 feet.
  The locations and descriptions of the locks and dams are contained
in the following table.

                                                          Lock chamber                 Length of
Pool                                                                                   movable              Number        Fixed
Pool
No.
                      Mile 1                                                              dams               of gates     weir
                                                 Length      Width       Lift          including            20' x 80'     (feet)
                                                 (feet)       (feet)     (feet)       piers (feet)

   6   65.3 Arkansas River ._........._              600          110           12            1,430                16 _..
   5   51.2 Arkansas River ..........                600          110           13            1, 430               16
  4    37.7 Arkansas River .,           ..           600          110           13           1, 430                16
  3    13.2 navigation route......------------       600          110           13           1, 430                16 -
  2    10.3 navigation route--.........-             600          110           12 .....................-                      25
   1   5.7 navigation route__............_           600          110           25           S   505    ..

1Miles measured along alinement of navigation route.
SWicket-type dam.
            RIVERS AND           HARBORS--LITTLE                ROCK, ARK.,        DISTRICT          1009

   The estimated cost (1952) is $105,580,000 for construction of locks
and dams, $6,420,000 for construction of canals, and $170,000 for
lands and damages, totaling $112,170,000 for new work.
   The existing project was authorized by the River and Harbor Act
approved July 24, 1946. (House Doc. 758, 79th Cong., 2d sess.)
   Local cooperation.-See requirements for entire project.
   Operationsandresults during fiscal year.--Engineeringstudies were
continued and a revised project estimate was prepared in the light
of changes of plan and more adequate engineering data. Among the
general items under study were navigation routes, type of navigation
dams for the Arkansas River, design criteria, and sedimentation and
degradation. The Arkansas River Board was dissolved February 1,
1952, by order of the Chief of Engineers and studies on all features
of the multiple purpose project except bank stabilization were dis-
continued as of that date.
   As the work during the fiscal year consisted of planning and collec-
tion of basic data for the preparation of a definite project report, no
costs are applicable under this heading.
   Conditionat end of fiscal year.--A revised project estimate has been
made, and navigation routes, types of navigation dams for the Arkan-
sas River, design criteria, and sedimentation and degradation have
been studied. The Arkansas River Board has been dissolved and all
studies on these features of the multiple purpose project have been
discontinued.
   The tdtal costs to the end of the fiscal year for planning and bank
stabilization and channel rectification work were $1,169,483.39 for
new work. Unsegregated expenditures, including planning, and bank
stabilization and channel rectification, were $1,075,438.63.
   Proposed operations.-See proposed operations for entire project.
BANK        STABILIZATION AND CHANNEL RECTIFICATION, ARKANSAS
                    RIVER, ARK. (VICKSBURG DISTRICT)

  Location.-The bank-stabilization and channel-rectification proj-
ects are laid out in reaches extending from fixed point to fixed point
on the Arkansas River from the mouth to 101.7 miles above the mouth.
(River miles as measured on the 1943 survey.)
  Existing project.-The bank-stabilization program is a part of the
general over-all long range plan for multiple purpose development
of the Arkansas River. Studies indicate that the banks of the river
can be effectively stabilized only by completing an entire reach be-
tween two relatively stable or fixed points. The reach, project number,
and location of each bank-stabilization and channel-rectification
project are contained in the following table.

                                Reach                                   Project
                                                                        number       Location of reach 1

Jefferson County free bridge to Rob Roy Bridge---------------------           4   Mile 101.7 to mile 89.
Rob Roy Bridge to Arkansas Post Canal__         __---------------------___    3   Mile 89 to mile 42.
Arkansas Post Canal to Yancopin Bridge---------------............             2   Mile 42 to mile 23.5.
Yancopin Bridge to mouth__----------------------....................          1   Mile 23.5 to mile 0.

  1River mileage from   1943 survey.
1010   REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   The estimated cost, revised in July 1951, is $37,812,000 for con-
struction and $18,000 for lands and damages, totaling $37,830,000
for new work.
   The existing project was authorized by the River and Harbor Act
approved July 24, 1946 (House Doc. 758, 79th Cong., 2d sess.).
   Local cooperation-Seerequirements for entire project.
   Operations and results during fiscal year.-One contract for con-
struction of pile dikes at New Gascony, Ark., on the left bank, was
initiated and completed. Work under three contracts for revetment
construction was initiated; in the reach from Plum Bayou to Rob Roy,
on the left bank, at Brunson's Crossing, on the left bank, and at
Medford Bend, on the right bank, respectively. The contract for
work in the reach from Plum Bayou to Rob Roy is 63 percent com-
plete, 37 percent complete at Brunson's Crossing, and 46 percent
complete at Medford Bend. Construction of revetment at Rob Roy,
on the right bank, was initiated by hired labor and is 76 percent
complete. One contract was let for construction of flank protection
in the reach from Plum Bayou to Rob Roy, and at Brunson's Crossing,
and for revetment and pile dike construction in the Brunson Reach at
Richland Bend.
   The costs during the fiscal year were $837,548.17 for planning and
bank stabilization and channel rectification work. The unsegregated
expenditures for planning and bank stabilization and channel recti-
fication work were $749,866.81.
   Condition at end of fiscal year.-Studies, planning, and design were
continued. Construction of pile dikes at New Gascony, Ark., have
been completed. Revetment construction at Rob Roy, Plum Bayou
to Rob Roy, Brunson's Crossing, and Medford Bend is in progress.
Contracts have been let for flank protection, Plum Bayou to Rob Roy,
and Brunson's Crossing, and for revetment and pile dike construction
in the Brunson Reach at Richland Bend.
   Bank stabilization and channel rectification works have been con-
structed in the Arkansas River between Pine Bluff, Ark., and the
mouth under appropriations for flood control, Mississippi River and
tributaries, of which 33,143 linear feet of pile dikes and 18,090 linear
feet of revetment are operative. This work is reported in the annual
report of the president, Mississippi River Commission.
   The total costs to the end of the fiscal year for planning and bank
stabilization and channel rectification were $1,169,483.39 for new
work. Unsegregated expenditures to the end of the fiscal year, in-
cluding planning, and bank stabilization and channel rectification,
were $1,075,438.63.
   Proposedoperations.-See proposed operations for entire project.
              RIVERS AND HARBORS-LITTLE                                             ROCK,      ARK.,        DISTRICT               1011
                                               Cost and financial summary
                                                        CONSOLIDATED

                                                           Fiscal year ending June 30                                      Total to June
                                                                                                                          30, 1952, includ-
                                                                                                                          ing fiscal years
                                           1948          1949            1950              1951             1952           prior to 1948

New work:
   Appropriated-------------.........             ----
                                                  ----............
                                                             $500, 000. 00 $1,850,000.00 $838, 000. 00 $4,208,038.84       ' $7, 777, 005. 79
   Cost------------------............. ............           266, 918. 41 710, 769. 88 1, 173, 612. 66 1, 791, 413. 07      14, 323, 680. 97
   Expenditures.....------..--.---------............   237,252. 27     692, 331. 841, 154, 172. 651, 504, 617.02             13, 969, 340. 73


Other new work data:
    Unobligated balance, June 30, 1952-_                                        -             _
                                                                                             ..--                        272, 771. 73
        Appropriated for fiscal year ending June 30, 1953__       _                                                   3,756,000.00
        Unobligated balance available for fiscal year 1953 _.....                                                     4, 028, 771. 73
        Estimated additional amount needed to be appropriated for
          completion of existing project___                                                                        809, 798, 961. 16
IIncludes $380,966.95 from previous project.

                                         2. UPPER WHITE RIVER, ARK.

  Location.-These works are on the White River, Ark., lock and
dam No. 1 being 1 mile below Batesville, Ark., and Nos. 2 and 3 being
7.5 and 19.3 miles, respectively, above that city. (See Mississippi
River Commission alluvial valley map, scale 1: 500,000, and U. S.
Geological Survey map, scale 1: 500,000.)
   Previous projects.-See previous projects for White River, page
1874, annual report for 1915.
  Existing project.-The existing project provides for the construc-
tion of 10 fixed dams with concrete locks to give 4-foot navigation the
year around. The River and Harbor Act of March 2, 1907, after
providing for the completion of the third lock and dam, abandoned
further construction work, its language fixing the appropriation car-
ried therein as the final one. The stream is nontidal, with an ordinary
freshet fluctuation of 16 to 18 feet, and with an extreme stage fluctua-
tion of 38 feet just below lock No. 1 and 51 feet at Calico Rock, 39
miles above lock No. 3.
   The cost of new work under the project was $813,197. The estimate
of annual cost of maintenance (1952) is $55,000, including $40,000
for operation and care.
   The existing project was adopted by the following river and harbor
acts:

       Acts                                   Work authorized                                                Documents

Mar. 3, 1899        Existing project adopted............-------------
                                                               ---        H. Doc. 78, 54th Cong., 2d sess.;
                                                                           annual report, 1897, p. 1992.
Mar.     2,1907     Abandonment of further new work on the project-...... H. Doe. 150, 59th Cong., 1st sess.
June 26, 19341 Operating and care of locks and dams provided for
                       with funds from War Department appropriations
                       for rivers and harbors.

1 Permanent Appropriations Repeal Act.
1012         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

  The locations, dimensions, etc., of the three completed locks and
dams are as follows:

                                                Lock 1                         Lock 2                               Lock 3

Location-__-------.        ----       - Batesville----.-------      Earnharts-------
                                                                            ........                    Walls Ferry.
Distance from mouth of river.._ 299.8 miles----------............   308.3 miles----------............   320.1 miles.
Dimensions of locks:
    Length available............
                              147 feet..........-.....          147 feet_.-------------                 147 feet.
    Width available-............
                             36 feet-------------.............. 36 feet___-
                                                                         .....-.--                      36 feet.
    Depth on lower sill at mean 4.3 feet ....................
                                                          ..................
     low water (open river).
    Depth on lower sill at nor- ........................
                                                      6.5 feet---.....--...----...---... 4.7 feet.
      mal pool.
   Depth on upper sill at nor- 7.1 feet-------------................ 5.3 feet.------------- 5.2 feet.
     mal pool.
   Lift at mean low water and 15.6 feet....
     normal pool.
   Lift at normal pools.--.....      .------------------------12.8 feet------------...............
                                                                                            14.5 feet.
   Foundations- ..............      Bedrock------------............. Bedrock .............. Bedrock.
Dams:
   Kind of--------------..    ----. Fixed--------------. Fixed.--------------. Fixed.
   Type of construction- ...... Timber crib filled Timber crib filled Timber crib filled with
                                      with stone.                      with stone.            stone.
                                                        658 feet................
    Length..-.................. 660.5 feet-----------..............          750.7 feet.
Date opened to navigation---    1904--------          - 1905__-------        1908.
Date ofcompletion-.............1904___.--------------- 1905---------------   1908.
Cost of construction.............
                                $278,587.56                                  $236,981.31.
                                                        $297,627.94----------.............
                                          ...--....--------...



   All dams have concrete caps.
   The approximate location of these locks and dams is shown on dis-
trict map (sketch) printed in annual report for 1911, opposite page
1877.
   Terminal facilities.--Log slips, derricks, and conveyors exist at the
several woodworking establishments, all for the individual use of the
owners. The terminal facilities are considered adequate for the
present commerce.
   Operationsand results duringfiscal year.-The work performed dur-
ing the fiscal year consisted of operation of the locks and routine main-
tenance of appurtenant river structures, buildings, and grounds, all
by hired labor and Government plant. The United States derrick
boat No. 001 during August 1951 removed 1,600 cubic yards of mud
and sunken drift from the fleet harbor near lock No. 1 and from the
lock upper gate recess. A license for a term of 25 years was negotiated
with the city of Batesville, Ark., for operation and maintenance of
lock and dam No. 1 as an incident to its development and use of the
pool and lake area as a recreational site.
   The costs during the fiscal year were $13,983.56 for operation and
care. The expenditures were $11,152.65.
   Condition at end of fiscal year.-The existing project, as amended,
was completed in 1908. All locks, dams, buildings, and other appur-
tenances are in good condition except the lock approaches have par-
tially filled in due to lack of dredging. Tabulation under "Existing
project" gives data regarding the principal features of construction.
These works, by aid of dredging, give all-year slack-water navigation
for 4-foot draft from 1 mile below Batesville to Guion, which is 29
miles upstream therefrom. Waterborne commerce through the locks
has become insufficient to warrant continued operation and mainte-
nance of the project at Federal expense.
   In accordance with the policy of the Corps of Engineers to suspend
lock operation and maintenance of waterways affording little or no
              RIVERS             AND HARBORS-LITTLE                                      ROCK,            ARK.,     DISTRICT                   1013
benefit to general commerce and navigation, and to eliminate non-
essential maintenance expenditures, all concerned were informed on
June 23, 1952 by public notice that Federal operation and mainte-
nance of the three locks and dams would be terminated at midnight
June 30, 1952, and that the city of Batesville, Ark., would assume
responsibility for operation and maintenance of all facilities at lock
and dam No. 1 on or about July 1, 1952. The gates of locks Nos. 2
and 3 have been secured in a closed position and the real estate in the
vicinity of these locks will be offered for lease during fiscal year 1953.
  The total costs to the end of the fiscal year were:
New work (construction of locks and dams)                                                   ----------------                     $813, 196. 81
Maintenance (dredging and snagging) (includes $60,613.63 not
  covered by cost and financial summary for White River, Ark.)__                                                                      104, 084. 62
Operation and care (locks and dams Nos. 1, 2, and 3)-----------                                                                       495, 935. 78

           Total cost to June 30, 1952--------------------------                                                               1, 413, 217. 21
   The total expenditures to the end of the fiscal year were $1,413,557.26.
   In addition, the sum of $1,187,282.59 was expended between January
6, 1904, and June 30, 1935, on the operation and care of the works of
the improvement under the provisions of the permanent indefinite
appropriations for such purposes.
   Proposed operations.--The balance unexpended June 30, 1952,
$1,766.11, will be applied during fiscal year 1953 to the payment of
outstanding accounts.
   No work is scheduled for fiscal year 1954.
                                                 Cost and financial summary

                                                                 Fiscal year ending June 30                                           Total to June
                                                                                                                                     30, 1952, includ-
                                                                                                                                      ing fiscal years
                                            1948              1949               1950               1951           1952                 priorto 1948

New work:
    Appropriated .........    ........................                    ............     ............                                   $813, 196. 81
    Cost- ---------- -     ------------               ----------------------.----------.--                      --------        --.        813,196. 81
    Expenditures---.........------------              -------- ------------------------                        --------        ---         813,196. 81
Maintenance:
   Appropriated-.........              $30, 000.00       $38, 000. 00       $28, 147. 44       $ 30, 679. 28     $4, 471.67            1 1, 787, 302. 99
    Cost-....--------------              49, 037. 03       42, 309. 97        37, 566.40         31, 504. 26     13, 983. 56           1 1, 787, 302. 99
    Expenditures---....----              47, 253. 57       44, 617. 37        34, 241. 85        30, 205. 17     11, 152. 65           11, 787, 653. 04

  1 Includes $1,187,282.59 from permanent appropriation for operating and care, and cost applicable to oper-
ating and care operations in the amount of $60,613.63 paid from funds allotted during fiscal years 1937 and
1938 to White River for operations on both White and Upper White River projects.

      3. EXAMINATIONS, SURVEYS, AND CONTINGENCIES (GENERAL)

   The costs during the fiscal year were $2,307.13 and the expenditures
were $4,398.98.
   The balance unexpended June 30, 1952, $779.56, together with an
allotment for fiscal year 1953 of $3,400 for contingencies, totaling
$4,179.56 will be applied as needed during the fiscal year 1953 to pay-
ment of outstanding liabilities and other expenses to be incurred under
this heading.
   The additional sum of $3,800 can be profitably expended for con-
tingencies during fiscal year 1954.
1014            REPORT OF               CHIEF OF ENGINEERS, U. S. ARMY, 1952

                                             Cost and financial summary
                                                           Fiscal year ending June 30                                          Total to June
                                                                                                                              30, 1952, includ-
                                                                                                                              ing fiscal years
                                         1948             1949            1950              1951                  1952          prior to1948

Maintenance:
   Appropriated- ........            $26, 000.00       $7, 000. 00      $2, 000. 00    $10, 500. 00             $1, 100. 00     $1, 161, 977. 52
   Cost --- -----------               15, 857. 78       8, 458. 42       8, 199. 75     11, 392. 98              2, 307. 13      1, 161, 283. 52
   Expenditures--......------...      14, 615. 87       9, 625. 72       8, 140. 10      9, 354. 99              4, 398. 98      1, 161, 197. 96


                                   4. INACTIVE               NAVIGATION                     PROJECTS

                                                                       For last   Cost and expenditures to                      Estimated
                                                                     full report        June 30, 1952                             amount to
                      Name of project                                see Annual                                                 required
                                                                       Reportmplete                                             required to
                                                                        for-      New work Maintenance                           complete

1. White River, Ark. (above Peach Orchard
            ...........
     Bluff)__        __  ___.........................                   1950          $337, 801. 57        1$785, 666. 26             (2)
2. Black River, Ark. and Mo------------------...................        1950            80, 000. 00          658, 221. 86             ()
3. Current River, Ark. and Mo             -----------------             1950            17, 000. 00          125, 912. 47             (5)
  1 Includes $358.80, Little Red River, and excludes $60,613.63, Upper White River, Ark.
  2 Channels adequate for existing commerce. Completion not contemplated.

                                     5. MISCELLANEOUS                          ACTIVITIES

Status of all investigations for navigation called for by river and harbor acts
                          and committee resolutions

                                                                                        Date Trans-                 Document       Recom-
                  Locality                             Authorization act                 mitted to                    No.         mendation
                                                                                         Congress

Arkansas River from Little Rock,                 River and Harbor Act, ..
Ark., to Mississippi
                 1       River via                July 24, 1946.
  Grand Prairie.
Arkansas, White, and Red River
Basins, Ark., La., Okla., Tex.,
                                                 Flood Control Act, May
                                                   17, 1950.
                                                                                      -.-
                                2
N. Mex., Colo., Kans. and Mo.
Grand Prairie, Ark., waterway                    River and Harbor Act,                _..
from Arkansas River at Little                    July 24, 1946.
  Rock to the Mississippi River.'
Mississippi River to Arkansas                    River and Harbor Act, ...........................
  River at Little Rock, Ark., via                 July 24, 1946.
  Grand Prairie.'
Newport, Ark., between Missis-                   Senate Public Works Com-                     ...................
                                                                                                   __
  sippi River and Newport, Ark.;                   mittee resolution, July
  for flood control and naviga-                    29, 1949.
  tion on White River.' 3
Red, Arkansas and White River                    Flood Control Act, May ................ ........
  Basins, Ark., La., Okla., Tex.,                  17, 1950.
  N. Mex., Colo., Kans. and Mo.5
Taneycomo Lake, Mo. (located on                  River and Harbor Act, ..........................
White River).'                                    July 24, 1946.
White, Arkansas and Red River                    Flood Control Act, May _......................
Basins, Ark., La., Okla., Tex.,                   17, 1950.
N. Mex., Colo., Kans. and Mo.5
White River, Ark---....----------                River and Harbor Act,
                                                   Aug. 30, 1935.
                                                                                      .......           ---.......
White River, Ark., and Mo., im-                  Rivers and Harbors Com-_             .......................
provement for navigation, flood                   mittee resolution, Jan.
control, and irrigation.                          24, 1939.
   Do----....--.--------------                   Commerce Committee res-               ..
                                                   olution, Feb. 8, 1939.
White River between Newport                      Senate Public Works Com-             ..............
Ark., and the Mississippi River,                  mittee resolution, July
for flood control and naviga-                    29, 1949.
tion.' 3
  1To be incorporated in the comprehensive report on the Arkansas, White, and Red River Basins for the
conservation and development of land and water resources which will be prepared by the Arkansas-White-
Red Office, Southwestern Division, Corps of Engineers, U S. Army, Tulsa, Okla.
  2 A coordinated comprehensive report prepared by Federal and State agencies for the conservation and
development of land and water resources.
  2 Report being prepared by the district engineer, Memphis district.
                FLOOD       CONTROL--LITTLE                 ROCK,      ARK.,       DISTRICT              1015
                       6. VAN BUREN, ARKANSAS RIVER, ARK.
   Location.-This project is located on the left bank of the Arkansas
River at and in the immediate vicinity of the city of Van Buren (mile
353.4), Crawford County, Ark. (See U. S. Geological Survey map
for Fort Smith (Ark.) quadrangle.)
   Existing project.-The plan of improvement provides for the con-
struction of a compacted earthfill levee, a concrete flood wall, an inter-
cepting storm sewer and ditch, and a sanitary sewage pumping station
on the left bank of the Arkansas River in the reach from high ground
near the St. Louis-San Francisco Railway bridge (mile 353.7) to the
city limits at a point on the existing Crawford County levee opposite
mile 352.7. The levee connects with the authorized project for Craw-
ford County levee district. The total length of the levee and flood
wall is about 1.3 miles, of which approximately 0.4 mile is new levee,
0.6 mile is riverside enlargement of the existing Crawford County
levee, and about 0.3 mile is reinforced concrete flood wall. Four
existing storm drains which discharge into the Arkansas River are
provided with drainage structures in the levee and flood wall and are
equipped with flood-gates. An intercepting sewer and ditch conveys
interior runoff occurring during high river stages to Ned Lake in the
Crawford County levee district. The project provides for the pro-
tection of the city of Van Buren, Ark., with a levee and flood wall
having a 3-foot freeboard above a confined flood profile based on a
flow of 800,000 cubic feet per second in the river.
   The Federal cost of the completed project is $438,222.19 for con-
struction and the estimated cost to local interests for lands and dam-
ages is $50,000, a total of $489,000.
   The existing project was authorized by the Flood Control Act ap-
proved December 22, 1944, as amended by section 3 of the Flood
Control Act approved July 24, 1946, and the Flood Control Act ap-
proved June 30, 1948. (See H. Doc. 447, 78th Cong., 2d sess.)
   Local cooperation.-Seepages 4-5 for requirements. Assurances of
local cooperation were submitted by local interests and were approved
by the Secretary of War on April 21, 1947. All rights of way have
been furnished.
   Operations and results during fiscal year.-Outstandingobligations
were liquidated.
   The costs during the fiscal year were $135.41 and the expenditures
were $135.41, all for new work.
   Condition at end of fiscal year.-The project is complete.
   The total costs to the end of the fiscal year were $438,222.19 and
the expenditures were $438,222.19, all for new work.
   Proposed operations.-None.
                                   Cost and financial summary
                                                Fiscal year ending June 30                       Total to June
                                                                                                 30, 1952, includ-
                                                                                                 ing fiscal years
                                1948          1949         1950         1951          1952         priorto 1948

New work:
   Appropriated-.........$210, 000. 00    -$90,000.00     .--       -$10,000.00     -$777. 81        $438, 222. 19
   Cost-__-............... 215, 823. 14    185, 026. 90    $863.15     3, 701.02       135. 41        438, 222. 19
   Expenditures- .......    199, 073.65    201, 426. 73     469. 95    4,071.29        135.41         438,222.19
1016       REPORT OF CHIEF OF ENGINEERS, U.      S. ARMY,   1952

  7.     CRAWFORD COUNTY LEVEE DISTRICT, ARKANSAS RIVER, ARK.

   Location.-This project is located on the left bank of the Arkansas
River from a point near the eastern limits of the city of Van Buren,
Ark. (mile 352.7) to a point near the mouth of Frog Bayou (mile
331.9), Crawford County, Ark. (See U. S. Geological Survey map
for Fort Smith (Ark.) quadrangle.)
   Existing project.-The plan of improvement provides for the con-
struction of a compacted earth-fill levee, approximately 19.8 miles
long, extending from the downstream end of the Van Buren, Ark., proj-
ect at mile 352.7 downstream to mile 332, near the mouth of Frog
Bayou. This levee follows the present alinement of an existing levee
except at the locations where encroachment of the river made it advis-
able to set the levee farther from the banks. Six new drainage struc-
tures, equipped with floodgates, have been built. The existing project
for the Crawford County levee district, which is a modification of the
previously authorized flood-control project, provides for the protection
of approximately 15,060 acres of rural lands and communities with a
levee having a 11/2 -foot freeboard above a confined flood profile based
on a flow of 800,000 cubic feet per second in the river. The modified
project differs from the previously authorized project in that it pro-
vides for a levee grade about 7 feet higher and a compacted earth-fill
embankment.
   The estimated Federal cost of the project (1952) is $2,142,000 for
construction and the estimated cost to local interests for lands and
damages is $74,000, a total of $2,216,000.
   The existing project, authorized by the Flood Control Act approved
December 22, 1944, and modified by section 3 of the Flood Control Act
approved July 24, 1946, and the Flood Control Act approved June 30,
1948, is a modification of the project authorized by the Flood Control
Act approved August 18, 1941. (See H. Doc. 447, 78th Cong., 2d
sess.)
  Local cooperation.-See pages 4-5 for requirements. Assurances of
local cooperation were submitted by local interests and were approved
by the Secretary of War on April 17, 1947. All rights-of-way other
than those required for construction of a setback levee, have been
furnished.
   Operations and results during fiscal year.-Surveys and foundation
investigations were made for the setback of a portion of the project
levee due to bank caving in the vicinity of river mile 338. Preparation
of construction plans for the setback was initiated and is 20 percent
complete. The levee was mowed and minor adjustments to drainage
gates were made. The levee was transferred on September 27, 1951,
to the Crawford County Levee District for maintenance and operation.
   The costs during the fiscal year were $11,737.15 and the expenditures
were $11,777.02, all for new work.
   Condition at end of fiscal year.-The project is complete with the
exception of the setback of a portion of the levee which is threatened
by bank caving.
   The total costs to the end of the fiscal year were $1,950,304.59 and
the expenditures were $1,950,304.59, all for new work.
               FLOOD CONTROL---LITTLE                   ROCK, ARK.,          DISTRICT                1017
  Proposedoperations.-Thebalance unexpended June 30,1952, $191,-
695.41, will be applied during fiscal year 1953 to completion of plans
and specifications for the setback levee and to construction of the set-
back levee.
  With the expenditure of these funds it is expected that the project
will be complete. No work is scheduled for fiscal year 1954.
                                 Cost and financial summary

                                            Fiscal year ending June 30-                       Total to June
                                                                                             30,1952, includ-
                                                                                             ing fiscal years
                              1948         1949         1950         1951         1952        prior to 1948

New work:
   Appropriate--....-.....$775,000. 00 $600,000.00 $300,000. 00 -$156,054.00 $131,354.00       $2,142,000.00
   Cost---------------       526, 724. 54 717,048. 69 293, 640. 60 357, 299. 48 11, 737.15      1,950, 304. 59
   Expenditures--------- 414, 473. 11 826,873. 59 236,592. 78 417, 544. 24      11, 777.02      1, 950, 304. 59


Other new work data :
   Unobligated balance, June 30, 1952-----
                                         ..... __ ------ _         $191, 695.41
   Unobligated balance available for fiscal year 1953_------------ 191, 695. 41

                8. NEAR DARDANELLE, ARKANSAS RIVER, ARK.
   Location.--This project is located on the right bank of the Arkansas
River and extends from a point near the southern limits of Dardanelle,
Ark. (mile 254.5) to Mill Creek (mile 247), Yell County, Ark. (See
U. S. Geological Survey map for Dardanelle (Ark.) quadrangle.)
   Existing project.-The plan of improvement provides for the con-
struction of a compacted earthfill levee extending in a southeasterly
direction from high ground near the southern limits of the town of
Dardanelle to a ridge at Arkansas River mile 247 after crossing Mill
Creek near its mouth. This part of the project is 8.2 miles in length,
of which 4.7 miles is new levee, 1.5 miles riverside enlargement and 2
miles landside enlargement. An existing large drainage structure at
Mill Creek has been utilized. The existing project for the Dardanelle
drainage district which is a modification of the previously authorized
flood control project provides for the protection of approximately
9,590 acres of rural land with a levee having a                     11/2-foot
                                                          freeboard above
a confined flood profile based on a flow of 800,000 cubic feet per second
in the river. The modified project differs from the previously author-
ized project in that it provides for a levee grade about 2 feet higher and
a compacted earth-fill embankment.
   The Federal cost of the project (1952) is $273,000 for construction
and estimated cost to local interests for land and damages is $16,000, a
total of $289,000.
   The existing project, authorized by the Flood Control Act approved
December 22, 1944, is a modification of the project authorized by the
Flood Control Act approved June 22, 1936. (See H. Doc. 447, 78th
Cong., 2d sess.)
   Local cooperation.-Seepages 4-5 for requirements. The necessary
assurances of local cooperation submitted by local interests, were
approved by the Secretary of War on June 10, 1946. All rights-of-
way, other than those required for construction of setback levee, have
been furnished.
1018        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   Operationsand results during fiscal year.-A contract was awarded
for construction of a setback of a portion of the levee in the vicinity
of mile 251.9.
   The costs during the fiscal year were $721.33 and the expenditures
were -$5,328.29, all for new work.
   Condition at end of fiscal year.-The project is complete with the
exception of the setback of a portion of the levee which is under
contract. Construction of the setback was not started during the
fiscal year.
   The total costs to the end of the fiscal year were $181,251.92 and
the expenditures were $181,251.92, all for new work.
   Proposedoperations.-The balance unexpended June 30, 1952, $84,-
247 97 will be applied to construction of the setback levee.
   With the expenditure of these funds it is expected that the project
will be complete. No work is scheduled for fiscal year 1954.
                                  Cost and financial summary

                                              Fiscal year ending June 30                                Total to June
                                                                                                       30, 1952, includ-
                                                                                                       ing fiscal years
                              1948          1949            1950           1951           1952           prior to1948

New work:
   Appropriated_____....    $1, 500.00 -$29,976.00      $78,000. 00 ....------.-   ......----    3 .       $265, 499. 89
   Cost_ ---------         127, 711.11   12, 802.32       4, 277. 49       $321.00          $721.33         181, 251. 92
   Expenditures-_......    128, 426. 14   14, 472. 54     4, 311. 91      6, 314. 30   -5, 328. 29          181, 251. 92


Other new work data:
   Unobligated balance, June 30, 1952_ __-----__--------------                                          $61, 287. 97
   Unobligated balance available for fiscal year 1953__---------                                         61, 287.97
   Estimated additional amount needed to be appropriated for
      completion of existing project_-----------------------------                                        7, 500. 11

              9. WEST OF MORRILTON, ARKANSAS RIVER, ARK.

   Location.-This project is located on the left bank of the Arkansas
River in Pope and Conway Counties, Ark., about 3 miles west of
Morrilton. It extends from about mile 236.5 to about mile 224.5,
and lies immediately upstream from the confluence of Point Remove
Creek (mile 223) and the Arkansas River. (See U. S. Geological
Survey map for Morrilton (Ark.) quadrangle, scale 1: 125,000.)
   Existing project.-The plan of improvement provides for the con-
struction of a compacted earthfill levee beginning at high ground
immediately north of Galla Lake and approximately opposite Arkan-
sas River mile 236.5 and extending in a southeasterly direction along
the left bank of the Arkansas River to a point approximately opposite
mile 224.5; thence extending generally northward, crossing the present
course of Point Remove Creek at miles 2.5 and 9.3; thence along
the right bank of the creek to a point at approximately creek mile
21.5; thence extending westward to high ground about 13/4 miles
west of the junction of the east and west forks of the creek. The
total length of the levee will be about 24.5 miles, of which 21.7 miles
will be new levee and 2.8 miles will be enlargement of the existing
levee. Fourteen new drainage structures, including three major stru-
          FLOOD   CONTROL---LITTLE    ROCK,   ARK.,   DISTRICT    1019
tures of reinforced concrete, will be constructed for interior drainage.
In order to facilitate flows at Point Remove Creek, a cutoff channel
approximately 1.3 miles in length will be excavated across a nar-
row neck of land between creek miles 9.4 and 2.3, thereby shortening
the flow distance in the creek about 5.8 miles; and the remaining
portions of the creek channel between the junction of the east and
west forks and the mouth of the stream will be cleared. The average
depth of the channel will be 29 feet with side slopes of 1 on 2 and a
bottom width of 20 feet.
   The existing project which is a modification of the previously
authorized flood-control project provides for the protection of approx-
imately 21,860 acres of rural land in Pope County levee district
No. 1 and Conway County levee districts Nos. 3 and 7 from floods
of the Arkansas River and of Point Remove Creek with a levee
having a 1Y2-foot freeboard above a confined flood profile based
on a flow of 800,000 cubic feet per second in the river and a coincident
flow of about 16,000 cubic feet per second in the creek. The modified
project differs from the previously authorized project in that it
provides for .a levee along the Arkansas River with a grade about
3 feet higher, a compacted earthfill embankment, extending the levee
along Point Remove Creek together with a cutoff channel and chan-
nel clearing of that stream.
    The estimated Federal cost of the project (1952), is $2,090,000
for construction and the estimated cost to local interests for lands
and damages is $129,000, a total of $2,219,000.
    The existing project, authorized by the Flood Control Act ap-
proved December 22, 1944, is a modification of the project authorized
by the Flood Control Act approved June 22, 1936. (See H. Doc.
447, 78th Cong., 2d sess.)
    Local cooperation.-Seepages 4-5 for requirements. The necessary
assurances of local cooperation submitted by the local interests were
approved by the Secretary of War on June 13, 1946. All rights-of-
way except those between miles 2 and 11 along Point Remove Creek
have been furnished.
    Operations and results during fiscal year.-Erosion repairs, seed-
ing, and sodding on the portion of the levee along the Arkansas River
w ere completed by hired lab6r. The portion of the project along
Arkansas River was transferred on October 5, 1951, to local interests
for maintenance and operation.
    The costs during the fiscal year were $7,353.21 and the expenditures
were $6,501.17, all for new work.
    Condition at end of fiscal year.-The project is complete with the
exception of that portion between miles 2 and 11 along Point Remove
Creek and erosion repairs between miles 11 and 25, Point Remove
Creek. Construction of the portion between miles 2 and 11, Point
Remove Creek, has been suspended pending compliance by local inter-
ests with the requirements of local cooperation in regard to that por-
tion of the project. The project as a whole is 57 percent complete.
    The total costs to the end of the fiscal year were $1,190,695.49 and
the expenditures were $1,190,696.36, all for new work.
    Proposed operations.-The balance unexpended June 30, 1952,
1020        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                      1952

$899,304.51, including accounts receivable, $895,000.87, will be applied
as follows:
New work:
   Preliminary engineering and planning by hired labor during
     the period July 1952 to June 1953-----------------------        $1, 739. 00
   Completion of levee by contract during period June 1952 to
     July 1953----       -----------------------------------        894, 999. 51
   Erosion repair, seeding, and sodding during the period July 1952
     to June 1953----------------------------------------             2, 566.00

               Total for all work--------                         ---------------------                        899, 304. 51
   The balance unexpended June 30, 1953, will be applied during
fiscal year 1954 to payment of outstanding accounts.
   No work is scheduled for fiscal year 1954.
                                      Cost and financial summary

                                                 Fiscal year ending June 30                                    Total to June
                                                                                                               30, 1952, includ-
                                                                                                               ing fiscal years
                               1948            1949           1950             1951               1952          prior to 1948


New work:
   Ap ropriated-     .---   .---...         $500, 000. 00 $1,027,276.00    $533, 924. 001...---    -----         $2,090,000.00
   Cost-----------------
             .........      $15, 672. 52      22, 398. 43   694, 847. 02    441,827. 46      $7, 353. 21          1, 190, 695. 49
   Expenditures---------      15, 607. 05     22, 496.90    633, 884.63     503, 609. 76          6, 501. 17      1, 190, 696. 36


Other new work data:
    Unobligated balance, June 30, 1952      ----------------------- $4, 304. 51
   Unobligated balance available for fiscal year 1953--------------4, 304. 51

10. CONWAY COUNTY LEVEE DISTRICT NO. 6, ARKANSAS RIVER, ARK.

  Location.-This project is located on the right bank of the Arkansas
River between miles 224.5 and 219.3, about 2 miles south of the city of
Morrilton, Conway County, Ark. (See U. S. Geological Survey map
of Morrilton (Ark.) quadrangle.)
  Existing project.-The plan of improvement provides for the con-
struction of a compacted earthfill levee along the right bank of the
Arkansas River between miles 224.5 and 219.3. The levee is approxi-
mately 4.4 miles in length and generally follows the alinement of the
existing levee. About 1.8 miles is new levee and 2.6 miles is enlarge-
ment of the existing levee. Four new drainage structures have been
built. The project provides for the protection of 1,840 acres of agri-
cultural land from floods on the Arkansas River with a levee having
a 1/2-foot freeboard above a confined flood profile based on a flow of
800,000 cubic feet per second in the river.
  The Federal cost of the project was $390,951.95 for construction,
and the estimated cost to local interests for lands and damages is
$23,000, a total of $413,952.
  The existing project was authorized by the Flood Control Act
approved December 22, 1944, as modified by the Flood Control Act
approved June 30, 1948. (See H. Doc.' 447, 78th Cong., 2d sess.)
  Local cooperation.-See pages 4-5 for requirements. The necessary
assurances of local cooperation submitted by the local interests, were
approved by the Secretary of War on June 13, 1946. All rights-of-ay
required have been furnished.
              FLOOD CONTROI--LITTLE                     ROCK, ARK.,                 DISTRICT                 1021
  Operations and results during fiscal year.--Outstandingobligations
were liquidated.
  The costs during the fiscal year were $1,851.30 and the expenditures
were $1,758.28, all for new work.
  Condition at end of fiscal year.-The project is complete.
  The total costs to the end of the fiscal year were $390,951.95 and the
expenditures were $390,951.95, all for new work.
  Proposed operations.-None.
                                Cost and financial summary

                                           Fiscal year ending June 30-                               Total to June
                                                                                                   , 30, 1952, includ-
                                                                                                    ing fiscal years
                            1948           1949         1950            1951           1952           prior to 1948

N;sWi:rtk:
                    .
   Appropriated-------    $33,000.00     $33,000.00 -$11,000.00     -$31,000.00     -$4,048.05           $390,951.95
   Cost----------------    65, 569.15      -631. 84       171. 52     15, 462. 67      1, 851.30          390, 951. 95
   Expenditures ......     71, 576. 62     -129. 56       170.87      15, 556. 52      1,758. 28          390, 951. 95



11. CONWAY COUNTY LEVEE DISTRICTS NOS. 1, 2, AND 8, ARKANSAS.
                       RIVER, ARK.

  Location.--This project is located on the left bank of the Arkansas
River extending from the bridge on State Highway No. 9 (mile 221),
about 21/2 miles southeast of the city of Morrilton, Conway County,
Ark., downstream to the mouth of Cadron Creek (mile 203.8). (See

     Eisting
IT. S. Geological Survey map for Morrilton (Ark.) quadrangle.)
  E          project.-The plan of improvement provides for the con-
struction of a compacted earthfill levee along the left bank of the
Arkansas River from high ground near the bridge on State Highway
No. 9 downstream to high ground near Cadron Creek. The levee
generally follows the alinement of the existing levees, except that it
cuts across a bend in the river in the vicinity of Conway County levee
district No. 1 where encroachment of the river made a setback neces-
sary. The levee is approximately 13.5 miles long, of which 5.4 miles
is an enlargement of an existing levee and 8.1 miles is new levee.
Seven new drainage structures have been built. The project provides
for the protection of approximately 14,320 acres of agricultural land
in Conway County levee districts Nos. 1, 2, and 8, and for 20 acres in
the town of Plumerville with a levee having a 1/2-foot freeboard above
a confined flood profile, based on a flow of 800,000 cubic feet per second
in the river.
   The Federal cost of the project was $1,018,810.21 for construction
and the estimated cost to local interests for lands and damages is
$66,000, a total of $1,084,840.
   The existing project was authorized by the Flood Control Act
approved December 22, 1944, as modified by the Flood Control Act
approved June 30, 1948. (See H. Doc. 447, 78th Cong., 2d sess.)
  Local cooperation.-See pages 4-5 for requirements. The necessary
assurances of local cooperation have been submitted by local interests
and were approved by the Secretary of War on June 13, 1946. All
rights of way have been furnished.
       245554-53-vol. 1----65
1022          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

  Operationsand results during fiscal year.-Outstandingobligations
were liquidated.
  The costs during the fiscal year were $5,513.45 and the expenditures
were $5,483.13, all for new work.
  Condition at end of fiscal year.-The project is complete.
  The total costs to the end of the fiscal year were $1,018,840.21 and
the expenditures were $1,018,840.21, all for new work.
  Proposed operations.-None.
                                          Cost and financial summary

                                                       Fiscal year ending June 30                          Total to .Tune
                                                                                                           30, 1952, includ-
                                                                                                           ing fiscal years
                                      1948           1949         1950           1951           1952         prior to 1948


New work:
   Appropriated-......... $675, 000. 00 $115, 000. 0C -$92,000.00            -$80,000.00    -$14,159.79      $1,018. 840. 21
    Cost -----... . -.--.-..
                    -              767, 638. 72   149, 202. 51   3, 957.75    46, 607. 66     5, 513.45       1, 018, 840. 21
    Expenditures---        :--..   755, 486. 74   163, 254. 68   3,141. 95    47, 516. 96     5, 483. 13      1, 018, 840. 21



;12. SOUTH BANK ARKANSAS RIVER (HEAD OF FOURCHE ISLAND TO
                  PENNINGTON BAYOU), ARK.

   Location.-This project is located on the right bank of the Arkansas
River, beginning at mile 161.4, near the eastern limits of the city of
Little Rock, Pulaski County, Ark., and extending downstream to mile
141.1. (See U. S. Geological Survey State maps, scale 1: 500,000.)
   Existing project.-The plan of improvement provides for the con-
struction of a compacted earthfill levee along the right bank of the
Arkansas River, between miles 161.4 and 141.1, thence across Penning-
ton Bayou and Harris Bayou to high ground, about 3 miles east of
Hensley, Ark. The levee, about 19.1 miles long, follows in general
the alinement of the existing levees along the river. Fifteen drain-
age structures are provided for interior drainage.
   The existing project which is a modification of a previously author-
ized flood control project provides for the protection of approximately
32,000 acres of rural land in three separate levee systems known as
the Fourche Island levee, the Fourche Place levee, and the Woodson
levee, with a levee having a 11/2 -foot freeboard above a confined flood
profile based on a flow of 800,000 cubic feet per second in the Arkansas
River. The modified project differs from the previously authorized
project in that it provides for a levee grade about 2 feet higher and a
compacted earthfill embankment.
  The estimated Federal cost of the project (1952) is $1,366,560 for
the construction and the estimated cost to local interests for lands
and  damages is $87,000, a total of $1,453,560.
  The existing project, authorized by the Flood Control Act approved
December 22, 1944, is a modification of the project authorized August
18, 1941. (See H. Doc. 447, 78th Cong., 2d sess.)
  Local cooperation.-See pages 4-5 for requirements. Assurances of
local cooperation were submitted by local interests and approved by
the Secretary of War on February 28, 1947. Rights-of-way have been
furnished for the upstream 18 miles of the project.
              FLOOD      CONTROL--LITTLE                  ROCK, ARK.,              DISTRICT              1023

   Operationsand results during fiscal year.-Construction of the proj-
ect was essentially completed. The work accomplished during the
fiscal year includes placement of 256,045 cubic yards of levee embank-
ment and erosion repairs.
   The costs during the fiscal year were $96,013.46 and the expenditures
were $115,549.70, all for new work.
   Condition at end of fiscal year.-The project is essentially complete.
Work remaining to complete the project consists of erosion repairs and
mowing portions of the levee preparatory to transfer of the project to
local interests for operation and maintenance.
   The total costs to the end of the fiscal year were $1,351,366.59 and
the expenditures were $1,351,399.21, all for new work.
   Proposed operations.-The balance unexpended June 30, 1952, in-
cluding accounts receivable, $15,193.41, will be applied during fiscal
year 1953 to erosion repairs and mowing of the levee and to special
hydrologic investigations.
   The project will be transferred to local interests for operation and
maintenance during fiscal year 1953.
   No work is scheduled for fiscal year 1954.
                                Cost and financial summary

                                            Fiscal year ending June 30                            Total to June
                                                                                                 30, 1952, includ-
                                                                                                 ing fiscal years
                             1948         1949           1950           1951          1952        priorto 1948

New work:
   Appropriated-........
                       332, 000.00 $400, 000.00 $459, 560.
                                                         00 -$90.000.00$ ....... ! $1,
                                                                                     366, 560. 00
   Cost_--------------. 292, 768. 92   281, 636. 39   428, 375. 02   231, 725.60   $96,013.46       1, 351, 366.59
   Expenditures----,--. 277, 874.20    257,202.33     471, 277.35    208,310.20    115, 549.70      1, 351, 309. 21


Other new work data:
    Unobligated balance, June 30, 1952_--.                 --
                                               ---.-----....                                     $15,193.41
    Unobligated balance available for fiscal year 1953----.----                                   15, 193. 41

   13. BLUE MOUNTAIN RESERVOIR, ARKANSAS RIVER BASIN, ARK.

   Location.-The Blue Mountain Dam is located in Yell County,
Ark., on the Petit Jean River about 74.4 miles above its confluence
with the Arkansas River, and about 12 miles south of Paris, Logan
County, Ark. Blue Mountain Reservoir extends westward from
the dam into Logan County. (See U. S. Geological Survey map
for Magazine, Ark., quadrangle, scale 1: 125,000.)
   Existing project.-The plan of improvement provides for the con-
struction of an earth-fill dam about 2,800 feet long and about 115
feet in height above the stream bed. Outlet works consist of a gate-
controlled, concrete-lined tunnel through the right abutment, dis-
charges from which are directed back into the Petit Jean River at
a point about 3,000 feet below the dam. An uncontrolled saddle
spillway is located on the left abutment, about 1,200 feet downstream
from the dam axis. The reservoir, which is one unit of a compre-
hensive plan for flood control and other purposes in the Arkansas
River Basin, controls approximately 46 percent of the total drain-
age area of the Petit Jean River. It provides storage capacity of
about 233,000 acre-feet for flood control, and a permanent pool of
1024          REPORT OF CHIEF OF ENGINEERS,                                  U.     S. ARMY, 1952

about 25,000 acre-feet for recreational purposes and as a wildlife
refuge.
   The estimated cost of the project (1952) is $4,229,542 for con-
struction and $545,458 for lands and damages, totaling $4,775,000.
The estimated cost (1952) of annual maintenance, is $75,000.
   The existing project was authorized by the Flood Control Act
approved June 28, 1938.
   Local cooperation.-Section2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Ordinary maintenance
and operation of the project were continued. Installation and test-
ing of radio facilities for transmission of hydrologic data and the
final real-estate audit were initiated.
   Twelve notable rises occurred in the Petit Jean River during the
fiscal year. Flooding was prevented on an average of about 5,470
acres of improved land for each flood. The results of flow regu-
lation on river stages at Danville are given in the following tabu-
lation. Danville is 25.6 miles downstream from the dam and just
downstream from the mouth of Dutch Creek which is the principal
tributary of the Petit Jean River.

                                     Blue Mountain Reservoir                              Danville, Arkansas    I
                                     Outflow
                                   coincident Maximum             Corre-                        Estimated
   Date of peak           Peak      with peak     pool ele-    sponding             Experi-     crest stage   Estimated
      inflow             inflow     flow from      vation         flood-             enced       without      reduction
                       (cubic feet    uncon-    (feet above      control          crest stage      Blue        in stage
                       per second) trolled area  mean   sea      storage             (feet)     Mountain         (feet)
                                   (cubic feet     level)      (acre-feet)                      Dam (feet)
                                   per second)

July 3, 1951.......         4,100             25      387.9        12, 500              12.5          18. 8          6. 3
Oct. 31, 1951.......       13, 750           200      393 7        35. 600              20.8          24. 3          3.5
Nov. 23, 1951....           7, 000         1,100      390.0        20, 200              14.3          21.7           7. 5
Dec. 8, 1951 .-..._         4,850            500      387.7        11,800               18.0          21. 5          3.5
Jan. 2, 1952 .......        9, 550         1,300      390.9        23. 800              19.7          23.7           4.0
Mar. 3, 1952......          6, 700            25      387.8        12, 200              17.0          19 3           2. 3
Mar. 10, 1952.....         13, 300           250      393. 5       34, 700              22. 1         24.4           2. 3
Mar. 21, 1952-....          5, 300           500      391.0        24, 200              20.3          20. 5          0.2
Apr. 4, 1952......          8, 000           250      389. 8       19, 400              18. 7         21.6           2. 9
Apr. 12, 1952....          18, 500           200      401.8        80, 600              23.5          26.5           3.0
Apr. 22, 1952.....         15, 000           275      406.4       114, 300              25 1          26 9           1.8
May 23, 1952......          3, 700         1,300      392.6        30, 800              17. 2         18.0           0. 8

  1 Appreciable overflow begins at 17.0 feet.


  The pool elevation at the beginning of the fiscal year was 385.05 feet
above mean sea level, corresponding to 27,850 acre-feet of total storage.
At the end of the fiscal year the pool elevation was 384.81 feet above
mean sea level, corresponding to 27,120 acre-feet of total storage. The
maximum pool level during the fiscal year was 406.4 feet above mean
sea level, corresponding to 138,940 acre-feet of total storage. The con-
servation pool elevation was fluctuated during the warm months as
an aid in the control of mosquitoes. Sufficient releases were made
from the reservoir during low-water periods to supply water require-
ments for Danville, Ark.
   The costs during the fiscal year were $9,736.34 for new work and
$60,492.07 for maintenances. The total expenditures during the fiscal
year were $70,110.77.
                       :FLOOD               CONTROL--LITTLE                   ROCK,       ARK.,         DISTRICT               1025
   Condition at end of fiscal year.-The project is substantially com-
plete. Work remaining to complete the project consists of completion
of installation and testing of radio facilities for transmission of
hydrologic data and completion of the final real estate audit.
   The total costs to the end of the fiscal year were $4,767,117.75 for
new work and $293,793.49 for maintenance. The total expenditures
were $5,055,351.38.
  Proposed operations.-The balance unexpended June 30, 1952, in-
cluding accounts receivable, $18,547.22, plus an allotment in fiscal year
1953 of $44,800 for maintenance, a total of $63,347.22, will be applied
as follows:
Accounts payable June 30, 1952------------------------------- $6, 183. 75
New work:
    Complete installation and testing of radio facilities
      for transmission of hydrologic data by hired labor
      during the period July 1952 to June 1953--------- $7, 590. 25
    Complete final real estate audit by hired labor during
      the period July 1952 to June 1953---------- ------- 292. 00
      Total for new work-----------------                ------- ---    7, 882.25
Maintenance:
               .
   Operation------       ---------------------             29, 000. 00
    Ordinary maintenance and repairs----1-----------1,281. 22
    Reservoir management-----------------------             9, 000. 00
      Total for maintenance---------           ------------      ---   49, 281. 22
           Total for all work                              ..-------..--------------------------.. 63, 347. 22
  With the expenditure of these funds the project will be complete.
  The sum of $64,000 can be profitably expended during fiscal year
1954 for operation and for ordinary maintenance and repairs.
                                                   Cost and financial summary

                                                                 Fiscal year ending June 30                             Total to June
                                                                                                                       30, 1952, includ-
                                                                                                                       ing fiscal years
                                               1948            1949           1950          1951           1952         priorto 1948


New work:
   Appropriated-- --.....------------                      -$92,984.71     $24,684. 71 -$6, 500.00       -$215. 29       $4,775, 000. 00
    Cost----------------..............$224,307.86            43, 472. 77    28, 428. 12   48, 565. 75     9, 736. 34      4, 767, 117. 75
    Expenditures-......... 210, 228. 40                      57, 002. 00    35, 857. 13   41, 442. 27     9, 331.73       4, 762, 025.54
Maintenance:
    Appropriated------.........             100, 000.00      46, 500. 00    47, 000.00    42, 000.00     63,155.00          298, 655.00
    Cost---------------..................    51,404. 71      64, 851.09     71, 358. 95   45, 686.67     60, 492.07         293, 793.49
    Expenditures--......---...               49, 788. 31     65, 054. 21    72, 876. 51   44, 827. 77    60. 779. 04        293, 325. 84


Other new work data:
    Unobligated balance, June 30, 1952------------------------                                                           $1, 584. 20
    Unobligated balance available for fiscal year 1953------------                                                        1, 584. 20

                14. NIMROD RESERVOIR, ARKANSAS RIVER BASIN, ARK.
  Location.-The Nimrod Dam is located in Perry County, Ark., on
the Fourche La Fave River, 62.6 miles above its confluence with
Arkansas River, and about 19 miles southeast of Danville, Yell County,
Ark. (See U. S. Geological Survey map for Hot Springs, Ark., quad-
rangle, scale 1: 125,000.) Nimrod Reservoir extends westward from
the dam into Yell County.
  Ewisting project.-The plan of improvement provides for the con-
struction of a concrete gravity type dam 995 feet long and about 97
1026       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                       1952

feet in height above the stream bed. It consists of a spillway section
198 feet long located above the river channel, and two non-overflow
sections contiguous thereto and extending into the abutments. Seven
gate-controlled conduits for regulating and discharging flood flows
are located through the base of the spillway section. In addition, two
smaller valve-controlled conduits are provided through the spillway
section for regulating low flows. Penstocks and provisions for future
spillway gates have been installed to provide for future power genera-
tion. The reservoir, which is one unit of a comprehensive plan for
flood control and other purposes in the Arkansas River Basin, controls
approximately 60 percent of the entire drainage area of the Fourche
La Fave River. It provides storage capacity of about 307,000 acre-,
feet for flood control, and a permanent pool of about 29,000 acre-feet
for recreational purposes and as a wildlife refuge.
   The estimated cost of the project (1952), is $2,997,744 for construc-
tion and $776,656 for lands and damages, totaling $3,774,400. The
estimated cost (1952) of annual maintenance is $75,000.
   The existing project was authorized by the Flood Control Act ap-
proved June 28, 1938.
   Local cooperation.-'Section2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Ordinary maintenance
and operation of the project were continued. Installation and testing
of radio facilities for transmission of hydrologic data were initiated.
   Ten notable rises occurred on the Fourche La Fave River during the
fiscal year. Flooding was prevented on an average of about 3,670
acres of improved land for each flood. The results of flood regulation
on river stages at Aplin are given in the following tabulation. Aplin
is 13.7 miles downstream from the dam and just downstream from
the mouth of South Fourche La Fave River which is the principal
tributary.
                                   Nimrod Reservoir                                  Aplin, Ark.1

                                 Outflow
  Date of peak       Peak     with peak Maximum
                              coincident                    Corre-
                                             pool ele-   sponding        Experi-     Estimated Estimated
    mnflow          inflow     flow from      vation        flood-        enced      crest stage reduction
                  (cubic feet    uncon-    (feet above     control     crest stage    Nimrod      in stage
                  per second) trolled area mean sea        storage        (feet)     D      fet)    (feet)
                              (cubic feet     level)     (acre-feet)                 Dam feet)
                              per second)

July 4, 1951.......     8, 200            10    348. 4       29, 800         12.0          19. 7        7.7
Oct. 31, 1951......    25,000             10    353.9        67, 400         17.3          33.4        16. 1
Dec. 9, 1951......      6, 800        1,200     345.9        16, 500         14.9          20.5         5.6
Jai. 3, 1952 .......   14,600             10    351.9        52, 400         25.7          31.1         5. 4
Mar. 10, 1952.....     18, 100            10    351.4        48, 900         25.3          32. 4        7. 1
Mar. 22, 1952_...       9, 900            10    348.3        29, 200         20. 2         29. 4        9. 2
Apr. 4, 1952-......     8, 800        2, 000    348.2        28, 700         12.0          23.6        11.6
Apr. 13, 1952 ..
               _..     28, 000            10    359. 5      117, 600         26. 5         33. 4        6. 9
Apr. 23, 1952.....     40, 000            10    367. 8      220, 400         28.0          34. 5        6. 5
May 23, 1952......      6, 550            10    345. 5       14, 500         14. 7         22. 7        8.0

1Appreciable overflow   begins at 17 feet.

  The pool elevation at the beginning of the fiscal year was 343.10 feet
above mean sea level, corresponding to 33,000 acre-feet of total storage.
At the end of the fiscal year the pool elevation was 342.92 feet above
mean sea level, corresponding to 32,280 acre-feet of total storage. The:
                      FLOOD             CONTROL--LITTLE                ROCK,        ARK.,           DISTRICT                      1027
maximum pool level during the fiscal year was 367.8 feet above mean
sea level, corresponding to 249,400 acre-feet of total storage. The con-
servation pool elevation was fluctuated during the warm months as an
aid in the control of mosquitoes.
  The costs during the fiscal year were $17,585.12 for new work and
$61,544.67 for maintenance. The total expenditures during the fiscal
year were $69,167.80.
   Condition at end of fiscal year.-The                                       project is substantially com-
plete. Work remaining to complete the project includes dewatering
and inspection of the stilling basin and completion of the installation
and testing of radio facilities for transmission of hydrologic data.
  The total costs to the end of the fiscal year were $3,768,068.41 for new
work and $508,353.89 for maintenance. The total expenditures were
$4,264,252.61.
   Proposed operations.-The balance unexpended June 30, 1952, in-
cluding accounts receivable, $21,005.74, plus an allotment for fiscal
year 1953 of $44,800 for maintenance, a total of $65,805.74, will be ap-
plied as follows:
Accounts payable June 30, 1952     ---------- ----------------                                                          $13, 217. 97
New work:
    Continue engineering, including preparation of opera-
     tion and maintenance manual and cooperative
     work with the U. S. Weather Bureau, by hired
     labor during the period July 1952 to June 1953___ $4, 095. 47
    Continue installation and testing of radio facilities
     for transmission of hydrologic data by hired labor
     during the period July 1952 to June 1953-----.. 2, 197. 00

      Total for new work----------------- -------------                                                                  '    6,292.47
Maintenance:
   Operation ---------------------------------          28, 000. 00
   Ordinary maintenance and repairs-----.---------- 10, 295. 30
   Reservoir management ___-. ------           --- ----  8, 000. 00
          Total for maintenance ---------                                ----.          ---------                            46, 295.30
          Total for all work--------------------------                                                                       65, 805. 74
  With the expenditure of these funds the project will be complete.
  The sum of $69,000 can be profitably expended during fiscal year
1954 for operation and for ordinary maintenance and repairs.
                                               Cost and financial summary
                                                          Fiscal year ending June 30-                                    Total to June
                                                                                                                        30, 1952, includ-
                                                                                                                        ing fiscal years
                                           1948          1949          1950           1951               1952                priorto 1948

New work:
   ApDropriated-------         $75, 039. 12 $163,460.88
               ........--..-------.                                                $10,000.00       ...-----------...          774,360.88
                                                                                                                             $3,
   Cost--------------................   $66, 278. 94   16, 044.00   167, 629.29     60, 790.09       $17, 585.12              3, 768, 068.41
   Expenditures ....-------              67, 655.32    13, 912.31   168, 964.46     56, 163.66         9, 594.32              3, 756, 837.36
Maintenance:
                              75,000.00 80,000.00
   A nropriated .....--------..                                      59. 000. 00    59, 500.00        60. 400.00                510,833.07
                              64, 224. 82
   Cost------------- -................    75, 918.09                 72, 610. 84    62, 696. 15       61, 544. 67               508, 353.89
   Exp.nditures    ...------- 63, 927.51  78, 484. 28                74, 512. 29    62,504.61         59,573.48                 507, 415. 25

Other new work data:
    Unobligated balance, June 30, 1952 ---------------------                                                                 $3, 771. 76
    Unobligated balance available for fiscal year 1953---...-------                                                           3, 771. 76
      Estimated additional amount needed to be appropriated for com-
        pletion of existing project- ------   ----------                                                                           39.12
1028          REPORT OF CHIEF OF ENGINEERS,                               U.    S. ARMY,         1952

             15. ARKANSAS RIVER BASIN, LITTLE ROCK DISTRICT

   Location.-These improvements are located on tributaries of the
Arkansas River and are in the State of Arkansas. More definite loca-
tions of the individual items are given in the following paragraphs:
   Existing project.-The Flood Control Act approved June 28, 1938,
approved the general comprehensive plan for flood control and other
purposes in the Arkansas River Basin as set forth in Flood Control
Committee Document 1, 75th Congress, first session, with such modifi-
cations thereof as in the discretion of the Secretary of War and the
Chief of Engineers may be advisable, and authorized the sum of
$21,000,000 for reservoirs, for the initiation and partial accomplish-
ment of the plan, the reservoirs to be selected and approved by the
Chief of Engineers, subject to the provision that the authorization
shall include the Canton Reservoir on the North Canadian River in
Oklahoma, as set forth in House Document 569, 75th Congress, third
session. The Flood Control Act approved August 18, 1941, modified
the general comprehensive plan to include the reservoirs in the Grand
 (Neosho) River Basin in Oklahoma and Missouri, and in the Verdigris
River Basin in Kansas, in accordance with the recommendations of
the Chief of Engineers in House Documents 107 and 440 of the 76th
Congress, first session, and, in addition to previous authorizations, the
latter act authorized to be appropriated the sum of $29,000,000 for the
prosecution of the comprehensive plan. The Flood Control Act ap-
proved December 22, 1944, authorized to be appropriated the sum of
$35,000,000, the Flood Control Act approved July 24, 1946, authorized
to be appropriated the sum of $40,000,000, and the Flood Control Act
approved May 17, 1950, authorized to be appropriated the sum of
$15,000,000, in addition to previous authorizations for the continued
prosecution of this comprehensive plan. The reservoirs within the
Little Rock district included in the comprehensive plan are listed
below:
                                                     Reservoirs

                                       Ditane     Nearess-       Height of dam    Reser-         Power       Total
   Name                 River         above        earest       above stream bed   voir         develop-   estimated
                                                                                                                  1
                                      mouth                         and type     capacity         ment       cost

                                      miles                                         acre-feet   kilotoatts
Blue Moun-          Petit Jean-....    74. 4    Blue    Moun-    115 feet; earth-    233, 000       ()     $4, 775, 000
  tain.'                                          tain, Ark.       fill.
Nimrod     -.....   Fourche
                      Fave.
                                La      62. 6   Nimrod, Ark_-. 97 feet; concrete-
                                                                 gravity.
                                                                                    307, 000       (4)      3, 774, 400


11952 price levels.
s For details of this project, see individual report.
 = None.
4 Includes provision for future power installation.

  Blue Mountain and Nimrod Reservoirs were selected and approved
for construction by the Chief of Engineers in accordance with the
above authorization, and individual reports on the two reservoirs
are given in the preceding pages. All operations previously reported
           FLOOD CONTROL-LITTLE ROCK, ARK.,          DISTRICT      1029
under the heading "Arkansas River Basin, Little Rock district" for
those two projects are now contained in the individual reports, and
previous costs and expenditures have also been transferred to those
reports.
         16. EAST POPLAR BLUFF AND POPLAR BLUFF, MO.

   Location.-This project is located on the left bank of the Black
River in and adjacent to the eastern part of the city of Poplar Bluff,
Butler County, Mo. (mile 210.9). (See U. S. Geological Survey map
for Poplar Bluff, Mo., quadrangle, and Corps of Engineers map for
Harviell, Mo., quadrangle.)
   Existing project.-The plan of improvement provides for a new
compacted earth fill levee encircling that part of the city of Poplar
Bluff lying east of the Black River. The levee will begin at a point
opposite Black River mile 211.8, extend southeastward along Palmer
Slough and across the Missouri Pacific Railroad, then southward
to Black River at mile 208.4, thence up the left bank of Black River
and along the city waterfront to the point of beginning. The plan
will require construction of 3.2 miles of standard levee; raising of 1.4
miles of streets to serve as levee; construction of 1 large drainage
structure and 8 small culverts; installation of a sewage pumping sta-
tion; and excavation of 0.7 mile of ditch along the riverside of the
east levee. The levee will have a 3-foot freeboard above the flow
line of a project flood as modified by Clearwater Reservoir and con-
fined by the levee. The discharge of the modified project flood is
37,000 cubic feet per second. Protection will be provided for 410
aores within the city of Poplar Bluff and for 310 acres adjacent thereto.
This plan of improvement is a modification of the original project
plan and provides essentially the same degree of protection.
   The estimated Federal cost of the project (1952) is $319,000 for
construction and the estimated cost to local interests for lands and
damages is $71,000, a total of $390,000.
   The existing project was authorized by the Flood Control Act
approved June 22, 1936. (See H. Doc. 102, 73d Cong., 1st sess.)
   Local cooperation.-Seepages 4-5 for requirements. Assurances of
local cooperation were submitted by local interests and approved by
the Secretary of War on June 2, 1947. All rights-of-way have been
furnished.
   Operations and results during fiscal year.-None.
   Condition at end of fiscal year.-Plansand specifications have been
completed.
   The total costs and expenditures to the end of the fiscal year were
$39,926.87, all for new work.
   Proposed operations.-No work is scheduled for fiscal year 1953.
   The sum of $279,100 can be profitably expended for the fiscal year
1954 for completion of construction of the levee, drainage structures,
and pumping station.
1030        REPORT OF CHIEF OF ENGINEERS,                                  U.      S. ARMY,::    1952
                                           Cost and financial summary

                                                   Fiscal year ending June 30-                          Total to
                                                                                                      June 3'), 1952,
                                                                                                        including
                               1947            1948           1949          1950          1951         fiscal years
                                                                                                      prior  to 1947

New work:
   Appropriated..-----       ----------      $9, 500.00    $153, 400.00   $85, 090.00 -$222, 973.13       $39, 926. 87
   Cost----------.........    -$544.45        4, 910. 50     16, 490.79     2, 898.23        642.98        39, 9 6 87
   Expenditures----....        1,435. 90      4, 539. 57     17, 032.20     2,426.08         914.65        39, 926. 87

Other new work data: Estimated additional amount needed to be
  appropriated for completion of existing project---__ ___-- __--- $279, 073. 13

        17. BLACK RIVER, POPLAR BLUFF, MO., TO KNOBEL, ARK.
   Location.-This project is located on the right and left banks of
Black River in Butler County, Mo., and Clay County, Ark., between
Poplar Bluff, Mo. (mile 210.9), and latitude of Knobel, Ark. (mile
140). (See U. S. Geological Survey map for Poplar Bluff, Mo., quad-
rangle, and Corps of Engineers maps for Harviell, Mo., Rector, Ark.-
Mo. and Knobel, Ark.-Mo. quadrangles.)
   Existing project.-The plan of improvement provides for flood pro-
tection along Black River, Ark. and Mo., from a point near the Mis-
souri Pacific Railroad in Poplar Bluff, mile 210.9, downstream to
the latitude of Knobel, Ark., mile 140.
   The plan of improvement for the Arkansas portion of the project
between miles 140 and 173 provided for construction of levees and
drainage structures. This work was completed at a cost of $445,584.54
and transferred to local levee districts for maintenance and operation
in June 1911.
   The plan of improvement for the Missouri portion of the project
provides for construction of a new levee along the right bank of
Black River from Poplar Bluff to a point near the Missouri-Arkansas
State line; enlargement of the Inter-River drainage district levee and
the upper part of the Arkansas portion of the Poplar Bluff, Mo., to
Knobel, Ark., levee, and the construction of a pumping station, for
protection against Black River floods. The levee along the west or
right bank of Black River will be a compacted-earth fill. It will
extend from a point near the Missouri Pacific Railroad bridge in
Poplar Bluff downstream to a cutoff to be made across the neck of
the river loop between miles 210.6 and 209.9, thence along the right
bank of the cutoff and along the natural river bank and the existing
levee to river mile 208.4. It will extend from there downstream
parallel to Black River to a point opposite Whitlow, Mo. From there
it will parallel the existing levee, generally on the riverside, to the
State line and thence extend southwestward to an open end at river
mile 165.7. The grade of the upper 2.3 miles of levee will be 3 feet
above the profile of the modified and confined design flood (37,000
cubic feet per second), and the grade of the remainder will be not less
than 2 feet above the profile of that flood. The new levee will be 28
miles long and have an average height of 10.5 feet. The proposed
enlargements along the left bank will make those structures equivalent
in grade and cross section to the right bank levee. The total length of
enlarged levees will be 35.4 miles, and the average height will be 8.5
                FLOOD      CONTROL---LITTLE               ROCK,      ARK.,       DISTRICT                1031

feet. This plan is a modification of the original project plan and
provides essentially the same degree of protection.
   The estimated Federal cost of the Missouri portion of the project
 (1952) is $3,783,000 for construction and the estimated cost to local
interests for lands and damages is $166,000, a total of $3,949,000.
   The existing project was authorized by the Flood Control Act ap-
proved June 22, 1936. (See H. Doc. 102, 73d Cong., 1st sess.)
   Local cooperation.-See pages 4-5 for requirements. The necessary
assurances of local cooperation, covering that part of the plan of
improvement lying west of Black River in Missouri, submitted by
local interests, were approved July 11, 1947.
   Operations and results during fiscal year.-Plansand specifications
for a pumping station in Inter-River drainage district were completed
by contract. Contracts for furnishing the pumps and motors and
for construction of the pumping station were awarded.
   The costs during the fiscal year were $23,434.92 and the expenditures
were $21,737.84, all for new work.
   Condition at end of fiscal year.-The contract for pumps and motors
is 65 percent complete. Planning for .the remainder of the Missouri
portion of the project has been suspended pending completion of the
comprehensive report on the Arkansas, White, and Red River Basins
in which modification of the project authorization to meet more nearly
the desires of local interests will be considered, and all unexpended
planning funds have been revoked.
   The total costs to the end of the fiscal year were $504,470.34 and the
expenditures were $502,782.64, all for new work (including the cost
and expenditure of $445,584.54 for previous construction of the Ar-
kansas portion only during the fiscal years 1938 to 1942, inclusive).
   Proposed operations.-The balance unexpended June 30, 1952, $86,-
564.41, including accounts receivable, will be applied during fiscal
year 1953 as follows:
Accounts payable June 30, 1952________________-_____            ____$_ $1,689. 87
New work: Complete construction of pumping station in Inter-River
  drainage district by contract during period July 1952 to June 1953__ 84, 874. 54
        Total for all work--__-                    ____--                                -         86, 564. 41
  With the expenditure of these funds it is expected that the pumping
station will be complete.
  No work is scheduled for fiscal year 1954.
                                  Cost and financial summary

                                              Fiscal year ending June 30                          Total to June
                                                                                                 30,1952, includ-
                                                                                                 ing fiscal years
                              1948          1949         1950         1951         1952           priorto 1948

New work:
   Appropriated---..----- $30, 500. 00   $10,000.00 -----------..
                                                                .. $94,000.00     -$739. 66          $589, 344. 88
   Cost----------------     4,219.40      13, 316.38  $7, 605.31     2,281. 80   23, 434. 92          504, 470. 34
   Expenditures----...._    3,301.60      13, 283. 91  8, 052.51     1, 835.40   21, 737.84           502,782.64


Other new work data:
    Unobligated balance, June 30, 1952          ___---------------------                         $12, 176. 44
    Unobligated balance available for fiscal year 1953__-.- -___                                  12, 176. 44
    Estimated additional amount needed to be appropriated for
      completion of existing project .-----------------------                                  3, 639, 239. 66
1032    REPORT OF CHIEF OF ENGINEERS,        U.   S. ARMY, 1952

       18. CLEARWATER RESERVOIR, WHITE RIVER BASIN, MO.

   Location.-Clearwater Dam is located in Wayne and Reynolds
Counties, Mo., on the Black River, 257.4 miles above its confluence
with the White River, 6 miles southwest of Piedmont, Mo., and 32
miles northwest of Poplar Bluff, Mo. (See U. S. Geological Survey
map for Piedmont, Mo., quadrangle, scale 1: 62,500.) From the dam,
the reservoir extends northward and westward in Reynolds County.
   Existing project.-The plan of improvement provides for an earth-
fill dam 4,225 feet long and 154 feet in height above the stream bed.
Outlet works consisting of a gate-controlled, concrete-lined tunnel
are located in the right abutment and discharge into the river below
the dam. An uncontrolled, concrete-type ogee spillway is located on
the right abutment with overflow discharging into Webb Valley and
reentering the river at a point about 1 mile downstream from the dam.
The reservoir, which is one unit of a comprehensive plan for flood
control and other purposes in the White River Basin, controls the
runoff from an area of approximately 898 square miles. It provides
storage capacity of about 391,000 acre-feet for flood control, and a
permanent pool of about 22,(00 acre-feet for recreational purposes
and as a wildlife refuge.
   The estimated cost of the project (1952) is $9,190,630 for construc-
tion and $833,370 for lands and damages, totaling $10,024,000. The
estimated cost for annual maintenance (1952) is $75,000.
   The existing project was authorized by the Flood Control Act
approved June 28, 1938.
   Local cooperation.-Section2 of the Flood Control Act, approved
June 28, 1938, applies.
   Operationsand results during fiscal year.-Ordinaryoperation and
maintenance of the project were continued. Construction of the spill-
way structure by contract, and drilling and grouting of the spillway
lining by hired labor, were completed. Drilling of a water-supply
well for the administration building was started by contract. The
contract was terminated, and drilling was continued by hired labor.
Grouting of derrick stone upstream from the spillway by hired labor
was started.
   Nine noteworthy rises occurred on the Black River above the Clear-
water Reservoir during the fiscal year. Flooding was prevented on
an average of about 6,700 acres of cultivated land for each rise. The
results of regulation on the river stages at Poplar Bluff, 46.4 miles
downstream, are given in the following tabulation.
                FLOOD CONTROL---LITTLE ROCK, ARK.,                                DISTRICT             1033

                                    Clearwater Reservoir                          Poplar Bluff, Mo.1

                                     Outflow
                                   coincident  Maximum         Corre-        Experi-
                                                                                       Estimated
                                                                                       creststage rstimated
  Date of pea           Peak       with peak pool eleva-     sponding
                        inflow     flow from   tion (feet       flood-     enced crest  withoutreduction
                      (cubic feet    uncon-      above         control     stage(feet) Clearwater instage
                      per second) trolled area mean sea        storage                 Dam (feet)    (feet)
                                   (cubic feet   level)      (acre-feet)
                                   per second)

July 1, 1951 ...          19, 500           600     512.3        42, 340        11.5        17.3           5.8
July 14, 1951...          20, 300           700     528. 8      108,680         12.2        17. 8          5.6
Nov. 13, 1951 ....        11, 000        2, 800     506. 6       25, 970        11.4        16. 8          5.4
Nov. 16, 1951.....         6,400         2, 800     508.2        30,260         11.6        14.7           3.1
Nov. 24, 1951 _-          12, 000        1, 000     521.0        73, 680        16. 7       18. 4          1.7
Mar. 11, 1952 .....       16, 800           400     516.0        54, 720        16. 1       18.6           2. 5
Mar. 22, 1952.....         3, 800        1,200      520.0        69, 720        14.8        15.6           0.8
Apr. 5,1952 .....          9, 700           850     514.7        50,180         12.5        16. 3          3. 8
Apr. 13, 1952....         12, 000        1,000      521.0        73, 680        14.4        17. 8          3. 4


  I Appreciable overflow    begins at 12 feet.

   The pool elevation at the beginning of the fiscal year was 501.30 feet
above mean sea level, corresponding to 35,400 acre-feet of total storage
and was 494.89 feet at the end of the fiscal year, corresponding to
23,370 acre-feet of total storage. The maximum pool elevation during
the fiscal year was 528.8 feet, corresponding to 130,600 acre-feet of
total storage. Sufficient releases were made from the reservoir during
the low-water periods to supply water requirements downstream.
The conservation pool elevation was fluctuated during the warm
months as an aid in the control of mosquitoes.
   The costs during the fiscal year were $188,722.22 for new work and
$64,127.07 for maintenance. The total expenditures during the fiscal
year were $341,300.91.
   Condition at end of fiscal year.-The project is substantially com-
plete. Work remaining to complete the project consists of completing
the water supply well, completion of grouting of derrick stone up-
stream from the spillway, and acquisition of additional lands and
additional relocations to provide for surcharge storage.
   The total costs to the end of the fiscal year were $9,641,471.03 for new
work and $234,987.36 for maintenance. The total expenditures were
$9,869,706.95.
  Proposed operations.-The balance unexpended June 30, 1952,
$369,298.21, including accounts receivable, $250,000, plus an allotment
in fiscal year 1953 of $47,100 for maintenance, a total of $416,398.21,
will be applied as follows:
Accounts payable June 30, 1952-----.----------------------------                                    $9, 017.14
New work:
    Continue planning for miscellaneous construction
     and reservoir development by hired labor during
     the period July 1952 to June 1953_- ----     ---__.  $21, 227. 00
    Complete final real-estate audit by hired labor
     during period July 1952 to June 1953-----------            75. 00
    Continue miscellaneous construction work, includ-
     ing completion of water supply well, grouting
     derrick stone, and expansion and improvement of
     facilities for public use by hired labor during the
     period July 1952 to June 1953- --            _--- --  13, 335. 00
1034           REPORT OF CHIEF OF ENGINEERS,                                          U.    S. ARMY,          1952

New work-Continued
   Relocations and land acquisition to provide for
     surcharge storage and for miscellaneous con-
     struction of facilities for public health and
     safety--------------------------------        $322, 252. 13

        Total for new work .            -.-..--                                                     -__.           $356, 889. 13
Maintenance:
    Operation ---------------------------------                                                 30, 000. 00
    Ordinary maintenance and repairs -------.-.                                                 11, 491.94
    Reservoir management........-------------   --------                                         9, 000.00.
                                                                                                         00

              Total for maintenance_---__                          -- -_----.-                     -----             50, 491. 94

              Total for all work_ --------                                --------                         _ -416,        398.21
  The sum of $64,500 can be profitably expended during fiscal year
1954 for operation and for ordinary maintenance and repairs.
                                              Cost and financial summary

                                                            Fiscal year ending June 30                              Total to June
                                                                                                                   30, 1952, includ-
                                                                                                                   ing fiscal years
                                         1948             1949           1950           1951           1952          prior to 1948


New work:
   Appropriated-------.........$2,000,000.00 $1,182,139.84             $59, 960.16 -$306,000.00------------          $9, 998, 360.16
    Cost----------------...............2,170, 118. 25   298, 440. 55   183, 279. 60   432, 164. 60 $188, 722. 22      9, 641, 471.03
    Expenditures----......... 2, 003, 833. 54           653, 025. 60   175, 262. 23   346, 597. 37 277, 740. 20       9, 635, 096. 39
Maintenance:
    Appropriated                   -----.........--------
                                 ............       71, 000. 00         52, 000. 00    51, 000. 00   66, 645. 00        240, 645. 00
    Cost ----------------------                          58, 414. 61    57, 863. 29    54, 582. 39   64, 127. 07        234, 987. 36
                   .........------............
    Expenditures-------                                  57, 460. 42    59, 002. 85    54, 586. 58 . 63, 560. 71        234, 610. 56


Other new work data:
   Unobligated balance,                       June 30, 1952_ ..         .        __--------- $102,527.52
   Unobligated balance                       available for fiscal year 1953_          ______-102, 527. 52
   Estimated additional                      amount needed to be appropriated for com-
      pletion of existing                     project. ---------------------------             25,639. 84

             19. NORFORK RESERVOIR, WHITE RIVER BASIN, ARK.

   Location.-The Norfork Dam is located on the North Fork River
about 4.8 miles above its confluence with the White River, near Nor-
fork, Baxter County, Ark. (See U. S. Geological Survey map for
Mountain Home, Ark., quadrangle, scale 1: 125,000.) Norfork Reser-
voir extends northward from the dam across Baxter County, Ark.,
into Ozark County, Mo.
   Existing project.-The plan of improvement provides for construc-
tion of a concrete gravity-type dam 2,624 feet long and 222 feet in
height above the stream bed. The dam consists of a spillway section
568 feet long located above the river channel and two non-overflow
sections contiguous thereto and extending into the abutments.
   The spillway is controlled by 12 radial crest gates 28 feet high and
40 feet long. The flood control outlets consist of eleven 4- by 6-foot
conduits through the dam at the base of the spillway which are con-
trolled by hydraulically operated slide gates. The total capacity of the
           FLOOD   CONTROL-LITTLE       ROCK,   ARK.,   DISTRICT      1035
outlets is about 23,000 cubic feet per second with the reservoir filled
to top of power pool, elevation 552. The powerhouse at the base of
the dam on the right side of the spillway is provided with two pen-
stocks and two 35,000-kilowatt generating units. Two additional pen-
stocks are provided through the dam for installation of additional
generating units in the future.
   The reservoir, which is one unit of a comprehensive plan for flood
control and other purposes in the White River Basin, controls practi-
cally the entire drainage area of the North Fork River. It has a
total storage capacity of about 1,983,000 acre-feet, of which 732,000
acre-feet is for flood control and 1, 251,000 acre-feet is for generation of
power.
   The estimated cost of the project (1952) is $27,608,000 for construc-
tion and $1,192,000 for lands and damages, totaling $28,800,000. The
estimated cost for annual maintenance is $260,000 (1952).
   The existing project was authorized by the Flood Control Act ap-
proved June 28, 1938, as amended by the Flood Control Act approved
August 18, 1941.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
    Operationsand results during fiscal year.-Ordinaryoperation and
maintenance of the project were continued. Contracts for installa-
tion and wiring of electrical equipment, for procurement of switch-
board, carrier current and metering equipment, an for air-blast equip-
ment were completed. Contract was awarded for procurement of
instrument transformers.
    There were no major repairs or replacements of flood control or
electrical generating equipment during the fiscal year. At least one
of the two 3.5,000 kilowatt generators was available for operation at
all times. A total of 338,925,200 kilowatt-hours of electrical energy
was delivered to the Southwestern Power Administration for sale and
was purchased by 1 private power company, 1 municipality, and 2
Rural Electrification Administration cooperatives for $1,488,988.45.
    The results of operation of the Norfork Reservoir for flood control
are shown under the heading, White River Basin, Little Rock district.
    The costs during the fiscal year were $124,444.36 for new work and
 $226,785.69 for maintenance. The total expenditures during the fiscal
year were $337,643.57.
    Condition at end of fiscal year.-Constr.uction of the project is
essentially complete. Work remaining to complete the project in-
cludes the procurement and installation of miscellaneous powerhouse
and switchyard equipment and construction of miscellaneous facilities
for reservoir management and public use.
    The total costs to the end of the fiscal year were $28,110,719.45 for
new work and $1,647,411.29 for maintenance. The total expenditures
were $29,742,088.04.
    Proposed operations.-The balance unexpended June 30, 1952, in-
cluding accounts receivable, $341,984.04, plus an allotment in fiscal year
1036           REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                        1952

1953 of $245,000 for maintenance, a total of $586,984.04, will be applied
as follows:
Accounts payable, June 30, 1952__.......................                                                              $22, 389. 38
New work :
    Continue planning for miscellaneous construction
      and reservoir development by hired labor dur-
      ing the period July 1952 to June 1953-----_ $20, 700. 00
    Continue installation of miscellaneous powerhouse
      equipment by hired labor during the period July
      1952 to June 1953-_                      __-------
                                                  --..---       58, 301.00
    Comiplete procurement and installation of circuit
      breakers and switchboard equipment by contract
      during the period July 1952 to June 1953 , _ _            22, 287. 00
    Complete procurement of 161 kv. transformers and
      load control and carrier current equipment by
      contract during the period July 1952 to June 1953_         61, 606.00
    Initiate procurement of 3-phase transformer by
      contract during the period July 1952 to June
      1953-         --       __129,                                 269. 16
    Continue reservoir activities, planning, and con-
      struction by hired labor during the period July
      1952 to June 1953---------                 _-----_----20,      500. 00
        Total new work -------------.-.--------------            .-312, 663. 16
Maintenance:
   Operation ------------   ---------------------   150, 200. 00
   Ordinary maintenance and repairs-------------- 54, 731.50
   Improvement and reconstruction---------             7, 000. 00
   Reservoir management-----------       ---------    40, 000. 00
              Total for maintenance-- ---------                                      --------    ___           --    251, 931. 50
               Total for all work_---------------------------------                                                  586, 984. 04
   The sum of $247,000 can be profitably expended during fiscal year
1.954 for operation and for ordinary maintenance and repair, improve-
ment and reconstruction.
                                            Cost and financial summary

                                                          Fiscal year ending June 30                                 Total to June
                                                                                                                     30, 1952, includ-
                                                                                                                     ing fiscal years
                                        1948            1949            1950             1951           1952          prior to 1948


New work:
     Appropriated-.......----           .                   047.21 $744,052.79
                                                     $-----------750,                  $98,000.00 $669, 847.21        $28, 800, 000.00
     Cost .--------------..     ..   $708,429.97      941, 372. 78 1,400, 160. 89      192, 574. 08 124, 444. 36       28, 110, 719. 45
   Expenditures--------.........      673, 360. 21    877, 245. 30 1, 438, 266. 82     288, 950. 84    93, 727. 67     28, 085,132. 88
Maintenance:
    Appropriated--------.........     265, 000. 00    210, 000. 00   227, 000. 00      250, 000. 00   233, 500. 00      1, 663, 900. 00
    Cost ---------------              226, 911. 51    222, 309. 20   256, 857. 40      249, 488. 87   226, 785. 69      1, 647, 411.29
     Expenditures--------........     206, 768. 54   242, 532. 04    263, 754. 85      242, 426. 70   243, 915. 90      1, 656, 955. 16


Other new work data:
    Unobligated balance, June 30, 1952_--- ------    ___----  - $278, 660.14
    Unobligated balance available for fiscal year 1953---------- 278, 660. 14

20. TABLE ROCK RESERVOIR, WHITE RIVER BASIN, MO. AND ARK.
   Location.-The Table Rock Dam site is at mile 528.8 on the White
River in Taney County, Mo., about 8 miles upstream and southwest
of Branson, Mo. (See sectional aeronautical chart, Tulsa sheet, scale
1: 500,000; Harrison sheet NJ15-11, Army Map Service series V502,
          FLOOD CONTROL---LITTLE      ROCK,   ARK.,   DISTRICT     1037
scale 1:250,000; U. S. Geological Survey map for Forsyth, Mo.,
quadrangle, scale 1: 125,000.) From the dam the reservoir will
extend westward into Stone and Barry Counties, Mo., and into
Boone, Carroll, and Benton Counties, Ark.
   Existing project.-The existing project is approved for the com-
bined purposes of flood control; the generation of hydroelectric
power; and for other beneficial uses. The project plan provides for
construction of a dam 6,388 feet long consisting of a concrete gravity
structure across the main part of the valley with two rolled earth fill
abutment sections and a hydroelectric power generating plant. The
concrete portion of the dam will be 2,424 feet long and 258 feet high
above the stream bed. The left abutment embankment will be 2,985
feet long with a maximum height of 80 feet. The right abutment
embankment will be 979 feet long with a maximum height of 30
feet. The concrete portion of the dam will include a spillway sec-
tion 664 feet long which will be bridged for a roadway across the
dam. The flow over the spillway will be controlled by 14 radial
crest gates 40 feet wide and 28 feet high. Flow through the dam
will be regulated by thirteen 4- by 6-foot conduits equipped with
hydraulically operated slide gates. The total discharge capacity
of the outlets will be 28,000 cubic feet per second with the reservoir
filled to the top of the spillway gates, elevation 931. Flow to the
power plant will be through four 18-foot-diameter penstocks. The
powerhouse at the downstream base of the dam will provide space
for four 42,000-kilowatt generating units, two of which will be in-
stalled initially. The two initial units will produce, during an
average year, 446 million kilowatt-hours of energy. The switch-
yard will be located on the left bank downstream from the power-
house. The reservoir formed by the Table Rock Dam will be one
unit of a comprehensive plan for flood control and other purposes in
the White River basin and will control the runoff from an area
of approximately 4,020 square miles. The reservoir will have a total
storage capacity of about 3,462,000 acre-feet, of which 760,000 will be
for flood control and 2,702,000 for the generation of hydroelectric
power. The reservoir will have an area of 52,250 acres at top of
flood-control pool, elevation 931, and 43,070 acres at top of power pool,
elevation 915. The reservoir area will be developed for recreational
purposes and provisions will be made for conservation of wildlife.
The estimated cost of the project (1952) is $72,270,000 for construc-
tion and (6,340,000 for lands and damages, totaling $78,610,000. The
existing project was authorized by the Flood Control Act approved
August 18, 1941.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
    Operations and results during fiscal year.-Review of the plan for
development of the Table Rock Dam site, which included study of the
use of alternate types of dam structures, was completed. Preparation
of plans and specifications for preliminary construction work was
initiated. Explorations necessary for determination of a source of
concrete aggregates for the dam were completed and all laboratory
tests in connection with aggregates were essentially completed. Col-
     245554-53--vol. 1-66
1038     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

lection of land ownership data for acquisition of the dam site and
reservoir area was initiated.
   The costs during the fiscal year were $120,153.89 and the expendi-
tures were $120,905.66, all for new work.
   Condition at end of fiscal year.-Preparation of plans and specifica-
tions is under way. Preliminary engineering is 60 percent complete.
Relocations, land acquisition, and construction have not been started.
   The costs to the end of the fiscal year were $1,066,355.18 and the
expenditures were $1,065,718.05, all for new work.
   Proposed operations.-Thefunds unexpended June 30, 1952, includ-
ing accounts receivable, $100,329.60, plus an allotment of $2,985,000
for new work in fiscal year 1953, totaling $3,085,329.60, will be applied
as follows:
Accounts payable June 30, 1952------------------------------                  $678. 73
New work:
    Continue planning, including preparation of plans and specifi-
       cations for miscellaneous construction by hired labor during
      period July 1952 to June 1953----------------------                 295, 650. 87
    Construct access road by contract during period July 1952 to
      June 1953------------------------              ------------ ----    300, 000. 00
    Construct cffice and service buildings by contract during
       period July 1952 to June 1953 -----                                488, 000. 00
    Construct service utilities by contract during period July 1952
       to June 1953--        -----------------------------------           46, 000. 00
    Initiate construction of dam and appurtenances by continuing
       contract during period July 1952 to June 1953- --------         1, 390, 000. 00
    Initiate relocations by contract during period July 1952 to
      June 1953 -------------------------------                           300, 000, 00
    Initiate land acquisition by hired labor during period July
      1952 to June 1953----------------------------------                 250, 000, 00
    Reservoir activities by hired labor during period July 1952 to
      June 1953-------------------- ----                                   15, 000. 00
        Total for all work------------         -------------------      3, 085, 329. 60
  The sum of $11,000,000 can be profitably expended for the following
schedule of work during fiscal year 1954:
New work:
   Continue planning, including preparation of plans and specifica-
      tions for miscellaneous construction by hired labor during
     period July 1953 to June 1954-----------------------            $200, 000
   Construct access railroad by contract during period July 1953
     to June 1954-----------------------------------------            752, 000
   Continue construction of dam and appurtenances by contract
     during period July 1953 to June 1954-------------------- 7, 000, 000
   Initiate purchase of powerhouse and switchyard equipment by
     contract during period July 1953 to June 1954-------------- 536, 000
   Continue relocations by contract during period July 1953 to
     June 1954------------------------------------------            1,500, 000
   Continue land acquisition by hired labor during period July 1953
     to June 1954-------------         -------------------------- 1,000, 000
   Reservoir activities by hired labor during period July 1953 to
     June 1954------------       --------------------------------      12, 000

        Total for all work----------          ----------------------      11, 000, 000
                    FLOOD           CONTROL--LITTLE                       ROCK, ARK.,                DISTRICT                1039
                                              Cost and financial summary

                                                            Fiscal year ending June 30                                Total to June
                                                                                                                     30, 1952, includ-
                                                                                                                     ing fiscal years
                                          1948            1949            1950           1951           1952           prior to 1948


New work:
   Appropriated------     ............ ...........
               ........--------------                                 $125, 000. 00 $100, 000. 00 $150, 000. 00        $1, 166,006. 05
    Cost ................-------------- $77, 207. 48   $34, 573. 53     36, 064.80    153, 249. 12   120,153. 89        1, 066, 355. 18
    Expenditures      --------.          72, 625. 11    36, 333. 92     34, 025. 66   152, 504.22    120, 905. 66       1, 065, 718.05


Other new work data:
      Unobligated balance, June 30, 1952 ......... -- _.    ---------                                                  $97, 704. 94
      Appropriated for fiscal year ending June 30, 1953-----------                                                  2, L83, 000. 00
      Unobligated balance available for 1nscal year 1953------------                                                3, 082, 704. 94
      Estimated additional amount needed to be appropriated for
        completion of existing project ..---- --------------- 74,458, 993.95
          21.     BULL SHOALS RESERVOIR, WHITE RIVER BASIN, ARK.

   Location.-The Bull Shoals Dam is located at mile 418.6 on the
White River in Baxter and Marion Counties, Ark., about 7 miles
north of Cotter, Ark., and 10 miles west of Mountain Home, Ark.
 (See sectional aeronautical chart, Tulsa sheet, scale 1: 500,000.)
The Bull Shoals Reservoir extends northwest along White River
to the Ozark Beach Dam at mile 506.1 and comprises lands in Taney
and Ozark Counties, Mo., and Boone, Marion, and Baxter Counties,
Ark.
   Existing project.--The project plan provides for the construc-
tion of a gravity-type concrete dam 2,256 feet long and 258 feet
in height above the stream bed, and a hydroelectric power generating
plant. The dam consists of a spillway section 808 feet long located
above the river channel and two nonoverflow sections contiguous
thereto and extending into the abutments. The spillway is con-
trolled by 17 radial crest gates 28 feet high by 40 feet long. The
flood-control outlets consist of sixteen 4- by 9-foot conduits through
the dam at the base of the spillway which are controlled by hydrau-
lically operated slide gates. The total capacity of the outlets is
49,000 cubic feet per second with the reservoir filled to the top of
the power pool, elevation 654. The powerhouse at the base of the
dam, on the left side of the spillway, is provided with eight penstocks,
and four 40,000-kilowatt generating units with provisions for in-
stallation of four additional generating units in the future. The
reservoir, which is one unit of a comprehensive plan for flood con-
trol and other purposes in the White River basin, controls the runoff
from an area of approximately 6,036 square miles. The reservoir
has a total storage capacity of about 5,408,000 acre-feet, of which
2,360,000 acre-feet is for flood control and 3,048,000 acre-feet is for
the generation of hydroelectric power.
   The estimated cost of the project (1952), is $70,241,000 for con-
struction and $6,056,000 for lands and damages, totaling $76,300,000.
The estimated cost of annual maintenance is $385,000 (1952).
1040    REPORT OF CHIEF OF ENGINEERS, U.        S. ARMY, 1952

   The existing project was authorized by the Flood Control Act
of August 18, 1941.
   Local cooperation.--Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Constructionof the dam
and appurtenant works was completed November 1, 1951. Construc-
tion of the powerhouse and switchyard was continued, and included
the placement of 1,583,459 pounds of reinforcing steel and 30,364 cubic
yards of concrete. Sixteen contracts for furnishing cement and var-
ious items of equipment for the powerhouse were completed. Work
by contract for furnishing turbines, generators, transformers, distribu-
tion centers, and other powerhouse equipment was continued. Clear-
ing of the reservoir area and relocation of cemeteries were completed
The relocation of roads, streets, and utilities and acquisition of lands
were continued. Facilities for reservoir management and public use,
including access roads to selected sites along the reservoir shore line,
were constructed. Twelve commercial boat dock sites were advertised
and leased to concessionaires to serve the visiting public.
   Operation and maintenance of the dam and appurtenant works were
initiated in November 1951.
   The results of the operation of Bull Shoals Reservoir for flood con-
trol are shown under the heading "White River Basin, Little Rock
District."
   The costs during the fiscal year were $13,731,951.71 for new work
and $51,276.32 for maintenance. The total expenditures during the
fiscal year were $14,438,887.46.
   Condition at end of fiscal year.-Constructionof the powerhouse and
switchyard is 85 percent complete. Four complete turbines and one
generator have been delivered. Delivery of other powerhouse equip-
ment, relocation work, and land acquisition are continuing. Work
remaining to complete the project includes completion of the power-
house structure and switchyard, completion of procurement and in-
stallation of generators, turbines, and other powerhouse and switch-
yard equipment, completion of abutment roads, miscellaneous minor
construction work by hired labor, and construction of additional facil-
ities for reservoir management and public use. The project as a whole
is 88 percent complete.
   The total costs to the end of the fiscal year were $67,519,430.04 for
new work and $51,276.32 for maintenance. The total expenditures
were $65,760,063.87.
   Proposed operations.-The balance unexpended June 30, 1952, in-
cluding accounts receivable, $7,628,894.64, together with allotments of
$995,000 for new work and $245,000 for maintenance in fiscal year
1953, a total of $8,868,894.64, will be applied as follows:
              FLOOD       CONTROL-LITTLE        ROCK,     ARK.,   DISTRICT          1041
Accounts payable June 30, 1952_        ------------------------  _        $1, 803, 014. 84
New work:
    Continue planning, including preparation of
      plans and specifications, of miscellaneous
      construction by hired labor during the period
      July 1952 to June 1953--        --------------- $153,258.00
    Lands and damages by hired labor during the
      period July 1952 to June 1953--------------910, 546. 00
    Relocations by contract during the period July
      1952 to June 1953 -------------------          2, 513, 830. 00
    Complete construction of powerhouse and
      switchyard, powerhouse wiring, and left abut-
      ment road; and purchase of generators and
      equipment by contract; and install elevator
      by hired labor during the period July 1952
      to June 1953--_----------------------3, 115, 593. 86
    Miscellaneous appurtenant work, including drill-
      ing and grouting, by hired labor during the
      period June 1952 to July 1953-------------- 65, 066. 00
    Reservoir activities, including miscellaneous
      construction of facilities for public health
      and safety by hired labor during the period
      July 1952 to June 1953-------------------          63, 143. 00
         Total for new work        _ --      --- --                         6, 821, 419. 86
Maintenance:
    Operation -------.                                   60, 000. 00
                                                        1-----------------------
    Ordinary maintenance and repairs ----------          42, 459. 94
    Reservoir management ---.--------------              42, 000. 00

       Total for maintenance-----------------------------                     244, 459. 94

       Total for all work------ --------------------------                  8, 868, 894. 64
  The sum of $2,100,000 can be profitably expended for the following
schedule of new work during fiscal year 1954:
New work :
    Continue planning, including preparation of plans and specifica-
      tions, of miscellaneous construction by hired labor during the
      period July 1953 to June 1954-----.....------    -----------------          $62, 600
    Relocations by contract during the period July 1953 to June 1954_ 1,128, 900
    Facilities to protect Ozark Beach hydroelectric plant------------700, 000
    Cleanup and landscaping by hired labor and public building by
      contract during the period July 1953 to June 1954-----___          __-
                                                                         --       100, 000
    Reservoir activities by hired labor during the period July 1953
      to June 1954------ -----------------------------                       ---- 108, 500
          Total----------------------------                    -----------      2, 100, 000
  The sum of $345,000 can be profitably expended during fiscal year
1954 for operation, ordinary maintenance and repairs, and for im-
provement and reconstruction.
1042         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                                        Cost and financial summary

                                               Fiscal year ending June 30                                      Total to June
                                                                                                              30, 1952, includ
                                                                                                              ing fiscal years
                         1948              1949              1950             1951              1952           priorto 1948

New work:
  Appropriated_ $6, 700, 000. 00 $14, 000, 000. 00 $12, 901, 500. 00 $16, 272, 000. 00 $14, 960, 000. 00       $73, 333, 500. 00
  Cost--...---- . 6, 541, 914.41 13, 301, 396. 48 15, 028, 377.44 15, 412, 981.96 13, 731, 951. 71              67, 519, 430.04
  Expenditures.   5, 137, 207. 96 13, 177, 557. 86 14, 305, 081. 62 15, 320, 199. 73 14, 394, 818. 47           65, 715, 994.88
Maintenance:
Appropriated-...-------.------------------------------------------                             51,461.00            51,461.00
Cost- --.---..--------------     ..------------- ..------------                .-------------- 51,276.32            51,276.32
Expenditures------------
              ..............          -----------------..............
                                                  ----------------.............--.............. 44, 068. 99          44, 068. 99


Other new work data:
    Unobligated balance, June 30, 1952----------------------$294,          574. 08
    Appropriated for fiscal year ending June 30, 1953------------   995, 000. 00
    Unobligated balance available for fiscal year 1953-              289, 574. 08
                                                                  1---------,
    Estimated additional amount needed to be appropriated for
      completion of existing project1------------------------,       971, 500. 00

                22. WHITE RIVER BASIN, LITTLE ROCK DISTRICT

   Location.-These improvements are located on the White River and
tributaries thereof and are in the States of Arkansas and Missouri.
More definite locations of the individual items are given in the follow-
ing paragraph.
   Existing project.-The Flood Control Act of June 28, 1938, ap-
proved the general comprehensive plan for flood control and other
purposes in the White River Basin, as set forth in Flood Control Com-
mittee Document 1, Seventy-fifth Congress, first session, with such
modifications thereof as in the discretion of the Secretary of War
and the Chief of Engineers may be advisable, and authorized the sum
of $25,000,000 for reservoirs, for the initiation and partial accomplish-
ment of the plan, the reservoirs to be selected and approved by the
Chief of Engineers. The Flood Control Act approved August 18,
1941, authorized to be appropriated the sum of $24,000,000, in addition
to previous authorizations, for the prosecution of the comprehensive
plan approved in the act of June 28, 1938, for the White River Basin
in Missouri and Arkansas, including the projects for flood control
and other purposes recommended by the Chief of Engineers in House
Document 917, Seventy-sixth Congress, third session, and the modi-
fications in the Norfork Reservoir project recommended by the Chief
of Engineers in House Document 290, Seventy-seventh Congress, first
session. The Flood Control Act approved December 22, 1944, au-
thorized to be appropriated the sum of $45,000,000, the Flood Control
Act approved July 24, 1946, authorized to be appropriated the sum of
$40,000,000, and the Flood Control Act approved May 17, 1950,
authorized to be appropriated the sum of $35,000,000, in addition to
previous authorizations, for the prosecution of the comprehensive plan.
The reservoirs included in the comprehensive plan are listed below:
                        FLOOD         CONTROL---LITTLE                ROCK,        ARK.,    DISTRICT                1043

                                            Dis-                      Height of Dam                    Power        Total
  Reservoir                   River        tance Nearest town above stream bed                   i    develop-    estimated
                                           mouth                 and type                               ment        Cost 1

                                           miles                                         Acre-feet    Kilowatts
Clearwater   2___Black-.......             257. 4    Piedmont,     154 feet earth-fill_    413, 000      (3)    $10, 024, 000
                                                       Mo.
Water Valley__            Eleven Point_      12. 6   Watervalley,  157 feet earth-fill_ 1, 563, 000      (4)      14, 412, 000
                                                       Ark.
Bell Foley ...            Strawberry_--      26. 2   Smithville,   133 feet earth-fill_    245,000       (3)       8, 830, 000
                                                       Ark.
Norfork 2-....            North Fork._        4. 8   Norfork, Ark_ 222 feet concrete- 1,983, 000        70,000    28, 800, 000
                                                                     gravity.
Lone Rock ...             Buffalo- .....      3. 6   Lone Rock,    216 feet concrete-      687, 000      (3)      25, 625, 000
                                                       Ark.          gravity.
Greers Ferry__ Little Red __                 77. 2   Heber            158 feet concrete-   524, 000      (3)      16, 531,000
                                                       Springs,         gravity.
                                                       Ark.
Bull Shoals 2.            White-_ .....     418. 6   Amos, Ark___     258 feet concrete- 5,408, 000    160, 000   76, 300, 000
                                                                       gravity.
Table Rock       2-   .....   do........    528. 8   Branson, Mo.     258 feet concrete- 3,462, 000     84, 000   78, 610, 000
                                                                        gravity and
                                                                        earth-fill.

  1 1952 price levels.
  2 For details of this project, see individual report.
  8None.
  4Includes provisions for future power installation.

   Clearwater, Norfork, Bull Shoals, and Table Rock Reservoirs were
selected and approved for construction by the Chief of Engineers in
accordance with the above authorization and individual reports on the
four reservoirs are given in the preceding pages. All costs and ex-
penditures for those four reservoirs previously reported under the
heading "White River Basin, Little Rock District" have been trans-
ferred to the individual reports.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operationsand results during fiscal year.-Stream gaging, field sur-
veys, foundation explorations, compilation of land ownership data,
plans and specifications, and studies in connection with the develop-
ment of the general comprehensive plan were continued by hired labor
during the year.
   Four noteworthy rises occurred on the Upper White and North
Fork Rivers during the fiscal year. Regulation of the rises on the
North Fork River by the Norfork Reservoir and modification of the
flow from the Upper White River in Bull Shoals Reservoir, which was
under construction, resulted in the protection of about 36,700 acres of
improved land along the White River for each flood of which approxi-
mately 25,600 and 11,100 can be credited to Bull Shoals and Norfork
Reservoirs, respectively. Flood modifications on the White River at
Calico Rock, 17 miles downstream from the mouth of the North Fork
River and 59 miles downstream from Bull Shoals Dam, and at New-
port, 102 miles downstream from Calico Rock, are given in the follow-
ing tabulation.
                                                                                                                                                                                                      White River
                                                             Bull Shoals Reservoir                                         Norfork Reservoir
                                                                                                                                                                                 Calico Rock, Ark.'                     Newport, Ark.s


                                                                                                                                                                          0+.o   CO
                                                                                                                                                                                                                                                  O
                                                                                           O                          ,                .          ..           ....   .   .'.
         Date of peak inflow                      Z                  o                                                        .                        .                  o               +           "                               "+
                                                                                                                                                                                                                                                  O
                                                                                                                                                                                                                                                  0
                                                      b       a     U       a                  a     Date of peak inflow          u        U               a              p                                       b



                                                                                                                                                                                                                                                  0


                                                                                                                                                                                                                                                  0M
July 4, 1951------....                           . 63, 500        23, 000       549. 3    382, 300   July 10, 1951-.....     40, 500   4 4, 950            557.0 113, 200         12. 7                                                           4T
                                                                                                                                                                                                                                                  In.
                                        __                    3                                                                                                                               19. 7        7.0        22. 5   26. 5        4. 0
Nov. 25, 1951----------------41,500                                5, 700       606.1 1, 380, 700    Nov. 23-24, 1951___     27, 400   4 2, 690            555. 2 71, 600         15.1        24. 3        9. 2       25. 5   28. 5        3. 0   O
Mar. 10, 1952...----------------49, 500                               150       636. 5 2, 327, 800    Mar. 10, 1952-.....    39, 300   4 5, 340            554. 5 55, 800         18. 7       30. 5       11.8        24. 7   28.8         4.1
Apr. 12, 1952----------------.................... 75,400           3,200        639.6 2,444,800      Apr. 12,1952-.....      38,400    ' 5, 400            554.9 64,800           18.3        27.5         9.2        25.6    28.3         2. 7   z0
     1 Flood stage 19 feet.
     2 Flood stage 26 feet.
     3 Dam under construction, 11 gates open.
     4 For generation of hydroelectric power.

                                                                                                                                                                                                                                                  CIl

                                                                                                                                                                                                                                                  LJ




                                                                                                                                                                                                                                                  F-+

                                                                                                                                                                                                                                                  '0
              FLOOD       CONTROL---LITTLE                 ROCK,        ARK.,         DISTRICT               1045
   The pool elevation of the Norfork Reservoir at the beginning of the
fiscal year was 552.42 feet above mean sea level, corresponding to 1,-
260,400 acre-feet of total storage. At the end of the fiscal year the
pool elevation was 547.31 feet above mean sea level, corresponding to
1,151,000 acre-feet of storage. The maximum pool elevation during
the fiscal year was 557.0 feet above mean sea level, corresponding to
1,364,400 acre-feet of total storage. The Bull Shoals conduit releases
were reduced to minimum low water requirements on July 23, 1951, to
begin filling of the power pool and filling was under way at the end
of the fiscal year. The pool elevation at the beginning of the fiscal
year was 510.0 feet above mean sea level, corresponding to 88,800 acre-
feet of storage and was 636.07 feet above mean sea level at the end of
the fiscal year with 2,311,000 acre-feet of water in storage.
   The costs during the fiscal year were $5,837.63 and the expenditures
were $8,813.87, all for new work.
   Conditionat end of fiscal year.-Furtherprogress on surveys, stud-
ies, and detailed plans for development of the general comprehensive
plan for flood control and other purposes in the White River Basin has
been made. The progress on projects selected for construction isgiven
in individual reports.
   The total costs to the end of the fiscal year were $799,515.42 and the
expenditures were $799,515.42, all for new work.
   Proposedoperations.-An allotment of $40,000 for planning in fiscal
year 1953 will be applied to site and foundation investigations for
Greers Ferry Reservoir.
   The sum of $37,700 can be profitably expended during fiscal year
1954 for preparation of detailed plans on Greers Ferry Reservoir.
                                  Cost and financial summary

                                               Fiscal year ending June 30                             Total to June
                                                                                                     30, 1952, includ-
                                                                                                     ing fiscal years
                              1948           1949          1950          1951           1952          priorto 1948

New work:
   Appropriated.--------- . ------    .-   $$24, 993.95 $150, 006.05 $100,000.00 -$142,184.58            $799, 515.42
   Cost--   _------..       $65, 589. 90    73, 617. 19   28, 006. 17   87, 476. 78     5, 837. 63        799, 515. 42
   Expenditures---           62, 862.92     77, 207. 71   28, 628.38    81, 373.43      8, 813. 87        799, 515. 42


Other new work data:
    Appropriated for fiscal year ending June 30, 1953_ .......     $40, 000. 00
    Unobligated balance available for fiscal year 1953---------     40,000. 00
   Estimated additional amount needed to be appropriated for
      completion of existing project_____-___________       __-64, 558, 484. 58
23. SNAGGING AND CLEARING UNDER AUTHORITY OF SECTION 2 OF
THE FLOOD CONTROL ACT APPROVED AUGUST 28, 1937, AS AMENDED
   The Flood Control Act approved August 28, 1937, as amended by
the Flood Control Acts approved August 11, 1939, August 18, 1941,
and July 24, 1946, authorized the allotment of not to exceed $1,000,000
from flood control appropriations for any one fiscal year for removal
of accumulated snags and other debris from, and clearing and
straightening of channels in navigable streams and tributaries thereof
when such work is advisable in the interest of flood control; pro-
vided that not more than $50,000 shall be allotted for this purpose
1046         REPORT OF CHIEF OF ENGINEERS,                                      U.     S. ARMY, 1952

for any single tributary from the appropriations for any one fiscal
year.
  The work of clearing and removing accumulated debris from the
channel of Tupelo Bayou upstream from mile 4, in Faulkner County,
Ark., was initiated and was 43 percent complete on June 30, 1952.
  The costs during the fiscal year were $7,097.80 and the expenditures
were $3,944.22, all for new work.
  The total costs to the end of the fiscal year were $67,565.04 and the
total expenditures were $64,411.46, all for new work.
  The balance unexpended June 30, 1952, $12,055.78, will be applied
during fiscal year 1953 to the payment of outstanding accounts and to
completion of clearing and removing accumulated debris from the
channel of Tupelo Bayou upstream from mile 4.
                                          Cost and financial summary

                                                       Fiscal year ending June 30                            Total to June
                                                                                                             30, 1952, includ-
                                                                                                             ing fiscal years
                                       1948          1949           1950             1951         1952        priorto 1948

New work:
   Appropriated--------              -$238. 62    $21, 400. 03   $13, 500.00 -$2,017.87       $16,000.00          $76, 467.24
   Cost---........                  ..i._-.-_
                                        -....       1,228. 64     29, 770. 27   1, 883.22       7, 097. 80         67, 565. 04
   Expenditures---------.........        12. 90     1,248.86      27, 983. 23    3,650.04       3,944.22           64, 411.46


Other new work data: Unobligated balance, June 30, 1952--------..                                              $8, 556. 75

24. PRELIMINARY EXAMINATIONS, SURVEYS,                                                  AND      CONTINGENCIES
                    FOR FLOOD CONTROL

   The costs during the fiscal year were $96,189.75 and the expenditures
were $96,914.34.
   The balance unexpended June 30, 1952, including accounts re-
ceivable, $7,512.73, together with an allotment of $47,000 in fiscal
year 1953, totaling $54,512.73, will be applied during the fiscal year
1953 to payment of outstanding liabilities and other expenses to be
incurred under this heading. Included under this heading is a com-
prehensive basin-wide investigation covering the Arkansas, White,
and Red River Basins; Arkansas, Louisiana, Oklahoma, Texas, New
Mexico, Colorado, Kansas, and Missouri, as on page 854.
  The additional sum of $108,800 isneeded to be appropriated for
the fiscal year 1954 for payment of expenses under this heading as
incurred.
                                           Cost and financial summary

                                                       Fiscal year ending June 30                             Total to June
                                                                                                             30, 1952, includ-
                                                                                                             ing fiscal years
                                       1948          1949           1950             1951         1952        priorto 1948

Maintenance:
   Appropriated-.........           $80,000.00$129, 800.00       $95, 000. 00 $119, 500. 00   $79, 600. 00     $2,363,328.   54
                      --
   Cost..................            56, 863.86 116, 074. 46     125, 431.63 104, 605. 25      96, 189. 75      2. 355, 968. 44
   Expenditures....--------          55, 871. 75 116, 859. 39    126, 208. 56 104, 043. 10     96, 914.34       2, 355, 905. 83
                     FLOOD CONTROL--LITTLE                                          ROCK, ARK.,                   DISTRICT               1047
                                25. INSPECTION OF COMPLETED WORKS

   The local flood protection projects for which inspection is required
under this heading comprise 13 levee projects in the White River
Basin, of which 4 were constructed or improved with United States
funds; and 21 levee projects in the Arkansas River Basin, of which
16 were constructed or improved with United States funds. Four
of the projects in the Arkansas River Basin also contain floodwalls
and pumping stations.
   Inspections of the local flood protection projects included under this
heading were made during the fiscal year to determine the extent of
compliance with approved regulations for maintenance and operation
of these projects. Responsible officials of the improvement districts
concerned were advised of inadequacies in the maintenance and opera-
tion of the local flood protection works under this jurisdiction where
appropriate.
   The costs during the fiscal year were $2,448.50, all for maintenance.
The expenditures were $2,438.68.
   The total costs to the end of the fiscal year were $4,241.11, all for
maintenance. The expenditures were $4,241.11.
   The balance unexpended June 30, 1952, including accounts receiv-
able, $258.89, plus an allotment of $2,000 during fiscal year 1953, a
total of $2,258.89, will be applied to expenses to be incurred under this
heading.
   The additional sum of $3,200 can be profitably expended for fiscal
year 1954 for payment of expenses incurred under this heading.
                                                  Cost and financial summary

                                                                   Fiscal year ending June 30                                     Total to June
                                                                                                                                 30, 1952, includ-
                                                                                                                                 ing fiscal years
                                             1948                1949               1950              1951           1952         priorto 1948

Maintenance:
    Appropriated--------.........--.........-----...---....--...------------------............      $2,000.00      $2, 500. 00          $4, 500. 00
    Cost...............--- --....                   .-     .. ---            --------.               1, 792. 61     2, 448. 50           4, 241.11
    Expenditures---....-----...------------- ------------.                                     --    1,802.43       2, 438. 68           4, 241. 11



             26. PLANT ALLOTMENT, LITTLE ROCK, ARK., DISTRICT
                                                  Cost and financial summary

                                                                   Fiscal year ending June 30                                     Total to June
                                                                                                                                 30, 1952, includ-
                                                                                                                                 ing fiscal years
                                             1948               1949                1950              1951           1952         prior to 1948


New work:
   Appropriated---....-          --.....                                 ........------------
                                           ----------------------.-----------                            -$197,000.00
   Cost ....--------------.............------------------------- ------------ ------------ -564,024.65
   Expenditures-------------------........         .---              ------------------------------------ -550, 512. 86


Other new work data: Unobligated balance, June 30, 1952--------                                                                  $322, 297. 45
1048         REPORT OF CHIEF OF ENGINEERS,                                     U     S:. ARMY, 1952

                       27. INACTIVE               FLOOD-CONTROL PROJECTS


                                                                      For last     Cost and expenditures       Estimated
                                                                    full renort       to June 30, 1952          amount
                      Name of project                               see annual                                  required
                                                                       report                          Mainte- to com-
                                                                        for-         New work          nance      plete

1. Big Bottom, Ark.'1. a     -----                                    1937
                                                                       193--            ---------   ------- $190,000.00
2. Skags Ferry. Black River east of Pocahontas, Ark.                  1941              81,023.32 ....         (..()
3. Little Black River, in Butler and Ripley Counties,
      Mo., and in Clay and Randolph Counties, Ark.' 4                  1937                        ....--.----------
                                                                                                   --------       816,500.00
4. Newport, White River, Ark.---------------------                    1941            314, 276.28 ........          (3)
5. Village Creek, White River and Mayberry Districts,
      Ark-.......------------------------------------.                 1941            532,310.17 ......--             (8)
6. Fort Smith, Arkansas River, Ark..------------------                1951         a 1, 077, 546.00 ........          (a)
7. McLean Bottom levee district No. 3, Arkansas
      River, Ark ..-----------------------    _____      ___           1950            422, 549.13 ........            ()
8. Clarksville, Ark. -----------------------------                    1937                                        215, 500.00
                                                                                                  ........----------------------
9. Carlen's Bottom drainage district No. 2, Arkansas
      River, Ark _----_----__________-----_                            1951           7 919, 954.63    ........        ()
10. Faulkner County, Arkansas River, Ark-----------.......             1941              99,510.65     .......-        (3)
11. Roland drainage district, Arkansas River, Ark.....                 1950             269, 907. 38   ..--------      (3)
12. North Little Rock, Arkansas River, Ark----------                   1943             501,639.08     --------        (3)
13. Little Rock, Arkansas River, Ark............-----------------      1951             883, 277.41    ..              (5)
14. From North Little Rock to Gillett, Ark. (above
      Plum Bayou) ...------------------------------                    1941            840, 914.32 .....               (8)
15. South Bank, Arkansas River (Tucker Lake), Ark_                     1950            376,597.37 ..----               (3)

  1 Conditions of local cooperation not likely to be fulfilled.
  2 In conformance with provisions of sec. 2 of the 1941 Flood Control Act, local interests were notified on
May 12, 1948, that authorization for construction of the project will expire 5 years from that date unless
assurances of local cooperation satisfactory to the Secretary of the Army are received prior to that time.
  3 Completed.
  4 In conformance with provisions of sec. 2 of the 1941 Flood Control Act, local interests were notified on
June 15, 1948, that authorization for construction of the project will expire 5 years from that date unless
assurances of local cooperation satisfactory to the Secretary of the Army are received prior to that time.
  5 Excludes work completed with contributed funds in the amount of $8,604.
  6 Deferred as project di l not qualify for Presidential certification in fiscal year 1953 budget request.
  7 Revoked during fiscal year, $3,089.37.

                               28. MISCELLANEOUS                       ACTIVITIES
   Status of all investigations for flood control called for by flood control acts
                            and committee resolutions

                                                                                  Date trans-     Document  Recom-
               Locality                           Authorization act                mitted to        No.    mndation
                                                                                   Congress

Arkansas River and tributaries,for        Flood Control Committee ...........................
flood control on Cadron Creek,             resolution, May 15, 1946.
  along the north side of the Arkan-
sas River, in Pope and Conway
  Counties, Ark.'
Arkansas River and tributaries, for        Flood Control Committee ...............
flood control on Chickalah Creek,          resolution, Mar. 1, 1946.
tributary of Petit Jean River in
  Logan and Yell Counties, Ark.'
Arkansas River,drainage and levee         House Public Works Com-
district No. 10 of Conway Coun-           mittee resolution, July
ty, Ark., for drainage.'                  26, 1951.
Arkansas River, levee district No.       .....   do....----------
1 of Conway County, Ark., for
drainage.'
Arkansas River, Cypress drainage          House Public Works Com-
district of Conway and Perry              mittee resolution, May
Counties, Ark.'                           27, 1949.
Arkansas River and tributaries,           Flood Control Committee
with a view to flood control, im-         resolution, July 25, 1946.
provement of Dutch Creek and
Spring Creek, Yell County,
Ark.'
Arkansas River, East End levee            House Public Works Com-
district, Little Rock, Ark., with         mittee resolution, April
respect to pumping stations.'             21, 1950.
   See footnotes at end of table.
                FLOOD CONTROL--LITTLE                        ROCK, ARK.,             DISTRICT                1049
   Status of all investigations for flood control called for by flood control acts
                      and committee resolutions--Continued

                                                                          Date trans-      Document
              Locality                        Authorization act           mitted to                  Recom-
                                                                           Congress           No.   mendation


Arkansas River and tributaries,          Flood Control Committee
for flood control on Lee Creek in         resolution, May 2, 1946.
western Arkansas and eastern
Oklahoma.l
Arkansas River and tributaries,          House Public Works Com-n-
with a view to providirig flood          mittee resolution, June
control and drainage in the vicin-        17, 1948.
ity of North Little Rock, Ark.
Arkansas River and tributaries,           Flood Control Committee         ...........
for flood control on Palarm Creek          resolution, June 21, 1944.
in Pulaski and Faulkner Coun-
  ties, Ark.'
Arkansas River for flood control          Flood Control Committee
  and control of caving banks              resolution, May 25, 1945.
above Little Rock, Ark., in the
  vicinity of Palarm Creek.
Arkansas River and tributaries, for      House Public Works Com- ...............
flood control along north side of        mittee resolution, Jan.
  Arkansas River in vicinity of           28, 1947.
  Spadra Creek, Johnson County,
Ark.'
Arkansas River, for water resources       Senate Public Works Com- ........
  of the White, Ouachita, and              mittee resolution, Feb.
  Arkansas Rivers and their tribu-         25, 1949.
  taries, in the State of Arkansas for
  irrigation and water supply.' 2
Arkansas, State of, for water re-        ..... do..............................---
  sources of the White, Ouachita,
  and Arkansas Rivers, and their
  tributaries, for irrigation and
  water supply.' 2
Arkansas, White, and Red River            Flood Control Act, May ...............           ----- -----
  Basins, Arkansas, Louisiana,              17, 1950.
  Oklahoma, Texas, New Mexico,3
  Colorado, Kansas. and Missouri.
Arkansas River and tributaries,           House Public Works Comrn- Apr. 24,1952           ------------    Favorable
  improvement for flood control            mittee resolution, March                                         for sur-
  and drainage on Plum Bayou,              15, 1949.                                                        vey.
  Ark.'
Archy Fork of Little Red River,           House Public Works Com- ...                      ------------
  Van Buren County, Ark., for              mittee resolution, Jan.
  flood control (tributary of White        28, 1947.
  River, Mo. and Ark.).'
Augusta, Ark., flood control on           Flood Control Committee ...............
  west bank White River between            resolution, Mar. 20,1944.
  Augusta and Clarendon, Ark.                                                              -------------
  and upstream from Augusta.'
Augusta, Ark., with a view to pro-        House Public Works Com- ..........
  viding flood control between             mittee resolution, June
  Newport and Augusta, Ark.,               17, 1948.
  along White River.'
Beaver Reservuir, Ark., construc-         Flood Control Committee                          ------------
  tion of multiple-purpose reservoir       resolution, Oct. 8, 1945.
  for flood control, hydroelectric
  power and municipal and in-
  dustrial water supply on White
   River.
Black River, Mo. and Ark-........   Flood Control Act, June              ...............
                                     28, 1938.
Cadron Creek, Pope and Conway Flood Control Committee                    --....-........
  Counties, Ark., for flood control  resolution, May 15, 1946.
  along north side of the Arkansas
  River.'
Chicklalah Creek, tributary of Flood Control Committee                   ...............
  Petit Jean River in Logan and       resolution, Mar. 1, 1946.
  Yell Counties, Ark., Arkansas
  River and tributaries (flood
  control).l
Clarendon, Ark., flood control on Flood Control Committee                ...............
  west bank White River between       resolution, Mar. 20, 1944.
  Augusta and Clarendon, Ark.,
  and upstream from Augusta.'
   See footnotes at end of table.
1050        REPORT OF CHIEF OF ENGINEERS, U.                                  S. ARMY,       1952

   Status of all in testigations for flood control called for by flood control acts
                       and committee resolutions--Continued

                                                                       Date trans-     Document  Recom-
              Locality                      Authorization act           mitted to        No.    mendtion
                                                                        Congress

Conway County drainage and House Public Works Com-
levee district No. 10, Arkansas,      mittee resolution, July ---- ---- ----
for drainage, Arkansas River.'        26, 1951.
Conway County levee district No. ----.... do-------------------......................
  1, Arkansas, for drainage, Ar-
kansas River.'
Crooked Creek, for flood control Flood Control Committee
at and in vicinity of Harrison,       resolution, May 28, 1946.
Ark. (tributary of White River).'
Dutch Creek and Spring Creek, Flood Control Committee
  Yell County. Ark., for flood con-    resolution, July 25, 1946.
trol (tributaries of Arkansas
  River).1
East End levee district, Little House Public Works Com-
  Rock, Ark., with respect             mittee resolution, April
  to pumping
           1      stations (Arkansas   21, 1950.
   River).
Greers Ferry, Ark., construction Flood Control Committee
  of multiple-purpose reservoir for    resolution, Apr. 5, 1940.
  flood control and irrigation on
  Little Red River, Ark. (tribu-
  tary of White River).
Harrison, Ark., flood protection on Flood-Control Committee -----------,----
   Crooked Creek (tributary of         resolution, May 28, 1946.
  White River. Mo. and Ark.).1
Lee Creek, Ark. and Okla., im- Flood Control Committee ----------- -~
  provement.for flood control (trib-   resolution, May 2, 1946.
  utary of Arkansas River).
Little Black River, Mo. and Ark.     House Public Works Com- ---------------
  improvement for flood control        mittee, resolution, May
   (tributary of White River).'       27, 1949.
Little Red River, for flood control. House Public Works Com- ---------
  on Archy Fork, Van Buren             mittee resolution, Jan. 28,
                                                                                   ~I~---
   County. Ark. (tributary of          1947.
  White River, Mo. and Ark.).'
Little Red River, Ark., construe- Flood Control Committee
  tion of multiple-purpose reser-      resolution, Apr. 5, 1940.
  voir in the vicinity of Greers
  Ferry, Ark., for flood control and
  irrigation (tributary of White
   River).
Little Rock, Ark., East End levee House Public Works Com-
  district, with respect to pumping    mittee resolution, April
  stations (Arkansas River).'          21, 1950.
Mayberry, White River and Village Flood Control Committee
   Creek levee districts, in Jackson   resolution, July 23, 1946.
                                                                     ---------------
   and Woodruff Counties, Ark., for
  flood control.
Newport, Ark., and Mississippi Senate Public Works Com-
   River, White River between, for
  flood control and navigation.'l
                                       mittee resolution, July
                                       29, 1949.                        --------   ~------
                                                                                ----------

Newport, Ark., with a view to House Public Works Com-
  providing flood control between      mittee resolution, June
  Newport and Augusta, Ark.            17, 1948.
  along White River
North Little Rock, Ark., with a House Public Works Com-
  view to providing flood control      mittee resolution, June
  and drainage in the vicinity of.      17, 1948.
Ouachita River, for water resources Senate Public Works Com-
  of the White, Ouachita and Ar-       mittee resolution, Feb.
                                                                       ---------------
                                                                     ----      --
  kansas Rivers, and their tribu-      25, 1949.
  taries in the State of Arkansas
  for irrigation and water supply. a
Palarm Creek in Pulaski and Flood Control Committee
  Faulkner Counties, Ark., for         resolution; June 21, 1944.
  flood control (tributary of the
  Arkansas River).1
Palarm Creek, for flood control Flood Control Committee
  and control of caving banks in       resolution, May 25, 1945.
  the Arkansas River above Little
   Rock, in the vicinity of.
Petit Jean River, Ark., improve- House Public Works Com-
  ment for flood control by channel    mittee resolution, Apr. 5,
  clearing and channel rectification   1949.
   (tributary of Arkansas River).'
     See footnotes at end of table.
                FLOOD       CONTROL--LITTLE                      ROCK,           ARK.,                DISTRICT                           1051
   Status of all investigations for flood control called for by flood control acts
                      and committee resolutions-Continued

                                                                                 Date trans-                      Document             Recom-
              Locality                          Authorization act                mitted to                        Do.                 mendation
                                                                                      Congress

                                        i                                                                    iI



Petit Jean River, for flood control         Flood Control Committee
  on Chickalah Creek in Logan                 resolution, Mar. 1, 1946.
  and Yell Counties, Ark. (tribu-                                                                             ------------
  tary of Arkansas River).'
Plum Bayou, Ark., improvement               House Public Works Com-              Apr. 24,1952                                         Favorable
  for flood' control and drainage             mittee resolution, Mar. 15,                                                              for sur-
  (tributary of Arkansas River).5                                                                                 -----------
                                              1949.                                                                                    vey.
Red, Arkansas and White River               Flood Control Act, May 17,
  Basins, Arkansas, Louisiana,                1950.
  Oklahoma, Texas, New Mexico,
  Colorado, Kansas and Missouri.3
Spadra Creek, Johnson County,               House Public Works Com-
  Ark., for flood control along               mittee resolution, Jan. 28,   ..    ..     .   .   .   .   .        ----------
  north side of Arkansas River.'              1947.
Spring Creek and Dutch Creek,               Flood Control Committee
  Yell County, Ark., for flood con-           resolution, July 25, 1946.
  trol (tributaries of Arkansas
  River) .                                                                                                   ----------;-
Village Creek, Jackson and Law-             House Public Works Com
  rence Counties, Ark., for flood             mittee resolution, Oct. 16,
  control (tributary of White                 1951.                                                          - - - - - -   - - - -.

  River).
Village Creek, White River and              Flood Control Committee         ..   ..     .    .   .
  Mayberry levee districts in Jack-           resolution, July 23, 1946.
  son and Woodruff Counties,
  Ark., for flood control (tributary
  of White River).
Water Resources of the White,               Senate Public Works Com-
  Ouachita, and Arkansas Rivers,             mittee resolution, Feb.
  and their tributaries, in the State        25, 1949.
  of Arkansas, for irrigation and
  water supply.l 2
White, Arkansas and Red River               Flood Control Act, May 17,      ------- ------
  Basins, Arkansas, Louisiana,                1950.
  Oklahoma, Texas, New Mexico,
  Colorado, Kansas and Missouri.5
White River, Ark. and Mo. (navi-            Rivers and Harbors Com- ---------------
  gation, flood control, and irriga-         mittee resolution, Jan.
  tion).                                     24, 1939.
     Do .......---.--- .-. .....-
                 ---                        Commerce Committeereso- --------------
                                             lution, Feb. 8, 1939.
White River and tributaries, Mis-           House Public Works Com-  --------------
souri and Arkansas, for flood con-          mittee resolution, Jan.
trol on Archy Fork of Little Red            28, 1947.
  River, Van Buren County,
Ark.'
White River, Mo. and Ark., flood            Flood Control Committee         ---------------
control on west bank between                 resolution, Mar. 20, 1944.
Augusta and Clarendon, Ark.,
and upstream from Augusta.'
White River, Mo. and Ark., with             Flood Control Committee         ---------------
view to construction of a multiple-          resolution, Oct. 8, 1945.
purpose reservoir for flood con-
trol, hydroelectric power, and
municipal and industrial water
supply near the Beaver Site.
White River and tributaries, Mis-           Flood Control Committee         ---------------
souri and Arkansas for flood pro-            resolution, May 28, 1946.
tection on Crooked Creek at and
in vicinity of Harrison, Ark.'
White River, Ark., construction of          Flood Control Committee              --------------
multiple purpose reservoir in                resolution, Apr. 5, 1940.
vicinity of Greers Ferry on Little
Red River, Ark. (flood control
and irrigation).
White River and tributaries, Mis-           House Public Works Com-
souri and Arkansas for flood con-            mittee resolution, May
trol on Little Black River.'                 27, 1949.
White River and tributaries, Mis-           Flood Control Committee
souri and Arkansas for flood con-            resolution, July 23, 1946.
trol in Village Creek, White
River, and Mayberry levee dis-
tricts in Jackson and Woodruff
Counties, Ark.
   See footnotes at end of table.
1052       REPORT OF CHIEF OF ENGINEERS,                         U. S.    ARMY,      1952

   Status of all investigations for flood control called for by flood control acts
                      and committee resolutions--Continued

                                                                 Date trans-   Document  Recom-
             Locality                   Authorization act         mitted to      No.    mendation
                                                                  Congress

White River and tributaries, Ar- House Public Works Com-               ..
kansas and Missouri, with a view    mittee resolution, June
to providing flood control be-      17, 1948.
tween Newport and Augusta,
Ark., along White Rive.1
White River and tributaries, Ar- House Public Works Com-
kansas and Missouri, for flood      mittee resolution, Oct.
control on Village Creek, Jackson   16, 1951.
and Lawrence Counties, Ark.
White River, for water resources Senate Public Works Comrn-
of the White, Ouachita, and         mittee resolution, Feb.
Arkansas Rivers and their tribu-    25, 1949.
taries, in the State of Arkansas,
for irrigation and water supply.l 2
White River between Newport, Senate Public Works Comrn-...............
Ark., and the Mississippi River,    mittee resolution, July
for flood control and naviga-       29, 1949.
tion.' 4

  1To be incorporated in the comprehensive report on the Arkansas, White, and Red River Basins for the
conservation and development of land and water resources, which will be prepared by the Arkansas-White-
Red Office, Southwestern Division, Corps of Engineers, U. S. Army, Tulsa, Okla.
  2 Report being prepared by the district engineer, Vicksburg District.
  * A Coordinated Comprehensive Report being Prepared by Federal and State Agencies for Conservation
and Development of Land and Water Resources.
  4 Report being prepared by the district engineer, Memphis District.
  a Limited to preliminary examination scope.

29. EMERGENCY FLOOD-CONTROL      WORK UNDER AUTHORITY     OF
   PUBLIC LAWS, 138 AND 318, SEVENTY-EIGHTH CONGRESS; PUBLIC
   LAW 75, SEVENTY-NINTH CONGRESS; AND PUBLIC LAWS 102 AND
   858, EIGHTIETH CONGRESS

   Because of the heavy demands for emergency repair work to flood-
control structures damaged or destroyed by the disastrous floods which
occurred in the spring of the years 1943, 1944, 1945, 1947, and 1948,
Congress in the act approved July 12, 1943, Public Law 138, S3venty-
eighth Congress; in the act approved May 29, 1944, Public Law 318,
Seventy-eighth Congress; in the act approved June 5, 1945, Public
Law 75, Seventy-ninth Congress; in the act approved June 23, 1947,
Public Law 102, Eightieth Congress; and in the act approved June 30,
1948, Public Law 858, Eightieth Congress, authorized the amounts
of $10,000,000, $12,000,000, $12,000,000, $15,000, 000, and $25,000,000,
respectively, to be appropriated as emergency funds to be expended
under the direction of the Secretary of the Army and the supervi-
sion of the Chief of Engineers for the repair, restoration, and strength-
ening of levees and other flood control works which had been
threatened or destroyed by these floods or which may be threatened
or destroyed by later floods, including the raising, extending, or other
modification of such works as may be necessary in the discretion of the
Chief of Engineers for the adequate functioning of the works for
flood control.
   Work accomplished pursuant to these acts during the fiscal year
consisted of the repair of pile dikes on the left bank of Arkansas
River in the vicinity of Jefferson County free bridge, river mile 115.6,
by contract, during the period September 29 to November 25, 1951.
                FLOOD        CONTROL--LITTLE                   ROCK,       ARK.,         DISTRICT               1053
  The costs during the fiscal year were $11,705.85 and the expendi-
tures were $18,181.91, all for maintenance.
  The total costs to the end of the fiscal year were $2,435,985.92 and
the total expenditures were $2,435,884.40.
  The balance unexpended June 30, 1952, $101.52, will be applied
during the fiscal year to the payment of outstanding accounts.
                                    Cost and financial summary

                                                 Fiscal year ending June 30                              Total to June
                                                                                                        30, 1952, includ-
                                                                                                        ing fiscal years
                                 1948           1949          1950           1951            1952         prior to 1948

Maintenance:
   Appropriated ........--   588, 458, 47 $266, 500. 00     $9, 943. 35   $36, 020.85    -$47.721.75      $2,435, 985. 92
    Cost--------------       460, 182. 80   267, 584. 84   100, 541. 17    34, 080. 64    11, 705. 85      2, 435, 985. 92
   Expenditures ........     437, 470. 93   150, 500. 86   239, 681. 30    28, 303, 70    18, 181.91       2, 435, 884.40



30. EMERGENCY FLOOD-CONTROL WORK UNDER AUTHORITY OF THE
   FLOOD CONTROL ACT APPROVED AUGUST 18, 1941, AS AMENDED

   The Flood Control Act approved August 18, 1941, as modified by
the Flood Control Acts approved July 24, 1946, June 30, 1948, and
May 17, 1950, authorized an emergency fund in amount of $15,000,000
to be expended in rescue work or in repair, restoration, or maintenance
of any flood-control work threatened or destroyed by flood, including
the strengthening, raising, extending, or other modification thereof as
may be necessary in the discretion of the Chief of Engineers for the
adequate functioning of the work for flood control. Section 14 of
the Flood Control Act approved July 24, 1946, furthermore, author-
ized the allotment from flood-control appropriations of not to exceed
$1,000,000 per year for the construction of emergency bank protection
works to prevent flood damage to highway bridge approaches, and pub-
lic works, when in the opinion of the Chief of Engineers such work is
advisable and provided that not more than $50,000 be allotted for this
purpose at any single locality from appropriations for any one fiscal
year.
   Pursuant to this act, funds in the amount of $112,509.38 were allot-
ted to the Little Rock District during the fiscal year for emergency
rep airs.
  Work accomplished during the fiscal year consisted of repairs to
the Poplar Bluff, Mo., to Knobel, Ark. (Arkansas portion) levee in
Western Clay drainage district, subdistrict No. 5, Ark., by hired labor
during the period August 27 to October 5, 1951. A contract for re.-
pair of a drainage structure in Perry County levee district No. 1, Ark.,
was awarded and notice to proceed was issued. The Near Dardanelle
levee, Arkansas River, Ark., is breached as a result of bank caving in
the vicinity of river mile 248 and will be repaired when local interests
furnish the necessary rights-of-way.
   The costs during the fiscal year were $20,625.10 and the expenditures
were $19,520.58, all for maintenance.

       245554-53-vol. 1--67
1054          REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   The total costs to the end of the fiscal year from United States funds
were $38,907.83 for new work and $441,444.14 for maintenance. The
total expenditures were $478,964.54.
   The costs and expenditures to the end of the fiscal year from con-
tributed funds were $74,535.
   The balance unexpended June 30, 1952, $110,988.80, will be applied
during fiscal year 1953 as follows:
Accounts payable June 30, 1952----------------------------------$1, 387. 43
Maintenance :
    Complete repair of drainage structure in Perry County levee
      district No. 1 by contract during period July 1952 to June 1953- 8, 601. 37
    Initiate and complete repair of Near Dardanelle levee in vicinity
      of river mile 248 by contract during period July 1952 to June
      1953 -----          ----------------------------------- 101, 000. 00
             Total for all work--------------------                                                                110, 988. 80

                                        Cost and financial summary

                                                    Fiscal year ending June 30                                      Total to June
                                                                                                                   30, 1952, includ-
                                                                                                                   ing fiscal years
                                    1948           1949                    1950        1951              1952        priorto 1948

New work:
   Appropriated_-_-..........---------         $50, 000.   00   ----..--        - $11,092.17            --------        $38, 907. 83
   Cost--------------
                ........       ----------- 1, 325.         53     $37, 582. 30 ------------------------                  38, 907. 83
   Expenditures--------------------              1, 449.   94      37, 457.89 ------------------------                   38, 907. 83
Maintenance:
   Appropriated- ...... --       $1, 189. 39 240, 000.     00    -18, 009. 41     18, 000. 00 $112, 509. 38            1 551, 045. 51
   Cost .      .....------------------------ 159, 359.     60      62, 630. 99        282. 91   20, 625. 10            1 441, 444. 14
   Expenditures...-----..--....----------..... 145, 346.   79      76, 643. 80 ------------     19, 520. 58            1 440, 056. 71

  1 Excludes $74,535 contributed funds.
      IMPROVEMENT OF RIVERS AND HARBORS IN THE
               TULSA, OKLA., DISTRICT

   This district comprises southern Kansas, small portions of south-
western Missouri and western Arkansas, northern Oklahoma, the
northern portion of the Texas Panhandle, and small portions of north-
eastern New Mexico and southeastern Colorado embraced in the drain-
age basin of the Arkansas River, and its tributaries above the mouth
of the Poteau River, inclusive, and below the mouth of Walnut Creek
near Great Bend, Kans., exclusive of that portion of the watershed
of the South Canadian River and its tributaries west 6f the Texas-New
Mexico State line; and a portion of western Arkansas, the northern
portion of the State of Texas, and the southern portion of the State
of Oklahoma embraced in the drainage basin of the Red River and its
tributaries above Fulton, Ark.
   District engineer: Col. Edward G. Herb, Corps of Engineers.
   Division engineer of the Southwestern Division, Dallas, Tex., com-
prising the Galveston, Tex., Fort Worth, Tex., Albuquerque, N. Mex.,
Little Rock, Ark., and Tulsa, Okla., districts: Col. Louis W. Prentiss,
Corps of Engineers to May 8, 1952; Col. Charles H. McNutt, Corps
of Engineers, acting May 8, 1952 to June 23, 1952; Col. Herbert D.
Vogel, Corps of Engineers from that date.
                                     IMPROVEMENTS

                 Navigation                          Flood control--Continued
                                       Page                                       Page
1. Arkansas River and tribu-                 15. Keystone Reservoir, Arkan-
      taries, Arkansas and Okla-                    sas River, Okla_-      __     1073
      homa ....                        1056   16. Polecat Creek, Okla. (Hey-
2. Examinations, surveys, and                      burn Reservoir and channel
      contingencies (general) __       1056         improvements)                 1075
3. Inactive navigation projects_      1057   17. Fall River Reservoir, Arkan-
4. Miscellaneous activities --        1057         sas River Basin, Kans __      1077
                                              18. Toronto Reservoir, Arkansas
                Flood control                       River Basin, Kans ......      1078
                                              19. Oologah Reservoir, Arkansas
5. Hutchinson, Arkansas River,                     River Basin, Okla .......     1080
     Kans_ _                           1058   20. Hulah    Reservoir,    Caney
6. Wichita and Valley Center,                      River, Okla-                  1081
        Kans_                          1061   21. Council Grove Reservoir,
7.   Kaw, Arkansas River, Okla_       1063         Grand     (Neosho)   River
8.   Carthage, Mo_                    1064         Basin, Kans__                 1083
9.   Bradens Bend, Okla .......       1065   22. Marion Reservoir,      Grand
10.   Optima Reservoir,      North                  (Neosho)     River   Basin,
        Canadian River, Okla ---       1066         Kans _                        1084
11.   Fort Supply Reservoir, North            23. Cedar Point Reservoir, Grand
        Canadian River, Okla    --     1067         (Neosho)     River   Basin,
                                                                                  1084
12.   Canton Reservoir, Arkansas
        River Basin, Okla-_,....       1068
                                                    Kans__
13.   Oklahoma City Floodway,                       K ans-- - - - - - - - -       1085
        North Canadian River,               25. Pensacola Reservoir, Arkan-
        Okla_                          1070       sas River Basin, Okla_ __       1086
14.   Great Salt Plains Reservoir,          26. Markham Ferry Reservoir,
        Salt Fork of Arkansas                     Arkansas    River   Basin,
        River, Okla_                   1072       Okla                            1088
                                                                        1055
1056     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

       Flood control-Continued                       Flood control--Continued
                                      Page                                          Page
27. Fort Gibson Reservoir, Ar-                39. Preliminary examinations,
      kansas River Basin, Okla_       1089          surveys, and contingencies
28. Tenkiller Ferry Reservoir,                      for flood control           _   1108
      Arkansas     River     Basin,           40. Inspection of completed
      Okla _                          1092          works --                        1109
29. Eufaula Reservoir, Canadian
      River, Okla_                    1095    41. Plant allotment   -      -        1109
30 Wister Reservoir, Arkansas                 42. Inactive flood-control proj-
      River Basin, Okla  -......      1096          ects_                           1110
31. Arkansas River Basin, Tulsa
      District_            _          1098    43. Miscellaneous activities ....     1111
32. Denison Dam (Lake Texoma)                 44. Emergency bank protection
      Red River, Tex. and Okla_       1100          work under authority of
33. Red River below Denison                         the Flood Control Act ap-
      Dam, Tulsa District    -----    1103          proved July 24, 1946 _...       1116
34. Boswell Reservoir, Boggy                  45. Emergency flood-control
      Creek, Okla_        __          1104          work under authority of
35. Hugo Reservoir, Kiamichi
      River, Okla                                   Public Laws Nos. 138 and
                        ______        1104
36. Millwood Reservoir, Little                      318, 78th Cong. and Public
      River, Ark____         ____                   Law No. 75 79th Cong.;
                                      1105
37. Red River levees and bank                       and Public Law No. 102,
                                                    80th Cong__________             1116
      stabilization in Arkansas
      below Denison Dam     -----     1106   I 46. Emergency flood-control
38. Snagging and clearing under                     work under authority of
      authority of the Flood Con-                   the Flood Control Act,
      trol Act approved July 24,                    approved Aug. 18, 1941, as
      1946.                           1108          amended ....-----------         1117

1. ARKANSAS RIVER AND TRIBUTARIES, ARKANSAS AND OKLAHOMA

  A consolidated report on this project for the Vicksburg, Little Rock
and Tulsa districts, submitted by the Little Rock District, South-
western Division, is on page 992.
   2. EXAMINATIONS, SURVEYS, AND CONTINGENCIES                          (GENERAL)

   The cost of work under this heading during the fiscal year was
$87,802.18 and the expenditures were $131,281.73. The balance un-
expended on June 30, 1952, $45.70, plus allotments for fiscal year 1953
of $150,000 for examinations and surveys and $600 for contingencies,
a total of $150,645.70, will be utilized as follows: $645.70 will be
applied to payment of expenses incurred in connection with inspection
of permits for structures in navigable waters of the Arkansas and
Red Rivers, and $150,000 will be utilized for continuation of engineer-
ing studies and investigations in connection with preparation of a
comprehensive basin-wide investigation covering the Arkansas, White
and Red River Basins, Ark., La., Okla., Tex., N. Mex., Colo., Kans.,
and Mo.
   The additional sums of $190,000 for examinations and surveys and
$600 for work contingencies can be profitably expended during the
fiscal year 1954.
            RIVERS AND HARBORS--TULSA,                                     OKLAHOMA,                DISTRICT             1057
                                      Cost and financial summary

                                                    Fiscal year ending June 30                                  Total to June
                                                                                                               30, 1952, includ-
                                                                                                               ing fiscal years
                                   1948            1949            1950             1951            1952            priorto 1948

Maintenance:
   Appropriated--------......... $2,000.00      $2,000.00 .......-....       1179, 000. 00    -$2, 300. 00            $856, 315.82
   Cost----------------1,258. 93                 3, 445. 29 - ......         . 99, 483. 23      87, 802. 18            856, 298. 00
   Expenditures.   ---------        350. 55      3, 445. 29 ...........         55, 975. 80    131, 281. 73            856, 270. 12


                           3. INACTIVE NAVIGATION PROJECTS

                                                                      For last   Cost and expenditures to
                                                                     full report       June 30, 1952       Estimated
                      Name of project                               see Annual                            reamount
                                                                       Report                             required to
                                                                       Report
                                                                        for-       ew work
                                                                                 New   work     Mainte-    complete
                                                                                                 nance

1. Arkansas River, Okla., above Fort Smith, Ark_-                         1938       $23, 290.00     $80, 758.06          (1)
2. Red River from Fulton, Ark., to mouth of Washita
    River, Okla... --------------------------------                       1924       378, 573. 82    182, 157. 05         (s)

  I2 Channels adequate for existing local commerce.
     Curtailment of project is recommended in H. Doc. 947, 64th Cong., 1st sess.
  $ Maintenance only.

                                4. MISCELLANEOUS ACTIVITIES
Status of all investigations for navigation called for by river and harbor acts
                           and committee resolutions

                                                                                  Date trans-       Document           Recom-
               Locality                          Authorization act                 mitted to
                                                                                   Congress             No.          mendation

Arkansas and Canadian Rivers,
Okla and Ark.
                                          River and Harbor Act,
                                              July 24, 1946.2
                                                                                 ---------------
Arkansas, White, and Red River            Flood Control Act, May                 -------------

Basins, Ark., La., Okla., Tex.,            17, 1950.2
N. Mex., Cclo., Kans., and Mo.,
with a view to developing
comprehensive and intgrated
plans of improvement for navi-
gation, flood control, domestic
and municipal water supplies,
reclamation and irrigation, de-
velopment and utilization of
hydroelectric power, conserva-
tion of soil, forest and fish and
wildlife resources including such
consideration of recreation uses,
salinity and sediment control,
and pollution abatement as may
be provided for under1 Federal
policies and procedures.
Canadian River and tributaries,
for navigation to vicinity of
                                          Commerce Committee res-
                                              olution, Nov. 19, 1945.2           --------------
Oklahoma City, Okla.
Canadian and Arkansas Rivers,             River and Harbor Act,
Okla. and Ark.
Oklahoma City Okla., vicinity
                                           July 24, 1946.2
                                          Commerce Committee res-
                                                                                 ---------------
                                                                                 ---------------
of Canadian River and tribu-              olution, Nov. 19, 1945.2
taries for navigation to.
   See footnotes at end of table.
1058        REPORT       OF    CHIEF OF ENGINEERS,                    U.   S.   ARMY,     1952


Status of all investigations for navigation called for by river and harbor acts
                     and committee resolutions-Continued

                                                                       Date trans-   Document     Recom-
              Locality                     Authorization act            mitted to
                                                                        Congress        no.      mendation

Red, Arkansas, and White River         Flood Control Act,      May ....         ..
Basins, Ark., La., Okla., Tex.,         17, 1950.2
N. Mex., Colo., Kans., and Mo.,
with a view to developing com-
prehensive and integrated plans
of improvement for navigation,
flood control, domestic and
municipal water supplies, rec-
lamation and irrigation, develop-
ment and utilization of hydro-
electric power, conservation of
soil, forest and fish and wildlife
resources including such con-
sideration of recreation uses,
salinity and sediment control,
and pollution abatement as may
be provided for under Federal
policies and procedures.'
Red River, Ark., La., Okla.,           Rivers and Harbors Com-
  Tex., for navigation, flood con-       mittee resolution, Feb.
trol, water power and irrigation.       25, 1938.3
Red River, La., Ark., Okla., and       Flood Control Committee
Tex., and connecting waterways,         resolution Jan. 26, 1939;
singly or together for naviga-          Rivers and Harbors Com-
tion, flood control and irrigation.     mittee resolution Jan. 24,
                                         1939; Commerce Com-
                                         mittee resolution, Feb.
                                         8. 1939.8
Red River, La., Ark., Okla., and      Rivers and Harbors Com-
  Tex., extension of navigable           mittee resolution, Apr.
  channel from Fulton, Ark., up-         27, 1944.3
  stream to Denison, Tex.
White, Arkansas, and Red River        Flood Control Act, May
  Basins, Ark., La., Okla., Tex.,        17, 1950.2
  N. Mex., Colo., Kans., and Mo.,
  with a view to developing com-
  prehensive and integrated plans
  of improvement for navigation,
- flood control, domestic and
  municipal water supplies, rec-
  lamation and irrigation, de-
  development and utilization of
  hydroelectric power, conserva-
  tion of soil, forest and fish and
  wildlife resources including such
  consideration of recreation uses,
  salinity and sediment control,
  and pollution abatement as may
  be provided for under Federal
  policies and procedures.'
Wichita River, Tex., navigation,      Rivers and Harbors Com-
  flood control, water power, irri-     mittee resolution, May 9,
   gation or water conservation.        1944.3


  1 A coordinated comprehensive report prepared by Federal and State agencies for the conservation and
development of land and water resources.
  2 To be incorporated in the comprehensive report on the Arkansas, White, and Red River Basins for the
conservation and development of land and water resources, which will be prepared in the Arkansas-White-
Red Office, Southwestern Division, Corps of Engineers, U. S. Army, Tulsa, Okla.
  3 To be incorporated in a comprehensive report on Red River and tributaries, Louisiana, Arkansas
Oklahoma, and Texas for navigation, flood control, power, and irrigation, which will be prepared by the
Board of Engineers for Rivers and Harbors.


                     5. HUTCHINSON, ARKANSAS RIVER, KANS.

  Location.--The work covered by this project is located on the Ar-
kansas River and Cow Creek, a tributary of the Arkansas River, in
the immediate vicinity of Hutchinson, Kans. (See U. S. Geological
Survey maps for Lyons and Hutchinson (Kans.) quadrangles, scale
1: 125,000.)
           FLOOD   CONTROL-TULSA,       OKLAHOMA,    DISTRICT       1059
    Existing project.-The plan of improvement consists of a 300-foot-
wide leveed diversion canal approximately 1 mile west of the city
limits of Hutchinson, intercepting Cow Creek at mile 14.9 above its
mouth and carrying floodwaters from the creek south for about 2 miles
to enter the Arkansas River at mile 822.3 above its mouth. The levee
on the left bank of the diversion canal starts at the hills about 41/2
miles north of the canal to intercept all of Cow Creek floodwaters.
The combined flow of the creek and the river is confined past the
city by levees on both sides of the river, forming a 1,000-foot floodway.
The fluanking levee on the right bank of the Arkansas River starts at
mile 822.3 above the mouth of the river and extends downstream to
mile 818.5. The flanking levee on the left bank of the Arkansas River
starts at the diversion canal and extends downstream to mile 816.5,
with an opening at the mouth of the present Harsha drainage canal.
Protection against backwater of the Arkansas River up the existing
canal is provided by increasing the height of the existing levees.
Additional protection is provided to a rural area west of the diversion
canal by a loop levee, and to the urban area of the Island Park sub-
division, northwest of Hutchinson, by a ring levee. The project
provides for the protection of 17,600 acres of industrial, urban, and
agricultural land, with grade elevation allowing a 3-foot freeboard
above the flow of the design flood.
   The estimated Federal cost (1952) is $4,726,000, and the estimated
non-Federal cost is $2,143,000.
   The existing project was authorized by the Flood Control Act
approved June 22, 1936.
   Local cooperation.-Seepages 4-5 for requirements.. Resolutions by
the city of Hutchinson, agreeing to meet the requirements were sub-
mitted by the city under the dates of March 16 and 30, 1945, and were
approved by the Secretary of War on July 4, 1945. The city of
Hutchinson has granted rights of entry for only the lot II portion
of the project (City side levees and diversion canal) which is under
construction by contract. The city has secured the necessary assur-
ances from the State of Kansas that highways would be relocated in
accordance with the project plan, and has contracted with utility
companies or initiated the relocation of various utilities. Right of
entry has not been furnished for remainder of the project including
the Island Park subdivision ring levee, the rural area loop levee, and
the right bank levee adjacent to the city of South Hutchinson.
   Operations and results during the fiscal year.-Construction of the
first phase of the project was started April 10, 1952. This phase, lot
II, consists of a flanking levee along the left bank of the Arkansas
River protecting the city proper, construction of improvements to the
existing Harsha drainage canal and construction of a training levee.
Cost-reimbursable contracts for relocation and alteration of existing
railroad facilities were awarded and relocation operations were initi-
ated by the owners. Preparation of contract plans and specifications
for construction of the remaining phases of the project, lots I, III,
and Island Park ring levee was continued.
   The cost during the fiscal year was $45,814.54 and the expenditures
were $44,418.83.
1060        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   Condition at end of fiscal year.-Construction of the first phase of
the project, lot II, was 2 percent complete and required railroad
relocations were initiated. Contract plans and specifications covering
the work remaining to complete the project, lots I, III, Island Park
ring levee, and railroad relocations required in those areas, are
approximately 75 percent complete.
   The total cost to the end of the fiscal year was $298,346.53 and the
expenditures were $296,937.70, all for new work.
   Proposed operations.-The unexpended balance at the end of the
fiscal year $1,883,062.30, plus accounts receivable, $204.07, and an
allotment of $1,393,000 during fiscal year 1953, a total of $3,276,266.37
will be applied to the following schedule of new work during the
ensuing fiscal year :
Accounts payable, June 30, 1952___________             ____     ___
                                                              ____                                   $1, 612. 90
Continue construction of levees, diversion canal and drainage
structures (lot II, city side levees), by continuing contract,
July 1952 to June 1953        -----------------------------                                       676, 691. 00
Continue railroad alterations and relocations, by continuing con-
tracts, July 1952 to June 1953-------------------------                                         2, 502, 639. 00
Construction of levees and drainage structures (lot III, South
Hutchinson, by continuing contract, March to June 1953______                                        75, 000. 00
Continue preparation of contract plans and specifications including
  negotiations with railroad owners, by hired labor, July 1952 to
  June 1953-------------------          ---------------------                                        20, 323. 47

        Total for all work --------------------------------                                      3, 276, 266. 37
  The sum of $1,153,000 can be profitably expended for new work
during fiscal year 1954, based upon the following schedule of work:
Complete construction of lot II, city side levees including Cow Creek
diversion canal, and lot III, South Hutchinson levee, by continuing
contracts, July 1953 to June 1954--------------------------                                          $307, 825
Complete railroad alterations and relocations, by continuing contracts,
July 1953 to June 1954__...--_______-___-..          ______---_                                        658, 500
Construction of Island Park ring levee and lot I, west of Cow Creek
diversion canal, by contracts, September 1953 to July 1954--------                                     171,000
Complete contract plans and specifications for all work, by hired
labor, July 1953 to June 1954-------------------------------                                            15, 675
        Total for all work             ----------------------------------                            1, 153, 000

                                  Cost and financial summary

                                              Fiscal year ending June 30                            Total to June
                                                                                                   30, 1952, includ-
                                                                                                   ing fiscal years
                       1948         1949          1950           1951               1952             prior to 1948

New work:
   Appropriated-___-_
                  -           _
                             _---  ______
                                   -          _    _       -$1,180, 000. 00    $1, 900,000.00        $2, 180. 000. 00
   Cost ........    $3, 510.47 $5, 477.10     $34, 563. 97         9,019. 86        45, 814.54           298 346.53
   Expenditures-     9, 334.48    5, 222.97    44, 785.67          -944.03          44, 418.83           296, 937. 70

Other new work data:
    Unobligated balance, June 30, 1952                                 4, 830. 05
                                                                      $------------------
    Appropriated for fiscal year ending June 30, 1953-----------. 1, 393, 00. 00
    Unobligated balance available for fiscal year 1953---- ------ 1, 397, 830. 05
    Estimated additional amount needed to be appropriated for
      completion of existing project-----------------------, 153, 000. 00
           FLOOD   CONTROL-TULSA,     OKLAHOMA,     DISTRICT      1061
    6. WICHITA AND VALLEY CENTER, ARKANSAS RIVER, KANS.

   Location.-The work covered by this project is located on the
Arkansas River, and Little Arkansas River and Chisholm Creek,
tributaries of the Arkansas River, in the immediate vicinity of Wichita
and Valley Center, Kans. (See U. S. Geological Survey map for
Wichita, Kans., quadrangle, scale 1: 125,000.)
   Existing project.-The plan of improvement provides protection
to people, city property and environs against floods from Chisholm
Creek, the Little Arkansas River, the Arkansas River, Big Slough
and Cowskin Creek. Under the plan, Little Arkansas River will
be diverted into the Arkansas River by means of a floodway be-
ginning at a point about 2 miles northwest of Valley Center and
extending southward to the Arkansas River (at river mile 785.7)
about 9 miles northwest of Wichita. The flows of Chisholm Creek
and its middle and west branch tributaries will be collected by a
system of levees and channels north of Wichita and diverted across
the Little Arkansas River into the Arkansas River (at mile 780).
Each of the above leveed diversion channels are about 3 miles in
length. The combined flows of the Little Arkansas River, Chisholm
Creek and Arkansas River will be confined and diverted to the west
of the city by a floodway, with existing stream channels being utilized
to carry flood flows to the limit of their existing capacity. This
floodway will begin at a point about 3.1 miles downstream from
the Kansas State Highway 96 river crossing and will provide a
channel having a normal bottom width of 80 feet and an average
depth of 10.9 feet. Levees flanking the floodway will, in general,
be spaced 900 feet center to center with an average height of 8.5
feet and a crown width of 8 feet or more. From the Arkansas
River the floodway would extend southwest 2 miles to intercept
Big Slough, along Big Slough for 5 miles, thence south and south-
east 2.5 miles to intercept Cowskin Creek, along Cowskin Creek
for 2 miles, thence east, and southeast about 5 miles entering the
Arkansas River approximately 1 mile northwest of Derby, Kans.
 (at river mile 760). Existing levees and drainage canals will be
enlarged, strengthened, or rectified as may be required. The com-
pleted system with five control structures will provide about 91.2 miles
of levee and provides for the protection of about 47,000 acres of
industrial, urban, and agricultural land with a minimum of 3 feet
freeboard above the flow of the design flood.
   The estimated Federal cost (1952), is $14,139,000 and the estimated
non-Federal cost is $6,222,000.
   The existing project was authorized by the Flood Control Act, ap-
proved June 22, 1936. (See H. Doc. 308, 74th Cong., 1st sess., which
contains the latest published maps.)
   Local cooperation.-See pages 4-5 for requirements. The city of
Wichita has furnished assurances of local cooperation for the entire
project which were approved by the Secretary of War on February
25, 1946. Local cooperation requirements are fulfilled for the com-
pleted portion of the project consisting of the Wichita Drainage
Canal and diversion of East Branch of Chisholm Creek. Right of
entry has been granted for portions of the project under contract
1062     REPORT OF CHIEF       OF ENGINEERS, U.        S. ARMY, 1952

and local interests are in the process of acquiring rights-of-way for
other phases of construction and approximately 80 percent of the
right-of-way for the entire project has been acquired.
   Operations and results during fiscal year.-Negotiations covering
necessary relocation or alteration of railroad facilities were continued
and construction operations covering the lower portion of the project
were continued under continuing contracts.
   The cost during the fiscal year was $149,449.36 and the expenditures
were $163,460.46, all for new work.
   Condition at end of fiscal year.-Construction by contract for clear-
ing, snagging, widening, and otherwise improving the existing East
Branch interception canal and Wichita drainage canal, initiated on
May 8,1950, was completed August 23, 1950. This portion of the pro-
ject was transferred to the city of Wichita, Kans., on February 7, 1951,
for future maintenance and operation. Construction of the first seg-
ment of the Big Slough-Cowskin Floodway (parcel A, phase I), ini-
tiated June 9, 1950, was completed by contract on January 25, 1952,
and the second segment (parcel A, phase II), was initiated by contract
on June 5, 1952. Construction of the floodway continues.
   The total cost at the end of the fiscal year was $1,018,238.33 for new
work, and the expenditures were $1,008,915.62.
   Proposed operations.-The balance unexpended June 30, 1952, $1,-
654,084.38, plus accounts receivable $704.20, and an allotment of $1,-
990,000 during fiscal year 1953, a total of $3,644,788.58, will be applied
to the following scheduled new work during fiscal year 1953:
Accounts payable, June 30, 1952____________________-------_          $10, 026.   91
Continue construction of Big Slough-Cowskin Floodway, by con-
  tinuing contracts, July 1952 to June 1953_---_____-- ___----_      843, 949.   00
Continue railroad alterations and relocations by continuing con-
  tracts, July 1952 to June 1953___----    _____--___             2, 431, 329.   00
Construct first segment of Arkansas River training levee by con-
  tract, July 1952 to May 1953__________-_____            _ -_   -_ 314, 540.    00
Continue preparation of contract plans and specifications, by
  hired labor, July 1952 to June 1953-------------------------        44, 943.   67
       Total for all work---
                         ._     -                                  3, 644, 788. 58
  The sum of $3,000,000 can be profitably expended for the following
scheduled work during fiscal year 1954:
Continuation of construction operations for the Big Slough-Cowskin
Floodway, by continuing contracts, July 1953 to June 1954 ...      __  $646, 000
Continuation of railroad alterations and relocations, by continuing
contracts, July 1953 to June 1954___________            _______ 2, 294, 500
Completion of contract plans for railroad alterations and initiation of
plans and specifications for the Little Arkansas Floodway and
Chisholm Creek diversion canal, by hired labor, July 1953 to June
1954 ---   __-_--          -_-_-_-_-_                                    59. 500
       Total for all work____------__        ------ ____-______        3, 000, 000
                FLOOD CONTROL---TULSA,                              OKLAHOMA,                DISTRICT                1063
                                         Cost and financial summary

                                                       Fiscal year ending June 30                             Total to June
                                                                                                             30, 1952, includ-
                                                                                                             ing fiscal years
                                      1948           1949          1950           1951           1952          prior to1948

New work:
   Appropriated      -   -      - $500,
                                     000.00      $490, 000.00 ...-----        ------    ... 500, 000.00        $2, 663, 000.00
   Cost-----------       ---.     119,742.13       80, 786.75 $161,785.43 $378,521.30         149, 499.36       1, 018, 238. 33
   Expenditures.-                 123, 259. 90     81, 032.97   122, 334.00    395, 256.36    163, 460.46       1, 008, 915.62


Other new work data:
  Unobligated balance, June 30, 1952___________ _________-                                                     $11, 163. 78
  Appropriated for fiscal year ending June 30, 1953------------                                             1, 990, 000. 00
  Unobligated balance available for fiscal year 1953_--- -----                                              2, 001, 163. 78
  Estimated additional amount needed to be appropriated for
    completion of existing project_______--------------_                                                    9, 486, 000. 00

                                 7. KAW, ARKANSAS RIVER, OKLA.

   Location.-The work covered by this project is located on the
Arkansas River at Kaw, Okla. (See U. S. Geological Survey map,
Kaw, Okla.-Kans., quadrangle, scale 1: 62,500.)
   Existing project.-The plan of improvement provides for con-
struction of about 2.2 miles of levee along the right bank of the
Arkansas River between miles 664.2 and 662.5 above the mouth of
the Arkansas River. The levee provides for the protection of the
city of Kaw (population 561, 1950 census) and would have an aver-
age height of about 10 feet. The estimated Federal cost (1952) is
$257,200 and the estimated non-Federal cost is $43,800.
   The levees and appurtenant works were authorized by the Flood
Control Act approved June 22, 1936. (See H. Doc. 308, 74th Cong.,
1st sess., which contains the latest published maps.)
   Local cooperation.-See pages 4-5 for requirements. Assurances
of local cooperation, furnished by local interests on October 22, 1949,
were accepted by the district engineer on December 5, 1949. Local
interests have not been active in procuring necessary rights-of-way
since the Presidential proclamation to initiate only civil work that
would promote national defense. Right of entry has not been granted
to the United States Government for construction of the project
in whole or part.
   Operations and results during fiscal year.-None. There were no
costs or expeditures during the fiscal year.
   Condition at end of the fiscal year.-Constructionplans and speci-
fications are advanced to a point where construction of the project
could be started within 60 days after formal rights of entry have
been furnished by local interests.
   Cost and expenditures to the end of the fiscal year totaled $34,284.12.
   Proposed operations.-Under existing policy, initiation of new
work construction is limited to those projects considered essential
to national defense, therefore, no construction is scheduled during
fiscal years 1953 or 1954.
1064         REPORT OF CHIEF OF ENGINEERS,                                     U. S. ARMY, 1952

                                        Cost and financial summary

                                                       Fiscal year ending June 30                             Total to June
                                                                                                             30, 1952, includ-
                                                                                                            ing fiscal years
                                      1948           1949           1950         1951            1952         prior to 1948


New work:
   Appropriated ---         _ ----.     --      $102, 000.00 --_--.--.        -$79,500.00 ---  -----   $34, 500.00
                                                                                          ...........---
   Cost-..........--------------   $7, 406.92       4, 846.01   $16, 598.57        839.54   ------------........... 34, 284.12
   Expenditures--------........     7,602. 89       3, 914.18    16, 585.92     1, 784.02   ------------           34, 284. 12


Other new work data:
  Unobligated balance, June 30, 1952_-___--------------             $215. 88
  Unobligated balance available for fiscal year 1953 -------------    215. 88
  Estimated additional amount needed to be appropriated for com-
    pletion of existing project--------------------------------- 222, 700. 00

                                                8. CARTHAGE, MO.

    Location.-The work covered by this project is located on Spring
River, a tributary of the Grand (Neosho) River in the Arkansas River
Basin, in the immediate vicinity of Carthage, Jasper County, Mo.
  (See U. S. Geological Survey map for Carthage (Mo.) quadrangle,
scale 1: 125,000.)
    Existing project.-The plan of improvement provides for construc-
tion of about one mile of levee along the south bank of Spring River
'commencing at mile 68.6 above its mouth and extending downstream
to mile 68. The project provides for the protection of major industrial
and commercial properties as well as transportation facilities in
Carthage, with a grade elevation allowing a freeboard of 3 feet above
the design flood.
    The estimated Federal cost (1952) is $345,000, and the estimated
non-Federal cost is $36,000.
    The existing project was authorized by the 1948 Flood Control Act
approved June 30, 1948. (See H. Doc. 445, 80th Cong., 2d sess., which
contains the latest published maps.)
    Local cooperation.-See pages 4-5 for requirements. In addition,
local interests are required to furnish acceptable assurances that the
flood-carrying capacity of the existing stream channels will not be
decreased. To date these requirements have not been met; however,
local interests have stated that a legally qualified organization would
be formed to comply with local cooperation requirements when noti-
fied that the requirements should be met.
    Operationsand results during fiscal year.-Engineeringstudies and
investigations were continued. The definite project report was sub-
mitted by the district engineer on August 2, 1951.
    The cost during the fiscal year was $802.33 and the expenditures
were $874.17.
    Condition at end of fiscal year.--Engineering studies and investi-
gations preliminary to preparation of contract plans and specifica-
tions were essentially complete.
    Cost and expenditures to the end of the fiscal year totaled $10,586.42,
all for new work.
    Proposed operations.-No work is scheduled for fiscal year 1953.
                1LOOD        CONTROL--TULSA,                     OKLAHOMA,                DISTRICT            1065
However, construction could be initiated early in fiscal year 1954 with
an allotment of $200,000 based upon the following schedule of work:
New work:
     Construction of levees, drainage structures and required reloca-
      tions, by continuing contract, November 1953 to July 1954__ ___$188, 100
     Engineering and design studies including preparation of contract
      plans and specifications, by hired labor, July 1953 to June 1954__ 11, 900
           Total for new work---------------------------------                                              200, 000

                                   Cost and financial summary

                                                    Fiscal year ending June 30                          Total to June
                                                                                                       30, 1952, includ-
                                                                                                       ing fiscal years
                                 1948           1949             1950         1951           1952       priorto 1948

New work:
   Appropriated--..----- -----------.--.----...               $14, 300. 00 -------   -$3, 713. 58
                                                                            ............                    $10, 586. 42
   Cost---
       ..............                   -   -   -     -_._-    2, 817. 97   $6, 966. 12      802. 33         10, 586. 42
   Expenditures__-------------                                 3, 547. 08    6, 165. 17      874. 17         10, 586. 42


Other new work data: Estimated additional amount needed to
  be appropriated for completion of existing project_ ----- __-$334, 413. 58

                                  9. BRADENS BEND, OKLA.

   Location.-The work covered by this project is located on the right
bank of the Arkansas River about 1 mile northeast of Braden, Le
Flore County, Okla., and about 9 miles southwest of Fort Smith,
Sebastian County, Ark. (See U. S. Geological Survey map for Fort
Smith (Ark.-Okla.) quadrangle, scale 1: 125,000.)
   Existing project.-The plan of improvement provides for construc-
tion of about 11,200 feet of revetment on the right bank of the Arkan-
sas River downstream from a point opposite river mile 370.4. The
project is designed to prevent the Arkansas River from cutting a new
channel into the Poteau River opposite that locality, and to protect
adjacent agricultural lands.
   The estimated Federal cost (1952) is $1,485,000.
   The existing project was authorized by the Flood Control Act ap-
proved June 30, 1948.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-There were no costs
or expenditures under this heading during fiscal year 1952.
   Condition at end of fiscal year.-No future work is proposed under
this heading. However, construction of the authorized protection is
under way and is reported in detail under bank stabilization work
between Wilson's Rock and Fort Smith. (See page 993 of the consoli-
dated report on navigation features of the project, Arkansas River
and tributaries, Arkansas and Oklahoma, for Vicksburg, Little Rock,
and Tulsa districts, submitted by the Little Rock District, South-
western Division.)
   Proposed operations.-None. As all additional work is scheduled
under the authority of the 1946 River and Harbor Act, no funds are
needed on this project during fiscal year 1954.
1066        REPORT OF CHIEF OF ENGINEERS, U.                                  S.   ARMY,        1952

                                    Cost and financial summary

                                                Fiscal year ending June 30                          Total to June
                                                                                                    30, 1952, includ-
                                                                                                    ing fiscal years
                                 1948          1949          1950          1951          1952        priorto 1948


New work:
   Appropriated..---------------.........------------$35, 000. 00 ...------------ $33,894.59               $1, 105. 41
   Cost   ------------------------------------                 948. 26  $157. 15 ----------------           1, 105. 41
   Expenditures_-----                ------------ ------------ 944. 36   161. 05    ------------            1, 105. 41



         10. OPTIMA RESERVOIR, NORTH CANADIAN RIVER, OKLA.

   Location.-The Optima Dam site is located on the North Canadian
River about 623 miles above its confluence with the South Canadian
River and about 41/2 miles northeast of Hardesty, Texas County, Okla.
 (See sectional aeronautical chart, Wichita sheet, scale 1: 500,000.)
   Existing project.-The plan of improvement provides for flood
control and irrigation in the North Canadian River Basin, Arkansas
River watershed, by construction of an earth-fill dam and concrete
spillway with a total length of 10,800 feet and rising 85 feet above
the stream bed, with a reservoir providing for the storage of 100,000
acre-feet for flood control, 70,000 acre-feet for irrigation and 90,000
acre-feet for sedimentation reserve. The permanent pool would also
be used for recreational and wildlife preservation purposes. A con-
crete gate-controlled spillway in the right abutment will provide for
the passage of flood flows into the valley below. The outlet works will
consist of three 36-inch low-flow control pipes.
   The estimated cost (1952) are $17,483,000 for construction, and
$3,472,000 for lands and damages, a total of $20,955,000.
   The existing project was authorized by the Flood Control Act, ap-
proved June 22, 1936. (See H. Doc. 308, 74th Cong., 1st sess.) The
present Optima Dam site is an alternate site located approximately
15 miles downstream from the one previously considered in the project
document.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Engineering studies
and investigations were continued upon a minimum basis until October
1951. All planning work was discontinued at that time in conformance
with Congressional limitations placed upon planning work for new
construction projects.
   The cost during the fiscal year was $997.90, all for new work. The
expenditures were $584.62.
   Condition at end of fiscal year.-Engineeringstudies and investiga-
tions preliminary to preparation of detailed contract plans and speci-
fications were about 85 percent complete.
   Cost and expenditures to the end of the fiscal year totaled
$168,067.81.
   Proposed operations.-No work is scheduled during fiscal years
1953 or 1954.
                 FLOOD       CONTROL---TULSA,                 OKLAHOMA,             DISTRICT                 1067
                                    Cost 'and financial summary

                                                Fiscal year ending June 30                            Total to June
                                                                                                     30, 1952, includ-
                                                                                                     ing fiscal years
                                1948          1949           1950          1951          1952         priorto 1948

New work:
   Appropriated......-----------------     $50, 000. 00 $100, 000. 00   $45, 000. 00 -$51,932.19         $168, 067. 81
   Cost   __---------------$215. 89         43, 459. 47   34, 622. 95    64, 214. 50       997. 90        168, 067. 81
   Expenditures ......           215. 89    42, 985. 57   28, 546. 71    71, 177. 92       584. 62        168, 067. 81


Other new work data: Estimated additional amount needed to
be appropriated for completion of existing project----------$20,                                    786, 932. 19

    11. FORT SUPPLY RESERVOIR, NORTH CANADIAN RIVER, OKLA.
    Location.-Fort Supply Reservoir is located on Wolf Creek, a
tributary of the North Canadian River, about 12 miles northwest of
Woodward, Woodward County, Okla. (See sectional aeronautical
chart, Wichita sheet, scale 1: 500,000.)
    Existing project.-The plan of improvement provides for flood
control in a portion of the North Canadian River Basin, in the
Arkansas River watershed in Oklahoma, by an earthfill dam and
concrete spillway with a total length of 11,325 feet, rising 85 feet
above the stream bed, with a reservoir providing for the storage
of 93,200 acre-feet for flood control and 14,300 acre-feet for a perma-
nent pool for recreation and preservation of wildlife. The outlet
works, consisting of a semi-elliptical conduit with an area approxi-
mately equivalent to a circular section 17.7 feet in diameter, controlled
by three 71/2- by 16-foot vertical-lift gates, and a stilling basin, are
located in the left abutment. A concrete chute-type spillway, approxi-
mately 800 feet long and 540 feet wide, controlled by a concrete weir
at the upstream end and terminating in a stilling basin, provides for
the passage of flood flows around the left end of the dam into the
river valley below. The reservoir controls practically the entire
drainage area of Wolf Creek and is operated as a unit of the co-
ordinated reservoir system for flood control in the Arkansas River
Basin.
   The costs were $7,232,725 for construction and $245,000 for lands
and damages, a total of $7,477,725. The estimated cost of annual
maintenance is $79,000 (1952).
   The existing project was authorized by the Flood Control Act
approved June 22, 1936. (See H. Doc. 308, 74th Cong., 1st sess.)
   Local coop eration.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during the fiscal year.-The last item of
construction, consisting of erection of prefabricated steel maintenance
building, was completed on March 31, 1952, by hired labor. All
completed structures were operated and maintained in a serviceable
condition throughout the year.
   The cost during the fiscal year was $22,887.77 for new work and
$56,775.92 for maintenance. The expenditures were $81,983.93.
   Condition at end of fiscal year.-Construction of the project is
complete. Construction of the project was started in March 1938,
utilizing Emergency Relief funds to build a construction camp.
1068            REPORT OF CHIEF OF ENGINEERS,                                      U.   S. ARMY,          1952

Actual construction work on the dam was initiated October 1938
and the project was placed in operation during October 1942.
  The total cost of new work to the end of the fiscal year was
$7,477,725.00, of which $7,390,687.29 was from regular funds and
$87,037.71 was from Emergency Relief funds. The total cost of main-
tenance was $450,896.61, all from regular funds.
   The total expenditures for new work and maintenance to the end
of the fiscal year were $7,927,101.03, of which $7,840,063.32 was from
regular funds and $87,037.71 was from Emergency Relief funds.
  Proposed operations.-The balance unexpended on June 30, 1952,
$6,394.66, and an allotment for fiscal year 1953 of $47,600 for main-
tenance, a total of $53,994.66, will be applied during the fiscal year to
the following schedule of work:
Accounts payable, June 30, 1952_---   -----------------------         $1, 520. 58
Maintenance:
    Operation of completed project-__      --------                       500. 00
                                                                      1---------17,
    Ordinary maintenance and repairs-----------------------18,            800. 00
    Reservoir management and maintenance of public-use areas-----      9, 300. 00
    Stream gaging, reservoir operation studies, and other special en-
      gineering studies and investigations_ ---------             _.
                                                               -----   6, 874. 08
               Total for all work--------                            ------------------------ 53, 994. 66
The sum of $60,000 can be profitably expended for operation and
maintenance during fiscal year 1954.
No work is proposed for fiscal year 1954.
                                            Cost and financial summary

                                                       Fiscal year ending June 30-                             Total to June
                                                                                                              30, 1952, includ-
                                                                                                              ing fiscal years
                                        1948          1949            1950          1951           1952        prior to 1948


New work:
   Appropriated .........-------------
                            -  --                                 $116, 500. 00 -$55,500.00   -$2, 275. 00    1$7, 477, 725. 00
   Cost___-                   - .. $21, 475. 71
                     -__-.....--                    $6, 924. 13     30, 322. 20    5, 515. 03   22, 887. 77    1 7, 477, 725. 00
   Expenditures---------...     ..   23, 404. 11     3, 878. 41     30, 529. 11    3, 230. 00   24, 965. 89    1 7, 477, 725. 00
Maintenance:
     Appropriated ....--------        55, 000. 00   60, 400. 00     80, 000. 00   60, 000. 00   55, 370. 69        455, 770. 69
     Cost..----....----- -----.....   52, 633. 83   60, 368. 01     85, 437. 16   55, 562. 29   56, 775. 92        450, 896. 61
     Expenditures--------........     52, 056. 49   61, 542. 82     84, 238. 73   56, 218. 53   57, 018. 04        449, 376. 03


  1 Includes $87,037.71 Emergency Relief funds.

          12. CANTON RESERVOIR, ARKANSAS RIVER BASIN, OKLA.

   Location.-Canton Reservoir is located on the North Canadian
River about 394 miles above its mouth and about 3 miles north of Can-
ton, Blaine County, Okla. (See sectional aeronautical chart, Wichita
sheet, scale 1: 500,000.)
   Existing project.-The plan of improvement provides for flood
control in a portion of the North Canadian River Basin, in the Ar-
kansas River watershed in Oklahoma, by an earthfill dam and concrete
spillway with a total length of 15,100 feet, rising 73 feet above the
river bed, with a reservoir providing for the storage of 240,000 acre-
feet for flood control and 150,000 acre-feet for conservation of water
and siltation reserve. Of the conservation storage, 69,000 acre-feet
is allocated for future irrigation and 38,000 acre-feet is allocated for
            FLOOD    CONTROL-TULSA,        OKLAHOMA,       DISTRICT         1069
future municipal water supply. The outlet works consist of three 7-
by 12-foot gated sluices through the spillway weir. A concrete spill-
way, controlled by sixteen 40- by 25-foot gates on the weir crest, pro-
vides for the passage of flood flows around the right end of the dam
into the river valley below. The reservoir is operated as a unit of
the coordinated reservoir system for flood control in the Arkansas
River Basin.
   The estimated costs (1952) are $9,453,000 for construction and
$920,000 for lands and damages, a total of $10,373,000. The estimated
cost of annual maintenance is $145,000 (1952).
   The existing project was authorized by the Flood Control Act ap-
proved June 28, 1938. (See H. Doc. 569, 75th Cong., 3d sess.). Pro-
vision for 69,000 acre-feet of irrigation storage was authorized by the
Flood Control Act of July 24, 1946, and future water supply storage
of 38,000 acre-feet was authorized by the Flood Control Act of June
30, 1948.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Minor construction
consisting of stabilization of approximately 1,000 feet of shoreline
was completed during the fiscal year. This work was initiated by
hired labor in March 1951, and completed early in fiscal year 1952.
Project structures were operated and maintained in a serviceable
condition.
   The costs during the fiscal year were $2,618.65 for new work and
$85,808.62 for maintenance. The expenditures were $88,239.23.
   Condition at end of fiscal year.-The project as a whole is essen-
tially complete. Actual construction work on the dam was initiated
in December 1940 and initial storage operations (to provide a con-
servation pool) were commenced April 15, 1948. The work remaining
to complete the project includes construction of maintenance building,
repair shops, operators' quarters and recreational development facili-
ties.
   The total cost of new work to the end of the fiscal year was $10,266,-
575.00 and the total cost of maintenance was $343,500.72. The total
expenditures were $10,611,120.00.
   Proposed operations.--The balance unexpended on June 30, 1952,
$2,002.10 plus $1,235.66 accounts receivable, and an allotment during
fiscal year 1953 of $78,700 for maintenance, a total of $81,937.76, will
be applied during fiscal year 1953 to the following schedule of work:
Accounts payable, June 30, 1952- ------____---------___            __ $1, 591.38
Maintenance :
    Operation of completed project_--- -__          --         -__ ___--25,600.00
    Ordinary maintenance and repairs_-___ _______--------               27, 400.00
    Reservoir management and maintenance of public-use areas... 16, 600. 00
    Stream gaging, reservoir operation studies and other special
      engineering studies and investigations _...._    --------- .      10, 746.38
      Total for maintenance----------------------------               - 80,346.38
          Total for all work ._-_ - ____
                                       -.... _____--  __ --             81, 937. 76



      245554-53-vol. 1--68
1070           REPORT OF CHIEF OF ENGINEERS, U.                                                   S. ARMY,              1952

  The sum of $148,000 can be profitably expended for the following
schedule of maintenance work during fiscal year 1954:
Maintenance:
   Operation ---------------------------------------                         ------ $39, 000
   Ordinary maintenance and repairs                      -------------------------- 35, 000
   Improvement and reconstruction                     ---------------------------- 74, 000
      Total for all work         ------------------------------------               148, 000

                                                Cost and financial summary

                                                               Fiscal year ending June 30-                                   Total to June
                                                                                                                            30, 1952, includ-
                                                                                                                            ing fiscal years
                                           1948               1949             1950           1951             1952           prior to 1948

New work:
   Appropriated .-.....-             $2,200,000.00 $700, 000. 00 $165,000. 00               $81, 000. 00 ....                 $10, 267, 975. 00
                                                                                                                   ..-----------
   Cost--------------                2, 431, 762. 01 273, 010. 85 178, 786. 73              108, 830. 33    $2, 618. 65         10, 266, 575. 00
   Expenditures- .-         -.--     2, 815, 177. 01 164, 937. 53 141, 702. 00              167, 872. 01      1, 061. 96        10, 266, 575. 00
Maintenance:
    Appropriated ......-------                                77, 300. 00
                                                  ..------------...          106, 500.00     85, 000. 00     76, 347. 10          345, 147. 10
    Cost-- __-------___             ._ ____          ...       77, 300. 00   105, 420. 00    74, 972. 10     85, 808. 62          343,500. 72
    Expenditures-------...........------------.........        75, 207. 11    98, 344. 65    83, 815. 97     87, 177. 27          344, 545. 00


Other new work data:
    Unobligated balance, June 30, 1952    ----------------------- $1, 400. 00
    Unobligated balance available for fiscal year 1953------------- 1,400. 00
    Estimated additional amount needed to be appropriated for com-
      pletion of existing project--1---------------------------05, 025. 00

   13. OKLAHOMA CITY FLOODWAY, NORTH CANADIAN RIVER, OKLA.

   Location.-The work covered by this project is located on the North
Canadian River at Oklahoma City, Okla. (See U. S. Geological Sur-
vey map, Chickasha, Okla., quadrangle, scale 1: 125,000.)
   Existing project.--he plan of improvement provides flood protec-
tion at Oklahoma City, Okla., against floods on the North Canadian
River and consists of an enlarged and straightened channel through
the city, designed to carry 45,000 cubic feet per second. The improve-
ment will be about 13.4 miles in length, beginning about 1 mile up-
stream from South May Avenue (river mile 273.7) and extending to
the vicinity of Spencer, Okla. (river mile 257.5). The major part of
the improvement will be about 13 feetdeep and will have a bottom
width of 425 feet. The side slopes will be lined with stone. Natural
drainage ways will be modified to drain into the canal by the construc-
tion of 15 lateral drainage ditches. Excavated material will be placed
in old channel and low areas.
   The estimated Federal cost (1952) is $10,460,000 and the non-Fed-
eral cost is $6,654,000.
   The project, as authorized by the Flood Control Act of July 24, 1946
 (see H. Doc. 572, 79th Cong., 2d sess.), was modified by the Flood
Control Act, approved May 17, 1950, to provide for construction in ac-
cordance with the canal plan described above.
   Local cooperation.-Seepages 4-5 for requirements. Local interests
advised that the city of Oklahoma City was in process of acquiring
rights of way for the entire project, and that rights of entry neces-
sary for the first construction contract will be granted by early in fiscal
year 1953.
               FLOOD       CONTROL--TULSA,              OKLAHOMA,          DISTRICT                 1071
   Operations and results during fiscal year.-Engineeringstudies and
investigations were continued.
   The cost during the fiscal year was $8,248.56 and the expenditures
were $8,137.65, all for new work.
   Condition at end of fiscal year.-Maps showing rights of way taking
line have been furnished local interests and acquisition of such rights
of way is under way. Preparation of detailed contract plans and
specifications for the first phase of construction is approaching
completion.
   The total cost to the end of the fiscal year was $267,151.14 and the
total expenditures were $266,846.27, all for new work.
   Proposed operations.-The balance unexpended on June 30, 1952,
$117,153.73 plus an allotment of $796,000.00 during fiscal year 1953, a
total of $913,153.73 will be applied to the following schedule of work:
Accounts payable, June 30, 1952_-------------------------------
                                 _$304.                                                                   87
New work :
    Construction of levees, canal and drainage structures (phase
      1, covering the lower end of the floodway), by continuing con-
      tract December 1952 to J'une 1953_____________________                                 430, 000.00
    Alteration and relocation of existing railroad facilities, by
      negotiated continuing contracts, March to June 1953--------                            320, 000. 00
    Continuation of engineering and design studies including prep-
      aration of contract plans and specifications, by hired labor,
      July 1952 to June 1953-------______________--____                                      162, 848. 86

                                   .......-
                Total for new work_--          _____--   __- ___                             912, 848. 86
                Total for all work_____ __-_____________--____                               913, 153. 73
   The sum of $3,200,000 can be profitably expended for the following
schedule of work during fiscal year 1954:
New work :
   Complete construction of levees, canal and drainage structures
      (phase 1), by continuing contract, July 1953 to June 1954___ $1, 818, 000
   Complete alteration and relocation of existing railroads re-
     quired for construction of phase 1 and initiate railroad relo-
     cations required for phase 2, by continuing contracts, July
     1953 to June 1954                                              1, 272, 000
   Continue engineering studies and design including preparation
     of contract plans and specifications for construction of phase
     2 of the floodway, by hired labor, July 1953 to June 1954____     110, 000

                                  --
           Total for new work ____________________-____                    ____        _       3, 200, 000
                                 Cost and financial summary

                                            Fiscal year ending June 30-                       Total to June
                                                                                             30, 1952, includ-
                                                                                             ing fiscal years
                              1948         1949        1950         1951        1952           prior to 1948

New work:
   Appropriated ....
                 -   . $100, 000. 00 $500, 000.00 ..----------- $216,000.00 ------------
                                                                                   _             $384,000.  00
                         84, 849. 17
   Cost..----------------..            41, 068.09 $92, 616. 48   40, 368. 84   $8, 248. 56        267, 151. 14
   Expenditures--------- 81, 281. 20   44, 430. 70   86, 859. 25 46, 137. 47    8, 137. 65        266, 846. 27


Other new work data:
    Unobligated balance, June 30, 1952__--         __----__       $116, 848. 86
    Appropriated for fiscal year ending June 30, 1953--------   - 796, 000. 00
    Unobligated balance available for fiscal year 1953-.-------  - 912, 848. 86
    Estimated additional amount needed to be appropriated for
      completion of existing project- ___---___-___
                                            --              -__  9, 280, 000. 00
1072    REPORT OF CHIEF OF ENGINEERS,          U.   S. ARMY,   1952

14. GREAT   SALT PLAINS      RESERVOIR, SALT        FORK OF ARKANSAS.
                             RIVER, OKLA.

   Location.-Great Salt Plains Reservoir is located on the Salt Fork
of the Arkansas River 103.3 miles above its mouth, and about 12 miles
east of Cherokee, Alfalfa County, Okla. (See sectional aeronautical
chart, Wichita sheet, scale 1: 5001000.)
   Existing project.-The plan of improvement provides for flood con-
trol in the Salt Fork Valley in the Arkansas River watershed in
Oklahoma, by an earthfill dam 5,700 feet long, rising 72 feet above
the riverbed, with a reservoir providing for the storage of 259,000;
acre-feet for flood control and 58,000 acre-feet for siltation, recreation,
and preservation of wildlife. A concrete cascade-type spillway ap-
proximately 800 feet long and 338 feet wide, containing three gravity-
type concrete weirs, provides for the passage of flood flows around the
right end of the dam into the river valley below. The outlet works
consist of four ungated 10- by 12-foot conduits through the center
section of the upper weir. The reservoir is operated as a unit of the
coordinated reservoir system for flood control in the Arkansas River
Basin.
   The estimated costs (1952) are $4,113,100 for construction and
$488,800 for lands and damages, a total of $4,601,900. The estimated
cost of annual maintenance is $81,000 (1952).
   The existing project was authorized by the Flood Control Act ap-
proved June 22, 1936. (See H. Doc. 308, 74th Cong., 1st sess., which
contains the latest published maps.)
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-The project structures
were operated and maintained in a serviceable condition throughout
the year. Soil erosion control measures protecting existing public
use facilities were effected.
   The costs during the fiscal year were $277.60 for new work and
$51,121.28 for maintenance. The expenditures were $53,829.27.
   Condition at end of fscal year.-The project as a whole is essen-
tially complete. Construction of the project was started in May 1938,
utilizing Emergency Relief funds to build a construction camp.
Actual construction work on the dam was initiated on September 28,
1938, and the project was placed in operation during July 1941. Com-
pletion of additional recreational development facilities will complete
all features of the project.
   The total cost of new work to the end of the fiscal year was
$4,598,630.51, of which $4,573,886.92 was from regular funds and
$24,743.59 was from Emergency Relief funds. The total cost of main-
tenance was $487,610.76, all from regular funds.
   The total expenditures for new work and maintenance to the end
of the fiscal year were $5,087,270.52, of which $5,062,526.93 was from
regular funds and $24,743.59 was from Emergency Relief funds.
   Proposed operations.-The balance unexpended on June 30, 1952,
$3,576.96 plus $1,059.40 accounts receivable, and an allotment during
fiscal year 1952 of $43,500.00 for maintenance, a total of $48,136.36,
will be applied as follows:
                    FLOOD           CONTROL--TULSA,                      OKLAHOMA,                  DISTRICT                 1073
Accounts payable, June 30, 1952-------     ---------------------- $3, 347. 64
Maintenance:
    Operation of completed project---------------------------           14, 900. 00
    Ordinary maintenance and repairs--------           ---------------- 17, 300. 00
    Reservoir management and maintenance of public-use areas-----        9, 900.00
    Stream gaging, reservoir operation studies and other special
      engineering studies and investigations ------------------          2, 688. 72
             Total for maintenance------------------       ----                                                        44,788.72
             Total for all work-------------    ------------ ------                                                    48,136. 36
   The sum of $55,000 can be profitably expended for the following
:schedule of work during fiscal year 1954:
Maintenance:
   Operation     ---------------------------------------------                                                            $26, 000
    Ordinary maintenance and repairs--------------------------                                                             25, 500
   Improvement and reconstruction--                         ------------------------                                        3, 500

          Total for maintenance--------------                                        ---- ----------------                  55, 000
                                            Cost and financial summary

                                                         Fiscal year ending June 30-                                  Total to June
                                                                                                                     30, 1952, includ-
                                                                                                                     ing fiscal years
                                       1948             1949             1950           1951             1952         prior to 1948

New work:
    Appropriated------......... ...........----------$125, 000. 00   $31,000.00     -$39,052.00 .......-----------   1 $4, 601, 948. 00
                                -
        -------------- -$2, 799. 58 19, 179. 94
    Cost_                                                             75, 321.85      22, 009. 32       $277. 60      1 4, 598, 630. 51
    Expenditures-.......         -1,041. 54            14, 811. 56    76, 485. 32     24, 953.64          539. 47     1 4, 598, 630. 51
Maintenance:
    Appropriated ........-------- 58, 000. 00         60, 400. 00     86, 400. 00     75, 000. 00     38, 599. 48         488, 899. 48
    Cost------_----- ----         52, 470.47          53, 992. 94     98, 735. 82     60, 796. 53     51, 121.28          487, 610. 76
                   ........-
    Expenditures-------           51, 314. 99         56, 452. 97     95, 230.87      62, 279. 61     53, 289. 80         488, 640. 01


Other new work data:
    Unobligated balance, June 30, 1952------------------------ $3, 317.49
    Unobligated balance available for fiscal year 1953------------... 3, 317. 49
  1 Includes $24,743.59 Emergency Relief funds.

               15. KEYSTONE RESERVOIR, ARKANSAS RIVER, OKLA.

   Location.-The work covered by this project is located on the main
stem of the Arkansas River 538.9 miles above its mouth, and about
2 miles downstream from the mouth of the Cimarron River near
Keystone, Okla., and about 15 miles west of Tulsa, Okla. (See U. S.
Geological Survey map for Hominy, Okla., quadrangle, scale 1: 125,-
000, Skedee and Yale, Okla., quadrangles, scale 1: 62,500.)
   Existing project.-The plan of improvement provides for con-
struction of a multiple-purpose reservoir which will be operated
as a unit of the coordinated system for flood control in the Arkansas
River Basin, and as a part of the multiple-purpose plan for naviga-
tion, hydroelectric power, flood control, and other purposes, Arkansas
River and tributaries, Arkansas and Oklahoma. Under the plan, the
reservoir will have a total storage capacity of 1,879,000 acre-feet, of
which 1,242,300 acre-feet will be allocated to flood control, 221,700
acre-feet to power, and 415,000 acre-feet will be set aside for con-
servation and sedimentation reserve. The dam will consist of an
earth-fill structure with a gate-controlled concrete spillway located in
the river channel and rising 123 feet above the stream bed. The
1074      REPORT OF CHIEF OF ENGINEERS, U.                       S. ARMY,    1952

structure will be 4,650 feet long, with the power intake and power-
house located adjacent to the spillway. Power design criteria pres-
ently are three 20,000 kilowatt units, a total of 60,000 kilowatts.
   The estimated costs (1952) are $61,965,000 for construction and
$65,719,000 for lands and damages, a total of $127,684,000.
   The existing project was authorized by the Flood Control Act ap-
proved May 17, 1950. In accordance with the recommendations of
the Chief of Engineers in Senate Document No. 107, 81st Con-
gress, 1st session, the comprehensive and multiple-purpose plans
for flood control and other purposes for the Arkansas River Basin
were modified by the substitution of the Keystone Reservoir on the
Arkansas River for the Mannford Reservoir on the Cimarron River,
and by the deletion of the Blackburn and Taft Reservoirs on the
Arkansas River.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Engineeringstudies and
investigations were continued.
   The cost during the fiscal year was $77,966.47 and the expenditures
were $76,740.43, all for new work.
   Condition at end of fiscal year.-Engineeringstudies and investiga-
tions preliminary to preparation of detailed contract plans and speci-
fications were 60 percent complete utilizing engineering data compiled
for the previously authorized Mannford Reservoir.
   The total cost to the end of the fiscal year was $291,966.47 and
the expenditures were $290,740.43, all for new work. These amounts
include the sum of $214,000 expended on the previously authorized
Mannford Reservoir, replaced by Keystone Reservoir, as authorized
by the 1950 Flood Control Act.
   Proposed operations.-The balance unexpended on June 30, 1952,
$73,259.57, plus $348.21 accounts receivable and an allotment of
$90,000 during fiscal year 1953, a total of $163,607.78 will be applied
as follows: The sum of $1,574.25 will be utilized in payment of ac-
counts payable, outstanding on June 30, 1952, and the remainder,
$162,033.53, will be applied to continuation of preliminary engineer-
ing planning.
   The sum of $3,000,000 can be profitably expended for the follow-
ing schedule of work during fiscal year 1954:
Construction of administration building including utility agreements
  for gas, electricity, telephone service and access road to the dam site,
  by continuing contracts, December 1953 to June 1954. .__._____             $252, 000
Initiate excavation for spillway and construction of first stage em-
  bankment, by continuing contract, February 1954 to June 1954___             300, 000
Acquisition of land, by hired labor, July 1953 to June 1954_......... 1, 000, 000

                                                              _____-----__
Relocation and alteration of existing railroad facilities, by continuing
  contracts, April 1954 to June 1954- --------
Continuation of engineering studies and design including preparation
                                                                           1, 174, 800
  of detailed contract plans and specifications, by hired labor, July
  1953 to June 1954---------------          -------------------------         273, 200
       Total for all work----------------------------------                     3, 000, 000
               FLOOD       CONTROL--TULSA,                OKLAHOMA,                DISTRICT                  1075

                                 Cost and financial summary

                                            Fiscal year ending June 30-                               Total to June
                                                                                                     30, 1952, includ-
                                                                                                     ing fiscal years
                              1948          1949         1950            1951            1952          prior to 1948

New work:
   Appropriated......... -$15,000.00 --   ...       .
                                                   --.          ...-......       ..- $150, 000. 00       $364, 000.00'
   Cost__- --------      - 15, 309. 43                      -        _- $1, 404. 94    77, 966. 47        291, 966. 47
   Expenditures_ __     - 15, 339. 05                                      1, 404. 94  76, 740.43         290, 740.43


Other new work data:
    Unobligated balance, June 30, 1952.__      _-_---------
                                                ..--           $70, 541.03
    Appropriated for fiscal year ending June 30, 1953--------   90, 000. 00
    Unobligated balance available for fiscal year 1953         1----------
                                                                60, 541.03
    Estimated additional amount needed to be appropriated for
      completion of existing project----------------------127, 230, 000. 00
        16. POLECAT CREEK, OKLA. (HEYBURN RESERVOIR AND
                     CHANNEL IMPROVEMENTS)
   Location.-Polecat Creek is a minor tributary to the Arkansas
River near Salpulpa, Creek County, Okla. (See U. S. Geological
Survey maps for Nuyaka, Hominy, and Claremore, Okla., quad-
rangles, scale 1: 125,000.)
   Existing project.-The plan of improvement provides for flood
protection in the Polecat Creek Valley by means of a reservoir at
mile 48.6, near Heyburn, Okla., and channel improvements at Sapulpa
on Rock Creek, its major tributary, and on Polecat Creek below the
mouth of Rock Creek. The Heyburn Dam is an earth-fill struc-
ture 2,920 feet long and rising 89 feet above the stream bed with
the reservoir providing a storage capacity of 49,500 acre-feet for
flood control and 10,200 acre-feet for siltation, recreation and preserva-
tion of wildlife. Outlet works consist of an .uncontrolled circular
drop inlet conduit. An uncontrolled saddle spillway, located about
1,000 feet west of the right abutment, provides for the passage of
flood flows into the river below. The channel of Rock Creek from
mile 4.4 to the mouth has been cleared by removal of debris and about
1.3 miles of this length is deepened. The channel of Polecat Creek
is cleared from the mouth of Rock Creek, mile 21.2, to the Arkansas
River. The improvements provide a high degree of protection to
12,540 acres of urban and rural land in the Polecat and Rock Creek
Valleys.
   The estimated Federal costs (1952) are $1,639,000 for construction
and $786,000 for lands and damages in the Heyburn Reservoir area,
a total of $2,397,000. The estimated non-Federal cost is $113,000.
The estimated cost of annual maintenance is $63,000 (1952).
   The existing project was authorized by the Flood Control Act
approved July 24, 1946.
   Local cooperation.-Section 2 of the Flood Control Act, approved
June 28, 1938, applies to the Heyburn Reservoir. See pages 4-5 for
requirements of local cooperation of the channel improvements. The
requirement of local cooperation in connection with construction of
the channel improvement phase of the project has been essentially
fulfilled, pending transfer of channel improvement works to local
interests for operation and maintenance.
1076     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                     1952

   Operations and results during fiscal year.--All project structures
were operated and maintained in a serviceable condition. Construc-
tion of maintenance building was started August 6, 1951, and com-
pleted March 19, 1952, by contract. Contract for widening Rock
Creek channel at U. S. Highway No. 75 was started May 26, 1952,
and continued to 33 percent completion. Construction of public-
use and recreational development facilities was continued by hired
labor.
   The costs during the fiscal year were $66,681.61 for new work
and $34,993.35 for maintenance. The expenditures were $92,561.67.
   Conditionat end of fiscal year.-The project as a whole is essentially
complete. Construction of the dam, by contract, was started March
9, 1948, and completed October 11, 1950. Embankment closure was
completed June 25, 1950, and impoundment of the conservation pool
was completed March 11, 1951. The work remaining to complete
the project consists of widening Rock Creek channel, construction of
certain deferred items consisting of operators' quarters and public
overlook shelter, and completion of public-use and recreational devel-
opment facilities.
   The total cost of new work to the end of the fiscal year was
$2,345,423.33 and the total cost of maintenance was $56,919.45. The
total expenditures were $2,389,174.78 for new work and maintenance.
   Proposed operations.-The balance unexpended on June 30, 1952,
of $68,626.32 plus $534.69 accounts receivable, and an allotment during
fiscal year 1953 of $31,900 for maintenance, a total of $101,061.01,
will be applied to the following scheduled work:
Accounts payable, June 30, 1952----     ------------------------         $25, 502. 69
New work:
    Complete widening of Rock Creek channel at United
      States Highway No. 75 crossing, by contract, July
      1952 to October 1952-----       ----------- ----- $32, 769. 50
    Completion of public-use and recreational develop-
      ment facilities, by hired labor, July 1952 to
      September 1952----------------------------4, 400. 74
    Complete enginnering studies and reports including
      maintenance and operation manual and complete
      closing out of all land purchase and condemna-
      tion cases, by hired labor, July 1952 to January
      1953-----------------------                ---          2, 606. 43
         Total for new work-.---------------         ----------           39, 776. 67
Maintenance:
  Operation of completed structures-------------------------               8, 000. 00
    Ordinary maintenance and repairs------------------------              12, 000. 00
    Reservoir management and maintenance of public-use facilities_        13, 000. 00
    Stream gaging, reservoir operation studies and other special
      engineering'studies and investigations--------------------          35, 781. 65

         Total for maintenance---------------                    ---      35, 781.65

         Total for all work-------....-------------------------          101, 061. 01
  The sum of $39,000 can be profitably expended for the following
schedule of work during fiscal year 1954:
Maintenance:
   Operation of completed project ...----            ---------------------$23, 500
   Ordinary maintenance and repairs-               ----------------------  15, 500
       Total for maintenance--- -          ----   ------------            -39,   000
                   FLOOD          CONTROL--TULSA,                        OKLAHOMA,                   DISTRICT                1077
                                           Cost and financial summary

                                                         Fiscal year ending June 30                                  Total to June
                                                                                                                     30, 1952, includ-
                                                                                                                     ing fiscal years
                                       1948            1949             1950            1951            1952           priorto 1948

New work:
   Appropriated-........ $1,000,000.00 $750,000.00 $900, 000.00 -$225,000.00 -$28, 000.00                              $2, 397, 000. 00
   Cost---..-..-.....- - .. 267, 588. 84 1, 012, 186. 17 724, 074. 87 274, 891.84 66, 681.61                            2, 345, 423. 33
   Expenditures-.........   217, 920. 28 898, 507.05 768, 024. 08 391, 054. 40    56, 917. 52                           2, 332, 423. 33
Maintenance:
   Appropriated ....--------- -----..............------------ --------..........----   24, 000. 00     36, 801. 10         60, 801. 10
   Cost...-----------------        ----         -----------------------                21, 926. 10     34, 993.35          56, 919. 45
   Expenditures--.....     ...------------     ------------ ------------               21,107.30       35, 644.15          56, 751. 45


Other new work data:
    Unobligated balance, June 30, 1952_-___-- ------ _____      $48, 493.67
    Unobligated balance, June 30, 1952 ______________----------$48, 493. 67

     17. FALL RIVER RESERVOIR, ARKANSAS RIVER BASIN, KANS.

   Location.-The Fall River dam site is located on the Fall River
about 54 miles above its confluence with the Verdigris River and about
4 miles northwest of Fall River, Greenwood County, Kans. (See U. S.
Geological Survey maps for Eureka (Kans.) quadrangle, scale
1: 125,000.)
   Existing project.-The plan of improvement provides for flood con-
trol and pollution abatement in the Verdigris River Basin, Arkansas
River watershed, by an earth-fill dam and concrete spillway with a
total length of about 6,000 feet long and rising 94 feet above the stream
bed with a reservoir providing for the storage of 236,000 acre-feet for
flood control and 27,000 acre-feet for water supply, pollution abate-
ment siltation, recreation, and preservation of wildlife. A concrete
channel spillway, controlled by eight 50- by 25-foot gates on the weir
crest, provides for passage of flood flows into the river valley below.
The outlet works consist of seven 5- by 8.5-foot gated sluices through
the spillway weir. The reservoir is operated as a unit of the compre-
hensive reservoir system for flood control in the Arkansas River Basin.
   The estimated costs (1952) are $8,325,000 for construction and
$2,135,000 for lands and damages, a total of $10,460,000. The esti-
mated cost of annual maintenance is $123,500 (1952).
   The existing project was authorized by the Flood Control Act, ap-
proved August 18, 1941. (See H. Doc. 440, 76th Cong., 1st sess.)
   Local cooperation.-Section2 of the Flood Control Act, approved
June 28, 1938, applies.
   Operations and results during fiscal year.-All project structures
were operated and maintained in a serviceable condition. Contracts
under way at the beginning of the fiscal year, covering construction
of administration and maintenance building and public toilets, were
completed during July 1951. Deficiency judgments, covering land
condemnation proceedings, refined the final cost of land acquisitions.
   The cost during the fiscal year was $8,506.58 for new work and
$81,950.70 for maintenance. The expenditures were $94,870.72.
   Condition at end of fiscal year.-Construction of the dam was
started, by contract, on May 9, 1946, embankment closure was com-
pleted May 30, 1949, impoundment of conservation pool was com-
1078            REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

pleted June 9, 1949, and dedication ceremonies were held September
5, 1949. No additional construction is contemplated at this project.
  The total cost of new work to the end of the fiscal year was $10,457,-
144.44 and the total cost of maintenance was $239,458.96. The total
expenditures were $10,693,567.62.
  Proposed operations.-The balance unexpended on June 30, 1952,
$9,015.64 plus $5.10 accounts receivable and an allotment during fiscal
year 1953 of $71,300 for maintenance, a total of $80,320.74, will be
applied as follows:
Accounts payable, June 30, 1952___-----     ___-----------------  $5, 040. 88
New work: Completion of engineering reports including preparation
  of maintenance and operation manual, by hired labor, June 1952
  to July 1953---------------------------------------------           855. 56

      Total for new work-                                                      855. 56
Maintenance :
   Operation of completed structures       .--------------------- 20, 500. 00
   Ordinary maintenance and repairs------ __- -------                      26, 000.00
   Reservoir management, including outleasing and maintenance of
      public-use facilities____------___--    ___-----------------17,          300. 00
   Stream gaging, reservoir operation studies and other special en-
      gineering studies and investigations ----..              _____--- __ 10, 624. 30
                Total for maintenance_-....       __.... _____   _______-    74,424. 30
                Total for all work          ---------------------------------
                                                                            80, 320. 74
  The sum of $92,000 can be profitably expended for the following
schedule of work during fiscal year 1954:
Maintenance:
    Operation ------------     -------------------------------- $53, 100
   Ordinary maintenance and repairs                              28, 900       --------------------------
        Improvement and reconstruction--------------                                                                          10, 000
           Total for maintenance_                                   ___-___-        _____-- ____--                            92, 000

                                                 Cost and financial summary

                                                                 Fiscal year ending June 30                            Total to June
                                                                                                                       30,1952, includ-
                                                                                                                       ing fiscal years
                                             1948              1949          1950           1951          1952           prior to 1948

New work:
     Appropriated......... $3,000,000.00 $4,400,000.00 $250, 000. 00 -$262,500.00 ....-----------.....                  $10, 460, 000. 00
     Cost....-------------- 3, 838, 912.52 3, 109, 005. 43 333, 644.61 124, 877.00     $8, 506. 58                       10, 457,144. 44
   Expenditures-.........3, 384, 619. 77 3, 424, 479. 54                   772, 905. 60   110, 512. 47   15, 267. 56     10, 457, 149. 54
Maintenance:
   Appropriated-------........... ..--..--..--...........------------      95, 000. 00     70, 000. 00   77, 583. 26        242, 583. 26
     Cost------.------ -----------------------                              92, 668. 39    64, 839. 87   81, 950. 70        239, 458. 96
                                          ......------------............
     Expenditures-------......... .....---------                            84, 018. 78    72, 796.14    79, 603.16         236, 418. 08


Other new work data:
    Unobligated balance, June 30, 1952_ ______-_--_--_-_-_         $2, 855. 56
    Unobligated balance available for fiscal year 1953-------------2, 855. 56

           18. TORONTO RESERVOIR, ARKANSAS RIVER BASIN, KANS.

  Location.-The Toronto Dam site is located on the Verdigris River
about 271.5 miles above its mouth and 4 miles south and east of To-
ronto, Woodson County, Kans. (See U. S. Geological Survey maps
for Fredonia, Kans., quadrangle, scale 1: 125,000.)
             FLOOD    CONTROL-TULSA,          OKLAHOMA,       DISTRICT           1079
   Existing project.-The plan of improvement provides for flood
control and water conservation in the Verdigris River Basin by con-
struction of an earth-fill dam about 4,200 feet long, with a maximum
height of 92 feet above the stream bed. The spillway and control
works will be combined in a concrete structure located near the right
abutment of the dam. The reservoir will have a total capacity of
1.95,000 acre-feet, of which 171,000 acre-feet will be for flood control
and 24,000 acre-feet for water supply, pollution abatement, siltation,
recreation and preservation of fish and wildlife. The reservoir will
be operated as a unit of the comprehensive reservoir system for flood
control in the Arkansas River Basin.
   The estimated costs (1952) are $9,377,000 for construction and
$7,984,000 for lands and damages, a total of $17,361,000.
   The project was authorized by the Flood Control Act, approved
August 18, 1941. (See H. Doc. 440, 76th Cong., 1st sess.)
   Local cooperation.-Section 2 of the Flood Control Act, approved
June 28, 1938, applies.
   Operationsand results during fiscal year.-Preparationof construc-
tion plans and specifications and other engineering studies for flood
control features were continued by hired labor.
   The cost during the fiscal year was $169,876.89, all for new work.
The expenditures were $170,034.62.
   Condition at end of fiscal year.-Constructionplans and specifica-
tions have been completed to a point where the initial construction
contracts could be advertised.
   Proposed operations.-The balance unexpended at the end of the
fiscal year, $72,606.67, plus $1,176.58 accounts receivable, and an allot-
ment of $25,000 during fiscal year 1953, a total of $98,783.25, will be
applied as follows: $1,074.60 will be utilized in payment of outstanding
accounts payable and $97,708.65 will be applied as needed in payment
of engineering and design expense incurred during fiscal year 1952 in
continuation of such work.
   The sum of $2,000,000 can be profitably expended for initiation of
construction during fiscal year 1954, based upon the following schedule
of work:
                                                             ----------
Acquisition of land, by hired labor, July 1953 to June 1954___                $750, 000
Clearing dam site area, by contract, October 1953 to December 1953__            17, 000
Construction of administration building, public overlook shelter and
  access road to dam site, including utility agreements for electricity,
  gas and telephone services, by continuing contracts, October 1953
  to June 1954-----         ---------------------------------------            129, 000
Relocation and alteration of existing Missouri Pacific RR facilities and
  relocation of U.  S. Highway   No. 54, by continuing contracts, August
  1953 to June 1954---__-----------------                                      529. 000
Initiate construction of the first stage embankment and excavation for
  spillway, by continuing contract, November 1953 to June 1954------           500, 000
Continuation of detailed planning, including preparation of contract
  plans and specifications, by hired labor, July 1953 to June 1954-..-..--      75, 000
      Total for all work-----------------------------        ---------       2, 000, 000
1080       REPORT OF CHIEF OF ENGINEERS,                             U.    S. ARMY,          1952

                                  Cost and financial summary

                                             Fiscal year ending June 30-                          Total to June
                                                                                                 30,1952, includ-
                                                                                                 ing fiscal years
                               1948         1949         1950          1951          1952          prior to 1948

New work:
   Appropriated___ __.   ---- -   ...----      -- --   $50,000.00 $40,000.00 $122,100.00             $382,100.00
   Cost---------------   $4, 091.10 $18, 160. 77       19, 520.12     9, 343.82   169, 876. 89        309, 391. 35
   Expenditures--------- 4, 633.27      19, 057.63     12, 877. 31   15, 635.48   170, 034.62         309, 493. 33


Other new work data:
    Unobligated balance, June 30, 1952------------------           $71, 804. 85
    Appropriated for fiscal year ending June 30, 1953_------        25, 000. 00
    Unobligated balance available for fiscal year 1953 _______ -    96, 804. 85
    Estimated additional amount needed to be appropriated for
      completion of existing project__--------------------     16, 953, 900. 00

       19. OOLOGAH RESERVOIR, ARKANSAS RIVER BASIN, OKLA.

   Locatio.--Oologah Reservoir is located on the Verdigris River 90
miles above its confluence with the Arkansas River and about 10 miles
northwest of Claremore, Rogers County, Okla. (See U. S. Geological
Survey maps for Claremore and Nowata (Okla.) quadrangles scale
1: 125,000.)
   Existing project.-The plan of improvement provides for flood con-
trol in the lower portion of the Verdigris River Valley by construction
of an earthfill dam 4,100 feet long and rising about 129 feet above the
river bed. The reservoir would provide for 950,000 acre-feet for flood-
control storage and 25,000 acre-feet for conservation, a total of 975,000
acre-feet. A gated concrete conduit will be constructed through the
embankment to form the outlet works. A gated spillway will be lo-
cated in a saddle about 2 miles from the left abutment and would
provide for passage of flood waters into the valley below the dam.
   The estimated costs (1952) are $8,916,000 for construction, and
$20,664,000 for lands and damages, a total of $29,580,000.
   The project as authorized by the Flood Control Act approved June
28, 1938, was modified by the Rivers and Harbors Act, approved July
24, 1946, to provide for a storage of 950,000 acre-feet for flood control,
427,000 acre-feet for power drawdown and 133,000 acre-feet for dead
storage.
   The project would be constructed initially for flood control with
power facilities added at such time that the oil field in the upper
portion of the reservoir area is depleted. The powerhouse to be con-
structed for the ultimate development would be located in the right
flood-plain area near the existing stream channel. The entire project
will be operated as a unit in the comprehensive plan for development
of the Arkansas River Basin for flood control and generation of
hydroelectric power.
   Local cooperation.-Section2 of the Flood Control Act, approved
June 28, 1938, applies.
   Operations and results during the fiscal year.-Preparationof de-
tailed plans and specifications was continued to October 25, 1951, at
which time all work was discontinued in view of the intent of the
Civil Functions Appropriation Act for 1952.
               FLOOD      CONTROL---TULSA,             OKLAHOMA,                DISTRICT              1081
  The cost during the fiscal year was $2,720.15, all for new work. The
expenditures were $2,634.15.
  Condition at end of fiscal year.-The dam site area comprising 871
acres has been acquired. Access road to the dam site is complete.
Contract plans and specifications for the initial construction phases
are essentially complete.
  Cost and expenditures to the end of the fiscal year totaled
$392,155.20, all for new work.
  Proposed operations.-The balance unexpended on June 30, 1952,
was $78,844.80. Under the present schedule of work, no allocation
of this unexpended balance is proposed during fiscal year 1953 or
1954.
                                 Cost and financial summary

                                           Fiscal year ending June 30                           Total to June
                                                                                               30,1952, includ-
                                                                                               ing fiscal years
                             1948         1949        1950          1951            1952         prior to 1948


New work:
                                                                      1 - ---------.
   Appropriated .------------------- ---------- $350, 000.00 ----------                            $471, 000.00
   Cost----------------------------------------    177, 622.98   $90,812.07       $2,720.15         392,155.20
   E xpenditures--------- -----------------        152, 965.11   115, 555. 94      2, 634.15        392,155.20


Other new work data:
    Unobligated balance, June 30, 1952------------------------     $78, 844. 80
   Unobligated balance available for fiscal year 1953                   ----------
                                                                    78, 844. 80
    Estimated additional amount needed to be appropriated for
      completion of existing project ------------------------- 29, 109, 000. 00
                  20. HULAH RESERVOIR, CANEY RIVER, OKLA.
   Location.-The Hulah Dam site is located on Caney River 96 miles
above its confluence with the Verdigris River and is about 15 miles
northwest of Bartlesville, near Hulah, Osage County, Okla. (See
U. S. Geological Survey maps for Pawhuska (Okla.) and Sedan
(Kans.) quadrangles, scale 1: 125,000.)
   Existing project.-The plan of improvement provides for flood
control in the Caney River Valley in the Verdigris River Basin, Ar-
kansas River watershed, by an earthfill dam and concrete spillway with
a total length of 5,200 feet rising 94 feet above the riverbed, with a
reservoir providing for the storage of 265,000 acre-feet for flood con-
trol and 30,000 acre-feet for conservation, siltation, recreation, and
preservation of wildlife. A concrete channel spillway, controlled by
ten 40- by 25-foot gates on the weir crest, provides for the passage
of flood flows over the dam into the river valley below. The reservoir
is operated as a unit of the coordinate reservoir system for flood control
in the Arkansas River Basin.
   The estimated costs (1952) are $7,631,000 for construction and
$3,368,000 for lands and damages, a total of $10,999,000. The estimated
cost of annual maintenance is $124,000 (1952).
   The existing project was authorized by the Flood Control Act
approved June 22, 1936. (See H. Doc. 308, 74th Cong., 1st sess.)
   Local cooperation.-Section2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-All project structures
were operated and maintained in a serviceable condition. Relocation
1082      REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

of Osage County roads was completed by contract on January 15,
1952, making the reservoir fully effective for flood-control storage on
that date. Relocation of Oklahoma State Highway No. 99 was com-
pleted, by contract, on August 21, 1951. Closing out of all land pur-
chase and condemnation cases was continued to 99 percent completion.
   The cost during the fiscal year was $157,690.07 for new work and
$68,089.16 for maintenance. The expenditures were $280,092.90.
   Condition at end of fiscal year.-The dam was constructed under a
two-phase program. The first phase, covering construction of the
embankment and excavation for the spillway was started May 3, 1946,
and completed August 7, 1947. The second stage, consisting of con-
struction of the embankment closure section and spillway was started
April 5, 1948, and completed June 20, 1950. Impoundment of the
conservation pool was completed September 24, 1951. However
until January 15, 1952, the project was operated as a detention reser-
voir, pending completion of all required relocations. The work re-
maining to complete the project consists of construction of certain
maintenance and operation facilities, including quarters for operative
personnel, development of recreational and public-use facilities and
construction of a public overlook shelter and comfort station.
  The total cost of new work to the end of the fiscal year was
$10,916,823.01 and the total cost of maintenance was $101,783.12. .The
total expenditures were $11,016,149.91.
  Proposed operations.-The balance unexpended on June 30, 1952,
$86,434.05, plus $404.23 accounts receivable, and an allotment for fiscal
year 1953 of $63,000 for maintenance, a total of $149,838.28, will be
applied as follows:
Accounts payable, June 30, 1952----------- --------------                  $58, 440. 56
New work:
    Completion of engineering studies and reports includ-
     ing preparation of operation and maintenance man-
     ual, by hired labor, June 1952 to July 1953_        -___.
                                                           $4, 077. 88
    Completion of all land purchase and condemnation
     cases including disposal of buildings and improve-
     ments in place, by hired labor, June 1952 to July
     1953 ------------------------------                --  2, 519. 00
    Construction of miscellaneous accessories, consisting
      of road barricades, remodel and painting of exist-
     ing warehouse purchased from the prime construc-
     tion contractor, by hired labor, October 1952 to
     April 1953                                                000. 00
                                                            1--------------------------------,
    Continuation of reservoir development and public-use
     facilities, by hired labor, November 1952 to June
     1953 ----------------------------------               19, 000. 00
        Total for new work---------___                    ___---  -_________ 26, 596. 88
Maintenance :
    Operation of completed structures--------------_,            $17, 600. 00
   Ordinary maintenance and repairs-----              ________    22, 100. 00
   Reservoir management and maintenance of public-use
      facilities       ---------------------------------          16, 800. 00
   Stream gaging, reservoir operation studies and other
      special engineering studies and investigations...            8, 300. 84
         Total for maintenance       ------------------------------             64, 800. 84
         Total for all work --.                                                149, 838. 28
                   FLOOD         CONTROL-TULSA,                       OKLAHOMA,           DISTRICT                  1083
  The sum of $71,000 can be profitably expended for the following
schedule of work during fiscal year 1954:
Maintenance:
   Operation of completed structures-------------------------- $41, 000
   Ordinary maintenance and repairs_    _____-- __________-     30, 000

        Total for maintenance                      ---------------------------------                               71, 000

                                         Cost and financial summary

                                                       Fiscal year ending June 30                            Total to June
                                                                                                            30, 1952, includ-
                                                                                                            ing fiscal years
                                     1948            1949            1950        1951          1952           priorto 1948

New work:
   Appropriated-_,..... $1,100,000.            $4,248,000.00
                                 00 $2,000,000.00            $195, 700. 00 -$222,839.29 $10, 999, 000.
                                                                                                     00
             ____
   Cost--------        _ 332,750.633,218,368.124,571,617.35 1,158, 074.38 157,690.07     10,916,823.01
   Expenditures ------       565.74 2,379,
                          325,           925.124,804,251.62 1,764,364.98 211,796.63      10,914,814.63
Maintenance:
   Appropriated------.....--...--------..............------_.....------------   42, 000.00    61, 583. 9E        103, 583. 96
   Cost ...-------------------------------------                                33, 693.96    68, 089.1          101, 783.12
   Expenditures ....-----------                    -    ..............-   -     33, 039. 00   68, 296. 28        101, 335.28


Other new work data:
    Unobligated balance, June 30, 1952 -----------------------                                              $71, 374. 98
    Unobligated balance available for fiscal year 1953-------------                                          71, 374. 9&

   21. COUNCIL GROVE RESERVOIR, GRAND (NEOSHO) RIVER BASIN,
                                                              KANS.
   Location.-The Council Grove Dam site is located on the Grand
 (Neosho) River, about 449.9 miles above its mouth and 2.5 miles north-
west of Council Grove, Morris County, Kans. (See U. S. Geological
Survey maps for Parkerville and Eskridge, Kans., quadrangles, scale
1: 125,000.)
   Existing project.-The plan of improvement provides for flood con-
trol and water conservation in the Grand (Neosho) River Basin by
the construction of an earthfill dam and concrete spillway with a total
length of about 4,120 feet, with a maximum height of 73 feet above
the stream bed. The spillway and control works will be combined in
the concrete structure, about 560 feet long and located near the right
abutment of the dam. The reservior will have a total capacity of
85,000 acre-feet, of which 60,000 acre-feet will be for flood control
and 25,000 acre-feet for water supply, pollution abatement, siltation,
recreation and preservation of fish and wildlife. The reservoir will
be operated as a unit of the reservoir system for flood control in the
Grand (Neosho) River Basin.
   The estimated costs (1952) are $5,485,000 for construction and
$3,525,000 for lands and damages, a total of $9,010,000.
   The project was authorized by the Flood Control Act approved May
17, 1950. (See H. Doc. 442, 80th Cong. 2d sess.).
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-None. There were no
costs or expenditures during the fiscal year.
1084    REPORT OF CHIEF OF ENGINEERS,         U.   S. ARMY,   1952

  Condition at end of fiscal year.-There have been no costs or ex-
penditures to date.
  Proposed operations.-No appropriation of funds have been made
and no work is scheduled for fiscal years 1953 and 1954.
  22. MARION RESERVOIR, GRAND (NEOSHO)             RIVER BASIN, KANS.

   Location.-The Marion Dam site is located on the Cottonwood River
about 126.7 miles above its mouth and 3 miles northwest of Marion,
Marion County, Kans. (See U. S. Geological Survey map for New-
ton, Kansas, quadrangle, scale 1: 125,000.)
   Existing project.-The plan of improvement provides for flood con-
trol and water conservation in the Grand (Neosho) River Basin by
the construction of an earthfill dam and concrete spillway with a total
length of about 7,000 feet, with a maximum height of 58 feet above the
stream bed. A dike about 1,065 feet long and 8 feet in maximum
height is provided in the right abutment. The spillway and control
works will be combined in the concrete structure about 480 feet long
and located near the right abutment of the dam. The reservoir will
have a total capacity of 90,000 acre-feet, of which 60,000 acre-feet will
be for flood control and 30,000 acre-feet for water supply, pollution
abatement, siltation, recreation and preservation of fish and wildlife.
The reservoir will be operated as a unit of the reservoir system for
flood control in the Grand.(Neosho) River Basin.
   The estimated costs (1952) are $5,562,000 for construction and
$1,728,000 for lands and damages, a total of $7,290,000.
   The project was authorized by the Flood Control Act approved May
17, 1950. (See H. Doc. 442, 80th Cong. 2d sess.)
   Local cooperation.-Section2 of the Flood Control Act, approved
June 28, 1938, applies.
   Operations and results during fiscal year.-None. There were no
costs or expenditures during the fiscal year.
   Condition at end of fiscal year.-There have been no costs or expend-
itures to date.
   Proposed operations.-No appropriation of funds has been made
and no work is scheduled for fiscal years 1953 and 1954.
23. CEDAR POINT RESERVOIR, GRAND (NEOSHO) RIVER BASIN, KANS.

   Location.-The Cedar Point Dam site is located on Cedar Creek
about 4.2 miles above its mouth and 2 miles south of Cedar Point,
Chase County, Kans. (See U. S. Geological Survey maps for Cot-
tonwood Falls, Kans., quadrangle, scale 1: 125,000.)
  Existing project.-The plan of improvement provides for flood
control and water conservation in the Grand (Neosho) River Basin
by the construction of an earthfill dam and concrete spillway with a
total length of about 3,580 feet, with a maximum height of 83 feet
above the stream bed. The spillway and control works will be com-
bined in the concrete structure about 484 feet long and in the valley
near the middle portion of the dam. The reservoir will have a total
capacity of 55,000 acre-feet, of which 36,200 acre-feet will be for flood
            FLOOD   CONTROI---TULSA,    OKLAHOMA,   DISTRICT       1085
control and 18,800 acre-feet for water supply, pollution abatement,
siltation, recreation and preservation of fish and wildlife. The
reservoir will be operated as a unit of the reservoir system for flood
control in the Grand (Neosho) River Basin.
  The estimated costs (1952) are $5,285,000 for construction and
$675,000 for lands and damages, a total of $5,960,000.
  The project was authorized by the Flood Control Act approved
May 17, 1950. (See H. Doc. 442, 80th Cong. 2d sess.)
  Local cooperation.-Section 2 of the Flood Control Act, approved
June 28, 1938, applies.
   Operations and results during fiscal year.-None. There were no
costs or expenditures during the fiscal year.
   Condition at end of fiscal year.-There have been no costs or
expenditures to date.
  Proposed operations.-No appropriation of funds has been made
and no work is scheduled for fiscal years 1953 and 1954.
24. STRAWN RESERVOIR,        GRAND     (NEOSHO)   RIVER BASIN, KAN~
    Location.-The Strawn Dam site is located on the Grand (Neosho)
River about 358.3 miles above its mouth and 1.5 miles northwest of
Strawn, Coffey County, Kans. (See U. S. Geological Survey maps
for Burlington and Emporia, Kans., quadrangles, scale 1: 125,000.)
    Existing project.-The plan of improvement provides for flood
control and water conservation in the Grand (Neosho) River Basin
by the construction of an earthfill dam and concrete spillway with a
total length of about 10,650 feet, with a maximum height of 71 feet
above the stream bed. The spillway and control works will be com-
bined in the concrete structure about 1,090 feet long and located in
the valley near the middle portion of the dam. The reservoir will
have a total capacity of 387,900 acre-feet, of which 320,600 acre-feet
will be for flood control and 67,300 acre-feet for water supply, pollu-
tion abatement, siltation, recreation and preservation of fish and
wildlife. The reservoir will be operated as a unit of the reservoir
system for flood control in the Grand (Neosho) River Basin.
    The estimated costs (1952) are $16,203,000 for construction and
 $21,831,000 for lands and damages, a total of $38,034,000.
    The project was authorized by the Flood Control Act approved
May 17, 1950. (See H. Doc. 442, 80th Cong., 2d sess.)
   Local cooperation.-Section 2 of the Flood Control Act, approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Preliminary studies
preparatory to preparation of detailed construction plans and speci-
fications were continued to approximately 80 percent completion.
   The cost during the fiscal year was $197,957.58 and the expenditures
were $199,363.89, all for new work.
   Condition at end of fiscal year.-Engineeringstudies and investiga-
tions were continued.
   The total cost to the end of the fiscal year was $197,957.58 and the
expenditures were $199,363.89.


     245554-53-vol. 1   69
1086         REPORT OF CHIEF OF ENGINEERS,                                              U.   S. ARMY, 1952

  Proposed operations.-The balance unexpended on June 30, 1952,
$50,636.11, plus accounts receivable in the amount of $1,943.89, and
an allotment of $100,000 during fiscal year 1953, a total of $152,580
new work funds, will be applied as follows: $537.58 will be utilized
in payment of accounts outstanding on June 30, 1952, and the re-
mainder, $152,042.42, will be applied in payment of expenses incurred
in continuing the engineering studies and investigations that are now
under way and in preparation of detailed plans and specifications for
initial construction contracts to be awarded after fiscal year 1953.
  The sum of $100,000 can be profitably expended during fiscal year
1954 to continue engineering studies and preparation of detailed plans
and specifications.
                                             Cost and financial summary

                                                             Fiscal year ending June 30                           Total to June
                                                                                                                  30, 1952, includ-
                                                                                                                  ing fiscal years
                                         1948              1949              1950         1951        1952          priorto 1948


New work:
   Appropriated          ....------------------       -------------------------------... $250, 000. 00                $250, 000. 00
   Cost_----- --------------           ---------------                --------      ------------   197, 957. 58        197, 957. 58
   Expenditures....       ----------------------------------------------                           199, 363. 89        199, 363. 89


Other new work data:
    Unobligated balance, June 30, 1952                                 -----------------------
                                                                      $48, 563.47
    Appropriated for fiscal year ending June 30, 1953------------     100, 000. 00
    Unobligated balance available for fiscal year 1953                148, 563. 47  -----------
    Estimated additional amount needed to be appropriated for
      completion of existing project----------------------        37, 684, 000.00

     25. PENSACOLA RESERVOIR, ARKANSAS RIVER BASIN, OKLA.

   Location.-PensacolaDam is located on the Grand (Neosho) River,
77 miles above its mouth, and adjacent to the town of Disney, Mayes
County, Okla. (See U. S. Geological Survey maps for Pryor, Wyan-
dotte, Vinita (Okla.), and Siloam Springs (Ark.), quadrangles,
scale 1: 125,000.)
   Existing project.-Duringfiscal year 1941 the Grand River Dam
Authority, an agency of the State of Oklahoma, under a license dated
July 26, 1939, issued by the Federal Power Commission, completed
the construction of a reservoir for flood control and hydroelectric
power at the Pensacola site in the Arkansas River Basin. The dam
is of the concrete, multiple arch type, 6,565 feet long and 147 feet above
the stream bed. The existing dam and reservoir provides 1,653,000
acre-feet of storage to top of power pool and 245,000 acre-feet of
flood-control storage. The flood-control storage lies between eleva-
tions 745 and 750. However, under the terms of the Federal Power
Commission license, the dam and appurtenant structures were con-
structed to a height which would allow storage of flood waters to
elevation 755 (Pensacola datum) at the Pensacola Dam, when neces-
sary lands or rights of way were acquired by the Federal Government.
   The Flood Control Act approved August 18, 1941, modified the
            FLOOD       CONTROL-TULSA,               OKLAHOMA,   DISTRICT      1087
general comprehensive plan for flood control and other purposes for
the Arkansas River Basin to include the Pensacola, Markham Ferry,
and Fort Gibson Reservoirs in the Grand (Neosho) River Basin in
Oklahoma and Missouri, in accordance with recommendations bf the
Chief of Engineers in House Document No. 107, 76th Congress, first
session. The improvements recommended in that document included
a reservoir for flood control at the Pensacola site which provided for
960,000 acre-feet of flood-control storage.
   The existing project now provides for making available 278,000
acre-feet of flood-control storage between elevations 750 and 755
 (Pensacola datum), in addition to the storage provided in the project
as constructed by the Grand River Dam Authority. Flowage ease-
ments for certain portions of the necessary lands have been acquired
by the Federal Government through the Southwestern Power Admin-
istration, Department of the Interior, and the Federal Works Agency.
The estimated cost (1952) for acquisition of additional flowage ease-
ments necessary for operation of the reservoir to elevation 755 (Pen-
sacola datum) at the Pensacola Dam is $1,710,000.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal yecar.-Flood control storage
in the project was operated by the Grand River Dam Authority (an
agency of the State of Oklahoma) under the direction of the Corps
of Engineers. The Grand River Dam Authority was reimbursed
for their expense in connection with maintaining and operating
local protection works at Wyandotte, Okla.
   The cost during the fiscal year was $33.11 for new work and $625.76
for maintenance. The expenditures were $695.35.
   Condition at end of fiscal year.-Real estate planning studies neces-
sary prior to completion of the land acquisition program, initiated
by other agencies, are essentially complete.
   The total cost to the end of the fiscal year was $52,125.60 for new
work and $3,422.61 for maintenance. The total expenditures were
$55,543.94.
   Proposed operations.-The balance unexpended on June 30, 1952,
$781.66, and an allotment of $3,000 for maintenance, a total of $3,781.66
will be utilized for the following scheduled work during fiscal year
1953.
Accounts payable, June 30, 1952 -      ----- _                                  $4. 27
Maintenance:
    Expense in connection with maintaining and operating Wyandotte
      local protection works, by hired labor, July 1952 to June 1953__      1, 000. 00
    Stream gaging, reservoir operation studies and other special
      engineering studies and investigations_ -____-___                     2, 777.39
        Total for all work____________________--________                    3, 781. 66
   The sum of $3,400 can be profitably expended during fiscal year
1954 for maintenance and operation of the Wyandotte local protection
works and continued participation in the district stream gaging and
reservoir operation program.
1.088       REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                                 Cost and financial summary

                                              Fiscal year ending June 30                            Total to June
                                                                                                    30, 1952, includ-
                                                                                                    ing fiscal years
                              1948          1949            1950          1951           1952        priorto 1948

New work:
   Appropriated- ......-----
                          $12, 000.00   ..---------         ----------                $2, 260. 95        $52, 125.60
   Cost----------------     6, 808.21      $2, 823.09 ..------------        74.64          33.11          52, 125.60
   Expenditures ---------   6,159. 62       3, 391. 76      $79, 92         74.64          33.11          52, 125. 60
Maintenance:
   Appropriated--
                --    ------------ ------------------------              3, 200.00     1,000.00            4, 200.00
   Cost--------    ------------ ------------                             2, 796. 85      625.76            3, 422.61
   Expenditures-------------- ------------------------                   2, 756.10       662.24            3, 418.34


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project               $1, 657, 874. 40
                                                          _--------_

26. MARKHAM FERRY RESERVOIR, ARKANSAS                                          RIVER BASIN, OKLA.

   Location.-The Markham Ferry dam site is located on the Grand
 (Neosho) River, 47 miles above its mouth, and .2.5 miles north and
west of Locust Grove, Mayes County, Okla. (See U. S. Geological
Survey maps for Pryor and Vinita (Okla.) quadrangles, scale
1: 125,000.)
   Existing project.-The plan of improvement provides for combined
flood control and hydroelectric power in this portion of the Grand
(Neosho) River Basin, in the Arkansas River watershed in Oklahoma,
by construction of a concrete gravity type dam and earthfill embank-
ment structure 3,855 feet in total length along the crest, rising 88
feet above the stream bed, with a reservoir providing for the storage
of 233,000 acre-feet for flood control and 187,000 acre-feet for storage
to top of power pool. The project will include a powerhouse structure
housing the hydroelectric generating equipment, a gate-controlled
spillway, and two nonoverflow abutment sections. A concrete gravity
nonoverflow section will form the left abutment of the structure and
the right abutment will be earthfill embankment. The powerhouse
structure will be located on the right bank with the spillway structure
extending across the existing river channel. The entire dam structure
will be topped by a roadway. The reservoir will be operated as a unit
of the three-reservoir system for dual purpose flood control and hydro-
electric power on the lower Grand (Neosho) River, and as one unit in
the comprehensive plan for flood control of the Arkansas River Basin.
   The estimated costs (1952) are $26,897,000 for construction and
$11,553,000 for lands and damages, a total of $38,450,000.
   The existing project was authorized by the Flood Control Act
approved August 18, 1941. (See H. Doc. 107, 76th Cong., 1st sess.,
which contains the latest published maps.)
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Engineering planning
studies and investigations were continued, by hired labor.
   The cost and expenditures during the fiscal year were $889.93.
                  FLOOD CONTROL--ULSA,                               OKLAHOMA,                DISTRICT                     1089
   Condition at end of fiscal year.--Preparationof detailed plans are
approximately 23 percent complete. Design of powerhouse and power
generating facilities was 17 percent complete.
   The total cost to the end of the fiscal year was $288,703.47, all for
new work. 'The total expenditures were $287,695.47.
  Proposed operations.--The balance unexpended on June 30, 1952,
$15,928.00 will be applied as follows: $1,008 will be utilized in pay-
ment of accounts outstanding on June 30, 1952, and the remainder,
$14,920.00, will be utilized in payment of expenses incurred in termina-
tion of engineering service contract for design of powerhouse and
power generating facilities.
  No work is scheduled for fiscal year 1954.
                                        Cost and financial summary

                                                       Fiscal year ending June 30                                   Total to June
                                                                                                                   30, 1952, includ-
                                                                                                                   ing fiscal years
                                   1948              1949           1950              1951            1952          priorto 1948

New work:
   Appropriated-       -------------------------------                       -----------          -$241,833.26         $303, 623.47
   Cost-------------               $9, 777. 32        $6, 000.59   $6, 747. 82]            -------       889. 93        288, 703. 47
    Expenditures                  10, 902. 79        5, 585. 87     6, 604.58       $2, 039. 96         889. 93         287, 695.47


Other new work data: Estimated additional amount needed to
  be appropriated for completion of existing project---------$38, 146, 376. 53

     27. FORT GIBSON RESERVOIR, ARKANSAS RIVER BASIN, OKLA.

   Location.-The Fort Gibson dam site is located on the Grand
 (Neosho) River, 7.7 miles above its mouth, and about 5 miles north
and east of Fort Gibson, Muskogee County, Okla. (See U. S. Geo-
logical Survey maps for Muskogee and Pryor, Okla., quadrangles,
scale 1: 125,000.)
   Existing project.-The plan of improvement provides for com-
bined flood control and hydroelectric power development in the por-
tion of the Grand (Neosho) River Basin, in the Arkansas River
watershed in Oklahoma, by a concrete gravity-type dam, 2,850 feet
long at the top, rising 110 feet above the stream bed, with a reservoir
providing for the storage of 922,000 acre-feet for flood control and
365,000 acre-feet for storage to top of power pool. The project will
include a powerhouse structure housing the hydroelectric generating
equipment, a gate-controlled spillway, and two nonoverflow abut-
ment sections. The powerhouse structure will be located on the left
bank of the existing river channel with the spillway structure ex-
tending across the river channel and a major portion of the right
bank flood plan. The reservoir will be operated as a unit of the
three-reservoir system for dual purpose flood control and hydro-
electric power on the lower Grand (Neosho) River, and as one unit
in the comprehensive plan for flood control of the Arkansas River
Basin.
1090    REPORT OF CHIEF OF ENGINEERS, U.        S. ARMY,   1952

   The estimated costs (1952) are $28,765,600 for construction and
$13,784,400 for lands and damages, a total of $42,550,000. The esti-
mated cost of annual maintenance is $443,300 (1952).
  The War Department Civil Appropriation Act, 1947 (Public Law
374, 79th Cong.), approved May 2, 1946, provided that in the con-
struction of the Fort Gibson flood control project in Oklahoma, the
Chief of Engineers is authorized and directed to cooperate with the
officials of the city of Muskogee in protecting the domestic water
supply of such city.
   The existing project was authorized by the Flood Control Act
approved August 18, 1941. (See H. Doc. 107, 76th Cong., 1st sess.,
which contains the latest published maps.)
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal year.-Construction of the
project as a whole was continued from 68 to 86 percent completion.
All construction contracts under way at the beginning of the fiscal
year were completed, with the exception of certain contracts covering
delivery of power generating equipment and construction of the power-
house and switchyard. Construction and procurement of these power
facilities was continued from 42 to 71 percent completion.
   Relocation and alteration of railroads, highways and pole lines
were continued to 74 percent completion.          Relocations covering
Wagoner and Mayes County roads and relocation and alteration of
the Missouri, Kansas & Texas Railway facilities are presently under
way, by contract.
   The existing works were operated throughout the fiscal year as a
detention reservoir, pending completion of required relocations and
certain phases of powerhouse construction. All completed structures
were maintained in a serviceable condition, by hired labor.
   The cost of all work during the fiscal year was $3,783,523.02 for
new work and $155,706.08 for maintenance. The expenditures were
$5,129.223.87.
   Condition at end of fiscal year.-Initial project construction began
in March 1942 with the construction of temporary field office build-
ings, but further construction at the project was held in abeyance
during World War II. Construction of the concrete dam and spill-
way, the largest single feature of the project, started by contract on
May 22, 1946, was completed on June 15, 1950, at a total cost of
$17,058,525.
  As parts of the highway relocation work were constructed in ac-
cordance with the desires of the Oklahoma Highway Department,
utilizing their specifications, the State of Oklahoma contributed
$34,340.12 for fiscal year 1950, and $80,933.58 during fiscal year 1951,
to defray the extra expense incurred by the Government in construct-
ing the improved facilities. In general, the work remaining to com-
plete the project, in addition to that work currently under way,
consists of construction of floating bulkhead, administration and
maintenance building.
            FLOOD     CONTROL---TULSA,           OKLAHOMA,               DISTRICT         1091
  The total cost to the end of the fiscal year was $36,328,034.28, of
which $35,868,313.36 was from new work funds, $344,447.22 was from
maintenance funds and $115,273.70 was from contributed funds. The
total expenditures to the end of the fiscal year were $35,397,758.49,
of which $35,282,484.79 was from regular funds and $115,273.70 was
from contributed funds.
  Proposed operations.-The balance unexpended June 30, 1952,
$6,165,725.21, plus $21,384.04 accounts receivable and allotments for
fiscal year 1953 in the amounts of $522,000 for new work and $190,000
for maintenance, a total of $6,899,109.25, will be applied to the fol-
lowing scheduled work:
Accounts payable, June 30, 1952__------------------ ---------                       $961, 763. 21

New work:
   Continued construction on powerhouse, switchyard and pro-
     curement of power generating equipment, by continuing
     contracts, July 1952 to June 1953_________        _______                  2, 253, 752. 00
   Construction of floating bulkhead, by contract, September
     1952 to July 1953--___________             ___                                   55, 000. 00
   Construction of maintenance buildings including service roads
     and utilities, by contract, April to July 1953_                                 174, 500. 00
   Completion of highway, railroad and utility line relocations,
    by continuing contract, July 1952 to June 1953_                             2, 175, 697. 00
   Completion of engineering and design studies except for prep-
     aration of operations manual, by hired labor, July 1952
     to June 1953 ---       - -       -    --.                                       201, 025. 26
   Completion of all land acquisition, by hired labor, July 1952
     to June 1953                                                                    267, 959. 00
      Total for new work     --------------------------------                   5, 127, 933.26

Maintenance :
   Operation of completed structures_                                                 70, 000. 00
    Ordinary maintenance and repairs_                                                 60, 000. 00
   Reservoir management, including out-leasing and mainte-
      nank of public-use areas_                                                       43, 000. 00
    Stream gaging, reservoir operation studies and other special
      engineering studies and investigations______________ __                         21, 262. 78
      Total for maintenance-------------------------------194,262.78
    Reserve for possible construction of Muskogee water line___ 615, 150. 00
      Total for all work                                                        6____________----_____
                                                                                6, 899, 109. 25
   The sums of $300,000 for new work and $345,000 for maintenance
can be profitably expended for the following schedules of work during
fiscal year 1954:
New work: Initiate construction of water supply line from the reser-
   voir to the City of Muskogee, Okla., by continuing contract,
   July 1953 to June 1954------         -   -                                          $300, 000
Maintenance:
     u eration--   -- - - - - - - - - - - - - - - - - - - - - - --                      207, 600
    Ordinary maintenance and repairs   3-----------------------------
                                                                                        137, 400
      Total for maintenance .....      -------------------------------                  345, 000
      Total for all work --------__.   -----------------------------                    645, 000
1092              REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

                                                       Cost and financial summary

                                                                         Fiscal year ending June 30                                Total to June
                                                                                                                                  30,1952, includ-
                                                                                                                                  ing fiscal years
                                1948                    1949                     1950               1951             1952          priorto 1948

New work:
Appropri-
  ated-.... $5, 000, 000.00 $9, 000, 000.00 $12, 000,000.00 $4, 946, 500.00 $2, 400, 000. 00 1$41, 099, 500.00
Cost-.......            7, 200, 942. 96         9, 347, 648.17              5, 452, 678. 85   5, 574, 800. 37   3, 783, 523.02    135, 868, 313.36
Expendi-
  tures _.. .            6, 302, 647.29          9,149, 125.24               5, 989, 353. 98   4,172, 944.89     4, 971, 916.90    134, 934, 999. 27
Maintenance:
  Appropri-
    ated...----- _ __..............._-------------                              58, 000.00       133, 500.00       157, 210.00         348, 710.00
  Cost---------           -- -----------
                                     ____ _                   - ___-__  --      53, 375. 71      135, 365.43       155, 706.08         344, 447.22
  Expendi-
    tures--......----------------------..............-----.............         46, 541.06       143, 637.49       157, 306.97         347, 485.52


Other new work data:
    Unobligated balance, June 30, 1952-----------------------      $581, 179. 70
    Appropriated for fiscal year ending June 30, 1953--------      -522, 000. 00
    Unobligated balance available for fiscal year 1953---------   1,103, 179. 70
    Estimated additional amount needed to be appropriated for
      completion of existing project ---------             ___-__    928, 500. 00
  1 Does not include $115,273.70 contributed funds.

28. TENKILLER FERRY RESERVOIR, ARKANSAS RIVER BASIN, OKLA.
    Location.-The Tenkiller Ferry dam site is located on the Illinois
River 13 miles above its confluence with the Arkansas River, and about
7 miles northwest of Vian, and 7 miles northeast of Gore, Sequoyah
County, Okla. (See U. S. Geological Survey maps for Muskogee
  (Okla.) and Tahlequah (Okla. and Ark.) quadrangles, scale
1: 125,000.)
   Existing project.-The plan of improvement provides for combined
flood control and hydroelectric power development in the Illinois
River Basin, by construction of an earthfill dam 3,000 feet long and
rising 197 feet above the river bed. The reservoir provides for the
storage of 600,000 acre-feet for flood control and 630,000 acre-feet of
storage to the top of power pool or total gross capacity of 1,230,000
acre-feet. A gated concrete spillway is provided at a saddle in the
right abutment and a 19-foot diameter gated conduit through the
ridge forms the outlet works. A second 19-foot gated conduit, ad-
jacent to the outlet conduit, forms a power penstock. A dike 1,350
feet long and with a maximum height of 25 feet extends along the
saddle ridge between the dam and spillway.
   The estimated costs for the project (1952) are $18,559,000 for con-
struction and $4,216,000 for lands and damages, a total of $22,775,000.
The estimated cost of annual maintenance is $327,700 (1952).
   The project, as authorized by the Flood Control Act approved
June 28, 1938 (See Committee Doc. No. 1, 75th Cong., 1st sess.), was
modified by the River and Harbor Act approved July 24, 1946, to pro-
vide for a storage of 600,000 acre-feet for flood control, 345,000 acre-
feet for power draw-down and 285,000 acre-feet for dead storage, and
the installation of two generators with a total capacity of 34,000
kilowatts.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
           FLOOD CONTROL---TULSA,     OKLAHOMA,     DISTRICT      1093
   Operations and results during fiscal year.-Construction of the
project as a whole was continued from 60 to 77 percent completion.
All major features under way, by contract, at the beginning of the
fiscal year were completed with the exception of certain contracts
covering delivery of power generating equipment, spillway crest
gates and construction of powerhouse and switchyard. Construc-
tion and procurement of power facilities was continued from 17 to 60
percent completion.
   Relocation and alteration of highways, pole lines and cemeteries
were continued to 48 percent completion. Relocation of county roads
including construction of bridges are currently under way in Cherokee
and Sequoyah Counties.
   The existing works were operated throughout the fiscal year as a
detention reservoir, pending completion of the embankment and re-
quired relocations. All completed structures were maintained in a
serviceable condition, by hired labor.
   The cost of all work during the fiscal year was $4,250,880.86. The
cost from regular funds was $4,208,568.58 for new work and $41,366.35
for maintenance, while the cost from contributed funds was $945.93.
The expenditures were $4,621,689.93 from regular funds and $945.93
from contributed funds.
   Condition at end of fiscal year.-Initial project construction, con-
sisting of access road construction, clearing dam site and first stage
embankment construction, was started June 17, 1947. Construction
of the second stage embankment including closure was started March
14, 1950, and completed May 2, 1952, while construction of the spill-
way, outlet and diversion tunnels, gate tower and access road to the
powerhouse, started February 9, 1949, and was completed July 12,
1951.
   Since a bridge was constructed in accordance with the desires of the
Cherokee County highway commissioners, utilizing their specifica-
tions, Cherokee County contributed $945.93 during fiscal year 1952 to
defray the extra expense incurred by the Government in constructing
the improved facilities.
   In general, the work remaining to complete the project, in addition
to that work currently under way, consists of construction of quarters
for operative personnel, additional public-use and recreational facili-
ties, bituminous surfacing of powerhouse access road, procurement of
minor additional power equipment, and final improvements to the
control area.
   The total cost to the end of the fiscal year was $18,171,740.98, of
which $18,129,428.70 was from new work funds, $41,366.35 was from
maintenance funds and $945.93 was from contributed funds. The
total expenditures to the end of the fiscal year were $17,624,841.33, of
which $17,623,895.40 was from regular funds and $945.93 was from
contributed funds.
   Proposed operations.-The balance unexpended June 30, 1952,
$2,412,109.33, plus $1,366.22 accounts receivable and allotments for
fiscal year 1953 of $2,115,000 for new work and $95,500 for mainte-
1094        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                       1952

nance, a total of $4,623,975.55, will be utilized during fiscal year 1953
for the following schedule of work:
Accounts payable, June 30, 1952_--__-__-__---                                _----------         $559, 35& 94
New work:
    Continue construction of powerhouse, switchyard and pro-
      curement of power generating equipment, by continuing
      contracts, July 1952 to June 1953_______---------------                                   2, 122, 265. 00
    Furnish and install crest gates and hoists, by continuing
      contract, July 1952 to June 1953                                                                232. 00
                                                                                                  6__________-------------54,
    Complete relocation and alteration of county roads, by
      contracts, July 1952 to April 1953-__------------------                                     742, 971. 00
    Outstanding cost on essentially completed contracts covering
      completion of embankment, outlet and diversion tunnels,
      clearing of reservoir area and grouting ridge, July to
      October 1952_____________________________---------------------------------------            192, 110.00
    Complete acquisition of all required lands and rights of way,
      by hired labor, July 1952 to June 1953_ __                __----------                       78, 099. 00
    Construct bituminous access road to powerhouse, by continu-
      ing contract, April to June 1953___ ___          _      ______------                         22, 000. 00
    Complete preparation of all detailed contract plans and speci-
      fications, by hired labor, July 1952 to June 1953------ _                                   151, 005. 96

          Total for new work ___- ________--  -----------        3, 962, 682. 96
Maintenance :
   Operation of completed structures___------------------------      38, 000. 00
   Ordinary maintenance and repairs------------------------24, 100. 00
   Reservoir management, including out-leasing and mainte-
      nance of public-use areas ______________________-____-23, 700. 00
    Stream gaging, reservoir operation studies and other special
      engineering studies and investigations___                      16, 133. 65
               Total for maintenance____-                       _______- -     -___               101, 933. 65

              Total for all work__--------------------------                                    4, 623, 975. 55
   The sums of $350,000 for new work and $216,000 for maintenance
can be profitably expended for the following schedule of work during
fiscal year 1954:
New work :
   Complete installation of crest gates, by continuing contract, July
     to September 1953__________________--------------------------- $92,400
   Complete bituminous access road to powerhouse, by continuing
     contract, July to December 1953---________----    _-----------       32, 600
   Construction of operators' quarters including extension of utility
     lines, by contracts, February to June 1954__________________         39, 500
   Construction of project access gravel roads and signs, by hired labor,
     October 1953 to June 1954___________________________________         63, 500
   Continuation of construction of initial public-use facilities, includ-
     ing gravel access roads and parking, toilets, drinking water,
     picnicking and camping facilities, and signs and markers, by hired
     labor, October 1953 to June 1954__________________________         _ 69, 500
   Planning and design for public-use facilities, by hired labor, July
     1953 to June 1954_ -------------------------------------- 11, 000
   Construction of accessories to construction, including final engineer-
     ing studies, by hired labor, July 1953 to June 1954-------------41, 500

          Total for new work ___        ________________________                                      350,000
Maintenance :
   Operation of completed structures ________-___    _______                                          123, 700
   Ordinary maintenance and repairs- ... __________________                                            92, 300
              Total for maintenance ___________________                                    __         216, 000
              Total for all work --------                  --                                         566, 000
                   FLOOD        CONTROL----TULSA,                          OKLAHOMA,                 DISTRICT               1095
                                          Cost and financial summary
                                                  UNITED STATES FUNDS

                                                              Fiscal year ending June 30                             Total to June
                                                                                                                    30, 1952, includ-
                                                                                                                    ing fiscal years
                                    1948                     1949         1950           1951           1952          priorto 1948

New work:
   Appropriated-......... $2,000,000.00 $2,800,000.00 $5,500,000.00 $5,065,000.00 $3,500,000.00                      $19, 988,204.73
   Cost,     -     -      1, 250, 281.30 2, 437, 968. 36 5, 021, 866.61 4, 826, 267. 87 4, 208, 568.58                18, 129, 428. 70
   Expenditures - - - - - 1,160, 581. 85 2,140, 527. 94 4, 266, 841.59 5, 060, 781. 35 4, 578, 997.20                 17, 581, 202.67
Maintenance:
   Appropriated...-----------------------------------------------                           47, 800.00                    47, 800.00
   Cost                                                                           -----     41,366.35                     41,366.35
   Expenditures --            --------------------------------------- 42, 692. 73                                         42, 692. 73


Other new work data:
    Unobligated balance, June 30, 1952_____-----------                                                                $11, 665. 47
    Appropriated for fiscal year ending June 30, 1953_____-__-- _                                                  2, 115, 000. 00
    Unobligated balance available for fiscal year 1953 ________                                                    2, 126, 665. 47
    Estimated additional amount needed to be appropriated for                                                                       -
      completion of existing project ________        _____-------------                                              671, 795. 27
                                                             CONTRIBUTED

                                                              Fiscal year ending June 30                             Total to June
                                                                                                                    30,1952, includ-
                                                                                                                    ing fiscal years
                                    1948                     1949         1950           1951           1952          priorto 1948


New work:
   Appropriated-        _      _._._
                                  -         -      -   _--     --   --            -----------.....
                                                                             -.....                     $945. 93             $945. 93
    Cost _          -           ---------------                                                          945.93               945.93
    Expenditures._                          --------------
                               __-----------_---                         ------------.-------            945.93               945. 93


              29. EUFAULIA RESERVOIR, CANADIAN RIVER, OKLA.
    Location.-The Eufaula dam site is located on the Canadian River,
27 miles above its confluence with the Arkansas River and about 12
miles east of Eufaula, McIntosh County, Okla. (See U. S. Geological
Survey maps for Okmulgee, Canadian, McAlester, and San Bois
 (Okla.) quadrangles, scale 1: 125,000.)
    Existing project.-The plan of improvement provides for flood
control, hydroelectric power, and sediment control on the Canadian
River as a part of the multiple purpose plan for development of the
Arkansas River Basin. The concrete and earthfill dam will be 3,180
feet long and rise 112 feet above the stream bed, and the reservoir will
have a storage capacity of 1,428,000 acre-feet for flood control 1,379,000
acre-feet for the generation of power and will provide a permanent
pool of 897,000 acre-feet for siltation, recreation, and preservation
of wildlife. A concrete channel spillway, controlled by twelve 40- by
32-foot gates on the weir crest, provides for the passage of flood flows
into the valley below. The powerhouse structure, which will be
located near the left side of existing river channel, will be connected
to the left abutment by a short earthfill embankment, and to the right
abutment by the spillway, a short nonoverflow section and the earth-
fill embankment. The reservior will be operated as a unit of the com-
prehensive system for improvement of the Arkansas River Basin for
flood control, navigation, hydroelectric power, and other purposes.
   The estimated costs (1952) are $56,542,000 for construction and
$82,908,000 for lands and damages, a total of $139,450,000.
1096         REPORT OF CHIEF               OF ENGINEERS,                U.   S. ARMY,           1952

   The existing project was authorized by the River and Harbor Act
approved July 24, 1946.
   Local cooperation.-Section 2 of the Flood Control Act approved
Jume 28, 1938, applies.
   Operations and results during fiscal year.-Only minor engineering
studies and investigations were continued.
   The cost during the fiscal year was $1,545.42, all for new work. The
expenditures were $1,155.06.
   Condition at end of fiscal year.-Engineeringstudies and site inves-
tigations preliminary to preparation of contract plans and specifica-
tions are essentially complete.
   Cost and expenditures to the end of the fiscal year totaled
$950,101.09, all for new work.
   Proposedoperations.--No work is scheduled during fiscal year 1953.
                                   Cost and financial summary

                                                Fiscal year ending June 30                            Total to June
                                                                                                      30, 1952, includ-
                                                                                                     ing fiscal years
                                1948          1949          1950          1951           1952         prior to 1948

New work:
   Appropriated.........   $500, 000. 00   $400,000.00 $150, 000.00     $50, 000. 00 -$149,898.91         $950, 101. 09
    Cost-__ _|_-_   _.--.
                     ...    479, 097. 67
                         S 464,032.88
                                            390, 576. 50
                                            404,942.15
                                                           63,245. 62
                                                           60, 830.60
                                                                         15, 635. 88
                                                                         19,140.40
                                                                                         1,545. 42
                                                                                         1,155.06
                                                                                                           950, 101.09
                                                                                                           950,101. 09


Other new work data: Estimated additional amount needed to
be appropriated for completion of existing project..--------- $138, 499, 898.91

         30. WISTER RESERVOIR, ARKANSAS RIVER BASIN, OKLA,
   Location.-The Wister dam site is located on the Poteau River
about 61 miles above its confluence with the Arkansas River and
about 2 miles south of Wister, Le Flore County, Okla. (See U. S.
Geological Survey maps for Winding Stair (Okla.) quadrangle,
scale 1: 125,000.)
   Existing project.-The plan of improvement provides for flood
control in the Poteau River Valley in the Arkansas River water-
shed by an earthfill dam about 5,700 feet long and rising 99 feet
above the riverbed, with a reservoir providing for the storage of
400,000 acre-feet for flood control and 30,000 acre-feet for siltation,
recreation and preservation of wildlife. An uncontrolled concrete
spillway located in a ridge in the right abutment provides for pas-
sage of flood flows into the valley below the dam. The outlet works
consist of two 16-foot by 12-foot 10-inch gated conduits near the
present channel. A dike about 2,400 feet long and 40 feet in maxi-
mum height is provided in the right abutment. The reservoir is
operated as a unit of the coordinated reservoir system for flood
control in the Arkansas River Basin.
  The estimated costs (1952) are $6,901,100 for construction and
$3,528,900 for lands and damages, a total of $10,430,000. The esti-
mated cost of annual maintenance is $141,000 (1952).
   The existing project was authorized by the Flood Control Act ap-
proved June 28, 1938. (See Flood Control Committee Dec. 1 75th
Cong., 1st sess.).
  Local cooperation.-Section2 of the Flood Control Act approved
June 28, 1938, applies.
                 FLOOD CONTROL---TULSA,                        OKLAHOMA,              DISTRICT                   1097
  Operations and results durinq fiscal year.--The project was oper-
ated and maintained in a serviceable condition throughout the year.
  The cost during the fiscal year was $80,866.63 for maintenance.
The expenditures were $62,797.74.
   Condition at end of fiscal year.-The project is essentially complete
and is in operation. Construction of the project was started April
10, 1946, and dedication ceremonies were held June 16, 1951.
   Although all land required for the project, 39,196 acres, has been
acquired, final settlements on some land await results of condemnation
proceedings. The work required to complete the project consists of
preparation of final reports.
   The total cost of new work to the end of the fiscal year was
$10,426,327.18, and the total cost of maintenance was $268,502.01. The
total expenditures were $10,641,971.37.
  Proposed operations.-The balance unexpended on June 30, 1952,
$56,219.01, plus $43.18 accounts receivable and an allotment for fiscal
year 1953 of $83,100 for maintenance, a total of $139,362.19, will be
utilized for the following schedule of work:
Accounts payable, June 30, 1952__________                                                                $52, 901.00
New work: Final cost for land acquired through condemnation
proceedings, preparations project completion reports and opera-
  tions manual------------------------------------------                                                    3, 672. 82
Maintenance :
   Operation of completed structures__---        ___---- ________-                                        20,000. 00
   Ordinary maintenance and repairs-- ---------------------                                               24,000. 00
   Reservoir management including out-leasing and maintenance
      of public-use facilities--___ ------------  ____-______                                              24, 700. 00
   Stream gaging, reservoir operation studies and other special
      engineering studies and investigations---------------        -                                       14, 088. 37
         Total for maintenance-------------------------------                                              82, 788. 37
      Total for all work-_ ___--------------__                                         -             . 139, 362. 19
                                                                                                    ._____
  The sum of $101,000 can be profitably expended for the following
schedule of work during fiscal year 1954:
Maintenance:
Operation of completed structures       ----------------------------- 47, 000
   Ordinary maintenance and repairs------ ---------------            -__-27,000
   Improvement and reconstruction _------------           ---- _____    27, 000
          Total for maintenance _....__                       -----------               _______               101, 000
                                      Cost and financial summary

                                                  Fiscal year ending June 30                             Total to June
                                                                                                         30, 1952, includ-
                                                                                                         ing fiscal years
                                   1948         1949           1950           1951          1952           prior to 1948

New work:
   Appropriated-..._ _.. $3,325,000.00 $4,008,500.00 $107, 320. 54          $92,000.  00 -$60,320.54      $10,430,  000.00
   Cost-              .--_
                         2, 213, 928. 91 4, 067, 707. 31 1, 044, 494.04
   Expenditures-........ 2, 066, 768. 76 4, 311, 887. 57 1, 159, 465. 38
                                                                            269, 822. 60 -2, 280. 80       10, 426, 327. 18
                                                                            264, 691.01 -14, 506. 67       10, 374, 664. 57
Maintenance:
    Appropriated ........--
                   __        ___ __..........
                                        _......... 107,100.00                83, 800. 00   77, 290. 38        268, 190. 38
    Cost....              ........................ 109, 750.49               77, 884. 89   80, 866. 63        268, 502. 01
    Expenditures....._ ___. ____ _______ -  __ ___ 103, 272. 68              86, 729. 71   77, 304.41         267, 306. 80


Other new work data:
      Unobligated balance, June 30, 1952_-------------                                                          $3, 630
      Unobligated balance available for fiscal year 1953--- ----.----                                            3, 630
1098    REPORT OF CHIEF OF ENGINEERS,        U.   S. ARMY,   1952

           31. ARKANSAS RIVER BASIN, TULSA DISTRICT

   Location.-These improvements are located on tributaries of the
Arkansas River and are in the States of Kansas and Oklahoma. More
definite locations of the individual items are given in the following
paragraph.
   Existing project.-The Flood Control Act approved June 28, 1938,
approved the general comprehensive plan for flood-control and other
purposes in the Arkansas River Basin, as set forth in Flood Control
Committee Document 1 (75th Cong., 1st sess.), with such modifica-
tions thereof as in the discretion of the Secretary of War and the
Chief of Engineers may be advisable, and authorized the sum of
$21,000,000 for reservoirs, for the initiation and partial accomplish-
ment of the plan, the reservoirs to be selected and approved by the
Chief of Engineers, subject to the provision that the authorization
shall include the Canton Reservoir on the North Canadian River in
Oklahoma, as set forth in House Document 569 (75th Cong., 3d sess.).
The Flood Control Act approved August 18, 1941, modified the
general comprehensive plan for the Arkansas River Basin to include
the reservoirs in the Grand (Neosho) River Basin in Oklahoma and
Missouri and in the Verdigris River Basin in Kansas, in accordance
with the recommendations of the Chief of Engineers in House Docu-
ments 107 and 440 (76th Cong., 1st sess.), and in addition to previous
amounts, authorized to be appropriated the sum of $29,000,000 for the
prosecution of the comprehensive plan. The Flood Control Acts
approved December 22, 1944, and July 24, 1946, June 30, 1948, and
May 17, 1950 authorized to be appropriated the additional sum of
$35,000,000, $40,000,000, $1,000,000 and $15,000,000, respectively, for
the prosecution of the comprehensive plan.
   The Flood Control Act approved May 17, 1950, modified the gen-
eral comprehensive plan for flood control and other purposes for
the Arkansas River Basin, approved by the Act of June 28, 1938, as
amended, and the multiple purpose plan for the Arkansas River and
tributaries, Arkansas and Oklahoma, approved by the River and
Harbor Act of July 24, 1946. The two stated plans were modified by
the substitution of the Keystone Reservoir on Arkansas River for
the Mannford Reservoir on the Cimarron River, and by the deletion
of the Blackburn and Taft Reservoirs on the Arkansas River, all in
accordance with the recommendations of the Chief of Engineers in
Senate Document 107 (78th Cong., 1st sess.) The reservoirs included
in the modified general comprehensive plan for flood control and
other purposes within the limits of the Tulsa district are listed below:
                                                                             Distance                                                                                                Power       Total   esti-
            Reservoir                               River                     above                  Nearest town                     Maximum height of               Reservoir      Power       Total esti
                                                                              mouthReservoir                                            dam and type                  capacity      develop-     mated cost,
                                                                              mouthdment                                                                                                          (1952) 1


                                                                                Miles                                                                                 Acre-feet     Kilowatts
Canton 2--- ..-.- __       .    -....- .   North Canadian ........------------.     394     Canton, Okla                          73 feet-earthfill---------------       390,000       (3)        4 $10, 373,000    I

Keystone 2--------- _-..               _ Arkansas------   ....    --------           539    Sand Springs, Okla --.. -- - 123 feet-earthfill - -.......                1, 879, 000      60, 000      127, 684, 000
Toronto 2-  -------------------            Verdigris ----------------..              271    Toronto, Kans_                        92 feet-earthfill- --........          195,000       (3)         4 17, 361, 000   0
Fall River 2------------------             Fall ----------- -----------               54    Fall River, Kans ...--         -..... 94 feet-earthfill---........           263, 000      (3)         410, 40, 000
Oologah2 ___________________ Verdigris------------.......                             90    Oologah, Okla ..........----..        129 feet earthfill---.........         975, 000      17, 000     4 29,580, 000
Tenkiller Ferry 2 ----------               Illinois--- -------------------             13   Vian, Okla-___-                       197 feet-earthfill --- ....            630,000       34,000        22, 775,000
Wister 2--                                 Poteau___.__.__.__.__..tea-                61    Wister, Okla _                        99 feet-earthfill -......              430, 000      (3)           10, 430, 000   0
Neodesha--------               __          Verdigris-------------------              223    Neodesha, Kans.____--          --...  35 feet-earthfill------.......          90,000       (3)         4 15,686,000
Elk City (Table Mound) .--- Elk- ---------- ------------                                9   Independence, Kans             ...... 95 feet-earthfill- -...........        289, 000      (3)         424, 390, 000
Markham Ferry 2----------                  Grand (Neosho) - -          ---            47    Locust Grove, Okla___________ 88 feet-concrete, earth- -------               420, 000      72, 000     538, 450. 000
Fort Gibson 2 .- -                       ---- do -----------------------                                                                                                                                            0
                                                                                     7. 7   Fort Gibson, Okla _ -_ ------110 feet-concrete gravity              .--   1, 287,000       73, 800       42, 550, 000

    1 Includes reservoir management and facilities for public use of the reservoir area.
    2 For details of this project, see individual report.
    3 None.
    4 Does not include power installation.
    5 Based upon initial installation of 2-18,000 kw power units.



                                                                                                                                                                                                                     .
                                                                                                                                                                                                                    0




                                                                                                                                                                                                                        j2"
1100           REPORT OF CHIEF OF ENGINEERS,                                        U.     S. ARMY,           1952

   Operations and results during fiscal year.-Work was continued
throughout the fiscal year on all reservoirs listed above. However,
with the exception of the Elk City (Table Mound) and Neodesha
Reservoirs, all of the above listed reservoirs are reported on indivi-
dually herein (see Tulsa district index). The cost and financial sum-
mary shown below covers only engineering studies and investiga-
tions, which have been made for the Elk City and Neodesha Reser-
voirs.
   The cost during the fiscal year, exclusive of projects reported else-
where, was $199.68 and the expenditures were $96.04, all for new
work.
   Condition at end of fiscal year.-The general comprehensive plaii,
including projects completed, under construction, and in planning
stage, was 25 percent complete. Engineering studies for the Elk
City and Neodesha Reservoirs are essentially complete for the definite
project plan.
   Cost and expenditures to the end of the fiscal year totaled $187,-
803.23, of which $89,893.23 was for Elk City (Table Mound) Reser-
voir and $97,910 was for Neodesha Reservoir.
  Proposed operations.-No work is scheduled during fiscal years
1953 and 1954.
                                           Cost and financial summary

                                                        Fiscal year ending June 30                                  Total to June
                                                                                                                   30, 1952, includ-
                                                                                                                   ing fiscal years
                                       1948            1949            1950           1951             1952         priorto 1948


New work:
   Appropriated----- .......                  ............
                               -$50, 000.00------------        --......-----...... -$45, 000. 00    -$7, 196. 77       $187, 803. 23
   Cost __--------------     -    44, 934. 66 $18, 829. 80            $8, 213. 98      4, 728. 68        199. 68        187, 803. 23
   Expenditures-....-----....     46, 049. 11       22, 326.31          5, 656. 59     7,218.97           96.04         187, 803. 23


Other new work data: Estimated additional amount needed to
  be appropriated for completion of existing project--------- $39, 888, 196. 77

   32. DENISON DAM (LAKE TEXOMA), RED RIVER, TEX. AND OKLA.

   Location.-The Denison Dam is located on Red River, 726 miles
above the mouth of the river and 5 miles northwest of Denison, Tex.
 (See U. S. Geological Survey maps for Denison, Tex., and Tishomingo,
Okla., quadrangles; scale 1:125,000.)
   Existing project.-The plan of improvement provides for the con-
struction of a rolled earth-fill dam 15,200 feet long, rising 165 feet
above the stream bed with the reservoir providing 2,690,800 acre-feet
of flood control storage, 1,813,800 acre-feet of power storage, and
1,211,100 acre-feet for accumulation of silt. The outlet works, con-
sisting of a gate-control house and eight conduits, each 20 feet in
diameter, and the powerhouse, are located on the right abutment. A
chute-type spillway located in a saddle on the right bank will dis-
charge through a creek to a point 1 mile below the dam. The plan
of improvement also provides for the diversion of the Washita River
and the construction of levees to protect the Cumberland oil field from
inundation.
           FLOOD   CONTROL--TULSA,    OKLAHOMA,     DISTRICT       1101

   The project provides for flood protection to lands in Texas, Okla-
homa, Arkansas, and Louisiana, the generation of power, improvement
of navigation, regulation of the flow of the Red River, and for other
beneficial uses.
   The estimated costs (based upon installation of three power gener-
ating units) (1952) are $39,745,000 for construction and $26,187,000
for lands and damages, a total of $65,932,000. The estimated cost of:
annual maintenance is $600,000 (1952).
   The existing project was authorized by the Flood Control Act
approved June 28, 1938, and amended by section 4, Public Law 868,
76th Congress, third session, approved October 17, 1940. (See H.
Doc. 541, 75th Cong., 3d sess., which contains the latest published
maps.)
    The congressional act, Public Law 454, 78th Congress, chapter 456,
second session, approved September 30, 1944, provided that from and
after the enactment of that act the lake formed by the impounding of
waters of the Red River by Denison Dam, shall be known and desig-
nated on the public records as Lake Texoma.
    Local cooperation.-Section 2 of the Flood Control Act, approved
June 28, 1938, applies.
    Operations and results during fiscal year.-Placement of riprap
protection, on the right bank downstream from the powerhouse, was
completed January 5, 1952, by contract. On April 12, 1952, work
was started, by contract, on extension of riprap on the upstream side of
the main dam embankment and at the end of the fiscal year this rip-
rap work was 11 percent complete. Cathodic protection for sluice
gates was completed, by contract, and repairs to power head gates were
continued, by hired labor.
    The project structures were operated and maintained in a service-
able condition throughout the fiscal year. Receipts from the sale
of power during the fiscal year totaled $947,189.12 and receipts from
out-leasing Government-owned land approximated $114,150.34.
    The cost during the fiscal year was $138,361.91 for new work and
$467,599.81 for maintenance. The expenditures were $667,640.51.
    Conditionat end of fiscal year.-The project as a whole is essentially
completed. Construction of the project was started in August 1939.
Storage of water for power generation was begun January 7, 1944,
and power from the first installed unit was available on March 9, 1945.
The second power unit was placed in operation on September 18, 1949.
The project as authorized provides for ultimate installation of five
power units. In addition to the work presently underway, the major
items of work remaining to complete the project, as presently author-
ized, consists of installation of vitreous tile floor in powerhouse,
completion of overlook building, and completion of recreational devel-
opment facilities.
    The total receipts from the sale of power generated at this project
amount to $6,488,050.38 and the total receipts from out-leasing Govern-
ment-owned land approximate $402,746.91. Such receipts are not
included in the cost and financial summary tabulated below.


      245554-53-vol. 1   70
1102     REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   The total cost of new work to the end of the fiscal year was
$59,718,351.78 and the total cost of maintenance was $2,941,932.97.
The total expenditures were $62,639,462.32.
   Proposedoperations.-Thebalance unexpended June 30,1952, $470,-
092.72, plus $2,374.32 accounts receivable and an allotment during
fiscal year 1953 of $400,000 for maintenance, a total of $872,467.04, will
be applied to the following schedule of work during fiscal year 1953:
Accounts payable, June 30, 1952_               -__________----------------- $78, 196. 75

New work:
   Complete extension of riprap on upstream side of main dam, by
     continuing contract, July 1952 to June 1953---------------            274, 188.00
   Install the floor and wainscoting in powerhouse, by contract,
     July 1952 to January 1953__________________                            22,500.00
   Installation of navigation lights on U. S. Highway No. 70 bridge
     and St. Louis-San Francisco railroad bridge, by contracts,
     July to November 1952-                                                  3,380. 00
   Furnish carrier current equipment, by supply contract, Septem-
     ber 1952 to J'une 1953_                                                13, 000. 00
   Installation of centralized lubricating system for station service
     units, continuation of powerhead gate repairs, and completion
     of outstanding land acquisition cases, by hired labor, July
     1952 to June 1953 ___.________                    _____                40, 948. 73
   Continuation of engineering studies including preparation of
     contract plans and specifications for installation of the 3rd
     power unit, by hired labor, July 1952 to June 1953_                    29, 620. 53
         Total for new work ____________________________
                               ---   --                                _   383, 637. 26
Maintenance:
    Operation of completed structures_ .... _______   _______     130,          300. 00
    Ordinary maintenance and repairs--------------------------123,              400. 00
   Reservoir management including out-leasing and maintenance of
      public-use facilities ______________---_________________     98,          600. 00
    Stream gaging, reservoir operation studies, and other special
      engineering studies and investigations _...____  __----__    58,          333. 03
         Total for maintenance ---------------------------------           410, 633. 03
         Total for all work __.________-___________--_____                 872, 467. 04
   The sums of $500,000 for new work and $416,000 for maintenance
can be profitably expended for the following schedule of work during
fiscal year 1954:
New work: Initiate construction covering installation of the third
   power generating unit, by continuing contracts, August 1953 to
   June 1954 ---------------------------------------------- $500,000.00

Maintenance:
   Operation of completed structures _______________--___-                 275, 000. 00
   Ordinary maintenance and repairs ____________________   _               100, 000.00
       Total for maintenance_________________-_-____--                     416, 000. 00
       Total for all work _____
                           ..                                     ___916,
                                                                      ___-__-_____________
                                                                               000. 00
                  FLOOD                CONTROL-TULSA,                            OKLAHOMA,                      DISTRICT                       1103

                                                     Cost and financial summary

                                                                Fiscal year ending June 30                                            Total to June
                                                                                                                                     30,1952, includ-
                                                                                                                                     ing fiscal years
                                              1948           1949               1950               1951                  1952          priorto 1948

New work:
   Appropriated -------------------- $499,600.00 $550,000.00 $208,000.00 $400,000.00                                                  $60,101,989.04
   Cost-              __ .$1,647,260.10   1, 791, 042. 88 882,101. 61 411, 477. 75 138, 361.91                                         59, 718, 351. 78
   Expenditures .--... -- 1, 409, 769. 79 1, 732, 376. 58 1, 081, 701.35 489, 417. 27 205, 127. 80                                     59, 699, 315. 99
Maintenance:
   Appropriated-----
                   .....---   423, 000. 00 310, 400. 00 523, 000. 00 492, 000.00 463, 334. 00                                             2, 952, 566. 00
   Cost                       411, 748. 78 319, 484.04 537, 459. 54 465, 592. 13 467, 599. 81                                             2, 941, 932. 97
   Expenditures--------. 406, 666. 83 326,144. 96 505, 462. 75 501, 290. 70 462, 512. 71                                                  2, 940,146. 33


Other new work data:
    Unobligated balance, June 30, 1952_______ ________-___.                                                                          $175, 617. 96
    Unobligated balance available for fiscal year 1953 ----------                                                                     175, 617. 96
    Estimated additional amount needed to be appropriated for
      completion of existing project _____
                                      -      -- ______________                                                                      5, 830, 010. 96

           33. RED RIVER BELOW DENISON DAM, TULSA DISTRICT

  Location.-The work covered by this project is located on the Red
River and its tributaries below Denison Dam, in Oklahoma, Arkansas,
Texas, and Louisiana.
  Existing project.-The Flood Control Act approved July 24, 1946,
approved the general plan for flood control on Red River below
Denison Dam, Tex. and Okla., which provides for the construction
of six flood control reservoirs in combination with existing or author-
ized Federal and non-Federal levee improvements, modified as re-
quired, and channel stabilization at locations where levee setbacks
are impossible or uneconomical. This act further authorized the
incorporation of the several separate existing projects for flood con-
trol along the Red River below Denison, above the jurisdiction of
the Mississippi River Commission, into this project. The total esti-
mated cost to the United States in the Tulsa district (1952) is $96,-
514,500 for construction and lands and damages. (See H. Doc. 602,
79th Cong., 2d sess.)
  Following are lists of the reservoirs and bank stabilization in the
Tulsa district included in the general flood control plan for the Red
River below Denison Dam:

                                                                                                                  Storage
         Project 1                                     Stream                     Drainage                                                Estimated
                                                                                    area             Conserva-               Flood con-     cost
                                                                                                       tion                     trol


                                                                                  Square
                                                                                    miles            Acre-feet         Acre-feet
Boswell Reservoir -....              Boggy Creek, Okla._ __ ...                       2, 273             35, 000        1, 100, 000        $23, 170,   000
Hugo Reservoir ...... _              Kiamichi River, Okla ......                      1, 706             20, 000            830, 000        20, 265,   000
Millwood Reservoir--.....            Little River, Ark-----------...........          4,144              52, 000        2, 208, 000         52, 855,   000
Bank stabilization_ .__.             Red River, Ark. (Index)               --...
                                                                             ........     ..............         ............----------
                                                                                                                  ------------                  224,   500
      Total.-.-      .............................                                .            . ............-............      -           96, 514, 500


  1 Details are presented in individual reports.
  s 1952.
  3 Details of entire program reported under New Orleans District.
1104         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                         1952

                  34. BOSWELL RESERVOIR, BOGGY CREEK, OKLA.

   Location.-The Boswell dam site is located on Boggy Creek, 17
miles above its mouth, and about 3 miles west of Soper, Choctaw
County, Okla. (See U. S. Geological Survey map for Antlers (Okla.)
quadrangle, scale 1 :125,000.)
   Existing project.-The plan of improvement provides for flood con-
trol in the Red River Basin by construction of an earthfill dam and
concrete structure 12,450 feet long and rising 95 feet above the stream
bed, with a reservoir providing for the storage of 1,100,00 acre-feet for
flood control and 35,000 acre-feet for siltation, recreation and preserva-
tion of wildlife. A concrete channel spillway, controlled by eleven 50-
by 25-foot gates on the weir crest, will provide for the passage of flood
flows into the river valley below. The reservoir will be operated as a
unit of a reservoir system for flood control in the Red River Basin.
   The estimated costs (1952) are $18,583,000 for construction and
$4,587,000 for lands and damages, a total of $23,170,000.
   The existing project was authorized by the Flood Control Act,
approved July 24, 1946.
   Local cooperation.-Section 2 of the Flood Control Act, approved
June 28, 1938, applies.
   Operations and results during fiscal year.-None.
   There were no costs during the fiscal year.
   Conditionat end of fiscal year.-Project is in preliminary engineer-
ing planning stage.
   The total cost and expenditures to the end of the fiscal year were
$128,786.19.
  Proposed operations.-No work is scheduled during fiscal years 1953
and 1954.
                                    Cost and financial summary

                                               Fiscal year ending June 30                         Total to June
                                                                                                 30, 1952, includ-
                                                                                                 ing fiscal years
                                1948          1949          1950         1951          1952        priorto 1948


New work:
                ......... $90, 000. 00 ....----------
   Appopriated--------                                   $100, 000. 00 -$60, 000.00 -$1, 213. 81     $128, 786. 19
   Cost__________ _----    50, 221. 22 $25,822. 31         29, 795. 64    22, 947. 02---.---...   -_ 128, 786. 19
   Expenditures------..... 50,140.23        25, 790.96     28, 956.99     23,909. 06       -11.05     128, 786. 19


Other new work data: Estimated additional amount needed to be
appropriated for completion of existing project________-- ___- $23, 041, 213. 81

                 35. HUGO RESERVOIR, KIAMICHI RIVER, OKLA.

   Location.-The Hugo dam site is located on the Kiamichi River,
20 miles above its mouth, and about 7 miles east of Hugo, Choctaw
County, Okla. (See U. S. Geological Survey map for Alikchi
 (Okla.) quadrangle, scale 1: 125,000.)
   Existing project.-The plan of improvement provides for flood con-
trol in the Red River Basin by construction of an earthfill dam and
concrete structure 6,335 feet long and rising about 89 feet above the
stream bed, with a reservoir providing for the storage of 830,000 acre-
feet for flood control and 20,000 acre-feet for siltation, recreation and
preservation of wildlife.                  A concrete channel spillway, controlled
                   FLOOD CONTROL--TULSA,                           OKLAHOMA,         DISTRICT           1105
by nine 50- by 25-foot gates on the- weir crest, will provide for the
passage of flood flows into the valley below. The reservoir will be
operated as a unit of a reservoir system for flood control in the Red
River Basin.
   The estimated costs, revised in 1952, are $17,334,000 for construc-
tion and $2,931,000 for lands and damages, a total of $20,265,000.
   The existing project was authorized by the Flood Control Act,
approved July 24, 1946.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
   Operations and results during fiscal' year.-None. There were no
,costs or expenditures during the fiscal year.
   Condition at end of fiscal year.-Project is in preliminary engi-
neering planning stage.
   The costs and expenditures to the end of the fiscal year totaled
$60,000.00.
   Proposed operations.-No work is scheduled during fiscal years
1953 and 1954.
                                       Cost and financial summary

                                                      Fiscal year ending June 30                 Total to June
                                                                                                30,1952, includ-
                                                                                                ing fiscal years
                                    1948            1949          1950        1951       1952     prior to1948

New work:
   Appropriated-__....           $60,000. 00 -                                                          $60, 000
   Cost----------      -----      23, 695.94     $30, 246. 10   $6, 053. 25    $4. 71 --....             60,000
   Expenditures.......--------    23, 665.37      30, 299. 18    5,864. 85    170. 60 ---                60,000


Other new work data : Estimated additional amount needed to be
appropriated for completion of existing project__------------ $20, 205, 000

                36. MILLWOOD RESERVOIR,                              LITTLE RIVER, ARK.

   Location.-The Millwood dam site is located on the Little River,
15.5 miles above its mouth, and about 10 miles northwest of Fulton,
Hempstead County, Ark. (See sectional aeronautical chart, Shreve-
port sheet, scale 1: 500,000.)
   Existing project.-The plan of improvement provides for flood con-
trol in the Red River Basin by construction of an earthfill dam and
concrete structure 18,900 feet long and rising about 97 feet above the
stream bed, with a reservoir providing for the storage of 2,208,000
acre-feet for flood control and 52,000 acre-feet for siltation, recrea-
tion, and preservation of wildlife. A concrete channel spillway,
controlled by twelve 40- by 30-foot gates on the weir crest, will provide
for the passage of flood flows into the valley below. The reservoir
will be operated as a unit of a reservoir system for flood control in
the Red River Basin.
   The estimated costs, revised in 1952, are $29,731,000 for construction
and $23,124,000 for lands and damages, a total of $52,855,000.
   The existing project was authorized by the Flood Control Act,
approved July 24, 1946.
   Local cooperation.-Section 2 of the Flood Control Act approved
June 28, 1938, applies.
1106       REPORT OF CHIEF OF ENGINEERS, U.                                    S. ARMY,            1952

   Operationsaind results during fiscal year.-Engineeringstudies, in-
vestigations and attendant cost were held to the minimum required to
complete the project site report.
   The cost during the fiscal year was $6,548.72 and the expenditures
were $4,340.15, all for new work.
   Condition at end of fiscal year.-Projectis in preliminary engineer-
ing planning stage. The preliminary planning is about 66 percent
complete.
   The total cost to the end of the fiscal year was $194,543.02 for new
work. The expenditures were $194,533.02.
   Proposed operations.-The balance unexpended at the end of the
fiscal year $296.80, will be utilized in payment of outstanding obliga-
tions.
   No additional work is scheduled during fiscal year 1953.
                                 Cost and financial summary

                                                 Fiscal year ending June 30                          Total to June
                                                                                                     30,1952, includ-
                                                                                                     ing fiscal years
                              1948              1949        1950           1951          1952         priorto 1948

New work:
   Appropriated__-__    ____...__._______ ________$200, 000. 00         $50, 000. 00 -$55,170.18          $194, 829. 82
   Cost- ------     ------        ---                     93, 909. 91    94, 084. 39    6, 548. 72         194, 543.02
   Expenditures_ -.    .           ..........            108, 781. 83    81,411.04      4, 340. 15         194, 533. 02


Other new work data : Estimated additional amount needed to be
  appropriated for completion of existing project________
                                                 ----          $52, 660, 170. 18

  37. RED RIVER LEVEES AND BANK STABILIZATION IN ARKANSAS
                     BELOW DENISON DAM

   Location.-The improvements covered by this project within the
Tulsa district are located along the left bank of Red River from the
vicinity of Index, Ark. (Tex.), downstream to Fulton, Ark.
   Existing project.-The plan of improvement provides for modi-
fication of existing and authorized Federal and non-Federal levees
and other flood control improvements, and for the protection of the
valley of the main stem of Red River by construction of revetment
and other channel stabilization work where needed to protect the
banks from caving at locations where levee setbacks are impossible
or uneconomical and to prevent the disruption to transportation facil-
ities when threatened by caving banks. The existing work to date
on the project has been confined to the vicinity of Index, Ark. (Tex.),
and includes construction of about 5,500 linear feet of revetment along
the left bank of Red River adjacent to the existing non-Federal levee
of the Ogden Levee district where construction of a setback levee
was impractical.
   The estimated Federal cost for this bank protection (1952) is
$224,500 and non-Federal costs, exclusive of costs to Ogden Levee
district, are $20,000 cash contributions, of which $10,000 was furnished
by the Arkansas State Highway Commission and $10,000 by the
Southwestern Gas & Electric Co. The Kansas City Southern Rail-
road furnished and hauled riprap stone without charge to the equiva-
lent of a contribution of $50,000.
                 FLOOD CONTROL---TULSA,                   OKLAHOMA,                  DISTRICT                    1107
   The existing project was authorized in the 1946 Flood Control Act
as set forth in House Document 602, 79th Congress, 2d session.
   Local cooperation.-All land, rights-of-way, easements and spoil
areas required for the bank protection adjacent to Ogden levee have
been furnished by the Ogden Levee District, Ark.
   Operations and results during the fiscal year.-Repairs to existing
bank stabilizing revetments were started, by contract, February 14,
1952, and continued to 94 percent completion. A total of 5,540 cubic
yards of dumped riprap stone and 8,600 cubic yards of earthfill was
placed during the fiscal year.
   The cost during the fiscal year was $46,208.34 and the expenditures
were $42,161.06, all for new work.
   Condition at end of fiscal year.-The above-mentioned repairs are
scheduled to be complete on July 11, 1952.
   The total cost for new work to the end of the fiscal year was
$225,164.99, of which $205,164.99 was from regular funds and $20,000
was from contributed funds. The expenditures to the end of the
fiscal year totaled $221,117.71, of which $201,117.71 was from regular
funds and $20,000 was from contributed funds.
   Proposed operations.-The balance unexpended on June 30, 1952,
was $23,338.94, of which $4,047.28 will be utilized in payment of
outstanding accounts payable. The remainder, $19,291.66, will be
applied to payment of contract expense incurred during completion
of the revetment work at Index, Tex.
   No additional stabilization work is scheduled for the remaining por-
tions of the authorized project within the Tulsa district.
                                 Cost and financial summary
                                     UNITED STATES FUNDS


                                             Fiscal year ending June 30                                   Total to June
                                                                                                         30,1952, includ-
                                                                                                         ing fiscal years
                              1948         1949          1950            1951            1952              priorto 1948

New work:
   Appropriated- .... _   -            .             $162, 000. 00   -$3, 043. 35     $65, 500. 00           $224, 456. 65
   Cost        .....                                    5, 495. 25    153, 461. 40     46, 208. 34            205, 164. 99
   Expenditures ...                        -9,             854. 19    149,102. 46      42, 161. 06            201, 117. 71


Other new work data:
    Unobligated balance, June 30, 1952__________________________ $5, 566. 66
    Unobligated balance available for fiscal year 1953______________ 5, 566. 66
                                           CONTRIBUTED


                                             Fiscal year ending June 30                                   Total to June
                                                                                                         30,1952, includ-
                                                                                                         ing fiscal years
                              1948         1949          1950            1951            1952             priorto 1948

New work:
   Appropriated----- ------------------------ $10, 000      $10, 000                      .....                  $20, 000
            ........------------ ------------------------ 20,
   Cost----------                                                000                                              20,000
   Expenditures ---------------....------------------------  20, 000                       ...       .            20, 000
                                                 I                              ,,
1108        REPORT OF CHIEF OF ENGINEERS, U. S.                                          ARMY,         1952

38. SNAGGING AND CLEARING UNDER AUTHORITY OF THE FLOOD
             CONTROL ACT APPROVED JULY 24, 1946

   The Flood Control Act approved July 24, 1946, authorized the
Secretary of War to allot not to exceed $1,000,000 for removing ac-
cumulated snags and other debris, and clearing and straightening
the channel in navigable streams and tributaries thereof, when, in
the opinion of the Chief of Engineers such work is advisable in the
interest of flood control: Provided, that not more than $50,000 shall
be expended for this purpose for any single tributary for any one
fiscal year.
   Pursuant to section 13 of this act, the sum of $21,490.24 has been
allotted to the Tulsa district. All of these funds have been expended
as listed below:
                                     Location                                                Completed        Amount
Slough Creek, tributary of Red River, Lamar County, Tex___ 1949 $17, 972. 76
Cherry and Red Fork Creeks, Tulsa County, Okla---------- -1952    2, 517. 48
                 .
Kingfisher, Okla-----------------------------------------  1952   1, 000. 00
  Cost and expenditures during the fiscal year totaled $1,033.28, of
which $33.28 was for Cherry and Red Fork Creeks and $1,000 was
for Kingfisher. All expenditures during the fiscal year were for
engineering studies and investigations.
  By letter dated January 12, 1952, local interests at Cherry and
Red Fork Creeks advised that they were financially unable to pur-
chase the required rights of way. Since that date, no additional
work has been performed on the Cherry and Red Fork Creeks project.
                                      Cost and financial summary

                                                  Fiscal year ending June 30                                Total to June
                                                __30,1952,                                                         includ-
                                                                                                           ing fiscal years
                                  1948          1949           1950            1951            1952         priorto 1948

New York:
   Appropriated ........       $50, 000. 00 -32, 027. 24     50, 000.00 ........---------- -46, 482. 52          21, 490. 24
   Cost__.._ ........ _    .     1,823.93     16,148.83       2,484.20- ...         ......     1, 033.28         21, 490.24
   Expenditures- ....            1, 625. 82   16, 346. 94     2, 840. 28      -356, 08        1, 033. 28         21, 490. 24


39. PRELIMINARY EXAAZINAITIONS, SURVEYS, A~ND                                                 CONTINGENCIES
                    FOR FLOOD CONTROL
   The cost of work under this heading during the fiscal year was
$245,405.57 and the expenditures were $249,441.89. The balance
unexpended on June 30, 1952, $17,920.30 plus $35.09 accounts receiv-
able, and an allotment of $177,500 for fiscal year 1953, a total of
$195,455.39, will be utilized as follows: $1,983.90 will be applied to
liquidation of outstanding accounts payable; the remainder, $193,-
471.49, will be applied to payment of expenses incurred in continuation
of engineering studies and investigations in connection with reports
assigned to this office. Included among these assignments is a compre-
hensive basin-wide investigation covering the Arkansas, White and
Red River Basins, Ark., La., Okla., Tex., N. Mex., Colo., Kans., and
Mo., as reported on page 854.
                    FLOOD           CONTROL-TULSA,                         OKLAHOMA,               DISTRICT                1109
  The additional sum of $309,600 can be profitably expended for
work under this heading during fiscal year 1954.
                                            Cost and financial summary

                                                           Fiscal year ending June 30                               Total to June
                                                                                                                   30,1952, includ-

                                        1948             1949             1950         1951            1952
                                                                                                                  ing  fiscalyears
                                                                                                                    prior to 1948

Maintenance:
    Appropriated-........$115, 000. 00 $160, 500. 00                  $56, 830. 00 $417, 000. 00 $233, 600. 00       $2,677,391. 35
    Cost ..--------------- 47, 887. 95 125, 083. 23                   132, 486. 74 416,117. 60 245, 405. 57           2, 661, 419. 86
    Expenditures- .......- 47,601. 29 123,680. 18                     140, 183.35 404, 260.46 249, 441. 89            2,659,471. 05



                            40. INSPECTION OF COMPLETED WORKS

  The cost of work under this heading during fiscal year 1952 was
$959.28 and the expenditures were $984.36. The balance unexpended
on June 30, 1952, $573.38, plus an allotment of $1,500 during fiscal year
1953, a total of $2,073.38, will be applied to payment of expenses
incurred for inspection of completed flood-control works as required
during fiscal year 1953.
  The additional sum of $2,500 can be profitably expended for work
under this heading during fiscal year 1954.
                                            Cost and financial summary

                                                           Fiscal year ending June 30                              Total to June
                                                                                                                  30, 1952, includ-
                                                                                                                  ing fiscal years
                                        1948             1949             1950         1951            1952         priorto 1948

Maintenance
                 ...-------------------............---....-----------............
   Appropriated----                                                                  $2, 000. 00     $1,020. 00          $3, 020. 00
   Cost--------         ------------------------------------                          1,487.34          959. 28           2,446. 62
   Expenditures.........
                -------------                 ------------------------                1,462. 26         984.36            2, 446. 62


Other new work data:
    Unobligated balance, June 30, 1952------------------------        $573. 38
    Unobligated balance available for fiscal year 1953---------------573.38

                  41. PLANT ALLOTMENT, TULSA, OKLA., DISTRICT
                                           Cost and financial summary

                                                           Fiscal year ending June 30                              Total to June
                                                                                                                  30, 1952, includ-
                                                                                                                  ing fiscal years
                                       1948              1949             1950         1951            1952         priorto 1948

New York:
       _--------
   Appropriated_---------                                       .       ,...-----.---------
                                                                      .------------                -$418,671.00      -$54, 063. 96
   Cost-----------------
   Expenditures--.                -$171,431.79 -$94, 711.87 $251, 495. 26 $177, 812.98 -540,517.78                   -392, 169. 24


Other new work data: Unobligated balance, June 30, 1952- -------                                                  $179, 549. 42
1110              REPORT             OF      CHIEF                   OF ENGINEERS,                            U.         S.    ARMY,              1952


                               42. INACTIVE FLOOD-CONTROL PROJECTS

                                                                                                 For last               Cost and expenditures
                                                                                               full report                 to June 30, 1952                  Estimated
                              Name of project                                                  see annual                                                      amount
                                                                                                 report                                                      required to
                                                                                                                                              Mainte-         complete
                                                                                                  forl--             New work                 Mainte-          complete


          ARKANSAS RIVER, MAIN STEM AND MINOR
                      TRIBUTARIES
                                                           2     -- - -    ---- ------
1.   Big Slough to Belle
                      - - - Plaine,             Kans. - - - - - - - - - -. - - - - - -
                               - - - - - - - - - - - 09                                                1937     ----------------------                        $5,800,000
2.   Augusta, Kans.3.- _.- - - - - - - - -       - - --               - - - - - - -               -   1938      ..................-----------------------       (4)
3.   Winfield, Kans.                       ---                                                        1937   ---         -----------------                       (4)
4.   Monett, Missouri 2_._._I___. ...... _                                                            1948                     -------                           676, 000
5.   Fort Gibson Bottom, Okla.5                      ----       - --                                  1948               $219. 74    --------                    652, 780
6.   Dirty Creek Bottom, Okla._                                                                       1948                 538.02 .........---------          1,019,462
7.   Big Skin Bayou-Camp Creek Bottom, Okla.5-----                                                    1948                 209.78     ----------                 774, 790
8.   Moffett Bottom, Okla. ----------------------------
                                                2                                                      1948             10, 824.06     ____...___              1, 856, 176
9.   Tucker Lake Bottom, 2Okla. 56--------------------                                                1949                 550.94 .........                   1,019, 449
10.   Braden Bottom, Okla. 5..                                                                         1949             13, 363.30 -----------                    344, 637
11. Emergency bank protection work, under the Flood
      Control Act approved Dec. 22, 1944 ______________                                                1950           53,995. 53     _....
                                                                                                                                  .....                          (4)
12. Tulsa and West Tulsa, Okla---------------------                                                    1950         2,780,982.35-----.....----.                  (4)
                              _..........
13. Jenks, Okla- _.____- ... --.                 .....                                                 1950          344, 797.11-----------..                    (4)
                       GRAND       (NEOSHO)         RIVER
                                   -- -- -- -- - - - - -       - - - - - - - - - - -   - -- -- -
14.   Florence, Kans..              7 -- -- -- -- -- -- -- --------                                    1937     ------------ ------------                      59,000
15.   Cottonwood Falls,2 -- -Kans.
                              - -- - - - - - - - - - -----------        - --                           1937     __---_-----           _________.....           26,000
16.   Emporia, Kans. 7                                                                                 1937     ------------........----------                 79, 000
17.   Burlington, Kans.2 7-------------------------                                                    1937     --------------------..........                 95, 000
18.   Le Roy, Kans. 7-------------                      2                                              1937     ------------------------                       34,000
19.   Neosho Falls, Woodson
                          2        County, Kans. 8-                                                    1937     -----------------------.........              114,000
20.   Humboldt, Kans. 2     s_                                                                         1937     ---- ----------------                          67,000
21.   Chetopa, Kans.? 8.            2      ...-------_---_----------..                                 1937       .....-- __--            .....------------.. 100, 000
22.   Cherokee County, Kans. 8                                         -                               1937     ....------ ____---....--        ..--------. 805, 000
23.   Iola, Kans ...............-----------------------------------                                    1939         22, 289. 80 ------------..........       (4)
                            VERDIGRIS RIVER
                                                                                       2
24. Verdigris River from mouth to Madison, Kans. 10__                                                  1938     -------------------..---...                    11815, 000
25. West of Fredonia, Wilson County, Kans.2 9
26. West of Benedict, Wilson County, Kans. 9 ______
                                                                            ..........                 1937     ---..........--         -........                662, 000
                                                 2                                                     1937     -............                      ..-...        683, 000
27. West of Elk City, Montgomery County, Kans. 9__                                                     1937     -------- ------------                            285, 000
28. Caney Creek, Washington County, Okla., and 2
     Chautauqua and Montgomery Counties, Kans. 9                                                       1937     --------------------                             550, 000
                 SALT FORK OF ARKANSAS RIVER

29. Blackwell, Okla.2            ___________________                                                   1937        ..       __..- _               --     _        175, 000
30. Cherokee, Okla.            8                                                                       1949             30, 012. 54       ____           _     1, 321,000
                    NORTH FORK OF RED RIVER
31. Lugert Reservoir, North Fork of Red River, Okla__                                                  1942             1,130, 000        .      .(12)

   1 In 1937 the projects were reported by the Memphis district; in 1938 and 1939 by the Little Rock district.
   2 Awaiting local cooperation.
   3 Project completed by Kansas Works Progress Administration.
   4 Complete.
   2 In conformance with provisions of the 1944 Flood Control Act, local interests were notified on Sept. 18,
1947, that authorization for construction of the project will expire 5 years from that date unless assurances
of local cooperation satisfactory to the Secretary of the Army are received prior to that time.
   6 In conformance with provisions of the 1941 Flood Control Act, local interests were notified on Oct. 9, 1947,
that authorization for construction of the project will expire 5 years from that date unless assurances of local
cooperation satisfactory to the Secretary of the Army are received prior to that time.
   7 In conformance with provisions of the 1941 Flood Control Act, local interests were notified on Oct. 31,
1947, that authorization for construction of the project will expire 5 years from that date unless assurances
of local cooperation satisfactory to the Secretary of the Army are received prior to that time.
  8 In conformance with provisions of the 1941 Flood Control Act, local interests were notified on Nov. 5,
1947, that authorization for construction of the project will expire 5 years from that date unless assurances
of local cooperation satisfactory to the Secretary of the Army are received prior to that time.
    * In conformance with provisions of the 1941 Flood Control Act, local interests were
notified on Apr. 18, 1952, that authorization for construction of the project will expire
5 years from that date unless assurances of local cooperation satisfactory to the Secretary
of the Army are received prior to that time.
    1o In  conformance with provisions of the 1944 Flood Control Act, local interests were
notified on Apr. 24, 1952, that authorization for construction of the project will expire
5 years from that date unless assurances of local cooperation satisfactory to the Secretary
of the Army are received prior to that time.
    a1Some work on this project was done by Wilson County (Kan.) Civil Works Adminis-
tration in 1933 and 1934.
    12 The participation by the War Department in the financing of the project has been
completed.
                  FLOOD       CONTROLr--TULSA,               OKLAHOMA,          DISTRICT       1111
                              43. MISCELLANEOUS ACTIVITIES
   Status of all investigations for flood control called for by flood control acts
                             and committee resolutions

                                                                        Date trans-
              Locality                       Authorization act           mitted to    No.   mendation
                                                                         Congress

Altus project, Oklahoma ........        Flood Control Committee
                                          resolution, Apr. 13, 1938.2
Arkansas City and vicinity flood        Flood Control Committee
  protection, Cowley County Ar-          resolution, May 5, 1944.2
  kansas River Basin, Kans.
Arkansas River and tributaries in       Commerce Committee res-
  the vicinity of Bixby Okla., in        olution, May 22, 1945.2
  the interest of flood control.
Arkansas River, Chikaskia River         Commerce Committee res-
  Okla., and Kans., tributary of         olution, Nov. 6, 1944.2
  Salt Fork.
Arkansas River and tributaries,         House Public Works Com-
   for flood control and related pur-     mittee resolution, Jan.
   poses at Enid, Okla.                   28, 1947.
Arkansas River for flood control at     Flood Control Committee2
  and in the vicinity of Hutchin-         resolution, Jan. 21, 1944.
  son, Kans.
Arkansas River and tributaries,         Flood Control Committee
  from Hutchinson, Kans. to the           resolution, June 21, 1944.2
  Kansas-Oklahoma State Line.
Arkansas River at Kingfisher,           House Public Work Com-
  Okla.                                  mittee 2 resolution, July
                                         6, 1949.
Arkansas River, Little River            Commerce Committee res-
   watershed, Okla. a tributary          olution, Jan. 15, 1944.2
  of Canadian River.
Arkansas River in Kan., Okla.,          House Public Works Com-
  and Ark., with a view to flood         mittee resolution, June
  control, with reference to Ok-         27, 1950.2
  mulgee Creek in Oklahoma.
Arkansas River and tributaries,         Flood Control Committee
   between the Kansas-Oklahoma            resolution, July 3, 1945.2
  State line and mouth of Cimarron
  River, particularly at Ponca
  City, Okla.
Arkansas River, Salt Creek and          Flood Control Act, Aug.
  tributaries, Osage County, Okla.        18, 1941.2
Arkansas River and tributaries,         Senate Public Works Com-
for flood control at and in vicinity     mittee resolution, May 9,
  of Strong City.                         1949.
Arkansas River, vicinity of Tam-        House Public Works Com-
  aha, Okla., Sans Bois Creek and         mittee resolution, June
  tributaries, within Short Moun-         27, 1950.2
  tain Reservoir area.
Arkansas River and tributaries,         Flood Control Committee
  and the Walnut River, and its           resolution, May 5, 1944.2
tributaries, Kans., for flood con-
  trol at and in the vicinity of
  Arkansas City, Cowley County,
  Kans.
Arkansas River and tributaries,         House Public Works Com-
flood control on Walnut River,          mittee resolution Oct. 16,
  Litte Walnut River, Whitewater         1951.3
  River, Ninnescah River, Rock
  Creek, Slate Creek, and other
  tributaries in southeastern sec-
tion of the State of Kansas.
Arkansas, White, and Red River          Flood Control Act, May
  Basins, Ark., La., Okla., Tex.,         17, 1950.1
  N. Mex., Colo., Kans., and Mo.,
with a view to developing com-
prehensive and integrated plans
of improvement for navigation,
flood control, domestic and mu-
nicipal water supplies, reclama-
tion and irrigation, development
and utilization of hydrolectic
power, conservation of soil, forest
and fish and wildlife resources
including such consideration of
recreation uses, salinity and sedi-
ment control, and pollution
abatement as may be provided
under Federal
           1       policies and pro-
cedures.
   See footnotes at end of table.
1112         REPORT OF CHIEF OF ENGINEERS, U. S. ARMY, 1952

   Status of all investigations for flood control called for by flood control acts
                      and committee resolutions-Continued

                                                                                     Date trans-Doment                                   R
                Locality                         Authorization act                    mitted to        No.                              mendation
                                                                                      Congress

Big Canyon, Washita River, Okla_,             Flood Control Act, Dec. 22,
                                                 1944.3
Big Elk Creek, Okla----------..............---... do      -----                -. - - - - - - -- - - - - - -
Bixby flood protection, Arkansas Commerce Committee res-
   River, Okla.                                  olution, May 22, 1945.2
Canadian River and its tributar- Commerce Committee res-                        - -   -   -   -   -   -   - -   -   -   -   -   -   -

  ies, Tex. and Okla.                            olution, June 5, 1944.2
Cane Creek, tributary of Arkan- House Public Works Com-
  sas River, Okla.                               mittee resolution, Au-
                                                 gust 17, 1949.2                ..    - - - - - -- - - - - - -
Chikaskia River, Okla. and Kans. Commerce Committee res-
  (tributary of Salt Fork of Arkan-              olution, Nov. 6, 1944.2       - - - - - - - -- - - - - - -
  sas River).
Clear and Dogy Creeks, Okla-...... Flood Control Act, Aug.
                                                 18, 1941.2                     -- - - - - - - - - - - - - -
Coal Creek, Okla--------------- House Public Works Com-
                                                 mittee resolution, June
                                                 27, 1950.2                        - - --.
                                                                                --.-                                - - -- - -
                       .............
Cossatot River, Ark-------------              Flood Control Act, June
                                                 22, 1936.3                     -- - - - - - - - - - - - - -
Cossatot River, Sevier County,                Flood Control Act, May 6,
   Ark.                                          1936.3
Cottonwood Creek, Logan and                   Senate Public Works Com-          - - - - - - --.-                    - - - - -
   Oklahoma Counties for flood                   mittee resolution, June
  control at and in vicinity of                  22, 1949.2                       .- - - - - - -                - - - - - -
   Guthrie, Okla.
Deep Fork, Okla., for flood control.          Flood Control Committee
                                                 resolution, Feb. 23, 1944.2
Deep Red Run, Tillman County,                 Flood Control Act, Dec.
   Okla.                                         22, 1944.3
Denison Reservoir, Red River, Senate Public Works Com-
   Tex. and Okla., with reference                mittee resolution, Au-
  to a crossing over Lake Texoma                 gust 18, 1949.
   at the Willis Site.
Denison Reservoir, Red River, House Public Works Coin-
   Tex. and Okla., with reference                mittee resolution, April
   to a crossing over Lake Texoma                21, 1950.
   at the Willis Site.
Dirty Creek, Muskogee County, Flood Control Act, Aug.                          ---------------
   Okla.                                         11, 1939.2
Dogy and Clear Creeks, tributar- Flood Control Act, Aug.                       ---------------
   ies of Arkansas River, Okla.                  18, 1941.2
Dry Cimarron River, Union                     Flood Control Act, May           ---------------
   County New Mexico, and Cimar-                 17, 1950.2
  ron River, Okla., Colo., and
Kans.
Eagletown Reservoir, Okla .........         Flood Control
                                                        3 Act, June            ---------------

                                              22, 1936.
Elm Creek, Okla.................. Flood ControlAct,
                                        3           Dec.22,
                                              1944.
Enid flood protection and related House Public Works Com- ---------------
  purposes, Arkansas River Basin,     mittee resolution, Jan.28,
  Okla.                               1947.
Eufaula Reservoir, Okla., on South Flood Control Act, June
  Canadian River.                       22, 1936.2
Fort Towson Dam and flood-con- Flood Control3
                                                    Act, July 24,
  trol reservoir, Gates Creek,        1946.
  Okla., with a view to completion
  of dam.
Gates Creek and tributaries, Okla., ...
                                      __do ....-------------      I---------------                                      --..
  with a view to the completion of
  the Fort Townson Dam and
  flood-control reservoir.
Guthrie, Okla., for flood control Senate Public Works Com-
  on Cottonwood Creek, Logan          mittee resolution, June
  and Oklahoma Counties.              22, 1949.2
Hickory Creek, tributary of Red Senate Public Works Com-
  River, Love County, Okla.           mittee resolution, Sept
                                      20, 1950.2
Hutchinson and vicinity, Arkansas Flood Control Committee
  River Basin, Kans.                  resolution, Jan. 21, 1944.2
Index, Tex., bank stabilization on Committee on Public
  Red River in vicinity of Index,     Works resolution, Mar.
  Tex.                                12, 1949.2
    See footnotes at end of table.
                   FLOOD CONTROIr-TULSA,                         OKLAHOMA,                     DISTRICT       1113
   Status of all investigations for flood control called for by flood control acts
                      and committee resolutions-Continued

                                                                               Date trans-
                Locality                         Authorization act              mitted to         Document  Recom-
                                                                                Congress            No.    mendation

Johns and Kingfisher Creeks, Okla-           Senate Public Works Com-
                                               mittee resolution, Apr.
                                               15, 1949.2
Kiamichi River, Okla.............. Flood Control Act, June
                                     28, 1938.3
Kingfisher and Johns Creeks, Okla. Senate Public Works Com-
                                     mittee resolution, Apr.
                                               15, 1949.2
Little Elk Creek, Okla....---..------        Flood Control Act, Dec. 22,
                                               1944.3
Little River, Ark.................           Flood Control Act, May 6,       ---- ---- ----
                                               1936.3
    Do--------------------              --   Flood Control Act, June
                                               22, 1936.3
Little River watershed, Okla.,               Commerce Committee
  tributary of the ArkansasRiver.              resolution, Jan.15,1944.2
Little River watershed, Okla.,               Flood Control Committee
  for flood control and allied                 resolution, Feb. 23, 1944.2
  purposes.
Lost Creek, Mo., at and in the               Flood Control Act, July 24,     ---------------

  vicinity of Seneca, Mo.                      1946.
Lost Creek for flood protection for          Flood Control Committee          --------------

  town of Seneca, Mo.                          resolution, Nov. 15, 1945.
Mangum-Salt Fork Greer County,
  Okla.
                                             Flood Control Act, Aug.
                                               11, 1939.3
                                                                             ------   ~---------
Mountain Fork of Sans Bois Creek             House Public Works Com-         ---------------
  within Short Mountain Reservoir              mittee resolution, June
  area, Arkansas River in vicinity             27, 1950.2
  of Tamaha, Okla., including.
Millwood Reservoir, Arkansas, in             Flood Control Act, May 17,
  the Red River Basin, (Survey                 1950.
  and study of alternate sites for).
Okmulgee Creek, Okla-----........      House Public Works Com-
                                         mittee resolution, June
                                          27, 1950.2
    Do- ------      -------............ Senate Public Works Com-
                                         mittee resolution, July
                                         30, 1949.2
Oologah Reservoir on Verdigris House Public Works Com-
  River, Okla., with the view to         mittee resolution, June
  possible relocation or reduction       17, 1948.2
  in size of the.
Pease River and tributaries, Tex.-_ Flood Control Act, June                  --------------
                                         22, 1936.3
Ponca City, Arkansas River Flood Control Committee                           --------------
  Basin, Okla.                           resolution, July 3, 1945.2
Pryor Creek, tributary of Grand Senate Public Works Com-                     --------------
  (Neosho) River in Oklahoma.            mittee resolution,
                                                   2           Feb.
                                         10, 1950.
Purdy Reservoir on Rush Creek, Flood Control       3    Act,  Aug.           --------------
  Okla.                                  11, 1939.
Red River, Ark----------     ------- Flood Control Act, June                 ---------------
                                         22, 1936.3
     Do--------      ---         ---   Flood Control Act, May 6,              --------------
                                         1936.3
Red, Arkansas, and White River Flood Control Act,May 17,                     --------------
  Basins, Ark., La., Okla., Tex.,        1950.1
  N. Mex., Colo., Kans., and Mo.,
  with a view to developing com-
  prehensive and integrated plans
  of improvement for navigation,
  flood control, domestic and mu-
  nicipal water supplies, reclama-
  tion and irrigation, development,
  and utilization of hydroelectric
  power, conservation of soil, forest
  and fish and wildlife resources in-
  cluding such consideration of
  recreation uses, salinity and sedi-
  ment control, and pollution
  abatement as may be provided
  for under Federal policies and
  procedures.l
Red River, La., Ark., Okla., and Rivers and Harbors Com-
  Tex., for navigation, flood con-       mittee resolution, Feb.
  trol, water power and irrigation.      25, 1938.2
    See footnotes at end of table.
1114        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                          1952

   Status'of all investigations for flood control called for by ftood control acts
                      and committee resolutions-Continued

                                                                         Date trans-                   Document
              Locality                       Authorization act            mitted to                      No.           Recom-
                                                                          Congress                                    mendation


Red River, La., Ark., Okla., and        Commerce Committee reso                    -                   _
Tex., and connecting waterways,         lution, Feb. 8,1939; Flood
singly or together for navigation,      Control Committee reso-
flood control and irrigation.           lution, Jan. 26, 1939;
                                         Rivers     and     Harbors
                                         Committee       resolution,
                                         Jan. 24, 1939.3
Red River at Index, Tex     ---------   House Public Works Com-
                                         mittee resolution, July 6,
                                          1949.2
Red River, Tex., bank stabiliza-        Senate Public Works Com-
tion in the vicinity of Index, Tex.      mittee resolution, Mar.
                                          12, 1949.2
Red River for flood-control works       Flood Control Committee
in Washita Valley, Okla.                 resolution, Apr. 14, 1937.3
Red River, Salt Fork of, and trib-      Flood Control Act, June
utaries, Oklahoma.                       28, 1938.3
Red River, La., Ark., Okla., and        Rivers and Harbors Com-              - -- -                _

Tex., for navigation, flood con-         mittee resolution, May 9,
trol, water power, irrigation or         1944.3
water conservation on Wichita
  River, Tex.
Red River, Tex., and Okla.,             Senate Public Works Com-
Denison Dam, with reference to          mittee resolution, Aug.
a crossing over Lake Texoma at          18, 1949; and House Pub-
the Willis Site.                        lic Works Committee
                                         resolution, Apr. 21, 1950.
Red River, Tex., Okla., Ark., and       Senate Public Works Com-
  La., downstream from Denison           mittee resolution, Jan.
  Dam to determine if existing           28, 1949.3
  project should be modified by
  substitution of smaller reservoirs
for flood control, hydroelectric
  power, recreation, and allied
purposes.
Red River and tributaries, Texas,       Senate Public Works Com-                               _           .   .
  Oklahoma,Arkansas, and Louisi-         mittee resolution, Oct.
ana downstream from Denison             11, 1951.
  Dam for bank stabilization.
Rush Creek, Purdy Reservoir,            Flood Control Act, Aug.
  Okla.                                   11, 1939.3
Saddle Mountain, Okla_____.......--     Flood Control
                                          22, 1944.
                                                   3  Act, Dec.                        -   -               - -
Sallisaw Creek, tributary of Arkan,     House Public Works Com-
sas River, Okla.                         mittee resolution, Mar.
                                          15, 1949.2
Salt Creek of Arkansas River and       Flood Control Act, Aug.
   tributaries, Osage County, Okla.       18, 1941.2
'Salt Fork, a tributary of Arkansas     Commerce Committee reso-
   River, and Chikaskia River,            lution, Nov. 6, 1944.3
   Okla. and Kans.
Salt Fork, Okla ____   -----           Flood Control Act, Dec.
                                          22, 1944.3
Salt Fork of Red River and tribu-       Flood Control Act, June
  taries, Okla.                           28, 1938.3
Salt Fork-Mangum, Greer County,         Flood Control Act, Aug.
  Okla.                                   11, 1939.3
Sanford, Tex., for construction of      Flood Control Committee              -
  dam on South Canadian River,            resolution, Jan. 21, 1944.2
  N. Mex., Tex., and Okla., at or in
  vicinity of.
Sans Bois Creek and tributaries,        House Public Works Com-
  Okla., Arkansas River, vicinity        mittee resolution, June
  of Tamaha, Okla., and including        27, 1950.2
  Mountain Fork of; within Short
  Mountain Reservoir area.
Seneca, Lost Creek, Arkansas            Flood Control Act, July 24,
  River Basin, Mo.                        1916.3
Seneca Lost Creek,Arkansas River        Flood Control Committee              -......
  Basin, Mo.                              resolution, Nov. 15, 1945.
Short Mountain Reservoir area,          House Public Works Com-         --
  Arkansas River in vicinity of           mittee resolution, June
  San Bois Creek and tributaries,         27, 1950.2
  vicinity of Tamaha, Okla., in-
  cluding Mountain Fork.
South Canadian River, Eufaula           Flood Control Act, June
  Reservoir, Okla., on.                   22, 1936.2
   See footnotes at end of table.
                         FLOOD        CONTROL---TULSA,          OKLAHOMA,          DISTRICT            1115
   Status of all investigations for flood control called for by flood control acts
                      and committee resolutions-Continued
                                                                           Date trans-   Document    Recom-
                    Locality                    Authorization act          mitted to      No.       mendation
                                                                            Congress

South Canadian River, Okla .__._           Flood Control Act, Aug.
                                             28, 1937.2
South Canadian River, N. Mex.,             Flood Control Committee
  Tex., and Okla., for construction          resolution, Jan. 21, 1944.2
of a dam at or in the vicinity of
  Sanford, Tex.
Strong City, Kans., for flood con-         Senate Public Works Com-
trol on Cottonwood River at and            mittee resolution, May 9,
in vicinity.                               1949.
Tamaha, Okla., Arkansas River,             House Public Works Com-
vicinity of Sans Bois Creek and             mittee 2resolution, June
tributaries within Short Moun-             27, 1950.
tain Reservoir area, including
Mountain Fork, Okla.
Turkey Creek, Okla_--------------          Flood Control Act, Dec.
                                             22, 1944.3
Verdigris River, Kans. and Okla--          Flood Control Committee
                                             resolution, Apr. 23, 1942.2
Verdigris River, Okla., and Kans.          House Public Works Com-
with the view to possible reloca-           mittee resolution, June
tion of reduction in size of the            17, 1948.2
  Oologah Reservoir.
Walnut    Bayou,    Little   River         Flood Control Act, Aug.
  County, Ark.                               28, 1937.3
Walnut River and its tributaries           Flood Control Committee
for flood control at and in the             resolution, May 5, 1944.2
  vicinity of Arkansas City, Cow-
ley County, Kans., Arkansas
  River and tributaries.
Washita River, Big Canyon, Mur-            Flood Control Act, Dec.
ray County, Okla.                           22, 1944.3
Washita River, Okla_------------           Flood Control Act, Aug.
                                             28, 1937.3
    Do ----------------------------        Flood Control Committee
                                             resolution, Apr. 14, 1937.3
    Do     .-----------------------        Commerce Committeereso-
                                             lution, Feb. 8,1939; Flood
                                             Control Committee reso-
                                             lution, Jan. 26, 1939;
                                             Rivers     and    Harbors
                                             Committee 3 resolution,
                                             Jan. 24, 1939.
White, Arkansas, and Red River             Flood Control Act, May 17,
Basins, Ark., La., Okla., Tex.,             1950.1
N. Mex., Colo., Kans., and Mo.,
with a view to developing com-
prehensive and integrated plans
of improvement for navigation,
flood control, domestic and
municipal water supplies, recla-
mation and irrigation, develop-
ment and utilization of hydro-
electric power, conservation of
soil, forest and fish and wildlife
resources including such consid-
eration of recreation uses, salinity
and sediment control, and pollu-
tion abatement as may be pro-
vided for under Federal policies
and procedures.'
Wichita River, Tex., navigation,           Rivers and Harbors Com-
flood control, power, irrigation,          mittee resolution, May 9,
or water conservation.                      1944.1
Willis Site, Denison Reservoir, Red        Senate Public Works Com-
River, Tex. and Okla., with                 mittee resolution, Aug.
reference to a crossing over at the.        18, 1949; and House Pub-
                                             lic Works Committee
                                             resolution, Apr. 21,1950.


  1A coordinated comprehensive report prepared by Federal and State agencies for the conservation and
development of land and water resources.
  2 To be incorporated in the comprehensive report on the Arkansas, White, and Red River Basins for the
conservation and development of land and water resources, which will be prepared in the Arkansas-White-
Red Office, Southwestern Division, Corps of Engineers, U. S. Army, Tulsa, Okla.
  3 To be incorporated in a comprehensive report on Red River and tributaries, Louisiana, Arkansas,
Oklahoma and Texas for navigation, flood-control, power, and irrigation, which will be prepared by the
Board of Engineers for rivers and harbors.
1116        REPORT OF CHIEF OF ENGINEERS,                                      U.    S. ARMY, 1952

44. EMERGENCY BANK PROTECTION WORK UNDER AUTHORITY OF THE
          FLOOD CONTROL ACT APPROVED JULY 24, 1946

  The Flood Control Act approved July 24, 1946, authorized the
Secretary of War to allot not to exceed $1,000,000 per year for the
construction of emergency bank protection works to prevent flood
damage to highways bridge approaches, and public works, when, in
the opinion of the Chief of Engineers, such work is advisable: Pro-
vided that not more than $50,000 shall be allotted for this purpose at
any single locality for any one fiscal year.
  Pursuant to section 14 of this act, the total sum of $191,431.64 has
been allotted to the Tulsa district. These funds have been allocated
for emergency bank-protection work on the Arkansas River as listed
below:
                                     Location                                                  Completed        Amount
Vicinity of Haskell, Okla---------------------            1948                                               $46, 070. 95
Bradens Bend, Okla-------------------------------------1949                                                   33, 765. 88
Vicinity of Haskell, Okla-------------------------------- 1950                                                49, 874. 74
Rice County, Kans. (sec. 12, T21S, R10W) ---------------- 1951                                                11, 720. 07
Kaw City, Okla-----------------------------------------1952                                                   47, 055. 10
Unallocated--------------------- -----------------------------                                                 2, 944. 90
  During the fiscal year 1952, emergency bank-protection works were
constructed at Kaw City, Okla. At the end of the fiscal year, this
work was essentially completed, with final completion date scheduled
for July 3, 1952.
  The cost during the fiscal year was $33,415.28. The expenditures
were $31,896.57. The difference between the funds allocated, $47,-
055.10, and the cost to June 30, 1952, $33,415.28, amounts to $13,639.82
and represents final cost outstanding on June 30, 1952.
                                         Cost and financial summary

                                                      Fiscal year ending June 30                             Total to June
                                                                                                            30, 1952, includ-
                                                                                                            ing fiscal years
                                     1948           1949           1950          1951           1952          priorto 1948

New work:
   Appropriated-_         -.-..   $48, 070.95    $35, 000.00    $50, 000.00    $8, 360. 69   $50, 000, 00       $191, 431.64
   Cost------... ----------         1, 720. 81    78, 105.85     49, 884. 91   11, 720.07     33, 415.28         174, 846. 92
   Expenditures------....           1,504. 15     78, 283. 71    49, 914. 60   11, 729.18     31, 896. 57        173, 328. 21


Other new work data :
    Unobligated balance, June 30, 1952       ---------------------------                                      $2, 735.34
    Unobligated balance available for fiscal year 1953-------                                  --------        2, 735. 34

45. EMERGENCY FLOOD CONTROL WORK UNDER AUTHORITY OF PUB-
  LIC LAWS NOS. 138 AND 318, SEVENTY-EIGHTH CONGRESS; PUBLIC
  LAW NO. 75, SEVENTY-NINTH CONGRESS; AND PUBLIC LAW NO. 102,
  EIGHTIETH CONGRESS

  Because of the heavy demands for emergency repair work to flood-
control structures damaged or destroyed by the disastrous floods which
occurred in the spring of 1943, 1944, 1945, and 1947, Congress in the
acts approved July 12, 1943, Public Law 138, and May 29, 1944, Public
Law 318, 78th Congress; in the act approved June 23, 1947, Public Law
              FLOOD CONTROL--TULSA,                         OKLAHOMA,            DISTRICT                 1117
102, 80th Congress, authorized appropriation of emergency funds in
the respective amounts of $10,000,000, $12,000,000, $12,000,000 and $15,-
000,000 to be expended under the direction of the Secretary of War
and the supervision of the Chief of Engineers for the repair, restora-
tion, and strengthening of levees and other flood-control works which
had been threatened or destroyed by the recent floods.
    Pursuant to these acts, the total sum of $1,705,785.74 has been
allotted to the Tulsa district. The sum of $779,000 was provided for
fiscal year 1952 operations for use during and after the disastrous
floods which occurred in this area during June and July 1951.
    Operations undertaken and completed during the fiscal year were
as follows: More than 5.0 regular employees were mobilized in the
flooded areas on the Neosho River to assist in flood-fighting operations.
Temporary water-supply plants were set up by Tulsa district per-
sonnel at the towns of Iola, LeRoy, and Humboldt. Approximately
600 people which could not be reached by local flood workers, were
evacuated by 25 Government-operated boats. Immediately after the
flood, work was started on rebuilding the levees along the Arkansas
Verdigris and Grand (Neosho) Rivers. Both Government-owned and
privately owned equipment was used, and necessary repairs were
effected by placement of 1,575,542 cubic yards of earth and 10,238
cubic yards of riprap stone at 155 separate levee locations. Recon-
naissance surveys conducted in the flooded areas indicate that total
damages caused by the flood approximate $44,735,000 and that 928,700
acres of land were inundated in this district.
    The cost during the fiscal year was $743,805.56 and the expenditures
were $741,357.83.
    The balance unexpended on June 30, 1952, $37,642.17, less $2,447.73
accounts payable, a total of $35,194.44, will be utilized for construction
of additional levee repairs as may be required.
                                 Cost and financial summary

                                             Fiscal year ending June 30                            Total to June
                                                                                                  30, 1952, includ-
                                                                                                  ing fiscal years
                              1948         1949            1950          1951          1952         priorto 1948



  Appropriated-.......    $F5, 880. 13   $4, 750. 00   -$9, 171. 26    $1, 761. 44 $779, 000.00     $1, 705, 785. 74
  Cost- ----    -----
              ...--        38, 377.44    10, 525.74      12, 557.69     1, 761.44 743, 805.56        1, 670, 591.30
  Expenditures.........    36, 864. 92    5,319. 13      19, 274. 82    1, 761. 44 741, 357. 83      1,668, 143.57



46. EMERGENCY FLOOD-CONTROL WORK UNDER AUTHORITY OF THE
    FLOOD CONTROL ACT APPROVED AUGUST 18, 1941 AS AMENDED

   Section 5 of Public Law 228, approved August 18, 1941, as amended
by section 12 of Public Law 526, approved July 24, 1946, authorized
allotments from funds heretofore appropriated for flood control not
to exceed $2,000,000 for any one fiscal year to be expended in rescue
work or in the repair or maintenance of any flood control work
threatened or destroyed by flood.
   Subsequent flood control acts have authorized additional appropria-
tions. Section 208 of Public Law 858, approved June 30, 1948, cited
     245554-53-vol. 1-             71
1118        REPORT OF CHIEF OF ENGINEERS, U. S. ARMY,                                                1952

$25,000,000 and section 210 of Public Law 516, approved May 17,
1950, cited $15,000,000 to be expended for the repair, restoration,
and strengthening of levees and other flood-control works which
have been or may be threatened or destroyed by floods, including the
raising, extending, or other modification of such works as may be
necessary in the discretion of the Chief of Engineers for the adequate
functioning of the works for flood control.
  Pursuant to these acts, the total sum of $515,509.48 has been allotted
to the combined Denison and Tulsa districts for the repair of levees.
  Operations undertaken during the fiscal year consisted of pro-
cessing applications for repair and restoration of private levees includ-
ing field investigations, surveys and preparation of contract plans
and specifications for such repairs as needed at 10 separate locations.
No rescue work was accomplished under this heading during the fiscal
year.
  The cost during the fiscal year was $3,139.22. The expenditures
were $3,010.45.
  The balance unexpended on June 30, 1952, under this authorization
amounts to $68,423.90, of which $1,888.88 will be applied to payment
of outstanding accounts and the remainder, $66,535.02, will be utilized
in payment of expenses incurred under this heading during fiscal
year 1953.
                                      Cost and flnancial summary

                                                  Fiscal year ending June 30                             Total to June
                                                                                                         30, 1952, includ-
                                                                                                         ing fiscal years
                                  1948          1949           1950           1951           1952          prior to 1948

Maintenance:
   Appropriated-...      ...   $48, 970. 00 $171,150. 00 -$44,121.91       $19,581.95     $54, 929. 44       $515, 509.48
    Cost--....--------------     6, 914. 37   43, 764. 88   126, 582. 01    11, 875. 26     3, 139. 22        448, 974. 46
    Expenditures.--.----.-      10, 287. 78   32, 933. 09   137, 891. 34    10, 700.11      3, 010. 45        447, 085.58
                                       INDEX

                                                                               Page

                                                                    Volume I          Volume 2
                                                               I-               I
                               A

Abbapoola Creek, S. C., navigation -           -- - - - --               517
Aberdeen Creek, Glouchester County, Va., investigation__                 453
Aberdeen, Ohio, flood control ....-.-._..----.---                                           1564
Aberdeen, Wash., flood control----------------------                                        2248
Abraham Creek, Pa., flood control------- - ----------                    357
Absecon Creek, N. J., navigation ---,      -     --.-.----- --           301
Absecon Inlet, N. J., navigation .__           ____....--.---.-- 291
Academy Creek, Brunswick Harbor, Ga., improvement. -                     535
Accident prevention________         --- _---                               2
Accotink Creek, Va., navigation-             ---                --       406
Acushnet River, New Bedford Harbor, Mass., investiga-
  tion--------------------------------------                        105, 149
Adams, Hoosic River Basin, Mass., flood control-                 --      251
Adams levee unit, Indiana, flood control ...--.--.. __.                                     1500
Addicks Reservoir, Tex., flood control-                                  920
Addison, N. Y., flood control--__-----------              ------         343                1628
Adena, Ohio, flood control_                                                                 1628


Advanced funds for river and harbor improvements and
  for flood-control works                  _            _                 19                 .
Advance planning      _______
Agate Bay (Two Harbors) Minn_.-_-__                                        Ad               1643
Ahnapee River, Wis., navigation--------------               ---                             1688
Ahkin, Minn., Miss. River near flood control_-                  -_-
Aquadilla Harbor, Puerto Rica, investigation-_---
Ala Wai Yacht Basin, T. H., investigation       -------
                                                             -           622
                                                                                            1229
                                                                                            2026
Alabama-Coosa branch of Mobile River system, investi-
  gation-                                                           698, 706
Alabama-Coosa Rivers, Ala. and Ga., navigation                           675
Alabama River, Ala., investigation__                                     698
Alafia River, Fla. navigation                                            602
Alameda Creek, Calif., investigation---------------                                         2035
     Flood Control_                                                                         2037
Alamitos Bay, Calif., investigation__                                                       1938
Alamogordo Dam, N. Mex., investigation_                -----             985
Alamo Reservoir, Bill Williams River, Ariz., flood con-
  trol ................        --- ---                                                      1972
Alaska engineering district_                                                                2285
Alaska Harbors and Rivers, Alaska, investigation_                                           2300
Albany, Berkley, and Emeryville Harbor, Calif., investi-
  gation_-------------------------------------                                              2026
Albemarle and Chesapeake Canal, N. C. and Va., im-
  provement_-___                                                         448
Albemarle Sound, N. C. and Va., investigation _                     453, 499
Albeni Falls, Idaho, flood control___________                                               2236
Albuquerque, N. Mex., engineering district_                              969
Alexandria, Va., impro.vement of Potomac River at --                     384
Algiers Lock, La_________________,                                       723
Algoma Harbor, Wis., navigation------------------                                           1687
Alhambra Creek, Calif., investigation                                                       2026
Alhambra Wash., Los Angeles, Calif., flood control ....                                     1941
Alice, Texas, Flood Control_                                             967
Aliso Creek Dam, Calif_-_-___-                                                        1961, 1971
                                                                                        I
       245554-- 53-vol. 1-     72
II                                   INDEX


                                                                     Page


                                                             Volume 1       Volume 2

Allatoona Reservoir, Coosa River Basin, Ga., flood con-
  trol_              -....-                                       702
Allegany on Allegheny River, N. Y., flood control-                                     1628
     Investigation ....     .  .                                                       1908
Allegheny River, Pa. and N. Y.:
     Construction of locks and dams                                                    1574
     Flood-control reservoirs___     __                                        1629
     Improvement by open-channel work--                                        1590
     Investigations___                                                  1590,.1633,
                                                                               1893
Allentown, Lehigh River, Pa., flood control_                      306
Alloway Creek, N. J., navigation_                                 301
Alma, Wis., harbor_      .                                                             1167
Almond, N. Y., flood control_                                     346
Almond Reservoir, N. Y., flood control_-__-     -  __-            339
Aloha-Rigolette area, Louisiana, flood control_              774, 790             -    i -
Alpena Harbor, Mich., navigation, investigation-......                      1829,1830
Alsea Bay, Oreg., investigation-__--__----------                                 2155
Altamaha River and Sound, Ga.:
     Investigation                                     .--        548
     Navigation_ _                                     .          539
Alternate Canal, Mich., investigation_-       --      -                                1830
Alton, Ill., investigation_      _____                                                 1127
Alton, Ind., flood control_        __                                                  1500
Altus project, Oklahoma, investigation-                          1111
Alvin, Tex., investigation__                                      915
Amazon Creek, Oreg., flood control_                                                    2157
                                                                 1810
Ambrose Channels, New Yok Harbor, N. Y., improve-
ment-                                                           1810
American Channel, Mich., navigation-__                                                 1810
American River, Calif., construction of reservoirs-                                    2320
American River & Sacramento River, Calif., investiga-
tions-                                                                 2060,2097
Amherstburg Channel, Detroit River, Mich., improve-
ment_                                                                                 1810
Amite River, La.:
    Investigation _                                          768,805         ._-. -_
     Navigation                                                  767        ......
Ammonoosuc River, N. H., investigation_                          149
Anarcortes Harbor, Wash.:
    Investigation _                                                                    2232
    Navigation_                                                                        2232
Anacostia Park, D. C                                              401
Anacostia River, D. C. and Md.:
    Investigation--__         _                                   407
    Navigation_                                                   401
    Reclamation and development of the flats                      401
    Flood control---       -                                      408
Anaheim Bay, Calif., investigation-_                                         --
                                                                              -       -938




Anahuac Channel, Tex., navigation                                 887
Anchorage Channel, New York Harbor, N. Y-                         186
Anchorage Harbor, Alaska, investigation                                                2300
Anclote River, Fla.:
    Investigation_                                                622
    Navigation_                                              597, 622
Anderson, Ind., flood control_                                               --- --
                                                                                        5Q


Andover Reservoir, Conn., flood control-      - -                 120
                                                %IND                                                          III

                                                                                                Page

                                                                                   Volume 1            Volume 2

Anegado Reach Channel, P. R. navigation-------_------                                615-
Angelica Creek, N. Y. investigation-- -------------------------
                                                  .                                                   1908
Angelina River, Tex.:
    Investigation.-----------------------------------                                935---------
    Navigation- ---------------------------------                                    928.
Angoon Harbor, Alaska, investigation--------__                            _-----------                2300
Animas River, Clo., investigation- ___----                    -----------                           -1993
Annapolis Harbor, Md., navigation....---------                       ---     -       324........
Annisquam River, Mass.:
    Investigation -----------------------------------                                 105         ..-
    Navigation       - - -. - e -         .. -----    --.-- .---                       36        ._
Annisquam River, Inland Waterway to Plum Island
  Sound, Essex Co., Mass., investigation............--------------                   105
Antelope Valley, Calif., investigation____ ......                  -.....-.--                         1973
Anthony Shoals Reservoir, Ga., flood control---....... l                             540          -
Aowa Creek, Nebr., investigation __----------------......                                             1339
Apalachee Bay, Fla., to Mexican border, navigation-.... 652,719,866
Apalachicola Bay, Fla., navigation ..             ...                                 698
                                                                                      698....-
Apalachicola, Chattahoochee, and Flint Rivers, Ga. and
   Fla.:
     Investigations_         ------------    ___.-             --------         -622,   698,
                                                                                    706, 866
     Navigation--_  --------------------------------                                       656---------
Apes Hole Creek, Md., investigation----                ----                               335
Aplin, Ark., flood control--------
                             ...-.-.-.                    - _              --        -1026
Apoon Mouth of Yukon River, Alaska - - ...----.-                                      ----           2298
Apopka Lake Fla., investigations- _-.                -----------                    622, 644
Appomattox River, Va., navigation_ --------                 _                             453
Apponaug Cove, R. I., investigation-                 ---   _--, _-105
Appoquinimink River, Del., navigation_,---- -----           _                            301
Appropriations, rivers and harbors and flood control                 _..                2, 17
Aqueduct, Washington, D. C., maintenance and repair of_                                   396
Aquia Creek, Va., navigation__     _____----------------406
Aransas Bay and Pass., Tex.:
      Channel to Port Lavaca_                           -
                                                ._---------- _--_____                    899
      Improvement at Port Aransas_-                                                      768
    Improvement of channel to Corpus Christi--                  --------        868
     Investigation_-------_     ---------------------------                     915
Arcadia Harbor, Mich., navigation__ ----------------                                 --      1740
Arcadia Wash system, Calif_----                   --                     -----            -- 1941
Archy Fork, Ark., investigation_---- -               ----------               1049
Arecibo Harbor, P. R.:
    Investigation ----------------------------                     ----         622
     Navigation --------------                               -----              612      6---



Arikaree River, Colo. and Kans.--.--------- ---------                                   -     251
                                                                                             1--------
Arkabutla Reservoir, Miss___ __-----------------                           ---------         2346
Arkansas River and Tributaries, Ark. and Okla.
     Tulsa District:
           Flood control.....                ----....------.--------------------
           Navigation-----------------------------                      995, 1003,-----
                                                                                 1051, 1098
      Little Rock District:
           Navigation_                                                            992, 1004,
                                                                                       1006
          Flood control---- ----------------------                               1015, 1028--------
      Vicksburg District:
          Navigation-------------------- ----------                                 815,994,
                                                                                        1009
IV                                     INDEX


                                                                                Page

                                                                    Volume 1           Volume 2

Arkansas, White and Red River Basins, Ark., La., Okla.,
  Tex., N. Mex., Colo., Kans., and Mo., investigations- _            768, 805,
                                                                     822, 842,
                                                                     850, 854,
                                                                    985, 1014,
                                                                   1049, 1057,
                                                                         1111
     Flood control, Pueblo, Colo_.----         --------                  971
    John Martin Reservoir, Colo__----------- ------                      972
Arkport Reservoir, N. Y., flood control_--. -------                      339
Arlington, Oreg., flood control_ ---       --------------------                             2189
Arlington Reservoir, Mo., flood control_       -----------------                      1251, 1290
Armistead, La., flood control__ ----                                 780, 811
Arnaudville, La---------------------------------                         753.
Aroostook River, Maine, investigation- _ --------                 149
Arroyo Colorado, Tex., investigation__ -     ---------            915
Arroyo Grande Creek, Calif., investigation_-_---------------                   1973
Arthur Kill, N. Y. and N. J.:
    Investigation ----------------------------------
                      _                                           243
     Navigation------- ------------------- --------               223
     Navigation of channel to Raritan River-----------            222
Ashepoo River, S. C., improvement of waterway Via --              505
Ashland County, Wis., investigation_-                    --------
                                                    _-----------               1667
Ashland Harbor, Wis., navigation_-__------------------             -1650
Ashland, Ky., flood control----------------_     ----------------        1554, 1564
Ashley River, S. C., navigation----------------                   517---------
Ashlog Bayou, Miss., flood control_ __---8--   --------           840
Ashtabula County, Ohio., investigation__-------------------                                 1893
Ashtabula Harbor and River, Ohio, navigation                   _
                                                 ----------------   -                       1858
Association of Congresses of Navigation, Permanent
  International__-------------------------------------                                      2387
Assoteague Channel and Island, Va., investigation------        335
Assumption Parish, La., investigations-------------    _  768, 805                ---------
Atascosa River, Tex., flood control __--       --------        963-                          -
Atchafalaya River, La.:
     Investigation--------------------------------                   768, 805    --          -339
    Navigation_ ------------------------------- 767,821
Aten, bank protection, Missouri River, Nebr ------------------                              1339
Athalia, Ohio, flood control_ __     -   ___-__-----------------                            1564
Atlantic-Gulf Ship Canal, Fla., navigation-----              621
Atlantic Intracoastal Waterway:
    Between Norfolk, Va., and the St. Johns River, Fla_
     Norfolk District - -----------------------------                    447
     Wilmington District      --   --------------                        467
     Charleston District_------------------   - -------                  505
     Savannah District -----------------------------                     521
    Jacksonville District -------------------------                      550
    Jacksonville to Miami, Fla_----             -------                  564
Atlantic Ocean, all Streams in Georgia flowing into-...                  548-
Atlantic Ocean to Gulf of Mexico, waterway across
  Florida, investigation_    __-- _----     --------                     623
Atlantic Tidewaters, investigation --------------------                  243                1893
Atwood Reservoir, Ohio, flood control__-------------------                                  1533
Auburn, N. Y., investigation-       -------------------                                     1908
Augusta, Ark., investigation_-       -        ___----------1049
Augusta, Ga., flood control-__ -------------                             547
Augusta, Kans., flood control---------------------                      1110
Augusta, Ky., flood control _------------------------------                                 1500
Au Gres River, Mich., investigation ----------          - -------                           1837
Augusta to Clarendon, White River, Ark., flood control_    854-
Aunt Betty Rodgersditch, Ark., flood control --            853 -                          ----
                                                  INDEX                                                              V


                                                                                               Page

                                                                                 Volume 1             Volume 2

Aurora, Colo., investigation ----------- -                    -     ------------------                            1339
Aurora, Ind., flood control___--              -      -----------------                  -                         1500
Au Sable Harbor, and Harbor of Refuge, Mich., naviga-
  tion------------- ----------------------------------------                                                      1815
Austin Hollow, Ill., investigation---------------------- ---                                                      1157
Austin-Washington Soil Conservation Dist., Tex., inves-
  tigation -----------------------------------------                                      923
Au Train River, Mich., investigation_ ---------------------                            ___                        1665
Avoca, N. Y., flood control ----- ------------------                                      344
Avoyelles and Eastern Rapides Parishes, La., investiga-
tion_----------------------                        --------------                        806
                                      B
Bachelor Island, Clark County, Wash-----------------__        --- _                        -_                     2182
Bachelors Bay, N. C., investigation___--- --           -     -                           499
Back Bay and River, Va., investigations--------------          453,                      465
Back Creek, Md., navigation ---------------                                              334 -
Back River, Brunswick Harbor, Ga., improvement .---.                                     535
Back River, Md., investigation.----__.--------------                                     335
Back River, Va., investigation         _ _------------ -----                             453
Back Sound, N. C., navigation________----------------                                    490
Bad River, Wis., investigation ---   ---------                                -------                 -           1669
Baffins Bay, La., and Tex., investigation------_                                        -915
Bagaduce River Maine, navigation                _____------102
Bagnell Dam, Mo-----------------------------------                                ---             1247
Bainbridge Island, Wash., investigation_------- - ---                       ----------- -2232
Baker Bay, Wash., navigation -------------------------                           ------           2136
Bakers Haulover Inlet, Fla., investigation -----------                               23 -
Bald Eagle Creek, Pa., flood control-------------__368                                    -_        _
Baldhill Reservoir, N. Dak., flood control----------------_--_ -_                                 1224
Ballard Locks, Wash., investigation------------------------                                       2232
Ballast Island, Ohio, investigation------------------------                   _    -    --        1830
Ballast to Powells Bay, Va., investigation-----_              ---                 335        ------
Ball Mountain Reservoir, Vt., flood control-----                   -------   125, 129
Ballona Creek, Calif.:
     Flood control, channel and jetties.-_ -              _-      ---
                                                                   -        ---             1939, 1941
     Investigation -----------------
                              _                  ------------          --------                   1973
Baltimore, Md.:
     Engineering district__------_------- -----                                   311
     Harbor and channels, navigation, investigation -...-                    312, 335
     Harbor, removal of drift-------------------------                            318
Banana River, Fla., navigation____------, ---- _                       _          572
Banner, Ill., special drainage and levee district, flood con-
  trol_-------------             ---------------------------------------                           1790
Banning Canyon, Calif., investigation                                                               973
                                                                                                  1----------------------
Barataria Bay and Bayou, La.:
      linvestigation---------------           ----- --------------                 768
     Navigation_            __________---_                                        767
Barbourville, Ky., flood control--                                                                 1419-----------------
                                                                                                 -419

Barcelona Harbor, N. Y., navigation__               ------           -------     _---              1892
Bargetown Levee, La-_                                                              812
Bar Harbor, Maine:
     Investigation------------------------105                                            ---         ..
      Navigation--                   .*------        _               ....                 102
Barker Reservoir, Tex., flood control__.------ ----------  920                                                -     .
Barkman's Creek, La., flood control_ --             ----   803                                            -   r
                                                                                                              -     ..
Barnegat Inlet, N. J. navigation__ _-_.--------------      301
Barnett Creek, Ky., flood control---------------------------..                                                    1500
Barre Falls Reservoir, Connecticut River Basin, Mass.,
  flood control    ---                          - -....        125, 135
                                              ....---------------                                -            -
VI                                                   INDEX


                                                                                         Page
                                                                                  Volume 1      Volume 2

Barren Island Gap, Md., navigation.------------- _                                    321
Barren River, Ky. and Tenn.:
     Investigation.--.-----.-----..        _-----__---                                               1450
     Navigation _ ...                   . __ _ .           .                                         1443
Barroom Bay, Tex., navigation__                         ___           _       _       868
Bartholomew Bayou, La. and Ark.:
     Flood control                 ----       -----------------                   823, 832
     Navigation .- _..--             --     _---------------                           821
Bartley, Republican River, Nebr., flood control-                                             1251, 1272
Bass HarborBar, Maine, navigation; investigation .....                            102, 105
Bastrop, La., flood control_                          __.         ____            823, 833
Bastrop Bayou, Tex., navigation-                                                       915
Bastrop-Fayette Soil Conservation District, Tex ......                                 923
Batavia and vicinity, Tonawanda Creek, N. Y., flood
  control------------------------------------                                                        1897
Bath, N. Y., flood control_                     .... _ . _..            .. __         344
Baton Rouge, La., investigation_                     _________..                      768
Baton Rouge to Gulf of Mexico, La., navigation ......                                 737
Battle Creek, Mich., investigation-.--_                _-.-.                -                        1743
Battle Creek, Nebr., flood control_                  ___       __                                    1337
Baudette Harbor and River, Minn., navigation---                                                      1664
Bautista Creek, Calif., flood control_                             _                                 1972
Bawcomville, La., flood control.                  . _                __           823, 834
Baxter Bayou, La., flood control_ .                 . ......                           840
Bay Creek, Ill., flood control___                         _.. __._...       _                1186, 1495
Bay Creek, Ill., investigation _                          ....                                     1505
Bayfield County, Wis., investigation------                         -                               1667
Bayfield Harbor, Wis., navigation__                                                                1664
Bay Ocean Peninsula, Oreg., navigation-                                                            2155
Bayou Chico, Fla., navigation___                                                      668
Bayou Coden, Ala., navigation__                                                       698
Bayou Galene, Miss., navigation__                                                     698
Bayou LaBatre, Ala., navigation                                                       698
Bayou Sorrel Lock, La                                                                 724
Bayous La Loutre, St. Malo and Yscloskey, La., navi-
  gation____                                                 .-                       736
Bayou Meto Basin and Grand Prairie Region, Ark.,
   investigation_                                              __                     842
Bay Ridge Channel, New York Harbor, N. Y., naviga-
  tion    -_-    -    - -      -    -  -                                              189
Bay River, N. C., navigation      __    _                                             498
Bayside-Gedney Channel, New York Harbor, N. Y.,
  improvement___                                                                       186
Beach City Reservoir, Ohio, flood control--                                                         1533
Beach Erosion Board        _                                                                        2311
Beach erosion control studies, list--_                                                              2313
Beals Harbor, Maine, navigation-                                                       102
Bear Butte Creek, S. Dak., investigation_                                                          1326
Bear Creek, Calif., flood control__                                                          2065, 2066
Bear Creek, Ky., navigation-                                                                       1443
Bear Creek, Miss.:
     Investigation___        _                                                        842
     Navigation.                                                                      821
Bear Creek, Mo., investigation_                                                                      1198
Bear Creek Reservoir, Lehigh River, Pa., flood controL-_                              305
Bear Dam and Reservoir, Calif___                                                                     2068
Beards Brook Reservoir, N. H., flood control__                                    111, 148
Beardstown, Ill.:
     Investigation -_                                                                               1777
     Flood control                                                                                  1785
Bear Mountain, Calif., investigation-- .........                                                    2097
                                                   INDEX                                                    VII


                                                                                              Page

                                                                                   Volume 1          Volume 2

Bear River, Calif., investigation -------------------------------                                            2060
Reservoir construction --------------------                                ------------------                2320
Bear River, Utah, Idaho and Wyo., investigation--                                             -      -       2097
Beaufort Harbor and River, N. C.:
      Improvement of harbor___                     _______-------------               483, 488   ---------
      Improvement of waterway to Pamlico Sound via
          Core Sound ----------------------------                                             483
      Investigation       --------------------------------                            453, 499 ---------
Beaufort Inlet, N. C., investigation_ ----                         ------ -                  499-          -
Beaufort, S. C., investigation- ..                ------------                                517 -
Beaver Bay Harbor, Minn., navigation---_                         .----------------.   .-                     1664
Beaver Creek, Mont., and N. Dak., investigation flood
  control        ---------------------------------------                                  ------ 1368, 1373,
                                                                                                             1376
Beaver Creek, Oregon, investigation--_-                                                       -2190
                                                                                   .----------.--------
Beaver Dam, Wash., Ariz., Utah, and Nev. investigation. _-----                                               1973
Beaver Dam Creek, Ala., flood control                      ....          _ ..                708
                                                                                              7-0-8-_
Beaver drainage district, Columbia County, Oreg., flood
  control         _
                 --------------------------------------------                                   --- 2182, 2188
Beaver Island, Mich., navigation- __ - -                      ----------------------                         1738
Beaver Reservoir, Ark. investigation- -------_049-                                         1
                                                                                         -1049
Beaver and Mahoning ivers, Pa., and Ohio:
      Flood-control reservoirs--- ------------------                                 --------                1629
      Investigations__              ___------       --        --------- _--------               --     1590, 1633
      Navigation_      ----------------------------------                                 ----------         1590
Belfast Harbor, Maine navigation_.----- ------------                                          103
Belhaven Harbor, N. a.:
      Investigation_-----------------------------------                                       500
      Navigation-_ _-__---------_-.-----____---498
Bellaire, Ohio, flood control_____       --              ------------             _----------                1628
Bellamy River, N. H., navigation-                   -___ ----------                        - 103
Bell City Drainage Canal, La., investigation--_                   --------                    768 -- -
Bell drainage district, Sangamon River, Ill., flood control-_-                            _ -- -        -    1790
Belle Fourche, Cheyenne River, S. Dak., flood control-- --_ __ --                                            1375
Belle Glade, Fla., investigation, flood control               -----------                     634
Belle Plaine, Kans., flood control _____.--                     .--------..                1110  ----
Belle River, Marine City, Mich., navigation--. --- --------------                                            1829
Bellevue, Ky., flood control ------------------------                                ----------              1500
Bellevue, Ohio, investigation-----------------------------------                                             1908
Bell 'Foley   Reservoir, Ark., flood control---------------                                1043---------
Bellingham Bay and Harbor, Wash.:
      Investigation -----------------------------------------                                                2232
      Navigation-------------- --- -----------------------                                      ----         2199
Belpre, Ohio, flood control -----------------------------------                                              1564
Belton Reservoir, Leon River, Tex., flood control-.....                                       952
Benbrook Reservoir, Tex. See Trinity River----------.                                        946
Bennetts Creek, Va. investigation __--- --                       _                           453.----------
Bennett Creek, N. X., flood control         .----------                                 344-----
Bennington, Hoosic River Basin, Vt., flood control ....                            148, 255-----
Bennington Reservoir, N. H       __      __-----------                        111----------
Bentleys Creek, Conn., investigation------------------                        105       --
Benton Harbor Canal, Mich-----------------------                        --- -----.-.        1709
Benwood, W. Va., flood control                    _------_...
                                                  ---------------------                      1625
Beresford Creek, S. C., navigation ------------------     .                   517
Berkley Harbor, Calif., investigation.---- ------------------------                         2026
Berlin Reservoir, Ohio, flood control          __-------- -----            _----------      1620
Bethlehem, Lehigh River, Pa., flood control---------                        ---
                                                                              308----
                                                                              335 -....
                                                                                           -    .
Betterton, Md., harbor of, investigation--....-------------
Beulah, N. Dak., flood control......-----------------------------.........                  1357
Beverly Harbor, Mass., navigation ..........----------                                    103
VIII                                                INDEX


                                                                                                Page

                                                                                     Volume 1          Volume 2

Big Bay Ditch, Ark., investigation_--------. ------                                  -     854
Big Bay Harbor Mich., navigation----------------.--------                                                - 1664
Big  Bayou and Black Pond Slough, Ark., investigation--                                          842
Big  Bend Reservoir, S. Dak., flood control---------------------                                         1312, 1315
Big  Bend Reservoir, W. Va., flood control--------- -- ------------                                            1565
Big  Black River, Miss.:
     Flood control-------------.-.--------------                                             - 837
     Navigation ------------------------------------                                             821
     Investigation___------------__---------------                                               842
Big Blue River, Kans. and Nebr_.--.--------------.                                    _.------           1251, 1279
Big Bottom Ark., flood control___---_------------,                                              1048_
Big Brush Greek, Tenn., investigation___                         ........... _.....___        .1437
Big Canyon Okla., investigation...----.....----------------                                     1112
Big Chazy River Champlain, N. Y., investigation.......                                           259
Big Creek, Ark.:
     Flood control----------------------------------                                             854
     Investigation--------...---------               ------------------                          854
Big Creek drainage basin, Ill., investigation__-----                              ------------                 1505
Big Creek, Kans., investigation-.....____.--------------                              _1290
Big (Cunningham) Creek, Ohio, navigation----- ----------                                            _          1892
Big Darby Creek Reservoir, Ohio, flood control-.----- __------                                                 1566
Big Dry Creek Reservoir and diversion, California flood
  control------ ---              -------------           -------------                        -----      2096,2097
Big Elk Creek, Okla., investigation_                  ___--              -        _             1111
Big Iron River, Mich., investigation--_----------------------                                                  1665
Big Joe River, Minn., investigation-_-.-.--                                  ________               __         1237
Big Lake, Ill., flood control_                _________             ________-_----------1787, 1790
Big Marco Pass, Fla., to Naples, Fla.:
     Investigation-----------------------------------                                            623
     Navigation ------------------------------------                                             621
Big Muddy Creek, Tenn., flood control_____________-__                                            852
Big Muddy R., Ill., investigation, flood control---------                                                1157, 1136
Big Pass, Fla., investigation_ -----------------                                                 623
Big Pigeon Bayou, La., navigation-____----__-----__                                              767
Big Prairie, Ill., flood control_            ___---___                 ____---------------1790
Big Sandy Creek and Mexico Bay, N. Y., investigation                          ------------                     1893
Big Sandy Creek, Tex., investigations----------------- 935, 965
Big Sandy River, including Levisa and Tug Forks, Va.,
  W. Va., and Ky.:
     Flood control reservoirs-----------------------------------                                               1565
     Investigation_               --      ---
                                        _________             __---                      --           --       1528
     Navigation_ --------------------------------------------                                                  1524
     Locks and Dams-----------------------------------------                                                   1525
Big Sarasota Pass, Fla., investigation-----------------                                          623
Big Sioux River, S. Dak. and Iowa:
     Investigation----------            ----------------------------                                           1339
     Navigation----------------------------------------------                                                  1308
Big Skin Bayou-Camp Creek Bottom, Okla., flood con-
  trol-------------------------------_                        -----------                       1110
Big Slough to Belle Plaine, Kans., flood control ---------                                      1110
Big Suamico River, Wis., navigation--------                                --------         _                  1740
Big Sunflower River, Miss., navigation, flood control --- 821, 841
Big Sur River, Calif., investigation__----__-_____                                              _ ---          2035
Big Swamp Creek Ala., investigation-------- ----------                                           706
Big Tariko, Kans. See Tarkio River_______
Big Thoroughfare River, Md., navigation--------------                                            328
Big Timber Creek, N. J., navigation-_-__-.                      ___-____                         301
Big Wills Creek, Pa., investigation----___-                                    -------           417
Big Wood River, Idaho, investigation                                                                           2280
Biles Creek, Pa., navigation-_                                                             2
                                                                                           263 .........----.
Billings, Mont., flood control---_--                     -.        ---                              1374
                                         INDEX                                                  IX


                                                                                Page

                                                                Volume 1               Volume 2

Biloxi Harbor and Bay, Miss.:
     Investigation_.                                                     699
     Navigation_-.--              --    --       -                       690
Binghamton, N. Y., flood control------------------                       341
Birch Hill Reservoir, Connecticut River Basin, Mass.,
  flood control       _   _ _                                   125, 132
Birch Reservoir, W. Va., flood control-                                                       1565
Birdsall Creek, N. Y., flood control______                               377
Birnie Creek, Wash., investigation-                                                           2155
Biscayne Bay, Fla., navigation_                                          58-
Bisteneau Lake, La., navigation.                                        767
Bixby flood protecton, Okla., investigation_..
Bixby Slough, Calif---                             --
                                                         -             1111
                                                                                              1938
Black Bayou Reservoir, La., flood control                       774, 805
     Investigation_                                                  806                  -       --




Blackburn Dam and Reservoir, Okla_                                   992
Black Butte Dam and Reservoir, Calif., flood control_ --                                      2090
Black Creek, Ala., flood control-                                    710
Black Creek, Fla., investigation_                                    623
Black Cypress, La., investigation_                              768, 806
Blackfish Bayou, Ark.:
     Investigation __                                                   854
     Navigation------                                                   850
Blackfoot Area, Idaho, flood control----------------                                          2267
Blackfoot River, Idaho, flood control---------------                                          2267
Black Lake, Mich.:
    Investigation                                                                             1741
    Navigation .....                                                                          1714
Blacklick Creek, Pa., investigation_                                                          1633
Black Pond Slough, Ark., investigation-------------                      842
Black River, Ark., Mo., and La.:_
    Flood control---------------               --                   1048
    Investigation                                                   1049
    Navigation___                                              816, 1014
Black River Harbor, Mich., navigation-------------                                            1664
Black River Harbor, N. Y., navigation-------------                                            1892
Black River, Mich., navigation-------------------                                             1829
Black River, N. C., navigation_------------------                       499
Black River, N. Y., investigation_                               ...   .....                  1908
Black River, Poplar Bluff, Mo., to Knobel, Ark., flood
  controL              -    -                                          1030                     --
Black River, S. C., investigation------------------                     520-------
Black River, Wis.:
    Investigation------------------------------                                               1212
    Navigation             -------------------------------                                    1211
     Flood control-----------            -------------------                                  1237
Black Rock Channel, Conn---__-----___            ----     -                94
Black Rock Channel, N. Y.:
     Investigation_                                                                           1893
     Navigation -------------------                                                -1875
Blackstone River Basin, Mass. and R. I., flood control_                  117
Black Walnut Harbor, Md., navigation _                                  334---------
Black Warrior, Warrior and Tombigbee Rivers, Ala.,
  navigation_ _                               ..      ...               678--------
     Locks and Dams_                                                    679
Blackwater Reservoir, Merrimack River Basin, N. H.,
  flood control_.............................                   111, 115               --.......----
Blackwater River, Fla., navigation; investigation-              698, 707           -
Blackwater and Lamine Rivers, Mo., investigation ._.                              1290
Blackwater River, Va., navigation ....----------                        453 ..........
Blackwell, Okla., flood control....______________.                     1110
X                                            INDEX


                                                                                       Page

                                                                         Volume 1             Volume 2

Blaine Harbor, Wash., investigation -----------------------------                              2232
     Navigation----------------------------------------------                                  2198
Blakely Mountain Reservoir, Ark., flood control--,,-------                        823
Blanchard Channel, Los Angeles Calif., flood control------ --                       -       -- 1941
Blind slough diking district, Clatsop County, Oreg.,
  flood control---------------------------------                  _-2188 -       ---
Block Island, R. I.:
     Construction of harbor of refuge_- ---             ----                       74
     Great Salt Pond=..----------------..                     -76
     Investigation-_ ------------------ ...      ------- ---------                105 _
Blood River, La., navigation--- ----------------------                            767 - - -
Blue Gum Canyon, Los Angeles, Calif., flood control----------------                            1941
Blue Hill Harbor, Maine, investigation_-----------------                          105
Blue Mountain Reservoir, Ark., flood control- .---------                        1023
Blue River Dam, McKenzie Basin, Oreg--------------- --------                            2159, 2190
Blue River, Ind., investigation ----------_          -------          - -----------            1505
Bluestone Reservoir, New River, W. Va., flood control_-
Bluewater Floodway, N. Mex., flood control-
                                                                    -------             1546, 1565
                                                                      _           984
Bluff Creek, Miss., navigation--------- -----                 .- - -.. --         698 _
Boards:
     Beach erosion --------------------------------                      ----------            2311
     Engineers for Rivers and Harbors..._---                .- ---------        ----     -     2307
     International:
          Kootenay Lake Board of Control_------ --------------           _-                    2403
          Lake Champlain Board of Control_-- -------- ------                            - - -2398
                                                o--------
          Lake of the Woods Board of Control- -----
          Lake Superior Board of Control --------------------             ___         _
                                                                                               2402
                                                                                               2401
          Massena Board of Control-_-- ---------------                                    -    2400
          Niagara---------- ----------                ---------------------                    2400
          Osoyoos Lake Board of Control -----------------                    -------           2403
          Prairie Portage Board of Control-_            -------------          ___             2402
          Rainy Lake Board of Control_---------------------__                                  2402
          St. Croix River, Maine, and New Brunswick,
             Board of Control_ ----------                     ----- -----                      2397
Boca Raton Inlet, Fla., investigation-_------------- -                            623
Bodcau Bayou, Ark. and La., investigation--            ----------           769, 806
Bodcau Bayou, Red Chute, and Loggy Bayou, La.,
  flood control----------------------------------                           774, 805 ......
Bodcau Bayou Reservoir, La---_______-                     __..--            774, 783 ----
Bodega Bay, Calif. navigation, investigation__       ------------------.                1987, 2026
Boeuf and Tensas Rivers and Bayou Macon, Ark., and
  La., investigation, flood control__----------- _ --                            842
Boeuf Bayou, La., investigation_ •--              -     ---          -768,      807
Boeuf River, Ark., and La.:
     Investigation.-----------------------------------                   842
     Navigation      -------------------------------            __       821
     Flood control----------- ---------------------                 833, 841               .
Boggy Creek, Okla., flood control___ ----                     -.-       1104
Bogue Falia, La., navigation- _                    ____--__--            767
Bogue Inlet, N. C -------------------------------                        500
Bois de Sioux and Red Rivers, Minn. and N. Dak.,
  flood control-----------------------------------------------                         1214
Bois de Sioux River, S. Dak., flood control__--------------------                 -1227
Boise River, and Valley, Idaho, investigation, flood
  control         -------------------------------------- --------             2280, 2267,
                                                                                       2272
Bolivar Peninsula, Tex.:
     Investigation --------------------------------_                     915.     ......
     Navigation_---------------------                 -- ----------      880
Bolivar Reservoir, Ohio, flood control-__ .---- -----                    ------                     1533
Bonfouca Bayou, La., navigation----- ...-  ----    --                    -   767-             ---
                                                                                    Page


                                                                         Volume 1          Volume 2

Bonnet Carre, spillway, La------------------------                ----------                   2346
Bonneville, Oreg., construction of dam at------------------------                              2113
Bompas Creek, Ill., flood control_____--------------------- -----                              1500
Bon Secour Bay, Ala., investigation-_________-- ___-- __                699
Booneville Reservoir, Ky., flood control ---------------
                                              _-------                       --                 1502
Boothbay Harbor, Maine:
    Investigation...-------------------------------                  -   105
    Navigation---_-------------            -----------------             103
Booth Point, Fla., to Old Tampa Bay, investigation - - -                 623
Boot Key Harbor, Fla., investigation, navigation .......                 623
Borel Canal, Calif., flood control_------------------------------                               2072
Boston, Mass.:
     Improvement of harbor--..... ----------------                             42
     Investigation_ -----------------  ---- -------------                     105
Boston, Mass., Metropolitan Dist., Beaches, investigation-                    105
Boston, Mass., Waterway, investigation-       --     ---                    - 105
Boston, Mass., to Long Island Sound Intracoastal Water-
  way, investigation--------------------------- ---                           105
Boswell Reservoir, Boggy Creek, Okla., flood control.--.                     1104
Bottle Run, Pa., flood control_------------------------                       365
Boulder, Colo., flood control ---------------------------                               - - 1328
Bowman irrigation project, North Dakota, investigations               -----------
                                                                   1368, 1376
Bow Creek, Nebraska, investigation..--- --------------       _           1339
Boyer River, east fork of, Iowa----------------------------------        1339
Brackenridge, Pa., flood control_ __--------------------__ _   ___       1628
Braden Bottom, Okla., flood control_--------------1110, 1116       ------
Bradens Bend, Okla., flood control_ ---------_----____       1065
Bradford, Pa., flood control investigation----------------------   1594, 1633
Brady, Tex., flood control- --------------------------         965
Brandenburg, Ky., investigation--------------------------------          1505
Bradywine River, Wilmington Harbor, Del., improve-
  ment -------------------------------------------             276
Branford Harbor, Conn.:
    Investigation....---------------------------------         105
     Navigation_ -----------------              ------                         104
Bransons Cove, Va., navigation--_            ___--
                                          --------        .-                  406
Brashears Creek, Ky., flood control1------------ ----------                    .       ---      1469
Brays Bayou, Tex., investigation __-__-2_____3.___                            923     _
Brazoria-Galveston Soil Conservation, Tex., investiga-
  tion_------            __----          ---------------------.. 923
Brazos Island Harbor, Tex., navigation-..------------                         908
Brazos River, Tex.:
    Improvement from Velasco to Old Washington _                              9_9
                                                                              915              _
    Improvement from mouth to Freeport-....-   - - _
    Mill Creek, Tex., flood control_---- .--------          954
                                                                            --896
    Whitney Reservoir--.     ------------------------- 950
    Investigations -------------------------..---     915, 965 .                                .
Brea Dam, Calif., flood control--.-- ----------- .-..  -------.                                 1961
Breton Bay, Md., navigation-___- ----.-----------           - 406
Brevoort levee, Indiana, flood control ---------------------------                              1479
Bridgeport Harbor, Conn.:
    Investigation....-----------------------------------      105
    Navigation -------------.----           ---------------    93
Bridges:
    Construction across navigable waters..---------------.---.--                              - 2393
    Rules governing opening of draws--------------------------                                  2393
Bridgewater, Va., flood control_ ---.--..-.---.--.---         418
Brilliant, Ohio, flood control- ------------.-----                      ---------       ---     1628
Broad Creek, Md., navigation ------------------------                         334
Broad Creek River, Del., navigation-------------.--.. -                       334
Broad Creek, Va., navigation---------                    --------..        - 395
                                                                                                                     Page

                                                                                                        Volume 1            Volume 2

Broadkill River, Del., navigation_ ...
Broad River, S. C., investigation_,--
                                                                           ... ,      --...---. -. ,_               301
                                                                                                                    5,20
                                                                                                                              .        .---
                                                                                                                                            .
Broad Sound, Boston Harbor, Mass., improvement..                                                                       46 ...
Broadwater Creek, Md., navigation-----                              ....   -      . -.  -334...
Brockway, Pa., flood control- -----                                                 -----.........                                        1628
Brockway Reservoir, Connecticut River Basin, Vt., flood
  control ----------------------------                                                   ------             125, 148              --
Broken Bow, Nebr., investigation-                                      -                                    _           .------..------- 1339
Bromley, Ky., flood control                                                                          -                                        00
                                                                                                                                          15--------------
Bronx River, N. Y.:
     Investigation.---.--                      ...----------------- ------                                          243                 ..-
     Navigation - _..                              ---------------------------                                      160               ..
Brooklyn, W. Va., flood control- .....                             __.                         __                .----
                                                                                                                 .-.-
                                                                                                                    ___.                  1564
Brookport, Ill., flood control--------...                                      --------------                                  1494, 1500
Brookville Reservoir, Ind, flood controL                                                .         ------                                  1502
Brookville, Pa,, investigation--,,---..----                                         ...-...                                               1--83
Broward County, Fla., investigation------                                                                           6--44             . .
Browns Bay, Va., investigation---------------                                         -----          --             45            -------
Browns Creek, N. Y., navigation- .-.                             -               --
                                                                               - --------                           242
Brownyood, Tex., investigation .--.--------                                                                         965------
Brownsville, Tex., navigation-..--------                                                   -- - -                 - 8-8 -------
Brunswick Harbor, Ga., navigation . --------.                                                                       A45
Brush Creek, W. Va., investigation - -                                          - -           --                - - --                      569
Bueana River, P. R., investigation---- ---------                                                                      44..---.4.
Bueanan, Ky., navigation- --------------                                                                                                  1,525
Buck Creek, S. C., investigation.--------------------                                                              520
                                                                                                                    520
Buchannan River, W. Va., navigation                                                                       .-----------.--- 1690
Buckhorn Reservoir, Ky., flood control-                                               -------                                                 02
Buckingham landing site, S. C., investigations- -------                                                     517, 520,                   ----
                                                                                                                    540
Bucksport Harbor, Maine, navigation                                             ----                                 102         -
Budd Inlet, Olympia Harbor, Wash ..----------                                              -----                                          2220
Buena Vista, Ohio, flood control_---------                 _._--------------..                                                            1564
Buffalo Bayou, Tex.:
     Flood control----- ---------------------------                                                        920, 950 _
     Investigation_ ---------------------                                              --------        915,9231,                  -------
Buffalo Creek, W. Va., and Pa,, investigation                                                                    ..                       1633
     Flood control----- ----------------------------------                                                                     139, 1896
Buffalo, N. Y.:
     Engineer district -------------------                                         ------------------                                 - 1841
     Improvement of Black Rock Channel and Tonawanda
         Harbor-----------------------------                                                      ------ --.---
                                                                                                 --                                       1875
     Improvement of harbor..------ ------ --------                                                -------              --                 1870
     Investigation--_ ----------------                                     -------.--.--
                                                                          ,--                          -.--                               1893
Buffalo River, Minn., investigati                         on.          _------                         --.- -                             1237
Buffalo River, Miss., flood control.- -.. --------                                                                  841.
Buffalo, Wyo., flood control----------------------------------                                                                            1374
Baffumville Reservoir, Mass., flood control.                                                               1.2.0, 148 .---
Buford Dam, Ga., navigation---- ----- ------                                              -- -r                      6-
Buford-Trenton Irrigation Proj., Mo. River, N. Dak- ...                                           -                 _                     1359
Buggs Island Reservoir, Va. and N. C., flood control. See
  John H. Kerr Res_ _-----------                            ----- -------. ---- --                                 456
Bull Dog Creek, Minn., investigation,-                                                    -----               .1676
Bull Shoals Reservoir, Ark., flood control__                         ---------------                              1039         ......
Bullock Cove, R. I., investigation..,-...                                                           .               106-
                                                                                                                    1.6
Burbank eastern system, Los Angeles, Calif., flood eontrodl - -,,.-                                                                       1941
Burbank western system (lower) Los Angeles, Calif., fod
  control...........................----------------------------------------..                               ..                           1941
Burbank western system (upper), Los Angeles, Calif.,
  flood ~ontrol,------          ....-....             -.--.-.                                                                        1941
Bureau Creek, Ill., investigation.,
                                -         -.......-. ----....     -t1198
                                                          ............
                                                                                               Page

                                                                                    Volume 1          Volume 2

Burgettstown Raccoon Creek, Pa .....----- ------                          -------                          1638
Burial Hill Beach, Conn ...         ........                       ----                     104
Burlington Harbor, Vt., navigation.---.--         --------.... .             243
Burlington, Kans., flood control- ------------------                       1110
Burlington, Ohio, flood control_..-. -__ -- _____-- _____ _____-- -                                        1564
Burns Dam and Reservoir, Calif., flood control --------------------                                        2067
Burns Ditch Harbor, Ind., investigation-.--.--                        --                                   1777
Burnsville Reservoir, W. Va., flood control ----------------             ---                               1566
Burr Creek Channel, Conn--..---------------                   ----             93
Burr Oak Reservoir, Ohio, flood control...           ----            --      -                     1541, 1565
Butler, Pa., investigation---_    -------------           ----------                                     1633
Buttahatchee River, Miss. and Ala., investigation .......                    707
Buttermilk Bay, Channel to Buzzards Bay, Mass., navi-
  gation-------- ----------------            -------------------               62
Buttermilk Channel, N. Y -------------------------                           192
Butternut Creek, N. Y ----------------------------                                          339
Buzzards Bay, Mass----------                   --------------------                   53, 62      ---------
                                      C

Caballero Creek, Los Angeles, Calif., flood control__----------------                                 1940
CacheCreek Basin, Calif., investigation..-----------
Cache River, ll., investigations, flood control -------------------
                                                                          -----_ __-                  2097
                                                                                               1157, 1505,
                                                                                                      1495
Cache Slough, California Flood Control.------------------------                                       2324
Caddo Lake Dam, La.:
     Investigation-----------------------------------                                  807
     Navigation------------------------------------                                    718
Caddo River, Ark., flood control-- ----------------                                    826
Caddoa (John Martin) Reservoir, Colo., flood control ...                               972
Cadet Bayou, Miss., investigation----------------------                                699
Cadle Creek, Md., navigation- ----------------------                                   334
Cadron Creek Ark., investigation------- --------------                                1049
Caesar Creek Reservoir, Ohio, flood controL_------- ----.------                          --           1502
Cagles Mill Reservoir, Ind., flood control -------------------                               - 1484, 1502
Cahaba River, Ala., navigation -----------------------                                 698
Cajon Creek, Santa Ana River Basin, Calif., flood control.-----------                                 1961
Calapooya River, Oreg., flood control ---------------------_         _                        --      2180
Calaveras River, Calif., flood control investigation--------__                  ----            2061, 1097
Calcasieu Pass and River, La.:
     Investigation___
                    -----------------------------------                                769
     Navigation -----------------------------------                                    759
     Lock------------------------------------------                                    723
Caledonia, N. Y., flood control-------------------------                                  - _-        1908
Calico Rock, Ark., flood control_ --------------------                               1044
Caliente Creek, Calif., investigation_-----------------                                             -2097
Calhoun-Victoria Soil Conservation District, Tex., inves-
  tigation---------------------------                           -----------            923
California, coast of, investigation_------------------------__                                  1938, 2026
California Debris Commission--._------------                                             _ -          2315
California, Ohio, flood control_-------------------                           ----------              1500
Calion Lake Dam, Ark., flood control investigation- --                            830, 807
Calion, Ouachita River, Ark., flood control-.---.                           --   -     823
Callahan, Fla.,flood control------- ------------------                                 642
Caloosahatchee River, Fla.:
     Investigation---------------                                                      623
     Navigation--- ------           _------....--....----------                        590
     Flood control---------------------------                                      - 632_
Calumet Harbor and River, Ill. and Ind., improvement
   of harbor (South Chicago Harbor)-                    -                    -      .- ,-                  1753
Calumet Lake, Ill., navigation  -                    ---....   ...........                                 1757
                                                  LDEX

                                                                                            Page

                                                                                Volume 1           Volume 2

Calumet (Little) River, Ind., investigation                    ,,--------------..-.-.--.                 1791
Calumet-Sag Channel, Ill., navigation..--------------------------                                        1764
Camas Creek Area, Idaho ---                  --------------------------                                  2267
Cambridge Harbor, Md., navigation--------......----                                    334
Cambridge, Ohio, investigation---------------__--------                                     .            1569
Cambridgeport Reservoir, Connecticut River Basin, Vt.,
  flood control- -   -----------------------------                                     125--
Camden Harbor, Maine, navigation_-.---.---.--..-.                             -        103     ..
Camelsback Site, Ariz., investigation-------------------                           -----------           1973
Cameron County, Tex., investigation------------------......                            923
Campbell's Island, Ill., investigation.                     ___             _ ...      ----              1198
Camp Blanding, Fla., investigation-_--- ---------------                                623
Canadian River, Okla., flood control------------------                                1095       .
Canadian River, N. Mex., flood control----------------                                 974
Canal Point, Fla., flood control_----- _----------- -                           -      634
Canacadea Creek, N. Y., flood control--.--------------                                 375
Canadian River, Tex. and Okla.:
     Investigations-----------------                             -----        1057, 1112
     Flood control_ -----------------------------...                            974, 1095 __             .._.
Canapitsit Channel, Mass., navigation              -----------------                   103
Canasawacta Creek, N. Y., flood control---------------                                 336
Canaveral Harbor, Fla., navigation investigation.......                           571, 623
                                                                                       1..
Cane Creek, Okla., investigation......................                              1112
Cane River, La., navigation, flood control -----.-.----                          767, 803                .
Caney Creek, Okla. and Kans., flood control-----------                               1110
                                      ----
Cancy River, Okla., flood control-----_                         __-------1081
Caney Fork River, Tenn., navigation, flood control.--------                 .-           --      1415,   1429
Canisteo, N. Y., flood control- ------------------                    ---              344
Cannelton, Ind., flood control_ ----------------               _ _        - --       --- -1471,          1500
Cannonball River, N. Dak., investigation_ -------                 ..--------                             1376
Canton, Mo., Mississippi River__             ------------------------                    ___             1188
Canton Reservoir, Okla., flood control -----------------                             1068 -- ---
Canton Township, Pa., investigation_ ----------------                               .1633
                                                                                --------
Canyon Reservoir, Guadalupe River, Tex., flood control_                                961
Cape Channel, N. C., investigation .------.              -------                   - 500
Cape Charles City Harbor, Va., navigation                 ------------                 453
Cape Cod Bay and Canal, Mass.:
    Investigation-----------------------------------                                   106
    Navigation ---- -----------------------------                            -----       53
Cape Fear River, N. C.:
    Improvement above Wilmington -.-                . -----                            491491 -
    Investigation ----------------------------------
                                       ....                                            504
    Navigation ------------------------------------                                    499
Cape Girardeau (east) Ill. and Mo.:
    Flood control_ --- ---------------              _-.                   -----             --           1129
    Investigation- ... _--       --------------------------------                            _           1157
Cape Lookout, N. C., harbor of Refuge-------499--_                           -.        499
Cape May Harbor, Cold Spring Inlet, N. J., investigation                               302
Cape May Canal, N. J ------------------------------                                    296
Cape Porpoise Harbor, Maine, navigation                                    -           103
Cape Vincent Harbor, N. Y., navigation_ ._ .--                                         _       -         1892
Carbon Canyon Dam and Channel, Santa Ana River
  Basin, Calif., flood control------------------------------------                                       1961
Carbon River, Wash., investigation-----------------------------                                          2248
Cardens Bottom drainage district No. 2, Arkansas River,
  Ark., flood control--------------------------------                                1048
Carlin Bayou, La., navigation-----------------------                              -755
Carlow Ditch, Mich., investigation             --------   .        .
                                                                .------         -----                    1837
Carlyle Reservoir, Ill., flood control------.   __ ---         _--
                                                            ___-_                __-_                    1155
Carmel River, Calif., investigation __ ------       __--_..       _ _---------2035
                            ... __ _ --- -----------..
Carmi, Ill., investigation---                                    -------                                 1505
                                                 INDEX                                                             XV


                                                                                               Page

                                                                                 Volume 1             Volume 2


Carolina Beach, N. C., investigation..------------------                                  500
Carpenters Creek, Pa., flood control_           --------..--......                        357    -       -   .     _
Carquinez Strait, Calif., navigation_------   -------                         _-------------                      2027
Carrabelle Bar, Harbor, and River, Fla.:
    Navigation------------------------------                                               698
      Investigation_.----------------------------------                                    699   -

Carroll County, Ill., flood control__-------------_---------- ------                                              1198
Carrollton Ky., flood control--------------------------------                                                     1500
Carr (or Columbia) Creek, Ill., investigation.              ------------------                                    1157
Carson River, Calif., and Nev.:
    Flood control.---------------             -------------------------                                           2100
    Investigation----------          ----------      --------------------                                         2097
Carters Creek, Va., navigation ----- :------------------                   406   -
Carthage, Mo., flood control_ ------             -----------              1064 -                                   ___
Carthage Dam & Reservoir, Tenn- -                   --------------------                                          1399
Carvers Harbor, Maine:
    Investigation------------          ---------      --------------       106
      Navigation          ---        _ ------------- ---------                             103
Cascade storage project, Idaho, investigation---------------------                                       2280
Cascadia Dam, South Santiam River, Oreg_-------------------- 2159, 2190
Cascades Canal, Oreg., navigation_                     _--------------------------                      2155
Caseville Harbor and Pigeon River, Mich., investigation                     ------------               - 1830
Casey Island, N. C., investigation                                                     5__---------_
                                                                                      500           ........
Caseys Pass, Fla.:
     Investigation__ __ ____------------                    -     ----                 623
     Navigation- --------------------------------                                      598 - - -
Caseyville, Ky., flood control_-------.-1----------- -------                               .             1500
Cashie River, N. C.:
     Investigation-----------------------------------                                  500
     Navigation            ----------------------------                                498
Cass Lake, Minn., investigation----------------------                           ----------               1237
Cassville, Wis., investigation___------------------ ---                                ___               1186
Castle Rock, Cowlitz River, Wash., flood control---------- -------                                       2189
Castlewood Reservoir, Colo., flood control_---------- -----------                                        1339
Catatonk Creek Basin, N. Y., investigation_---------                          -       374
Cathance River, Maine, navigation __-------                               -103                 --     -
Catlettsburg, Ky., flood control., navigation                                                            1525
                                                                                           _--------------------1564,
Cattaraugus Creek, N. Y.:
    Investigations__ ----------------------------------           __                              1893, 1908
     Navigation--------------------------------------------                                              1892
Cavallo Pass, Tex., improvement of channel to Port
  Lavaca-----------------------------------------                                      899
Cave-in-Rock, Ill., flood control ___-------------                   -------                             1500
Cave Run Reservoir, Ky., flood control_ -------------------                                              1502
Cayuga Creek, and Island, N. Y.:
     Flood control-                ..-.---------------    -----------------                       -      1896
    Investigations -----            -----------------------------------                           1893, 1908
Cedar and Iowa Rivers, Iowa, investigation------- ------                                 -        -      1198
Cedar Bayou, Tex., improvement____-_ __-------                          _             891
Cedar Bay to Thoroughfare Bay, N. C., improvement___                                  499
Cedar City, Utah, investigation__ --------------                                  _                      2097
Cedar Creek Channel, Conn ___-------------_                                              94
Cedar Hill, Mo., flood control -              - _____--                    _--------1155
Cedar Keys Harbor, Fla., navigation_ -                 ---------           --         622
Cedar Point Reservoir, Kans., flood control------------                              1084
Cedar River Harbor, Mich., navigation--___                    -------------------                        1740
Cedar River, Wash:
    Flood control --------------------------------------------                                           2240
    Investigation_ __.______--                 -   -      -           -    _------            -         2248
Celilo Falls, Oreg., navigation_---------                                                                          2106
Celina Dam and Reservoir, Tenn-__ --                           ---------                 _-          -           -1399
XVI                                             INDEX


                                                                                         Page

                                                                              Volume 1          Volume 2

Center Hill Reservoir, Tenn., flood control---------------------                               1429, 1434
Centinela Creek, Los Angeles, Calif., flood control -_-_-                         __----_            1941
Central and Southern, Fla., flood control investigation _ 632, 644 -_-___-
Central City, Nebr., investigation----__------------_ _                                     -_       1339
Central City Reservoir, Iowa, flood control ------------------                                       1197
Ceredo, Kenova, W. Va., flood control -----------                                   _          1564, 1569
Chadbourne Bridge, Mont., flood control__-----                           --           _              1377
Chain of Rocks Bridge, Ill., emergency protection__--_ ------                                  1157, 1122
Chambersburg, Ohio, flood control__ ---                    - ----------------
                                                                           _                         1564
Chamita Dam and Reservoir, Rio Chama, N. Mex., flood
  control------------------------------------------                                     978---------
Champlain Canal, N. Y., investigation_-__ -__---243
Champlain, N. Y., Big Chazy R., N. Y., investigation                                    257
Champlain Lake, N. Y. and Vt., channel between North
  and South Hero Islands, navigation ------------------                                 242
     International Board of Control_                       --------                      _-          2398
     Narrows of, navigation_--           -----------------------                        216
Chandeleur Islands Industrial Canal, La., investigation_                                769
Chandlerville, Ill., east of:
     Flood control_----------------------                       -----       -----------              179
     Investigation-----------------------------------                             ----------         1791
Chandlerville No. 2 Reservoir, Ill., flood control                 -------------------               1787
Channel between North and South Hero Islands, Lake
  Champlain, Vt_________----------------------------                  ----              242
Channel from Buzzards Bay to Buttermilk Bay, Mass__                                       62
Channel to Port Bolivar, Tex., navigation              _--------_                      880
Chariton River, Iowa and Mo., flood control_____________                               ___           1286
Charles Mill Reservoir, Ohio, flood control----------_                       --              -       1533
Charleston Harbor, S. C., investigation-_ -------                       _               517
Charleston, S. C.:
    Engineering district_____------       ------------------                            505
    Improvement of harbor_______________-----------                                     510
Charlevoix Harbor, Mich., navigation------ ---------------------                                     1735
Charlotte Harbor, Fla., navigation_____________-_--                         -_          600
Charlotte (Rochester) Harbor, N. Y., navigation-*_-                             -
                                                                            _-------_                1882
                                           -----
Chartiers Creek, Pa., investigation___________________                     _1633
Chatfield Reservoir, Colo________---_              -----------------------                           1327
Chatham (Stage) Harbor, Mass., navigation ------------                                   57
Chattahoochee River, Ga. and Ala.:
    Investigation_ -----------------------------------                                  699
    Navigation_ -------------------                  ---------------                   656
Chattanooga, Tenn., and Rossville, Ga., flood control----------_ __                                  1437
Chatooga Reservoirs, Ga., and S. C., flood control                                      540
Chaumont Bay and River, N. Y., investigation_-------------_                                          1893
Chauncey Run, N. Y., flood control_______---_---_--                        _            375
Cheat River, W. Va.:
    Investigation____      -------------------------------------                                     1634
    Navigation--------------------------------------------                                           1590
Cheatham Lock and Dam, navigation_-----------------------                                            1397
Cheboygan Harbor and River, Mich., navigation                      -----------------                 1829
Cheesequake Creek, N. J., navigation-----------------                                  242
Chefuncta River, La., navigation _____-------------                                    767
Chehalis River, Wash.:
    Flood control     _---------------           ------------------                   ------         2248
    Investigations___________---------------                                                   2232, 2248
    Navigation_ --           -----------------------------------                                     2222
Chelsea River, (Boston Harbor), Mas., investigation_-_                                  106
Chemung River, N. Y _                 ----              --------                   342
Chena Slough, Alaska:
      Investigation__ _ _-------                     -----------                                     2303
      Flood Control__            ---------------------                                               2303
                                             INDEX                                                 XVII

                                                                                    Page

                                                                         Volume 1          Volume 2

Chenango River, N. Y., flood control__                 _                      377
Chenango and Susquehanna Rivers, N. Y., investigation-_                       374
Chequamegon Bay, Wisconsin-..----               ---------                                          1650
Cherokee County, Kans., flood control_                                       1110
Cherokee, Okla., flood control _           _                                 1110
Cherry and Red Fork Creeks, Okla., flood control-                            1108
Cherry Creek Dam and Reservoir, Colo., flood control _
Cherry Valley Reservoir, Calif., flood control-_
Chesapeake Bay, Md., investigations_ ___.
                                                             -
                                                          ..-_                302
                                                                                           1312, 1325
                                                                                               2086

Chesapeake, Ohio, flood control             .----  - ---                                           1564
Cheshire, Ohio, flood control__          -     ___        __..     ._                              1564
Chestnut Creek, Va., flood control_.        .                 . .                                  1545
Chester, Ill., investigation-----------------------                                                1127
Chester River, Md., navigation      _..                                       318
Chester River, Pa., navigation, flood control_                           301, 309
Chetco Cove, Ore., investigation_                                                                  2155
Chetco River., Oreg., navigation                                                                   2155

Chetopa, Kans., flood control       -                                        1110-
Chevreuil Bayou, La., investigation                                      769, 807
Cheyenne River, S. Dak. and Wyo., investigation __ _                                               1376
Chicago Harbor and River:
    Improvement of harbor__             ._          _          _                                   1748

    Improvement of river _              .                            _                 1750,       1751
    Investigation_________                     __                                                  1777

Chicago, Ill., engineering district                --          ---                                 1745

Chicago Sanitary and Ship Canal__                                                                  1764

Chickalah Creek, Ark., investigation                                         1049
Chickamauga, Tenn., navigation_.._                                                                 1410

Chickasawhay River, Miss.:
    Investigation .--------                  --------------                   699
     Navigation _-------                                                      698
Chickasaw Creek, Ala., navigation                                             670
Chico Landing, Calif.:
    Investigation________                                                                          2060

    Flood control      _-----------------                                                          2322

     Navigation         _-------                                                                   2047

Chico River, P. R., investigation_                                            644
Chicopee, Connecticut River Basin, Mass., flood control__                126, 140
Chicopee River, Mass., investigation _                                        149
Chicot Lake, Ark., investigation_                                             842
Chief Joseph Dam, Wash., navigation_
Chikaskia River, Okla. and Kans., investigation
Chillicothe Reservoir, Mo., flood control
                                                            --                1112
                                                                                                   2206
                                                                                                   1251

Chilo, Ohio, flood control_                                                                        1500

Chincoteague Inlet and Bay, Va.:
     Investigation_                                                           335
     Waterway to Delaware Bay, navigation_                                    334
Chino Creek, Calif., flood control_                                                                1961
Chipola River, Fla., investigations_                                     699, 707
Chippewa Harbor, Isle Royale, Mich., navigation__-                                                 1664

Chippewa River, Wis., investigation, flood control-                          1061          1237,   1232

Chisholm Creek, Kansas, flood control_
Chittenango Creek and tributaries, New York, flood
  control_---           _----------------------------                                              1908

Chitto Bogue, La., navigation_                                                698
Chocolate Bayou, Tex., navigation             ___                             895
Choctawahatchee Bay and River, Fla. and Ala.:
    Improvement of river                                                 666, 698
     Investigation __                                                         699
Choptank River, Md., navigation             _                            320, 334
Choupique Bayou, La___                                                        813
       245554-53-vol. 1-           73
XVIII                                                        INDEX

                                                                                           Page

                                                                                Volume 1          Volume 2

Chouteau, Nameoki, and Venice drainage and levee
  district, Illinois, flood control-----------------------.. ----         1151
Chouteau Island, Ill., investigation_   -------.---.--.-----------        1157
Chowan River, Va. and N. C.:
    Investigation-------        -----------------------         465 ........
    Navigation-----------------------------------               498 ..
Christina R., Del, ---------------------------------            275
Chrisfield Harbor, Md., navigation--------------------          334
Christiansted Harbor, St. Croix, V. I__    --   ----            622
Chuckatuck Creek, Va., investigation --------                   453 -----    -
Chunky Creek and River, Miss., investigation-         -...
                                                     __ _       707
Cincinnati, Ohio:
     Flood control ---------------------------------------                                      1454,    1500
     Investigation--- -----------------------------                             --------                 1505
City Waterway, Tacoma Harbor, Wash-----------                                  _-----      ----          2217
Claiborne Harbor, Md., navigation_ ---------------                                      334 -
Clackamas River, Oreg_----- - ---                         --------------- --- -----                      2180
Claiborne Lock and Dam, Ala__---------- _-                    ---------                 676
Clam Creek, N. J-            -----------------------------                ----          291
Clanton, Humphreys & Shawnee Creeks, Ky., investiga-
  tion------------------------------------------------                                                   1505
Claremont Reservoir, Connecticut River Basin, N. H.,
  flood control ----------------- ----------------                                 125, 148 ---
Clarendon to Laconia Circle, Ark., flood control..--------                              854
Clarendon, Ark., investigation_ -- ------------------                                  1049 -
Clarington, Ohio, flood control------ ---------------------------                                        1564
Clarion River Reservoir, Pa.:
     Flood control--------- ------------------------------                                               1598
     Investigation___-----------------                               ------- __           -              1634
Clark Hill Reservoir, Ga. and S. C___ ----------------                                  542
Clarks River Ky., investigation----- -----------------                       _ _ -----       -           1437
Clarksville, Ark., flood control_ ----------------------                               1048
Clarksville, Ind., flood control------------------------                                        --       1462
Clatskanie Drainage Dist., Oreg-------------------- -----------                                          2182
Clatskanie River, Oreg., navigation ------------------------                                             2155
Clatsop County Diking Dists. Nos. 1 and 4, Oreg ...-                    -                                2182
Clear and Dogy Creeks, Okla., investigation -----------                                1112
Clear Creek, Ill.:
     Flood control__-------                ------------------               ----------           1127,   1131
     Investigation__--- ----------------------                   --------------------                    1158
Clear Creek and Lake, Tex., navigation ---- ---------                        --         893
Clear Fork of the Brazos River, Tex., investigation                                     965      -
Clear Lake Area, Calif., investigation -------------------------                                         2097
Clear Lake, Ill., flood control_ ---------------------------                                             1790
Clearwater Bay, Fla., investigation_ _ _- --------------                           624
Clearwater Reservoir, Mo., flood control---------------                          1032 -
Clearwater River, Minn., flood control --------------------------                                1218
Clearwater, Snake, and Salmon Rivers, Oreg, investi-
  gations ------------     ----------------------------------                              2266, 2280
Clendening Reservoir, Ohio, flood control ---                    ..------------------ -          1533
Cleveland Harbor, Ohio:
     Navigation -------------------------------                             -----------         1850
     Investigation___ __----------------             ----------------------                      1893
Cleves, Ohio, flood control_ -----------------                                     _------       1500
Clewiston, Fla., flood control_ -------------------------                          634
Clifton, W. Va., flood control_         __----------------------------                           1564
Clinch River, Tenn. and Va., navigation___---------                                             1415
Clinton Harbor, Conn., navigation---                 -----------------                87
Clinton, Ind., flood control-------- ---------------        _---      _       -------            1500
Clinton, Iowa, Pool No. 14_ ---                             1         . --       ----           1167
                                                  INDEX                                                  XIX

                                                                                            Page


                                                                                 Volume 1          Volume 2

Clinton River, Mich.:
     Flood control ------------------------------------ ------                                             1833
     Investigation                --. ---------------------------------                                    1837
     Navigation ------------------------------------                                      ----------       1829
Clintwood Reservoir, Va., flood control_ ------ -----                                           -          1565
Clooney Island, La ---------------------------------                                         760
Cloverport, Ky., flood control-__---------------__                                                         1500
Clyde, Pawtucket River Basin, R. I., flood control .---                                      148
Coal Creek, Colo., flood control-.-----                                     ....             989
                                                                                             989...-

Coal Creek Drainage and Levee District, Ill., flood con-
  trol-------------------------------------------------                                              1782, 1787
Coal Creek, Okla., investigation_--- --------------                                         1112 -
Coal Grove, Ohio, flood control--___--                         -------------------
                                                               __-                      -1564
Coan River, Va., navigation_ ______                          ----                            406
Coastal Plains Soil Conservation, Tex., investigation _ _                                    923
Coasters Harbor Island, R. I., navigation--------------                                      103
Cobscook Bay, Maine, navigation_                                                      -      102
Cocheco River, N. H., navigation__-------------                                              103
Cochrane, Wis_ ---------------------------------------------                                               1171
Cockfield Levee, La_ -____                    __      __------_                              812
Cockrell Creek, Va., navigation___                     -----------                           406
Cocoa, Fla., investigation               ---------------------                        623, 644
Coden Bayou, Ala., navigation_ -                     -            ____---------------        698
Codorus Creek, Pa., flood control ---.-------- __36-                                         369 -
Coeur D'Alene, Idaho, flood control__----------------- ------- 2247, 2248
Cohansey River, N. J., navigation_ ---                                 _
                                                               -_--_----     ----            288 _
Cohasset Harbor, Mass., navigation __.-------                                ---             103
Cohocton River, N. Y., flood control_--------                             ------          - 343 _          _
Cold Brook Reservoir, S. Dak., flood control_------------------                                            1371
Cold Spring Inlet, N. J.:
k Investigation ----------------------------- --- _                                          302
    Navigation-_----       -
                        --------------                                    -             289
Coldwater River, Miss., navigation- -------                                             8--2
                                                                                        821        ...
Colfax, La., flood control_--------------_---------                               774, 805       -_ --
Colfax, Wash., flood control-- ---------------------                                                     2273
Collier County, Fla., investigation --------------------                              623
Collinsville, Ala., flood control_ ---              _--- ----    --            -      706     .--
Collinsville to Shasta Dam, Calif., flood control------ ---                         -------       2090
     Navigation_----------------------------                        -------       --- -----       2047
Colonial Beach, Va., beach erosion4__0__________----                                  406 _
Colorado River, Tex. and Ariz. and Colorado:
     Investigations -------------------            -        -----            916, 935,            1973
                                                                                      965
     Flood control_ ---------------          ---              ----------         _965_
     Navigation ------------------------------------- 870--------
Colorado River and Brazos crossings, Louisiana and
  Texas Intercoastal Waterway, investigation-                                         916      ---------
Colorado Springs, Fountaine que Bouille River, Colo.,
  flood control-------- --------------------------                                    970
(Columbia Creek) or Carr, Ill., investigation ---------------------                               1158
Columbia Drainage Dist. No. 1, Oreg ---------------------------
                                                    _                                             2182
Columbia drainage and levee district No. 3, Illinois, flood
  control -----------------------------------------                                               1146
Columbia, La., flood control- ------             ------------                 823, 833, ---------
                                                                                      844
Columbia River, Oreg. and Wash.:
     At Baker Bay, Wash., navigation-_--- -----                              ..--------------     2136
     Below Vancouver, Wash__-__---------------                              _----------2131
     Bonneville, Oreg., construction of dam at--------------------                                2113
      Bridges at Cascade locks--------                             ----       _-_----                    2155
      Cascades Canal---        --------------------                                                      2155
xx                                                INEWE

                                                                                              Page

                                                                                 Volume 1            Volume 2

Columbia River, Oreg. and Wash.-Continued
    Celilo Falls to Snake River, including tributaries,
      improvements from_------- --             -------------------------                                   2106
    Celilo Falls to The Dalles Rapids, navigation_-- -                            --------                 2111
    Investigations---   ------------------------------------                                       2155, 2190,
                                                                                                    2248, 2266,
                                                                                                     2280
    Celilo Falls to Kennewick, Wash., navigation                    ------------------                     2106
    Chief Joseph Dam, Wash_                  - ---                                                         2206
    Dalles Dam----------------------------------
                    _                                                                   --------           2109
    Local flood protection_-- --              --------------------------                             2234, 2267
    McNary Dam, navigation_ ------                       -------              -----________                2261
    Mouth improvement_---------------------------------------                                              2138
    Vancouver to The Dalles, Oreg-----------                                                 --          -2121
    Wenatchee to Kettle Falls, Wash., navigation_                  -----            _         -_     --    2232
Columbia Slough, Oreg., navigation-__------------ ------------                                             2155
Columbus, Colorado River, Tex., flood control--.                                            965             -
Columbis, Ga., investigation --------------------------                                     699
Columbus, Nebr., investigation---------_-----------                                                        1340
Colusa, Calif., navigation______             _______________----2047
Combabee River, S. C., investigation------------------                                      520
Commerce for calendar year 1951-4--------------                                 ---- -- 4
Compo Beach, Westport, Conn., navigation ------------                                       104
Compton Creek, Los Angeles River Basin--------------                                    --                 1940
Compton Creek, N. J., navigation_ _ -___234-__-
Conchas Dam and Reservoir, N. Mex_-------------                             _               974
Concordia, Ky., flood control_            ___--- --------                ------           ----             1500
Conecuh River, Ala., investigation_____               _______--
Conejos River, Colo., flood control-----------------------977
                                                               -       ___698

Conemaugh River, Pa., investigations -------------------                                             1590, 1634
Conemaugh River Reservoir, Pa., flood control-----------------                                       1608, 1629
Conewango Creek, N. Y., investigation_---- ---                                                             1634
Coney Island Channel, N. Y., navigation--------------                                      243
Coney Island Creek, N. Y., navigation____- -                         -____--                188
Congaree River, S. C., navigation .. _____-                 __-__           _              517
Congaree-Santee, S. C., investigation-----------------518, 520
Congresses of Navigation, Permanent International
  Association of-_                                                   --          _-- ----                  2387
Conneaut Creek, Pa., investigation-_ -------                                         _--        -      -   1908
Conneaut Harbor, Ohio:
    Investigation -----------------------------------                                      ---------       1893
    Navigation ------------------                   --------------               -----------               1861
Connecticut Beach Erosion Control Study--- ------- _                                       106
Connecticut River Basin, Vt., N. H., Mass., Conn., flood
control:
    Local protection projects   ------------               ---------------                  126
      Reservoirs _            -          -           ---                                125
Connecticut River, Mass. and Conn.:
   Investigation   --------------------------------                              106, 149
     Navigation above Hartford, Conn_                        --------                   104
    Navigation below Hartford, Conn------------_                      84
Connoquenessing Creek, Pa., investigation_
Conotton Creek, Ohio, investigation _ _ _           __
                                                           _----
                                                       ------         -1634
                                                         _ _ _- - _ ----          _
                                                                               1569
Consolidated cost and financial summary ____2----__                   22
Consolidated diking and improvement district No. 1,
  Cowlitz County, Wash., flood control_ ------------------------ 2182, 2189
Contentnea Creek, N. C., navigation_--------------_                 498-------
Contoocook River, N. H., flood control_ , --- -         -                               113                -
Contra Costa County, Calif., investigation------------_                                                  2097
Conway County levee district No. 6, Arkansas River,
Ark., flood control_                                                                 1020_
                                                                                                                                               ;XK(

                                                                                                                 Page


                                                                                        Volume 1                                Volume 2


Conway County levee districts Nos. 1, 2, and 8, Arkan-
  sas River, Ark., flood control.__..                                                                 1021
Conway County, Drainage and Leveer                   strict Nos. 1
  and 10, Ark., investigation .....                                                                   1050
Conway, S. C., investigation_        _-_-                                                              520
Cook Inlet, Alaska, investigation_                                                                                                             2300
Coolidge Dam, Ariz. and N. Mex., investigation- -                      ---                                                                     1974
Cooper River, N. J., navigation - _............--.                                                     301
Cooper River, S. C.:
     Investigation ----                                      _-         --                             517
     Navigation ---...                                     .       ...                                 510
Coosa River, Ga. and Ala.:
     Flood control                                           _              _            702, 706
     Investigation ......                         ......                                 699, 707
     Navigation . . ...       ...      ..                                                              675         -        -   --   .-   --   r---




Coosawatte River, Ga., navigation ........--.                                                          698
Coos Bay, Harbor, and River, Oreg.:
     Improvement of entrance to bay and harbor_                                                                                                2149
     Improvement of river_                                                                                                                     2155
Copano Bay Soil Conservation District, Tex., investi-
  gation__                                                                                             923             ...                     -
Copes- Corner Reservoir, N. Y., flood control_                                                         339             --
Copper River & Gulf Coast, Alaska, investigation .....                                                                                         2300
Coquille River, Oreg.:
     Flood control
     Investigation                                       -      ..         .                                                      2190
     Navigation-                                                                                                                  2152
Coralville Reservoir, Iowa, flood control                                                                                   1190, 1197
Coraopolis, Pa., flood control_                                                                                                   1628
Cordova Harbor, Alaska:
    Investigation--------------------                      ----------                                                                          2300
    Navigation _                                                                -   -   --   -   --    ---   -
                                                                                                                                               2289
Corea Harbor, Maine, navigation, investigation_                                              26, 106
Core Creek, N. C., investigation__                                                                     504
Core Sound, N. C., improvement of waterway to Beaufort
  Harbor, investigation        _____                                                                   500
Corkscrew River, Fla., investigation                                                                   644
Corney, La., navigation-_      __                                      __                              821
Corning, N. Y., flood control ...-----.......                                                          342
Cornucopia Harbor, Wis., improvement investigation. -                                                                           1664, 1665
Corpus Christi, Tex.:
     Channel to Encinal Peninsula naval seaplane base.                                                 915
    Improvement of channel to Aransas Pass_                                                            903
Corpus Christi-Port Aransas waterway, investigation ---                                                916
Corsica River, Md., navigation_                                                                        334
Corte Madera Creek, Calif., investigation----------                                                                                            2035
Cos Cob Harbor, Conn__________                                                                         100
Cosmopolis, Wash., flood control ....            _ _._.. _..-.....                                                                             2248
Cossatot River, Ark., investigation_                                                                  1112
Cosumnes River, Calif., investigation                                                                                             2097
Cottage Grove Reservoir, Oreg., flood control                                                                               2159, 2168
Cotton Bayou Tex., investigation                      _      __                                        9110
Cottonwood       dreek, Okla., investigation ....                  .     .                            1112
Cottonwood Falls, Kans., flood control
Cottonwood Springs Reservoir, S. Dak., flood control..                          1371
Cotuit Harbor and West Bay, Mass., investigation-                   106
Coudersport, Pa., investigation__
Cougar Dam, Oreg --
                                                                                1634
                                                    _---------_=_,,,-- ~ 2169, 2174,
                                                                                                      ....
                                                                                2190
Council Bluffs, Iowa, flood control--------------------I-----            1312, 1334,
                                                                                1339
XXII                                             IrNIDE

                                                                                           Page


                                                                                Volume 1          Volume 2

Council Grove Reservoir, Kans., flood control--_------                                    1083
Courtenay, Fla., channel improvement_ -- __-----                 __             -          621
Coushatta, La., investigation, flood control------------807, 811-
Covington, Ky., flood control ......----- ----------------                                         1452,1500
Cow Bayou, Tex., navigation--..-..........                       _______                   862
Cow Creek, Kans., flood control-----.....---.....                                   -     1058
Cowlizt County drainage improvement districts Nos. 2,
  5, 11, 13 and 15 Washington, flood control----......-------___------                                   2182
Cowlizt, River, Wash.:
     Investigation__. -------------------                      ---------------         __2190 --
     Navigation- -----        ------------------------------------                                       2155
Coyote Creek, Calif__------------------------_                                     ____------            1941
Coyote Valley Reservoir, Calif., investigation, flood con-
  trol-----------           --------------------------------------                                 2035,2029
Crab & Wilson Creeks, Wash-_-------- -_--- -                                 - __--_-              -     2234
Cranberry Island Harbor, Maine, investigation .....---------                                106
Craig Harbor, Alaska_       ----------- --------               --------------                 -          2298
Crane Brook, N. Y., flood control                  --------------------------                            1908
Crane Creek, Ill., flood control__-----__ _----______                                    -___._    1787, 1790
Cranes Creek, Va., navigation____-----_                                                    406
Cravens Shoal, New York Harbor, N. Y., improvement_                                         186
Crawford County levee district, Arkansas River, Ark.,
  flood control____
                 ---------------------------------                                        1016
Creede, Willow Creek, Colo., flood control_---------_                      _               976
Cresent City Harbor, Calif., navigation__.                                     -----------       _       1980
Creve Coeur Creek, Mo., investigation -------                                                 _          1290
Criehaven Harbor Maine:
     Investigation--- ------------------------------                                        106
     Navigation -----------------------------------                                         103
Crooked Creek, Ark., investigation_                  __-------_                           1050
Crooked Creek Reservoir, Pa., flood control-_-------_ ----                                       _ 1605, 1629
Crooked River, Oreg., investigation_---- ---                                            -----
                                                                                       __--              2190
Crosby Run, N. Y., flood control- --- ________------_                                      345
Cross-Florida, Waterway, Fla.:
     Investigation_____ -----------------------                                   -         624
     Navigation ---------         --------------------------                               621
Cross Rip Shoals, Mass., navigation- _                    - -_
                                                            _      -- ___                    61
Cross-Rock Channel N. C., investigation ---------------                                    500
"Crow," Gimlet Creek, Ill., investigations_                       _----------------                1158, 1791
Crow River, Minn., investigation _                          -________ _____-____                 _       1237
Crystal River Fla., navigation ------------------------                                     622
Cubits Gap, a             .-----------------------------------                              739
Cubitt Creek, Va., investigation___________-_________                                      407
Cucklers Creek, N. C., investigation -------------------                                   504
Cuivre River, Mo., navigation__- --- __-----_                           _           __---__      _       1126
Culvers Bar, Conn ----------------------------------                                         92
Cumberland, Md., flood control_ ----------------                              _            409------
Cumberland River, Ky., and Tenn.:
    Flood control -----------------------------                ----                                     416
    Navigation--------------------------------------------                                             1395
    Locks --------------------------------------------------                                           1396
    Investigation.---------------------------------------------                                        1439
Cunningham Creek, Ohio, navigation _---------    --        _---_                                       1892
Current River, Ark., and Mo., navigation..--------------        1014
Cuttyhunk Harbor, Mass.:
    Investigation....-----------------------------------          106
    Navigation ------------------------------------                 65
Cuyahoga County Ohio, investigation---------------------------                                         1893
Cuyahoga River, Ohio, navigation _---- ----.--------------       _                  _                  1850
                                                INDEX                                              XXmII


                                                                                         Page

                                                                              Volume 1          Volume 2

Cypress Bayou and waterway between Shreveport, La.,
  and Jefferson, Tex.                                                              717
    Investigation ----- - - - - - - -- - - - - - - -                               807
Cypress Creek, Md., navigation______________________                               334
Cypress Creek, Tex., investigation flood control........                          769,
                                                                              777, 966
Cypress River, Tex., investigation..-.-----------------                            769
Cyr Rapids, Minn., investigation       -------------                                                 1237
                                    D
Dalecarlia Reservoir, Washington, D. C---------------                                 396   ----------


Dale Hollow Reservoir, Tenn. and Ky., flood control---- ------                               1425, 1434
Dallas Floodway, Tex., flood control_          ..........           _.....            932
                                                                                      944
Dalles-Celilo Canal, Oregon and Wash., improvement..-_                                              2111
Dalles Dam, Oregon navigation_...................                                                   2109
Dam A Reservoir, N eches River, Tex., navigation------                                931
Dam B Reservoir, Neches River, Tex., navigation -----                                 932
Damariscotta River, Maine:
     Investigation ______ _____ ______   ....         ___.......                      106
                                                                                      103   ----------
     N avigation     _--------------- ----                          --------
                                                                  .--
Dansville and vicinity, Genesee River, N. Y., flood con-
  trol-------- -----      ---------------                  .-.-. .-                                  1901
Danville, Ark., flood control..__ -_-_................                               1024
D'Arbonne Bayou, La., navigation ....                    _____ _               ..     821
Dardanelle, Ark., flood control ... __...............                                1017
Dardanelle Dam and Reservoir, Ark., navigation.......                                1004
Darien River and Harbor, Ga., navigation .............                                539
Dauphin Island Bay, Ala.:
     Inv estigation -_ . .-_ --.... ......                 ...... .....               699
     N av iga tion _ -.
                     -   _ -                  . .          . _ . . .--                698
Davenport Center Reservoir, N. Y., flood control.......                               338
Davenport, Iowa, investigation harbor_---------------                                        1186, 1167
Davis Creek, Va., navigation ......................                                   453
Davis Lock, St. Mary's River, Mich_--------.--_-----                                                1797
Dayton, Ky., flood control__.__.....___...........                                                  1500
Dayton, Touchet River, Wash., flood control....----.--                                              2280
Dayton, Wyo., flood control .......                          ------.........-                       1374
Dead Horse Canyon and Royal Boulevard Channel, Los
  Angeles Calif., flood control__....... .......                          .......                   1941
Deadmans Creek, Calif., flood control.----_-___                                                     2066
Deal Island, Md.:
     Lower Thoroughfare, improvement.-------.                                         334
     Upper Thoroughfare, improvement                ---------                         325
Debris control, Sacramento, Calif_._ __..._..........
Debs Inlet, N. Y., navigation _ __________                                            179
Deception Pass, Skagit Bay, Wash_____________                  .                  __  823           2232
Deep Bayou, Ark. and La., flood control
Deep Creek, Va., navigation .....
                                                     -------..
                                                 .........             _....          453
Deep Fork, Okla., investigation -_.                     ___                   __     1112
Deep Red Run, Okla., investigation_.__                                               1112
Deep River area, Wahkiakum County, Wash., flood con-                                                2189
  trol_                           -
Deep River, Wash., navigation_.            _              _         ._._.                           2155
Deer Creek, Calif., investigation-                         .....-              ....-  841           2097
Deer Creek, Miss., flood control. ...                 .............
Deer Creek Prairie levee unit, Indiana, flood control..                                            1500
Deer Creek Reservoir, Ohio_..                                                                      1566
Deer Island area, Columbia County, Oreg., flood control-                                     2182, 2189
XXIV                                            I


                                                                                                   Page

                                                                                        Volume 1           Volume 2

Deer Island Thoroughfare, Maine, navigation.._                                              1023          .
Degognia and Fountain Bluff, Ill., flood control -----------                                 -1138-
De Gray Reservoir, Ark., flood control--              -- _                              823, 826      ---.
Delaware Bay and River, Pa., N. J., and Del.:
    Above Cape May, N. J., investigation.--            -                            -        243
      At Camden, navigation, investigation-                    --       -          -269,     302
      At or near mouth of Neversink River, navigation.                                       301
      Flood Control investigation------08--------------  --                                                               __
      Harbor of refuge in bay, navigation---------_ --                                       285
      New York Bay Section, investigation--_ --------   _                                    243
      Philadelphia to sea:
           Investigation__ --------------------------                                   -    302
            Navigation_---             ------------------                   ----             265-             ---
      Philadelphia to Trenton:
           Improvement------                                     _
                                                    ----------------                         262
           Investigation---                                                                  302
      Waterway to Chesapeake Bay, Del., and M., inves-
       tigation, navigation                  -                                               278                          -
      Waterway to Rehoboth Bay, Del., improvement,
       investigation,
                   i3 navigation---------                                               302, 283           :-       .--
Delaware Reservoir, Ohio ......----------------
                                 -                                                                    1559, 1566
Delphi, Ind., flood control ----------------------------------                             1476, 1500
Denison, Iowa, flood control-                                                                      1.339
Denison Reservoir, Tex. and Okla., flood control investi-
  gation .-------------------------------------                               1100, 1112
Dennis Creek, N. J., navigation- -                ----          -- __       _        301
DePoe Bay, Oreg., navigation__---------------------------------                                   2142
Derby, Ind., flood control--------------------------------------                                   1500
Derelicts. See Wrecks.
Des Cannes Bayou, La., navigation__--_____-------                                    757
des Cyprairres, La., Flood Control_--------------------                              802
Des Glaises, Bayou, La., flood control_---------                          -      -805
Des Moines Harbor, Wash., investigation -------------------------                                 2232
Des Moines River, Iowa, flood control, investigation                                               1198
                                                                                           1--------------189,
Des Plaines River, Ill., investigation-- -----                 _______--__1791
Detroit, Mich., engineering district_                                       -__-____               1_____________--
                                                                                                  1795
Detroit Reservoir, Oreg., flood control             ---------------------               _  2159, 2175
Detroit River, Mich.:
    Navigation ------------------           _----------------                                     1809
Investigation                                                                                       830
                                                                                                   1----------------------
De Valls Bluff, Ark., flood control                  ___                             854
Devil Creek, Calif., flood control _______-____         --                       -_________-      1972
Devils Jump and Helenwood, Tenn., Ky. investigation.__-----                           _            1437
Dewey Reservoir, Ky., flood control_--------------------------                             1552, 1566
Dexter Lake, Fla., investigations               ---                                     624, 644
Dexter Reregulating Dam, Oreg---------------------                                                                   2-65
Dickinson Bayou, Tex.:
     Investigation     ---------------------------------           916
     Navigation ----------------------          -----------       894
Diking and improvement district No. 4, Wahkiakum
  County, Wash., flood control----------------_      -----__ -----     -                                             2189
Diking and improvement district No. 5, Cowlitz County,
  Wash., flood control________-__-__-__-___-_____                                                                    2188
Diking district No. 2, Clatsop County, Oreg., flood control                   ------------                           2188
Diking district No. 3, Clatsop County, Oreg., flood control-----------                                               2189
Diking district No. 5, Clatsop County, Oreg., flood control-------                                                   2188
Diking districts Nos. 1 and 3 (Puget Island) and Little
  Island, Wahkiakum County, Wash., flood control---------------,                                                     2189
Diking improvement district Nos. 1 and 2, Cowlitz
   County, Wash., flood control-.                     .-----------------------                                       2189
                                              INDEX                                                  XXV

                                                                                         Page

                                                                            Volume 1            Volume 2

Diking improvement district No. 13, Cowlitz County,
  Wash., flood control__      ____---- -                                 .---             2189
Diking improvement district No. 1, Pacific County,
  Wash., flood control_-______-           _______________           __--                  2189
Diking improvement district No. 11, Cowlitz County,
  Wash., flood control____--------------------------                                      2189
Dillon Reservoir, Ohio, flood control_ ----------------------                       1537, 1566
Dillonvale, Ohio, flood control__ -----               _---------- -- _       -    _       1628
Dirty Creek Bottom, Okla., flood control -------------                         1110---------
Dirty Creek, Okla., investigation            - ----------------                  1112
Dismal Swamp Canal, Va., navigation------------
Disposal of electric power           -      ---
                                                                  -----.           448
                                                                                     66--------------
District of Columbia:
      Anacostia Park_               -----------------                              401
      Anacostia River, reclamation of flats---------                               401----------
      Aqueduct, increasing water supply-------                                     396
      Improvement of Potomac River ----------------                                382
      Investigation ------------------------------------                           407
Doboy Sound, Ga- -----------------------------                                     521
Doctors Inlet, Fla., investigation_--- ---------------                             624
Dodge Creek, N. Y., flood control             --------------------------                             1591
Dogfish Bay, Wash., investigation ------------------------------                            2232
Dog River, Miss. navigation_ ___----------------                                 687---------
Dogy and Clear Creeks, Okla., investigation ------------                        1112
Dolores River Basin, Colo., investigation_ ------------------                                        1974
Dominguez Del Amo and Bixby Slough, Calif., investiga-
  tion --------------------------------------------------                                          - 1938
Dona Bay, Fla., investigation ------------------------                            624
Donaldsonville, La., investigation_-.
Donovan levee, Illinois, flood control -------------------------
                                                                            769,
                                                                            7---------------
                                                                                  807
                                                                                                     1790
Don Pedro Reservoir, Calif., flood control----------------- ------     2086
Door County, Wis., investigation__---------------- ------               1741
Dora Lake, Fla., investigations_ -------------------    624, 644 ---------
Dorcheat Bayou, La., navigation------------------             767-     -
Dorchester Bay and Neponset River, Mass., navigation_                              103
Dorena Reservoir, Oreg., flood control-----------------                                2159, 2169
Dosoris Creek, N. Y., investigation--- ---                                         243---------
Double Bayou, Tex.:
      Investigation _------                _   ---. -----                          916-----
      Navigation------------------------------------                               886-   -----
Double Creek, N. J., navigation - ---------------                                  301
Douglas County, Wis., investigation             -------------------------                            1667
Douglas Harbor, Alaska, investigation---_---------                 ------             -_             2300
Dover, Ky., flood control__________ ------------------                     --------                  1500
Dover, Ohio Reservoir, flood control_             ---------- ---------------                         1533
Dover Lock & Dam Tenn., navigation__-------------                           _ ---                    1397
Drainage district No. 1, Clatsop County, Oreg., flood
  control- --------------------------------                             ------------                 2188
Drift Creek, Oreg., investigation--- -----------------                    -- ------                  2156
Drum Inlet, N. C., navigation               -------------------                   482            -----
Dry Cimarron River, Okla., Colo., and Kansas, investi-
gation_------------------------------------------                               1112
Dry Creek, Calif., investigation-                 --------------------------                         2097
Dry   Creek, N. Y., flood control-------------------------------        1908
Dry   Creek, Idaho, investigation--     ---------------        -2280
Dry   Hollow, Oreg., investigation__  --------------              _----2190
Dry   Pass, Alaska:
      Investigation ,_-------------- ---------------    ----------      2300
      Navigation ----------------------------------------- --           2298
Dry Run, Iowa, flood control_    ---- ---------------- ---                                          1237
Du Chien Bayou, investigation_ -      .------------       854                              ......---
XXVI                                    INDEX


                                                                                   Page

                                                                        Volume 1          Volume 2

Duck Island Harbor, Conn., navigation__----------                            104
Duck Point Cove., Md., navigation---------------                             334
Duck River, Tenn., navigation_           ___                                                   1415
Dudley Creek, N. Y- ___-_---------------   -----     --                      340
DuLac Bayou, La., navigation_._.____            ____ ___                     767
Du Large Bayou, La., investigations
Duluth, Minn:
                                           ----                         769, 807
    Engineering district_______                                                                1641
    Improvement of Duluth-Superior Harbor_
     Investigation                --------            -
                                                              --                               1645
                                                                                               1665
Dunkirk Harbor, N. Y.:
    Investigation_             ___          _                                                  1893
    Navigation       -------     ---------------------                                         1868
Dunn Creek and Crescent Lake, Fla., navigation ......                        621
Dupre Bayou, La., navigation__        _.__-            __                    767
Dutch Creek, Ark., investigation----------------                            1050
Dutch Creek, Ill., flood control_ .            .....                                           1186
Dutch Island Harbor, R. I., investigation-.-                                 106
Dutch Slough, Calif., investigations__                                                2060,2097
Duxbury Harbor, Mass., navigation_                                           103
Dyberry Reservoir, Dyberry Creek, Pa., flood control
Dyke Creek, N. Y., flood control
                                                                   --        302
                                                                                               1898
Dymers Creek, Va., navigation_____..._                                       406
                                    E
Eagle Creek, Ky., investigation__                                                              1505
Eagle Creek Reservoir, Ohio., flood control_                                                   1629
Eagle Gorge Reservoir, Wash., flood control                                                    2240
Eagle Harbor, Mich., navigation_                                                               1664
Eagle Harbor, Wash., investigation          __                                                 2232
Eagle Lake to Matagordo, Colorado River, Tex., flood
  control    _---------------------          --------------                  965
Eagletown Reservoir, Okla., investigation___                                1112
East Barre, Winooski River Basin, Vt., flood control _                       255
East Bay Bayou, Tex.:
     Investigation__              ______                                     916
     Navigation _                                           _                915
East Boothbay, Harbor, Maine, navigation                                     103
East Branch, Clarion River Reservoir, Ohio River Basin,
  Pa., flood control________                  __                                               1598
East Brimfield Reservoir, Mass., flood control            -             120, 148
East Cape Girardeau and Clear Creek, Ill., flood control,
  investigation_             ---------                                                1127, 1158
East Chester Creek, N. Y., navigation        ---                             157
East End Levee District, Ark., investigation-                               1050
East Fork Creek, Ky., investigation_                                                           1569
East Fork Reservoir, Ohio., flood control_                                                     1502
East Greenwich Harbor Bay and Cove, R. I., investiga-
  tion-__     -       _                                                      107
East Hartford, Conn., flood control           _ __                      126, 148
Eastland, Leon River, Tex., flood control_                                   965
East Liverpool, Ill., flood control__                                                          1790
East Lynn Reservoir, W. Va., flood control                                                     1566
East Moline, Ill., investigation_                                                              1199
East of Hubly Bridge, Ill____________                                                          1790
East Pass Channel, Fla., from Gulf of Mexico into Choc-
  tawhatchee Bay, rvt
East Pearl River, Miss., navigation.
                                         -
                        navigation, flood controla
                                         ..........
                                                                        666, 702
                                                                             698
East Peoria, Ill., flood control_-----            _                         S1790
East Poplar Bluff and Poplar Bluff, Mo., flood control         --           1029 -- -- -
                                                                                             Page

                                                                                Volume 1            Volume 2


Eastport Harbor, Maine, investigation _ _ -_ _ _                _         106
East Rainelle, Meadow River, Ohio, flood control-----------------                        1570
East River, Brunswick Harbor, Ga., improvement                      ------535---------
East River, N. Y.:
    Improvement, including Coenties Reef                  -----------    .194
    Investigation -----------------------------------                    243
East Rockaway (Debs) Inlet, N. Y., navigation                 --------    179
East St. Louis, Ill., flood control_--- -_------------               _       ---         1149
East Sidney Reservoir, N. Y., flood control------------                   339
East Twin Creek, Calif., flood control-_ _-------              ------ ----               1972
Eaton, Wash Calif., flood control -- ____------                     _--------_           1941
Eau G;allie, Fla.:
    Navigation----------------------                  -------------      621.........
    Investigations --------------------------------                 624, 644 .........
Echo Bay Harbor N. Y., navigation--_ --------------                       242.........
Edenton Harbor, N. C., navigation-----....        ----------              498--------
Edenton, N. C., investigation_ ._..______-___--.                _         504-         -
Edgartown Harbor, Mass., navigation--___ __ -              ___-___-       103
Edisto Beach, S. C., investigation-----      -- ----                                   518
Edisto River, S. C.:
    Flood control       ---      --------------------                                  519
    Navigation--,---------------                                                       517
Edmonds Harbor, Wash., investigation--_   --------------                                                 2232
Edna, Tex., investigation-_ _--__               -__________ 916
Edward MacDowell Reservoir, N. H., flood control-----    111, 113
Edwardsport, Ind., investigation---------------               ....                           --          1505
Edwardsville, Pa., flood control-___- -- _            -------                        360
Eel levee unit 1 and 2, Indiana flood control_                 ----------                    -           1500
Eel River Calif.:
     Flood control--------------------------------------------                                           2035
     Investigation--__ ____---                     -________              ______-                        2035
Eel River, Mass ------------------------------------                                  51
Egegik River, Alaska, navigation_____                --------_                     _
                                                                                  ---                    2298
Eight-Mile Creek and Locust Creek, Ark., investigation.                              854
Eight Mile Creek, Colo., flood control-----                                          982-       ---
Eightmile River, Conn_ _--------------------                      --..-_              84
Elba, Ala., flood control ____---_______---___-._                                    708      -
Elba, Minn., investigation---- -------------                     ----                    _----------     1237
Eldred, Pa., investigation-----------------------                             -_-. ____..                1634
Elfin Cove, Alaska, navigation---------------------------------                                          2298
Elizabeth City, N. C., investigation_______--_--            -___                     453
Elizabeth River, N. J., navigation_- -------                  __         ----        242-       -        -
Elizabeth River, Va.:
     Improvement of Norfolk Harbor, including Eastern,
       Southern and Western Branches__                ---                         439---------
     Investigation -------------------               ----------------             454
Elizabethtown, Ill., flood control .----------------------------                              -  1500
Elk City (Table Mound) Reservoir, Kans., flood control                           1099
Elkhorn River Basin, Nebr., flood control investigation------------                        1337, 1340
Elkins, W. Va., flood control_ -           __--            .          ---------
                                                                    _---------             1615, 1628
Elkport, Iowa, flood control--------------------------- ---------                                1198
Elk River, Ala. and Tenn.:
     Navigation -------------------------------------------                                      1415
     Investigation---------------------------------------------
Elk River, Md., navigation_
Elk River, W. Va., navigation, flood control_
                                             _ - ..          -
                                                           -----------
                                                                  _          -
                                                                             ------
                                                                                    3             -334
                                                                                                 1437
                                                                                                  ---
                                                                                           1528, 1548
Ellison Bay and Sister Bay, Door County, Wis., investi-
  gation-----------------__-----------------                   ---------------                   1741
Elm Creek, Okla., investigation------------------------                         1112.........
Elmira, N. Y., flood control-------------------------                             342.
Elokomin slough, Washington, navigation-.--- --                                    .....-----------      2155
XXVIII

                                                                           Page

                                                                Volume 1          Volume 2

Ely, Nev., investigation--.-__-----------------_                                       2097
Embarrass River, Ill., investigation  --------------                                   1505
Emerald Wash and Live Oak Wash, Calif., flood control-                                  194
Emergency flood-control work. See districts.
Emeryville Harbor, Calif., investigation     -                                         2027
Empire, La., improvement of waterway to the Gulf of
  Mexico_--         ----------...---------.---------                 747
Empire, Ohio, flood control                                                            1628
Empire, Oreg., investigation_                                                          2156
Emporia, Kans., flood control________                               1110
Endikill Creek, N. Y., investigation-----------                      243
England Pond levee unit, Illinois                                                      1500
Enid flood protection, Okla., investigation
Enid Reservoir, Miss., flood control__
                                                      ----          1112
                                                                                       2337
Entiat River, Wash            _                                                        2234
Erie, Colo., flood control___---- -            ----------                              1328
Erie County, Ohio, investigations_                                             1894, 1908
Erie Canal, N. Y------------------------------                       213
Erie Drainage Dist., Ill. and Wis., investigation_                                     1199
Erie Harbor, Pa.:
     Investigation_-----------------------------                                      1894
     Navigation---      -------------------                                           1864
Erie Lake, investigations                                                      1741, 1777,
                                                                                1830, 1894
Escambia River, Fla.:
    Investigation----------       --------------------               699
    Navigation-------------------                    --------        698
Esopus Creek and Tributaries, N. Y., investigation ....              257
Espanola, N. Mex., flood control_                                    986
Essex River, Mass., navigation_                                      103
Estero River and Island, Fla., investigations-                  624, 644
Etowah R., Ga., flood control------------------                      702
Eufaula Reservoir, Okla.:
     Flood control_ -   -------------------------                   1095
     Investigation _                                                1112
Eustis Lake, Fla., investigations_                              624, 644
Evansville, Ind., flood control_                                               1473, 1500
Everett Harbor, Wash., navigation                                                    2204
Everglades, Fla.:
     Flood Control                                                   633
    Investigation__-                                                 624
Excelsior Springs, Mo., investigation_                                                 1290
Exeter River, N. H., navigation_                                     103
Expenditures:
    Miscellaneous works_ ___..._                                      20
    Rivers and harbors and flood control_
                             F
Fabius River, Mo., flood control_                                                      1198
Fairbanks, Alaska, flood control------------------
Fairfield, N. C., navigation                                        47-----------2303
                                                                     ._
                                                                    470
                                                                           _           2303

Fairhaven and New Bedford Harbors, Mass.:
     Investigation----        ---------                         105, 149 ---------
     Navigation.-      ------------- -----------                      63
Fairport Harbor, Ohio:
     Investigation--------        ----------------------                               1894
    Navigation         ...        .      .       .       ..                            1855
Fajardo Harbor, P. R., navigation, investigation-.......        622, 624
Fall-Austin Reservoir, Ill_------------------------                                  1186
Fall Creek Dam, Willamette River Basin, Oreg-         ..--                     2159, 2167
                                                   INDEX                                                   XxIX

                                                                                                 Page

                                                                                      Volume 1          Volume 2
                                                                                 I-               I
Falling Spring Dam, Va., flood control--------------
Fall River Basin, S. Dak., flood control-.-----------                                    4 3_-------
                                                                                        --
                                                                                        ---
Fall River Harbor, Mass.:
     Investigation------                 ------------------------                          107
     Navigation _-------------------------------                                            66
Fall River, Reservoir, Kans., flood control-----------                                    1077
Falmouth Harbor, Mass., navigation---------------                                          103
Falmouth Reservoir, Ky., flood control-------------                                                          1502

Fancy Bluff Creek, Ga., navigation----------------                                         539
Far Creek, N. C., navigation__----------------                                             475
Fargo-Moorhead, Minn. and N. Dak., flood control----                                                         1214
Farm Creek, Ill., flood control_--                        -------------           ----------
                                                                                                             1778
Farmdale Dam, Illinois____---                  -------------------                ----------                 1778
Farmers levee and drainage district, Illinois, flood control.                                                1790
Farmington Reservoir, Calif., flood control----------                                                        2061
Faulkner County Ark., flood control                      _                                1048
Fayette-Bastrop Soil Conservation District, Tex., investi-
  gation-_                 _____ __                                                        923
Fayetteville, Tenn., investigation-                       .---------------                                   1437
Feather River, Calif., navigation                       ....----------------                                 2060
Federalsburg, Md., flood control--------                                                       374
Federal Water Power Act, investigation and supervision
  of projects--------------------------------                                                                2391
Felsenthal Canal, Ark., navigation-----------------                                        818
Fernandina Harbor, Fla., navigation_---------------                                   537, 550
Fern Ridge Reservoir, Oreg., flood control_----------                                                 2159, 2172
Ferrels Bridge Reservoir, Tex., flood control-------                                  774, 777
Fifteen Mile Bayou, Ark., investigation..._.______                                         854
Fighting Island Channel, Detroit River, Mich,, naviga-
  tion---------------------------------------                                                                1809
Filberts Creek, N. C., investigation __                            __        .             504
Finneys Creek, Va., investigation------------------                                        454
Fire Island Inlet, N. Y., navigation_                                                      176
First Creek, Tenn., investigation_                                                                           1438
Fishermans Bay, Wash., investigation--------------                                                           2233
Fishing Bay, Md., navigation_                                                              334
Fishing Creek, Md., navigation___                                                          334
Fishing Creek, N. C., navigation-                                                          498
Fishing River, Mo., investigation----------------                                                            1290
Fish Lake, Ill., investigation____                                                                           1158
Fishtrap Reservoir, Ky., flood control_                                                                      1565
Fivemile River Harbor, Conn., navigation-------                                            104
Flagler Beach, Fla., investigation_----------------                                        624
Flagler County, Fla., investigation                       ------------                     644
Flat Pond, Maine____________------------                                                    32
Flathead Lake, Mont., improvement of Polson Bay                                                              2232
Flathead River, Mont.:
     Investigation_                     -------------
                                     __--                                                                    2248
     Navigation---------                   -----------                --------                               2232
Fletcher and Sunshine Gardens levee unit, Indiana, flood
  control--------------------------
              .--                                                     --------                               1500
Flint Creek, Ala., investigation-------------------                                                          1438
Flint River, Ala., and Tenn., investigation-----------                                                       1438
Flint River, Ga. and Fla.:
     Investigation--             --------------------                                      699
     Navigation              -------------------------------                               656
Flood control, general_---------------------------                                           4
Florence, Kans., flood control---                                                         1110
Florida Barge Canal_               -_________----.----------                               621
Florida Central and Southern, investigation flood control-                            645, 632
Florida east coast, investigations------------------                                  624, 645
XXX                                                   INDEX


                                                                                                  Page

                                                                                       Volume 1           Volume 2

Floyd River, Iowa, investigation ---------------------------------                                            1340
Flushing Bay and Creek, N. Y.:
     Investigation      ------                     --          ------                       243
     Navigation -----------------------------------                                         162
Fly Creek, Ala., navigation ---------------------------                                     698
Follansbee, W. Va., flood control_                                                    .               --       1628
                                                                                                   _------------_-----.._
Folsom Reservoir, Calif., flood control- -----                         -----------------                      2079
Fondulac Dam, Ill--------------------------------------------                                                 1778
Forest River, N. Dak., flood control- --                 __.-.-.--- _ __ -- ____--_-                           1234
Forked Deer River, Tenn., navigation, flood control....                                     850
Forsyth, Mont., flood control-          ----------------------                                -          -    1375
Fort Benning, Ga., lock and dam, navigation-----------
Fort Bragg, Calif., investigation_-----------
Fort Chartres and Ivy Landing Drainage Dist. No. 5, Ill.,
                                                                    -----          _-----
                                                                                    -       658
                                                                                                              2027
  flood control ------------
                          .          --------------------                          _  --..            1142, 1144
Fort Gay, W. Va., navigation_----__------------------                                         _                1525
Fort Gibson Bottom, Okla., flood control----------------                             ----------                1525
Fort Gibson Bottom, Okla., flood control --------------                                   1110-
Fort Gibson Reservoir, Okla., flood control------------                                    1089
Fort Loudoun, Tenn., navigation _..-------------------------------                                            1410
Fort Madison, Iowa, harbor--....-------------------                             _               ------         1167
Fort Myers, Fla., investigation_ ---            ------........                                                     .624.
Fort Peck Dam, Mont., navigation __                  ---------                      __----___                  1361
Fort Peck, Mont., engineering district_ ----------------------                                    _           1361
Fort Pierce Harbor, Fla.:
     Investigation___-- ---------------- ------ -                                   -- 624
     Navigation ------------------------------------                                        576
Fort Point Channel, Mass-_ --------                  ---------                          - 43
Fort Randall Reservoir, S. Dak., flood control_--_..                        ---            --         1312, 1315
Fort Smith, Arkansas River, Ark.:
     Flood control_---------------                -------------                   -        1048
     Navigation               ----------------              ----------                    1057
Fort Supply Reservoir, Okla., flood control-                            ----              1067-
                                                                                          1067
Fort Towson Dam, Okla., investigation---_-----           -----                            1112
Fort Wayne, Ind., investigations__ _- ..--------- -------                                            1741, 1777,
                                                                                                               1830
Fort Worth floodway, Texas, flood control
Fort Worth, Tex., engineering district_ ------
                                                              _       __-          -
                                                                                            948
                                                                                            927
Forty Fort, Pa., flood control                  ..---- -          -    -       -       -    357
Fountain Bluff, Ill., flood control-----------------------_                                                    1138
Fountain Que Bouille River, Colo., flood control--------                                   - 970
Fourche Island, Ark., flood control_ --          ---- ----        _                         1022
Fourche La Fave River, Ark., flood control_------------                                     1025
Four Pole Creek, W. Va., flood control_-------------------------                                               1567
Fowl River, Ala., investigations-____--------_                                              699
Fox River, Ill. and Wis.:
    Locks and Dams -----------------------------------------                                                1680
    Investigations------ --         -----------------------------                                    1741, 1743,
                                                                                                           1791,
    Navigation       --------------------------------
Francois Bayou, La., flood control_ __----- -         ----- _            803
                                                                                   ----------        1676, 1678
Frankfort Harbor, Mich., navigation_ -----------           __- _       ___         -_ 1730
Frankfort, Kans., investigation ----------------------------------                      1290
Frankfort, Ky., flood control__-------------------- _ _--                     ---       1500
Franklin to the Mermentau River, La., navigation------ 729, 734                      _
Franklin Falls Reservoir, N. H., flood control                            111
Franks Track, Calif., investigations_------.-                   - ___ .--         2060, 2097
Frazeyburg Reservoir, Ohio, flood control__-_--                .---------------         1566
Freeport Harbor, Tex.:
      Investigation,-           -        --------..    _ - --   -916
      Navigation                                        . _----------
                                                           _                               _....-------
                                                                                       ..---896-----
                                                       INDEX                                                      XXXI

                                                                                                      Page

                                                                                          Volume 1           Volume 2

Freeport on Pecatonica River, Ill., flood control.-                                                              1193
Freeport, Pa., flood control-        _..            .         _- _ ..-   -                                       1628
French Broad and Little Pigeon Rivers, Tenn., navigation._                                                       1415
French Broad River, Tenn., and N. C., investigation __ _                                                         1438
French Creek Reservoir, Pa., flood control, investigation_                                                 1629, 1634
French Lick, and West Baden Springs, Ind., investigation-                                                        1506
Frenchman Bayou, Ark., investigation____ _ ..-----                                     854
Friendly, W. Va., flood control _          _.           _._..                                                       1564
Front Cove, Va., investigation -          - - - -                                      454
Front Royal, Va., investigation__...__                                                 417
Fruitvale Ave. Bridge, Calif., investigation-                      __                                               2027
Fullerton Dam, Calif., flood control_ _             __..             .                                              1961
Fullerton, Ky., flood control .                     ...        _       _   -----.....                               1564
Fulton, Ark., flood control              _      _..              _._                  1106
Funds advanced for river and harbor improvements and
  for flood control works          _ _.       ...                        .              19
                                          G
Gaddsen, Ala., flood control_--__.__--_
Galax, Va., flood control_ _
Galena River, Ill., flood control____
                                                 _.           .
                                                                             _ -------
                                                                           . ___          _  -      _
                                                                                                         710

                                                                                                               _
                                                                                                                 1545,1564
                                                                                                                       1195
Galien River, Berrien County, Mich., investigation ............                                                        1791
Galion Bayou, La., flood control------------                               _--------                     803
Galere Bayou, Miss., navigation_---------------------                                                    698
Gallatin River, Mont., investigation__ __...........                                         _..___.                   1376
Gallipolis, Ohio, flood control, investigation-__-..............                                                 1564, 1528
Gallup, Ky., navigation____________                                   ____                                             1525
Gallup, N. Mex., investigation____                                          _                                          1974
Galveston Bay and Harbor, Tex.:
     Improvement of Galveston Channel---------------                                                    874
     Improvement of Galveston-Texas City Channel...                                                      878
     Improvement of harbor entrance ------------------                                                   874
     Investigation___-______-________                                    ___                             916
Galveston-Brazoria Soil Conservation District, Tex.,
  investigation __________                             --
                                               ______________                        _____-              924
Galveston County, Tex., beach erosion study                         -----------                          916
Galveston, Tex., engineering district------------------                                                 859
Gardiner Channel, Umpqua River, Oreg .....                                    ........      .........                  2148
Garfield, Utah, Great Salt Lake, investigation.................                                                        2060
Garrison, N. Dak., district_..............................                                                             1347
Garrison Reservoir, N. Dak., flood control__............_... ...                                             .   1348, 1349
Garrows Bend, Mobile River, Ala., navigation--....------....                        -                   670 -
Garza-Little Elm Dam, Tex.:
     Flood control- -.--                 ...-            ..........                                      939
     Investigation-- ----------------------- -----------                                                 935
Gasconade River, Mo.:
     Investigation ............                  ..................                          __                        1290
     Flood control ................................                                          ---           .           1251
     Navigation....__                       ...........................                   -....                        1250
Gastineau Channel, Alaska, navigation_..-................                                                        2292, 2298
Gaston Reservoir, Va. and N. C., flood control..--...-------.                                           456 -
Gate Creek Dam, McKenzie Basin, Oreg_ .. ..........                                                   ....       2159, 2190
Gates Creek, Okla., investigation _........_      -....                                _--             1112
Gathright Reservoir and Falling Spring Reregulating
  Dam, James River Basin, Va., flood control-----------........                                          463
Gauley River, W. Va., navigation___                .......................                                             1528
Gavins Point, S. Dak. and Nebr.:
     Flood control_......................................                                                        1312, 1320
     Investigations.................................._ _                                                         1010, 1340
XXXII                                          INDEX


                                                                                       Page

                                                                            Volume 1             Volume 2

Gaysville Reservoir, Connecticut River Basin, Vt., flood
  control-----------------------------------------                       125
Genegantslet Reservoir, Genegantslet Creek, N. Y., flood
  control------------------------------------------                      337
General Joe Wheeler, Tenn., navigation-...----...-.-----..--...                                          1410
Generals Cut, Ga--------------      ---------------..---                521                          .
Genesee River, Pa. and N. Y.:
    Flood control ------..--------.        --.-------             _1898
                                                               -----------
    Investigations------------      --------------------------                             1590, 1894,
                                                                                                  1909
     Navigation ------------------------------------                           -------           1882
Geneva, N. Y., investigation---.-----------------------------                 .1909
Georges River, Maine, navigation- ___-_....-.-.-                                       103
Georgetown Harbor, S. C., navigation -----------------                                508
Gering and Mitchell Valley, Colo., Wyo. and Nebr.,
  investigation-----------------------                     -----------------            -----            1340
Gila River, Ariz. and N. Mex.:
     Flood control-------------------                ---        -----        ------ -----                1969
     Investigation --.... --.---                       .----.---- --                          -
                                                                                     .----------         1974
Gilbert Run, Md., investigation_ -----.-.-...-----                                    417
Giles Creek, Nebr., flood control_----------------                        _       ----.-..-..            1337
Gill Township levee unit, Indiana, flood control.-------                -----------                      1505
Gillespie Dam, Ariz. investigation-----------------------------                                          1974
Gillett, Ark., flood control ......--           --------.--.               841, 1048        ..             ..
Gimlet Creek, Ill., investigation------------------------------                     1158,1791
Girtys Run, Pa., investigation___-----                      __-----------------
                                                            ___1634               -
Gladstone Harbor, Mich., navigation__.-----------------..----                          - 1740
Glasgow, Mont.:
     Flood control --------------------------------------------                          1375
     Investigation_.-----    . ______---------------.-----.---...                        1376
Gleason Creek, Nev., investigation--.----------------------------                        2097
Glen Cove Creek, N. Y., navigation_               ------------          ---     243
Glen Cove Harbor, N. Y., navigation- ------ -----                              -   242
Glorietta Bay, Calif., investigation_------------------------------                 1938
Gloucester Harbor, and Annisquam River, Mass., navi-
  gation_.-----_ .---    _____        __--- -            ----.-.. -- 36........
Goat Island Reservoir, Ga. and S. C., flood control ....             540 _
Golconda, Ill. flood control_____-------------------------------              1491, 1500
Gold Beach, Oreg., investigation__--_---------------------          ------          2156
Golden, Col., investigation___--                   ..-..
                                                  .----------                       ----                 1340
Golden Eagle, and West Point, Ill., Mo., investigation- -------------                                    1127
Golden Meadow, La., investigation --                .-- .-----        769.-.....
Goldsboro, Neuse River, N. C., flood control__          -----------   504
Goose Creek, S. C__-.---         ------------------               _   510
Goose Creek, Md., investigation___ -.------            -    -- --     335
Gordon Creek, Hattiesburg, Miss., flood control--------               710
Gordon Pass, Fla., investigation_ --     __-----..         ----       624
Gordon River, Fla., investigation ---------------------               645 _
Gordons Landing, Lake Champlain, Vt., navigation-_.                   242
Goshen Creek, N. J., navigation-_ -------------                            -       301.
Governors Run, Md., navigation_---------------------                               334
Gowanus Creek Channel, New York Harbor, N. Y.:
    Investigation-------------------------------                                 243
    Navigation     ----------------------------------                       190, 191
Grand Bayou, La., investigation_----------------------                           769---------
Grand Bayou Pass, La., navigation_-----.-------_                                 767-.
Grand Caillou Bayou, La.:
    Investigations -------------------------------                          769, 807.         ..----
    Navigation ------------------------------------                                767
Grand County, Col., investigation---           .-------                             _   -                1974
Grand Ecaille, La., investigation ...-------                                       769-          -
                                               INDEX                                                    XXXIII


                                                                                                Page

                                                                             Volume 1                  Volume 2

Grand Forks-East Grand Forks, Minn., and N. Dak.,
  flood control -------------------------            ------        ------                                   1214
Grand Haven Harbor and River, Mich., navigation;
  investigation       ---------------     -- .-------.......
                                                -         ---..                                    1716, 1741
Grand Marais, Mich., improvement of harbor of refuge-                  -1660
Grand Marais Harbor, Minn., navigation-------            ------- -      -1641
Grand (Neosho) River Basin, Kans- --                                      1083                    _- .-
Grand Prairie region, Arkansas, investigations- _-- _ 842, 1014
Grand River, Ohio, investigation; navigation              -----------------                        1590, 1634
                                                                                                            1854
Grand River, Mich.:
    Investigation         ----------------------------------------                          1743
    Navigation_      ------------------------------------------ 1716
Grand River, Mo., investigation, flood control                     __
                                                                   _     - _---------:1291, 1251
Grand River, N. and S. Dak., investigations----------------- 1368, 1376
Grand Tower, Ill., flood control--------------------                   -- ----              1136
Grand Traverse Bay Harbor, Mich., navigation- -------------                  _ ----         1657
Grand View Bay, N. Y., navigation                               --    --                    1892
Grandview, Ind., flood control__ ___________________----------             -        -       1500
Grande Ronde River, and Valley, Oregon, investigation,
  flood control       -----------------------------------------                    2280, 2267,
                                                                                                            2272
Granite City, Ill., investigation________ _____ ___---    _                                                 1127
Grannis Crossing Bridge, Mont-____________ __________-          ___                                     -1377
Granny Tweedle Levee, Ill., flood control ------------------------                                          1508
Grant Parish below Colfax, La., flood control             774, 790,
                                                                                   805
Granville, Pa., flood control___________________------------------------------------                 1636
Grapevine Reservoir, Tex., flood control ---------------                             942
Grasse River (Massena), N. Y., navigation ------------------------                                   1892
Grassy Creek, Ind., flood control -______-___-                                 ___-1511
Graybull, Wyo., flood control ____________-_________- -                                        -_    1374
Grays Harbor and River, Wash.:
    Investigation ---------------------------------------------                                      2233
    Navigation       ------------------------------------------                                2155, 2222
Grays Reef Passage, Mich., navigation--------------------------                                      1740
Great Basin, Nevada and Utah, investigation_ .                              --.---- .---             2098
Great Bend, Kans., investigation _--------------------                               985.......
Great Chazy River, N. Y., navigation -----------------                               242
Great Egg Harbor River, N. J., investigation- .-----                     -           302
Great Kills, Staten Island, N. Y., navigation-----------                             242
Great Lakes:
    Investigations-_-            -_-________________-------                 ___---------1665, 1741,
                                                                                               1830, 1894
    Waterway to Hudson River, improvement                   ----------               213
Great Lakes-Atlantic Tidewaters Deep Waterway, in-
  vistigation ---------------------------------------                                243             1894
Great Miami River, Ind., flood control-_______-      --                __-- --- ____                 1502
Great Pee Dee River, S. C.:
    Investigation -----------------------------------                                520
    Navigation------- --------------                       ------------               517
Great Salt Lake, Utah, investigations_-                     _ _--------- -        __-----2060, 2098
Great Salt Plains Reservoir, Okla__---               ----------                     1072
Great Salt Pond, Block Island, R. I.:
    Investigation-----------------------------------                                  107
     Navigation ---             ----            ------                                     76
Great Sodus Bay Harbor, N. Y., navigation-_-------------                               -                    1884
Great South Bay, N. Y., navigation_------
                                    .. ____---175                                                  -
Greeley, Colo., investigation---------
                                     _-         - -  _  -                                  --      -        1340
Green, Barren and Nolin Rivers and Bear Creek, Ky.,
  navigation investigation- -  -_----.-  - - - --                                  -            -1443,      1450
XXXIV                                            INDEX
XXXIV                                            INDIDX
                                                                                                        Page


                                                                                 Volume 1                      Volume 2


Green Bay Harbor, Wis., navigation                 _--                                                              1675
Green Bay, Iowa, flood control,----.-.--        ..-.---.-                                                           1198
Greene, N. Y., flood control_- .-.........--            --                                     377
Greenfield Bayou levee unit, Indiana flood control- ...                                       -1500
                                                                                           -----
Green Horn Creek, Rye, Colo., flood control_-.....      ,                                   982
Green Island,br...Iowa, flood control.. .    ..     ,                          .....   T       ---               1198
Green Peter Dam, Oreg.......                        ............                                          2159, 2175,
                                                                                                                 2190
Greenport Harbor, N. Y., navigation _              _-------                                    242
Green River Basin, Ill., investigation-      .    .---------                                   --                   1199
Green River, Ky.:
    Flood control_      .                  ---       ...   ....                                                     1502
    Investigation_.- -                   -         ,- -----                                                         1450
    Navigation----- -. . - -                 . . . ...     ....                    -       -        -
                                                                                                                    1443
Green River, Mass., investigation---_-.              -
                                               .---.-.-                                        149
Green River, Wash., flood control--             . . .-.-.----                                                       2240
Green River, Wyo., investigation____________-_-_                                                                    1975
Greenup, Ky., flood control          ___      _____                                                                 1564
Greenwich Bay, and Cove, R. I.:
      Investigation--                                                                          107
     Navigation _--      - -------                 -       -                                   104
Greenwich Cove, Conn., investigation_                                                          107
Greenwich Harbor, Conn., navigation                                                            104
Greers Ferry Reservoir, Ark.:
     Flood control                                                                         1043
     Investigation                                                                         1050
Gregory drainage district, Missouri, flood control_                                                                 1198
Grenada Reservoir, Miss., flood control-_                                                                           2347
Griffin Lake, Fla., investigations___--                                           624, 645
Grosse Tete Bayou, La., navigation_--------------                                      767
Grunet Point to Pemberton Point, Mass_                                                 107
Guadalupe River, Calif., investigation_                                                                             2035
Guadalupe River, Tex., beach erosion, investigation:
     Canyon Reservoir___                                                               961
     Improvement to Victoria __                                                        901
     Investigations: . _   . .............                                        935, 966
     Navigation _ _         ---------- -                                ....           901
Guayanes Harbor, P. R., navigation_                      _            ___              622
Guenes Channel, Wash_________                                                                                       2232
Guilford Creek, Va., investigation ....                      _       ..                        335
Guilford Harbor, Conn., navigation___                            ---                           104
Gulf Intracoastal Waterway between Apalachee Bay,
  Fla., and the Mexican border:
     Galveston District______              _______             _          _           866
     Investigation-------------------.-                                         S770, 916
     Mobile District                          --       _                              652
     New Orleans District__.__              _                                                  719
Gulf of Mexico, Fla., investigation            -                                               625
Gulfport Harbor, Miss.:
     Investigation----------                                                                   699
     Navigation------------ ---               -                                                693
Gull Lake Reservoir, Minn_----
Gunnison River, Colo., investigation-                _
Guntersville, Tenn., navigation__--
Gustavus Harbor, Alaska, investigation                                                                              2300
Guthrie, Okla., investigation___ _               _          _       _                      1112
Guyandot River, W. Va., navigation               - -                                                                1528
Guyandot Reservoir, W. Va., flood control                                                                           1565
Gypsum Creek, Kans., investigation_ _.                                                                              1291
                                                                                     Page

                                                                          Volume 1              Volume 2


                                 H
Hackensack River, N. J.:
    Investigation  --------------------------------                       244, 257        ......
    Navigation ------------------------------------                            218
Hacks Creek, Va., investigation-....                                            407                ...
Hadley Creek, Ill., flood control_                                   __1186
Hager Slough, Special Drainage District, Ill:
    Flood control_________ ___________-____ _____--- -                               _    1783
    Investigatigation__-----------------------------------1791
Halfmoon Bay, Calif., navigation-------------                                             2008
Half Moon Shoal, Mass               -----------------------------                61
Hallettsville, Texas, flood control                                             9-----60    .--
Haines Canyon, Los Angeles River Basin-----------------------_                            1940
Haines Harbor, Alaska, investigation ____2300
Hales Bar, Tenn---          --------------------------------                              1410
Hamburg, Ill., boat harbor opposite__ _________________________1170
Hamburg Township, N. Y., investigation_-----------------                                  1894
Hamlin Beach, N. Y., investigation _______________--_____                         ___-    1894
Hammersley Inlet, Wash.:
    Investigation---------------------------------------                                 2233
    Navigation --------------------------------------------                               2232
Hammond Bay Harbor, Mich., navigation                                                     1829
Hammondsport, Oswego River Basin, N. Y., flood control-----------                         1908
Hampton Beach, N. H., beach erosion control study ..                            107
Hampton Creek, Va.:
    Investigation.-----------------------------------                          454
    Navigation._        ----------------------------                            453
Hampton River and Harbor, N. H., investigation                      _ _         107
Hampton Roads, Va.:
    Improvement of approaches to Norfolk Harbor -                               446
    Removal of drift_             -----------                           -       446
Hanapepe River, T. H.:
    Beach erosion study------------------- ----                                           2027
    Flood control .               --- ---------------------------------                   2030
Hanging Rock, Ohio, flood control_                             ----     ___-___     _    -1564
Hanna, La., flood control________ __--                     _______         780,811
Hannaberry Lake area, Ark., investigation_              ------            ----------
                                                                                842
Hanna Reef, Tex., navigation                               915
Hannibal, Mo., harbor _ -------------------------------------                                            1167
Hansen flood-control basin- --- _--------__-             -     _----_-            --                     1940
Hanson Lock, La                              -----------                      735
Happy Creek, Va., investigation____________________                           417
Harbor at Pine Orchard, Branford, Conn., investigation_                       107
Harbor Beach, Mich., harbor of refuge-____________-_____-__                                              1829
Harbor Island Basin, Tex., navigation_--__-                 -__        -__    904
Harbor of Refuge, Ausable River, Mich-                -
                                                    ____-___ --         __________                       1815
Harbor of-Refuge, Delaware Bay, Del., navigation--...                         285
Harbor of Refuge, Nantucket, Mass _             ---         --     -       -     59
Harbor of Refuge, Seward, Alaska, navigation-___        __            -----------     _                  2290
Harbor of Refuge at Block Island, R. I.:
    Navigation--------_ -------------     ------- -----                          74
    Investigation_---         ___                                               107
Harbor of Refuge at Point Judith, and Point Judith
  Pond, R. I.:
     Investigation--_               -----------
                          _____-_-__107.
    Navigation ----------------------------------                                71
Hardin, Mont., Flood Control----------------                     ----          -----                     1377
Harding Drain Diversion, Ark_-,__- ---------                                    831
Harkers Point Basin, N. C., investigation,_ .                     -             500---------
       245554-53-vol. 1--74
XXXvI                                          INDEX


                                                                                         Page

                                                                              Volume 1          Volume 2

Harlan County Reservoir, Nebr., flood control                                                   1251, 1273
Harlem, Mont., flood control__ -----                                                                  1369
Harlem River, N. Y., navigation_
Harlingen, Texas:
     Investigation                                     ___________                   917
     Navigation.            ...   ...--.                                             868
Harpers Ferry, W. Va., flood control                                                 416
Harraseeket River, Maine, navigation_                                                103
Harriet Island, Minn_____                                                                         1167
Harrisburg, Ill., flood control__                                                           1489, 1500
Harris Lake, Fla., investigation___                                         626, 646
Harrison, Ark., investigation_                                                     1050
Harrison County, Miss., beach erosion study_                                         700
     Shore protection project_                                                       689
Harrisonville and Ivy Landing drainage and levee district
  No. 2, Illinois, flood control_                                                                    1145
Harrisville Harbor, Mich., navigation_                                                               1814
Harry L. Englebright (Upper Narrows) Reservor, Calif__                                               2320
Hartford, Conn.:
     Flood control_                                                         126, 143
     Investigation___                                                                107
Hartford, Kentucky, navigation_                                                                      1447
Hartford, W. Va., flood control___                                                                   1564
Hartwell Reservoir, Ga., and S. C., flood control
Havre de Grace, Md., investigation_
                                                              -......               541
                                                                                    335
Harvey Lock, La_---.--_                                                              123
Hashamomuck Creek, Long Island, N. Y., investigation.                               244
Haskell, Okla., Flood Control_                                                    1116
Hassayampa River, Ariz., investigation-------------                                               1975
Hastings, Minn., harbor_                                                ____...........--   1169, 1168
Hatchett Creek, Fla., investigation __.....                 . ......                625
Hatchie River, Miss., investigation, flood control__                        854, 852
Hatteras Inlet, N. C., investigation_.. --.............                             500
Haulover Inlet, Fla., investigation---_-------------                                625
Havre, Mont., flood control__                -...........                                         1370
Hawaiian Islands, Coasts of, investigation._ . -.... _                  .                         2027
Hawesville, Ky., flood control:_ __------              ....          ._                     1470, 1500
Haysi Reservoir, Va., flood control ..          ......          _ _ .__                           1565
Hay Creek, S. D. and Wyo., investigation_----------                                               1376
Hay, (West) Harbor, N. Y., navigation_.---.--.----.-                                104
Hays, Kansas, Investigation_ _ .___ .._ ._ ... _               ......                                1291
Hazen, N. Dak., flood control_         _ .._____ ..........                                          1357
Head of Passes, La___                      ___         ____          __             738
Heart River, N. Dak., investigation, flood control..                                        1357, 1355
Heise-Roberts area, Snake River, Idaho:
     Flood control-...... ...           . ......                    .------- ------         2267,2268
     Investigation_._--                                        .          -    ------ -2280
Helenwood and Devils Jump, Ky., and Tenn., Investiga-
  tion-_                 ..                                                                          1438
Hell Gate, East River, N. Y., investigation          ..... ....                   244
Hellen Creek, Md., navigation _ _ _ -             ---
Hempstead County levee district No. 1, Arkansas, flood
                                                                .                 406
  control                         .     . . ... --.               774,             805
Hempstead Harbor, N. Y., navigation-__-------                --                    164
Henderson County, Ill., flood control.             .---.--...----                                    1198
Henderson, N. Y., investigation ___._.._.... .                .                                      1894
Henderson River, Ill., flood control_    ....-.-......-                                              1192
Henderson, W. Va., flood control_. ...............                                                   1564
Hendricks Harbor, Maine___          ________________.                              103
Hendry Creek, Fla., investigation....        .............                         645
Hennepin, Ill., control_._     .      .         ..         .                                         1790
                                                 INDEX                                              XXXVII




                                                                                          Page

                                                                               Volume 1           Volume 2

Herbster, Wis., investigation__              --
                                      _______-__---------                                               1665
Heron, Bay, Ala., investigation-__---...-------------                             . . .
                                                                                         400
                                                                                          ---.
Herreid, S. Dak., flood control--........-----------                                                    1310
Herring Bay, Md., navigation ....--      -.-----------                                   334 ........-.
Herring Creek, Md., navigation______-------------                                        407 -----....-
Heyburn Reservoir, Okla., flood control.-------------                                   1075 -.---.-.-.
Hickory Creek, Okla., investigation----------------                                     1112
Hidalgo County, Tex., investigation................---------                             924
Higginsport, Ohio, flood control_ .....-..              .........                                       1500
Highland Creek, Ky., investigation.-.._.............                                                    1506
High Springs, Fla., investigation-____              _       .-     .--    .---
Hildebrand Lock and Dam, Monongahela River_----                                                         1584
Hillsboro Bay, Canal, River, and Inlet, Fla, navigation_                        604, 620
Hills Creek, Dam, Oreg___                                                 .                    2159, 2162
Hillsdale Drainage Dist., Ill. and Wis., investigation.. .                                              1199
Hilo Harbor, T. H.:
     Investigation____ ______________ _ _                   .                                           2027
     Navigation----------------------------....-.-.                                                     2023
Hilton Head Island, S. C_                                                                540
Hingham Harbor, Mass., navigation_                          _....._..........            103
Hiwassee River, Tenn., navigation_----------------___                         ----------                1415
Hockingport, Ohio, flood control---------------------                                                   1564
Hocking River, Ohio:                                                          ----------
     Flood control----- _- __------ __--.---_--_ ---___                                                 1541
     Investigation    -----------------------------                           ---------.-               1570
     Reservoirs                   --------                                    ------ ---                1565
Hodges Village Reservoir, Mass., flood control---.-.....                                 120
Hogan Reservoir, Calif., flood control            ----------                                            2061
Holbrook, Little Colorado River, Ariz., flood control _ _                                               1972
Holden Beach, N. C., investigation------------------                                     500 ----------


Holdens Creek, Va., investigation---------------------                                   335
Holland Harbor, Mich.:
     Investigation__ ..........
                      - - - _-- -- _-           -
                                               -_
                                               _.                                                       1741
     Navigation----------------------              -        - .                                         1714
Holley Dam, Oreg-..--------------------------                                                  2159, 2190
Hollywood, Fla., investigation__.--            _-------___._..                           645
Holmes River, Fla., navigation__--_---------                  _-- _--                    698
Holston River, Tenn., navigation ----------.....-                                                       1415
Holyoke, and Springfield, Mass.:
     Flood control...    ---    -- .........           .             ..         126, 139
     Investigation_-------------_-------- ----                         --                107
Homer Harbor, Alaska, investigation                                     ._                              2300
Homme Reservoir and Dam, N. Dak., flood control___                                                      1222
Homochitto River, Miss.:
     Flood Control------------------------                                               838
     Navigation                                                                          821
Homosassa River, Fla., navigation_             - -__ _-_                                 622
Honey Creek levee unit, Indiana, flood control                                 --------                 1500
Honey Hill Reservoir, Connecticut River Basin, N. H.,
  flood control-                                                                125, 148
Honga River, Md., navigation--                    -----                                  321
Honolulu, Hawaii:
    Investigation_ ---------                                                                            2027
    Harbor, navigation_                                                                                 2017
Hood Canal, Wash., investigation ....                                                                   2233
Hood River, Oreg., bridges __                                                                           2155
Hooker dam site, Ariz., and N. Mex., investigation ....                                                 1975
Hoonah Harbor, Alaska, investigation_                                                                   2300
Hoosic River Basin, N. Y., flood control                                        247, 259    ---      ------


Hoosick Falls, N. Y., flood control                 -                                   247
Hopewell, Va., investigation        .                                                   454
XXXVIII                                      INDEr

                                                                                     Page

                                                                        Volume 1             Volume 2

Hopkinsville Ky., investigation - ----  - -                              __ _                     1438
                                                                                                  1----------
Hopkinton-Everett Reservoir, flood control_---------1---                     48
Hopper dredge replacement ------------------ -------                           300
Hoquiam River, Wash., navigation -___----------------                       .2232__
Hoquiam, Wash., flood control-.-----------------------                           ------ - 2248
Hords Creek Reservoir, Tex., flood control_----------                         955
Hornell, N. Y. flood control------------------------                          345
Horn Harbor, ta., navigation_------- ---------------- 453
Horseshoe Cove, Fla., navigation_-------------------_                         622
Horseshoe Lake, Ill., investigation_               -______-___-___--
                                                                  __-                -_ 1127
Horton and Dutch Creeks, The Sny Basin, Ill., flood
  control-----------------------------------------                     -      -----       1186
Hoskins Creek, Va., navigation_--------------------_                          392
Hot Springs, Fall River Basin, S. Dak., flood control--------------                       175
Houma, La., outlets to open waters of Gulf of Mexico,
  investigations-                                                        770, 807         ----
Housatonic River, Conn.:
     Flood control_ _-----------------                   _   ---------        146            _
    Investigation -----------------------------------                         149
    Navigation --------------------------- _------                             91
Houston to Galveston Ship Channel, Tex.:
    Investigations_      ----------------------------                    917, 924
     Navigation_ _---------------------------------                            882
Howard Farms-Reno Beach Area, Ohio, flood control ---                          __                 1837
                               ------------
Howell Mill Shoals Dam, Ala________                                      -     676
Hubly Bridge, Sangamon River, Ill., flood control----------                                       1790
Hudson Harbor, Wisconsin --------------------------------                            --           1209
Hudson River, Fla., navigation        __-------------622
Hudson, Mohawk and Waterford Rivers, N. Y., flood
  control-_ -----------------                  -------------                   255
Hudson River, N. Y.:
    Improvement above New York__ ----------------                              208
     Improvement at New York_ ------------------                               201
     Investigation___--- -----------------------------                   244, 257--------
     Roundout Harbor, improvement ----..---.....       - ..                   206---
     Waterway to Great Lakes-enlargement of New
        York State Barge Canal- ....          .----------------                213
                                              _----
Hueneme, Calif., investigation__----------------          .. -------        1938
Huerfano River, Colo., investigation__-- -------------            985-
Hughes, W. Va., flood control---------- ------------- ------       ---      1567
Hugo Reservoir, Kiamichi River, Okla., flood control-....        1104---------
Hulah Reservoir, Okla-----_ __- _..------------..                1081.....   ..
Hull Creek Va., investigation-                           -
                                                 _--------------                     -
                                                                               407 .......
Humacoa Playa, Punta Santiago, P. R., investigation ....                       625-.       -
Humbolt Bay, River, and Harbor, Calif.:
     Investigation.---                    -------------------           -------                   2027
    Navigation --------------------------------------------                                    1982
Humboldt County, Calif., investigations-                     --------------------- 2036, 2098
Humboldt, Kans., flood control              ..---------.. -------------          1110
Humboldt River, Nev., flood control__---- ----------------                        ----         2097
Humphreys Clanton and Shawnee Creeks, Ky., investi-
gation__        ----------------------------------                                            1506
Hunters Run, Ohio--------------------------------------------                                  1570
Hunting Island, S. C. investigation-_ _                    .--------------        518---------
Huntington Harbor, k. Y., investigation-                          ._------------  165.........
Huntington, W. Va.:
    Engineering district ---------------------------------- --                                 1513
    Flood control--------             ---------------------- ---------- 1550, 1564
Huntsville, Ala., investigation----.----------------- ___1438
Hout, Minn., investigation-_.          --------------------..-.   .    .1237
                                                INIDsX                                            xxxp

                                                                                          Page

                                                                               Volume 1          Volume 2

Huron County, Ohio, investigation_--  .    ----..--                     - -----                     1909
Huron Harbor, Ohio, navigation_ ----          ..........-                      .                    1------------.
                                                                                                    1844
Huron Lake, investigation_          .      --................-..--            -..... .              1830
Huron River, Mich., investigation.... ......                    -----..---...                  -1837
Hurricane Ditch, Ark., flood control- -------.----..----                            853
Hutchinson, Kans.:
    Flood control--------------------- ----------                                 1058 ........
    Investigation--....--------,                   -,..-.-T....-.                 1112 .......
Hutchinson River (East Chester Creek), N. Y-----------                              157 ........-------
Hyannis Harbor, Mass., investigation--_,          --.-..            ...          -103 .-.-       ,, T_
Hydaburg Harbor, Alaska, investigation-------------_                           - _ -                2300
Hydraulic Mining, regulation of ------------------
                                ...                                  --------------                 2316
Hylebos Waterway, Tacoma Harbor, Wash--------------------                          ...              2218
Hyndman Borough, Pa., investigation, -----                         ----             417 ......


Iao Stream, T. H., investigation-__-              ----.--------------.---.                     2036
Ice Harbor at Marcus Hook, Pa., navigation               ----------            301 .........
Ice Harbor at New Castle, Del., navigation .............                       301 .         -
Ice Harbor Dam, Snake River__..............-..........                                         2260
Illuliuk Harbor, Alaska, navigation. -           _-------        ..----..-----                 2298
Illinois and Mississippi Canal, Ill.:
      Investigation__.                                                                         1186
                                                                 _------------------------------------
      Locks----------------
                 ....                        ---------------- -------------- 1181, 1182
      Navigation ..---------------------------------------------                                      1180
Illinois River, Ill.:
      Flood control---------------------------------------------                                      1790
      Investigations.__-----.---..----.--..----...-....--.1127,                                      1158,
                                                                                               1777, 1791
Illinois Waterway, Illinois:
      Investigation__-         ...          ..-..
                                            _......._1777,              ..                           1127
      Locks and Dams __--     ------------------------------------                                   1768
      Navigation-- ------------------------------.                          -----.         1764, 1126
Imperial and San Diego County, Calif., investigation.--- -------- ___                                1975
Imperial River, Fla., investigation--..- ----.-.----.---.                          645-          -......
Inactive Canalized Waterways_          -----------------------                        4
Index, Tex.:
      Flood control__-.-------.---.---                      .1106                       ........-
      Investigation.------------------------------.   .1112                             .- ....
Indiana Harbor, Ind., improvement- . ,.....                     , .---------------                   1758
Indianapolis, Indiana, flood control,------------------------------                                  1482
Indiana shore of Lake Michigan, investigation---------------------                                   1777
Indian Bay, Wash., investigation...----.-.-----..-..                                                 2233
Indian Creek, Ill., investigation ---------------................---------------           1158, 1340
Indian Creek, Ind., investigation ---------------------------                                        1506
Indian Creek Watershed, Iowa, investigation.               ------------
                                                                    _       _-_-1340
Indian Ford Dam, Wis_ -----              -----------------------------      __             _         1198
Indian Harbor, Maine_ ------------------------------                                 26
Indian Ledge, Matinicus, Maine, investigation_                                     107 . .              .
Indianola, Republican River, Nebr., flood control                ---------         --      1251, 1289,
                                                                                                     1290
Indian River, Fla., investigations_                                        625, 645__
Indian River Inlet and Bay, Del., navigation_-----------                           286
Indian River Inlet to Rehoboth Bay, Del., Waterway-..                              301            ..........
Indian Rock Dam, Pa., Flood Control-----------------                               369 .........
Industrial Canal, New Orleans, La., investigation ...                                70 .-- -.-
Industry, Pa., flood control.. - - - - - -...........---...                     ....-       -        1628
XL                                                  INDEX

                                                                                                  Page

                                                                                     Volume 1            Volume 2

Inland Waterway, from:
     Chincoteague Bay to Delaware Bay, Del_.----.                                     -     301
     Between Jefferson, Tex., and Shreveport, La  _                                         717
     Between Rehoboth Bay and Delaware Bay, DeL ._                                          283
     Delaware River to Chesapeake Bay---------------                                        278
      From Empire, La., to Gulf of Mexico--- -----_--                                      -747
     Franklin to Mermentau River, La_ -------        _---          -    734
     Plum Island Sound to Annisquam River, Mass., in-
                  ---------------------------------
       vestigation_                                                     107
Inner Harbor Navigation Canal Lock, La_               __-.---           722
International Boundary Waters--- -----------                  _      ------ _                                  2397
Interoceanic Canal surveys ----------------------               --------------                                 2389
Intracoastal Waterway:
     Between Apalachee Bay, Fla., and the Mexican
       Border     ----------------------------------             652, 719,
                                                                        866
     Between Norfolk, Va., and the St. Johns River, Fla- 447, 467,
                                                                  505, 521
                                                                                                    - -             .
     Boston to Long Island Sound, investigation                   ---------
                                                                        107
      Caloosahatchee River to Anclote River, Fla-........                                 -597
      Cross-Florida Barge Canal_------- ------------                                  - -621
      Gulf Intracoastal Waterway, navigation -----------                                   652---------
      Investigations-------------------------------                                  625, 627, _
                                                                                             645
      Jacksonville to Miami, Fla_-------6----                    --------
                                                                    -                     -- 564
      Miami to Key West, Fla--     __- _--  ------                                           621
      Mississippi River to Bayou Teche, La_                                                  767
      New Jersey----             --- _        ---------------------                               96-296
      Okeechobee Waterway__---- -                         _ _--_         -----                 590
      Tombigbee-Tennessee Rivers Waterway-----------                                            684 _
Iola, Kans., flood control                      __--------------------------                  1110
Iowa and Cedar Rivers, Iowa, investigation.. -                               _ __-        -         --        1199
Iowa River, Minn. and Iowa, investigation Flood Con-
   trol --------------------------------------------------                                             1199, 1190
Ipswich River, Mass., navigation ---------------------                                          103
Iron Canyon (Table Mountain) Dam Sacramento River----------_                                                  2090
Irondequoit Bay, N. Y., investigation_-                        ------------------                             1894
Ironton, Ohio, flood control_--------- ---------                             ___ ----                _ 1557, 1564
Irrigation policy----------------                                                                  6-       --
Irvington Harbor, N. Y., navigation_-242-...........                                           242
Isabella Reservoir, Calif., flood control --------------------------                                          2070
Island Creek, Md., navigation ----------------------                                   334, 406                 --
Island End River, Mass_ _-------------                                                         - 40       --
Island levee unit, Indiana, flood control_ --                         ------        _------1500
Isle au Haut Thoroughfare, Maine_------                             -             _             102-
Isle La Plume, Wis., investigation ---------------------                                          -     -     1212
Isles of Shoals Harbor, Maine and N. H., navigation -_                                           35
Israel River, N. H------- --------------------------                                           149
Ithaca, Oswego River Basin, N. Y., flood control-----------------_                                            1908
      Investigation_   -----------------------------------                                ---------           1909
Ivy Landing, Ill., flood control- -                     __------------ _                   ---------          1142

                                       J
Jackson Creek, Va., navigation------------------------         406
Jackson Hole, Wyo., flood control_                - _     -------..---- 2268, 2278
Jackson, Ky., flood control________ ____---       __-_- _---------1460, 1500
Jackson, Miss., Pearl River at, flood control                 ------------
                                                               706
Jacksonville, Fla.:
      Engineering district----    -     -------------                                       549- ---
      Harbor- ---       ----      ----------                                                552---5
      Investigation of~waterways_ ------              ----                       -         -625.........
                                               INDEX                                               XLI

                                               ?NDEX                                               XLI
                                                                                       Page

                                                                            Volume 1          Volume 2

Jacksonville to Miami Intracoastal Waterway_                                            625-------
Jamaica Bay, N. Y., navigation_             .              .___          .._            181-
James River, N. Dak. and S. Dak., investigation ......                             --    -         1340
James River, Va.:
     Investigation_             .........         .._ ....         _            ._      465
      Navigation         _                          - "-------                          430
James River Basin, Va., flood control                    _                              463
Janesville and Indian Ford Dams, Wis., flood controL _                                             1198
Jefferson Barracks, Mo., investigation__. __,                      ----
                                                                   ,                               1158
Jefferson County drainage districts, Tex., investigation_                          917, 924
Jefferson, Madison and Gallatin Rivers, Mont.,investigation_                                       1376
Jefferson-Shreveport Waterway, La. and Tex., investigation                         770, 807
      Navigation ,    ..                           --                 -                 717
Jeffersonville-Clarksville, Ind., flood control-_.                  _       ..               1462, 1500
Jemez Canyon Dam and Reservoir, N. Mex., flood control_..                               979
Jemez Creek, N. Mex., flood control..
Jenks, Okla., flood control______ __
                                                    .      -          ....-             979
                                                                                       1110
Jenkins Creek, Md., investigation,----_ --                                              335
Jennings Beach, Conn., navigation__                 -         - -                       104
Jessamine Creek Reservoir, Ky., flood control---                                             1461, 1502
Jim Woodruff Lock and Dam, Ga., Navigation_-                                            658
Jim Woodruff Dam, Ga., and Fla ,,_.......                   .....                       657
Joanna Reservoir, Mo., flood control .........                                                     1155
John A. Hulen Camp, Tex., investigation .....
John Day Dam, Oreg. and Wash., navigation                                                          2155
John Day River area, Clatsop County, Oreg.:
     Flood control          --                                                                     2189
     Investigation_ ,                                                                              2190
John Drainage Dist., Oreg                 _                                                        2182
John H. Kerr Reservoir, Va. and N. C., flood control_                   -          456, 457
John Martin Reservoir, Arkansas River, Colo., flood control-                            972
Johns and Kingfisher Creeks, Okla., investigation__                                    1113
Johns Creek, Ky., flood control_ __                                                                1552
Johns Island, S. C., investigation..__                                                  520
Johnsonburg, Pa., flood control-                    -           -                                  1628
Johnson Creek, Oreg                                                            .             2159, 2178
Johnsons Bayou, La., navigation.                                                        915
Johnsons River, Conn          --_                     _                                  93
Johnstown, Pa., flood control-_                 .           -                                1607, 1628
Jonathan and Moxahala Creeks, investigation ........                                               1570
Jones Bluff Lock and Dam, Ala_                                                          676
Jones Creek, Va., investigation_                                                        454
Jones Inlet N. Y., navigation,...            ....      .              ..                178
Jonesville, La., flood control                                                          835
Jordan River, Miss., navigation                    _-          ___                      698
Jordan River, Utah, investigation-................                                                 2098
      Flood control, _                      _                                                      2097
Josias River, Maine___ _                                                                 32
Jules Creek, Va., investigation                                                         407
Juneau Harbor, Alaska, navigation-                                                                 2292
Juniata River, Pa., investigation..                                                     374
Jupiter Inlet, Fla., investigation_ ................                                    625
                                   K

Kahului Harbor, T. H., navigation, .       ..                                                      2022
Kake Harbor, Alaska, investigation.-.-...-_--------                                                2300
Kalamazoo River, Mich.:
    Investigation_     _   ___          ..                                                         1743
      Navigation ......             .....                               _                          1712
                                                                                                       Page

                                                                                           Volume 1           Volume 2


Kalaupapa Landing, Hawaii, investigation------------------                                                         -    2027
Kalepolepo Boat Harbor, Hawaii, investigation--------........---------                                                  2027
Kalispell Mont., investigation- -...----------------...      ._,_                                                       2248
Kanab Creek, Utah and Ariz., investigation---...-------------- .1976
Kanawha River, W. Va.:
     Locks and Dams -------------------------------
                               .                                                                    ------              1521
     Flood-control reservoirs -----------------------                                            ------------           1565
     Investigations--------------------------                                       -------------              1528, 1570
     Navigation ----------------------------------------------                                                          1520
Kankakee River, Ill., and Ind.:
     Flood control ---------------------------------. --                                              - -        --     1790
     Investigation_----------                    -----------------------                              -_                1791
Kanopolis Reservoir, Missouri River, Kans_- ---------                                        _         -_ -1251, 1276
Kansas City, Mo., engineering district                    ---.            ..----.---.--.-------                         1241
Kansas Cities, Mo. and Kans.:
     Flood Control               --------------------------------------- 1251, 1259,
                                                                                                                        1289
     Investigation-.          ---------------------------                                  ----------                   1291
Kansas River, Kans., flood control-___-                               -------------------                               1282
Kapalama Basin, T. H., navigation----------------------------                                                           2018
Karlson Island, Clatsop County, Oreg., flood control--------------..                                                    2189
Kaskaskia Island, Ill., flood control_                                      -------------- _---------                   1157
Kaskaskia River, Ill.:
     Investigation ---------------------                                 ---------------------                        -1158
     Navigation ------------------                                     ---- ----------------                            1126
     Flood control----------------------------------------                                                              1161
Kaunakakai Gulch, T. H., investigation--------------------------                                                        2036
Kaunakakai Harbor, T. H., navigation_ ------------------                                                                2020
Kaunakakai Stream, T. H., flood control ------------------------                                                        2037
Kawaihae Harbor, Hawaii, navigation _._-----------------                                                                2026
Kawainui Swamp, Island of Oahu, T. H., flood control--_------_ -                                                        2032
Kaweah River, Calif., flood control-------- -------..-..--..--.-------                                                  2084
Kawkawlin River., Mich., investigation                           -            _-,-----                 -1838
Kaw, Okla., flood control_               ----                   ---------                  1063, 1116-
Keauhou Bay, Hawaii, investigation--- ----
Keehi Lagoon, T. H., navigation ____-.
                                                                                 ------------ _
                                                                                                               -
                                                                                                                        2027
                                                                                                                        2016
                                                                                                        .----------------
Keithsburg, Ill., flood control -----------------------------------                                                     1198
Kelly Lake, Ill., flood control-----------------------                                       -----------                1790
Kendrick, Idaho, flood control ...                                   ------------------------                           2267
Kennebec River, Maine:
     Investigation-----------------------------------                                                 149 -- __---_
     Navigation- -8.____               _......___               --           --          -        -    28-
Kennebunk River, Maine, navigation -----------------                                                  103
Kennewick, Wash., navigation----------------------                                                                      2106
Kenosha Harbor, Wis., navigation; investigation----------------- 1706, 1741
Kentucky River, Ky.:
     Locks and Dams---------------------------------_                                           --------                1441
     Flood-control reservoirs __--------------- ---------------                                                         1502
     Navigation                 -------------------------------------                                                   1440
Kentucky, Tenn., navigation----------------------------------                                                           1410
Kern River, Calif., investigation, flood control_-------                                                      1975, 2070,
                                                                                                                        209$
Kerton Valley, Ill., flood control_-----------------------------                                                        1781
Ketchikan Harbor, Alaska:
     Investigation--__------------------------------------------                                                        2300
     Navigation---------------------------                                       -------------                          2296
Keuka Lake, Oswego River Basin, N. Y., flood control------------                                                        1908
Kewalo Basin, Honolulu, T. H., investigation--------------------                                                        2029
Kewaunee Harbor, Wis., navigation_---- ------------------                                                 ----          1689
Keweenaw Waterway, Mich., navigation_                                                                                   1654
Keyport Harbor, N. J., navigation.-- -                                    .           -            242
                                                                                                         Page

                                                                                          Volume 1              Volume 2

Keystone Lock and Dam, La_-. ---           _- ,.-.                           _
                                                                            ---     --          753
Keystone Reservoir, Okla., flood control -----                            -------            - 1073
K ey West, Fla., im provem ent of harborfoo-
                                                      i -- e626,
                                                                             __1_
                                                                             f
                                                                              - -         --    621
Key West, Fla., investigation--_                                     --
Key West, Fla., Intracoastal Waterway from Miami,
  navigation-----------------------------                                                         621
Kiamichi River, Okla., investigation, flood control .--                                            1g_1113,
                                                                                                 1104
Kickapoo River, Wis., investigation_---------------_                                                                 1237
                                                                                                                     1-----
Kingfisher and Johns Creek, Okla., investigation, flood
   control --          -------------                                                     1113, 1108
Kings Bayou, Ark., navigationot          -m      -----                                             915
Kings Brook, N. Y----------------------------------                                                   -------- 1593
Kings Creek, Va., navigation                                                                        53
                                                                                                  4--------------------------
Kingsley Lake, Fla., investigation------....   .626---      _                                     626
Kings River, Calif., flood control-       -      --    - ----.
                                             - ..........- -                                      --               2074
Kingston Harbor, Mass., (North Plymouth Harbor)
  navigation. - _ -_           _- _ -
                             -----              --                                                103
Kingston, Pa., flood control--- _ - -- ---.---         - -                                 --     360
Kingsville, Ohio, investigation--                  .-..- -
                                        .-- . --....                                                                 1894
Kingsville, Tex., investigation.- ----. ------.        -- _                                        917
Kinkaid Creek, Ill., investigation-------------------------------                                                  1158
Kiser Creek, Ill., flood control ----------------------------------                                                1186
Kiskiminitas River, Pa., investigations__ __--_____-_                                        ___           1590, 1634
Flood control---. _-__-------                 .- ----------    .                 _--         -                   1608
Kissimmee River, Fla.:
     Investigati on..------------.                             .                           6------------------
                                                                                             25, 645       ..-.-.-.-
     Navigation       -----------                    ---------                                     621
Kittanning, Pa., flood control                                                                              628, 1632
                                                                                                           1----------------------------
Klamath River, Oreg., investigation--           .            .               _
                                                                         .-----               ....-.              2036
Knappa area, Clatsop County, Oreg., flood control-----------------                                                2189
Knapps Narrows, Md., navigation-------------                                                        334
Knife River and Harbor, Minn. and N. Dak,:
     Flood control         ---------------------------------                                        ----            357
     Investigation      --              ----------------------------------
                                              ,                                                                   1665
     Navigation ----------------              ---------------------                             ------            1644
Knightville Reservoir, Mass., flood control1---                                    -        125, 136         .
Knobbs Creek, Va., navigation                    .               ..------------------------.       453
Knutson Dam, Minn., investigation-- ......                                          .-          ..-.        1212, 1237
Kodiak Harbor, Alaska:
    Investigation__- __ ___                          ...--------- --              _
                                                                              -------      -----                    2300
    Navigation- -        -                      ---------------------------                                         22'98
KoKosing River, Ohio, investigation- -----.-                         ------------
                                                                       .--                                          1570
Kootenai River, Idaho and Mont.:
    Flood control -------------------------                              -------------------                        2235
    Investigation ---------------------------------------------                                                     2248
    Navigation ----------------------------------------------                                                       2232
Kootenay Lake Board of control------- ---------------                                    ----------                 2203
Kremmling, Colo., investigation_-------- -.--                                     --         .-  --                 1975
Kuhio Bay, T. H., navigation                      _               ---------------------
                                                          _---------------                                          2023
Kuttawa Lock and Dam, Ky., navigation--- ----------.            .                    ----    __                     1397
Kvichak (Upper) River, Alaska, investigation--------------------                                                    2300
                                         L

La Batre Bayou, Ala., navigation_            -------      --------      698.
La Crosse, Wis., investigation--------------------------------                                                        212
Lacey, Langellier, West Matanzas, and Kerton Valley,
  Ill., flood control -----------------------------------                                                            1781
Lackawaxen R. Pa., flood control--__.--                   .304
LM
Lackawanna     River, Pa., investigation; flood controL .          874,      .                                      . .
Lac La Belle Harber, Mich., navigation-                            .__.-_._.. -
                                                                            .....                                -164
XIS                                                INDEX

                                                                                               Page


                                                                                   Volume 1           Volume 2


Lacombe Bayou, La., navigation- -------------------                                         --- 767
Lac qui Parle Reservoir, Minn-                  ----------               ------.              ---.---.       1231
Lafayette River, Va.:
                       ...........
    Investigation--------                                 .........------------.                 454
    Navigation -------------------------------------                                             453
La Fourche Bayou, Ark. and La., investigation--------.....                                       770
Lafourche Bayou, La., navigation; investigation- .-------.....                              749, 808 -
Lafourche Parish, La., investigation ------------...                            -...             770
La Grange, Colorado River, Tex., flood control---------                                          965
La Grange Bayou, Fla., navigation6                  ....-.-...                            --       98 -
                                                                                                 6---
Laguna Canyon Calif., investigation_-....--                         ---------------- ---                - -1975
Laguna Dominguez, investigation-,, -----------------------------                                             1975
Laguna Mountains, Calif., investigation-----. ---------------------                                          1979
Laguna Madre Bay, La. and Tex.:
    Investigation--
                 ...................-------------...                                             915
    Navigation......                ...------------------------ ..                               908
Lahaina. Harbor, Maui, T. H., investigation.._ -                    - _              __ - __   _ _           2027
Lake Apopka, Fla., investigations__ .......                                                 626, 645         --
Lake Ashtabula and Baldhill Dam, N. D,, flood control. -----                                        -    -   1224
Lake Bisteneau, La., navigation - -- _ ---.                                    --- _      -      767
Lake Borgne, La., navigation,-_--_.-                                _---_--...            -      736
Lake Brownwood Reservoir, Tex., flood control...----.....                                        957
Lake Calument, Ill., navigation                           -...       _------       --.-
                                                                                  .--      -1757
Lake Champlain, N. Y., and Vt., navigation                       -----------              216
Lake Champlain in vicinity of Milton and S. Hero, Vt.:
    Board of Control_ _----.-------_            -        ---           ----   _----- .2398
    Investigation__-           __---                   __--------------                   244
Lake Charles. Deep Water Channel, La., investigation..._                                   770       ..    .
                                 _
    Navigation------_ ___-------------                  ..
                                                    ------                    -           767
Lake Chautauqua, N. Y., flood control---------------------------                                          1628
Lake City, Minn., harbor           ---------------------------------                              1167, 1171
Lake County, Ohio, investigation--------------------------------                                          1894
Lake Crescent, Fla., navigation------------------------......................             621
Lake Crockett, Wash., navigation--------------------------------                                          2203
Lake Dexter, Fla., investigations--------------------                               626, 646     -           .
Lake Dora, Fla_-----------------------------                                    - 626, 646              -
Lake Erie to Ohio River Canal, investigation....------------                     _-_      --      1590, 1830
Lake Eustis, Fla., investigations_ -------------------                              626, 646.-
Lake Griffin, Fla., investigations__---..----.---.-.--                              626, 646........
Lake Harbor, Fla., flood control ------.----------                          ----          634
Lake Harbor, Mich., investigation,                  ------------------------------ 1741
Lake Harney, Fla., navigation--.------------------------                                  557
Lake Harris, Fla., investigations___------------------                              626, 646          -----
Lake Michigan Ship Canal, Wis., navigation---_------------------                                          1685
Lake Minnetonka, Minn., investigation__.---------.---.-.                                 .1212
Lake Montauk Harbor, N. Y., navigation-----..          .                -.                172
Lake Ogleton, Md., navigation -----------------------                                     334
Lake Okeechobee, Fla.:
      Investigations          -------------------------------                      626, 646        ...--
    Flood Control__.---------------.------               --------         632.          .
    Navigation.--------------------------------                          590
Lake of the Woods Minn.:
    International (ontrol Board------------------                 ------ -------       2401
    Investigation ---------------------------------------------                        1665
                 ----------------------------------------------
    Navigation .......                                                                 1662
Lake Pontchartrain, La.:
    Investigation--------              ------------------------           808-   -----
    Flood Control -----------------------------------                     793---------
    Navigation- ---------------_-----_--_---           740
Lake River, Wash., navigation---------.--------------    ----                                              2155
Lake Series Reports__-----.---....-...       --..-... ----. --                                             2308
                                                  INDEX                                                 XLV


                                                                                            Page

                                                                                 Volume 1          Volume 2

Lakes, Great. See Great Lakes,
Lake Superior Board of Control,..------ --------------               -------                            2401
Lake Superior, investigation..............-----------------------------------                           1830
Lake Survey, U. S-------.......
                             --       ---------------------------                                       1911
Lake Texoma, Red River, Tex., and Okla., flood control.                  1100
Lake Tohopekalgia, Fla., investigations---- --.-...--                            627, 646 .......-            .
Lake Traverse, Minn., and S. Dak., navigation---------- .1211                 -----
Lake Traverse and Bois de Sioux River, S. Dak., flood
  control- ---------------------- ---              -----------        ---------                        1227
Lake Washington, Miss, navigation _-. - -------------                            821---------
Lake Washington Ship Canal, Wash., improvement                        ---------------      2198, 2212
Lake Winnepesaukee, N. H., navigation--------34                                   34      .........
Lake Worth Inlet, Fla., navigation, investigation-.......                        627.........
La Loutre Bayou, La., navigation--------- -----------                            736 ---            -

La Marsh, Ill., flood control_----------      -------- ----------------                                1786
LaMoine River, Ill., flood control ---.-------.--------                       --------                 1788
Lamine River, Mo., investigation---.                 ..----------------     --.      ---               1291
Lamoille River, Vt., flood control_-        -----           - -- _ -             255
Lamprey River, N. H., navigation ---------------------                           103 --               -
Lancaster, Cayuga Creek, N. Y., flood control--------------------
                                                               ....                                    1896
Lancaster, Ohio, investigation-- ----------------                --- ---- -------                      1570
Langellier, Ill., flood control ----.--------------------------                                        1781
L'Anguille River, Ark.:
    Flood control- -------------         ---------- ---------                    854
      Navigation                     .
                        ----------------- -.---------                                  850
Lansing, Iowa, harbor-------------------------------------                                        1167, 1168
Lansing, Mich., investigation          --------------------------                                         1743
La Plata River, Colo., investigation__----------------------------                                        1975
La Quinta, Tex., Port Aransas-Corpus Christi Water-
   way, investigation--------------------------------                                 917
Larchmont Harbor, N. Y., navigation__ -----.-----.--                                  242
Las Animas, Colo., flood control__-.......                     .-- -_-             - 989      ----
Las Chollas Creek, Calif., investigation---------------------------                                       1975
La Trappe River, Md., navigation-------------------                                   334 -
Latrobe, Pa., flood control_---- -_--------.                        -------. .      -----         1628, 1632
Lavaca Bay, Tex. improvement of channel from Pass
   Cavallo to Port Lavaca-----------------------------                                .899         _
Lavaca River, Tex., flood control--------------------_                         917, 960 .n..f.l-.-
Lavon Reservoir, Tex., flood control- --------------                             -937                      .
Lawrence, Kans., Kansas River at, flood control-----_-.-..
Lawrence, Mass., flood control -------.---------------
                                                                              ..         _.--.
                                                                                      111 -- -
                                                                                               --

                                                                                                          1285
Lawrenceburg, Ind., flood control-_            ---------------------------- 1458, 1500
Leaf River, Miss.:
    Investigation ----------------------------------                                  700 _
     Navigation --- -------------------------------                                   698--------
Leatherwood Creek, Ohio, investigation- -.------.-----                       . .          --....       -1570
L'eau Bleu Bayou, La., flood control-------------------__
                                                      .-..---                                            -800
Leavenworth, Ind., flood control_.--------------------------                            ---             - 1500
Leavenworth, Kans., investigation-_ __---                           --
                                                              --___--------.                         -1291
Lebanon Junction, Ky., investigation_             -------------------------                            - 1506
Le Carpe Bayou, La.:
    Investigation....-----------------------------------                              771
    Navigation       ---------------------------                  -------             767
Leech Lake Reservoir, Minn ------------                              . _--       -      - --- -         1204
Leech River, Minn., navigation_----.---------                  -----------            -1211
Lee Creek, Ark. and Okla., investigation.---------------                   1049 ----
Lee Ferry, Ariz., investigation.....------------- ------------------                     1975
Leesburg, Fla., investigations_.--------------------- .              627, 646 _ .-. ...
Leesville, Ohio, Reservoir, flood control.------ -----------                   ---      X1533
Leesville Reservoir, Va., flood control -----------------                   456 ----
Leetsdale, Pa., flood control -- _-_--------      .. ---.---.-                           1628
XLVI                                                             DX

                                                                                                              Page

                                                                                                   Volume 1              Volume 2


Leeville, La., investigation--_ ------------------..                                  ..                 771         .........
Lehigh River, Pa., flood control.-.------...-305-                                                                .               ..
Leipsic River, Del., navigation      -      ......- ..                                                   301
Leland Harbor, Mich., navigation---------------.--                                                                               17
Lemon Bay, Fla., investigation, navigation -             --                                          698
                                                                                                   627,
Lemon Creek, Staten Island, N. Y., navigation --..-                                                      242         -
Lemont, Ill., investigation ..      .......--..        -                                    -...                                 1791
Leon River, Tex., investigation flood control                         -----------                  965, 952          --          -.-
Leroy, Kans., flood control,~,                             ,-                 . -1110
Letart Falls, Ohio, flood control_ .___56.---                         -       -----       _-64
Letart, W. Va., flood control _----              -- __ _            ___----.-.1564
Levees between Shelby Bridge and Baum's Bridge,
  Kankakee River, Ind., flood control-,--                    .---     ----...----------                                          1790
Levee unit 1, Little Wabash River, Il., flood control_
Levee unit 2, Little Wabash River, Ind., flood control=. -- -
                                                                                          ---------
                                                                                               -
                                                                                                 1500,
                                                                                                 1500,
                                                                                                                                 1505
                                                                                                                                 1505
Levee unit 1, Eel River, Ind- .....                      ........--             -----                                            1500
Levee unit 2, Eel River, Ind-----------......-------------------..........                                                       1500
Levee unit 3, East Fork of White River, Ind., flood
  control-- -     -----------            .----.        .----.------------.--.                                                    1505
Levee units 3 and 4, Wabash River, Ill. and Ind., flood
  control---.............-------------------------------------------                                                             1505
Levee unit 5, Wabash River, Ind., flood control                            --------------....                                    1487
Levee unit 6, Wabash River, Ill., flood control_-_-.------.-                            -         ---                            1500
Levee unit 7, White River, Ind___ ---                  _-- -        -      ---.-----        -1501
Levee unit 8, West Fork of White River, Ind., flood
  control1---------------------------------------------------                                                                     488
Levee unit 1, White River, Ind., flood control.--------------------                                                              1501
Levee unit 2, White River, Ind., flood control---------------                                            -----                   1501
Levee unit 9, White River, Ind ---------------------------------                                                                 1505
Levee unit 10, White River, Ind---------------.............-----.---                                                             1505
Levee unit 17 Wabash River, Ind., flood control- .....-                 --            -                                          1500
Levisa Fork, ,. Va.:
    Investigation -------------                -----                                      ---------..... 1528
    Navigation--------------------------                                                    ---------..........1524
Lewis and Clark Irrigation District, N. Dak., flood
   control- ------------.-----------------------------------                                                              1357
Lewis and Clark River area, Clatsop County, Oreg.,
   flood control--------------                                              -------           -        --........ 2182, 2189
Lewisport, Ky. flood control_ ......-----------------------                                          ....
                                                                                                     ..-                  1501
Lewis River, Wash., navigation .. _-                          -----.--                    .-.-.-....          .           2155
Lewiston-Clarkston Levees                ---.......... ---.                                    ------ .                   2280
Lexington, Nebr., investigation                       -------------------------                                           1340
Liberty (Bedloe) Island, New York Harbor, N. Y _                                                      1186 .-.---
Liberty (Poulsbo or Dogfish) Bay, Wash., investigation__ -.-                                             --       2232, 2233
Libby.Dam, Mont., flood control .......                                  ..          .....------------                    2235
Lick Creek, Tenn., investigation_                       -----... --.----------------                                      1438
Licking River, Ky,:
      Flood-control reservoirs..                                                                                          1502
                                                                                                        .-..----------------------
      Investigation           .---------------------------------------                                                    150
      Navigation -------             -----------------------------------                                                  1450
Lighthouse Service Depot, Fla., investigation-_---2-                                                   627-
Lightning Creek, Idaho---_                    ----..-----------------------                                               2234
Lillibridge Creek, N. Y-              ..----                                  -----------                                 1591
Lincoln County, Oregon, investigation                           ---.--------------                                        2191
Lincoln Nebraska, investigation-------------- ----------------                                                            1340
Lisle, N'. Y. flood control-------------                             --------- ---                     340---------
Little Bay (Aransas Bay at Fulton), Tex., navigation ___                                               915
Little Black River, Mo. and Ark.:
       Flood control...                            -----                             --                 1048.            ..           .
       Investigation-_ __- --.                      ----------               ----                      - 1050.
                                           -
Little Caillou Bayou, La., navigation ......----.--                                                -     751.....
                                                                                                                   ELYII

                                                                                                         Page

                                                                                          Volume 1              Volume 2

Little Calumet River, Ill. and Ind., investigation-
Navigation ----------                 -----        -----------
                                                                               -                                     1791
                                                                                                                     1764
Little Choptank River to Choptank River, Md., water-
  way, improvement ---------------------------                                              334
Little Colorado River, Ariz. and N. Mex., investigation_                                                             1975
Little Creek, Va., investigation .-                    .---------------                     454
Little Cypress River, Tex., flood control------------.....                                  803
Little Egg Harbor, N. J., navigation.--------------                                         301
Little Elk Creek, Okla., investigation -------------                                      1113
Little Elk River, Md., navigation---------                                                   334
Little Elm Reservoir, Tex. See Gavza-Little Elm reser-                                                    -                -sf
   voirs---------------             -----------------------                                  939
Little Fork River, Minn., investigation--------------
Little Girls Point, Mich., investigation-                                                                  .         1665.7
Little Goose Dam, Snake River_
Little Harbor, N. H.:
      Investigation-      - ..... -                                       .-.                 107
      Navigation_        --      --      -
Little Harbor, Woods Hole, Mass., navigation.
                                                                                              103
                                                                                              103
Little Joe River, Minn., investigation-----------------
Littlejohn Creek, Calif.:
      Flood control----------------------------------                                                                2061
      Investigation----_------------------------------                                                               2098
Little Juniata River, Pa. flood control.- _----------                                        368
Little Kanawha River, W. Va.:
      Flood-control reservoirs_                                                                                      1566
      Investigation     ---------------------------- ---                                                             1570
      Navigation      -                                                                                              1518
Locks and Dams-                                                                      ..   -------

                                                                                                                     1519
Little Lake Harbor Mich., navigation-_-------                                       ----            --

                                                                                                                     1664
Little Machipongo River Va., navigation_             ....          ......                    453
Little Magothy River, Md., investigation_-----------                                         335
Little Manatee River, Fla., navigation _ - ---           _- ____..                           621
Little Miami River, Ohio, flood-control reservoirs--- -_                                                             1502
Little Missouri River, Ark.:
      Flood control in basin___             -     __ . . .                  .        823, 827
      Navigation _                                                                           8@}
Little Missouri River, Mont. and N. Dak., investigation-
Little Narragansett Bay, R. I                                                                  78 136,               1376
Little Nemeha River, Kans. and Nebr., investigation.-.                                                               1291
Little Papillion Creek, Nebr., investigation-..---.-                                                                 1340
Little Pass. Fla., investigation,           _____--_        __                               627
Little Pee blee River, S. C., navigation                  -----                              517
Little Pigeon Bayou, La., navigation_ _--------------                                        767 --......
Little Piney Creek, Mo., investigation_.,-. _--                           -
Little Raccoon Creek, Ind., investigation_-----------                         --I- - - - -  - - --                   1506
Little Raccoon Creek, Ohio, flood control.                         __                                                1570
Little Red River, Ark., investigation------_-----                                          1050
Little River, Ark. and La.:
      Flood control _       -           _             _                                    1105
     Investigations------_-----_-- --                          ...                855, 1113
     Navigation                                                                              821
Little River, Ark. and Mo., investigation_____ _                                           1113
Little River, Del., navigation                                          .--.-               801                      1438
Little River, Ky., investigation---------------------
Little River, Va., navigation ________-                               ..--                  428
Little River, N. C. and S. C., investigation---------                                       517
Little River, N. Y., investigation-----------------
Little River Creek, Va., navigation__ __ ----                          -      _             41113
Little River watershed, Oklahoma, investigation .......                                   1113
XLVIII                                           19EX

                                                                                          Page

                                                                               Volume 1          Volume 2

Little Rock, Ark.:
     Engineering district-----------------------------                                 991
      Flood control----------------------------------                                1048
     Investigation_ - _                                          __       _ _        1050
Little Salmon River, N. Y., investigation_-------                           -                     1895
Little Sandy River, Ky., investigation_                                    .                      1570
Little Sarasota Bay, Fla., investigation----------------                               627
Little Sioux River, Iowa, flood control-----------------                                          1333
Little Soddy and Harbor Soddy Creeks, Tenn., investi-
  gation              _--                                                                         1438
Little Sodus Bay, N. Y., navigation__                                                             1892
Little Tallahatchie River, Miss., navigation, flood control_
Little Tarkio and Squaw Creeks, Mo., investigation--_                                             1291
Little Tennessee River, Tenn., navigation_--------------                                          1415
Little Trout River, N. Y., flood control----------------                        ----------        1906
Little Valley Wash., Utah, flood control---------------                                           2097
Little Wabash levee units Nos. 1 and 2, Illinois, flood
  control-------------------                                                                      1505
Little Wabash River, Ill., investigation----------------                                          1506
Little Wicomico River, Va., navigation----------------                                 389
Little Willow and Wakefield Creeks, Minn-------------                                             1230
Little Wills Creeks, Pa., investigation_---------------                                417
Little Wood River, Idaho ---------------                               --                         2267
Livermore Valley, Calif., investigation-----------------                                          2036
Liverpool, Ill., flood control_____________---_______                                             1790
Livingstone Channel, Detroit River, Mich., navigation-__                                          1809
Lobdell Canal, Del_--------------------------                                                   -
Lobster Cove, Annisquam River-_----------                                                37
Local cooperation__________----------                        _ --- -                   4, 5
Lockport, Ill., investigation _                     ____            ___                           1791
Locklies Creek, Va., navigation____-------_                                            406
Lockwoods Folly River, N. C., navigation----- --                -                      499
                                                                                       854
Locust Creek, Ark., investigation------------------
Logan Hollow, Ill., investigation ---------------------                                           1158
Logan Reservoir, Ohio, flood control_----------------                                             1565

Logansport, Ind.:
      Flood control----------------------                           -------                       1505

      Investigation ------------------------------                                                1506

Loggy Bayou, La.:
      Investigation               ---------------------------                          808
      Navigation------------------------------                                         767
Lone Rock Reservoir, Ark., flood control             ---------                        1043
Long Bay, N. H .---------                ---------------------                           34
Long Beach, Mass--------------                         ---------------                   51
Long Beach Harbor, Calif., navigation; investigation___                   --    -----       1925; 1938
Long Island intracoastal waterway, New York, naviga-
   tion------              -----------------------------                               174
Long Island, Dosoris Creek, N. Y., investigation.._.                          -        244
Long Island Sound to Boston, Intra Waterway, investi-
   gation-------------------------------------                                         107
Long Tom River, Oreg., flood control--------------                                                2172

Long Point Levee, La----------------                           ----------              812
Lookout Bight, N. C., navigation                        ___-------                     490
Lookout Point Reservoir, Oreg., flood control_                                              2159, 2163
Loosahatchie River, Tenn., investigation, flood control -                         855, 852        1941
Lopez Canyon Diversion, Calif_                      ----- _-----              _
Lopez Flood-Control Basin, Calif_                                               ----------        1940

Lopez Island, Wash., investigation_                                                               2233

Lorain County, Ohio, investigation                                                                 1895
                                             INDEX                                                XLIX
                                                                       i



                                                                                         Pa age


                                                                              Volume 1        Volume 2
                                                                           r - -        -
                                                                                      -;I
Lorain Harbor, Ohio:
    Investigation . ----    ---- --- ---_       -- ---
                                                   _    -- _       - -- -                          1895
    Navigation----------             ----------------------                                        1846
Los Angeles, Calif.:
    Engineering district_-----------------------_                           ----- ---(             1919
    Flood control on river                                                                         1941.
    Improvement of harbor-----.-.             -        -----                                       1925
    Investigations_                                                                          1938, 1975
Los Angeles County drainage area, California:
    Flood control        -                                                                         1939
    Investigation-----------------------------------                                               1975
Lost Creek, Ill.:
    Flood control-----------------------------                                               1785, 1790
    Investigation-------------------------------_--                                                1506
Lost Creek, Mo., investigation __              ____--            -     __        1113

Lost River, Ind., investigation, flood control-----------                                    1506, 1480
Lost River, Minn., investigation----------------------                                             1237
Louisa, Ky., navigation_ _             _                              __                           1525
Louisiana, Mo., investigation____-----------_-_                                  1113
Louisiana-Texas Intracoastal Waterway, investigation_,_                           917
Louisiana, streams and bayous, investigation_---                             771, 806
Louisiana and other States, Ren. of Water Hyacinth,
  investigation_---------------------- --                                 _       627
Louisville and Portland Canal, Kentucky. ---             _                                    S1382
Louisville, Ky.:
    Engineering district_----------------------                                                    1439
    Flood control_------------------                          ---------                      1463, 1501
Loup River, Neb., investigation-                                                                   1340
Lovell, Wyo., flood control_---------_------                         - -                           1377
Lowell Creek, Alaska, flood control_                                                               2303
Lowell, Mass., flood control.__-----                      -----       _      111, 148
Lower Columbia River Basin, Oreg                                                                   2182
    Bank Protection Works-------------------                                                       2183
Lower Granite Dam, Snake River_-------                           -    __                           2260
Lower Machodoc Creek, Va., navigation_--              ----                        406
Lower Monumental Dam, Snake River-                                                                 2260
Lower Mud Lake, La_-----------------------                                        758
Lower Rio Grande Valley, Tex., investigation------                                924
Lower San Francisco Bay, Calif., navigation-----------                                             026,
Lower San Joaquin River, Calif., flood control-              ...                                   2086
Lower Thoroughfare, Deals Island, Md., navigation----                             334
Lower Walla Walla River, Wash__ -                            --
                                                           -__-                                    2267
Loyalhanna Creek, Pa., investigation, flood control                                          1634, 1629
Loyalhanna Reservoir, Pa., flood control                                                           -1613
Lubec Channel, Maine, navigation_____---                      _                    102
Lucas Bend, La              -   -            --                                    812
Lucky Peak Reservoir, Idaho,      flood   control     -                                            2270
Ludington Harbor, Mich.:
    Investigation       ----                                                                       1741
    Navigation---------                                                                            1725
Ludlow, Ky., flood control___--                 -                                                  1501
Ludlow Reservoir, Connecticut River Basin, Vt., flood
  control------------------                                                        125
Lugert Reservoir, Okla., flood control.---               ----                     1110
Lumber River, N. C., and S. C., navigation__-_                -                    517
Lussenhop levee, Illinois, flood control____--                                                     1790
Lutsen Harbor, Minn.,-navigation                                                                   1664
Luxapalila River, Ala. and Miss.,investigation... .....                            707
Lycoming Creek, Pa., flood control--_   ...          --_        -                  375
Lyford levee, Indiana, flood control...,-         --                                               1505
Lynchburg, Va., investigation___                     __                            465
I!




                                                                                                  Page

                                                                                      Volume 1           Volume 2


Lynches River, S. C., investigation.           _- _-_                                       520
Lynch River, S. C., navigation ...........--.-        ---                                   517
Lynn Harbor, Mass., navigation.------                    --- ,--                             103
Lynnhaven Inlet and Bay, Va., investigation _                                               454
Lynn-Nahant, Mass., investigation                 ------          ---                       107
Lyons, N. Y., investigation ---_       .. __        .______                                                1909
Lytle Creek, Calif., flood control      ..                                                           1961, 1972
                                       M
MacArthur Look, St. Marys River, Mich-....                               - - --                                1797
Macatawa Lake, Mich.:
    Investigation_-------...,                            .------                                               1741
    Navigation        ----------..                               ------ ,                                      1714
Machias River, Maine, navigation.-------                                                      102
Mackay Creek, N. C, navigation.....--                         -,                              498
Mackinac Harbor, Mich., improvement, investigation,.                                                   1829,   1830
Mackinac Island, Mich., to Round Island, Mich., chan-
nel improvement__ ______..                -          _--       ---                                            1829
Mackinac Straits, Mich., improvement of Poe Reef Shoal.                                                        1829
Mackinac City Harbor, Mich., investigation_---.-----                                                           1830
Mackinaw River, Ill., flood control____                    ----            -----                               1988
Macon Bayou, Ark. and La.:
    Flood control_------- - -- - - - -------          .-                                      841
    Investigation .-----------------_______                                                   842
    Navigation_ _-----------------------                                                      821
Macon, Ga., flood control------------------------                                             546
Madison, Ind., flood control-....                      -------------                                           1501
Madison River, Mont., investigation..........--------                                                          1376
Madison Township, Ohio, investigation --------------                                                           1895
                                                                                    ----------




Mad R., Conn., flood control ......                                      .       .-           145        ---   209-
Magna, Little Valley Wash, Utah........                                 ___---------_         3-------
Magothy River, Md., investigation----------,                                 -----          335

Magruder drainage district, Columbia County, Oreg.,
floodcontrol -- - -          -        -        - -- --------                      -  -----------      2182,   2188
Mahoning Creek Reservoir, Pa.:
    Flood control ---------------------..                                  ----                        1602,   1629
    Investigation--- .....--       -------------                    --------    _                              1634
Mahoning River, Ohio, investigation. -                                                                         1590
Main Ship Channel, New York Harbor, N. Y., improve-
ment. -,,-----------                 -.-------.---                          -----            186
Maiden River, Mass., navigation__- __-_----------                                             103
Malheur improvement district, Idaho, flood control -                                                           2280
Malheur River, Greg. _ .................                          .......                                      2267
Mamaroneck Harbor, N. Y.:
    Investigation, east basin of                                     --                       244
    Navigation.-------------                     _______                                      156
Manasquan Inlet and River, N. J.:
    Investigation _..---....-                 .... --                                   244, 302
    Navigation_                                                                               294
Manatee River, Fla., navigation; investigation _ _- __..                                621, 646
                                                                                                                     -823
Manchac Bayou, La., navigation------.------.
Manchester Harbor, Mass., navigation-.
                                                                                              767
                                                                                              103                   ,8i~
Manchester, Ohio, flood control____.                         .___                                              1564
Mancos River, Colo., investigation-----                      ------                                            1975
Mandan, N. Dak.:                                                                                               1355
    Flood control _____ ..__ . ...._              ...       ___     .- _ ...._
                                                                                                               1357
    Investigation ..                   ..                           .          .. .
Mandeville, La., investigation-_____.                   .. _---,.                __..         771
Manghum-Salt, Fork, Okla., investigation------------                                         1113
                                            INDVX                                                          LI

                                                                                     Page

                                                                          Volume 1          Volume 2
                                                                      .              Page

Manhasset Bay, N. Y.:
   Investigation_---------------------                                       244
     Navigation.        ------------------              ------               242             -   -_   --




Manistee Harbor and River, Mich., navigation_ _-_ _----               :----------              1727
Manistique Harbor, Mich., navigation----                    -------                            1669
Manitowoc Harbor, Wis., navigation-           -.--.--.-       _ _-        - i-----------       1693
Mannford Reservoir, Okla., navigation..- -- - - --- -_ _- _                         992
Mannington, W. Va., investigation_ --         -----                    -                       1634
Mannsville, N. Y., investigation __-                      ..                                   1909
Manoa Valley, T. H_           ___          .        --                    _                    203&
Manokin River, Md.:
    Investigation- .        ------------------------.....                 .         335
    Navigation_                                                                     334
MansfieldHollow Reservoir, Conn., flood control--......                        120, 121
Mansfield Reservoir, Ind., flood control__._...
Manteo (Shallowbag) Bay, N. C., navigation--
Mantua Creek, N. J., navigation _
                                                         -.--....
                                                                _ ._
                                                                                    474
                                                                               266, 301
                                                                                               1502

Maple River, N. Dak., flood control_                        _ -._._ -_                         1214
Mapleshade, Ohio, flood control _----------------                                              1564
Maquoketa River, Iowa, investigation_------              ---.--                                1199
Marblehead Harbor, Mass.:
    Investigation ....                          .                       .           107
    N avigation         ---------- -- -- - -- -- - -- -                             103
Mare Island Strait, Calif., navigation; investigation-                        ---- - 1995, 1997,
                                                                                               2027
Marietta, Ohio, flood control____ -___          ._._._ __.. _ __                               1564
Marion Reservoir, Kans., flood control_
Mariposa Creek, Calif., flood control_.
                                               ---------
                                               --------                                  2066, 2067
Markham Ferry Reservoir, Okla., flood control.- -.                   -             1088
Marmarth, N. Dak., flood control_         __        ...          . .                           1357
Marquette Bay and Harbor, Mich., improvement of
harbor __        ----          -------                                                  1658, 1659
Marshall Creek, Wash__                                                                         1941
Marsh Creek, Idaho:
    Flood control_---------                  --                                                2270
    Investigation _           _   _                 .                                          2280
Marsh Creek, N. Y., investigation _        ..           ._                                     1909
Marsh Lake Reservoir, Minn., flood control--_--                               ---------        1232
Marsh River, Minn., flood control -------------                               ----------       1214
Marshland drainage district, Columbia County, Oreg.,
flood control_ _                                                                              2188
Marshyhope Creek, Md., investigation                                                374
Martin County, Fla., investigation___                                               646
Martin Creek, Nev., investigation                                                              2098
Martinez, Calif., investigation___                                                             2027
Martins Ferry, Ohio, flood control                                                             1628
Mason and Menard, Ill., flood control__                                                        1790
Masonboro Inlet, N. C., navigation_                                                 470
Mason J. Niblack levee unit, Indiana, flood control_                                           1501
Mason, W. Va., flood control___                                                                1564
Massena Board of Control, operations of International__ ----------                             2400
Massillon, Ohio, flood control_                                                          1529, 1564
Matadero Creek, Calif., investigation                                                          2036
Matagorda Bay, Tex.:                                                                965
    Flood control
    Investigation___                                                                924
    Navigation                                                                      868
                                                                                    627
Matanzas Bay, Fla., investigation                       .------.----. -
Matawan Creek, N. J.:
    Investigation ....           ------                                             244 _-     .

    Navigation...                                                         .         242
      2455'54-53--vol. 1--75
LII                                               INDEX


                                                                                                Page

                                                                                  Volume 1             Volume 2

Matinicus Harbor, Maine, navigation                ------------------                        27
Matinicus, Maine, Indian Ledge, investigation                  ----------             -108
                                                                                             103
Mattapoisett Harbor, Mass., navigation_-_                     ----
                                           --------
Mattaponi River, Va., navigation; investigation
Matthews Canyon Reservoir, Nev., flood control---
                                                                                  453, 465
                                                                                  -
                                                                                                       -
                                                                                                               1972
Mattituck Harbor, N. Y-______-___---.                       -------    ___                   169
Mauckport, Ind., flood control____- --                         -    --- ---------                              1501
Maumee Bay and River, Ind., Ohio:
    Investigation___ -----------                        ---------                                   1742, 1777,
                                                                                                           1838
    Navigation-_    --- ---------------                       -------------------                          1829
    Toledo Harbor, improvement, investigation-----------------1826, 1830
Maunie, Ill., investigation-- -----------------------------                                                1506
Maurice River, N. J., navigation __--                -----              __      _           301
Maximo Point, Fla., investigation -----------------                                         627
Mayaguez Harbor, P. R., navigation__                          ------                        616
Mayberry Creek, Ark., investigation_..-------------                                       1050
Mayfield Creek, Ky., flood control, investigation......                             853, 855         -_-
                                                                                                       -   _-
Masyville Ky., flood control-_ __-------------------                                    -----        1561, 1565
McCook, Nebr., near Republican River. --------------------                                     ---         1271
McCraney, Hadley, Kaiser, Six Mile, and Bay Creeks,
Pike County, Ill..-----........---------------------------------------1186
McDowell Dam Site, Ariz., investigation                   --- -------_----------_                          1975
McGee Bend Dam, Texas, navigation-----------------                                         929--
McGee Creek, Ill., flood control           ------------------------------                                  1157
McGinnis levee unit, Indiana flood control                      ------------------------                   1501
McHenry Valley Creek, N. Y., flood control----- -----                                      346
McKans Bay, Va., investigation             ..         .....-----------....                 407
McKay Creek, Oregon, investigation-_-                                              .------------------     2191
McKees Rock, Pa., flood control---........------------...------- -------                                   1628
McKenzie River, Oreg., flood control,--------- ------------------                                          2180
McLean Bottom levee district No. 3, Arkansas River,
Ark., flood control_ ------------------------------                                      1048
McNary Lock and Dam, Oreg., navigation                              _----------------- --                  2261
Meadow River, W. Va., flood control__ -----.----.----------                                    ----        1570
Medicine Creek, Minn., investigation-                .---            .-----------------                    1237
Medomak River, Maine, navigation_                 ------------             ----            103
Meherrin River, N. C., navigation                   --------------                       498-              -         .
Melbourne, Fla., investigations__ ---------------                      627, 646 ---
Melbourne Harbor, Fla., navigation- .---....--       ........               621 -       _ _.
Melones Reservoir (New), Calif., flood control--  ...---..------------                     2086
Melrose Reservoir, Va., flood control------------------                     456--------
Memphis Harbor, Tenn., navigation------ ------------                        847.......
Memphis, Tenn.:
   Engineering district-_               _-_---- ---------..                      --      847-          --        .
    Flood control----                      .                 ----
                                                   .---------------     -       850          -

Mendota Bridge, Minn., investigation_.              __------------_---------                     1237
Menemsha Creek, Marthas Binyard, Mass., navigation--                            103.........
Menominee Harbor and River, Mich. and Wis., naviga-
tion ---------     - - ------  ------------------                      ----------               1672
Meramec Park, Mo., flood control -------------------------                           -       -   1155
Merced County group, California, flood control---------------             ...              -   -2066
Merced River, Calif., flood control--_-          _ .-          .---- .---.-----                  2100
Meredosia Drainage Dist., Ill. and Wisc., investigation--- ---------                             1199
Meredosia Lake and Willow Creek, Ill., flood control--                       -          -----    1157
Meridian Creek, Tenn., flood control---------------               -            85--857------
Mermentau River, La.:
    Flood control--------------------------- ---                                797---------
                                                          734-
      Improvement of waterway to Franklin, La---......---..
                                 _
      Investigation---------..--,,     -- _         -771, 806 ....
      Navigation ....   ...........         -    --...... 757-
                                                ....            ---
                                                 INDEX                                                    LIII


                                                                                           Page

                                                                                Volume 1          Volume 2

Merrimack River Basin, N. H. and Mass.:
    Flood control---------------....--------.----                  .      110
    Investigation-----.....-------...         ---------------        108, 149 ..-.
    Navigation- ,---       ----    -------      .----.. _..  .  -----     103 - .                     .
Metlakatla Harbor, Alaska, navigation--------------------------                    -                      2298
Metamora Reservoir, Ind., flood control--------------- ----------                                         1502
Methow River, Wash-----------------------------------------                                               2234
Metropolis, Ill., flood control----------------------------------                                         1501
Mexico Bay, N. Y., investigation------------- -------- ----------                                         1895
Meyers Chuck Harbor, Alaska, navigation-----------------------                                            2298
Miami Harbor and River, Fla.:
    Improvement of harbor._------------------------                       586
    Investigations--------              -------------    ------      627, 646 ...
      Navigation-               .-------i.- ---------------                             586
Miami to Key West, Fla., Intracoastal Waterway, inves-
tigation--    -----------------             -------------        ---      627
Mainus River, Conn., navigation.----------------------                     100
Michigan City Harbor, Ind.:
    Investigation ---------------------------------------------                                      1777
    Navigation ----------------------------------                     ----------                     1762
Michigan Lake, investigation_...----            -.-----
                                                    _--    ------
                                                              .                                1742,1777,
                                                                                                   1830
Middle Creek, N. C., investigation....--------------------                              500
Middleport, Ohio, flood control-----------------..--                                    ---               1565
Middle Guadalupe Basin, investigation.--..--_..                     --.    -            924
Middle Island Creek, W. Va., flood control ---------                          -------------              1567
Middle River, and connecting channels, Calif.:
     Flood control_--------------------                  ----------                 -----           -    2100
     Navigation------------------------------ ------                             - ------                2060
Middle River, Md., navigation _ ------                   _____-_                          334
Middle River, N. C., investigation-.------------___                                       500
Middlesboro, Ky., flood control-----------------------------                                      1416, 1434
Middleton Shoals Reservoir, Ga. and S. C., flood control_                                 540
Midland drainage district, Columbia County, Oreg.,
flood control -----------------------------------------                                          2182, 2188
Milan, Ill., navigation------------------__.                     -----------------                    - 1184
Miles City, Mont., flood control__---------------------___-------                                 1374, 1377
Miles Creek, Calif_ --.--- -----------------                               _ ---- _          _-          2066
Miles River, Talbot County, Md., investigation--------                                    335
Milford Haven, Conn., navigation_------------------ -                                     104
Milford Haven, Va., navigation                                                            406
Milford Reservoir, Kans-------------- --------- --------------                                           1251
Milk River, Mont.:
     Flood control____-_____ ___-------------                             _          ---_____ 1369, 1370
     Investigation, navigation _---_,_-_                                           _
                                                                              _.--------_         --     1376
Mill Cove area, Boothbay Harbor, Maine, investigation_                           105, 108
Mill Creek and South slough, Illinois, navigation------------- ----                                      1184
Mill Creek, Calif., flood control_---- ---------
Mill Creek, Ind------------------------------------
                                                            _--------              _-_                   2033
                                                                                   --------              1484
Mill Creek Levees, Santa Ana River Basin, Calif-----
Mill Creek, Md., navigation--------_ _____________
                                                                    ....-..              _334
                                                                                                         1972
Mill Creek Reservoir, Ohio, West Fork of                ---------------      _ _         _--         -1456
Mill Creek, Tex., flood control -----------------------
                                                _                                         954
Mill Creek, Va., navigation __--___________- __                      __-                  406
Mill Creek Valley, Ohio, investigation             -----------------                                     1506
Mill Creek, Wash.:
     Flood control_-------------------------------_ _-                                          _ 2267, 2274
     Investigation_ ---------------------------------------
Mill Creek, West Fork, Ohio, flood control_-----------
Miller City, Ill., investigation
                                                                                   --                    2280
                                                                                                _ 1456, 1502
                                                                                                         1158
Miller, Ohio, flood control_-----------------------                                                       1565
LIV                                                    1IND


                                                                                                    Page

                                                                                         Volume 1          Volume 2

Miller Pond, Ill.:
     Flood control----------- ,,-,--. ----------------------                                                      1133
     Investigation..                    ...            -          ------------------                              1159
Millers Bay Wash., investigation--,,-                  _,.            ,    --------- -----              -         2233
Millers R., Mass., flood control              --,,,              ---------------                   132
Millersburg Reservoir, Ohio, flood control--- ..............               -       -..-                           1568
Millers Ferry Lock and Dam, Ala                     __                  ,.,                       676 .
Mill Four drainage district, Yaquina River, Oreg., flood
control-        --------------------                                                                             2---------
                                                                                                                 2189
Millicoma River, Oreg., navigation-                      ,----                                                    2155
Mill River, Conn -----------------------------------                                                90
Milwood Reservoir, Little River, Ark., flood control------                                      1105
Mills Creek, Fla., flood control.--------...                   __- ------                         642
Millwood Reservoir, in Red River Basin, Ark.:
     Investigation-----------------------------------                                           1113
     Flood control--------           -- ----------------
                                            _      ,                            ..              1105
Millwood, W, Va., flood control---------------------------------                                                  1565
Milton-Freewater, Walla Walla River, Oreg., flood con-
trol---                   ------- --------------------
                        ....-----------                                                           ---         -   2276
Milton, Ky., flood control          .---
                                     -----------..-_                     -----                                    1501
Milwaukee, Wis.:
     Engineering district________-_______- __-                               --                                   1669
     Improvement of harbor -----                  _-----------------------------                                  1700
     Investigations-------.----                 ------     --------                        ----             1742, 1743
Miners Bend, Nebr., flood control ____--------------                                             ..----------     1323
Mingo Creek, S. C., navigation-----------------------                                             517-
Mingo Junction, Ohio, flood control----------------------------                                                   1628
Mining City Reservoir, Ky., flood control---------------__---                                                     1502
Minnesota River, Minn.:
     Flood control-------------------------------                                                --               1231
     Investigations ..------..----                                                      --                  1212, 1237
     Navigation----------------------------------------------                                                     1207
Miscellaneous civil works--                                                                         16            2393
Mispillion River, Del., navigation---------------------                                           301
Mission Bay, Calif., navigation_                    --          ---------                       - -, --           1934
Mission River, La. and Tex., investigation ---------                                              918 ---
Mississippi River:
     Flood control -----------------------------------                                              10 ---------
     Investigations ------------------------------                                       771, 806,         1127, 1149i
                                                                                         850, 855,         1186, 1199,
                                                                                                1014 1212, 1238,
                                                                                                                 1778
    Navigation ---------------------------------                         821                                     1211
    At Canton, Mo --                  ----------------                                                           1188
    Baton Rouge to Gulf of Mexico, La---------------                    737-
    Between Ohio and Missouri Rivers -------------------                  ----                          -    1120
    Missouri River to Minneapolis --------------          -----------                                  1163, 1125
    Locks and dams----------------_        ----------      - --      _---                              1164, 1165
    Near Aitkin, Minn_.MM______MMMMMMMMMMMMMMMMM_    _                                                 MM1229
    Reservoirs at Headwaters -------                   -----------------              ___.                   1204
Mississippi River Commission:
    Report of the President ------------------
                                    _                      ------------                                          2331
         Flood control on lower Mississippi River:
             Alluvial valley mapping                                                                             2341
              Arkabutla Dam and Reservoir, Miss-----_               --------                                     2346
              Atchafalaya floodway, Louisiana---- -------------                                                  234&
              Atchafalaya River and Basin, improve-
                ments        ------------------------------------                                        2335, 2346
              Bank protection, works----------------                                                           2360
                    Bayous Rapides, Boeuf and Cocodrie, La---------                                              2335
                    Bonnet Carre spillway, Louisiana _----- ----------                                           2343
                                                             INDEX                                                               LV

                                                                                                               Page

                                                                                                 Volume 1             Volume 2


Mississippi River Commission-Continued
    Report of the President-Continued
         Flood control on lower Mississippi River-Con.
                      Channel, improvements                                  -----------                                     2338
              Charenton drainage and navigation canal,
                  Louisiana_ ----------------------------------                                                     ----         2345
              Dams and reservoirs-                                     -            -          - -- -....--                      2339
              Emergency work on tributaries ---------------------                                                                2383
              Enid Dam and Reservoir, Miss-------                                               -                                2347
              Floodways------------                                                   ----------------                           2334
              Grenada Dam and Reservoir, Miss------------------                                                                 2347
              Levees---------------------------                                                 ----------               2351, 2366
              Morganza floodway, Louisiana------------------_                                                                    2344
              Organization-------------------------                                                      ------                 2332
              Sardis Dam and Reservoir, Miss---_- --                                                                             2346
              St. Francis Basin Project:
                        Memphis Harbor Project-___-_                                               ___- _____-                   2351
                       Wappapello Dam and Reservoir, Mo_                                               _                         2350
              Surveys, gages and observations ---------------------                                                              2341
              West Memphis Drainage Project_---------__ _                                              --         _          -- 2351
              Wax Lake outlet----------_                                      ----------------------                            2345
              Yalobusha River_---------------------------------                                                                  2349
              Yazoo Basin project:
                       Arkabutla Dam and Reservoir, Miss------------                                                             2337
                       Enid Dam and Reservoir, Miss .......-                                                                     2337
                       Grenada Dam and Reservoir, Yalo-
                             busha River, Miss_-                          ________ _-- _______                                   2347
                       Sardis Dam and Reservoir, Miss --------                                                 -                 2346
Mississippi Sound, Ala. Investigation---------- ---                                                            700
Missoula River, Wash_-                            -____---
                                                      _         ----------------                       ------                    2234
Missouri River:
     Agricultural levees, flood control-....---------------                                                    --        1251, 1253,
                                                                                                                          1312, 1328
    Flood control:
         Kenslers Bend, Nebr., to Sioux City--------------- -----                                                                1323
          McCook Lake Bend_------                                         ._-------------                                        1324
         Flood control in basin:
              Kansas City District---------------------                                                       - --               1250
              Omaha District                                                                                             -        311
                                                                                                                                 1----------------------
              Garrison District-------- --------------                                                    --------               1348
              Fort Peck District___                                    ----.-----.--         ---       .--- ---           -      1368
    Investigation_-----                     ------------------------- ----------                                        1212, 1238,
                                                                                                                         1291, 1310,
                                                                                                                         1340, 1357,
                                                                                                                                 1376
     Navigation:
         At Fort Peck, Mont_ --                               __--                                                  -
                                                                                                             .-----------.------ 1361
         Kansas City to mouth_                                  -------------.---------- _                                       1242
         Kansas City to Rulo___---------                                  ---------- -----------                                 1242
         Kansas City to Sioux City------------------------                                                      ----             1302
         Sioux City to Fort Benton -----------------------------                                                                 1309'
Mitchell and Gering Valleys, Colo., Wyo. and Nebr., in-
vestigations------------------------------------------------ _ _                                                                1341
Mobile, Ala., engineering district-_- --------------                                                           651 ...
Mobile Bay, Harbor, and River, Ala.:
     Improvement of harbor and bar                                       ----------                            669---------
                    --------------
       Investigation_                                                  ---------                          700-.             .-
Mobile, Tennessee, Tombigbee Rivers waterway investi-
gation--------------------
           _                        ---------------                                             --        700       -----
Mobjack Bay, Va., investigation---,,                         ------------                  -         .    454---------
LVI                                                      INDEX


                                                                                                        Page

                                                                                             Volume 1          Volume 2

Moffett Bottom, Okla, flood control                                           .__.___            1110
Mohawk Reservoir, Ohio          _       _         _ ... _                 .. _..                                    1533
Mohawk River, N. Y., investigation.---------_-                                               244, 257
Mohawk, Hudson and Waterford Rivers, N. Y., flood
control-       -       -        -_ . __-.- ...                           ..-. -                  255               -
Mohicanville Reservoir, Ohio flood control-------                                                                 S1533
Mojave River, Calif., investigation _ _ .. . _._                                               ----_1975
                                                                                                     --
Mokelumme River, Calif:
    Investigation__                                .         ...          .                                         2098
    Navigation_------              ---------                                                                        2060
Molalla River, Oreg            _    _            _...             ...........                                       2180
Mona Lake Mich., investigation_                           ..
                                                          ____._                                                    1742
Monarch,     yo., flood control_          _ .....    ___                  .__._        .                            1374
Monett, Mo., flood dontrol_______________                                                       1110
Monkey Run Creek, N. Y., flood control-----------                                                346
Monongahela River, W. Va. and Pa.:
    Locks and Dams _ _                      _.......                                                             1582
    Flood control reservoirs__ ._____......__                                .___                                1629
    Investigations _            __            ... .......                                                  1590, 1634
    Navigation        -          _      .         .----                  ---                                     1580
Monroe Bay and Creek, Va., navigation investigation-
Monroe Harbcr Mich., navigation-----_
                                                                                     -       406, 407
                                                                                                                    1823
Monroe Front, La., flood control_                                                                 823
Monterey Bay and Harbor, Calif.:
    Investigation_____                                                                                              2027
    Navigation_                                                                                                     2010
Montezuma River, Colo., investigation_                                                                              1975
Montour Falls, Oswego River Basin, N. Y., flood control_                                                            1902
Montville Creek, N. Y., flood control ....
Moorefield, W. Va., flood control ....                    .
                                                                       -       __        _        416
                                                                                                                    1908

Moores Ferry Reservoir, Va., flood control                               __                                         1565
Mooringsport Reservoir, La.:
    Flood Control_ _                 .....           .... _           _ _..                  774, 778
    Navigation__ - ...... -.                    .........                 ..                      718
Moosabec Bar, Maine, navigation__-.
Moose R., Vt. flood control_______
                                                                       -                          102
                                                                                                  125
Moose River, Minn., investigation__                       _           _           _                                 1238
Mora River, N. Mex., investigation___                                                             985
Moreau River, S. Dak., investigation_
Morehead City Harbor, N. C.:
                                                                   ---                                              1376

    Navigation . _                        _ __ _               _                                4810---------
    Investigation _._. _             ..              . .               .. ...          .         500 -    ----
Morgan City, La.:
    Investigations__         _ _..______                               _________             772, 808
    Navigation__        -                     - - . - .--              - - -                      767
Morgantown Lock and Dam, W. Va _.                                             ... __                                1583
Moriches Inlet, N. Y., investigation.__                            ..
                                                               _.__-                              244
Mormon Channel, Calif., navigation_                                                                        2040, 2045
Morrilton, West of, Arkansas, flood control-_--.--...-                                          1018
Morris Cove, Conn         ___._____        ..           ..__....                    ..            88
Morrison, Colo., flood control             _                   _ -____-_...                                         1339
Morristown Harbor, N. Y., navigation
Morro Bay, Calif., navigation_
                                                            ----                  .---                              1892
                                                                                                                    1920
Moscow, Ohio, flood control----- .-             _---                                                                1501
Mosquito Creek Reservoir, Ohio, flood control _                                                                     1622
Moss Bluff Lock and Dam, Fla. ... ...... ___..___                                                 561
Moss Landing, Calif.:
       Inve st ig at ion ___    --                        - _ _ __   - -                                         2027
       Navigation_-          - -- -                      -- -     -- -                                           2009
Mot, N. Dak., investigation-.- ------------  -                                       .                           1376
Mounds and Mound City, Ill., flood control--__                                                             1497, 1501
                                              INDEX                                                LVII


                                                                                        Page

                                                                            Volume 1           Volume 2

Moundsville, W. Va., flood control_-------------------------------  1628
Mountain Brook Reservoir, Merrimack River Basin,
N. H., flood control ----------------..------------- 111, 148 -------
Mountain Fork, Okla., investigation -----------------       113
Mount Carmel, Ill., investigation --             ---------                           -              1506
Mount Clemens, Clinton River, Mich., flood control--------------                                    1833
Mount Holly, Rancocas Creek, N. J., flood control           308
Mount Hope Bay, Mass__-------                     ---------                        66                .
Mount Morris Reservoir, Genesee River, N. Y., flood
control-------- ----------- ---------- - - --      -----                          --               1899
Mount Vernon, Ohio, investigation ------                              -    ----                     1571
Mount Vernon, Washington, investigation -----------------------                                     2248
Mouse (Souris) River, N. Dak., investigation             ---------------------                      1238
Mouth of Sangamon River, Ill., flood control---------------------                                   1783
Mouth of Trinity River Tex., navigation--            ....       ------           - 915
Moxahala & Jonathan Creeks, Ohio:
   Flood control      ---------------------------------------------                                 1338
   Investigation_ ---------------------------------------------                                     1571
Mud creek, Ala., investigation_-                _________                     -----
                                                                       __-------                    1438
Mud Creek, Nebr., investigation---------------------_______                                         1341
Mud Creek, N. Y., investigation_            ---.__- __--______                          -_          1909
Mud Lake Area, Idaho __ __ _                                                                        2267
Mud Mountain Dam, Wash., flood control_-- ------ __-                              -   _             2242
Mud River, Minn., investigation -------------.-------                                               1238
Mud River Reservoir, W. Va., flooa control------------___                                           1565
Muddy Creek, Miss., flood control-------__                           -----_         852
Mulberry Creek, Va., navigation __             -       -_______------- 406
Mullet Key, Fla., investigation--                 -                               628
Mulock Creek, Fla., investigation ---------------------                               646
Multnomah Channel, Oreg., navigation ---------------------------                                   2155
Multnomah drainage district No. 1, Multnomah County,
Oreg., flood control_- ---                   __-------_                     ___----__ 2182, 2189
Muncie, Ind., flood control_           -      ------.            _       -       -
                                                                                __------1481
Munising Harbor, Mich., investigation --------------------------                                   1665
Murderkill River, Del., navigation --------------------                               282
Murfreesboro Reservoir, Ark., flood control------------ 823, 830 _
Muscatine, Iowa, harbor- ..                            ------                                      1169
Muskegon Harbor, Mich., navigation ---------------------------                                     1719
Muskingum River, Ohio:
    Locks and dams___---------                                ------        -.-         -   --     1516
    Flood-control reservoirs-_                      --               .-      _---- --    _   1531, 1566
    Investigations_ ---- __---------_                                       __-__--- -       1528, 1571
    Navigation ----------------------------------------------                                      1514
Mustang Creek, flood control-----------------------                             802, 803 -
Mustinka River, Minn., flood control ---------------------------                                   1214
Myrtle Beach, S. C                                                                    517
Mystic River, Conn., navigation_---      ....                           _79
Mystic River, Mass.:
    Investigation -----------------------------------                                 149
    Navigation- ---------------------------------                                      40
Mystic South Channel, Boston Harbor, Mass., investi-                                  108
gation_
                                  N
Nacoohee and Sautee Valleys, Ga. (Int. Rept.)---------         707-
Nagle Creek Channel, Iowa___------------------------------------                                    1200
Nahant-Lynn, Mass., investigation          --------------------108.
Nameoki Drainage and Levee Dist., Ill., flood control_-- -----------                                1151
Nandua Creek, Va., navigation-- -----------     - -----
                                                    .          453-
LVII                                         INDME


                                                                                    Page

                                                                         Volume 1          Volume 2

Nansemond River, Va.:
    Investigation __ .       ......................                           454
    Navigation_         --           __                                       434
Nantasket Beach, Mass., investigation                                         108      _-___+.r..



Nantasket Gut, Mass_...                   .                                    48      L-LL1----



Nantasket Roads, Mass---------------                                           48
Nanticoke, Pa., flood control __                                              374
Nanticoke River (including Northwest Fork), Del. and
  Md.:
    Investigation ...----..                                                   374
    Navigation---------                                                  323, 334
Nantucket Harbor and Sound, Mass.:
    Construction of harbor and refuge                                          59                    --       _--



    Investigation .        -------------                  ------              108
Nantucket Sound, Cross Rip Shoals, Mass...........                             61
Napa River, Calif.:
    Flood control-----------------------------                                               2035
    Investigation          -----------------------------                               2027, 2036
    Navigation-------------------------------                                  -..--                          1995
Naples, Fla., to Big Marco Pass., Fla.:
    Channel improvement__                                                    621
    Investigation---          ---------------------------                    628
Narragansett Bay, R. I.:
    Investigation------------------------------                               108
     Navigation                                                                69
Narragansett pier, Rhode Island, investigation .........                      108
Narraguagus River, Maine:
    Investigation_--------------------- -------                               149
    Navigation-------              -----------------------                    102
Narrow River, at mouth of, Narragansett Bay, R. I., in-
  vestigation --------------------                      -------------        108
Narrows of Lake Champlain, N. Y. and Vt., navigation-                        216
Narrows Reservoir, Ark., flood control_                                      827
Naselle River, Wash.:
    Investigation----           --------------------------                                                    2233
    Navigation _--------------------------                                                                    2227
Nashua, Merrimack River Basin, N. H., flood control
Nashville, Tenn., engineering district ....----------...
                                                                   --    111, 148                             1395
Natalbany River, La.:
    Flood control-----------------------------                                802
    Navigation------ -------------------------                                767
Natchaug R., Conn., flood control_                                            121
Natchitoches Parish, La., flood control_                                 774, 788
Naugatuck R., Conn., flood control ----                   ___- ------         146
Navasota Soil Conservation District, Tex., investigation-                     924
Navidad River, Tex., flood control investigation           -....         917, 960
Navigation Locks and Dams, Arkansas and Verdigris
  Rivers, Okla., Nos.:
    1, 2, and 3 (Tulsa Dist.)_                       . .          __         999
    25 (Tulsa Dist.)               __----                                   1002
    7, 8, 9, 10, 11, 12, 13, 19, and 22 (Little Rock Dist.)_                1005
    1, 2, 3, 4, 5, and 6 (Vicksburg Dist.)______                            1008
Navigation operations____                                                      3
Nawiliwili Harbor, T. H., navigation; investigation_                                       - 2028
                                                                                       2013,
Neabsco Creek, Va., navigation                                               406
Neah Bay Wash.:
    Investigation_-----------------------------                                                               2233
     Navigation_-------------------------------                                                               2232
Neale Sound, Md., navigation-------------------                              406
Near Dardanelle, Arkansas River, Ark., flood control                        1017           ---   -   -    -   .



                                                                   -..
                                                [NDEX                                                  I4


                                                                                        Page

                                                                             Volume 1          Volume 2

Near Springfield on Sangamon River, Ill., flood control---------__         1790
Neches River, Tex.:
    Investigations_----------         - -- ______       _ 918, 935,
                                                                  966
    Navigation-------- --------------------------            859,928 ---------
Nehalem Bay and River, Oreg., navigation; investigation-----------2155, 2156
Nehalem, Oreg., flood control            ---   ___-         ___          _____2184
Nelscott, Oreg., investigation------------------------------                                         2156
Nemaha River, Nebr. and Kans., investigation-_ -----------                              _            1292
Neodesha Reservoir, Kans., flood control--------------                              1099
Neosho Falls, Kans., flood control --------------------                             1110
Neosho (Grand) River Basin, Kans                      ______________                1083
Nestucca River, Oreg.:
                          ----------
      Investigation ___-_-_                                                                          2191
      Flood control------------------                      ------------------------                  2192
Neuse River, N. C.:
      Investigations---- ---------------------------                           500, 504.........
      Navigation---------------------------_                  --------               498
Neva Strait, Alaska, investigation_                  ----     -      --       __-_--                 2300
Neville Island, Pa., flood control--------------------------------                                   1628
New Albany, Ind., flood control-----------------------------                                   1467, 1501
New Amsterdam, Ind., flood control____________________________                                       1501
Newark Bay, N. J., navigation -----------------------                                218
Newark, Ohio, flood control---------------------------------1536, 1565
New Bedford and Fairhaven Harbor, Mass.:
      Investigation__----------------------------                        _     108, 149---------
      Navigation---------- ------------------                                          63
Newbegun Creek, N. C., navigation-------- _                           ___            498
New Boston, Ohio, flood control--------------------------------                                      1558
New Buffalo Harbor, Mich., navigation-- -                     _ _----_                               1777
Newburg Branch of Little Piney Creek, Mo., investiga-
  tion-----_     --------------------------                  ----------------                        1292
Newburyport Harbor, Mass.:
      Investigation-----------------------------------                               108
      Navigation_------------- -----------------------                               103
New Creek, Staten Island, N. Y., investigation              ---------                244
New Cumberland, W. Va., flood control_--                         -    __ -           ---------
                                                                                     -- _            1628
New Don Pedro Reservoir, Calif., flood control --------------------                                  2086
New England Division__________ ________-__-25
New Harbor, Maine, navigation --------------------- _                                103
New Harmony Bridge, Ind., flood control----------_                       ----     -     _      1488, 1501
New Harmony, Ind., flood control_____________-------------                                           1501
New Haven, Conn., breakwater ----------------------                                  104
New Haven Harbor, Conn.:
      Investigation-----------------------------------                               108
      Navigation----               -      --           --------                      88
New Iberia Commercial Canal, La., investigation- ..      _      772---------
New Jersey and New York Channels, improvement                   222
New Jersey coast, investigation_______________________     245, 302
New Jersey Intracoastal Waterway:
   Investigation --------------------------------          245, 302---------
   Navigation ----------------------------------           289,296
New Kensington, Pa., flood control ------------------------------             1628
New London Harbor, Conn.:
   Investigation       ---------------------------- ----   105, 108 ---------
      Navigation----_--------------                                                   81           _
New Madrid
    Ml1    Floodway, Mo., investigation                                              855   -
New Martinsville, W. Va., flood control --------                   --      ------                   1565
New Matamoras, Ohio, flood control-_ .--
New Melones Reservoir, Calif., flood control_
                                              -                         --------      1-            1565
                                                                                                    2086
LX                                          INDEX


                                                                                    Page

                                                                        Volume 1           Volume 2

New Orleans, La.:
   Engineering district______ __------------                 713
   Improvement of Intracoastal Waterway to Apalachee
     Bay, Fla----------------------------------              719
   Investigation ---------------------------                 772
   Harbor -------------------------------------              742
New Pass, Fla., investigation -------------------------      628
Newport, Ark., flood control, investigation-__----    1044, 1048,
                                                                       1014, 1050
Newport Bay Harbor, Calif.:
   Investigation__ ------- _          --         -----           - -- __________
                                                               -__             --               1939
   Navigation -------------------------------------------                                       1928
Newport Harbor, R. I.:
   Investigation--        ------       -----           ------------  _             108
   Navigation --------------------------------                                     103
Newport, Ky., flood control_------------------------------------                                1450
Newport News Creek, Va., navigation-----------------                               436
Newport News, Va., improvement of channel to              ---------                438
Newport News, Va., Salters Creek, investigation--------                            454
Newport, Ky----------------------------------------------                                       1501
Newport, Ohio, flood control-----------------------                           ----              1565
New Richmona, Ohio, flood control-___--_                                    _____-----          1501
New River, Fla., navigation_------------------                                     621
New River, La., flood control_                    ------                 .---      803
New River, N. C., flood control_____- _--                       --     --          502
New River, Va. and W. Va.:
   Flood control_        -------------------------------------                                  1546
   Navigation_                                                                     470          1528
New Rochelle Harbor, N. Y., navigation---------- ----                              242
Newry-Old Pickens Reservoir, S. C., flood control
New Savanneh Bluff Lock and Dam --
                                                             ------
                                                               -530-
                                                                                   540
New Smyrna, la., investigation ----                                            628
Newtown Creek, N. Y., navigation, flood control-.....                197
New Willamette Falls, navigation lock, Oreg ----------------------                              2159
New York and New Jersey Channels:
   Navigation _ -------------------                    _             222
   Investigation ------------------                 ---------------- 245
New York Bay and Harbor, N. Y.:
   Ambrose Channel, navigation- ----                  ------------   185
   Anchorage Channel, navigation---------                            185
   Barge Canal---------------------------------_                 --  213
   Bayside Channel, navigation- -                ---------------     185
   Craven Shoal, removal of__                      -----             185
   Delaware River, waterway to, investigation--------                243
     Drift, collection and removal            -----                            205
     Entrance Channels and Anchorage Areas-------                              184
     Investigation --------------------- --- ---------                         245
     Kill Van Kull, navigation___               -----------                    218-
   Main Ship Channel, navigation __--------                                    184
   Red Hook Flats anchorage, navigation             -------------              185
   Supervision of------------------------------------                         -------           2394
New York engineering district___ -----------          -                   -153---------
New York (Southern) Flood Control Project--------                              338
Nezpique Bayou, La., navigation_                -----------                    757
Niagara and Orleans Counties, N. Y., investigation--_ _,-----                      -       1909
Niagara Falls:
    Investigation -----------------------------------                      ----------      1895
    Supervision of power_--            -----------------------------                       2390
Niagara River, N. Y., navigation, investigation                      -----          1875, 1880,
                                                                                                1895
Niagara Special International Board -                 -------------                             2398
                                                    INIDEX                                                    LXI


                                                                                               Page

                                                                                    Volume 1           Volume 2

Niagara St. to Stewart and Gray Rd., Los Angeles, Calif.,
  flood control -----------------------------------------------                                               1940
Nicaraguan Canal, survey---_-----_    -----------------------                       _              _          2389
Nimrod Reservoir, Ark., flood control -----------------                                     1025 - --
Nine Mile Drain, Mich., investigation-----------------                          __ --- ___                    1838
Niobrara, Nebr., investigation, flood control--------------------_                                    1341,   1339
Nishnabotna River, Iowa:
     Flood control --------------------------------------------                                               1309
     Investigation---------------------------------------------                                               1341
Nisqually River, Wash., investigation---------------------------                                              2248
Nixes Mate Shoal, Mass-_ - _ _. ---------------                                                 43
Nixon Creek, Tenn., flood control,                 _ -        -__ _ _ -----                   857
Nodaway River, Mo., investigation___----------------__---                                                     1292
Nolin Reservoir, Ky., flood control--------------------                                ----------             1502
Nolin River, Ky., navigation_-------------------------                                 ---------              1443
Nome Harbor, Alaska, navigation-------------------- -------- --                                               2285
Nomini Bay and Creek, Va., navigation                   ---------------                       406
Nonconnah Creek, Tenn., flood control-------                         - -----                  850
Nooksack River Basin, Wash.:
     Investigation----------------------------------- ----------                                              2248
     Navigation ---------------------------------------                                          _ --         2198
Norfolk Harbor, Va.:
     Drift removal_----------------                    --------------                         446
     General improvement, including main channel of
       Elizabeth River and portions of southern, eastern
       and western branches -------------------------                                         439
     Improvement of channels to Newport News..--------                                        438
     Improvement of Scotts Creek, Va-----------------                                         442
     Improvement of Thimble Shoal----------__-                                        -_      427
     Investigation ----------------------------------                                         454
Norfolk Port, Va., investigation _---- --- ------                            --               455
Norfolk, Nebr., flood control- --------------------                             _-       --------             1337
Norfolk, Va., engineering district_------------                               __-             421
Norfolk, Va., to Beaufort Inlet, investigations -.----                            -455, 465,
                                                                                         500.
Norfolk, Va., to St. John's River, Fla_                           .----- -                    447
Norfolk, Va., to the sounds of N. C., waterway                    ---------            455,   498
Norfork Reservoir, Ark., flood control------                       --------        1034, 1043
Normal, Ky., flood control_------------
                                  ____                                                   --- --               1565
North Adams, Hoosic River Basin, Mass., flood control                                  248, 259
North Alexander, Ill.:
     Flood control ---------              ------          ---            --        _---------                 1130
     Investigation_           -        --. -_ . -                      -------                --        -_    1160
Northhampton, Mass., flood control---            ... -- _- -              - _          126, 148
North Andover, Merrimack River Basin, Mass., flood
  control---------------------------------------111, 148 ..
North Beach Airport, N. Y., investigation -                     _         _- __ -        -245
North Bosque River, Tex., investigation ---------------                                       966
North Canadian R., Okla., flooa control_                             -                      1066
North Canal, Tex. See Buffalo Bayou, Tex.
North Carolina sounds to Norfolk, Va., waterway...                                            498
North Concho River, Tex., flood control__----                                                 958
North Cove, Old Saybrook, Conn.-                        ----          --        ---    84
Northeast Harbor, Maine_ __ _     -                     -            --          -    102
North East, Pa., investigation ..                      ---. .-----..            --------                      1895
Northeast River, Md, navigation ----------------------     334
Northeast River, N. 6.:
    Investigation.....5-----------------------------------  04
    Navigation _     ------------------------------------- 499                                    --
Northern and northwestern lakes_          --                                                                  1911
LXII                                             INDR


                                                                                             Page

                                                                                Volume 1             Volume 2

North Fork of Redbank & Sandy Lick Creeks, investiga-
       _
tion-------------           ------------------------------------                 1292, 1635
North Fork of Republican River, Colo., investigation_-__-            --    - -. - -   -1292
North Hartland Reservoir, Connecticut River Basin,
Vt., flood control---------------------_-------                        125, 148
North Kingsville Village, Ohio, investigation--_--.----.-----_-_-- 1898
North Landing River, Va., investigations------ -------                  454, 465  ---
North Little Rock, Ark,:
    Flood control_----------------------------------            __          1048
    Investigation-----------------------------------                        1050
North Little Rock to Gillett, Ark. (below Plum Bayou),
flood control-----------------------------                        -         841-
North Platte River, Colo., Wyo., and Nebr., investiga-
tion------------------------------------------------------                             1341
Northport Harbor, N. Y., navigation----- -------------                       242
North River, Ga., navigation,_,------------------------                      539
North River, Va., investigation-------------------...                        417
North Springfield Reservoir, Connecticut River Basin,
Vt., flood control-----------------------_
Northwest Fork, Del. and Md., navigation.----------_
                                                                        125, 148
                                                                             323-
                                                                                                 ----------
Norwalk Harbor, Conn., navigation_--_ ----------                       - -                  96
Norwalk River Basin, Conn., flood control__ --   -150--------
Norwich, Conn. channel improvement, flood control...   120, 122                                  --------
Norwich, New York, flood control-_---______________         377                                              .-
Novato Creek, Calif., investigation---
                                    ------                                      _ ---                             2036
Noxubee River, Ala., and Miss.:
    Investigation     ----------------------------------                707
    Navigation- ----------------          -------------------           698
Noyo River, and Harbor, Calif., navigation_------ _____-----                                                      1985
Nubble channel Mass -------------   _-.....-                             46
Nueces River, Tex., investigation __________________966
                                            ...
No. 2, Barren Reservoir, Ky., flood control----------_           ------- _                                        1502
No. 2, Green Reservoir, Ky., flood control-------------------- _          _                              -        1502


Oahe Reservoir, S. Dak. and N. Dak., flood control---------------                                        1312
Oak Bay to Port Townsend Bay, Wash., waterway im-
  provement,_                                                      _ __        ..                         2232
Oak Creek, Md., improvement of channel to Plain Deal-
  ing Creek ----------------------------------------                                      334
Oakford, Ill., flood control                     -__----------------------------                          1790
                                                                                                        -__
Oakland Harbor, Calif., navigation, investigation----------------2001, 2028
Oak Orchard Harbor, N. Y.:
    Investigation ------------
                           _                       --------------------------                     1895, 1909
     Navigation------- -----------------------------                               --------               1892
Obey River, Tenn., navigation, flood control-                                  _-- .------  --     1415, 1425
Obion Creek, Ky., investigation_- -------                         ___.-. --.-.    -- 855              _
Obion River, Tenn.:
    Flood control- -------          _ ---------             ,      _--,      -           852
    Navigation -------             -----   -------------------                           850
Occohannock Creek, Va., navigation_------------------                                     453
Occoquan Creek, Va., navigation------_                        --------------              406-.---
Ocean City Harbor and Inlet, Md.:
    Investigation----------   -------------------------                                 335                  _      .
    Navigation------------------------------------                                      330
Ocklockonee River, Ga. and Fla., navigation                 -----------                 698698
Ochoco Creek, Oregon, investigation_-- --.-.    -----                                   _            -            2191
0Ocmulgee River Ga., navigation---                                                           9.539
Oconee River, da., navigation __________________._                                      539      -
Oconto Harbor, Wis., navigation-   _    -    --_                                                                  1674
                                                                                                            txag

                                                                                                 Page

                                                                             Volume 1                   Volume 2

Oconto River, Wis., investigation__-__...                                                                       1743
Odanah, Wis., investigation__                                                                                   1667
Ogdensburg Harbor, N. Y.:
    Investigation                                                                -   -
                                                                                     --- -   -                  1895
    Navigation_                                                                                                 1889
Ogeechee River, Ga., investigation_                                                      548
Ogleton Lake, Md          navigation ..                                                  334
Ogunquit-Perkins Cove, Maine, investigation_                                             108
Ohio River ....-------                              -------                                                     1381
    Flood Control in basin:
         Huntington district-------_          .        .....                                                    1563
         Louisville district------   ---    ---      .....-.-                                                   1498
          Nashville district-__ _ -                    -_ -                                                     1434
         Pittsburg district-----------------       ------                                                       1627
    Improvements:                                                                        7--)0
         Locks and dams, construction_ ....                                                             1382, 1384
         Open-channel work____- ____..            _-
                                                  _ ______                                                1389
    Investigations__-__                  __     ___________                                        1415, 1450,
                                                                                                   1507, 1528,
                                                                                                   1571, 1591,
                                                                                                    1635, 1895
Ohio shore of Lake Erie, beach erosion study_--------                                                     1895
Oil Creek, Pa., investigation_-            -- __-__--                   -___-___                          1635
Okanogan River, Wash.
     Flood control _                           ----         ---- -----                                          2234
     Investigation _----               ---                                                                      2249
Okeechobee Cross-Florida Canal, investigations                  -_----           628, 647
Okeechobee-Everglades area, flood control_                                            633
Okeechobee Lake drainage areas:
     Flood control__-__-                 _          _        _                        633
     Investigations _-- ----------                                               628, 647
     Navigation---------- -                       -                                   590
Okeechobee Waterway, Fla.:
     Navigation_-                                                                     590
     Investigation __                                                                 647
     Food control----                                                                 634
Oklahoma City, floodway, North Canadian River, Okla_ 1057, 1070
Oklawaha River, Fla.:
     Investigations_- __     ___-,_                                              628, 647
     Navigation      - -                                                              561
Okmulgee Creek, Okla., investigation                                                 1113
Olcott Harbor, N. Y.:
     Investigation .....-...    ..........              . _____ .. _         .                                  1896
     Navigation       --                          --                       -                                    1892
Old Hickory Dam and Reservoir, Tenn___                                                                          1399
Oldmans Creek, N. J., navigation                ___                                   301
Old Pass Lagoon, Fla.:
     Navigation          __                                                           666
     Flood control-                                                                   702
                                                                                      702           - - - ---
Old River, Calif., navigation_                                                                                  2057
Old River, La.:
     Investigation      _                                                             772
     Navigation         •.                                                            767
Old River, Ohio, navigation__                                                                                   1851
Old Tampa Bay, Fla., investigation_                                                   628
Old Town Creek, Miss., navigation_                                                    698
Olean on Allegheny River, N. Y., flood control                                                          1592, 1628
Olentangy River, Ohio                                ---                                                      1559
Olga Strait, Alaska, investigation_----------                     ----                                        2300
Oliver Inlet, Alaska, investigation,.--                   --     ------                                       2300
LXIV                                         INDEX


                                                                                    Page

                                                                     Volume 1              Volume 2

Olympia Harbor, Wash.:
     Investigation ....                                                                         2233
     Navigation _               __----      -     -      ---    -                               2220
Omaha Creek, Nebr., investigation --                ----                                        1341
Omaha, Nebr.:
     Engineering district         - - -      - - -                                               1301
     Flood control-                                                                        1312, 1335
Ompompanoosuc River, Vt., flood control_____                               128
Onancock River, Va., navigation                                            453
One Hundred and Two and Missouri Rivers, Mo., in-
  vestigation-_-__              -                                                               1292
Oneida Creek, N. Y., investigation_                          _                                  1909
Onondago Creek, N. Y., flood control                                                            1905
Onset Bay, Mass _ ---                                                          53
Ontonagon Harbor, Mich., navigation_                                                            1652
Oologah Reservoir, Okla.:
     Flood control _         ._ _.                                        1080
     Investigation ..      --. .                                          1113
Operation Snowbound:
     Garrison N. Dak., District_____                                                       1348, 1357
     Kansas City District_                                                                       1250
     Omaha District_                                                                             1342
Optima Reservoir, Okla., flood control ....                              1066
Orange River, Fla., navigation_                                           621
Orange Lake Basin, Fla., investigations .....                        628, 649
Oregon, bays, inets, and rivers, Oregon, investigation_                                      2156
Oregon slough, Oregon, navigation, investigation_                                      2132, 2155-
Orleans, Ind., flood control_______________________                                          1480
Orleans, N. Y., investigation__                                                              1909
Orleans Parish, La., investigation__                                 772, 808
Orowoc Creek, N. Y., navigation__                                         242
Ortona Spillway, Fla., flood control_                                     637
Orwell Reservoir (Otter Tail River), Minn., flood con-
  trol _      .-----                                                                            1214
Osage River, Kans. and Mo.:
     Flood control-_                                                                             1251
     Navigation         -          --                                                            1247
Osceola Reservoir, Mo., flood control___                                                   1251, 129&
Osoyoos Lake Board of Control __                                                                 2403
Ostanaula and Coosawatte Rivers, Ga., navigation .....                     698
Oswayo Creek, N. Y ___....                                                                      1591
Oswego Canal, N. Y-                                                        213
Oswego Harbor and River, N. Y.:
     Flood control                                                                              1902
     Investigation ,__                                                                          1909
                                                                                9

     Navigation_
                                                                      ------
                                                                                                1886,
Otselic River, N. Y                                                        339
Other Agencies, work for------------------------                                4
Otter Creek, Vt.:
     Navigation _----------------------                 --------           242
     Flood control_ ___                                                    246
Otter Tail River, Minn., flood control----                                                      1214
Ottumwa, Iowa, investigation                                                                    1199
Ouachita River and river system, Arkansas and Louisi-
  ana:
     Flood control-----------          -------------------              822, 844
     Locks and dams_        ------        -------------                      817
     Investigations-....--          -------------                      808, 842,
                                                                            1050
    Navigation    -------------------------------                            816
Ouleout Creek, N. Y___-----                               _--------------    339
                                     INDEX                                        LXV




                                                                      Page

                                                           Volume 1          Volume 2

Overton-Red River Waterway, La., navigation .......             716 1
Owasco inlet and outlet, Montville, and Dry Creeks,
  State ditch, and Crane Brooks, N. Y., flood control_ -                            1908
Owego Creek, N. Y., investigation; flood control .......   374, 377
Owensboro, Ky., flood control_                                                    1501
Owens Dam and Reservoir, Calif., flood control_                                   2067
Owensmouth Ave. to Lankershim Blvd., Los Angeles,
  Calif., flood control_                                                            1940
Owls Head Harbor, Maine, navigation                             103
Owyhee River Basin, investigation___                                              2280
Oxford, N. Y., flood control    ___.___                         340
Oyster Channel, Va.:
    Investigation       _                                       454
    Navigation _ -- - - - -                                     423
Oyster Creek Channel, N. J-                                     291
Oyster Creek, Tex.:
    Investigation--------      ---------------------            918
    Navigation _                                                915
Ozan Creek, Ark., flood control_                                827
Ozark Dam and Reservoir, Ark____                               1004
Ozona Channel, Fla., navigation___                              622
                            P
Pacific coast lines, California, beach erosion study                              1939
Pacific Ocean, San Diego County, Calif. investigation___                          1976
Pacoima Wash Channel, Los Angeles, dalif., flood con-
  trol_                                                                        1941
Paducah, Ky., flood control---                                           1492, 1501
Pagan River, Va., navigation; investigation_               453, 454
Paint Creek Reservoir, Ohio, flood control                                        1566
Painted Post, N. Y., flood control-                             343
Painted Rock Reservoir, Ariz., flood control__                                    1970
Paint Rock River, Ala., investigation_                                            1438
Pajaro River, Calif.:
     Flood control     --                                                        2035
     Investigation___                                                            2036
Palacios, Tex., investigation_                                  918
Palarm Creek, Ark., investigation_                             1050
Palatka, Fla., investigations_                             628, 647
Palm Beach, Fla.:
     Beach Erosion Control                                      621
     Harbor- _--          --         _                          578
     Navigation         -                                       621
Palolo Valley, T. H., investigation--                                            2036
Palouse River, Idaho, Wash., Oreg., investigation, flood
  control               _                                               2280, 2267,
                                                                               2273
Pamlico and Tar Rivers, N. C., navigation-_                    478
Pamlico Sound, N. C.:
    Improvement of waterway to Avon, N. C                       477                   0
                                                                                     9--
    Improvement of waterway to Beaufort Harbor ...              483
    Improvement of waterway to Rodanthe, N. C .....             498
    Improvement of waterway to Stumpy Point Channel_            498
    Investigation .-      -    -.                               500
Pamunkey River, Va., navigation ....         -- -               453      --------


Panama City Harbor, Fla., navigation._._._                      664
Pantego Creek, N. C., investigations_- ------ ,_           501, 504
Panther Creek,, Ky., investigation                                               1507
Panther Creek Levee, Ill., flood control                                         1990
LAVI                                           IN1DEX

                                                                                       Page

                                                                         Volume 1             Volume 2

Panther Mountain Reservoir, Moose River, N. Y., flood
  control-                                        --------------------        _                     908
                                                                                                   1----------------------
Paonia, Colo., investigation_-_     __    --      _____           _--        -_                    1976
Papillion (Little) Creek, Nebr., investigation---          ..------------------                    1341
Paradise Valley, Nev., investigation                                                                098
                                                                                                   2----------------------
Parish Creek, Md., navigation------------------------                     334
Park River, N. Dak., flood control---- ----------         __ -- ____                      1222, 1234
Parkersburg, W. Va., flood control_----__-              ___--------_                      1539, 1565
Parnassus, Pa., flood control------------------------- ----------                               1628
Pas a Loutre, La-            -__-__-___  ______------------               737
Pascagoula Harbor and River, Miss.:
     Improvement of harbor----                      _
                                                  -------                        686
     Improvement of river ___________               _____-__---           -688
     Investigation--------------------------------700,                           708
Pasquotank River, N. C., waterway from Norfolk to
  Sounds of North Carolina:
     Flood control -------------------------------                               501
    Investigation_                                                               455
Passaic River, N. J.:
     Investigation---------------                                                257
    Navigation -----       --------           ---------------                    218
Passamaquoddy tidal-power project, Maine ------------                            102
Pass Cavallo, Tex., channel to Port Lavaca:
    Investigation _                    ______ _______----_ .-----                918
     Navigation_                                   _             -               899
Pass Christian Harbor, Miss., navigation--------------___
                                                    ___              _          698
Pass Manchac, La., navigation-_-                -767
Passumpsic River, Vt., investigation       __-__-__                              150
Patapsco River, Md., navigation ---------------------                            312
Patehogue River, Conn., investigation _           -                              108                  .---------
Patoka River, Ind., investigation                                                                   507
                                                                                                   1----------------------
Patriot, Ind., flood control-e_ -- sin---,
Patuxent River, Md., navigation
                                               flodc-------,
                                                 ----
                                              in-_              ---             406
                                                                                       -------     1501
Pawcatuck River, R. I. and Conn., navigation-77._                                  -77             .
Pawleys Island, S. C., investigation ...--------------                           518
Paw Paw River, Mich., navigation_.......____                 __                                    1708
Pawtucket, Blackstone River Basin, R. I., flood control                  118, 148                        .
Pawtucket (Seekonk) River, R. I., navigation---                           -_      70
Pawtuxet Cove, R. I., investigation__     ---------------                        108
Payette River and Valley, Idaho, investigation flood
  control----------_-------                        -                              __      2281,2267
Paynes Creek Calif., investigation.
Peace River, Fla., investigations--
                                  ...                                    628, 647
Peach Island, Ontario, investigation-_---------                                                    1830
Peach Orchard Bluff, Ark., improvement of White River-                           850
Pearl River, Miss. and La.:
    Flood control -----            -----
                               .------        ---------                    - 706           _
    Investigation --------------------------------                       700, 707.........
    Navigation ----------------------------------                        694, 698
    Locks ----------------------------------------                            695
Pease River, Tex., investigation -----------------------                     1113---------
Pecan Bayou, Tex.:
    Flood control--------------------------- -----
    SInvestigation --..      ---------------
                                                                         955, 957
                                                                                966
                                                                                          ---------
Pecatonica River,    Ill., investigation; flood control-                       --
                                                                           ...----    1199, 1193
Pecks Creek, Va.,    investigation- _-_                                       407--------
Peconie River, N.    Y., navigation-      ----------------                     171----------
Pecos River, Tex.    and N. Mex., investigation-                              985 -         ..-.-
Pee Dee-Yadkin, River, S. C., investigation-_               -_                   520.--
                                                                               -20
                                                    INDEX                                                LXVII


                                                                                               Page

                                                                                    Volume 1          Volume 2

Peekskill Harbor, N. Y., navigation___                             _____            __         242 L.
Pekin and La Marsh drainage and levee district, Illinois,
   flood control_-------                  ---------------------                                              1786
Pelican Harbor, Alaska, investigation. _                                       __                            2300
Pemberton Point to Gurnet Point, Mass., beach erosion
   control study------------------- ----                               -                        107
Pembina River, N. Dak., investigation- _________                                                             1238
Pembina River Reservoir, N. Dak., flood control.__                                                           1237
Pembroke Creek, N. C., navigation----------------_                                             498
Pemigewasset R., N. H., flood control____________
Pendleton Camp, Calif., investigation_----------
Pendleton Umatilla River, Oreg., flood control- _ _ ..
                                                                     _ ___.                    111
                                                                                                             1939
                                                                                                             2280
Pend Oreille River and Lake, Idaho, investigation, flood
   control-     --------         ------------------------_-                                                  2236
Peninsula drainage district No. 1 and 2, Multnomah
   County, Oreg., flood control__                                .     . .              .            2182,   2189
Pennington Bayou, Ark., flood control ....                                                     1022
Penny Slough, Rock River, Ill., flood control..-_______                                                      1198
Penobscot River, Maine_                 ___ .__ .___ ._____ ..___ ._                           102
Pensacola Bay and Harbor, Fla.:
      Improvement of harbor ....                              ........          __.       662, 667
      Investigation__ __ -----------------                                                     700
Pensacola Reservoir, Okla., flood control__._ __ __                                           1086
Pensaukee Harbor, Wis., navigation__-                                  _ _                                   1740
Pentwater Harbor, Mich., navigation _ _ ____                                      ._____                     1723
Pepperells Cove, Maine, navigation_.......                                  ... _              103
Pequist River, N. J., flood control_                            _ __ __ _        __ ___        308
Perdido Bay, River and Ala. and Fla., investigations ...                                  700, 707
Perkins Cove, Ogunquit, Maine:
      Investigation.. ..               .....................                          ..       108
      Navigation-----------------------                                                          32
Permanent International Association of the Congress of
   Navigation _------------------                         -----------                                        2387
Perquimans River, N. C., navigation investigation .... 498, 504
Perry County Drainage and Levee Districts Nos. 1, 2
  and 3, Mo.:
      Flood control---- _.-_                              __.------------ --                                 1139
      Investigation__-          -       -                   -              -                                 1160
Perry Creek, Iowa, investigation ....                                                                        1341
Perry Reservoir, Kans_                           _            _            _                                 1251
Perry Township, Ohio, investigation                                                                          1896
Peru, Indiana, flood control__                                                                               1505
Petaluma Creek, Calif.:
      Investigation                ---         ------------------                                            2036
      Navigation        -------------------------------                                                      1993
Petersburg Harbor, Alaska, navigation                                                                        2298
Petit Anse Bayou, La., navigation_                                                             755
Petite Caillou Bayou, La., investigation                                                  772, 808
Petit Jean River, Ark., investigation; flood control ..... 1050, 1023
Petoskey Harbor, Mich., navigation---------------                                                            1737
Phelps Creek, N. Y-_-----------                               --------------                   351
Philadelphia, Pa., engineering district_-------------                                          261
Phillips Inlet, Fla., investigation--                              _--------------             700
Philpott Reservoir, Va., flood control__-------- ----                                     456, 461
Phoebus, Va., improvement of channel to Hampton Roads_                                         453
Picketwire (Purgatoire) River, Colo., investigation- ...                                       985
                                                                                                             1410
Pickwick Landing, Tenn., navigation--.-                                 ---_ _       --
Piedmont Reservoir, Ohio_                                                                                    1533
Pierce, Nebr., flood control_--------------------                                                            1337
        245554-53-vo1. 1-76
 LXVIII                                           INDEX-.


                                                                                               Page


                                                                                    Volume 1          Volume 2


Pierre Bayou, La.:
      Flood control----- -------------                        ___ ----         _ 774, 787,
                                                                                         805
      Navigation- -----------------------------------                                      767
Pigeon Bayous, La., improvement------------------_                                        767
Pigeon Creek, Ill. and Ind----------------------------_____                                        1186, 1473
Pigeon River and Caseville Harbor, Mich., investigation_                      --                          1831
                                                       _--
Pilot Rock, Birch Creek, Oreg., flood control-----------_----
Pinal County, Ariz., investigation .-------------..
Pine Bluff, Ark ----------------------------------
                                                                              --
                                                                                   _-
                                                                                        _
                                                                                     823, 831
                                                                                                          2280
                                                                                                           1976
Pine Canyon Reservoir, Nev., flood control                                  _
                                                            ---------------------                         1972
Pine City, Minn., investigation ____-                     ____-___                  --
                                                                                  _ _____--.        1212, 1238
Pine Creek, Pa.:
      Flood control_-----                              _
                                                 ---------------                              _----        1630
      Investigation_-----------------                                                                     11635
Pine Flat Reservoir, Calif., flood control----------------                     _         --- -_ ---      2074
Pine Island Bayou, Tex., investigations--                            --             918, 935
Pinellas County, Fla., investigation ------------                                         628
Pine Orchard, harbor at, Branford, Conn., investigation                              105, 107 -
Pine River Reservoir, Minn_ _                                    --------                      _         1204
Pine River, St. Clair City, Mich., navigation               --------------------               _          1829
Pineville, Ky., flood control_ _---__                   __-____-----              ___        _           1418
Pineville, Red River, La., flood control --------                      _-_          774, 792
Pinhook Creek, Ala., investigation-_                    ----------------------
                                                                              _____             _         1438
Pinopolis Dam, S. C., investigation --------------------                                  518
Pioneer Reservoir, Arikaree River, Colo.and Kans., flood
   control--------------               ---------------------------------                            1251, 1270
Piscataqua River, Maine, and N. H., investigation                                          108
Pithlachascotie River, Fla., navigation             --------- -------
                                                               _                           622
Pittsburgh Harbor, Pa., navigation ------------------------------                                        1590
Pittsburgh, Pa., engineering district----------                     _--------___               --        1573
Pittsburgh, Pa.:
      Flood control ---------------------------------                                      -----          1628
      Investigation--------------------------------------------                                           1635
Plain Dealing Creek, Md., improvement of channel to
   Oak Creek---------           -----------------------------                              334
Planning-Rivers and Harbors------------------------                                          2
Plaquemine Brule, Bayou, La., navigation --------------                                   767
Plaquemine Lock, La---------------------------------                                      723
Platoro Reservoir, Conejos River, Colo., flood control___                                 977
Platte River, Colo., Nebr., and Wyo., investigation------ -------- _ -                                   1341
Platte River, Mo. and Iowa, investigations -----------------
Platte River near Ashland and Schuyler, Nebr., flood
                                                                                           _        1292, 1341

   control ---------------------------------------------------                                            1339
Plattsburg Harbor, N. Y., navigation                          ------------..              242
Playa del Rey Inlet Harbor and Basin, Venice, Calif.,
   investigation .---------------------------------------                                                 1939
,Pleasant Hill Reservoir, Ohio, flood control-                                                            1533
Pleasant River, Maine, navigation .........                                                102
Pleasant Valley, N. Y., flood control---------------_---                                  260---------
Pleasanton, Tex., flood control_--
                                 -                    ---                ---             963
Plum Payou, Ark., investigation-_                                                      151--.........1051
Plum Creek, Colo., flood control______------------------------                                            1327
Plum Creek, Ky., flood control -----------------------------------                                        1503
Plum Island Sound, Mass., investigation__
Plymouth Harbor, Mass.:
                                                     _          _
                                                               _._  109-                                -
     Investigation- ---------- ----------------------               109
     Navigation-    -----------------------------------              51
Plymouth, Pa., flood control     ________-            ___.---362
Pocahontas, Ark., flood control_                      .           1048
Poca Reservoir, W. Va., flood control_- ----------.--                                                     1566
                                        INDEX                                           LXIX

                                                                             Page

                                                                  Volume 1          Volume 2

Pocatello area, Portneuf River, Idaho, investigation-__                                  2281
Pocomoke River, Md., navigation                                        327
Poe Lock, St. Mary's River, Mich_                                                        1797
Point Dume, Calif., investigation                                                        1939
Point Judith, and Point Judith Pond, R. I., harbor of
  refuge, investigation; navigation_                               107, 71
Point Lookout Creek, Md_             ___                               407
Point Lookout Harbor, Mich., navigation_                                                  1829
Point Pinos, Calif., investigation                 ----------                             2028
Point Pleasant, W. Va., flood control__                                             1543, 1565
Pokegama Reservoir, Minn                                                                  1204
Polecat Creek, Okla., flood control_                                  1075
Pollock Rip Shoals, Nantucket Sound, Mass., navigation_                 58
Polson Bay, Flathead Lake, Mont., navigation _---   ----                                 2232
Pomeroy, Ohio:
      Flood control_           --   ----------------------                            1565
     Investigation _                 -        -          -    -                       1571
Pomme de Terre Reservoir, Mo., flood control_                                   1251, 1287
Pompano, Hillsboro Inlet, Fla., investigation _--                      628
Ponca Creek, S.° Dak. and Nebr., investigation                                           1342
Ponca City, Okla., investigation_                                     1113
Ponce de Leon Inlet, Fla., investigation_                              628
Ponce Harbor, P. R., navigation _______               _                622
Ponchatoula Creek and River, La., navigation; flood con-
  trol-----                                                       767, 803
Pond Creek, Tenn., flood control_                                      852
Pontchartrain Lake, La.:
      Flood control               _                                    793
     Investigation__                                              772, 808
Pontiac, Mich., investigation__                                      -----               1838
Pontiac diversion, Pawtuxet River Basin, R. I., flood con-
  trol        ----------------                                         148
Poor Fork of Cumberland River, Ky., investigation, F. C_                                 1416
Popes Creek, Va., investigation                 --                     409
Poplar Bluff, Mo., flood control_               _ ___                 1029
Poplar River, Wis., investigation_ ---            _ ___--
                                                      --                                 1238
Poquonock River, Conn__                ______________                   93
Portage Lake harbor of refuge, Mich., navigation__                              1654, 1729
Port Alexander, Alaska:
     Investigation ....                                                               2300
     Navigation                              __                                       2298
Port Allen Harbor, T. H., navigation, investigation_                            2014, 2028
Port Angeles Harbor, Wash., navigation_                                               2232
Port Aransas, Tex., navigation_.--              -___-__________       903
Port Aransas-Corpus Christi Waterway, investigation_ _                918
Port Arthur, Tex., investigations-_-                              918, 924-
Port Arthur Canal, Tex., navigation, investigation .....          859, 918
Port Austin Harbor, Mich___                                                              1829
Port Bay, N. Y., navigation_             _ ____                                          1892
Port Bolivar, Tex.:
     Investigation_                                                   919
     Navigation           -                                           880
Port Chester Harbor, N. Y.:
     Investigation                                                    245
     Navigation                                                       154
Port Clinton Harbor, Ohio, navigation               - -                                  1829
Port Everglades Harbor, Fla., navigation_                             582-
Port Gamble Harbor, Wash., improvement-                                                 2210
Port Henry Harbor, N. Y., navigation_                                 242-
Port Hueneme, Calif., investigation__                                 168----           1939
Port Jefferson Harbor, N. Y., navigation                              168 - -          -- -
LXX                                          INDEX


                                                                                      Page


                                                                        Volume 1             Volume 2

Portland Harbor, Maine, navigation_------------------                             30
Portland, Maine to Boston, Mass., waterway, investi-
  gation --     .---------------                                                108
Portland (North) Harbor, Oreg., investigation----                                                2156
Portland, Ohio, flood control---------------------                                               1565
Portland, Oreg., engineering district--------------                                              2105
Portland, Oreg., flood control_ _                                                                2159
Port Lavaca, Tex., channel to Pass Cavallo:
     investigation.--       -      -- - --- - - --                              919
     Navigation_                                                                899
Port Mansfield, Tex., investigation___                                          919
Portneuf River and Marsh Creek, Idaho, investigation
  flood control_ _       _       _   _      _
                                        _ ___                                                 2270,
                                                                                         2267, 2281
Port of Friday Harbor, Wash., investigation_                                                   2233
Port Ontario Harbor, N. Y., navigation                                                         1892
Port Orchard Bay, Wash., navigation-            -                                              2232
Port Oxford Oreg., investigation_               --         - -                                 2156
Port Royal hound, S. C., navigation_                 -                          605
Port St. Joe Harbor, Fla., navigation ....                                      662
Port Sanilac Harbor, Mich., navigation            ___                                            1818
Port Series Reports _                    . .                                      108            2308
Portsmouth Harbor, N. H.:
    Investigation----...   -------------------------                            108
     Navigation - -             -                                               103
Portsmouth Harbor, Va., channel to Nansemond Ord-
  nance Depot, navigation_____ _ ... _ .......            _      .___           453
Portsmouth, New Boston, Ohio:
     Flood control_           .                             ____                                 1565
     Navigation          --------------------           --------                                 1526
Port Tobacco Run, Md., investigation ....                                       417
Port Townsend Bay to Oak Bay, Wash., waterway im-
  provement--       -------------------------------                                              2232
Port Townsend, Wash., investigation__                                                            2233
Portuguez River, P. R., investigation                                    ---    647



Portville on Allegheny River, N. Y.:
     Flood control_-                                                                     1591, 1628
     Investigation---------------------------------                                            1635
Port Washington Harbor, Wis.:
     Investigation       ------------------------------                                          1742
     Navigation-------------------------- -----                                                  1698
Port Wing Harbor, Wis., navigation                                                               1649
Poso Creek, Calif., investigation_                                                               2098
Posten Bayou, La. and Ark. flood control              _                         803
Potomac River:
     Improvement at Alexandria, Va                                              384
     Improvement at Lower Cedar Point, Md_                                      406
     Improvement at Mount.Vernon, Va.-----------                                406.
     Improvement at Washington, D. C-                                         379
     Improvement below Washington, D._C_                                      385
     Investigation      -------------------------------                 407, 417
     North side of Washington Channel, D. C_                                  382
     Waterchestnut elimination .......................                        387
                                                                            .....
Potowomut River, R. I., navigation__                                            104-
                                                                               ..
Poulsbo Bay, Wash., investigation_                                                               2233
Powder River, Oreg., investigation---                                                            2281
Powells Bay, Va., investigation _                                               335
Powhatan Point, Ohio, flood control _                                                            1565
Prado Dam, Calif., flood control                                                                 1961
Prairie du Chien, Wis., harbors--_----------------                                               1169
                                                INDE3                                                LXXI




                                                                                          Page

                                                                               Volume 1          Volume 2

Prairie du Pont Drainage and Levee Dist......._..                          _                  1160, 1148
Prairie du Rocher and vicinity, Illinois, flood control-. -                                         1141
Prairie Portage Board of Control_ _..._
Prattville, Autauga Creek, Ala., flood control-
Prescott area, Columbia County, Oreg., flood control
                                                    _      ....
                                                                  ---               706
                                                                                                    2402
                                                                                                   -----
                                                                                                  ---------------
                                                                                                     2189
President Roads, Mass_                                                               43
Presque Isle Harbor, Marquette, Mich., navigation__                                                   1658
Presque Isle Peninsula, Erie, ra:
     Beach erosion study          _          ..    __                                                 1896
     Navigation                        _        -         -                                           1865
Preston drainage and levee district, Illinois:
     Flood control-----------                                                                         1134
     Investigation -      .      ..---------                       _.__                               1160
Prestonville, Ky., flood control--------------------                                                  1501
Price Landing, Mo., flood control                   _                                                 1157
Priest Rapids Dam., Wash., flood control_                                                             2245
Prince of Wales Island, Alaska, investigation                       ---                               2300
Princeton, W. Va., investigation-_-----                                                               1571
Proctor, Otter Creek, Vt., flood control_ _._                                       255
Proctor, W. Va., flood control__                _____                 ___                             1565
Proctorville, Ohio, flood control             --- ------                                              1565
Program-Rivers and Harbors_______                                                         2
Prompton Reservoir, Lackawaxen River, Pa., flood
  control-- - - --.           -- - -.--                 - -- - - -                  304
Providence Harbor and River, R. I., investigation, navi-
  gation---- .       .        - -- - - .--- ---
                            .--                                         -.      109, 69
Providencetown Harbor, Mass., navigation.                                          103
Pryor Creek, Okla., investigation-,_..                   :.....-          -       1113
Pudding River, Oreg., flood control                . ..             . .                       2159,2189
Pueblo, Colo., flood control _.......                 ..          ._-.-    _        971
Puget Sound, and its Tributary waters, Wash., improve-
  ment of, investigation       _     .............. _         ..._ ..... _                    2198, 2233
Pullman, Wash., flood control,_ __________                        ___                               2273
Pultneyville Harbor, N. Y., navigation_                        .... ..                              1892
Pungo River, N. C., investigation---.,_-..--------                                  501
Punta Santiago, P. R., investigation--------.--.----                                629
Punxsutawney, Pa., flood control_--..-...-......-..--                                         1601, 1628
Purdy Creek, N. Y., flood control_.                                                 344
Purdy Reservoir, Okla., investigationi._............._.                            1113
Purgatoire River, Colo., investigation, flood control- ..                           984
Purification of water supply at Washington, D. C.......                             398
Put-in-Bay Harbor, Ohio, navigation-.-_..--...------                                                  1829
Putnam County, Fla., investigations             - -----                        629, 647
Puyallup River, Wash., improvement of Tacoma Harbor
  investigation, flood control_          __                                     -------       2218,2241

                                    Q
Queens Creek, Va., investigation_     ---     ----                             407, 455
Queenstown Harbor, Md., navigation             -----                                334
Queue de Tortue Bayou, La., navigation__                                            767
Quilcene Bay Harbor, Wash., investigation                                                             2233
Quillayute River, Wash., navigation .....                                                             2209
Quinby Creek, Va., navigation                                                       422
Quincy Shore, Mass., beach erosion, investigation ......                            109
Quinnipiac River, Conn ___- - _-- - -     - -------                                  88
                             R
Raccoon Creek, N. J., navigation_-------------------                                3011
Raccoon Creek, Ohio, investigation, flood control--  ..-..---                    -_---                1571
LXXII                                           INDEX


                                                                                                   Page

                                                                                 Volume 1                 Volume 2

Raccoon (Little) Creek, Ind., investigation--...----                          - - - - - - - - - -              1507
Raccoon Creek, Pa., flood control ..       _     --     -                     - - - - - - - - - -              1637
Raccoon levee unit, Indiana, flood control   ----------                       - - - - - - - - - -              1501
Raccoon River, Iowa, investigation-_                ------------              - - - - - - - - - -              1199
Rachel, W. Va., flood control_--_ -- __------                                 - - - - - - - - - -              1639
Racine Harbor, Wis.:
    Investigation_-- -- --- -- --- -. --. --       .- ...                                                      1742
    Navigation _              -                  _..--
                                                 -      -                                                      1703
Racine, Ohio, flood control._              .___
                                              __                                                               1565
Rahway River, N. J.:
    Investigation_       ..                  _       .__                                     257
      Navigation                                                                             242
Rainier drainage district, Columbia County, Oreg., flood
  control __ __ _                                                                                     2182, 2189
Rainier, Minn., investigation__.       .         ______           __                                        1665
Rainy Lake Board of Control_                                                                                2402
Rainy Lake and River, Minn. investigations                    ---                                     1665, 1667
Rancocas Creek or River, N. .:
    Flood control.         . .      ...     . -. ..             -..                          308
    Navigation -                  -      - ..--  -   -      - ..-                            301
Randolph Reservoir, Va., flood control __                     ___                            456
Ranoeline Lake, Wis., investigation_            -------------
Rapid Creek, S. Dak., investigation......-...--..-
                                                                                                               1743
                                                                                                                137
Rapidan River, Va., flood control__.... ...        ..........                                414
Rapides Parish, La.:
    Flood control-     .     ..-----.------- 790,                                            813
      Investigation -_                             - -- - -
                                -- -.--- - - .-- ...--                                       808
Rappahannock River, Va.:
      Navigation---__-_                     -     -__ _. -            -                      390
    Flood control _                             . ..._    ...       .....                    406
Raritan Bay and River, N. J.:
    Improvement of channel to Arthur Kill ...........                             223, 227
    Improvement of river ....                               _._._____             222, 229
    Investigation_        .                    ____       ._...           _            245
Rathburn Reservoir, Iowa_           ...         .....            ..                                            1251

Ravenswood, W. Va., flood control---                                                                           1565
Raymond, Wash., flood control- -.--                    _--        -----                                        2248
Raystown Reservoir, Pa., investigation-------------                                          374
Reclamation District No. 768, Calif., investigation_                                                           2036
Recreation facilities at reservoirs___                                                          5
Rector Creek, Ill., investigation                                                                              1507
Red Bank, Pa.:
    Flood control                                                                                              1629
    Investigation_                                                                                             1635
Red Bluff, Calif.:
    Investigations          -----------------------------                                             2060, 2098
    Navigation -------------------------------
                _                                                                                           2047
Red Fish Bay and Landing, Tex.:
    Investigation         ------------------------------                                     919
    Navigation--------------------                       -----------                         868
Red Fork Creek, Okla., flood control------                      ------                       1108
Red Hook Channel, New York Harbor, N. Y., naviga-
  tion____---------------------------------------                                 186, 189--------
Red Lake and Red Lake River, Minn.:
    Flood control------------------------------                                                                1218
    Investigation      _ ------------------------------                                                        1238
    Navigation_--__--------------------                                                                        1211
Red Lake levee, La----------------                                                  -   --   812



Redmond, Utah, flood control--------------------                                                               2093
Redondo Beach Harbor, Calif., investigation, navigation_-                                                      1923
                                       INDEX                                           LXXIII


                                                                           Page

                                                                Volume 1          Volume 2

Red, Arkansas and White River Basins, Ark., La., Okla.,
  Tex., N. Mex., Colo., Kans. and Mo., investigation-__          772, 808,
                                                                 822, 842,
                                                                 850, 855,
                                                                985, 1014,
                                                               1051, 1058,
                                                                     1113
Red River, La., Ark., Tex. and Okla.:
    Below Denison Dam:
        New Orleans district, flood control__                    773, 774,
                                                                      779
         Vicksburg district, flood control-        __                 844    - - - - - - - - - -
         Tulsa district, flood control-_       -               1103, 1106
     Below Fulton, Ark___                                       715, 1057    - - - - - - - - - -
     Investigations___         __                                773, 808,   - - - - - - - - - -
                                                                     1058
     Overton-Waterway, La_                                            716
     Vicinity of Shreveport, La., flood control - - -_---        744, 781
Red River of the North Drainage Basin, Minn., S. Dak.,
  and N. Dak.:
     Investigation___                                                                       1239
     Flood control                                                                          1213
     Navigation-                                                                            1211
Red River Parish, La., flood control            _                774, 805
Red River, Tenn., navigation________              ________                           1415
Red Rock Reservoir, Iowa, flood control ....                                   1189, 1197
Red Run, Clinton River, Mich., flood control-                                        1834
Redstone Creek, Pa., flood control ..........                                        1617
Redwater Creek, S. Dak., investigation-------------                                  1376
Red Willow Reservoir, Nebr., flood control_                                          1251
Red Wing, Minn., harbor__          ______                                            1166
Redwood City Harbor, Calif., navigation_                                             2005
Redwood Creek, Calif., navigation__                                                  2005
Reed's Creek, Ill., investigation__                                                  1160
Reedy River, S. C.,.investigation _____                              520
Reelfoot Lake Area, Ky. and Tenn., investigation .....               855
Reevesville, Ill., flood control__        _____                                1495, 1501
Refugio, Texas, investigation_-_                           _         919
Regulation of hydraulic mining and preparation of plans_.                                  2315
Rehoboth Bay to Delaware Bay, Del., investigation .....              302
Reno Beach Lucas County, Ohio, flood control ........                                      1837
Rennslaer County tributaries, Hudson River, N. Y., in-
  vestigation      _                                                 257
Republican River, Kans., Colo. and Nebr.:
     Flood control                                                             1251, 1291
    Investigation ....                                                               1292
Reserved Channel, Mass__                                              43
Reserved Channel, Boston Harbor, Mass., investigation_               109
Reservoirs at Headwaters of Mississippi River_                                             1204
Reservoirs placed in operation during fiscal year 1950___              8
Revere, Mass., beach erosion study                                   109
Rice County, Kans., flood control_                                  1116
Rice Creek, Fla., investigations------                --        629, 647      -    _   2      9
Richardson, Ky., navigation__                                                       1525
Richardson Bay, Calif., investigation, navigation_                            2028, 1991
Richland Creek, Ill., investigation_                                                1160
Richland Reservoir, Mo., flood control-_                                      1251, 1290
Richmond Harbor, Calif.:
    Investigation ....    .................----.--                                         -2028
    Navigation ....-                                   .                                    1998
Richmond Harbor, Maine, navigations __             _     _..         103 .... _-_
LXXIV                                      INDEX


                                                                                  Page

                                                                       Volume 1          Volume 2

Richmonds Island Harbor, Maine, navigation             -----------
                                                           103
Ridgeley, W. Va., flood control------------------------    409.
Ridgeway, Pa., flood control -----------------------------------
                                 _                    _                                       1628
Rigaud Bayou, La., investigation_--_                       773
Rigolette Bayou, La., flood control.--------------------   791
Rilla, La., flood control-----------------_                                  844
Ringgold Cove, Md., investigation__    -- ________  -------                  335
Rio Chama, N. Mex., flood control_ _-----------                              978
Rio Grande Floodway, N. Mex., flood control-- ------                    -    981
Rio Grande River, N. Mex., and Colorado, investigation,
  flood control_------------- ----          --------            ----   985, 982
Rio Hondo, Calif., flood control_       ------------------------------                1939,1941
Rio Hondo Channel: Santa Fe Ry. to Whittier Narrows
  flood control basin ------------------------------------------                            1946
Rio Hondo, N. Mex., flood control, investigation--.                    -_ 982, 985
Rio Hondo, Tex., harbor of refuge, investigation ..--------                    919
Ripley, Ohio, flood control_--------------------------------------                          1501
Rising Sun, Ind., flood control- ...- _________             ----------                      1501
Riverdale, Connecticut River Basin, Mass., flood control-                 126, 141
Riverland levee district, Missouri, flood control.      ------------------                  1157
River Road at Sioux City, Iowa, flood control--------------------                           1332
Riverside levees, Calif., flood control, investigation---------- ----                 1972, 1976
Riverview, W. Va., flood control         ---. --------------        _         -------       1565
Riviera, Tex., investigation ______     ___.----------                         919
Roanoke Rapids Reservoir, N. C., flood control.....---------                   456
Roanoke River and tributaries, Va., investigation...                           465
Roanoke River Basin, N. C., and Va.:
     Flood control..---------------------------------                          455
     John H. Kerr, Res.....------------------------------                      457
     Navigation--------------------- -------------                             472
Roaring Branch, Bennington, Vt., flood control--........                       258
Roberts Bay, Fla., investigation_.------.
                                      _   -----                              629
Robinson Watershed, Calif., investigation_       ------------------------                     2098
Rochester and McCleary's Bluff levee unit, Illinois, flood
  control- ------------------------------------                  -------                      1501
Rochester (Charlotte) Harbor, N. Y., navigation           ------------------                  1882
Rochester, Pa., flood control_ -----------------               _ _.._-------                  1628
Rochester Reservoir, Iowa, flood control ------------------------                             1199
Roch Creek, Fla., investigation_-----__          ____------___         647 !
Rock Hall Harbor, Md., navigation----....          ---------         - 334
Rockhold Creek, Md., navigation-------------------                           334
Rock Island, Ill., engineering district_---------------------------                          1179
Rock Island, Ill., harbor ---------------------------------------                            1167
Rockland Harbor, Maine:
    Investigation_ .--------.                   ------.--...  ---.           -_109
    Navigation            _
                        _ ---------------------------------                    103
Rockland Reservoir, Neches River, Texas, navigation_--                         930_       ....
Rockport Harbor, Maine, navigation-___ ------                         -__ --   103---------
Rockport Harbor, Mass., navigation- -----.---.                     _-_         103
Rockport Harbor, Tex., navigation_ .-----.-.-.                         _       868
Rockport, Ind., flood control------------------------------------                            1501
Rock River, Ill. and Wis.:
    Investigation----------------------------------------                            1186, 1199
    Flood control--------------------------------------------                                1194
    Navigation ----------------------------------------------                                1180
Rocky Fork drainage and levee district, Illinois, flood
  control_------------------------------------------                                 ----    1790
Rocky Fork Reservoir, Ohio, flood control-----------------------                             1566
Rocky River Harbor, Ohio, navigation___----------_-_-_-                            _         1849
Rocky River, Ohio, investigation- _------------------------                                  1896
                                                    INDEX                                                   LXXV


                                                                                                 Page

                                                                                      Volume 1          Volume 2

Rodanthe, N. C., channel from Pamlico Sound to, navi-
  gation__-------------- --           ------------------------                              498
Rogers City Harbor, Mich., navigation--------------------------                                                1829
Rogue River, Oreg., investigations---.       __-_         --_      _--            _-__-__                2156, 2191
Roland drainage district, Ark. River, Ark., flood control.                                 1048
Rolling Fork River, Ky., investigation_--..-...----.-..-                               --                      1507
Rollinson Channel, N. C.:
     Investigation-----------------------------------                                        500
     Navigation-- ------.-------              -------         -----------                   480
Rome, Ga., flood control                         .-----------------------------             706----
Rome, Ind., flood control--- -----------                                          _-------------....           1501
Romeo, Ill., investigation-------------------------------------                                                1791
Rondout Harbor, N. Y., navigation---------------------.                                     206
Root River, Minn., investigation-------------------- ------------                                              1239
Root River, Wis., improvement of Racine Harbor------------------                                               1703
Roseau River, Minn., investigation_--------------------------------                                            1239
Roseville, Calif., investigation____                                   _------                       _         2098
Roseville, Ohio, flood control_- ---              -------               __ --- -----                     1538, 1565
Rosiclare, Ill., flood control__--------.------------..-                                                       1490
Rossview Reservoir, Tenn. and Ky., flood control------------------                                             1434
Rossville, Ga., flood control --.. __--.....------.-           -        -----                                  1437
Rouge River, Mich.:
     Navigation----------------------------------                                     ---------                1820
     Investigation....----------------------------------------                                           1831, 1838
Rough River, Ky.:
     Flood control.       ------------------------------------                              ---- 1501, 1503
     Navigation _         ----------------------------- -- ------                                              1447
Round Pond Harbor, Maine, investigation-___---.
Rouses Point, Lake Champlain, N. Y., navigation
                                                                                             109.
                                                                                            242.....
                                                                                            242
                                                                                                            -   ..
Royal River, Maine, navigation_---.---------------                                           103 _
Rubio Canyon, Diversion, Calif., flood control-------------                                 -__-               1941
Ruffy Brook, Minn., investigation_-.--__               ----------------------                                  1239
Rush Creek, Okla., investigation-__.----------                                -           1114      ----
Rush River, N. Dak., flood control__--------------------_-_                             -___                   1214
Russell and Allison levee unit, Illinois, fliod control_ -----                        -                        1501
Russell Creek, S. C., investigation_________________                                   -517--
Russell, Ky., flood control__---------------------                     -------------                     1556, 1565
Russian River, Calif., flood control_ -
Rutherford Fork, Obion River, Tenn., flood control_
Rutland, Otter Creek, Vt., flood control ---               _ __--_
                                                                             ------- .-
                                                                                            852
                                                                                            246 _
                                                                                                            ---
                                                                                                       -2028, 2029


                                    _
Rye Harbor, N. H., investigation--.----- ---------                                          109


Sabin Lock, St. Mary's River, Mich-...-.                                         .....----- _         __      1797
Sabine Lake, Tex., investigations_ -       ..------------                                919, 924   ---------
Sabine-Neches Canal, Tex-...-------...                ----..-                                 862
Sabine-Neches Waterway, Tex.:
     Investigations_---     --------------              __                   -       919, 935,
                                                                                            966
     Navigation_ ------------------------------------                                 859.-                     ..
Sabine River, Tex., investigations ------                   -__-- -              935, 966 -             -        ..
Sabino Canyon, Ariz., investigation------------------------------                                              1976
Sabula, Iowa, flood control_         _--------------               --.-----------                           -1198
Sackets Harbor, N. Y.:
     Investigation__- .---           -     -. ------------------------                                        1896
     Navigation_ --------------------------------------------                                                 1892
Saco, Mont. flood control_ ------------------                           ---------                             1393
Saco River, Maine, navigation -----------------------                                 103-
Sacramento, Calif., engineering district-__ ---                                  _------- ---                 2039
LXXVI                                 INDEX


                                                                        Page
                                                             Volume 1          Volume 2

Sacramento River, Calif.:
     Collinsville to Shasta Dam, Calif., flood control.-.-_-                     2090
     Debris control--....       -. --.---.                                 2315, 2320
     Flood control------------------------------                           2079, 2322
     Hydraulic mining       ...-.                                                2315
     Investigations- _.. --          -        -        -                   2060, 2098
     Navigation         _                                                        2047
Saddle Mountain, Okla., investigation-                              1114
Safford Valley, Ariz., investigation_                                               1976
Sag Harbor, N. Y., navigation___                                     243
Saginaw Bay and River, Mich.:
     Investigation        -....                                                1831, 1838
     Navigation_                                                                     1817
St. Albans Harbor, Lake Champlain, Vt., navigation --.               242
St. Andrew Bay, Fla., navigation_                                    665
St. Anthony Falls, Minn., improvement of Mississippi
   River from Missouri River to Minneapolis_                                         1166
St. Augustine Harbor and Inlet, Fla., navigation, inves-
  tigation_--                                                621,   629,
                                                                     647
St. Catherines Sound, Md., navigation __.          _                 406
St. Claire Flats Canal, Lake and River, Mich.:
     Improvement of channels in Lake St. Claire                                     1807
      Improvement of St. Claire River_                                              1804
St. Croix River, Minn. and Wis.:
      Investigations______________                                             1212, 1239
      Navigation_                                                                    1208
St. Croix River, Maine, navigation_                                 102
St. Croix River, Maine and New Brunswick, operations
   of International Board of Control                                                2397
St. Francis Bay and River, Ark.:
      Investigation___                                              855
      Navigation---------                                           850
St. Genevieve and St. Marys, Mo., investigation_                                     1160
St. Genevieve Levee Dist. No. 1, Mo., flood control___                               1157
St. George Island, Md___                                            406
St. James Harbor, Beaver Island, Mich., navigation ....                           -- 1738
St. James Harbor, N. Y., investigation            _                 245
St. Jeromes Creek, Md., navigation_                                 406
St. Johnsbury, Vt., investigation__                                 150
St. Johns County, Fla., investigation __                            647
St. Johns River, Fla.:
      At Jacksonville                        __                     553
      Improvement Jacksonville to the Ocean_                        447
      Petween Norfolk, Va., and St. Johns Riv., 'Fla                447
      Investigations_                                          629, 647
      Jacksonville to Lake Harney_                                  557
St. Jones River, Del., navigation_                                  301
St. Joseph Harbor and River, Mich., and Ind.:
      Improvement of harbor_                                                   1708, 1740
      Investigation_                __ __ _                                          1743
St. Lawrence River, improvement between Ogdensburg,
   N. Y., and Lake Ontario_         _                                                1892
St. Louis County, Mo., flood control_                                                1157
St. Louis, Mo., engineering district_                                                1119
St. Louis, Mo., investigation_                                                       1160
St. Louis River, Minn., investigation      -      __                                 1667
St. Lucie Canal, Inlet, and River, Fla., improvement of
   inlet-          ___  ___-__-         -____-                591, 621,
                                                                    637
St. Malo Bayou, La., navigation___              _    __ __ __       736
                                                INDEX                                            LXXVII


                                                                                         Page

                                                                              Volume 1          Volume 2

St. Maries, Idaho, flood control___        --------------
                                                  _                         __ __-____-2248
St. Marks River, Fla.:
     Investigation     --------------------------------                           629, 701
     Navigation-------------------------------------                                   698
St. Martinsville, La___________                     - _____________                    753
St. Mary DeGalvez Bay, Fla., investigation ------------                                 701
St. Marys Bay, La. and Tex., investigation_-....                _ _.._    .            919
St. Marys, Pa., flood control-------------------------------------                                    1628
St. Marys River, Ga. and Fla., navigation, investigation                          539, 548            _
St. Marys River, Mich., investigation; navigation---_ _--------_                              1831,   1795
St. Marys, Mo., investigation_________ ____________--                                                 1160
St. Marys River, Ohio and Ind., investigations_----------- --                               _ 1778,   1831
St. Marys, W. Va., flood control_--------------------------------                                     1565
St. Michael Canal, Alaska, navigation_____--                             --
                                                                       __-__         _-               2298
St. Michaels, Md., investigation___-                    ____________-           -       335-
St. Patricks Creek, Md., navigation-----------------_                                  406
                               -___________
St. Paul Harbor, Minn-_____________                                                ____               1166
St. Paul, Minn., engineering district                           -----------                           1203
St. Petersburg Harbor, Fla.:                                                                            M
     Investigation------- ----------------------------                                  629
     Navigation------------------------------------                                     621
St. Peters Creek, Md., investigation -------------------                                335
St. Regis River, Mont., investigation, flood control                   ----------------               2234
St. Simon Sound, Ga-------------------------------                                     535
St. Thomas Harbor, V. I., navigation-----------------                                  622
Sakonnet Harbor and River, R. I.:
     Investigation       -----------------------------------                            109
      Navigation_        ----            -- ----------                              103
Salamanca, N. Y., investigation-- -                  -----   ___ __---             -___               1635
Salem Church Reservoir, Va., flood control-                                      414
Salem Harbor, Mass.:
     Investigation-----------------------------------                            109
     Navigation ------------------------------                          ---       38
Salem, Ind., investigation--------------------------------------                                      1507
Salem River, N. J., navigation_ ---                              --
                                                       -- __ ______              301
Salinas River, Calif.:
     Flood control- ---------------------------                              _                        2030
     Investigation--__--------------------------------2036
Saline Point, La., flood control --             __-__-     ---      ____    774, 805
Saline River, Ark.:
      Investigation         ----------                       -------                843
     Navigation_ -----------------------------------                           821
Saline River, Ill., investigation, flood control          --------------------      1507, 1489
Salisbury, Mass., investigation-_              -___--__- -____---_             109
Salkahatchie Rivers, S. C., navigation-                       -
                                                           _________--517
Sallisaw Creek, Okla., investigation_-                    __________          1114
Salmon River, Alaska, flood control________________-__________                            2303
Salmon River, Oreg.:
     Investigations_-            ___-_------------                                  2266, 2281
     Navigation-- --------------                  ---------------------------             2155
Salt Creek, Fla. See St. Petersburg Harbor.
Salt Creek, Ill.:
     Flood control------------------------- -------------                                 1790
     Investigation------------------__                 ----------------- ----------       1791
Salt Creek, Nebr., investigation, flood control-              -------------------         1342
Salt Creek of Arkansas River, Okla., investigation -.                         1114
     Flood control           ___--------------          ---------- ___-       1072
     Investigation_------------------------------__                           1114
Salt Fork, Kans. and Okla., investigation_  ' - --                            -    1114
                                                 ....-
Salt Lake City, Jordan River, Utah, flood control--                                                   2097
Salt and Gila Rivers, Ariz., investigation---                                                         1976
LXXVIII                                          INDEX


                                                                                           Page


                                                                                Volume 1          Volume 2

Salt River, Ky., investigation, flood control_ -----..                  --------                  1507, 1469
Salt River, Mo., investigation_              .- ---------------                                         1160
Salters Creek, Newport News, Va., investigation- _ _ _                 _                 455
Salton Sea,'Calif., investigation_         ------             -- --         -         -            -_   1976
Salyersville, Ky., flood control_---------
                                       ....             ----------------       _1505
Samish River, Wash., investigation_ -------------                         -___              -_____      2249
Sammamish River, Wash, investigation-_-_--_--                             ------------- _               2249
Sampit R., S. C------------------------------------                                      508
San Angelo Reservoir, Tex., flood control--------------_958
San Antonio Channel, P. R., navigation--------------------------                                         614
San Antonio Creek, Calif-_____-_ ____                   -----------------           ________            1961
San Antonio Dam, Calif., flood control---------_                       ---------             _    1961, 1962
San Antonio River, Tex., investigations---------------935, 966 ____
San Bernard River, Tex.:
     Investigation ----------------------------------                                    919
     Navigation-- -------------------------------                                        868
San Bernardino County, Calif., investigation--------------------_                                       1976
San Carlos diversion dam, Ariz. & Mex., investigation--------- _ --                                     1976
Sand Creek, Colo., Wyo. and Nebr., investigation_----                            ------- _            -1342
Sand Creek Idaho, investigation_.-                          --.
                                                          .-.---                      -
                                                                            - _ __--___    ----         2281
San Diego County, Calif.:
     Streams flowing into Pacific Ocean, investigation---_-- _ _ --                               --    1976
     Stream flowing into Salton Sea, investigation....            ----------------                1976, 1977
San Diego Harbor and River, Calif.:
     Improvement of harbor ....------------------------------------                                     1931
     Investigation ---------------------------------------------                                        1939
San Diego River and Mission Bay, Calif., flood control-_ _- - __-1968                    _
     Flood control-------------- ------------------------------                                         1968
     Navigation--__ _.----------------..                                    _1934..           .
San Dieguito River, Calif., investigation-_ --------------------                        -1976
Sand Hill River, Minn., flood control_--....-.-.------------___.                                        1214
Sandusky River & Harbor, Ohio:
     Investigation_-------------            --      - ---------                  ----            1571, 1896,
                                                                                                        1909
     Navigation     ------------------------------------------                                    1841, 1892
Sandy Bay, Cape Ann, Mass., navigation--------------                                     103
Sandy drainage district, Multnomah County, Oreg., flood
  control_  ----     -     -------------------------------------                                2182, 2183,
                                                                                                        2189
Sandy Hook, N. J., navigation_ ------                        ---
                                                           __-____             -         236
Sandy Hook Bay at Leonardo, N. J__                     .--------------                   243
Sandy Lake Reservoir, Minn -----------------------------------                                          1204
Sandy Lick Creek, Pa., investigation_                -------------------                                1635
Sandy Pond, N. Y., investigation---1----------------------------                                         896
Sandy River, Oreg., investigation- --------------                          ---                          2156
Sanford, Fla., investigations------------------------ 629, 648
Sanford, Texas, investigation__ _ _ ----                -----------                     1114---          .
San Francisco Bay and Harbor, Calif.:
    Collection and removal of drift --------------- --------------                     1991
    Improvement------------------ ------------------------                             1988
    Investigation ---------------------------------------------                        2028
San Francisco, Calif.:
    Engineering district-------------------------- -----------                         1979
    Investigation- -----------------------------------------                           2028
San Francisquito Creek., Calif., investigation----- ----             - ---------       2036
San Gabriel River, Calif.:
    Flood control.-----------              -----------------------------         1939, 1941
    Investigation----------------------_                 ------------------            1976
Sangamon River, Ill.:
    Flood control,                                                               1783, 1790
      Investigation -        -- -           -    -        - -----------------                          1791
                                              NDEX                                                 LXXIX


                                                                                         Page

                                                                         Volume 1               Volume 2

San Jacinto, Calif., flood control________--------                                                    1972
San Jacinto River, Tex.:
    Investigation       -------------------
                            .                              -------                  966
     Navigation-----------------------                     --------                 883     -
San Joaquin River, Calif.:
    Investigations-__ ------------------------                                              2061, 209
    Navigation                                                                                    2040
San Juan Dam, Santa Ana River Basin, Calif., flood
  control-------         ------------------                                                     196.1, 1972
San Juan Harbor, P. R.:
    Investigation     -------             __      -- __                             629
    Navigation              _-------         ----   --                              614
San Lorenzo Creek and River, Calif., investigation, flood
   control_-------------            --------------                                          2036, 2037
San Luis Obispo Harbor, Calif., navigation           ----------                                   1938
San Luis Rey River, Calif., investigation--
San Pablo Bay, Calif.:
                                                            - -                                   1977
    Investigation._____---   -- _-- -- - __       _ __ ___                                        2028
    Navigation-_                   ---------------
                                               --      -                                    1993, 1997
San Rafael Creek, Calif.:
    Investigation-         -    -         -                                                           2028
     Navigation.--_                                                              -----                1992
Sans Bois Creek, Okla., investigation ...                                      1114
Santa Ana River, Calif., flood control_                 ---                           1960, 1968
Santa Anita Wash, Calif_-----------           ----                                           1941
Santa Barbara Harbor, Calif.:
      Investigation -----------------
                    _                             _-              --         -   -----
                                                                                  - -
                                                                                             1939
      Navigation                                              ---                           1921
Santa Clara River, Calif., flood control:       -         ----                              1972
Santa Cruz Irrigation District, N. Mex., flood control --                        986
Santa Cruz, Calif., Beach Erosion Study----------                                           2028
Santa Cruz River, Ariz., investigation-------------                                         1977
Santa Fe Channel, Calif.,.navigation -------                             -----    630_      1999
Santa Fe flood control basin, Calif----------
                                       _
                                                         .                                  1941
Santa Fe River, Fla., investigation__                                            630
Santa Margarita River, Calif., investigation__                                              1977
Santa Maria River, Calif., investigation                                                    1977
Santa Monica Harbor, Calif., investigation .....                            ....  -o0       1939
Santa Rosa Island, Fla., investigation                              .----
Santa Ynez River, Calif., investigation-              -          -              520
                                                                                            1977
Santee-Congaree, S. C., investigaton ....                               -5,518,520
Santee River, N. C. and S. C.:
      Investigation_ ------               -                               518, 520
      N avigation - __ __-- - -- - - -- - -- - -- - -                            517
Santiam River, Oreg., flood control       _                                                 2180
Sapelo Harbor, Ga., navigation_._...__.                    _                     5398
Sarasota Bay, Fla., investigation_      _._                  _
Sardis, Ohio, flood control_ _    ....      ___                                             1565
Sardis Reservoir, Miss., flood control_                                                     2346
Sargent and Broken Bow, Nebr., investigation_                                               1342
Sasanoa River, Maine, navigation                                                 103
Sasco Hill Beach, Conn___________                                     ------     630
                                                                                 104
                                                                                  242-




Satilla River, Ga., navigation; investigation                             539, 548
Saugatuck Harbor, Mich., navigation           -----                                         1712
Saugerties Harbor, N. Y., navigation------.                         -           242
Saugus River, Mass.:
      Investigation-__                           -------                         109
      Navigation     _         _                                                 103
Sault Ste. Marie, Mich., investigation.                                                     1831
Sautee and Nacoochee Valleys, Ga. (Int. Rept.)                                   707
LXXX                                   INDEX


                                                                                Page

                                                                    Volume 1           Volume 2


Sauvie Island (areas A and B), Multnomah County,
  Oreg., flood control_                                                            2182, 2189
Savage River Dam, Md., flood control_      -                               412
Savanna, Ill., investigation_____                                                           1186
Savannah, Ga., engineering district_                                       521
Savannah Harbor and River, Ga.:
    Improvement of harbor______                                           525
    Improvement of river above Augusta_                                   539
    Improvement of river at Augusta_______                                539
    Improvement of river below Augusta___                                 530
    Investigations ---------------------                             540, 548
Savannah River Basin, Ga. and S. C., flood control     ----               540
Saw Mill Bay, N. Y., investigation------------           __                                 1896
Sawtelle-Westwood, Calif., flood control-------------_     -                                1941
Saxon, Wis., investigation                             -
                                  -_____________________-__-                                1665
Scappoose drainage district, Columbia County, Oreg.,
  flood control_-------------      -----------                                     2182, 2189
Scarboro River, Maine, between Prouts Neck and Pine
  Point, navigation__                                                      103
Schell Run, Pa., flood control_____________________                        368
Schofield River, Oreg., navigation---- ---------..                                          2147
Schoolfield Reservoir, Va. and N. C., flood control_
Schooner Bayou, La.:
                                                      --                  456
     Investigation-                                                        773
    Lock--------------                                                     798
Schuyler, Nebr.:
    Flood control
    Investigation___ - _  --  -------                           -   ---------
                                                                                            1342
Schuylkill River, Pa.:
    Improvement above Fairmont Dam___                                     271
    Navigation-----------                                                 272
Scioto River, Ohio:
     At Portsmouth_                                                                         1526
     Flood-control reservoirs                                                               1566
     Investigations_______                                                         1529, 1571,
                                                                                            1909
Sciotoville, Ohio, flood control___                                                         1565
Scituate Harbor, Mass.:
     Investigation _                                                       109
     Navigation _                 -----------                              103
Scuppernong River, N. C., navigation_ __ __ __ ___ __ __ __ _              498
Seabeck Harbor, Wash., investigation_                                                       2233
Seaford, Del., navigation_                                                 324
Seahorn drainage and levee district, Illinois, flood control_                               1790
Sealevel, N. C., investigation___                                          501
Seattle Harbor, Wash., improvement of Duwamish
  River and east and west waterways__                                                       2215
Seattle, Wash., investigation____        ____________                                       2233
Seattle, Wash., engineering district-..     _                                               2197
Sebastian Inlet, Fla., investigations_                               630, 648
Sebewaing River Harbor, Mich., navigation__                                                 1829
Sebewaing, Sebewaing River, Mich., flood control__                                          1831
Seekonk (Pawtucket) River, R. I.:
     Investigation ....                                                    109
    Navigation_                                                             70
Segnette Bayou, La.:
    Investigation                      _                                   773
     Navigation__--                                                        765
Seldovia Harbor, Alaska:
    Investigation__                                                                         2300
     Navigation-                                                                            2298
                                      INDEX                                             LXXXI


                                                                               Page

                                                                    Volume 1          Volume 2

Selsers Creek, La., flood control              -            -            803
Seneca, Mo., investigation_                                             1114
Seneca County, Ohio, investigation _                                                       1910
Senecaville Reservoir, Ohio                                                                1533
Sepulveda flood control basin_______                                                       1940
Sesuit Harbor, Mass., investigation_                                     109
Seven-mile Creek, Ill., investigation_                                                     1507
Severn River, Md., investigation_                                        335
Sevier River, Utah and Nevada, investigations, flood
  control__--_                                                                    2093,2099
Seward, Alaska, Harbor of Refuge, navigation .........                                 2290
Seward, Nebr., Big Blue River_                                                         1279
Seymour Narrows, British Columbia, Canada, investiga-
  tion, Shallotte River, N. C.:
     Investigation .___                                                  501
     Navigation_                         ___ __ __ _                     499
Shamokin Creek, Pa., flood control_                                      363
Shark River, N. J., navigation; investigation__                     240, 245
Shasta Dam to Collinsville, Calif., flood control_..____                          2050, 2090
Shawnee Creek, Ky., investigation_                                                      1507
Shawneetown, Ill., flood control__________ _______                                      1501
Sheboygan Harbor, Wis., navigation, investigation___                              1696, 1742
Sheep Island Slough, N. C., investigation_                               501
Sheepshead Bay, N. Y., navigation_                                       242
Shell Bayou, Ala., navigation_                                           669
Shell Creek, Nebr., investigation ....                                                     1342
Shelley Area, Idaho ___ __ ___                                                             2267
Shellrock River, Minn., investigation_                                                     1199
Shelter Bay, Mich., investigation                                                          1665
Shem Creek, S. C.:
     Investigation ....                                                  518
     Navigation-------                                                   510
Shenango Reservoir, Pa. and Ohio, flood control .......                                -1629
Sherman Island, (Lower) Calif., investigations_                                   2061, 2099
Sherwood Island State Park, Conn., navigation. .......                   104
Sheridan, Wyo., flood control _ _                                                           1374
Sheyenne River, N. Dak., flood control-_                                              1214, 1224
Shields River, Mont., flood control_                                                        1375
Shilshole Bay, Seattle, Wash., investigation_                                               2233
Shinnecock Inlet, N. Y., investigation-                                  245
Ship Island Pass, Miss., improvement of pass and chan-
  nel to Gulfport _                                                      693
Shipyard River, S. C., navigation__                                      514
Shoal Harbor, N. J., navigation-                                         234
Shoals, Ind., flood control                                                                1505
Shore Protection Board. See Beach Erosion Board.
Short Creek, Ariz. and Utah, investigation__                                               1977
Short Cut Canal, Mich., navigation__                                                       1822
Short Mountain Dam and Reservoir, Okla., navigation,
  investigation- _          --                  -               993, 1001,
                                                                      1114
Shreveport-Jefferson Waterway, La., investigations -----         773, 809
Shreveport, La., to Jefferson, Tex., improvement of
   waterway --------------------------------------                       717
Shrewsbury River, N. J.:
     Investigation --------------------.    -----.-----.        -        245
     Navigation- -----------------                 ----                  237
Shufflebarger levee unit, Indiana, flood control           --                              1501
Sidney, Mont., flood control                                                               1379
Siletz River, Oreg., investigation_                  .....               _                 2156
'LXXXII                              INDEX


                                                                       Page

                                                            Volume 1          Volume 2

Silver Lake Harbor, N. C., navigation_.                          481
Silver Springs Run, Fla., investigations-----------         630, 648
Silver Strand, San Diego Harbor, Calif., investigation___                          1939
Silvies River, Oreg., investigation       ._________-_                             2191
Simpson Creek, N. C. and S. C., investigation         ___        520
Sinepuxent Bay, Md.:
      Navigation                                                 330
     Investigation_------ -----                                  336
Sink Run, Pa., flood control---                                  368
Sioux Bayou and connecting waterways, Mississippi, in-
   vestigation     --         ----                               701
Sioux City, Iowa, flood control______                                     1312, 1339
Stpsey River, Ala. and Miss., investigation_                     707
Siskiwit River, Wis., investigation, navigation       ___                          1665
Sister Bay, Wis., investigation .....                                              1742
Sistervilles, W. Va., flood control   _                                            1565
Sitka Harbor, Alaska:
     Investigation_-                                                               2301
      Navigation_                                                                  2298
Siuslaw River, Oreg.:
     Investigations_    .                                                 2156, 2191
      Navigation_                                                               2155
Six Mile Creek, Ill., flood control_                                            1186
Six Mile Creek Slough, Fla., investigation                       648
Six Runs River, N. C., investigation                             504
Skaggs Ferry, Black River, Ark., flood control .........        1048
Skagit Bay and River, Wash.:
     Flood control_                                                             2248
      Investigations_                                                     2233, 2249
      Navigation                                                          2198, 2232
Skagway Harbor and River, Alaska:
      Flood control                                                       2301, 2304
      Investigation          -
      Navigation_-    -                                                   2291, 2299
Skamokawa Creek area, Wahkiakum County, Wash.,
   flood control-_                                                                2189
Skamokawa Creek, Wash., navigation_ _ __                                          2155
Skamokawa Slough, Washington, navigation_                                         2155
Skillet Fork, Branch, Ill., investigation_                                        1507
Skinner Creek, N. Y., investigation_                                              1910
Skipanon Channel and River, Oreg., improvement of
.. channel-_ __ _ __ __ -__ _                                                     2155
Skunk River Basin, Iowa, investigation_                                           1199
Skokomish River, Wash., investigation_                                            2249
Skykomish River, Wash., investigation_                                            2249
Slaughter Creek, Md., navigation__                              334
Slough Creek, Tex., flood control _                            1108
Slovan, Raccoon Creek, Pa., flood control                                          1637
Smallers Drain, Va., investigation _-                           336
Smith Creek, Md., navigation_                                   406
Smithfield and Wayne Co. line, N. C., investigation ....        504
Smithland, Ky., flood control-_                                                   1501
Smith Mountain Reservoir, Va., flood control-                   456
Smith River, Calif. and Oreg., navigation_                                        2155
Smith Creek and River, N. C. and Va.:
      Investigation _                                           501--------
      Navigation__                                              499
Smiths Ferry, Pa., flood control       --                                  1628
Smoky Hill River, Kans__                                             1276, 1279
Smyrna River, Del., navigation__           ______ __            301----------
                                                INDEX                                             LXXXIII


                                                                                           Page

                                                                                Volume 1          Volume 2


Snagging and clearing in the interest of flood control and
  of navigation. See districts.
Snake River, Idaho, Oreg., and Wash.:
     Investigations_---___---------------_                                                    2266, 2281
     Flood control_ -----------                   _____-__           -____ -__ _              2278, 2282
     Navigation ------------------------------------                                  -------        2260
Snake River, Minn., investigations__                    ____-___-_               ___-_        1213, 1239
Snohomish River, Wash.:
     Investigation --------------------------------------------                                      2249
     Navigation -----------------------------------                                 --------         2198
Snoqualmie River, Wash.:
     Investigation_----             ----------------                     ----------
                                                                         -     _                     2249
     Navigation ---------------                -------------------               ----------          2198
Snowbound Operations:
     Garrison N. Dak. District----_____                        ___--------------1348,                 1357
     Kansas City District_________________________                                  ___              1250
     Omaha District------------                                                   -----               1342
Sny Basin, Ill., flood control_--------------__                                      -_________      1186
Sny Island, Ill., flood control------ -----------------------------                                  1198
Soddy and Little Soddy Creeks, Tenn., investigation- -- _-------_                                    1438
Soldier Ledge channel, Hussy Sd., Maine, navigation                                      30      - -
Soldier and Half Day Creeks, Kans-----------------------------                                       1282
Solomon Creek, Pa., investigation_____----------____                                    374
Solomon, Kans., south of, Smoky Hill River-----------_-_-                                            1279
Sonoita River, Ariz., investigation- ..               ___--_______                ____-     _        1977
Souris (Mouse) River, N. Dak., investigation               ---------------------                     1240
South and Aowa Creeks, Nebr., investigation                ---------------------                     1342
South Bank Arkansas River, Ark., flood control                -------       _1022, 1048
South Basin Suisan Bay, Calif., investigation---------------------                                   2028
South Beardstown drainage and levee district, Ill., flood
  control -----------------------------------------------                                     1785, 1787
                                                                                                     1790
South Beloit, Ill., flood control ------------------------------__                                   1194
South Boston, Va., investigation_                      ---------------      __          465.           ..
South Bristol Harbor, Maine:
     Investigation -----------------------------------                                  109
     Navigation-----------------------------------                                      103---------
South Canadian River, N. Mex., Okla. and Tex., inves-
  tigations_------------------------------------985,                                   1114
South Chicago Harbor, Ill., improvement------------------------                                      1753
South Coventry Reservoir, Conn., flood control--------- 120, 148                                     -
Southern and Central Florida,                ----------------------                     632
Southern New York Flood Control Project-....                       -        -        338            -
South Fork of Cumberland River, Ky., navigation                  --------- -1415
South Fork River, Tenn., investigation_                __     --     _-------_ ---         1438
South Grand Reservoir, Mo., flood control-- ---------------------                          1251
South Harpswell, Maine, investigation _ ----_                  __-_            110
South Haven Harbor, Mich., improvement -.-------------------                               1710
South Milwaukee Harbor, Wis., navigation- -----                 __        -----------      1740
South Norfolk Basin, Va., investigation ---------------                        455---------
South Pass, La -------------                                            739, 744
South Platte River Basin, Colo., flood control-----------------                            1327
South Plymouth Reservoir, Canasawacta Creek, N. Y.,
  flood control -------------------------------------                          336
South Point, Ohio, flood control-                -___                             --       1565
                                                                                -----------------
Southport Beach, Conn_ .. ____-                                                104---
                                                               -_________________
Southport Harbor, Conn., navigation_-----------                                104-
South Portsmouth, Ky., flood control                _--------------   --------             1565
South Prairie Creek, Wash., investigation-----                                       --                 2249
South Quincy, Ill., flood control----_        -----------                                               1198
South River, Mo., flood control--_-_                                                                    1198
        245554-53-vol. 1-77
LXXIV                                  INDEX


                                                                          Page

                                                               Volume 1          Volume 2


South River, N. C., navigation_                                     498
South River, N. J., navigation_                                     233
South Slough, Ill., navigation_
South Tunbridge Reservoir, Connecticut River Basin,
   Vt., flood control                                               125
Southwest Pass, La_______________             ____- _          739, 743
Sowashee Creek, Meridian, Miss., flood control__                    710
Spadra Creek, Johnson County, Ark., investigation ....             1051
Spanish Fork River, Utah, flood control                                                    2094
Spearfish Creek, S. Dak., investigation-        -_-      _                                 1376
Spindletop Gulley, Tex., investigation_                             919
Spokane River, Wash. and Idaho, flood control_                               2247,2248
Spoon River, Ill                -       -                  -                      1794
Spring Creek, Ark., investigation-___                              1051
Spring Creek, S. Dak., flood control               -     -                                 1310
Springdale Bridge on Yellowstone River_                                                    1377
Springdale, Connecticut River Basin, Mass., flood con-
   trol---------------------                                   126, 139
Springfield, Connecticut River Basin, Mass., flood con-
   trol--------------                                          126, 148
Springfield and Holyoke, Mass., to Hartford, Conn.,
   investigation_                                                   107          - - - -

Spring Lake, Ill., flood control___       ________________                                 1790
Springsteel Island Harbor, Lake of the Woods, Minn.,
   investigation             ----------                                                    1665
Spuyten Duyvil Creek, N. Y., navigation_                            200
Squaib Bay, Wash., investigation_                                                          2233
Squalicum Creek, Wash., navigation                                                         2200
Squaw Creek, Mo., investigation                                                            1292
Stamford Harbor, Conn., navigation                                   98
Stanislaus River, Calif., flood control_                                                   2086
Starlings Creek, Va., navigation__                                  334
Starr County, Tex., investigation-                                  924
State Ditch, N. Y., flood control_                                                         1908
Staten Island, New Creek, N. Y., investigation ........             245
States' rights in development of watersheds ............              5
Steele Bayou, Miss., navigation, flood control-                821, 841
Steer Creek, W. Va., flood control                                                         1566
Steinahatchee River, Fla., navigation_                              622
Sterling, Ill., investigation_                                                             1186
Stewart Canyon Debris Basin, Ventura River Basin,
   Calif-                                                                          1972
Stewarts Ferry Reservoir, Tenn., flood control_                              1432, 1434
Stikine River, Alaska, navigation_                                                 2298
Stillaguamish River, Wash.:
      Flood control_ _ _                                                           2239
      Navigation_             _                                              2198, 2232
Still Pond Harbor and Creek, Md., investigation ......             336
Stillwater Harbor, Minn____                                                                1209
Stillwater Reservoir, Pa., flood control                           356
Stockton Channel, San Joaquin River, Calif., improve-
  ment-_ _ __-_ __ __ _                                                      2040, 2045
Stockton Harbor, Maine, navigation                                  102
Stone Horse Shoals                                                   58
Stonehouse Creek, Jefferson Co., Kans., flood control____                    1251, 1284
Stones River, Tenn_                                                                1432
Stonington Harbor, Conn., navigation__                              104
Stonington Harbor, Maine, investigation                             110
Stony Creek, Pa.:
      Flood control_                                                                       1607
      Investigation_                                                                       1635
                                                  INDEX                                                   LXXXV


                                                                                                  Page

                                                                                       Volume 1          Volume 2

Storms Creek, Ohio_____________-------                            ___-__          _______              1557
Straight Slough, Ark., investigation_________________ _                                    855
Strattonville, Ohio, flood control_________________--________                                  _       1628
Strawn Reservoir, Kans., flood control-                            _----_                 1--_
                                                                                          1085       .
Stringtown-Fort Chartres and Ivy Landing, Ill., flood
   control ---------------------------------------------------                                         1142
Strong City, Kans., investigation_________ ___                                 __  _      1115
Stuart Reservoir, Va., flood control___________________                                    456
Sturgeon Bay and Lake Michigan Ship Canal, Wis.:
     Investigation ------------------------------------------                                          1742
     Navigation ---------------------------------------------                                          1685
Sturgis, Ky., flood control_          ____-                 -___
Submerged Weir, Niagara River, N. Y ________________ ________
                                                                       __----_       _________   1501, 1507
                                                                                                       1892
Sucarnoochee Creek, Ala., investigation---------------                                     707
Success Reservoir, Calif., flood control ---------------------------                                   2084
Sugar Creek levee unit, Indiana, flood control--- ------ _----------1501
Sugar Hill Reservoir, Connecticut River Basin, N. H.:
     Flood control ----------------------------------                                      125
         B
     Investigation______      l          , _____            ____1                          150
Suisun Bay Channel, Calif., navigation                         _________________________2053
Suisun Channel, Calif., navigation_               -------------                                               2055
Sullivan Falls Harbor, Maine, navigation ____________-                        102
Sulphur River, Tex. and Ark.:
     Investigation_-----------------------------------                        809
     Navigation ------------------------------------                          767
     Flood control       -------------------------------                  ---------   775, 802
Summersville Reservoir, W. Va., flood control                  --------------------       1565
Sumpawanus (Babylon Creek) Inlet, N. Y., navigation-                          242
Sunbury, Pa., flood control ________________                   ____--363
Sunday Creek, Ohio, flood control------------------------------                           1541
Sun River, Mont., investigation, flood control --------------------                       1376
Sunshine and Boulder Creeks, Colo., flood control _----------------                       1328
Superior Harbor, Wis.:
     Navigation ---------------------------------------------                             1645
     Investigation__                                           __- -                      1666
                                                                               - _-___-__---____
Superior, Lake, investigation--------------------------------                       1667, 1742
Supervision of the Harbor of New York____________                        _______          23,94
Surry Mountain Reservoir, N. H., flood control- -------                  125, 130
Surveys:
     General statement regarding ________                ________--            12
     Interoceanic Canal Surveys_ ------                                                   2389
     Navigation, flood control, power, and irrigation                          15
     Northern and northwestern lakes ---------------------------                          1911
Susquehanna River, Pa., Md. and N. Y.:
     Investigation ----------------------              -----------            374
     Navigation above and below Havre de Grace, Md _                          334
      Flood control         --              ---        -----                       - -359
Sutton Reservoir, W. Va., flood control
Suwanee River, Fla. and Ga.:
                                                   ---------       __          -----      _         _ 1548, 1565
     Investigations________________________                               --           548, 630,               708
                                                                                            648
    Navigation ------------------------------------                                         622
Swan Lake, Ark., flood control -----------------------------                                                   803
Swan Quarter Bay, N. C., to Deep Bay, N. C., waterway,
  navigation---------------------------------------          498
Swansboro Harbor and Bogue Inlet, N. C., investigation. -    501
Swanton Harbor, Vt., navigation_-------                                                       242
Swift Creek, N. C., navigation_________ -_________                                            498
Swiger, Whitney, Young-Hoblit levee, Illinois, flood
   control- -------                        ----                --------                                       1790
LXXXVI                                               INDEX


                                                                                                  Page

                                                                                       Volume 1          Volume 2

Swinomish slough, Washington, navigation, investigation_                                _____         2198, 2201,
                                                                                                            2233
Switzer Creek, Calif., investigation -------------------------                                              1977
Swoyersville, Pa., flood control ----------------
                                                ___         _             -_                   357
Sycamore, Wash., Los Angeles River Basin- -------------- _ _                                       -----        1940
Syracuse, Ohio, flood control---------------------_ _ _--__                                                     1565
Syracuse, Oswego River Basin, N. Y., flood control                         ----------------                     1905
                                     T
Taber Reservoir, Va., flood control__ _ _ _- - -_______               -                        456
Table Mound Reservoir, Kans., flood control-----------                                        1099               -
Table Mountain Reservoir, (Iron Canyon), Calif., flood
  control ------------------------------------------------                                                      2090
Table Rock Reservoir, Mo., flood control_--------------                                       1036 _
Tacoma Harbor, Wash.:
     Investigation---------------------------------------------                                                 2234
     Navigation----                 -_                                                 _                        2217
                                                                                                    _-----------------------------------
Tacoma, Payallup River, Wash., flood control_--------                       __             _ __ _               2241
Taft Dam and Reservoir, Arkansas River, Okla., navi-
  gation-------------------------------------------                                            992
Talkeetna, Alaska, flood control- --                 ------__            ___ ---           ---- __
                                                                                          ____                  2303
Tallahatchie River, Miss., navigation_ --                         -__ ____ _                   821
Tallapoosa River, Ala., navigation-____           -            --                -______ 698
Tallow Hill Reservoir, Ga., flood control____                           _ -_ ----              540
Tamaha, Okla., investigation__-______ ____________                                            1115   --       -
Tamarac River, Minn., investigation_----------------------                                                      1240
Tampa Bay and Harbor, Fla.:
     Investigation__---------------__                                              _           630
     Navigation _------------                ----------------------                            602
Tanana River, Alaska, flood control_______________-                                        __       _           2303
Taneycomo Lake, Mo., investigation-________            -__-_                                 1014
Tangier Channel, Va., navigation-____________ ____-334
Tangipahoa River, La., investigation________________                                           809
Tanners Creek, Ind., flood control-                                    -__-______-____
                                                                                     _     ____                 1459
Tappan Reservoir, Ohio, flood control---                         ------ __---------1533
Tar Bay, Md., navigation---------------------------                                            321
Tar Creek, Ill., flood control_-_____--              -        __________                -                       1790
Tarkio River, Kansas, investigation__------------                                                               1290
Tar River and Creek, N. C., navigation--------------- 478, 504
Tarrytown Harbor, N. Y., navigation _______-                            -__- --                242
Taunton, Mass., navigation-___                      ________________                           103
Tawas River, Mich., investigation-----------------------------                                                  1831
Taylor Creek, Fla., investigation_                 _________________                           631
Taylors Bayou, Tex.:
     Investigations_         ------------------------------- 919, 925
     Navigation-----------------------------------                                             861
Taylorsville, Ky., flood control--                     ___ ___ __ ____-____ ___ 1469, 1501
Tchula Lake, Miss., navigation__ -------------------                                           821
Teche Bayou, La.:
     Flood control -----------------------                              -------                794
     Navigation-------------------- -------------- 752, 767
Tell City, Ind., flood control_____ _-----__--____                                   ________-_ 1472, 1501
Tenakee Harbor, Alaska, investigation -------------------------                                                 2301
Tenants Harbor, Maine, navigation_----------_                                                  103
Tenasillahe Island, Clatsop County, Oreg., flood control----------- 2182, 2188
Tenkiller Ferry Reservoir, Okla., flood control -------                                       1092
Ten Mile Creek, Ill., investigations_ ------------                         -       _ _ ---         _ 1160, 1991
Tennessee River, Tenn., Ala., and Ky.:
     Investigation ---------------------------------------------                                                1415
      Navigation _-_------------                      ------------------ -----                                 1408
      Locks and Dams-- ------                               ----------         -                               1408
                                                     INDEX                                                 LXXXVII


                                                                                                    Page

                                                                               Volume 1                    Volume 2

Tennessee-Tombigbee Waterway, Alabama and Missis-
  sippi, investigation, navigation_....................                         700, 684
Tensas River, Ark. and La.:
     Investigation .------------    .. .. ..--..       .-                                   842
      N avigation ------------------------------------                                      821
      Flood control- - -    -.... . ..........   - --                                       841
Terminus Reservoir, Calif., flood control-                            -                                 2084
Terre Aux Boeufs, La., navigation_ _                              ..            _            765
Terrebonne Bayou, La.:
     Navigation ----------------........                               -                751, 767
     Investigation_ . ....                       ...   ...        ...                        809
Terre Haute, Ind., flood control__                      .              __
Terre Noire Creek, Ark., flood control_
Terry Creek, Ga., improvement_
                                                                    -- _                     827
                                                                                             535
                                                                                                             ---     1505




Teton River, Idaho ...                   _....                 ...                                                 -2267


Texar Bayou, Fla., investigation_                               .                            701
Texarkana Reservoir, Tex., flood control-                -                              774, 775
Texas City Channel, Tex.:
     Investigations______ _............                               _......           920, 925
     Navigation- -           . .. .. .                 -. -. - -- -                          878
Thames River Basin, Conn., R. I. and Mass.:
     Flood control _-            .. .. .. ..                      - - -..                    119
     Investigation_ .........                 . ....         ....          _______           150
Thames River, Conn., navigation_                          ...          ___                    82
The Island Reservoir, Vt., flood control--...
Thief River, Minn. Investigation                 ----------
                                                                          -                  125
                                                                                                            --      11240


Thimble Shoal Channel and Norfolk Harbor, Va.:
     Navigation--..--_ ....---- _                              ...-                          427
     Investigation...             ______ _ _____               .....                         455
Thirty Mile Creek, Mont., flood control_-
Thomaston Reservoir, Housatonic River Basin, Conn.,
                                                              --                   _

                                                                                   -   --   -   -       1369
  flood control_           . ....               -_ -           ..-----              .--      146 I-------
Thompson Lake Drainage and Levee District, Ill., flood
   control- -                                  -          .       .           .      -                  1780
Thoroughfare Bay with Cedar Bay, T. C., channel con-
   necting, navigation-. -------         __-         -   ---------                           499
Thoroughfare channel to Albemarle Sound, N. C-_
Three Forks, Mont., investigation, flood control.-
                                                                      --                     501
                                                                                                  1375, 1376
Three Islands Reservoir, Tenn., flood control_                . .. ,                                    1434
Three Mile Creek, Mobile River, Ala., navigation. ..                                         670
Three Mile Creek, Kans., investigation__ ...........                                                    1292
Thunder Bay, River, Mich_ _...................                                    __                    1829
Tickfaw River, La., improvement of, including tribu-
  taries _                    _--.----
                                     -   -   -   -   -             --.-                      767
Ticonderoga River, N. Y., navigation__                                                       242
Tigre Bayou, La., navigation______                                                           755
Tilghman Island Harbor, Md., navigation_                                                     334
Tillamook Bay, bar, and entrance, Oregon:
     Improvement_ .                       .        .                                                    2140
     Investigation_ . . .                                                                               2156
Tionesta Reservoir, Pa., flood control_                                                           1595, 1629
Tioughnioga River, N. Y_._                                          _                        340
Tiptonville to Obion River, Tenn., flood control .......                                     854
Titusville, Fla., investigations-- -------.--                      --                   631, 648
Tobey Creek, Pa., flood control_ .........                                                   361
Tolchester Beach Area, Md. investigation__                                                   336
Tohopekaliga Lake, Fla., investigations-                                                631, 648
Toledo Harbor, Ohio:
     Investigation                                                    --                                1831
     Navigation _                      -_                                                               1826
LXXXVIII                                            INDEX


                                                                                                Page

                                                                                    Volume 1           Volume 2

Toledo, Ohio, investigations_                                           -      -         -- __       __  1778, 1831
Toledo, Wash., investigation -                                                                                 2191
Tolu, Ky., flood control---------------------------------------                                                1501
Tombigbee River, Ala. and Miss.:
      Flood control_                        ----------------                     ____-- --          706
      Investigations _                        --------------------                         _ 701, 706,         1416
                                                                                                    708
      Navigation ------------------------------------                                               678
Tombigbee and Tennessee Waterway ------------------                                                 684
Tombigbee and Warrior Rivers, investigation                                                         708    -
Toms River, N. J., navigation_---                                -__--________                      301
Tonawanda Creek, N. Y., investigation, flood control--- _------_                                        1910, 1897
Tonawanda Harbor, N. Y.:
      Investigation_ _                                      -                          -----------             1896
      Navigation---_------ ----                                                                                1875
Tongue River Reservoir, N. Dak., flood control------------------1235, 1237
Topeka, Kans., flood control__________                --------------                                     1282, 1289
Topsail Inlet, N. C., investigation_                                    ___________                 501
Toronto Reservoir, Kans., flood control__---------                                                 1078
Totuskey Creek, Va., navigation___________                                                          393
Touchet River, Wash., investigation, flood control                                                    _ 2281, 2267,
                                                                                                               2277
Town Creek, Md., navigation -------------                                          - -334 _
Town Creek, West Fork of Tombigbee River, Miss -. _                                                 704
Town Creek, S. C ---------------------------------                                                  510-
Town Creek, Tenn., flood control_--                                                                 852
Town River, Mass.:
      Investigation------------------- -------                                                      110
      Navigation------------------_                                 ------------------               49
Townshend Reservoir, Vt., flood control--------------- 125, 148
Trabuco Dam, Calif., flood control---------------------------                                            1961, 1973
Tradewater River, Ky., navigation_---------------                                                              1450
Transportation Series Report ____                                                                              2309
Traverse City Harbor, Mich., navigation------------------------                                                1734
Treatment of Yuba River Debris Situation                       ----------------------                          2315
Tred Avon River, Md., navigation----__                                           __------           334
Trent River, N. C.:
      Flood control-----------------                                --- --------------              502
      Investigation--                     --------------------------                                500
      Navigation                        ------------------------------                              498
Trenton Channel, Mich, navigation_--___--____                                               ____ ___           1810
Trinidad, Purgatoire River, Colo.:
      Flood control_ _                                -____        ______-----        ___           984
      Investigation ---------                            ------------------------                   985
Trinity Bay Soil Conservation District, Tex., investiga-
  tion_ ____
  tion---------------------------------------------92                                               925
Trinity River and Tributaries, Tex.:
      Flood control_                    _________--------              --------------               926
      Investigations------------------                                    ------ __           920, 935,
                                                                                           966
     Navigation     ---------------------------------- 888, 915 ---
Tri Pond levee unit, Illinois, flood control_______ ___---___-____-_                                           1501
Troublesome River, Colo., investigation------_                                                                 1977
Troy, Ind., flood control---------------------------------_                  ------                            1501
Truckee River, Calif., and Nev., investigation_---_            -   ---------                                   2099
Flood control___                                                                                               2100
Tualatin River, Oreg.:
     Flood control_-----------------------
                                _                           ----------------------                             2180
     Investigation_---------------------------------------------                                               2190
Tuckahoe River, Md., navigation_                                                           334
Tucker Lake, Ark., flood control_ ------                             -          -         1048
                                             INDEX                                            LXXXIX


                                                                                       Page

                                                                           Volume 1           Volume 2

Tucker Lake Bottom, Okla., flood control---------------                             1110
Tuckerton Creek, N. J., navigation_--------                                         293
Tucson Diversion Channel, Gila River Basin, Ariz., flood
  control----------------------------------------------                                              1969
Tucumcari, N. Mex. flood control----------------____                            974
Tug Fork, W. Va.:
    Navigation ----------------------------------------------
                     _      _ _                                                                      1524
    Investigation___--------------------------------------------                                     1529
Tujunga Wash channel, Los Angeles River Basin, ---                                                   1941
Tule River, Calif., flood control----                   ___        -    -    --
                                                                  ____-__________                    2084
Tulare Lake, Calif., flood control-----------------------------2070,                                 2074
Tully Reservoir, Mass., flood control_ _-                      --
                                                             ________     125, 133              --
Tulsa and West Tulsa, Arkansas River, Okla., flood con-
  trol_
      --------------------------------------------                            1110
Tulsa, Okla., engineering district---                   _-.-          _       1055_
Tunungwanx Creek, Pa-__ ___1594
Tuolumne River, Calif., flood control---------------------------_                                    2086
Tupelo Bayou, Ark., flood control - - -         -                 1046
Turkey Bend, Tex., investigation                                   920
Turkey Point, Md., investigation ------                            336
Turkey Creek, Okla., investigation--------_                                         1115   --
Turkey River, Iowa, flood control, investigation_                     1198,                          1199
Turtle Bayou, Tex., investigation_ -------------------          920
Turtle Creek and Shellbrock River, Minn., investigation_                                             1199
Turtle Creek, Ill__-----------------------_  ------------- ----------                                1191
Turtle Creek Reservoir, Pa., flood control, investigation-----------1629,                            1635
Turtle River, Brunswick Harbor, Ga., improvement ...            534
Tuscakawas River, Ohio, flood control __-----------------  ---          -_                           1529
Tuscarora Creek, N. Y., flood control________-        __-_      343
Tuscumbia River, Tenn., investigation; flood control       854, 552 ___
Tuttle Creek Reservoir, Kans., flood control-                  ----   _                    1251, 1280
Twelve Mile Bayou Bend, La., flood control_-----------          781.
Twelve Pole Creek, W. Va., flood control reservoir -----------------                                1566
Twin Rivers, Wis., navigation-----    _--------------       ____---_                            -1692
Twitch Cove Md., navigation ____--.-        -         _____     328
Two Bayour Creek, Ark., flood control-_-- -                     - -        -840
Two Harbors (Agate Bay), Minn., navigation                 ---------------------                     1643
Two Mile Creek, Oregon, investigation_                                                               2191
Two Rivers Harbor, Wis.:
                  _
    Investigation-----------------------------------                  -             --------- 1742
    Navigation ---------------------------------------------                                  1691
Two Rivers, Minn., investigation-------------------                            _    -----     1240
Tyaskin Creek, Md., navigation_------_____                                          334
Tygarts Creek, Ky., investigation ----..-.-.-........                                         1572
Tygart River Dam, W. Va.---                                                                   1577
Tyrone, Pa., flood control_             -        -__ ___         -______            368._.
Tyronza River, Ark., investigation                 -___
                                                   -         - ______               855
                              U
Umatilla Harbor, Oreg_ _--              ----------------                                             2265
Umatilla River, Oreg., investigation, flood control_--                -        _----2266, 2267,
                                                                                          2281
Umpqua Harbor and River, Oreg.:
    Floodcontrol---------------------------------            ----                                    2185
    Investigations----------------------------------------2156,                                      2191
    Navigation -------------------------------------------                                           2146
Union Reservoir, Mo., flood control -----------------------------                                    1155
Union River, Maine, navigation            ___-____-___-     102
Uniontown, Ky., flood control-----------                                       --      -1475,        1501
Uniontown, Pa., flood control_                                                                       1617
XC                                                INDEX


                                                                                                Page

                                                                                  Volume 1             Volume 2

Union Township Levee Dist., Mo______.............                                                      1197, 1198
Union Village Reservoir, Vt., flood control-.--.........
Upper Chipola River, Fla., navigation-...            ..-- -.-..                   125,    128


                                                                                          698
Upper Columbia Lock and Dam, Ala. and Ga_._....                                           658
Upper Grays River area, Wahkiakum County, Wash.,
  flood control________                       .     . .                                                     2189
Upper Machodoc Creek, Va., navigation...                                                  406
Upper Mississippi River Basin, flood control:
     Rock Island Dist_________            _ .. ... _ ..  _                                         1154, 1189,
                                                                                                          1196
     Chicago Dist-_              _.-.- - - -    ..                           _                           1787
Upper Narrows (Harry L. Englebright) Reservoir---                                                        2320
Upper Neches Channel, Tex., navigation.----------                                         859
Upper Puyallup River, Wash.:
     Flood control _                     _                                                                  2248
     Investigation_ _      _                                                                                2249
Upper Throughfare, Deals Island, Md., navigation ---                                      325
Upper White River, Ark., navigation_.__.                                                 1011
Urbanna Creek, Va., navigation              -                                             406
U. S. Lake Survey_                                                                                          1911
Utah Lake, Utah investigation__                                                                             2099
Utica, Ind., flood control__..._            _        ___                                                    1501

                                      V
Valdez Harbor, Alaska:
     Investigation--                                                -_____                                  2301
     Navigation-                   ..        ..           -             -                                   2288
Valley Center and Wichita, Kansas, flood control ......                                  1061
Valley Drainage & Levee Destrict, Illinois-                                   .                             1785
Van Buren, Arkansas River, Ark., flood control.....                       ___            1015
Vanceburg, Ky., flood control                   .---------------------                                      1565



Vancouver Lake area, Columbia River, investigations -                                              2156, 2191
Venice Bay, Fla., investigation-_                                  -....
                                                               _-......                   631
Venice, Calif., Playa Del Ray Inlet, investigation ...                                                      1939
Venice Island, Calif., flood control_                                                                       2102
Venice Drainage and Levee District, Ill., flood control+._                                                  1151
Venice Inlet, Fla.:
     Investigation____       .... ____                __         _                        631
     Navigation--------------------------------                                           597
Ventura, Ventura River Basin, Calif., flood control -                                                       1973
Verdigris River, Kans., and Okla.:
     Flood control._             .                                .      .               1110
     Investigation._..     .          .       .               ...        . _             1115
     Navigation_ _ _ _______               .. ..............                              999
Verdugo, Wash., flood control. .. .        _          ..........                                            1940
Vermilion Bay and River, La., improvement of Intra-
  coastal Waterways via_....................                                              794
Vermilion Bayou, La., navigation___                                                       767
Vermilion Lock, La .                                                                      724
Vermilion Harbor, Ohio:
     Investigation_ __                                                                                    1896
     Navigation-__-_                                                                                      1892
Vermillion River, Ill. and Kans., investigation-                                                   1292,1791
Vermilion R., La., flood control .......                                                  794      ---------
Verney Mills Dam, N. H., flood control--------                                            113.                 -
Vernon Mayer, La., flood control_                                                         750     -
Verona, Calif., navigation___                                                                          -2047
Vevay, Ind., flood control----------------------                                                      1501
                                                                                           1---------
                                                                                          815---------
                                                                                                            10
Vicksburg, Miss., engineering district_ ....
Vicksburg-Yazoo Area, Miss., investigation-------                                         843                      .
                                                      INDEX                                                        XCI


                                                                                                       Page

                                                                                           Volume 1           Volume 2

Victoria, Calhoun-Soil Conservation District, Tex..                                              925------
Victory Reservoir, Connecticut River Basin, Vt., flood
         _
  control--       --
              -..-------            --.-.. - -   --                                        -     125
Villa Grove Ill., investigation--------------------------                                      -----             1507
Villa Park bam, Calif., flood control_-------------------------..                                          1961, 1973
Village Creek, White River and Mayberry districts,
  Arkansas, flood control, investigation_------------               1048, 1051                                -     -
Vinalhaven, Carvers Harbor, Maine, investigation------                      110
Vincennes, Ind., flood control--_------_-----.-----               ---------                                1477, 1501
Vincent Bayou, La., flood control ---------------------                     803
Vineyard Haven Harbor, Mass., navigation-------------                       103
Vinton Waterway, La., navigation ---------------------                      767
Virgin River, Nev., Ariz., and Utah, investigation           .....------                                           1977
Virginia Beach, Va., beach erosion study, investigation_                    455
Virginia coast waterway, improvement          __---_--------                334
Volga, Iowa, flood control--_---- ---            _------------         -------                                     1200

                                        W
Wabash levee Dist. No. 3, Ill., investigation-                                   ---   -..--   -- -    -           1507
Wabash River, Ind. and Ill.:
   Flood control_----______-____--__                                            ------------- 1476,               1502,
                                                                                                                  1505
    Investigation             ------------------------------------                                                1507
Wabasha, Minn., harbor                ------------------------------                                              1169
Waccamaw River, N. C. and S. C.:
    Improvement of river            ------------------------                                      517          -------
    Investigation-----_      ----------------   _               -------                           520-
Waddington Harbor, N. Y. navigation .                         .         ------------------
                                                                                     ___          __                 1892
Wahkiakum Diking Dists. kos. 1, 3 and 4, Oreg                                              _.---- _                  2182
Wahpeton-Breckenridge flood control---------------------------                                                       1214
Wailua River Basin, T. H., investigation -------------- ---------                                                    2036
Waikiki, Oahu T. H., investigation ------------------------                                                          2028
Waimea and anapepe, Kauai, T. H., investigation ------                                                 -- 2028, 2036
Waitsburg, Wash., flood control -------------------------                                                            2278
Wake Island Harbor, navigation-...---                __-----------------                                -            2026
Waldo Lake, Oreg ----------------------------------------                                                    2159, 2190
Walker River, Calif., and Nev., investigation-----..-.-.                                 ----                        2099
Walla Walla, Wash.:
    Engineering District -------------------------..---                                      ----. . -               2259
    Investigation--_    ------------------------------------------                                   _               2281
Walla Walla River, Wash.:
    Flood control --------------.-------                                           --------               --         2276
    Investigation_----------------------------------                                 ----------                      2281
Wallabout Channel, N. Y., navigation_------------                                                 242
Wallace Bayou, La. flood control. __---------------                                       802, 803
Wallace Channel, N. C., investigation, navigation                                                 .501
Wallace Lake Reservoir, La., flood control-_---           ..                - __          774, 785 .              ..
Walluski River, Clatsop County, Oreg., flood control--------------                                                   2189
Walnut Bayou, Ark., investigation                                        -...............-. 1115
Walnut Creek drainage area, Calif., investigation, flood
          _
control-----_-----------            -----------------------                         ----------              1941, 2099
Walnut River, Kans., investigation -.. .                        _._ -.......                     1115 -
Wapato Waterway, Tacoma Harbor, Wash - - - - --                                        ------                        2218
    Investigation                                      - -- --
                                           .------------------                ---               ---.                 2234
Wappapello Reservoir, Mo., flood control------------------------                                                     2350
Wappinger Creek, N. Y., navigation, flood control------                   ...             242, 260 .......---------
Ware River, Mass., flood control---------------------...... ......                                 135
Wareham Harbor, Mass., navigation-.-----------                                                     103          -
Warm Creek, Calif., flood control-.---------------------------                                                     1972
Warren River, R. I., navigation- --------.------------   104
XCII                                              INDEX


                                                                                            Page

                                                                                 Volume 1          Volume 2

Warrenton diking district No. 1, Clatsop County, Oreg.,
flood control -         _                  .                   .-.-.-- -                               2188
Warrenton diking district No. 2, Clatsop County, Oreg.,
flood control -                                                                                        2188
Warrenton diking district No. 3, Clatsop County, Oreg.,
flood control                                                                                          2189
Warrior and Tombigbee Rivers, investigation_                                           708
Warrior River, Ala.:
    Investigation ....     -    .......-- ---     ---    -- ---       ---  -.         701
    Navigation _ _ _            __                 .            - .. - .--            678
Warroad Harbor and River, Minn.:
    Investigation ___            __             .                 .. ...                                1667
    Navigation-              -                -         -             -                                 1662
Warwick River, Md., navigation_______                                                 334
Warwood, W. Va., flood control                                                                          1628
Washington, Austin, Soil Conservation District, Tex----                               925
Washington Bayou and Lake, Miss., navigation ......                                   821
Washington Canal and South River, N. J., navigation-__                                233
Washington, D. C.:
    Aqueduct-_     __          . ..........                                           396
    Engineering district _             .                                              379
    Flood control _            . . .                  _..._                           416
    Harbor at _        .                                                              379
    Investigations__                                                                  407
Washington Island Harbors, Wis., navigation                                                             1740
Washington Lake Ship Canal, Wash., investigation-                                                       2234
Washington, Pa., investigation                                                                          1635
Washita River, Okla., investigation                                                  1115
Watch Hill Cove, R. I_                                                                 77
Waterbury, Winooski River Basin, Vt., flood control
Waterbury Reservoir, Winooski River Basin, Vt., flood
                                                                           ---        255

control _                                                                            255
Water-chestnut elimination, Washington, D. C_                                         387
Wateree River, S. C.:
    Investigation ....                  _             __ .                            520
    Navigation                                                                        517
Waterford, Hudson and Mohawk Rivers, N. Y., flood
control_ _ -         -             ---                                               255
Water hyacinths:
    Investigations ____                  _.. _ _ _                  _ ___ __     631, 701,
                                                                                  773, 920
       Removal of, from Florida, Alabama, Mississippi,
        Louisiana, and Texas waters       .-                               --    618, 673,
                                                                                       763
Water Levels of the Great Lakes, investigations ._                  ---.                       1666, 1742
Waterloo, Nebr., flood control___                                                                    1337
Water Resources of the White, Ouachita, and Arkansas
Rivers, investigation_                                                              1051
Water Valley Reservoir, Ark., flood control-_-      _                                1043
Waterway on Coast of Virginia_                                                        334
Waterway Connecting Tombigbee and Tennessee
Rivers, Ala. and Miss____        _____                                               684
Waterways Experiment Station, Vicksburg, Miss ......                                                   2385
Watkins Glen, Oswego River Basin, N. Y., flood control _                                               1904
Watson Bayou, Fla., navigation_                                                       665
Watson, Mo., investigation_ _ ___                                                                       1292
Watts Bar, Tenn., navigation __                                                                         1410
Watts levee, Illinois, flood control                                                                    1790
Waukegan Harbor, Ill., navigation__                                                                     1745
Waverly, W. Va., flood control______        -                                                           1565
Way Cake Creek, N. J., navigation_                                                    242
                                             INDEX                                              XCIII


                                                                                     Page

                                                                         Volume 1           Volume 2

Waynesboro, Va., flood control-_         -------- ------                      416
Wears Creek, Mo., investigation              ----------
Webb District Improvement Co., Columbia County,-
  Oreg., flood control--------------------                                                       2188
Webb, W. Va., navigation__              __                __                                     1525
Webbers Falls Dam and Reservoir, Okla., navigation -                     993, 1000
Weber River, Utah, investigation                                _                             2099
Weeping Water Creek, Nebr., investigation, flood control-                                     1342
Wiedmer Chemicals Drainage and Levee Dist., Mo_                                               1157
Weiser River, Idaho, investigation, flood control_                                      2281, 2267
Wekiva River, Fla., investigation, flood control ........                 631, 649
Weldon River, Mo., investigation__                                                               1293
Welles Harbor, Midway Island_                                                                    2026
Wellfleet Harbor, Mass., navigation----------------                            103
Wellsburg, W. Va., flood control___                                                              1628
Wells Harbor, Maine, navigation             -------                            103
Wellsville, N. Y., flood control .                  __                                        1898
Wellsville, Ohio, flood control       ---------------                                   1628, 1632
Wenatchee River, Wash__                                                                 2232, 2234
Wenkel Drainage and Levy Dist., Ill., flood control_                                          1148
West Baden Springs, Ind., investigation_
West Bay and Cotuit Harbor, Mass., investigation
West Bridgewater, Pa., flood control-
                                                                -...          106
                                                                                              1508
                                                                                                 1628
West Brookfield Reservoir, Connecticut River Basin,
  Mass., flood control_                                                   125, 148
West Canaan Reservoir, Connecticut River Basin, N. H.,
flood control       ---------------------------------                    125, 148
Westchester Creek, N. Y., investigation, navigation ..                         159
Westcott Cove, Conn                         __...      _.._.         _         104
West Divide, Colo., investigation-------------------                                             1977
Westfield River, Mass.:
    Investigation -------------          ----------------                     150
    Flood control_          __                    _              - -_         136
West Fork of Mill Creek Reservoir, Ohio, flood control_                                          1456
West Fork Reservoir, Little Kanawha River, W. Va.,
flood control------- --           ----------------------                                        1566
West Fork River, W. Va., investigation                      -----                                1635
West Fork of White River, Ind., investigation                   ---                              1508
West Gap St. George Island, Fla., investigation_
West Hill Reservoir, Blackstone River Basin, Mass., flood
control        -      .        ..        .     __        ---                 118 1--------
Westland District Improvement Co., Columbia County,
Oreg., flood control_                    ._                                                    2188
West Matanzas, Ill., flood control-------                                                       1781
West Memphis Ark., investigations .                 ---------             850, 856
West Monroe, La., flood control ....              __.                    823, 833
West of Benedict, Kans., flood control              -----                   1110
West of Elk City, Kans., flood control-_                                    1110
West of Fredonia, Kans., flood control            ---         --            1110
West of Morrilton, Ark., flood control_                                     1018
West Oneonta Reservoir, N. Y., flood control                                  339
West Pittston, Pa., flood control-                                            374
West Point, Ky., flood control____________                                                      1501
West Point, Nebr., flood control------                                                          1337
Westport district, Columbia and Clatsop Counties, Oreg.,
flood control                                                                                  2189
Westport Harbor, Conn., navigation_                                           104
Westport, Ky., flood control____                                                                1501
Westport River, Mass., navigation__                                           103
Westport slough, Oregon, navigation                                _                            2135
West*River, Conn__                                                             88
XCIV                                              INDEX


                                                                                           Page

                                                                                Volume 1          Volume 2

West Springfield, Mass., flood control----------------- 126, 142                              ---
West Terre Haute, Ind., flood control-------------------------                             1501
Westville Reservoir, Mass., flood control....---------------120, 148---------
Weymouth Back River, Mass., navigation_-_---                 -      _           103
Weymouth Fore River, Mass.:
    Investigation -------------------               --------      -----          110
    Navigation- -----------------------------------                               47
Whatcom Creek, Wash., navigation __--.-----                  --------------                2200
Wheeling-Benwood, W. Va., flood control....----------------------                    1625, 1628
White, Arkansas and Red River basins, investigations-_ 773, 809,
                                                                           850, 985,
                                                                                      1051
Whitefish Point Harbor, Mich., navigation...-----------------------                            1664
Whitebird, Idaho______                                                                        2267
                                                           __---------------------------------------------
White Lake Harbor, Mich., navigation ---------------------------                              1722
White levee units Nos. 1, 2, and 7, Indiana, flood control                ------------        1501
White Pine County, Calif., investigation--------..  ..---   - __             _--              2009
White River, Ark., (above Peach Orchard Bluff) navi-
gation----_-------_-------------------------------                  1014 -
White River, Ark. and Mo.:
    Investigations ------------------------------- 822, 843, 1014, 1051,
                                                             856, 850,             1058, 1115
                                                                     1011
      Navigation------               ---------------                           850, 1011
      Flood control--------- ----------------------                            854, 1032,                 -
                                                                                    1042
White River, Calif., investigation -------------------------------                                     2099
White River, Ind.:
     Flood control -------      ------------------                 - ---------               1481, 1482
     Investigation....---------------------------                -----          --           1450, 1508
     Navigation ----------------------------------------------                                         1450
White River, Wash-------------------------------------------                                           2242
White Rock Dam & Res., S. D., flood control_                               _ _          _---           1228
Whitewater River, Calif., investigation---------------------------                                     1977
White Rock Creek, Tex., investigation----                    _
                                                            ---         - _         966----
Whitewater River, Minn., investigation_              -_- ---------            __-------                1240
Whitewater River, Calif., investigation--------------------------                                     -1977
Whitewood Creek, S. Dak., investigation------------- -----------                                       1376
Whitings Creek, Va., navigation__--- --------                                       406---------
Whitlow Ranch Reservoir, Queen Creek, Ariz., flood
  control--------------------------------------------------                                            1973
Whitney Point, N. Y., flood control-- _            ------                     -- 3403-             ..
Whitney Point Reservoir, N. Y., flood control ...-_-                .
                                                                   -339---------
Whitney Reservoir, Brazos River, Tex., flood control..                              950
Whittier Narrows flood-control basin, Calif- ----.                           _ _ __- -      -          1941
Wichita and Valley Center, Kans., flood control .....--------                      1061
Wichita River, Tex., investigations _ .--.----------                      1058, 1115               ..---.-----
Wickford Harbor, R. I., navigation--------------------                              104
Wicomico Creek and River, Md., investigation---------                               335
Wicomico River, Md., navigation.....---------------------                           334.         .      .
Wiedmer Chemicals drainage and levee district, Missouri,
flood control-----------------------------------------------                                          1157
Wilcox, Pa., flood control__------ --------------------                      __         _              1628
Wilder, Ky., flood control_--- -------------------                        _-----------1501
Wild Horse Creek, Colo., flood control -82-..........                               982-
Wild Rice River, Minn., flood control-----------------                                                 1214
Wiley Creek Dam, Oreg ----------------------------------                                     2159, 2190
Wilkes-Barre-Hanover Township, Pa., flood control_---                               359.-.......
Willacy County, Tex., investigation- -- -------------- --                           925
Willamette Falls fish ladder                        ------------                               2159, 2190
                                                      INDEX                                                      XCV

                                                                                                    Pa ge


                                                                                        Volume 1            Volume 2

Willapa Harbor and River, Wash.:
     Investigation_                                      -        -------              __                 -         2234
     Navigation-------                     -                    ----------        - ---- -                          2227
Willamette River, Oreg.:
     Flood control in basin_                      .             __                                                  2158
     Improvement above Portland, and Yamhill River
        navigation__
     Improvement at Williamette Falls, navigation_
                                                                                       -----                        2124
                                                                                                                    2128
     Improvement below Portland, navigation.                                                                        2131
     Bank protection_--                        --                 -                                                 2179
     Investigation ....-                                                   --.-                                     2191
Williamsport, Md., investigation-_----------------                                                       417
Williamsport, Pa., flood control--------------------                                          --         365
Williamstown, W. Va., flood control__-_- -                                      ----                  - .__._       1565
Williamville Reservoir, Connecticut River Basin, Vt.,
     flood control_ --               _- .                   .------
                                                         ----                                            148
Willis Site Red River, Tex., and Okla., investigation....                                               1115
Williston, N. Dak., flood control_                       ----------------                       -------             1357
Willoughby Channel, Va.:
     Investigation__              _- __---------------                                                   455
     Navigation __-- --------                               --------------                               435
Willow Creek, Colo., flood control --------------------                                                  976
Willow Creek, Mont., flood control-..-------                                                                        1377
Willow Creek, Oreg., investigation--                                                                                2191
Willow Creek, S. C., investigation--------------------                                                   520
Wills Creek, Pa., investigation__                           -                                            417
Wills Creek Reservoir, Ohio, flood control                                 --------                                 1533
Wilmette Harbor, Ill., investigation_---------------                                                               _1778
Wilmington Harbor, Del.:
     Investigation__--            __----            -           _            _-------- --                302
     Navigation_         -           ___--         -____-             -----               --             275
Wilmington Harbor, N. C., navigation_- -                                    _ _-----------494
Wilmington, N. C., engineering district__ -----                                                -         467
Wilson and Wenkel and Prairie Du Pont drainage and
levee districts, Illinois, flood control--------------                                                             1148
Wilson Canyon and Mansfield St. channel, Calif_                                -                                    1941
Wilson Harbor, N. Y., navigation..                             ._                                                   1892
Wilson Point Harbor, Conn., navigation---------------                                                    104
Wilson, Tenn., navigation-----------                                                          -                     1410
Wilson, Wyo., investigation....           _........._...                                          .---- ..          2281
Winchester Bay, Oreg., investigaion.............------..--                                             .            2156
Winery Canyon, Calift ----.                                ------                                                   1941
Winfield, Kans., flood control_-. -- ___-----_-_--                                                      1110
Winnebago, Lake, harbors on_....__                        .....         __.                     ___ _               1683
Winnepesaukee Lake, N. H., navigation.---------------                                                     34
Winnibigoshish Reservoir, Minn__...........                                        ....-------
                                                                                            -                       1204
Winona, Minn., investigation, basin-.-                              -                                        1213, 1168,
                                                                                                                    1240
Winooski River, Vt.:
     Flood control_--------                -         -____--                ------------                 255
     Investigation-__- ----                   ___------                ---------                         257
Winsted, Connecticut River Basin, Conn., flood control                                             126, 145
Winter Harbor, Maine, investigation                       --------------                                 110
Winter Harbor, Va., navigation ----------------------                                                    453
Winthrop Beach, Mass., beach erosion study..-----------                                                  103
Winthrop Harbor, Mass., navigation_------__--                                                _           103
Winyah Bay, S. C., navigation ------------------------                                                   506
Wisconsin River, Wis.:
     Investigations _                                                                                         1213, 1240
     Navigation      -------------------------------                                           ----------           1211
 XCVI                                          INDEX


                                                                                    Page

                                                                         Volume 1          Volume 2

Wishart Point, Va., investigation_                                           336
Wister Reservoir, Okla., flood control                                      1096
Withlacoochee River, Fla.:
    Investigation _                                                      632, 649
    Navigation            -                                                   609
    Flood control                                                             643
Wolf Creek, Colo., flood control _                                            989
Wolf Creek Reservoir, Ky., flood control_                                              1420, 1434
Wolf Creek, Okla., flood control___                                         1067
Wolf River, Tenn. and Miss.:
    Navigation____                                                            698
    Investigation_                                                            856
    Flood control_                                                            850
Wolf River (Memphis Harbor), Tenn., navigation _ _                            847
Wolf River, Wis., navigation___                                                                 1683
Woodbridge Creek, N. J., navigation_                                          228
Woodbury Creek, N. J., navigation                                             301
Wood Island Harbor, Maine, and the Pool at Biddeford,
navigation_                                                                  103
Woodlands, W. Va., flood control_                                                               1565
Wood River drainage and levee district, Illinois, flood
control__------------------------------------
Woods Hole Channel, Mass., navigation                __                       103
Woodson drainage district, Columbia County, Oreg.,
flood control_                 ------------                                           2182, 2188
Woonsocket, Blackstone River Basin, R. I., flood control_                118, 148
Worcester diversion, Blackstone River Basin, Mass., flood
control-----------------------------------                              118, 148
Work for other agencies_                                                        4
Wrangell Harbor, Alaska, navigation                                                            2295
Wrangell Narrows, Alaska, navigation                                                           2293
Wray, Colo., investigation__            ___.______________                                     1293
Wrightsville, Winooski River Basin, Vt., flood control-    -                 255
                          Y
Yadkin River, N. C.:
    Flood control -----     ----------------------                           518
    Investigation                                                            520
    Navigation                                                               517
Yakima River, Wash.:
    Flood control -------------------------------                                     2234, 2248
      Investigation _                                                                       2249
Yalobusha River, Miss., navigation            ___         _                  821
Yamhill River, Oreg.:
     Investigations --------         ------------                 ----                2156,2191
     Navigation--------------------------------                                            2124
Yampa River, Colo., investigation                                                          1977
Yankton, S. Dak., navigation, (flood control) investiga-
     tion _ _       _                                                                  1310, 1342
Yaquina Bay, Harbor, and River, Oreg.:
     Improvement of bay and harbor--- ------------                                          2144
     Improvement of river __      -----------------                                         2155
     In vestigations _     -----------------------------                              2156, 2191
Yazoo River, Miss., navigation                                               821
Yellow Creek, Ky., flood control_             ---------------                         1417, 1435
Yellow Medicine Creek, Minn., investigation--------                                         1240
Yellow Mill Channel, Conn_----           _                 -
                                                    -.-.-.--------            93
Yellow River, Fla., and Ala., investigation                                  708
Yellowstone River Basin, Mont. and Wyo ._                                                      1374
Yellow Water River, La., flood control--------------                         803
                                      INDEX                                               XCVII


                                                                             Page

                                                                  Volume 1          Volume 2


York Harbor, Maine:
    Investigation____--___-___--_______                 -
                                                     ______ --     110
    Navigation ------------------------------------                103
York, Pa., flood control ---------------------------             -369
York River, Va., navigation                                        453
York Spit Channel, Va., navigation_                                425
Youghiogheny River, Pa.:
    Flood-control reservoir________________________            ____                 1617, 1629
    Investigation ----------------------------------               --                     1635
    Navigation                                                                             1588
Youngs Bay and River, Oreg., navigation        _                                           2155
Youngs River Dikes, Clatsop County, Oreg., flood control_                                  2189
Yscloskey Bayou, La., navigation_____________________                    736
Yuba River, Calif., construction of restraining dams------_ _     _                        2318
                             Z
Zanesville, Ohio, flood control_--           __-_____
Zippel Bay Harbor, Minn., improvement __ _ ___ __ __ _    _
                                                                                           1565
                                                                                           1664
Zumbro River and tributaries, Minn., investigation- _ _ -                -1240




                                                  U. S. GOVERNMENTPRINTING OFFICE: 1953
